DOCUMENT:
|
Agenda Kick-off meeting Model Alignment Phase 2 (Sep-20, 201 2)
|
Doc.Name
|
S5eMA20001
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20001.zip
|
|
|
Source:
|
Rapporteur
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Meeting Minutes Kick-off meeting Model Alignment Phase 2 (Se p-20, 2012)
|
Doc.Name
|
S5eMA20002
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20002.zip
|
|
|
Source:
|
Minutes Taker
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Approved Multi-SDO Project 'Converged Management Model Align ment (Phase 2)' (S5-120807r1)
|
Doc.Name
|
S5eMA20003
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20003.zip
|
|
|
Source:
|
Multi-SDO Meeting
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Overview 3GPP/TM Forum JWG Model Alignment (Phase 1)
|
Doc.Name
|
S5eMA20004
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20004.zip
|
|
|
Source:
|
Convener Phase 1
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Converged Management Model Alignment (Phase 2) – Proj ect Structure & Working Methods (1st draft)
|
Doc.Name
|
S5eMA20005
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20005.zip
|
|
|
Source:
|
Rapporteur
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Converged Management Model Alignment (Phase 2) "Project Stru cture & Working Methods" (2nd draft)
|
Doc.Name
|
S5eMA20006
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20006.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 2nd meeting Model Alignment Phase 2 (Nov-01, 2012)
|
Doc.Name
|
S5eMA20007
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20007.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Meeting Minutes 2nd meeting Model Alignment Phase 2 (Nov-01, 2012)
|
Doc.Name
|
S5eMA20008
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20008.zip
|
|
|
Source:
|
Minutes Taker
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
FMC FNIM V3.0 (S5vTMFa339)
|
Doc.Name
|
S5eMA20009
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20009.zip
|
|
|
Source:
|
3GPP-TMF JWG RMA
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
FMC 3GPP/TMF Model Relationships & UCs V3.0 (S5vTMFa341)
|
Doc.Name
|
S5eMA20010
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20010.zip
|
|
|
Source:
|
3GPP-TMF JWG RMA
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
FMC Model Repertoire V3.0 (S5vTMFa342)
|
Doc.Name
|
S5eMA20011
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20011.zip
|
|
|
Source:
|
3GPP-TMF JWG RMA
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Draft Frankfurt F2F Meeting Agenda M-SDO Converged Managemen t Model Alignment (Nov-27, 2012)
|
Doc.Name
|
S5eMA20012
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20012.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Proposed Project Prioritization
|
Doc.Name
|
S5eMA20013
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20013.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
3GPP TS 32.152 IRP IS UML Repertoire
|
Doc.Name
|
S5eMA20014
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20014.zip
|
|
|
Source:
|
3GPP
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Converged Management Model Alignment (Phase 2) "Project Stru cture & Working Methods" (3rd draft)
|
Doc.Name
|
S5eMA20015
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20015.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Frankfurt F2F Meeting Agenda M-SDO Converged Management Mode l Alignment (Nov-27, 2012) V1
|
Doc.Name
|
S5eMA20016
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20016.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 3rd meeting Model Alignment Phase 2 (Nov-21, 2012)
|
Doc.Name
|
S5eMA20017
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20017.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Meeting Minutes 3rd meeting Model Alignment Phase 2 (Nov-21, 2012)
|
Doc.Name
|
S5eMA20018
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20018.zip
|
|
|
Source:
|
Minute Taker / Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Comparison of UIM Specification Styles
|
Doc.Name
|
S5eMA20019
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20019.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Operations Model Repertoire
|
Doc.Name
|
S5eMA20020
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20020.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
NGCOR_Phase_1_Final_Deliverable
|
Doc.Name
|
S5eMA20021
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20021.zip
|
|
|
Source:
|
Deutsche Telekom
|
Abstract:
|
NGMN Next Generation Converged Operations Requirements Phase 1 Final Deliverable
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
subclass impact to inherited attribute properties
|
Doc.Name
|
S5eMA20022
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20022.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
3GPP TS 32.103 Integration Reference Point (IRP) overview an d usage guide V11.0.0
|
Doc.Name
|
S5eMA20023
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20023.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
3GPP TS 32.302 Notification Integration Reference Point (IRP ); Information Service (IS) V11.0.0
|
Doc.Name
|
S5eMA20024
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20024.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
3GPP TS 32.602 Basic CM Integration Reference Point (IRP); I nformation Service (IS) V11.0.0
|
Doc.Name
|
S5eMA20025
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20025.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
3GPP TS 32.612 Bulk CM Integration Reference Point (IRP): In formation Service (IS) V11.0.0
|
Doc.Name
|
S5eMA20026
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20026.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
3GPP TS 32.662 Kernel CM Integration Reference Point (IRP); Information Service (IS) V11.0.0
|
Doc.Name
|
S5eMA20027
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20027.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on FOM related Model Repertoire input
|
Doc.Name
|
S5eMA20028
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20028.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on FOM UOM input
|
Doc.Name
|
S5eMA20029
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20029.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Frankfurt F2F Meeting Agenda M-SDO Converged Management Mode l Alignment (Nov-27, 2012) V2
|
Doc.Name
|
S5eMA20030
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20030.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
Y
|
The file is uploaded
|
|
DOCUMENT:
|
Frankfurt F2F Meeting Agenda M-SDO Converged Management Mod el Alignment (Nov-27, 2012) V2
|
Doc.Name
|
S5eMA20031
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20031.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Frankfurt F2F Meeting Minutes M-SDO Converged Management Mod el Alignment (Nov-27, 2012)
|
Doc.Name
|
S5eMA20032
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20032.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Operations Model Repertoire - Updated Frankfurt F2F
|
Doc.Name
|
S5eMA20033
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20033.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Operations Model Repertoire - Updated Frankfurt F2F - Enhanced Dec. 20
|
Doc.Name
|
S5eMA20034
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20034.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
pCR (based on V3.d4) Model Repertoire V3.0
|
Doc.Name
|
S5eMA20035
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20035.zip
|
|
|
Source:
|
editor (Ericsson)
|
Withdrawn:
|
Y
|
The file is not uploaded
|
|
DOCUMENT:
|
Agenda 5th meeting (F2F) Model Alignment Phase 2 (Mar-6/7, 2 012)
|
Doc.Name
|
S5eMA20036
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20036.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM)
|
Doc.Name
|
S5eMA20037
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20037.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Ericsson comments on S5eMA20034
|
Doc.Name
|
S5eMA20038
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20038.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Tool usage regarding FMC NM standards production
|
Doc.Name
|
S5eMA20039
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20039.zip
|
|
|
Source:
|
3GPP SA5
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 5th meeting (F2F) Model Alignment Phase 2 (Mar-6/7, 2012)
|
Doc.Name
|
S5eMA20040
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20040.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Operations Model Repertoire - Vienna Output
|
Doc.Name
|
S5eMA20041
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20041.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Converged Management Model Alignment (Phase 2) "Project Stru cture & Working Methods" (5th draft)
|
Doc.Name
|
S5eMA20042
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20042.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire draft 5.0
|
Doc.Name
|
S5eMA20043
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20043.zip
|
|
|
Source:
|
editor (Ericsson)
|
Specification:
|
This is the first draft of the Multi-SDO Model Alignment work on Model Repertoir e.
It starts with version number 5.0
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Suggested changes to Model Repertoire V5.0 Draft
|
Doc.Name
|
S5eMA20044
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20044.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 6th meeting Model Alignment Phase 2 (Mar-21, 2013)
|
Doc.Name
|
S5eMA20045
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20045.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
3GPP TS 32.103 Integration Reference Point (IRP) overview a nd usage guide V11.2.0
|
Doc.Name
|
S5eMA20046
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20046.zip
|
|
|
Source:
|
3GPP
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 6th meeting Model Alignment Phase 2 (Mar-21, 2012)
|
Doc.Name
|
S5eMA20047
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20047.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 7th meeting Model Alignment Phase 2 (Mar-28, 2013)
|
Doc.Name
|
S5eMA20048
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20048.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire draft 5.0 clean copy
|
Doc.Name
|
S5eMA20049
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20049.zip
|
|
|
Source:
|
editor (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 7th meeting Model Alignment Phase 2 (Mar-28, 2013)
|
Doc.Name
|
S5eMA20050
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20050.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire draft 5.0 v2
|
Doc.Name
|
S5eMA20051
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20051.zip
|
|
|
Source:
|
editor (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
pCR to Model Repertoire Relation between SupportQualifier an d Qualifier
|
Doc.Name
|
S5eMA20052
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20052.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 8th meeting Model Alignment Phase 2 (May-10, 2013)
|
Doc.Name
|
S5eMA20053
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20053.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 8th meeting Model Alignment Phase 2 (May-10, 2012)
|
Doc.Name
|
S5eMA20054
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20054.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
pCR on qualifiers
|
Doc.Name
|
S5eMA20055
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20055.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 9th meeting Model Alignment Phase 2 (May-15, 2013)
|
Doc.Name
|
S5eMA20056
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20056.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 9th meeting Model Alignment Phase 2 (May-15, 2013)
|
Doc.Name
|
S5eMA20057
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20057.zip
|
|
|
Source:
|
Secretary (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Editorial pCR on Model Repertoire draft 5.0 v2
|
Doc.Name
|
S5eMA20058
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20058.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
E TD UOM
|
Doc.Name
|
S5eMA20059
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20059.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Revised: Tool usage regarding FMC NM standards production
|
Doc.Name
|
S5eMA20060
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20060.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
pCR on precondition and postcondition for Model Repertoire
|
Doc.Name
|
S5eMA20061
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20061.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 10th meeting Model Alignment Phase 2 (May-23, 2013)
|
Doc.Name
|
S5eMA20062
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20062.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 10th meeting Model Alignment Phase 2 (May-23, 2013)
|
Doc.Name
|
S5eMA20063
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20063.zip
|
|
|
Source:
|
Secretary (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Communication Peers defined in 3GPP and TM Forum
|
Doc.Name
|
S5eMA20064
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20064.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 11th meeting (F2F) Model Alignment Phase 2 (Jun-3/4, 2012)
|
Doc.Name
|
S5eMA20065
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20065.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Comparison between IA and SS in 3GPP TS 28.65x V11
|
Doc.Name
|
S5eMA20066
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20066.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
NGCOR Project Requirements in the context of FNIM/UIM and FN OM/UOM.ppt
|
Doc.Name
|
S5eMA20067
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20067.zip
|
|
|
Source:
|
Deutsche Telekom,Orange/FT
|
Withdrawn:
|
Y
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 11th meeting (F2F) Model Alignment Phase 2 (Jun-3/4, 2012)
|
Doc.Name
|
S5eMA20068
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20068.zip
|
|
|
Source:
|
Secretary (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Revised Minutes 10th meeting Multi-SDO Project Converged Man agement Model Alignment
|
Doc.Name
|
S5eMA20069
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20069.zip
|
|
|
Source:
|
Secretary (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
NGCOR Project Requirements in the context of FNIM/UIM and FN OM/UOM
|
Doc.Name
|
S5eMA20070
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20070.zip
|
|
|
Source:
|
Deutsche Telekom,Orange/FT
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Updated UIM Data Dictionary report
|
Doc.Name
|
S5eMA20071
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20071.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
FMC FNIM V5.0 Draft
|
Doc.Name
|
S5eMA20072
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20072.zip
|
|
|
Source:
|
editor (Ericsson)
|
Abstract:
|
Using FNIM V3.0 as base, this adds an Annex to capture the "tool usage from 3gpp /sa5 perspective" - action based on agreement on call conference discussion.
This document version number start with 5.x indicating specification produced in MSDO JWG phase 2 work.
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 12th meeting Model Alignment Phase 2 (June-20, 2013)
|
Doc.Name
|
S5eMA20073
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20073.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
FMC FNIM V5.1 Draft
|
Doc.Name
|
S5eMA20074
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20074.zip
|
|
|
Source:
|
editor (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 12th meeting Model Alignment Phase 2 (June-20, 2013)
|
Doc.Name
|
S5eMA20075
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20075.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
E TD Skeleton for UOM specification
|
Doc.Name
|
S5eMA20076
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20076.zip
|
|
|
Source:
|
editor (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 13th meeting Model Alignment Phase 2 (Aug-1, 2013)
|
Doc.Name
|
S5eMA20077
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20077.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 13th meeting Model Alignment Phase 2 (August 1, 2013 )
|
Doc.Name
|
S5eMA20078
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20078.zip
|
|
|
Source:
|
editor (Ericsson)
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 14th meeting (conference call) Multi-SDO Project Con verged Management Model Alignment
|
Doc.Name
|
S5eMA20079
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20079.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on Model Repertoire v5.1
|
Doc.Name
|
S5eMA20080
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20080.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on use of ITU-T CMISE type operations
|
Doc.Name
|
S5eMA20081
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20081.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire draft 5.1
|
Doc.Name
|
S5eMA20082
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20082.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire draft 5.2
|
Doc.Name
|
S5eMA20083
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20083.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 14th meeting (F2F) Model Alignment Phase 2 (Aug-28/2 9, 2013)
|
Doc.Name
|
S5eMA20084
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20084.zip
|
|
|
Source:
|
Secretary
|
Withdrawn:
|
Y
|
The file is not uploaded
|
|
DOCUMENT:
|
UOM 5.1 draft
|
Doc.Name
|
S5eMA20085
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20085.zip
|
|
|
Source:
|
Editor
|
Withdrawn:
|
N
|
The file is not uploaded
|
|
DOCUMENT:
|
Minutes 14th meeting (F2F) Model Alignment Phase 2 (Aug-28/2 9, 2013)
|
Doc.Name
|
S5eMA20086
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20086.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM)
|
Doc.Name
|
S5eMA20087
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20087.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM): DT comments to S5eMA20087
|
Doc.Name
|
S5eMA20088
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20088.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 15th meeting (conference call) Multi-SDO Project Conv erged Management Model Alignment
|
Doc.Name
|
S5eMA20089
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20089.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 15th meeting (conference call) Multi-SDO Project Con verged Management Model Alignment
|
Doc.Name
|
S5eMA20090
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20090.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 16th meeting Multi-SDO Project Converged Management Model Alignment
|
Doc.Name
|
S5eMA20091
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20091.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 16th meeting (conference call) Multi-SDO Project Con verged Management Model Alignment
|
Doc.Name
|
S5eMA20092
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20092.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 17th meeting (conference call) Multi-SDO Project Conv erged Management Model Alignment
|
Doc.Name
|
S5eMA20093
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20093.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 17th meeting (conference call) Multi-SDO Project Con verged Management Model Alignment
|
Doc.Name
|
S5eMA20094
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20094.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
Y
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM)
|
Doc.Name
|
S5eMA20095
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20095.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 17th meeting (conference call) Multi-SDO Project Con verged Management Model Alignment
|
Doc.Name
|
S5eMA20096
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20096.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 18th meeting (conference call) Multi-SDO Project Conv erged Management Model Alignment
|
Doc.Name
|
S5eMA20097
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20097.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is not uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM)
|
Doc.Name
|
S5eMA20098
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20098.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 18th meeting (conference call) Multi-SDO Project Con verged Management Model Alignment
|
Doc.Name
|
S5eMA20099
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20099.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 19th meeting (conference call) Multi-SDO Project Conv erged Management Model Alignment
|
Doc.Name
|
S5eMA20100
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20100.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM)
|
Doc.Name
|
S5eMA20101
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20101.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes18th Meeting(cc)ModelAlignmentPhase2(Nov 28,2013)
|
Doc.Name
|
S5eMA20102
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20102.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
Y
|
The file is not uploaded
|
|
DOCUMENT:
|
Minutes19th Meeting(cc)ModelAlignmentPhase2(Nov 28,2013)
|
Doc.Name
|
S5eMA20103
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20103.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 20th meeting (conference call) Multi-SDO Project Conv erged Management Model Alignment
|
Doc.Name
|
S5eMA20104
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20104.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM)
|
Doc.Name
|
S5eMA20105
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20105.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 20th Meeting(cc)ModelAlignmentPhase2(Dec 04,2013)
|
Doc.Name
|
S5eMA20106
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20106.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 21th meeting (conference call) Multi-SDO Project Conv erged Management Model Alignment
|
Doc.Name
|
S5eMA20107
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20107.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 21th Meeting(cc)ModelAlignmentPhase2(Dec 11,2013)
|
Doc.Name
|
S5eMA20108
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20108.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM)
|
Doc.Name
|
S5eMA20109
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20109.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 22nd meeting (conference call) Multi-SDO Project Conv erged Management Model Alignment
|
Doc.Name
|
S5eMA20110
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20110.zip
|
|
|
Source:
|
Convenor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 21st Meeting(cc)ModelAlignmentPhase2(Dec 11,2013)
|
Doc.Name
|
S5eMA20111
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20111.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
Y
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 21st Meeting(cc)ModelAlignmentPhase2(Dec 11,2013)
|
Doc.Name
|
S5eMA20112
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20112.zip
|
|
|
Source:
|
Ericsson
|
Abstract:
|
Replaces 108 and 111.
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Input for an Umbrella Operations Model (UOM)
|
Doc.Name
|
S5eMA20113
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20113.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 22nd Meeting(cc)ModelAlignmentPhase2(Dec 18,2013)
|
Doc.Name
|
S5eMA20114
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20114.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
UOM v5.1 draft
|
Doc.Name
|
S5eMA20115
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20115.zip
|
|
|
Source:
|
Editor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Generic Operations in TM Forum TIP and JWG MA
|
Doc.Name
|
S5eMA20116
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20116.zip
|
|
|
Source:
|
Deutsche Telekom
|
Abstract:
|
High level comparison of generic operations in TIP A&P and JWG MA.
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Additions/modifications in the Model Repertoire based on the UOM discussions
|
Doc.Name
|
S5eMA20117
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20117.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Comments to draft UOM Version 5.1
|
Doc.Name
|
S5eMA20118
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20118.zip
|
|
|
Source:
|
Deutsche Telekom
|
Abstract:
|
Provides comments from DT.
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 23rd meeting (face to face) Multi-SDO Project Converg ed Management Model Alignment
|
Doc.Name
|
S5eMA20119
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20119.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 23rd meeting (face to face) Multi-SDO Project Conver ged Management Model Alignment
|
Doc.Name
|
S5eMA20120
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20120.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 24th meeting (joint cc) TIP A&P and JWG MA
|
Doc.Name
|
S5eMA20121
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20121.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 25th / 26th meetings (cc) mSDO Project Converged Mana gement Model Alignment
|
Doc.Name
|
S5eMA20122
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20122.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
More detailed comparison of Generic Operations in TM Forum T IP and JWG MA
|
Doc.Name
|
S5eMA20123
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20123.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 25th + 26th Meeting(cc)ModelAlignmentPhase2(March 13 +14,2014)
|
Doc.Name
|
S5eMA20124
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20124.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire 5.3 draft
|
Doc.Name
|
S5eMA20125
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20125.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
UOM 5.2 draft
|
Doc.Name
|
S5eMA20126
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20126.zip
|
|
|
Source:
|
Ericsson
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 27th meeting (cc) mSDO Project Converged Management M odel Alignment
|
Doc.Name
|
S5eMA20127
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20127.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 27th meeting (cc) Multi-SDO Project Converged Manage ment Model Alignment
|
Doc.Name
|
S5eMA20128
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20128.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 28th meeting (cc) mSDO Project Converged Management M odel Alignment
|
Doc.Name
|
S5eMA20129
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20129.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 28th meeting (cc) Multi-SDO Project Converged Manage ment Model Alignment
|
Doc.Name
|
S5eMA20130
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20130.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 29th meeting (cc) mSDO Project Converged Management M odel Alignment
|
Doc.Name
|
S5eMA20131
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20131.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire 5.3 draft v3
|
Doc.Name
|
S5eMA20132
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20132.zip
|
|
|
Source:
|
Ericsson, Editor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
UOM 5.2 draft v3
|
Doc.Name
|
S5eMA20133
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20133.zip
|
|
|
Source:
|
Ericsson, Editor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 29th meeting (cc) Multi-SDO Project Converged Manage ment Model Alignment
|
Doc.Name
|
S5eMA20134
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20134.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Agenda 30th meeting (cc) mSDO Project Converged Management M odel Alignment
|
Doc.Name
|
S5eMA20135
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20135.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Minutes 30th meeting (cc) Multi-SDO Project Converged Manage ment Model Alignment
|
Doc.Name
|
S5eMA20136
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20136.zip
|
|
|
Source:
|
Deutsche Telekom
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire 5.3 d1
|
Doc.Name
|
S5eMA20137
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20137.zip
|
|
|
Source:
|
Ericsson, Editor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
UOM 5.2 d1
|
Doc.Name
|
S5eMA20138
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20138.zip
|
|
|
Source:
|
Ericsson, Editor
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Model Repertoire 5.3
|
Doc.Name
|
S5eMA20139
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20139.zip
|
|
|
Source:
|
Convener
|
Abstract:
|
Final version of Model Repertoire from JWG MA Phase 2.
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
Umbrella Operation Model (UOM) 5.2
|
Doc.Name
|
S5eMA20140
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20140.zip
|
|
|
Source:
|
Convener
|
Abstract:
|
Final version of Umbrella Operation Model (UOM) from JWG MA Phase 2.
|
Withdrawn:
|
N
|
The file is uploaded
|
|
DOCUMENT:
|
LS on Multi-SDO Model Alignment (Phase 2) JWG Output Documen ts Completion
|
Doc.Name
|
S5eMA20141
|
Allocations:
|
Content Type:
|
File Name:
|
S5eMA20141.zip
|
|
|
Source:
|
Convener
|
Withdrawn:
|
N
|
The file is uploaded
|
|