AGENDA S2-131
0 All Agenda Items S2-131
1 Opening of the meeting Frank
2 Approval of the agenda Frank
2.1 IPR Call and Antitrust Reminder Frank
3 Meeting reports Frank
4 General Frank
4.1 Common issues and Incoming LSs Frank
5 Pre-Rel-15 Essential Corrections Frank
5.1 3GPP Packet Access Maintenance Puneet
5.2 QoS and PCC Maintenance Frank
5.3 Non-3GPP Access Maintenance Krisztian
5.4 IMS and IMS-Related Maintenance Krisztian
6 Release 15 and future releases Frank
6.1 Rel-15 3GPP Packet Acc. Maint. - essential corrections - excl. R15 5GS Puneet
6.2 Rel-15 PCC/QoS Maintenance- essential corrections - excl. R15 5GS Frank
6.3 Rel-15 Non-3GPP Access Maint. - essential corrections - excl. R15 5GS Krisztian
6.4 Rel-15 IMS-Related Maintenance- essential corrections - excl. R15 5GS Krisztian
6.5 Rel-15 maintenance - 5G System Architecture Frank
6.5.1 General aspects, concepts and reference models Frank
6.5.2 Common Access Control, RM and CM functions and procedure flows Frank
6.5.3 Session management and continuity functions and flows Krisztian
6.5.4 Security related functions and flows Frank
6.5.5 QoS concept and functionality Frank
6.5.6 Policy and charging control Frank
6.5.7 3GPP access specific functionality and flows Frank
6.5.8 Specific services support Puneet
6.5.9 Interworking and Migration Irfan
6.5.10 Non-3GPP access specific functionality and flows Krisztian
6.5.11 Framework functions Frank
6.6 Architecture enhancements for 3GPP support of advanced V2X services (eV2XARC) LaeYoung
6.7 Wireless and Wireline Convergence for the 5G system architecture (5WWC) Krisztian
6.8 Access Traffic Steering, Switch and Splitting support in the 5G system architecture (ATSSS) Krisztian
6.9 Cellular IoT support and evolution for the 5G System (CIoT_5G) Puneet
6.10 Study on encrypted traffic detection and verification (FS_ENTRADE) Not_on_agenda
6.11 Enablers for Network Automation for 5G (eNA) Puneet
6.12 Enhancing Topology of SMF and UPF in 5G Networks (ETSUN) Krisztian
6.13 Enhancement to the 5GC Location Services (eLCS) Krisztian
6.14 Study on Enhanced IMS to 5GC Integration (FS_eIMS5G) Not_on_agenda
6.15 5GS Enhanced support of Vertical and LAN Services (Vert_LAN) Frank
6.15.1 5GS Enhanced support of Vertical and LAN Services - 5G-LAN aspects Frank
6.15.2 5GS Enhanced support of Vertical and LAN Services - TSN aspects Frank
6.15.3 5GS Enhanced support of Vertical and LAN Services - type a/b aspects Frank
6.16 Study on System enhancements for Provision of Access to Restricted Local Operator Services by Unauthenticated UEs (PARLOS_SA2) Puneet
6.17 Study on EPC support for Mobility with Low Latency Communication (FS_LLC_Mob) Not_on_agenda
6.18 Study on enhancement of systems using EPS for Ultra Reliability and Availability using commodity equipment (FS_EPS_URACE) Not_on_agenda
6.19 Enhancements to the Service-Based 5G System Architecture (eSBA) Frank
6.20 Enhancement of URLLC supporting in 5GC (5G_URLLC) Frank
6.21 Enhancement of Network Slicing (eNS) Frank
6.22 Study on Application Awareness Interworking between LTE and NR (FS_AAI_LTE_NR) Not_on_agenda
6.23 Single radio voice continuity from 5GS to 3G (5G_SRVCC) Puneet
6.24 Study on architecture aspects for using satellite access in 5G (FS_5GSAT_ARCH) Puneet
6.25 Study on supporting Flexible Local Area Data Network Not_on_agenda
6.26 Study on system architecture for next generation real time communication services Not_on_agenda
6.27 5GS Transfer of Policies for Background Data Transfer Not_on_agenda
6.28 Study on optimisations on UE radio capability signalling (FS_RACS) Puneet
6.29 Study on User Data Interworking and Coexistence (FS_UDICoM) Krisztian
6.31 TEI16 Category B/C - Enhancements and Improvements only. 3GPP Packet Access Frank
6.32 TEI16 Category B/C - Enhancements and Improvements only. PCC/QoS Not_on_agenda
6.33 TEI16 Category B/C - Enhancements and Improvements only. Non-3GPP Access Not_on_agenda
6.34 TEI16 Category B/C - Enhancements and Improvements only. IMS, IMS-Related, Emergency, Other Not_on_agenda
7 Project Planning and Management Frank
7.1 New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals Frank
7.2 Review of the Work Plan Frank
7.3 Planning future meetings Frank
8 AOB Frank
9 Close of the Meeting Frank
99 Withdrawn and reserved documents Withdrawn