Last Allocated Document: S2-133088
Temporary Documents List - Ordered by Agenda Item
Colour Key: |
Agenda Item, Agenda Title |
No Conclusion |
Conclusion Reached |
Document Revised |
Document Withdrawn |
Document Not Handled |
|
To use hyperlinks, this file must be placed above Folder 'Docs'
Created: 2013-07-31 10:32     START OF LIST
Chair |
Rx |
Agenda |
TD |
Doc_Type |
LongTitle |
Source |
WI |
Rev_By |
Rev_Of |
LS_Source_file |
Comment |
Decision |
- |
- |
1 |
- |
- |
Opening of the meeting |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2 |
- |
- |
Approval of the agenda |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
2 |
S2-132334 |
Agenda |
Draft Agenda for SA WG2#98 |
SA WG2 Chairman |
- |
S2-132735 |
|
| Revised to S2-132735. |
Revised |
Erik |
Y |
2 |
S2-132735 |
Agenda |
Draft Agenda for SA WG2#98 |
SA WG2 Chairman |
- |
| S2-132334 |
| Approved |
Approved |
- |
- |
2.1 |
- |
- |
Handling of Postponed Work |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2.2 |
- |
- |
IPR Call Reminder |
- |
- |
- |
- |
- |
- |
- |
- |
- |
3 |
- |
- |
Meeting reports |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
3 |
S2-132335 |
REPORT |
Draft Report of SA WG2 meeting #97 |
SA WG2 Secretary |
- |
|
|
| Approved |
Approved |
Erik |
Y |
3 |
S2-132375 |
REPORT |
SA WG2 Chairman's Report on TSG SA#60 |
SA WG2 Chairman |
- |
|
|
| Noted |
Noted |
- |
- |
4 |
- |
- |
General issues and Incoming LSs |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
4 |
S2-132349 |
LS In |
LS from CT WG1: reply to 'LS on End-to-end QoS handling of MTSI' |
CT WG1 |
- |
| S2-132011 |
C1-132536 |
Noted |
Noted |
Erik |
Y |
4 |
S2-132348 |
LS In |
LS from CT WG1: Reply LS on support for user location age or timestamp |
CT WG1 |
- |
| S2-132010 |
C1-132538 |
Noted |
Noted |
Erik |
Y |
4 |
S2-132357 |
LS In |
LS from GSMA-RCPG: Response LS to 3GPP SA WG1 on CSFB charging (response to S1-124513) |
GSMA-RCPG |
TEI12 |
|
| RCPG 09_010 |
This was postponed to meeting #99. |
Postponed |
Erik |
Y |
4 |
S2-132359 |
LS In |
LS from SA WG5: LS on Standardization of a Diameter interface for Circuit Switched (CS) Domain Charging |
SA WG5 |
- |
|
| S5-131011 |
Noted |
Noted |
Erik |
Y |
4 |
S2-132358 |
LS In |
LS from SteerCo: LS on Standardization of a Diameter interface for Circuit Switched (CS) Domain Charging |
SteerCo |
- |
|
| SteerCo_Response_LS |
Noted |
Noted |
Erik |
Y |
4 |
S2-132591 |
LS In |
LS from ETSI MSG: eCall for IMS |
ETSI MSG |
eCall |
|
| Liaison Statement to SA2 & CT1r1 |
Noted |
Noted |
Erik |
Y |
4 |
S2-132345 |
LS In |
LS from CT WG1: LS on UE Requirements for PSAP callback |
CT WG1 |
EMC_PC |
| S2-132007 |
C1-132674 |
This LS was postponed to meeting #99. |
Postponed |
Erik |
Y |
4 |
S2-132374 |
CR |
23.167 CR0234: Requirement Alignment for call back |
Research In Motion UK Ltd |
TEI11, EMC1 |
S2-132736 |
|
| Related to LS in S2-132345. Revised to S2-132736. |
Revised |
Erik |
Y |
4 |
S2-132736 |
CR |
23.167 CR0234R1: Requirement Alignment for call back |
Research In Motion UK Ltd |
TEI11, EMC1 |
| S2-132374 |
| This CR was agreed |
Agreed |
Frank |
Y |
4 |
S2-132373 |
CR |
23.167 CR0233: Reinstatement of call back functionality removed in Release 11 |
Research In Motion UK Ltd |
TEI12 |
|
|
| Reinstates Rel-12 functionality removed from Rel-11 in CR0234. Noted |
Noted |
Erik |
Y |
4 |
S2-132351 |
LS In |
LS from CT WG4: LS on Progress of work item Dia_SGSN_GMLC |
CT WG4 |
Dia_SGSN_GMLC |
| S2-132017 |
C4-130842 |
Response drafted in S2-132416. Revised to S2-132737 (for e-mail approval). Noted. Postponed to meeting #99 |
Postponed |
Erik |
Y |
4 |
S2-132416 |
LS OUT |
[DRAFT] LS Reply on Progress of work item Dia_SGSN_GMLC |
Ericsson, ST-Ericsson |
Dia_SGSN_GMLC |
S2-132737 |
|
| Response to S2-132351. Revised to S2-132737. |
Revised |
Erik |
Y |
4 |
S2-132737 |
LS OUT |
[DRAFT] LS Reply on Progress of work item Dia_SGSN_GMLC |
Ericsson, ST-Ericsson |
Dia_SGSN_GMLC |
| S2-132416 |
| For e-mail approval. Noted |
Noted |
Erik |
Y |
4 |
S2-132354 |
LS In |
LS from GSMA IREG: LS on QoS and roaming agreements |
GSMA IREG |
TEI11 |
| S2-132144 |
Packet_doc_65_016_LS_215 |
Response drafted in S2-132402. Revised to S2-133061 (for e-mail approval). Final response in S2-133074 |
Response in S2-133074 |
Erik |
Y |
4 |
S2-132402 |
LS OUT |
[DRAFT] LS reply on QoS and roaming agreements |
Ericsson, ST Ericsson |
TEI11 |
S2-132742 |
|
| Response to S2-132354. Revised to S2-132742. |
Revised |
Erik |
Y |
4 |
S2-132742 |
LS OUT |
[DRAFT] LS reply on QoS and roaming agreements |
Ericsson, ST Ericsson |
TEI11 |
S2-133061 |
S2-132402 |
| Revised to S2-133061. |
Revised |
Erik |
Y |
4 |
S2-133061 |
LS OUT |
[DRAFT] LS reply on QoS and roaming agreements |
Ericsson, ST Ericsson |
TEI11 |
S2-133074 |
S2-132742 |
| For e-mail approval. Approved. Revised in S2-133074 |
Revised |
Erik |
Y |
4 |
S2-133074 |
LS OUT |
LS reply on QoS and roaming agreements |
SA WG2 |
TEI11 |
| S2-133061 |
| Revision of e-mail approved S2-133061. Approved |
Approved |
Ivano |
Y |
4 |
S2-132404 |
CR |
23.401 CR2570: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
S2-132739 |
|
| Revised to S2-132739. |
Revised |
Ivano |
Y |
4 |
S2-132738 |
CR |
23.401 CR2570R1: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
S2-133050 |
S2-132403 |
| Revised to S2-133050. |
Revised |
Ivano |
Y |
4 |
S2-133050 |
CR |
23.401 CR2570R2: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
| S2-132738 |
| This CR was agreed |
Agreed |
Ivano |
Y |
4 |
S2-132403 |
CR |
23.401 CR2569: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
S2-132738 |
|
| Revised to S2-132738. |
Revised |
Ivano |
Y |
4 |
S2-132739 |
CR |
23.401 CR2569R1: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
S2-133051 |
S2-132404 |
| Revised to S2-133051. |
Revised |
Ivano |
Y |
4 |
S2-133051 |
CR |
23.401 CR2569R2: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
| S2-132739 |
| This CR was agreed |
Agreed |
Ivano |
Y |
4 |
S2-132406 |
CR |
23.060 CR1803: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
S2-132741 |
|
| Revised to S2-132741. |
Revised |
Ivano |
Y |
4 |
S2-132741 |
CR |
23.060 CR1803R1: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
S2-133053 |
S2-132406 |
| Revised to S2-133053. |
Revised |
Ivano |
Y |
4 |
S2-133053 |
CR |
23.060 CR1803R2: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
| S2-132741 |
| This CR was agreed |
Agreed |
Ivano |
Y |
4 |
S2-132405 |
CR |
23.060 CR1802: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
S2-132740 |
|
| Revised to S2-132740. |
Revised |
Ivano |
Y |
4 |
S2-132740 |
CR |
23.060 CR1802R1: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
S2-133052 |
S2-132405 |
| Revised to S2-133052. |
Revised |
Ivano |
Y |
4 |
S2-133052 |
CR |
23.060 CR1802R2: Clarifications on QoS and roaming |
Ericsson, ST Ericsson |
TEI11 |
| S2-132740 |
| This CR was agreed |
Agreed |
Erik |
Y |
4 |
S2-132336 |
LS In |
LS from IEEE OmniRAN Study Group: Interpretations of assumptions in chapter 16 of 3GPP TS 23.402 V11.6.0 (2013-03) on the behavior of a Trusted WLAN Access Network |
IEEE OmniRAN Study Group |
- |
| S2-131557 |
omniran-13-0024-01-ecsg |
Response drafted in S2-132743 (withdrawn). Postponed to meeting #99 |
Postponed |
Erik |
N |
4 |
S2-132743 |
LS OUT |
[DRAFT Reply LS on Interpretations of assumptions in chapter 16 of 3GPP TS 23.402 |
SA WG2 |
- |
|
|
| This was not provided and was withdrawn. |
Withdrawn |
Erik |
Y |
4 |
S2-132390 |
LS In |
LS from ETSI STQ: Delay values in 3GPP Rel-12 |
ETSI STQ |
- |
|
| STQ(13)43_056r1 |
This was postponed to meeting #99. |
Postponed |
Erik |
Y |
4 |
S2-132337 |
LS In |
LS from NGNM: List of high level recommendations from NGMN |
NGNM |
- |
| S2-131559 |
2013_04_04_NGMN-Liaison |
Proposed to postpone this LS until there is prepared discussion or to note this LS if there is no intention to do so. Postponed to meeting #99 |
Postponed |
Erik |
Y |
4 |
S2-132355 |
LS In |
LS from CT WG3: Reply LS on End-to-end QoS handling of MTSI |
CT WG3 |
E2EMTSI |
| S2-132146 |
C3-130837 |
Noted |
Noted |
Erik |
Y |
4 |
S2-132525 |
LS In |
LS from GSMA Wi-Fi Roaming Task Force: Wi-Fi Roaming Task Force - Signalling Optimisation |
GSMA Wi-Fi Roaming Task Force |
- |
|
| output LS 3GPP WFA 26062013 |
This needs to be forwarded to SA WG3. Is there anything we can do now or should we postpone this? Postponed to meeting #99 |
Postponed |
Erik |
Y |
4 |
S2-132730 |
LS In |
LS from SA WG3: LS reply on NAT and GIBA |
SA WG3 |
- |
|
| S3-130835 |
SA WG3 response to S2-132323 (S2#97). Postponed to meeting #99 |
Postponed |
Erik |
Y |
4 |
S2-132731 |
LS In |
LS from SA WG3: Reply LS on enhancing IMEI based Lawful Interception in IMS |
SA WG3 |
- |
|
| S3-130836 |
SA WG3 response to S2-131521 (S2#96). Postponed to meeting #99 |
Postponed |
Erik |
Y |
4 |
S2-132733 |
LS In |
LS from SA WG3: Reply LS on 'LS on Notifications on Firewall Traversal' from LS Reply SA WG1 S1-133279 |
SA WG3 |
- |
|
| S3-130879 |
Postponed to meeting #99 |
Postponed |
- |
- |
5 |
- |
- |
Essential Corrections for Pre-Release 12 items |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5.1 |
- |
- |
SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, SA WG2 Part of FULL_MOCN-GERAN; SA WG2 Part of GWCN_GERAN |
- |
- |
- |
- |
- |
- |
- |
Frank |
Y |
5.1 |
S2-132447 |
CR |
23.401 CR2575: Fix equivalent PLMN list handling |
NEC |
TEI11 |
S2-132791 |
|
| Revised to S2-132791. |
Revised |
Frank |
Y |
5.1 |
S2-132791 |
CR |
23.401 CR2575R1: Fix equivalent PLMN list handling |
NEC |
TEI11, SAES |
| S2-132447 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132792 |
CR |
23.401 CR2576R1: Fix equivalent PLMN list handling |
NEC |
TEI11, SAES |
| S2-132448 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132449 |
CR |
23.272 CR0880: Fix CSFB MT call failure due to HO |
NEC |
TEI11 |
S2-132793 |
|
| Revised to S2-132793. |
Revised |
Frank |
Y |
5.1 |
S2-132793 |
CR |
23.272 CR0880R1: Fix CSFB MT call failure due to HO |
NEC |
TEI11 |
S2-132878 |
S2-132449 |
| Revised to S2-132878. |
Revised |
Frank |
Y |
5.1 |
S2-132878 |
CR |
23.272 CR0880R2: Fix CSFB MT call failure due to HO |
NEC |
TEI11, SAES-CSFB |
| S2-132793 |
| This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132572 |
CR |
23.401 CR2583: Avoiding PDN GW relocation when radio and S1 bearers are active |
Alcatel-Lucent, US Cellular |
TEI11, SIPTO |
S2-132794 |
|
| Revised to S2-132794. |
Revised |
Frank |
Y |
5.1 |
S2-132794 |
CR |
23.401 CR2583R1: Avoiding PDN GW relocation when radio and S1 bearers are active |
Alcatel-Lucent, US Cellular |
TEI11, SIPTO |
| S2-132572 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132573 |
CR |
23.401 CR2584: Avoiding PDN GW relocation when radio and S1 bearers are active |
Alcatel-Lucent |
TEI11, SIPTO |
S2-132795 |
|
| Revised to S2-132795. |
Revised |
Frank |
Y |
5.1 |
S2-132795 |
CR |
23.401 CR2584R1: Avoiding PDN GW relocation when radio and S1 bearers are active |
Alcatel-Lucent |
TEI11, SIPTO |
S2-132879 |
S2-132573 |
| Revised to S2-132879. |
Revised |
Frank |
Y |
5.1 |
S2-132879 |
CR |
23.401 CR2584R2: Avoiding PDN GW relocation when radio and S1 bearers are active |
Alcatel-Lucent, US Cellular |
TEI11, SIPTO |
| S2-132795 |
| This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132647 |
CR |
23.272 CR0886: Correction of resume procedure after CSFB |
Intel |
TEI11, CSFB |
S2-132796 |
|
| Revised to S2-132796. |
Revised |
Frank |
Y |
5.1 |
S2-132796 |
CR |
23.272 CR0886R1: Correction of resume procedure after CSFB |
Intel |
TEI11, CSFB |
| S2-132647 |
| The problem is acknowledged, but further study is needed. Noted in parallel sessions |
Noted |
Frank |
Y |
5.1 |
S2-132347 |
LS In |
LS from CT WG1: Reply LS on UE’s inconsistent behaviour when PS Back-off timer is running |
CT WG1 |
NIMTC |
| S2-132009 |
C1-132609 |
Responses drafted in S2-132623 and S2-132664. Revised in S2-132883 (for e-mail approval). Noted. Postponed to meeting #99 |
Postponed |
Frank |
Y |
5.1 |
S2-132623 |
LS OUT |
Reply LS on UE's inconsistent behaviour when PS Back-off timer is running |
Huawei, Hisilicon |
NIMTC |
|
|
| Response to S2-132347. Noted |
Noted |
Frank |
Y |
5.1 |
S2-132622 |
DISCUSSION |
UE's inconsistent behaviour when PS Back-off timer is running |
Huawei, Hisilicon |
NIMTC |
|
|
| Noted in parallel sessions |
Noted |
Frank |
Y |
5.1 |
S2-132665 |
CR |
23.401 CR2522R3: Disabling ISR when (E)MM backoff timer applies |
Qualcomm Incorporated, Samsung |
NIMTC |
| S2-131282 |
| Resubmission of S2-131282.. Not Handled |
- |
Frank |
Y |
5.1 |
S2-132666 |
CR |
23.401 CR2523R2: Disabling ISR when (E)MM backoff timer applies |
Qualcomm Incorporated, Samsung |
NIMTC |
| S2-131262 |
| Resubmission of S2-131262.. Not Handled |
- |
Frank |
Y |
5.1 |
S2-132667 |
CR |
23.401 CR2524R2: Disabling ISR when (E)MM backoff timer applies |
Qualcomm Incorporated, Samsung |
NIMTC |
| S2-131263 |
| Resubmission of S2-131263.. Not Handled |
- |
Frank |
Y |
5.1 |
S2-132664 |
LS OUT |
[DRAFT] Reply LS on UE's inconsistent behaviour when PS Back-off timer is running |
Qualcomm Incorporated, Samsung |
NIMTC |
S2-132797 |
|
| Response to S2-132347. Revised to S2-132797. |
Revised |
Frank |
Y |
5.1 |
S2-132797 |
LS OUT |
[DRAFT] Reply LS on UE's inconsistent behaviour when PS Back-off timer is running |
Qualcomm Incorporated, Samsung |
NIMTC |
S2-132883 |
S2-132664 |
| Response to S2-132347. Revised to S2-132883. |
Revised |
Frank |
Y |
5.1 |
S2-132883 |
LS OUT |
[DRAFT] Reply LS on UE's inconsistent behaviour when PS Back-off timer is running |
Qualcomm Incorporated, Samsung |
NIMTC |
| S2-132797 |
| Response to S2-132347. For e-mail approval. Noted |
Noted |
Frank |
Y |
5.1 |
S2-132896 |
REPORT |
Parallel Session Notes on 5.1, 5.4, 6.1.1, 6.11.1 |
Convenor |
- |
|
|
| Noted |
Noted |
Frank |
Y |
5.1 |
S2-132489 |
CR |
23.272 CR0882: Improve how CSFB UE return back to the former LTE PLMN |
Huawei, Hisilicon,Yota, Alcatel-Lucent, China Mobile, NEC, CATT, ZTE, Orange |
TEI11, CSFB |
S2-132798 |
|
| Revised to S2-132798. |
Revised |
Frank |
Y |
5.1 |
S2-132798 |
CR |
23.272 CR0882R1: Improve how CSFB UE return back to the former LTE PLMN |
Huawei, Hisilicon, Yota, Alcatel-Lucent, China Mobile, NEC, CATT, ZTE, Orange |
TEI11, SAES-CSFB |
| S2-132489 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132386 |
CR |
23.060 CR1799: Solution of restricting the USIM to specific UEs |
Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks |
SIMTC-Reach |
|
|
| This CR is related to discussions in SA WG3 and should be technically agreed in SA WG3 before handled in SA WG2. Not Handled |
- |
Frank |
Y |
5.1 |
S2-132387 |
CR |
23.401 CR2568: Solution of restricting the USIM to specific UEs |
Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks |
SIMTC-Reach |
|
|
| This CR is related to discussions in SA WG3 and should be technically agreed in SA WG3 before handled in SA WG2. Not Handled |
- |
Frank |
Y |
5.1 |
S2-132471 |
CR |
23.272 CR0881: SMS in MME and SMS over IP |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, |
SIMTC |
S2-132877 |
|
| Revised to S2-132877. |
Revised |
Frank |
Y |
5.1 |
S2-132877 |
CR |
23.272 CR0881R1: SMS in MME and SMS over IP |
Alcatel-Lucent |
SIMTC |
| S2-132471 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132535 |
CR |
23.401 CR2493R2: Interoperation between MME and Gn/Gp SGSN |
Samsung |
TEI11 |
S2-132800 |
S2-130904 |
| Resubmission of S2-130904. Revised to S2-132800. |
Revised |
Frank |
Y |
5.1 |
S2-132800 |
CR |
23.401 CR2493R3: Interoperation between MME and Gn/Gp SGSN |
Samsung |
TEI11, SAES |
| S2-132535 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132536 |
CR |
23.401 CR2528R1: Interoperation between MME and Gn/Gp SGSN |
Samsung |
TEI11 |
S2-132801 |
S2-130905 |
| Resubmission of S2-130905. Revised to S2-132801. |
Revised |
Frank |
Y |
5.1 |
S2-132801 |
CR |
23.401 CR2528R2: Interoperation between MME and Gn/Gp SGSN |
Samsung |
TEI11, SAES |
| S2-132536 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132684 |
CR |
23.272 CR0889: TMSI reallocation for CSFB/emergency handling with IMSI |
Nokia Siemens Networks |
TEI11, CSFB |
S2-132802 |
|
| Revised to S2-132802. |
Revised |
Frank |
Y |
5.1 |
S2-132802 |
CR |
23.272 CR0889R1: TMSI reallocation for CSFB/emergency handling with IMSI |
Nokia Siemens Networks |
TEI11, CSFB |
S2-132880 |
S2-132684 |
| Revised to S2-132880. |
Revised |
Frank |
Y |
5.1 |
S2-132880 |
CR |
23.272 CR0889R2: TMSI reallocation for CSFB/emergency handling with IMSI |
Nokia Siemens Networks |
TEI11, SAES-CSFB |
| S2-132802 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132344 |
LS In |
LS from CT WG1: LS on GERAN Iu mode |
CT WG1 |
TEI12 |
| S2-132006 |
C1-132352 |
Noted in parallel sessions |
Noted |
Frank |
Y |
5.1 |
S2-132490 |
CR |
23.060 CR1806: Removal of GERAN Iu mode |
Huawei, Hisilicon |
TEI12, SAES |
S2-132803 |
|
| Revised to S2-132803. |
Revised |
Frank |
Y |
5.1 |
S2-132803 |
CR |
23.060 CR1806R1: Removal of GERAN Iu mode |
Huawei, Hisilicon |
TEI12 |
| S2-132490 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132532 |
CR |
23.272 CR0883: Correction on 1xCSFB IMS interaction |
Samsung |
TEI11 |
S2-132804 |
|
| Revised to S2-132804. |
Revised |
Frank |
Y |
5.1 |
S2-132804 |
CR |
23.272 CR0883R1: Correction on 1xCSFB IMS interaction |
Samsung |
TEI11 |
S2-132881 |
S2-132532 |
| Revised to S2-132881. |
Revised |
Frank |
Y |
5.1 |
S2-132881 |
CR |
23.272 CR0883R2: Correction on 1xCSFB IMS interaction |
Samsung |
TEI11, SAES-CSFB |
| S2-132804 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132685 |
DISCUSSION |
ISR issue with CSFB/ emergency handling with IMSI |
Nokia Siemens Networks |
TEI9, CSFB |
|
|
| Noted in parallel sessions |
Noted |
Frank |
Y |
5.1 |
S2-132686 |
CR |
23.272 CR0890: ISR with CSFB/ emergency handling with IMSI |
Nokia Siemens Networks |
TEI9, CSFB |
S2-132805 |
|
| Revised to S2-132805. |
Revised |
Frank |
Y |
5.1 |
S2-132805 |
CR |
23.272 CR0890R1: ISR with CSFB/ emergency handling with IMSI |
Nokia Siemens Networks |
TEI9, CSFB |
S2-132882 |
S2-132686 |
| Revised to S2-132882. |
Revised |
Frank |
Y |
5.1 |
S2-132882 |
CR |
23.272 CR0890R2: ISR with CSFB/ emergency handling with IMSI |
Nokia Siemens Networks |
TEI9, SAES-CSFB |
| S2-132805 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132687 |
CR |
23.272 CR0891: ISR with CSFB/ emergency handling with IMSI |
Nokia Siemens Networks |
TEI9, CSFB |
S2-132806 |
|
| Revised to S2-132806. |
Revised |
Frank |
Y |
5.1 |
S2-132806 |
CR |
23.272 CR0891R1: ISR with CSFB/ emergency handling with IMSI |
Nokia Siemens Networks |
TEI9, SAES-CSFB |
| S2-132687 |
| This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132688 |
CR |
23.272 CR0892: ISR with CSFB/ emergency handling with IMSI |
Nokia Siemens Networks |
TEI9, CSFB |
S2-132807 |
|
| Revised to S2-132807. |
Revised |
Frank |
Y |
5.1 |
S2-132807 |
CR |
23.272 CR0892R1: ISR with CSFB/ emergency handling with IMSI |
Nokia Siemens Networks |
TEI9, SAES-CSFB |
| S2-132688 |
| This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132537 |
CR |
23.401 CR2529R1: Clarification on attach with handover type |
Samsung |
TEI11 |
| S2-130906 |
| Resubmission of S2-130906. Noted in parallel sessions |
Noted |
Frank |
Y |
5.1 |
S2-132538 |
CR |
23.401 CR2530R1: Clarification on attach with handover type |
Samsung |
TEI11 |
| S2-130907 |
| Resubmission of S2-130907. Noted in parallel sessions |
Noted |
Frank |
Y |
5.1 |
S2-132533 |
CR |
23.401 CR2494R2: S1AP: initial Context Setup Complete correction |
Samsung |
TEI11 |
| S2-130902 |
| Resubmission of S2-130902. Noted in parallel sessions |
Noted |
Frank |
Y |
5.1 |
S2-132534 |
CR |
23.401 CR2531R1: S1AP: initial Context Setup Complete correction |
Samsung |
TEI11 |
| S2-130903 |
| Resubmission of S2-130903. Noted in parallel sessions |
Noted |
Frank |
Y |
5.1 |
S2-132715 |
DISCUSSION |
MME selection during inter-RAT handover |
Nokia Siemens Networks |
TEI12, SAES |
|
|
| Not Handled |
Not Handled |
Frank |
Y |
5.1 |
S2-132566 |
CR |
23.272 CR0893: Corrections to UE return to last used LTE PLMN after CSFB |
Alcatel-Lucent |
TEI11, SAES |
S2-132799 |
|
| LATE DOC: Rx 10/07, 11:00. This CR is the same as (withdrawn) S2-132565, with the corrected CR number. Revised to S2-132799. |
Revised |
Frank |
Y |
5.1 |
S2-132799 |
CR |
23.272 CR0893R1: Corrections to UE return to last used LTE PLMN after CSFB |
Alcatel-Lucent |
TEI11, SAES |
S2-132884 |
S2-132566 |
| Revised to S2-132884. |
Revised |
Frank |
Y |
5.1 |
S2-132884 |
CR |
23.272 CR0893R2: Corrections to UE return to last used LTE PLMN after CSFB |
Alcatel-Lucent |
TEI11, SAES-CSFB |
| S2-132799 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.1 |
S2-132565 |
CR |
23.401 CR2579: Corrections to UE return to last used LTE PLMN after CSFB |
Alcatel-Lucent |
TEI11, SAES |
|
|
| WITHDRAWN |
Withdrawn |
Ivano |
Y |
5.1 |
S2-132448 |
CR |
23.401 CR2576: Fix equivalent PLMN list handling |
NEC |
TEI11 |
S2-132792 |
|
| Revised in parallel sessions to S2-132792 |
Revised |
- |
- |
5.2 |
- |
- |
SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc. Rel-11 PCC/QoS: SAPP, QoS_SSL, SIRIG |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
5.2 |
S2-132990 |
REPORT |
Chairman's Notes Non-3GPP, PCC/QoS, FS_CNO ULI and IMS parallel sessions |
Convenor |
- |
|
|
| Noted |
Noted |
Ivano |
Y |
5.2 |
S2-132701 |
CR |
23.203 CR0834: Some corrections to SAPP |
China Telecom, ZTE, CATT |
SAPP |
S2-132924 |
|
| Revised to S2-132924. |
Revised |
Ivano |
Y |
5.2 |
S2-132924 |
CR |
23.203 CR0834R1: Some corrections to SAPP |
China Telecom, ZTE, CATT, Allot communications |
SAPP |
| S2-132701 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Ivano |
Y |
5.2 |
S2-132702 |
CR |
23.203 CR0835: Some corrections to SAPP |
China Telecom, ZTE, CATT |
SAPP |
S2-132925 |
|
| Revised to S2-132925. |
Revised |
Ivano |
Y |
5.2 |
S2-132925 |
CR |
23.203 CR0835R1: Some corrections to SAPP |
China Telecom, ZTE, CATT, Allot communications |
SAPP |
| S2-132702 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Ivano |
Y |
5.2 |
S2-132397 |
CR |
23.060 CR1800: Definition for a valid state of the TFT setting |
Ericsson, ST Ericsson |
TEI11, SAES |
S2-132926 |
|
| Revised to S2-132926. |
Revised |
Ivano |
Y |
5.2 |
S2-132926 |
CR |
23.060 CR1800R1: Definition for a valid state of the TFT setting |
Ericsson, ST Ericsson |
TEI11, SAES |
| S2-132397 |
| Noted (technically endorsed) |
Noted (technically endorsed) |
Ivano |
Y |
5.2 |
S2-132398 |
CR |
23.060 CR1801: Definition for a valid state of the TFT setting |
Ericsson, ST Ericsson |
TEI11, SAES |
S2-132927 |
|
| Revised to S2-132927. |
Revised |
Ivano |
N |
5.2 |
S2-132927 |
CR |
23.060 CR1801R1: Definition for a valid state of the TFT setting |
Ericsson, ST Ericsson |
TEI11, SAES |
| S2-132398 |
| WITHDRAWN |
Withdrawn |
Ivano |
Y |
5.2 |
S2-132466 |
CR |
23.401 CR2553R1: DL traffic mapping alignment with 23.060 |
Ericsson, ST Ericsson |
TEI11, SAES |
S2-132931 |
S2-131621 |
| Resubmission of S2-131621. Revised to S2-132931. |
Revised |
Ivano |
Y |
5.2 |
S2-132931 |
CR |
23.401 CR2553R2: DL traffic mapping alignment with 23.060 |
Ericsson, ST Ericsson |
TEI11, SAES |
S2-133054 |
S2-132466 |
| Revised to S2-133054. |
Revised |
Ivano |
Y |
5.2 |
S2-133054 |
CR |
23.401 CR2553R3: DL traffic mapping alignment with 23.060 |
Ericsson, ST Ericsson |
TEI11, SAES |
| S2-132931 |
| Noted. Technically Endorsed (not for TSG SA approval at this time) |
Noted |
Ivano |
Y |
5.2 |
S2-132467 |
CR |
23.401 CR2554R1: DL traffic mapping alignment with 23.060 |
Ericsson, ST Ericsson |
TEI11, SAES |
S2-132932 |
S2-131622 |
| Resubmission of S2-131622. Revised to S2-132932. |
Revised |
Ivano |
N |
5.2 |
S2-132932 |
CR |
23.401 CR2554R2: DL traffic mapping alignment with 23.060 |
Ericsson, ST Ericsson |
TEI11, SAES |
| S2-132467 |
| WITHDRAWN |
Withdrawn |
Ivano |
Y |
5.2 |
S2-132624 |
CR |
23.401 CR2525R4: Unidirectional TAD |
Huawei, Hisilicon, Intel |
TEI10, SAES |
| S2-132052 |
| Resubmission of S2-132052. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132625 |
CR |
23.401 CR2526R4: Unidirectional TAD |
Huawei, Hisilicon, Intel |
TEI10, SAES |
| S2-132053 |
| Resubmission of S2-132053. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132626 |
CR |
23.401 CR2527R4: Unidirectional TAD |
Huawei, Hisilicon, Intel |
TEI10, SAES |
| S2-132054 |
| Resubmission of S2-132054. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132933 |
LS OUT |
[DRAFT] LS on uplink packet filters |
SA WG2 |
TEI11, SAES |
S2-133075 |
| - |
Created in Parallel sessions. For e-mail approval. Revision 1 approved. Revised to S2-133075. |
Revised |
Ivano |
Y |
5.2 |
S2-133075 |
LS OUT |
LS on uplink packet filters |
SA WG2 |
TEI11, SAES |
| S2-132933 |
- |
e-mail revision 1 of S2-132933. Approved |
Approved |
Ivano |
Y |
5.2 |
S2-132399 |
CR |
23.203 CR0824: PCC support for unidirectional downlink flows in NW-initiated procedures |
Ericsson, ST Ericsson |
TEI11, SAES |
S2-132934 |
|
| Revised to S2-132934. |
Revised |
Ivano |
Y |
5.2 |
S2-132934 |
CR |
23.203 CR0824R1: PCC support for unidirectional downlink flows in NW-initiated procedures |
Ericsson, ST Ericsson |
TEI11, SAES |
S2-133055 |
S2-132399 |
| Revised to S2-133055. |
Revised |
Ivano |
Y |
5.2 |
S2-133055 |
CR |
23.203 CR0824R2: PCC support for unidirectional downlink flows in NW-initiated procedures |
Ericsson, ST Ericsson |
TEI11, SAES |
| S2-132934 |
| Noted. Technically Endorsed (not for TSG SA approval at this time) for attachment to the LS. |
Noted |
Ivano |
Y |
5.2 |
S2-132400 |
CR |
23.203 CR0825: PCC support for unidirectional downlink flows in NW-initiated procedures |
Ericsson, ST Ericsson |
TEI11, SAES |
S2-132935 |
|
| Revised to S2-132935. |
Revised |
Ivano |
N |
5.2 |
S2-132935 |
CR |
23.203 CR0825R1: PCC support for unidirectional downlink flows in NW-initiated procedures |
Ericsson, ST Ericsson |
TEI11, SAES |
| S2-132400 |
| WITHDRAWN |
Withdrawn |
Ivano |
Y |
5.2 |
S2-132627 |
CR |
23.203 CR0814R1: PCC support for unidirectional TAD |
Huawei, Hisilicon, Intel |
TEI10, SAES |
| S2-131680 |
| Resubmission of S2-131680. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132628 |
CR |
23.203 CR0815R1: PCC support for unidirectional TAD |
Huawei, Hisilicon, Intel |
TEI10, SAES |
| S2-131681 |
| Resubmission of S2-131681. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132629 |
CR |
23.203 CR0816R1: PCC support for unidirectional TAD |
Huawei, Hisilicon, Intel |
TEI10, SAES |
| S2-131682 |
| Resubmission of S2-131682. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132412 |
CR |
23.401 CR2572: Correction of HSS initiated Subscriber QoS Modification |
Ericsson, ST-Ericsson |
TEI11 |
|
|
| Discussion of this issue is postponed to next meeting. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132413 |
CR |
23.401 CR2573: Correction of HSS initiated Subscriber QoS Modification |
Ericsson, ST-Ericsson |
TEI11 |
|
|
| Discussion of this issue is postponed to next meeting. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132567 |
DISCUSSION |
Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent |
TEI11, NWK-LP2IMS |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132568 |
CR |
23.401 CR2581: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
NWK-PL2IMS |
S2-132937 |
|
| Revised to S2-132937. |
Revised |
Ivano |
Y |
5.2 |
S2-132937 |
CR |
23.401 CR2581R1: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
NWK-PL2IMS |
S2-133047 |
S2-132568 |
| Revised to S2-133047. |
Revised |
Ivano |
Y |
5.2 |
S2-133047 |
CR |
23.401 CR2581R2: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
NWK-PL2IMS |
| S2-132937 |
| This CR was agreed |
Agreed |
Ivano |
N |
5.2 |
S2-133057 |
CR |
23.401 CR2581R3: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
NWK-PL2IMS |
|
|
| WITHDRAWN |
Withdrawn |
Ivano |
Y |
5.2 |
S2-132570 |
CR |
23.203 CR0827: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
TEI11, NWK-PL2IMS |
|
|
| May need to handle 23.401 CRs first. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132569 |
CR |
23.401 CR2582: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
NWK-PL2IMS |
S2-132938 |
|
| LATE DOC: Rx 09/07, 18:10. Revised to S2-132938. |
Revised |
Ivano |
Y |
5.2 |
S2-132938 |
CR |
23.401 CR2582R1: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
NWK-PL2IMS |
S2-133048 |
S2-132569 |
| Revised to S2-133048. |
Revised |
Ivano |
Y |
5.2 |
S2-133048 |
CR |
23.401 CR2582R2: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
NWK-PL2IMS |
| S2-132938 |
| This CR was agreed |
Agreed |
Ivano |
N |
5.2 |
S2-133058 |
CR |
23.401 CR2582R3: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
NWK-PL2IMS |
|
|
| WITHDRAWN |
Withdrawn |
Ivano |
Y |
5.2 |
S2-132571 |
CR |
23.203 CR0828: Reporting ULI and TimeZone at Network-initiated bearer release related procedures |
Alcatel-Lucent, AT&T |
TEI11, NWK-PL2IMS |
|
|
| LATE DOC: Rx 09/07, 18:10. Noted in parallel sessions |
Noted |
Ivano |
Y |
5.2 |
S2-132619 |
CR |
23.203 CR0829: Correction of a single logical DRA entity |
China Telecom, China Unicom, China Mobile |
PCC |
|
|
| Not Handled |
- |
- |
- |
5.3 |
- |
- |
SAE: 23.402 (including eANDSF, MUPSAP, MAPCON, FlowMob, SMOG), DIDA, LOBSTER, SaMOG_WLAN, BBAI I, II |
- |
- |
- |
- |
- |
- |
- |
_Not On Agenda |
Y |
5.3 |
S2-132574 |
CR |
23.402 CR1163: Correction of UE Location Information over S2a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
TEI11, SaMOG |
|
|
| Not Handled |
- |
_Not On Agenda |
Y |
5.3 |
S2-132575 |
CR |
23.402 CR1164: Correction of UE Location Information over S2a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
TEI11, SaMOG |
|
|
| Not Handled |
- |
_Not On Agenda |
Y |
5.3 |
S2-132601 |
CR |
23.402 CR1168: Removal of ISMP rules with active/idle validity |
Motorola Mobility |
TEI11 |
|
|
| Not Handled |
- |
_Not On Agenda |
Y |
5.3 |
S2-132602 |
CR |
23.402 CR1169: Removal of ISMP rules with active/idle validity |
Motorola Mobility |
TEI11 |
|
|
| Not Handled |
- |
- |
- |
5.4 |
- |
- |
Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC |
- |
- |
- |
- |
- |
- |
- |
Frank |
Y |
5.4 |
S2-132343 |
LS In |
LS from CT WG4: LS on Use of ECN in the Context of MPS |
CT WG4 |
eMPS_Gateway |
| S2-132005 |
C4-131011 |
Response drafted in S2-132552. Revised to S2-133046 (for e-mail approval). Final response in S2-133076 |
Response in S2-133076 |
Frank |
Y |
5.4 |
S2-132553 |
CR |
23.228 CR1041: Use of ECN in MPS |
Applied Communication Sciences, NCS, AT&T, Alcatel-Lucent |
eMPS |
S2-132814 |
|
| Revised to S2-132814. |
Revised |
Frank |
Y |
5.4 |
S2-132814 |
CR |
23.228 CR1041R1: Use of ECN in MPS |
Applied Communication Sciences, NCS, AT&T, Alcatel-Lucent |
eMPS |
S2-132885 |
S2-132553 |
| Revised to S2-132885. |
Revised |
Frank |
Y |
5.4 |
S2-132885 |
CR |
23.228 CR1041R2: Use of ECN in MPS |
Applied Communication Sciences, NCS, AT&T, Alcatel-Lucent, Sprint |
eMPS |
| S2-132814 |
| This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132554 |
CR |
23.228 CR1042: Use of ECN in MPS |
Applied Communication Sciences, NCS, AT&T, Alcatel-Lucent |
eMPS |
S2-132815 |
|
| Revised to S2-132815. |
Revised |
Frank |
Y |
5.4 |
S2-132815 |
CR |
23.228 CR1042R1: Use of ECN in MPS |
Applied Communication Sciences, NCS, AT&T, Alcatel-Lucent |
eMPS |
S2-132886 |
S2-132554 |
| Revised to S2-132886. |
Revised |
Frank |
Y |
5.4 |
S2-132886 |
CR |
23.228 CR1042R2: Use of ECN in MPS |
Applied Communication Sciences, NCS, AT&T, Alcatel-Lucent, Sprint |
eMPS |
| S2-132815 |
| This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132552 |
LS OUT |
[DRAFT] LS reply on Use of ECN in the Context of MPS |
Applied Communication Sciences, NCS |
- |
S2-132816 |
|
| Response to S2-132343. Revised to S2-132816. |
Revised |
Frank |
Y |
5.4 |
S2-132816 |
LS OUT |
[DRAFT] LS reply on Use of ECN in the Context of MPS |
Applied Communication Sciences, NCS |
- |
S2-132887 |
S2-132552 |
| Response to S2-132343. Revised to S2-132887. |
Revised |
Frank |
Y |
5.4 |
S2-132887 |
LS OUT |
[DRAFT] LS reply on Use of ECN in the Context of MPS |
Applied Communication Sciences, NCS |
- |
S2-133046 |
S2-132816 |
| Response to S2-132343. Revised, as wrong document was uploaded, in S2-133046. |
Revised |
Frank |
Y |
5.4 |
S2-133046 |
LS OUT |
[DRAFT] LS reply on Use of ECN in the Context of MPS |
Applied Communication Sciences, NCS |
eMPS |
S2-133076 |
S2-132887 |
| For e-mail approval. Revision 1 approved. Revised to S2-133076. |
Revised |
Frank |
Y |
5.4 |
S2-133076 |
LS OUT |
LS reply on Use of ECN in the Context of MPS |
SA WG2 |
eMPS |
| S2-133046 |
| e-mail revision 1 of S2-133046. Approved |
Approved |
Frank |
Y |
5.4 |
S2-132350 |
LS In |
LS from CT WG1: Reply LS to the LS on Optimization of the IMS Information and Security Parameters for CS to PS SRVCC from GERAN to E-UTRAN/HSPA |
CT WG1 |
rSRVCC-GERAN, rSRVCC-CT |
| S2-132012 |
C1-132535 |
Noted in parallel sessions |
Noted |
Frank |
Y |
5.4 |
S2-132368 |
CR |
23.167 CR0228: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132817 |
|
| Revised to S2-132817. |
Revised |
Frank |
Y |
5.4 |
S2-132817 |
CR |
23.167 CR0228R1: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132888 |
S2-132368 |
| Revised to S2-132888. |
Revised |
Frank |
Y |
5.4 |
S2-132888 |
CR |
23.167 CR0228R2: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd, Ericsson, ST Ericsson |
EMC1 |
| S2-132817 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132371 |
CR |
23.167 CR0231: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132820 |
|
| Revised to S2-132820. |
Revised |
Frank |
Y |
5.4 |
S2-132820 |
CR |
23.167 CR0231R1: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132891 |
S2-132371 |
| Revised to S2-132891. |
Revised |
Frank |
Y |
5.4 |
S2-132891 |
CR |
23.167 CR0231R2: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd, Ericsson, ST Ericsson |
EMC1 |
| S2-132820 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132372 |
CR |
23.167 CR0232: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132866 |
|
| Revised to S2-132866. |
Revised |
Frank |
Y |
5.4 |
S2-132866 |
CR |
23.167 CR0232R1: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132892 |
S2-132372 |
| Revised to S2-132892. |
Revised |
Frank |
Y |
5.4 |
S2-132892 |
CR |
23.167 CR0232R2: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd, Ericsson, ST Ericsson |
EMC1 |
| S2-132866 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132443 |
CR |
23.237 CR0464: Correction of IMEI encoding |
Research In Motion UK Ltd |
IMS_EMER_GPRS_EPS-SRVCC |
|
|
| Noted in parallel sessions |
Noted |
Frank |
Y |
5.4 |
S2-132444 |
CR |
23.237 CR0465: Correction of IMEI encoding |
Research In Motion UK Ltd |
IMS_EMER_GPRS_EPS-SRVCC |
|
|
| Noted in parallel sessions |
Noted |
Frank |
Y |
5.4 |
S2-132445 |
CR |
23.237 CR0466: Correction of IMEI encoding |
Research In Motion UK Ltd |
IMS_EMER_GPRS_EPS-SRVCC |
S2-132867 |
|
| Revised to S2-132867. |
Revised |
Frank |
Y |
5.4 |
S2-132867 |
CR |
23.237 CR0466R1: Correction of IMEI encoding |
Research In Motion UK Ltd |
IMS_EMER_GPRS_EPS-SRVCC |
S2-132893 |
S2-132445 |
| Revised to S2-132893. |
Revised |
Frank |
Y |
5.4 |
S2-132893 |
CR |
23.237 CR0466R2: Correction of IMEI encoding |
Research In Motion UK Ltd |
TEI11, IMS_EMER_GPRS_EPS-SRVCC |
| S2-132867 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132446 |
CR |
23.237 CR0467: Correction of IMEI encoding |
Research In Motion UK Ltd |
IMS_EMER_GPRS_EPS-SRVCC |
S2-132868 |
|
| Revised to S2-132868. |
Revised |
Frank |
Y |
5.4 |
S2-132868 |
CR |
23.237 CR0467R1: Correction of IMEI encoding |
Research In Motion UK Ltd |
IMS_EMER_GPRS_EPS-SRVCC |
| S2-132446 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132681 |
CR |
23.272 CR0887: Replacing 'emergency' indication in CSFB with high priority indication |
Nokia Siemens Networks |
eMPS |
S2-132869 |
|
| Revised to S2-132869. |
Revised |
Frank |
N |
5.4 |
S2-132869 |
CR |
23.272 CR0887R1: Replacing 'emergency' indication in CSFB with high priority indication |
Nokia Siemens Networks |
eMPS |
| S2-132681 |
| Withdrawn in parallel sessions |
Withdrawn |
Frank |
Y |
5.4 |
S2-132682 |
CR |
23.272 CR0888: Replacing 'emergency' indication in CSFB with high priority indication |
Nokia Siemens Networks |
eMPS |
S2-132870 |
|
| Revised to S2-132870. |
Revised |
Frank |
N |
5.4 |
S2-132870 |
CR |
23.272 CR0888R1: Replacing 'emergency' indication in CSFB with high priority indication |
Nokia Siemens Networks |
eMPS |
| S2-132682 |
| Withdrawn in parallel sessions |
Withdrawn |
Frank |
Y |
5.4 |
S2-132683 |
LS OUT |
LS on CSFB with priority call handling |
Nokia Siemens Networks |
eMPS |
S2-132871 |
|
| Revised to S2-132871. |
Revised |
Frank |
N |
5.4 |
S2-132871 |
LS OUT |
LS on CSFB with priority call handling |
Nokia Siemens Networks |
eMPS |
| S2-132683 |
| Withdrawn in parallel sessions |
Withdrawn |
Frank |
Y |
5.4 |
S2-132369 |
CR |
23.167 CR0229: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132818 |
|
| Revised to S2-132818. |
Revised |
Frank |
Y |
5.4 |
S2-132818 |
CR |
23.167 CR0229R1: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132889 |
S2-132369 |
| Revised to S2-132889. |
Revised |
Frank |
Y |
5.4 |
S2-132889 |
CR |
23.167 CR0229R2: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd, Ericsson, ST Ericsson |
EMC1 |
| S2-132818 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132370 |
CR |
23.167 CR0230: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132819 |
|
| Revised to S2-132819. |
Revised |
Frank |
Y |
5.4 |
S2-132819 |
CR |
23.167 CR0230R1: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd |
EMC1 |
S2-132890 |
S2-132370 |
| Revised to S2-132890. |
Revised |
Frank |
Y |
5.4 |
S2-132890 |
CR |
23.167 CR0230R2: Requirement Alignment for emergency registration and call back |
Research In Motion UK Ltd, Ericsson, ST Ericsson |
EMC1 |
| S2-132819 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132338 |
LS In |
LS from RAN WG2: Response LS on Provisioning of E-UTRA Radio Capabilities in GERAN |
RAN WG2 |
rSRVCC-GERAN |
| S2-131569 |
R2-131514 |
Noted in parallel sessions |
Noted |
Frank |
Y |
5.4 |
S2-132342 |
LS In |
LS from GERAN WG2: Response LS on Provisioning of E-UTRA Radio Capabilities in GERAN |
GERAN WG2 |
rSRVCC-GERAN |
| S2-131663 |
GP-130562 |
Noted in parallel sessions |
Noted |
Frank |
Y |
5.4 |
S2-132465 |
DISCUSSION |
Discussion on transfer of UE E-UTRA capability information for rSRVCC |
Ericsson, ST-Ericsson |
rSRVCC |
|
|
| Noted in parallel sessions |
Noted |
Frank |
Y |
5.4 |
S2-132508 |
DISCUSSION |
Provision of UE E-UTRAN Capabilities at rSRVCC |
Renesas Mobile Europe Ltd |
rSRVCC |
|
|
| Noted in parallel sessions |
Noted |
Frank |
Y |
5.4 |
S2-132469 |
CR |
23.204 CR0102: IP-SM-GW with Diameter interfaces for SMS in MME |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
SIMTC |
S2-132872 |
|
| Revised to S2-132872. |
Revised |
Frank |
Y |
5.4 |
S2-132872 |
CR |
23.204 CR0102R1: IP-SM-GW with Diameter interfaces for SMS in MME |
Alcatel-Lucent |
SIMTC |
| S2-132469 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
5.4 |
S2-132470 |
CR |
23.204 CR0103: IP-SM-GW with Diameter interfaces for SMS in MME |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, |
SIMTC |
S2-132873 |
|
| Revised to S2-132873. |
Revised |
Frank |
Y |
5.4 |
S2-132873 |
CR |
23.204 CR0103R1: IP-SM-GW with Diameter interfaces for SMS in MME |
Alcatel-Lucent |
SIMTC |
| S2-132470 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
- |
- |
5.5 |
- |
- |
IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6 |
- |
- |
Release 12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6.1 |
- |
- |
Release 12 Maintenance |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6.1.1 |
- |
- |
3GPP Packet Access: LIPA Mobility and SIPTO at the Local Network (LIMONET) |
- |
- |
- |
- |
- |
- |
- |
Frank |
Y |
6.1.1 |
S2-132353 |
LS In |
LS from RAN WG3: LS on Local Network ID and Mobility |
RAN WG3 |
LIMONET-RAN-Core |
| S2-132107 |
R3-131174 |
Postponed to meeting #99 |
Postponed |
Frank |
Y |
6.1.1 |
S2-132414 |
CR |
23.401 CR2574: Correction of SIPTO at Local Network |
Ericsson, ST-Ericsson |
LIMONET |
S2-132808 |
|
| Revised to S2-132808. |
Revised |
Frank |
Y |
6.1.1 |
S2-132808 |
CR |
23.401 CR2574R1: Correction of SIPTO at Local Network |
Ericsson, ST-Ericsson |
LIMONET |
S2-132894 |
S2-132414 |
| Revised to S2-132894. |
Revised |
Frank |
Y |
6.1.1 |
S2-132894 |
CR |
23.401 CR2574R2: Correction of SIPTO at Local Network |
Ericsson, ST-Ericsson |
LIMONET |
| S2-132808 |
| This CR was agreed |
Agreed |
Frank |
Y |
6.1.1 |
S2-132415 |
CR |
23.060 CR1805: Correction of SIPTO at Local Network |
Ericsson, ST-Ericsson |
LIMONET |
S2-132809 |
|
| Revised to S2-132809. |
Revised |
Frank |
Y |
6.1.1 |
S2-132809 |
CR |
23.060 CR1805R1: Correction of SIPTO at Local Network |
Ericsson, ST-Ericsson |
LIMONET |
| S2-132415 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
6.1.1 |
S2-132539 |
DISCUSSION |
SIPTO@LN PDN connection and CSFB |
Samsung |
LIMONET |
|
|
| WITHDRAWN in parallel sessions |
Withdrawn |
Frank |
Y |
6.1.1 |
S2-132540 |
CR |
23.272 CR0884: SIPTO@LN PDN connection and CSFB |
Samsung |
LIMONET |
|
|
| WITHDRAWN in parallel sessions |
Withdrawn |
Frank |
Y |
6.1.1 |
S2-132576 |
CR |
23.060 CR1807: Correction of Local Home Network |
Alcatel-Lucent |
LIMONET |
S2-132810 |
|
| Revised to S2-132810. |
Revised |
Frank |
Y |
6.1.1 |
S2-132810 |
CR |
23.060 CR1807R1: Correction of Local Home Network |
Alcatel-Lucent |
LIMONET |
S2-132895 |
S2-132576 |
| Revised to S2-132895. |
Revised |
Frank |
Y |
6.1.1 |
S2-132895 |
CR |
23.060 CR1807R2: Correction of Local Home Network |
Alcatel-Lucent |
LIMONET |
| S2-132810 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
6.1.1 |
S2-132577 |
CR |
23.401 CR2585: Correction of Local Home Network |
Alcatel-Lucent |
LIMONET |
S2-132811 |
|
| Revised to S2-132811. |
Revised |
Frank |
Y |
6.1.1 |
S2-132811 |
CR |
23.401 CR2585R1: Correction of Local Home Network |
Alcatel-Lucent |
LIMONET |
| S2-132577 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
6.1.1 |
S2-132594 |
CR |
23.401 CR2586: Correction on ISR handling for SIPTO@LN |
Research In Motion UK Limited |
LIMONET |
S2-132812 |
|
| Revised to S2-132812. |
Revised |
Frank |
Y |
6.1.1 |
S2-132812 |
CR |
23.401 CR2586R1: Correction on ISR handling for SIPTO@LN |
Research In Motion UK Limited |
LIMONET |
| S2-132594 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Frank |
Y |
6.1.1 |
S2-132595 |
CR |
23.401 CR2587: Clarification on deactivating SIPTO@LN upon idle mode mobility |
Research In Motion UK Limited |
LIMONET |
S2-132813 |
|
| Revised to S2-132813. |
Revised |
Frank |
Y |
6.1.1 |
S2-132813 |
CR |
23.401 CR2587R1: Clarification on deactivating SIPTO@LN upon idle mode mobility |
Research In Motion UK Limited |
LIMONET |
| S2-132595 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
- |
- |
6.1.2 |
- |
- |
PCC/QoS Aspects: Usage Monitoring Control enhancement - SA WG2 Part (UMONC), Application Based Charging (ABC) |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
6.1.2 |
S2-132395 |
CR |
23.203 CR0823: Editorial corrections for Application Based Charging |
Allot Communications |
ABC |
S2-132859 |
|
| Revised to S2-132859. |
Revised |
Ivano |
Y |
6.1.2 |
S2-132859 |
CR |
23.203 CR0823R1: Editorial corrections for Application Based Charging |
Allot Communications |
ABC |
S2-132922 |
S2-132395 |
| Revised to S2-132922. |
Revised |
Ivano |
Y |
6.1.2 |
S2-132922 |
CR |
23.203 CR0823R2: Editorial corrections for Application Based Charging |
Allot Communications |
ABC |
| S2-132859 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Ivano |
Y |
6.1.2 |
S2-132765 |
CR |
23.203 CR0836: Clarifications for CSG information transfer |
Allot Communications |
EHNB |
S2-132781 |
|
| Created in Parallel sessions. Revised to S2-132781. |
Revised |
Ivano |
Y |
6.1.2 |
S2-132781 |
CR |
23.203 CR0836R1: Clarifications for CSG information transfer |
Allot Communications |
EHNB |
| S2-132765 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Ivano |
Y |
6.1.2 |
S2-132766 |
CR |
23.203 CR0837: Clarifications for CSG information transfer |
Allot Communications |
EHNB |
S2-132782 |
|
| Created in Parallel sessions. Revised to S2-132782. |
Revised |
Ivano |
Y |
6.1.2 |
S2-132782 |
CR |
23.203 CR0837R1: Clarifications for CSG information transfer |
Allot Communications |
EHNB |
S2-133073 |
S2-132766 |
| Agreed in parallel sessions. This CR was agreed. Revised by MCC to correct CR Cover page in S2-133073. Revised to S2-133073. |
Revised |
Ivano |
Y |
6.1.2 |
S2-133073 |
CR |
23.203 CR0837R2: Clarifications for CSG information transfer |
Allot Communications |
EHNB |
| S2-132782 |
| MCC Revision of S2-132782. This CR was agreed |
Agreed |
Ivano |
Y |
6.1.2 |
S2-132767 |
CR |
23.203 CR0838: Clarifications for CSG information transfer |
Allot Communications |
EHNB |
S2-132783 |
|
| Created in Parallel sessions. Revised to S2-132783. |
Revised |
Ivano |
Y |
6.1.2 |
S2-132783 |
CR |
23.203 CR0838R1: Clarifications for CSG information transfer |
Allot Communications |
EHNB |
| S2-132767 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Ivano |
Y |
6.1.2 |
S2-132768 |
CR |
23.203 CR0839: Clarifications for CSG information transfer |
Allot Communications |
ABC, EHNB |
S2-132784 |
|
| Created in Parallel sessions. Revised to S2-132784. |
Revised |
Ivano |
Y |
6.1.2 |
S2-132784 |
CR |
23.203 CR0839R1: Clarifications for CSG information transfer |
Allot Communications |
ABC, EHNB |
| S2-132768 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Ivano |
Y |
6.1.2 |
S2-132858 |
LS OUT |
[DRAFT] LS on CSG related PCC requirements |
SA WG2 |
EHNB, ABC |
S2-132923 |
| - |
LS OUT created during the meeting based on offline discussions. Related to the previous CRs. Revised to S2-132923. |
Revised |
Ivano |
Y |
6.1.2 |
S2-132923 |
LS OUT |
LS on CSG related PCC requirements |
SA WG2 |
EHNB, ABC |
| S2-132858 |
- |
Agreed in parallel sessions. Approved |
Approved |
- |
- |
6.1.3 |
- |
- |
Non-3GPP Packet Access Maintenance: Operator Policies for IP Interface Selection (OPIIS) |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
6.1.3 |
S2-132346 |
LS In |
LS from CT WG1: Request for clarifications of stage 2 requirements for OPIIS |
CT WG1 |
OPIIS-CT |
| S2-132008 |
C1-132644 |
Responses drafted in S2-132587 and S2-132661 (Not handled). Postponed to meeting #99 |
Postponed |
Ivano |
Y |
6.1.3 |
S2-132586 |
DISCUSSION |
Clarifications on Inter-APN Routing Policies |
Qualcomm Incorporated |
OPIIS |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.1.3 |
S2-132587 |
LS OUT |
[DRAFT] Reply LS on Request for clarifications of stage 2 requirements for OPIIS |
Qualcomm Incorporated |
OPIIS |
S2-132780 |
|
| Revised to S2-132780. |
Revised |
Ivano |
Y |
6.1.3 |
S2-132780 |
LS OUT |
[DRAFT] Reply LS on Request for clarifications of stage 2 requirements for OPIIS |
Qualcomm Incorporated |
OPIIS |
| S2-132587 |
| WITHDRAWN |
Withdrawn |
Ivano |
Y |
6.1.3 |
S2-132588 |
CR |
23.402 CR1165: Correction relative priority of IARP and ISRP filter rules |
Qualcomm Incorporated |
OPIIS |
|
|
| Not Handled |
- |
Ivano |
Y |
6.1.3 |
S2-132589 |
CR |
23.402 CR1166: Provisioning of IARP by H-ANDSF only |
Qualcomm Incorporated |
OPIIS |
S2-132778 |
|
| Revised to S2-132778. |
Revised |
Ivano |
Y |
6.1.3 |
S2-132778 |
CR |
23.402 CR1166R1: Provisioning of IARP by H-ANDSF only |
Qualcomm Incorporated, Nokia Siemens Network, Nokia |
OPIIS |
| S2-132589 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
Ivano |
Y |
6.1.3 |
S2-132590 |
CR |
23.402 CR1167: Applicability of IARP to new PDN connections |
Qualcomm Incorporated |
OPIIS |
|
|
| Not Handled |
- |
Ivano |
Y |
6.1.3 |
S2-132662 |
DISCUSSION |
How to handle the IARP in roaming case |
LG Electronics |
OPIIS |
|
|
| Noted in parallel sessions. The issue described in this paper will be further discussed offline and conclusions (if any) will be captured in S2-132779. |
Noted |
Ivano |
Y |
6.1.3 |
S2-132661 |
LS OUT |
[DRAFT] Reply LS on Request for clarifications of stage 2 requirements for OPIIS |
LG Electronics |
OPIIS |
|
|
| Response to S2-132346. Not Handled |
Not Handled |
Ivano |
Y |
6.1.3 |
S2-132663 |
CR |
23.402 CR1171: Handling of IARP in roaming case |
LG Electronics |
OPIIS |
|
|
| Not Handled |
- |
Ivano |
Y |
6.1.3 |
S2-132674 |
DISCUSSION |
Discussion on OPIIS questions coming from CT WG1 (C1-132644) |
Nokia Siemens Networks, Nokia |
OPIIS |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.1.3 |
S2-132675 |
CR |
23.402 CR1172: Including NSWO policies into Inter-APN Routing Policies |
Nokia Siemens Networks, Nokia |
OPIIS |
S2-132779 |
|
| Revised to S2-132779. |
Revised |
Ivano |
Y |
6.1.3 |
S2-132779 |
CR |
23.402 CR1172R1: Including NSWO policies into Inter-APN Routing Policies |
Nokia Siemens Networks, Nokia |
OPIIS |
S2-132981 |
S2-132675 |
| Revised to S2-132981. |
Revised |
Ivano |
N |
6.1.3 |
S2-132981 |
CR |
23.402 CR1172R2: Including NSWO policies into Inter-APN Routing Policies |
Nokia Siemens Networks, Nokia |
OPIIS |
| S2-132779 |
| WITHDRAWN |
Withdrawn |
- |
- |
6.1.4 |
- |
- |
IMS-Related Maintenance, (SMSMI), IMS Business Trunking for IP-PBX in Static Mode of Operation (BusTI) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6.2 |
- |
- |
Machine Type Communications Enhancements for Rel-12 (MTCe) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6.2.1 |
- |
- |
(BB1): Small Data and Device Triggering Enhancements (MTCe-SDDTE) |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.2.1 |
S2-132729 |
P-CR |
Corrected clarifications for the T5 Small Data Service |
Huawei, HiSilicon, Intel, CATT, HTC, MediaTek, ITRI, III, CATR, KPN, China Telecom, China Unicom, ZTE |
MTCe-SDDTE |
S2-132785 |
|
| LATE DOC: Rx 12/07, 12:00. Revised to S2-132785. |
Revised |
Erik |
Y |
6.2.1 |
S2-132785 |
P-CR |
Corrected clarifications for the T5 Small Data Service |
Huawei, HiSilicon, Intel, CATT, HTC, MediaTek, ITRI, III, CATR, KPN, China Telecom, China Unicom, ZTE |
MTCe-SDDTE |
S2-133007 |
S2-132729 |
| Revised to S2-133007. |
Revised |
Erik |
Y |
6.2.1 |
S2-133007 |
P-CR |
Corrected clarifications for the T5 Small Data Service |
Huawei, HiSilicon, Intel, CATT, HTC, MediaTek, ITRI, III, CATR, KPN, China Telecom, China Unicom, ZTE |
MTCe-SDDTE |
| S2-132785 |
| Approved |
Approved |
Erik |
Y |
6.2.1 |
S2-132385 |
P-CR |
Removing ENs for the Small data fast path solution |
Ericsson, ST-Ericsson |
MTCe-SDDTE |
S2-132786 |
|
| Revised to S2-132786. |
Revised |
Erik |
Y |
6.2.1 |
S2-132786 |
P-CR |
Removing ENs for the Small data fast path solution |
Ericsson, ST-Ericsson |
MTCe-SDDTE |
| S2-132385 |
| Approved |
Approved |
Erik |
Y |
6.2.1 |
S2-132713 |
P-CR |
Limitations of Small Data Fast Path |
Nokia Siemens Networks, Nokia |
MTCe-SDDTE |
S2-132787 |
|
| Revised to S2-132787. |
Revised |
Erik |
N |
6.2.1 |
S2-132787 |
P-CR |
Limitations of Small Data Fast Path |
Nokia Siemens Networks, Nokia |
MTCe-SDDTE |
| S2-132713 |
| WITHDRAWN |
Withdrawn |
Erik |
Y |
6.2.1 |
S2-132439 |
P-CR |
Connectionless Session Handling issue resolution |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
MTCe-SDDTE |
S2-132788 |
|
| Revised to S2-132788. |
Revised |
Erik |
Y |
6.2.1 |
S2-132788 |
P-CR |
Connectionless Session Handling issue resolution |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
MTCe-SDDTE |
S2-133008 |
S2-132439 |
| Revised to S2-133008. |
Revised |
Erik |
Y |
6.2.1 |
S2-133008 |
P-CR |
Connectionless Session Handling issue resolution |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
MTCe-SDDTE |
| S2-132788 |
| Approved |
Approved |
Erik |
Y |
6.2.1 |
S2-132491 |
P-CR |
Clarification of IP via NAS solution |
Huawei, Hisilicon |
MTCe-SDDTE |
S2-132789 |
|
| Revised to S2-132789. |
Revised |
Erik |
Y |
6.2.1 |
S2-132789 |
P-CR |
Clarification of IP via NAS solution |
Huawei, Hisilicon |
MTCe-SDDTE |
S2-133009 |
S2-132491 |
| Merger of S2-132491, S2-132472 and S2-132473. Revised to S2-133009. |
Revised |
Erik |
Y |
6.2.1 |
S2-133009 |
P-CR |
Clarification of IP via NAS solution |
Huawei, Hisilicon |
MTCe-SDDTE |
| S2-132789 |
| Approved |
Approved |
Erik |
Y |
6.2.1 |
S2-132472 |
P-CR |
Updates to Small Data Transmission from RRC Idle Mode solution |
NEC |
MTCe-SDDTE |
S2-132789 |
S2-130844 |
| Resubmission of S2-130844. This was merged off-line into S2-132789. |
Merged into S2-132789 |
Erik |
Y |
6.2.1 |
S2-132473 |
P-CR |
Updates to Small Data connection release in clause 5.1.1.3.1 (solution 1). |
NEC |
MTCe-SDDTE |
S2-132789 |
S2-131997 |
| Resubmission of S2-131997. This was merged off-line into S2-132789. |
Merged into S2-132789 |
Puneet |
Y |
6.2.1 |
S2-132833 |
REPORT |
SDDTE drafting report |
Intel |
- |
|
|
| Noted |
Noted |
Erik |
Y |
6.2.1 |
S2-132734 |
LS In |
LS from SA WG3: Reply LS on input on security aspects for MTCe solutions |
SA WG3 |
MTCe-SDDTE, MTCe-UEPCOP |
|
| S3-130889 |
SA WG3 response to LS S2-132327 (S2#97). Noted |
Noted |
Erik |
Y |
6.2.1 |
S2-132462 |
DISCUSSION |
Proposed interim conclusion* for SDDTE small data UP approaches |
Ericsson, ST-Ericsson |
MTCe-SDDTE |
|
|
| This was noted. The 'fastpath' solution 6(A) will not be part of ongoing evaluation due to the complexity of the solution and little remaining time in Rel-12. |
Noted |
Erik |
Y |
6.2.1 |
S2-132632 |
P-CR |
Evaluation and proposed conclusion on small data solutions |
Huawei, HiSilicon, CATT, HTC, Intel, MediaTek, Sierra Wireless, Cisco, ZTE, CATR, KPN, China Telecom, China Unicom, China Mobile |
MTCe-SDDTE |
S2-132840 |
|
| Revised to S2-132840. |
Revised |
Erik |
Y |
6.2.1 |
S2-132840 |
P-CR |
Evaluation and proposed conclusion on small data solutions |
Huawei, HiSilicon, CATT, HTC, Intel, MediaTek, Sierra Wireless, Cisco, ZTE, CATR, KPN, China Telecom, China Unicom, China Mobile, Acision, Interdigital, NEC, ITRI, III, Broadcom |
MTCe-SDDTE |
S2-132897 |
S2-132632 |
| Revised in parallel sessions in S2-132897 |
| Erik |
Y |
6.2.1 |
S2-132438 |
P-CR |
Conclusion for Optimized Service Request |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ST-Ericsson, KDDI, Qualcomm Incorporated |
MTCe-SDDTE |
|
|
| Noted |
Noted |
Erik |
Y |
6.2.1 |
S2-132440 |
P-CR |
Evaluation considerations for control plane small data solutions |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
MTCe-SDDTE |
S2-132838 |
S2-131728 |
| Resubmission of S2-131728. Revised to S2-132838. |
Revised |
Erik |
Y |
6.2.1 |
S2-132838 |
P-CR |
Evaluation considerations for control plane small data solutions |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
MTCe-SDDTE |
| S2-132440 |
| Noted |
Noted |
Puneet |
Y |
6.2.1 |
S2-132841 |
OTHER |
Show of hands - MTCe-SDDTE |
MTCe-SDDTE Rapporteur |
MTCe-SDDTE |
S2-132915 |
|
| Results in S2-132915. |
Results in S2-132915 |
Puneet |
Y |
6.2.1 |
S2-132915 |
OTHER |
Results of Show of hands - MTCe-SDDTE |
SA WG2 Secretary |
MTCe-SDDTE |
| S2-132841 |
| Noted |
Noted |
Erik |
Y |
6.2.1 |
S2-132644 |
P-CR |
Overall evaluation and conclusion for Key issue 5.2.1 |
Intel, HTC |
MTCe-SDDTE |
S2-132726 |
|
| Merged with S2-132716 and S2-132505 into S2-132726 |
Merged into S2-132726 |
Erik |
Y |
6.2.1 |
S2-132716 |
P-CR |
Remove EN of Solution MME/SGSN Control of Trigger Load over T5 to MTC-IWF |
CATT |
MTCe-SDDTE |
S2-132726 |
|
| Merged with S2-132644 and S2-132505 into S2-132726 |
Merged into S2-132726 |
Erik |
Y |
6.2.1 |
S2-132505 |
P-CR |
Evaluation of Overload Control for Device Triggering |
ZTE |
MTCe-SDDTE |
S2-132726 |
|
| Merged with S2-132644 and S2-132716 into S2-132726 |
Merged into S2-132726 |
Erik |
Y |
6.2.1 |
S2-132726 |
P-CR |
Overall evaluation and conclusion for Key issue 5.2.1 |
Intel, HTC, CATT, ZTE |
MTCe-SDDTE |
S2-133033 |
S2-132644 |
| MERGED DOC: Merge of S2-132644, S2-132716, S2-132505. Revised to S2-133033. |
Revised |
Erik |
Y |
6.2.1 |
S2-133033 |
P-CR |
Overall evaluation and conclusion for Key issue 5.2.1 |
Intel, HTC, CATT, ZTE |
MTCe-SDDTE |
| S2-132726 |
| Approved |
Approved |
Erik |
Y |
6.2.1 |
S2-132917 |
LS OUT |
[DRAFT] LS on requesting further input on MTCe solution 5.1.2.3.1 |
SA WG2 |
MTCe-SDDTE |
S2-133077 |
| - |
For e-mail approval. Revision 1 approved. Revised to S2-133077. |
Revised |
Erik |
Y |
6.2.1 |
S2-133077 |
LS OUT |
LS on requesting further input on MTCe solution 5.1.2.3.1 |
SA WG2 |
MTCe-SDDTE |
| S2-132917 |
- |
e-mail revision 1 of S2-132917. Approved |
Approved |
Erik |
Y |
6.2.1 |
S2-132468 |
P-CR |
Resolution to open issues with T5 Messaging Service |
Ericsson, ST-Ericsson |
MTCe-SDDTE |
| S2-131797 |
| Resubmission of S2-131797.. Not Handled |
Not Handled |
Erik |
Y |
6.2.1 |
S2-132732 |
LS In |
LS from SA WG3: Reply LS on interaction of oneM2M with Underlying Networks |
SA WG3 |
MTCe |
|
| S3-130842 |
SA WG3 response to S2-132326 (S2#97). Postponed to meeting #99 |
Postponed |
Erik |
Y |
6.2.1 |
S2-132561 |
P-CR |
T5 message integrity protection clarification |
NEC |
MTCe-SDDTE |
| S2-131947 |
| Resubmission of S2-131947.. Not Handled |
Not Handled |
Erik |
Y |
6.2.1 |
S2-132714 |
P-CR |
Limitations of Connectionless Data Transmission |
Nokia Siemens Networks, Nokia |
MTCe-SDDTE |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.2.1 |
S2-132679 |
DISCUSSION |
Operator view on SDDTE solution evaluation |
KPN |
MTCe-SDDTE |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.2.1 |
S2-132437 |
P-CR |
Conclusion for Connectionless solution |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, KDDI |
MTCe-SDDTE |
|
|
| Noted |
Noted |
Erik |
Y |
6.2.1 |
S2-132645 |
P-CR |
Overall evaluation and conclusion for Key issue 5.2.3 |
Intel, LG Electronics |
MTCe-SDDTE |
S2-132916 |
|
| Revised to S2-132916. |
Revised |
Erik |
Y |
6.2.1 |
S2-132916 |
P-CR |
Overall evaluation and conclusion for Key issue 5.2.3 |
Intel, LG Electronics |
MTCe-SDDTE |
| S2-132645 |
| Approved |
Approved |
Erik |
Y |
6.2.1 |
S2-132504 |
P-CR |
Considerations for SDDTE Solution Evaluation |
ZTE |
MTCe-SDDTE |
S2-132839 |
|
| Revised to S2-132839. |
Revised |
Erik |
Y |
6.2.1 |
S2-132839 |
P-CR |
Considerations for SDDTE Solution Evaluation |
ZTE |
MTCe-SDDTE |
| S2-132504 |
|
|
| Erik |
Y |
6.2.1 |
S2-132631 |
P-CR |
Clarification of the T5 Small Data Service |
Huawei, HiSilicon, Intel, CATT, HTC, MediaTek, ITRI, III, CATR, KPN, China Telecom, China Unicom |
MTCe-SDDTE |
|
|
| Updated proposal in S2-132729. WITHDRAWN |
Withdrawn |
Erik |
Y |
6.2.1 |
S2-133005 |
OTHER |
Way forward proposal for normative work on small data transmission |
Intel |
MTCe-SDDTE |
|
|
| Noted |
Noted |
Frank |
Y |
6.2.1 |
S2-132897 |
P-CR |
Evaluation and proposed conclusion on small data solutions |
Huawei, HiSilicon, CATT, HTC, Intel, MediaTek, Sierra Wireless, Cisco, ZTE, CATR, KPN, China Telecom, China Unicom, China Mobile, Acision, Interdigital, NEC, ITRI, III, Broadcom, Nokia Siemens Network |
MTCe-SDDTE |
S2-133062 |
S2-132840 |
| Revised to S2-133062. |
Revised |
Frank |
Y |
6.2.1 |
S2-133062 |
P-CR |
Conclusion for MTCe-SDDTE |
Huawei, HiSilicon, CATT, HTC, Intel, MediaTek, Sierra Wireless, Cisco, ZTE, CATR, KPN, China Telecom, China Unicom, China Mobile, Acision, Interdigital, NEC, ITRI, III, Broadcom, Nokia Siemens Network |
MTCe-SDDTE |
| S2-132897 |
| Approved |
Approved |
Frank |
Y |
6.2.1 |
S2-133063 |
P-CR |
Evaluation Annex for MTCe-SDDTE |
Huawei, HiSilicon, CATT, HTC, Intel, MediaTek, Sierra Wireless, Cisco, ZTE, CATR, KPN, China Telecom, China Unicom, China Mobile, Acision, Interdigital, NEC, ITRI, III, Broadcom, Nokia Siemens Network |
MTCe-SDDTE |
| S2-132897 |
| For e-mail approval. Noted |
Noted |
- |
- |
6.2.2 |
- |
- |
(BB3): UE Power Consumption Optimizations (MTCe-UEPCOP) |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.2.2 |
S2-132341 |
LS In |
LS from TSG GERAN: Reply LS on requesting input on MTCe solutions |
TSG GERAN |
MTCe-UEPCOP |
| S2-131661 |
GP-130535 |
This LS was then postponed to meeting #99. |
Postponed |
Erik |
Y |
6.2.2 |
S2-132441 |
P-CR |
Procedure for Extended Long DRX Determining |
Alcatel-Lucent Shanghai Bell, Alcatel-Lucent |
MTCe-UEPCOP |
S2-132728 |
S2-131732 |
| Resubmission of S2-131732. Merged with S2-132603 into S2-132728 |
Merged into S2-132728 |
Erik |
Y |
6.2.2 |
S2-132603 |
P-CR |
DRX value assignment - extended DRX cycle in idle mode |
Ericsson, ST-Ericsson |
MTCe-UEPCOP |
S2-132728 |
|
| Merged with S2-132441 into S2-132728 |
Merged into S2-132728 |
Erik |
Y |
6.2.2 |
S2-132728 |
P-CR |
Procedure for Extended Long DRX Determining |
Ericsson, ST-Ericsson, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent |
MTCe-UEPCOP |
S2-132832 |
|
| MERGED DOC: Merge of S2-132441 and S2-132603. Revised to S2-132832. |
Revised |
Erik |
Y |
6.2.2 |
S2-132832 |
P-CR |
Procedure for Extended Long DRX Determining |
Ericsson, ST-Ericsson, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent |
MTCe-UEPCOP |
| S2-132728 |
| Approved |
Approved |
Erik |
Y |
6.2.2 |
S2-132442 |
P-CR |
Considerations for power saving state |
Alcatel-Lucent Shanghai Bell, Alcatel-Lucent |
MTCe-UEPCOP |
S2-132834 |
S2-131731 |
| Resubmission of S2-131731. Revised to S2-132834. |
Revised |
Erik |
Y |
6.2.2 |
S2-132834 |
P-CR |
Considerations for power saving state |
Alcatel-Lucent Shanghai Bell, Alcatel-Lucent |
MTCe-UEPCOP |
S2-133036 |
S2-132442 |
| Revised to S2-133036. |
Revised |
Erik |
Y |
6.2.2 |
S2-133036 |
P-CR |
Considerations for power saving state |
Alcatel-Lucent Shanghai Bell, Alcatel-Lucent |
MTCe-UEPCOP |
| S2-132834 |
| Approved |
Approved |
Erik |
N |
6.2.2 |
S2-133064 |
P-CR |
Considerations for power saving state |
Alcatel-Lucent Shanghai Bell, Alcatel-Lucent |
MTCe-UEPCOP |
| S2-133036 |
| WITHDRAWN |
Withdrawn |
Erik |
Y |
6.2.2 |
S2-132672 |
P-CR |
NAS retransmission timers for long DRX cycle |
Qualcomm Incorporated |
MTCe-UEPCOP |
S2-132835 |
S2-131913 |
| Resubmission of S2-131913. Revised to S2-132835. |
Revised |
Erik |
Y |
6.2.2 |
S2-132835 |
P-CR |
NAS retransmission timers for long DRX cycle |
Qualcomm Incorporated |
MTCe-UEPCOP |
S2-133065 |
S2-132672 |
| Revised to S2-133065. |
Revised |
Erik |
Y |
6.2.2 |
S2-133065 |
P-CR |
NAS retransmission timers for long DRX cycle |
Qualcomm Incorporated |
MTCe-UEPCOP |
| S2-132835 |
| For e-mail approval. Noted |
Noted |
Erik |
Y |
6.2.2 |
S2-132464 |
P-CR |
Re-transmission and reachability aspects when using long DRX cycle in idle mode |
Ericsson, ST-Ericsson |
MTCe-UEPCOP |
S2-132836 |
|
| Revised to S2-132836. |
Revised |
Erik |
Y |
6.2.2 |
S2-132836 |
P-CR |
Re-transmission and reachability aspects when using long DRX cycle in idle mode |
Ericsson, ST-Ericsson |
MTCe-UEPCOP |
S2-132850 |
S2-132464 |
| Revised to S2-132850. |
Revised |
Erik |
Y |
6.2.2 |
S2-132850 |
P-CR |
Re-transmission and reachability aspects when using long DRX cycle in idle mode |
Ericsson, ST-Ericsson |
MTCe-UEPCOP |
| S2-132836 |
| The Editor was asked to replace SMSC with SMS Infrastructure in the solution. This was then approved. |
Approved |
Erik |
Y |
6.2.2 |
S2-132474 |
P-CR |
Editor's Note removal and correction to the Network Assisted Power Saving solution |
NEC |
MTCe-UEPCOP |
S2-132837 |
|
| Revised to S2-132837. |
Revised |
Erik |
Y |
6.2.2 |
S2-132837 |
P-CR |
Editor's Note removal and correction to the Network Assisted Power Saving solution |
NEC |
MTCe-UEPCOP |
S2-132851 |
S2-132474 |
| Revised to S2-132851. |
Revised |
Erik |
Y |
6.2.2 |
S2-132851 |
P-CR |
Editor's Note removal and correction to the Network Assisted Power Saving solution |
NEC |
MTCe-UEPCOP |
| S2-132837 |
| Approved |
Approved |
Erik |
Y |
6.2.2 |
S2-132463 |
P-CR |
Overall evaluation of UEPCOP solutions |
Ericsson, ST-Ericsson |
MTCe-UEPCOP |
S2-132852 |
|
| Revised to S2-132852. |
Revised |
Erik |
Y |
6.2.2 |
S2-132852 |
P-CR |
Overall evaluation of UEPCOP solutions |
Ericsson, ST-Ericsson |
MTCe-UEPCOP |
S2-133006 |
S2-132463 |
| Revised to S2-133006. |
Revised |
Erik |
Y |
6.2.2 |
S2-133006 |
P-CR |
Overall evaluation of UEPCOP solutions |
Ericsson, ST-Ericsson |
MTCe-UEPCOP |
S2-133072 |
S2-132852 |
| Revised to S2-133072. |
Revised |
Erik |
Y |
6.2.2 |
S2-133072 |
P-CR |
Overall evaluation of UEPCOP solutions |
Ericsson, ST-Ericsson |
MTCe-UEPCOP |
| S2-133006 |
| Approved |
Approved |
Erik |
Y |
6.2.2 |
S2-132630 |
P-CR |
Evaluation of UE power saving solutions |
Huawei, Hisilicon |
MTCe-UEPCOP |
S2-132853 |
|
| Revised to S2-132853. |
Revised |
Erik |
Y |
6.2.2 |
S2-132853 |
P-CR |
Evaluation of UE power saving solutions |
Huawei, Hisilicon |
MTCe-UEPCOP |
S2-132898 |
S2-132630 |
| Revised to S2-132898. |
Revised |
Erik |
Y |
6.2.2 |
S2-132898 |
P-CR |
Evaluation of UE power saving solutions |
Huawei, Hisilicon |
MTCe-UEPCOP |
S2-133066 |
S2-132853 |
| Revised to S2-133066. |
Revised |
Erik |
Y |
6.2.2 |
S2-133066 |
P-CR |
Evaluation of UE power saving solutions |
Huawei, Hisilicon |
MTCe-UEPCOP |
S2-133071 |
S2-132898 |
| Revised to S2-133071. |
Revised |
Erik |
Y |
6.2.2 |
S2-133071 |
P-CR |
Evaluation of UE power saving solutions |
Huawei, Hisilicon |
MTCe-UEPCOP |
| S2-133066 |
| Approved |
Approved |
Erik |
Y |
6.2.2 |
S2-132849 |
OTHER |
Show of hands - MTCe-UEPCOP |
MTCe-UEPCOP Rapporteur |
MTCe-UEPCOP |
|
|
| Results provided in S2-132854 |
Results in S2-132854 |
Erik |
Y |
6.2.2 |
S2-132854 |
OTHER |
Results of the Show of hands - MTCe-UEPCOP |
SA WG2 Secretary |
MTCe-UEPCOP |
|
|
| Results from S2-132849. Noted |
Noted |
Erik |
Y |
6.2.2 |
S2-132855 |
LS OUT |
[DRAFT] LS on UEPCOP CT considerations |
SA WG2 |
MTCe-UEPCOP |
S2-133078 |
| - |
For e-mail approval. Approved. Revised in S2-133078. |
Revised |
Erik |
Y |
6.2.2 |
S2-133078 |
LS OUT |
LS on UEPCOP CT considerations |
SA WG2 |
MTCe-UEPCOP |
| S2-132855 |
- |
Revision of e-mail approved S2-132855. Approved |
Approved |
Erik |
Y |
6.2.2 |
S2-132475 |
P-CR |
Evaluation update to Extended DRX in idle mode solution |
NEC |
MTCe-UEPCOP |
S2-132856 |
S2-131630 |
| Resubmission of S2-131630. Revised to S2-132856. |
Revised |
Erik |
Y |
6.2.2 |
S2-132856 |
P-CR |
Evaluation update to Extended DRX in idle mode solution |
NEC |
MTCe-UEPCOP |
| S2-132475 |
| Approved |
Approved |
Erik |
Y |
6.2.2 |
S2-132646 |
P-CR |
Solution Evaluation for extending DRX using UE assistance information |
Intel |
MTCe-UEPCOP |
S2-132857 |
|
| Revised to S2-132857. |
Revised |
Erik |
Y |
6.2.2 |
S2-132857 |
P-CR |
Solution Evaluation for extending DRX using UE assistance information |
Intel |
MTCe-UEPCOP |
| S2-132646 |
| Approved |
Approved |
Erik |
Y |
6.2.2 |
S2-132671 |
P-CR |
Extended DRX: Selection between idle and connected DRX. |
Qualcomm Incorporated |
MTCe-UEPCOP |
| S2-131912 |
| Resubmission of S2-131912.. Not Handled |
Not Handled |
- |
- |
6.3 |
- |
- |
WID for Policy and Charging Control for supporting fixed broadband Access networks (P4C-F) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6.3.1 |
- |
- |
TR Phase P4C-F work |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
6.3.1 |
S2-132360 |
LS In |
LS from SA WG5: Response to BBF Reply to 3GPP LS on (remaining) verification of assumptions for convergent scenario |
SA WG5 |
P4C-F |
|
| S5-131012 |
Noted in parallel sessions |
Noted |
Ivano |
Y |
6.3.1 |
S2-132339 |
LS In |
LS from SA WG5: LS on PCC for convergence (P4C-F) |
SA WG5 |
P4C-F |
| S2-131593 |
S5-130720 |
Response drafted in S2-132752. Revised to S2-132949 (for e-mail approval). Final response in S2-133079 |
Response in S2-133079 |
Ivano |
Y |
6.3.1 |
S2-132526 |
DISCUSSION |
Discussion paper on AAA-based Charging when PCC/TR-134 is used |
Orange |
- |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.3.1 |
S2-132527 |
P-CR |
P4C-F: Revision of AAA-based Charging |
Orange |
P4C-F |
S2-132753 |
|
| Revised to S2-132753. |
Revised |
Ivano |
Y |
6.3.1 |
S2-132753 |
P-CR |
P4C-F: Revision of AAA-based Charging |
Orange |
P4C-F |
| S2-132527 |
| Approved |
Approved |
Ivano |
Y |
6.3.1 |
S2-132752 |
LS OUT |
[DRAFT] Response LS on PCC for convergence (P4C-F) |
SA WG2 |
P4C-F |
S2-132949 |
| - |
Response to S2-132339. Created in paralell sessions. Revised to S2-132949. |
Revised |
Ivano |
Y |
6.3.1 |
S2-132949 |
LS OUT |
[DRAFT] Response LS on PCC for convergence (P4C-F) |
SA WG2 |
P4C-F |
S2-133079 |
S2-132752 |
- |
For e-mail approval. Approved. Revised to S2-133079. |
Revised |
Ivano |
Y |
6.3.1 |
S2-133079 |
LS OUT |
Response LS on PCC for convergence (P4C-F) |
SA WG2 |
P4C-F |
| S2-132949 |
- |
Revision of e-mail approved S2-132949. Approved |
Approved |
Ivano |
Y |
6.3.1 |
S2-132755 |
TR Cover |
Presentation of TR 23.896 to TSG SA for Information and Approval |
Rapporteur |
- |
S2-133083 |
|
| For e-mail approval. Revision 3 approved. Revised to S2-133083. |
Revised |
Ivano |
Y |
6.3.1 |
S2-133083 |
TR Cover |
Presentation of TR 23.896 to TSG SA for Information and Approval |
Rapporteur |
- |
| S2-132755 |
| e-mail revision 3 of S2-132755. Approved |
Approved |
Ivano |
Y |
6.3.1 |
S2-132754 |
LS OUT |
[DRAFT] LS on P4C-F assumptions and status of the work |
SA WG2 |
P4C-F |
S2-133080 |
| - |
For e-mail approval. Revision 3 (Ericsson) approved. Revised to S2-133080. |
Revised |
Ivano |
Y |
6.3.1 |
S2-133080 |
LS OUT |
LS on P4C-F assumptions and status of the work |
SA WG2 |
P4C-F |
| S2-132754 |
- |
e-mail revision 3 of S2-132754. Approved |
Approved |
- |
- |
6.3.2 |
- |
- |
Normative Phase work |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
6.3.2 |
S2-132528 |
DISCUSSION |
Way forward on the discussion to start to normative work in P4C-F |
Ericsson, ST-Ericsson, ZTE |
P4C-F |
| S2-131791 |
| Resubmission of S2-131791. Noted in parallel sessions. |
Noted |
Ivano |
Y |
6.3.2 |
S2-132633 |
CR |
23.203 CR0830: Adding New Annex to support Fixed Broadband Access: general, definition and high level requirements |
Huawei, Allot Communications |
P4C-F |
S2-132756 |
|
| Revised to S2-132756. |
Revised |
Ivano |
Y |
6.3.2 |
S2-132756 |
CR |
23.203 CR0830R1: Adding New Annex to support Fixed Broadband Access: general, definition and high level requirements |
Huawei, Allot Communications |
P4C-F |
| S2-132633 |
| This CR was agreed |
Agreed |
Ivano |
Y |
6.3.2 |
S2-132634 |
CR |
23.203 CR0831: Adding New Annex to support Fixed Broadband Access: Reference Architecture |
Huawei, Allot Communications |
P4C-F |
S2-132939 |
|
| Revised to S2-132939. |
Revised |
Ivano |
Y |
6.3.2 |
S2-132939 |
CR |
23.203 CR0831R1: Adding New Annex to support Fixed Broadband Access: Reference Architecture |
Huawei, Allot Communications |
P4C-F |
S2-133019 |
S2-132634 |
| Revised to S2-133019. |
Revised |
Ivano |
Y |
6.3.2 |
S2-133019 |
CR |
23.203 CR0831R2: Adding New Annex to support Fixed Broadband Access: Reference Architecture |
Huawei, Allot Communications |
P4C-F |
| S2-132939 |
| This CR was agreed |
Agreed |
Ivano |
Y |
6.3.2 |
S2-132635 |
CR |
23.203 CR0832: Adding new Annex to support Fixed Broadband Access: functional description |
Huawei, Allot Communications |
P4C-F |
S2-132940 |
|
| Revised to S2-132940. |
Revised |
Ivano |
Y |
6.3.2 |
S2-132940 |
CR |
23.203 CR0832R1: Adding new Annex to support Fixed Broadband Access: functional description |
Huawei, Allot Communications |
P4C-F |
S2-133020 |
S2-132635 |
| Revised to S2-133020. |
Revised |
Ivano |
Y |
6.3.2 |
S2-133020 |
CR |
23.203 CR0832R2: Adding new Annex to support Fixed Broadband Access: functional description |
Huawei, Allot Communications |
P4C-F |
| S2-132940 |
| This CR was agreed |
Agreed |
Ivano |
Y |
6.3.2 |
S2-132401 |
CR |
23.203 CR0826: Fixed Broadband Access Annex Functional Entities. |
Ericsson, ST Ericsson, Allot Communications, Huawei |
P4C-F |
S2-132941 |
|
| Revised to S2-132941. |
Revised |
Ivano |
Y |
6.3.2 |
S2-132941 |
CR |
23.203 CR0826R1: Fixed Broadband Access Annex Functional Entities. |
Ericsson, ST Ericsson, Allot Communications, Huawei |
P4C-F |
S2-133021 |
S2-132401 |
| Revised to S2-133021. |
Revised |
Ivano |
Y |
6.3.2 |
S2-133021 |
CR |
23.203 CR0826R2: Fixed Broadband Access Annex Functional Entities. |
Ericsson, ST Ericsson, Allot Communications, Huawei |
P4C-F |
| S2-132941 |
| This CR was agreed |
Agreed |
Ivano |
Y |
6.3.2 |
S2-132636 |
CR |
23.203 CR0833: Adding New Annex to support Fixed Broadband Access: IP-CAN procedures |
Huawei, Allot Communications |
P4C-F |
S2-132942 |
|
| Revised to S2-132942. |
Revised |
Ivano |
Y |
6.3.2 |
S2-132942 |
CR |
23.203 CR0833R1: Adding New Annex to support Fixed Broadband Access: IP-CAN procedures |
Huawei, Allot Communications |
P4C-F |
| S2-132636 |
| Agreed in parallel sessions. This CR was agreed |
Agreed |
- |
- |
6.4 |
- |
- |
Proximity Services (ProSe) |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.4 |
S2-132431 |
P-CR |
ProSe ad hoc solution for one-to-many communications |
Intel |
ProSe |
S2-132827 |
|
| Revised to S2-132827. |
Revised |
Erik |
Y |
6.4 |
S2-132827 |
P-CR |
ProSe ad hoc solution for one-to-many communications |
Intel |
ProSe |
| S2-132431 |
| For e-mail approval. Approved |
Approved |
Erik |
Y |
6.4 |
S2-132453 |
P-CR |
Direct communication one-to-many |
Qualcomm Incorporated |
ProSe |
S2-132826 |
S2-131820 |
| Resubmission of S2-131820. Revised to S2-132826. |
Revised |
Erik |
Y |
6.4 |
S2-132826 |
P-CR |
Direct communication one-to-many |
Qualcomm Incorporated |
ProSe |
| S2-132453 |
| For e-mail approval. Approved |
Approved |
Erik |
Y |
6.4 |
S2-132461 |
P-CR |
Solution for ProSe group communication beyond E-UTEAN coverage |
ITRI |
ProSe |
S2-132828 |
|
| Revised to S2-132828 |
Revised |
Erik |
Y |
6.4 |
S2-132828 |
P-CR |
Solution for ProSe group communication beyond E-UTEAN coverage |
ITRI |
ProSe |
| S2-132461 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132483 |
P-CR |
UE Relay for Public Safety |
HTC |
ProSe |
S2-132829 |
|
| Revised to S2-132829. |
Revised |
Erik |
Y |
6.4 |
S2-132829 |
P-CR |
UE Relay for Public Safety |
HTC |
ProSe |
| S2-132483 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132523 |
P-CR |
Solution for Public Safety UE-to-UE Relays |
CATT |
ProSe |
S2-132830 |
|
| Revised to S2-132830. |
Revised |
Erik |
Y |
6.4 |
S2-132830 |
P-CR |
Solution for Public Safety UE-to-UE Relays |
CATT |
ProSe |
S2-133010 |
S2-132523 |
| Revised to S2-133010. |
Revised |
Erik |
Y |
6.4 |
S2-133010 |
P-CR |
Solution for Public Safety UE-to-UE Relays |
CATT |
ProSe |
| S2-132830 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132485 |
P-CR |
ProSe Relay functionality |
Broadcom Corporation |
ProSe |
S2-132831 |
|
| Revised to S2-132831. |
Revised |
Erik |
Y |
6.4 |
S2-132831 |
P-CR |
ProSe Relay functionality |
Broadcom Corporation |
ProSe |
| S2-132485 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132610 |
P-CR |
Solution for Identifiers used in ProSe Direct discovery |
Motorola Solutions |
ProSe |
S2-132862 |
S2-131934 |
| Resubmission of S2-131934. Revised to S2-132862. |
Revised |
Erik |
Y |
6.4 |
S2-132862 |
P-CR |
Solution for Identifiers used in ProSe Direct discovery |
Motorola Solutions |
ProSe |
| S2-132610 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132516 |
P-CR |
Retrieval of ProSe ID |
CATT |
ProSe |
S2-132863 |
S2-131654 |
| Resubmission of S2-131654. Revised to S2-132863. |
Revised |
Erik |
Y |
6.4 |
S2-132863 |
P-CR |
Retrieval of ProSe ID |
CATT |
ProSe |
S2-133011 |
S2-132516 |
| Revised to S2-133011. |
Revised |
Erik |
Y |
6.4 |
S2-133011 |
P-CR |
Retrieval of ProSe ID |
CATT |
ProSe |
| S2-132863 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132484 |
P-CR |
ProSe EPC Based Discovery Architecture and Procedures |
Broadcom Corporation |
ProSe |
S2-132864 |
S2-131888 |
| Resubmission of S2-131888. Merged with S2-132487 into S2-132864. |
Merged into S2-132864 |
Erik |
Y |
6.4 |
S2-132487 |
P-CR |
ProSe Identities |
Broadcom Corporation |
ProSe |
S2-132864 |
S2-130925 |
| Resubmission of S2-130925. Merged off-line with S2-132484 into S2-132864 |
Merged into S2-132864 |
Erik |
Y |
6.4 |
S2-132864 |
P-CR |
ProSe EPC Based Discovery Architecture and Procedures |
Broadcom Corporation |
ProSe |
| S2-132484 |
| Merge of S2-132487 and S2-132484. Approved |
Approved |
Erik |
Y |
6.4 |
S2-132420 |
P-CR |
ProSe Identities |
Ericsson, ST-Ericsson |
ProSe |
S2-132865 |
|
| Revised to S2-132865. |
Revised |
Erik |
Y |
6.4 |
S2-132865 |
P-CR |
ProSe Identities |
Ericsson, ST-Ericsson |
ProSe |
| S2-132420 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132611 |
P-CR |
Proposals for ProSe identifiers for direct ProSe discovery |
Motorola Solutions |
ProSe |
S2-132952 |
|
| Revised to S2-132952. |
Revised |
Erik |
Y |
6.4 |
S2-132952 |
P-CR |
Proposals for ProSe identifiers for direct ProSe discovery |
Motorola Solutions, ETRI |
ProSe |
S2-133067 |
S2-132611 |
| Revised to S2-133067. |
Revised |
Erik |
Y |
6.4 |
S2-133067 |
P-CR |
Proposals for ProSe identifiers for direct ProSe discovery |
Motorola Solutions, ETRI |
ProSe |
| S2-132952 |
| For e-mail approval. Approved |
Approved |
Erik |
Y |
6.4 |
S2-132492 |
P-CR |
ProSe Identity |
Huawei, Hisilicon |
ProSe |
S2-132953 |
|
| Revised to S2-132953. |
Revised |
Erik |
Y |
6.4 |
S2-132953 |
P-CR |
ProSe Identity |
Huawei, Hisilicon |
ProSe |
S2-133012 |
S2-132492 |
| Revised to S2-133012. |
Revised |
Erik |
Y |
6.4 |
S2-133012 |
P-CR |
ProSe Identity |
Huawei, Hisilicon |
ProSe |
| S2-132953 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132454 |
P-CR |
ProSe Identities- way forward |
Qualcomm Incorporated |
ProSe |
S2-132954 |
|
| Revised to S2-132954. |
Revised |
Erik |
Y |
6.4 |
S2-132954 |
P-CR |
ProSe Identities- way forward |
Qualcomm Incorporated |
ProSe |
S2-133013 |
S2-132454 |
| Revised to S2-133013. |
Revised |
Erik |
Y |
6.4 |
S2-133013 |
P-CR |
ProSe Identities- way forward |
Qualcomm Incorporated |
ProSe |
S2-133068 |
S2-132954 |
| Revised to S2-133068. |
Revised |
Erik |
Y |
6.4 |
S2-133068 |
P-CR |
ProSe Identities- way forward |
Qualcomm Incorporated |
ProSe |
| S2-133013 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132430 |
P-CR |
Solution for EPC Support for WLAN direct communication |
Intel, III, KPN, Sony, Telecommunication Systems |
ProSe |
S2-132955 |
S2-131696 |
| Resubmission of S2-131696. Revised to S2-132955. |
Revised |
Erik |
Y |
6.4 |
S2-132955 |
P-CR |
Solution for EPC Support for WLAN direct communication |
Intel, III, KPN, Sony, Telecommunication Systems |
ProSe |
| S2-132430 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132658 |
P-CR |
Solution for selecting WLAN Direct communication path |
LG Electronics |
ProSe |
S2-132956 |
S2-131939 |
| Resubmission of S2-131939. Revised to S2-132956. |
Revised |
Erik |
N |
6.4 |
S2-132956 |
P-CR |
Solution for selecting WLAN Direct communication path |
LG Electronics |
ProSe |
| S2-132658 |
| WITHDRAWN |
Withdrawn |
Erik |
Y |
6.4 |
S2-132459 |
P-CR |
Solution for ProSe assisted WLAN direct communication |
Qualcomm Incorporated |
ProSe |
S2-132957 |
|
| Revised to S2-132957. |
Revised |
Erik |
Y |
6.4 |
S2-132957 |
P-CR |
Solution for ProSe assisted WLAN direct communication |
Qualcomm Incorporated |
ProSe |
S2-133042 |
S2-132459 |
| Revised to S2-133042. |
Revised |
Erik |
Y |
6.4 |
S2-133042 |
P-CR |
Solution for ProSe assisted WLAN direct communication |
Qualcomm Incorporated |
ProSe |
| S2-132957 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132596 |
P-CR |
Network-assisted WiFi Direct Communication |
Motorola Mobility |
ProSe |
S2-132958 |
|
| Revised to S2-132958. |
Revised |
Erik |
Y |
6.4 |
S2-132958 |
P-CR |
Network-assisted WiFi Direct Communication |
Motorola Mobility |
ProSe |
S2-133045 |
S2-132596 |
| Revised to S2-133045. |
Revised |
Erik |
Y |
6.4 |
S2-133045 |
P-CR |
Network-assisted WiFi Direct Communication |
Motorola Mobility |
ProSe |
| S2-132958 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132520 |
P-CR |
Solution for WLAN direct communication |
CATT |
ProSe |
|
|
| Noted |
Noted |
Erik |
Y |
6.4 |
S2-132419 |
P-CR |
ProSe Roaming Reference Architecture proposal |
Ericsson, ST-Ericsson |
ProSe |
S2-132965 |
|
| Revised to S2-132965. |
Revised |
Erik |
Y |
6.4 |
S2-132965 |
P-CR |
ProSe Roaming Reference Architecture proposal |
Ericsson, ST-Ericsson |
ProSe |
| S2-132419 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132509 |
P-CR |
ProSe Entity |
Renesas Mobile Europe Ltd |
ProSe |
S2-132966 |
|
| Revised to S2-132966. |
Revised |
Erik |
Y |
6.4 |
S2-132966 |
P-CR |
ProSe Entity |
Renesas Mobile Europe Ltd |
ProSe |
| S2-132509 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132548 |
P-CR |
Clarification to Assumptions about Prose Direct Communication Modes |
General Dynamics Broadband UK |
ProSe |
S2-132967 |
|
| Revised to S2-132967. |
Revised |
Erik |
Y |
6.4 |
S2-132967 |
P-CR |
Clarification to Assumptions about Prose Direct Communication Modes |
General Dynamics Broadband UK |
ProSe |
| S2-132548 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132648 |
P-CR |
Configuration of ProSe feature support of network in UE |
LG Electronics |
ProSe |
S2-132968 |
S2-131800 |
| Resubmission of S2-131800. Revised to S2-132968. |
Revised |
Erik |
Y |
6.4 |
S2-132968 |
P-CR |
Configuration of ProSe feature support of network in UE |
LG Electronics |
ProSe |
| S2-132648 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132555 |
P-CR |
ProSe Configuration |
NEC |
ProSE |
S2-132969 |
|
| Revised to S2-132969. |
Revised |
Erik |
Y |
6.4 |
S2-132969 |
P-CR |
ProSe Configuration |
NEC |
ProSE |
| S2-132555 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132456 |
P-CR |
Application authorisation for using ProSe |
Qualcomm Incorporated |
ProSe |
S2-132970 |
|
| Revised to S2-132970. |
Revised |
Erik |
Y |
6.4 |
S2-132970 |
P-CR |
Application authorisation for using ProSe |
Qualcomm Incorporated |
ProSe |
S2-133049 |
S2-132456 |
| Revised to S2-133049. |
Revised |
Erik |
Y |
6.4 |
S2-133049 |
P-CR |
Application authorisation for using ProSe |
Qualcomm Incorporated |
ProSe |
| S2-132970 |
| Approved |
Approved |
Erik |
Y |
6.4 |
S2-132486 |
P-CR |
Architecture Consideration for Service Continuity for ProSe-enabled UE |
Broadcom Corporation |
ProSe |
| S2-131889 |
| Resubmission of S2-131889. Noted |
Noted |
Erik |
Y |
6.4 |
S2-132707 |
P-CR |
Assignment of ProSe identifiers and procedure to register & authorize for ProSe services |
InterDigital Communications, HTC |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132557 |
P-CR |
ProSe Relay |
NEC |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132614 |
P-CR |
Solution on Relay for Public Safety ProSe |
LG Electronics |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132705 |
P-CR |
ProSe communication using UE-to-UE relay |
Renesas Mobile Europe Ltd. |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132706 |
P-CR |
Network connection via ProSe UE-to-Network relay |
Renesas Mobile Europe Ltd. |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132559 |
P-CR |
E-UTRAN based discovery of ProSe Relays |
NEC |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132564 |
P-CR |
Prose identifiers used for solutions 6.1.6 and 6.1.7 and 6.2.2 of TR 23.703 |
Alcatel-Lucent |
- |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132452 |
P-CR |
Assignment of expressions |
Qualcomm Incorporated, Motorola Mobility, U.S. Department of Commerce |
ProSe |
| S2-131818 |
| Resubmission of S2-131818.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132621 |
P-CR |
Solution for ProSe Identities |
ETRI |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132541 |
P-CR |
Group communication |
Samsung |
ProSe |
|
|
| LATE DOC: Rx 11/07, 02:30. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132721 |
CR |
23.401 CR2588: EPC-level discovery and EPC support for WLAN direct communication |
Intel |
ProSe |
|
|
| LATE DOC: Rx 09/07, 16:50. Not Handled |
- |
Erik |
Y |
6.4 |
S2-132649 |
P-CR |
Solution for EPC-level ProSe Discovery with time window |
LG Electronics |
ProSe |
| S2-131802 |
| Resubmission of S2-131802.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132650 |
P-CR |
Solution for EPC-level ProSe Discovery within the different PLMNs |
LG Electronics |
ProSe |
| S2-131803 |
| Resubmission of S2-131803.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132482 |
P-CR |
Network Assisted ProSe discovery |
HTC |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132427 |
P-CR |
Solution DX for Network Controlled ProSe Discovery (Alt. 1) |
Telecom Italia |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132428 |
P-CR |
Network Controlled ProSe Discovery in roaming scenarios (Solution DX) |
Telecom Italia |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132429 |
P-CR |
Solution DY for Network Controlled ProSe Discovery (Alt. 2) |
Telecom Italia |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132708 |
P-CR |
EPC assisted direct discovery |
InterDigital Communications |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132720 |
P-CR |
Two solutions for ProSe Service Continuity |
Intel, III, Sony |
ProSe |
| S2-131698 |
| Resubmission of S2-131698.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132546 |
P-CR |
Solution for ProSe Service Continuity |
Samsung |
ProSe |
| S2-131919 |
| Resubmission of S2-131919.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132660 |
P-CR |
Solution for triggering service continuity in ProSe |
LG Electronics |
ProSe |
| S2-131937 |
| Resubmission of S2-131937.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132556 |
P-CR |
ProSe Service Continuity |
NEC |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132518 |
P-CR |
Solution for ProSe Service Continuity |
CATT |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132615 |
P-CR |
Solution for ProSe Direct Communication one-to-one with a network initiation |
LG Electronics |
ProSe |
| S2-131868 |
| Resubmission of S2-131868.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132651 |
P-CR |
Solution for EPC-level ProSe Discovery Request containing ProSe Communication Request |
LG Electronics |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132543 |
P-CR |
ProSe one-to-one communication |
Huawei, Hisilicon |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132542 |
P-CR |
Network Triggered ProSe Direct Discovery |
Huawei, Hisilicon |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132659 |
P-CR |
Solution for deactivation of ProSe communication due to the revocation of ProSe Discovery permission |
LG Electronics |
ProSe |
| S2-131938 |
| Resubmission of S2-131938.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132700 |
DISCUSSION |
Solution for IMS based NAT-Traversal on Service Continuity aspect |
Institute for Information Industry |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132699 |
DISCUSSION |
Solution for NAT-Traversal on Service Continuity aspect |
Institute for Information Industry |
ProSe |
| S2-131922 |
| Resubmission of S2-131922.. Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132709 |
P-CR |
Establishment of a ProSe communication path via eNB |
InterDigital Communications |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132457 |
P-CR |
Updates to network authorised one-to-one communication |
Qualcomm Incorporated |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132458 |
P-CR |
Updates to network independent one-to-one communication |
Qualcomm Incorporated |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132460 |
P-CR |
Taxonomy of direct discovery solutions |
Qualcomm Incorporated |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132514 |
P-CR |
key issue of direct communication release |
CATT |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132515 |
P-CR |
key issue of ProSe group communication |
CATT |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132547 |
P-CR |
ProSe Manager Functions in UE |
Samsung |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132558 |
P-CR |
ProSe Discovery |
NEC |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132620 |
P-CR |
Use of & Switchover to Infrastructure Path for ProSe |
TPS |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132643 |
P-CR |
Non target ProSe discovery of Solution 8 |
ZTE corporation |
ProSe |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.4 |
S2-132678 |
P-CR |
ProSe charging |
KPN |
ProSe |
|
|
| Not Handled |
Not Handled |
- |
- |
6.5 |
- |
- |
Group Communication System Enablers for LTE (GCSE_LTE) |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.5 |
S2-132493 |
P-CR |
Key issue on Priority and pre-emption |
Huawei, Hisilicon |
GCSE_LTE |
S2-132918 |
|
| Revised to S2-132918. |
Revised |
Erik |
Y |
6.5 |
S2-132918 |
P-CR |
Key issue on Priority and pre-emption |
Huawei, Hisilicon |
GCSE_LTE |
| S2-132493 |
| Approved |
Approved |
Erik |
Y |
6.5 |
S2-132612 |
P-CR |
New Key Issue: Resource Management |
Motorola Solutions |
GCSE_LTE |
|
|
| Noted |
Noted |
Erik |
Y |
6.5 |
S2-132677 |
P-CR |
Update of geographical scope key issue |
KPN |
GCSE_LTE |
S2-132919 |
|
| Revised to S2-132919. |
Revised |
Erik |
Y |
6.5 |
S2-132919 |
P-CR |
Update of geographical scope key issue |
KPN |
GCSE_LTE |
S2-133031 |
S2-132677 |
| Revised to S2-133031. |
Revised |
Erik |
Y |
6.5 |
S2-133031 |
P-CR |
Update of geographical scope key issue |
KPN |
GCSE_LTE |
| S2-132919 |
| Approved |
Approved |
Erik |
Y |
6.5 |
S2-132506 |
P-CR |
MuSe with Configurable Geographic Service Area |
ZTE |
MTCe-SDDTE |
S2-132920 |
|
| Revised to S2-132920. |
Revised |
Erik |
Y |
6.5 |
S2-132920 |
P-CR |
MuSe with Configurable Geographic Service Area |
ZTE |
MTCe-SDDTE |
S2-133032 |
S2-132506 |
| Revised to S2-133032. |
Revised |
Erik |
Y |
6.5 |
S2-133032 |
P-CR |
MuSe with Configurable Geographic Service Area |
ZTE |
MTCe-SDDTE |
| S2-132920 |
| Approved |
Approved |
Erik |
Y |
6.5 |
S2-132691 |
P-CR |
Mobility handling with Solution 3 |
Nokia Siemens Networks |
GCSE_LTE |
S2-132921 |
|
| Revised to S2-132921. |
Revised |
Erik |
Y |
6.5 |
S2-132921 |
P-CR |
Mobility handling with Solution 3 |
Nokia Siemens Networks |
GCSE_LTE |
S2-133034 |
S2-132691 |
| Revised to S2-133034. |
Revised |
Erik |
Y |
6.5 |
S2-133034 |
P-CR |
Mobility handling with Solution 3 |
Nokia Siemens Networks |
GCSE_LTE |
| S2-132921 |
| Approved |
Approved |
Erik |
Y |
6.5 |
S2-132680 |
DISCUSSION |
Proposal to request CT WG1 consideration of GCSE_LTE capabilities in Rel-12 |
UK Home Office |
- |
|
|
| Noted. The SA WG2 Chairman will identify this as a task for the SA WG2 prioritization to be done at TSG SA. |
Noted |
Erik |
Y |
6.5 |
S2-132451 |
P-CR |
Solutions of PTP transmission at RAN |
ITRI |
- |
|
|
| Noted |
Noted |
Erik |
Y |
6.5 |
S2-132488 |
P-CR |
Architecture Solution for GCSE in multiple PLMN and roaming scenario |
Broadcom Corporation |
GCSE_LTE |
| S2-131890 |
| Resubmission of S2-131890. Noted |
Noted |
Erik |
Y |
6.5 |
S2-132563 |
P-CR |
Refinement of solution in section 6.5 |
Alcatel-Lucent, EADS |
- |
S2-132971 |
|
| Revised to S2-132971. |
Revised |
Erik |
Y |
6.5 |
S2-132971 |
P-CR |
Refinement of solution in section 6.5 |
Alcatel-Lucent, EADS |
- |
| S2-132563 |
| Approved |
Approved |
Erik |
Y |
6.5 |
S2-132560 |
P-CR |
Service continuity during unicast/multicast delivery change |
NEC |
GCSE_LTE |
|
|
| Noted |
Noted |
Erik |
Y |
6.5 |
S2-132549 |
P-CR |
Mapping between AS Group ID(s) and TMGI(s) |
Qualcomm Incorporated |
GCSE_LTE |
| S2-131872 |
| Resubmission of S2-131872. Approved |
Approved |
Erik |
Y |
6.5 |
S2-132692 |
P-CR |
Additional media component handling with Solution 3 |
Nokia Siemens Networks |
GCSE_LTE |
S2-132972 |
|
| Revised to S2-132972. |
Revised |
Erik |
Y |
6.5 |
S2-132972 |
P-CR |
Additional media component handling with Solution 3 |
Nokia Siemens Networks |
GCSE_LTE |
S2-133035 |
S2-132692 |
| Revised to S2-133035. |
Revised |
Erik |
Y |
6.5 |
S2-133035 |
P-CR |
Additional media component handling with Solution 3 |
Nokia Siemens Networks |
GCSE_LTE |
| S2-132972 |
| Approved |
Approved |
Erik |
Y |
6.5 |
S2-132550 |
P-CR |
Clarifications on pre-established eMBMS bearers for GCSE |
Qualcomm Incorporated |
GCSE_LTE |
| S2-131873 |
| Resubmission of S2-131873.. Not Handled |
Not Handled |
Erik |
Y |
6.5 |
S2-132551 |
P-CR |
Clarifications on interface between the BMSC and the GCSE AS |
Qualcomm Incorporated |
GCSE_LTE |
| S2-131875 |
| Resubmission of S2-131875.. Not Handled |
Not Handled |
Erik |
Y |
6.5 |
S2-132517 |
P-CR |
Group Communications with dynamic group service area |
CATT |
GCSE_LTE |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.5 |
S2-132690 |
P-CR |
Functional requirements on GC2 for Solution 3 |
Nokia Siemens Networks |
GCSE_LTE |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.5 |
S2-132689 |
P-CR |
GCSE TR 23.768 current solutions evaluations and near term goals |
Nokia Siemens Networks |
GCSE_LTE |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.5 |
S2-132613 |
OTHER |
Candidate GCSE_LTE capabilities for potential de-prioritization in Rel-12 |
Motorola Solutions |
GCSE_LTE |
|
|
| Not Handled |
Not Handled |
Erik |
N |
6.5 |
S2-132580 |
P-CR |
PtP and/or PtM decisions when the Multipoint Service is E-MBMS |
General Dynamics Broadband UK |
GCSE_LTE |
|
|
| LATE DOC: WITHDRAWN |
Withdrawn |
- |
- |
6.6 |
- |
- |
User Plane Congestion Management (UPCON) |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.6 |
S2-132433 |
P-CR |
Rapporteurs proposal for restructuring TR 23.705 |
NEC |
UPCON |
S2-132821 |
|
| Revised to S2-132821. |
Revised |
Erik |
Y |
6.6 |
S2-132821 |
P-CR |
Rapporteurs proposal for restructuring TR 23.705 |
NEC |
UPCON |
| S2-132433 |
| Approved |
Approved |
Erik |
Y |
6.6 |
S2-132366 |
P-CR |
UPCON: Aligning Definitions for 'Attended' and 'Unattended' Data Traffic |
KDDI |
- |
S2-132822 |
|
| Revised to S2-132822. |
Revised |
Erik |
Y |
6.6 |
S2-132822 |
P-CR |
UPCON: Aligning Definitions for 'Attended' and 'Unattended' Data Traffic |
KDDI |
- |
| S2-132366 |
| Approved |
Approved |
Erik |
Y |
6.6 |
S2-132388 |
P-CR |
Congestion information |
Sprint |
UPCON |
|
|
| Noted |
Noted |
Erik |
Y |
6.6 |
S2-132434 |
P-CR |
Congestion indication semantics and reporting (considerations and proposal) |
NEC |
UPCON |
S2-132790 |
|
| Revised to S2-132790. |
Revised |
Erik |
Y |
6.6 |
S2-132790 |
P-CR |
Congestion indication semantics and reporting (considerations and proposal) |
NEC |
UPCON |
S2-132823 |
S2-132434 |
| Revised to S2-132823. |
Revised |
Erik |
Y |
6.6 |
S2-132823 |
P-CR |
Congestion indication semantics and reporting (considerations and proposal) |
NEC |
UPCON |
S2-132973 |
S2-132790 |
| Revised to S2-132973. |
Revised |
Erik |
Y |
6.6 |
S2-132973 |
P-CR |
Congestion indication semantics and reporting (considerations and proposal) |
NEC, NTT DOCOMO, China Mobile |
UPCON |
| S2-132823 |
| Approved |
Approved |
Erik |
Y |
6.6 |
S2-132407 |
P-CR |
Bitrate threshold based RAN user plane congestion notification |
Ericsson, ST-Ericsson |
UPCON |
S2-132824 |
|
| Revised to S2-132824. |
Revised |
Erik |
Y |
6.6 |
S2-132824 |
P-CR |
Bitrate threshold based RAN user plane congestion notification |
Ericsson, ST-Ericsson |
UPCON |
S2-132974 |
S2-132407 |
| Revised to S2-132974. |
Revised |
Erik |
Y |
6.6 |
S2-132974 |
P-CR |
Bitrate threshold based RAN user plane congestion notification |
Ericsson, ST-Ericsson |
UPCON |
S2-133069 |
S2-132824 |
| Revised to S2-133069. |
Revised |
Erik |
Y |
6.6 |
S2-133069 |
P-CR |
Bitrate threshold based RAN user plane congestion notification |
Ericsson, ST-Ericsson |
UPCON |
| S2-132974 |
| For e-mail approval. Noted |
Noted |
Erik |
Y |
6.6 |
S2-132825 |
LS OUT |
[DRAFT] LS on Questions to RAN on UPCON |
SA WG2 |
UPCON |
S2-132979 |
| - |
Revised to S2-132979. |
Revised |
Erik |
Y |
6.6 |
S2-132979 |
LS OUT |
[DRAFT] LS on Questions to RAN on UPCON |
SA WG2 |
UPCON |
S2-133070 |
S2-132825 |
- |
Revised to S2-133070. |
Revised |
Erik |
Y |
6.6 |
S2-133070 |
LS OUT |
LS on Questions to RAN on UPCON |
SA WG2 |
UPCON |
| S2-132979 |
- |
Approved |
Approved |
Erik |
Y |
6.6 |
S2-132476 |
P-CR |
RAN User Plane congestion criteria |
China Mobile |
UPCON |
|
|
| Noted |
Noted |
Erik |
Y |
6.6 |
S2-132383 |
P-CR |
Refinement of the RPPF/RCAF based Solution for Operator Controlled Off-path Congestion Awareness and Notification |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Allot Communications, KDDI, Broadcom Corporation, ZTE, Movik |
UPCON |
S2-132860 |
|
| Revised to S2-132860. |
Revised |
Erik |
Y |
6.6 |
S2-132860 |
P-CR |
Refinement of the RPPF/RCAF based Solution for Operator Controlled Off-path Congestion Awareness and Notification |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Allot Communications, KDDI, Broadcom Corporation, ZTE, Movik |
UPCON |
S2-132975 |
S2-132383 |
| Revised to S2-132975. |
Revised |
Erik |
Y |
6.6 |
S2-132975 |
P-CR |
Refinement of the RPPF/RCAF based Solution for Operator Controlled Off-path Congestion Awareness and Notification |
Alcatel-Lucent, Allot Communications, KDDI, Broadcom Corporation, ZTE, Movik, China Telecom |
UPCON |
| S2-132860 |
| Noted |
Noted |
Erik |
Y |
6.6 |
S2-132389 |
P-CR |
Solution for User Plane Congestion aggregate reporting |
Sprint |
UPCON |
|
|
| Noted |
Noted |
Erik |
Y |
6.6 |
S2-132481 |
P-CR |
Clarification of C-plane signalling for RAN user plane congestion awareness solution |
NTT DOCOMO, Intel |
UPCON |
S2-132861 |
|
| Revised to S2-132861. |
Revised |
Erik |
Y |
6.6 |
S2-132861 |
P-CR |
Clarification of C-plane signalling for RAN user plane congestion awareness solution |
NTT DOCOMO, Intel |
UPCON |
S2-132976 |
S2-132481 |
| Revised to S2-132976. |
Revised |
Erik |
Y |
6.6 |
S2-132976 |
P-CR |
Clarification of C-plane signalling for RAN user plane congestion awareness solution |
NTT DOCOMO, Intel |
UPCON |
| S2-132861 |
| Approved |
Approved |
Erik |
Y |
6.6 |
S2-132531 |
P-CR |
Consideration on RAN-sharing scenario for congestion notification |
Samsung |
UPCON |
S2-132962 |
|
| Revised to S2-132962. |
Revised |
Erik |
Y |
6.6 |
S2-132962 |
P-CR |
Consideration on RAN-sharing scenario for congestion notification |
Samsung |
UPCON |
| S2-132531 |
| Approved |
Approved |
Erik |
Y |
6.6 |
S2-132381 |
P-CR |
Identification of EPS bearers affected by congestion |
Cygnus Broadband |
UPCON |
|
|
| Noted |
Noted |
Erik |
Y |
6.6 |
S2-132364 |
P-CR |
Tunnelling methods between the TDF and the P-GW and enhancements for Solutions 3, 5, 6 |
Allot Communications |
UPCON |
S2-132963 |
|
| Revised to S2-132963. |
Revised |
Erik |
Y |
6.6 |
S2-132963 |
P-CR |
Tunnelling methods between the TDF and the P-GW and enhancements for Solutions 3, 5, 6 |
Allot Communications |
UPCON |
S2-132977 |
S2-132364 |
| Revised to S2-132977. |
Revised |
Erik |
Y |
6.6 |
S2-132977 |
P-CR |
Tunnelling methods between the TDF and the P-GW and enhancements for Solutions 3, 5, 6 |
Allot Communications |
UPCON |
| S2-132963 |
| Approved |
Approved |
Erik |
Y |
6.6 |
S2-132435 |
P-CR |
Enhancing policy related terminology and concepts for user plane congestion handling |
NEC |
UPCON |
S2-132964 |
|
| Revised to S2-132964. |
Revised |
Erik |
Y |
6.6 |
S2-132964 |
P-CR |
Enhancing policy related terminology and concepts for user plane congestion handling |
NEC |
UPCON |
S2-132978 |
S2-132435 |
| Revised to S2-132978. |
Revised |
Erik |
Y |
6.6 |
S2-132978 |
P-CR |
Enhancing policy related terminology and concepts for user plane congestion handling |
NEC |
UPCON |
| S2-132964 |
| Approved |
Approved |
Erik |
Y |
6.6 |
S2-132450 |
P-CR |
Enhancement of TFT filters |
Telecom Italia |
UPCON |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132710 |
P-CR |
GTP-U packet processing performance with UPCON extension header |
NEC |
UPCON |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132494 |
P-CR |
QoE consideration in streaming optimization for congestion mitigation |
Huawei, Hisilicon |
UPCON |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132510 |
P-CR |
Adding DSCP Option for FPI Marking |
Nokia Siemens Networks, Nokia Corp., Juniper Networks |
UPCON |
| S2-131721 |
| Resubmission of S2-131721. Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132638 |
P-CR |
FPI marking solution for uplink prioritization |
Huawei, Hisilicon |
UPCON |
| S2-131688 |
| Resubmission of S2-131688.. Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132511 |
P-CR |
Relationship between QCI and FPI and usage of FPI |
Nokia Siemens Networks |
UPCON |
| S2-131720 |
| Resubmission of S2-131720. Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132408 |
P-CR |
Enhancements to Operator Control of RAN Congestion Handling Solution |
Ericsson, ST-Ericsson |
UPCON |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132544 |
P-CR |
A new solution for downlink traffic |
Nokia |
UPCON |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132530 |
P-CR |
Charging issue in RAN-based congestion mitigation |
Samsung |
UPCON |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132669 |
P-CR |
UPCON Solution for Performance Differentiation keeping bearer level QoS. |
Qualcomm Incorporated |
UPCON |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132436 |
P-CR |
Uplink Traffic Prioritization during RAN User Plane Congestion |
NEC |
UPCON |
| S2-131942 |
| Resubmission of S2-131942.. Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132545 |
P-CR |
A solution for uplink traffic |
Nokia |
UPCON |
| S2-131956 |
| Resubmission of S2-131956.. Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132637 |
P-CR |
Prioritization scheme considerations for the FPI marking solution |
Huawei, Hisilicon |
UPCON |
| S2-131687 |
| Resubmission of S2-131687.. Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132668 |
P-CR |
Uplink scheduling prioritization solution |
Qualcomm Incorporated |
UPCON |
| S2-131908 |
| Resubmission of S2-131908.. Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132670 |
P-CR |
Solution to the Key Issue of Video Delivery: Dynamic Adaptive Streaming over HTTP |
Qualcomm Incorporated |
UPCON |
| S2-131910 |
| Resubmission of S2-131910.. Not Handled |
Not Handled |
Erik |
Y |
6.6 |
S2-132477 |
P-CR |
Solution for the Video delivery control for congestion mitigation |
China Mobile |
UPCON |
|
|
| Not Handled |
Not Handled |
- |
- |
6.7 |
- |
- |
WLAN Network Selection for 3GPP Terminals (WLAN_NS) |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
6.7 |
S2-132340 |
LS In |
LS from Wi-Fi Alliance: Hotspot 2.0 Release 2 Draft Technical Specification |
Wi-Fi Alliance |
- |
| S2-131606 |
LS on Hotspot 2 0 Rel 2 20130423 |
Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132361 |
LS In |
LS from WiFi Alliance Hotspot 2.0 Marketing Task Group: Wi-Fi Alliance Offloading Standards Work |
WiFi Alliance Hotspot 2.0 Marketing Task Group |
WLAN_NS |
|
| 20130606_WFA_SS_3GPP |
Response drafted in S2-132498 (for e-mail approval). Final response in S2-133081 |
Response in S2-133081 |
Ivano |
Y |
6.7 |
S2-132498 |
LS OUT |
Reply LS on WiFi-Alliance on Offloading Standards Work |
Huawei, Hisilicon |
WLAN_NS |
S2-132745 |
|
| Response to S2-132361. Revised to S2-132745. |
Revised |
Ivano |
Y |
6.7 |
S2-132745 |
LS OUT |
[DRAFT] Reply LS on WiFi-Alliance Offloading Standards Work |
Huawei, Hisilicon |
WLAN_NS |
S2-133081 |
S2-132498 |
| Response to S2-132361. For e-mail approval. Revision 10 approved. Revised to S2-133081. |
Revised |
Ivano |
Y |
6.7 |
S2-133081 |
LS OUT |
Reply LS on WiFi-Alliance Offloading Standards Work |
SA WG2 |
WLAN_NS |
| S2-132745 |
| e-mail revision 10 of S2-132745. Response to S2-132361. Approved |
Approved |
Ivano |
Y |
6.7 |
S2-132724 |
LS In |
LS from WBA: Liaison Statement to 3GPP SA WG2 and CT WG1 |
WBA |
- |
|
| WBA-LiasionStatement to 3GPP 09072013 |
Postponed to meeting #99 |
Postponed |
Ivano |
Y |
6.7 |
S2-132597 |
P-CR |
Conclusions about the Co-existence and Alignment between HS2.0 and ANDSF Policies |
Motorola Mobility, Qualcomm Incorporated |
WLAN_NS |
S2-132746 |
|
| Revised to S2-132746. |
Revised |
Ivano |
Y |
6.7 |
S2-132655 |
P-CR |
Integrating HS2.0 policies with ANDSF |
Intel, AT&T |
WLAN_NS |
S2-132746 |
|
| Applicable parts will be captured in S2-132746. Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132746 |
P-CR |
Conclusions about the Co-existence and Alignment between HS2.0 and ANDSF Policies |
Motorola Mobility, Qualcomm Incorporated |
WLAN_NS |
S2-132982 |
S2-132597 |
| Revised to S2-132982. |
Revised |
Ivano |
Y |
6.7 |
S2-132982 |
P-CR |
Conclusions about the Co-existence and Alignment between HS2.0 and ANDSF Policies |
Motorola Mobility, Qualcomm Incorporated, AT&T, Intel |
WLAN_NS |
| S2-132746 |
| Agreed in parallel sessions. Vodafone objected to agreeing this document because they believe that the current solutions proposed do not fulfil the objectives of the WID. Approved with 1 objection |
Approved with 1 Objection |
Ivano |
Y |
6.7 |
S2-132496 |
P-CR |
Solution 10 and solution 4 convergence consideration |
Huawei, Hisilicon |
WLAN_NS |
|
|
| Proposes to capture in solution 10 certain aspects of solution 4. Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132423 |
P-CR |
Support for VPLMN provided WLAN service providers |
Research In Motion Ltd., UK |
WLAN_NS |
|
|
| Proposes to allow the VPLMN to provide a list of WLAN service providers to the device. New concept. Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132421 |
P-CR |
Alignment of WLAN access network ranking principles with HS2.0 |
Research In Motion Ltd., UK |
WLAN_NS |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132495 |
P-CR |
Solution #10 PLMN based v-ANDSF policy preference |
Huawei, Hisilicon |
WLAN_NS |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132497 |
P-CR |
Solution #10 enhancement for different power up cases |
Huawei, Hisilicon |
WLAN_NS |
S2-132943 |
|
| Revised to S2-132943. |
Revised |
Ivano |
Y |
6.7 |
S2-132943 |
P-CR |
Solution #10 enhancement for different power up cases |
Huawei, Hisilicon |
WLAN_NS |
| S2-132497 |
| Agreed in parallel sessions. Approved |
Approved |
Ivano |
Y |
6.7 |
S2-132585 |
P-CR |
On the relation between WLAN SP and ISMP |
Qualcomm Incorporated |
WLAN_NS |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132598 |
P-CR |
Enabling Non-Seamless WLAN Offload for Single-Radio UEs |
Motorola Mobility |
WLAN_NS |
|
|
| Proposes a new key issue and a solution to address it. If there is agreement on the nature of the problem, do we need to create a new key issue or can we simply adopt the approach proposed in S2-132585? WIthdrawn in paralell sessions |
Withdrawn |
Ivano |
Y |
6.7 |
S2-132599 |
P-CR |
Updates to Solution #10: WLAN Selection Based on WLANSP Rules |
Motorola Mobility |
WLAN_NS |
S2-132944 |
|
| Revised to S2-132944. |
Revised |
Ivano |
Y |
6.7 |
S2-132944 |
P-CR |
Updates to Solution #10: WLAN Selection Based on WLANSP Rules |
Motorola Mobility |
WLAN_NS |
| S2-132599 |
| Agreed in parallel sessions. Approved |
Approved |
Ivano |
Y |
6.7 |
S2-132584 |
P-CR |
Corrections for solution 10 |
Qualcomm Incorporated |
WLAN_NS |
S2-132945 |
|
| Revised to S2-132945. |
Revised |
Ivano |
Y |
6.7 |
S2-132945 |
P-CR |
Corrections for solution 10 |
Qualcomm Incorporated |
WLAN_NS |
| S2-132584 |
| Agreed in parallel sessions. Approved |
Approved |
Ivano |
Y |
6.7 |
S2-132524 |
P-CR |
WLAN network selection using active ISRP rule and active WLANSP rule |
CATT |
WLAN_NS |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132422 |
P-CR |
Support for WLANs that are non HS2.0 capable when using WLAN_SP |
Research In Motion Ltd., UK |
WLAN_NS |
S2-132946 |
|
| Revised to S2-132946. |
Revised |
Ivano |
Y |
6.7 |
S2-132946 |
P-CR |
Support for WLANs that are non HS2.0 capable when using WLAN_SP |
Research In Motion Ltd., UK |
WLAN_NS |
S2-132983 |
S2-132422 |
| Revised to S2-132983. |
Revised |
Ivano |
Y |
6.7 |
S2-132983 |
P-CR |
Support for WLANs that are non HS2.0 capable when using WLAN_SP |
Research In Motion Ltd., UK |
WLAN_NS |
| S2-132946 |
| Approved |
Approved |
Ivano |
Y |
6.7 |
S2-132656 |
P-CR |
Conclusion for Key Issue #5 |
Intel, AT&T |
WLAN_NS |
S2-132758 |
|
| Revised to S2-132758. |
Revised |
Ivano |
Y |
6.7 |
S2-132758 |
P-CR |
Conclusion for Key Issue #5 |
Intel, AT&T |
WLAN_NS |
| S2-132656 |
| Agreed in parallel sessions. Approved |
Approved |
Ivano |
Y |
6.7 |
S2-132529 |
P-CR |
Evaluation for WLAN_NS solutions |
Samsung, Renesas Mobile Europe Ltd., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Intel |
WLAN_NS |
S2-132757 |
|
| Revised to S2-132757. |
Revised |
Ivano |
Y |
6.7 |
S2-132757 |
P-CR |
Evaluation for WLAN_NS solutions |
Samsung, Renesas Mobile Europe Ltd., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Intel |
WLAN_NS |
S2-133023 |
S2-132529 |
| Broadcom Corporation and Vodafone objected to this conclusion in the parallel session because they believe the ANDSF policies shall contain additional parameters in addition to those listed in the P-CR (e.g. thresholds on the RSSI). Revised to S2-133023. |
Revised |
Ivano |
Y |
6.7 |
S2-133023 |
P-CR |
Evaluation for WLAN_NS solutions |
Samsung, Renesas Mobile Europe Ltd., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Intel, Qualcomm Incorporated, Nokia, China Mobile, AT&T, Huawei |
WLAN_NS |
| S2-132757 |
| Approved with 1 Objection and a concern from Broadcom |
Approved with 1 Objection |
Ivano |
Y |
6.7 |
S2-132698 |
P-CR |
Evaluation of Solutions for Key issue#4 |
Vodafone |
WLAN_NS |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.7 |
S2-132695 |
P-CR |
Traffic steering between 3GPP access and WLAN access |
Vodafone |
WLAN_NS |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.7 |
S2-132578 |
P-CR |
Key issue #9: Selection of WLAN with S2a connectivity for home routed services |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom Corporation |
WLAN_NS |
S2-132947 |
|
| Revised to S2-132947. |
Revised |
Ivano |
Y |
6.7 |
S2-132947 |
P-CR |
Key issue #9: Selection of WLAN with S2a connectivity for home routed services |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom Corporation |
WLAN_NS |
S2-133059 |
S2-132578 |
| Revised to S2-133059. |
Revised |
Ivano |
Y |
6.7 |
S2-133059 |
P-CR |
Key issue #9: Selection of WLAN with S2a connectivity for home routed services |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom Corporation |
WLAN_NS |
| S2-132947 |
| Approved |
Approved |
Ivano |
Y |
6.7 |
S2-132657 |
TR COVER |
Cover Sheet for TR 23.865 for Approval at TSG SA |
Intel |
WLAN_NS |
S2-132948 |
|
| Revised to S2-132948. |
Revised |
Ivano |
Y |
6.7 |
S2-132948 |
TR COVER |
Cover Sheet for TR 23.865 for Approval at TSG SA |
Intel |
WLAN_NS |
S2-133056 |
S2-132657 |
| Revised to S2-133056. |
Revised |
Ivano |
Y |
6.7 |
S2-133056 |
TR Cover |
Cover Sheet for TR 23.865 for Approval at TSG SA |
Intel |
WLAN_NS |
| S2-132948 |
| Approved |
Approved |
Ivano |
Y |
6.7 |
S2-132696 |
P-CR |
WLAN selection when 3GPP network is not available |
Vodafone |
WLAN_NS |
|
|
| LATE DOC: Rx 09/07, 23:00. Not Handled |
Not Handled |
Ivano |
Y |
6.7 |
S2-132697 |
P-CR |
Validity Conditions for WLAN selection |
Vodafone |
WLAN_NS |
|
|
| Not Handled |
Not Handled |
- |
- |
6.8 |
- |
- |
ProSe Group Communication, ProSe Relays and Group Communication System Enablers for LTE Common Aspects (ProSe/GCSE_LTE) |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.8 |
S2-132605 |
P-CR |
Expanding the Key Issue on Public Safety UE-to-Network Relays |
Intel, General Dynamics Broadband UK |
GCSE_LTE, ProSe |
|
|
| Noted |
Noted |
Erik |
Y |
6.8 |
S2-132562 |
P-CR |
On ProSe Relays |
Alcatel-Lucent, EADS |
- |
S2-132842 |
|
| Revised to S2-132842. |
Revised |
Erik |
Y |
6.8 |
S2-132842 |
P-CR |
On ProSe Relays |
Alcatel-Lucent, EADS |
- |
S2-133014 |
S2-132562 |
| Revised to S2-133014. |
Revised |
Erik |
Y |
6.8 |
S2-133014 |
P-CR |
On ProSe Relays |
Alcatel-Lucent, EADS |
- |
| S2-132842 |
| Approved |
Approved |
Erik |
Y |
6.8 |
S2-132432 |
P-CR |
Solution for Public Safety UE-to-Network Relays |
Intel |
GCSE_LTE, ProSe |
S2-132843 |
|
| Revised to S2-132843. |
Revised |
Erik |
Y |
6.8 |
S2-132843 |
P-CR |
Solution for Public Safety UE-to-Network Relays |
Intel |
GCSE_LTE, ProSe |
S2-133037 |
S2-132432 |
| Revised to S2-133037. |
Revised |
Erik |
Y |
6.8 |
S2-133037 |
P-CR |
Solution for Public Safety UE-to-Network Relays |
Intel |
GCSE_LTE, ProSe |
| S2-132843 |
| Approved for inclusion in TR 23.703. |
Approved |
Erik |
Y |
6.8 |
S2-132642 |
P-CR |
Application layer based ProSe Relay |
ZTE corporation |
ProSe |
S2-132844 |
|
| Revised to S2-132844. |
Revised |
Erik |
Y |
6.8 |
S2-132844 |
P-CR |
Application layer based ProSe Relay |
ZTE corporation |
ProSe |
S2-133038 |
S2-132642 |
| Revised to S2-133038. |
Revised |
Erik |
Y |
6.8 |
S2-133038 |
P-CR |
Application layer based ProSe Relay |
ZTE corporation |
ProSe |
| S2-132844 |
| Approved |
Approved |
Erik |
Y |
6.8 |
S2-132607 |
P-CR |
Public Safety UE to Network Relays |
Vodafone |
ProSe |
S2-132845 |
|
| Revised to S2-132845. |
Revised |
Erik |
Y |
6.8 |
S2-132845 |
P-CR |
Public Safety UE to Network Relays |
Vodafone |
ProSe |
S2-133022 |
S2-132607 |
| Revised to S2-133022. |
Revised |
Erik |
Y |
6.8 |
S2-133022 |
P-CR |
Public Safety UE to Network Relays |
Vodafone |
ProSe |
S2-133039 |
S2-132845 |
| Revised to S2-133039. |
Revised |
Erik |
Y |
6.8 |
S2-133039 |
P-CR |
Public Safety UE to Network Relays |
Vodafone |
ProSe |
| S2-133022 |
| Approved |
Approved |
Erik |
Y |
6.8 |
S2-132676 |
P-CR |
L2 ProSe UE-to-Network Relays with Bearer sharing |
Nokia Siemens Networks |
ProSe |
S2-132846 |
|
| Revised to S2-132846. |
Revised |
Erik |
Y |
6.8 |
S2-132846 |
P-CR |
L2 ProSe UE-to-Network Relays with Bearer sharing |
Nokia Siemens Networks |
ProSe |
S2-133040 |
S2-132676 |
| Revised to S2-133040. |
Revised |
Erik |
Y |
6.8 |
S2-133040 |
P-CR |
L2 ProSe UE-to-Network Relays with Bearer sharing |
Nokia Siemens Networks |
ProSe |
| S2-132846 |
| Approved |
Approved |
Erik |
Y |
6.8 |
S2-132455 |
P-CR |
ProSe UE-to-Network Relays |
Qualcomm Incorporated |
ProSe |
S2-132847 |
|
| Revised to S2-132847. |
Revised |
Erik |
Y |
6.8 |
S2-132847 |
P-CR |
ProSe UE-to-Network Relays |
Qualcomm Incorporated |
ProSe |
S2-133041 |
S2-132455 |
| Revised to S2-133041. |
Revised |
Erik |
Y |
6.8 |
S2-133041 |
P-CR |
ProSe UE-to-Network Relays |
Qualcomm Incorporated |
ProSe |
| S2-132847 |
| Approved |
Approved |
Erik |
Y |
6.8 |
S2-132519 |
P-CR |
solution for communication via UE-to-network relay |
CATT |
ProSe |
|
|
| Noted |
Noted |
Erik |
Y |
6.8 |
S2-132606 |
P-CR |
Solution for Public Safety UE-to-UE Relays |
Intel |
ProSe, GCSE_LTE |
S2-132848 |
|
| Revised to S2-132848. |
Revised |
Erik |
Y |
6.8 |
S2-132848 |
P-CR |
Solution for Public Safety UE-to-UE Relays |
Intel |
ProSe, GCSE_LTE |
| S2-132606 |
| Approved |
Approved |
- |
- |
6.9 |
- |
- |
Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
6.9 |
S2-132717 |
P-CR |
Adding WebRTC scenario |
ZTE |
IMS_WebRTC |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.9 |
S2-132479 |
P-CR |
WebRTC Assumptions and Architectural Requirements |
Orange |
IMS_WebRTC |
S2-132749 |
|
| Revised to S2-132749. |
Revised |
Ivano |
Y |
6.9 |
S2-132749 |
P-CR |
WebRTC Assumptions and Architectural Requirements |
Orange |
IMS_WebRTC |
S2-132988 |
S2-132479 |
| Revised to S2-132988. |
Revised |
Ivano |
Y |
6.9 |
S2-132988 |
P-CR |
WebRTC Assumptions and Architectural Requirements |
Orange |
IMS_WebRTC |
| S2-132749 |
| Agreed in parallel sessions. Approved |
Approved |
Ivano |
Y |
6.9 |
S2-132512 |
P-CR |
Assumptions / Requirements for WebRTC |
Nokia Siemens Networks, Ericsson |
IMS_WebRTC |
S2-132750 |
|
| Revised to S2-132750. |
Revised |
Ivano |
Y |
6.9 |
S2-132750 |
P-CR |
Assumptions / Requirements for WebRTC |
Nokia Siemens Networks, Ericsson |
IMS_WebRTC |
S2-132771 |
S2-132512 |
| Revised to S2-132771. |
Revised |
Ivano |
Y |
6.9 |
S2-132771 |
P-CR |
Assumptions / Requirements for WebRTC |
Nokia Siemens Networks, Ericsson |
IMS_WebRTC |
S2-132989 |
S2-132750 |
| Revised to S2-132989. |
Revised |
Ivano |
Y |
6.9 |
S2-132989 |
P-CR |
Assumptions / Requirements for WebRTC |
Nokia Siemens Networks, Ericsson |
IMS_WebRTC |
| S2-132771 |
| Agreed in parallel sessions. Approved |
Approved |
Ivano |
Y |
6.9 |
S2-132592 |
P-CR |
WebRTC architecture requirements |
Alcatel-Lucent |
IMS_WebRTC |
|
|
| Noted in parallel sessions. Applicable content will be merged into S2-132750. |
Noted |
Ivano |
Y |
6.9 |
S2-132639 |
DISCUSSION |
Considerations for WebRTC Access to IMS architecture aspects |
Huawei, Hisilicon |
IMS_WebRTC |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.9 |
S2-132640 |
P-CR |
Architecture requirements for WebRTC access to IMS |
Huawei, Hisilicon |
IMS_WebRTC |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.9 |
S2-132718 |
P-CR |
Discussion on the roaming in the WebRTC |
ZTE |
IMS_WebRTC |
|
|
| Noted in parallel sessions. An editor's note on roaming support will be captured in S2-132750. |
Noted |
Ivano |
Y |
6.9 |
S2-132719 |
P-CR |
Discussion on on-path and off-path signalling mode in the WebRTC |
ZTE |
IMS_WebRTC |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.9 |
S2-132417 |
P-CR |
Re-use of existing IMS architecture for WebRTC clients |
Ericsson, ST-Ericsson |
IMS_WebRTC |
S2-132772 |
|
| Revised to S2-132772. |
Revised |
Ivano |
Y |
6.9 |
S2-132772 |
P-CR |
Re-use of existing IMS architecture for WebRTC clients |
Ericsson, ST-Ericsson |
IMS_WebRTC |
S2-133016 |
S2-132417 |
| Revised to S2-133016. |
Revised |
Ivano |
Y |
6.9 |
S2-133016 |
P-CR |
Re-use of existing IMS architecture for WebRTC clients |
Ericsson, ST-Ericsson |
IMS_WebRTC |
| S2-132772 |
| Approved |
Approved |
Ivano |
Y |
6.9 |
S2-132513 |
P-CR |
Architectural Alternative for WebRTC |
Nokia Siemens Networks |
IMS_WebRTC |
S2-132773 |
|
| Revised to S2-132773. |
Revised |
Ivano |
Y |
6.9 |
S2-132773 |
P-CR |
Architectural Alternative for WebRTC |
Nokia Siemens Networks |
IMS_WebRTC |
S2-133017 |
S2-132513 |
| Revised to S2-133017. |
Revised |
Ivano |
Y |
6.9 |
S2-133017 |
P-CR |
Architectural Alternative for WebRTC |
Nokia Siemens Networks |
IMS_WebRTC |
| S2-132773 |
| Approved |
Approved |
Ivano |
Y |
6.9 |
S2-132593 |
P-CR |
WebRTC solution proposal |
Alcatel-Lucent |
IMS_WebRTC |
S2-132929 |
|
| Revised to S2-132929. |
Revised |
Ivano |
Y |
6.9 |
S2-132929 |
P-CR |
WebRTC solution proposal |
Alcatel-Lucent |
IMS_WebRTC |
S2-132950 |
S2-132593 |
| Revised to S2-132950. |
Revised |
Ivano |
Y |
6.9 |
S2-132950 |
P-CR |
WebRTC solution proposal |
Alcatel-Lucent |
IMS_WebRTC |
S2-133018 |
S2-132929 |
| Revised to S2-133018. |
Revised |
Ivano |
Y |
6.9 |
S2-133018 |
P-CR |
WebRTC solution proposal |
Alcatel-Lucent |
IMS_WebRTC |
| S2-132950 |
| Approved |
Approved |
Ivano |
Y |
6.9 |
S2-132641 |
P-CR |
High level architecture for WebRTC access to IMS |
Huawei, Hisilicon |
IMS_WebRTC |
S2-132928 |
|
| Revised to S2-132928. |
Revised |
Ivano |
Y |
6.9 |
S2-132928 |
P-CR |
High level architecture for WebRTC access to IMS |
Huawei, Hisilicon |
IMS_WebRTC |
S2-132930 |
S2-132641 |
| Revised to S2-132930. |
Revised |
Ivano |
Y |
6.9 |
S2-132930 |
P-CR |
High level architecture for WebRTC access to IMS |
Huawei, Hisilicon |
IMS_WebRTC |
| S2-132928 |
| Approved |
Approved |
- |
- |
6.10 |
- |
- |
IMS Registration Control (IMS_RegCon) |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
6.10 |
S2-132693 |
LS OUT |
[DRAFT] LS on IMS Registration Control |
China Mobile |
IMS_RegCon |
S2-132748 |
|
| Revised to S2-132748. |
Revised |
Ivano |
Y |
6.10 |
S2-132748 |
LS OUT |
LS on IMS Registration Control |
SA WG2 |
IMS_RegCon |
| S2-132693 |
| Agreed in parallel sessions. Approved |
Approved |
Ivano |
Y |
6.10 |
S2-132418 |
DISCUSSION |
Discussion Paper on IMS_RegCon alternative solutions |
Ericsson, ST-Ericsson, Nokia Siemens Networks, Huawei, ZTE |
IMS_RegCon |
|
|
| Noted in parallel sessions. Endorsed. Will be attached to the outgoing LS to CT WG4. |
Noted |
Ivano |
Y |
6.10 |
S2-132507 |
DISCUSSION |
The impacts analysis on HSS and Cx of UAR and SAA solution |
ZTE |
IMS_RegCon |
S2-132747 |
|
| Revised to S2-132747. |
Revised |
Ivano |
Y |
6.10 |
S2-132747 |
DISCUSSION |
The impacts analysis on HSS and Cx of UAR and SAA solution |
ZTE |
IMS_RegCon |
| S2-132507 |
| Noted in parallel sessions. Endorsed. Will be attached to the outgoing LS to CT WG4. |
Noted |
Ivano |
Y |
6.10 |
S2-132694 |
Presentation |
Living Document for IMS_RegCon |
China Mobile |
IMS_RegCon |
|
|
| Noted in parallel sessions. Endorsed. Will be attached to the outgoing LS to CT WG4. |
Noted |
Ivano |
Y |
6.10 |
S2-132394 |
DISCUSSION |
Living Document for IMS_RegCon |
China Mobile |
IMS_RegCon |
|
|
| Related to LS OUT in S2-132391. WITHDRAWN |
Withdrawn |
Ivano |
Y |
6.10 |
S2-132391 |
LS OUT |
[DRAFT] LS on IMS Registration Control |
China Mobile |
IMS_RegCon |
|
|
| Related attachment in S2-132394. WITHDRAWN |
Withdrawn |
- |
- |
6.11 |
- |
- |
Study on Core Network Overload solutions (FS_CNO) Phase 2 submissions. |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6.11.1 |
- |
- |
GTP-C Overload TEI12 CRs |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.11.1 |
S2-132365 |
CR |
23.401 CR2567: Introduction of GTP-c Load Control |
Cisco, Ericsson, ST Ericsson, Alcatel-Lucent, Verizon |
TEI12 |
S2-132875 |
|
| Revised to S2-132875. |
Revised |
Erik |
Y |
6.11.1 |
S2-132875 |
CR |
23.401 CR2567R1: Introduction of GTP-c Load Control |
Cisco, Ericsson, ST Ericsson, Alcatel-Lucent, Verizon |
TEI12 |
S2-133029 |
S2-132365 |
| Revised to S2-133029. |
Revised |
Erik |
Y |
6.11.1 |
S2-133029 |
CR |
23.401 CR2567R2: Introduction of GTP-c Load Control |
Cisco, Ericsson, ST Ericsson, Alcatel-Lucent, Verizon, AT&T, China Mobile, KPN |
TEI12 |
| S2-132875 |
| This CR was agreed |
Agreed |
Erik |
Y |
6.11.1 |
S2-132409 |
CR |
23.401 CR2571: GTP-C overload handling |
Ericsson, ST-Ericsson, Alcatel-Lucent, Cisco, Verizon, AT&T, China Mobile, KPN |
TEI12, CNO |
S2-132874 |
|
| Revised to S2-132874. |
Revised |
Erik |
Y |
6.11.1 |
S2-132874 |
CR |
23.401 CR2571R1: GTP-C overload handling |
Ericsson, ST-Ericsson, Alcatel-Lucent, Cisco, Verizon, AT&T, China Mobile, KPN |
TEI12, CNO |
S2-133028 |
S2-132409 |
| Revised to S2-133028. |
Revised |
Erik |
Y |
6.11.1 |
S2-133028 |
CR |
23.401 CR2571R2: GTP-C overload handling |
Ericsson, ST-Ericsson, Alcatel-Lucent, Cisco, Verizon, AT&T, China Mobile, KPN |
TEI12 |
| S2-132874 |
| This CR was agreed |
Agreed |
Erik |
Y |
6.11.1 |
S2-132410 |
CR |
23.060 CR1804: GTP-C overload/Load handling |
Ericsson, ST-Ericsson, Alcatel-Lucent, Cisco, AT&T, China Mobile, KPN |
TEI12, CNO |
S2-132876 |
|
| Revised to S2-132876. |
Revised |
Erik |
Y |
6.11.1 |
S2-132876 |
CR |
23.060 CR1804R1: GTP-C overload/Load handling |
Ericsson, ST-Ericsson, Alcatel-Lucent, Cisco, AT&T, China Mobile, KPN |
TEI12, CNO |
S2-133030 |
S2-132410 |
| Revised to S2-133030. |
Revised |
Erik |
Y |
6.11.1 |
S2-133030 |
CR |
23.060 CR1804R2: GTP-C overload/Load handling |
Ericsson, ST-Ericsson, Cisco, AT&T, China Mobile, Alcatel Lucent, KPN |
TEI12 |
| S2-132876 |
| This CR was agreed |
Agreed |
- |
- |
6.11.2 |
- |
- |
ULI Signalling Optimizations ongoing study |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.11.2 |
S2-132392 |
P-CR |
A ULI reporting control solution using ULI signalling cache |
China Mobile |
FS_CNO |
|
|
| Noted in parallel sessions |
Noted |
Erik |
Y |
6.11.2 |
S2-132396 |
P-CR |
CNO avoidance for ULI reporting |
Ericsson, ST Ericsson, Nokia Siemens Networks |
FS_CNO |
S2-132760 |
|
| Revised to S2-132760. |
Revised |
Erik |
Y |
6.11.2 |
S2-132760 |
P-CR |
CNO avoidance for ULI reporting |
Ericsson, ST Ericsson, Nokia Siemens Networks |
FS_CNO |
S2-132985 |
S2-132396 |
| Revised to S2-132985. |
Revised |
Erik |
Y |
6.11.2 |
S2-132985 |
P-CR |
CNO avoidance for ULI reporting |
Ericsson, ST Ericsson, Nokia Siemens Networks |
FS_CNO |
| S2-132760 |
| Agreed in parallel sessions. Approved |
Approved |
Erik |
Y |
6.11.2 |
S2-132608 |
P-CR |
Reducing ULI signalling load in LTE |
Vodafone |
FS_CNO |
S2-132759 |
|
| Revised to S2-132759. |
Revised |
Erik |
Y |
6.11.2 |
S2-132759 |
P-CR |
Reducing ULI signalling load in LTE |
Vodafone |
FS_CNO |
S2-132984 |
S2-132608 |
| Revised to S2-132984. |
Revised |
Erik |
Y |
6.11.2 |
S2-132984 |
P-CR |
Reducing ULI signalling load in LTE |
Vodafone |
FS_CNO |
| S2-132759 |
| Approved |
Approved |
Erik |
Y |
6.11.2 |
S2-132711 |
P-CR |
Update of solution 3 performing ULI reporting using LCS procedures |
Orange |
FS_CNO |
S2-132761 |
|
| Revised to S2-132761. |
Revised |
Erik |
Y |
6.11.2 |
S2-132761 |
P-CR |
Update of solution 3 performing ULI reporting using LCS procedures |
Orange |
FS_CNO |
S2-132986 |
S2-132711 |
| Revised to S2-132986. |
Revised |
Erik |
Y |
6.11.2 |
S2-132986 |
P-CR |
Update of solution 3 performing ULI reporting using LCS procedures |
Orange |
FS_CNO |
| S2-132761 |
| Approved |
Approved |
Erik |
Y |
6.11.2 |
S2-132382 |
P-CR |
Update of solution 2 for User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
FS_CNO |
S2-132762 |
|
| Revised to S2-132762. |
Revised |
Erik |
Y |
6.11.2 |
S2-132762 |
P-CR |
Update of solution 2 for User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
FS_CNO |
S2-132987 |
S2-132382 |
| Revised to S2-132987. |
Revised |
Erik |
Y |
6.11.2 |
S2-132987 |
P-CR |
Update of solution 2 for User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
FS_CNO |
S2-133060 |
S2-132762 |
| Revised to S2-133060. |
Revised |
Erik |
Y |
6.11.2 |
S2-133060 |
P-CR |
Update of solution 2 for User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
FS_CNO |
| S2-132987 |
| Approved |
Approved |
Erik |
Y |
6.11.2 |
S2-132362 |
P-CR |
Evaluation related with Solutions for User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
FS_CNO |
S2-132763 |
|
| Revised to S2-132763. |
Revised |
Erik |
Y |
6.11.2 |
S2-132763 |
P-CR |
Evaluation related with Solutions for User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
FS_CNO |
| S2-132362 |
| Approved |
Approved |
Erik |
Y |
6.11.2 |
S2-132363 |
P-CR |
Conclusions for User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
FS_CNO |
S2-132764 |
|
| LATE DOC: Rx 09/07, 17:30. Revised to S2-132764. |
Revised |
Erik |
Y |
6.11.2 |
S2-132764 |
P-CR |
Conclusions for User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
FS_CNO |
| S2-132363 |
| Noted |
Noted |
Erik |
Y |
6.11.2 |
S2-132393 |
P-CR |
Clarification of ULI reporting in Scenario 7 |
China Mobile |
FS_CNO |
|
|
| Not Handled |
Not Handled |
- |
- |
6.12 |
- |
- |
Study on S2a Mobility based On GTP and WLAN access to EPC (FS_SaMOG) |
- |
- |
- |
- |
- |
- |
- |
Ivano |
Y |
6.12 |
S2-132604 |
P-CR |
Single-scenario approach allowing IP-mobility extensions to rel-11 |
Ericsson, ST-Ericsson, Qualcomm Incorporated |
FS_SaMOG |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.12 |
S2-132478 |
P-CR |
Suggested Way Forward of SaMOG |
China Mobile |
FS_SaMOG |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.12 |
S2-132600 |
P-CR |
Conclusion for Single-PDN and Multi-PDN UEs |
Motorola Mobility, Cisco, Orange, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, Juniper Networks |
FS_SaMOG |
S2-132751 |
|
| Aligned with S2-132478. Revised to S2-132751. |
Revised |
Ivano |
Y |
6.12 |
S2-132751 |
P-CR |
Conclusion for Single-PDN and Multi-PDN UEs |
Motorola Mobility, Cisco, Orange, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, Juniper Networks |
FS_SaMOG |
S2-132774 |
S2-132600 |
| Revised to S2-132774. |
Revised |
Ivano |
Y |
6.12 |
S2-132774 |
P-CR |
Conclusion for Single-PDN and Multi-PDN UEs |
Motorola Mobility, Cisco, Orange, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, Juniper Networks |
FS_SaMOG |
S2-132951 |
S2-132751 |
| Revised to S2-132951. |
Revised |
Ivano |
Y |
6.12 |
S2-132951 |
P-CR |
Conclusion for Single-PDN and Multi-PDN UEs |
Motorola Mobility, Cisco, Orange, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, Juniper Networks |
FS_SaMOG |
| S2-132774 |
| Approved |
Approved |
Ivano |
Y |
6.12 |
S2-132499 |
P-CR |
Support single solution approach |
Huawei, Hisilicon, China Telecom, CATT, HTC, Renesas Mobile Europe, LG Electronics, ITRI |
FS_SaMOG |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.12 |
S2-132579 |
P-CR |
Annex illustrating stage 3 detailed WLCP protocol |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, Ericsson, ST Ericsson, Huawei, Hisilicon |
FS_SaMOG |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.12 |
S2-132652 |
P-CR |
SaMOG Phase-2 DHCP-based UE Implementation Considerations |
ZTE corporation |
FS_SaMOG |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.12 |
S2-132367 |
DISCUSSION |
FS_SaMOG: Solutions Selection |
KDDI |
- |
|
|
| Noted in parallel sessions |
Noted |
Ivano |
Y |
6.12 |
S2-132581 |
P-CR |
Conclusion on SaMOG control plane solutions |
Qualcomm Incorporated, Ericsson, ST-Ericsson |
FS_SAMOG |
S2-132775 |
|
| Revised to S2-132775. |
Revised |
Ivano |
N |
6.12 |
S2-132775 |
P-CR |
Conclusion on SaMOG control plane solutions |
Qualcomm Incorporated, Ericsson, ST-Ericsson |
FS_SAMOG |
| S2-132581 |
| WITHDRAWN. The proposed conclusions on the control plane were merged into S2-132774. |
Withdrawn |
Ivano |
Y |
6.12 |
S2-132582 |
P-CR |
Conclusion on SaMOG user plane solutions |
Qualcomm Incorporated, Ericsson, ST-Ericsson |
FS_SAMOG |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.12 |
S2-132653 |
INFO |
SaMOG Phase-2 Solutions Performance Analysis |
ZTE corporation |
FS_SaMOG |
|
|
| Not Handled |
Not Handled |
Ivano |
Y |
6.12 |
S2-132725 |
WID |
WID on S2a Mobility Based on Trusted WLAN access to EPC |
ZTE corporation |
S2-132776 |
|
| LATE REQ. LATE DOC: Rx 11/07, 10:55. Provided on Request of the SA WG2 Chairman. Revised to S2-132776. |
Revised |
Ivano |
Y |
6.12 |
S2-132776 |
WID |
WID on S2a Mobility Based on Trusted WLAN access to EPC |
ZTE corporation |
S2-133043 |
S2-132725 |
| Revised to S2-133043. |
Revised |
Ivano |
Y |
6.12 |
S2-133043 |
WID |
WID on S2a Mobility Based on Trusted WLAN access to EPC |
ZTE corporation |
S2-133086 |
S2-132776 |
| For e-mail approval. Revision 2 approved. Revised to S2-133086. |
Revised |
Ivano |
Y |
6.12 |
S2-133086 |
WID |
New WID on S2a Mobility Based on Trusted WLAN access to EPC |
ZTE corporation |
| S2-133043 |
| e-mail revision 2 of S2-133043. Approved |
Approved |
Ivano |
Y |
6.12 |
S2-132727 |
TR Cover |
SaMOG Phase-2 TR Coversheet |
ZTE corporation |
FS_SaMOG |
S2-132777 |
|
| LATE REQ. LATE DOC: Rx 11/07, 10:55. Provided on Request of the SA WG2 Chairman. Revised to S2-132777. |
Revised |
Ivano |
Y |
6.12 |
S2-132777 |
TR Cover |
SaMOG Phase-2 TR Coversheet |
ZTE corporation |
FS_SaMOG |
S2-133044 |
S2-132727 |
| Revised to S2-133044. |
Revised |
Ivano |
Y |
6.12 |
S2-133044 |
TR Cover |
Cover sheet to present TR 23.852 for approval at the SA 61 plenary |
ZTE corporation |
FS_SaMOG |
S2-133084 |
S2-132777 |
| For e-mail approval. Revision 1 approved. Revised to S2-133084. |
Revised |
Ivano |
Y |
6.12 |
S2-133084 |
TR Cover |
Cover sheet to present TR 23.852 for approval at the SA 61 plenary |
ZTE corporation |
FS_SaMOG |
| S2-133044 |
| e-mail revision 1 of S2-133044. Approved |
Approved |
- |
- |
6.13 |
- |
- |
Study on Optimizing Offloading to WLAN in 3GPP RAT mobility (FS_WORM) |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.13 |
S2-132722 |
P-CR |
New Key Issue 1bis: ANDSF WLAN preferences with respect to specific 3GPP capability |
Orange |
FS_WORM |
|
|
| Noted |
Noted |
Erik |
Y |
6.13 |
S2-132521 |
P-CR |
Minor modification to solution 2 |
CATT |
FS_WORM |
S2-132906 |
|
| Revised to S2-132906. |
Revised |
Erik |
Y |
6.13 |
S2-132906 |
P-CR |
Minor modification to solution 2 |
CATT |
FS_WORM |
| S2-132521 |
| Approved |
Approved |
Erik |
Y |
6.13 |
S2-132583 |
P-CR |
Removal of FFS from solution 1 |
Qualcomm Incorporated |
FS_WORM |
S2-132907 |
|
| Revised to S2-132907. |
Revised |
Erik |
Y |
6.13 |
S2-132907 |
P-CR |
Removal of FFS from solution 1 |
Qualcomm Incorporated |
FS_WORM |
S2-133024 |
S2-132583 |
| Revised to S2-133024. |
Revised |
Erik |
Y |
6.13 |
S2-133024 |
P-CR |
Removal of FFS from solution 1 |
Qualcomm Incorporated |
FS_WORM |
| S2-132907 |
| Approved |
Approved |
Erik |
Y |
6.13 |
S2-132616 |
P-CR |
Evaluation of Solution 4 |
LG Electronics |
FS_WORM |
S2-132908 |
|
| Revised to S2-132908. |
Revised |
Erik |
Y |
6.13 |
S2-132908 |
P-CR |
Evaluation of Solution 4 |
LG Electronics |
FS_WORM |
| S2-132616 |
| Approved |
Approved |
Erik |
Y |
6.13 |
S2-132425 |
P-CR |
Proposed conclusions for FS_WORM: TR 23.890 |
Research In Motion Ltd., UK |
FS_WORM |
S2-132909 |
|
| Revised to S2-132909. |
Revised |
Erik |
Y |
6.13 |
S2-132909 |
P-CR |
Proposed conclusions for FS_WORM: TR 23.890 |
Research In Motion Ltd., UK |
FS_WORM |
| S2-132425 |
| Approved |
Approved |
Erik |
Y |
6.13 |
S2-132426 |
TR Cover |
Cover Sheet for TR 23.890 for information and approval at TSG SA |
Research In Motion Ltd., UK |
FS_WORM |
S2-132910 |
|
| Revised to S2-132910. |
Revised |
Erik |
Y |
6.13 |
S2-132910 |
TR Cover |
Cover Sheet for TR 23.890 for information and approval at TSG SA |
Research In Motion Ltd., UK |
FS_WORM |
| S2-132426 |
| Approved |
Approved |
Erik |
Y |
6.13 |
S2-132424 |
WID |
Draft FS_WORM Feature WID |
Research In Motion Ltd., UK |
S2-132911 |
|
| Revised to S2-132911. |
Revised |
Erik |
Y |
6.13 |
S2-132911 |
WID |
Draft FS_WORM Feature WID |
Research In Motion Ltd., UK |
S2-133026 |
S2-132424 |
| Revised to S2-133026. |
Revised |
Erik |
Y |
6.13 |
S2-133026 |
WID |
Draft FS_WORM Feature WID |
Research In Motion Ltd., UK |
S2-133087 |
S2-132911 |
| For e-mail approval. Approved. Revised by MCC to clean up in S2-133087. |
Revised |
Erik |
Y |
6.13 |
S2-133087 |
WID |
Feature WID for optimized offloading to WLAN in 3GPP RAT mobility |
Research In Motion Ltd., UK |
| S2-133026 |
| MCC cleanup revision of e-mail approved S2-133026. Approved |
Approved |
Erik |
Y |
6.13 |
S2-132522 |
CR |
23.401 CR2578: Addition of a note in general description of inter-RAT HO |
CATT |
WORM |
S2-132912 |
|
| Revised to S2-132912. |
Revised |
Erik |
Y |
6.13 |
S2-132912 |
CR |
23.401 CR2578R1: Addition of a note in general description of inter-RAT HO |
CATT |
WORM |
S2-133025 |
S2-132522 |
| Revised to S2-133025. |
Revised |
Erik |
Y |
6.13 |
S2-133025 |
CR |
23.401 CR2578R2: Addition of a note in general description of inter-RAT HO |
CATT |
WORM |
| S2-132912 |
| conditionally approved, pending approval of the WORM WID. |
Conditionally Agreed |
Erik |
Y |
6.13 |
S2-132617 |
CR |
23.402 CR1170: Adding a recommendation on hysteresis mechanism for WORM feature |
LG Electronics |
WORM |
S2-132913 |
|
| Revised to S2-132913. |
Revised |
Erik |
Y |
6.13 |
S2-132913 |
CR |
23.402 CR1170R1: Adding a recommendation on hysteresis mechanism for WORM feature |
LG Electronics |
WORM |
| S2-132617 |
| Reviewed and conditionally approved, pending approval of the WORM WID. |
Conditionally Agreed |
Erik |
Y |
6.13 |
S2-132618 |
CR |
23.272 CR0885: Adding a recommendation on hysteresis mechanism for WORM feature |
LG Electronics |
WORM |
S2-132914 |
|
| Revised to S2-132914. |
Revised |
Erik |
Y |
6.13 |
S2-132914 |
CR |
23.272 CR0885R1: Adding a recommendation on hysteresis mechanism for WORM feature |
LG Electronics |
WORM |
S2-133027 |
S2-132618 |
| Revised to S2-133027. |
Revised |
Erik |
Y |
6.13 |
S2-133027 |
CR |
23.272 CR0885R2: Adding a recommendation on hysteresis mechanism for WORM feature |
LG Electronics |
WORM |
| S2-132914 |
| conditionally approved, pending approval of the WORM WID. |
Conditionally Agreed |
- |
- |
6.14 |
- |
- |
Consideration of LS on LTE-HRPD SON WID conditional approval (See SP-130298/RP-130865) |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
6.14 |
S2-132352 |
LS In |
LS from RAN WG3: LS on information of progress in the SI on LTE-HRPD SON |
RAN WG3 |
FS_LTE_HRPD_SON |
| S2-132106 |
R3-131134 |
This was reviewed and noted. |
Noted |
Erik |
Y |
6.14 |
S2-132356 |
LS In |
LS from TSG RAN: LS on LTE-HRPD SON WID conditional approval |
TSG RAN |
LTE_HRPD_SON |
|
| RP-130865 |
A Response LS was drafted in S2-132961 (for e-mail approval). Final response in S2-133082 |
Response in S2-133082 |
Erik |
Y |
6.14 |
S2-132411 |
DISCUSSION |
SA WG2 proposed way forward on 'LTE-HRPD SON WID conditional approval' |
Ericsson, ST-Ericsson |
- |
|
|
| Noted |
Noted |
Erik |
Y |
6.14 |
S2-132500 |
DISCUSSION |
Discussion on LTE-HRPD SON support |
China Telecom, Huawei, Hisilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Qualcomm Incorporated |
LTE_HRPD_SON |
|
|
| This was presented and noted. |
Noted |
Erik |
Y |
6.14 |
S2-132501 |
CR |
23.401 CR2577: Description of E-UTRAN-HRPD Inter-RAT SON |
Huawei, Hisilicon, China Telecom, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Qualcomm Incorporated |
LTE_HRPD_SON |
|
|
| WITHDRAWN |
Withdrawn |
Erik |
Y |
6.14 |
S2-132503 |
CR |
23.002 CR0266: Add New Interface Description between MME and HRPD AN |
Huawei, Hisilicon, China Telecom, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Qualcomm Incorporated |
LTE_HRPD_SON |
|
|
| WITHDRAWN |
Withdrawn |
Erik |
Y |
6.14 |
S2-132502 |
CR |
23.402 CR1162: Add Interface Description of E-UTRAN-HRPD Inter-RAT SON |
Huawei, Hisilicon, China Telecom, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Qualcomm Incorporated |
LTE_HRPD_SON |
S2-132959 |
|
| Revised to S2-132959. |
Revised |
Erik |
Y |
6.14 |
S2-132959 |
CR |
23.402 CR1162R1: Add Interface Description of E-UTRAN-HRPD Inter-RAT SON |
Huawei, Hisilicon, China Telecom, Alcatel-Lucent?, Alcatel-Lucent Shanghai Bell?, ZTE?, Qualcomm Incorporated?.... |
LTE_HRPD_SON |
S2-132960 |
S2-132502 |
| Revised to S2-132960. |
Revised |
Erik |
Y |
6.14 |
S2-132960 |
CR |
23.402 CR1162R2: Add Interface Description of E-UTRAN-HRPD Inter-RAT SON |
Huawei, Hisilicon, China Telecom, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Qualcomm Incorporated, Ericsson |
LTE_HRPD_SON |
| S2-132959 |
| Noted. Technically Endorsed (not for TSG SA approval at this time) |
Noted |
Erik |
Y |
6.14 |
S2-132961 |
LS OUT |
[DRAFT] Reply LS on LTE-HRPD SON WID conditional approval |
SA WG2 |
LTE_HRPD_SON |
S2-133082 |
| - |
Response to S2-132356. For e-mail approval. Approved. Revised to S2-133082. |
Revised |
Erik |
Y |
6.14 |
S2-133082 |
LS OUT |
LS Reply on LTE-HRPD SON WID conditional approval |
SA WG2 |
LTE_HRPD_SON |
| S2-132961 |
- |
Revision of e-mail approved S2-132961. Approved |
Approved |
- |
- |
6.15 |
- |
- |
Technical Enhancements and Improvements (TEI12) |
- |
- |
- |
- |
- |
- |
- |
_Not On Agenda |
Y |
6.15 |
S2-132654 |
CR |
23.246 CR0276: M1 Group re-usage |
Ericsson, ST-Ericsson, Verizon Wireless |
MBMS_EPS |
|
|
| Not Handled |
- |
- |
- |
6.16 |
- |
- |
Minor Corrections and Clean Up (TEI12) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7 |
- |
- |
Project Planning and Management |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.1 |
- |
- |
Work Items Discussed in Parallel Session |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
7.1 |
S2-132384 |
WID |
New WID on User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
- |
S2-133085 |
|
| For e-mail approval. Revision 4 approved with statement in report. Revised to S2-133085. |
Revised |
Erik |
Y |
7.1 |
S2-133085 |
WID |
New WID on User Location Information reporting improvements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
- |
| S2-132384 |
| e-mail revision 4 of S2-132384. Approved with statement in the report |
| Erik |
Y |
7.1 |
S2-132480 |
WID |
Network-provided Location information for IMS Trusted WLAN Access Network (TWAN) case |
Alcatel-Lucent, Telecom-Italia, US Cellular |
S2-132723 |
|
| Revised to S2-132723. |
Revised |
Erik |
Y |
7.1 |
S2-132723 |
WID |
Network-provided Location information for IMS Trusted WLAN Access Network (TWAN) case |
Alcatel-Lucent, Telecom-Italia, US Cellular, Orange |
S2-132744 |
S2-132480 |
| Revision of S2-132480. More supporting companies, some clarification. LATE DOC: Rx 11/07, 18:25. Revised to S2-132744. |
Revised |
Erik |
Y |
7.1 |
S2-132744 |
WID |
New WID on Network Provided Location Information for IMS (TWAN case) |
Alcatel-Lucent, Telecom-Italia, US Cellular, Orange |
S2-133088 |
S2-132723 |
| For e-mail approval. Approved. Revised by MCC to clean up in S2-133088 |
Revised |
Erik |
N |
7.1 |
S2-133088 |
WID |
New WID on Network Provided Location Information for IMS (TWAN case) |
Alcatel-Lucent, Telecom-Italia, US Cellular, Orange |
| S2-132744 |
| MCC cleanup revision of e-mail approved S2-132744. Approved |
Approved |
Erik |
Y |
7.1 |
S2-132703 |
DISCUSSION |
Radio access mode awareness by core network |
China Telecom, China Unicom, ZTE |
- |
|
|
| WITHDRAWN |
Withdrawn |
Erik |
Y |
7.1 |
S2-132704 |
WID |
Radio access mode awareness by core network |
China Telecom, China Unicom, ZTE |
- |
|
|
| WITHDRAWN |
Withdrawn |
- |
- |
7.1.1 |
- |
- |
AOB |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.2 |
- |
- |
Review of the Work Plan |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
7.2 |
S2-132376 |
DISCUSSION |
Chairman's Analysis of ProSe, GCSE_LTE and UPCON for Inter-TSG Release 12 Planning |
SA WG2 Chairman, SA WG1 Chairman |
- |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
7.2 |
S2-132377 |
DISCUSSION |
SA WG2 Chairman's Draft Input to TSG SA#61 Prioritization |
SA WG2 Chairman |
- |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
7.2 |
S2-132378 |
DISCUSSION |
Work Planning Considerations |
SA WG2 Chairman |
- |
|
|
| Not Handled |
Not Handled |
Erik |
Y |
7.2 |
S2-132379 |
WORKPLAN |
Work Planning at SA WG2#98 |
SA WG2 Chairman |
- |
S2-133015 |
|
| Revised to S2-133015. |
Revised |
Erik |
Y |
7.2 |
S2-133015 |
WORKPLAN |
Work Planning at SA WG2#98 |
SA WG2 Chairman |
- |
| S2-132379 |
| Noted |
Noted |
Erik |
N |
7.2 |
S2-132609 |
DISCUSSION |
ProSe and GCSE. A Release 12 prioritization proposal |
Deutsche Telekom |
- |
|
|
| LATE DOC: WITHDRAWN |
Withdrawn |
- |
- |
7.3 |
- |
- |
Planning future meetings |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
7.3 |
S2-132380 |
DISCUSSION |
Additional SA WG2#101bis Meeting Proposal |
SA WG2 Chairman |
- |
|
|
| noted and endorsed |
Noted |
Erik |
Y |
7.3 |
S2-132712 |
P-CR |
PCRF determine different ULI reporting frequency using LCS procedure |
China Unicom |
FS_CNO |
|
|
| WITHDRAWN |
Withdrawn |
- |
- |
8 |
- |
- |
AOB |
- |
- |
- |
- |
- |
- |
- |
Erik |
Y |
8 |
S2-132673 |
DISCUSSION |
Consideration Expected for Off-line Work |
Samsung |
- |
|
|
| Not Handled |
Not Handled |
|
Created: 2013-07-31 10:32     END OF LIST
Last Allocated Document: S2-133088