Document List for 3GPPSA5-Multi-SDO Converged PM
List generated on : 2014-09-11 at 14:47:56 (GMT +01:00)

DOCUMENT: Agenda Kick-off meeting Model Alignment Phase 2 (Sep-20, 201
2)
Doc.Name S5eMA20001 Allocations: Content Type:
File Name: S5eMA20001.zip
Source: Rapporteur
Withdrawn: N
The file is uploaded
 
DOCUMENT: Meeting Minutes Kick-off meeting Model Alignment Phase 2 (Se
p-20, 2012)
Doc.Name S5eMA20002 Allocations: Content Type:
File Name: S5eMA20002.zip
Source: Minutes Taker
Withdrawn: N
The file is uploaded
 
DOCUMENT: Approved Multi-SDO Project 'Converged Management Model Align
ment (Phase 2)' (S5-120807r1)
Doc.Name S5eMA20003 Allocations: Content Type:
File Name: S5eMA20003.zip
Source: Multi-SDO Meeting
Withdrawn: N
The file is uploaded
 
DOCUMENT: Overview 3GPP/TM Forum JWG Model Alignment (Phase 1)
Doc.Name S5eMA20004 Allocations: Content Type:
File Name: S5eMA20004.zip
Source: Convener Phase 1
Withdrawn: N
The file is uploaded
 
DOCUMENT: Converged Management Model Alignment (Phase 2) – Proj
ect Structure & Working Methods (1st draft)
Doc.Name S5eMA20005 Allocations: Content Type:
File Name: S5eMA20005.zip
Source: Rapporteur
Withdrawn: N
The file is uploaded
 
DOCUMENT: Converged Management Model Alignment (Phase 2) "Project Stru
cture & Working Methods" (2nd draft)
Doc.Name S5eMA20006 Allocations: Content Type:
File Name: S5eMA20006.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 2nd meeting Model Alignment Phase 2 (Nov-01, 2012)
Doc.Name S5eMA20007 Allocations: Content Type:
File Name: S5eMA20007.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Meeting Minutes 2nd meeting Model Alignment Phase 2 (Nov-01,
2012)
Doc.Name S5eMA20008 Allocations: Content Type:
File Name: S5eMA20008.zip
Source: Minutes Taker
Withdrawn: N
The file is uploaded
 
DOCUMENT: FMC FNIM V3.0 (S5vTMFa339)
Doc.Name S5eMA20009 Allocations: Content Type:
File Name: S5eMA20009.zip
Source: 3GPP-TMF JWG RMA
Withdrawn: N
The file is uploaded
 
DOCUMENT: FMC 3GPP/TMF Model Relationships & UCs V3.0 (S5vTMFa341)
Doc.Name S5eMA20010 Allocations: Content Type:
File Name: S5eMA20010.zip
Source: 3GPP-TMF JWG RMA
Withdrawn: N
The file is uploaded
 
DOCUMENT: FMC Model Repertoire V3.0 (S5vTMFa342)
Doc.Name S5eMA20011 Allocations: Content Type:
File Name: S5eMA20011.zip
Source: 3GPP-TMF JWG RMA
Withdrawn: N
The file is uploaded
 
DOCUMENT: Draft Frankfurt F2F Meeting Agenda M-SDO Converged Managemen
t Model Alignment (Nov-27, 2012)
Doc.Name S5eMA20012 Allocations: Content Type:
File Name: S5eMA20012.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Proposed Project Prioritization
Doc.Name S5eMA20013 Allocations: Content Type:
File Name: S5eMA20013.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: 3GPP TS 32.152 IRP IS UML Repertoire
Doc.Name S5eMA20014 Allocations: Content Type:
File Name: S5eMA20014.zip
Source: 3GPP
Withdrawn: N
The file is uploaded
 
DOCUMENT: Converged Management Model Alignment (Phase 2) "Project Stru
cture & Working Methods" (3rd draft)
Doc.Name S5eMA20015 Allocations: Content Type:
File Name: S5eMA20015.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Frankfurt F2F Meeting Agenda M-SDO Converged Management Mode
l Alignment (Nov-27, 2012) V1
Doc.Name S5eMA20016 Allocations: Content Type:
File Name: S5eMA20016.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 3rd meeting Model Alignment Phase 2 (Nov-21, 2012)
Doc.Name S5eMA20017 Allocations: Content Type:
File Name: S5eMA20017.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Meeting Minutes 3rd meeting Model Alignment Phase 2 (Nov-21,
2012)
Doc.Name S5eMA20018 Allocations: Content Type:
File Name: S5eMA20018.zip
Source: Minute Taker / Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Comparison of UIM Specification Styles
Doc.Name S5eMA20019 Allocations: Content Type:
File Name: S5eMA20019.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Operations Model Repertoire
Doc.Name S5eMA20020 Allocations: Content Type:
File Name: S5eMA20020.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: NGCOR_Phase_1_Final_Deliverable
Doc.Name S5eMA20021 Allocations: Content Type:
File Name: S5eMA20021.zip
Source: Deutsche Telekom
Abstract: NGMN Next Generation Converged Operations Requirements Phase 1 Final Deliverable
Withdrawn: N
The file is uploaded
 
DOCUMENT: subclass impact to inherited attribute properties
Doc.Name S5eMA20022 Allocations: Content Type:
File Name: S5eMA20022.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: 3GPP TS 32.103 Integration Reference Point (IRP) overview an
d usage guide V11.0.0
Doc.Name S5eMA20023 Allocations: Content Type:
File Name: S5eMA20023.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: 3GPP TS 32.302 Notification Integration Reference Point (IRP
); Information Service (IS) V11.0.0
Doc.Name S5eMA20024 Allocations: Content Type:
File Name: S5eMA20024.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: 3GPP TS 32.602 Basic CM Integration Reference Point (IRP); I
nformation Service (IS) V11.0.0
Doc.Name S5eMA20025 Allocations: Content Type:
File Name: S5eMA20025.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: 3GPP TS 32.612 Bulk CM Integration Reference Point (IRP): In
formation Service (IS) V11.0.0
Doc.Name S5eMA20026 Allocations: Content Type:
File Name: S5eMA20026.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: 3GPP TS 32.662 Kernel CM Integration Reference Point (IRP);
Information Service (IS) V11.0.0
Doc.Name S5eMA20027 Allocations: Content Type:
File Name: S5eMA20027.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: Discussion on FOM related Model Repertoire input
Doc.Name S5eMA20028 Allocations: Content Type:
File Name: S5eMA20028.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: Discussion on FOM UOM input
Doc.Name S5eMA20029 Allocations: Content Type:
File Name: S5eMA20029.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: Frankfurt F2F Meeting Agenda M-SDO Converged Management Mode
l Alignment (Nov-27, 2012) V2
Doc.Name S5eMA20030 Allocations: Content Type:
File Name: S5eMA20030.zip
Source: Convener
Withdrawn: Y
The file is uploaded
 
DOCUMENT: Frankfurt F2F Meeting Agenda M-SDO Converged Management Mod
el Alignment (Nov-27, 2012) V2
Doc.Name S5eMA20031 Allocations: Content Type:
File Name: S5eMA20031.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Frankfurt F2F Meeting Minutes M-SDO Converged Management Mod
el Alignment (Nov-27, 2012)
Doc.Name S5eMA20032 Allocations: Content Type:
File Name: S5eMA20032.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Operations Model Repertoire - Updated Frankfurt
F2F
Doc.Name S5eMA20033 Allocations: Content Type:
File Name: S5eMA20033.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Operations Model Repertoire - Updated Frankfurt
F2F - Enhanced Dec. 20
Doc.Name S5eMA20034 Allocations: Content Type:
File Name: S5eMA20034.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: pCR (based on V3.d4) Model Repertoire V3.0
Doc.Name S5eMA20035 Allocations: Content Type:
File Name: S5eMA20035.zip
Source: editor (Ericsson)
Withdrawn: Y
The file is not uploaded
 
DOCUMENT: Agenda 5th meeting (F2F) Model Alignment Phase 2 (Mar-6/7, 2
012)
Doc.Name S5eMA20036 Allocations: Content Type:
File Name: S5eMA20036.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM)
Doc.Name S5eMA20037 Allocations: Content Type:
File Name: S5eMA20037.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Ericsson comments on S5eMA20034
Doc.Name S5eMA20038 Allocations: Content Type:
File Name: S5eMA20038.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Tool usage regarding FMC NM standards production
Doc.Name S5eMA20039 Allocations: Content Type:
File Name: S5eMA20039.zip
Source: 3GPP SA5
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 5th meeting (F2F) Model Alignment Phase 2 (Mar-6/7,
2012)
Doc.Name S5eMA20040 Allocations: Content Type:
File Name: S5eMA20040.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Operations Model Repertoire - Vienna Output
Doc.Name S5eMA20041 Allocations: Content Type:
File Name: S5eMA20041.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Converged Management Model Alignment (Phase 2) "Project Stru
cture & Working Methods" (5th draft)
Doc.Name S5eMA20042 Allocations: Content Type:
File Name: S5eMA20042.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire draft 5.0
Doc.Name S5eMA20043 Allocations: Content Type:
File Name: S5eMA20043.zip
Source: editor (Ericsson)
Specification: This is the first draft of the Multi-SDO Model Alignment work on Model Repertoir
e.

It starts with version number 5.0
Withdrawn: N
The file is uploaded
 
DOCUMENT: Suggested changes to Model Repertoire V5.0 Draft
Doc.Name S5eMA20044 Allocations: Content Type:
File Name: S5eMA20044.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 6th meeting Model Alignment Phase 2 (Mar-21, 2013)
Doc.Name S5eMA20045 Allocations: Content Type:
File Name: S5eMA20045.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: 3GPP TS 32.103 Integration Reference Point (IRP) overview a
nd usage guide V11.2.0
Doc.Name S5eMA20046 Allocations: Content Type:
File Name: S5eMA20046.zip
Source: 3GPP
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 6th meeting Model Alignment Phase 2 (Mar-21, 2012)
Doc.Name S5eMA20047 Allocations: Content Type:
File Name: S5eMA20047.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 7th meeting Model Alignment Phase 2 (Mar-28, 2013)
Doc.Name S5eMA20048 Allocations: Content Type:
File Name: S5eMA20048.zip
Source: Nokia Siemens Networks
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire draft 5.0 clean copy
Doc.Name S5eMA20049 Allocations: Content Type:
File Name: S5eMA20049.zip
Source: editor (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 7th meeting Model Alignment Phase 2 (Mar-28, 2013)
Doc.Name S5eMA20050 Allocations: Content Type:
File Name: S5eMA20050.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire draft 5.0 v2
Doc.Name S5eMA20051 Allocations: Content Type:
File Name: S5eMA20051.zip
Source: editor (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: pCR to Model Repertoire Relation between SupportQualifier an
d Qualifier
Doc.Name S5eMA20052 Allocations: Content Type:
File Name: S5eMA20052.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 8th meeting Model Alignment Phase 2 (May-10, 2013)
Doc.Name S5eMA20053 Allocations: Content Type:
File Name: S5eMA20053.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 8th meeting Model Alignment Phase 2 (May-10, 2012)
Doc.Name S5eMA20054 Allocations: Content Type:
File Name: S5eMA20054.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: pCR on qualifiers
Doc.Name S5eMA20055 Allocations: Content Type:
File Name: S5eMA20055.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 9th meeting Model Alignment Phase 2 (May-15, 2013)
Doc.Name S5eMA20056 Allocations: Content Type:
File Name: S5eMA20056.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 9th meeting Model Alignment Phase 2 (May-15, 2013)
Doc.Name S5eMA20057 Allocations: Content Type:
File Name: S5eMA20057.zip
Source: Secretary (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: Editorial pCR on Model Repertoire draft 5.0 v2
Doc.Name S5eMA20058 Allocations: Content Type:
File Name: S5eMA20058.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: E TD UOM
Doc.Name S5eMA20059 Allocations: Content Type:
File Name: S5eMA20059.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Revised: Tool usage regarding FMC NM standards production
Doc.Name S5eMA20060 Allocations: Content Type:
File Name: S5eMA20060.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: pCR on precondition and postcondition for Model Repertoire
Doc.Name S5eMA20061 Allocations: Content Type:
File Name: S5eMA20061.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 10th meeting Model Alignment Phase 2 (May-23, 2013)
Doc.Name S5eMA20062 Allocations: Content Type:
File Name: S5eMA20062.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 10th meeting Model Alignment Phase 2 (May-23, 2013)
Doc.Name S5eMA20063 Allocations: Content Type:
File Name: S5eMA20063.zip
Source: Secretary (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: Communication Peers defined in 3GPP and TM Forum
Doc.Name S5eMA20064 Allocations: Content Type:
File Name: S5eMA20064.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 11th meeting (F2F) Model Alignment Phase 2 (Jun-3/4,
2012)
Doc.Name S5eMA20065 Allocations: Content Type:
File Name: S5eMA20065.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
DOCUMENT: Comparison between IA and SS in 3GPP TS 28.65x V11
Doc.Name S5eMA20066 Allocations: Content Type:
File Name: S5eMA20066.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: NGCOR Project Requirements in the context of FNIM/UIM and FN
OM/UOM.ppt
Doc.Name S5eMA20067 Allocations: Content Type:
File Name: S5eMA20067.zip
Source: Deutsche Telekom,Orange/FT
Withdrawn: Y
The file is uploaded
 
DOCUMENT: Minutes 11th meeting (F2F) Model Alignment Phase 2 (Jun-3/4,
2012)
Doc.Name S5eMA20068 Allocations: Content Type:
File Name: S5eMA20068.zip
Source: Secretary (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: Revised Minutes 10th meeting Multi-SDO Project Converged Man
agement Model Alignment
Doc.Name S5eMA20069 Allocations: Content Type:
File Name: S5eMA20069.zip
Source: Secretary (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: NGCOR Project Requirements in the context of FNIM/UIM and FN
OM/UOM
Doc.Name S5eMA20070 Allocations: Content Type:
File Name: S5eMA20070.zip
Source: Deutsche Telekom,Orange/FT
Withdrawn: N
The file is uploaded
 
DOCUMENT: Updated UIM Data Dictionary report
Doc.Name S5eMA20071 Allocations: Content Type:
File Name: S5eMA20071.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: FMC FNIM V5.0 Draft
Doc.Name S5eMA20072 Allocations: Content Type:
File Name: S5eMA20072.zip
Source: editor (Ericsson)
Abstract: Using FNIM V3.0 as base, this adds an Annex to capture the "tool usage from 3gpp
/sa5 perspective" - action based on agreement on call conference discussion.

This document version number start with 5.x indicating specification produced in
MSDO JWG phase 2 work.
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 12th meeting Model Alignment Phase 2 (June-20, 2013)
Doc.Name S5eMA20073 Allocations: Content Type:
File Name: S5eMA20073.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: FMC FNIM V5.1 Draft
Doc.Name S5eMA20074 Allocations: Content Type:
File Name: S5eMA20074.zip
Source: editor (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 12th meeting Model Alignment Phase 2 (June-20, 2013)
Doc.Name S5eMA20075 Allocations: Content Type:
File Name: S5eMA20075.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: E TD Skeleton for UOM specification
Doc.Name S5eMA20076 Allocations: Content Type:
File Name: S5eMA20076.zip
Source: editor (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 13th meeting Model Alignment Phase 2 (Aug-1, 2013)
Doc.Name S5eMA20077 Allocations: Content Type:
File Name: S5eMA20077.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 13th meeting Model Alignment Phase 2 (August 1, 2013
)
Doc.Name S5eMA20078 Allocations: Content Type:
File Name: S5eMA20078.zip
Source: editor (Ericsson)
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 14th meeting (conference call) Multi-SDO Project Con
verged Management Model Alignment
Doc.Name S5eMA20079 Allocations: Content Type:
File Name: S5eMA20079.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Discussion on Model Repertoire v5.1
Doc.Name S5eMA20080 Allocations: Content Type:
File Name: S5eMA20080.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Discussion on use of ITU-T CMISE type operations
Doc.Name S5eMA20081 Allocations: Content Type:
File Name: S5eMA20081.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire draft 5.1
Doc.Name S5eMA20082 Allocations: Content Type:
File Name: S5eMA20082.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire draft 5.2
Doc.Name S5eMA20083 Allocations: Content Type:
File Name: S5eMA20083.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 14th meeting (F2F) Model Alignment Phase 2 (Aug-28/2
9, 2013)
Doc.Name S5eMA20084 Allocations: Content Type:
File Name: S5eMA20084.zip
Source: Secretary
Withdrawn: Y
The file is not uploaded
 
DOCUMENT: UOM 5.1 draft
Doc.Name S5eMA20085 Allocations: Content Type:
File Name: S5eMA20085.zip
Source: Editor
Withdrawn: N
The file is not uploaded
 
DOCUMENT: Minutes 14th meeting (F2F) Model Alignment Phase 2 (Aug-28/2
9, 2013)
Doc.Name S5eMA20086 Allocations: Content Type:
File Name: S5eMA20086.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM)
Doc.Name S5eMA20087 Allocations: Content Type:
File Name: S5eMA20087.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM): DT comments to
S5eMA20087
Doc.Name S5eMA20088 Allocations: Content Type:
File Name: S5eMA20088.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 15th meeting (conference call) Multi-SDO Project Conv
erged Management Model Alignment
Doc.Name S5eMA20089 Allocations: Content Type:
File Name: S5eMA20089.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 15th meeting (conference call) Multi-SDO Project Con
verged Management Model Alignment
Doc.Name S5eMA20090 Allocations: Content Type:
File Name: S5eMA20090.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 16th meeting Multi-SDO Project Converged Management
Model Alignment
Doc.Name S5eMA20091 Allocations: Content Type:
File Name: S5eMA20091.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 16th meeting (conference call) Multi-SDO Project Con
verged Management Model Alignment
Doc.Name S5eMA20092 Allocations: Content Type:
File Name: S5eMA20092.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 17th meeting (conference call) Multi-SDO Project Conv
erged Management Model Alignment
Doc.Name S5eMA20093 Allocations: Content Type:
File Name: S5eMA20093.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 17th meeting (conference call) Multi-SDO Project Con
verged Management Model Alignment
Doc.Name S5eMA20094 Allocations: Content Type:
File Name: S5eMA20094.zip
Source: Ericsson
Withdrawn: Y
The file is uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM)
Doc.Name S5eMA20095 Allocations: Content Type:
File Name: S5eMA20095.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 17th meeting (conference call) Multi-SDO Project Con
verged Management Model Alignment
Doc.Name S5eMA20096 Allocations: Content Type:
File Name: S5eMA20096.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 18th meeting (conference call) Multi-SDO Project Conv
erged Management Model Alignment
Doc.Name S5eMA20097 Allocations: Content Type:
File Name: S5eMA20097.zip
Source: Convenor
Withdrawn: N
The file is not uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM)
Doc.Name S5eMA20098 Allocations: Content Type:
File Name: S5eMA20098.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 18th meeting (conference call) Multi-SDO Project Con
verged Management Model Alignment
Doc.Name S5eMA20099 Allocations: Content Type:
File Name: S5eMA20099.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 19th meeting (conference call) Multi-SDO Project Conv
erged Management Model Alignment
Doc.Name S5eMA20100 Allocations: Content Type:
File Name: S5eMA20100.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM)
Doc.Name S5eMA20101 Allocations: Content Type:
File Name: S5eMA20101.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes18th Meeting(cc)ModelAlignmentPhase2(Nov 28,2013)
Doc.Name S5eMA20102 Allocations: Content Type:
File Name: S5eMA20102.zip
Source: Ericsson
Withdrawn: Y
The file is not uploaded
 
DOCUMENT: Minutes19th Meeting(cc)ModelAlignmentPhase2(Nov 28,2013)
Doc.Name S5eMA20103 Allocations: Content Type:
File Name: S5eMA20103.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 20th meeting (conference call) Multi-SDO Project Conv
erged Management Model Alignment
Doc.Name S5eMA20104 Allocations: Content Type:
File Name: S5eMA20104.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM)
Doc.Name S5eMA20105 Allocations: Content Type:
File Name: S5eMA20105.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 20th Meeting(cc)ModelAlignmentPhase2(Dec 04,2013)
Doc.Name S5eMA20106 Allocations: Content Type:
File Name: S5eMA20106.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 21th meeting (conference call) Multi-SDO Project Conv
erged Management Model Alignment
Doc.Name S5eMA20107 Allocations: Content Type:
File Name: S5eMA20107.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 21th Meeting(cc)ModelAlignmentPhase2(Dec 11,2013)
Doc.Name S5eMA20108 Allocations: Content Type:
File Name: S5eMA20108.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM)
Doc.Name S5eMA20109 Allocations: Content Type:
File Name: S5eMA20109.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 22nd meeting (conference call) Multi-SDO Project Conv
erged Management Model Alignment
Doc.Name S5eMA20110 Allocations: Content Type:
File Name: S5eMA20110.zip
Source: Convenor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 21st Meeting(cc)ModelAlignmentPhase2(Dec 11,2013)
Doc.Name S5eMA20111 Allocations: Content Type:
File Name: S5eMA20111.zip
Source: Ericsson
Withdrawn: Y
The file is uploaded
 
DOCUMENT: Minutes 21st Meeting(cc)ModelAlignmentPhase2(Dec 11,2013)
Doc.Name S5eMA20112 Allocations: Content Type:
File Name: S5eMA20112.zip
Source: Ericsson
Abstract: Replaces 108 and 111.
Withdrawn: N
The file is uploaded
 
DOCUMENT: Input for an Umbrella Operations Model (UOM)
Doc.Name S5eMA20113 Allocations: Content Type:
File Name: S5eMA20113.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 22nd Meeting(cc)ModelAlignmentPhase2(Dec 18,2013)
Doc.Name S5eMA20114 Allocations: Content Type:
File Name: S5eMA20114.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: UOM v5.1 draft
Doc.Name S5eMA20115 Allocations: Content Type:
File Name: S5eMA20115.zip
Source: Editor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Generic Operations in TM Forum TIP and JWG MA
Doc.Name S5eMA20116 Allocations: Content Type:
File Name: S5eMA20116.zip
Source: Deutsche Telekom
Abstract: High level comparison of generic operations in TIP A&P and JWG MA.
Withdrawn: N
The file is uploaded
 
DOCUMENT: Additions/modifications in the Model Repertoire based on the
UOM discussions
Doc.Name S5eMA20117 Allocations: Content Type:
File Name: S5eMA20117.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Comments to draft UOM Version 5.1
Doc.Name S5eMA20118 Allocations: Content Type:
File Name: S5eMA20118.zip
Source: Deutsche Telekom
Abstract: Provides comments from DT.
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 23rd meeting (face to face) Multi-SDO Project Converg
ed Management Model Alignment
Doc.Name S5eMA20119 Allocations: Content Type:
File Name: S5eMA20119.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 23rd meeting (face to face) Multi-SDO Project Conver
ged Management Model Alignment
Doc.Name S5eMA20120 Allocations: Content Type:
File Name: S5eMA20120.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 24th meeting (joint cc) TIP A&P and JWG MA
Doc.Name S5eMA20121 Allocations: Content Type:
File Name: S5eMA20121.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 25th / 26th meetings (cc) mSDO Project Converged Mana
gement Model Alignment
Doc.Name S5eMA20122 Allocations: Content Type:
File Name: S5eMA20122.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: More detailed comparison of Generic Operations in TM Forum T
IP and JWG MA
Doc.Name S5eMA20123 Allocations: Content Type:
File Name: S5eMA20123.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 25th + 26th Meeting(cc)ModelAlignmentPhase2(March 13
+14,2014)
Doc.Name S5eMA20124 Allocations: Content Type:
File Name: S5eMA20124.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire 5.3 draft
Doc.Name S5eMA20125 Allocations: Content Type:
File Name: S5eMA20125.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: UOM 5.2 draft
Doc.Name S5eMA20126 Allocations: Content Type:
File Name: S5eMA20126.zip
Source: Ericsson
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 27th meeting (cc) mSDO Project Converged Management M
odel Alignment
Doc.Name S5eMA20127 Allocations: Content Type:
File Name: S5eMA20127.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 27th meeting (cc) Multi-SDO Project Converged Manage
ment Model Alignment
Doc.Name S5eMA20128 Allocations: Content Type:
File Name: S5eMA20128.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 28th meeting (cc) mSDO Project Converged Management M
odel Alignment
Doc.Name S5eMA20129 Allocations: Content Type:
File Name: S5eMA20129.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 28th meeting (cc) Multi-SDO Project Converged Manage
ment Model Alignment
Doc.Name S5eMA20130 Allocations: Content Type:
File Name: S5eMA20130.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 29th meeting (cc) mSDO Project Converged Management M
odel Alignment
Doc.Name S5eMA20131 Allocations: Content Type:
File Name: S5eMA20131.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire 5.3 draft v3
Doc.Name S5eMA20132 Allocations: Content Type:
File Name: S5eMA20132.zip
Source: Ericsson, Editor
Withdrawn: N
The file is uploaded
 
DOCUMENT: UOM 5.2 draft v3
Doc.Name S5eMA20133 Allocations: Content Type:
File Name: S5eMA20133.zip
Source: Ericsson, Editor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 29th meeting (cc) Multi-SDO Project Converged Manage
ment Model Alignment
Doc.Name S5eMA20134 Allocations: Content Type:
File Name: S5eMA20134.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Agenda 30th meeting (cc) mSDO Project Converged Management M
odel Alignment
Doc.Name S5eMA20135 Allocations: Content Type:
File Name: S5eMA20135.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Minutes 30th meeting (cc) Multi-SDO Project Converged Manage
ment Model Alignment
Doc.Name S5eMA20136 Allocations: Content Type:
File Name: S5eMA20136.zip
Source: Deutsche Telekom
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire 5.3 d1
Doc.Name S5eMA20137 Allocations: Content Type:
File Name: S5eMA20137.zip
Source: Ericsson, Editor
Withdrawn: N
The file is uploaded
 
DOCUMENT: UOM 5.2 d1
Doc.Name S5eMA20138 Allocations: Content Type:
File Name: S5eMA20138.zip
Source: Ericsson, Editor
Withdrawn: N
The file is uploaded
 
DOCUMENT: Model Repertoire 5.3
Doc.Name S5eMA20139 Allocations: Content Type:
File Name: S5eMA20139.zip
Source: Convener
Abstract: Final version of Model Repertoire from JWG MA Phase 2.
Withdrawn: N
The file is uploaded
 
DOCUMENT: Umbrella Operation Model (UOM) 5.2
Doc.Name S5eMA20140 Allocations: Content Type:
File Name: S5eMA20140.zip
Source: Convener
Abstract: Final version of Umbrella Operation Model (UOM) from JWG MA Phase 2.
Withdrawn: N
The file is uploaded
 
DOCUMENT: LS on Multi-SDO Model Alignment (Phase 2) JWG Output Documen
ts Completion
Doc.Name S5eMA20141 Allocations: Content Type:
File Name: S5eMA20141.zip
Source: Convener
Withdrawn: N
The file is uploaded
 
141 Numbers Reserved... (7 Withdrawn)
With 0 Revisions   And   0 Addenda
Last Reservation/Withdrawal On '2014-09-11 at 14:45:18 (GMT +01:00)'

136 Files Uploaded (with Correct Filename)
Last Upload On '2014-09-11 at 14:47:52 (GMT +01:00)'