Tdoc List
2017-03-31 11:51
TDoc | Title | Source | Type | For | Agenda | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|
S5‑171500 | Agenda | WG Chairman | agenda |
2Approval of the agenda
| Yes |
Yes
| approved | No | |||
S5‑171501 | Report from SA5#111 | MCC | report |
4.1Last SA5 meeting report
| Yes |
Yes
| approved | No | |||
S5‑171502 | SA5 status report at last SA meeting | WG Chairman | report |
4.2Last SA meeting report
| Yes |
Yes
| noted | No | |||
S5‑171503 | SA5 results at last SA meeting | WG Chairman | report |
4.2Last SA meeting report
| Yes |
YesRobert (Ericsson): if SA5 takes the lead in EE, what does this mean for work to be done in other groups?
The Chair commented that this wasn't mentioned in SA but the work can be done with LS.
Christian (Huawei) commented that other groups work with energy efficiency already, SA doesn’t have a global mandate.
Maryse (Nokia) asked for clarification of the WID summary documents. The Chair commented that SA will provide a list of WIDs where they expect summaries to be made.
| revised | No | S5‑171836 | ||
S5‑171504 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑171780 | ||
S5‑171505 | OAM Executive Report from THIS Meeting | WG Vice Chair (Huawei) | report |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑172001 | ||
S5‑171506 | Leaders meeting agenda | WG Chairman | agenda |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑171507 | Leaders meeting minutes | WG Chairman | report |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑171508 | CH Agenda and Time Plan | CH SWG Chair | agenda |
7.1Charging Plenary
| Yes |
Yes
| approved | No | |||
S5‑171509 | CH Executive Report from THIS Meeting | CH SWG Chair | report |
7.1Charging Plenary
| Yes |
Yes
| noted | No | |||
S5‑171510 | SA5 Meeting Calendar | WG Vice Chair (Huawei) | other |
5.4SA5 meeting calendar
| Yes |
Yes
| noted | No | |||
S5‑171511 | SA5 Working Procedures | WG Vice Chair (Huawei) | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| approved | No | |||
S5‑171512 | SA5 Meeting Facility Requirements | WG Vice Chair (Orange) | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑171513 | Process for management of draft TSs/TRs | WG Chairman | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑171514 | CR Quality Check | MCC | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑171515 | Deliverables due for the NEXT SA Plenary | ETSI Secretariat | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑171516 | Ongoing SA5 WIDs and SIDs | WG Vice Chair (Huawei) | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑171517 | SA5 3GPP Work Plan | ETSI Secretariat | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑171518 | Minutes of New Work Item proposals - OAM&P | WG Vice Chair (Orange) | report |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | |||
S5‑171519 | Minutes of OAM&P Maintenance and Rel-15 small Enhancements | MCC | report |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| noted | No | |||
S5‑171520 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | Rapporteur (Huawei) | report |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | |||
S5‑171521 | Minutes for Study on Implementation for the Partitioning of Itf-N | Rapporteur(China Mobile) | report |
6.5.3Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| noted | No | |||
S5‑171522 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions | Rapporteur(China Mobile) | report |
6.4.1.1Management concept, architecture and requirements for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | |||
S5‑171523 | Minutes for Configuration Management for mobile networks that include virtualized network functions | Rapporteur(ZTE) | report |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | |||
S5‑171524 | Minutes for Fault Management for mobile networks that include virtualized network functions | Rapporteur(Huawei) | report |
6.4.1.3Fault Management for mobile networks that include virtualized network functions
| No |
No
| withdrawn | Yes | |||
S5‑171525 | Minutes for Performance management for mobile networks that include virtualized network functions | Rapporteur(Intel) | report |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | |||
S5‑171526 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | Rapporteur (Nokia Networks) | report |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171797 | ||
S5‑171527 | Minutes for Filtering of PM measurements and data volume measurements for shared networks | Rapporteur(Ericsson) | report |
6.4.2Filtering of PM measurements and data volume measurements for shared networks
| No |
No
| withdrawn | Yes | |||
S5‑171528 | Minutes of Study on OAM support for assessment of energy efficiency in mobile access networks | Rapporteur (Orange) | report |
6.5.1Study on OAM support for assessment of energy efficiency in mobile access networks
| Yes |
Yes
| noted | No | |||
S5‑171529 | Minutes for Study on OAM aspects of SON for AAS-based deployments | Rapporteur (Nokia Networks) | report |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| noted | No | |||
S5‑171530 | Minutes for Study on Management and Orchestration of Network Slicing | Rapporteur (Ericsson) | report |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171531 | Minutes for Study on management aspects of next generation network architecture and features | Rapporteur(Nokia) | report |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | |||
S5‑171532 | IPR and legal declaration | WG Chairman | other |
3IPR declaration
| Yes |
Yes
| noted | No | |||
S5‑171533 | Status of email approvals | WG Vice Chair (Orange) | other |
5.1Administrative issues at SA5 level
| No |
No
| reserved | No | |||
S5‑171534 | Minutes of OAM support for Licensed Shared Access (LSA) | Rapporteur (Nokia) | report |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| noted | No | |||
S5‑171535 | OAM&P SWG action list | WG Vice Chair (Huawei) | other |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑171955 | ||
S5‑171536 | Work Plan status | WG Chair | other |
5.5Review of the Work Plan
| No |
No
| reserved | No | |||
S5‑171537 | Minutes of OAM&P SWG opening session | WG Vice Chair (Huawei) | report |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑171538 | Minutes of Study on Management aspects of selected IoT-related features | Rapporteur (Cisco) | report |
6.5.7Study on Management aspects of selected IoT-related features
| Yes |
Yes
| noted | No | |||
S5‑171539 | Minutes of Study on a RESTful HTTP-based Solution Set | Rapporteur (Nokia) | report |
6.5.8Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| noted | No | |||
S5‑171540 | Minutes of Study on management aspects of virtualized network functions that are part of the NR | Rapporteur (Intel) | report |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | |||
S5‑171541 | Minutes of Study on Management Enhancement of CUPS of EPC Nodes | Rapporteur (Huawei) | report |
6.5.10Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| noted | No | |||
S5‑171542 | pCR TS 28.520 Rapporteur update for EditHelp | Intel Corporation (UK) Ltd | pCR | Approval |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | ||
S5‑171543 | pCR TS 28.520 removal of editor note | Intel Corporation (UK) Ltd | pCR | Approval |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171544 | pCR TS 28.520 correct the requirement references in the tracibility field | Intel Corporation (UK) Ltd | pCR | Approval |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171883 | |
S5‑171545 | pCR TS 28.520 delete unused requirement and change requirement reference | Intel Corporation (UK) Ltd | pCR | Decision |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171873 | |
S5‑171546 | pCR TR 32.864 add IFA13 to the reference, and correct reference accordingly | Intel Corporation (UK) Ltd | pCR | Decision |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | ||
S5‑171547 | Add UC on querying MO attributes that may trigger VNF scaling | Intel Corporation (UK) Ltd | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171548 | Discussion paper on NRMs supporting query of MO attributes that may trigger VNF scaling | Intel Corporation (UK) Ltd | discussion | Agreement |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171549 | Discussion paper on supporting selection of EM in VNF instantiation | Intel Corporation (UK) Ltd | discussion | Endorsement |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171929 | |
S5‑171550 | pCR TS 28.520 Correction of NFV PM UCs | Intel Corporation (UK) Ltd | pCR | Approval |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171876 | |
S5‑171551 | pCR TR 28.801 Add UC on Self-Creation of NSI | Intel Corporation (UK) Ltd | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171866 | ||
S5‑171552 | pCR TR 28.801 Add UC on Self-reconfiguration of NSI | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171867 | |
S5‑171553 | pCR TR 28.801 Add UC on Self-Optimization of NSI | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171868 | |
S5‑171554 | pCR TR 28.801 Add UC on Self-Healing of NSI | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑171910 | |
S5‑171555 | pCR TR 28.800 Add architecture option to support network slice management | Intel Corporation (UK) Ltd | pCR |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171904 | ||
S5‑171556 | pCR TR 32.864 Add UC on Update of transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑171945 | |
S5‑171557 | pCR TR 32.864 add UC on NS instantiation containing CN VNF and VNF that is part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑171946 | |
S5‑171558 | pCR TR 32 864 Add UC to establish the relation between CN VNF and RAN VNF | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑171947 | |
S5‑171559 | pCR 28.801 Clean-up of introduction clause | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171560 | pCR 28.801 Clean-up of Network Slice Instance lifecycle description | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | ||
S5‑171561 | pCR 28.801 Clean-up of Network slice concepts | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171827 | |
S5‑171562 | pCR 28.801 Clean-up of Network slice subnet concepts | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171846 | |
S5‑171563 | pCR 28.801 Remove invalid UC | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | ||
S5‑171564 | pCR 28.801 Clean-up Use Case for Management support to the network slicing | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171912 | |
S5‑171565 | pCR 28.801 Generalize Use Case for creating NSI | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171913 | |
S5‑171566 | pCR 28.801 Generalize Use Cases for modifying and terminating NSI | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171567 | pCR 28.801 Clean-up Use Case for network slice creation | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | ||
S5‑171568 | pCR 28.801 Clean-up Use Case for changing capacity of a NSI | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171914 | |
S5‑171569 | pCR 28.801 Clean-up Use Case for changing capacity of a NSSI | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | ||
S5‑171570 | pCR 28.801 Clean-up requirements for network slice lifecycle management | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171821 | |
S5‑171571 | pCR 28.801 Clean-up requirements for network slice configuration management | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171820 | |
S5‑171572 | pCR TR 32 864 Add UC on Adding VNFFGs to a NS containing VNF that is part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | ||
S5‑171573 | pCR TR 32 864 Add UC on On-boarding NSD that references the VNFD of virtualized part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | ||
S5‑171574 | pCR TR 32.864 Add potential solutions for instantiating the virtualized part of gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑171948 | |
S5‑171575 | pCR TR 32.864 Add NRM options for gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑171949 | |
S5‑171576 | New WID OAM aspects of LTE and WLAN integration | Intel Corporation (UK) Ltd | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171829 | |
S5‑171577 | TS quality campaign table for first theme | Ericsson LM | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| endorsed | No | |||
S5‑171578 | pCR 28.510-Rapporteur Cleanup | ZTE Corporation | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | ||
S5‑171579 | discussion paper about solution of enabling-disabling auto-scaling | ZTE Corporation | discussion | Endorsement |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171580 | pCR TS 28510 Add enabling-disabling auto-scaling use case and requirement | ZTE Corporation, Nokia | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171581 | pCR TS 28510 Add VNF information sysnchronization use case | ZTE Corporation, Nokia | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171832 | |
S5‑171582 | pCR TS 28511 Add procedure of enable-disable autoscaling through Itf-N | ZTE Corporation, Nokia | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171583 | pCR TS 28511 Add procedure of VNF instance informaiton synchronization | ZTE Corporation, Nokia | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171584 | discussion paper about solution of creating MOI triggering VNF instantiation | ZTE Corporation, Intel | discussion | Endorsement |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171585 | pCR 28.511-Rapporteur's proposal | ZTE Corporation | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171845 | |
S5‑171586 | pCR 28.512-Rapporteur proposal | ZTE Corporation | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | ||
S5‑171587 | pCR TS 28512 Add description of interface definition | ZTE Corporation | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171937 | |
S5‑171588 | R14 CR TS 28.622 Add VNFInfo related attributes in IOC ManagedFunction | ZTE Corporation, Intel | CR | Agreement |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171844 | |
S5‑171589 | pCR to TR 32.857 NRSRP NRSRQ measurements | Cisco Systems Inc. | pCR | Approval |
6.5.7Study on Management aspects of selected IoT-related features
| Yes |
Yes
| revised | No | S5‑171940 | |
S5‑171590 | pCR to TR 32.857 eMTC PM measurements | Cisco Systems Inc. | pCR | Approval |
6.5.7Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | ||
S5‑171591 | pCR to TR 32.865 Clarification of Cell splitting | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| revised | No | S5‑171898 | |
S5‑171592 | pCR to TR 32.865 Clarification of Cell merging | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| revised | No | S5‑171899 | |
S5‑171593 | pCR to TR 32.865 Clarification of Cell shaping.doc | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| revised | No | S5‑171900 | |
S5‑171594 | pCR to TR 32.865 Hybrid SON for AAS | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| noted | No | ||
S5‑171595 | pCR to 28.801 Network slice concepts correction | Cisco Systems Inc. | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171827 | |
S5‑171596 | pCR to 28.801 Information model correction | Cisco Systems Inc. | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171827 | |
S5‑171597 | pCR to 28.801 Information model correction 2 | Cisco Systems Inc. | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171598 | pCR to 28.801 Network slice subnet concept clarification | Cisco Systems Inc. | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑171846 | |
S5‑171599 | pCR to 28.801 Clarification of the SON concepts in network slicing | Cisco Systems Inc. | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171847 | |
S5‑171600 | pCR to 28.801 Key issues clarification | Cisco Systems Inc. | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171863 | |
S5‑171601 | Rel-14 CR 32.260 Introduction of 3GPP Data Off status indication in AS charging | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.7Charging Aspect of 3GPP PS Data off Function
| Yes |
Yes
| revised | No | S5‑171804 | |
S5‑171602 | Rel-14 CR 32.298 Introduction of 3GPP Data Off status indication in AS charging | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.7Charging Aspect of 3GPP PS Data off Function
| Yes |
Yes
| revised | No | S5‑171805 | |
S5‑171603 | Rel-14 CR 32.274 Improve Message flows offline charging for SMS delivery | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| revised | No | S5‑171799 | |
S5‑171604 | Rel-14 CR 32.274 Introduce additional Message flows offline charging for Device Triggering | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| revised | No | S5‑171800 | |
S5‑171605 | Rel-14 CR 32.274 Introduce Message flows online charging for Device Triggering | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| revised | No | S5‑171801 | |
S5‑171606 | Rel-14 CR 32.274 Introduce Message flows online charging for MSISDN-less MO-SMS via T4 | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| revised | No | S5‑171802 | |
S5‑171607 | Rel-14 CR 32.298 Correction in ASN1 syntax | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171807 | |
S5‑171608 | new SID study on network policy management for mobile networks based on NFV scenarios | China Mobile Com. Corporation | SID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171813 | |
S5‑171609 | New Work Item on Charging Enhancement for eFMSS | China Telecom | WID new | Approval |
7.2New Charging Work Item proposals
| Yes |
Yes
| revised | No | S5‑171795 | |
S5‑171610 | Updated Tdoc_template to allow option of reflecting proposed modifications within relevant TS/TR draft document | NEC EUROPE LTD | other | Approval |
5.1Administrative issues at SA5 level
| Yes |
YesTo be clarified further. There were some concerns on having the whole specification acting as a pCR. MCC argued that this would be type DraftTR/TS instead. MCC also recommended to provide input to SA5 working procedures instead of modifying the official 3GPP template. Instead of a cover, the tdoc template could be put on top so as not to have two docs in the pCR file.
| noted | No | ||
S5‑171611 | pCR TR 32.865 Clause 8 - Conclusions | Nokia Corporation | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| revised | No | S5‑171902 | |
S5‑171612 | pCR TR 32.865 Clause 9 - Recommendations | Nokia Corporation | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| revised | No | S5‑171903 | |
S5‑171613 | pCR TR 28.802 Clause 4 - add QMC issue description | Nokia Corporation | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | ||
S5‑171614 | pCR TR 28.802 Clause 4 - add NR and 5GC architecture issue description | Nokia Corporation | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑171938 | |
S5‑171615 | pCR TR 28.802 Add use cases to support management for data storage architectures | Nokia Corporation | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑171939 | |
S5‑171616 | Report of 3GPP-BBF Workshop Feb 18th 2017 | WG Vice Chair (Huawei) | report | Information |
4.3Inter-organizational reports
| Yes |
Yes
| noted | No | ||
S5‑171617 | Revised WID Study on Implementation for the Partitioning of Itf-N | China Mobile Com. Corporation | SID revised |
6.5.3Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| agreed | No | |||
S5‑171618 | Discussion paper addition of MTT PRB usage performance measurements | Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171816 | |
S5‑171619 | Discussion paper addition of IP throughput performance measurements | Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| noted | No | ||
S5‑171620 | Rel-14 CR 32.425 Add MTT PRB performance measurements use case | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑171621 | Rel-14 CR 32.425 Add IP throughput performance measurements use case | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑171622 | pCR 32.866 Clause 6.1 Input on usage of REST APIs in other SDOs | ORANGE | pCR | Agreement |
6.5.8Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| withdrawn | Yes | ||
S5‑171623 | Rel-14 CR 32.260 Implement IMS visited network identifier for S8HR | China Mobile US Research Cente | CR |
7.4.4Charging Aspects of S8 Home Routing Architecture for VoLTE
| Yes |
Yes
| revised | No | S5‑171792 | ||
S5‑171624 | pCR 28.801 Proposal for classifying use cases and requirements | ORANGE, Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑171819 | |
S5‑171625 | Rel-14 CR 32.298 Implement IMS visited network identifier for S8HR | China Mobile US Research Cente | CR |
7.4.4Charging Aspects of S8 Home Routing Architecture for VoLTE
| Yes |
Yes
| revised | No | S5‑171793 | ||
S5‑171626 | Rel-14 CR 32.299 Implement IMS visited network identifier for S8HR | China Mobile US Research Cente | CR |
7.4.4Charging Aspects of S8 Home Routing Architecture for VoLTE
| Yes |
Yes
| revised | No | S5‑171794 | ||
S5‑171627 | Discussion Paper on NAPS Charging | Huawei Technologies | discussion | Information |
7.2New Charging Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑171628 | Discussion on the Analysis of the Charging Support for AULC | Huawei Technologies | discussion | Information |
7.4.5Charging Aspects of Improvements of Awareness of User Location Change (AULC)
| Yes |
Yes
| noted | No | ||
S5‑171629 | Discussion paper on EE work in SA5 | ORANGE | discussion | Discussion |
6.5.1Study on OAM support for assessment of energy efficiency in mobile access networks
| Yes |
Yes
| noted | No | ||
S5‑171630 | R14 CR 32.251 Addition of the subcription operation for AULC | Huawei | CR | Agreement |
7.4.5Charging Aspects of Improvements of Awareness of User Location Change (AULC)
| Yes |
Yes
| revised | No | S5‑171796 | |
S5‑171631 | Discussion on the Charging consideration for 3GPP PS Data Off in Roaming Cases | Huawei | discussion |
7.4.7Charging Aspect of 3GPP PS Data off Function
| Yes |
Yes
| noted | No | |||
S5‑171632 | R14 CR 32.251 Charging enhancement for 3GPP PS Data off in roaming cases | Huawei | CR | Agreement |
7.4.7Charging Aspect of 3GPP PS Data off Function
| Yes |
Yes
| revised | No | S5‑171806 | |
S5‑171633 | pCR 32.866 Clause 6.1 Input on usage of REST APIs in other SDOs | ORANGE, Nokia | pCR | Approval |
6.5.8Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑171942 | |
S5‑171634 | R14 CR 32401-d10 Correction of internal references. Editorial updates. | Ericsson AB | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171817 | |
S5‑171635 | pCR TR 28.801 Adding use case for providing network slice service with guaranteed quality of performance | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171917 | |
S5‑171636 | pCR TR 28.801 Add requirements related to monitor performance | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171977 | |
S5‑171637 | pCR TR 28.801 Adding use case for flexible deploying NSI based on customer’s service requirement | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171918 | |
S5‑171638 | pCR TR 28.801 Adding use case for management data isolation with shared AN andor common CN network functions | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171919 | |
S5‑171639 | pCR TS 28 801 Modify UC management for support frequency spectrum use case | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171920 | |
S5‑171640 | R14 CR TS 28.525 Moving LCM supported use cases and requirements from TS 28.510 | NTT DOCOMO | CR | Agreement |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171877 | |
S5‑171641 | pCR TS 28.510 Removing UC and reqs for unsupported VNF instantiation through Itf-N | NTT DOCOMO | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171642 | pCR TS 28.510 Removing unsupported scaling notification from EM to NM | NTT DOCOMO | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171833 | |
S5‑171643 | pCR TS 28.511 Changing procedure to remove unsupported VNF instantiation indication through Itf-N | NTT DOCOMO | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171644 | pCR TS 28.511 Changing procedure to remove unsupported VNF scaling notification through Itf-N | NTT DOCOMO | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171835 | |
S5‑171645 | pCR TR 28.800 Text proposal on the Management architecture introduction | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171905 | |
S5‑171646 | pCR TR 28.800 Adding management functions of next generation networks and services | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171906 | |
S5‑171647 | pCR TR 28.800 Adding use case and requirements for data collection and reporting | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171907 | |
S5‑171648 | pCR TR 28.800 Adding data collection and reporting function | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | ||
S5‑171649 | pCR TR 28.800 Text proposal on the Management architecture introduction | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| withdrawn | Yes | ||
S5‑171650 | pCR TR 28.800 Adding management functions of next generation networks and services | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| withdrawn | Yes | ||
S5‑171651 | pCR TR 28.800 Adding use case and requirements for data collection and reporting | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| withdrawn | Yes | ||
S5‑171652 | pCR TR 28.800 Adding data collection and reporting function | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| withdrawn | Yes | ||
S5‑171653 | R15 DraftTR 32.899 Skeleton of Study on Charging Aspects of 5G System Architecture Phase 1 | Huawei | draft TR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑171857 | |
S5‑171654 | pCR TR 28.802 Adding use case for signaling based QoE information collection | Huawei | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑171935 | |
S5‑171655 | pCR TR 28.801 Add network slicing related performance measurement data aggregation solution | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171656 | pCR TR 28.801 Add network slicing related alarm data aggregation solution | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171657 | pCR TR 28.801 Add usecase and requirements for configuring CN with slice specific information | Huawei, China Mobile | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171921 | |
S5‑171658 | pCR TR 28.801 Add potential solutions for NST and NSST | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171659 | pCR TR 28.801 Add potential solution for management data isolation when network slice instance is shared by multiple customers | Huawei, CATR | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171660 | pCR TR 28.801 Update on network slice concepts | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑171827 | |
S5‑171661 | pCR TR 28.801 Update on network slice subnet concepts | Huawei, CATT | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑171846 | |
S5‑171662 | pCR TR 28.801 Adding requirements related to lifecycle management | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171930 | |
S5‑171663 | pCR TR 28.801 Update the monitor performance related requirement | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171931 | |
S5‑171664 | pCR TR 28.801 Configuration of RAN transport network related interfaces | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171922 | |
S5‑171665 | pCR TR 28.801 Generic customer service provision procedure | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171666 | pCR TR 28.801 Procedure for nework slice provision | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171667 | pCR TR 28.801 Update types of slices | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171668 | pCR TR 28.801 Add use case and requirements for changing topology of a NSI | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171669 | pCR TR 28.801 Add use case and requirements for changing topology of a NSSI | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171670 | pCR TR 28.801 Update the potential solution for management support to facilitate UE roaming between NSIs in different administrative domain | Huawei, China Unicom | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171671 | pCR TR 28.801 Add potential solution for NSI related service performance measurement | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171672 | pCR TR 28.801 Add potential solution for NSI supervision | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171673 | pCR TR 28.801 Add potential solution for NSI activation | Huawei, China Telecom | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171674 | pCR TR 28.801 Add potential solution for NSI deactivation | Huawei, China Telecom | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171675 | pCR TR 28.801 Add use case and requirements for NSI Self-Healing | Huawei, China Telecom, CATR, CATT | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171910 | |
S5‑171676 | pCR TR 28.801 Add use case and requirements for NSSI Self-Healing | Huawei, China Telecom, CATR | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171911 | |
S5‑171677 | pCR TR 28.801 Add use case and requirements for management support to redundant NSSIs and NSSI constituents | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171678 | pCR TR 28.801 Add use case and requirements for NSI self-optimization | Huawei, China Telecom, CATR, CATT | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171869 | |
S5‑171679 | pCR TR 28.801 Add use case and requirements for NSSI self-optimization | Huawei, China Telecom, CATR | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171908 | |
S5‑171680 | pCR TR 28.801 Add use case and requirements for resource balancing among NSIs | Huawei, China Mobile | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171681 | pCR TR 28.801 Add use case and requirement for network slice priority | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171682 | pCR TR 28.801 Add potential solution of limited level of management exposure for network slicing | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171683 | pCR TR 28.801 Add use case and requirements for NSI reversion | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171684 | pCR TR 28.801 Update potential solution of modifying a NSI | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171685 | pCR TR 28.801 Add requirement for network slice management | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171932 | |
S5‑171686 | pCR TR 28.801 Update SON concept | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171864 | |
S5‑171687 | Discussion on network slicing designing | Huawei | discussion | Discussion |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171688 | pCR TR 28.801 Add UC on management support for RAN self-configuration for an NSI | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑171908 | |
S5‑171689 | pCR TR 28.801 Clean up of multi operator use case | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171951 | |
S5‑171690 | pCR TR 28.801 Add proposed solutions for managed entity lifecycles | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | ||
S5‑171691 | pCR TR 28.801 Improve network slice management functions diagram | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171865 | |
S5‑171692 | pCR TR 32.867 Add use case and requirements for PDN-GW imitated dedicated bearer creation, deletion and modification related measurement in CUPS | Huawei | pCR | Approval |
6.5.10Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| revised | No | S5‑171950 | |
S5‑171693 | pCR TR 32.867 Add use case and requirements for active EPS bearers related measurement in CUPS | Huawei | pCR | Approval |
6.5.10Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| merged | No | S5‑171950 | |
S5‑171694 | pCR TR 32.867 Add use case and requirements for UE requested bearer resource modification related measurements in CUPS | Huawei | pCR | Approval |
6.5.10Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| merged | No | S5‑171950 | |
S5‑171695 | pCR TR 32.867 Add use case and requirements for PDN connections related measurements for EPC in CUPS | Huawei | pCR | Approval |
6.5.10Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| merged | No | S5‑171950 | |
S5‑171696 | pCR TS 28.301 Modify use cases for LSA scenario 2 | TELECOM ITALIA S.p.A. | pCR | Approval |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| revised | No | S5‑171880 | |
S5‑171697 | pCR TS 28.302 LSACell attributes | TELECOM ITALIA S.p.A. | pCR | Approval |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| revised | No | S5‑171881 | |
S5‑171698 | pCR 28.801 Proposed note on roles Network Operator and Communication Service Provider | ORANGE | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171982 | |
S5‑171699 | R15 pCR 32.899 Study on Charging Aspects of 5G System-References | Huawei | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑171858 | |
S5‑171700 | R15 pCR 32.899 Study on Charging Aspects of 5G System-Scope | Huawei | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑171859 | |
S5‑171701 | R14 CR 32.299 Correction on the description of AVPs | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| Yes |
Yes
| revised | No | S5‑171787 | |
S5‑171702 | R14 CR 32.277 Addition of the triggers and description for ProSe Direct Communication charging | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| Yes |
Yes
| revised | No | S5‑171788 | |
S5‑171703 | R14 CR 32.277 Addition of the fields for ProSe one-to-one communication charging | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| Yes |
Yes
| revised | No | S5‑171790 | |
S5‑171704 | R14 CR 32.298 Addition of the fileds for ProSe one-to-one communication Charging | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| Yes |
Yes
| revised | No | S5‑171791 | |
S5‑171705 | Rel-15 pCR 32.899 TR skeleton update | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑171861 | |
S5‑171706 | [Draft]LSOut to SA2 for TDF support of Presence Reporting Area | Huawei | LS out | Approval |
7.1Charging Plenary
| Yes |
Yes
| revised | No | S5‑171783 | |
S5‑171707 | LSOut to CT1 for support of ProSe Direct one-to-one Communication charging | Huawei | LS out | Agreement |
7.1Charging Plenary
| Yes |
Yes
| revised | No | S5‑171784 | |
S5‑171708 | pCR 28.302 Add System Context for scenario 2 | Nokia | pCR |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| revised | No | S5‑171882 | ||
S5‑171709 | pCR 28.302 Add model for scenario 2 | Nokia | pCR |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| revised | No | S5‑171884 | ||
S5‑171710 | pCR 28.302 Add operations and notifications allowing the NM to get LSRAI from the LC | Nokia | pCR |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| revised | No | S5‑171885 | ||
S5‑171711 | pCR 28.302 Add operations and notifications allowing the LC to get LSRAI confirmation from the NM | Nokia | pCR |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| revised | No | S5‑171886 | ||
S5‑171712 | Discussion on use cases and definition for average number of active UEs | China Telecom, Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171933 | |
S5‑171713 | Rel-14 CR 32.425 Add use cases and definition for average number of active UEs | China Telecom, Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑171714 | pCR 32.869 Update of Scope and References | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑171852 | |
S5‑171715 | pCR 32.869 Update of Definitions, symbols and abbreviations | Ericsson LM | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑171853 | |
S5‑171716 | pCR 32.869 Update of Introduction | Ericsson LM | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑171854 | |
S5‑171717 | Rel-14 CR TS 32.240 Correction of TF abbreviation | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑171718 | Rel-14 CR TS 32.260 Correction of TRF description | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171808 | |
S5‑171719 | Rel-14 CR TS 32.299 Correction of IMEI and IMEISV handling | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171809 | |
S5‑171720 | Rel-14 CR TS 32.298 Correction of IMEI and IMEISV handling | Ericsson LM | CR | Approval |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| noted | No | ||
S5‑171721 | Rel-14 CR TS 32.276 Correction of ISUP Cause not shown as grouped | Ericsson LM | CR | Approval |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171722 | Rel-14 CR TS32.299 Correction of ISUP Cause naming | Ericsson LM | CR | Approval |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171849 | |
S5‑171723 | Rel-14 CR TS 32.299 Adding Unused Quota timer to CCA | Ericsson LM | CR | Approval |
7.4.1Resource optimization for PS domain online charging sessions
| Yes |
Yes
| revised | No | S5‑171785 | |
S5‑171724 | Key issues for Charging Aspects of 5G System Architecture Phase 1 | Ericsson LM | other | Discussion |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| noted | No | ||
S5‑171725 | Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | ORANGE | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171814 | |
S5‑171726 | Skeleton proposal for TS 28.xxx IRP Requirements | ORANGE | other | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171960 | |
S5‑171727 | Skeleton proposal for TS 28.yyy IRP IS | ORANGE | other | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171961 | |
S5‑171728 | Liaison Statement from NGMN Alliance Project NWMO to SA5 on creation of "5G Network and Service Management including Orchestration" | NGMN | LS in |
5.3Liaison statements at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑171729 | Reply LS rom CT1 to the progress of QoE Measurement Collection for Streaming to RAN3, SA4, SA5 and CT1 | C1-170510 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑171730 | Reply LS from CT1 cc SA5 to the progress of QoE Measurement Collection for Streaming | C1-171221 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑171731 | LS from CT4 to SA5 on Trace management aspects for CUPS | C4-171416 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑171732 | LS from CT4 to SA5 on Online and Offline Charging support with Control and User Plane Separation | C4-171455 | LS in |
7.1Charging Plenary
| Yes |
Yes
| replied to | No | |||
S5‑171733 | Liaison to 3GPP SA5 in response to S5-166351, and S5-171384 | ETSI TC EE | LS in |
6.5.1Study on OAM support for assessment of energy efficiency in mobile access networks
| Yes |
Yes
| noted | No | |||
S5‑171734 | LS from ONF to SA5 "For information: Publication of ONF TR-540: Orchestration: A More Holistic View" | Open Networking Foundation (ONF) | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesNokia commented that the link shows a specific set of requirements on orchestration that need to be taken account by SA5: they should be accepted, rejected or ignored.
Nokia proposed to keep this LS open in order to analyze it.
It was decided to postpone it to check the document.
| postponed | No | |||
S5‑171735 | LS Reply from ETSI NFV to 3GPP SA5 on NFV Support to Network Slicing Management | ETSI ISG NFV | LS in |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171736 | Reply LS from RAN2 to the progress of QoE Measurement Collection for Streaming to RAN3, SA4, SA5 and CT1 | R2-1702095 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑171737 | Reply LS from RAN2 to SA5 on the progress of QoE Measurement Collection for Streaming | R2-1702096 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑171738 | LS on the progress of QoE Measurement Collection for Streaming to RAN3, SA4, SA5 and CT1 | R2-1702098 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| postponed | No | |||
S5‑171739 | Reply to SA5 on the reply LS on Flexible eNB-ID and Cell-ID in E-UTRAN | R3-170850 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑171740 | Resubmitted LS reply from ATIS to SA5 on "Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network" | Alliance for Telecommunications Industry Solutions (ATIS) | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑171741 | LS from ETSI TC RRS to SA5 on Finalization and approval of TS 103 379 (LSA protocols and information elements) | ETSI TC RRS | LS in |
5.3Liaison statements at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑171742 | LS from SA2 cc SA5 on standardization of Northbound SCEF API | S2-170647 | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesMaryse (Nokia) commented that this topic was being discussed in the Charging SWG.
| noted | No | |||
S5‑171743 | Reply LS from SA2 to SA5 on charging support for V2X Communication | S2-171349 | LS in |
7.1Charging Plenary
| Yes |
Yes
| noted | No | |||
S5‑171744 | LS from SA3-LI to SA5 on Use of the long-term identities for Charging in the VPLMN for 5G | S3i170043 | LS in |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| replied to | No | |||
S5‑171745 | LS from SA4 to SA5 on the progress of QoE Measurement Collection for Streaming | S4-170157 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑171746 | LS from SA4 ccSA5 SA5 on Reply LS on the progress of QoE Measurement Collection for Streaming | S4-170188 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑171747 | Resubmitted LS from ITU-T to SA5 on seeking collaboration on draft Recommendation "Energy efficiency Metrics and measurement methodology for 5G solutions" | ITU-T Study Group 5 | LS in |
6.5.1Study on OAM support for assessment of energy efficiency in mobile access networks
| Yes |
Yes
| postponed | No | |||
S5‑171748 | Reply LS from TSG SA to SA5 on management of network slices for transport and virtualization aspects | SP-170276 | LS in |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171749 | Resubmitted LS from SA2 to SA5-CH on implication on charging from eFMSS | S2-164279 | LS in |
7.1Charging Plenary
| Yes |
Yes
| replied to | No | |||
S5‑171750 | Resubmitted Response from SA2 to SA5 on the clarification of the definition of NSI and the relation to NST (S2-170035/S5-166479) | S2-170598 | LS in |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171751 | LS reply to ATIS NRSC on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” | ORANGE, Huawei | LS out | Approval |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑171812 | |
S5‑171752 | pCR 32.866 Add common principles and design patterns | Nokia | pCR |
6.5.8Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑171943 | ||
S5‑171753 | pCR TR 28.801 Add general network slice management requirements to Clause 6 | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171934 | ||
S5‑171754 | pCR TR 28 801 Draft conclusions and recommendations | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | |||
S5‑171755 | pCR TR 28 801 Rapporteur update on network slice subnet consistency | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | |||
S5‑171756 | pCR TR 28 801 Rapporteur update on requirements | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171757 | pCR TR 28 801 Rapporteur update on use cases | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171819 | ||
S5‑171758 | pCR TR 28 801 Rapporteur update text alignment shared and dedicated | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171825 | ||
S5‑171759 | pCR TR 28 801 Use case and requirements for NSS capability exposure | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171928 | ||
S5‑171760 | pCR TR 28.801 Update use case and requirements for activation and de-activation of a NSSI | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171761 | pCR TR 28.801 Update use case and requirements for change capacity of a NSSI | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171762 | CR TS 28.525 VNF application software update | Gemalto N.V. | CR | Approval |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171878 | |
S5‑171763 | pCR TR 28.801 Update use case and requirements for creation and termination of NSSI | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171764 | pCR TR 28.801 Update use case and requirements for modification of a NSSI | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171765 | pCR TR 28 801 Network slicing solution description | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| not treated | No | |||
S5‑171766 | pCR TR 28 801 Description of the meaning of completeness | Ericsson LM | pCR |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | |||
S5‑171767 | Sequence proposal for network slicing 6.5.5 | Ericsson LM | other |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171818 | ||
S5‑171768 | Rel-15 pCR 32.899 TR skeleton update | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| No |
Yes
| withdrawn | Yes | ||
S5‑171769 | Rel-15 pCR 32.899 Scope | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| merged | No | S5‑171859 | |
S5‑171770 | Rel-15 pCR 32.899 High level charging requirements | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑171888 | |
S5‑171771 | Rel-15 pCR 32.899 Session management - PDU session | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑171889 | |
S5‑171772 | Discussion paper on process for CRs to TS 32.298 for ASN.1 validation | Nokia, Alcatel-Lucent Shanghai Bell | discussion | Approval |
8Any Other Business
| Yes |
Yes
| noted | No | ||
S5‑171773 | Rel-14 CR 32.274 Introduce new CDR for Device Triggering | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| revised | No | S5‑171803 | |
S5‑171774 | pCR R14 28.802 QoE use cases, requirement and solution for collection from individual UE | Ericsson | pCR |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| merged | No | S5‑171935 | ||
S5‑171775 | pCR R14 28.802 QoE conclusions and recommendations | Ericsson | pCR |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑171936 | ||
S5‑171776 | New WID on Management of QoE data collection | Ericsson LM | WID new |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171815 | ||
S5‑171777 | pCR TR 28.802 Add use case to support management for AMF group | Nokia Corporation | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑171778 | Report from SA5#111Bis | MCC | report |
4.1Last SA5 meeting report
| Yes |
Yes
| approved | No | |||
S5‑171779 | 5G Network and Service Management including Orchestration | Cisco,Deutsche Telekom | other | Presentation |
4.3Inter-organizational reports
| Yes |
Yes
| noted | No | ||
S5‑171780 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑171504 | |
S5‑171781 | Reply to: LS from CT4 to SA5 on Online and Offline Charging support with Control and User Plane Separation | Nokia | LS out | approval |
7.1Charging Plenary
| Yes |
Yes
| approved | No | ||
S5‑171782 | Reply to LS from SA2 to SA5-CH on implication on charging from eFMSS | China Telecom | LS out | Approval |
7.1Charging Plenary
| Yes |
Yes
| revised | No | S5‑172002 | |
S5‑171783 | LS on TDF support of Presence Reporting Area | Huawei | LS out | Approval |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| approved | No | S5‑171706 | |
S5‑171784 | LSOut to CT1 for support of ProSe Direct one-to-one Communication charging | Huawei | LS out | Approval |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| approved | No | S5‑171707 | |
S5‑171785 | Rel-14 CR TS 32.299 Adding Unused Quota timer to CCA | Ericsson LM | CR | Approval |
7.4.1Resource optimization for PS domain online charging sessions
| Yes |
Yes
| agreed | No | S5‑171723 | |
S5‑171786 | Rel-14 CR TS 32.251 Adding Unused Quota timer to CCA | Ericsson | CR | Agreement |
7.4.1Resource optimization for PS domain online charging sessions
| Yes |
Yes
| agreed | No | ||
S5‑171787 | R14 CR 32.299 Correction on the description of AVPs | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| Yes |
Yes
| agreed | No | S5‑171701 | |
S5‑171788 | R14 CR 32.277 Addition of the triggers and description for ProSe Direct Communication charging | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| Yes |
Yes
| agreed | No | S5‑171702 | |
S5‑171789 | R14 CR 32.277 Charging information for ProSe Direct Communication charging | Huawei | CR | Agreement |
7.4.1Resource optimization for PS domain online charging sessions
| Yes |
Yes
| agreed | No | ||
S5‑171790 | R14 CR 32.277 Addition of the fields for ProSe one-to-one communication charging | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| Yes |
Yes
| agreed | No | S5‑171703 | |
S5‑171791 | R14 CR 32.298 Addition of the fileds for ProSe one-to-one communication Charging | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| Yes |
Yes
| revised | No | S5‑171896 | S5‑171704 |
S5‑171792 | Rel-14 CR 32.260 Implement IMS visited network identifier for S8HR | China Mobile US Research Cente | CR | - |
7.4.4Charging Aspects of S8 Home Routing Architecture for VoLTE
| Yes |
Yes
| agreed | No | S5‑171623 | |
S5‑171793 | Rel-14 CR 32.298 Implement IMS visited network identifier for S8HR | China Mobile US Research Cente | CR | - |
7.4.4Charging Aspects of S8 Home Routing Architecture for VoLTE
| Yes |
Yes
| agreed | No | S5‑171625 | |
S5‑171794 | Rel-14 CR 32.299 Implement IMS visited network identifier for S8HR | China Mobile US Research Cente | CR | - |
7.4.4Charging Aspects of S8 Home Routing Architecture for VoLTE
| Yes |
Yes
| agreed | No | S5‑171626 | |
S5‑171795 | New Work Item on Charging Enhancement for eFMSS | China Telecom | WID new | Approval |
7.2New Charging Work Item proposals
| Yes |
Yes
| revised | No | S5‑171893 | S5‑171609 |
S5‑171796 | R14 CR 32.251 Addition of the subcription operation for AULC | Huawei | CR | Agreement |
7.4.5Charging Aspects of Improvements of Awareness of User Location Change (AULC)
| Yes |
Yes
| agreed | No | S5‑171630 | |
S5‑171797 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | Rapporteur (Nokia Networks) | report | - |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | S5‑171526 | |
S5‑171798 | LS to SA2 on Support of PRA for OCS | Huawei | LS out | Approval |
7.4.5Charging Aspects of Improvements of Awareness of User Location Change (AULC)
| Yes |
Yes
| approved | No | ||
S5‑171799 | Rel-14 CR 32.274 Improve Message flows offline charging for SMS delivery | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| agreed | No | S5‑171603 | |
S5‑171800 | Rel-14 CR 32.274 Introduce additional Message flows offline charging for Device Triggering | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| agreed | No | S5‑171604 | |
S5‑171801 | Rel-14 CR 32.274 Introduce Message flows online charging for Device Triggering | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| agreed | No | S5‑171605 | |
S5‑171802 | Rel-14 CR 32.274 Introduce Message flows online charging for MSISDN-less MO-SMS via T4 | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| agreed | No | S5‑171606 | |
S5‑171803 | Rel-14 CR 32.274 Introduce new CDR for Device Triggering | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.8Charging for SMS via T4
| Yes |
Yes
| agreed | No | S5‑171773 | |
S5‑171804 | Rel-14 CR 32.260 Introduction of 3GPP Data Off status indication in AS charging | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.7Charging Aspect of 3GPP PS Data off Function
| Yes |
Yes
| agreed | No | S5‑171601 | |
S5‑171805 | Rel-14 CR 32.298 Introduction of 3GPP Data Off status indication in AS charging | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.7Charging Aspect of 3GPP PS Data off Function
| Yes |
Yes
| revised | No | S5‑171897 | S5‑171602 |
S5‑171806 | R14 CR 32.251 Additional charging trigger for 3GPP PS Data off | Huawei | CR | Agreement |
7.4.7Charging Aspect of 3GPP PS Data off Function
| Yes |
Yes
| agreed | No | S5‑171632 | |
S5‑171807 | Rel-14 CR 32.298 Correction in ASN1 syntax | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171894 | S5‑171607 |
S5‑171808 | Rel-14 CR TS 32.260 Correction of TRF description | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑171718 | |
S5‑171809 | Rel-14 CR TS 32.299 Correction of IMEI and IMEISV handling | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | S5‑171719 | |
S5‑171810 | Rel-14 CR TS 32.251 Correction of IMEI and IMEISV handling | Ericsson | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑171811 | Reply to: LS from CT4 to SA5 on Trace management aspects for CUPS | Huawei | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑171956 | |
S5‑171812 | LS reply to ATIS NRSC on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” | ORANGE, Huawei | LS out | Approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | S5‑171751 | |
S5‑171813 | new WID study on network policy management for mobile networks based on NFV scenarios | China Mobile Com. Corporation | SID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171957 | S5‑171608 |
S5‑171814 | Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | ORANGE | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑171725 | |
S5‑171815 | New WID on Management of QoE data collection | Ericsson LM | WID new | - |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171962 | S5‑171776 |
S5‑171816 | Discussion paper addition of MTT PRB usage performance measurements | Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171959 | S5‑171618 |
S5‑171817 | R14 CR 32401-d10 Correction of internal references. | Ericsson AB | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑171634 | |
S5‑171818 | Sequence proposal for network slicing 6.5.5 | Ericsson LM | other | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171875 | S5‑171767 |
S5‑171819 | Rapporteur update on use cases | Ericsson LM | discussion | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171874 | S5‑171757 |
S5‑171820 | pCR 28.801 Clean-up requirements for network slice configuration management | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171571 | |
S5‑171821 | pCR 28.801 Clean-up requirements for network slice lifecycle management | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171570 | |
S5‑171822 | discussion sequence proposal | ZTE | other | Information |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | ||
S5‑171823 | Reorganization of requirements | Ericsson | discussion | Endorsement |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171824 | Update of requirements | Ericsson | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171825 | pCR TR 28 801 Rapporteur update text alignment shared and dedicated | Ericsson LM | pCR | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171871 | S5‑171758 |
S5‑171826 | pCR 28.801 Clean-up of Network Slice Instance lifecycle description | Nokia,Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171827 | pCR 28.801 Clean-up of Network slice concepts | Nokia,Huawei,Cisco | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | S5‑171561 | |
S5‑171828 | Deliverables due for the NEXT SA Plenary | ETSI Secretariat | other | - |
5.5Review of the Work Plan
| No |
No
| withdrawn | Yes | ||
S5‑171829 | New SID Study on OAM aspects of LTE and WLAN integration | Intel Corporation (UK) Ltd | SID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑171576 | |
S5‑171830 | Add UC on querying MO attributes that may trigger VNF scaling | Intel Corporation (UK) Ltd | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| No |
No
| withdrawn | Yes | ||
S5‑171831 | Draft TS 28.510 | ZTE | draft TS | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | ||
S5‑171832 | pCR TS 28510 Add VNF information sysnchronization use case | ZTE Corporation, Nokia | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | S5‑171581 | |
S5‑171833 | pCR TS 28.510 Removing unsupported scaling notification from EM to NM | NTT DOCOMO | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | S5‑171642 | |
S5‑171834 | pCR TS 28511 Add procedure of VNF instance informaiton synchronization | ZTE Corporation, Nokia | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| No |
No
| withdrawn | Yes | ||
S5‑171835 | pCR TS 28.511 Changing procedure to remove unsupported VNF scaling notification through Itf-N | NTT DOCOMO | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | S5‑171644 | |
S5‑171836 | SA5 results at last SA meeting | WG Chairman | report | - |
4.2Last SA meeting report
| Yes |
Yes
| noted | No | S5‑171503 | |
S5‑171837 | Draft TS 28.512 | ZTE | draft TS | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | ||
S5‑171838 | Rel-8 32.401 Correction of internal reference | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171839 | Rel-9 32.401 Correction of internal reference | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171840 | Rel-10 32.401 Correction of internal reference | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171841 | Rel-11 32.401 Correction of internal reference | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171842 | Rel-12 32.401 Correction of internal reference | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171843 | Rel-13 32.401 Correction of internal reference | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171844 | R14 CR TS 28.622 Add VNFInfo related attributes in IOC ManagedFunction | ZTE Corporation, Intel | CR | Agreement |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| not pursued | No | S5‑171588 | |
S5‑171845 | pCR 28.511-Rapporteur's proposal | ZTE Corporation | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | S5‑171585 | |
S5‑171846 | pCR 28.801 Clean-up of Network slice subnet concepts | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171975 | S5‑171562 |
S5‑171847 | pCR to 28.801 Clarification of the SON concepts in network slicing | Cisco Systems Inc. | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171599 | |
S5‑171848 | Rel-14 CR TS 32.260 Correction of IMEI and IMEISV handling | Ericsson | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑171849 | Rel-12 CR TS32.299 Correction of ISUP Cause naming | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑171722 | |
S5‑171850 | Rel-13 CR TS32.299 Correction of ISUP Cause naming | Ericsson | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171851 | Rel-14 CR TS32.299 Correction of ISUP Cause naming | Ericsson | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑171852 | pCR 32.869 Update of Scope and References | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑171714 | |
S5‑171853 | pCR 32.869 Update of Definitions, symbols and abbreviations | Ericsson LM | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑171715 | |
S5‑171854 | pCR 32.869 Update of Introduction | Ericsson LM | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑171716 | |
S5‑171855 | Draft TR 32.869 | Ericsson | draft TR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| No |
Yes
| left for email approval | No | ||
S5‑171856 | SID on Overload Control for Diameter Charging Applications | Ericsson | SID revised | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| agreed | No | ||
S5‑171857 | R15 DraftTR 32.899 Skeleton of Study on Charging Aspects of 5G System Architecture Phase 1 | Huawei | draft TR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑171653 | |
S5‑171858 | R15 pCR 32.899 Study on Charging Aspects of 5G System-References | Huawei | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑171699 | |
S5‑171859 | R15 pCR 32.899 Study on Charging Aspects of 5G System-Scope | Huawei | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑171700 | |
S5‑171860 | Work Plan for Study TR 32.899 | Nokia | discussion | Endorsement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑171891 | |
S5‑171861 | Rel-15 pCR 32.899 TR skeleton update | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑171705 | |
S5‑171862 | New WID study on charging in CUPS architecture | Ericsson | WID new | Agreement |
7.1Charging Plenary
| Yes |
Yes
| noted | No | ||
S5‑171863 | pCR to 28.801 Key issues clarification | Cisco Systems Inc. | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171600 | |
S5‑171864 | pCR TR 28.801 Update SON concept | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171981 | S5‑171686 |
S5‑171865 | pCR TR 28.801 Improve network slice management functions diagram | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171691 | |
S5‑171866 | pCR TR 28.801 Add UC on Self-Creation of NSI | Intel Corporation (UK) Ltd | pCR | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | S5‑171551 | |
S5‑171867 | pCR TR 28.801 Add UC on Self-reconfiguration of NSI | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171552 | |
S5‑171868 | pCR TR 28.801 Add UC on Self-Optimization of NSI | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171915 | S5‑171553 |
S5‑171869 | pCR TR 28.801 Add use case and requirements for NSI self-optimization | Huawei, China Telecom, CATR, CATT | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| merged | No | S5‑171915 | S5‑171678 |
S5‑171870 | Draft TR 28.801 | Ericsson | draft TR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
Yes
| left for email approval | No | ||
S5‑171871 | pCR TR 28 801 Rapporteur update text alignment shared and dedicated | Ericsson LM | pCR | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171825 | |
S5‑171872 | Draft TS 28.520 | Intel | draft TS | Approval |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | ||
S5‑171873 | pCR TS 28.520 delete unused requirement and change requirement reference | Intel Corporation (UK) Ltd | pCR | Decision |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | S5‑171545 | |
S5‑171874 | Rapporteur update on use cases | Ericsson LM | discussion | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| endorsed | No | S5‑171819 | |
S5‑171875 | Sequence proposal for network slicing 6.5.5 | Ericsson LM | other | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | S5‑171818 | |
S5‑171876 | pCR TS 28.520 Correction of NFV PM UCs | Intel Corporation (UK) Ltd | pCR | Approval |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | S5‑171550 | |
S5‑171877 | R14 CR TS 28.525 Moving LCM supported use cases and requirements from TS 28.510 | NTT DOCOMO | CR | Agreement |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| agreed | No | S5‑171640 | |
S5‑171878 | CR TS 28.525 VNF application software update | Gemalto N.V. | CR | Approval |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| revised | No | S5‑171958 | S5‑171762 |
S5‑171879 | Report from breakout session | Nokia | report | Information |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | ||
S5‑171880 | pCR TS 28.301 Modify use cases for LSA scenario 2 | TELECOM ITALIA S.p.A. | pCR | Approval |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| approved | No | S5‑171696 | |
S5‑171881 | pCR TS 28.302 LSACell attributes | TELECOM ITALIA S.p.A. | pCR | Approval |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| approved | No | S5‑171697 | |
S5‑171882 | pCR 28.302 Add System Context for scenario 2 | Nokia | pCR | - |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| approved | No | S5‑171708 | |
S5‑171883 | pCR TS 28.520 correct the requirement references in the tracibility field | Intel Corporation (UK) Ltd | pCR | Approval |
6.4.1.4Performance management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | S5‑171544 | |
S5‑171884 | pCR 28.302 Add model for scenario 2 | Nokia | pCR | - |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| revised | No | S5‑171969 | S5‑171709 |
S5‑171885 | pCR 28.302 Add operations and notifications allowing the NM to get LSRAI from the LC | Nokia | pCR | - |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| approved | No | S5‑171710 | |
S5‑171886 | pCR 28.302 Add operations and notifications allowing the LC to get LSRAI confirmation from the NM | Nokia | pCR | - |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| approved | No | S5‑171711 | |
S5‑171887 | Cover sheet TR 32.856 | ORANGE | TS or TR cover | Approval |
6.5.1Study on OAM support for assessment of energy efficiency in mobile access networks
| Yes |
Yes
| approved | No | ||
S5‑171888 | Rel-15 pCR 32.899 High level charging requirements | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑171770 | |
S5‑171889 | Rel-15 pCR 32.899 Session management - PDU session | Nokia, Alcatel-Lucent Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑171771 | |
S5‑171890 | Reply LS to LS from SA3-LI to SA5 on Use of the long-term identities for Charging in the VPLMN for 5G | Ericsson | LS out | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑171891 | Work Plan for Study TR 32.899 | Nokia | discussion | Endorsement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| noted | No | S5‑171860 | |
S5‑171892 | Draft TR 32.899 | Huawei | draft TR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| No |
Yes
| left for email approval | No | ||
S5‑171893 | New Work Item on Charging Enhancement for eFMSS | China Telecom | WID new | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| No |
Yes
| left for email approval | No | S5‑171795 | |
S5‑171894 | Rel-14 CR 32.298 Correction in ASN1 syntax | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| No |
Yes
| left for email approval | No | S5‑171807 | |
S5‑171895 | New Work Item on Charging Enhancement for eFMSS | China Telecom | WID new | Approval |
7.2New Charging Work Item proposals
| No |
No
| withdrawn | Yes | ||
S5‑171896 | R14 CR 32.298 Addition of the fileds for ProSe one-to-one communication Charging | Huawei | CR | Agreement |
7.4.3Charging Aspects of Enhanced Proximity-based Services
| No |
Yes
| left for email approval | No | S5‑171791 | |
S5‑171897 | Rel-14 CR 32.298 Introduction of 3GPP Data Off status indication in AS charging | Nokia, Alcatel-Lucent Shanghai Bell | CR | Agreement |
7.4.7Charging Aspect of 3GPP PS Data off Function
| No |
Yes
| left for email approval | No | S5‑171805 | |
S5‑171898 | pCR to TR 32.865 Clarification of Cell splitting | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| revised | No | S5‑171952 | S5‑171591 |
S5‑171899 | pCR to TR 32.865 Clarification of Cell merging | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| revised | No | S5‑171953 | S5‑171592 |
S5‑171900 | pCR to TR 32.865 Clarification of Cell shaping.doc | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| revised | No | S5‑171954 | S5‑171593 |
S5‑171901 | pCR to TR 32.865 Hybrid SON for AAS | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| No |
No
| withdrawn | Yes | ||
S5‑171902 | pCR TR 32.865 Clause 8 - Conclusions | Nokia Corporation | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| approved | No | S5‑171611 | |
S5‑171903 | pCR TR 32.865 Clause 9 - Recommendations | Nokia Corporation | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| approved | No | S5‑171612 | |
S5‑171904 | pCR TR 28.800 Add architecture option to support network slice management | Intel Corporation (UK) Ltd | pCR | - |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171971 | S5‑171555 |
S5‑171905 | pCR TR 28.800 Text proposal on the Management architecture introduction | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171972 | S5‑171645 |
S5‑171906 | pCR TR 28.800 Adding management functions of next generation networks and services | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171973 | S5‑171646 |
S5‑171907 | pCR TR 28.800 Adding use case and requirements for data collection and reporting | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171974 | S5‑171647 |
S5‑171908 | pCR TR 28.801 Add use case and requirements for NSSI self-optimization | Huawei, Intel, CATT, CATR, China Telecom | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171679 | |
S5‑171909 | pCR TR 28.801 Add UC on Self-Healing of NSI | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171910 | pCR TR 28.801 Add use case and requirements for NSI Self-Healing | Huawei, Intel, CATT, CATR, China Telecom | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171675 | |
S5‑171911 | pCR TR 28.801 Add use case and requirements for NSSI Self-Healing | Huawei, Intel, CATT, CATR, China Telecom | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171676 | |
S5‑171912 | pCR 28.801 Clean-up Use Case for Management support to the network slicing | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171564 | |
S5‑171913 | pCR 28.801 Generalize Use Case for creating NSI | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171916 | S5‑171565 |
S5‑171914 | pCR 28.801 Clean-up Use Case for changing capacity of a NSI | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171976 | S5‑171568 |
S5‑171915 | pCR TR 28.801 Add UC on Self-Optimization of NSI | Huawei, Intel, CATT, CATR, China Telecom | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171868 | |
S5‑171916 | pCR 28.801 Generalize Use Case for creating NSI | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171913 | |
S5‑171917 | pCR TR 28.801 Adding use case for providing network slice service with guaranteed quality of performance | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171635 | |
S5‑171918 | pCR TR 28.801 Adding use case for flexible deploying NSI based on customer’s service requirement | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171637 | |
S5‑171919 | pCR TR 28.801 Adding use case for management data isolation with shared AN andor common CN network functions | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171638 | |
S5‑171920 | pCR TS 28 801 Modify UC management for support frequency spectrum use case | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171999 | S5‑171639 |
S5‑171921 | pCR TR 28.801 Add usecase and requirements for configuring CN with slice specific information | Huawei, China Mobile | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171978 | S5‑171657 |
S5‑171922 | pCR TR 28.801 Configuration of RAN transport network related interfaces | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171979 | S5‑171664 |
S5‑171923 | pCR TR 28.801 Add use case and requirements for changing topology of a NSI | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171924 | pCR TR 28.801 Add use case and requirements for changing topology of a NSSI | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171925 | pCR TR 28.801 Add use case and requirements for management support to redundant NSSIs and NSSI constituents | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171926 | pCR TR 28.801 Add use case and requirements for resource balancing among NSIs | Huawei, China Mobile | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171927 | pCR TR 28.801 Add use case and requirement for network slice priority | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
No
| withdrawn | Yes | ||
S5‑171928 | pCR TR 28 801 Use case and requirements for NSS capability exposure | Ericsson LM | pCR | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| noted | No | S5‑171759 | |
S5‑171929 | Discussion paper on supporting selection of EM in VNF instantiation | Intel Corporation (UK) Ltd | discussion | Endorsement |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| noted | No | S5‑171549 | |
S5‑171930 | pCR TR 28.801 Adding requirements related to lifecycle management | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171662 | |
S5‑171931 | pCR TR 28.801 Update the monitor performance related requirement | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171663 | |
S5‑171932 | pCR TR 28.801 Add requirement for network slice management | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑171980 | S5‑171685 |
S5‑171933 | Discussion on use cases and definition for average number of active UEs | China Telecom, Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171964 | S5‑171712 |
S5‑171934 | pCR TR 28.801 Add general network slice management requirements to Clause 6 | Ericsson LM | pCR | - |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171753 | |
S5‑171935 | pCR TR 28.802 Adding use case for signaling based QoE information collection | Huawei,Ericsson | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑171654 | |
S5‑171936 | pCR R14 28.802 QoE conclusions and recommendations | Ericsson | pCR | - |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑171775 | |
S5‑171937 | pCR TS 28512 Add description of interface definition | ZTE Corporation | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| approved | No | S5‑171587 | |
S5‑171938 | pCR TR 28.802 Clause 4 - add NR and 5GC architecture issue description | Nokia Corporation | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑171614 | |
S5‑171939 | pCR TR 28.802 Add use cases to support management for data storage architectures | Nokia Corporation | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑171984 | S5‑171615 |
S5‑171940 | pCR to TR 32.857 NRSRP NRSRQ measurements | Cisco Systems Inc. | pCR | Approval |
6.5.7Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | S5‑171589 | |
S5‑171941 | Draft TR 32.857 | Cisco | draft TR | Approval |
6.5.7Study on Management aspects of selected IoT-related features
| No |
Yes
| left for email approval | No | ||
S5‑171942 | pCR 32.866 Clause 6.1 Input on usage of REST APIs in other SDOs | ORANGE, Nokia | pCR | Approval |
6.5.8Study on a RESTful HTTP-based Solution Set
| No |
Yes
| left for email approval | No | S5‑171633 | |
S5‑171943 | pCR 32.866 Add common principles and design patterns | Nokia | pCR | - |
6.5.8Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑171752 | |
S5‑171944 | R14 CR TS 28.622 add auto-scaling switch in IOCManagedFunction | ZTE | CR | Agreement |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| Yes |
Yes
| not pursued | No | ||
S5‑171945 | pCR TR 32.864 Add UC on Update of transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑171987 | S5‑171556 |
S5‑171946 | pCR TR 32.864 add UC on NS instantiation containing CN VNF and VNF that is part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑171988 | S5‑171557 |
S5‑171947 | pCR TR 32 864 Add UC to establish the relation between CN VNF and RAN VNF | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑171989 | S5‑171558 |
S5‑171948 | pCR TR 32.864 Add potential solutions for instantiating the virtualized part of gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑171574 | |
S5‑171949 | pCR TR 32.864 Add NRM options for gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑171575 | |
S5‑171950 | pCR TR 32.867 Add use case and requirements for PDN-GW imitated dedicated bearer creation, deletion and modification related measurement in CUPS | Huawei | pCR | Approval |
6.5.10Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| revised | No | S5‑171990 | S5‑171692 |
S5‑171951 | pCR TR 28.801 Clean up of multi operator use case | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171689 | |
S5‑171952 | pCR to TR 32.865 Clarification of Cell splitting | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| approved | No | S5‑171898 | |
S5‑171953 | pCR to TR 32.865 Clarification of Cell merging | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| approved | No | S5‑171899 | |
S5‑171954 | pCR to TR 32.865 Clarification of Cell shaping.doc | Cisco Systems Inc. | pCR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| Yes |
Yes
| approved | No | S5‑171900 | |
S5‑171955 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑171535 | |
S5‑171956 | Reply to: LS from CT4 to SA5 on Trace management aspects for CUPS | Huawei | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | S5‑171811 | |
S5‑171957 | new WID study on network policy management for mobile networks based on NFV scenarios | China Mobile Com. Corporation | SID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑171992 | S5‑171813 |
S5‑171958 | CR TS 28.525 VNF application software update | Gemalto N.V. | CR | Agreement |
6.4.1.5Lifecycle management for mobile networks that include virtualized network functions
| Yes |
Yes
| agreed | No | S5‑171878 | |
S5‑171959 | Discussion paper addition of MTT PRB usage performance measurements | Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171963 | S5‑171816 |
S5‑171960 | Skeleton proposal for TS 28.xxx IRP Requirements | ORANGE | other | Approval |
6.2New OAM&P Work Item proposals
| No |
Yes
| left for email approval | No | S5‑171726 | |
S5‑171961 | Skeleton proposal for TS 28.yyy IRP IS | ORANGE | other | Approval |
6.2New OAM&P Work Item proposals
| No |
Yes
| left for email approval | No | S5‑171727 | |
S5‑171962 | New WID on Management of QoE data collection | Ericsson LM | WID new | - |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑171815 | |
S5‑171963 | Discussion on adding use cases for PRB usage and IP Throughput measurements | Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171994 | S5‑171959 |
S5‑171964 | Discussion on use cases and definition for average number of active UEs | China Telecom, Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑171995 | S5‑171933 |
S5‑171965 | pCR TS 28510 Add VNF information sysnchronization use case | ZTE Corporation, Nokia | pCR | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| No |
No
| withdrawn | Yes | ||
S5‑171966 | Draft TS 28.511 | ZTE | draft TS | Approval |
6.4.1.2Configuration Management for mobile networks that include virtualized network functions
| No |
Yes
| left for email approval | No | ||
S5‑171967 | Draft TS 28.301 | Nokia | draft TS | Approval |
6.4.3OAM support for Licensed Shared Access (LSA)
| No |
Yes
| left for email approval | No | ||
S5‑171968 | Draft TS 28.302 | Nokia | draft TS | Approval |
6.4.3OAM support for Licensed Shared Access (LSA)
| No |
Yes
| left for email approval | No | ||
S5‑171969 | pCR 28.302 Add model for scenario 2 | Nokia | pCR | - |
6.4.3OAM support for Licensed Shared Access (LSA)
| Yes |
Yes
| approved | No | S5‑171884 | |
S5‑171970 | Draft TR 32.865 | Nokia | draft TR | Approval |
6.5.2Study on OAM aspects of SON for AAS-based deployments
| No |
Yes
| left for email approval | No | ||
S5‑171971 | pCR TR 28.800 Add architecture option to support network slice management | Intel Corporation (UK) Ltd | pCR | - |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑171998 | S5‑171904 |
S5‑171972 | pCR TR 28.800 Text proposal on the Management architecture introduction | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑171905 | |
S5‑171973 | pCR TR 28.800 Adding management functions of next generation networks and services | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| left for email approval | No | S5‑171906 | |
S5‑171974 | pCR TR 28.800 Adding use case and requirements for data collection and reporting | Huawei | pCR | Approval |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| left for email approval | No | S5‑171907 | |
S5‑171975 | pCR 28.801 Clean-up of Network slice subnet concepts | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171846 | |
S5‑171976 | pCR 28.801 Clean-up Use Case for changing capacity of a NSI | Nokia | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171914 | |
S5‑171977 | pCR TR 28.801 Add requirements related to monitor performance | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171636 | |
S5‑171978 | pCR TR 28.801 Add usecase and requirements for configuring CN with slice specific information | Huawei, China Mobile | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
Yes
| left for email approval | No | S5‑171921 | |
S5‑171979 | pCR TR 28.801 Configuration of RAN transport network related interfaces | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
Yes
| left for email approval | No | S5‑171922 | |
S5‑171980 | pCR TR 28.801 Add requirement for network slice management | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171932 | |
S5‑171981 | pCR TR 28.801 Update SON concept | Huawei | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171864 | |
S5‑171982 | pCR 28.801 Proposed note on roles Network Operator and Communication Service Provider | ORANGE | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| No |
Yes
| left for email approval | No | S5‑171698 | |
S5‑171983 | Draft TS 28.802 | Nokia | draft TS | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | ||
S5‑171984 | pCR TR 28.802 Add use cases to support management for data storage architectures | Nokia Corporation | pCR | Approval |
6.5.6Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | S5‑171939 | |
S5‑171985 | Draft TR 32.866 | Nokia | draft TR | Approval |
6.5.8Study on a RESTful HTTP-based Solution Set
| No |
Yes
| left for email approval | No | ||
S5‑171986 | Draft TR 32.864 | Intel | draft TR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| No |
Yes
| left for email approval | No | ||
S5‑171987 | pCR TR 32.864 Add UC on Update of transport network requirements | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| No |
Yes
| left for email approval | No | S5‑171945 | |
S5‑171988 | pCR TR 32.864 add UC on NS instantiation containing CN VNF and VNF that is part of a gNB | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑171946 | |
S5‑171989 | pCR TR 32 864 Add UC to establish the relation between CN VNF and RAN VNF | Intel Corporation (UK) Ltd | pCR | Approval |
6.5.9Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑171947 | |
S5‑171990 | pCR TR 32.867 Add use case and requirements for PDN-GW imitated dedicated bearer creation, deletion and modification related measurement in CUPS | Huawei | pCR | Approval |
6.5.10Study on Management Enhancement of CUPS of EPC Nodes
| No |
Yes
| left for email approval | No | S5‑171950 | |
S5‑171991 | Draft TR 32.867 | Huawei | draft TR | Approval |
6.5.10Study on Management Enhancement of CUPS of EPC Nodes
| No |
Yes
| left for email approval | No | ||
S5‑171992 | new WID study on network policy management for mobile networks based on NFV scenarios | China Mobile Com. Corporation | SID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑171957 | |
S5‑171993 | LS to RAN2 on adding PRB usage distribution and IP Throughput distribution measurements | Huawei | LS out | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| left for email approval | No | ||
S5‑171994 | Discussion on adding use cases for PRB usage and IP Throughput measurements | Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| left for email approval | No | S5‑171963 | |
S5‑171995 | Discussion on use cases and definition for average number of active UEs | China Telecom, Huawei | discussion | Discussion |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| left for email approval | No | S5‑171964 | |
S5‑171996 | LS to RAN2 on adding average number of total active Ues | Huawei | LS out | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| left for email approval | No | ||
S5‑171997 | Draft TR 28.800 | Huawei | draft TR | discussion |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| left for email approval | No | ||
S5‑171998 | pCR TR 28.800 Add architecture option to support network slice management | Intel Corporation (UK) Ltd | pCR | - |
6.5.4Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑171971 | |
S5‑171999 | pCR TS 28 801 Modify UC management for support frequency spectrum use case | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| revised | No | S5‑172000 | S5‑171920 |
S5‑172000 | pCR TS 28 801 Modify UC management for support frequency spectrum use case | China Mobile Com. Corporation | pCR | Approval |
6.5.5Study on Management and Orchestration of Network Slicing
| Yes |
Yes
| approved | No | S5‑171999 | |
S5‑172001 | OAM Executive Report from THIS Meeting | WG Vice Chair (Huawei) | report | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑171505 | |
S5‑172002 | Reply to LS from SA2 to SA5-CH on implication on charging from eFMSS | China Telecom | LS out | Approval |
7.1Charging Plenary
| No |
Yes
| left for email approval | No | S5‑171782 |