Tdoc List
2017-08-25 15:02
Agenda | Topic | TDoc | Title | Source | Type | For | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Opening of the meeting |   | ||||||||||
2 | Approval of the agenda | S5‑174000 | Agenda | WG Chairman | agenda | Yes |
Yes
| approved | No | |||
3 | IPR declaration | S5‑174025 | IPR and legal declaration | WG Chairman | other | Yes |
Yes
| noted | No | |||
4 | Meetings and activities reports |   | ||||||||||
4.1 | Last SA5 meeting report | S5‑174001 | Report from last SA5 meeting | MCC | report | Yes |
Yes
| approved | No | |||
4.2 | Last SA meeting report | S5‑174002 | SA5 status report at last SA meeting | WG Chairman | report | Yes |
Yes
| noted | No | |||
S5‑174003 | SA5 results at last SA meeting | WG Chairman | report | Yes |
Yes
| noted | No | |||||
4.3 | Inter-organizational reports |   | ||||||||||
5 | Cross-SWG issues |   | ||||||||||
5.1 | Administrative issues at SA5 level | S5‑174006 | Leaders meeting agenda | WG Chairman | agenda | Yes |
Yes
| noted | No | |||
S5‑174007 | Leaders meeting minutes | WG Chairman | report | Yes |
YesMCC clarified the upload of skeletons in 3GU so delegates can create their pCRs.
The Chair will talk with the Work Plan Manager to deal with the WID name changes in the work plan.
The Chair commented on the meeting calendar for 2019:
- Charging would like to co-locate with SA2 as much as possible.
- Colocation with SA2 in December 2018 would be a very late date, currently in the "red zone" which would complicate SA preparation.
- Overlaps with SA3 will be minimised. Thomas will talk with the SA3 Chair (Anand Prasad) about this.
- An Asian host is needed for 2018. IF3 will be contacted.
| noted | No | |||||
S5‑174011 | SA5 Working Procedures | WG Vice Chair (Huawei) | other | Yes |
Yes
| approved | No | |||||
S5‑174012 | SA5 Meeting Facility Requirements | WG Vice Chair (Orange) | other | Yes |
YesIt was commented that the start time is not usually correct in the invitation sent by the host.
Ericsson commented that this was important for transport to the meeting location; it should be clarified well in advance.
| approved | No | |||||
S5‑174013 | Process for management of draft TSs/TRs | WG Chairman | other | Yes |
Yes
| revised | No | S5‑174348 | ||||
S5‑174348 | Process for management of draft TSs/TRs | WG Chairman | other | - | Yes |
Yes
| approved | No | S5‑174013 | |||
S5‑174014 | CR Quality Check | MCC | other | Yes |
Yes
| noted | No | |||||
S5‑174026 | Status of email approvals | WG Vice Chair (Orange) | other | No |
No
| reserved | No | |||||
5.2 | Technical issues at SA5 level |   | ||||||||||
5.3 | Liaison statements at SA5 level | S5‑174045 | LS from ETSI TC CYBER ccSA5 on Middlebox security | ETSI TC CYBER | LS in | Yes |
Yes
| noted | No | |||
S5‑174046 | LS from GSMA cc SA5 on Network Slicing initiative | GSMA | LS in | Yes |
YesNokia: no word on management here, no impact on our work here.
Huawei: does this mean that GSMA will not work on the management of slices?
Nokia: they will not work on that, this will impact SA1 and SA2 work.
Huawei: the management interface will be provided by SA5. Nokia replied that this wasn't mentioned.
Ericsson: we are copied, no need to reply.
Verizon commented that Charging could also work on the billing of the slices.
Deutsche Telekom commented that there will be impact on several groups, as GSMA will come up with their own network slice definition and the requirements.
Nokia: we cannot stop the study until they bring us that definition. In any case I don’t see big impacts whenever they bring the definition.
Huawei: time plan for their work is not mentioned here.
Postponed for the next meeting.
| postponed | No | |||||
S5‑174047 | LS from RAN2 to SA5 on supported features by 5GC for E-UTRA connected to 5G CN | R2-1706153 | LS in | Yes |
YesEricsson: we'll try to do the management once it is clarified what features are supported.
Maryse (Nokia) commented that this is impacting the management aspect, not the Charging aspects.
Nokia: trace MDT and SON; these are features that we are being asked.
Ericsson: we could reply on the QoE as well.
The discussions was postponed for the next meeting.
| postponed | No | |||||
S5‑174071 | LS from SA2 cc SA5 on Supported features by 5GC for E-UTRA connected to 5G CN | S2-175192 | LS in | Yes |
YesEricsson: no traffic support is needed yet for the features that SA2 is not covering in Rel-15.
Nokia: in the table; MTC, to enable M2M services is partially covered by SA5.
| noted | No | |||||
S5‑174090 | LS on Evolution of IMSI format and E.212 Recommendation | ITU-T Study Group 2 | LS in | Yes |
YesMaryse (Charging) commented that there will be an impact on the billing system. This should be addressed first in SA1 before we can work on this.
MCC clarified that this LS wasn’t sent to any group in particular but hand-picked since it may impact SA5's work.
Ericsson: a reply should be coordinated by 3GPP, maybe at SA level. The Chair took note of this and will comment it with the SA Chair.
It was decided to note it and let it to SA to handle it.
| noted | No | |||||
S5‑174295 | LS from MEF Forum to SA5 on MEF Forum Work on 5G | MEF Forum | LS in | Yes |
YesThe Chair commented that SA5 could respond with their 5G WIDs once they were defined, but it was better to postpone it for the next meeting.
| postponed | No | |||||
5.4 | SA5 meeting calendar | S5‑174010 | SA5 Meeting Calendar | Ericsson LM | other | Yes |
YesSome companies (Vodafone, Huawei, China Mobile) expressed their concern about having a meeting in India in October 2018. This meeting was still currently discussed with the TSDSI.
Adhoc meetings in 2018:
Huawei was in favour of adding more meetings, adhcos with decision power, given the current high workload.
They also suggested having parallel tracks and one-and-a-half-week meetings.
The Chair commented that extending the meeting time would be more complex for the host.
Huawei commented that other groups are having already 10 meetings per year.
Vodafone pointed out cost restrictions of some companies.
| noted | No | |||
5.5 | Review of the Work Plan | S5‑174015 | Deliverables due for the NEXT SA Plenary | MCC | other | Yes |
Yes
| noted | No | |||
S5‑174016 | Ongoing SA5 WIDs and SIDs | WG Vice Chair (Huawei) | other | Yes |
Yes
| noted | No | |||||
S5‑174017 | SA5 3GPP Work Plan | MCC | other | Yes |
Yes
| noted | No | |||||
S5‑174028 | Work Plan status | WG Chair | other | No |
No
| reserved | No | |||||
5.6 | Elections |   | ||||||||||
6 | OAM&P |   | ||||||||||
6.1 | OAM&P Plenary | S5‑174004 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | Yes |
Yes
| revised | No | S5‑174328 | ||
S5‑174328 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | - | Yes |
Yes
| noted | No | S5‑174004 | |||
S5‑174005 | OAM Executive Report from THIS Meeting | WG Vice Chair (Huawei) | report | Yes |
Yes
| revised | No | S5‑174488 | ||||
S5‑174488 | OAM Executive Report from THIS Meeting | WG Vice Chair (Huawei) | report | - | No |
No
| reserved | No | S5‑174005 | |||
S5‑174027 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | Yes |
Yes
| revised | No | S5‑174398 | ||||
S5‑174398 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | - | Yes |
Yes
| noted | No | S5‑174027 | |||
S5‑174029 | Minutes of OAM&P SWG opening session | WG Vice Chair (Huawei) | report | Yes |
Yes
| noted | No | |||||
S5‑174050 | LS from SA2 to SA5 on EUTRAN sharing enhancement | S2-173701 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑174052 | LS from TSG SA cc SA5 on Energy Efficiency | SP-170597 | LS in | Yes |
Yes
| noted | No | |||||
S5‑174062 | LS from RAN2 to SA5 on changing the Neighbour cell Relation acronym to “NCR” | R2-1707464 | LS in | Yes |
Yes
| noted | No | |||||
S5‑174064 | Resubmitted LS on Collection Period correction for MDT M3 measurement in eUTRAN | R3-171382 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑174065 | Resubmitted LS reply to ATIS NRSC on “Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” | ATIS | LS in | Yes |
Yes
| replied to | No | |||||
S5‑174067 | LS from ETSI NFV to SA5 on Progress on ETSI NFV APIs specifications for Management and Orchestration interfaces | ETSI ISG NFV | LS in | Yes |
Yes
| noted | No | |||||
S5‑174068 | Time management in OAM&P SWG | WG Vice Chair (Huawei) | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑174072 | Response LS from SA2 to SA5 on progress of Network Slicing related work | S2-175300 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑174350 | Reply to: Response LS from SA2 to SA5 on progress of Network Slicing related work | Huawei | LS out | approval | Yes |
Yes
| approved | No | S5‑174183 | |||
S5‑174085 | LS from BBF to SA5 on Cooperation on Network Slicing | Broadband Forum (BBF) | LS in | Yes |
Yes
| replied to | No | |||||
S5‑174329 | Reply to: LS from BBF to SA5 on Cooperation on Network Slicing | Huawei | LS out | approval | Yes |
Yes
| revised | No | S5‑174382 | |||
S5‑174382 | Reply to: LS from BBF to SA5 on Cooperation on Network Slicing | Huawei | LS out | approval | Yes |
Yes
| approved | No | S5‑174329 | |||
S5‑174088 | Overview of SDOs’ work on network slicing | ORANGE | discussion | Presentation | Yes |
Yes
| noted | No | ||||
S5‑174089 | LS from BBF to SA5 on User Services Platform specification available for review | BBF | LS in | Yes |
Yes
| noted | No | |||||
S5‑174183 | Draft LS reply from SA5 to SA2 on progress of Network Slicing related work | Huawei | LS out | Approval | Yes |
Yes
| revised | No | S5‑174350 | |||
S5‑174265 | WI Summary the management of mobile network which inlcudes virtualzied network functions | China Mobile M2M Company Ltd. | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174294 | Preparation of SA2-SA5 discussion on slicing | Huawei | discussion | Information | Yes |
Yes
| noted | No | ||||
S5‑174297 | LS reply to ATIS NRSC on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” | ORANGE | LS out | Approval | Yes |
Yes
| revised | No | S5‑174331 | |||
S5‑174331 | LS reply to ATIS NRSC on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” | ORANGE | LS out | Approval | Yes |
Yes
| approved | No | S5‑174297 | |||
6.2 | New OAM&P Work Item proposals | S5‑174018 | Minutes of New Work Item proposals - OAM&P | WG Vice Chair (Orange) | report | Yes |
Yes
| noted | No | |||
S5‑174070 | Report 5G management architecture WID planning conference call | OAM&P SWG chairman | report | Approval | Yes |
Yes
| revised | No | S5‑174330 | |||
S5‑174330 | Report 5G management architecture WID planning conference call | OAM&P SWG chairman | report | Approval | Yes |
Yes
| approved | No | S5‑174070 | |||
S5‑174092 | Discussion on the organization of 5G related WIDs | ORANGE, NEC | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑174103 | proposal on 5G network and service management WI structure | Intel Finland Oy, ZTE | discussion | Approval | Yes |
Yes
| noted | No | ||||
S5‑174104 | New WID on Management of NG-RAN that includes virtualized network | Intel Finland Oy | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑174105 | New WID on Automation of network slicing | Intel Finland Oy | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑174106 | New WID on performance measurements for NG-RAN | Intel Finland Oy | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑174137 | Discussion on introducing Intelligence in 3GPP network management | Huawei | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174138 | New SID Study on introducing intelligence in management of 3GPP network | Huawei | SID new | Approval | Yes |
Yes
| revised | No | S5‑174349 | |||
S5‑174349 | New SID Study on introducing intelligence in management of 3GPP network | Huawei | SID new | Approval | Yes |
Yes
| noted | No | S5‑174138 | |||
S5‑174139 | Discussion on the potential Rel-15 5G management WIDs | Huawei | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174140 | New WID on multi-operator management of services and slices | Huawei | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑174209 | New WID on Fault supervision of network slicing for 5G networks and services | ZTE Corporation | WID new | Agreement | Yes |
Yes
| revised | No | S5‑174413 | |||
S5‑174413 | New WID on Fault supervision of network slicing for 5G networks and services | ZTE Corporation | WID new | Agreement | Yes |
Yes
| noted | No | S5‑174209 | |||
S5‑174240 | new WID on SON for AAS deployment management | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement | Yes |
Yes
| revised | No | S5‑174335 | |||
S5‑174335 | new WID on SON for AAS deployment management | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement | Yes |
Yes
| agreed | No | S5‑174240 | |||
S5‑174241 | New WID on NR NRM IRP | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑174242 | New WID on Performance Measurement for NR | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑174243 | New WID on 5GC NRM IRP | Nokia, Alcatel-Lucent Shanghai Bell | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑174244 | Proposed way forward of 5G NFs management normative works | Nokia, Alcatel-Lucent Shanghai Bell | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174245 | discussion paper on NR management WID planning | Nokia, Alcatel-Lucent Shanghai Bell | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174292 | TDocs sequence proposal for 6.2 | ORANGE, Huawei | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑174334 | Organization of future 5G WIDs | Huawei | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
6.3 | OAM&P Maintenance and Rel-15 small Enhancements | S5‑174019 | Minutes of OAM&P Maintenance and Rel-15 small Enhancements | MCC | report | Yes |
Yes
| noted | No | |||
S5‑174141 | Discussion on modifications of Area Scope parameters for MDT | Huawei | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174142 | Rel-15 CR 32.422 Modification of parameters of Area Scope for MDT | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑174207 | Support EUTRAN sharing enhancement | Ericsson Inc. | CR | Approval | No |
Yes
| revised | No | S5‑174269 | |||
S5‑174208 | Support EUTRAN new sharing arrangement | Ericsson Inc. | CR | Approval | No |
Yes
| revised | No | S5‑174268 | |||
S5‑174210 | R14 CR TS 28.510 Remove the duplicated use cases and requirements | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑174239 | CR 32.865 clarify management and control functionalities | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑174336 | |||
S5‑174336 | CR 32.865 clarify management and control functionalities | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑174239 | |||
S5‑174264 | CR 32.101 Addition of management functions and entities | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑174268 | Support EUTRAN new sharing arrangement | Ericsson Inc. | CR | Approval | Yes |
Yes
| revised | No | S5‑174337 | S5‑174208 | ||
S5‑174337 | Support EUTRAN new sharing arrangement | Ericsson Inc. | CR | Approval | Yes |
Yes
| agreed | No | S5‑174268 | |||
S5‑174269 | Support EUTRAN sharing enhancement | Ericsson Inc. | CR | Agreement | Yes |
Yes
| revised | No | S5‑174338 | S5‑174207 | ||
S5‑174338 | Support EUTRAN sharing enhancement | Ericsson Inc. | CR | Agreement | Yes |
Yes
| agreed | No | S5‑174269 | |||
S5‑174296 | Rel-15 CR 32.101 Replacement of 3G term | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑174339 | |||
S5‑174339 | Rel-15 CR 32.101 Replacement of 3G term | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑174296 | |||
S5‑174333 | LSOut reply to 3GPP SA5 on Managing EM IP address provided to VNF | ETSI NFV | LS in | discussion | Yes |
Yes
| noted | No | ||||
6.4 | Rel-14 Operations, Administration, Maintenance and Provisioning (OAM&P) |   | ||||||||||
6.4.1 | Management of mobile networks that include virtualized network functions |   | ||||||||||
6.4.1.1 | Performance management for mobile networks that include virtualized network functions | S5‑174022 | Minutes for Performance management for mobile networks that include virtualized network functions | Rapporteur(Intel) | report | Yes |
Yes
| noted | No | |||
S5‑174126 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| revised | No | S5‑174340 | |||
S5‑174340 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| revised | No | S5‑174412 | S5‑174126 | ||
S5‑174412 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| revised | No | S5‑174458 | S5‑174340 | ||
S5‑174458 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Approval | No |
Yes
| left for email approval | No | S5‑174412 | |||
S5‑174127 | CR TS 32.404 Add new collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑174459 | |||
S5‑174459 | CR TS 32.404 Add new collection method for 3GPP NF performance measurements related to VR | Intel Corporation (UK) Ltd | CR | Agreement | No |
Yes
| left for email approval | No | S5‑174127 | |||
S5‑174128 | CR TS 32.409 Add VR related measurements for IMS NFs | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑174341 | |||
S5‑174341 | CR TS 32.409 Add VR related measurements for IMS NFs | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑174460 | S5‑174128 | ||
S5‑174460 | CR TS 32.409 Add VR related measurements for IMS NFs | Intel Corporation (UK) Ltd | CR | Agreement | No |
Yes
| left for email approval | No | S5‑174341 | |||
S5‑174129 | CR TS 32.426 Add VR related measurements for EPC NFs | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑174342 | |||
S5‑174342 | CR TS 32.426 Add VR related measurements for EPC NFs | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑174461 | S5‑174129 | ||
S5‑174461 | CR TS 32.426 Add VR related measurements for EPC NFs | Intel Corporation (UK) Ltd | CR | Agreement | No |
Yes
| left for email approval | No | S5‑174342 | |||
S5‑174332 | LSOut reply to 3GPP SA5 on progress of measurement definitions | ESI NFV | LS in | discussion | Yes |
Yes
| noted | No | ||||
S5‑174384 | Exception sheet Performance management for mobile networks that include virtualized network functions | Intel | WI exception request | Agreement | No |
Yes
| left for email approval | No | ||||
6.5 | Rel-15 Operations, Administration, Maintenance and Provisioning (OAM&P) |   | ||||||||||
6.5.1 | Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | S5‑174036 | Minutes of Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | Rapporteur (ORANGE) | report | Yes |
Yes
| noted | No | |||
S5‑174043 | pCR 28.304 Update with correct TS numbers and titles | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑174343 | |||
S5‑174343 | pCR 28.304 Update with correct TS numbers and titles | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑174043 | |||
S5‑174044 | pCR 28.305 Update with correct TS numbers and titles | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174053 | Discussion Paper on the need for two options regarding PEECMON IRP | ORANGE | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174054 | pCR TS 28.304 Add justification for the two options | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑174346 | |||
S5‑174346 | pCR TS 28.304 Add justification for the two options | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑174054 | |||
S5‑174055 | pCR TS 28.304 High-level use case and business level reqs for supervising PEE related alarms | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑174347 | |||
S5‑174347 | pCR TS 28.304 High-level use case and business level reqs for supervising PEE related alarms | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑174055 | |||
S5‑174056 | pCR TS 28.304 High-level use case and business level reqs for monitoring PEE configuration changes | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑174351 | |||
S5‑174351 | pCR TS 28.304 High-level use case and business level reqs for monitoring PEE configuration changes | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑174056 | |||
S5‑174057 | pCR TS 28.304 Specification-level requirements for Option No. 1 | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑174352 | |||
S5‑174352 | pCR TS 28.304 Specification-level requirements for Option No. 1 | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑174057 | |||
S5‑174058 | pCR TS 28.304 Specification-level requirements for Option No. 2 | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑174353 | |||
S5‑174353 | pCR TS 28.304 Specification-level requirements for Option No. 2 | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑174058 | |||
S5‑174059 | pCR TS 28.305 Structuring clauses 5 and 6 for introducing the two options | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑174354 | |||
S5‑174354 | pCR TS 28.305 Structuring clauses 5 and 6 for introducing the two options | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑174059 | |||
S5‑174060 | pCR TS 28.305 Input to information model for Option 2 | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑174355 | |||
S5‑174355 | pCR TS 28.305 Input to information model for Option 2 | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑174060 | |||
S5‑174061 | TS 28.306 Skeleton | ORANGE | draft TS | Approval | Yes |
Yes
| revised | No | S5‑174356 | |||
S5‑174356 | TS 28.306 Skeleton | ORANGE | draft TS | Approval | Yes |
Yes
| approved | No | S5‑174061 | |||
S5‑174344 | Draft TS 28.305 | ORANGE | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
S5‑174345 | Draft TS 28.304 | ORANGE | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
6.5.2 | Management of QoE measurement collection | S5‑174037 | Minutes of Management of QoE measurement collection | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑174266 | R15 pCR 28404-000 Introduction and scope for QoE collection | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174357 | |||
S5‑174357 | R15 pCR 28404-000 Introduction and scope for QoE collection | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174266 | |||
S5‑174267 | R15 pCR 28404-000 Use cases and requirement for QoE collection | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174358 | |||
S5‑174358 | R15 pCR 28404-000 Use cases and requirement for QoE collection | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174267 | |||
S5‑174385 | Draft TS 28.404 | Ericsson | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
6.5.3 | Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements | S5‑174038 | Minutes of Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑174041 | Skeleton TS 28.530 | Ericsson LM | draft TS | Approval | Yes |
Yes
| approved | No | ||||
S5‑174042 | pCR TS 28.530 Introduction and scope for network slicing in mobile networks | Ericsson LM | pCR | Approval | Yes |
Yes
| revised | No | S5‑174359 | |||
S5‑174359 | pCR TS 28.530 Introduction and scope for network slicing in mobile networks | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | S5‑174042 | |||
S5‑174151 | pCR 28.530 Add concept and use case of V2X services using network slicing | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174152 | pCR 28.530 Add concept and use case of network slicing with fixed mobile convergence | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174153 | pCR 28.530 Add business level use cases of providing communication services with massive IoT connections using network slice | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174154 | pCR 28.530 Add concept of services using network slicing | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174155 | pCR 28.530 Add network slice definitions | Huawei, Ericsson | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174360 | pCR 28.530 Add network slice definitions | Huawei, Ericsson | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174156 | pCR 28.530 Add network slice subnet definitions | Huawei, Ericsson | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174157 | pCR 28.530 Add potential network slice deployment scenarios | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174158 | pCR 28.530 Add definition for network slice template | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174159 | pCR 28.530 Add network slice management related roles description | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174160 | pCR 28.530 Add network slice lifecycle management description | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174161 | pCR 28.530 Add high level service requirements | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174162 | pCR 28.530 Use of the non-3GPP parts of a slice by the 3GPP management system | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174163 | pCR 28.530 Clarify communication service instance lifecycle | Huawei, CATR, China Telecom | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174164 | pCR 28.530 Exposure of management functions to 3rd party | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174165 | pCR 28.530 Exposure of the management data to 3rd party | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174166 | pCR 28.530 Definition of service instance | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174167 | pCR 28.530 Add business level general requirements | Huawei, China Unicom, CATR | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174205 | Slice management modelling | Ericsson Inc. | discussion | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174206 | add UC and Req re service hosting for network slice management | Ericsson Inc. | discussion | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174238 | pCR 28.530 text proposal for background and concepts | Ericsson Limited | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174281 | S5-174xxx Sequence proposal for network slicing agenda point 6.5.3 | Ericsson Limited | discussion | Discussion | No |
Yes
| withdrawn | Yes | ||||
S5‑174282 | Sequence proposal for network slicing agenda point 6.5.3 | Ericsson Limited | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑174367 | breakout session conclusion for managed slice definition | Huawei | discussion | discussion | Yes |
Yes
| noted | No | ||||
S5‑174386 | Draft TS 28.530 | Ericsson | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
6.5.4 | Provisioning of network slicing for 5G networks and services | S5‑174039 | Minutes of Provisioning of network slicing for 5G networks and services | Rapporteur (Huawei) | report | No |
No
| withdrawn | Yes | |||
S5‑174214 | Provisioning of network slicing for 5G networks and services | Huawei Telecommunication India | draft TS | Agreement | Yes |
Yes
| not treated | No | ||||
S5‑174215 | pCR 28.531 Adding new skeleton clauses | Huawei, Nokia | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174216 | pCR 28.531 Adding content of scope | Huawei | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174248 | pCR 28.531 Adding new skeleton clauses | Huawei, Nokia | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑174249 | pCR 28.531 Adding content of scope | Huawei | pCR | Approval | Yes |
Yes
| not treated | No | ||||
6.6 | OAM&P Studies |   | ||||||||||
6.6.1 | Study on Implementation for the Partitioning of Itf-N | S5‑174021 | Minutes for Study on Implementation for the Partitioning of Itf-N | Rapporteur(China Mobile) | report | Yes |
Yes
| noted | No | |||
S5‑174256 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N | China Mobile Com. Corporation | pCR | Yes |
Yes
| revised | No | S5‑174416 | ||||
S5‑174416 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N | China Mobile Com. Corporation | pCR | - | Yes |
Yes
| revised | No | S5‑174462 | S5‑174256 | ||
S5‑174462 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N | China Mobile Com. Corporation | pCR | - | Yes |
Yes
| revised | No | S5‑174487 | S5‑174416 | ||
S5‑174487 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N | China Mobile Com. Corporation | pCR | - | No |
Yes
| left for email approval | No | S5‑174462 | |||
6.6.2 | Study on Management and Orchestration Architecture of Next Generation Network and Service | S5‑174020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | Rapporteur (Huawei) | report | Yes |
Yes
| noted | No | |||
S5‑174174 | pCR 28.800 Key issues to be considered for 5G management architecture options | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174396 | |||
S5‑174396 | pCR 28.800 Key issues to be considered for 5G management architecture options | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174463 | S5‑174174 | ||
S5‑174463 | pCR 28.800 Key issues to be considered for 5G management architecture options | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174396 | |||
S5‑174175 | pCR 28.800 Considerations on the 5G NF management standard interfaces | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174397 | |||
S5‑174397 | pCR 28.800 Considerations on the 5G NF management standard interfaces | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174175 | |||
S5‑174176 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174399 | |||
S5‑174399 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174464 | S5‑174176 | ||
S5‑174464 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174399 | |||
S5‑174177 | pCR 28.800 Add requirement for management and orchestration of networks containing non-5G NE and 5G NE | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174400 | |||
S5‑174400 | pCR 28.800 Add requirement for management and orchestration of networks containing non-5G NE and 5G NE | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174177 | |||
S5‑174178 | pCR 28.800 Define key management functionality | Huawei | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174179 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174401 | |||
S5‑174401 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture | Huawei,SK Telekom | pCR | Approval | Yes |
Yes
| revised | No | S5‑174466 | S5‑174179 | ||
S5‑174466 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture | Huawei,SK Telekom | pCR | Approval | Yes |
Yes
| approved | No | S5‑174401 | |||
S5‑174180 | pCR 28.800 Use case of multi-operator service support with management data | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174402 | |||
S5‑174402 | pCR 28.800 Use case of multi-operator service support with management data | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174180 | |||
S5‑174181 | pCR 28.800 Interface for service management | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174403 | |||
S5‑174403 | pCR 28.800 Interface for service management | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174465 | S5‑174181 | ||
S5‑174465 | pCR 28.800 Interface for service management | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174403 | |||
S5‑174182 | pCR 28.800 Concept of infrastructure management function | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174404 | |||
S5‑174404 | pCR 28.800 Concept of infrastructure management function | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑174182 | |||
S5‑174246 | discussion papar for 28.800 on 5G service management information framework | Nokia, Alcatel-Lucent Shanghai Bell | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174247 | PCR 28.800 Add service management model definition | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174406 | PCR 28.800 Add service management model definition | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174387 | Draft TR 28.800 | Huawei | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.6.3 | Study on Management and Orchestration of Network Slicing | S5‑174023 | Minutes for Study on Management and Orchestration of Network Slicing | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑174094 | pCR to 28.801 NSSI role | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174361 | |||
S5‑174361 | pCR to 28.801 NSSI role | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174094 | |||
S5‑174095 | pCR to 28.801 Definitions | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174362 | |||
S5‑174362 | pCR to 28.801 Definitions | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174467 | S5‑174095 | ||
S5‑174467 | pCR to 28.801 Definitions | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174362 | |||
S5‑174096 | pCR to 28.801 SON Clarification | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174363 | |||
S5‑174363 | pCR to 28.801 SON Clarification | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174096 | |||
S5‑174097 | pCR to 28.801 Automated NSI optimization.doc | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174130 | pCR TR 28.801 Changes on CSMF | Intel Corporation (UK) Ltd | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174184 | pCR 28.801 Clarifications on the Editor's Notes related to management architecture | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| merged | No | S5‑174366 | |||
S5‑174185 | pCR 28.801 Clarification on Use case and Requirements for Slice Specific information configuration for CN | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174186 | pCR 28.801 Clarifications on the Editor's Notes related to SON | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| merged | No | S5‑174365 | |||
S5‑174187 | pCR 28.801 Clarifications on the Editor's Notes related to the relation between two use cases | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174188 | pCR 28.801 Update solution for Management support to facilitate UE roaming between Network Slice Instances in different administrative domains | Huawei, China Unicom, CATR | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174189 | pCR 28.801 Clean-up the use case for management data isolation when multiple customers share the same Network Slice Instance | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174190 | pCR 28.801 Clean-up requirements for Network slice lifecycle management and Network slice configuration management | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| merged | No | S5‑174390 | |||
S5‑174191 | pCR 28.801 Update solution for modifying a network slice instance | Huawei, China Unicom, CATR | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174192 | pCR 28.801 Clean-up of Editor's notes on RAN part of network slice instance | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| merged | No | S5‑174390 | |||
S5‑174193 | pCR 28.801 Management function involvement for providing different types of services | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174194 | pCR 28.801 Update potential solution for the priority of the NSI | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174195 | pCR 28.801 Add potential solution for managing the shared NSSI constituent managed by the other NSSMF(s) | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| merged | No | S5‑174368 | |||
S5‑174196 | pCR 28.801 Resolving the editor’s notes of management exposure solution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174197 | pCR 28.801 Management function involvement for providing different types of services | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑174270 | pCR 28.801 proposal for handling editor’s notes in clause 4 | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174365 | |||
S5‑174365 | pCR 28.801 proposal for handling editor’s notes in clause 4 | Ericsson Limited,Huawei, China Unicom | pCR | Approval | Yes |
Yes
| revised | No | S5‑174468 | S5‑174270 | ||
S5‑174468 | pCR 28.801 proposal for handling editor’s notes in clause 4 | Ericsson Limited,Huawei, China Unicom | pCR | Approval | Yes |
Yes
| approved | No | S5‑174365 | |||
S5‑174271 | pCR 28.801 clarification on use case management data isolation in 5.1.7 | Ericsson Limited | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174272 | pCR 28.801 proposal for handling editor’s notes in clause 5.1 | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174366 | |||
S5‑174366 | pCR 28.801 proposal for handling editor’s notes in clause 5.1 | Ericsson Limited, Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174272 | |||
S5‑174273 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174368 | |||
S5‑174368 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 | Huawei, China Unicom, Ericsson, SK Telecom | pCR | Approval | Yes |
Yes
| revised | No | S5‑174369 | S5‑174273 | ||
S5‑174369 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 | Huawei, China Unicom, Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174469 | S5‑174368 | ||
S5‑174469 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 | Huawei, China Unicom, Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174369 | |||
S5‑174274 | pCR 28.801 proposal for handling editor’s notes in clause 6.2 | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174390 | |||
S5‑174390 | pCR 28.801 proposal for handling editor’s notes in clause 6.2 | Ericsson Limited,Huawei,China Unicom | pCR | Approval | Yes |
Yes
| approved | No | S5‑174274 | |||
S5‑174275 | pCR 28.801 proposal for handling editor’s notes in clause 7.1, 7.2 and 7.3 | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174391 | |||
S5‑174391 | pCR 28.801 proposal for handling editor’s notes in clause 7.1, 7.2 and 7.3 | Ericsson Limited | pCR | Approval | Yes |
Yes
| approved | No | S5‑174275 | |||
S5‑174276 | pCR 28.801 proposal for handling editor’s notes in 7.4 7.9 7.13 and 7.14 | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174392 | |||
S5‑174392 | pCR 28.801 proposal for handling editor’s notes in 7.4 7.9 7.13 and 7.14 | Ericsson Limited | pCR | Approval | Yes |
Yes
| approved | No | S5‑174276 | |||
S5‑174277 | pCR 28.801 Clarify terminology customer service in relation to network slice | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174393 | |||
S5‑174393 | pCR 28.801 Clarify terminology customer service in relation to network slice | Ericsson Limited | pCR | Approval | Yes |
Yes
| approved | No | S5‑174277 | |||
S5‑174278 | pCR 28.801 add conclusions and recommendations | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174395 | |||
S5‑174395 | pCR 28.801 add conclusions and recommendations | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑174470 | S5‑174278 | ||
S5‑174470 | pCR 28.801 add conclusions and recommendations | Ericsson Limited,Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174395 | |||
S5‑174279 | Presentation of 28.801 to SA for approval | Ericsson Limited | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑174280 | Sequence proposal for network slicing agenda point 6.6.3 | Ericsson Limited | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑174364 | Draft TR 28.801 | Ericsson | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.6.4 | Study on management aspects of next generation network architecture and features | S5‑174024 | Minutes for Study on management aspects of next generation network architecture and features | Rapporteur(Nokia) | report | Yes |
Yes
| noted | No | |||
S5‑174198 | Discussion on edge computing management way forward | Huawei | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑174199 | pCR 28.802 Introduction of edge computing management | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174411 | |||
S5‑174411 | pCR 28.802 Introduction of edge computing management | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174471 | S5‑174199 | ||
S5‑174471 | pCR 28.802 Introduction of edge computing management | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174411 | |||
S5‑174200 | pCR 28.802 Management of 5GC NFs supporting edge computing | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174414 | |||
S5‑174414 | pCR 28.802 Management of 5GC NFs supporting edge computing | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174200 | |||
S5‑174201 | pCR 28.802 Management of edge computing AFs | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174415 | |||
S5‑174415 | pCR 28.802 Management of edge computing AFs | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑174201 | |||
S5‑174202 | pCR 28.802 Management of edge computing services | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174417 | |||
S5‑174417 | pCR 28.802 Management of edge computing services | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑174202 | |||
S5‑174203 | pCR 28.802 Update usecase and requirements for Management support for NRF | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174204 | pCR 28.802 Update solution of configuration management of 5GC | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174418 | pCR 28.802 Update solution of configuration management of 5GC | Huawei | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174250 | pCR 28.802 Add use cases to support management for gNB with functional split | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174408 | |||
S5‑174408 | pCR 28.802 Add use cases to support management for gNB with functional split | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑174250 | |||
S5‑174251 | pCR 28.802 Add potential solution for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174409 | |||
S5‑174409 | pCR 28.802 Add potential solution for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174472 | S5‑174251 | ||
S5‑174472 | pCR 28.802 Add potential solution for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174409 | |||
S5‑174252 | pCR 28.802 Add conclusion and recommendation for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174410 | |||
S5‑174410 | pCR 28.802 Add conclusion and recommendation for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174473 | S5‑174252 | ||
S5‑174473 | pCR 28.802 Add conclusion and recommendation for NR management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174410 | |||
S5‑174253 | pCR 28.802 Add use cases to support management for AMF Set | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174419 | |||
S5‑174419 | pCR 28.802 Add use cases to support management for AMF Set | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174474 | S5‑174253 | ||
S5‑174474 | pCR 28.802 Add use cases to support management for AMF Set | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174419 | |||
S5‑174254 | pCR 28.802 Add potential solution for AMF Set management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174420 | |||
S5‑174420 | pCR 28.802 Add potential solution for AMF Set management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174475 | S5‑174254 | ||
S5‑174475 | pCR 28.802 Add potential solution for AMF Set management | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174420 | |||
S5‑174255 | pCR 28.802 add potential solution of SON for New RAN | Nokia, Cisco Systems, Inc., Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174422 | |||
S5‑174422 | pCR 28.802 add potential solution of SON for New RAN | Nokia, Cisco Systems, Inc., Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| noted | No | S5‑174255 | |||
S5‑174284 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174407 | |||
S5‑174407 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174476 | S5‑174284 | ||
S5‑174476 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174407 | |||
S5‑174287 | Presentation of 28.802 to SA for information | Nokia, Alcatel-Lucent Shanghai Bell | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑174288 | pCR 28.802 Update 5GC NRM solution | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174421 | |||
S5‑174421 | pCR 28.802 Update 5GC NRM solution | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑174288 | |||
S5‑174388 | Draft TR 28.802 | Nokia | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
S5‑174394 | Document sequence | Nokia | other | Information | Yes |
Yes
| noted | No | ||||
6.6.5 | Study on Management aspects of selected IoT-related features | S5‑174030 | Minutes of Study on Management aspects of selected IoT-related features | Rapporteur (Cisco) | report | Yes |
Yes
| noted | No | |||
S5‑174098 | SID revision Study on IoT Management | Cisco Systems Inc. | SID revised | Agreement | Yes |
Yes
| revised | No | S5‑174426 | |||
S5‑174426 | SID revision Study on IoT Management | Cisco Systems Inc. | SID revised | Agreement | Yes |
Yes
| agreed | No | S5‑174098 | |||
S5‑174099 | pCR to 32.875 Handover related measurements | Cisco Systems Inc. | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174100 | pCR to 32.875 Cell level radio bearer QoS related measurements | Cisco Systems Inc. | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174101 | pCR to 32.875 Radio resource utilization related measurements | Cisco Systems Inc. | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174102 | pCR to 32.875 Paging related measurements | Cisco Systems Inc. | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174217 | pCR to 32.857 Handover related measurements | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174424 | |||
S5‑174424 | pCR to 32.857 Handover related measurements | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174217 | |||
S5‑174218 | pCR to 32.857 Cell level radio bearer QoS related measurements | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174219 | pCR to 32.857 Radio resource utilization related measurements | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174220 | pCR to 32.857 Paging related measurements | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174437 | |||
S5‑174437 | pCR to 32.857 Paging related measurements | Cisco Systems Inc. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174220 | |||
S5‑174423 | Draft TR 32.857 | Cisco | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.6.6 | Study on a RESTful HTTP-based Solution Set | S5‑174031 | Minutes of Study on a RESTful HTTP-based Solution Set | Rapporteur (Nokia) | report | Yes |
Yes
| noted | No | |||
S5‑174147 | pCR 32.866 Discussion of REST implementation levels | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174429 | |||
S5‑174429 | pCR 32.866 Discussion of REST implementation levels | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174147 | |||
S5‑174148 | pCR 32.866 Discussion of options for resource identification | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174430 | |||
S5‑174430 | pCR 32.866 Discussion of options for resource identification | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174148 | |||
S5‑174149 | pCR 32.866 Discussion of options for asynchronous operations | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174432 | |||
S5‑174432 | pCR 32.866 Discussion of options for asynchronous operations | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174149 | |||
S5‑174150 | pCR 32.866 Subscribe/notify operations | Huawei | pCR | Approval | Yes |
Yes
| merged | No | S5‑174433 | |||
S5‑174168 | pCR 32.866 Add REST design principles | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑174427 | |||
S5‑174427 | pCR 32.866 Add REST design principles | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑174168 | |||
S5‑174169 | pCR 32.866 Add Richardson Maturity Model | Nokia Germany | pCR | Approval | Yes |
Yes
| merged | No | S5‑174429 | |||
S5‑174170 | pCR 32.866 Add HTTP method descriptions | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑174428 | |||
S5‑174428 | pCR 32.866 Add HTTP method descriptions | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑174170 | |||
S5‑174171 | pCR 32.866 Clarify resource identification mechanism | Nokia Germany | pCR | Yes |
Yes
| approved | No | |||||
S5‑174172 | pCR 32.866 Add design patterns | Nokia Germany | pCR | Yes |
Yes
| revised | No | S5‑174433 | ||||
S5‑174433 | pCR 32.866 Add design patterns | Nokia Germany | pCR | - | Yes |
Yes
| approved | No | S5‑174172 | |||
S5‑174173 | pCR 32.866 Clarify mapping of the Alarm IRP | Nokia Germany | pCR | Yes |
Yes
| revised | No | S5‑174434 | ||||
S5‑174434 | pCR 32.866 Clarify mapping of the Alarm IRP | Nokia Germany | pCR | - | Yes |
Yes
| approved | No | S5‑174173 | |||
S5‑174425 | Cover sheet TR 32.866 | Nokia | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑174431 | Draft TR 32.866 | Nokia | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.6.7 | Study on management aspects of virtualized network functions that are part of the NR | S5‑174032 | Minutes of Study on management aspects of virtualized network functions that are part of the NR | Rapporteur (Intel) | report | Yes |
Yes
| noted | No | |||
S5‑174107 | pCR TR 32.864 Add potential solutions to support partially virtualized NF under NFV concept | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174442 | |||
S5‑174442 | pCR TR 32.864 Add potential solutions to support partially virtualized NF under NFV concept | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | S5‑174107 | |||
S5‑174108 | pCR TR 32.864 Corrections regarding transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval | No |
No
| withdrawn | Yes | ||||
S5‑174109 | pCR TR 32.864 Add gap analysis on adding, deleting and replacing the non-virtualized part of gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174439 | |||
S5‑174439 | pCR TR 32.864 Add gap analysis on adding, deleting and replacing the non-virtualized part of gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑174109 | |||
S5‑174110 | pCR TR 32.864 Add the CU and DU modelling option | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174111 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174440 | |||
S5‑174440 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174478 | S5‑174111 | ||
S5‑174478 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174440 | |||
S5‑174112 | pCR TR 32.864 Add potential solution for establishing relation between the CN NF and the gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174441 | |||
S5‑174441 | pCR TR 32.864 Add potential solution for establishing relation between the CN NF and the gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | S5‑174112 | |||
S5‑174113 | pCR TR 32.864 Add potential solution for instantiating NS containing CN VNF and gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174443 | |||
S5‑174443 | pCR TR 32.864 Add potential solution for instantiating NS containing CN VNF and gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑174113 | |||
S5‑174114 | pCR TR 32.864 Add potential solution for updating transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174444 | |||
S5‑174444 | pCR TR 32.864 Add potential solution for updating transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174479 | S5‑174114 | ||
S5‑174479 | pCR TR 32.864 Add potential solution for updating transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174444 | |||
S5‑174115 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174445 | |||
S5‑174445 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174480 | S5‑174115 | ||
S5‑174480 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB | Intel Corporation (UK) Ltd | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174445 | |||
S5‑174116 | pCR TR 32.864 Add potential solution for adding VNFFGD and VNFFGs for the gNB | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174117 | pCR TR 32.864 add UC for collecting performance measurements | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174118 | pCR TR 32.864 add UC for fault detection | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174119 | pCR TR 32 864 Add UC on validation of NsDf for a NSD | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174435 | |||
S5‑174435 | pCR TR 32 864 Add UC on validation of NsDf for a NSD | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑174119 | |||
S5‑174120 | pCR TR 32.864 Add conclusions | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174446 | |||
S5‑174446 | pCR TR 32.864 Add conclusions | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174481 | S5‑174120 | ||
S5‑174481 | pCR TR 32.864 Add conclusions | Intel Corporation (UK) Ltd | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174446 | |||
S5‑174121 | pCR TR 32.864 Add Recommendations | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174447 | |||
S5‑174447 | pCR TR 32.864 Add Recommendations | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑174121 | |||
S5‑174262 | pCR TR 32.864 Add UC on depoyment of non-virtualized part of gNB based on the available non-virualized resource | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174436 | |||
S5‑174436 | pCR TR 32.864 Add UC on depoyment of non-virtualized part of gNB based on the available non-virualized resource | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174262 | |||
S5‑174263 | pCR 32.864 Add UC on instantiation of virtualized part of a gNB with the concrete NFVI-POP information | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174438 | |||
S5‑174438 | pCR 32.864 Add UC on instantiation of virtualized part of a gNB with the concrete NFVI-POP information | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174263 | |||
S5‑174405 | Sequence proposal | Intel | other | Information | Yes |
Yes
| noted | No | ||||
S5‑174477 | Draft TR 32.864 | Intel | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
S5‑174482 | Presentation sheet TR 32.864 for information | Intel | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
6.6.8 | Study on Management Enhancement of CUPS of EPC Nodes | S5‑174033 | Minutes of Study on Management Enhancement of CUPS of EPC Nodes | Rapporteur (Huawei) | report | Yes |
Yes
| noted | No | |||
S5‑174143 | pCR 32.867 Add potential solution for PGW and SGW related measurements in CUPS | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑174448 | |||
S5‑174448 | pCR 32.867 Add potential solution for PGW and SGW related measurements in CUPS | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑174143 | |||
S5‑174144 | pCR 32.867 Editor's notes resolution | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174145 | pCR 32.867 Add conclusions | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174146 | pCR 32.867 Add recommendations | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑174483 | Draft TR 32.867 | Huawei | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.6.9 | Study on OAM aspects of LTE and WLAN integration | S5‑174034 | Minutes of Study on OAM aspects of LTE and WLAN integration | Rapporteur (Intel) | report | Yes |
Yes
| revised | No | S5‑174383 | ||
S5‑174383 | Minutes of Study on OAM aspects of LTE and WLAN integration | Rapporteur (Intel) | report | - | Yes |
Yes
| noted | No | S5‑174034 | |||
S5‑174122 | pCR TR 32.868 Add LWA overview and concept | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174449 | |||
S5‑174449 | pCR TR 32.868 Add LWA overview and concept | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174484 | S5‑174122 | ||
S5‑174484 | pCR TR 32.868 Add LWA overview and concept | Intel Corporation (UK) Ltd | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174449 | |||
S5‑174123 | pCR TR 32.868 Add UC on provisioning WLAN informaton to WT for non-collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174380 | |||
S5‑174380 | pCR TR 32.868 Add UC on provisioning WLAN informaton to WT for non-collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval | No |
Yes
| left for email approval | No | S5‑174123 | |||
S5‑174124 | pCR TR 32.868 Add UC on management of relation between eNB and WT for non-collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174381 | |||
S5‑174381 | pCR TR 32.868 Add UC on management of relation between eNB and WT for non-collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | S5‑174124 | |||
S5‑174125 | pCR TR 32.868 Add UC on provisioning WLAN informaton to eNB for collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑174450 | |||
S5‑174450 | pCR TR 32.868 Add UC on provisioning WLAN informaton to eNB for collocated LWA | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑174125 | |||
S5‑174485 | Draft TR 32.868 | Intel | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.6.10 | Study on network policy management for mobile networks based on NFV scenarios | S5‑174035 | Minutes of Study on network policy management for mobile networks based on NFV scenarios | Rapporteur ( China Mobile) | report | Yes |
Yes
| noted | No | |||
S5‑174257 | pCR TR 32.871 adding the deployment use case | China Mobile | pCR | Approval | Yes |
Yes
| revised | No | S5‑174451 | |||
S5‑174451 | pCR TR 32.871 adding the deployment use case | China Mobile | pCR | Approval | Yes |
Yes
| approved | No | S5‑174257 | |||
S5‑174258 | pCR TR 32.871 adding the deployment requirements | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174452 | |||
S5‑174452 | pCR TR 32.871 adding the deployment requirements | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174258 | |||
S5‑174259 | pCR TR 32.871 adding the policy operation requirements | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174453 | |||
S5‑174453 | pCR TR 32.871 adding the policy operation requirements | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174259 | |||
S5‑174260 | pCR TR 32.871 adding the general process | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174454 | |||
S5‑174454 | pCR TR 32.871 adding the general process | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174260 | |||
S5‑174261 | pCR TR 32.871 modification on the concept | China Mobile M2M Company Ltd. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174455 | Draft TR 32.871 | China Mobile | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.6.11 | Study on system and functional aspects of Energy Efficiency in 5G networks | S5‑174040 | Minutes of Study on system and functional aspects of Energy Efficiency in 5G networks | Rapporteur (ORANGE) | report | Yes |
Yes
| noted | No | |||
S5‑174066 | TR 32.972 skeleton | ORANGE | draft TR | Agreement | Yes |
Yes
| revised | No | S5‑174456 | |||
S5‑174456 | TR 32.972 skeleton | ORANGE | draft TR | Agreement | Yes |
Yes
| approved | No | S5‑174066 | |||
S5‑174082 | pCR TS 32.972 - Introduction | ORANGE | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑174083 | pCR TS 32.972 – About EE KPIs and metrics | ORANGE | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174457 | |||
S5‑174457 | pCR TS 32.972 – About EE KPIs and metrics | ORANGE | pCR | Agreement | No |
Yes
| left for email approval | No | S5‑174083 | |||
S5‑174486 | Draft TR 32.972 | ORANGE | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
7 | Charging |   | ||||||||||
7.1 | Charging Plenary | S5‑174008 | CH Agenda and Time Plan | CH SWG Chair | agenda | Yes |
Yes
| approved | No | |||
S5‑174009 | CH Executive Report from THIS Meeting | CH SWG Chair | report | Presentation | Yes |
Yes
| noted | No | ||||
S5‑174049 | LS from SA2 to SA5 on Request to update maximum data rate values in EPS | S2-173685 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑174299 | Reply to: LS from SA2 to SA5 on Request to update maximum data rate values in EPS | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑174063 | Resubmitted LS from SA2 to SA5 on Stage 2 completion on introduction of WLAN as alternative technology for ProSe Direct Discovery | S2-172506 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑174298 | Reply to: Resubmitted LS from SA2 to SA5 on Stage 2 completion on introduction of WLAN as alternative technology for ProSe Direct Discovery | Ericsson | LS out | approval | Yes |
Yes
| noted | No | ||||
S5‑174069 | Report from 3GPP SA5-on charging work for CUPS ad hoc | CH SWG Chair | report | Approval | Yes |
Yes
| approved | No | ||||
S5‑174073 | LS from ETSI TC LI on Request of updated information on SA5 standards or reports related to billing systems and parameters for 5G access and services | ETSI TC LI | LS in | Yes |
Yes
| replied to | No | |||||
S5‑174322 | Reply to: LS from ETSI TC LI on Request of updated information on SA5 standards or reports related to billing systems and parameters for 5G access and services | Nokia | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑174232 | LSOut to Reply on SA2 for LS on standardization of Northbound SCEF API Charging | HUAWEI TECHNOLOGIES Co. Ltd. | LS out | Approval | Yes |
Yes
| revised | No | S5‑174301 | |||
7.2 | New Charging Work Item proposals |   | ||||||||||
7.3 | Charging Maintenance and Rel-15 small Enhancements | S5‑174074 | Rel-14 CR 32.298 Correction on handling of Private and Public user ID for IMS charging | ORANGE,Nokia | CR | Agreement | Yes |
Yes
| agreed | No | S5‑173359 | |
S5‑174075 | Rel-13 CR 32.298 Correction on handling of Private and Public user ID for IMS charging | ORANGE,Nokia | CR | Approval | Yes |
Yes
| agreed | No | S5‑173357 | |||
S5‑174076 | Rel-12 CR 32.298 Correction on handling of Private and Public user ID for IMS charging | ORANGE,Nokia | CR | Agreement | Yes |
Yes
| agreed | No | S5‑173355 | |||
S5‑174077 | Rel-11 CR 32.298 Correction on handling of Private and Public user ID for IMS charging | ORANGE,Nokia | CR | Agreement | Yes |
Yes
| agreed | No | S5‑173353 | |||
S5‑174078 | Rel-12 CR 32.260 Correction in the Trigger for Charging from I-CSCF | Nokia | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑174079 | Rel-13 CR 32.260 Correction in the Trigger for Charging from I-CSCF | Nokia | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑174080 | Rel-14 CR 32.260 Correction in the Trigger for Charging from I-CSCF | Nokia | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑174081 | Rel-14 CR 32.298 Addition of the fields ProSe Direct Discovery for Public Safety | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑173343 | |||
S5‑174087 | Rel-14 CR 32.298 Addition of FE Identifier List to IMS Charging | Deutsche Telekom AG | CR | Agreement | Yes |
Yes
| revised | No | S5‑174310 | S5‑173345 | ||
S5‑174310 | Rel-14 CR 32.298 Addition of FE Identifier List to IMS Charging | Deutsche Telekom AG | CR | Agreement | Yes |
Yes
| agreed | No | S5‑174087 | |||
S5‑174131 | Rel-14 CR 32.298 Introduce T4 Device Trigger charging | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑173399 | |||
7.4 | Rel-15 Charging |   | ||||||||||
7.4.1 | Charging Enhancement for eFMSS | S5‑174234 | Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval | Yes |
Yes
| revised | No | S5‑174303 | |
S5‑174303 | Rel-15 CR 32.251 Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval | Yes |
Yes
| agreed | No | S5‑174234 | |||
S5‑174236 | Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval | Yes |
Yes
| revised | No | S5‑174304 | |||
S5‑174304 | Rel-15 CR 32.298 Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval | Yes |
Yes
| agreed | No | S5‑174236 | |||
S5‑174237 | Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval | Yes |
Yes
| revised | No | S5‑174305 | |||
S5‑174305 | Rel-15 CR 32.299 Charging enhancement for eFMSS | China Telecom Corporation Ltd. | CR | Approval | Yes |
Yes
| agreed | No | S5‑174237 | |||
7.4.2 | Charging aspects of EDCE5 | S5‑174051 | LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC | S2-174068 | LS in | Yes |
Yes
| replied to | No | |||
S5‑174289 | Reply to LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC | Nokia | LS out | Approval | Yes |
Yes
| revised | No | S5‑174300 | |||
S5‑174300 | Reply to LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC | Nokia | LS out | Approval | Yes |
Yes
| approved | No | S5‑174289 | |||
7.4.3 | Charging aspects of NAPS | S5‑174048 | LS from SA2 to SA5 on standardization of Northbound SCEF API Charging | S2-173674 | LS in | Yes |
Yes
| replied to | No | |||
S5‑174301 | Reply to: LS from SA2 to SA5 on standardization of Northbound SCEF API Charging | Huawei | LS out | approval | Yes |
Yes
| approved | No | S5‑174232 | |||
S5‑174084 | Response LS from SA6 to SA5 on standardization of Northbound SCEF API Charging | S6-171107 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑174302 | Reply to: Response LS from SA6 to SA5 on standardization of Northbound SCEF API Charging | Huawei | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑174086 | Northbound Application Program Interfaces (APIs) for exposure function interworking charging | HUAWEI TECHNOLOGIES Co. Ltd. | draft TS | Approval | Yes |
Yes
| approved | No | ||||
S5‑174228 | Rel-15 pCR 32.254 Update of the skeleton | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174306 | |||
S5‑174306 | Rel-15 pCR 32.254 Update of the skeleton | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174228 | |||
S5‑174229 | Rel-15 pCR 32.254 Scope and Reference | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174307 | |||
S5‑174307 | Rel-15 pCR 32.254 Scope and Reference | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174229 | |||
S5‑174230 | Rel-15 pCR 32.254 Definitions, Symbols and Abbreviations | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑174308 | |||
S5‑174308 | Rel-15 pCR 32.254 Definitions, Symbols and Abbreviations | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑174230 | |||
S5‑174231 | Rel-15 pCR 32.254 Architecture considerations | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174309 | |||
S5‑174309 | Rel-15 pCR 32.254 Architecture considerations | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174231 | |||
S5‑174293 | LS from SA3 cc SA5 Reply LS on Security for T8 interface | S3-172076 | LS in | Yes |
Yes
| postponed | No | |||||
7.5 | Charging Studies |   | ||||||||||
7.5.1 | Study on Overload Control for Diameter Charging Applications | S5‑174134 | pCR 32.869 Update of Problems and Goals | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174311 | |
S5‑174311 | pCR 32.869 Update of Problems and Goals | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174134 | |||
S5‑174135 | pCR 32.869 Update of Introduction | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174312 | |||
S5‑174312 | pCR 32.869 Update of Introduction | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174135 | |||
S5‑174136 | pCR 32.869 Update of Offline Part | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174313 | |||
S5‑174313 | pCR 32.869 Update of Offline Part | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174136 | |||
S5‑174327 | draft TR 32.869 | Ericsson | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
7.5.2 | Study on forward compatibility for 3GPP Diameter Charging Applications | S5‑174233 | pCR TR 32.870 Refinement on existing Application and Diameter description | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174314 | |
S5‑174314 | pCR TR 32.870 Refinement on existing Application and Diameter description | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑174233 | |||
S5‑174235 | pCR TR 32.870 Introduction of key issues | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174315 | |||
S5‑174315 | pCR TR 32.870 Introduction of key issues | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑174235 | |||
S5‑174290 | pCR TR 32.870 key issues set 2 | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174291 | pCR TR 32.870 solutions introduction | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174326 | draft TR 32.870 | Nokia, Alcatel-Lucent Shanghai Bell | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
7.5.3 | Study on Charging Aspects of 5G System Architecture Phase 1 | S5‑174132 | pCR TR 32.899 Roaming | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174316 | |
S5‑174316 | pCR TR 32.899 Roaming | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑174132 | |||
S5‑174133 | pCR TR 32.899 Online and Offline Charging evaluation | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑174317 | |||
S5‑174317 | pCR TR 32.899 Online and Offline Charging evaluation | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑174133 | |||
S5‑174221 | Updated Work Plan for Study TR 32.899 | HUAWEI TECHNOLOGIES Co. Ltd. | discussion | Agreement | Yes |
Yes
| revised | No | S5‑174375 | |||
S5‑174375 | Updated Work Plan for Study TR 32.899 | HUAWEI TECHNOLOGIES Co. Ltd. | discussion | Agreement | Yes |
Yes
| noted | No | S5‑174221 | |||
S5‑174222 | Rel-15 pCR 32.899 Introduce Service Based architecture topic | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174318 | |||
S5‑174318 | Rel-15 pCR 32.899 Introduce Service Based architecture topic | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174222 | |||
S5‑174223 | Rel-15 pCR 32.899 Network Slicing for Tenant Based Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174319 | |||
S5‑174319 | Rel-15 pCR 32.899 Network Slicing for Tenant Based Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174223 | |||
S5‑174224 | Rel-15 pCR 32.899 Network Capability Exposure of Charging System | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174320 | |||
S5‑174320 | Rel-15 pCR 32.899 Network Capability Exposure of Charging System | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174224 | |||
S5‑174225 | Rel-15 pCR 32.899 Charging for Interworking between 5G System and Existing Systems | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174321 | |||
S5‑174321 | Rel-15 pCR 32.899 Charging for Interworking between 5G System and Existing Systems | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174225 | |||
S5‑174226 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Quota Management | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174370 | |||
S5‑174370 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Quota Management | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174226 | |||
S5‑174227 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Parallel Traffic | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| revised | No | S5‑174371 | |||
S5‑174371 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Parallel Traffic | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement | Yes |
Yes
| approved | No | S5‑174227 | |||
S5‑174283 | pCR 32.899 Key Issue Triggers and reporting in the separate SMF and UPF - Registration procedure | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174372 | |||
S5‑174372 | pCR 32.899 Key Issue Triggers and reporting in the separate SMF and UPF - Registration procedure | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174283 | |||
S5‑174285 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - UPF usage monitoring | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174373 | |||
S5‑174373 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - UPF usage monitoring | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174285 | |||
S5‑174286 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - Continuous time | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑174374 | |||
S5‑174374 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - Continuous time | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑174286 | |||
S5‑174376 | draft TR 32.899 | HUAWEI TECHNOLOGIES Co. Ltd. | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
S5‑174377 | Presentation of draft TR 32.899 to SA#77 for information | HUAWEI TECHNOLOGIES Co. Ltd. | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑174378 | LS to SA2 and CT4 on 5G Charging Study Phase 1 on N4 | Ericsson | LS out | Approval | Yes |
Yes
| approved | No | ||||
S5‑174379 | Update "Study on Charging Aspects of 5G System Architecture Phase 1" | HUAWEI TECHNOLOGIES Co. Ltd. | SID revised | Agreement | Yes |
Yes
| revised | No | S5‑174389 | |||
S5‑174389 | Update "Study on Charging Aspects of 5G System Architecture Phase 1" | HUAWEI TECHNOLOGIES Co. Ltd. | SID revised | Agreement | Yes |
Yes
| agreed | No | S5‑174379 | |||
7.5.4 | Study on Volume Based Charging Aspects for VoLTE | S5‑174091 | TR 32.848 Skeleton | China Mobile Com. Corporation | draft TR | Approval | Yes |
Yes
| approved | No | ||
S5‑174093 | TR 32.848 Skeleton | China Mobile Com. Corporation | draft TR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑174211 | pCR 32.848 Skeleton update | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑174323 | |||
S5‑174323 | pCR 32.848 Skeleton update | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑174211 | |||
S5‑174212 | pCR 32.848 Refrence | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑174324 | |||
S5‑174324 | pCR 32.848 Refrence | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑174212 | |||
S5‑174213 | pCR 32.848 Scope | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑174325 | draft TR 32.848 | China Mobile Com. Corporation | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
8 | Any Other Business |   | ||||||||||
9 | Closing of the meeting |   |