Agenda with allocated Tdocs

Created: 2008-05-09 15:57     Last document: S2-083903

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
Opening of the SA WG2 #64 meeting
2
Approval of the SA WG2 #64 agenda
S2-083178 Proposed meeting agenda for SA WG2#64b and SA WG2 meeting #65 SA WG2 Chairman AGENDA Approval Yes Yes Revised No S2-083848
    S2-083848 Proposed meeting agenda for SA WG2#64b and SA WG2 meeting #65 SA WG2 Chairman AGENDA Approval Yes Yes Revised No S2-083877 S2-083178
    S2-083877 Proposed meeting agenda for SA WG2#64b and SA WG2 meeting #65 SA WG2 Chairman AGENDA Approval Yes No No S2-083848
2.1
IPR Call Reminder
3
Meeting reports
4
Common (IMS and non-IMS) Incoming LSs
5
Release 5 and earlier
6
Release 6
7
Release 7
8
3GPP System Architecture Evolution (SAE)
8.1
High level functions (common high level functions for all accesses)
8.1.3
QoS general aspects (label, AMBR, QCI, etc.)
8.1.5
Network discovery and selection, terminal steering
8.1.7
PCC Updates to 23.203 (from both 23.401 and 23.402 functions)
8.1.8
Common aspects on 23.401 and 23.402
8.2
Functions and procedures for SAE to support LTE access - common and GTP-specific aspects
8.2.1
Attach/Detach procedures
8.2.8
Idle state signalling optimization
S2-083321 ISR Alignments Nokia Siemens Networks DISCUSSION Discussion Yes Yes Noted No
    S2-083425 Remained open issues on ISR ZTE DISCUSSION Approval Yes Yes Noted. Some agreements reached. No
    S2-083504 On stopping the paging in ISR context Alcatel-Lucent DISCUSSION Approval Yes Yes Noted No
    S2-083539 Optionality of ISR support Qualcomm Europe DISCUSSION Approval Yes Yes Noted No
    S2-083322 23.401 CR0314: ISR Alignments for R7 interoperation procedures Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083880
    S2-083880 23.401 CR0314R1: ISR Alignments for R7 interoperation procedures Nokia Siemens Networks CR Approval No No No S2-083322
    S2-083361 23.401 CR0171R3: Periodic TA update description Huawei CR Approval Yes No No
    S2-083362 23.401 CR0217R1: downlink signalling triggered service request procedure in ISR Huawei CR Approval Yes No No
    S2-083363 23.401 CR0218R1: Bearer Management with ISR triggered by Subscription Data Changing Huawei CR Approval Yes No No
    S2-083364 23.401 CR0213R1: Detach Handling due to 3GPP handover non-3GPP for ISR Huawei CR Approval Yes No No
    S2-083365 23.401 CR0215R1: To maintain activated ISR after Handover Huawei CR Approval Yes No No
    S2-083409 23.401 CR0327: Updating TAU of HOV procedures Nokia Siemens Networks CR Approval Yes No No
    S2-083423 23.401 CR0331: ISR Activation ZTE CR Approval Yes No No
    S2-083424 23.401 CR0332: Detach procedure with ISR activated ZTE CR Approval Yes No No
    S2-083503 23.401 CR0346: On network triggered Service request with ISR Alcatel-Lucent CR Approval Yes No No
    S2-083617 23.401 CR0356: Network Triggered Service Request with ISR function activated CATT CR Approval Yes No No
    S2-083618 23.401 CR0357: PDN GW initiated bearer deactivation with ISR activated CATT CR Approval Yes No No
    S2-083619 23.401 CR0244R1: Attach procedure after the ISR activation CATT CR Approval Yes No No
    S2-083620 23.401 CR0171R4: Periodic TA update description CATT CR Approval Yes No No
    S2-083621 23.401 CR0359: ISR Principles CATT CR Approval Yes No No
8.2.9
General clean-up of 23.401
8.2.10
MME load balancing
8.3
Functions and procedures for SAE to support interoperation between LTE and legacy PS accesses (LTE <-> 2G/3G/CDMA2000)
8.3.3
Interworking with 2G/3G PS (Updates to 23.401)
S2-083235 Mapping between GUTI and P-TMSI Ericsson DISCUSSION Approval Yes Yes Noted No
    S2-083323 23.401 CR0315: ISR Alignments for R8 RAU/TAU procedures Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083858
    S2-083236 23.401 CR0304: Mapping between GUTI and P-TMSI Ericsson CR Approval Yes Yes Noted No
    S2-083858 23.401 CR0315R1: ISR Alignments for R8 RAU/TAU procedures Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083879 S2-083323
    S2-083879 23.401 CR0315R2: ISR Alignments for R8 RAU/TAU procedures Nokia Siemens Networks CR Approval No No No S2-083858
    S2-083243 23.401 CR0308: Support of EPC bearer model on S3 and S4 interfaces Alcatel-Lucent CR Approval Yes Yes Revised No S2-083859
    S2-083859 23.401 CR0308R1: Support of EPC bearer model on S3 and S4 interfaces Alcatel-Lucent CR Approval Yes No No S2-083243
    S2-083244 23.401 CR0309: Interoperability between UEs and different PS domain network configurations Alcatel-Lucent CR Approval Yes Yes Revised No S2-083860
    S2-083860 23.401 CR0309R1: Interoperability between UEs and different PS domain network configurations Alcatel-Lucent CR Approval Yes No No S2-083244
    S2-083861 23.401 CR0383: Mapping between S-TMSI and P-TMSI Ericsson CR Approval No No No
    S2-083329 23.401 CR0319: Updating pre-Rel8 SGSN to Gn/Gp SGSN Nokia Siemens Networks CR Approval Yes No No
    S2-083229 Avoidance of excessive idle state signalling during inter-RAT mobility Ericsson DISCUSSION Approval Yes No No
    S2-083366 23.401 CR0321: Handling for the PDN connections having no default bearers in TAU Huawei CR Approval Yes No No
    S2-083441 23.401 CR0337: Update of 23.401 Section 5.6.3 "Serving GW" to Support 2G/3G Connectivity to the EPS via S4 Motorola CR Approval Yes No No
    S2-083230 23.401 CR0302: Avoidance of excessive idle state signalling during inter-RAT mobility Ericsson CR Approval Yes No No
    S2-083231 23.060 CR0630: Addition of RAT history list to UE context in SGSN Ericsson CR Approval Yes No No
    S2-083239 23.401 CR0305: Default bearer handling Ericsson CR Approval Yes No No
    S2-083240 23.401 CR0306: IRAT Handover Reject Ericsson CR Approval Yes No No
    S2-083241 23.401 CR0307: IRAT Handover Cancel Ericsson CR Approval Yes No No
    S2-083242 Intersystem change LTE/2G-3G Ericsson DISCUSSION Approval Yes No No
    S2-083458 AMBR on Iu/Gb Rel-8 Ericsson DISCUSSION Approval Yes No No
    S2-083478 23.401 CR0342: P-GW Address and TEID in MME Samsung CR Approval Yes No No
    S2-083543 23.401 CR0047R3: Network Assisted Cell Change from E-UTRAN to GERAN Qualcomm Europe CR Approval Yes No No
    S2-083810 23.401 CR0288R1: PDP context handling between GERAN/UTRAN and E-UTRAN for idle mode mobility Qualcomm Europe CR Approval Yes No No
8.3.6
Updates to 23.060
S2-083330 23.060 CR0633: SAE update for clauses 1 to 5.3 Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083850
    S2-083850 23.060 CR0633R1: SAE update for clauses 1 to 5.3 Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083894 S2-083330
    S2-083894 23.060 CR0633R2: SAE update for clauses 1 to 5.3 Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083898 S2-083850
    S2-083898 23.060 CR0633R3: SAE update for clauses 1 to 5.3 Nokia Siemens Networks CR Approval No Yes Approved No S2-083894
    S2-083718 23.060 CR0649: Updates to section 5.4 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083851
    S2-083851 23.060 CR0649R1: Updates to section 5.4 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083896 S2-083718
    S2-083896 23.060 CR0649R2: Updates to section 5.4 for the EPC Vodafone CR Approval No Yes Approved No S2-083851
    S2-083467 23.060 CR0639: Revised Functional Assignment Table Samsung CR APPROVAL Yes Yes Revised No S2-083852
    S2-083852 23.060 CR0639R1: Revised Functional Assignment Table Samsung CR APPROVAL Yes Yes Approved No S2-083467
    S2-083331 23.060 CR0634: SAE update for clause 5.6 Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083853
    S2-083853 23.060 CR0634R1: SAE update for clause 5.6 Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083895 S2-083331
    S2-083895 23.060 CR0634R2: SAE update for clause 5.6 Nokia Siemens Networks CR Approval Yes Yes Approved No S2-083853
    S2-083762 23.060 CR0659: Mobile IPv4 FA support in Rel-8 Starent CR Approval Yes Yes Revised No S2-083854
    S2-083854 23.060 CR0659R1: Mobile IPv4 FA support in Rel-8 Starent CR Approval Yes No No S2-083762
    S2-083719 23.060 CR0650: Updates to section 5.8 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083855
    S2-083855 23.060 CR0650R1: Updates to section 5.8 for the EPC Vodafone CR Approval Yes Yes Approved No S2-083719
    S2-083720 23.060 CR0651: Updates to section 5.9 for the EPC Vodafone CR Approval Yes Yes Noted No
    S2-083721 23.060 CR0652: Updates to section 6.1 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083856
    S2-083856 23.060 CR0652R1: Updates to section 6.1 for the EPC Vodafone CR Approval No No No S2-083721
    S2-083722 23.060 CR0653: Updates to section 6.2 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083857
    S2-083857 23.060 CR0653R1: Updates to section 6.2 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083897 S2-083722
    S2-083897 23.060 CR0653R2: Updates to section 6.2 for the EPC Vodafone CR Approval No Yes Approved No S2-083857
    S2-083723 23.060 CR0654: Updates to section 6.3 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083862
    S2-083862 23.060 CR0654R1: Updates to section 6.3 for the EPC Vodafone CR Approval Yes Yes Approved No S2-083723
    S2-083673 23.060 CR0645: Update of 23.060 for Attach sections 6.4 an 6.5 Nortel CR Approval Yes Yes Revised No S2-083863
    S2-083863 23.060 CR0645R1: Update of 23.060 for Attach sections 6.4 an 6.5 Nortel CR Approval Yes Yes Revised No S2-083874 S2-083673
    S2-083874 23.060 CR0645R2: Update of 23.060 for Attach sections 6.4 an 6.5 Nortel CR Approval Yes Yes Revised No S2-083899 S2-083863
    S2-083899 23.060 CR0645R3: Update of 23.060 for Attach sections 6.4 an 6.5 Nortel CR Approval No No No S2-083874
    S2-083674 23.060 CR0646: Update of 23.060 for Detach section 6.6 Nortel CR Approval Yes Yes Revised No S2-083864
    S2-083864 23.060 CR0646R1: Update of 23.060 for Detach section 6.6 Nortel CR Approval Yes Yes Revised No S2-083900 S2-083674
    S2-083900 23.060 CR0646R2: Update of 23.060 for Detach section 6.6 Nortel CR Approval No No No S2-083864
    S2-083724 23.060 CR0655: Updates to section 6.7 for the EPC Vodafone CR Approval Yes Yes Noted. Some parts included in S2-083856 No
    S2-083725 23.060 CR0656: Updates to section 6.8 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083865
    S2-083865 23.060 CR0656R1: Updates to section 6.8 for the EPC Vodafone CR Approval Yes Yes Approved No S2-083725
    S2-083375 23.060 CR0637: Update "6.9 Location Management Procedures" with S4 in SGSN Huawei CR Approval Yes Yes Revised No S2-083866
    S2-083866 23.060 CR0637R1: Update "6.9 Location Management Procedures" with S4 in SGSN Huawei CR Approval No No No S2-083375
    S2-083726 23.060 CR0657: Updates to section 6.14 for the EPC Vodafone CR Approval Yes Yes Revised No S2-083868
    S2-083868 23.060 CR0657: Updates to section 6.14 for the EPC Vodafone CR Approval No No Revision of S2-083726. RETURN at S2#65 No S2-083726
    S2-083759 23.060 CR0658: Update of Clause 6.12 Service Request Procedure (Iu mode) Orange CR Approval Yes Yes Revised No S2-083869
    S2-083869 23.060 CR0658R1: Update of Clause 6.12 Service Request Procedure (Iu mode) Orange CR Approval No Yes Revised No S2-083901 S2-083759
    S2-083901 23.060 CR0658R2: Update of Clause 6.12 Service Request Procedure (Iu mode) Orange CR Approval No No No S2-083869
    S2-083245 23.060 CR0631: Update of section 6.13 Intersystem Change Alcatel-Lucent CR Approval Yes Yes Revised No S2-083867
    S2-083867 23.060 CR0631R1: Update of section 6.13 Intersystem Change Alcatel-Lucent CR Approval Yes Yes Revised No S2-083870 S2-083245
    S2-083870 23.060 CR0631R2: Update of section 6.13 Intersystem Change Alcatel-Lucent CR Approval Yes No Revision of S2-083867. RETURN at S2#65 No S2-083867
    S2-083225 23.060 CR0627: Introduction of S4 in TS 23.060 clause 8 Ericsson CR Approval Yes Yes Revised No S2-083871
    S2-083871 23.060 CR0627R1: Introduction of S4 in TS 23.060 clause 8 Ericsson CR Approval No No Revision of S2-083225. RETURN at S2#65 No S2-083225
    S2-083226 23.060 CR0628: Introduction of S4 in TS 23.060 clause 9 Ericsson CR Approval Yes Yes Revised No S2-083873
    S2-083872 High Level PDP Context EPS Bearer mapping issues Ericsson DISCUSSION Discussion Yes No RETURN at S2#65 No
    S2-083468 PMIP-based S5/S8 support for GPRS procedures Samsung DISCUSSION APPROVAL Yes No No
    S2-083873 23.060 CR0628R1: Introduction of S4 in TS 23.060 clause 9 Ericsson CR Approval Yes No RETURN No S2-083226
    S2-083544 23.060 CR0640: Update of clauses 9.3, 9.4, 9.5, 9.6 Qualcomm Europe CR Approval Yes Yes Revised No S2-083875
    S2-083875 23.060 CR0640R1: Update of clauses 9.3, 9.4, 9.5, 9.6 Qualcomm Europe CR Approval No No No S2-083544
    S2-083207 23.060 CR0624R2: PDP type Signalling during PDP Context Activation Nokia, Nokia Siemens Networks CR Approval Yes Yes Noted No
    S2-083876 23.060 CR0661: Removal of IP address allocation options Nokia, Nokia Siemens Networks CR Approval Yes No No
    S2-083797 23.060 CR0660: Update to Clause 12 NTT DoCoMo CR APPROVAL Yes Yes Revised No S2-083881
    S2-083881 23.060 CR0660R1: Update to Clause 12 NTT DoCoMo CR APPROVAL Yes No No S2-083797
    S2-083440 23.060 CR0638: Update of 23.060 Section 13 "Information Storage" to Support 2G/3G Connectivity to the EPS via S4 Motorola CR Approval Yes Yes Revised No S2-083882
    S2-083882 23.060 CR0638R1: Update of 23.060 Section 13 "Information Storage" to Support 2G/3G Connectivity to the EPS via S4 Motorola CR Approval No No No S2-083440
    S2-083374 23.060 CR0636: Recovery and Restoration Procedures Huawei CR Approval Yes Yes Revised No S2-083883
    S2-083883 23.060 CR0636R1: Recovery and Restoration Procedures Huawei CR Approval No No No S2-083374
    S2-083227 23.060 CR0629: Introduction of S4 in TS 23.060 clause 14 Ericsson CR Approval Yes Yes Revised No S2-083884
    S2-083884 23.060 CR0629R1: Introduction of S4 in TS 23.060 clause 14 Ericsson CR Approval Yes Yes Approved No S2-083227
    S2-083332 23.060 CR0635: SAE update for clause 15 Nokia Siemens Networks CR Approval Yes Yes Revised No S2-083885
    S2-083885 23.060 CR0635R1: SAE update for clause 15 Nokia Siemens Networks CR Approval Yes No No S2-083332
    S2-083545 23.060 CR0641: Update of clause 16 Qualcomm Europe CR Approval Yes Yes Revised No S2-083886
    S2-083886 23.060 CR0641R1: Update of clause 16 Qualcomm Europe CR Approval No No No S2-083545
    S2-083546 23.060 CR0642: Update of Annex A Qualcomm Europe CR Approval Yes Yes Revised No S2-083887
    S2-083887 23.060 CR0642R1: Update of Annex A Qualcomm Europe CR Approval No No No S2-083546
    S2-083675 Rel-8 SGSN interface with HSS Nortel DISCUSSION Discussion Yes Yes Noted No
    S2-083568 23.060 CR0643: Clarify the different meanings for the use of "MT" Motorola CR Approval Yes Yes Revised No S2-083888
    S2-083888 23.060 CR0643R1: Clarify the different meanings for the use of "MT" Motorola CR Approval No Yes Approved No S2-083568
    S2-083685 23.060 CR0648: Handling PDP-Context preservation in Rel-8 SGSN Motorola CR Approval Yes Yes Merged into S2-083873 and S2-083881. Noted No
    S2-083246 Rules for the transfer of PDP contexts and EPS Bearer contexts Alcatel-Lucent DISCUSSION Approval Yes Yes Noted No
    S2-083247 23.060 CR0632: Rules for the transfer of PDP contexts and EPS Bearer contexts Alcatel-Lucent CR Approval Yes Yes Noted. Included in S2-083856 No
    S2-083596 23.060 CR0644: RA List support in GPRS China Mobile CR Approval No No No
    S2-083676 Reserved for Nortel (Laurence) Nortel No No No
8.4
Functions and procedures for SAE to support LTE access with PMIP-based core, and non-3GPP accesses
8.4.7
General clean-up of 23.402
8.7
Single Radio Voice Call Continuity (SR-VCC)
8.7.1
SR-VCC for GSM and UMTS
8.7.2
SR-VCC for CDMA2000 1xRTT
8.11
CS fallback
9
IMS SWG - See S2-083180 for details
9.1
Opening of the SWG
9.2
Approval of the agenda
9.3
Tdoc allocation and Incoming LSs
9.4
Release 7
9.5
Release 8 Work Items
9.5.1
IMS System enhancements for corporate network access
9.5.2
Documentation of TISPAN NGN R1 and R2
9.5.3
Stage 2 aspects of Service-Level Inter-working for Messaging Services
9.5.4
IMS Service Continuity
9.5.4.1
Scope, Definitions, Requirements, Assumptions, Principles, etc.
9.5.4.2
Information flows
9.5.5
IMS Centralized Services
9.5.5.1
Open issues
9.5.5.2
Scope, Definitions, Requirements, Assumptions, Principles, etc.
9.5.5.3
Architecture, functional description (MSC-centric solution)
9.5.5.4
Architecture, functional description (UE-centric solution)
9.5.5.5
Information flows (MSC-centric solution)
9.5.5.6
Information flows (UE-centric solution)
9.5.5.7
General, Other
9.5.6
Other Rel-8 Work Items
9.6
Study Items
9.6.4
Study on Customized Alerting Tones
9.7
Any Other Business
9.7.1
Reports
9.99
Reserved for IMS SWG Revisions
10
Non-IMS and non-SAE
10.1
I-WLAN mobility
10.4
RED (Registration in Densely populated area)
10.5
ETWS (Earthquake and Tsunami Warning System)
11
Project Planning and Management
11.1
New and revised Work Items
11.2
Review of the Work Plan
12
AOB
12.1
Review of Future Meetings
13
Close of the Meeting
99
WITHDRAWN ITEMS

Created: 2008-05-09 15:57     Last document: S2-083903