Agenda with allocated Tdocs

Created: 2015-05-29 14:04     Last document: S5-153369

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
Opening of the meeting
2
Approval of the agenda
S5-153000 Agenda WG Chairman agenda - Yes Yes approved No
3
IPR declaration
S5-153039 IPR and legal declaration WG Chairman other - Yes Yes noted No
4
Meetings and activities reports
4.1
Last SA5 meeting report
S5-153001 Report from last SA5 meeting ETSI Secretariat meeting report / action list - Yes Yes approved No
4.2
Last SA meeting report
S5-153002 SA5 status report at last SA meeting WG Chairman meeting report / action list - Yes Yes noted No
    S5-153003 SA5 results at last SA meeting WG Chairman meeting report / action list - Yes Yes noted No
4.3
Inter-organizational reports
S5-153047 Meeting Report NFV ISG IFA - 3GPP SA5 Workshop Helsinki April 20-21 WG Chairman meeting report / action list - Yes Yes noted No
    S5-153202 Report of methodology coordination meeting between SA5 and ITU-T SG2 WG Vice Chair meeting report / action list - Yes Yes noted No
5
Cross-SWG issues
5.1
Administrative issues at SA5 level
S5-153007 Leaders meeting agenda WG Chairman agenda - Yes Yes noted No
    S5-153008 Leaders meeting minutes WG Chairman meeting report / action list - Yes Yes noted No
    S5-153014 SA5 Working Procedures WG Chairman other - Yes Yes approved No
    S5-153015 SA5 Meeting Facility Requirements WG Chairman other - Yes Yes noted No
    S5-153016 Process for management of draft TSs/TRs WG ViceChair other - Yes Yes approved No
    S5-153017 CR Quality Check ETSI Secretariat other - Yes Yes noted No
    S5-153021 List of Rapporteurs ETSI Secretariat other - Yes Yes noted No
    S5-153134 Status of post SA5#101 email approvals WG Chairman other - No No [not addressed] No
    S5-153135 SA5 work plan status after SA5#101 WG Chairman other - No No [not addressed] No
5.2
Technical issues at SA5 level
5.3
Liaison statements at SA5 level
S5-153211 Input LS from ONF on information modeling work recently approved and published ONF_IMP_LS_20150513 i/c LS - Yes Yes postponed No
    S5-153364 Guidelines of cooperation of SA5 with external entities Ericsson other discussion No Yes left for email approval No
5.4
SA5 meeting calendar
S5-153013 SA5 Meeting Calendar WG Chairman other - Yes Yes noted No
5.5
Review of the Work Plan
S5-153018 Deliverables due for the NEXT SA Plenary ETSI Secretariat other - Yes Yes noted No
    S5-153019 Rel-13 SA5 WIDs WG Chairman other - Yes Yes noted No
    S5-153020 SA5 3GPP Work Plan ETSI Secretariat other - Yes Yes noted No
6
OAM&P
6.1
OAM&P Plenary
S5-153004 Time Plan for OAM&P and Converged Management SWGs WG Chairman other - Yes Yes revised No S5-153216
    S5-153216 Time Plan for OAM&P and Converged Management SWGs WG Chairman other - Yes Yes approved No S5-153004
    S5-153005 OAM Executive Report from THIS Meeting OAM SWG Chair meeting report / action list - Yes Yes noted No
    S5-153081 OAM action list before the meeting OAM SWG Chair meeting report / action list - Yes Yes noted No
    S5-153082 OAM action list after the meeting OAM SWG Chair meeting report / action list - Yes Yes noted No
    S5-153207 Input LS from BBF on WT-196 Issue 2 Amendment 1 Review (resubmitted) bbf2015.335.02 i/c LS - Yes Yes replied to No
    S5-153217 Reply to: Input LS from BBF on WT-196 Issue 2 Amendment 1 Review (resubmitted) Alcatel-Lucent o/g LS approval Yes Yes approved No
6.2
New Work Item proposals - OAM&P & Converged Management
S5-153022 Minutes of New Work Item proposals - OAM&P & Converged Management Rapporteur meeting report / action list - Yes Yes noted No
    S5-153130 WID BB Network Management of Virtualized Mobile Core Network Huawei, China Mobile new WID - Yes Yes revised No S5-153305
    S5-153305 WID BB Network Management of Virtualized Mobile Core Network Huawei, China Mobile new WID - Yes Yes revised No S5-153360 S5-153130
    S5-153360 WID BB Network Management of Virtualized Mobile Core Network Huawei, China Mobile new WID - No Yes agreed No S5-153305
    S5-153138 New WID management concept, architecture and requirements for virtualized mobile core network and mixed mobile core network China Mobile new WID Approval Yes Yes revised No S5-153306
    S5-153306 New WID management concept, architecture and requirements for virtualized mobile core network and mixed mobile core network China Mobile new WID Approval Yes Yes revised No S5-153369 S5-153138
    S5-153369 New WID management concept, architecture and requirements for virtualized mobile core network and mixed mobile core network China Mobile new WID Approval No Yes agreed No S5-153306
6.3
Maintenance and Rel-13 small Enhancements - OAM&P & Converged Management
S5-153023 Minutes of Maintenance and Rel-13 small Enhancements - OAM&P & Converged Management Rapporteur meeting report / action list - Yes Yes noted No
    S5-153066 pCR for Rel-11 SuperCR 28623 Align id attribute definitions Ericsson pseudo CR / text proposal - Yes Yes approved No
    S5-153067 pCR for Rel-12 SuperCR 28623 Align Id attribute definitions Ericsson pseudo CR / text proposal - Yes Yes approved No
    S5-153068 pCR for Rel-11 SuperCR 28652 Align id attribute definitions Ericsson pseudo CR / text proposal - Yes Yes approved No
    S5-153218 pCR for Rel-11 SuperCR 28652 Align id attribute definitions Ericsson pseudo CR / text proposal - No Yes withdrawn Yes
    S5-153069 pCR for Rel-12 SuperCR 28652 Align id attribute definitions Ericsson pseudo CR / text proposal - Yes Yes approved No
    S5-153219 pCR for Rel-12 SuperCR 28652 Align id attribute definitions Ericsson pseudo CR / text proposal - No Yes withdrawn Yes
    S5-153070 pCR for Rel-11 SuperCR 28653 Align id attribute definitions Ericsson pseudo CR / text proposal - Yes Yes approved No
    S5-153071 pCR for Rel-12 SuperCR 28653 Align id attribute definitions Ericsson pseudo CR / text proposal - Yes Yes approved No
    S5-153072 Rel-11 CR 28652 Add missing IOC notification support Ericsson CR - Yes Yes withdrawn Yes
    S5-153073 Rel-12 CR 28652 Add missing IOC notification support Ericsson CR - Yes Yes withdrawn Yes
    S5-153074 Rel-11 CR 28652 Correct IsNullable properties for power attributes Ericsson CR - Yes Yes withdrawn Yes
    S5-153075 Rel-12 CR 28652 Correct IsNullable properties for power attributes Ericsson CR - Yes Yes withdrawn Yes
    S5-153076 Rel-12 CR 32300 Disambiguate DN lenght constraint Ericsson CR - Yes Yes withdrawn Yes
    S5-153101 Rel-13 CR 32.101 Replacement of 3G term Huawei CR - Yes Yes noted No
    S5-153193 Rel-11 CR 28652 Add missing IOC notification support Ericsson CR - Yes Yes agreed No
    S5-153194 Rel-12 CR 28652 Add missing IOC notification support Ericsson CR - Yes Yes agreed No
    S5-153195 Rel-11 CR 28652 Correct IsNullable properties for power attributes Ericsson CR - Yes Yes agreed No
    S5-153196 Rel-12 CR 28652 Correct IsNullable properties for power attributes Ericsson CR - Yes Yes agreed No
    S5-153197 Rel-12 CR 32300 Disambiguate DN lenght constraint Ericsson CR - Yes Yes revised No S5-153224
    S5-153224 Rel-12 CR 32300 Disambiguate DN lenght constraint Ericsson CR - Yes Yes agreed No S5-153197
6.4
Rel-13 Operations, Administration, Maintenance and Provisioning (OAM&P)
6.4.1
Enhanced Network Management (NM) centralized Coverage and Capacity Optimization
S5-153033 Minutes for Enhanced Network Management (NM) centralized Coverage and Capacity Optimization Rapporteur meeting report / action list - Yes Yes noted No
    S5-153064 Rel-13 CR 28.628 Add measurements for NM centralized Coverage and Capacity Optimization (CCO) Ericsson CR Approval Yes Yes revised No S5-153270
    S5-153270 Rel-13 CR 28.628 Add measurements for NM centralized Coverage and Capacity Optimization (CCO) Ericsson CR Approval Yes Yes revised No S5-153344 S5-153064
    S5-153344 Rel-13 CR 28.628 Add measurements for NM centralized Coverage and Capacity Optimization (CCO) Ericsson CR Approval Yes Yes agreed No S5-153270
6.4.2
WLAN Management
6.4.2.1
WLAN Network Resource Model for Type-2 interface
S5-153027 Minutes for WLAN Network Resource Model for Type-2 interface Rapporteur meeting report / action list - No Yes withdrawn Yes
6.4.2.2
WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface
S5-153029 Minutes for WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface Rapporteur meeting report / action list - Yes Yes revised No S5-153345
    S5-153345 Minutes for WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface Rapporteur meeting report / action list - Yes Yes noted No S5-153029
    S5-153048 Add collection methods for counters defined in other SDOs Intel CR - Yes Yes revised No S5-153271
    S5-153271 Add collection methods for counters defined in other SDOs Intel CR - Yes Yes revised No S5-153346 S5-153048
    S5-153346 Add collection methods for counters defined in other SDOs Intel CR - No Yes left for email approval No S5-153271
    S5-153049 Discussion paper of PM collection method Intel discussion - Yes Yes noted No
6.4.3
Energy Efficiency related Performance Measurements
S5-153026 Minutes for Energy Efficiency related Performance Measurements Rapporteur meeting report / action list - Yes Yes noted No
    S5-153077 Issue list with status Nokia Networks other - Yes Yes noted No
    S5-153078 R13 32.425 Add usage of measurements supporting EE coverage KPI Nokia Networks CR - Yes Yes revised No S5-153272
    S5-153272 R13 32.425 Add usage of measurements supporting EE coverage KPI Nokia Networks CR - Yes Yes agreed No S5-153078
    S5-153079 Revised WID Energy Efficiency related Performance Measurements Nokia Networks revised WID - No Yes withdrawn Yes
    S5-153232 Proposal for revised WID Energy Efficiency related Performance Measurements Orange revised WID discussion Yes Yes revised No S5-153347
    S5-153347 Proposal for revised WID Energy Efficiency related Performance Measurements Orange revised WID discussion Yes Yes agreed No S5-153232
    S5-153359 LS to ETSI EE on revised WID Energy efficiency Nokia Networks o/g LS discussion No Yes left for email approval No
6.4.4
Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement
S5-153028 Minutes for Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement Rapporteur meeting report / action list - Yes Yes noted No
    S5-153103 pCR 32.446 Changes for Logged MBSFN MDT Alcatel-Lucent pseudo CR / text proposal - Yes Yes approved No
    S5-153220 Rel 13 CR 32.421 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153273
    S5-153273 Rel 13 CR 32.421 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153354 S5-153220
    S5-153354 Rel 13 CR 32.421 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes agreed No S5-153273
    S5-153221 Rel 13 CR 32.422 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153274
    S5-153274 Rel 13 CR 32.422 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153349 S5-153221
    S5-153349 Rel 13 CR 32.422 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes agreed No S5-153274
    S5-153222 Rel 13 CR 32.441 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153275
    S5-153275 Rel 13 CR 32.441 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153348 S5-153222
    S5-153348 Rel 13 CR 32.441 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes agreed No S5-153275
    S5-153223 Rel 13 CR 32.442 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153276
    S5-153276 Rel 13 CR 32.442 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153350 S5-153223
    S5-153350 Rel 13 CR 32.442 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes agreed No S5-153276
    S5-153225 Rel 13 CR 32.446 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes revised No S5-153351
    S5-153351 Rel 13 CR 32.446 Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement. Alcatel-Lucent CR discussion Yes Yes agreed No S5-153225
6.5
OAM&P Studies
6.5.1
Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function
S5-153031 Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function Rapporteur meeting report / action list - Yes Yes noted No
    S5-153093 Revised WID Study on Enhancements of OAM aspects of Distributed MLB SON Rapporteur revised WID Approval Yes Yes agreed No
    S5-153168 pCR on TR 32.860 Non-uniform load distribution PS and Solution Ericsson pseudo CR / text proposal - Yes Yes noted No
    S5-153169 pCR on TR 32.860 Hybrid SON re use of statistic to predict future Ericsson pseudo CR / text proposal - Yes Yes approved No
    S5-153170 pCR on TR 32.860 Hybrid SON re effectiveness of NM analysis Ericsson pseudo CR / text proposal - Yes Yes approved No
    S5-153171 pCR on TR 32.860 Configuration for CAC Problem Statement and solution Ericsson pseudo CR / text proposal - Yes Yes noted No
    S5-153172 pCR on TR 32.860 Algorithm misalignment PS and solution Ericsson pseudo CR / text proposal - Yes Yes noted No
    S5-153280 Draft TR 32.860 Rapporteur draft TS/TR discussion No Yes left for email approval No
6.5.2
Study on Application and Partitioning of Itf-N
S5-153036 Minutes for Study on Application and Partitioning of Itf-N Rapporteur meeting report / action list - No Yes withdrawn Yes
6.5.3
Study on Network Management of Virtualized Networks
S5-153025 NSD life cycle state Ericsson other - Yes Yes noted No
    S5-153030 Minutes for Study on Network Management of Virtualized Networks Rapporteur meeting report / action list - Yes Yes revised No S5-153353
    S5-153353 Minutes for Study on Network Management of Virtualized Networks Rapporteur meeting report / action list - Yes Yes noted No S5-153030
    S5-153040 proposed Concept & Background text Steven Wright , AT&T pseudo CR / text proposal decision Yes Yes noted No
    S5-153059 pCR to 32.842 NSD Update Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153226
    S5-153226 pCR to 32.842 NSD Update Cisco pseudo CR / text proposal Approval Yes Yes approved No S5-153059
    S5-153060 pCR to 32.842 NSD Query Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153227
    S5-153227 pCR to 32.842 NSD Query Cisco pseudo CR / text proposal Approval Yes Yes approved No S5-153060
    S5-153061 pCR to 32.842 Delete NSD Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153228
    S5-153228 pCR to 32.842 Delete NSD Cisco pseudo CR / text proposal Approval Yes Yes approved No S5-153061
    S5-153062 pCR to 32.842 Requirements related to operations with VNF Package Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153230
    S5-153230 pCR to 32.842 Requirements related to operations with VNF Package Cisco,Huawei pseudo CR / text proposal Approval Yes Yes approved No S5-153062
    S5-153063 pCR to 32.842 Requirements related to operations with NSD Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153231
    S5-153231 pCR to 32.842 Requirements related to operations with NSD Cisco pseudo CR / text proposal Approval Yes Yes approved No S5-153063
    S5-153080 Guidance of referencing to NFV MANO GS OAM SWG Chair pseudo CR / text proposal - Yes Yes noted No
    S5-153094 pCR MME overload mitigation by MME VNF procedure Intel, China Mobile, ZTE pseudo CR / text proposal - Yes Yes revised No S5-153233
    S5-153233 pCR MME overload mitigation by MME VNF procedure Intel, China Mobile, ZTE pseudo CR / text proposal - Yes Yes revised No S5-153338 S5-153094
    S5-153338 pCR MME overload mitigation by MME VNF procedure Intel, China Mobile, ZTE pseudo CR / text proposal - Yes Yes noted No S5-153233
    S5-153095 pCR MME VNF termination procedure Intel, China Mobile, ZTE pseudo CR / text proposal - Yes Yes revised No S5-153234
    S5-153234 pCR MME VNF termination procedure Intel, China Mobile, ZTE pseudo CR / text proposal - Yes Yes revised No S5-153339 S5-153095
    S5-153339 pCR MME VNF termination procedure Intel, China Mobile, ZTE pseudo CR / text proposal - Yes Yes noted No S5-153234
    S5-153096 pCR performance management procedure Intel, China Mobile pseudo CR / text proposal - Yes Yes noted No
    S5-153235 pCR performance management procedure Intel, China Mobile pseudo CR / text proposal - No Yes withdrawn Yes
    S5-153097 pCR virtualized resource performance measurements use case Intel pseudo CR / text proposal - Yes Yes revised No S5-153236
    S5-153236 pCR virtualized resource performance measurements use case Intel pseudo CR / text proposal - Yes Yes noted No S5-153097
    S5-153340 pCR virtualized resource performance measurements use case Intel pseudo CR / text proposal - No Yes withdrawn Yes
    S5-153098 pCR performance management requirements Intel pseudo CR / text proposal - Yes Yes noted No
    S5-153237 pCR performance management requirements Intel pseudo CR / text proposal - No Yes withdrawn Yes
    S5-153102 pCR TR 32.842 Update LCM requirement of NM China Mobile, Huawei, Intel pseudo CR / text proposal Approval Yes Yes revised No S5-153315
    S5-153315 pCR TR 32.842 Update LCM requirement of NM China Mobile, Huawei, Intel pseudo CR / text proposal Approval Yes Yes revised No S5-153337 S5-153102
    S5-153337 pCR TR 32.842 Update LCM requirement of NM China Mobile, Huawei, Intel pseudo CR / text proposal Approval Yes Yes approved No S5-153315
    S5-153104 pCR TR 32.842 Add use case of VNF scaling initiated by EM with scaling target ZTE, China Mobile pseudo CR / text proposal - Yes Yes noted No
    S5-153105 pCR 32 842 VNF configuration management procedure ZTE, China Mobile pseudo CR / text proposal - Yes Yes noted No
    S5-153106 pCR 32 842 VNF performance management procedure ZTE, China Mobile pseudo CR / text proposal - Yes Yes revised No S5-153319
    S5-153319 pCR 32 842 VNF performance management procedure ZTE, China Mobile pseudo CR / text proposal - Yes Yes approved No S5-153106
    S5-153114 TR 32.842 Rapporteur clean-up proposal Huawei draft TS/TR - Yes Yes revised No S5-153239
    S5-153239 TR 32.842 Rapporteur clean-up proposal Huawei draft TS/TR - Yes Yes approved No S5-153114
    S5-153115 pCR 32.842 Conclusions and recommendations Huawei, China Mobile pseudo CR / text proposal - Yes Yes revised No S5-153322
    S5-153322 pCR 32.842 Conclusions and recommendations Huawei, China Mobile pseudo CR / text proposal - Yes Yes revised No S5-153355 S5-153115
    S5-153355 pCR 32.842 Conclusions and recommendations Huawei, China Mobile pseudo CR / text proposal - Yes Yes approved No S5-153322
    S5-153116 pCR 32.842 Modify mixed network management mapping relationship figure Huawei pseudo CR / text proposal - Yes Yes revised No S5-153281
    S5-153281 pCR 32.842 Modify mixed network management mapping relationship figure Huawei pseudo CR / text proposal - Yes Yes approved No S5-153116
    S5-153117 pCR 32.842 Modify network management reference model Huawei, China Mobile pseudo CR / text proposal - Yes Yes noted No
    S5-153118 pCR 32.842 Add NFV management layer concept Huawei pseudo CR / text proposal - Yes Yes noted No
    S5-153119 pCR 32.842 Update 7.3.1 Instantiation of VNF with UML options Huawei pseudo CR / text proposal - Yes Yes approved No
    S5-153120 pCR 32.842 Add FM Procedure flow for the correlation done in EM Huawei pseudo CR / text proposal - Yes Yes revised No S5-153282
    S5-153282 pCR 32.842 Add FM Procedure flow for the correlation done in EM Huawei pseudo CR / text proposal - Yes Yes approved No S5-153120
    S5-153121 pCR 32.842 Add NS Initiation Flow Huawei pseudo CR / text proposal - Yes Yes revised No S5-153283
    S5-153283 pCR 32.842 Add NS Initiation Flow Huawei pseudo CR / text proposal - Yes Yes noted No S5-153121
    S5-153122 pCR 32.842 Add NS Termination Flow Huawei pseudo CR / text proposal - Yes Yes revised No S5-153314
    S5-153314 pCR 32.842 Add NS Termination Flow Huawei pseudo CR / text proposal - Yes Yes revised No S5-153336 S5-153122
    S5-153336 pCR 32.842 Add NS Termination Flow Huawei pseudo CR / text proposal - Yes Yes noted No S5-153314
    S5-153123 pCR 32.842 Add general description for dashed box in management procedures Huawei pseudo CR / text proposal - Yes Yes revised No S5-153300
    S5-153300 pCR 32.842 Add general description for dashed box in management procedures Huawei pseudo CR / text proposal - Yes Yes revised No S5-153357 S5-153123
    S5-153357 pCR 32.842 Add general description for dashed box in management procedures Huawei,KDDI pseudo CR / text proposal - No Yes left for email approval No S5-153300
    S5-153124 pCR 32.842 Modify the note 9 description Huawei pseudo CR / text proposal - Yes Yes revised No S5-153302
    S5-153302 pCR 32.842 Modify the note 9 description Huawei pseudo CR / text proposal - Yes Yes revised No S5-153356 S5-153124
    S5-153356 pCR 32.842 Modify the note 9 description Huawei pseudo CR / text proposal - Yes Yes approved No S5-153302
    S5-153129 pCR TR 32.842 Generic NRM for virtual network ZTE pseudo CR / text proposal - Yes Yes revised No S5-153321
    S5-153321 pCR TR 32.842 Generic NRM for virtual network ZTE pseudo CR / text proposal - Yes Yes noted No S5-153129
    S5-153131 pCR TR32.842 modification of potential requirements for mixed network management KDDI pseudo CR / text proposal Approval Yes Yes revised No S5-153303
    S5-153303 pCR TR32.842 modification of potential requirements for mixed network management KDDI pseudo CR / text proposal Approval Yes Yes noted No S5-153131
    S5-153132 pCR TR32.842 adding managemet procedure followed by VNF lifecycle management KDDI pseudo CR / text proposal Approval Yes Yes revised No S5-153304
    S5-153304 pCR TR32.842 adding managemet procedure followed by VNF lifecycle management KDDI pseudo CR / text proposal Approval Yes Yes noted No S5-153132
    S5-153133 pCR TR32.842 clarification of dotted-line arrows in the procedures KDDI pseudo CR / text proposal Approval Yes Yes noted No
    S5-153136 pCR 32.842 Add potential requirement for VNF Package Huawei pseudo CR / text proposal - Yes Yes revised No S5-153230
    S5-153159 [Draft] LS on VNFM enhancements to support SA5 use cases for network management of virtualized networks NTT DOCOMO o/g LS Approval Yes Yes revised No S5-153311
    S5-153311 LS on VNFM enhancements to support SA5 use cases for network management of virtualized networks NTT DOCOMO o/g LS Approval Yes Yes revised No S5-153365 S5-153159
    S5-153365 LS on VNFM enhancements to support SA5 use cases for network management of virtualized networks NTT DOCOMO o/g LS Approval No Yes left for email approval No S5-153311
    S5-153161 pCR 32.842 Add potential requirement on notification due to infrastructure state changes NTT DOCOMO pseudo CR / text proposal Approval Yes Yes revised No S5-153310
    S5-153310 pCR 32.842 Add potential requirement on notification due to infrastructure state changes NTT DOCOMO pseudo CR / text proposal Approval Yes Yes approved No S5-153161
    S5-153162 pCR 32.842 Add potential requirement on VNF snapshot capture NTT DOCOMO pseudo CR / text proposal Approval Yes Yes revised No S5-153307
    S5-153307 pCR 32.842 Add potential requirement on VNF snapshot capture NTT DOCOMO pseudo CR / text proposal Approval Yes Yes approved No S5-153162
    S5-153163 pCR 32.842 Add potential requirement for VNF auto-healing by VNFM NTT DOCOMO pseudo CR / text proposal Approval Yes Yes revised No S5-153308
    S5-153308 pCR 32.842 Add potential requirement for VNF auto-healing by VNFM NTT DOCOMO pseudo CR / text proposal Approval Yes Yes approved No S5-153163
    S5-153164 pCR 32.842 Amending requirement for auto-scaling by VNFM of a VNF NTT DOCOMO pseudo CR / text proposal Approval Yes Yes revised No S5-153309
    S5-153309 pCR 32.842 Amending requirement for auto-scaling by VNFM of a VNF NTT DOCOMO pseudo CR / text proposal Approval Yes Yes approved No S5-153164
    S5-153165 pCR TR 32.842 VNF failures detected by VNF or EM Intel pseudo CR / text proposal - Yes Yes revised No S5-153312
    S5-153312 pCR TR 32.842 VNF failures detected by VNF or EM Intel pseudo CR / text proposal - Yes Yes revised No S5-153361 S5-153165
    S5-153361 pCR TR 32.842 VNF failures detected by VNF or EM Intel pseudo CR / text proposal - No Yes left for email approval No S5-153312
    S5-153166 pCR TR 32.842 changes to VNFC alarm use case Intel pseudo CR / text proposal - Yes Yes revised No S5-153313
    S5-153313 pCR TR 32.842 changes to VNFC alarm use case Intel pseudo CR / text proposal - Yes Yes revised No S5-153362 S5-153166
    S5-153362 pCR TR 32.842 changes to VNFC alarm use case Intel pseudo CR / text proposal - No Yes left for email approval No S5-153313
    S5-153173 pCR on TR 32.842 regarding VNF model Ericsson pseudo CR / text proposal - Yes Yes noted No
    S5-153174 pCR on TR 32.842 scaling trigger and decision Ericsson pseudo CR / text proposal - Yes Yes noted No
    S5-153238 Need for separate 6.2 and 6.1? Ericsson discussion discussion Yes Yes noted No
    S5-153278 Agenda for joint SA5-IFA conference call (in May.28) OAM SWG Chair agenda discussion No Yes approved No
    S5-153284 Add principles and update for gap analysis section Huawei,Nokia Networks pseudo CR / text proposal discussion Yes Yes revised No S5-153363
    S5-153363 Add principles and update for gap analysis section Huawei,Nokia Networks pseudo CR / text proposal discussion No Yes left for email approval No S5-153284
    S5-153367 Draft TR 32.842 Rapporteur draft TS/TR discussion No Yes left for email approval No
6.5.4
Study on KQIs for Service Experience
S5-153037 Minutes for Study on KQIs for Service Experience Rapporteur meeting report / action list - Yes Yes revised No S5-153366
    S5-153366 Minutes for Study on KQIs for Service Experience Rapporteur meeting report / action list - No Yes noted No S5-153037
    S5-153041 pCR 32.862 ETSI QoS parameters for mobile Web browsing Orange pseudo CR / text proposal - Yes Yes approved No
    S5-153042 pCR 32.862 Input for section on KQIs in ITU-T Orange pseudo CR / text proposal - Yes Yes revised No S5-153323
    S5-153323 pCR 32.862 Input for section on KQIs in ITU-T Orange pseudo CR / text proposal - Yes Yes approved No S5-153042
    S5-153055 Draft 32.862 0.2.0 Rapporteur draft TS/TR - Yes Yes noted No
    S5-153056 pCR 32862 Add Video Streaming Scenario Rapporteur pseudo CR / text proposal - Yes Yes revised No S5-153316
    S5-153316 pCR 32862 Add Video Streaming Scenario Rapporteur pseudo CR / text proposal - Yes Yes approved No S5-153056
    S5-153057 pCR 32862 Add File Transfer Scenario Rapporteur pseudo CR / text proposal - Yes Yes revised No S5-153317
    S5-153317 pCR 32862 Add File Transfer Scenario Rapporteur pseudo CR / text proposal - Yes Yes approved No S5-153057
    S5-153058 pCR 32862 Add E-mail Scenario Rapporteur pseudo CR / text proposal - Yes Yes revised No S5-153318
    S5-153318 pCR 32862 Add E-mail Scenario Rapporteur pseudo CR / text proposal - Yes Yes approved No S5-153058
    S5-153065 pCR for Overview of the KQI Standardization Status Ericsson pseudo CR / text proposal - Yes Yes revised No S5-153229
    S5-153229 pCR for Overview of the KQI Standardization Status Ericsson pseudo CR / text proposal - Yes Yes revised No S5-153325 S5-153065
    S5-153325 pCR for Overview of the KQI Standardization Status Ericsson pseudo CR / text proposal - No Yes left for email approval No S5-153229
    S5-153137 pCR 32.862 Add VoLTE call monitoring scenario Huawei pseudo CR / text proposal - Yes Yes noted No
    S5-153157 pCR 32862 Add Mobile Bidirectional Voice Scenario Huawei pseudo CR / text proposal Approval Yes Yes revised No S5-153326
    S5-153326 pCR 32862 Add Mobile Bidirectional Voice Scenario Huawei pseudo CR / text proposal Approval Yes Yes approved No S5-153157
    S5-153158 pCR 32862 Add Voice Streaming Scenario Huawei pseudo CR / text proposal Approval Yes Yes revised No S5-153327
    S5-153327 pCR 32862 Add Voice Streaming Scenario Huawei pseudo CR / text proposal Approval Yes Yes approved No S5-153158
    S5-153190 pCR 32.862 Addition of short and multimedia messaging services to scope PIWorks pseudo CR / text proposal Approval Yes Yes withdrawn Yes
    S5-153191 pCR 32.862 Addition of short and multimedia messaging services to scope P.I.Works pseudo CR / text proposal Approval Yes Yes approved No
    S5-153192 pCR 32.862 NGMN Service Quality Definition and Measurement for HTTP Adaptive Streaming P.I.Works pseudo CR / text proposal - Yes Yes revised No S5-153320
    S5-153320 pCR 32.862 NGMN Service Quality Definition and Measurement for HTTP Adaptive Streaming P.I.Works pseudo CR / text proposal - Yes Yes revised No S5-153343 S5-153192
    S5-153343 pCR 32.862 NGMN Service Quality Definition and Measurement for HTTP Adaptive Streaming P.I.Works pseudo CR / text proposal - Yes Yes approved No S5-153320
    S5-153328 Draft TR 32.862 Rapporteur draft TS/TR discussion No Yes left for email approval No
6.5.5
Study on OAM support for Licensed Shared Access
S5-153024 Minutes for Study on OAM support for Licensed Shared Access Rapporteur meeting report / action list - Yes Yes noted No
    S5-153099 pCR TR 32.855 add LSA UC description Nokia Networks pseudo CR / text proposal - Yes Yes approved No
    S5-153100 pCR TR 32.855 add definitions section Nokia Networks pseudo CR / text proposal - Yes Yes approved No
    S5-153160 pCR TR 32.855 add LSA UC requirements Ericsson pseudo CR / text proposal - Yes Yes revised No S5-153277
    S5-153277 pCR TR 32.855 add LSA UC requirements Ericsson pseudo CR / text proposal - Yes Yes revised No S5-153368 S5-153160
    S5-153368 pCR TR 32.855 add LSA UC requirements Ericsson pseudo CR / text proposal - Yes Yes approved No S5-153277
    S5-153167 pCR TR 32.855 Incumbent to reclaim the spectrum use case Intel pseudo CR / text proposal - Yes Yes noted No
    S5-153279 Draft TR 32.855 Rapporteur draft TS/TR discussion No Yes left for email approval No
7
Converged Management
7.1
Converged Management Plenary
S5-153006 Converged Management Executive report from THIS meeting Converged Management SWG Chair meeting report / action list - Yes Yes noted No
    S5-153200 CMAN action list before the meeting CMAN SWG Chair meeting report / action list - Yes Yes noted No
    S5-153201 CMAN action list after the meeting CMAN SWG Chair meeting report / action list - Yes Yes noted No
7.2
Rel-13 Operations, Administration, Maintenance and Provisioning (OAM&P)
7.2.1
Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations
7.2.1.1
TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations
S5-153032 Minutes for TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations Rapporteur meeting report / action list - Yes Yes noted No
    S5-153044 Progress status TR 32.838 Rapporteur other - Yes Yes noted No
    S5-153050 pCR to 32.838 Table 7.3.5 Cisco pseudo CR / text proposal Approval Yes Yes approved No
    S5-153051 pCR to 32.838 Table 7.1.1 Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153329
    S5-153329 pCR to 32.838 Table 7.1.1 Cisco pseudo CR / text proposal Approval Yes Yes approved No S5-153051
    S5-153052 pCR to 32.838 Table 7.2.1 Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153330
    S5-153330 pCR to 32.838 Table 7.2.1 Cisco pseudo CR / text proposal Approval Yes Yes approved No S5-153052
    S5-153053 pCR to 32.838 Table 7.3.2 Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153331
    S5-153331 pCR to 32.838 Table 7.3.2 Cisco pseudo CR / text proposal Approval Yes Yes approved No S5-153053
    S5-153054 pCR to 32.838 Table 7.2.12 Cisco pseudo CR / text proposal Approval Yes Yes revised No S5-153332
    S5-153332 pCR to 32.838 Table 7.2.12 Cisco pseudo CR / text proposal Approval Yes Yes approved No S5-153054
    S5-153092 pCR to 32.838 Table 7.5.4 Cisco pseudo CR / text proposal Approval Yes Yes approved No
    S5-153113 Introduction of Top OPE recommendations related to Common Channel Optimization (CCO) Huawei pseudo CR / text proposal - Yes Yes approved No
    S5-153333 Draft TR 32.838 Rapporteur draft TS/TR discussion No Yes left for email approval No
7.2.1.2
TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations
S5-153034 Minutes for TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations Rapporteur meeting report / action list - No Yes withdrawn Yes
7.2.2
Converged management Performance Management Interface Definitions
S5-153035 Minutes for Converged Management PM Interface definitions Rapporteur meeting report / action list - Yes Yes revised No S5-153342
    S5-153342 Minutes for Converged Management PM Interface definitions Rapporteur meeting report / action list - Yes Yes noted No S5-153035
    S5-153206 M-SDO JWG PM2: Metadefinitions for Measurements and KPIs V0.14 Rapporteur other - Yes Yes noted No
7.3
Converged Management Studies
7.3.1
Study on Compliance of 3GPP SA5 specifications to the NGMN NGCOR
S5-153038 Minutes for compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements Rapporteur meeting report / action list - Yes Yes noted No
    S5-153045 Progress status TR 32.837 Rapporteur other - Yes Yes noted No
    S5-153125 pCR 32.837 Introduce GEN requirements Huawei pseudo CR / text proposal - Yes Yes approved No
    S5-153126 pCR 32.837 Introduce PM requirements Huawei pseudo CR / text proposal - Yes Yes approved No
    S5-153127 pCR 32.837 Introduce the new format to INVM section Huawei pseudo CR / text proposal - Yes Yes revised No S5-153334
    S5-153334 pCR 32.837 Introduce the new format to INVM section Huawei pseudo CR / text proposal - Yes Yes approved No S5-153127
    S5-153128 pCR 32.837 Introduce the new format to FM section Huawei pseudo CR / text proposal - Yes Yes revised No S5-153335
    S5-153335 pCR 32.837 Introduce the new format to FM section Huawei pseudo CR / text proposal - Yes Yes approved No S5-153128
    S5-153341 Latest draft NGCOR compliance TR 32.837 Rapporteur draft TS/TR discussion No Yes left for email approval No
8
Charging
8.1
Charging Plenary
S5-153009 CH Agenda and Time Plan CH SWG Chair agenda - Yes Yes approved No
    S5-153010 CH Detailed Report from LAST Meeting CH SWG Chair meeting report / action list - Yes Yes approved No
    S5-153011 CH Executive Report from THIS Meeting CH SWG Chair meeting report / action list - Yes Yes noted No
    S5-153012 CH Detailed Report from THIS Meeting CH SWG Chair meeting report / action list - No No [not addressed] No
    S5-153043 LSout from SA5 to CT4 on Addition of AVP code definitions Nokia Networks o/g LS approval Yes Yes revised No S5-153240
    S5-153240 LSout from SA5 to CT4 on Addition of AVP code definitions Nokia Networks o/g LS approval Yes Yes approved No S5-153043
    S5-153083 Discussion paper on Network Race condition for Gy reference point Alcatel-Lucent discussion Approval Yes Yes noted No
    S5-153084 Reply to LS on Network Race condition for Gy reference point Alcatel-Lucent o/g LS Approval Yes Yes revised No S5-153241
    S5-153241 Reply to LS on Network Race condition for Gy reference point Alcatel-Lucent o/g LS Approval Yes Yes approved No S5-153084
    S5-153176 Reply to LS on VoLTE charging Orange o/g LS - Yes Yes revised No S5-153215
    S5-153215 Reply to LS on VoLTE charging Orange o/g LS - Yes Yes revised No S5-153242 S5-153176
    S5-153242 Reply to LS on VoLTE charging Orange o/g LS - Yes Yes approved No S5-153215
    S5-153199 LSout oneM2M Reply LS on Extension of 3GPP Service-Information AVP Ericsson o/g LS Approval Yes Yes revised No S5-153289
    S5-153289 LSout oneM2M Reply LS on Extension of 3GPP Service-Information AVP Ericsson o/g LS Approval Yes Yes approved No S5-153199
    S5-153205 DP Impact on charging when introducing new cause URI parameter value Orange discussion - Yes Yes noted No
    S5-153208 Input LS from CT4 on Network Race condition for Gy reference point C4-150684 i/c LS - Yes Yes replied to No
    S5-153209 Input LS from CT4 on UE identity used between ProSe Functions for ProSe Service Authorization C4-150687 i/c LS - Yes Yes noted No
    S5-153210 Reply LS from CT4 on Charging Characteristics in ProSe Subscription Information C4-150690 i/c LS - Yes Yes noted No
    S5-153212 Input LS from oneM2M TP on extension of 3GPP Service-Information AVP TP-2015-0628R02 i/c LS - Yes Yes noted No
    S5-153213 Input LS from GSMA WSOLU on VoLTE charging (resubmitted) WSOLU 03_015rev1 i/c LS - Yes Yes replied to No
    S5-153214 Input LS from GSMA on VoLTE Roaming Charging RAG 15 Doc_007 i/c LS - Yes Yes replied to No
    S5-153243 Reply to: Input LS from GSMA on VoLTE Roaming Charging Orange o/g LS approval Yes Yes revised No S5-153358
    S5-153358 Reply to: Input LS from GSMA on VoLTE Roaming Charging Orange o/g LS approval Yes Yes approved No S5-153243
    S5-153298 Reply LS on usage of P-Charging-Vector header field Ericsson o/g LS discussion Yes Yes approved No
    S5-153301 LS on the usage of Relayed-Charge header field C1-152042 i/c LS discussion Yes Yes noted No
    S5-153324 LS on usage of P-Charging-Vector header field C1-152283 i/c LS discussion Yes Yes replied to No
8.2
New Charging Work Item proposals
S5-153046 WID MBMS Charging Enhancements in the BM-SC Ericsson other Approval No Yes withdrawn Yes
    S5-153107 Discussion on WebRTC related charging work ZTE discussion - Yes Yes noted No
    S5-153108 Draft New WID on Charging Aspects of WebRTC Access to IMS ZTE new WID - Yes Yes noted No
    S5-153109 Draft New WID on Charging Aspects of IP Flow Mobility support for S2a and S2b Interfaces (NBIFOM) ZTE new WID - Yes Yes revised No S5-153244
    S5-153244 New WID on Charging Aspects of IP Flow Mobility support for S2a and S2b Interfaces (NBIFOM) ZTE new WID - Yes Yes noted No S5-153109
    S5-153178 Draft New WID on charging aspects of Service capability Exposure Huawei new WID - Yes Yes noted No
8.3
Charging Maintenance and Rel-13 small Enhancements
S5-153085 Rel-12 CR 32.251 Correction TDF as Node Functionality Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Aproval Yes Yes revised No S5-153265
    S5-153265 Rel-12 CR 32.251 Correction TDF as Node Functionality Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Aproval Yes Yes agreed No S5-153085
    S5-153086 Rel-12 CR 32.299 Correction TDF as Node Functionality Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes revised No S5-153266
    S5-153266 Rel-12 CR 32.299 Correction TDF as Node Functionality Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes agreed No S5-153086
    S5-153087 Rel-13 CR 32.251 Correction TDF as Node Functionality Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes revised No S5-153267
    S5-153267 Rel-13 CR 32.251 Correction TDF as Node Functionality Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes agreed No S5-153087
    S5-153088 Rel-13 CR 32.299 Correction TDF as Node Functionality Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes revised No S5-153268
    S5-153268 Rel-13 CR 32.299 Correction TDF as Node Functionality Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes agreed No S5-153088
    S5-153141 Rel-8 CR 32.299 Correction for dynamic address flags associated to PDN connection Nokia Networks CR approval Yes Yes agreed No
    S5-153142 Rel-9 CR 32.299 Correction for dynamic address flags associated to PDN connection Nokia Networks CR approval Yes Yes agreed No
    S5-153143 Rel-10 CR 32.299 Correction for dynamic address flags associated to PDN connection Nokia Networks CR approval Yes Yes agreed No
    S5-153144 Rel-11 CR 32.299 Correction for dynamic address flags associated to PDN connection Nokia Networks CR approval Yes Yes agreed No
    S5-153145 Rel-12 CR 32.299 Correction for dynamic address flags associated to PDN connection Nokia Networks CR approval Yes Yes agreed No
    S5-153146 Rel-13 CR 32.299 Correction for dynamic address flags associated to PDN connection Nokia Networks CR approval Yes Yes agreed No
    S5-153147 Rel-10 CR 32.299 Correction of RAT Type - alignment with TS 29.061 Nokia Networks CR approval Yes Yes revised No S5-153260
    S5-153260 Rel-10 CR 32.299 Correction of RAT Type - alignment with TS 29.061 Nokia Networks CR approval Yes Yes agreed No S5-153147
    S5-153148 Rel-11 CR 32.299 Correction of RAT Type - alignment with TS 29.061 Nokia Networks CR approval Yes Yes revised No S5-153261
    S5-153261 Rel-11 CR 32.299 Correction of RAT Type - alignment with TS 29.061 Nokia Networks CR approval Yes Yes agreed No S5-153148
    S5-153149 Rel-12 CR 32.299 Correction of RAT Type - alignment with TS 29.061 Nokia Networks CR approval Yes Yes revised No S5-153262
    S5-153262 Rel-12 CR 32.299 Correction of RAT Type - alignment with TS 29.061 Nokia Networks CR approval Yes Yes agreed No S5-153149
    S5-153150 Rel-13 CR 32.299 Correction of RAT Type - alignment with TS 29.061 Nokia Networks CR approval Yes Yes revised No S5-153263
    S5-153263 Rel-13 CR 32.299 Correction of RAT Type - alignment with TS 29.061 Nokia Networks CR approval Yes Yes agreed No S5-153150
    S5-153151 Rel-11 CR 32.260 Clarification on IMS Transit Functions Nokia Networks CR approval Yes Yes noted No
    S5-153152 Rel-12 CR 32.260 Clarification on IMS Transit Functions Nokia Networks CR approval Yes Yes noted No
    S5-153153 Rel-13 CR 32.260 Clarification on IMS Transit Functions Nokia Networks CR approval Yes Yes revised No S5-153264
    S5-153264 Rel-13 CR 32.260 Clarification on IMS Transit Functions Nokia Networks CR approval Yes Yes agreed No S5-153153
    S5-153154 Rel-12 CR 32.299 Correction for ProSe Charging Nokia Networks CR approval Yes Yes noted No
    S5-153155 Rel-13 CR 32.299 Correction for ProSe Charging Nokia Networks CR approval Yes Yes revised No S5-153285
    S5-153285 Rel-13 CR 32.299 Correction for ProSe Charging Nokia Networks CR approval Yes Yes agreed No S5-153155
    S5-153156 Rel-12 CR 32.298 Correction for ProSe Charging Nokia Networks CR approval Yes Yes revised No S5-153286
    S5-153286 Rel-13 CR 32.298 Correction for ProSe Charging Nokia Networks CR approval Yes Yes agreed No S5-153156
    S5-153177 R13 32.251 CRusage of Charging Characteristics for activating PCC function - Alignment with 23.203 China Telecom, Huawei CR - Yes Yes revised No S5-153287
    S5-153287 R13 32.251 CRusage of Charging Characteristics for activating PCC function - Alignment with 23.203 China Telecom, Huawei CR - Yes Yes agreed No S5-153177
    S5-153198 Rel-13 CR 32.299 Support for M2M-Information in the Service-Information AVP Ericsson CR Approval Yes Yes revised No S5-153288
    S5-153288 Rel-13 CR 32.299 Support for M2M-Information in the Service-Information AVP Ericsson CR Approval Yes Yes agreed No S5-153198
    S5-153297 Rel-13 CR 32.299 Harmonisation of clauses for vendor specific AVP Nokia Networks CR agreement Yes Yes agreed No
    S5-153299 Alignment of Direct Communications CDR with PC3ch protocol Ericsson, Nokia Networks CR discussion Yes Yes agreed No
8.4
Rel-13 Charging
8.4.1
Inter-PLMN PS domain online charging
8.4.1.1
TR on Inter-PLMN PS domain online charging
S5-153139 pCR - Key issue HPLMN OCS control over VPLMN IP-CAN bearer Nokia Networks pseudo CR / text proposal approval Yes Yes noted No
    S5-153179 pCR 32.843 discussion of AVP filtering key issue Huawei pseudo CR / text proposal - No Yes withdrawn Yes
    S5-153180 R13 32.843 pCR discussion of AVP filtering key issue Huawei pseudo CR / text proposal - Yes Yes noted No
    S5-153181 R13 32.843 pCR message content and additional message flows for dedicated profile solution3 Huawei pseudo CR / text proposal - Yes Yes revised No S5-153249
    S5-153249 R13 32.843 pCR message content and additional message flows for dedicated profile solution3 Huawei pseudo CR / text proposal - Yes Yes approved No S5-153181
    S5-153182 pCR TR 32.843 recommendation for Key issues #1 and #3 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes revised No S5-153246
    S5-153246 pCR TR 32.843 recommendation for Key issues #1 and #3 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes approved No S5-153182
    S5-153183 pCR TR 32.843 conclusion for Key issues 5 Home OCS determination Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes revised No S5-153247
    S5-153247 pCR TR 32.843 conclusion for Key issues 5 Home OCS determination Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes approved No S5-153183
    S5-153184 pCR TR 32.843 Partial Conclusion for Key issues #6 AVP filtering Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes revised No S5-153245
    S5-153245 pCR TR 32.843 Partial Conclusion for Key issues #6 AVP filtering Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes noted No S5-153184
    S5-153185 pCR TR 32.843 Key issues 10 and 11 resolution Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes revised No S5-153248
    S5-153248 pCR TR 32.843 Key issues 10 and 11 resolution Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes approved No S5-153185
    S5-153186 pCR TR 32.843 solution 3 dedicated profile correction Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes noted No
    S5-153187 pCR TR 32.843 Dedicated profile selection for scenario 1 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes revised No S5-153251
    S5-153251 pCR TR 32.843 Dedicated profile selection for scenario 1 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes approved No S5-153187
    S5-153188 pCR TR 32.843 Dedicated prof Scenario 2 Roaming Mobile - FBA Convergence Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes approved No
    S5-153189 pCR TR 32.843 Conclusion and recommendations for phase 1 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes revised No S5-153252
    S5-153252 pCR TR 32.843 Conclusion and recommendations for phase 1 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal Approval Yes Yes approved No S5-153189
    S5-153250 New chapter structure for dedicated profiles/implementations Alcatel-Lucent, Alcatel-Lucent Shanghai Bell pseudo CR / text proposal discussion Yes Yes approved No
8.4.1.2
Specification of Inter-PLMN PS domain online charging
S5-153253 Cover sheet TR 32.843 presentation for information to SA Alcatel-Lucent other approval Yes Yes approved No
    S5-153254 LS to SA2 OCS proxy Alcatel-Lucent o/g LS discussion Yes Yes approved No
    S5-153255 LS to CT3 OCS address determination Alcatel-Lucent o/g LS discussion Yes Yes approved No
    S5-153256 LS to GSMA Alcatel-Lucent o/g LS discussion Yes Yes revised No S5-153352
    S5-153352 LS to GSMA Alcatel-Lucent o/g LS discussion No Yes sent for email approval No S5-153256
    S5-153269 Draft TR 32.843 Rapporteur draft TS/TR discussion No Yes left for email approval No
8.4.2
ULI and release causes for charging enhancement for VoLTE
S5-153089 Rel-13 32.251 Introduction of multiple Release causes in EPC Charging Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes revised No S5-153257
    S5-153257 Rel-13 32.251 Introduction of multiple Release causes in EPC Charging Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes agreed No S5-153089
    S5-153090 Rel-13 32.299 Introduction of multiple Release causes in EPC Charging Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes revised No S5-153258
    S5-153258 Rel-13 32.299 Introduction of multiple Release causes in EPC Charging Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes agreed No S5-153090
    S5-153091 Rel-13 32.298 Introduction of multiple Release causes in EPC Charging Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes revised No S5-153259
    S5-153259 Rel-13 32.298 Introduction of multiple Release causes in EPC Charging Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR Approval Yes Yes agreed No S5-153091
8.4.3
Charging on enhancements for IMS Service Continuity
S5-153140 Rel-13 CR 32.260 Addition of Inter-UE transfer call flows for IMS Service Continuity Nokia Networks CR approval Yes Yes agreed No
8.4.4
Enhanced S2a Mobility Over Trusted WLAN access to EPC - Charging (preliminary work before approval by SA)
8.4.5
Announcements for IMS Online Charging (preliminary work before approval by SA)
S5-153203 Rel-13 CR 32.260 Charging Announcements Introduction Amdocs CR - Yes Yes revised No S5-153290
    S5-153290 Rel-13 CR 32.260 OCS-provided annoucements introduction Amdocs CR - Yes Yes agreed No S5-153203
    S5-153204 Rel-13 CR 32.275 Ignoring charging annoucements for call diversion and call transfer Amdocs CR - Yes Yes noted No
8.5
Charging Studies
8.5.1
Study on Determination of Completeness of Charging Information in IMS
S5-153110 TR32850 Proposal of use cases description ZTE pseudo CR / text proposal - Yes Yes revised No S5-153291
    S5-153291 TR32850 Proposal of use cases description ZTE pseudo CR / text proposal - Yes Yes agreed No S5-153110
    S5-153295 TR32850 Proposal of use cases description Rapporteur draft TS/TR discussion No Yes left for email approval No
8.5.2
Study on Overload Control for Diameter Charging Applications (preliminary work before approval by SA)
S5-153111 Skeleton 328xx-000 Study on Overload Control for Diameter Charging Applications ZTE draft TS/TR - Yes Yes revised No S5-153292
    S5-153292 Skeleton 328xx-000 Study on Overload Control for Diameter Charging Applications ZTE draft TS/TR - Yes Yes approved No S5-153111
    S5-153112 TR328xx Scope of Study on Overload Control for Diameter Charging Applications ZTE pseudo CR / text proposal - Yes Yes revised No S5-153293
    S5-153293 TR328xx Scope of Study on Overload Control for Diameter Charging Applications ZTE pseudo CR / text proposal - Yes Yes approved No S5-153112
    S5-153175 TR328xx Add Reference and General Description of Study on Overload Control for Diameter Charging Applications ZTE pseudo CR / text proposal - Yes Yes revised No S5-153294
    S5-153294 TR328xx Add Reference and General Description of Study on Overload Control for Diameter Charging Applications ZTE pseudo CR / text proposal - Yes Yes approved No S5-153175
    S5-153296 TR 32.8xx (Study on Overload Control for Diameter Charging Applications) Rapporteur draft TS/TR discussion No Yes left for email approval No
9
Any Other Business
10
Closing of the meeting

Created: 2015-05-29 14:04     Last document: S5-153369