Agenda with allocated Tdocs
Created: 2008-05-09 15:57 Last document: S2-083903
Agenda | Topic | Tdoc | Title | Source | Doc-type | Doc-for | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
Opening of the SA WG2 #64 meeting |
|||||||||||
2 |
Approval of the SA WG2 #64 agenda |
S2-083178 | Proposed meeting agenda for SA WG2#64b and SA WG2 meeting #65 | SA WG2 Chairman | AGENDA | Approval | Yes | Yes | Revised | No | S2-083848 | |
S2-083848 | Proposed meeting agenda for SA WG2#64b and SA WG2 meeting #65 | SA WG2 Chairman | AGENDA | Approval | Yes | Yes | Revised | No | S2-083877 | S2-083178 | ||
S2-083877 | Proposed meeting agenda for SA WG2#64b and SA WG2 meeting #65 | SA WG2 Chairman | AGENDA | Approval | Yes | No | No | S2-083848 | ||||
2.1 |
IPR Call Reminder |
|||||||||||
3 |
Meeting reports |
|||||||||||
4 |
Common (IMS and non-IMS) Incoming LSs |
|||||||||||
5 |
Release 5 and earlier |
|||||||||||
6 |
Release 6 |
|||||||||||
7 |
Release 7 |
|||||||||||
8 |
3GPP System Architecture Evolution (SAE) |
|||||||||||
8.1 |
High level functions (common high level functions for all accesses) |
|||||||||||
8.1.3 |
QoS general aspects (label, AMBR, QCI, etc.) |
|||||||||||
8.1.5 |
Network discovery and selection, terminal steering |
|||||||||||
8.1.7 |
PCC Updates to 23.203 (from both 23.401 and 23.402 functions) |
|||||||||||
8.1.8 |
Common aspects on 23.401 and 23.402 |
|||||||||||
8.2 |
Functions and procedures for SAE to support LTE access - common and GTP-specific aspects |
|||||||||||
8.2.1 |
Attach/Detach procedures |
|||||||||||
8.2.8 |
Idle state signalling optimization |
S2-083321 | ISR Alignments | Nokia Siemens Networks | DISCUSSION | Discussion | Yes | Yes | Noted | No | ||
S2-083425 | Remained open issues on ISR | ZTE | DISCUSSION | Approval | Yes | Yes | Noted. Some agreements reached. | No | ||||
S2-083504 | On stopping the paging in ISR context | Alcatel-Lucent | DISCUSSION | Approval | Yes | Yes | Noted | No | ||||
S2-083539 | Optionality of ISR support | Qualcomm Europe | DISCUSSION | Approval | Yes | Yes | Noted | No | ||||
S2-083322 | 23.401 CR0314: ISR Alignments for R7 interoperation procedures | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083880 | |||
S2-083880 | 23.401 CR0314R1: ISR Alignments for R7 interoperation procedures | Nokia Siemens Networks | CR | Approval | No | No | No | S2-083322 | ||||
S2-083361 | 23.401 CR0171R3: Periodic TA update description | Huawei | CR | Approval | Yes | No | No | |||||
S2-083362 | 23.401 CR0217R1: downlink signalling triggered service request procedure in ISR | Huawei | CR | Approval | Yes | No | No | |||||
S2-083363 | 23.401 CR0218R1: Bearer Management with ISR triggered by Subscription Data Changing | Huawei | CR | Approval | Yes | No | No | |||||
S2-083364 | 23.401 CR0213R1: Detach Handling due to 3GPP handover non-3GPP for ISR | Huawei | CR | Approval | Yes | No | No | |||||
S2-083365 | 23.401 CR0215R1: To maintain activated ISR after Handover | Huawei | CR | Approval | Yes | No | No | |||||
S2-083409 | 23.401 CR0327: Updating TAU of HOV procedures | Nokia Siemens Networks | CR | Approval | Yes | No | No | |||||
S2-083423 | 23.401 CR0331: ISR Activation | ZTE | CR | Approval | Yes | No | No | |||||
S2-083424 | 23.401 CR0332: Detach procedure with ISR activated | ZTE | CR | Approval | Yes | No | No | |||||
S2-083503 | 23.401 CR0346: On network triggered Service request with ISR | Alcatel-Lucent | CR | Approval | Yes | No | No | |||||
S2-083617 | 23.401 CR0356: Network Triggered Service Request with ISR function activated | CATT | CR | Approval | Yes | No | No | |||||
S2-083618 | 23.401 CR0357: PDN GW initiated bearer deactivation with ISR activated | CATT | CR | Approval | Yes | No | No | |||||
S2-083619 | 23.401 CR0244R1: Attach procedure after the ISR activation | CATT | CR | Approval | Yes | No | No | |||||
S2-083620 | 23.401 CR0171R4: Periodic TA update description | CATT | CR | Approval | Yes | No | No | |||||
S2-083621 | 23.401 CR0359: ISR Principles | CATT | CR | Approval | Yes | No | No | |||||
8.2.9 |
General clean-up of 23.401 |
|||||||||||
8.2.10 |
MME load balancing |
|||||||||||
8.3 |
Functions and procedures for SAE to support interoperation between LTE and legacy PS accesses (LTE <-> 2G/3G/CDMA2000) |
|||||||||||
8.3.3 |
Interworking with 2G/3G PS (Updates to 23.401) |
S2-083235 | Mapping between GUTI and P-TMSI | Ericsson | DISCUSSION | Approval | Yes | Yes | Noted | No | ||
S2-083323 | 23.401 CR0315: ISR Alignments for R8 RAU/TAU procedures | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083858 | |||
S2-083236 | 23.401 CR0304: Mapping between GUTI and P-TMSI | Ericsson | CR | Approval | Yes | Yes | Noted | No | ||||
S2-083858 | 23.401 CR0315R1: ISR Alignments for R8 RAU/TAU procedures | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083879 | S2-083323 | ||
S2-083879 | 23.401 CR0315R2: ISR Alignments for R8 RAU/TAU procedures | Nokia Siemens Networks | CR | Approval | No | No | No | S2-083858 | ||||
S2-083243 | 23.401 CR0308: Support of EPC bearer model on S3 and S4 interfaces | Alcatel-Lucent | CR | Approval | Yes | Yes | Revised | No | S2-083859 | |||
S2-083859 | 23.401 CR0308R1: Support of EPC bearer model on S3 and S4 interfaces | Alcatel-Lucent | CR | Approval | Yes | No | No | S2-083243 | ||||
S2-083244 | 23.401 CR0309: Interoperability between UEs and different PS domain network configurations | Alcatel-Lucent | CR | Approval | Yes | Yes | Revised | No | S2-083860 | |||
S2-083860 | 23.401 CR0309R1: Interoperability between UEs and different PS domain network configurations | Alcatel-Lucent | CR | Approval | Yes | No | No | S2-083244 | ||||
S2-083861 | 23.401 CR0383: Mapping between S-TMSI and P-TMSI | Ericsson | CR | Approval | No | No | No | |||||
S2-083329 | 23.401 CR0319: Updating pre-Rel8 SGSN to Gn/Gp SGSN | Nokia Siemens Networks | CR | Approval | Yes | No | No | |||||
S2-083229 | Avoidance of excessive idle state signalling during inter-RAT mobility | Ericsson | DISCUSSION | Approval | Yes | No | No | |||||
S2-083366 | 23.401 CR0321: Handling for the PDN connections having no default bearers in TAU | Huawei | CR | Approval | Yes | No | No | |||||
S2-083441 | 23.401 CR0337: Update of 23.401 Section 5.6.3 "Serving GW" to Support 2G/3G Connectivity to the EPS via S4 | Motorola | CR | Approval | Yes | No | No | |||||
S2-083230 | 23.401 CR0302: Avoidance of excessive idle state signalling during inter-RAT mobility | Ericsson | CR | Approval | Yes | No | No | |||||
S2-083231 | 23.060 CR0630: Addition of RAT history list to UE context in SGSN | Ericsson | CR | Approval | Yes | No | No | |||||
S2-083239 | 23.401 CR0305: Default bearer handling | Ericsson | CR | Approval | Yes | No | No | |||||
S2-083240 | 23.401 CR0306: IRAT Handover Reject | Ericsson | CR | Approval | Yes | No | No | |||||
S2-083241 | 23.401 CR0307: IRAT Handover Cancel | Ericsson | CR | Approval | Yes | No | No | |||||
S2-083242 | Intersystem change LTE/2G-3G | Ericsson | DISCUSSION | Approval | Yes | No | No | |||||
S2-083458 | AMBR on Iu/Gb Rel-8 | Ericsson | DISCUSSION | Approval | Yes | No | No | |||||
S2-083478 | 23.401 CR0342: P-GW Address and TEID in MME | Samsung | CR | Approval | Yes | No | No | |||||
S2-083543 | 23.401 CR0047R3: Network Assisted Cell Change from E-UTRAN to GERAN | Qualcomm Europe | CR | Approval | Yes | No | No | |||||
S2-083810 | 23.401 CR0288R1: PDP context handling between GERAN/UTRAN and E-UTRAN for idle mode mobility | Qualcomm Europe | CR | Approval | Yes | No | No | |||||
8.3.6 |
Updates to 23.060 |
S2-083330 | 23.060 CR0633: SAE update for clauses 1 to 5.3 | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083850 | |
S2-083850 | 23.060 CR0633R1: SAE update for clauses 1 to 5.3 | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083894 | S2-083330 | ||
S2-083894 | 23.060 CR0633R2: SAE update for clauses 1 to 5.3 | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083898 | S2-083850 | ||
S2-083898 | 23.060 CR0633R3: SAE update for clauses 1 to 5.3 | Nokia Siemens Networks | CR | Approval | No | Yes | Approved | No | S2-083894 | |||
S2-083718 | 23.060 CR0649: Updates to section 5.4 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083851 | |||
S2-083851 | 23.060 CR0649R1: Updates to section 5.4 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083896 | S2-083718 | ||
S2-083896 | 23.060 CR0649R2: Updates to section 5.4 for the EPC | Vodafone | CR | Approval | No | Yes | Approved | No | S2-083851 | |||
S2-083467 | 23.060 CR0639: Revised Functional Assignment Table | Samsung | CR | APPROVAL | Yes | Yes | Revised | No | S2-083852 | |||
S2-083852 | 23.060 CR0639R1: Revised Functional Assignment Table | Samsung | CR | APPROVAL | Yes | Yes | Approved | No | S2-083467 | |||
S2-083331 | 23.060 CR0634: SAE update for clause 5.6 | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083853 | |||
S2-083853 | 23.060 CR0634R1: SAE update for clause 5.6 | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083895 | S2-083331 | ||
S2-083895 | 23.060 CR0634R2: SAE update for clause 5.6 | Nokia Siemens Networks | CR | Approval | Yes | Yes | Approved | No | S2-083853 | |||
S2-083762 | 23.060 CR0659: Mobile IPv4 FA support in Rel-8 | Starent | CR | Approval | Yes | Yes | Revised | No | S2-083854 | |||
S2-083854 | 23.060 CR0659R1: Mobile IPv4 FA support in Rel-8 | Starent | CR | Approval | Yes | No | No | S2-083762 | ||||
S2-083719 | 23.060 CR0650: Updates to section 5.8 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083855 | |||
S2-083855 | 23.060 CR0650R1: Updates to section 5.8 for the EPC | Vodafone | CR | Approval | Yes | Yes | Approved | No | S2-083719 | |||
S2-083720 | 23.060 CR0651: Updates to section 5.9 for the EPC | Vodafone | CR | Approval | Yes | Yes | Noted | No | ||||
S2-083721 | 23.060 CR0652: Updates to section 6.1 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083856 | |||
S2-083856 | 23.060 CR0652R1: Updates to section 6.1 for the EPC | Vodafone | CR | Approval | No | No | No | S2-083721 | ||||
S2-083722 | 23.060 CR0653: Updates to section 6.2 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083857 | |||
S2-083857 | 23.060 CR0653R1: Updates to section 6.2 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083897 | S2-083722 | ||
S2-083897 | 23.060 CR0653R2: Updates to section 6.2 for the EPC | Vodafone | CR | Approval | No | Yes | Approved | No | S2-083857 | |||
S2-083723 | 23.060 CR0654: Updates to section 6.3 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083862 | |||
S2-083862 | 23.060 CR0654R1: Updates to section 6.3 for the EPC | Vodafone | CR | Approval | Yes | Yes | Approved | No | S2-083723 | |||
S2-083673 | 23.060 CR0645: Update of 23.060 for Attach sections 6.4 an 6.5 | Nortel | CR | Approval | Yes | Yes | Revised | No | S2-083863 | |||
S2-083863 | 23.060 CR0645R1: Update of 23.060 for Attach sections 6.4 an 6.5 | Nortel | CR | Approval | Yes | Yes | Revised | No | S2-083874 | S2-083673 | ||
S2-083874 | 23.060 CR0645R2: Update of 23.060 for Attach sections 6.4 an 6.5 | Nortel | CR | Approval | Yes | Yes | Revised | No | S2-083899 | S2-083863 | ||
S2-083899 | 23.060 CR0645R3: Update of 23.060 for Attach sections 6.4 an 6.5 | Nortel | CR | Approval | No | No | No | S2-083874 | ||||
S2-083674 | 23.060 CR0646: Update of 23.060 for Detach section 6.6 | Nortel | CR | Approval | Yes | Yes | Revised | No | S2-083864 | |||
S2-083864 | 23.060 CR0646R1: Update of 23.060 for Detach section 6.6 | Nortel | CR | Approval | Yes | Yes | Revised | No | S2-083900 | S2-083674 | ||
S2-083900 | 23.060 CR0646R2: Update of 23.060 for Detach section 6.6 | Nortel | CR | Approval | No | No | No | S2-083864 | ||||
S2-083724 | 23.060 CR0655: Updates to section 6.7 for the EPC | Vodafone | CR | Approval | Yes | Yes | Noted. Some parts included in S2-083856 | No | ||||
S2-083725 | 23.060 CR0656: Updates to section 6.8 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083865 | |||
S2-083865 | 23.060 CR0656R1: Updates to section 6.8 for the EPC | Vodafone | CR | Approval | Yes | Yes | Approved | No | S2-083725 | |||
S2-083375 | 23.060 CR0637: Update "6.9 Location Management Procedures" with S4 in SGSN | Huawei | CR | Approval | Yes | Yes | Revised | No | S2-083866 | |||
S2-083866 | 23.060 CR0637R1: Update "6.9 Location Management Procedures" with S4 in SGSN | Huawei | CR | Approval | No | No | No | S2-083375 | ||||
S2-083726 | 23.060 CR0657: Updates to section 6.14 for the EPC | Vodafone | CR | Approval | Yes | Yes | Revised | No | S2-083868 | |||
S2-083868 | 23.060 CR0657: Updates to section 6.14 for the EPC | Vodafone | CR | Approval | No | No | Revision of S2-083726. RETURN at S2#65 | No | S2-083726 | |||
S2-083759 | 23.060 CR0658: Update of Clause 6.12 Service Request Procedure (Iu mode) | Orange | CR | Approval | Yes | Yes | Revised | No | S2-083869 | |||
S2-083869 | 23.060 CR0658R1: Update of Clause 6.12 Service Request Procedure (Iu mode) | Orange | CR | Approval | No | Yes | Revised | No | S2-083901 | S2-083759 | ||
S2-083901 | 23.060 CR0658R2: Update of Clause 6.12 Service Request Procedure (Iu mode) | Orange | CR | Approval | No | No | No | S2-083869 | ||||
S2-083245 | 23.060 CR0631: Update of section 6.13 Intersystem Change | Alcatel-Lucent | CR | Approval | Yes | Yes | Revised | No | S2-083867 | |||
S2-083867 | 23.060 CR0631R1: Update of section 6.13 Intersystem Change | Alcatel-Lucent | CR | Approval | Yes | Yes | Revised | No | S2-083870 | S2-083245 | ||
S2-083870 | 23.060 CR0631R2: Update of section 6.13 Intersystem Change | Alcatel-Lucent | CR | Approval | Yes | No | Revision of S2-083867. RETURN at S2#65 | No | S2-083867 | |||
S2-083225 | 23.060 CR0627: Introduction of S4 in TS 23.060 clause 8 | Ericsson | CR | Approval | Yes | Yes | Revised | No | S2-083871 | |||
S2-083871 | 23.060 CR0627R1: Introduction of S4 in TS 23.060 clause 8 | Ericsson | CR | Approval | No | No | Revision of S2-083225. RETURN at S2#65 | No | S2-083225 | |||
S2-083226 | 23.060 CR0628: Introduction of S4 in TS 23.060 clause 9 | Ericsson | CR | Approval | Yes | Yes | Revised | No | S2-083873 | |||
S2-083872 | High Level PDP Context EPS Bearer mapping issues | Ericsson | DISCUSSION | Discussion | Yes | No | RETURN at S2#65 | No | ||||
S2-083468 | PMIP-based S5/S8 support for GPRS procedures | Samsung | DISCUSSION | APPROVAL | Yes | No | No | |||||
S2-083873 | 23.060 CR0628R1: Introduction of S4 in TS 23.060 clause 9 | Ericsson | CR | Approval | Yes | No | RETURN | No | S2-083226 | |||
S2-083544 | 23.060 CR0640: Update of clauses 9.3, 9.4, 9.5, 9.6 | Qualcomm Europe | CR | Approval | Yes | Yes | Revised | No | S2-083875 | |||
S2-083875 | 23.060 CR0640R1: Update of clauses 9.3, 9.4, 9.5, 9.6 | Qualcomm Europe | CR | Approval | No | No | No | S2-083544 | ||||
S2-083207 | 23.060 CR0624R2: PDP type Signalling during PDP Context Activation | Nokia, Nokia Siemens Networks | CR | Approval | Yes | Yes | Noted | No | ||||
S2-083876 | 23.060 CR0661: Removal of IP address allocation options | Nokia, Nokia Siemens Networks | CR | Approval | Yes | No | No | |||||
S2-083797 | 23.060 CR0660: Update to Clause 12 | NTT DoCoMo | CR | APPROVAL | Yes | Yes | Revised | No | S2-083881 | |||
S2-083881 | 23.060 CR0660R1: Update to Clause 12 | NTT DoCoMo | CR | APPROVAL | Yes | No | No | S2-083797 | ||||
S2-083440 | 23.060 CR0638: Update of 23.060 Section 13 "Information Storage" to Support 2G/3G Connectivity to the EPS via S4 | Motorola | CR | Approval | Yes | Yes | Revised | No | S2-083882 | |||
S2-083882 | 23.060 CR0638R1: Update of 23.060 Section 13 "Information Storage" to Support 2G/3G Connectivity to the EPS via S4 | Motorola | CR | Approval | No | No | No | S2-083440 | ||||
S2-083374 | 23.060 CR0636: Recovery and Restoration Procedures | Huawei | CR | Approval | Yes | Yes | Revised | No | S2-083883 | |||
S2-083883 | 23.060 CR0636R1: Recovery and Restoration Procedures | Huawei | CR | Approval | No | No | No | S2-083374 | ||||
S2-083227 | 23.060 CR0629: Introduction of S4 in TS 23.060 clause 14 | Ericsson | CR | Approval | Yes | Yes | Revised | No | S2-083884 | |||
S2-083884 | 23.060 CR0629R1: Introduction of S4 in TS 23.060 clause 14 | Ericsson | CR | Approval | Yes | Yes | Approved | No | S2-083227 | |||
S2-083332 | 23.060 CR0635: SAE update for clause 15 | Nokia Siemens Networks | CR | Approval | Yes | Yes | Revised | No | S2-083885 | |||
S2-083885 | 23.060 CR0635R1: SAE update for clause 15 | Nokia Siemens Networks | CR | Approval | Yes | No | No | S2-083332 | ||||
S2-083545 | 23.060 CR0641: Update of clause 16 | Qualcomm Europe | CR | Approval | Yes | Yes | Revised | No | S2-083886 | |||
S2-083886 | 23.060 CR0641R1: Update of clause 16 | Qualcomm Europe | CR | Approval | No | No | No | S2-083545 | ||||
S2-083546 | 23.060 CR0642: Update of Annex A | Qualcomm Europe | CR | Approval | Yes | Yes | Revised | No | S2-083887 | |||
S2-083887 | 23.060 CR0642R1: Update of Annex A | Qualcomm Europe | CR | Approval | No | No | No | S2-083546 | ||||
S2-083675 | Rel-8 SGSN interface with HSS | Nortel | DISCUSSION | Discussion | Yes | Yes | Noted | No | ||||
S2-083568 | 23.060 CR0643: Clarify the different meanings for the use of "MT" | Motorola | CR | Approval | Yes | Yes | Revised | No | S2-083888 | |||
S2-083888 | 23.060 CR0643R1: Clarify the different meanings for the use of "MT" | Motorola | CR | Approval | No | Yes | Approved | No | S2-083568 | |||
S2-083685 | 23.060 CR0648: Handling PDP-Context preservation in Rel-8 SGSN | Motorola | CR | Approval | Yes | Yes | Merged into S2-083873 and S2-083881. Noted | No | ||||
S2-083246 | Rules for the transfer of PDP contexts and EPS Bearer contexts | Alcatel-Lucent | DISCUSSION | Approval | Yes | Yes | Noted | No | ||||
S2-083247 | 23.060 CR0632: Rules for the transfer of PDP contexts and EPS Bearer contexts | Alcatel-Lucent | CR | Approval | Yes | Yes | Noted. Included in S2-083856 | No | ||||
S2-083596 | 23.060 CR0644: RA List support in GPRS | China Mobile | CR | Approval | No | No | No | |||||
S2-083676 | Reserved for Nortel (Laurence) | Nortel | No | No | No | |||||||
8.4 |
Functions and procedures for SAE to support LTE access with PMIP-based core, and non-3GPP accesses |
|||||||||||
8.4.7 |
General clean-up of 23.402 |
|||||||||||
8.7 |
Single Radio Voice Call Continuity (SR-VCC) |
|||||||||||
8.7.1 |
SR-VCC for GSM and UMTS |
|||||||||||
8.7.2 |
SR-VCC for CDMA2000 1xRTT |
|||||||||||
8.11 |
CS fallback |
|||||||||||
9 |
IMS SWG - See S2-083180 for details |
|||||||||||
9.1 |
Opening of the SWG |
|||||||||||
9.2 |
Approval of the agenda |
|||||||||||
9.3 |
Tdoc allocation and Incoming LSs |
|||||||||||
9.4 |
Release 7 |
|||||||||||
9.5 |
Release 8 Work Items |
|||||||||||
9.5.1 |
IMS System enhancements for corporate network access |
|||||||||||
9.5.2 |
Documentation of TISPAN NGN R1 and R2 |
|||||||||||
9.5.3 |
Stage 2 aspects of Service-Level Inter-working for Messaging Services |
|||||||||||
9.5.4 |
IMS Service Continuity |
|||||||||||
9.5.4.1 |
Scope, Definitions, Requirements, Assumptions, Principles, etc. |
|||||||||||
9.5.4.2 |
Information flows |
|||||||||||
9.5.5 |
IMS Centralized Services |
|||||||||||
9.5.5.1 |
Open issues |
|||||||||||
9.5.5.2 |
Scope, Definitions, Requirements, Assumptions, Principles, etc. |
|||||||||||
9.5.5.3 |
Architecture, functional description (MSC-centric solution) |
|||||||||||
9.5.5.4 |
Architecture, functional description (UE-centric solution) |
|||||||||||
9.5.5.5 |
Information flows (MSC-centric solution) |
|||||||||||
9.5.5.6 |
Information flows (UE-centric solution) |
|||||||||||
9.5.5.7 |
General, Other |
|||||||||||
9.5.6 |
Other Rel-8 Work Items |
|||||||||||
9.6 |
Study Items |
|||||||||||
9.6.4 |
Study on Customized Alerting Tones |
|||||||||||
9.7 |
Any Other Business |
|||||||||||
9.7.1 |
Reports |
|||||||||||
9.99 |
Reserved for IMS SWG Revisions |
|||||||||||
10 |
Non-IMS and non-SAE |
|||||||||||
10.1 |
I-WLAN mobility |
|||||||||||
10.4 |
RED (Registration in Densely populated area) |
|||||||||||
10.5 |
ETWS (Earthquake and Tsunami Warning System) |
|||||||||||
11 |
Project Planning and Management |
|||||||||||
11.1 |
New and revised Work Items |
|||||||||||
11.2 |
Review of the Work Plan |
|||||||||||
12 |
AOB |
|||||||||||
12.1 |
Review of Future Meetings |
|||||||||||
13 |
Close of the Meeting |
|||||||||||
99 |
WITHDRAWN ITEMS |
Created: 2008-05-09 15:57 Last document: S2-083903