Agenda with allocated Tdocs
Created: 2015-05-29 14:04     Last document: S5-153369
Agenda |
Topic |
Tdoc |
Title |
Source |
Doc-type |
Doc-for |
Avail |
Treated |
Decision |
Wdrn |
Replaced-by |
Replaces |
1 Opening of the meeting
|
|
|
|
|
|
|
|
|
|
| 2 Approval of the agenda S5-153000 |
Agenda |
WG Chairman |
agenda |
- |
Yes |
Yes |
approved |
No |
|
| 3 IPR declaration S5-153039 |
IPR and legal declaration |
WG Chairman |
other |
- |
Yes |
Yes |
noted |
No |
|
| 4 Meetings and activities reports
|
|
|
|
|
|
|
|
|
|
| 4.1 Last SA5 meeting report S5-153001 |
Report from last SA5 meeting |
ETSI Secretariat |
meeting report / action list |
- |
Yes |
Yes |
approved |
No |
|
| 4.2 Last SA meeting report S5-153002 |
SA5 status report at last SA meeting |
WG Chairman |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153003 |
SA5 results at last SA meeting |
WG Chairman |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| 4.3 Inter-organizational reports S5-153047 |
Meeting Report NFV ISG IFA - 3GPP SA5 Workshop Helsinki April 20-21 |
WG Chairman |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153202 |
Report of methodology coordination meeting between SA5 and ITU-T SG2 |
WG Vice Chair |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| 5 Cross-SWG issues
|
|
|
|
|
|
|
|
|
|
| 5.1 Administrative issues at SA5 level S5-153007 |
Leaders meeting agenda |
WG Chairman |
agenda |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153008 |
Leaders meeting minutes |
WG Chairman |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153014 |
SA5 Working Procedures |
WG Chairman |
other |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153015 |
SA5 Meeting Facility Requirements |
WG Chairman |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153016 |
Process for management of draft TSs/TRs |
WG ViceChair |
other |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153017 |
CR Quality Check |
ETSI Secretariat |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153021 |
List of Rapporteurs |
ETSI Secretariat |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153134 |
Status of post SA5#101 email approvals |
WG Chairman |
other |
- |
No |
No |
[not addressed] |
No |
|
| |
|
S5-153135 |
SA5 work plan status after SA5#101 |
WG Chairman |
other |
- |
No |
No |
[not addressed] |
No |
|
| 5.2 Technical issues at SA5 level
|
|
|
|
|
|
|
|
|
|
| 5.3 Liaison statements at SA5 level S5-153211 |
Input LS from ONF on information modeling work recently approved and published |
ONF_IMP_LS_20150513 |
i/c LS |
- |
Yes |
Yes |
postponed |
No |
|
| |
|
S5-153364 |
Guidelines of cooperation of SA5 with external entities |
Ericsson |
other |
discussion |
No |
Yes |
left for email approval |
No |
|
| 5.4 SA5 meeting calendar S5-153013 |
SA5 Meeting Calendar |
WG Chairman |
other |
- |
Yes |
Yes |
noted |
No |
|
| 5.5 Review of the Work Plan S5-153018 |
Deliverables due for the NEXT SA Plenary |
ETSI Secretariat |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153019 |
Rel-13 SA5 WIDs |
WG Chairman |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153020 |
SA5 3GPP Work Plan |
ETSI Secretariat |
other |
- |
Yes |
Yes |
noted |
No |
|
| 6 OAM&P
|
|
|
|
|
|
|
|
|
|
| 6.1 OAM&P Plenary S5-153004 |
Time Plan for OAM&P and Converged Management SWGs |
WG Chairman |
other |
- |
Yes |
Yes |
revised |
No |
S5-153216 |
| |
|
S5-153216 |
Time Plan for OAM&P and Converged Management SWGs |
WG Chairman |
other |
- |
Yes |
Yes |
approved |
No |
| S5-153004 |
|
|
S5-153005 |
OAM Executive Report from THIS Meeting |
OAM SWG Chair |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153081 |
OAM action list before the meeting |
OAM SWG Chair |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153082 |
OAM action list after the meeting |
OAM SWG Chair |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153207 |
Input LS from BBF on WT-196 Issue 2 Amendment 1 Review (resubmitted) |
bbf2015.335.02 |
i/c LS |
- |
Yes |
Yes |
replied to |
No |
|
| |
|
S5-153217 |
Reply to: Input LS from BBF on WT-196 Issue 2 Amendment 1 Review (resubmitted) |
Alcatel-Lucent |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
|
| 6.2 New Work Item proposals - OAM&P & Converged Management S5-153022 |
Minutes of New Work Item proposals - OAM&P & Converged Management |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153130 |
WID BB Network Management of Virtualized Mobile Core Network |
Huawei, China Mobile |
new WID |
- |
Yes |
Yes |
revised |
No |
S5-153305 |
| |
|
S5-153305 |
WID BB Network Management of Virtualized Mobile Core Network |
Huawei, China Mobile |
new WID |
- |
Yes |
Yes |
revised |
No |
S5-153360 |
S5-153130 |
|
|
S5-153360 |
WID BB Network Management of Virtualized Mobile Core Network |
Huawei, China Mobile |
new WID |
- |
No |
Yes |
agreed |
No |
| S5-153305 |
|
|
S5-153138 |
New WID management concept, architecture and requirements for virtualized mobile core network and mixed mobile core network |
China Mobile |
new WID |
Approval |
Yes |
Yes |
revised |
No |
S5-153306 |
| |
|
S5-153306 |
New WID management concept, architecture and requirements for virtualized mobile core network and mixed mobile core network |
China Mobile |
new WID |
Approval |
Yes |
Yes |
revised |
No |
S5-153369 |
S5-153138 |
|
|
S5-153369 |
New WID management concept, architecture and requirements for virtualized mobile core network and mixed mobile core network |
China Mobile |
new WID |
Approval |
No |
Yes |
agreed |
No |
| S5-153306 |
6.3 Maintenance and Rel-13 small Enhancements - OAM&P & Converged Management S5-153023 |
Minutes of Maintenance and Rel-13 small Enhancements - OAM&P & Converged Management |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153066 |
pCR for Rel-11 SuperCR 28623 Align id attribute definitions |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153067 |
pCR for Rel-12 SuperCR 28623 Align Id attribute definitions |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153068 |
pCR for Rel-11 SuperCR 28652 Align id attribute definitions |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153218 |
pCR for Rel-11 SuperCR 28652 Align id attribute definitions |
Ericsson |
pseudo CR / text proposal |
- |
No |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153069 |
pCR for Rel-12 SuperCR 28652 Align id attribute definitions |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153219 |
pCR for Rel-12 SuperCR 28652 Align id attribute definitions |
Ericsson |
pseudo CR / text proposal |
- |
No |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153070 |
pCR for Rel-11 SuperCR 28653 Align id attribute definitions |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153071 |
pCR for Rel-12 SuperCR 28653 Align id attribute definitions |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153072 |
Rel-11 CR 28652 Add missing IOC notification support |
Ericsson |
CR |
- |
Yes |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153073 |
Rel-12 CR 28652 Add missing IOC notification support |
Ericsson |
CR |
- |
Yes |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153074 |
Rel-11 CR 28652 Correct IsNullable properties for power attributes |
Ericsson |
CR |
- |
Yes |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153075 |
Rel-12 CR 28652 Correct IsNullable properties for power attributes |
Ericsson |
CR |
- |
Yes |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153076 |
Rel-12 CR 32300 Disambiguate DN lenght constraint |
Ericsson |
CR |
- |
Yes |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153101 |
Rel-13 CR 32.101 Replacement of 3G term |
Huawei |
CR |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153193 |
Rel-11 CR 28652 Add missing IOC notification support |
Ericsson |
CR |
- |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153194 |
Rel-12 CR 28652 Add missing IOC notification support |
Ericsson |
CR |
- |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153195 |
Rel-11 CR 28652 Correct IsNullable properties for power attributes |
Ericsson |
CR |
- |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153196 |
Rel-12 CR 28652 Correct IsNullable properties for power attributes |
Ericsson |
CR |
- |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153197 |
Rel-12 CR 32300 Disambiguate DN lenght constraint |
Ericsson |
CR |
- |
Yes |
Yes |
revised |
No |
S5-153224 |
| |
|
S5-153224 |
Rel-12 CR 32300 Disambiguate DN lenght constraint |
Ericsson |
CR |
- |
Yes |
Yes |
agreed |
No |
| S5-153197 |
6.4 Rel-13 Operations, Administration, Maintenance and Provisioning (OAM&P)
|
|
|
|
|
|
|
|
|
|
| 6.4.1 Enhanced Network Management (NM) centralized Coverage and Capacity Optimization S5-153033 |
Minutes for Enhanced Network Management (NM) centralized Coverage and Capacity Optimization |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153064 |
Rel-13 CR 28.628 Add measurements for NM centralized Coverage and Capacity Optimization (CCO) |
Ericsson |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153270 |
| |
|
S5-153270 |
Rel-13 CR 28.628 Add measurements for NM centralized Coverage and Capacity Optimization (CCO) |
Ericsson |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153344 |
S5-153064 |
|
|
S5-153344 |
Rel-13 CR 28.628 Add measurements for NM centralized Coverage and Capacity Optimization (CCO) |
Ericsson |
CR |
Approval |
Yes |
Yes |
agreed |
No |
| S5-153270 |
6.4.2 WLAN Management
|
|
|
|
|
|
|
|
|
|
| 6.4.2.1 WLAN Network Resource Model for Type-2 interface S5-153027 |
Minutes for WLAN Network Resource Model for Type-2 interface |
Rapporteur |
meeting report / action list |
- |
No |
Yes |
withdrawn |
Yes |
|
| 6.4.2.2 WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface S5-153029 |
Minutes for WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
revised |
No |
S5-153345 |
| |
|
S5-153345 |
Minutes for WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
| S5-153029 |
|
|
S5-153048 |
Add collection methods for counters defined in other SDOs |
Intel |
CR |
- |
Yes |
Yes |
revised |
No |
S5-153271 |
| |
|
S5-153271 |
Add collection methods for counters defined in other SDOs |
Intel |
CR |
- |
Yes |
Yes |
revised |
No |
S5-153346 |
S5-153048 |
|
|
S5-153346 |
Add collection methods for counters defined in other SDOs |
Intel |
CR |
- |
No |
Yes |
left for email approval |
No |
| S5-153271 |
|
|
S5-153049 |
Discussion paper of PM collection method |
Intel |
discussion |
- |
Yes |
Yes |
noted |
No |
|
| 6.4.3 Energy Efficiency related Performance Measurements S5-153026 |
Minutes for Energy Efficiency related Performance Measurements |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153077 |
Issue list with status |
Nokia Networks |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153078 |
R13 32.425 Add usage of measurements supporting EE coverage KPI |
Nokia Networks |
CR |
- |
Yes |
Yes |
revised |
No |
S5-153272 |
| |
|
S5-153272 |
R13 32.425 Add usage of measurements supporting EE coverage KPI |
Nokia Networks |
CR |
- |
Yes |
Yes |
agreed |
No |
| S5-153078 |
|
|
S5-153079 |
Revised WID Energy Efficiency related Performance Measurements |
Nokia Networks |
revised WID |
- |
No |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153232 |
Proposal for revised WID Energy Efficiency related Performance Measurements |
Orange |
revised WID |
discussion |
Yes |
Yes |
revised |
No |
S5-153347 |
| |
|
S5-153347 |
Proposal for revised WID Energy Efficiency related Performance Measurements |
Orange |
revised WID |
discussion |
Yes |
Yes |
agreed |
No |
| S5-153232 |
|
|
S5-153359 |
LS to ETSI EE on revised WID Energy efficiency |
Nokia Networks |
o/g LS |
discussion |
No |
Yes |
left for email approval |
No |
|
| 6.4.4 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement S5-153028 |
Minutes for Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153103 |
pCR 32.446 Changes for Logged MBSFN MDT |
Alcatel-Lucent |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153220 |
Rel 13 CR 32.421 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153273 |
| |
|
S5-153273 |
Rel 13 CR 32.421 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153354 |
S5-153220 |
|
|
S5-153354 |
Rel 13 CR 32.421 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
agreed |
No |
| S5-153273 |
|
|
S5-153221 |
Rel 13 CR 32.422 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153274 |
| |
|
S5-153274 |
Rel 13 CR 32.422 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153349 |
S5-153221 |
|
|
S5-153349 |
Rel 13 CR 32.422 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
agreed |
No |
| S5-153274 |
|
|
S5-153222 |
Rel 13 CR 32.441 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153275 |
| |
|
S5-153275 |
Rel 13 CR 32.441 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153348 |
S5-153222 |
|
|
S5-153348 |
Rel 13 CR 32.441 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
agreed |
No |
| S5-153275 |
|
|
S5-153223 |
Rel 13 CR 32.442 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153276 |
| |
|
S5-153276 |
Rel 13 CR 32.442 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153350 |
S5-153223 |
|
|
S5-153350 |
Rel 13 CR 32.442 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
agreed |
No |
| S5-153276 |
|
|
S5-153225 |
Rel 13 CR 32.446 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised |
No |
S5-153351 |
| |
|
S5-153351 |
Rel 13 CR 32.446 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
agreed |
No |
| S5-153225 |
6.5 OAM&P Studies
|
|
|
|
|
|
|
|
|
|
| 6.5.1 Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function S5-153031 |
Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153093 |
Revised WID Study on Enhancements of OAM aspects of Distributed MLB SON |
Rapporteur |
revised WID |
Approval |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153168 |
pCR on TR 32.860 Non-uniform load distribution PS and Solution |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153169 |
pCR on TR 32.860 Hybrid SON re use of statistic to predict future |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153170 |
pCR on TR 32.860 Hybrid SON re effectiveness of NM analysis |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153171 |
pCR on TR 32.860 Configuration for CAC Problem Statement and solution |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153172 |
pCR on TR 32.860 Algorithm misalignment PS and solution |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153280 |
Draft TR 32.860 |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 6.5.2 Study on Application and Partitioning of Itf-N S5-153036 |
Minutes for Study on Application and Partitioning of Itf-N |
Rapporteur |
meeting report / action list |
- |
No |
Yes |
withdrawn |
Yes |
|
| 6.5.3 Study on Network Management of Virtualized Networks S5-153025 |
NSD life cycle state |
Ericsson |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153030 |
Minutes for Study on Network Management of Virtualized Networks |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
revised |
No |
S5-153353 |
| |
|
S5-153353 |
Minutes for Study on Network Management of Virtualized Networks |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
| S5-153030 |
|
|
S5-153040 |
proposed Concept & Background text |
Steven Wright , AT&T |
pseudo CR / text proposal |
decision |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153059 |
pCR to 32.842 NSD Update |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153226 |
| |
|
S5-153226 |
pCR to 32.842 NSD Update |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153059 |
|
|
S5-153060 |
pCR to 32.842 NSD Query |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153227 |
| |
|
S5-153227 |
pCR to 32.842 NSD Query |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153060 |
|
|
S5-153061 |
pCR to 32.842 Delete NSD |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153228 |
| |
|
S5-153228 |
pCR to 32.842 Delete NSD |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153061 |
|
|
S5-153062 |
pCR to 32.842 Requirements related to operations with VNF Package |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153230 |
| |
|
S5-153230 |
pCR to 32.842 Requirements related to operations with VNF Package |
Cisco,Huawei |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153062 |
|
|
S5-153063 |
pCR to 32.842 Requirements related to operations with NSD |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153231 |
| |
|
S5-153231 |
pCR to 32.842 Requirements related to operations with NSD |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153063 |
|
|
S5-153080 |
Guidance of referencing to NFV MANO GS |
OAM SWG Chair |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153094 |
pCR MME overload mitigation by MME VNF procedure |
Intel, China Mobile, ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153233 |
| |
|
S5-153233 |
pCR MME overload mitigation by MME VNF procedure |
Intel, China Mobile, ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153338 |
S5-153094 |
|
|
S5-153338 |
pCR MME overload mitigation by MME VNF procedure |
Intel, China Mobile, ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
| S5-153233 |
|
|
S5-153095 |
pCR MME VNF termination procedure |
Intel, China Mobile, ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153234 |
| |
|
S5-153234 |
pCR MME VNF termination procedure |
Intel, China Mobile, ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153339 |
S5-153095 |
|
|
S5-153339 |
pCR MME VNF termination procedure |
Intel, China Mobile, ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
| S5-153234 |
|
|
S5-153096 |
pCR performance management procedure |
Intel, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153235 |
pCR performance management procedure |
Intel, China Mobile |
pseudo CR / text proposal |
- |
No |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153097 |
pCR virtualized resource performance measurements use case |
Intel |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153236 |
| |
|
S5-153236 |
pCR virtualized resource performance measurements use case |
Intel |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
| S5-153097 |
|
|
S5-153340 |
pCR virtualized resource performance measurements use case |
Intel |
pseudo CR / text proposal |
- |
No |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153098 |
pCR performance management requirements |
Intel |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153237 |
pCR performance management requirements |
Intel |
pseudo CR / text proposal |
- |
No |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153102 |
pCR TR 32.842 Update LCM requirement of NM |
China Mobile, Huawei, Intel |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153315 |
| |
|
S5-153315 |
pCR TR 32.842 Update LCM requirement of NM |
China Mobile, Huawei, Intel |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153337 |
S5-153102 |
|
|
S5-153337 |
pCR TR 32.842 Update LCM requirement of NM |
China Mobile, Huawei, Intel |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153315 |
|
|
S5-153104 |
pCR TR 32.842 Add use case of VNF scaling initiated by EM with scaling target |
ZTE, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153105 |
pCR 32 842 VNF configuration management procedure |
ZTE, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153106 |
pCR 32 842 VNF performance management procedure |
ZTE, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153319 |
| |
|
S5-153319 |
pCR 32 842 VNF performance management procedure |
ZTE, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153106 |
|
|
S5-153114 |
TR 32.842 Rapporteur clean-up proposal |
Huawei |
draft TS/TR |
- |
Yes |
Yes |
revised |
No |
S5-153239 |
| |
|
S5-153239 |
TR 32.842 Rapporteur clean-up proposal |
Huawei |
draft TS/TR |
- |
Yes |
Yes |
approved |
No |
| S5-153114 |
|
|
S5-153115 |
pCR 32.842 Conclusions and recommendations |
Huawei, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153322 |
| |
|
S5-153322 |
pCR 32.842 Conclusions and recommendations |
Huawei, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153355 |
S5-153115 |
|
|
S5-153355 |
pCR 32.842 Conclusions and recommendations |
Huawei, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153322 |
|
|
S5-153116 |
pCR 32.842 Modify mixed network management mapping relationship figure |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153281 |
| |
|
S5-153281 |
pCR 32.842 Modify mixed network management mapping relationship figure |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153116 |
|
|
S5-153117 |
pCR 32.842 Modify network management reference model |
Huawei, China Mobile |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153118 |
pCR 32.842 Add NFV management layer concept |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153119 |
pCR 32.842 Update 7.3.1 Instantiation of VNF with UML options |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153120 |
pCR 32.842 Add FM Procedure flow for the correlation done in EM |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153282 |
| |
|
S5-153282 |
pCR 32.842 Add FM Procedure flow for the correlation done in EM |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153120 |
|
|
S5-153121 |
pCR 32.842 Add NS Initiation Flow |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153283 |
| |
|
S5-153283 |
pCR 32.842 Add NS Initiation Flow |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
| S5-153121 |
|
|
S5-153122 |
pCR 32.842 Add NS Termination Flow |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153314 |
| |
|
S5-153314 |
pCR 32.842 Add NS Termination Flow |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153336 |
S5-153122 |
|
|
S5-153336 |
pCR 32.842 Add NS Termination Flow |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
| S5-153314 |
|
|
S5-153123 |
pCR 32.842 Add general description for dashed box in management procedures |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153300 |
| |
|
S5-153300 |
pCR 32.842 Add general description for dashed box in management procedures |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153357 |
S5-153123 |
|
|
S5-153357 |
pCR 32.842 Add general description for dashed box in management procedures |
Huawei,KDDI |
pseudo CR / text proposal |
- |
No |
Yes |
left for email approval |
No |
| S5-153300 |
|
|
S5-153124 |
pCR 32.842 Modify the note 9 description |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153302 |
| |
|
S5-153302 |
pCR 32.842 Modify the note 9 description |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153356 |
S5-153124 |
|
|
S5-153356 |
pCR 32.842 Modify the note 9 description |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153302 |
|
|
S5-153129 |
pCR TR 32.842 Generic NRM for virtual network |
ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153321 |
| |
|
S5-153321 |
pCR TR 32.842 Generic NRM for virtual network |
ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
| S5-153129 |
|
|
S5-153131 |
pCR TR32.842 modification of potential requirements for mixed network management |
KDDI |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153303 |
| |
|
S5-153303 |
pCR TR32.842 modification of potential requirements for mixed network management |
KDDI |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
noted |
No |
| S5-153131 |
|
|
S5-153132 |
pCR TR32.842 adding managemet procedure followed by VNF lifecycle management |
KDDI |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153304 |
| |
|
S5-153304 |
pCR TR32.842 adding managemet procedure followed by VNF lifecycle management |
KDDI |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
noted |
No |
| S5-153132 |
|
|
S5-153133 |
pCR TR32.842 clarification of dotted-line arrows in the procedures |
KDDI |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153136 |
pCR 32.842 Add potential requirement for VNF Package |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153230 |
| |
|
S5-153159 |
[Draft] LS on VNFM enhancements to support SA5 use cases for network management of virtualized networks |
NTT DOCOMO |
o/g LS |
Approval |
Yes |
Yes |
revised |
No |
S5-153311 |
| |
|
S5-153311 |
LS on VNFM enhancements to support SA5 use cases for network management of virtualized networks |
NTT DOCOMO |
o/g LS |
Approval |
Yes |
Yes |
revised |
No |
S5-153365 |
S5-153159 |
|
|
S5-153365 |
LS on VNFM enhancements to support SA5 use cases for network management of virtualized networks |
NTT DOCOMO |
o/g LS |
Approval |
No |
Yes |
left for email approval |
No |
| S5-153311 |
|
|
S5-153161 |
pCR 32.842 Add potential requirement on notification due to infrastructure state changes |
NTT DOCOMO |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153310 |
| |
|
S5-153310 |
pCR 32.842 Add potential requirement on notification due to infrastructure state changes |
NTT DOCOMO |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153161 |
|
|
S5-153162 |
pCR 32.842 Add potential requirement on VNF snapshot capture |
NTT DOCOMO |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153307 |
| |
|
S5-153307 |
pCR 32.842 Add potential requirement on VNF snapshot capture |
NTT DOCOMO |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153162 |
|
|
S5-153163 |
pCR 32.842 Add potential requirement for VNF auto-healing by VNFM |
NTT DOCOMO |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153308 |
| |
|
S5-153308 |
pCR 32.842 Add potential requirement for VNF auto-healing by VNFM |
NTT DOCOMO |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153163 |
|
|
S5-153164 |
pCR 32.842 Amending requirement for auto-scaling by VNFM of a VNF |
NTT DOCOMO |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153309 |
| |
|
S5-153309 |
pCR 32.842 Amending requirement for auto-scaling by VNFM of a VNF |
NTT DOCOMO |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153164 |
|
|
S5-153165 |
pCR TR 32.842 VNF failures detected by VNF or EM |
Intel |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153312 |
| |
|
S5-153312 |
pCR TR 32.842 VNF failures detected by VNF or EM |
Intel |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153361 |
S5-153165 |
|
|
S5-153361 |
pCR TR 32.842 VNF failures detected by VNF or EM |
Intel |
pseudo CR / text proposal |
- |
No |
Yes |
left for email approval |
No |
| S5-153312 |
|
|
S5-153166 |
pCR TR 32.842 changes to VNFC alarm use case |
Intel |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153313 |
| |
|
S5-153313 |
pCR TR 32.842 changes to VNFC alarm use case |
Intel |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153362 |
S5-153166 |
|
|
S5-153362 |
pCR TR 32.842 changes to VNFC alarm use case |
Intel |
pseudo CR / text proposal |
- |
No |
Yes |
left for email approval |
No |
| S5-153313 |
|
|
S5-153173 |
pCR on TR 32.842 regarding VNF model |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153174 |
pCR on TR 32.842 scaling trigger and decision |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153238 |
Need for separate 6.2 and 6.1? |
Ericsson |
discussion |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153278 |
Agenda for joint SA5-IFA conference call (in May.28) |
OAM SWG Chair |
agenda |
discussion |
No |
Yes |
approved |
No |
|
| |
|
S5-153284 |
Add principles and update for gap analysis section |
Huawei,Nokia Networks |
pseudo CR / text proposal |
discussion |
Yes |
Yes |
revised |
No |
S5-153363 |
| |
|
S5-153363 |
Add principles and update for gap analysis section |
Huawei,Nokia Networks |
pseudo CR / text proposal |
discussion |
No |
Yes |
left for email approval |
No |
| S5-153284 |
|
|
S5-153367 |
Draft TR 32.842 |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 6.5.4 Study on KQIs for Service Experience S5-153037 |
Minutes for Study on KQIs for Service Experience |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
revised |
No |
S5-153366 |
| |
|
S5-153366 |
Minutes for Study on KQIs for Service Experience |
Rapporteur |
meeting report / action list |
- |
No |
Yes |
noted |
No |
| S5-153037 |
|
|
S5-153041 |
pCR 32.862 ETSI QoS parameters for mobile Web browsing |
Orange |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153042 |
pCR 32.862 Input for section on KQIs in ITU-T |
Orange |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153323 |
| |
|
S5-153323 |
pCR 32.862 Input for section on KQIs in ITU-T |
Orange |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153042 |
|
|
S5-153055 |
Draft 32.862 0.2.0 |
Rapporteur |
draft TS/TR |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153056 |
pCR 32862 Add Video Streaming Scenario |
Rapporteur |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153316 |
| |
|
S5-153316 |
pCR 32862 Add Video Streaming Scenario |
Rapporteur |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153056 |
|
|
S5-153057 |
pCR 32862 Add File Transfer Scenario |
Rapporteur |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153317 |
| |
|
S5-153317 |
pCR 32862 Add File Transfer Scenario |
Rapporteur |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153057 |
|
|
S5-153058 |
pCR 32862 Add E-mail Scenario |
Rapporteur |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153318 |
| |
|
S5-153318 |
pCR 32862 Add E-mail Scenario |
Rapporteur |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153058 |
|
|
S5-153065 |
pCR for Overview of the KQI Standardization Status |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153229 |
| |
|
S5-153229 |
pCR for Overview of the KQI Standardization Status |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153325 |
S5-153065 |
|
|
S5-153325 |
pCR for Overview of the KQI Standardization Status |
Ericsson |
pseudo CR / text proposal |
- |
No |
Yes |
left for email approval |
No |
| S5-153229 |
|
|
S5-153137 |
pCR 32.862 Add VoLTE call monitoring scenario |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153157 |
pCR 32862 Add Mobile Bidirectional Voice Scenario |
Huawei |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153326 |
| |
|
S5-153326 |
pCR 32862 Add Mobile Bidirectional Voice Scenario |
Huawei |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153157 |
|
|
S5-153158 |
pCR 32862 Add Voice Streaming Scenario |
Huawei |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153327 |
| |
|
S5-153327 |
pCR 32862 Add Voice Streaming Scenario |
Huawei |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153158 |
|
|
S5-153190 |
pCR 32.862 Addition of short and multimedia messaging services to scope |
PIWorks |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153191 |
pCR 32.862 Addition of short and multimedia messaging services to scope |
P.I.Works |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153192 |
pCR 32.862 NGMN Service Quality Definition and Measurement for HTTP Adaptive Streaming |
P.I.Works |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153320 |
| |
|
S5-153320 |
pCR 32.862 NGMN Service Quality Definition and Measurement for HTTP Adaptive Streaming |
P.I.Works |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153343 |
S5-153192 |
|
|
S5-153343 |
pCR 32.862 NGMN Service Quality Definition and Measurement for HTTP Adaptive Streaming |
P.I.Works |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153320 |
|
|
S5-153328 |
Draft TR 32.862 |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 6.5.5 Study on OAM support for Licensed Shared Access S5-153024 |
Minutes for Study on OAM support for Licensed Shared Access |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153099 |
pCR TR 32.855 add LSA UC description |
Nokia Networks |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153100 |
pCR TR 32.855 add definitions section |
Nokia Networks |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153160 |
pCR TR 32.855 add LSA UC requirements |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153277 |
| |
|
S5-153277 |
pCR TR 32.855 add LSA UC requirements |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153368 |
S5-153160 |
|
|
S5-153368 |
pCR TR 32.855 add LSA UC requirements |
Ericsson |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153277 |
|
|
S5-153167 |
pCR TR 32.855 Incumbent to reclaim the spectrum use case |
Intel |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153279 |
Draft TR 32.855 |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 7 Converged Management
|
|
|
|
|
|
|
|
|
|
| 7.1 Converged Management Plenary S5-153006 |
Converged Management Executive report from THIS meeting |
Converged Management SWG Chair |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153200 |
CMAN action list before the meeting |
CMAN SWG Chair |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153201 |
CMAN action list after the meeting |
CMAN SWG Chair |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| 7.2 Rel-13 Operations, Administration, Maintenance and Provisioning (OAM&P)
|
|
|
|
|
|
|
|
|
|
| 7.2.1 Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations
|
|
|
|
|
|
|
|
|
|
| 7.2.1.1 TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations S5-153032 |
Minutes for TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153044 |
Progress status TR 32.838 |
Rapporteur |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153050 |
pCR to 32.838 Table 7.3.5 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153051 |
pCR to 32.838 Table 7.1.1 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153329 |
| |
|
S5-153329 |
pCR to 32.838 Table 7.1.1 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153051 |
|
|
S5-153052 |
pCR to 32.838 Table 7.2.1 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153330 |
| |
|
S5-153330 |
pCR to 32.838 Table 7.2.1 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153052 |
|
|
S5-153053 |
pCR to 32.838 Table 7.3.2 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153331 |
| |
|
S5-153331 |
pCR to 32.838 Table 7.3.2 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153053 |
|
|
S5-153054 |
pCR to 32.838 Table 7.2.12 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153332 |
| |
|
S5-153332 |
pCR to 32.838 Table 7.2.12 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153054 |
|
|
S5-153092 |
pCR to 32.838 Table 7.5.4 |
Cisco |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153113 |
Introduction of Top OPE recommendations related to Common Channel Optimization (CCO) |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153333 |
Draft TR 32.838 |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 7.2.1.2 TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations S5-153034 |
Minutes for TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations |
Rapporteur |
meeting report / action list |
- |
No |
Yes |
withdrawn |
Yes |
|
| 7.2.2 Converged management Performance Management Interface Definitions S5-153035 |
Minutes for Converged Management PM Interface definitions |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
revised |
No |
S5-153342 |
| |
|
S5-153342 |
Minutes for Converged Management PM Interface definitions |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
| S5-153035 |
|
|
S5-153206 |
M-SDO JWG PM2: Metadefinitions for Measurements and KPIs V0.14 |
Rapporteur |
other |
- |
Yes |
Yes |
noted |
No |
|
| 7.3 Converged Management Studies
|
|
|
|
|
|
|
|
|
|
| 7.3.1 Study on Compliance of 3GPP SA5 specifications to the NGMN NGCOR S5-153038 |
Minutes for compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements |
Rapporteur |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153045 |
Progress status TR 32.837 |
Rapporteur |
other |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153125 |
pCR 32.837 Introduce GEN requirements |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153126 |
pCR 32.837 Introduce PM requirements |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153127 |
pCR 32.837 Introduce the new format to INVM section |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153334 |
| |
|
S5-153334 |
pCR 32.837 Introduce the new format to INVM section |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153127 |
|
|
S5-153128 |
pCR 32.837 Introduce the new format to FM section |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153335 |
| |
|
S5-153335 |
pCR 32.837 Introduce the new format to FM section |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153128 |
|
|
S5-153341 |
Latest draft NGCOR compliance TR 32.837 |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 8 Charging
|
|
|
|
|
|
|
|
|
|
| 8.1 Charging Plenary S5-153009 |
CH Agenda and Time Plan |
CH SWG Chair |
agenda |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153010 |
CH Detailed Report from LAST Meeting |
CH SWG Chair |
meeting report / action list |
- |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153011 |
CH Executive Report from THIS Meeting |
CH SWG Chair |
meeting report / action list |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153012 |
CH Detailed Report from THIS Meeting |
CH SWG Chair |
meeting report / action list |
- |
No |
No |
[not addressed] |
No |
|
| |
|
S5-153043 |
LSout from SA5 to CT4 on Addition of AVP code definitions |
Nokia Networks |
o/g LS |
approval |
Yes |
Yes |
revised |
No |
S5-153240 |
| |
|
S5-153240 |
LSout from SA5 to CT4 on Addition of AVP code definitions |
Nokia Networks |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
| S5-153043 |
|
|
S5-153083 |
Discussion paper on Network Race condition for Gy reference point |
Alcatel-Lucent |
discussion |
Approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153084 |
Reply to LS on Network Race condition for Gy reference point |
Alcatel-Lucent |
o/g LS |
Approval |
Yes |
Yes |
revised |
No |
S5-153241 |
| |
|
S5-153241 |
Reply to LS on Network Race condition for Gy reference point |
Alcatel-Lucent |
o/g LS |
Approval |
Yes |
Yes |
approved |
No |
| S5-153084 |
|
|
S5-153176 |
Reply to LS on VoLTE charging |
Orange |
o/g LS |
- |
Yes |
Yes |
revised |
No |
S5-153215 |
| |
|
S5-153215 |
Reply to LS on VoLTE charging |
Orange |
o/g LS |
- |
Yes |
Yes |
revised |
No |
S5-153242 |
S5-153176 |
|
|
S5-153242 |
Reply to LS on VoLTE charging |
Orange |
o/g LS |
- |
Yes |
Yes |
approved |
No |
| S5-153215 |
|
|
S5-153199 |
LSout oneM2M Reply LS on Extension of 3GPP Service-Information AVP |
Ericsson |
o/g LS |
Approval |
Yes |
Yes |
revised |
No |
S5-153289 |
| |
|
S5-153289 |
LSout oneM2M Reply LS on Extension of 3GPP Service-Information AVP |
Ericsson |
o/g LS |
Approval |
Yes |
Yes |
approved |
No |
| S5-153199 |
|
|
S5-153205 |
DP Impact on charging when introducing new cause URI parameter value |
Orange |
discussion |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153208 |
Input LS from CT4 on Network Race condition for Gy reference point |
C4-150684 |
i/c LS |
- |
Yes |
Yes |
replied to |
No |
|
| |
|
S5-153209 |
Input LS from CT4 on UE identity used between ProSe Functions for ProSe Service Authorization |
C4-150687 |
i/c LS |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153210 |
Reply LS from CT4 on Charging Characteristics in ProSe Subscription Information |
C4-150690 |
i/c LS |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153212 |
Input LS from oneM2M TP on extension of 3GPP Service-Information AVP |
TP-2015-0628R02 |
i/c LS |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153213 |
Input LS from GSMA WSOLU on VoLTE charging (resubmitted) |
WSOLU 03_015rev1 |
i/c LS |
- |
Yes |
Yes |
replied to |
No |
|
| |
|
S5-153214 |
Input LS from GSMA on VoLTE Roaming Charging |
RAG 15 Doc_007 |
i/c LS |
- |
Yes |
Yes |
replied to |
No |
|
| |
|
S5-153243 |
Reply to: Input LS from GSMA on VoLTE Roaming Charging |
Orange |
o/g LS |
approval |
Yes |
Yes |
revised |
No |
S5-153358 |
| |
|
S5-153358 |
Reply to: Input LS from GSMA on VoLTE Roaming Charging |
Orange |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
| S5-153243 |
|
|
S5-153298 |
Reply LS on usage of P-Charging-Vector header field |
Ericsson |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153301 |
LS on the usage of Relayed-Charge header field |
C1-152042 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153324 |
LS on usage of P-Charging-Vector header field |
C1-152283 |
i/c LS |
discussion |
Yes |
Yes |
replied to |
No |
|
| 8.2 New Charging Work Item proposals S5-153046 |
WID MBMS Charging Enhancements in the BM-SC |
Ericsson |
other |
Approval |
No |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153107 |
Discussion on WebRTC related charging work |
ZTE |
discussion |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153108 |
Draft New WID on Charging Aspects of WebRTC Access to IMS |
ZTE |
new WID |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153109 |
Draft New WID on Charging Aspects of IP Flow Mobility support for S2a and S2b Interfaces (NBIFOM) |
ZTE |
new WID |
- |
Yes |
Yes |
revised |
No |
S5-153244 |
| |
|
S5-153244 |
New WID on Charging Aspects of IP Flow Mobility support for S2a and S2b Interfaces (NBIFOM) |
ZTE |
new WID |
- |
Yes |
Yes |
noted |
No |
| S5-153109 |
|
|
S5-153178 |
Draft New WID on charging aspects of Service capability Exposure |
Huawei |
new WID |
- |
Yes |
Yes |
noted |
No |
|
| 8.3 Charging Maintenance and Rel-13 small Enhancements S5-153085 |
Rel-12 CR 32.251 Correction TDF as Node Functionality |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Aproval |
Yes |
Yes |
revised |
No |
S5-153265 |
| |
|
S5-153265 |
Rel-12 CR 32.251 Correction TDF as Node Functionality |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Aproval |
Yes |
Yes |
agreed |
No |
| S5-153085 |
|
|
S5-153086 |
Rel-12 CR 32.299 Correction TDF as Node Functionality |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153266 |
| |
|
S5-153266 |
Rel-12 CR 32.299 Correction TDF as Node Functionality |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
agreed |
No |
| S5-153086 |
|
|
S5-153087 |
Rel-13 CR 32.251 Correction TDF as Node Functionality |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153267 |
| |
|
S5-153267 |
Rel-13 CR 32.251 Correction TDF as Node Functionality |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
agreed |
No |
| S5-153087 |
|
|
S5-153088 |
Rel-13 CR 32.299 Correction TDF as Node Functionality |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153268 |
| |
|
S5-153268 |
Rel-13 CR 32.299 Correction TDF as Node Functionality |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
agreed |
No |
| S5-153088 |
|
|
S5-153141 |
Rel-8 CR 32.299 Correction for dynamic address flags associated to PDN connection |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153142 |
Rel-9 CR 32.299 Correction for dynamic address flags associated to PDN connection |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153143 |
Rel-10 CR 32.299 Correction for dynamic address flags associated to PDN connection |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153144 |
Rel-11 CR 32.299 Correction for dynamic address flags associated to PDN connection |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153145 |
Rel-12 CR 32.299 Correction for dynamic address flags associated to PDN connection |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153146 |
Rel-13 CR 32.299 Correction for dynamic address flags associated to PDN connection |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153147 |
Rel-10 CR 32.299 Correction of RAT Type - alignment with TS 29.061 |
Nokia Networks |
CR |
approval |
Yes |
Yes |
revised |
No |
S5-153260 |
| |
|
S5-153260 |
Rel-10 CR 32.299 Correction of RAT Type - alignment with TS 29.061 |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
| S5-153147 |
|
|
S5-153148 |
Rel-11 CR 32.299 Correction of RAT Type - alignment with TS 29.061 |
Nokia Networks |
CR |
approval |
Yes |
Yes |
revised |
No |
S5-153261 |
| |
|
S5-153261 |
Rel-11 CR 32.299 Correction of RAT Type - alignment with TS 29.061 |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
| S5-153148 |
|
|
S5-153149 |
Rel-12 CR 32.299 Correction of RAT Type - alignment with TS 29.061 |
Nokia Networks |
CR |
approval |
Yes |
Yes |
revised |
No |
S5-153262 |
| |
|
S5-153262 |
Rel-12 CR 32.299 Correction of RAT Type - alignment with TS 29.061 |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
| S5-153149 |
|
|
S5-153150 |
Rel-13 CR 32.299 Correction of RAT Type - alignment with TS 29.061 |
Nokia Networks |
CR |
approval |
Yes |
Yes |
revised |
No |
S5-153263 |
| |
|
S5-153263 |
Rel-13 CR 32.299 Correction of RAT Type - alignment with TS 29.061 |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
| S5-153150 |
|
|
S5-153151 |
Rel-11 CR 32.260 Clarification on IMS Transit Functions |
Nokia Networks |
CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153152 |
Rel-12 CR 32.260 Clarification on IMS Transit Functions |
Nokia Networks |
CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153153 |
Rel-13 CR 32.260 Clarification on IMS Transit Functions |
Nokia Networks |
CR |
approval |
Yes |
Yes |
revised |
No |
S5-153264 |
| |
|
S5-153264 |
Rel-13 CR 32.260 Clarification on IMS Transit Functions |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
| S5-153153 |
|
|
S5-153154 |
Rel-12 CR 32.299 Correction for ProSe Charging |
Nokia Networks |
CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153155 |
Rel-13 CR 32.299 Correction for ProSe Charging |
Nokia Networks |
CR |
approval |
Yes |
Yes |
revised |
No |
S5-153285 |
| |
|
S5-153285 |
Rel-13 CR 32.299 Correction for ProSe Charging |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
| S5-153155 |
|
|
S5-153156 |
Rel-12 CR 32.298 Correction for ProSe Charging |
Nokia Networks |
CR |
approval |
Yes |
Yes |
revised |
No |
S5-153286 |
| |
|
S5-153286 |
Rel-13 CR 32.298 Correction for ProSe Charging |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
| S5-153156 |
|
|
S5-153177 |
R13 32.251 CRusage of Charging Characteristics for activating PCC function - Alignment with 23.203 |
China Telecom, Huawei |
CR |
- |
Yes |
Yes |
revised |
No |
S5-153287 |
| |
|
S5-153287 |
R13 32.251 CRusage of Charging Characteristics for activating PCC function - Alignment with 23.203 |
China Telecom, Huawei |
CR |
- |
Yes |
Yes |
agreed |
No |
| S5-153177 |
|
|
S5-153198 |
Rel-13 CR 32.299 Support for M2M-Information in the Service-Information AVP |
Ericsson |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153288 |
| |
|
S5-153288 |
Rel-13 CR 32.299 Support for M2M-Information in the Service-Information AVP |
Ericsson |
CR |
Approval |
Yes |
Yes |
agreed |
No |
| S5-153198 |
|
|
S5-153297 |
Rel-13 CR 32.299 Harmonisation of clauses for vendor specific AVP |
Nokia Networks |
CR |
agreement |
Yes |
Yes |
agreed |
No |
|
| |
|
S5-153299 |
Alignment of Direct Communications CDR with PC3ch protocol |
Ericsson, Nokia Networks |
CR |
discussion |
Yes |
Yes |
agreed |
No |
|
| 8.4 Rel-13 Charging
|
|
|
|
|
|
|
|
|
|
| 8.4.1 Inter-PLMN PS domain online charging
|
|
|
|
|
|
|
|
|
|
| 8.4.1.1 TR on Inter-PLMN PS domain online charging S5-153139 |
pCR - Key issue HPLMN OCS control over VPLMN IP-CAN bearer |
Nokia Networks |
pseudo CR / text proposal |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153179 |
pCR 32.843 discussion of AVP filtering key issue |
Huawei |
pseudo CR / text proposal |
- |
No |
Yes |
withdrawn |
Yes |
|
| |
|
S5-153180 |
R13 32.843 pCR discussion of AVP filtering key issue |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153181 |
R13 32.843 pCR message content and additional message flows for dedicated profile solution3 |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153249 |
| |
|
S5-153249 |
R13 32.843 pCR message content and additional message flows for dedicated profile solution3 |
Huawei |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153181 |
|
|
S5-153182 |
pCR TR 32.843 recommendation for Key issues #1 and #3 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153246 |
| |
|
S5-153246 |
pCR TR 32.843 recommendation for Key issues #1 and #3 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153182 |
|
|
S5-153183 |
pCR TR 32.843 conclusion for Key issues 5 Home OCS determination |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153247 |
| |
|
S5-153247 |
pCR TR 32.843 conclusion for Key issues 5 Home OCS determination |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153183 |
|
|
S5-153184 |
pCR TR 32.843 Partial Conclusion for Key issues #6 AVP filtering |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153245 |
| |
|
S5-153245 |
pCR TR 32.843 Partial Conclusion for Key issues #6 AVP filtering |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
noted |
No |
| S5-153184 |
|
|
S5-153185 |
pCR TR 32.843 Key issues 10 and 11 resolution |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153248 |
| |
|
S5-153248 |
pCR TR 32.843 Key issues 10 and 11 resolution |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153185 |
|
|
S5-153186 |
pCR TR 32.843 solution 3 dedicated profile correction |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-153187 |
pCR TR 32.843 Dedicated profile selection for scenario 1 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153251 |
| |
|
S5-153251 |
pCR TR 32.843 Dedicated profile selection for scenario 1 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153187 |
|
|
S5-153188 |
pCR TR 32.843 Dedicated prof Scenario 2 Roaming Mobile - FBA Convergence |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153189 |
pCR TR 32.843 Conclusion and recommendations for phase 1 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
revised |
No |
S5-153252 |
| |
|
S5-153252 |
pCR TR 32.843 Conclusion and recommendations for phase 1 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
Approval |
Yes |
Yes |
approved |
No |
| S5-153189 |
|
|
S5-153250 |
New chapter structure for dedicated profiles/implementations |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pseudo CR / text proposal |
discussion |
Yes |
Yes |
approved |
No |
|
| 8.4.1.2 Specification of Inter-PLMN PS domain online charging S5-153253 |
Cover sheet TR 32.843 presentation for information to SA |
Alcatel-Lucent |
other |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153254 |
LS to SA2 OCS proxy |
Alcatel-Lucent |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153255 |
LS to CT3 OCS address determination |
Alcatel-Lucent |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-153256 |
LS to GSMA |
Alcatel-Lucent |
o/g LS |
discussion |
Yes |
Yes |
revised |
No |
S5-153352 |
| |
|
S5-153352 |
LS to GSMA |
Alcatel-Lucent |
o/g LS |
discussion |
No |
Yes |
sent for email approval |
No |
| S5-153256 |
|
|
S5-153269 |
Draft TR 32.843 |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 8.4.2 ULI and release causes for charging enhancement for VoLTE S5-153089 |
Rel-13 32.251 Introduction of multiple Release causes in EPC Charging |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153257 |
| |
|
S5-153257 |
Rel-13 32.251 Introduction of multiple Release causes in EPC Charging |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
agreed |
No |
| S5-153089 |
|
|
S5-153090 |
Rel-13 32.299 Introduction of multiple Release causes in EPC Charging |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153258 |
| |
|
S5-153258 |
Rel-13 32.299 Introduction of multiple Release causes in EPC Charging |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
agreed |
No |
| S5-153090 |
|
|
S5-153091 |
Rel-13 32.298 Introduction of multiple Release causes in EPC Charging |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
revised |
No |
S5-153259 |
| |
|
S5-153259 |
Rel-13 32.298 Introduction of multiple Release causes in EPC Charging |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
Yes |
Yes |
agreed |
No |
| S5-153091 |
8.4.3 Charging on enhancements for IMS Service Continuity S5-153140 |
Rel-13 CR 32.260 Addition of Inter-UE transfer call flows for IMS Service Continuity |
Nokia Networks |
CR |
approval |
Yes |
Yes |
agreed |
No |
|
| 8.4.4 Enhanced S2a Mobility Over Trusted WLAN access to EPC - Charging (preliminary work before approval by SA)
|
|
|
|
|
|
|
|
|
|
| 8.4.5 Announcements for IMS Online Charging (preliminary work before approval by SA) S5-153203 |
Rel-13 CR 32.260 Charging Announcements Introduction |
Amdocs |
CR |
- |
Yes |
Yes |
revised |
No |
S5-153290 |
| |
|
S5-153290 |
Rel-13 CR 32.260 OCS-provided annoucements introduction |
Amdocs |
CR |
- |
Yes |
Yes |
agreed |
No |
| S5-153203 |
|
|
S5-153204 |
Rel-13 CR 32.275 Ignoring charging annoucements for call diversion and call transfer |
Amdocs |
CR |
- |
Yes |
Yes |
noted |
No |
|
| 8.5 Charging Studies
|
|
|
|
|
|
|
|
|
|
| 8.5.1 Study on Determination of Completeness of Charging Information in IMS S5-153110 |
TR32850 Proposal of use cases description |
ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153291 |
| |
|
S5-153291 |
TR32850 Proposal of use cases description |
ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
agreed |
No |
| S5-153110 |
|
|
S5-153295 |
TR32850 Proposal of use cases description |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 8.5.2 Study on Overload Control for Diameter Charging Applications (preliminary work before approval by SA) S5-153111 |
Skeleton 328xx-000 Study on Overload Control for Diameter Charging Applications |
ZTE |
draft TS/TR |
- |
Yes |
Yes |
revised |
No |
S5-153292 |
| |
|
S5-153292 |
Skeleton 328xx-000 Study on Overload Control for Diameter Charging Applications |
ZTE |
draft TS/TR |
- |
Yes |
Yes |
approved |
No |
| S5-153111 |
|
|
S5-153112 |
TR328xx Scope of Study on Overload Control for Diameter Charging Applications |
ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153293 |
| |
|
S5-153293 |
TR328xx Scope of Study on Overload Control for Diameter Charging Applications |
ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153112 |
|
|
S5-153175 |
TR328xx Add Reference and General Description of Study on Overload Control for Diameter Charging Applications |
ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
revised |
No |
S5-153294 |
| |
|
S5-153294 |
TR328xx Add Reference and General Description of Study on Overload Control for Diameter Charging Applications |
ZTE |
pseudo CR / text proposal |
- |
Yes |
Yes |
approved |
No |
| S5-153175 |
|
|
S5-153296 |
TR 32.8xx (Study on Overload Control for Diameter Charging Applications) |
Rapporteur |
draft TS/TR |
discussion |
No |
Yes |
left for email approval |
No |
|
| 9 Any Other Business
|
|
|
|
|
|
|
|
|
|
| 10 Closing of the meeting
|
|
|
|
|
|
|
|
|
|
| |
Created: 2015-05-29 14:04     Last document: S5-153369