1 | Opening of the meeting | Erik |
2 | Approval of the agenda | Erik |
2.1 | Handling of Postponed Work | Erik |
2.2 | IPR Call Reminder | Erik |
3 | Meeting reports | S2-99 |
4 | General issues and Incoming LSs | S2-99 |
5 | Essential Corrections for Pre-Release 12 items | S2-99 |
5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-99 |
5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc. Rel-11 PCC/QoS: SAPP, QoS_SSL, SIRIG | S2-99 |
5.3 | SAE: 23.402 (including eANDSF, MUPSAP, MAPCON, FlowMob, SMOG), DIDA, LOBSTER, SaMOG_WLAN, BBAI I, II | S2-99 |
5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-99 |
5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-99 |
6 | Release 12 | S2-99 |
6.1 | Release 12 Maintenance (for WIDs that complete before the conclusion of Release 12) | S2-99 |
6.1.1 | 3GPP Packet Access: LIPA Mobility and SIPTO at the Local Network (LIMONET) | S2-99 |
6.1.2 | PCC/QoS Aspects: Usage Monitoring Control enhancement – SA2 Part (UMONC), Application Based Charging (ABC) | S2-99 |
6.1.3 | Non-3GPP Packet Access Maintenance: Operator Policies for IP Interface Selection (OPIIS) | S2-99 |
6.1.4 | IMS-Related Maintenance, SMSMI, BusTI | S2-99 |
6.2 | Machine Type Communications Enhancements for Rel-12 (MTCe) | S2-99 |
6.2.1 | (BB1): Small Data and Device Triggering Enhancements (MTCe-SDDTE) | S2-99 |
6.2.2 | (BB3): UE Power Consumption Optimizations (MTCe-UEPCOP) | S2-99 |
6.3 | WID for Policy and Charging Control for supporting fixed broadband Access networks (P4C) (BB1): P4C-F | S2-99 |
6.4 | Proximity Services (ProSe) | S2-99 |
6.5 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-99 |
6.6 | User Plane Congestion Management (UPCON) | S2-99 |
6.7 | WLAN Network Selection for 3GPP Terminals (WLAN_NS) | S2-99 |
6.8 | ProSe Group Communication, ProSe Relays and Group Communication System Enablers for LTE Common Aspects (ProSe/GCSE_LTE) | S2-99 |
6.9 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-99 |
6.10 | IMS Registration Control (IMS_RegCon) | S2-99 |
6.11 | User Location Information reporting improvements (CNO-ULI) | S2-99 |
6.12 | Study on Core Network Overload solutions (FS_CNO) Phase 2 submissions: ULI Signalling Optimizations on-going study | S2-99 |
6.13 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-99 |
6.14 | Study on Optimizing Offloading to WLAN in 3GPP RAT mobility (WORM) | S2-99 |
6.15 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-99 |
6.16 | Technical Enhancements and Improvements (TEI12) | S2-99 |
6.16.1 | TEI12: 3GPP Packet Access Enhancements and Improvements (to TS 23.060, TS 23.272 or 23.401) | S2-99 |
6.16.2 | TEI12: PCC/QoS Enhancements and Improvements (to TS 23.060, 23.203, 23.401, 23.402) | S2-99 |
6.16.3 | TEI12: Non-3GPP Access Enhancements and Improvements (to TS 23.402) | S2-99 |
6.16.4 | TEI12: IMS- or Emergency-Related Enhancements and Improvements (to TS 23.167, TS 23.216, TS 23.228, TS 23.237) | S2-99 |
6.17 | Minor Corrections and Clean Up (TEI12) – Category F only, no stage 3 impact. | S2-99 |
7 | Project Planning and Management | S2-99 |
7.1 | New and Revised Work Items | S2-99 |
7.1.1 | Work Items Discussed in Parallel Session | S2-99 |
7.2 | Review of the Work Plan | S2-99 |
7.3 | Planning future meetings | S2-99 |
8 | AOB | S2-99 |
9 | Close of the Meeting | Erik |