IPR call reminder:
“I draw
your attention to your obligations under the 3GPP Partner Organizations’ IPR
policies. Every Individual Member organization is obliged to declare to the
Partner Organization or Organizations of which it is a member any IPR owned
by the Individual Member or any other organization which is or is likely to
become essential to the work of 3GPP. Delegates
are asked to take note that they are thereby invited:
|
Antitrust policy Reminder:
“I also
draw your attention to the fact that 3GPP activities are subject to all
applicable antitrust and competition laws and that compliance with said laws
is therefore required of any participant of this TSG/WG meeting including the
Chairman and Vice Chairman. In case of question I recommend that you contact
your legal counsel. The
leadership shall conduct the present meeting with impartiality and in the
interests of 3GPP. Furthermore,
I would like to remind you that timely submission of work items in advance of
TSG/WG meetings is important to allow for full and fair consideration of such
matters.” |
List for Meeting: S2-128 All Sessions
Temporary Documents List - Ordered by Agenda Item
To use hyperlinks, this file must be placed above Folder 'Docs'
CURRENT STATS - OPEN DOCS: Total: 1     CRs: 0     P-CRs: 1     Other: 0
Created: 2018-07-13 14:38     START OF LIST
AI | TD# | Type | Doc For | Title | Source | Rel | Work Item | Comments | Result |
---|---|---|---|---|---|---|---|---|---|
1 | - | - | - | Opening of the meeting | - | - | {Frank} | - | - |
2 | - | - | - | Approval of the agenda | - | - | {Frank} | - | - |
2 | S2-186305 | AGENDA | Approval | Draft Agenda for SA WG2#128 | SA WG2 Chairman | Approved | Approved | ||
2.1 | - | - | - | IPR Call and Antitrust Reminder | - | - | {Frank} | - | - |
- | - | - | - | IPR Call | - | - | - | - | - |
- | - | - | - | Antitrust Reminder | - | - | - | - | - |
3 | - | - | - | Meeting reports | - | - | {Frank} | - | - |
3 | S2-186306 | REPORT | Approval | Draft Report of SA WG2 meeting #127BIS | SA WG2 Secretary | Revised to S2-187293. | Revised | ||
3 | S2-187293 | REPORT | Approval | Draft Report of SA WG2 meeting #127BIS | SA WG2 Secretary | Revision of S2-186306. Approved | Approved | ||
4 | - | - | - | General | - | - | {Frank} | - | - |
4.1 | - | - | - | Common issues and Incoming LSs | - | - | {Frank} | - | - |
4.1 | S2-186368 | LS IN | Information | LS from ETSI NTECH: Information about publication of ETSI TS 103 195-2 v1.1.1 'An Architectural Reference Model for Autonomic Networking, Cognitive Networking and Self-Management' | ETSI NTECH (NTECH(18)000006) | Noted | Noted | ||
5 | - | - | - | Pre-Rel-15 Essential Corrections | - | - | {Frank} | - | - |
5.1 | - | - | - | 3GPP Packet Access Maintenance | - | - | {Puneet} | - | - |
- | - | - | - | CUPS | - | - | - | - | - |
5.1 | S2-186552 | CR | Approval | 23.214 CR0067: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-14 | CUPS | Revised in parallel session to S2-187144. Change work item code to CUPS | Revised |
5.1 | S2-187144 | CR | Approval | 23.214 CR0067R1: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-186552. Revised to S2-187591. | Revised |
5.1 | S2-187591 | CR | Approval | 23.214 CR0067R2: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-187144. For e-mail approval. This CR was agreed | Agreed |
5.1 | S2-186553 | CR | Approval | 23.214 CR0068: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | CUPS | Revised in parallel session to S2-187145. Change work item code to CUPS | Revised |
5.1 | S2-187145 | CR | Approval | 23.214 CR0068R1: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | CUPS | Revision of S2-186553. Revised to S2-187592. | Revised |
5.1 | S2-187592 | CR | Approval | 23.214 CR0068R2: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | CUPS | Revision of S2-187145. For e-mail approval. This CR was agreed | Agreed |
- | - | - | - | CIoT | - | - | - | - | - |
5.1 | S2-186833 | CR | Approval | 23.401 CR3449: Correction to S1-U bearer(s) establishment procedure during data transport using CP CIoT Optimisation | Huawei, HiSilicon | Rel-15 | TEI15, CIoT | Noted in parallel session | Noted |
5.2 | - | - | - | QoS and PCC Maintenance | - | - | {Frank} | - | - |
5.3 | - | - | - | Non-3GPP Access Maintenance | - | - | {Krisztian} | - | - |
5.4 | - | - | - | IMS and IMS-Related Maintenance | - | - | {Krisztian} | - | - |
6 | - | - | - | Release 15 and future releases | - | - | {Frank} | - | - |
6.1 | - | - | - | Rel-15 3GPP Packet Access Maintenance - essential corrections - excl. R15 5GS | - | - | {Puneet} | - | - |
- | - | - | - | Broadcast of positioning assistance data | - | - | - | - | - |
6.1 | S2-186619 | DISCUSSION | Decision | Discussion on the BEST Protocol | Convida Wireless LLC | Rel-16 | BEST_MTC_Sec | Noted in parallel session | Noted |
6.1 | S2-186623 | LS OUT | Approval | [DRAFT] Reply LS on new BEST Service | Convida Wireless LLC | Rel-16 | BEST_MTC_Sec | Response to S2-174091 from S2#122 ? Revised in parallel session to S2-187146. | Revised |
6.1 | S2-187146 | LS OUT | Approval | [DRAFT] Reply LS on new BEST Service | Convida Wireless LLC | Rel-16 | BEST_MTC_Sec | Revision of S2-186623. Revised in parallel session to S2-187226. | Revised |
6.1 | S2-187226 | LS OUT | Approval | Reply LS on new BEST Service | SA WG2 | Rel-16 | BEST_MTC_Sec | Revision of S2-187146. Agreed in parallel session Block approved | Approved |
6.1 | S2-186316 | LS IN | Action | LS from RAN WG2: LS on GAD shape(s) for high accuracy positioning | RAN WG2 (R2-1806492) | Rel-15 | LCS_LTE_acc_enh-Core | Postponed S2-184697 from S2#127BIS. Postponed in parallel session No contribution at this meeting | Postponed |
6.1 | S2-186317 | LS IN | Action | LS from RAN WG3: Response to LS on encrypting broadcasted positioning data and LS on provisioning of positioning assistance data via LPPa for broadcast | RAN WG3 (R3-182409) | Rel-15 | LCS_LTE_acc_enh-Core | Postponed S2-184698 from S2#127BIS. Noted in parallel session | Noted |
6.1 | S2-186321 | LS IN | Information | LS from SA WG3: Security solution for encryption of broadcast positioning information | SA WG3 (S3-181926) | Rel-15 | Postponed S2-185480 from S2#127BIS. Noted in parallel session | Noted | |
6.1 | S2-186536 | CR | Approval | 23.271 CR0434: Cleanup of Broadcast of Assistance Data for E-UTRAN | Qualcomm Incorporated, Ericsson | Rel-15 | TEI15 | Agreed in parallel session Block approved | Agreed |
- | - | - | - | TEI15, CIoT/MTC | - | - | - | - | - |
6.1 | S2-186358 | CR | Approval | 23.401 CR3443: Negotiation of long periodic TAU timer value | ORANGE, Telecom Italia, Sprint | Rel-15 | NIMTC, TEI15 | Revised in parallel session to S2-187151. Change following in the first bullet - 'allocate this value' to 'allocate the value requested by the UE' | Revised |
6.1 | S2-187151 | CR | Approval | 23.401 CR3443R1: Negotiation of long periodic TAU timer value | ORANGE, Telecom Italia, Sprint | Rel-15 | NIMTC, TEI15 | Revision of S2-186358. Agreed in parallel session Block approved | Agreed |
6.1 | S2-186359 | CR | Approval | 23.060 CR2038: Negotiation of long periodic RAU timer value | ORANGE, Telecom Italia, Sprint | Rel-15 | NIMTC, TEI15 | Revised in parallel session to S2-187152. Change following in the first bullet - 'allocate this value' to 'allocate the value requested by the MS' | Revised |
6.1 | S2-187152 | CR | Approval | 23.060 CR2038R1: Negotiation of long periodic RAU timer value | ORANGE, Telecom Italia, Sprint | Rel-15 | NIMTC, TEI15 | Revision of S2-186359. Agreed in parallel session Block approved | Agreed |
6.1 | S2-186515 | CR | Approval | 23.682 CR0405: The proposal for subscribed PTW length using Network Parameter Configuration procedure via SCEF | China Mobile | Rel-15 | TEI15 | Noted in parallel session | Noted |
6.1 | S2-186520 | CR | Approval | 23.401 CR3445: The proposal for subscribed PTW length | China Mobile | Rel-15 | TEI15 | Revised in parallel session to S2-187147. | Revised |
6.1 | S2-187147 | CR | Approval | 23.401 CR3445R1: The proposal for subscribed PTW length | China Mobile | Rel-15 | TEI15 | Revision of S2-186520. Revised in parallel session to S2-187227. | Revised |
6.1 | S2-187227 | CR | Approval | 23.401 CR3445R2: The proposal for subscribed PTW length | China Mobile | Rel-15 | TEI15 | Revision of S2-187147. Revised in parallel session to S2-187239. | Revised |
6.1 | S2-187239 | CR | Approval | 23.401 CR3445R3: The proposal for subscribed PTW length | China Mobile | Rel-15 | TEI15 | Revision of S2-187227. For e-mail approval. e-mail revision 2 approved. Revised to S2-187607. Judy (E///): provides rev1. Hannu (Nokia): provides rev2. | Revised |
6.1 | S2-187607 | CR | Approval | 23.401 CR3445R4: The proposal for subscribed PTW length | China Mobile | Rel-15 | TEI15 | e-mail revision 2 of S2-187239. This CR was agreed | Agreed |
6.1 | S2-186534 | DISCUSSION | Approval | Way forward on UE differentiation | Qualcomm Incorporated, Nokia, Deutsche Telekom, Orange | Rel-15 | TEI15, NB_IOTenh2-Core | Noted in parallel session | Noted |
6.1 | S2-186535 | CR | Approval | 23.401 CR3447: RAN-modified CN assistance parameters | Qualcomm Incorporated, Nokia, Deutsche Telekom, Orange | Rel-15 | TEI15, NB_IOTenh2-Core | Revised in parallel session to S2-187148. Should go to SA WG2 plenary session if no compromise is possible based on offline work. | Revised |
6.1 | S2-187148 | CR | Approval | 23.401 CR3447R1: RAN-modified CN assistance parameters | Qualcomm Incorporated, Nokia, Deutsche Telekom, Orange | Rel-15 | TEI15, NB_IOTenh2-Core | Revision of S2-186535. Noted | Noted |
6.1 | S2-186773 | CR | Approval | 23.401 CR3448: Clarification on EDT procedure | NTT DOCOMO INC. | Rel-15 | TEI15 | Revised in parallel session to S2-187153. | Revised |
6.1 | S2-187153 | CR | Approval | 23.401 CR3448R1: Clarification on EDT procedure | NTT DOCOMO INC. | Rel-15 | TEI15 | Revision of S2-186773. Revised in parallel session to S2-187243. | Revised |
6.1 | S2-187243 | CR | Approval | 23.401 CR3448R2: Clarification on EDT procedure | NTT DOCOMO INC. | Rel-15 | TEI15 | Revision of S2-187153. Revised to S2-187595. | Revised |
6.1 | S2-187595 | CR | Approval | 23.401 CR3448R3: Clarification on EDT procedure | NTT DOCOMO INC. | Rel-15 | TEI15 | Revision of S2-187243. For e-mail approval. Postponed Judy (E///): provides rev1. Dario (Huawei): provides rev2. Judy (E///): proposes to postpone the CR. Dario (Huawei): proposes to postpone the CR. Aoken (Docomo): agrees to postpone the CR. | Postponed |
6.1 | S2-186831 | DISCUSSION | Discussion | Relationship between Traffic Profile and Release Assistance Information | Huawei, HiSilicon | Rel-15 | Revision of (unhandled) S2-185325 from S2#127BIS. Noted in parallel session | Noted | |
6.1 | S2-186923 | CR | Approval | 23.682 CR0402R1: Traffic Profile for NB-IoT UE Uu operation optimisation | Huawei, HiSilicon | Rel-15 | NB_IOTenh2-Core | Revision of (unhandled) S2-185326 from S2#127BIS. LATE DOC: Rx 27/06, 03:30. Revised in parallel session to S2-187150. | Revised |
6.1 | S2-187150 | CR | Approval | 23.682 CR0402R2: Traffic Profile for NB-IoT UE Uu operation optimisation | Huawei, HiSilicon | Rel-15 | NB_IOTenh2-Core | Revision of S2-186923. Revised in parallel session to S2-187242. | Revised |
6.1 | S2-187240 | CR | Approval | 23.401 CR3452: Traffic Profile for NB-IoT UE Uu operation optimisation | Huawei, HiSilicon | Rel-15 | NB_IOTenh2-Core | Created in parallel session. New CR created as a companion CR for 23.682 CR. Revised in parallel session to S2-187241. | Revised |
6.1 | S2-187242 | CR | Approval | 23.682 CR0402R3: Traffic Profile for NB-IoT UE Uu operation optimisation | Huawei, HiSilicon | Rel-15 | NB_IOTenh2-Core | Revision of S2-187150. Revised to S2-187594. | Revised |
6.1 | S2-187594 | CR | Approval | 23.682 CR0402R4: Traffic Profile for NB-IoT UE Uu operation optimisation | Huawei, HiSilicon | Rel-15 | NB_IOTenh2-Core | Revision of S2-187242. For e-mail approval. This CR was agreed Judy (E///): provides rev1. Puneet (Intel): objects rev1. Judy (E///): provides rev2. Dario (Huawei): provides rev3, OK with rev0. Judy (E///): OK with rev3. Hannu (Nokia): provides rev4. Puneet (Intel): can only accept rev0. Dario (Huawei): can accept rev0. Judy (E///): prefers rev3 or rev4, can live with rev0. Hannu (Nokia): proposes to postpone the CR. Hannu (Nokia): can live with rev0. | Agreed |
6.1 | S2-187241 | CR | Approval | 23.401 CR3452R1: Traffic Profile for NB-IoT UE Uu operation optimisation | Huawei, HiSilicon | Rel-15 | NB_IOTenh2-Core | Revision of S2-187240. Revised to S2-187593. | Revised |
6.1 | S2-187593 | CR | Approval | 23.401 CR3452R2: Traffic Profile for NB-IoT UE Uu operation optimisation | Huawei, HiSilicon | Rel-15 | NB_IOTenh2-Core | Revision of S2-187241. For e-mail approval. This CR was agreed | Agreed |
6.1 | S2-186928 | CR | Approval | 23.401 CR3431R3: Introduction of local RRM policy specific UE differentiation | Vodafone, Ericsson | Rel-15 | NB_IOTenh2-Core | Revision of (noted) S2-185765 from S2#127BIS. Revised in parallel session to S2-187149. Should go to SA WG2 plenary session if no compromise is possible based on offline work. | Revised |
6.1 | S2-187149 | CR | Approval | 23.401 CR3431R4: Introduction of local RRM policy specific UE differentiation | Vodafone, Ericsson | Rel-15 | NB_IOTenh2-Core | Revision of S2-186928. Noted | Noted |
- | - | - | - | Other | - | - | - | - | - |
6.1 | S2-186355 | CR | Approval | 23.251 CR0108: Definition of Primary PLMN ID | ORANGE | Rel-15 | SAES, TEI15 | Postponed in parallel session | Postponed |
6.1 | S2-186374 | CR | Approval | 23.401 CR3444: UE Radio Capability Update using TAU procedure | Intel | Rel-15 | TEI15 | Revised in parallel session to S2-187222. | Revised |
6.1 | S2-187222 | CR | Approval | 23.401 CR3444R1: UE Radio Capability Update using TAU procedure | Intel | Rel-15 | TEI15 | Revision of S2-186374. Revised in parallel session to S2-187228. | Revised |
6.1 | S2-187228 | CR | Approval | 23.401 CR3444R2: UE Radio Capability Update using TAU procedure | Intel | Rel-15 | TEI15 | Revision of S2-187222. Revised to S2-187596. | Revised |
6.1 | S2-187596 | CR | Approval | 23.401 CR3444R3: UE Radio Capability Update using TAU procedure | Intel | Rel-15 | TEI15 | Revision of S2-187228. Endorsed for attachment to the LS. | Endorsed |
6.1 | S2-187223 | LS OUT | Approval | [DRAFT] LS on E-UTRAN UE Radio Capability Update using TAU procedure | SA WG2 | - | - | Created in parallel session. Merged into S2-187539 | Merged |
6.1 | S2-186881 | CR | Approval | 23.401 CR3450: Correction on Secondary RAT data usage report | Huawei, HiSilicon | Rel-15 | EDCE5 | Revised in parallel session to S2-187224. | Revised |
6.1 | S2-187224 | CR | Approval | 23.401 CR3450R1: Correction on Secondary RAT data usage report | Huawei, HiSilicon | Rel-15 | EDCE5 | Revision of S2-186881. Agreed in parallel session Block approved | Agreed |
6.1 | S2-186962 | CR | Approval | 23.401 CR3451: UE radio capabilities - alignment with rSRVCC from GERAN | Vodafone | Rel-15 | rSRVCC, TEI15 | Agreed in parallel session Block approved | Agreed |
6.2 | - | - | - | Rel-15 PCC/QoS Maintenance - essential corrections - excl. R15 5GS | - | - | {Frank} | - | - |
6.2 | S2-186526 | CR | Approval | 23.401 CR3446: Corrections for ARP priority level | Huawei, HiSilicon | Rel-15 | TEI15 | Revised in parallel session to S2-187353. | Revised |
6.2 | S2-187353 | CR | Approval | 23.401 CR3446R1: Corrections for ARP priority level | Huawei, HiSilicon | Rel-15 | TEI15 | Revision of S2-186526. Agreed in parallel session Block approved | Agreed |
6.2 | S2-186527 | CR | Approval | 23.203 CR1122: Corrections for low latency QCIs | Huawei, HiSilicon | Rel-15 | EDCE5 | Revised in parallel session to S2-187354. | Revised |
6.2 | S2-187354 | CR | Approval | 23.203 CR1122R1: Corrections for low latency QCIs | Huawei, HiSilicon | Rel-15 | EDCE5 | Revision of S2-186527. Agreed in parallel session Block approved | Agreed |
6.3 | - | - | - | Rel-15 Non-3GPP Access Maintenance - essential corrections - excl. R15 5GS | - | - | {Krisztian} | - | - |
6.4 | - | - | - | Rel-15 IMS-Related Maintenance - essential corrections - excl. R15 5GS | - | - | {Krisztian} | - | - |
6.5 | - | - | - | Rel-15 maintenance - 5G System Architecture | - | - | {Frank} | - | - |
6.5.1 | - | - | - | General aspects, concepts and reference models | - | - | {Frank} | - | - |
6.5.1 | S2-186454 | CR | Approval | 23.501 CR0455R1: Storage of structured proprietary data in UDSF | Deutsche Telekom | Rel-15 | 5GS_Ph1 | Revision of (unhandled) S2-185468 from S2#127BIS. Revised to S2-187297. UDSF | Revised |
6.5.1 | S2-187297 | CR | Approval | 23.501 CR0455R2: Storage of structured proprietary data in UDSF | Deutsche Telekom | Rel-15 | 5GS_Ph1 | Revision of S2-186454. Revised in parallel session to S2-187493. | Revised |
6.5.1 | S2-187493 | CR | Approval | 23.501 CR0455R3: Storage of structured proprietary data in UDSF | Deutsche Telekom | Rel-15 | 5GS_Ph1 | Revision of S2-187297. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186537 | CR | Approval | 23.501 CR0483: Storage of permanent identities for private networks | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised to S2-187298. IDs | Revised |
6.5.1 | S2-187298 | CR | Approval | 23.501 CR0483R1: Storage of permanent identities for private networks | Qualcomm Incorporated, Ericsson, Intel | Rel-15 | 5GS_Ph1 | Revision of S2-186537. Revised in parallel session to S2-187494. | Revised |
6.5.1 | S2-187494 | CR | Approval | 23.501 CR0483R2: Storage of permanent identities for private networks | Qualcomm Incorporated, Ericsson, Intel | Rel-15 | 5GS_Ph1 | Revision of S2-187298. Agreed in parallel session. Noted | Noted |
6.5.1 | S2-186367 | LS IN | Action | LS from GSMA: Question on 5G network slices | GSMA (18SIMSG23_Doc_004r2) | Response drafted in S2-186664. Final response in S2-187599. | Replied to | ||
6.5.1 | S2-186664 | LS OUT | Approval | [DRAFT] Reply LS on GSMA question on 5G network slices | Qualcomm Austria RFFE GmbH | Response to S2-186367. Revised to S2-187299. | Revised | ||
6.5.1 | S2-187299 | LS OUT | Approval | [DRAFT] Reply LS on GSMA question on 5G network slices | SA WG2 | Revision of S2-186664. Revised in parallel session to S2-187495. | Revised | ||
6.5.1 | S2-187495 | LS OUT | Approval | [DRAFT] Reply LS on GSMA question on 5G network slices | SA WG2 | Revision of S2-187299. Revised in parallel session to S2-187562. | Revised | ||
6.5.1 | S2-187562 | LS OUT | Approval | [DRAFT] Reply LS on GSMA question on 5G network slices | SA WG2 | Revision of S2-187495. Revised to S2-187599. | Revised | ||
6.5.1 | S2-187599 | LS OUT | Approval | Reply LS on GSMA question on 5G network slices | SA WG2 | Revision of S2-187562. Approved | Approved | ||
6.5.1 | S2-186334 | LS IN | Action | LS from RAN WG3: Reply LS on Allowed NSSAI indication to RAN | RAN WG3 (R3-183481) | Rel-15 | NR_newRAT-Core | Postponed S2-185504 from S2#127BIS. Noted | Noted |
6.5.1 | S2-186340 | LS IN | Information | LS from RAN WG2: Reply LS on inclusion of NSSAI information during Inactive to connected mode transition | RAN WG2 (R2-1809176) | Rel-15 | NR_newRAT | Postponed S2-185516 from S2#127BIS. Noted | Noted |
6.5.1 | S2-186626 | DISCUSSION | Agreement | On the Configured NSSAI valid for all PLMNs | Nokia, Nokia Shanghai Bell, Telecom Italia, Mediatek, ZTE Wistron, Huawei, Intel | Rel-15 | Noted | Noted | |
6.5.1 | S2-186659 | DISCUSSION | Agreement | Final conclusions on Configured NSSAI not associated to any PLMNs | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Noted | Noted |
6.5.1 | S2-186629 | CR | Approval | 23.501 CR0495: Removal of the Configured NSSAI valid for all PLMNs | Nokia, Nokia Shanghai Bell, Telecom Italia, Mediatek, ZTE Wistron, Huawei, Intel | Rel-15 | 5GS_Ph1 | This was left for off-line discussion. Postponed in parallel session | Postponed |
6.5.1 | S2-186660 | CR | Approval | 23.501 CR0498: Completion of description on Configured NSSAIs | Qualcomm | Rel-15 | 5GS_Ph1 | This was left for off-line discussion. Postponed in parallel session | Postponed |
6.5.1 | S2-187496 | DISCUSSION | Endorsement | Question for decision on Configured NSSAI valid for all PLMNs | Qualcomm | Created in parallel session. Noted in parallel session | Noted | ||
6.5.1 | S2-186387 | CR | Approval | 23.502 CR0519: Network Slicing Subscription Change Indication | Ericsson, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised, merging S2-186480, to S2-187300. Slice subscription change | Revised |
6.5.1 | S2-187300 | CR | Approval | 23.502 CR0519R1: Network Slicing Subscription Change Indication | Ericsson, Nokia, Nokia Shanghai Bell, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-186387, merging S2-186480. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186480 | CR | Approval | 23.502 CR0528: UE Configured NSSAI update | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Merged in S2-187300. Slice subscription change | Merged |
6.5.1 | S2-186588 | CR | Approval | 23.501 CR0487: 23.501 CR0487: Correction to Configured NSSAI for the HPLMN | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187301. NSSAI configured | Revised |
6.5.1 | S2-187301 | CR | Approval | 23.501 CR0487R1: 23.501 CR0487: Correction to Configured NSSAI for the HPLMN | MediaTek Inc., Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186588. Revised in parallel session to S2-187485. | Revised |
6.5.1 | S2-187485 | CR | Approval | 23.501 CR0487R2: 23.501 CR0487: Correction to Configured NSSAI for the HPLMN | MediaTek Inc., Huawei, HiSilicon, Ericsson, Intel | Rel-15 | 5GS_Ph1 | Revision of S2-187301. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186630 | CR | Approval | 23.501 CR0496: Configured NSSAI update | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session NSSAI configured | Noted |
6.5.1 | S2-186631 | CR | Approval | 23.502 CR0558: Configured NSSAI update | Ericsson | Rel-15 | 5GS_Ph1 | Not Handled NSSAI configured | Not Handled |
6.5.1 | S2-186385 | CR | Approval | 23.502 CR0518: Requested NSSAI in Network Initiated Change of Network slices | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187302. NSSAI requested | Revised |
6.5.1 | S2-187302 | CR | Approval | 23.502 CR0518R1: Requested NSSAI in Network Initiated Change of Network slices | Ericsson, Nokia, Nokia Shanghai Bell, Telecom Italia, Motorola Mobility, Lenovo, InterDigital Inc. | Rel-15 | 5GS_Ph1 | Revision of S2-186385. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186936 | CR | Approval | 23.501 CR0537: 23.501: Requested NSSAI in non-roaming case | ETRI | Rel-15 | 5GS_Ph1 | Noted in parallel session NSSAI requested | Noted |
6.5.1 | S2-186386 | CR | Approval | 23.501 CR0358R2: Requested NSSAI in access stratum | Ericsson, LG Electronics, Sony, Qualcomm Incorporated, Samsung | Rel-15 | 5GS_Ph1 | Revision of (postponed) S2-185831 from SA2#127BIS. Not Handled NSSAI & AS | Not Handled |
6.5.1 | S2-186455 | CR | Approval | 23.502 CR0526: Update of parameter in call flow and service operation for NSI ID | KDDI, Telecom Italia, ZTE Wistron, ETRI | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187303. NSI ID | Revised |
6.5.1 | S2-187303 | CR | Approval | 23.502 CR0526R1: Update of parameter in call flow and service operation for NSI ID | KDDI, Telecom Italia, ZTE Wistron, ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-186455. Revised in parallel session to S2-187560. | Revised |
6.5.1 | S2-187560 | CR | Approval | 23.502 CR0526R2: Update of parameter in call flow and service operation for NSI ID | KDDI, Telecom Italia, ZTE Wistron, ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-187303. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186456 | CR | Approval | 23.501 CR0468: Update of UPF selection factor for network slice instance | KDDI, ETRI | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-186504, to S2-187304. NSI ID | Revised |
6.5.1 | S2-187304 | CR | Approval | 23.501 CR0468R1: Update of UPF selection factor for network slice instance | KDDI, ETRI, ZTE Wistron, China Telecom | Rel-15 | 5GS_Ph1 | Revision of S2-186456, merging S2-186504. Revised off-line to S2-187527 | Revised |
6.5.1 | S2-187527 | CR | Approval | 23.501 CR0468R2: Update of UPF selection factor for network slice instance | KDDI, ETRI, ZTE Wistron, China Telecom | Rel-15 | 5GS_Ph1 | Revision of S2-187304. Postponed in parallel session | Postponed |
6.5.1 | S2-186504 | CR | Approval | 23.501 CR0476: UPF selection factor | China Telecom | Rel-15 | 5GS_Ph1 | This was merged into S2-187304. NSI ID | Merged |
6.5.1 | S2-186469 | CR | Approval | 23.501 CR0470: Clarification on UE context exchanged on N26 interface | NTT DOCOMO | Rel-15 | 5GS_Ph1 | To be merged into a revision of S2-186809, if possible. Revised off-line to S2-187434. Slice IWK | Revised |
6.5.1 | S2-187434 | CR | Approval | 23.501 CR0470R1: Clarification on UE context exchanged on N26 interface | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-186469. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186725 | CR | Approval | 23.501 CR0506: Correction on Establishing a PDU Session in a Network Slice | Samsung | Rel-15 | 5GS_Ph1 | Await outcome of PCC discussions. Postponed in parallel session. Slice IWK | Postponed |
6.5.1 | S2-186774 | CR | Approval | 23.502 CR0582: Default S-NSSAI correction and NSSF service update | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187305. Slice IWK | Revised |
6.5.1 | S2-187305 | CR | Approval | 23.502 CR0582R1: Default S-NSSAI correction and NSSF service update | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186774. Revised in parallel session to S2-187486. | Revised |
6.5.1 | S2-187486 | CR | Approval | 23.502 CR0582R2: Default S-NSSAI correction and NSSF service update | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187305. Revised in parallel session to S2-187561. | Revised |
6.5.1 | S2-187561 | CR | Approval | 23.502 CR0582R3: Default S-NSSAI correction and NSSF service update | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187486. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186775 | CR | Approval | 23.501 CR0513: Multiple PDU session per DNN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187306. Slice IWK | Revised |
6.5.1 | S2-187306 | CR | Approval | 23.501 CR0513R1: Multiple PDU session per DNN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186775. Revised in parallel session to S2-187487. | Revised |
6.5.1 | S2-187487 | CR | Approval | 23.501 CR0513R2: Multiple PDU session per DNN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187306. WITHDRAWN | Withdrawn |
6.5.1 | S2-186776 | CR | Approval | 23.502 CR0583: Multiple PDU session per DNN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187307. Slice IWK | Revised |
6.5.1 | S2-187307 | CR | Approval | 23.502 CR0583R1: Multiple PDU session per DNN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186776. Revised in parallel session to S2-187488. | Revised |
6.5.1 | S2-187488 | CR | Approval | 23.502 CR0583R2: Multiple PDU session per DNN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187307. WITHDRAWN | Withdrawn |
6.5.1 | S2-186502 | CR | Approval | 23.501 CR0475: MCC implementation correction of 23.501 CR0255R7 | MCC | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved NSSAI mapping | Agreed |
6.5.1 | S2-186894 | CR | Approval | 23.501 CR0532: Incorrect text implying slicing is optional | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187308. | Revised |
6.5.1 | S2-187308 | CR | Approval | 23.501 CR0532R1: Incorrect text implying slicing is optional | Nokia, Nokia Shanghai Bell, Telecom Italia, Ericsson, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-186894. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186493 | CR | Approval | 23.501 CR0474: Support of tracing in 5GS signalling: overview | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187309. | Revised |
6.5.1 | S2-187309 | CR | Approval | 23.501 CR0474R1: Support of tracing in 5GS signalling: overview | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186493. Revised in parallel session to S2-187489. | Revised |
6.5.1 | S2-187489 | CR | Approval | 23.501 CR0474R2: Support of tracing in 5GS signalling: overview | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187309. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186494 | CR | Approval | 23.502 CR0530: Support of tracing in 5GS signalling: SM related signalling and data | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187310. | Revised |
6.5.1 | S2-187310 | CR | Approval | 23.502 CR0530R1: Support of tracing in 5GS signalling: SM related signalling and data | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186494. Revised in parallel session to S2-187490. | Revised |
6.5.1 | S2-187490 | CR | Approval | 23.502 CR0530R2: Support of tracing in 5GS signalling: SM related signalling and data | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187310. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186495 | CR | Approval | 23.502 CR0531: Support of tracing in 5GS signalling: SMSF related signalling and data | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Incorrect TD number on header. Revised in parallel session to S2-187311. | Revised |
6.5.1 | S2-187311 | CR | Approval | 23.502 CR0531R1: Support of tracing in 5GS signalling: SMSF related signalling and data | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186495. Revised in parallel session to S2-187491. | Revised |
6.5.1 | S2-187491 | CR | Approval | 23.502 CR0531R2: Support of tracing in 5GS signalling: SMSF related signalling and data | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187311. Agreed in parallel session Block approved | Agreed |
6.5.1 | S2-186499 | CR | Approval | 23.503 CR0099: Support of tracing in 5GS signalling: PCF related signalling and data (SM part) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187312. | Revised |
6.5.1 | S2-187312 | CR | Approval | 23.503 CR0099R1: Support of tracing in 5GS signalling: PCF related signalling and data (SM part) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186499. Revised in parallel session to S2-187492. | Revised |
6.5.1 | S2-187492 | CR | Approval | 23.503 CR0099R2: Support of tracing in 5GS signalling: PCF related signalling and data (SM part) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187312. Agreed in parallel session Block approved | Agreed |
6.5.2 | - | - | - | Common Access Control, RM and CM functions and procedure flows | - | - | {Frank} | - | - |
6.5.2 | S2-186310 | LS IN | Action | LS from RAN WG2: LS to SA WG2 and CT WG1 on enabling and disabling NG RAN Capabilities | RAN WG2 (R2-1804094) | Rel-15 | LTE_5GCN_connect-Core | Postponed S2-184668 from S2#127BIS. Response drafted in S2-186940. Final response in S2-187539 | Replied to |
6.5.2 | S2-186940 | LS OUT | Approval | [DRAFT] Reply LS on enabling and disabling NG RAN Capabilities | Motorola Mobility, Lenovo | Rel-15 | Response to S2-186310. Revised in parallel session to S2-187429. | Revised | |
6.5.2 | S2-187429 | LS OUT | Approval | [DRAFT] Reply LS on enabling and disabling NG RAN Capabilities | SA WG2 | Rel-15 | Revision of S2-186940. Revised in parallel session, merging S2-187223, to S2-187539. | Revised | |
6.5.2 | S2-187539 | LS OUT | Approval | Reply LS on enabling and disabling NG RAN Capabilities | SA WG2 | Rel-15 | Revision of S2-187429, merging S2-187223. Approved | Approved | |
6.5.2 | S2-186318 | LS IN | Action | LS from RAN WG3: Reply LS on TAI and forbidden TAI List for 5GS | RAN WG3 (R3-182492) | Rel-15 | NR_newRAT-Core | Postponed S2-184701 from S2#127BIS. Noted in parallel session Take into account | Noted |
6.5.2 | S2-186319 | LS IN | Action | LS from CT WG4: LS on Service Area Restrictions | CT WG4 (C4-183458) | Postponed S2-184731 from S2#127BIS. Response drafted in S2-186791. Final response in S2-187540 | Replied to | ||
6.5.2 | S2-186791 | LS OUT | Approval | [DRAFT] Reply LS on Service Area Restrictions | Qualcomm Tech. Netherlands B.V | Rel-15 | 5GS_Ph1 | Response to S2-186319. Revised to S2-187430. | Revised |
6.5.2 | S2-187430 | LS OUT | Approval | [DRAFT] Reply LS on Service Area Restrictions | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186791. Revised in parallel session to S2-187540. | Revised |
6.5.2 | S2-187540 | LS OUT | Approval | Reply LS on Service Area Restrictions | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187430. Agreed in parallel session Block approved | Approved |
6.5.2 | S2-186320 | LS IN | Action | LS from SA WG1: Reply LS on Delay Tolerant Access and Low Access Priority in 5GS | SA WG1 (S1-181364) | Rel-15 | 5GS_Ph1 | Postponed S2-184794 from S2#127BIS. Response drafted in S2-186708. Final response in S2-187600 | Replied to |
6.5.2 | S2-186707 | DISCUSSION | Approval | Delay Tolerant Access and Low Access Priority in 5GS | Intel | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.2 | S2-186538 | CR | Approval | 23.501 CR0484: Introducing low access priority to 5G system | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187542. | Revised |
6.5.2 | S2-187542 | CR | Approval | 23.501 CR0484R1: Introducing low access priority to 5G system | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-186538. Noted | Noted |
6.5.2 | S2-187456 | CR | Approval | 23.501 CR0543: Unified Access Control for UE configured for EAB | Intel, Ericsson, Nokia, Nokia Shanghai Bell, NEC, LG Electronics | Rel-15 | 5GS_Ph1 | Created in parallel session. Revised in parallel session to S2-187541. | Revised |
6.5.2 | S2-187541 | CR | Approval | 23.501 CR0543R1: Unified Access Control for UE configured for EAB | Intel, Ericsson, Nokia, Nokia Shanghai Bell, NEC, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-187456. This CR was approved | Agreed |
6.5.2 | S2-186708 | LS OUT | Approval | [DRAFT] Reply LS on Delay Tolerant Access and Low Access Priority in 5GS | Intel | Rel-15 | 5GS_Ph1 | Response to S2-186320. Revised in parallel session to S2-187457. | Revised |
6.5.2 | S2-187457 | LS OUT | Approval | [DRAFT] Reply LS on Delay Tolerant Access and Low Access Priority in 5GS | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186708. Revised to S2-187600. | Revised |
6.5.2 | S2-187600 | LS OUT | Approval | Reply LS on Delay Tolerant Access and Low Access Priority in 5GS | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187457. Approved | Approved |
6.5.2 | S2-186331 | LS IN | Action | LS from RAN WG3: LS on RAN initiated TNL Associations over NGAP | RAN WG3 (R3-183397) | Rel-15 | NR_newRAT-Core | Postponed S2-185501 from S2#127BIS. Response drafted in S2-186867. Final response in S2-187431 | Replied to |
6.5.2 | S2-186866 | DISCUSSION | Approval | Discussions on RAN initiated TNL Associations over NGAP | Huawei | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.2 | S2-186868 | CR | Approval | 23.501 CR0528: NG-RAN node support multiple TNL Endpoints | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.2 | S2-186867 | LS OUT | Approval | [DRAFT] LS Reply on RAN initiated TNL Associations over NGAP | Huawei | Rel-15 | 5GS_Ph1 | Response to S2-186331. Revised in parallel session to S2-187431. | Revised |
6.5.2 | S2-187431 | LS OUT | Approval | LS Reply on RAN initiated TNL Associations over NGAP | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186867. Agreed in parallel session Block approved | Approved |
6.5.2 | S2-186339 | LS IN | Action | LS from RAN WG2: LS on Connection Control | RAN WG2 (R2-1809168) | Rel-15 | NR_newRAT-Core, LTE_5G-CN | Postponed S2-185515 from S2#127BIS. Response drafted in S2-186959. Final response in S2-187543 | Replied to |
6.5.2 | S2-186959 | LS OUT | Approval | [DRAFT] Reply LS on Connection Control | Qualcomm Incorporated | Rel-15 | NR_newRAT-Core | Response to S2-186339. Revised in parallel session to S2-187432. | Revised |
6.5.2 | S2-187432 | LS OUT | Approval | [DRAFT] Reply LS on Connection Control | SA WG2 | Rel-15 | NR_newRAT-Core | Revision of S2-186959. Revised in parallel session to S2-187543. | Revised |
6.5.2 | S2-187543 | LS OUT | Approval | Reply LS on Connection Control | SA WG2 | Rel-15 | NR_newRAT-Core | Revision of S2-187432. Agreed in parallel session Block approved | Approved |
6.5.2 | S2-186375 | CR | Approval | 23.501 CR0461: Further correction to identifiers in Registration procedure | Intel | Rel-15 | 5GS_Ph1 | Merged into S2-187433 Registration IDs | Merged |
6.5.2 | S2-186442 | CR | Approval | 23.501 CR0466: Correcting use of identifiers during registration in equivalent PLMNs | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-186375, to S2-187433. Registration IDs | Revised |
6.5.2 | S2-187433 | CR | Approval | 23.501 CR0466R1: Correcting use of identifiers during registration in equivalent PLMNs | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-186442, merging S2-186375. WITHDRAWN | Withdrawn |
6.5.2 | S2-186376 | CR | Approval | 23.502 CR0515: Further corrections to identifiers in Registration procedure | Intel | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-186443, to S2-187435. Registration IDs | Revised |
6.5.2 | S2-187435 | CR | Approval | 23.502 CR0515R1: Further corrections to identifiers in Registration procedure | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-186376, merging S2-186443. WITHDRAWN | Withdrawn |
6.5.2 | S2-186443 | CR | Approval | 23.502 CR0524: Correction to use of identifier in equivalent PLMNs | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Merged into S2-187435 Registration IDs | Merged |
6.5.2 | S2-186845 | CR | Approval | 23.502 CR0598: Clarification on 5G-GUTI in use during Registration procedure | OPPO | Rel-15 | 5GS_Ph1 | Noted in parallel session Registration GUTI | Noted |
6.5.2 | S2-186382 | DISCUSSION | Approval | 5GS Temporary Identifier aspects | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187436. Sharing temp ID | Revised |
6.5.2 | S2-187436 | DISCUSSION | Approval | 5GS Temporary Identifier aspects | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186382. Proposal 1A was endorsed. Noted in parallel session | Noted |
6.5.2 | S2-186383 | CR | Approval | 23.501 CR0462: Temporary identifier coordination | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session Sharing temp ID | Noted |
6.5.2 | S2-186778 | CR | Approval | 23.501 CR0514: 5G S-TMSI for the network sharing | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | This was left for off-line discussion. Noted in parallel session Sharing temp ID | Noted |
6.5.2 | S2-186589 | CR | Approval | 23.501 CR0488: 23.501 CR0488: Correction to TAI list generation | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187437. TAI list | Revised |
6.5.2 | S2-187437 | CR | Approval | 23.501 CR0488R1: 23.501 CR0488: Correction to TAI list generation | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revision of S2-186589. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186590 | CR | Approval | 23.502 CR0548: Service Accept to complete Service Request | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187442. SR update | Revised |
6.5.2 | S2-187442 | CR | Approval | 23.502 CR0548R1: Service Accept to complete Service Request | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revision of S2-186590. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186638 | CR | Approval | 23.502 CR0563: Update to Registration procedure with AMF relocation | InterDigital Inc. | Rel-15 | 5GS_Ph1 | This was left for off-line checking. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186614 | CR | Approval | 23.502 CR0555: Editorial Fixes to the UECM Text | Convida Wireless LLC | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved Rather under IWK | Agreed |
6.5.2 | S2-186813 | CR | Approval | 23.501 CR0521: 23.501: 5G AN Parameters sent during Service Request | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187438. SR AN params | Revised |
6.5.2 | S2-187438 | CR | Approval | 23.501 CR0521R1: 23.501: 5G AN Parameters sent during Service Request | Nokia, Nokia Shanghai Bell, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186813. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186814 | CR | Approval | 23.502 CR0595: 23.502: 5G AN Parameters sent during Service Request | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187439. SR AN params | Revised |
6.5.2 | S2-187439 | CR | Approval | 23.502 CR0595R1: 23.502: 5G AN Parameters sent during Service Request | Nokia, Nokia Shanghai Bell, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186814. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186388 | CR | Approval | 23.501 CR0463: Correcting handling of RAT restriction and Forbidden Areas | Ericsson | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved Mobility restriction | Agreed |
6.5.2 | S2-186755 | CR | Approval | 23.501 CR0509: Mobility Restriction List clean up | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187440. Mobility restriction | Revised |
6.5.2 | S2-187440 | CR | Approval | 23.501 CR0509R1: Mobility Restriction List clean up | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-186755. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186758 | CR | Approval | 23.502 CR0579: TS 23.502: Mobility Restriction List Clean up | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved Mobility restriction | Agreed |
6.5.2 | S2-186777 | CR | Approval | 23.502 CR0584: Clarification on priority service | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | 23.502 CR number. Cover sheet shows 23.501!. Revised in parallel session to S2-187441. Mobility restriction MPS | Revised |
6.5.2 | S2-187441 | CR | Approval | 23.501 CR0542: Clarification on priority service | Huawei, Hisillicon | Rel-15 | 5GS_Ph1 | Revision of S2-186777. Revised in parallel session to S2-187544. | Revised |
6.5.2 | S2-187544 | CR | Approval | 23.501 CR0542R1: Clarification on priority service | Huawei, Hisillicon | Rel-15 | 5GS_Ph1 | Revision of S2-187441. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186506 | CR | Approval | 23.502 CR0533: Clarification to UE Configuration Update | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187453. UCU update access | Revised |
6.5.2 | S2-187453 | CR | Approval | 23.502 CR0533R1: Clarification to UE Configuration Update | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186506. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186519 | CR | Approval | 23.502 CR0535: Clarification on UE configuration update procedure | OPPO | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187454. UCU update em | Revised |
6.5.2 | S2-187454 | CR | Approval | 23.502 CR0535R1: Clarification on UE configuration update procedure | OPPO | Rel-15 | 5GS_Ph1 | Revision of S2-186519. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186677 | CR | Approval | 23.502 CR0565: Correction of UE configuration update procedure | Intel, Apple, OPPO | Rel-15 | 5GS_Ph1 | Revised off-line to S2-187452 UCU update | Revised |
6.5.2 | S2-187452 | CR | Approval | 23.502 CR0565R1: Correction of UE configuration update procedure | Intel, Apple, OPPO | Rel-15 | 5GS_Ph1 | Revision of S2-186677. Revised in parallel session to S2-187455. | Revised |
6.5.2 | S2-187455 | CR | Approval | 23.502 CR0565R2: Correction of UE configuration update procedure | Intel, Apple, OPPO | Rel-15 | 5GS_Ph1 | Revision of S2-187452. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186806 | CR | Approval | 23.501 CR0516: GUAMI Definition Correction | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-186966. | Revised |
6.5.2 | S2-186966 | CR | Approval | 23.501 CR0516R1: GUAMI Definition Correction | Nokia, Nokia Shanghai Bell, Orange | Rel-15 | 5GS_Ph1 | Revision of S2-186806. Revised in parallel session to S2-187458. GUAMI def | Revised |
6.5.2 | S2-187458 | CR | Approval | 23.501 CR0516R2: GUAMI Definition Correction | Nokia, Nokia Shanghai Bell, Orange | Rel-15 | 5GS_Ph1 | Revision of S2-186966. Revised in parallel session to S2-187545. | Revised |
6.5.2 | S2-187545 | CR | Approval | 23.501 CR0516R3: GUAMI Definition Correction | Nokia, Nokia Shanghai Bell, Orange | Rel-15 | 5GS_Ph1 | Revision of S2-187458. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186965 | CR | Approval | 23.501 CR0540: Clarification of the AMF Set definition | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187459. AMF Set def | Revised |
6.5.2 | S2-187459 | CR | Approval | 23.501 CR0540R1: Clarification of the AMF Set definition | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-186965. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186807 | CR | Approval | 23.501 CR0517: 23.501: NGAP-UE-TNLA-Binding re-creation when preferred TNL is unavailable | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | It was decided to check whether this is already covered as an error case in RAN WG3 and to consider such a CR if needed in the future. This CR was then noted in parallel session. | Noted |
6.5.2 | S2-186808 | CR | Approval | 23.502 CR0593: 23.502: NGAP-UE-TNLA-Binding re-creation when preferred TNL is unavailable | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.2 | S2-186812 | CR | Approval | 23.502 CR0594: Peer NF association of GUAMI with a given UE | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187460. | Revised |
6.5.2 | S2-187460 | CR | Approval | 23.502 CR0594R1: Peer NF association of GUAMI with a given UE | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186812. Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186817 | CR | Approval | 23.501 CR0522: Clarification on DNN based congestion control for System interworking w/o N26 | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187461. | Revised |
6.5.2 | S2-187461 | CR | Approval | 23.501 CR0522R1: Clarification on DNN based congestion control for System interworking w/o N26 | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186817. WITHDRAWN | Withdrawn |
6.5.2 | S2-186857 | CR | Approval | 23.501 CR0525: Correction on mobility management back-off timer | Vivo | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.2 | S2-186907 | CR | Approval | 23.502 CR0615: Correction on inter-PLMN mobility | CATT | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187462. | Revised |
6.5.2 | S2-187462 | CR | Approval | 23.502 CR0615R1: Correction on inter-PLMN mobility | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-186907. Revised in parallel session to S2-187546. | Revised |
6.5.2 | S2-187546 | CR | Approval | 23.502 CR0615R2: Correction on inter-PLMN mobility | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-187462. Agreed in parallel session Block approved | Agreed |
6.5.3 | - | - | - | Session management and continuity functions and flows | - | - | {Frank} | - | - |
6.5.3 | S2-186308 | LS IN | Action | LS from RAN WG3: LS on Handling of end marker packets | RAN WG3 (R3-181575) | Rel-15 | NR_newRAT-Core | Postponed S2-184663 from S2#127BIS. Noted in parallel session | Noted |
6.5.3 | S2-186327 | LS IN | Action | LS from CT WG4: LS OUT on N16 Communication Failure | CT WG4 (C4-184353) | Rel-15 | 5GS_Ph1 | Postponed S2-185494 from S2#127BIS. Noted in parallel session | Noted |
6.5.3 | S2-186781 | CR | Approval | 23.502 CR0586: N16 communication failure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187412. | Revised |
6.5.3 | S2-187412 | CR | Approval | 23.502 CR0586R1: N16 communication failure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186781. Revised in parallel session to S2-187533. | Revised |
6.5.3 | S2-187533 | CR | Approval | 23.502 CR0586R2: N16 communication failure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187412. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186361 | CR | Approval | 23.502 CR0513: Correction to SMF registration of PDU Session ID | Telecom Italia, KDDI, ZTE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187413. PDU estab NSI ID | Revised |
6.5.3 | S2-187413 | CR | Approval | 23.502 CR0513R1: Correction to SMF registration of PDU Session ID | Telecom Italia, KDDI, ZTE Wistron | Rel-15 | 5GS_Ph1 | Revision of S2-186361. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186362 | CR | Approval | 23.502 CR0514: Correction to handling of DNNs not supported by the network | Telecom Italia | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved DNN in NAS transport | Agreed |
6.5.3 | S2-186680 | CR | Approval | 23.502 CR0566: DNN Usage Clarification | Intel | Rel-15 | 5GS_Ph1 | Noted in parallel session DNN handling | Noted |
6.5.3 | S2-186378 | CR | Approval | 23.502 CR0516: Mandatory valid lifetime configuration for old IP prefix in multi-homing | Intel, InterDigital Inc. | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved IP lifetime | Agreed |
6.5.3 | S2-186465 | CR | Approval | 23.503 CR0097: PDU Session selection | InterDigital Inc. | Rel-15 | TEI15 | Revised in parallel session to S2-187414. PDU session to same DNN | Revised |
6.5.3 | S2-187414 | CR | Approval | 23.503 CR0097R1: PDU Session selection | InterDigital Inc. | Rel-15 | TEI15 | Revision of S2-186465. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186478 | CR | Approval | 23.501 CR0471: Correction to AF influence on traffic routing | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187415. AF influence | Revised |
6.5.3 | S2-187415 | CR | Approval | 23.501 CR0471R1: Correction to AF influence on traffic routing | Huawei, HiSillicon | Rel-15 | 5GS_Ph1 | Revision of S2-186478. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186479 | CR | Approval | 23.502 CR0527: Corrections to AF influence on traffic routing | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved AF influence | Agreed |
6.5.3 | S2-186496 | CR | Approval | 23.502 CR0532: User Location Information added in N2 UE Context Release Complete | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187416. ULI | Revised |
6.5.3 | S2-187416 | CR | Approval | 23.502 CR0532R1: User Location Information added in N2 UE Context Release Complete | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186496. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186507 | CR | Approval | 23.502 CR0534: Clarification on CN-initiated selective deactivation of UP connection | LG Electronics | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved Selective deact | Agreed |
6.5.3 | S2-186554 | CR | Approval | 23.501 CR0485: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187417. PFD | Revised |
6.5.3 | S2-187417 | CR | Approval | 23.501 CR0485R1: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186554. Revised in parallel session to S2-187528. | Revised |
6.5.3 | S2-187528 | CR | Approval | 23.501 CR0485R2: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187417. Revised to S2-187601. | Revised |
6.5.3 | S2-187601 | CR | Approval | 23.501 CR0485R3: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187528. For e-mail approval. e-mail revision 1 approved. Revised to S2-187608. Mirko (Huawei): provides rev1. | Revised |
6.5.3 | S2-187608 | CR | Approval | 23.501 CR0485R4: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | e-mail revision 1 of S2-187601. This CR was agreed | Agreed |
6.5.3 | S2-186595 | CR | Approval | 23.501 CR0491: TS23.501 Add missing event for Nsmf_EventExposure Service | ZTE | Rel-15 | 5GS_Ph1 | Noted in parallel session SMF services | Noted |
6.5.3 | S2-186596 | CR | Approval | 23.501 CR0492: TS23.501 Removal PCC policy for Routing rules configuration | ZTE | Rel-15 | 5GS_Ph1 | WITHDRAWN Routing rules | Withdrawn |
6.5.3 | S2-186640 | CR | Approval | 23.501 CR0497: Clarification on handling of Ethernet frames at UPF | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187418. Ethernet | Revised |
6.5.3 | S2-187418 | CR | Approval | 23.501 CR0497R1: Clarification on handling of Ethernet frames at UPF | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-186640. Revised in parallel session to S2-187529. | Revised |
6.5.3 | S2-187529 | CR | Approval | 23.501 CR0497R2: Clarification on handling of Ethernet frames at UPF | Qualcomm Incorporated, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187418. This CR was approved | Agreed |
6.5.3 | S2-186718 | CR | Approval | 23.501 CR0505: Clarification on SSC Mode Selection Policy | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187419. SSC mode | Revised |
6.5.3 | S2-187419 | CR | Approval | 23.501 CR0505R1: Clarification on SSC Mode Selection Policy | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186718. Withdrawn | Withdrawn |
6.5.3 | S2-186748 | CR | Approval | 23.502 CR0577: UE context in SMF data | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187420. SMF context | Revised |
6.5.3 | S2-187420 | CR | Approval | 23.502 CR0577R1: UE context in SMF data | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186748. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186779 | CR | Approval | 23.501 CR0515: Subscription of selecting the same SMF and UPF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187421. SMF/UPF selection | Revised |
6.5.3 | S2-187421 | CR | Approval | 23.501 CR0515R1: Subscription of selecting the same SMF and UPF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186779. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186780 | CR | Approval | 23.502 CR0585: Subscription of selecting the same SMF and UPF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187422. SMF/UPF selection | Revised |
6.5.3 | S2-187422 | CR | Approval | 23.502 CR0585R1: Subscription of selecting the same SMF and UPF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186780. Revised in parallel session to S2-187530. | Revised |
6.5.3 | S2-187530 | CR | Approval | 23.502 CR0585R2: Subscription of selecting the same SMF and UPF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187422. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186782 | CR | Approval | 23.502 CR0587: Clarification on UPF tunnel change | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187423. CN tunnel | Revised |
6.5.3 | S2-187423 | CR | Approval | 23.502 CR0587R1: Clarification on UPF tunnel change | Huawei, Hisillicon | Rel-15 | 5GS_Ph1 | Revision of S2-186782. This CR was approved | Agreed |
6.5.3 | S2-186818 | CR | Approval | 23.502 CR0596: Corrections in clause 4.3.3 PDU Session Modification and clause 4.3.4 PDU Session Release | ETRI | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187424. PDU session modify | Revised |
6.5.3 | S2-187424 | CR | Approval | 23.502 CR0596R1: Corrections in clause 4.3.3 PDU Session Modification and clause 4.3.4 PDU Session Release | ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-186818. WITHDRAWN | Withdrawn |
6.5.3 | S2-186428 | CR | Approval | 23.501 CR0465: Clarification on a wildcard DNN | Samsung | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187425. DNN wildcard. Change to 'The wildcard DNN is a value that can be used for the DNN field of Subscribed DNN list of Session Management Subscription data defined in clause 5.2.3.3 of TS 23.502 [3].' | Revised |
6.5.3 | S2-187425 | CR | Approval | 23.501 CR0465R1: Clarification on a wildcard DNN | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-186428. Revised in parallel session to S2-187531. | Revised |
6.5.3 | S2-187531 | CR | Approval | 23.501 CR0465R2: Clarification on a wildcard DNN | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-187425. Revised in parallel session to S2-187534. | Revised |
6.5.3 | S2-187534 | CR | Approval | 23.501 CR0465R3: Clarification on a wildcard DNN | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-187531. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186679 | CR | Approval | 23.501 CR0500: DNN Usage Clarification | Intel | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187426. DNN handling | Revised |
6.5.3 | S2-187426 | CR | Approval | 23.501 CR0500R1: DNN Usage Clarification | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-186679. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186426 | CR | Approval | 23.502 CR0523: Correction for UE requested LADN Information | Samsung, Intel, Huawei, LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187427. LADN UE req | Revised |
6.5.3 | S2-187427 | CR | Approval | 23.502 CR0523R1: Correction for UE requested LADN Information | Samsung, Intel, Huawei, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186426. Revised in parallel session to S2-187535. Add trigger back, QC have concerns | Revised |
6.5.3 | S2-187535 | CR | Approval | 23.502 CR0523R2: Correction for UE requested LADN Information | Samsung, Intel, Huawei, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-187427. Noted | Noted |
6.5.3 | S2-186678 | CR | Approval | 23.501 CR0499: LADN Clarification | Intel, Huawei, Samsung | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved LADN 5.6.5 | Agreed |
6.5.3 | S2-186427 | CR | Approval | 23.501 CR0464: Clarification on LADN | Samsung, Huawei, LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187428. LADN 5.6.5 | Revised |
6.5.3 | S2-187428 | CR | Approval | 23.501 CR0464R1: Clarification on LADN | Samsung, Huawei, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186427. Revised in parallel session to S2-187532. Rev mark the added 'as' | Revised |
6.5.3 | S2-187532 | CR | Approval | 23.501 CR0464R2: Clarification on LADN | Samsung, Huawei, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-187428. Revised in parallel session to S2-187536. | Revised |
6.5.3 | S2-187536 | CR | Approval | 23.501 CR0464R3: Clarification on LADN | Samsung, Huawei, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-187532. Agreed in parallel session Block approved | Agreed |
6.5.3 | S2-186508 | CR | Approval | 23.501 CR0478: Clarification on LADN DNN(s) configured in AMF | LG Electronics | Rel-15 | 5GS_Ph1 | Noted in parallel session LADN in AMF | Noted |
6.5.3 | S2-186880 | CR | Approval | 23.502 CR0604: Handling LADN service area during handovers | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revised off-line in S2-187515. LADN HOV | Revised |
6.5.3 | S2-187515 | CR | Approval | 23.502 CR0604R1: Handling LADN service area during handovers | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-186880. Agreed in parallel session Block approved | Agreed |
6.5.4 | - | - | - | Security related functions and flows | - | - | {Frank} | - | - |
6.5.4 | S2-186364 | LS In | Information | LS from CT WG6: Reply LS on SoR mechanism | CT WG6 (C6-180295) | Rel-15 | 5GS_Ph1-CT | Noted in parallel session | Noted |
6.5.4 | S2-186366 | LS In | Action | LS from TSG SA: LS on Guidance on Way Forward for Steering of Roaming | TSG SA (SP-180621) | Rel-15 | Noted in parallel session | Noted | |
6.5.4 | S2-186915 | CR | Approval | 23.502 CR0618: Nudm service update to support protection of Steering of Roaming | Samsung, Ericsson, Intel, Nokia, Nokia Shanghai Bell, Qualcomm, T-Mobile USA | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.4 | S2-186916 | CR | Approval | 23.501 CR0536: Update on AUSF service operation to support Steering of Roaming | Samsung, Ericsson, Intel, Nokia, Nokia Shanghai Bell, Qualcomm, T-Mobile USA | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.4 | S2-186309 | LS IN | Action | LS from SA WG3: LS on AS Security Context Setup | SA WG3 (S3-180986) | Rel-15 | 5GS_Ph1-SEC | Postponed S2-184664 from S2#127BIS. Noted in parallel session | Noted |
6.5.4 | S2-186632 | CR | Approval | 23.502 CR0559: Correction to AS security handling in registration procedure | Ericsson | Rel-15 | 5GS_Ph1 | Merged into S2-187399 | Merged |
6.5.4 | S2-186805 | CR | Approval | 23.502 CR0592: Correction to AS Security Context | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-186632, to S2-187399. | Revised |
6.5.4 | S2-187399 | CR | Approval | 23.502 CR0592R1: Correction to AS Security Context | Nokia, Nokia Shanghai Bell, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186805, merging S2-186632. Agreed in parallel session Block approved | Agreed |
6.5.4 | S2-186311 | LS IN | Action | LS from CT WG1: LS on UE capability related to integrity protection of DRBs | CT WG1 (C1-182603) | Rel-15 | 5GS_Ph1-CT | Postponed S2-184674 from S2#127BIS. Noted in parallel session | Noted |
6.5.4 | S2-186312 | LS IN | Action | LS from CT WG1: LS on modification of solution for PLMN and RAT selection policies for roaming based on SA WG2 comments | CT WG1 (C1-182779) | Rel-15 | 5GS_Ph1-CT | Postponed S2-184679 from S2#127BIS. Noted in parallel session Action: Specify | Noted |
6.5.4 | S2-186322 | LS IN | Action | LS from SA WG3: Reply LS on UE capability related to integrity protection of DRBs | SA WG3 (S3-181930) | Rel-15 | Postponed S2-185481 from S2#127BIS. Noted in parallel session Take into account, solved by CRs from last meeting? | Noted | |
6.5.4 | S2-186323 | LS IN | Action | LS from SA WG3: LS response on Initial NAS message protection | SA WG3 (S3-181933) | Rel-15 | 5GS_Ph1_Sec | Postponed S2-185482 from S2#127BIS. Response drafted in S2-186377. Final response in S2-187505 | Replied to |
6.5.4 | S2-186325 | LS IN | Action | LS from CT WG1: Reply LS on initial NAS message protection | CT WG1 (C1-183727) | Rel-15 | 5GS_Ph1-CT | Postponed S2-185491 from S2#127BIS. Responses drafted in S2-186377 and S2-186663. Final response in S2-187505 | Replied to |
6.5.4 | S2-186377 | LS OUT | Approval | Reply LS on initial NAS message protection | Intel | Rel-15 | Response to S2-186325 and S2-186323. Revised in parallel session to S2-187400. | Revised | |
6.5.4 | S2-187400 | LS OUT | Approval | Reply LS on initial NAS message protection | SA WG2 | Rel-15 | Response to S2-186325 and S2-186323. Revision of S2-186377. Revised in parallel session to S2-187405. | Revised | |
6.5.4 | S2-187405 | LS OUT | Approval | [DRAFT] Reply LS on initial NAS message protection | SA WG2 | Rel-15 | Revision of S2-187400. Revised in parallel session to S2-187505. | Revised | |
6.5.4 | S2-187505 | LS OUT | Approval | Reply LS on initial NAS message protection | SA WG2 | Rel-15 | Revision of S2-187405. Agreed in parallel session Block approved | Approved | |
6.5.4 | S2-186663 | LS OUT | Approval | [DRAFT] Reply LS on initial NAS message protect | Qualcomm Austria RFFE GmbH | Rel-15 | 5GS_Ph1 | Response to S2-186325. Not Handled | Not Handled |
6.5.4 | S2-186336 | LS IN | Information | LS from SA WG3: LS response on Initial NAS message protection | SA WG3 (S3-182087) | Rel-15 | 5GS_Ph1_Sec | Postponed S2-185509 from S2#127BIS. Postponed | Postponed |
6.5.4 | S2-186662 | CR | Approval | 23.502 CR0564: Modifications to Registration Procedure for initial NAS security support | Qualcomm | Rel-15 | 5GS_Ph1 | 23.502 CR number. Cover sheet shows 23.501! Not Handled | Not Handled |
6.5.4 | S2-186324 | LS IN | Action | LS from SA WG3: LS on TLS and inter PLMN routing | SA WG3 (S3-181956) | Rel-15 | Postponed S2-185486 from S2#127BIS. Response drafted in S2-186821. Postponed | Postponed | |
6.5.4 | S2-186821 | LS OUT | Approval | [DRAFT] Reply LS on TLS and inter PLMN routing | Huawei, HiSilicon | Response to S2-186324. Revised in parallel session to S2-187401. | Revised | ||
6.5.4 | S2-187401 | LS OUT | Approval | [DRAFT] Reply LS on TLS and inter PLMN routing | SA WG2 | Revision of S2-186821. Postponed in parallel session | Postponed | ||
6.5.4 | S2-186329 | LS IN | Action | LS from CT WG4: Reply LS on AUSF/UDM instance selection and SUCI parameters | CT WG4 (C4-184576) | Rel-15 | 5GS_Ph1-CT | Postponed S2-185497 from S2#127BIS. Noted in parallel session | Noted |
6.5.4 | S2-186379 | CR | Approval | 23.501 CR0458R2: MME handling of UE 5GMM capability | Intel | Rel-15 | 5GS_Ph1 | Revision of (postponed) S2-186066 from SA2#127BIS. Revised in parallel session to S2-187402. | Revised |
6.5.4 | S2-187402 | CR | Approval | 23.501 CR0458R3: MME handling of UE 5GMM capability | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-186379. WITHDRAWN | Withdrawn |
6.5.4 | S2-186628 | CR | Approval | 23.501 CR0494: Handling of UP Security Policy when IWK with EPS | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187403. | Revised |
6.5.4 | S2-187403 | CR | Approval | 23.501 CR0494R1: Handling of UP Security Policy when IWK with EPS | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186628. Agreed in parallel session Block approved | Agreed |
6.5.4 | S2-186927 | LS OUT | Approval | [DRAFT] LS on security handling when deploying UDSF | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187404. | Revised |
6.5.4 | S2-187404 | LS OUT | Approval | [DRAFT] LS on security handling when deploying UDSF | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186927. Revised in parallel session to S2-187506. | Revised |
6.5.4 | S2-187506 | LS OUT | Approval | LS on security handling when deploying UDSF | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187404. Agreed in parallel session Block approved | Approved |
6.5.5 | - | - | - | QoS concept and functionality | - | - | {Frank} | - | - |
6.5.5 | S2-186332 | LS IN | Action | LS from RAN WG3: LS on signalling of dynamic 5QI values | RAN WG3 (R3-183409) | Rel-15 | NR_newRAT-Core | Postponed S2-185502 from S2#127BIS. Response drafted in S2-186540. Final response in S2-187355 | Replied to |
6.5.5 | S2-186539 | DISCUSSION | Approval | On signalling dynamic 5QI values | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.5 | S2-186540 | LS OUT | Approval | [DRAFT] Reply LS on signalling of dynamic 5QI values | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Response to S2-186332. Revised in parallel session to S2-187344. | Revised |
6.5.5 | S2-187344 | LS OUT | Approval | [DRAFT] Reply LS on signalling of dynamic 5QI values | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186540. Revised in parallel session to S2-187355. | Revised |
6.5.5 | S2-187355 | LS OUT | Approval | Reply LS on signalling of dynamic 5QI values | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187344. Agreed in parallel session Block approved | Approved |
6.5.5 | S2-186810 | CR | Approval | 23.501 CR0519: No Dynamic 5QI signalling towards RAN - Align with RAN WG3 | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-186633 | CR | Approval | 23.502 CR0560: Priority Level signalled with standardized 5QIs and QoS characteristics signalled with dynamically assigned 5QIs. | Vencore Labs, OEC, AT&T, T-Mobile USA, Sprint | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187345. | Revised |
6.5.5 | S2-187345 | CR | Approval | 23.502 CR0560R1: Priority Level signalled with standardized 5QIs and QoS characteristics signalled with dynamically assigned 5QIs. | Vencore Labs, OEC, AT&T, T-Mobile USA, Sprint, Verizon UK Ltd. | Rel-15 | 5GS_Ph1 | Revision of S2-186633. This was left for further consideration and was postponed in parallel session | Postponed |
6.5.5 | S2-186528 | DISCUSSION | Discussion | 5QI priority level overwriting for nonGBR | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.5 | S2-186699 | CR | Approval | 23.501 CR0501: Clarification for pre-configured QoS rule | CATT | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187346. | Revised |
6.5.5 | S2-187346 | CR | Approval | 23.501 CR0501R1: Clarification for pre-configured QoS rule | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-186699. Postponed in parallel session | Postponed |
6.5.5 | S2-186700 | CR | Approval | 23.501 CR0502: Clarification for QoS handling at UPF | CATT | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187347. | Revised |
6.5.5 | S2-187347 | CR | Approval | 23.501 CR0502R1: Clarification for QoS handling at UPF | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-186700. Agreed in parallel session Block approved | Agreed |
6.5.5 | S2-186811 | CR | Approval | 23.501 CR0520: Notification Control applicability | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187348. | Revised |
6.5.5 | S2-187348 | CR | Approval | 23.501 CR0520R1: Notification Control applicability | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186811. Revised in parallel session to S2-187356. | Revised |
6.5.5 | S2-187356 | CR | Approval | 23.501 CR0520R2: Notification Control applicability | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187348. Agreed in parallel session Block approved | Agreed |
6.5.5 | S2-186489 | CR | Approval | 23.501 CR0473: The resource type of QoS Flow associated with the default QoS rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187349. | Revised |
6.5.5 | S2-187349 | CR | Approval | 23.501 CR0473R1: The resource type of QoS Flow associated with the default QoS rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186489. Revised in parallel session to S2-187502. | Revised |
6.5.5 | S2-187502 | CR | Approval | 23.501 CR0473R2: The resource type of QoS Flow associated with the default QoS rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187349. Revised in parallel session to S2-187507. | Revised |
6.5.5 | S2-187507 | CR | Approval | 23.501 CR0473R3: The resource type of QoS Flow associated with the default QoS rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187502. Agreed in parallel session Block approved | Agreed |
6.5.5 | S2-186529 | CR | Approval | 23.501 CR0479: Clarifications for 5QI priority level overwriting | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187350. | Revised |
6.5.5 | S2-187350 | CR | Approval | 23.501 CR0479R1: Clarifications for 5QI priority level overwriting | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186529. Revised in parallel session to S2-187503. | Revised |
6.5.5 | S2-187503 | CR | Approval | 23.501 CR0479R2: Clarifications for 5QI priority level overwriting | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187350. WITHDRAWN | Withdrawn |
6.5.5 | S2-186530 | CR | Approval | 23.501 CR0480: 5QI-QCI alignment | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187351. | Revised |
6.5.5 | S2-187351 | CR | Approval | 23.501 CR0480R1: 5QI-QCI alignment | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186530. Revised off-line to S2-187537. | Revised |
6.5.5 | S2-187537 | CR | Approval | 23.501 CR0480R2: 5QI-QCI alignment | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187351. Revised to S2-187602. | Revised |
6.5.5 | S2-187602 | CR | Approval | 23.501 CR0480R3: 5QI-QCI alignment | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187537. This CR was approved | Agreed |
6.5.5 | S2-186531 | CR | Approval | 23.501 CR0481: Number of packet filters supported by UE | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187352. | Revised |
6.5.5 | S2-187352 | CR | Approval | 23.501 CR0481R1: Number of packet filters supported by UE | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186531. Revised in parallel session to S2-187504. | Revised |
6.5.5 | S2-187504 | CR | Approval | 23.501 CR0481R2: Number of packet filters supported by UE | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187352. This CR was agreed | Agreed |
6.5.6 | - | - | - | Policy and charging control | - | - | {Krisztian} | - | - |
6.5.6 | S2-186969 | LS In | Action | LS from SA WG5: LS on Introduction of a new charging method for PCC Rule. | SA WG5 (S5-184204) | Rel-15 | 5GS_Ph1-DCH | Postponed in parallel session | Postponed |
6.5.6 | S2-186970 | LS In | Action | LS from SA WG5: LS on Use of NRF framework by CHF for information | SA WG5 (S5-184290) | Rel-15 | 5GS_Ph1-SBI_CH | Response drafted in S2-187067. Final response in S2-187577. | Replied to |
6.5.6 | S2-187067 | LS OUT | Approval | [DRAFT] LS reply to LS on Use of NRF framework by CHF for information | SA WG2 | Rel-15 | 5GS_Ph1 | Created in parallel session. Response to S2-186970. Revised to S2-187577. | Revised |
6.5.6 | S2-187577 | LS OUT | Approval | LS reply to LS on Use of NRF framework by CHF for information | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187067. Approved | Approved |
- | - | - | - | Incoming LS | - | - | - | - | - |
6.5.6 | S2-186326 | LS IN | Action | LS from CT WG1: LS on UE policy | CT WG1 (C1-183867) | Rel-15 | 5GS_Ph1-CT | Postponed S2-185493 from S2#127BIS. Responses drafted in S2-186486 and S2-186645. Final response in S2-187578 | Replied to |
6.5.6 | S2-186486 | LS OUT | Approval | [DRAFT] LS reply to LS on UE policy | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Response, merging S2-186645, to S2-186326. Revised in parallel session to S2-187068. | Revised |
6.5.6 | S2-187068 | LS OUT | Approval | [DRAFT] LS reply to LS on UE policy | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186486., merging S2-186645. Revised to S2-187578. | Revised |
6.5.6 | S2-187578 | LS OUT | Approval | LS reply to LS on UE policy | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187068. Approved | Approved |
6.5.6 | S2-186645 | LS OUT | Approval | [DRAFT] Reply LS on UE policy | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Response to S2-186326 Merged into S2-187068 | Merged |
6.5.6 | S2-186341 | LS IN | Action | LS from CT WG3: LS on clarification for spending limit control functionality | CT WG3 (C3-183783) | Rel-15 | 5GS_Ph1 | Postponed S2-185517 from S2#127BIS. Response drafted in S2-186485. Final response in S2-187579 | Replied to |
6.5.6 | S2-186634 | CR | Approval | 23.503 CR0108: N28 session termination | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187069. | Revised |
6.5.6 | S2-187069 | CR | Approval | 23.503 CR0108R1: N28 session termination | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186634. Revised off-line to S2-187572. | Revised |
6.5.6 | S2-187572 | CR | Approval | 23.503 CR0108R2: N28 session termination | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187069. This CR was approved | Agreed |
6.5.6 | S2-186635 | CR | Approval | 23.502 CR0561: Adding N28 session termination procedure and updates to CHF services | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187070. | Revised |
6.5.6 | S2-187070 | CR | Approval | 23.502 CR0561R1: Adding N28 session termination procedure and updates to CHF services | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186635. Revised off-line to S2-187573. | Revised |
6.5.6 | S2-187573 | CR | Approval | 23.502 CR0561R2: Adding N28 session termination procedure and updates to CHF services | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187070. This CR was approved | Agreed |
6.5.6 | S2-186485 | LS OUT | Approval | [DRAFT] LS reply to LS on clarification for spending limit control functionality | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Response to S2-186341. Revised in parallel session to S2-187071. | Revised |
6.5.6 | S2-187071 | LS OUT | Approval | [DRAFT] LS reply to LS on clarification for spending limit control functionality | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186485. Revised to S2-187579. | Revised |
6.5.6 | S2-187579 | LS OUT | Approval | LS reply to LS on clarification for spending limit control functionality | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187071. Approved | Approved |
- | - | - | - | UE policy delivery | - | - | - | - | - |
6.5.6 | S2-186605 | DISCUSSION | Agreement | Discussion on UE policy management and distribution | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.6 | S2-186606 | CR | Approval | 23.503 CR0106: Update to UE policy distribution | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187072. | Revised |
6.5.6 | S2-187072 | CR | Approval | 23.503 CR0106R1: Update to UE policy distribution | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186606. Noted | Noted |
6.5.6 | S2-186607 | CR | Approval | 23.502 CR0554: Update to UE policy provision and update | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187073. | Revised |
6.5.6 | S2-187073 | CR | Approval | 23.502 CR0554R1: Update to UE policy provision and update | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186607. WITHDRAWN | Withdrawn |
6.5.6 | S2-186615 | CR | Approval | 23.502 CR0556: AMF to PCF interactions in the UE Configuration Update for UE policy delivery procedure | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.6 | S2-186683 | CR | Approval | 23.503 CR0111: Clarification on initial UE policy provisioning | Intel | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187075. | Revised |
6.5.6 | S2-187075 | CR | Approval | 23.503 CR0111R1: Clarification on initial UE policy provisioning | Intel, Telecom Italia | Rel-15 | 5GS_Ph1 | Revision of S2-186683. Revised in parallel session to S2-187132. | Revised |
6.5.6 | S2-187132 | CR | Approval | 23.503 CR0111R2: Clarification on initial UE policy provisioning | Intel, Telecom Italia | Rel-15 | 5GS_Ph1 | Revision of S2-187075. Revised to S2-187580. | Revised |
6.5.6 | S2-187580 | CR | Approval | 23.503 CR0111R3: Clarification on initial UE policy provisioning | Intel, Telecom Italia | Rel-15 | 5GS_Ph1 | Revision of S2-187132. For e-mail approval. This CR was agreed | Agreed |
6.5.6 | S2-186684 | CR | Approval | 23.502 CR0568: UE triggered UE policy provisioning procedure | Intel | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187076. | Revised |
6.5.6 | S2-187076 | CR | Approval | 23.502 CR0568R1: UE triggered UE policy provisioning procedure | Intel, Qualcomm Inc, Samsung, Mediatek | Rel-15 | 5GS_Ph1 | Revision of S2-186684. This was postponed. | Postponed |
6.5.6 | S2-186904 | CR | Approval | 23.502 CR0612: SBI friendly UE policy delivery procedure | Samsung | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187074. | Revised |
6.5.6 | S2-187074 | CR | Approval | 23.502 CR0612R1: SBI friendly UE policy delivery procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-186904. Revised to S2-187581. | Revised |
6.5.6 | S2-187581 | CR | Approval | 23.502 CR0612R2: SBI friendly UE policy delivery procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-187074. For e-mail approval. e-mail revision 4 approved. Revised to S2-187609. LaeYoung (LG): provides rev1. Iskren (NEC): objects rev0. Jicheol (Samsung): provides rev2. Iskren (NEC): provides rev3. Krisztian (Apple): provides rev4. LaeYoung (LG): supports rev4. Iskren (NEC): supports rev4. Jicheol (Samsung): supports rev4. | Revised |
6.5.6 | S2-187609 | CR | Approval | 23.502 CR0612R3: SBI friendly UE policy delivery procedure | Samsung | Rel-15 | 5GS_Ph1 | e-mail revision 4 of S2-187581. This CR was agreed | Agreed |
6.5.6 | S2-186490 | CR | Approval | 23.502 CR0529: UE Policy Delivery in case of UE not reachable | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-187582. | Revised |
6.5.6 | S2-187582 | CR | Approval | 23.502 CR0529R1: UE Policy Delivery in case of UE not reachable | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186490. For e-mail approval. Withdrawn | Withdrawn |
6.5.6 | S2-186491 | CR | Approval | 23.503 CR0098: UE Policy Delivery in case of UE not reachable | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | 23.503 CR number. Cover sheet shows 23.502! Revised to S2-187583. | Revised |
6.5.6 | S2-187583 | CR | Approval | 23.503 CR0098R1: UE Policy Delivery in case of UE not reachable | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186491. For e-mail approval. This CR was agreed | Agreed |
6.5.6 | S2-186560 | CR | Approval | 23.502 CR0540: PCF added as consumer of EventExposure service of AMF and SMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187109. | Revised |
6.5.6 | S2-187109 | CR | Approval | 23.502 CR0540R1: PCF added as consumer of EventExposure service of AMF and SMF | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186560. Revised to S2-187584. | Revised |
6.5.6 | S2-187584 | CR | Approval | 23.502 CR0540R2: PCF added as consumer of EventExposure service of AMF and SMF | Huawei, HiSilicon, Ericsson, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187109. This CR was approved | Agreed |
- | - | - | - | URSP/ANDSP | - | - | - | - | - |
6.5.6 | S2-186641 | DISCUSSION | Decision | Discussion on UE policy update and enforcement handling | Qualcomm Incorporated, | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.6 | S2-186643 | CR | Approval | 23.503 CR0109: URSP updates and Application to PDU session association re-evaluation | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187077. | Revised |
6.5.6 | S2-187077 | CR | Approval | 23.503 CR0109R1: URSP updates and Application to PDU session association re-evaluation | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-186643. Revised in parallel session to S2-187133. | Revised |
6.5.6 | S2-187133 | CR | Approval | 23.503 CR0109R2: URSP updates and Application to PDU session association re-evaluation | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-187077. This CR was approved | Agreed |
6.5.6 | S2-186681 | CR | Approval | 23.503 CR0110: UE policy graceful enforcement time in URSP rule | Intel, Nokia, OPPO, SAMSUNG, Orange, KDDI, China Unicom, Apple | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187078. | Revised |
6.5.6 | S2-187078 | CR | Approval | 23.503 CR0110R1: UE policy graceful enforcement time in URSP rule | Intel, Nokia, OPPO, SAMSUNG, Orange, KDDI, China Unicom, Apple | Rel-15 | 5GS_Ph1 | Revision of S2-186681. Noted | Noted |
6.5.6 | S2-186348 | CR | Approval | 23.503 CR0094: Essential correction and clarification about user preference for URSP | KDDI, Orange, Telecom Italia, AT&T, Vodafone, Sprint, Deutsche Telekom, T-Mobile USA, China Mobile, Verizon UK ltd. | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187079. | Revised |
6.5.6 | S2-187079 | CR | Approval | 23.503 CR0094R1: Essential correction and clarification about user preference for URSP | KDDI, Orange, Telecom Italia, AT&T, Vodafone, Sprint, Deutsche Telekom, T-Mobile USA, China Mobile, Verizon UK ltd, Telefonica, BT, KPN, SK Telecom, China Unicom, China Telecom | Rel-15 | 5GS_Ph1 | Revision of S2-186348. Revised in parallel session to S2-187134. | Revised |
6.5.6 | S2-187134 | CR | Approval | 23.503 CR0094R2: Essential correction and clarification about user preference for URSP | KDDI, Orange, Telecom Italia, AT&T, Vodafone, Sprint, Deutsche Telekom, T-Mobile USA, China Mobile, Verizon UK ltd, Telefonica, BT, KPN, SK Telecom, China Unicom, China Telecom | Rel-15 | 5GS_Ph1 | Revision of S2-187079. For e-mail approval. Postponed Dimitris (Lenovo): proposes to postpone the CR. Krisztian (Apple): proposes to postpone the CR. Hong (QC): proposes to postpone the CR. Florin (Broadcom): proposes to postpone the CR. Guillaume (Mediatek): proposes to postpone the CR. | Postponed |
6.5.6 | S2-186730 | CR | Approval | 23.503 CR0114: Detailed desciption on user preference | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186425 | CR | Approval | 23.503 CR0095: Clarification on user preference and URSP | Samsung, Intel | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186514 | CR | Approval | 23.503 CR0102: 23.503 CR0102: Clarification on User preference URSP | OPPO | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186853 | CR | Approval | 23.503 CR0116: Correction on UE policy delivery | OPPO | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186703 | CR | Approval | 23.503 CR0113: Clarification on Application identifier | Samsung | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186513 | DISCUSSION | Discussion | Discussion on URSP configuration in case of Application interruption | OPPO | Not Handled | Not Handled | ||
6.5.6 | S2-186512 | CR | Approval | 23.503 CR0101: Clarification on URSP configuration | OPPO | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186757 | CR | Approval | 23.503 CR0115: WLAN SSID as validity condition for WLAN offload in URSP rules | Motorola Mobility, Lenovo | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186682 | CR | Approval | 23.502 CR0567: Clarification on ANDSP support | Intel | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
- | - | - | - | Others | - | - | - | - | - |
6.5.6 | S2-186503 | CR | Approval | 23.503 CR0100: Correction of Terminologies (OCS and traffic filter for URSP) in TS23.503 | KDDI | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186351 | CR | Approval | 23.502 CR0512: Change OCS to CHF | KDDI | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186433 | CR | Approval | 23.503 CR0096: Clarification of Network area information for BDT in order to align with TS23.203. | KDDI, TOYOTA ITC | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186488 | DISCUSSION | Discussion | Discussion on AMF-PCF Association Termination | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186487 | CR | Approval | 23.502 CR0489R2: AMF-PCF Association termination | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of (noted) S2-185959 from SA2#127BIS. Not Handled | Not Handled |
6.5.6 | S2-186598 | CR | Approval | 23.502 CR0552: TS23.502 Clarification on AM Policy Association termination | ZTE | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186616 | CR | Approval | 23.503 CR0107: Policy Control Request triggers for updating the AM Policy Association | Ericsson | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186617 | CR | Approval | 23.502 CR0557: Termination of the AM Policy Association | Ericsson | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186532 | CR | Approval | 23.503 CR0103: Number of packet filters supported by UE | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186555 | CR | Approval | 23.503 CR0104: Application detection report when the PFDs are removed | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186556 | CR | Approval | 23.502 CR0538: Correction to the procedure of PFD Retrieval by the SMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186577 | DISCUSSION | Discussion | Discussion on the interaction between vPCF and vUDR | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186575 | CR | Approval | 23.503 CR0105: The interaction between vPCF and vUDR | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | 23.503 CR number. Cover sheet shows 23.502! Not Handled | Not Handled |
6.5.6 | S2-186576 | CR | Approval | 23.502 CR0542: The interaction between vPCF and vUDR | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186597 | CR | Approval | 23.502 CR0551: TS23.502 Removal Internal group ID from the input parameter in Npcf_AMPolicyControl_Create service | ZTE | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186599 | CR | Approval | 23.502 CR0553: TS23.502 Correct the figure in clause 4.16.4 SM Policy Association Establishment | ZTE | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186693 | CR | Approval | 23.503 CR0112: Notification Control applicability | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6 | S2-186914 | CR | Approval | 23.502 CR0617: Clarification on Nbsf_Management_Update service operation | China Mobile | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.7 | - | - | - | 3GPP access specific functionality and flows | - | - | {Frank} | - | - |
6.5.7 | S2-186333 | LS IN | Action | LS from RAN WG3: LS on Location Reporting for Area of Interest | RAN WG3 (R3-183456) | Rel-15 | NR_newRAT-Core | Postponed S2-185503 from S2#127BIS. Response drafted in S2-186891. Final response in S2-187563 | Replied to |
6.5.7 | S2-186891 | LS OUT | Approval | [DRAFT] Reply LS on Location Reporting for Area of Interest | Samsung | Rel-15 | 5GS_Ph1 | Response to S2-186333. Revised in parallel session to S2-187320. | Revised |
6.5.7 | S2-187320 | LS OUT | Approval | Reply LS on Location Reporting for Area of Interest | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186891. Revised in parallel session to S2-187563. | Revised |
6.5.7 | S2-187563 | LS OUT | Approval | Reply LS on Location Reporting for Area of Interest | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187320. Agreed in parallel session Block approved | Approved |
6.5.7 | S2-186307 | LS IN | Action | LS from RAN WG3: LS on data forwarding for intra-system handover | RAN WG3 (R3-181542) | Rel-15 | NR_newRAT-Core | Postponed S2-184661 from S2#127BIS. Noted in parallel session | Noted |
6.5.7 | S2-186892 | CR | Approval | 23.502 CR0606: Clarification on representation of AoI for NG-RAN location reporting procedure | Samsung | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187321. | Revised |
6.5.7 | S2-187321 | CR | Approval | 23.502 CR0606R1: Clarification on representation of AoI for NG-RAN location reporting procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-186892. Agreed in parallel session Block approved | Agreed |
6.5.7 | S2-186338 | LS IN | Action | LS from RAN WG2: Reply LS on Reply LS on coexistence between RRC inactive and dual connectivity | RAN WG2 (R2-1809161) | Rel-15 | NR_newRAT | Postponed S2-185512 from S2#127BIS. Noted in parallel session Take into account | Noted |
6.5.7 | S2-186759 | CR | Approval | 23.501 CR0511: RRC-INACTIVE state and GUTI reallocation procedure over non-3GPP access | NEC | Rel-15 | 5GS_Ph1 | This was left for further discussion. This was later withdrawn. | Withdrawn |
6.5.7 | S2-186389 | CR | Approval | 23.502 CR0520: Triggers for Network Triggered Service Request and UE Activity procedure | Ericsson | Rel-15 | 5GS_Ph1 | This was left for further discussion. Revised off-line in S2-187329. | Revised |
6.5.7 | S2-187329 | CR | Approval | 23.502 CR0520R1: Triggers for Network Triggered Service Request and UE Activity procedure | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186389. Revised in parallel session to S2-187564. | Revised |
6.5.7 | S2-187564 | CR | Approval | 23.502 CR0520R2: Triggers for Network Triggered Service Request and UE Activity procedure | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-187329. This CR was agreed | Agreed |
6.5.7 | S2-186533 | CR | Approval | 23.501 CR0482: Paging policy differentiation for RRC inactive | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187322. | Revised |
6.5.7 | S2-187322 | CR | Approval | 23.501 CR0482R1: Paging policy differentiation for RRC inactive | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186533. Revised to S2-187603. | Revised |
6.5.7 | S2-187603 | CR | Approval | 23.501 CR0482R2: Paging policy differentiation for RRC inactive | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-187322. For e-mail approval. This CR was agreed | Agreed |
6.5.7 | S2-186591 | CR | Approval | 23.501 CR0489: TS23.501 Clarification on PPD for RRC inactive state | ZTE | Rel-15 | 5GS_Ph1 | This was left for further discussion. Noted | Noted |
6.5.7 | S2-186541 | CR | Approval | 23.502 CR0537: Corrections in Reachability procedures | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187323. | Revised |
6.5.7 | S2-187323 | CR | Approval | 23.502 CR0537R1: Corrections in Reachability procedures | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-186541. Revised in parallel session to S2-187565. | Revised |
6.5.7 | S2-187565 | CR | Approval | 23.502 CR0537R2: Corrections in Reachability procedures | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-187323. Postponed | Postponed |
6.5.7 | S2-186580 | CR | Approval | 23.502 CR0543: Correction on Connection Resume procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187324. | Revised |
6.5.7 | S2-187324 | CR | Approval | 23.502 CR0543R1: Correction on Connection Resume procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186580. Revised in parallel session to S2-187566. | Revised |
6.5.7 | S2-187566 | CR | Approval | 23.502 CR0543R2: Correction on Connection Resume procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187324. Agreed in parallel session Block approved | Agreed |
6.5.7 | S2-186581 | CR | Approval | 23.502 CR0544: Correction on signalling message holding during HO | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187325. | Revised |
6.5.7 | S2-187325 | CR | Approval | 23.502 CR0544R1: Correction on signalling message holding during HO | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186581. Agreed in parallel session Block approved | Agreed |
6.5.7 | S2-186593 | CR | Approval | 23.502 CR0550: TS23.502 Clarifications on Xn based handover | ZTE | Rel-15 | 5GS_Ph1 | 23.502 CR number. Cover sheet shows 23.501!. Revised in parallel session to S2-187326. | Revised |
6.5.7 | S2-187326 | CR | Approval | 23.502 CR0550R1: TS23.502 Clarifications on Xn based handover | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186593. Corrupt file uploaded. Revised to S2-187508. | Revised |
6.5.7 | S2-187508 | CR | Approval | 23.502 CR0550R2: TS23.502 Clarifications on Xn based handover | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-187326. Revised in parallel session to S2-187567. | Revised |
6.5.7 | S2-187567 | CR | Approval | 23.502 CR0550R3: TS23.502 Clarifications on Xn based handover | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-187508. Revised in parallel session to S2-187570. | Revised |
6.5.7 | S2-187570 | CR | Approval | 23.502 CR0550R4: TS23.502 Clarifications on Xn based handover | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-187567. This CR was agreed | Agreed |
6.5.7 | S2-186592 | CR | Approval | 23.502 CR0549: TS23.502 handover | ZTE | Rel-15 | 5GS_Ph1 | 23.502 CR number. Cover sheet shows 23.501!. Revised in parallel session to S2-187327. | Revised |
6.5.7 | S2-187327 | CR | Approval | 23.502 CR0549R1: TS23.502 handover | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-186592. Revised in parallel session to S2-187568. | Revised |
6.5.7 | S2-187568 | CR | Approval | 23.502 CR0549R2: TS23.502 handover | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-187327. Agreed in parallel session. Revised to S2-187597. | Revised |
6.5.7 | S2-187597 | CR | Approval | 23.502 CR0549R3: TS23.502 handover | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-187568. This CR was agreed | Agreed |
6.5.7 | S2-186792 | CR | Approval | 23.502 CR0589: Indirect data forwarding for N2 based HO Clean up | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.7 | S2-186844 | CR | Approval | 23.501 CR0523: UE location report to the SMF by RAN in RRC Inactive State | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | This was left for off-line discussion. Revised off-line to S2-187538. | Revised |
6.5.7 | S2-187538 | CR | Approval | 23.501 CR0523R1: UE location report to the SMF by RAN in RRC Inactive State | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186844. Revised in parallel session to S2-187569. | Revised |
6.5.7 | S2-187569 | CR | Approval | 23.501 CR0523R2: UE location report to the SMF by RAN in RRC Inactive State | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187538. WITHDRAWN | Withdrawn |
6.5.7 | S2-186931 | CR | Approval | 23.502 CR0478R4: Clarification on N1 data transfer for RRC-Inactive UE | China Mobile, Ericsson, China Telecom, China Unicom, CATT, Huawei, ZTE, Motorola Mobility, Lenovo, OPPO, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of (agreed with objection) S2-186269 from S2#127BIS. Revised in parallel session to S2-187328. | Revised |
6.5.7 | S2-187328 | CR | Approval | 23.502 CR0478R5: Clarification on N1 data transfer for RRC-Inactive UE | China Mobile, Ericsson, China Telecom, China Unicom, CATT, Huawei, ZTE, Motorola Mobility, Lenovo, OPPO, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186931. Postponed in parallel session. Noted | Noted |
6.5.7 | S2-186934 | DISCUSSION | Discussion | DP for clarification on N1 data transfer for RRC-Inactive UE | China Mobile Com. Corporation | LATE DOC: Rx: 02/07 09:25. Noted in parallel session | Noted | ||
6.5.8 | - | - | - | Specific services support | - | - | {Frank} | - | - |
6.5.8 | S2-186335 | LS IN | Action | LS from RAN WG3: LS on Radio Capability Check for IMS Voice | RAN WG3 (R3-183538) | Rel-15 | NR_newRAT-Core | Postponed S2-185507 from S2#127BIS. Noted in parallel session | Noted |
6.5.8 | S2-186584 | CR | Approval | 23.502 CR0546: Clarification on UE Capability Match Request procedure | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187330. | Revised |
6.5.8 | S2-187330 | CR | Approval | 23.502 CR0546R1: Clarification on UE Capability Match Request procedure | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186584. Agreed in parallel session Block approved | Agreed |
6.5.8 | S2-186350 | CR | Approval | 23.501 CR0460: Missing TADs behaviour | BlackBerry UK Limited | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187331. | Revised |
6.5.8 | S2-187331 | CR | Approval | 23.501 CR0460R1: Missing TADs behaviour | BlackBerry UK Limited | Rel-15 | 5GS_Ph1 | Revision of S2-186350. Revised in parallel session to S2-187497. | Revised |
6.5.8 | S2-187497 | CR | Approval | 23.501 CR0460R2: Missing TADs behaviour | BlackBerry UK Limited | Rel-15 | 5GS_Ph1 | Revision of S2-187331. Revised to S2-187604. | Revised |
6.5.8 | S2-187604 | CR | Approval | 23.501 CR0460R3: Missing TADs behaviour | BlackBerry UK Limited | Rel-15 | 5GS_Ph1 | Revision of S2-187497. This CR was agreed | Agreed |
6.5.8 | S2-186448 | CR | Approval | 23.501 CR0467: MO service correction | BlackBerry UK Limited | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187332. | Revised |
6.5.8 | S2-187332 | CR | Approval | 23.501 CR0467R1: MO service correction | BlackBerry UK Limited | Rel-15 | 5GS_Ph1 | Revision of S2-186448. Noted in parallel session | Noted |
6.5.8 | S2-186481 | CR | Approval | 23.501 CR0472: Clarification on UE Registration type with only PDU Session for Emergency Services | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187333. | Revised |
6.5.8 | S2-187333 | CR | Approval | 23.501 CR0472R1: Clarification on UE Registration type with only PDU Session for Emergency Services | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186481. Revised in parallel session, merging S2-187334, to S2-187498. | Revised |
6.5.8 | S2-187498 | CR | Approval | 23.501 CR0472R2: Clarification on UE Registration type with only PDU Session for Emergency Services | Huawei, Hisilicon, NEC | Rel-15 | 5GS_Ph1 | Revision of S2-187333, merging S2-187334. This CR was agreed | Agreed |
6.5.8 | S2-186756 | CR | Approval | 23.501 CR0510: Clarification to the UE's behavior of emergency registered UE | NEC | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187334. | Revised |
6.5.8 | S2-187334 | CR | Approval | 23.501 CR0510R1: Clarification to the UE's behavior of emergency registered UE | NEC | Rel-15 | 5GS_Ph1 | Revision of S2-186756. Merged into S2-187498 | Merged |
6.5.8 | S2-186557 | CR | Approval | 23.228 CR1191: Clarification on access network information during IMS call in 5G dual connectivity scenario | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187335. | Revised |
6.5.8 | S2-187335 | CR | Approval | 23.228 CR1191R1: Clarification on access network information during IMS call in 5G dual connectivity scenario | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186557. Agreed in parallel session Block approved | Agreed |
6.5.8 | S2-186585 | CR | Approval | 23.502 CR0547: Fixing clause number | LG Electronics | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.8 | S2-186661 | CR | Approval | 23.228 CR1192: IP address allocation | BlackBerry UK Limited | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.8 | S2-186746 | CR | Approval | 23.502 CR0575: SMS subsciption Change | NEC | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187336. | Revised |
6.5.8 | S2-187336 | CR | Approval | 23.502 CR0575R1: SMS subsciption Change | NEC | Rel-15 | 5GS_Ph1 | Revision of S2-186746. Postponed in parallel session | Postponed |
6.5.8 | S2-186747 | CR | Approval | 23.502 CR0576: UE Context in SMSF data | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187337. | Revised |
6.5.8 | S2-187337 | CR | Approval | 23.502 CR0576R1: UE Context in SMSF data | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186747. Revised in parallel session to S2-187499. | Revised |
6.5.8 | S2-187499 | CR | Approval | 23.502 CR0576R2: UE Context in SMSF data | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187337. This CR was agreed | Agreed |
6.5.8 | S2-186749 | CR | Approval | 23.501 CR0508: Emergency call and eCall support when the ng-eNode is connected to EPC and 5GC | NEC | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187338. | Revised |
6.5.8 | S2-187338 | CR | Approval | 23.501 CR0508R1: Emergency call and eCall support when the ng-eNode is connected to EPC and 5GC | NEC | Rel-15 | 5GS_Ph1 | Revision of S2-186749. Revised in parallel session to S2-187500. | Revised |
6.5.8 | S2-187500 | CR | Approval | 23.501 CR0508R2: Emergency call and eCall support when the ng-eNode is connected to EPC and 5GC | NEC | Rel-15 | 5GS_Ph1 | Revision of S2-187338. Agreed in parallel session Block approved | Agreed |
6.5.8 | S2-186754 | CR | Approval | 23.502 CR0578: Access Node Selection for MT SMS | NEC | Rel-15 | 5GS_Ph1 | Incorrect version used - should be v15.2.0. Noted in parallel session | Noted |
6.5.8 | S2-186861 | CR | Approval | 23.501 CR0526: Clarification on the target CN indication when Emergency Services Fallback | OPPO | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.8 | S2-186864 | CR | Approval | 23.502 CR0600: Homogeneous Support of IMS Voice over PS Sessions indication | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187339. | Revised |
6.5.8 | S2-187339 | CR | Approval | 23.502 CR0600R1: Homogeneous Support of IMS Voice over PS Sessions indication | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186864. Agreed in parallel session Block approved | Agreed |
6.5.8 | S2-186869 | CR | Approval | 23.501 CR0529: Clarification on Homogeneous Support of IMS Voice over PS Sessions indication | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187340. | Revised |
6.5.8 | S2-187340 | CR | Approval | 23.501 CR0529R1: Clarification on Homogeneous Support of IMS Voice over PS Sessions indication | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186869. Agreed in parallel session Block approved | Agreed |
6.5.8 | S2-186893 | CR | Approval | 23.502 CR0607: MT SMS failure recovery | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187341. | Revised |
6.5.8 | S2-187341 | CR | Approval | 23.502 CR0607R1: MT SMS failure recovery | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186893. Revised in parallel session to S2-187501. | Revised |
6.5.8 | S2-187501 | CR | Approval | 23.502 CR0607R2: MT SMS failure recovery | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187341. Agreed in parallel session Block approved | Agreed |
6.5.8 | S2-186895 | CR | Approval | 23.501 CR0533: Update of SMSF selection function | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.8 | S2-186932 | CR | Approval | 23.167 CR0331: Update on Domain Selection Rules for emergency session attempts | Samsung | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187342. | Revised |
6.5.8 | S2-187342 | CR | Approval | 23.167 CR0331R1: Update on Domain Selection Rules for emergency session attempts | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-186932. This CR was agreed | Agreed |
6.5.8 | S2-186964 | CR | Approval | 23.501 CR0539: Emergency Services Support indicator for non-3GPP access | ORANGE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187343. | Revised |
6.5.8 | S2-187343 | CR | Approval | 23.501 CR0539R1: Emergency Services Support indicator for non-3GPP access | ORANGE | Rel-15 | 5GS_Ph1 | Revision of S2-186964. Revised to S2-187605. | Revised |
6.5.8 | S2-187605 | CR | Approval | 23.501 CR0539R2: Emergency Services Support indicator for non-3GPP access | ORANGE | Rel-15 | 5GS_Ph1 | Revision of S2-187343. For e-mail approval. e-mail revision 2 approved. Revised to S2-187610. Devaki (Nokia): provides rev1. Antoine (Orange): provides rev2. Guillaume (Mediatek): fine with rev2. Devaki (Nokia): fine with rev2. | Revised |
6.5.8 | S2-187610 | CR | Approval | 23.501 CR0539R3: Emergency Services Support indicator for non-3GPP access | ORANGE | Rel-15 | 5GS_Ph1 | e-mail revision 2 of S2-187605. This CR was agreed | Agreed |
6.5.9 | - | - | - | Interworking and Migration | - | - | {Irfan} | - | - |
- | - | - | - | General | - | - | - | - | - |
6.5.9 | S2-186328 | LS IN | Action | LS from CT WG4: LS on the use of PGW FQDN in the SMF Selection | CT WG4 (C4-184570) | Rel-15 | 5GS_Ph1-CT | Postponed S2-185496 from S2#127BIS. Response drafted in S2-186424. Final response in S2-187378 | Replied to |
6.5.9 | S2-186423 | CR | Approval | 23.502 CR0390R1: Discovering SMF instance at EPS to 5GS interworking | Ericsson | Rel-15 | 5GS_Ph1 | Revision of (unhandled) S2-184747 from SA2#127BIS. Revised in parallel session to S2-187357. | Revised |
6.5.9 | S2-187357 | CR | Approval | 23.502 CR0390R2: Discovering SMF instance at EPS to 5GS interworking | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186423. Revised in parallel session to S2-187377. The no-N26 case will be handled in the next meeting and potential simplifications in description of the selection procedure. | Revised |
6.5.9 | S2-187377 | CR | Approval | 23.502 CR0390R3: Discovering SMF instance at EPS to 5GS interworking | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-187357. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186424 | LS OUT | Approval | [DRAFT] Reply LS on the use of PGW FQDN in the SMF Selection | Ericsson | Rel-15 | 5GS_Ph1 | Response to S2-186328. Revised in parallel session to S2-187358. | Revised |
6.5.9 | S2-187358 | LS OUT | Approval | [DRAFT] Reply LS on the use of PGW FQDN in the SMF Selection | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186424. Revised in parallel session to S2-187378. | Revised |
6.5.9 | S2-187378 | LS OUT | Approval | Reply LS on the use of PGW FQDN in the SMF Selection | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187358. Agreed in parallel session Block approved | Approved |
6.5.9 | S2-186315 | LS IN | Action | LS from CT WG4: LS on Access Restriction Data for NR in EPC | CT WG4 (C4-183466) | Rel-15 | 5GS_Ph1-CT | Postponed S2-184692 from S2#127BIS. Response drafted in S2-186449. Final response in S2-187380 | Replied to |
6.5.9 | S2-186453 | CR | Approval | 23.502 CR0525: Handling of subscription restrictions for mobility from EPS to 5GS | Cisco Systems | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187359. | Revised |
6.5.9 | S2-187359 | CR | Approval | 23.502 CR0525R1: Handling of subscription restrictions for mobility from EPS to 5GS | Cisco Systems, Ericsson? | Rel-15 | 5GS_Ph1 | Revision of S2-186453. Revised in parallel session to S2-187379. | Revised |
6.5.9 | S2-187379 | CR | Approval | 23.502 CR0525R2: Handling of subscription restrictions for mobility from EPS to 5GS | Cisco Systems, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-187359. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186449 | LS OUT | Approval | [DRAFT] Reply LS on Access Restriction Data for NR in EPC | Cisco Systems Belgium | Rel-15 | Response to S2-186315. Revised in parallel session to S2-187360. | Revised | |
6.5.9 | S2-187360 | LS OUT | Approval | [DRAFT] Reply LS on Access Restriction Data for NR in EPC | Cisco Systems Belgium | Rel-15 | - | Revision of S2-186449. Revised in parallel session to S2-187380. | Revised |
6.5.9 | S2-187380 | LS OUT | Approval | Reply LS on Access Restriction Data for NR in EPC | SA WG2 | Rel-15 | - | Revision of S2-187360. Agreed in parallel session Block approved | Approved |
6.5.9 | S2-186809 | CR | Approval | 23.501 CR0518: Merging Network Slice with regular EPS Interworking | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187361. Pointer to Slice IWK in the EPC IWK section. | Revised |
6.5.9 | S2-187361 | CR | Approval | 23.501 CR0518R1: Merging Network Slice with regular EPS Interworking | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186809. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186852 | CR | Approval | 23.501 CR0524: Null interworking with GERAN/UTRAN CS domain | Vodafone | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186862 | CR | Approval | 23.501 CR0527: 5G-TMSI should map to M-TMSI | Vodafone | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
- | - | - | - | N26: 5G ->4G | - | - | - | - | - |
6.5.9 | S2-186384 | CR | Approval | 23.502 CR0517: Temporary identitier usage at interworking | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187362. | Revised |
6.5.9 | S2-187362 | CR | Approval | 23.502 CR0517R1: Temporary identitier usage at interworking | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186384. Postponed in parallel session | Postponed |
6.5.9 | S2-186505 | CR | Approval | 23.501 CR0477: Clarification on the SSC mode be supported between 5GS and EPS IWK | China Telecom | Rel-15 | 5GS_Ph1 | 23.501 CR number. Cover sheet shows 23.502!. Revised in parallel session to S2-187363. This is a 23.502 CR. New CR number: TS 23.502 CR0624. | Revised |
6.5.9 | S2-187363 | CR | Approval | 23.502 CR0624: Clarification on the SSC mode be supported between 5GS and EPS IWK | China Telecom | Rel-15 | 5GS_Ph1 | Revision of S2-186505. WITHDRAWN | Withdrawn |
6.5.9 | S2-186727 | CR | Approval | 23.502 CR0573: Clarification on the delivery of EBI to UE and RAN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Withdrawn in parallel session. | Withdrawn |
6.5.9 | S2-186728 | CR | Approval | 23.501 CR0507: Clarification on cancel registration with N26 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187364. | Revised |
6.5.9 | S2-187364 | CR | Approval | 23.501 CR0507R1: Clarification on cancel registration with N26 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186728. Postponed in parallel session | Postponed |
6.5.9 | S2-186729 | CR | Approval | 23.502 CR0574: Clarification on cancel registration with N26 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | 23.502 CR number. Cover sheet shows 23.503! Not Handled | Not Handled |
6.5.9 | S2-186783 | CR | Approval | 23.502 CR0588: Data handling in UPF during IRAT handover | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.9 | S2-186803 | CR | Approval | 23.502 CR0590: 5GS to EPS Mobility | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187365. | Revised |
6.5.9 | S2-187365 | CR | Approval | 23.502 CR0590R1: 5GS to EPS Mobility | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186803. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186855 | CR | Approval | 23.502 CR0599: RRC Inactive to EPC mobility | Vodafone | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187376. | Revised |
6.5.9 | S2-187376 | CR | Approval | 23.502 CR0599R1: RRC Inactive to EPC mobility | Vodafone | Rel-15 | 5GS_Ph1 | Revision of S2-186855. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186380 | CR | Approval | 23.502 CR0619: 5GS-EPS interworking for Multi-homed IPv6 PDU Session | Intel | Rel-16 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186874 | CR | Approval | 23.502 CR0602: Clarification on the target MME capability from AMF to SMF for 5GS to EPS mobility | ZTE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187366. | Revised |
6.5.9 | S2-187366 | CR | Approval | 23.502 CR0602R1: Clarification on the target MME capability from AMF to SMF for 5GS to EPS mobility | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-186874. Agreed in parallel session Block approved | Agreed |
- | - | - | - | N26: 4G ->5G | - | - | - | - | - |
6.5.9 | S2-186937 | CR | Approval | 23.502 CR0620: Clafication on retrievial of the security context from old AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | 23.502 CR number. Cover sheet shows 23.503! This is a CR to TS 23.502. Revised in parallel session to S2-187367. | Revised |
6.5.9 | S2-187367 | CR | Approval | 23.502 CR0620R1: Clafication on retrievial of the security context from old AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186937. Revised in parallel session to S2-187381. | Revised |
6.5.9 | S2-187381 | CR | Approval | 23.502 CR0620R2: Clafication on retrievial of the security context from old AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187367. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186411 | CR | Approval | 23.502 CR0522: EPS to 5GS mobility with N26 | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-186875, to S2-187368. | Revised |
6.5.9 | S2-187368 | CR | Approval | 23.502 CR0522R1: EPS to 5GS mobility with N26 | Ericsson, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-186411, merging S2-186875. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186872 | CR | Approval | 23.501 CR0531: Clarification on the PDU session handling in EPS to 5GS handover with N26 | ZTE, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187369. | Revised |
6.5.9 | S2-187369 | CR | Approval | 23.501 CR0531R1: Clarification on the PDU session handling in EPS to 5GS handover with N26 | ZTE, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186872. Revised in parallel session to S2-187383. | Revised |
6.5.9 | S2-187383 | CR | Approval | 23.501 CR0531R2: Clarification on the PDU session handling in EPS to 5GS handover with N26 | ZTE, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187369. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186873 | CR | Approval | 23.502 CR0601: Clarification on the PDU session handling in EPS to 5GS handover with N26 | ZTE, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187370. | Revised |
6.5.9 | S2-187370 | CR | Approval | 23.502 CR0601R1: Clarification on the PDU session handling in EPS to 5GS handover with N26 | ZTE, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186873. Revised in parallel session to S2-187382. | Revised |
6.5.9 | S2-187382 | CR | Approval | 23.502 CR0601R2: Clarification on the PDU session handling in EPS to 5GS handover with N26 | ZTE, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187370. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186521 | CR | Approval | 23.502 CR0536: Selection of target AMF in EPS to 5GS handover procedure using N26 | China Mobile | Rel-15 | 5GS_Ph1 | Postponed in parallel session | Postponed |
6.5.9 | S2-186701 | CR | Approval | 23.502 CR0569: Indirect data forwarding for interworking with N26 | Samsung | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187371. | Revised |
6.5.9 | S2-187371 | CR | Approval | 23.502 CR0569R1: Indirect data forwarding for interworking with N26 | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-186701. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186804 | CR | Approval | 23.502 CR0591: Registration type for Nudm_UECM_Registration | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187372. | Revised |
6.5.9 | S2-187372 | CR | Approval | 23.502 CR0591R1: Registration type for Nudm_UECM_Registration | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186804. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186875 | CR | Approval | 23.502 CR0603: Update the Nsmf_PDUSession_CreateSMContext for EPS to 5GS mobility | ZTE | Rel-15 | 5GS_Ph1 | Merged into S2-187368 | Merged |
6.5.9 | S2-186871 | CR | Approval | 23.501 CR0530: Clarification on the non-IP PDU session type for EPS to 5GS interworking | ZTE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187373. | Revised |
6.5.9 | S2-187373 | CR | Approval | 23.501 CR0530R1: Clarification on the non-IP PDU session type for EPS to 5GS interworking | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-186871. Revised in parallel session to S2-187384. | Revised |
6.5.9 | S2-187384 | CR | Approval | 23.501 CR0530R2: Clarification on the non-IP PDU session type for EPS to 5GS interworking | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-187373. For e-mail approval. e-mail revision 1 approved. Revised to S2-187611. LaeYoung (LG): provides rev1. | Revised |
6.5.9 | S2-187611 | CR | Approval | 23.501 CR0530R3: Clarification on the non-IP PDU session type for EPS to 5GS interworking | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-187384. This CR was agreed | Agreed |
6.5.9 | S2-186905 | CR | Approval | 23.502 CR0613: Correction to handover from 5GS to EPS | CATT | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187374. | Revised |
6.5.9 | S2-187374 | CR | Approval | 23.502 CR0613R1: Correction to handover from 5GS to EPS | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-186905. Agreed in parallel session Block approved | Agreed |
6.5.9 | S2-186906 | CR | Approval | 23.502 CR0614: Handling PDN connections with PGW not within the new PLMN | CATT | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.9 | S2-186912 | CR | Approval | 23.502 CR0616: Update to PDN connection establishment | CATT | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187375. | Revised |
6.5.9 | S2-187375 | CR | Approval | 23.502 CR0616R1: Update to PDN connection establishment | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-186912. Agreed in parallel session Block approved | Agreed |
- | - | - | - | No N26 | - | - | - | - | - |
6.5.9 | S2-186702 | CR | Approval | 23.501 CR0503: UE support for dual registration mode interworking | Samsung, Verizon, SK Telecom, LG Electronics | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.9 | S2-186410 | CR | Approval | 23.502 CR0521: 5GS to EPS Mobility without N26 | Ericsson | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.10 | - | - | - | Non-3GPP access specific functionality and flows | - | - | {Krisztian} | - | - |
- | - | - | - | Incoming LS | - | - | - | - | - |
6.5.10 | S2-186313 | LS IN | Action | LS from CT WG1: Reply LS on 5G service request procedure | CT WG1 (C1-182803) | Rel-15 | 5GS_Ph1-CT | Postponed S2-184682 from S2#127BIS. Responses drafted in S2-186714 and S2-186770. Postponed | Postponed |
6.5.10 | S2-186712 | DISCUSSION | Discussion | Discussion on DL signaling handling for non-3GPP PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.10 | S2-186768 | DISCUSSION | Discussion | How to handle the downlink signalling pending over Non-3GPP access | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.10 | S2-186713 | CR | Approval | 23.501 CR0504: DL signalling handling for non-3GPP PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-186968, to S2-187051. | Revised |
6.5.10 | S2-187051 | CR | Approval | 23.501 CR0504R1: DL signalling handling for non-3GPP PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-186713., merging S2-186968. Agreed in parallel session Block approved | Agreed |
6.5.10 | S2-186769 | CR | Approval | 23.502 CR0580: Handling of downlink NAS signalling for UE in CM-IDLE on Non-3GPP access | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187050. | Revised |
6.5.10 | S2-187050 | CR | Approval | 23.502 CR0580R1: Handling of downlink NAS signalling for UE in CM-IDLE on Non-3GPP access | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186769. Withdrawn | Withdrawn |
6.5.10 | S2-186771 | CR | Approval | 23.502 CR0581: Clarification for the access type for downlink signalling | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187080. | Revised |
6.5.10 | S2-187080 | CR | Approval | 23.502 CR0581R1: Clarification for the access type for downlink signalling | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186771. Noted in parallel session | Noted |
6.5.10 | S2-186967 | CR | Approval | 23.502 CR0622: Handling of downlink NAS signalling for UE in CM-IDLE on Non-3GPP access | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | LATE REQ. LATE DOC: Rx 29/06, 18:00. Revised in parallel session to S2-187052. | Revised |
6.5.10 | S2-187052 | CR | Approval | 23.502 CR0622R1: Handling of downlink NAS signalling for UE in CM-IDLE on Non-3GPP access | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186967. Revised in parallel session to S2-187128. | Revised |
6.5.10 | S2-187128 | CR | Approval | 23.502 CR0622R2: Handling of downlink NAS signalling for UE in CM-IDLE on Non-3GPP access | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187052. Withdrawn | Withdrawn |
6.5.10 | S2-186968 | CR | Approval | 23.501 CR0541: Handling of downlink NAS signalling for UE in CM-IDLE on Non-3GPP access | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | LATE REQ. LATE DOC: Rx 29/06, 18:00 Merged into S2-187051 | Merged |
6.5.10 | S2-186714 | LS OUT | Approval | [DRAFT] Reply LS on 5G service request procedure | LG Electronics | Rel-15 | 5GS_Ph1 | Response to S2-186313. Revised in parallel session, merging S2-187081, to S2-187130. | Revised |
6.5.10 | S2-187130 | LS OUT | Approval | [DRAFT] Reply LS on 5G service request procedure | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-186714, merging S2-187081. Revised to S2-187585. | Revised |
6.5.10 | S2-187585 | LS OUT | Approval | [DRAFT] Reply LS on 5G service request procedure | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-187130. For e-mail approval. Postponed Hualin (Huawei): provides rev1. Nicolas (Nokia): provides rev2. Nicolas (Nokia): proposes to postpone the LS OUT. Stefano (QC): proposes to postpone the LS OUT. Myungjune (LG): proposes to postpone the LS OUT. | Postponed |
6.5.10 | S2-186770 | LS OUT | Approval | LS Response on downlink signalling handling for N3GPP | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Response to S2-186313. Revised in parallel session to S2-187081. | Revised |
6.5.10 | S2-187081 | LS OUT | Approval | LS Response on downlink signalling handling for N3GPP | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186770. Merged into S2-187130 | Merged |
- | - | - | - | Corrections | - | - | - | - | - |
6.5.10 | S2-186636 | CR | Approval | 23.502 CR0562: Correction to Service Request QoS when changing between non-3GPP and 3GPP accesses | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-186715, to S2-187049. | Revised |
6.5.10 | S2-187049 | CR | Approval | 23.502 CR0562R1: Correction to Service Request QoS when changing between non-3GPP and 3GPP accesses | Nokia, Nokia Shanghai Bell, LGE | Rel-15 | 5GS_Ph1 | Revision of S2-186636., merging S2-186715. Revised in parallel session to S2-187129. | Revised |
6.5.10 | S2-187129 | CR | Approval | 23.502 CR0562R2: Correction to Service Request QoS when changing between non-3GPP and 3GPP accesses | Nokia, Nokia Shanghai Bell, LGE | Rel-15 | 5GS_Ph1 | Revision of S2-187049. Revised to S2-187586. | Revised |
6.5.10 | S2-187586 | CR | Approval | 23.502 CR0562R3: Correction to Service Request QoS when changing between non-3GPP and 3GPP accesses | Nokia, Nokia Shanghai Bell, LGE | Rel-15 | 5GS_Ph1 | Revision of S2-187129. For e-mail approval. Postponed Hualin (Huawei): provides rev1. Nicolas (Nokia): comments. Hualin (Huawei): provides rev2. George (E///): comments. Nicolas (Nokia): provides rev3. Hualin (Huawei): OK with rev3. George (E///): OK with rev3. Myungjune (LG): provides rev4. George (E///): objects rev4. Hualin (Huawei): OK with rev3, objects rev4. Myungjune (LG): comments. Hualin (Huawei): comments. Myungjune (LG): comments. Hualin (Huawei): comments. Myungjune (LG): comments. Hualin (Huawei): comments. Myungjune (LG): comments. Hualin (Huawei): comments. Myungjune (LG): comments. Hualin (Huawei): comments. Nicolas (Nokia): comments. Stefan (E///): comments. Nicolas (Nokia): proposes to postpone the CR. Stefan (E///): proposes to postpone the CR. Stefano (QC): proposes to postpone the CR. Myungjune (LG): proposes to postpone the CR. Hualin (Huawei): proposes to postpone the CR. Guillaume (Mediatek): proposes to postpone the CR. | Postponed |
6.5.10 | S2-186715 | CR | Approval | 23.502 CR0570: Access type notification to SMF in Service Request | LG Electronics | Rel-15 | 5GS_Ph1 | Merged into S2-187049 | Merged |
6.5.10 | S2-186716 | CR | Approval | 23.502 CR0571: Clarification on AN parameters in N3GPP procedures | LG Electronics | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.10 | S2-186717 | CR | Approval | 23.502 CR0572: Default IPsec tunnel for a PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.10 | S2-186772 | CR | Approval | 23.501 CR0512: Clarification of the Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187053. | Revised |
6.5.10 | S2-187053 | CR | Approval | 23.501 CR0512R1: Clarification of the Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186772. Withdrawn | Withdrawn |
6.5.10 | S2-186882 | CR | Approval | 23.502 CR0605: Clarification on N3IWF key delivery during registration procedure | Samsung | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187110. | Revised |
6.5.10 | S2-187110 | CR | Approval | 23.502 CR0605R1: Clarification on N3IWF key delivery during registration procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-186882. Agreed in parallel session Block approved | Agreed |
6.5.10 | S2-186961 | CR | Approval | 23.501 CR0538: Correction to interworking with EPC with N3GPP PDU Sessions | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.10 | S2-186971 | CR | Approval | 23.502 CR0623: Clarifications about MOBIKE and N3IWF certificate | Motorola Mobility, Lenovo | Rel-15 | 5GS_Ph1 | LATE REQ. LATE DOC: Rx 29/06, 15:00. Agreed in parallel session Block approved | Agreed |
6.5.11 | - | - | - | Framework functions | - | - | {Puneet} | - | - |
- | - | - | - | LSs | - | - | - | - | - |
6.5.11 | S2-186314 | LS IN | Action | LS from CT WG3: LS on the update of Nnef_PFDmanagement description | CT WG3 (C3-182500) | Rel-15 | 5GS_Ph1-CT | Postponed S2-184689 from S2#127BIS. Postponed in parallel session | Postponed |
6.5.11 | S2-186330 | LS IN | Action | LS from CT WG4: LS Reply on Overload Control of Service Based Interfaces | CT WG4 (C4-184613) | Rel-15 | 5GS_Ph1-CT | Postponed S2-185499 from S2#127BIS. Noted in parallel session | Noted |
- | - | - | - | Others | - | - | - | - | - |
6.5.11 | S2-186558 | CR | Approval | 23.501 CR0486: Deployment option for NF Discovery and Selection | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.11 | S2-186559 | CR | Approval | 23.502 CR0539: Alignment on Namf_EventExposure_Subscribe service operation | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186594 | CR | Approval | 23.501 CR0490: TS23.501 Clarification on Network Function Repository Function | ZTE | Rel-15 | 5GS_Ph1 | Noted in parallel session | Noted |
6.5.11 | S2-186902 | CR | Approval | 23.502 CR0611: Corrections to NRF services description | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187054. | Revised |
6.5.11 | S2-187054 | CR | Approval | 23.502 CR0611R1: Corrections to NRF services description | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186902. Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186608 | CR | Approval | 23.501 CR0493: Network Exposure in Roaming Situations | Convida Wireless LLC, AT&T, Intel | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187225. Modify the text as below : For external exposure of services related to specific UE(s), the NEF resides in the HPLMN. Depending on operator agreements, the NEF in the HPLMN may have interface(s) with NF(s) in the VPLMN. | Revised |
6.5.11 | S2-187225 | CR | Approval | 23.501 CR0493R1: Network Exposure in Roaming Situations | Convida Wireless LLC, AT&T, Intel, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-186608. Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186823 | CR | Approval | 23.502 CR0597: Correction on AMF and UDM service table | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187055. | Revised |
6.5.11 | S2-187055 | CR | Approval | 23.502 CR0597R1: Correction on AMF and UDM service table | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-186823. Revised in parallel session to S2-187131. Fix the cover page | Revised |
6.5.11 | S2-187131 | CR | Approval | 23.502 CR0597R2: Correction on AMF and UDM service table | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-187055. Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186898 | CR | Approval | 23.502 CR0608: Add monitoring event cancelltion call flows | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187058. | Revised |
6.5.11 | S2-187058 | CR | Approval | 23.502 CR0608R1: Add monitoring event cancelltion call flows | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186898. Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186899 | CR | Approval | 23.502 CR0609: Nudm_EventExposure_Subscribe and unsubscribe service operation correction | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187059. Fix the WI code on the cover sheet | Revised |
6.5.11 | S2-187059 | CR | Approval | 23.502 CR0609R1: Nudm_EventExposure_Subscribe and unsubscribe service operation correction | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186899. Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186900 | CR | Approval | 23.502 CR0610: Time stamp in Namf, Nsmf and Nnef EventExposure_Notify service operations | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186901 | CR | Approval | 23.501 CR0534: Corrections to NF profile description | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187056. | Revised |
6.5.11 | S2-187056 | CR | Approval | 23.501 CR0534R1: Corrections to NF profile description | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186901. Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186903 | CR | Approval | 23.501 CR0535: Corrections to NF services names and references | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-187057. | Revised |
6.5.11 | S2-187057 | CR | Approval | 23.501 CR0535R1: Corrections to NF services names and references | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186903. Agreed in parallel session Block approved | Agreed |
6.5.11 | S2-186947 | CR | Approval | 23.502 CR0621: Missing NEF services. | ORANGE | Rel-15 | 5GS_Ph1 | Incorrect version (15.5.0) - should be v15.2.0. Revised in parallel session to S2-187060. | Revised |
6.5.11 | S2-187060 | CR | Approval | 23.502 CR0621R1: Missing NEF services. | ORANGE | Rel-15 | 5GS_Ph1 | Revision of S2-186947. Revised to S2-187587. | Revised |
6.5.11 | S2-187587 | CR | Approval | 23.502 CR0621R2: Missing NEF services. | ORANGE | Rel-15 | 5GS_Ph1 | Revision of S2-187060. For e-mail approval. This CR was agreed | Agreed |
6.6 | - | - | - | Study on architecture enhancements for 3GPP support of advanced V2X services (FS_eV2XARC) | - | - | {LaeYoung} | - | - |
- | - | - | - | Incoming LS | - | - | - | - | - |
6.6 | S2-186365 | LS In | Action | LS from RAN WG1: Reply LS on PC5 transmission mechanism selection | RAN WG1 (R1-1807718) | Rel-15 | LTE_eV2X-Core | Noted in parallel session | Noted |
- | - | - | - | Editorial based on the agreement at SA2#127bis | - | - | - | - | - |
6.6 | S2-186647 | P-CR | Approval | Update to solution for eV2X system migrations | Qualcomm Incorporated, Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Agreed in parallel session Block approved | Approved |
- | - | - | - | New/Updated KIs (including Solution proposals) | - | - | - | - | - |
6.6 | S2-186687 | P-CR | Approval | New key issue: Support 5G deployment option #3 | Intel | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-186973. | Revised |
6.6 | S2-186973 | P-CR | Approval | New key issue: Support 5G deployment option #3 | Intel | Rel-16 | FS_eV2XARC | Revision of S2-186687. Revised in parallel session to S2-186984. | Revised |
6.6 | S2-186984 | P-CR | Approval | New key issue: Support 5G deployment option #3 | Intel | Rel-16 | FS_eV2XARC | Revision of S2-186973. Agreed in parallel session Block approved | Approved |
6.6 | S2-186827 | P-CR | Approval | Key issue 8 update: session and service continuity requirement based edge computing | China Mobile | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-186974. | Revised |
6.6 | S2-186974 | P-CR | Approval | Key issue 8 update: session and service continuity requirement based edge computing | China Mobile | Rel-16 | FS_eV2XARC | Revision of S2-186827. Revised in parallel session to S2-186985. | Revised |
6.6 | S2-186985 | P-CR | Approval | Key issue 8 update: session and service continuity requirement based edge computing | China Mobile | Rel-16 | FS_eV2XARC | Revision of S2-186974. Agreed in parallel session Block approved | Approved |
6.6 | S2-186838 | P-CR | Approval | New Solution for KI8 and KI extension: Support for MEC topology exposure for efficient UPF anchor selection | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of (unhandled) S2-185343 from S2#127BIS. Not Handled | Not Handled |
6.6 | S2-186841 | P-CR | Approval | Key Issue on Broadcast Support for eV2X | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of (unhandled) S2-185345 from S2#127BIS. Revised in parallel session to S2-186975. | Revised |
6.6 | S2-186975 | P-CR | Approval | Key Issue on Broadcast Support for eV2X | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-186841. Revised in parallel session to S2-186986. | Revised |
6.6 | S2-186986 | P-CR | Approval | Key Issue on Broadcast Support for eV2X | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-186975. Agreed in parallel session Block approved | Approved |
6.6 | S2-186842 | P-CR | Approval | Solution for broadcast KI | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-186843 | P-CR | Approval | New Key Issue and Solution for Dynamic Application Adjustment. | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-186949 | P-CR | Approval | Update to Support of edge computing Key Issue #8 | InterDigital Inc. | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-186950 | P-CR | Approval | Solution to KI#8:5GS V2X Edge Computing | InterDigital Inc. | Rel-16 | FS_eV2XARC | Noted in parallel session | Noted |
- | - | - | - | Uu communication related | - | - | - | - | - |
6.6 | S2-186409 | P-CR | Approval | Solution for KI#3: QoS Support for eV2X over Uu interface | Ericsson | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-186976. | Revised |
6.6 | S2-186976 | P-CR | Approval | Solution for KI#3: QoS Support for eV2X over Uu interface | Ericsson, LG Electronics | Rel-16 | FS_eV2XARC | Revision of S2-186409. Revised in parallel session to S2-186987. | Revised |
6.6 | S2-186987 | P-CR | Approval | Solution for KI#3: QoS Support for eV2X over Uu interface | Ericsson, LG Electronics | Rel-16 | FS_eV2XARC | Revision of S2-186976. Agreed in parallel session Block approved | Approved |
6.6 | S2-186586 | P-CR | Approval | Solution to key issue#10 for non-IP based V2X message transmission and reception over Uu | LG Electronics, NTT DOCOMO | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-186977. | Revised |
6.6 | S2-186977 | P-CR | Approval | Solution to key issue#10 for non-IP based V2X message transmission and reception over Uu | LG Electronics, NTT DOCOMO | Rel-16 | FS_eV2XARC | Revision of S2-186586. Revised in parallel session to S2-186988. | Revised |
6.6 | S2-186988 | P-CR | Approval | Solution to key issue#10 for non-IP based V2X message transmission and reception over Uu | LG Electronics, NTT DOCOMO | Rel-16 | FS_eV2XARC | Revision of S2-186977. Agreed in parallel session Block approved | Approved |
6.6 | S2-186835 | P-CR | Approval | Update of Solution 2 - QoS Support for eV2X over Uu interface | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of (unhandled) S2-185340 from S2#127BIS. Not Handled | Not Handled |
6.6 | S2-186837 | P-CR | Approval | Procedure descriptions for Solution 16 - QoS Enhancements for eV2X Services | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-186978. | Revised |
6.6 | S2-186978 | P-CR | Approval | Procedure descriptions for Solution 16 - QoS Enhancements for eV2X Services | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-186837. Revised in parallel session to S2-186989. | Revised |
6.6 | S2-186989 | P-CR | Approval | Procedure descriptions for Solution 16 - QoS Enhancements for eV2X Services | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-186978. Agreed in parallel session Block approved | Approved |
- | - | - | - | PC5 communication related | - | - | - | - | - |
6.6 | S2-186648 | P-CR | Approval | EV2X QoS Support of PC5 communications | Qualcomm Incorporated, | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-186979. | Revised |
6.6 | S2-186979 | P-CR | Approval | EV2X QoS Support of PC5 communications | Qualcomm Incorporated, | Rel-16 | FS_eV2XARC | Revision of S2-186648. Revised in parallel session to S2-186990. | Revised |
6.6 | S2-186990 | P-CR | Approval | EV2X QoS Support of PC5 communications | Qualcomm Incorporated, LG Electronics, InterDigital Inc. | Rel-16 | FS_eV2XARC | Revision of S2-186979. Agreed in parallel session Block approved | Approved |
6.6 | S2-186760 | P-CR | Approval | Solution to Key Issue #2 -Supporting multiple V2X applications requiring different operating carrier frequency (for V2X over PC5) or RAT type (for V2X over Uu) | Motorola Mobility, Lenovo | Rel-16 | FS_eV2XARC | Noted in parallel session | Noted |
6.6 | S2-186933 | P-CR | Approval | Solution for KI#2 / KI#12: PC5 resource control | Samsung | Rel-16 | FS_eV2XARC | Noted in parallel session | Noted |
6.6 | S2-186587 | P-CR | Approval | Update of Solution#6 | LG Electronics | Rel-16 | FS_eV2XARC | Revised in parallel session, merging S2-186751, to S2-186980. | Revised |
6.6 | S2-186980 | P-CR | Approval | Update of Solution#6 | LG Electronics, CATT, NTT DOCOMO, Motorola Mobility, Lenovo | Rel-16 | FS_eV2XARC | Revision of S2-186587., merging S2-186751. Agreed in parallel session Block approved | Approved |
6.6 | S2-186751 | P-CR | Approval | Update to Solution#6 | CATT | Rel-16 | FS_eV2XARC | Merged into S2-186980 | Merged |
6.6 | S2-186839 | P-CR | Approval | Procedures for the provision of Network-controlled QoS for PC5 communication | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Opened in parallel session. Revised in parallel session to S2-186983. | Revised |
6.6 | S2-186983 | P-CR | Approval | Procedures for the provision of Network-controlled QoS for PC5 communication | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-186839. Postponed in parallel session | Postponed |
6.6 | S2-186860 | LS OUT | Approval | [DRAFT] LS on Service Authorization to NG-RAN for eV2X communications over PC5 | LG Electronics | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
- | - | - | - | Architecture related and dependant | - | - | - | - | - |
6.6 | S2-186620 | P-CR | Approval | V2X reference architecture | Ericsson, CATT, Samsung | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-186621 | P-CR | Approval | Update of solution #3 | Ericsson, Samsung | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-186981. | Revised |
6.6 | S2-186981 | P-CR | Approval | Update of solution #3 | Ericsson, Samsung | Rel-16 | FS_eV2XARC | Revision of S2-186621. Revised in parallel session to S2-186991. | Revised |
6.6 | S2-186991 | P-CR | Approval | Update of solution #3 | Ericsson, Samsung | Rel-16 | FS_eV2XARC | Revision of S2-186981. Agreed in parallel session Block approved | Approved |
6.6 | S2-186685 | P-CR | Approval | EV2X Solution #4 update addressing key issue #11 | Intel, LG Electronics | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-186686 | P-CR | Approval | Update on eV2X Solution #10 addressing key issue #12 based on Architecture in A.2 | Intel, LG Electronics | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-186982. | Revised |
6.6 | S2-186982 | P-CR | Approval | Update on eV2X Solution #10 addressing key issue #12 based on Architecture in A.2 | Intel, LG Electronics, Blackberry | Rel-16 | FS_eV2XARC | Revision of S2-186686. Agreed in parallel session Block approved | Approved |
6.6 | S2-186750 | P-CR | Approval | Service Authorization and Provisioning to UE for eV2X communications over PC5 based on UE V2X capability | CATT | Rel-16 | FS_eV2XARC | Noted in parallel session | Noted |
6.6 | S2-186834 | P-CR | Approval | Update of Solution 5 for eV2X parameters provisioning | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of (unhandled) S2-185341 from S2#127BIS. Not Handled | Not Handled |
6.6 | S2-186840 | P-CR | Approval | New Solution for KI12: Interworking solution for architectual option B | Huawei, HiSilicon, InterDigital | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
- | - | - | - | Slicing related | - | - | - | - | - |
6.6 | S2-186688 | P-CR | Approval | EV2X Conclusion for key issue #7 | Intel, LG Electronics?, Qualcomm?, Ericsson? | Rel-16 | FS_eV2XARC | Confirm Sources! Not Handled | Not Handled |
6.6 | S2-186836 | P-CR | Approval | Further considerations on slicing for eV2X services and update of Solution 7 | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of (unhandled) S2-185341 from S2#127BIS. Not Handled | Not Handled |
6.6 | S2-186935 | P-CR | Approval | Solution for KI#5 / KI#6 / KI#11: Service authorization based on S-NSSAI | Samsung | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.7 | - | - | - | Study on the Wireless and Wireline Convergence for the 5G system architecture (FS_5WWC) | - | - | {Krisztian} | - | - |
- | - | - | - | Trusted Non-3GPP Access | - | - | - | - | - |
6.7 | S2-186497 | P-CR | Approval | Update of Solution #1: Support of Trusted Non-3GPP Access | Motorola Mobility, Lenovo, Broadcom | Rel-16 | FS_5WWC | Revised in parallel session to S2-187002. | Revised |
6.7 | S2-187002 | P-CR | Approval | Update of Solution #1: Support of Trusted Non-3GPP Access | Motorola Mobility, Lenovo, Broadcom | Rel-16 | FS_5WWC | Revision of S2-186497. Agreed in parallel session Block approved | Approved |
6.7 | S2-186829 | P-CR | Approval | PDU session establishment procedure | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revised in parallel session to S2-187003. | Revised |
6.7 | S2-187003 | P-CR | Approval | PDU session establishment procedure | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-186829. Revised in parallel session to S2-187082. | Revised |
6.7 | S2-187082 | P-CR | Approval | PDU session establishment procedure | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-187003. This was reviewed and approved. | Approved |
6.7 | S2-186438 | P-CR | Approval | Update of Solution #3: Access to 5GC from UEs without supporting NAS on non-3GPP access | Motorola Mobility, Lenovo, Broadcom | Rel-16 | FS_5WWC | Revised in parallel session to S2-187004. | Revised |
6.7 | S2-187004 | P-CR | Approval | Update of Solution #3: Access to 5GC from UEs without supporting NAS on non-3GPP access | Motorola Mobility, Lenovo, Broadcom | Rel-16 | FS_5WWC | Revision of S2-186438. Agreed in parallel session. Revised in parallel session to S2-187122. | Revised |
6.7 | S2-187122 | P-CR | Approval | Update of Solution #3: Access to 5GC from UEs without supporting NAS on non-3GPP access | Motorola Mobility, Lenovo, Broadcom | Rel-16 | FS_5WWC | Revision of S2-187004. This was reviewed and approved. | Approved |
- | - | - | - | General | - | - | - | - | - |
6.7 | S2-186830 | P-CR | Approval | Editorial corrections | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revised in parallel session to S2-187005. | Revised |
6.7 | S2-187005 | P-CR | Approval | Editorial corrections | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-186830. Revised in parallel session to S2-187083. Remove [28] and [29] references | Revised |
6.7 | S2-187083 | P-CR | Approval | Editorial corrections | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-187005. Agreed in parallel session Block approved | Approved |
- | - | - | - | Solution revisions and new solutions | - | - | - | - | - |
6.7 | S2-186765 | P-CR | Approval | Solution for FWA | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revised in parallel session to S2-187006. | Revised |
6.7 | S2-187006 | P-CR | Approval | Solution for FWA | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-186765. Revised in parallel session to S2-187084. | Revised |
6.7 | S2-187084 | P-CR | Approval | Solution for FWA | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-187006. Approved | Approved |
6.7 | S2-186398 | P-CR | Approval | SM procedures for 5WWC | Ericsson | Rel-16 | FS_5WWC | Revised in parallel session to S2-187007. | Revised |
6.7 | S2-187007 | P-CR | Approval | SM procedures for 5WWC | Ericsson | Rel-16 | FS_5WWC | Revision of S2-186398. Agreed in parallel session Block approved | Approved |
6.7 | S2-186399 | P-CR | Approval | MM procedures for 5WWC | Ericsson | Rel-16 | FS_5WWC | Revised in parallel session to S2-187008. | Revised |
6.7 | S2-187008 | P-CR | Approval | MM procedures for 5WWC | Ericsson | Rel-16 | FS_5WWC | Revision of S2-186399. Agreed in parallel session Block approved | Approved |
6.7 | S2-186517 | P-CR | Approval | 23.716 solutions: small update to Solution #9 - new IPV6 address allocation mechanisms | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5WWC | Agreed in parallel session Block approved | Approved |
6.7 | S2-186518 | P-CR | Approval | 23.716 new solution: Subscription control for the Support of ranges of IP address/Prefixes in a PDU Session | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5WWC | Revised in parallel session to S2-187027. | Revised |
6.7 | S2-187027 | P-CR | Approval | 23.716 new solution: Subscription control for the Support of ranges of IP address/Prefixes in a PDU Session | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5WWC | Revision of S2-186518. Agreed in parallel session Block approved | Approved |
6.7 | S2-186762 | P-CR | Approval | IPTV solution for WWC | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revised in parallel session to S2-187028. | Revised |
6.7 | S2-187028 | P-CR | Approval | IPTV solution for WWC | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-186762. Revised in parallel session to S2-187085. | Revised |
6.7 | S2-187085 | P-CR | Approval | IPTV solution for WWC | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-187028. Revised off-line to S2-187571. | Revised |
6.7 | S2-187571 | P-CR | Approval | IPTV solution for WWC | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-187085. Approved | Approved |
6.7 | S2-186622 | P-CR | Approval | Unicast media delivery for 5WWC | Ericsson | Rel-16 | FS_5WWC | Revised in parallel session to S2-187029. | Revised |
6.7 | S2-187029 | P-CR | Approval | Unicast media delivery for 5WWC | Ericsson | Rel-16 | FS_5WWC | Revision of S2-186622. Approved | Approved |
6.7 | S2-186400 | P-CR | Approval | Mobility Restrictions for 5WWC | Ericsson | Rel-16 | FS_5WWC | Revised in parallel session to S2-187030. | Revised |
6.7 | S2-187030 | P-CR | Approval | Mobility Restrictions for 5WWC | Ericsson | Rel-16 | FS_5WWC | Revision of S2-186400. Agreed in parallel session Block approved | Approved |
6.7 | S2-186763 | P-CR | Approval | Update of Registration Restriction solution | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revised in parallel session to S2-187031. | Revised |
6.7 | S2-187031 | P-CR | Approval | Update of Registration Restriction solution | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-186763. Agreed in parallel session Block approved | Approved |
6.7 | S2-186847 | P-CR | Approval | Solution Updates for Key Issue 13 | Intel | Rel-16 | FS_5WWC | Revised in parallel session to S2-187032. | Revised |
6.7 | S2-187032 | P-CR | Approval | Solution Updates for Key Issue 13 | Intel, Huawei | Rel-16 | FS_5WWC | Revision of S2-186847. Revised in parallel session to S2-187086. | Revised |
6.7 | S2-187086 | P-CR | Approval | Solution Updates for Key Issue 13 | Intel, Huawei | Rel-16 | FS_5WWC | Revision of S2-187032. Approved | Approved |
6.7 | S2-186761 | P-CR | Approval | Solution for RG configuration and management | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revised in parallel session to S2-187033. | Revised |
6.7 | S2-187033 | P-CR | Approval | Solution for RG configuration and management | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-186761. Revised to S2-187588. | Revised |
6.7 | S2-187588 | P-CR | Approval | Solution for RG configuration and management | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-187033. Approved | Approved |
6.7 | S2-186742 | P-CR | Approval | 23.716 new solutions: Line Id Transfer to and usage within 5GC | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5WWC | Not Handled | Not Handled |
- | - | - | - | Hybrid Access | - | - | - | - | - |
6.7 | S2-186863 | P-CR | Approval | 5WWC: Applicability of ATSSS for 5G-RG | Telstra | Rel-16 | FS_5WWC | Revised in parallel session to S2-187034. | Revised |
6.7 | S2-187034 | P-CR | Approval | 5WWC: Applicability of ATSSS for 5G-RG | Telstra | Rel-16 | FS_5WWC | Revision of S2-186863. Revised in parallel session to S2-187087. | Revised |
6.7 | S2-187087 | P-CR | Approval | 5WWC: Applicability of ATSSS for 5G-RG | Telstra | Rel-16 | FS_5WWC | Revision of S2-187034. Approved | Approved |
6.7 | S2-186766 | P-CR | Approval | Hybrid Access definition and solution | Huawei, HiSilicon | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-186397 | P-CR | Approval | AMF selection for 5WWC | Ericsson | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-186764 | P-CR | Approval | Service Control for Hybrid control | Huawei, HiSilicon | Rel-16 | FS_5WWC | Not Handled | Not Handled |
- | - | - | - | UE behind RG | - | - | - | - | - |
6.7 | S2-186524 | DISCUSSION | Discussion | TR 23.716: Updates to Architectural Requirements | OTD, Charter | Noted in parallel session | Noted | ||
6.7 | S2-186523 | P-CR | Approval | TR 23.716: Updates to Architectural Requirements | OTD, Charter | Rel-16 | FS_5WWC | Revised in parallel session to S2-187035. | Revised |
6.7 | S2-187035 | P-CR | Approval | TR 23.716: Updates to Architectural Requirements | OTD, Charter | Rel-16 | FS_5WWC | Revision of S2-186523. Revised in parallel session to S2-187088. | Revised |
6.7 | S2-187088 | P-CR | Approval | TR 23.716: Updates to Architectural Requirements | OTD, Charter | Rel-16 | FS_5WWC | Revision of S2-187035. Revised to S2-187589. | Revised |
6.7 | S2-187589 | P-CR | Approval | TR 23.716: Updates to Architectural Requirements | OTD, Charter | Rel-16 | FS_5WWC | Revision of S2-187088. For e-mail approval. e-mail revision 2 approved. Revised to S2-187612. Laurent (Nokia): provides rev1. Curt (Charter): provides rev2. Jeff (Trideaworks): provides a revision in a separate mail thread. Jeff & Selvam (Trideaworks): withdraw their revision. | Revised |
6.7 | S2-187612 | P-CR | Approval | TR 23.716: Updates to Architectural Requirements | OTD, Charter | Rel-16 | FS_5WWC | e-mail revision 2 of S2-187589. Approved | Approved |
6.7 | S2-186951 | P-CR | Approval | Attempt to update Scenario 3 to clarify relationships between 'end UEs', 'RGs' and core network entities | Vodafone | Rel-16 | FS_5WWC | Revised in parallel session to S2-187036. | Revised |
6.7 | S2-187036 | P-CR | Approval | Attempt to update Scenario 3 to clarify relationships between 'end UEs', 'RGs' and core network entities | Vodafone | Rel-16 | FS_5WWC | Revision of S2-186951. Revised in parallel session to S2-187089. | Revised |
6.7 | S2-187089 | P-CR | Approval | Attempt to update Scenario 3 to clarify relationships between 'end UEs', 'RGs' and core network entities | Vodafone | Rel-16 | FS_5WWC | Revision of S2-187036. For e-mail approval. Approved | Approved |
6.7 | S2-186767 | P-CR | Approval | UE relay: slice and QoS issues | Huawei, HiSilicon | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-186846 | P-CR | Approval | Solution of 5GC Capable UE behind 5G-RG connected to 5GC via NG-RAN/W-5GAN | Intel | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-186401 | P-CR | Approval | Updates to solution #11 'Support 3GPP UEs via 5G-RG/FN-RG for wireline access network using N3GPP solutions' | Ericsson | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-186437 | P-CR | Approval | Update of Solution #11: Support 5GC-capable UEs via 5G-RG/FN-RG for wireline access network using N3GPP solutions | Motorola Mobility, Lenovo | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-186828 | P-CR | Approval | Home WLAN accessing solution | Huawei, HiSilicon | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-186929 | P-CR | Approval | TR 23.716: update solution 6.12 | ITRI | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.8 | - | - | - | Study on Access Traffic Steering, Switch and Splitting support in the 5G system architecture (FS_ATSSS) | - | - | {Krisztian} | - | - |
- | - | - | - | Solution updates | - | - | - | - | - |
6.8 | S2-186444 | P-CR | Approval | Architectural Updates for ATSSS Solution 1 | Broadcom | Rel-16 | FS_ATSSS | Revision of (unhandled) S2-185346 from S2#127BIS. Revised in parallel session to S2-187037. | Revised |
6.8 | S2-187037 | P-CR | Approval | Architectural Updates for ATSSS Solution 1 | Broadcom | Rel-16 | FS_ATSSS | Revision of S2-186444. Revised in parallel session to S2-187090. Delete cases a) and b) in 6.1.7.3.1.2 | Revised |
6.8 | S2-187090 | P-CR | Approval | Architectural Updates for ATSSS Solution 1 | Broadcom | Rel-16 | FS_ATSSS | Revision of S2-187037. Agreed in parallel session Block approved | Approved |
6.8 | S2-186353 | P-CR | Approval | Additional options for L4 convergence method in Solution 1 | Deutsche Telekom | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187038. | Revised |
6.8 | S2-187038 | P-CR | Approval | Additional options for L4 convergence method in Solution 1 | Deutsche Telekom | Rel-16 | FS_ATSSS | Revision of S2-186353. Revised in parallel session to S2-187091. Delete: 'As MP-TCP and MP-QUIC is used for reliable traffic, SCTP is used for splitting non-reliable traffic like UDP over multiple paths by encapsulating such traffic accordingly. The UDP generic overcomes the application of a defined intermediate layer like SCTP and also overcomes the additional GRE layer of 6.1.7.2.' | Revised |
6.8 | S2-187091 | P-CR | Approval | Additional options for L4 convergence method in Solution 1 | Deutsche Telekom | Rel-16 | FS_ATSSS | Revision of S2-187038. Agreed in parallel session Block approved | Approved |
6.8 | S2-186675 | P-CR | Approval | Updates to ATSSS Solution 1 | NICT | Rel-16 | FS_ATSSS | Noted in parallel session | Noted |
6.8 | S2-186849 | P-CR | Approval | Updates of Solution 1 with alternative UP Convergence Method and Evaluation Procedure | Intel | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187039. | Revised |
6.8 | S2-187039 | P-CR | Approval | Updates of Solution 1 with alternative UP Convergence Method and Evaluation Procedure | Intel | Rel-16 | FS_ATSSS | Revision of S2-186849. Revised in parallel session to S2-187092. | Revised |
6.8 | S2-187092 | P-CR | Approval | Updates of Solution 1 with alternative UP Convergence Method and Evaluation Procedure | Intel | Rel-16 | FS_ATSSS | Revision of S2-187039. Approved | Approved |
6.8 | S2-186436 | P-CR | Approval | Solution 2: Update of Combined Establishment | Motorola Mobility, Lenovo | Rel-16 | FS_ATSSS | Revision of (unhandled) S2-185257 from S2#127BIS. Revised in parallel session to S2-187040. | Revised |
6.8 | S2-187040 | P-CR | Approval | Solution 2: Update of Combined Establishment | Motorola Mobility, Lenovo | Rel-16 | FS_ATSSS | Revision of S2-186436. Agreed in parallel session Block approved | Approved |
6.8 | S2-186466 | P-CR | Approval | Solution 2 Update: Modifying Multi-access PDU Session as single-access PDU | InterDigital Inc. | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187041. | Revised |
6.8 | S2-187041 | P-CR | Approval | Solution 2 Update: Modifying Multi-access PDU Session as single-access PDU | InterDigital Inc. | Rel-16 | FS_ATSSS | Revision of S2-186466. Revised in parallel session to S2-187103. | Revised |
6.8 | S2-187103 | P-CR | Approval | Solution 2 Update: Modifying Multi-access PDU Session as single-access PDU | InterDigital Inc. | Rel-16 | FS_ATSSS | Revision of S2-187041. Approved | Approved |
6.8 | S2-186794 | P-CR | Approval | Updating 6.2 Solution 2 to add a procedure for Multi-Access PDU Session Modification | ETRI | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187042. | Revised |
6.8 | S2-187042 | P-CR | Approval | Updating 6.2 Solution 2 to add a procedure for Multi-Access PDU Session Modification | ETRI | Rel-16 | FS_ATSSS | Revision of S2-186794. Revised in parallel session to S2-187104. | Revised |
6.8 | S2-187104 | P-CR | Approval | Updating 6.2 Solution 2 to add a procedure for Multi-Access PDU Session Modification | ETRI, ITRI | Rel-16 | FS_ATSSS | Revision of S2-187042. Revised in parallel session to S2-187108. | Revised |
6.8 | S2-187108 | P-CR | Approval | Updating 6.2 Solution 2 to add a procedure for Multi-Access PDU Session Modification | ETRI, ITRI | Rel-16 | FS_ATSSS | Revision of S2-187104. Approved | Approved |
6.8 | S2-186930 | P-CR | Approval | Resolve EN in Release of a Multi-Access PDU Session | ITRI | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187043. | Revised |
6.8 | S2-187043 | P-CR | Approval | Resolve EN in Release of a Multi-Access PDU Session | ITRI | Rel-16 | FS_ATSSS | Revision of S2-186930. Agreed in parallel session Block approved | Approved |
6.8 | S2-186461 | P-CR | Approval | ATSSS execution procedure for TFCP solution | OPPO, Huawei | Rel-16 | FS_ATSSS | Revision of (unhandled) S2-184788 from S2#127BIS. Revised in parallel session to S2-187044. | Revised |
6.8 | S2-187044 | P-CR | Approval | ATSSS execution procedure for TFCP solution | OPPO, Huawei | Rel-16 | FS_ATSSS | Revision of S2-186461. Agreed in parallel session Block approved | Approved |
6.8 | S2-186561 | P-CR | Approval | Update of TFCP solution | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187045. | Revised |
6.8 | S2-187045 | P-CR | Approval | Update of TFCP solution | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revision of S2-186561. Agreed in parallel session Block approved | Approved |
6.8 | S2-186562 | P-CR | Approval | Editorial correction for TFCP solution | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Agreed in parallel session Block approved | Approved |
6.8 | S2-186563 | P-CR | Approval | ATSSS path performance measurement function | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187046. | Revised |
6.8 | S2-187046 | P-CR | Approval | ATSSS path performance measurement function | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revision of S2-186563. Revised in parallel session to S2-187105. | Revised |
6.8 | S2-187105 | P-CR | Approval | ATSSS path performance measurement function | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revision of S2-187046. Revised in parallel session to S2-187107. Replace 'measured' with 'evaluated' in the EN | Revised |
6.8 | S2-187107 | P-CR | Approval | ATSSS path performance measurement function | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revision of S2-187105. Agreed in parallel session Block approved | Approved |
6.8 | S2-186848 | P-CR | Approval | 23.793: Update of Solution 5 | Apple (UK) Limited | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187047. | Revised |
6.8 | S2-187047 | P-CR | Approval | 23.793: Update of Solution 5 | Apple (UK) Limited | Rel-16 | FS_ATSSS | Revision of S2-186848. Revised in parallel session to S2-187106. | Revised |
6.8 | S2-187106 | P-CR | Approval | 23.793: Update of Solution 5 | Apple (UK) Limited | Rel-16 | FS_ATSSS | Revision of S2-187047. Approved | Approved |
6.8 | S2-186445 | P-CR | Approval | Clarification on the establishment procedure of proxyied MPTCP connections | Orange | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-186452 | P-CR | Approval | TR 23.793: MPTCP Proxy Selection Policy and miscellaneous changes | ZTE Wistron | Rel-16 | FS_ATSSS | Revised in parallel session to S2-187048. | Revised |
6.8 | S2-187048 | P-CR | Approval | TR 23.793: MPTCP Proxy Selection Policy and miscellaneous changes | ZTE Wistron | Rel-16 | FS_ATSSS | Revision of S2-186452. Revised in parallel session to S2-187102. | Revised |
6.8 | S2-187102 | P-CR | Approval | TR 23.793: MPTCP Proxy Selection Policy and miscellaneous changes | ZTE Wistron | Rel-16 | FS_ATSSS | Revision of S2-187048. Agreed in parallel session Block approved | Approved |
6.8 | S2-186569 | P-CR | Approval | Update of solution #6 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-186719 | P-CR | Approval | Update Solution 8 - resolving editor's notes | LG Electronics | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
- | - | - | - | New solutions | - | - | - | - | - |
6.8 | S2-186439 | P-CR | Approval | Consolidated ATSSS Solution | Motorola Mobility, Lenovo | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-186600 | P-CR | Approval | QoS flow handling for Multi-Access PDU session | ZTE | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-186720 | P-CR | Approval | QoS handling in MA-PDU Session | LG Electronics | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.9 | - | - | - | Study on Cellular IoT support and evolution for the 5G System (FS_CIoT_5G) | - | - | {Puneet} | - | - |
6.9 | S2-186624 | P-CR | Approval | Discussion and New Key Issues for Objective: 1 | Convida Wireless LLC, Qualcomm, AT&T, Intel, Verizon UK Ltd | Rel-16 | FS_CIoT_5G | Agreed in parallel session Block approved | Approved |
6.9 | S2-186509 | P-CR | Approval | Documentation of IWK-NEF in TR 23.724 | Qualcomm Incorporated, Convida Wireless, AT&T | Rel-16 | FS_CIoT_5G | Agreed in parallel session Block approved | Approved |
- | - | - | - | Key Issue 3 | - | - | - | - | - |
6.9 | S2-186391 | P-CR | Approval | KI3: MT signalling for power saving UE | Ericsson | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-184853 from SA2#127BIS. Revised in parallel session to S2-187181. | Revised |
6.9 | S2-187181 | P-CR | Approval | KI3: MT signalling for power saving UE | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-186391. Revised in parallel session to S2-187265. In step 1 change 'are' to 'may be' In note under step 2 remove 'location report request.' | Revised |
6.9 | S2-187265 | P-CR | Approval | KI3: MT signalling for power saving UE | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-187181. Agreed in parallel session Block approved | Approved |
6.9 | S2-186392 | P-CR | Approval | KI3: Paging of power saving UEs | Ericsson | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-184854 from SA2#127BIS. Revised in parallel session to S2-187182. | Revised |
6.9 | S2-187182 | P-CR | Approval | KI3: Paging of power saving UEs | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-186392. Revised in parallel session to S2-187266. | Revised |
6.9 | S2-187266 | P-CR | Approval | KI3: Paging of power saving UEs | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-187182. Revised in parallel session to S2-187283. Delete location reporting | Revised |
6.9 | S2-187283 | P-CR | Approval | KI3: Paging of power saving UEs | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-187266. Agreed in parallel session Block approved | Approved |
6.9 | S2-186735 | P-CR | Approval | Solution for KI3: UE availability after DDN failure for multiple AFs | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-185336 from S2#127BIS. Revised in parallel session to S2-187183. | Revised |
6.9 | S2-187183 | P-CR | Approval | Solution for KI3: UE availability after DDN failure for multiple AFs | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revision of S2-186735. Agreed in parallel session Block approved | Approved |
- | - | - | - | Key Issue 13 | - | - | - | - | - |
6.9 | S2-186393 | P-CR | Approval | PCR 23.724: Update to KI#13 | Ericsson | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-184855 from SA2#127BIS. Revised in parallel session to S2-187184. | Revised |
6.9 | S2-187184 | P-CR | Approval | PCR 23.724: Update to KI#13 | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-186393. Postponed in parallel session | Postponed |
6.9 | S2-186394 | P-CR | Approval | Local RRM Policy UE Differentiation for KI#13 | Ericsson | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-184856 from SA2#127BIS. Revised in parallel session to S2-187185. | Revised |
6.9 | S2-187185 | P-CR | Approval | Local RRM Policy UE Differentiation for KI#13 | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-186394. Revised in parallel session to S2-187267. | Revised |
6.9 | S2-187267 | P-CR | Approval | Local RRM Policy UE Differentiation for KI#13 | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-187185. Postponed in parallel session | Postponed |
6.9 | S2-186734 | P-CR | Approval | Update of Solution 26: Expected UE Behaviour provisioning for CIoT | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187186. | Revised |
6.9 | S2-187186 | P-CR | Approval | Update of Solution 26: Expected UE Behaviour provisioning for CIoT | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revision of S2-186734. Revised in parallel session to S2-187268. | Revised |
6.9 | S2-187268 | P-CR | Approval | Update of Solution 26: Expected UE Behaviour provisioning for CIoT | Huawei, HiSilicon, InterDigital Inc., Convida, Motorola Mobility, Lenovo | Rel-16 | FS_CIoT_5G | Revision of S2-187186. Agreed in parallel session Block approved | Approved |
- | - | - | - | Key Issue 1 | - | - | - | - | - |
6.9 | S2-186390 | P-CR | Approval | KI1: Solution 19 improvement | Ericsson | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-184851 from SA2#127BIS. Revised in parallel session to S2-187187. | Revised |
6.9 | S2-187187 | P-CR | Approval | KI1: Solution 19 improvement | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-186390. Agreed in parallel session Block approved | Approved |
6.9 | S2-186737 | P-CR | Approval | Solution for KI1: Small Data transmission based on independently suspended and resumed PDU sessions | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-185338 from S2#127BIS. Postponed in parallel session | Postponed |
6.9 | S2-186738 | P-CR | Approval | Solution for KI8: Reliable Data Service support in the SMF | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-185333 from S2#127BIS. Noted in parallel session | Noted |
6.9 | S2-186887 | P-CR | Approval | Solution update: NIDD service activation for AMF and SMF | Samsung | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-185033 from S2#127BIS. Revised in parallel session to S2-187188. | Revised |
6.9 | S2-187188 | P-CR | Approval | Solution update: NIDD service activation for AMF and SMF | Samsung | Rel-16 | FS_CIoT_5G | Revision of S2-186887. Agreed in parallel session Block approved | Approved |
6.9 | S2-186888 | P-CR | Approval | New solution: Aggregation of Data over NAS | Samsung | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-185034 from S2#127BIS. Revised in parallel session to S2-187189. | Revised |
6.9 | S2-187189 | P-CR | Approval | New solution: Aggregation of Data over NAS | Samsung, Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revision of S2-186888. For e-mail approval. Noted Hans (E///): objects the CR. Syed (Docomo): proposes to postpone the CR. Sebastian (QC): objects the CR. Sunghoon (Samsung): comments. | Noted |
6.9 | S2-186343 | P-CR | Approval | Evaluation of Solution 6 | Sony | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187204. | Revised |
6.9 | S2-187204 | P-CR | Approval | Evaluation of Solution 6 | Sony | Rel-16 | FS_CIoT_5G | Revision of S2-186343. Revised in parallel session to S2-187269. | Revised |
6.9 | S2-187269 | P-CR | Approval | Evaluation of Solution 6 | Sony | Rel-16 | FS_CIoT_5G | Revision of S2-187204. Revised in parallel session to S2-187284. Change 'data PDU message' to 'small data PDU message' | Revised |
6.9 | S2-187284 | P-CR | Approval | Evaluation of Solution 6 | Sony | Rel-16 | FS_CIoT_5G | Revision of S2-187269. Agreed in parallel session Block approved | Approved |
6.9 | S2-186441 | P-CR | Approval | Clarifying RAI handling | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187205. | Revised |
6.9 | S2-187205 | P-CR | Approval | Clarifying RAI handling | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revision of S2-186441. Revised in parallel session to S2-187270. | Revised |
6.9 | S2-187270 | P-CR | Approval | Clarifying RAI handling | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revision of S2-187205. Agreed in parallel session Block approved | Approved |
6.9 | S2-186741 | P-CR | Approval | Update to Solution 1 for Release assistance handling | Huawei, HiSilicon, SK Telecom | Rel-16 | FS_CIoT_5G | Postponed in parallel session | Postponed |
6.9 | S2-186460 | P-CR | Approval | Solution Update: Update to Solution 1 | OPPO | Rel-16 | FS_CIoT_5G | Postponed in parallel session | Postponed |
6.9 | S2-186510 | P-CR | Approval | Optionality of SMF selection for small data solution 2 | China Mobile | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187206. | Revised |
6.9 | S2-187206 | P-CR | Approval | Optionality of SMF selection for small data solution 2 | China Mobile | Rel-16 | FS_CIoT_5G | Revision of S2-186510. Withdrawn | Withdrawn |
6.9 | S2-186522 | P-CR | Approval | Solution for infrequent small data transmission with temporary PDU session | China Mobile | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187207. | Revised |
6.9 | S2-187207 | P-CR | Approval | Solution for infrequent small data transmission with temporary PDU session | China Mobile | Rel-16 | FS_CIoT_5G | Revision of S2-186522. Revised in parallel session to S2-187271. | Revised |
6.9 | S2-187271 | P-CR | Approval | Solution for infrequent small data transmission with temporary PDU session | China Mobile | Rel-16 | FS_CIoT_5G | Revision of S2-187207. Revised in parallel session to S2-187285. Change in step 8: delete 'may' and add 's' to changes | Revised |
6.9 | S2-187285 | P-CR | Approval | Solution for infrequent small data transmission with temporary PDU session | China Mobile | Rel-16 | FS_CIoT_5G | Revision of S2-187271. Agreed in parallel session Block approved | Approved |
6.9 | S2-186602 | P-CR | Approval | Update for Solution 5: Small Data Fast Path communication | ZTE | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187208. | Revised |
6.9 | S2-187208 | P-CR | Approval | Update for Solution 5: Small Data Fast Path communication | ZTE | Rel-16 | FS_CIoT_5G | Revision of S2-186602. Revised in parallel session to S2-187272. | Revised |
6.9 | S2-187272 | P-CR | Approval | Update for Solution 5: Small Data Fast Path communication | ZTE | Rel-16 | FS_CIoT_5G | Revision of S2-187208. Agreed in parallel session Block approved | Approved |
6.9 | S2-186653 | P-CR | Approval | Introduce Early Data Transmission option to Solution 1 | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-186654 | P-CR | Approval | New solution: Early Data Transmission with Immediate RRC completion | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-186656 | P-CR | Approval | Solution 19 clarifications | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Agreed in parallel session Block approved | Approved |
6.9 | S2-186752 | P-CR | Approval | Update to solution 19 | CATT | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-186753 | P-CR | Approval | Update to Solution 30 | CATT | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187209. | Revised |
6.9 | S2-187209 | P-CR | Approval | Update to Solution 30 | CATT | Rel-16 | FS_CIoT_5G | Revision of S2-186753. Revised in parallel session to S2-187273. Change IWF-NEF to IWK-NEF throughout the paper including figures | Revised |
6.9 | S2-187273 | P-CR | Approval | Update to Solution 30 | CATT | Rel-16 | FS_CIoT_5G | Revision of S2-187209. Agreed in parallel session Block approved | Approved |
6.9 | S2-186890 | P-CR | Approval | Solution 19 update: to resolve ENs | Samsung | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187210. | Revised |
6.9 | S2-187210 | P-CR | Approval | Solution 19 update: to resolve ENs | Samsung | Rel-16 | FS_CIoT_5G | Revision of S2-186890. Revised in parallel session to S2-187275. Removing changes under clause 6.19.3 | Revised |
6.9 | S2-187275 | P-CR | Approval | Solution 19 update: to resolve ENs | Samsung | Rel-16 | FS_CIoT_5G | Revision of S2-18210. Agreed in parallel session Block approved | Approved |
6.9 | S2-186897 | P-CR | Approval | TR 23.724 Impact area of UP (CL) solution | Nokia, Nokia Shanghai Bell | Rel-16 | FS_CIoT_5G | Agreed in parallel session Block approved | Approved |
6.9 | S2-186953 | P-CR | Approval | Update to Solution#19: UP deactivation for UE in RRC inactive state | InterDigital Inc., | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187211. | Revised |
6.9 | S2-187211 | P-CR | Approval | Update to Solution#19: UP deactivation for UE in RRC inactive state | InterDigital Inc., | Rel-16 | FS_CIoT_5G | Revision of S2-186953. Revised in parallel session to S2-187274. | Revised |
6.9 | S2-187274 | P-CR | Approval | Update to Solution#19: UP deactivation for UE in RRC inactive state | InterDigital Inc., LG Electronics | Rel-16 | FS_CIoT_5G | Revision of S2-187211. Revised in parallel session to S2-187286. | Revised |
6.9 | S2-187286 | P-CR | Approval | Update to Solution#19: UP deactivation for UE in RRC inactive state | InterDigital Inc., LG Electronics | Rel-16 | FS_CIoT_5G | Revision of S2-187274. For e-mail approval. Approved | Approved |
- | - | - | - | Key Issue 2 | - | - | - | - | - |
6.9 | S2-186736 | P-CR | Approval | Solution for KI 1 and KI 2: Packet Aggregation for Small Data Delivery | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-185331 from S2#127BIS. Revised in parallel session to S2-187212. | Revised |
6.9 | S2-187212 | P-CR | Approval | Solution for KI 1 and KI 2: Packet Aggregation for Small Data Delivery | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of S2-186736. Revised in parallel session to S2-187234. | Revised |
6.9 | S2-187234 | P-CR | Approval | Solution for KI 1 and KI 2: Packet Aggregation for Small Data Delivery | Huawei, HiSilicon, Convida Wireless LLC, Samsung | Rel-16 | FS_CIoT_5G | Revision of S2-187212. For e-mail approval. Noted Hans (E///): objects the CR. Sebastian (QC): objects the CR. | Noted |
6.9 | S2-186395 | P-CR | Approval | Solution 7 improvement | Ericsson | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187213. | Revised |
6.9 | S2-187213 | P-CR | Approval | Solution 7 improvement | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-186395. Revised in parallel session to S2-187282. Remove (also KI#3) | Revised |
6.9 | S2-187282 | P-CR | Approval | Solution 7 improvement | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-187213. Revised in parallel session to S2-187287. | Revised |
6.9 | S2-187287 | P-CR | Approval | Solution 7 improvement | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-187282. For e-mail approval. e-mail revision 1 approved. Revised to S2-187613. Sebastian (QC): provides rev1. Hans (E///): OK with rev1. | Revised |
6.9 | S2-187613 | P-CR | Approval | Solution 7 improvement | Ericsson | Rel-16 | FS_CIoT_5G | e-mail revision 1 of S2-187287. Approved | Approved |
6.9 | S2-186435 | P-CR | Approval | Combining RRC-INACTIVE and 5G UP optimization for efficient handling of bursty frequent small data | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187214. | Revised |
6.9 | S2-187214 | P-CR | Approval | Combining RRC-INACTIVE and 5G UP optimization for efficient handling of bursty frequent small data | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revision of S2-186435. Revised in parallel session to S2-187276. | Revised |
6.9 | S2-187276 | P-CR | Approval | Combining RRC-INACTIVE and 5G UP optimization for efficient handling of bursty frequent small data | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revision of S2-187214. Agreed in parallel session Block approved | Approved |
6.9 | S2-186583 | P-CR | Approval | Solution for KI2: Default GBR QoS Flow | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Key Issue 7 | - | - | - | - | - |
6.9 | S2-186739 | P-CR | Approval | Update of Solution 27: Reuse of EPS Overload Control Mechanisms Editor's Notes | Huawei, HiSilicon, Intel | Rel-16 | FS_CIoT_5G | Revision of (unhandled) S2-185334 from S2#127BIS. Revised in parallel session to S2-187215. | Revised |
6.9 | S2-187215 | P-CR | Approval | Update of Solution 27: Reuse of EPS Overload Control Mechanisms Editor's Notes | Huawei, HiSilicon, Intel | Rel-16 | FS_CIoT_5G | Revision of S2-186739. Revised in parallel session to S2-187277. Removing last paragraph in 2.27.2.5 | Revised |
6.9 | S2-187277 | P-CR | Approval | Update of Solution 27: Reuse of EPS Overload Control Mechanisms Editor's Notes | Huawei, HiSilicon, Intel | Rel-16 | FS_CIoT_5G | Revision of S2-187215. Agreed in parallel session Block approved | Approved |
- | - | - | - | Key Issue 9 | - | - | - | - | - |
6.9 | S2-186611 | P-CR | Approval | Concluding Key Issue #9 | Convida Wireless LLC, AT&T, Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187216. | Revised |
6.9 | S2-187216 | P-CR | Approval | Concluding Key Issue #9 | Convida Wireless LLC, AT&T, Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | Rel-16 | FS_CIoT_5G | Revision of S2-186611. Agreed in parallel session Block approved | Approved |
- | - | - | - | Key Issue 6 | - | - | - | - | - |
6.9 | S2-186704 | P-CR | Approval | Interim conclusion for Key issue #6 | Intel | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187217. | Revised |
6.9 | S2-187217 | P-CR | Approval | Interim conclusion for Key issue #6 | Intel | Rel-16 | FS_CIoT_5G | Revision of S2-186704. Agreed in parallel session Block approved | Approved |
- | - | - | - | Key Issue 11 | - | - | - | - | - |
6.9 | S2-186740 | P-CR | Approval | Update solution #37 for KI 11:Monitoring | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187218. Rapporteur will fix hanging paragraph while implementing the P-CR. | Revised |
6.9 | S2-187218 | P-CR | Approval | Update solution #37 for KI 11:Monitoring | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revision of S2-186740. Agreed in parallel session Block approved | Approved |
6.9 | S2-186705 | P-CR | Approval | Solution update and interim conclusion for Key issue #11: Monitoring | Intel | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187219. | Revised |
6.9 | S2-187219 | P-CR | Approval | Solution update and interim conclusion for Key issue #11: Monitoring | Intel | Rel-16 | FS_CIoT_5G | Revision of S2-186705. Revised in parallel session to S2-187278. Fix hanging paragraph Step 6a and 7 optional Remove conclusion (clause 8) | Revised |
6.9 | S2-187278 | P-CR | Approval | Solution update and interim conclusion for Key issue #11: Monitoring | Intel | Rel-16 | FS_CIoT_5G | Revision of S2-187219. Agreed in parallel session Block approved | Approved |
- | - | - | - | Key Issue 15 | - | - | - | - | - |
6.9 | S2-186883 | P-CR | Discussion | Solution discussion for KI#15 | NTT DOCOMO | Rel-16 | FS_CIoT_5G | Noted in parallel session | Noted |
6.9 | S2-186467 | P-CR | Approval | NAS based Solution for KI#15 | NTT DOCOMO | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187221. | Revised |
6.9 | S2-187221 | P-CR | Approval | NAS based Solution for KI#15 | NTT DOCOMO | Rel-16 | FS_CIoT_5G | Revision of S2-186467. Revised in parallel session to S2-187279. | Revised |
6.9 | S2-187279 | P-CR | Approval | NAS based Solution for KI#15 | NTT DOCOMO | Rel-16 | FS_CIoT_5G | Revision of S2-187221. Agreed in parallel session Block approved | Approved |
6.9 | S2-186468 | P-CR | Approval | RRC based Solution for KI#15 | NTT DOCOMO | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187220. | Revised |
6.9 | S2-187220 | P-CR | Approval | RRC based Solution for KI#15 | NTT DOCOMO | Rel-16 | FS_CIoT_5G | Revision of S2-186468. Revised in parallel session to S2-187280. | Revised |
6.9 | S2-187280 | P-CR | Approval | RRC based Solution for KI#15 | NTT DOCOMO | Rel-16 | FS_CIoT_5G | Revision of S2-187220. Agreed in parallel session Block approved | Approved |
6.9 | S2-186655 | P-CR | Approval | Solution to KI15: UE CN selection using broadcast information | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187229. Focus on option A | Revised |
6.9 | S2-187229 | P-CR | Approval | Solution to KI15: UE CN selection using broadcast information | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revision of S2-186655. Agreed in parallel session Block approved | Approved |
6.9 | S2-186706 | P-CR | Approval | Solution for Key Issue #15: Core Network selection for Cellular IoT | Intel | Rel-16 | FS_CIoT_5G | Merged into S2-187230 | Merged |
6.9 | S2-186732 | P-CR | Approval | Solution for KI15: Core Network selection for Cellular IOT | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revised in parallel session, merging S2-186706, to S2-187230. Redirection part will be merged with NTT DCM | Revised |
6.9 | S2-187230 | P-CR | Approval | Solution for KI15: Core Network selection for Cellular IOT | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Revision of S2-186732., merging S2-186706. Revised in parallel session to S2-187281. | Revised |
6.9 | S2-187281 | P-CR | Approval | Solution for KI15: Core Network selection for Cellular IOT | Huawei, HiSilicon, Intel | Rel-16 | FS_CIoT_5G | Revision of S2-187230. For e-mail approval. e-mail revision 2 approved. Revised to S2-187614. Puneet (Intel): provides rev1. Steve (Huawei): provides rev2. Puneet (Intel): OK with rev2. | Revised |
6.9 | S2-187614 | P-CR | Approval | Solution for KI15: Core Network selection for Cellular IOT | Huawei, HiSilicon, Intel | Rel-16 | FS_CIoT_5G | e-mail revision 2 of S2-187281. Approved | Approved |
- | - | - | - | Key Issue 5 | - | - | - | - | - |
6.9 | S2-186342 | P-CR | Approval | Update to Solution 33: Delayed paging response | Sony, NEC | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187231. | Revised |
6.9 | S2-187231 | P-CR | Approval | Update to Solution 33: Delayed paging response | Sony, NEC, OPPO | Rel-16 | FS_CIoT_5G | Revision of S2-186342. Agreed in parallel session Block approved | Approved |
6.9 | S2-186354 | P-CR | Approval | Completing solution 33 | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187232. | Revised |
6.9 | S2-187232 | P-CR | Approval | Completing solution 33 | Qualcomm Incorporated, Huawei, HiSilicon, Blackberry UK Ltd. | Rel-16 | FS_CIoT_5G | Revision of S2-186354. Revised in parallel session, merging S2-187233, to S2-187290. | Revised |
6.9 | S2-187290 | P-CR | Approval | Completing solution 33 | Qualcomm Incorporated, Huawei, HiSilicon, Blackberry UK Ltd., NEC | Rel-16 | FS_CIoT_5G | Revision of S2-187232, merging S2-187233. For e-mail approval. Postponed Puneet (Intel): provides rev1. Sebastian (QC): provides rev2. Steve (Huawei): provides rev3. Puneet (Intel): can only accept rev1. Iskren (NEC): OK with rev1. Sebastian (QC): proposes to postpone the P-CR. | Postponed |
6.9 | S2-186434 | P-CR | Approval | Update to Solution 32: MO Data Buffering in the UE | NEC, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-187233. | Revised |
6.9 | S2-187233 | P-CR | Approval | Update to Solution 32: MO Data Buffering in the UE | NEC, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of S2-186434. For e-mail approval. Merged into S2-187290 | Merged OPEN |
6.9 | S2-186458 | P-CR | Approval | Solution Update: Update to Solution 33 | OPPO, NEC | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-186459 | P-CR | Approval | Solution for KI5: Network controlled UL data transmission delay | OPPO | Rel-16 | FS_CIoT_5G | For e-mail approval. e-mail revision 3 approved. Revised to S2-187615. Antoine (Orange): provides rev1. Leo (DT): provides rev2. Hannu (Nokia): comments. Antoine (Orange): provides rev3. Hannu (Nokia): OK with rev3. | Revised |
6.9 | S2-187615 | P-CR | Approval | Solution for KI5: Network controlled UL data transmission delay | OPPO | Rel-16 | FS_CIoT_5G | e-mail revision 3 of S2-186459. Approved | Approved |
6.9 | S2-186642 | P-CR | Approval | Impacts Update to Solution 32: MO Data Buffering in the UE | NEC, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-186911 | P-CR | Approval | Solution on Delayed MT data transmission for power saving | CATT | Rel-16 | FS_CIoT_5G | Opened in parallel session. Noted in parallel session | Noted |
- | - | - | - | Key Issue 4 | - | - | - | - | - |
6.9 | S2-186574 | P-CR | Approval | Update of Solution 23 - MICO Mode Management for Expected Application Behaviour | Huawei, HiSilicon, SK Telecom | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-186889 | P-CR | Approval | Solution 8 update: to resolve ENs | Samsung | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Key Issue 16 | - | - | - | - | - |
6.9 | S2-186733 | P-CR | Approval | Solution on KI#16: Support of Group Communication and Messaging | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Key Issue 10 | - | - | - | - | - |
6.9 | S2-186939 | P-CR | Approval | Update to Solution 15: External parameter provisioning | Motorola Mobility, Lenovo | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.10 | - | - | - | Study on encrypted traffic detection and verification (FS_ENTRADE) | - | - | {Not_on_agenda} | - | - |
6.11 | - | - | - | Study of enablers for Network Automation for 5G (FS_eNA) | - | - | {Puneet} | - | - |
- | - | - | - | General | - | - | - | - | - |
6.11 | S2-186357 | P-CR | Approval | NWDAF related corrections to TR 23.791 | AT&T | Rel-16 | FS_eNA | Noted in parallel session | Noted |
- | - | - | - | NWDAF interaction with OAM/RAN | - | - | - | - | - |
6.11 | S2-186666 | DISCUSSION | Approval | Discussion about NWDAF interactions with OAM | Huawei, HiSilicon, CATR, Convida Wireless LLC, China Unicom, China Mobile, NTT DoCoMo? | FS_eNA | Confirm Sources!. Revised to S2-186972. Multi company | Revised | |
6.11 | S2-186972 | DISCUSSION | Approval | Discussion about NWDAF interactions with OAM | Huawei, HiSilicon, CATR, Convida Wireless LLC, China Unicom, China Mobile, Orange, Alibaba | FS_eNA | Revision of S2-186666. LATE DOC: Rx 02/07, 08:30. Noted in parallel session | Noted | |
6.11 | S2-186743 | DISCUSSION | Endorsement | ENA: avoiding overlap with other WG | Nokia, Nokia Shanghai Bell, Ericsson | Rel-16 | FS_eNA | Noted in parallel session | Noted |
6.11 | S2-186668 | P-CR | Approval | Use Case and KI for NWDAF exposing analytics to OAM | Huawei, HiSilicon | Rel-16 | FS_eNA | Revised in parallel session to S2-187165. | Revised |
6.11 | S2-187165 | P-CR | Approval | Use Case and KI for NWDAF exposing analytics to OAM | Huawei, HiSilicon | Rel-16 | FS_eNA | Revision of S2-186668. Revised in parallel session to S2-187253. | Revised |
6.11 | S2-187253 | P-CR | Approval | Use Case and KI for NWDAF exposing analytics to OAM | Huawei, HiSilicon | Rel-16 | FS_eNA | Revision of S2-187165. Revised in parallel session to S2-187263. Change as follow - The NWDAF shall be able to provide analytics to OAM if required by SA WG5. | Revised |
6.11 | S2-187263 | P-CR | Approval | Use Case and KI for NWDAF exposing analytics to OAM | Huawei, HiSilicon | Rel-16 | FS_eNA | Revision of S2-187253. Agreed in parallel session Block approved | Approved |
6.11 | S2-186744 | SID REVISED | Approval | UPDATE to SID: Study of enablers for Network Automation for 5G | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Revision of SP-180613. Revised in parallel session to S2-187164. | Revised |
6.11 | S2-187164 | SID REVISED | Approval | UPDATE to SID: Study of enablers for Network Automation for 5G | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Revision of S2-186744. Revised in parallel session to S2-187254. | Revised |
6.11 | S2-187254 | SID REVISED | Approval | UPDATE to SID: Study of enablers for Network Automation for 5G | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Revision of S2-187164. For e-mail approval. e-mail revision 19 endorsed. Revised to S2-187616. Antoine (Orange): provides rev1. Laurent (Nokia): provides rev2. Hucheng (CATT): fine with rev1, cannot accept rev2. Zhuoyun (Lenovo): fine with rev1, cannot accept rev2. Zhendong (ZTE): fine with rev1, cannot accept rev2. Wei (China Mobile): fine with rev1, cannot accept rev2. Laurent (Nokia): provides rev3. Belen (E///): provides rev4. Xiaobo (Huawei): provides rev5. Malla (Docomo): provides rev6. Belen (E///): prefers rev5. Zhuoyun (Lenovo): comments. Malla (Docomo): comments. Antoine (Orange): provides rev7. Leo (DT): provides rev8. Farooq (AT&T): comments. Laurent (Nokia): comments. Farooq (AT&T): comments. Belen (E///): provides rev9. Tao (China Mobile): provides rev10. Susana (VF): provides rev11. Tao (China Mobile): fine with rev11. Belen (E///): comments. Antoine (Orange): fine with rev11. Laurent (Nokia): provides rev12. Laurent (Nokia): provides rev13. Antoine (Orange): comments. Farooq (AT&T): comments. Xiaobo (Huawei): provides rev14. Xiaobo (Huawei): provides rev15. Susana (VF): provides rev16. Laurent (Nokia): provides rev17. Belen (E///): provides rev18. Xiaobo (Huawei): provides rev19. Laurent (Nokia): supports rev19. Farooq (AT&T): cannot accept the NOTE in rev19. Laurent (Nokia): comments. Farooq (AT&T): comments. Laurent (Nokia): proposes to endorse rev19 and Laurent will bring further revision to the SID in the August meeting. Belen (E///): supports Laurent. LaeYoung (LG): supports Laurent. Farooq (AT&T): supports Laurent. Xiaobo (Huawei): supports Laurent. | Revised |
6.11 | S2-187616 | SID REVISED | Approval | UPDATE to SID: Study of enablers for Network Automation for 5G | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | e-mail revision 19 of S2-187254. Endorsed | Endorsed |
6.11 | S2-186745 | P-CR | Approval | 23.791: TR scope update | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186669 | P-CR | Approval | Solution for Key Issue 4: Interactions with OAM for Network Data Collection | Huawei, HiSilicon, Telecom Italia, Orange | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186446 | P-CR | Approval | New solution (Key issue 10): NWDAF service to provide recommendation for NF instance selection | KDDI | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186667 | LS OUT | Approval | [DRAFT] LS on Issues of OAM consuming analytics from NWDAF | Huawei, HiSilicon | FS_eNA | Revised in parallel session to S2-187163. | Revised | |
6.11 | S2-187163 | LS OUT | Approval | [DRAFT] LS on Data Analytics in SA WG2/NWDAF | Huawei, HiSilicon | - | FS_eNA | Revision of S2-186667. Revised in parallel session to S2-187262. | Revised |
6.11 | S2-187262 | LS OUT | Approval | [DRAFT] LS on Data Analytics in SA WG2/NWDAF | Huawei, HiSilicon | - | FS_eNA | Revision of S2-187163. For e-mail approval. e-mail revision 3 approved. Revised to S2-187617. Antoine (Orange): provides rev1. Belen (E///): provides rev2. Antoine (Orange): provides rev3. Tao (China Mobile): supports rev3. Xiaobo (Huawei): proposes to postpone the LS. Belen (E///): proposes to send the LS as in rev3. Xiaobo (Huawei): agrees to send the LS as in rev3. Laurent (Nokia): agrees to send the LS as in rev3. | Revised |
6.11 | S2-187617 | LS OUT | Approval | LS on Data Analytics in SA WG2/NWDAF | SA WG2 | - | FS_eNA | e-mail revision 3 of S2-187262. Approved | Approved |
6.11 | S2-186952 | LS OUT | Approval | [DRAFT] LS on Network Data Analytics | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-187190 | Other | Information | eNA Drafting session Output | Huawei | - | FS_eNA | Created in parallel session. Noted in parallel session | Noted |
- | - | - | - | Use Cases | - | - | - | - | - |
6.11 | S2-186698 | P-CR | Approval | TR23.791: Use Case NWDA-assisted autonomous traffic steering | China Telecom | Rel-16 | FS_eNA | LATE DOC: Rx 27/06, 02:45. Noted in parallel session | Noted |
- | - | - | - | Key Issues | - | - | - | - | - |
6.11 | S2-186344 | P-CR | Approval | New Key Issue: Recommendations produced by NWDAF | ORANGE, Huawei | Rel-16 | FS_eNA | Revised in parallel session to S2-187166. | Revised |
6.11 | S2-187166 | P-CR | Approval | New Key Issue: Recommendations produced by NWDAF | ORANGE, Huawei | Rel-16 | FS_eNA | Revision of S2-186344. Revised in parallel session to S2-187255. | Revised |
6.11 | S2-187255 | P-CR | Approval | New Key Issue: Recommendations produced by NWDAF | ORANGE, Huawei | Rel-16 | FS_eNA | Revision of S2-187166. For e-mail approval. e-mail revision 5 approved. Revised to S2-187618. Laurent (Nokia): provides rev1. Laurent (Nokia): provides rev2. Belen (E///): comments. Laurent (Nokia): provides rev3. Belen (E///): fine with rev3. Antoine (Orange): provides rev4. Laurent (Nokia): provides rev5. Antoine (Orange): fine with rev5. | Revised |
6.11 | S2-187618 | P-CR | Approval | New Key Issue: Recommendations produced by NWDAF | ORANGE, Huawei | Rel-16 | FS_eNA | e-mail revision 5 of S2-187255. Approved | Approved |
6.11 | S2-186356 | P-CR | Approval | Update of Key Issue 10 | AT&T | FS_eNA | Revised in parallel session to S2-187167. Change 'AF used for UPF steering/selection' to 'SMF used for UPF steering/selection' | Revised | |
6.11 | S2-187167 | P-CR | Approval | Update of Key Issue 10 | AT&T | - | FS_eNA | Revision of S2-186356. Agreed in parallel session Block approved | Approved |
6.11 | S2-186639 | P-CR | Approval | An addition of a new Key Issue on Network Status | AT&T | Rel-16 | FS_eNA | Revised in parallel session to S2-187168. Rapporteur will remove typo on 'f' in the requirement. | Revised |
6.11 | S2-187168 | P-CR | Approval | An addition of a new Key Issue on Network Status | AT&T, KDDI, Convida Wireless LLC, Huawei | Rel-16 | FS_eNA | Revision of S2-186639. Agreed in parallel session Block approved | Approved |
6.11 | S2-186723 | P-CR | Approval | Update on Key Issue #1 and #2 for analytic information metadata exposure to 5GS NFs and AFs | Samsung | Rel-16 | FS_eNA | Revised in parallel session to S2-187169. Rapporteur to fix NWADF to NWDAF | Revised |
6.11 | S2-187169 | P-CR | Approval | Update on Key Issue #1 and #2 for analytic information metadata exposure to 5GS NFs and AFs | Samsung | Rel-16 | FS_eNA | Revision of S2-186723. Agreed in parallel session Block approved | Approved |
6.11 | S2-186726 | P-CR | Approval | Update on Key Issue #1 and #2 to allow the registration of a new analytic information definition by 5G NF and AF | Samsung | Rel-16 | FS_eNA | Revised in parallel session to S2-187170. | Revised |
6.11 | S2-187170 | P-CR | Approval | Update on Key Issue #1 and #2 to allow the registration of a new analytic information definition by 5G NF and AF | Samsung | Rel-16 | FS_eNA | Revision of S2-186726. Withdrawn | Withdrawn |
6.11 | S2-186919 | P-CR | Approval | Key Issue: UE-driven analytics sharing mechanisms to 5GC | Samsung | Rel-16 | FS_eNA | Merged into S2-187192 | Merged |
6.11 | S2-186921 | P-CR | Approval | New Key Issue: UE driven analytics sharing | Lenovo, Motorola Mobility | Rel-16 | FS_eNA | Revised in parallel session, merging S2-186919, to S2-187192. | Revised |
6.11 | S2-187192 | P-CR | Approval | New Key Issue: UE driven analytics sharing | Lenovo, Motorola Mobility, Samsung, China Mobile | Rel-16 | FS_eNA | Revision of S2-186921., merging S2-186919. Revised in parallel session to S2-187256. | Revised |
6.11 | S2-187256 | P-CR | Approval | New Key Issue: UE driven analytics sharing | Lenovo, Motorola Mobility, Samsung, China Mobile | Rel-16 | FS_eNA | Revision of S2-187192. Revised in parallel session to S2-187264. Change second bullet as follow - How the NWDAF use the data provided by the UE to do analytics and provides the analytics information to other NFs; | Revised |
6.11 | S2-187264 | P-CR | Approval | New Key Issue: UE driven analytics sharing | Lenovo, Motorola Mobility, Samsung, China Mobile | Rel-16 | FS_eNA | Revision of S2-187256. Agreed in parallel session Block approved | Approved |
- | - | - | - | Solutions (one paper per company: the remainder if time permits) | - | - | - | - | - |
6.11 | S2-186670 | P-CR | Approval | Update Solution 3: How to define the service experience | Huawei, HiSilicon, Convida Wireless LLC, AT&T, Telecom Italia | Rel-16 | FS_eNA | Revised in parallel session to S2-187193. Multi company | Revised |
6.11 | S2-187193 | P-CR | Approval | Update Solution 3: How to define the service experience | Huawei, HiSilicon, Convida Wireless LLC, AT&T, Telecom Italia, China Mobile | Rel-16 | FS_eNA | Revision of S2-186670. Agreed in parallel session Block approved | Approved |
6.11 | S2-186345 | P-CR | Approval | New Solution: Recommendations produced by NWDAF | ORANGE, Huawei | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186346 | P-CR | Approval | Solution to Key Issue #3: Data Collection by subscription to NFs/AFs | ORANGE, Huawei | Rel-16 | FS_eNA | Revision of (unhandled) S2-185463 from S2#127BIS. Revised in parallel session to S2-187194. Multi company | Revised |
6.11 | S2-187194 | P-CR | Approval | Solution to Key Issue #3: Data Collection by subscription to NFs/AFs | ORANGE, Huawei | Rel-16 | FS_eNA | Revision of S2-186346. Revised in parallel session to S2-187257. Change 'generic service' to 'new service' | Revised |
6.11 | S2-187257 | P-CR | Approval | Solution to Key Issue #3: Data Collection by subscription to NFs/AFs | ORANGE, Huawei | Rel-16 | FS_eNA | Revision of S2-187194. Agreed in parallel session Block approved | Approved |
6.11 | S2-186347 | P-CR | Approval | Solution 2 update: Content of Network Data Analytics Feedback | ORANGE | Rel-16 | FS_eNA | Revised in parallel session to S2-187195. | Revised |
6.11 | S2-187195 | P-CR | Approval | Solution 2 update: Content of Network Data Analytics Feedback | ORANGE | Rel-16 | FS_eNA | Revision of S2-186347. Revised in parallel session to S2-187258. | Revised |
6.11 | S2-187258 | P-CR | Approval | Solution 2 update: Content of Network Data Analytics Feedback | ORANGE | Rel-16 | FS_eNA | Revision of S2-187195. For e-mail approval. e-mail revision 1 approved. Revised to S2-187619. Laurent (Nokia): provides rev1. | Revised |
6.11 | S2-187619 | P-CR | Approval | Solution 2 update: Content of Network Data Analytics Feedback | ORANGE | Rel-16 | FS_eNA | e-mail revision 1 of S2-187258. Approved | Approved |
6.11 | S2-186464 | P-CR | Approval | Solution to Key Issues 9 | Ericsson | Rel-16 | FS_eNA | Revised in parallel session to S2-187196. | Revised |
6.11 | S2-187196 | P-CR | Approval | Solution to Key Issues 9 | Ericsson | Rel-16 | FS_eNA | Revision of S2-186464. Revised in parallel session to S2-187259. Add 'local' before data analytic in left arrow in the figure Change 'central NWDAF' to 'NWDAF' in clause 6.1.1 | Revised |
6.11 | S2-187259 | P-CR | Approval | Solution to Key Issues 9 | Ericsson | Rel-16 | FS_eNA | Revision of S2-187196. Agreed in parallel session Block approved | Approved |
6.11 | S2-186618 | P-CR | Approval | Solution to KI#7: NWDAF assisting Future Background Data Transfer | Ericsson | Rel-16 | FS_eNA | Revision of (unhandled) S2-184824 from S2#127BIS. Not Handled | Not Handled |
6.11 | S2-186671 | P-CR | Approval | Update Solution for Key Issue 5: NWDAF-Assisted QoS Profile Provisioning | Huawei, HiSilicon | Rel-16 | FS_eNA | Revised in parallel session, merging S2-186676, to S2-187197. | Revised |
6.11 | S2-187197 | P-CR | Approval | Update Solution for Key Issue 5: NWDAF-Assisted QoS Profile Provisioning | Huawei, HiSilicon, China Telecom | Rel-16 | FS_eNA | Revision of S2-186671., merging S2-186676. Revised in parallel session to S2-187260. | Revised |
6.11 | S2-187260 | P-CR | Approval | Update Solution for Key Issue 5: NWDAF-Assisted QoS Profile Provisioning | Huawei, HiSilicon, China Telecom | Rel-16 | FS_eNA | Revision of S2-187197. For e-mail approval. Approved | Approved |
6.11 | S2-186672 | P-CR | Approval | Solution for Key Issue 7: NWDAF assisting Future Background Data Transfer | Huawei, HiSilicon | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186673 | P-CR | Approval | Analytic Information Exposure to SMF for Traffic Handling | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186676 | P-CR | Approval | 23.791: Solution to QoS Profile Provisioning and adjustment | China Telecommunications | Rel-16 | FS_eNA | Merged into S2-187197 | Merged |
6.11 | S2-186689 | P-CR | Approval | New solution: NWDAF Influence on traffic routing | Intel | Rel-16 | FS_eNA | Revised in parallel session to S2-187191. | Revised |
6.11 | S2-187191 | P-CR | Approval | New solution: NWDAF Influence on traffic routing | Intel, AT&T | Rel-16 | FS_eNA | Revision of S2-186689. Noted in parallel session | Noted |
6.11 | S2-186711 | P-CR | Approval | Solution for Key Issue 8: Performance improvement and supervision of mIoT terminals | China Mobile | Rel-16 | FS_eNA | Revised in parallel session to S2-187198. | Revised |
6.11 | S2-187198 | P-CR | Approval | Solution for Key Issue 8: Performance improvement and supervision of mIoT terminals | China Mobile, Lenovo, Motorola Mobility | Rel-16 | FS_eNA | Revision of S2-186711. Revised in parallel session to S2-187261. Change 'offline cluster' to 'cluster' Remove UE from the figure Add 'into' in step 2. | Revised |
6.11 | S2-187261 | P-CR | Approval | Solution for Key Issue 8: Performance improvement and supervision of mIoT terminals | China Mobile, Lenovo, Motorola Mobility | Rel-16 | FS_eNA | Revision of S2-187198. Agreed in parallel session Block approved | Approved |
6.11 | S2-186724 | P-CR | Approval | A solution to provide the available analytic information metadata | Samsung | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186731 | P-CR | Approval | A solution to register a new definition of analytic information provided by NWDAF | Samsung | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186876 | P-CR | Approval | Solution on the mobility decision | ZTE | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186877 | P-CR | Approval | Solution on the UPF selection | ZTE | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186908 | P-CR | Approval | Solution for optimizing connection management based on NWDAF output | CATT | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186909 | P-CR | Approval | Solution for overload avoidance with the help of NWDAF output | CATT | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-186924 | P-CR | Approval | Update solution 5 in TR 23.791 | Lenovo, Motorola Mobility | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.12 | - | - | - | Study on Enhancing Topology of SMF and UPF in 5G Networks (FS_ETSUN) | - | - | {Krisztian} | - | - |
- | - | - | - | Solution updates | - | - | - | - | - |
6.12 | S2-186447 | P-CR | Approval | Updates to Solution 5 | Cisco, Softbank | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187017. | Revised |
6.12 | S2-187017 | P-CR | Approval | Updates to Solution 5 | Cisco, Softbank | Rel-16 | FS_ETSUN | Revision of S2-186447. Revised in parallel session to S2-187113. | Revised |
6.12 | S2-187113 | P-CR | Approval | Updates to Solution 5 | Cisco, Softbank | Rel-16 | FS_ETSUN | Revision of S2-187017. Agreed in parallel session. Revised to S2-187598. | Revised |
6.12 | S2-187598 | P-CR | Approval | Updates to Solution 5 | Cisco, Softbank | Rel-16 | FS_ETSUN | Revision of S2-187113. For e-mail approval. Approved | Approved |
6.12 | S2-186784 | P-CR | Approval | Registration, PDU Session establishment, Xn handover Procedures for solution 6 | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187018. | Revised |
6.12 | S2-187018 | P-CR | Approval | Registration, PDU Session establishment, Xn handover Procedures for solution 6 | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-186784. Revised in parallel session to S2-187114. | Revised |
6.12 | S2-187114 | P-CR | Approval | Registration, PDU Session establishment, Xn handover Procedures for solution 6 | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-187018. Agreed in parallel session Block approved | Approved |
6.12 | S2-186785 | P-CR | Approval | UL-CL insertion when ULCL is in different region comparing to A-SMF | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187019. | Revised |
6.12 | S2-187019 | P-CR | Approval | UL-CL insertion when ULCL is in different region comparing to A-SMF | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-186785. Agreed in parallel session Block approved | Approved |
6.12 | S2-186955 | P-CR | Approval | Solution for I-SMF selection during 4G to 5G IWK | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187020. | Revised |
6.12 | S2-187020 | P-CR | Approval | Solution for I-SMF selection during 4G to 5G IWK | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-186955. Agreed in parallel session Block approved | Approved |
6.12 | S2-186948 | P-CR | Approval | Removal of Editor's note in Sol#15 | NEC | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187021. | Revised |
6.12 | S2-187021 | P-CR | Approval | Removal of Editor's note in Sol#15 | NEC | Rel-16 | FS_ETSUN | Revision of S2-186948. Agreed in parallel session Block approved | Approved |
6.12 | S2-186603 | P-CR | Approval | L-SMF clarification for solution 16: I-UPF insertion and L-SMF/L-UPF selection | ZTE | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187022. | Revised |
6.12 | S2-187022 | P-CR | Approval | L-SMF clarification for solution 16: I-UPF insertion and L-SMF/L-UPF selection | Qualcomm Incorporated, LG Electronics, InterDigital Inc. | Rel-16 | FS_ETSUN | Revision of S2-186603. Revised in parallel session to S2-187111. | Revised |
6.12 | S2-187111 | P-CR | Approval | L-SMF clarification for solution 16: I-UPF insertion and L-SMF/L-UPF selection | ZTE | Rel-16 | FS_ETSUN | Revision of S2-187022. Revised in parallel session to S2-187112. | Revised |
6.12 | S2-187112 | P-CR | Approval | L-SMF clarification for solution 16: I-UPF insertion and L-SMF/L-UPF selection | ZTE | Rel-16 | FS_ETSUN | Revision of S2-187111. Agreed in parallel session Block approved | Approved |
- | - | - | - | New solutions | - | - | - | - | - |
6.12 | S2-186627 | P-CR | Approval | New solution for UL-CL/BP Insertion with UPF that is capable to flexibly interface any SMF | Ericsson | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187023. | Revised |
6.12 | S2-187023 | P-CR | Approval | New solution for UL-CL/BP Insertion with UPF that is capable to flexibly interface any SMF | Ericsson | Rel-16 | FS_ETSUN | Revision of S2-186627. Agreed in parallel session Block approved | Approved |
6.12 | S2-186786 | P-CR | Approval | Reduce latency to setup the user plane | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187024. | Revised |
6.12 | S2-187024 | P-CR | Approval | Reduce latency to setup the user plane | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-186786. Revised in parallel session to S2-187115. | Revised |
6.12 | S2-187115 | P-CR | Approval | Reduce latency to setup the user plane | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-187024. Agreed in parallel session Block approved | Approved |
- | - | - | - | Evaluations, conclusions | - | - | - | - | - |
6.12 | S2-186787 | P-CR | Approval | Evaluation of solution #6 and conclusion proposal | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187025. | Revised |
6.12 | S2-187025 | P-CR | Approval | Evaluation of solution #6 and conclusion proposal | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-186787. Revised in parallel session to S2-187116. Delete the last line | Revised |
6.12 | S2-187116 | P-CR | Approval | Evaluation of solution #6 and conclusion proposal | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-187025. Agreed in parallel session Block approved | Approved |
6.12 | S2-186788 | P-CR | Approval | Evaluation for the solution 10 | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-187026. | Revised |
6.12 | S2-187026 | P-CR | Approval | Evaluation for the solution 10 | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-186788. Revised in parallel session to S2-187117. | Revised |
6.12 | S2-187117 | P-CR | Approval | Evaluation for the solution 10 | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-187026. Revised in parallel session to S2-187121. Delete 'However, similar mechanism is adopted at the EPC, SMF/DHCP all can allocate the IP address.' | Revised |
6.12 | S2-187121 | P-CR | Approval | Evaluation for the solution 10 | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-187117. Agreed in parallel session Block approved | Approved |
6.13 | - | - | - | Study on Enhancement to the 5GC Location Services (FS_eLCS) | - | - | {Krisztian} | - | - |
- | - | - | - | Incoming LS | - | - | - | - | - |
6.13 | S2-186337 | LS IN | Action | LS from RAN WG2: LS on LMF determination that the UE is served by NR | RAN WG2 (R2-1809136) | Rel-15 | NR_newRAT-Core | Postponed S2-185510 from S2#127BIS. Response drafted in S2-186958. Final response in S2-187096 | Replied to |
6.13 | S2-186958 | LS OUT | Approval | [DRAFT] LS Reply on LMF determination that the UE is served by NR | Huawei | Response to S2-186337. Revised in parallel session to S2-187009. | Revised | ||
6.13 | S2-187009 | LS OUT | Approval | [DRAFT] LS Reply on LMF determination that the UE is served by NR | Huawei | - | - | Revision of S2-186958. Revised in parallel session to S2-187096. Remove rev marks Remove [Draft] Fix typo Add line between bullets | Revised |
6.13 | S2-187096 | LS OUT | Approval | LS Reply on LMF determination that the UE is served by NR | SA WG2 | - | - | Revision of S2-187009. Agreed in parallel session Block approved | Approved |
- | - | - | - | KIs | - | - | - | - | - |
6.13 | S2-186650 | P-CR | Approval | Key Issue on Coexistence with the Location Solution in Release 15 | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revised in parallel session to S2-187010. | Revised |
6.13 | S2-187010 | P-CR | Approval | Key Issue on Coexistence with the Location Solution in Release 15 | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-186650. Agreed in parallel session Block approved | Approved |
- | - | - | - | Solution updates | - | - | - | - | - |
6.13 | S2-186651 | P-CR | Approval | Support for Key Issue on Coexistence with the Location Solution in Release 15 | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revised in parallel session to S2-187011. | Revised |
6.13 | S2-187011 | P-CR | Approval | Support for Key Issue on Coexistence with the Location Solution in Release 15 | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-186651. Agreed in parallel session Block approved | Approved |
6.13 | S2-186649 | P-CR | Approval | Enhancements to Solution 2 | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revised in parallel session to S2-187012. | Revised |
6.13 | S2-187012 | P-CR | Approval | Enhancements to Solution 2 | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-186649. Revised in parallel session to S2-187097. | Revised |
6.13 | S2-187097 | P-CR | Approval | Enhancements to Solution 2 | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-187012. Agreed in parallel session Block approved | Approved |
6.13 | S2-186652 | P-CR | Approval | Support of Low Power Periodic and Triggered Location for Solution 2 using EDT | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revised in parallel session to S2-187013. | Revised |
6.13 | S2-187013 | P-CR | Approval | Support of Low Power Periodic and Triggered Location for Solution 2 using EDT | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-186652. Revised in parallel session to S2-187098. Modify NOTE 2 as following: 'Use of the permitted values of RAI…' Remove 4th bullet in 6.x.3.2 | Revised |
6.13 | S2-187098 | P-CR | Approval | Support of Low Power Periodic and Triggered Location for Solution 2 using EDT | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-187013. Agreed in parallel session Block approved | Approved |
6.13 | S2-186819 | P-CR | Approval | Update of Solution 4 'Positioning operations considering different LMF deployment scenarios' with the MR-LR case for solution 4A | Huawei, HiSilicon | Rel-16 | FS_eLCS | Agreed in parallel session Block approved | Approved |
6.13 | S2-186492 | P-CR | Approval | Updates for LMF selection criteria | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eLCS | Revised in parallel session to S2-187014. | Revised |
6.13 | S2-187014 | P-CR | Approval | Updates for LMF selection criteria | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eLCS | Revision of S2-186492. Revised in parallel session to S2-187099. | Revised |
6.13 | S2-187099 | P-CR | Approval | Updates for LMF selection criteria | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eLCS | Revision of S2-187014. Agreed in parallel session Block approved | Approved |
6.13 | S2-186925 | P-CR | Approval | Update solution 12: LCS support for non-3GPP access | Lenovo, Motorola Mobility | Rel-16 | FS_eLCS | Agreed in parallel session Block approved | Approved |
6.13 | S2-186604 | P-CR | Approval | Adding charging aspects and other updates to solution 14 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eLCS | Revised in parallel session to S2-187015. | Revised |
6.13 | S2-187015 | P-CR | Approval | Adding charging aspects and other updates to solution 14 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eLCS | Revision of S2-186604. Revised in parallel session to S2-187100. | Revised |
6.13 | S2-187100 | P-CR | Approval | Adding charging aspects and other updates to solution 14 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eLCS | Revision of S2-187015. Agreed in parallel session Block approved | Approved |
- | - | - | - | New solutions | - | - | - | - | - |
6.13 | S2-186405 | P-CR | Approval | Supported positioning methods | Ericsson | Rel-16 | FS_eLCS | Revised in parallel session to S2-187016. | Revised |
6.13 | S2-187016 | P-CR | Approval | Supported positioning methods | Ericsson | Rel-16 | FS_eLCS | Revision of S2-186405. Agreed in parallel session Block approved | Approved |
6.13 | S2-186696 | P-CR | Approval | New Solution for KI#15: Location continuity support for N26 based Handovers | CATT | Rel-16 | FS_eLCS | Revised in parallel session to S2-187101. | Revised |
6.13 | S2-187101 | P-CR | Approval | New Solution for KI#15: Location continuity support for N26 based Handovers | CATT | Rel-16 | FS_eLCS | Revision of S2-186696. Agreed in parallel session Block approved | Approved |
6.13 | S2-186822 | P-CR | Approval | Solution for KI 11 Coordination of Positioning Signalling Transmitted via CP Path and UP Path | Huawei, HiSilicon | Rel-16 | FS_eLCS | Not Handled | Not Handled |
6.13 | S2-186918 | P-CR | Approval | GMLC based Positioning Access selection for LCS service | CATT | Rel-16 | FS_eLCS | Not Handled | Not Handled |
- | - | - | - | Evaluations, conclusions | - | - | - | - | - |
6.13 | S2-186566 | P-CR | Approval | Evaluation of Solution5: Privacy Check procedure | Vivo | Rel-16 | FS_eLCS | Not Handled | Not Handled |
6.13 | S2-186922 | P-CR | Approval | Evaluation of solutions of Key Issue #4 | CATT | Rel-16 | FS_eLCS | Not Handled | Not Handled |
6.13 | S2-186920 | P-CR | Approval | Evaluation of solutions and conclusion of Key Issue #14 | CATT | Rel-16 | FS_eLCS | Not Handled | Not Handled |
6.13 | S2-186956 | P-CR | Approval | Way forward for event exposure key issue conclusion | Huawei, HiSilicon | Rel-16 | FS_eLCS | Not Handled | Not Handled |
6.14 | - | - | - | Study on Enhanced IMS to 5GC Integration (FS_eIMS5G) | - | - | {Not_on_agenda} | - | - |
6.15 | - | - | - | 5GS Enhanced support of Vertical and LAN Services (FS_Vertical_LAN) | - | - | {Frank} | - | - |
- | - | - | - | TR Skeleton, Scope | - | - | - | - | - |
6.15 | S2-186795 | P-CR | Approval | 23.734: TR Skeleton for Study on 5GS Enhanced support of Vertical and LAN Services | Nokia, Nokia Shanghai Bell (Rapporteur) | Rel-16 | FS_Vertical_LAN | Agreed in parallel session Block approved | Approved |
6.15 | S2-186796 | P-CR | Approval | TR Scope | Nokia, Nokia Shanghai Bell | Rel-16 | FS_Vertical_LAN | Agreed in parallel session. Rapporteur should make editorial corrections Block approved | Approved |
- | - | - | - | Network Selection and access control | - | - | - | - | - |
6.15 | S2-186511 | P-CR | Approval | Definitions, architectural assumptions and key issue related to network identification, selection and access control | Qualcomm Incorporated, Nokia, Nokia Shanghai Bell | Rel-16 | FS_Vertical_LAN | Revised in parallel session, merging S2-186815, to S2-187463. | Revised |
6.15 | S2-187463 | P-CR | Approval | Definitions, architectural assumptions and key issue related to network identification, selection and access control | Qualcomm Incorporated, Nokia, Nokia Shanghai Bell | Rel-16 | FS_Vertical_LAN | Revision of S2-186511, merging S2-186815. Revised in parallel session to S2-187548. | Revised |
6.15 | S2-187548 | P-CR | Approval | Definitions, architectural assumptions and key issue related to network identification, selection and access control | Qualcomm Incorporated, Nokia, Nokia Shanghai Bell, Deutsche Telekom, vivo, Intel | Rel-16 | FS_Vertical_LAN | Revision of S2-187463 For e-mail approval. Approved | Approved |
6.15 | S2-187549 | P-CR | Approval | Definitions, architectural assumptions and key issue related to network identification, selection and access control (solution) | Qualcomm Incorporated, Nokia, Nokia Shanghai Bell | Rel-16 | FS_Vertical_LAN | Created in parallel session. For e-mail approval. e-mail revision 2 approved. Revised to S2-187620. Runze (Huawei): provides rev1. Sebastian (QC): provides rev2. Runze (Huawei): OK with rev2. | Revised |
6.15 | S2-187620 | P-CR | Approval | Definitions, architectural assumptions and key issue related to network identification, selection and access control (solution) | Qualcomm Incorporated, Nokia, Nokia Shanghai Bell | Rel-16 | FS_Vertical_LAN | e-mail revision 2 of S2-187549. Approved | Approved |
6.15 | S2-186824 | P-CR | Approval | Key Issue Proposal on 5GLAN Group Management | Huawei, HiSilicon, KPN | Rel-16 | FS_Vertical_LAN | Revised in parallel session, merging S2-186854, to S2-187464. | Revised |
6.15 | S2-187464 | P-CR | Approval | Key Issue Proposal on 5GLAN Group Management | Huawei, HiSilicon, KPN | Rel-16 | FS_Vertical_LAN | Revision of S2-186824, merging S2-186854. Revised in parallel session to S2-187550. | Revised |
6.15 | S2-187550 | P-CR | Approval | Key Issue Proposal on 5GLAN Group Management | Huawei, HiSilicon, KPN, Intel | Rel-16 | FS_Vertical_LAN | Revision of S2-187464. For e-mail approval. e-mail revision 3 approved. Revised to S2-187621. Shabnam (E///): comments. Runze (Huawei): comments. Shabnam (E///): provides rev1. Ellen (Intel): provides rev2. Shabnam (E///): objects rev2. Runze (Huawei): prefers rev2. Shabnam (E///): provides rev3. Runze (Huawei): OK with rev3. | Revised |
6.15 | S2-187621 | P-CR | Approval | Key Issue Proposal on 5GLAN Group Management | Huawei, HiSilicon, KPN, Intel | Rel-16 | FS_Vertical_LAN | e-mail revision 3 of S2-187550. Approved | Approved |
6.15 | S2-186815 | P-CR | Approval | Key issue: Access and Mobility control for vertical LAN UE | Vivo | Rel-16 | FS_Vertical_LAN | Merged into S2-187463 | Merged |
6.15 | S2-186850 | P-CR | Approval | New Key Issues for Network Discovery & Selection and Access Control & Restriction | Intel | Rel-16 | FS_Vertical_LAN | Revised in parallel session to S2-187465. | Revised |
6.15 | S2-187465 | P-CR | Approval | New Key Issues for Network Discovery & Selection and Access Control & Restriction | Intel, Qualcomm Incorporated | Rel-16 | FS_Vertical_LAN | Revision of S2-186850. Revised in parallel session to S2-187547. | Revised |
6.15 | S2-187547 | P-CR | Approval | New Key Issues for Network Discovery & Selection and Access Control & Restriction | Intel, Qualcomm Incorporated, Deutsche Telekom AG | Rel-16 | FS_Vertical_LAN | Revision of S2-187465. For e-mail approval. Approved | Approved |
6.15 | S2-186851 | P-CR | Approval | Key issues for 5G-LAN Service Discovery, Selection and Restriction | Intel | Rel-16 | FS_Vertical_LAN | Revised in parallel session to S2-187466. | Revised |
6.15 | S2-187466 | P-CR | Approval | Key issues for 5G-LAN Service Discovery, Selection and Restriction | Intel | Rel-16 | FS_Vertical_LAN | Revision of S2-186851. Revised in parallel session to S2-187551. | Revised |
6.15 | S2-187551 | P-CR | Approval | Key issues for 5G-LAN Service Discovery, Selection and Restriction | Intel | Rel-16 | FS_Vertical_LAN | Revision of S2-187466. For e-mail approval. e-mail revision 3 approved. Revised to S2-187622. Shabnam (E///): provides rev1. Ellen (Intel): provides rev2. Shabnam (E///): comments. Ellen (Intel): provides rev3. | Revised |
6.15 | S2-187622 | P-CR | Approval | Key issues for 5G-LAN Service Discovery, Selection and Restriction | Intel | Rel-16 | FS_Vertical_LAN | e-mail revision 3 of S2-187551. Approved | Approved |
- | - | - | - | Type-a Network, Interaction with PLMN | - | - | - | - | - |
6.15 | S2-186637 | P-CR | Approval | Relationship between type-a networks and PLMNs; key issue on PLMN access for type-a network subscribers | Qualcomm Incorporated | Rel-16 | FS_Vertical_LAN | Noted in parallel session | Noted |
6.15 | S2-186816 | P-CR | Approval | Key issue: Interworking between type-a networks and public networks | Vivo | Rel-16 | FS_Vertical_LAN | Postponed in parallel session | Postponed |
- | - | - | - | Type-b Network | - | - | - | - | - |
6.15 | S2-186797 | P-CR | Approval | Key issue on accessing PLMN services via type-b network | Nokia, Nokia Shanghai Bell, Qualcomm | Rel-16 | FS_Vertical_LAN | Noted in parallel session | Noted |
- | - | - | - | TSN (Time Sensitive Networking) | - | - | - | - | - |
6.15 | S2-186825 | P-CR | Approval | Key Issue Proposal on Clock Synchronization | Huawei, HiSilicon | Rel-16 | FS_Vertical_LAN | Revised in parallel session to S2-187467. | Revised |
6.15 | S2-187467 | P-CR | Approval | Key Issue Proposal on Clock Synchronization | Huawei, HiSilicon | Rel-16 | FS_Vertical_LAN | Revision of S2-186825. Revised in parallel session to S2-187552. | Revised |
6.15 | S2-187552 | P-CR | Approval | Key Issue Proposal on Clock Synchronization | Huawei, HiSilicon | Rel-16 | FS_Vertical_LAN | Revision of S2-187467. For e-mail approval. e-mail revision 1 approved. Revised to S2-187623. Sebastian (QC): provides rev1. Runze (Huawei): OK with rev1 | Revised |
6.15 | S2-187623 | P-CR | Approval | Key Issue Proposal on Clock Synchronization | Huawei, HiSilicon | Rel-16 | FS_Vertical_LAN | e-mail revision 1 of S2-187552. Approved | Approved |
6.15 | S2-186798 | P-CR | Approval | Key issue on support for TSN | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | Rel-16 | FS_Vertical_LAN | Revised in parallel session, merging S2-186826, to S2-187468. | Revised |
6.15 | S2-187468 | P-CR | Approval | Key issue on support for TSN | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | Rel-16 | FS_Vertical_LAN | Revision of S2-186798, merging S2-186826. Revised in parallel session to S2-187553. | Revised |
6.15 | S2-187553 | P-CR | Approval | Key issue on support for TSN | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | Rel-16 | FS_Vertical_LAN | Revision of S2-187468. For e-mail approval. Approved | Approved |
6.15 | S2-186826 | P-CR | Approval | Key Issue Proposal on Control of Deterministic Packet Delivery | Huawei, HiSilicon | Rel-16 | FS_Vertical_LAN | Merged into S2-187468 | Merged |
- | - | - | - | 5G LAN & Other items | - | - | - | - | - |
6.15 | S2-186567 | P-CR | Approval | Key issue: Architecture of vertical LAN | Vivo | Rel-16 | FS_Vertical_LAN | Noted in parallel session | Noted |
6.15 | S2-186946 | P-CR | Approval | Support for 5GLAN communication service key issue | Huawei, HiSilicon | Rel-16 | FS_Vertical_LAN | Revised in parallel session, merging S2-186854 and S2-186942, to S2-187469. | Revised |
6.15 | S2-187469 | P-CR | Approval | Support for 5GLAN communication service key issue | Huawei, HiSilicon, Intel, InterDigital Inc. | Rel-16 | FS_Vertical_LAN | Revision of S2-186946, merging S2-186854 and S2-186942. Revised in parallel session to S2-187554. | Revised |
6.15 | S2-187554 | P-CR | Approval | Support for 5GLAN communication service key issue | Huawei, HiSilicon, Intel, InterDigital Inc. | Rel-16 | FS_Vertical_LAN | Revision of S2-187469. For e-mail approval. e-mail revision 2 approved. Revised to S2-187624. Antoine (Orange): comments. Zhangjan (Huawei): provides rev1 (marked as rev3 on the reflector). Sebastian (QC): provides rev2. Ellen (Intel): OK with rev2. | Revised |
6.15 | S2-187624 | P-CR | Approval | Support for 5GLAN communication key issue | Huawei, HiSilicon, Intel, InterDigital Inc. | Rel-16 | FS_Vertical_LAN | e-mail revision 2 of S2-187554. Approved | Approved |
6.15 | S2-186854 | P-CR | Approval | Key issues of Service and Session Management for 5G-LAN type Service | Intel | Rel-16 | FS_Vertical_LAN | Merged into S2-187464 and S2-187469 | Merged |
6.15 | S2-186942 | P-CR | Approval | New Key Issue: Routing in 5GLAN | InterDigital Inc. | Rel-16 | FS_Vertical_LAN | Merged into S2-187469 | Merged |
6.15 | S2-186799 | P-CR | Approval | Key issue on support for Service Exposure for Vertical and LAN Services | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | Rel-16 | FS_Vertical_LAN | Revised in parallel session to S2-187470. | Revised |
6.15 | S2-187470 | P-CR | Approval | Key issue on support for Service Exposure for Vertical and LAN Services | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated, Convida Wireless | Rel-16 | FS_Vertical_LAN | Revision of S2-186799. Agreed in parallel session Block approved | Approved |
6.16 | - | - | - | Study on System enhancements for Provision of Access to Restricted Local Operator Services by Unauthenticated UEs (FS_PARLOS_SA2) | - | - | {Krisztian} | - | - |
- | - | - | - | Architectural assumptions | - | - | - | - | - |
6.16 | S2-186579 | P-CR | Approval | Architectural Assumptions: RLOS access to authenticated UEs | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revised in parallel session to S2-186993. | Revised |
6.16 | S2-186993 | P-CR | Approval | Architectural Assumptions: RLOS access to authenticated UEs | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186579. Revised in parallel session to S2-187093. Replace bullet above the NOTE: If the UE performs RLOS attach, the network may perform authentication if security information is available. Otherwise, authentication to EPC access for RLOS is skipped. | Revised |
6.16 | S2-187093 | P-CR | Approval | Architectural Assumptions: RLOS access to authenticated UEs | Nokia, Nokia Shanghai Bell, Ericsson | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186993. Agreed in parallel session Block approved | Approved |
- | - | - | - | Solution updates | - | - | - | - | - |
6.16 | S2-186542 | P-CR | Approval | On congestion control for PaRLOS | Qualcomm Incorporated | Rel-16 | FS_PARLOS | Revised in parallel session to S2-186994. | Revised |
6.16 | S2-186994 | P-CR | Approval | On congestion control for PaRLOS | Qualcomm Incorporated | Rel-16 | FS_PARLOS | Revision of S2-186542. Revised in parallel session to S2-187123. | Revised |
6.16 | S2-187123 | P-CR | Approval | On congestion control for PaRLOS | Qualcomm Incorporated | Rel-16 | FS_PARLOS | Revision of S2-186994. For e-mail approval. Approved | Approved |
6.16 | S2-186570 | P-CR | Approval | Update of solution #4 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revised in parallel session to S2-186996. | Revised |
6.16 | S2-186996 | P-CR | Approval | Update of solution #4 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186570. Revised in parallel session, merging S2-187000, to S2-187094. | Revised |
6.16 | S2-187094 | P-CR | Approval | Update of solution #4 | Nokia, Nokia Shanghai Bell, Ericsson | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186996, merging S2-187000. Revised in parallel session to S2-187127. | Revised |
6.16 | S2-187127 | P-CR | Approval | Update of solution #4 | Nokia, Nokia Shanghai Bell, Ericsson | Rel-16 | FS_PARLOS_SA2 | Revision of S2-187094. Approved | Approved |
6.16 | S2-186885 | P-CR | Approval | Clarification on EPC Solution#4 | Samsung | Rel-16 | FS_PARLOS_SA2 | Revised in parallel session to S2-186997. | Revised |
6.16 | S2-186997 | P-CR | Approval | Clarification on EPC Solution#4 | Samsung | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186885. Revised in parallel session to S2-187095. Undo changes on step 18 and 25. | Revised |
6.16 | S2-187095 | P-CR | Approval | Clarification on EPC Solution#4 | Samsung | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186997. Agreed in parallel session Block approved | Approved |
6.16 | S2-186571 | P-CR | Approval | Update of solution #5 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revised in parallel session to S2-186998. | Revised |
6.16 | S2-186998 | P-CR | Approval | Update of solution #5 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186571. Revised in parallel session to S2-187124. | Revised |
6.16 | S2-187124 | P-CR | Approval | Update of solution #5 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186998. Revised to S2-187590. | Revised |
6.16 | S2-187590 | P-CR | Approval | Update of solution #5 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revision of S2-187124. For e-mail approval. e-mail revision 4 approved. Revised to S2-187625. George (E///): provides rev1. Nicolas (Nokia): provides rev2. Nicolas (Nokia): provides rev3. George (E///): provides rev4. Nicolas (Nokia): fine with rev4. | Revised |
6.16 | S2-187625 | P-CR | Approval | Update of solution #5 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | e-mail revision 4 of S2-187590. Approved | Approved |
6.16 | S2-186402 | P-CR | Approval | Update to Solution 6 to Key issue #EPC-3 and #EPC-4 to enable VoLTE calls after initial attachment | Ericsson | Rel-16 | FS_PARLOS_SA2 | Noted in parallel session | Noted |
6.16 | S2-186938 | P-CR | Approval | Update to Solution 9 to enhance the congestion control description | Motorola Mobility, Lenovo, Qualcomm, Charter Communications, Nokia, Nokia Shanghai Bell, Intel, Sprint | Rel-16 | FS_PARLOS_SA2 | Revised in parallel session to S2-186995. | Revised |
6.16 | S2-186995 | P-CR | Approval | Update to Solution 9 to enhance the congestion control description | Motorola Mobility, Lenovo, Qualcomm, Charter Communications, Nokia, Nokia Shanghai Bell, Intel, Sprint | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186938. Agreed in parallel session Block approved | Approved |
6.16 | S2-186913 | P-CR | Approval | UE behaviour when RLOS attached UE selects non-equivalent PLMN | NEC | Rel-16 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-186572 | P-CR | Approval | Update of solution #10 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revised in parallel session to S2-186999. | Revised |
6.16 | S2-186999 | P-CR | Approval | Update of solution #10 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186572. Revised in parallel session to S2-187125. | Revised |
6.16 | S2-187125 | P-CR | Approval | Update of solution #10 | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186999. Approved | Approved |
- | - | - | - | New solutions | - | - | - | - | - |
6.16 | S2-186406 | P-CR | Approval | New solution to allow Authentication for RLOS attached UE and update to Solution #8 | Ericsson | Rel-16 | FS_PARLOS_SA2 | Revised in parallel session to S2-187000. | Revised |
6.16 | S2-187000 | P-CR | Approval | New solution to allow Authentication for RLOS attached UE and update to Solution #8 | Ericsson | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186406. Merged into S2-187094 | Merged |
6.16 | S2-186408 | P-CR | Approval | Solution to Key Issue #EPC-4 | Ericsson | Rel-16 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-186870 | P-CR | Approval | Partial Solution to Key Issue #EPC-7 'level of security' | Vodafone | Rel-16 | FS_PARLOS_SA2 | Revised in parallel session to S2-187001. | Revised |
6.16 | S2-187001 | P-CR | Approval | Partial Solution to Key Issue #EPC-7 'level of security' | Vodafone | Rel-16 | FS_PARLOS_SA2 | Revision of S2-186870. Revised in parallel session to S2-187126. | Revised |
6.16 | S2-187126 | P-CR | Approval | Partial Solution to Key Issue #EPC-7 'level of security' | Vodafone | Rel-16 | FS_PARLOS_SA2 | Revision of S2-187001. Approved | Approved |
6.16 | S2-186886 | P-CR | Approval | Solution to access restriction on UE's attach for RLOS | Samsung | Rel-16 | FS_PARLOS_SA2 | Not Handled | Not Handled |
- | - | - | - | Outgoing LS | - | - | - | - | - |
6.16 | S2-186407 | LS OUT | Approval | LS on Authentication for RLOS EPS Attach | Ericsson | FS_PARLOS_SA2 | Not Handled | Not Handled | |
- | - | - | - | Evaluations, conclusions | - | - | - | - | - |
6.16 | S2-186403 | P-CR | Approval | Handling of IMS Registration for RLOS UEs | Ericsson | Rel-16 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-186543 | P-CR | Approval | Evaluation and conclusion for Key Issue EPC-1 | Qualcomm Incorporated | Rel-16 | FS_PARLOS | Not Handled | Not Handled |
6.16 | S2-186544 | P-CR | Approval | Evaluation and conclusion for Key Issue EPC-2 | Qualcomm Incorporated | Rel-16 | FS_PARLOS | Not Handled | Not Handled |
6.16 | S2-186573 | P-CR | Approval | Title: | Nokia, Nokia Shanghai Bell | Rel-16 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.17 | - | - | - | Study on EPC support for Mobility with Low Latency Communication (FS_LLC_Mob) | - | - | {Not_on_agenda} | - | - |
6.18 | - | - | - | Study on enhancement of systems using EPS for Ultra Reliability and Availability using commodity equipment (FS_EPS_URACE) | - | - | {Not_on_agenda} | - | - |
6.19 | - | - | - | Study on Enhancements to the Service-Based 5G System Architecture (FS_eSBA) | - | - | {Frank} | - | - |
- | - | - | - | General aspects and key issues | - | - | - | - | - |
6.19 | S2-186412 | P-CR | Approval | ESBA - Interoperability aspects in key issue 6 | Ericsson | Rel-16 | FS_eSBA | Revised in parallel session to S2-187406. | Revised |
6.19 | S2-187406 | P-CR | Approval | ESBA - Interoperability aspects in key issue 6 | Ericsson | Rel-16 | FS_eSBA | Revision of S2-186412. Agreed in parallel session Block approved | Approved |
6.19 | S2-186477 | P-CR | Approval | On terminology for SBA | Huawei, HiSilicon | Rel-16 | FS_eSBA | Postponed in parallel session | Postponed |
6.19 | S2-186440 | P-CR | Approval | An addition to Key Issue 2 | AT&T, Sprint | Rel-16 | FS_eSBA | Revised in parallel session to S2-187407. | Revised |
6.19 | S2-187407 | P-CR | Approval | An addition to Key Issue 2 | AT&T, Sprint | Rel-16 | FS_eSBA | Revision of S2-186440. Revised in parallel session to S2-187511. | Revised |
6.19 | S2-187511 | P-CR | Approval | An addition to Key Issue 2 | AT&T, Sprint | Rel-16 | FS_eSBA | Revision of S2-187407. Agreed in parallel session Block approved | Approved |
6.19 | S2-186416 | P-CR | Approval | New issue on roaming | Ericsson | Rel-16 | FS_eSBA | Revised in parallel session to S2-187408. | Revised |
6.19 | S2-187408 | P-CR | Approval | New issue on roaming | Ericsson | Rel-16 | FS_eSBA | Revision of S2-186416. Revised in parallel session to S2-187512. | Revised |
6.19 | S2-187512 | P-CR | Approval | New issue on roaming | Ericsson | Rel-16 | FS_eSBA | Revision of S2-187408. For e-mail approval. Approved | Approved |
- | - | - | - | Solutions to Framework aspects (KI#3) | - | - | - | - | - |
6.19 | S2-186417 | P-CR | Approval | Service framework requirements | Ericsson | Rel-16 | FS_eSBA | Revised in parallel session to S2-187409. | Revised |
6.19 | S2-187409 | P-CR | Approval | Service framework requirements | Ericsson | Rel-16 | FS_eSBA | Revision of S2-186417. Revised in parallel session to S2-187513. | Revised |
6.19 | S2-187513 | P-CR | Approval | Service framework requirements | Ericsson | Rel-16 | FS_eSBA | Revision of S2-187409. For e-mail approval. e-mail revision 1 approved. Revised to S2-187626. Fenqin (Huawei): provides rev1. Magnus (E///): prefers rev0, can live with rev1. | Revised |
6.19 | S2-187626 | P-CR | Approval | Service framework requirements | Ericsson | Rel-16 | FS_eSBA | e-mail revision 1 of S2-187513. Approved | Approved |
6.19 | S2-186429 | P-CR | Approval | Update of Solution 3.1 'Amendments to Service Interaction model' to address editors notes | Deutsche Telekom | Rel-16 | FS_eSBA | Revised in parallel session to S2-187410. | Revised |
6.19 | S2-187410 | P-CR | Approval | Update of Solution 3.1 'Amendments to Service Interaction model' to address editors notes | Deutsche Telekom | Rel-16 | FS_eSBA | Revision of S2-186429. Revised in parallel session to S2-187514. | Revised |
6.19 | S2-187514 | P-CR | Approval | Update of Solution 3.1 'Amendments to Service Interaction model' to address editors notes | Deutsche Telekom | Rel-16 | FS_eSBA | Revision of S2-187410. For e-mail approval. Approved | Approved |
6.19 | S2-186943 | P-CR | Approval | Update to Illustrated Procedures: 'Delivery of Messages' | InterDigital Inc. | Rel-16 | FS_eSBA | Revised in parallel session to S2-187411. | Revised |
6.19 | S2-187411 | P-CR | Approval | Update to Illustrated Procedures: 'Delivery of Messages' | InterDigital Inc. | Rel-16 | FS_eSBA | Revision of S2-186943. Revised in parallel session to S2-187516. | Revised |
6.19 | S2-187516 | P-CR | Approval | Update to Illustrated Procedures: 'Delivery of Messages' | InterDigital Inc. | Rel-16 | FS_eSBA | Revision of S2-187411. For e-mail approval. Withdrawn | Withdrawn |
6.19 | S2-186498 | P-CR | Approval | Further clarification for distributed service framework | China Mobile | Rel-16 | FS_eSBA | Revised in parallel session to S2-187443. | Revised |
6.19 | S2-187443 | P-CR | Approval | Further clarification for distributed service framework | China Mobile | Rel-16 | FS_eSBA | Revision of S2-186498. Revised in parallel session to S2-187517. | Revised |
6.19 | S2-187517 | P-CR | Approval | Further clarification for distributed service framework | China Mobile | Rel-16 | FS_eSBA | Revision of S2-187443. For e-mail approval. Approved | Approved |
6.19 | S2-186658 | DISCUSSION | Discussion | Discussion on eSBA key issue 3 | Oracle Corporation, Verizon | Rel-16 | FS_eSBA | Noted in parallel session | Noted |
6.19 | S2-186657 | P-CR | Approval | Distributed service framework | Oracle, Verizon | Rel-16 | FS_eSBA | Revised in parallel session to S2-187444. | Revised |
6.19 | S2-187444 | P-CR | Approval | Distributed service framework | Oracle, Verizon, Cisco. | Rel-16 | FS_eSBA | Revision of S2-186657. Revised in parallel session to S2-187518. | Revised |
6.19 | S2-187518 | P-CR | Approval | Distributed service framework | Oracle, Verizon, Cisco. | Rel-16 | FS_eSBA | Revision of S2-187444. For e-mail approval. e-mail revision 1 approved. Revised to S2-187627. Uri (Oracle): provides rev1. | Revised |
6.19 | S2-187627 | P-CR | Approval | Distributed service framework | Oracle, Verizon, Cisco. | Rel-16 | FS_eSBA | e-mail revision 1 of S2-187518. Approved | Approved |
6.19 | S2-186413 | P-CR | Approval | Solution proposal 'Flexible Service Framework' to address key issue 'Improvements to service framework related aspects' | Ericsson | Rel-16 | FS_eSBA | Revised in parallel session to S2-187445. | Revised |
6.19 | S2-187445 | P-CR | Approval | Solution proposal 'Flexible Service Framework' to address key issue 'Improvements to service framework related aspects' | Ericsson | Rel-16 | FS_eSBA | Revision of S2-186413. Revised in parallel session to S2-187519. | Revised |
6.19 | S2-187519 | P-CR | Approval | Solution proposal 'Flexible Service Framework' to address key issue 'Improvements to service framework related aspects' | Ericsson | Rel-16 | FS_eSBA | Revision of S2-187445. For e-mail approval. Approved | Approved |
6.19 | S2-186801 | P-CR | Approval | 23.742: Enhancements to Services Framework | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eSBA | Revised in parallel session to S2-187446. | Revised |
6.19 | S2-187446 | P-CR | Approval | 23.742: Enhancements to Services Framework | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eSBA | Revision of S2-186801. Revised in parallel session to S2-187520. | Revised |
6.19 | S2-187520 | P-CR | Approval | 23.742: Enhancements to Services Framework | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eSBA | Revision of S2-187446. For e-mail approval. Approved | Approved |
6.19 | S2-186414 | P-CR | Approval | Solution proposal 'hierarchical service framework' to address key issue 'Improvements to service framework related aspects' | Ericsson | Rel-16 | FS_eSBA | Not Handled | Not Handled |
6.19 | S2-186415 | P-CR | Approval | Solution proposal 'improvements to the service framework' to address key issue 'Improvements to service framework related aspects' | Ericsson | Rel-16 | FS_eSBA | Not Handled | Not Handled |
- | - | - | - | Solutions to high reliable deployment (KI#4) | - | - | - | - | - |
6.19 | S2-186963 | P-CR | Approval | Solution #4.3 update | NTT DOCOMO | Rel-16 | FS_eSBA | Revised in parallel session to S2-187447. | Revised |
6.19 | S2-187447 | P-CR | Approval | Solution #4.3 update | NTT DOCOMO | Rel-16 | FS_eSBA | Revision of S2-186963. Agreed in parallel session Block approved | Approved |
6.19 | S2-186430 | P-CR | Approval | Update of Solution 4.1SBA with stateless and unsticky services to address editors notes | Deutsche Telekom | Rel-16 | FS_eSBA | Revised in parallel session to S2-187449. | Revised |
6.19 | S2-187449 | P-CR | Approval | Update of Solution 4.1SBA with stateless and unsticky services to address editors notes | Deutsche Telekom | Rel-16 | FS_eSBA | Revision of S2-186430. For e-mail approval. Approved | Approved |
6.19 | S2-186501 | P-CR | Approval | Common Network Data Service | China Mobile | Rel-16 | FS_eSBA | Revised in parallel session to S2-187450. | Revised |
6.19 | S2-187450 | P-CR | Approval | Common Network Data Service | China Mobile | Rel-16 | FS_eSBA | Revision of S2-186501. Revised in parallel session to S2-187510. | Revised |
6.19 | S2-187510 | P-CR | Approval | Common Network Data Service | China Mobile | Rel-16 | FS_eSBA | Revision of S2-187450. For e-mail approval. Approved | Approved |
6.19 | S2-186789 | P-CR | Approval | Group based solution for NF/NF service instance reliability | Huawei, HiSilicon, SK Telecom | Rel-16 | FS_eSBA | Revised in parallel session to S2-187451. | Revised |
6.19 | S2-187451 | P-CR | Approval | Group based solution for NF/NF service instance reliability | Huawei, HiSilicon, SK Telecom | Rel-16 | FS_eSBA | Revision of S2-186789. Agreed in parallel session Block approved | Approved |
6.19 | S2-186418 | P-CR | Approval | Update of the Service Instance Set solution | Ericsson | Rel-16 | FS_eSBA | Revised in parallel session to S2-187509. | Revised |
6.19 | S2-187509 | P-CR | Approval | Update of the Service Instance Set solution | Ericsson, Vodafone | Rel-16 | FS_eSBA | Revision of S2-186418. For e-mail approval. Noted Devaki (Nokia): provides rev1. Fenqin (Huawei): comments. K-H (DT): comments. Fenqin (Huawei): provides rev2. Magnus (E///): provides rev3. OK with rev0, rev1 or rev3. Antoine (Orange): provides rev4. Magnus (E///): provides rev5. OK with rev0, rev1, rev3 or rev5. Devaki (Nokia): provides rev6. Antoine (Orange): provides rev7. Magnus (E///): OK with rev0, rev1, rev3 or rev5, can live with rev6. Antoine (Orange): can only accept rev4 or rev7. Devaki (Nokia): prefers rev6 or rev7. Fenqin (Huawei): can accept rev6. Magnus (E///): comments. Devaki (Nokia): comments. Susana (VF): OK with rev5, can live with rev6. Antoine (Orange): comments. Magnus (E///): comments. Devaki (Nokia): comments. | Noted |
6.19 | S2-186820 | P-CR | Approval | Solution for the optimization for profile of NF/NF service instance | Huawei, HiSilicon | Rel-16 | FS_eSBA | Not Handled | Not Handled |
- | - | - | - | Solutions to UP Services (KI#2) | - | - | - | - | - |
6.19 | S2-186697 | P-CR | Approval | One Solution for Key Issue #2: Extend Service Concept into User Plane | CATT | Rel-16 | FS_eSBA | Revised in parallel session to S2-187448. | Revised |
6.19 | S2-187448 | P-CR | Approval | One Solution for Key Issue #2: Extend Service Concept into User Plane | CATT | Rel-16 | FS_eSBA | Revision of S2-186697. Revised in parallel session to S2-187521. | Revised |
6.19 | S2-187521 | P-CR | Approval | One Solution for Key Issue #2: Extend Service Concept into User Plane | CATT | Rel-16 | FS_eSBA | Revision of S2-187448. For e-mail approval. Approved | Approved |
6.19 | S2-186957 | P-CR | Approval | Architecture Principle for UPF Reporting | Huawei, HiSilicon, SKT | Rel-16 | FS_eSBA | Not Handled | Not Handled |
6.19 | S2-186500 | P-CR | Approval | UPF service introduced in SBA | China Mobile | Rel-16 | MBMS_LTE_enh2, FS_eSBA | Not Handled | Not Handled |
6.20 | - | - | - | Study on enhancement of URLLC supporting in 5GC (FS_5G_URLLC) | - | - | {Frank} | - | - |
- | - | - | - | General/new KI | - | - | - | - | - |
6.20 | S2-186419 | P-CR | Approval | An overview of the IETF DetNet activity | Ericsson | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187313. | Revised |
6.20 | S2-187313 | P-CR | Approval | An overview of the IETF DetNet activity | Ericsson | Rel-16 | FS_5G_URLLC | Revision of S2-186419. Revised in parallel session to S2-187474. | Revised |
6.20 | S2-187474 | P-CR | Approval | An overview of the IETF DetNet activity | Ericsson | Rel-16 | FS_5G_URLLC | Revision of S2-187313. Agreed in parallel session Block approved | Approved |
6.20 | S2-186578 | P-CR | Approval | Specific QoS & Policy control for URLLC services | Huawei, HiSilicon | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187314. | Revised |
6.20 | S2-187314 | P-CR | Approval | Specific QoS & Policy control for URLLC services | Huawei, HiSilicon | Rel-16 | FS_5G_URLLC | Revision of S2-186578. Revised in parallel session to S2-187475. | Revised |
6.20 | S2-187475 | P-CR | Approval | Specific QoS & Policy control for URLLC services | Huawei, HiSilicon | Rel-16 | FS_5G_URLLC | Revision of S2-187314. Noted in parallel session | Noted |
- | - | - | - | Solution for KI#1 | - | - | - | - | - |
6.20 | S2-186421 | P-CR | Approval | Updates to Solution #1 on Redundant user plane paths based on dual connectivity | Ericsson | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187315. | Revised |
6.20 | S2-187315 | P-CR | Approval | Updates to Solution #1 on Redundant user plane paths based on dual connectivity | Ericsson | Rel-16 | FS_5G_URLLC | Revision of S2-186421. Revised in parallel session to S2-187472. | Revised |
6.20 | S2-187472 | P-CR | Approval | Updates to Solution #1 on Redundant user plane paths based on dual connectivity | Ericsson | Rel-16 | FS_5G_URLLC | Revision of S2-187315. Agreed in parallel session Block approved | Approved |
6.20 | S2-186422 | P-CR | Approval | Updates to solution #2 on Multiple UEs per device for user plane redundancy | Ericsson | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187316. | Revised |
6.20 | S2-187316 | P-CR | Approval | Updates to solution #2 on Multiple UEs per device for user plane redundancy | Ericsson | Rel-16 | FS_5G_URLLC | Revision of S2-186422. Agreed in parallel session Block approved | Approved |
6.20 | S2-186431 | P-CR | Approval | Support for VLAN ID learning to enable IEEE 802.1CB (Frame Replication and Elimination for Reliability) combined with IEEE 802.1Q | Qualcomm Incorporated | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187317. | Revised |
6.20 | S2-187317 | P-CR | Approval | Support for VLAN ID learning to enable IEEE 802.1CB (Frame Replication and Elimination for Reliability) combined with IEEE 802.1Q | Qualcomm Incorporated | Rel-16 | FS_5G_URLLC | Revision of S2-186431. Agreed in parallel session Block approved | Approved |
6.20 | S2-186483 | P-CR | Approval | Update of solution#3 and solution#4 | Huawei, HiSilicon | Rel-16 | FS_eNS | Revised in parallel session to S2-187318. | Revised |
6.20 | S2-187318 | P-CR | Approval | Update of solution#3 and solution#4 | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of S2-186483. Revised in parallel session to S2-187473. | Revised |
6.20 | S2-187473 | P-CR | Approval | Update of solution#3 and solution#4 | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of S2-187318. Agreed in parallel session Block approved | Approved |
6.20 | S2-186722 | P-CR | Approval | Update the solution #4 | Samsung | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187319. | Revised |
6.20 | S2-187319 | P-CR | Approval | Update the solution #4 | Samsung | Rel-16 | FS_5G_URLLC | Revision of S2-186722. Agreed in parallel session Block approved | Approved |
6.20 | S2-186802 | P-CR | Approval | Solution for 5G URLLC in 5G System | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187387. | Revised |
6.20 | S2-187387 | P-CR | Approval | Solution for 5G URLLC in 5G System | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5G_URLLC | Revision of S2-186802. Revised in parallel session to S2-187471. | Revised |
6.20 | S2-187471 | P-CR | Approval | Solution for 5G URLLC in 5G System | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5G_URLLC | Revision of S2-187387. For e-mail approval. Approved | Approved |
6.20 | S2-186721 | P-CR | Approval | Solution for establishing N3 and N9 tunnels for redundant transmission | Samsung | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187388. | Revised |
6.20 | S2-187388 | P-CR | Approval | Solution for establishing N3 and N9 tunnels for redundant transmission | Samsung, Huawei, HiSilicon, Lenovo, Motorola Mobility | Rel-16 | FS_5G_URLLC | Revision of S2-186721. Agreed in parallel session Block approved | Approved |
6.20 | S2-186926 | P-CR | Approval | Solution for KI 1#: Redundant Transmission in core network for URLLC service | Lenovo, Motorola Mobility | Rel-16 | FS_5G_URLLC | Postponed in parallel session | Postponed |
- | - | - | - | Solution for KI#2 | - | - | - | - | - |
6.20 | S2-186516 | P-CR | Approval | Updating for solution#5 in FS_URLLC | OPPO | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187389. | Revised |
6.20 | S2-187389 | P-CR | Approval | Updating for solution#5 in FS_URLLC | OPPO | Rel-16 | FS_5G_URLLC | Revision of S2-186516. Revised in parallel session to S2-187476. | Revised |
6.20 | S2-187476 | P-CR | Approval | Updating for solution#5 in FS_URLLC | OPPO | Rel-16 | FS_5G_URLLC | Revision of S2-187389. For e-mail approval. e-mail revision 1 approved. Revised to S2-187628. Shabnam (E///): comments. Yang (Oppo): provides rev1. | Revised |
6.20 | S2-187628 | P-CR | Approval | Updating for solution#5 in FS_URLLC | OPPO | Rel-16 | FS_5G_URLLC | e-mail revision 1 of S2-187476. Approved | Approved |
6.20 | S2-186484 | P-CR | Approval | Update of solution#5 | Huawei, HiSilicon | Rel-16 | FS_eNS | Not Handled | Not Handled |
- | - | - | - | Solution for KI#3 | - | - | - | - | - |
6.20 | S2-186420 | P-CR | Approval | Anchor change for Ethernet PDU Sessions | Ericsson | Rel-16 | FS_5G_URLLC | Not Handled | Not Handled |
6.20 | S2-186482 | P-CR | Approval | Architectural Updates for ATSSS Solution 1 | Huawei, HiSilicon | Rel-16 | FS_eNS | Not Handled | Not Handled |
- | - | - | - | Solution for KI#4 | - | - | - | - | - |
6.20 | S2-186945 | P-CR | Approval | Solution for QoS Monitoring for URLLC Services | Huawei, HiSilicon | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187398. | Revised |
6.20 | S2-187398 | P-CR | Approval | Solution for QoS Monitoring for URLLC Services | Huawei, HiSilicon | Rel-16 | FS_5G_URLLC | Revision of S2-186945. Revised in parallel session to S2-187477. | Revised |
6.20 | S2-187477 | P-CR | Approval | Solution for QoS Monitoring for URLLC Services | Huawei, HiSilicon | Rel-16 | FS_5G_URLLC | Revision of S2-187398. For e-mail approval. Approved | Approved |
- | - | - | - | Solution for KI#5 | - | - | - | - | - |
6.20 | S2-186525 | P-CR | Approval | Solution for Key Issue 5 | Sony | Rel-16 | FS_5G_URLLC | Revised in parallel session to S2-187390. | Revised |
6.20 | S2-187390 | P-CR | Approval | Solution for Key Issue 5 | Sony, Interdigital | Rel-16 | FS_5G_URLLC | Revision of S2-186525. Revised in parallel session to S2-187478. | Revised |
6.20 | S2-187478 | P-CR | Approval | Solution for Key Issue 5 | Sony, Interdigital | Rel-16 | FS_5G_URLLC | Revision of S2-187390. Agreed in parallel session Block approved | Approved |
6.21 | - | - | - | Study on Enhancement of Network Slicing (FS_eNS) | - | - | {Puneet} | - | - |
- | - | - | - | Scope | - | - | - | - | - |
6.21 | S2-186450 | P-CR | Approval | TR 23.740: eNS TR update on scope and references | ZTE Wistron | Rel-16 | FS_eNS | Agreed in parallel session Block approved | Approved |
- | - | - | - | Architectural assumptions | - | - | - | - | - |
6.21 | S2-186475 | P-CR | Approval | Architectural assumptions for M.E.A.N.S | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of (unhandled) S2-185388 from S2#127BIS. Revised in parallel session to S2-187171. | Revised |
6.21 | S2-187171 | P-CR | Approval | Architectural assumptions for M.E.A.N.S | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of S2-186475. Revised in parallel session to S2-187247. | Revised |
6.21 | S2-187247 | P-CR | Approval | Architectural assumptions for M.E.A.N.S | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of S2-187171. Agreed in parallel session Block approved | Approved |
- | - | - | - | New Key Issues | - | - | - | - | - |
6.21 | S2-186610 | P-CR | Approval | KI on Slice Specific Authentication and Authorization using non 3GPP credentials | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNS | Merged into S2-187172 | Merged |
6.21 | S2-186944 | P-CR | Approval | New Key Issue: Access to specific Network Slices authorized and authenticated through additional User Identifiers | InterDigital Inc. | Rel-16 | FS_eNS | Revised in parallel session, merging S2-186610, to S2-187172. | Revised |
6.21 | S2-187172 | P-CR | Approval | New Key Issue: Access to specific Network Slices authorized and authenticated through additional User Identifiers | InterDigital Inc. | Rel-16 | FS_eNS | Revision of S2-186944, merging S2-186610. Revised in parallel session to S2-187248. Removing last bullet and changes over changes. | Revised |
6.21 | S2-187248 | P-CR | Approval | New Key Issue: Access to specific Network Slices authorized and authenticated through additional User Identifiers | InterDigital Inc. | Rel-16 | FS_eNS | Revision of S2-187172. Agreed in parallel session Block approved | Approved |
- | - | - | - | Solutions for KI#1 (Mutually Exclusive Access to Network Slices) | - | - | - | - | - |
6.21 | S2-186360 | P-CR | Endorsement | Enforcement of Mutually Exclusive Access to Network Slices | Telecom Italia | Rel-16 | FS_eNS | Noted in parallel session | Noted |
6.21 | S2-186476 | P-CR | Approval | Solutions for MEANS (Mutually Exclusive Access to Network Slices) | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of (unhandled) S2-185389 from S2#127BIS. Revised in parallel session to S2-187173. | Revised |
6.21 | S2-187173 | P-CR | Approval | Solutions for MEANS (Mutually Exclusive Access to Network Slices) | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of S2-186476. Revised in parallel session to S2-187249. | Revised |
6.21 | S2-187249 | P-CR | Approval | Solutions for MEANS (Mutually Exclusive Access to Network Slices) | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of S2-187173. Agreed in parallel session Block approved | Approved |
6.21 | S2-186451 | P-CR | Approval | TR 23.740: Solution for Slicing Group support for mutually exclusive access to network slices | ZTE Wistron | Rel-16 | FS_eNS | Revised in parallel session to S2-187174. | Revised |
6.21 | S2-187174 | P-CR | Approval | TR 23.740: Solution for Slicing Group support for mutually exclusive access to network slices | ZTE Wistron | Rel-16 | FS_eNS | Revision of S2-186451. Revised in parallel session to S2-187250. | Revised |
6.21 | S2-187250 | P-CR | Approval | TR 23.740: Solution for Slicing Group support for mutually exclusive access to network slices | ZTE Wistron | Rel-16 | FS_eNS | Revision of S2-187174. Revised in parallel session to S2-187288. Change bullet 4 under clause 6.x.1.2.2 as follow : MEANS applies if it is supported E2E. | Revised |
6.21 | S2-187288 | P-CR | Approval | TR 23.740: Solution for Slicing Group support for mutually exclusive access to network slices | ZTE Wistron | Rel-16 | FS_eNS | Revision of S2-187250. Agreed in parallel session Block approved | Approved |
6.21 | S2-186612 | P-CR | Approval | Mutual Exclusion among slices solution | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNS | Revised in parallel session to S2-187175. | Revised |
6.21 | S2-187175 | P-CR | Approval | Mutual Exclusion among slices solution | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNS | Revision of S2-186612. Revised in parallel session to S2-187251. | Revised |
6.21 | S2-187251 | P-CR | Approval | Mutual Exclusion among slices solution | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNS | Revision of S2-187175. Agreed in parallel session Block approved | Approved |
6.21 | S2-186941 | P-CR | Approval | Solution to KI1: Mutually exclusive access to Network Slices | InterDigital Inc. | Rel-16 | FS_eNS | Revised in parallel session, merging S2-186960, to S2-187176. | Revised |
6.21 | S2-187176 | P-CR | Approval | Solution to KI1: Mutually exclusive access to Network Slices | InterDigital Inc., ITRI | Rel-16 | FS_eNS | Revision of S2-186941, merging S2-186960. Revised in parallel session to S2-187252. | Revised |
6.21 | S2-187252 | P-CR | Approval | Solution to KI1: Mutually exclusive access to Network Slices | InterDigital Inc., ITRI | Rel-16 | FS_eNS | Revision of S2-187176. Revised in parallel session to S2-187289. | Revised |
6.21 | S2-187289 | P-CR | Approval | Solution to KI1: Mutually exclusive access to Network Slices | InterDigital Inc., ITRI | Rel-16 | FS_eNS | Revision of S2-187252. For e-mail approval. Noted Tricci (ZTE): provides rev1. Ulises (Interdigital): provides rev2. Tricci (ZTE): OK with rev2. Alessio (Nokia): provides rev3. Chia-Lin (ITRI): supports rev2. Ulises (Interdigital): provides rev4. Alessio (Nokia): can only accept rev3. Ulises (Interdigital): can only accept rev2 or rev4. Mario (TIM): supports Ulises Alessio (Nokia): proposes to NOTE the P-CR. Mario (TIM): comments. Alessio (Nokia): comments. Mario (TIM): comments. Alessio (Nokia): comments. Ulises (Interdigital): can only accept rev2 or rev4. Alessio (Nokia): can only accept rev3. | Noted |
6.21 | S2-186960 | P-CR | Approval | TR 23.740: potential way to achieve Mutually Exclusive access to Network Slices | ITRI | Rel-16 | FS_eNS | Merged into S2-187176 | Merged |
6.21 | S2-186896 | P-CR | Approval | Solution to Mutually exclusive access to Network Slices | China Telecommunications | Rel-16 | FS_eNS | WITHDRAWN | Withdrawn |
- | - | - | - | Solutions for KI#2 (Enabling interworking for slicing between EPC and 5GC) | - | - | - | - | - |
6.21 | S2-186601 | P-CR | Approval | Solution for Key issue#2: Enabling interworking for slicing between EPC and 5GC | ZTE | Rel-16 | FS_eNS | Revised in parallel session to S2-187177. | Revised |
6.21 | S2-187177 | P-CR | Approval | Solution for Key issue#2: Enabling interworking for slicing between EPC and 5GC | ZTE | Rel-16 | FS_eNS | Revision of S2-186601. Agreed in parallel session Block approved | Approved |
6.21 | S2-186665 | P-CR | Approval | Solution for key issue #2 'Enabling interworking for slicing between EPC and 5GC' | Qualcomm Incorporated | Rel-16 | FS_eNS | Revised in parallel session to S2-187178. | Revised |
6.21 | S2-187178 | P-CR | Approval | Solution for key issue #2 'Enabling interworking for slicing between EPC and 5GC' | Qualcomm Incorporated | Rel-16 | FS_eNS | Revision of S2-186665. Agreed in parallel session Block approved | Approved |
6.21 | S2-186790 | P-CR | Approval | Mobility from EPC to 5GC for slice support | Huawei, HiSilicon | Rel-16 | FS_eNS | Revised in parallel session to S2-187179. | Revised |
6.21 | S2-187179 | P-CR | Approval | Mobility from EPC to 5GC for slice support | Huawei, HiSilicon | Rel-16 | FS_eNS | Revision of S2-186790. Agreed in parallel session Block approved | Approved |
6.21 | S2-186910 | P-CR | Approval | Solution for Connected mode mobility from EPC to 5GC | CATT | Rel-16 | FS_eNS | Revised in parallel session to S2-187180. | Revised |
6.21 | S2-187180 | P-CR | Approval | Solution for Connected mode mobility from EPC to 5GC | CATT | Rel-16 | FS_eNS | Revision of S2-186910. Agreed in parallel session Block approved | Approved |
- | - | - | - | Solutions for KI#3 (Slice Specific Authentication) | - | - | - | - | - |
6.21 | S2-186613 | P-CR | Approval | Slice Specific Authentication and Authorization using non 3GPP credentials - Solution | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNS | Not Handled | Not Handled |
6.21 | S2-186674 | P-CR | Approval | Solution for Slice Specific Authentication and Authorization using non 3GPP credentials | Qualcomm Incorporated | Rel-16 | FS_eNS | Not Handled | Not Handled |
6.22 | - | - | - | Study on Application Awareness Interworking between LTE and NR (FS_AAI_LTE_NR) | - | - | {Not_on_agenda} | - | - |
6.23 | - | - | - | Study for single radio voice continuity from 5GS to 3G (FS_5G-SRVCC) | - | - | {Krisztian} | - | - |
- | - | - | - | Solution updates | - | - | - | - | - |
6.23 | S2-186564 | P-CR | Approval | Fix the leftover FFS for Solution #4 | Vivo | Rel-16 | FS_5G-SRVCC | Revised in parallel session to S2-187061. | Revised |
6.23 | S2-187061 | P-CR | Approval | Fix the leftover FFS for Solution #4 | Vivo | Rel-16 | FS_5G-SRVCC | Revision of S2-186564. Agreed in parallel session Block approved | Approved |
6.23 | S2-186879 | P-CR | Approval | Update the impact to the solution 2. | ZTE | Rel-16 | FS_5G-SRVCC | Agreed in parallel session Block approved | Approved |
6.23 | S2-186690 | P-CR | Approval | Update of solution #3 on returning UE from UTRAN to NG-RAN or E-UTRAN | Intel, Huawei | Rel-16 | FS_5G-SRVCC | Revised in parallel session to S2-187062. | Revised |
6.23 | S2-187062 | P-CR | Approval | Update of solution #3 on returning UE from UTRAN to NG-RAN or E-UTRAN | Intel, Huawei | Rel-16 | FS_5G-SRVCC | Revision of S2-186690. Revised in parallel session to S2-187118. Add 'using MME-lite' to the title | Revised |
6.23 | S2-187118 | P-CR | Approval | Update of solution #3 on returning UE from UTRAN to NG-RAN or E-UTRAN | Intel, Huawei | Rel-16 | FS_5G-SRVCC | Revision of S2-187062. Agreed in parallel session Block approved | Approved |
- | - | - | - | New solutions | - | - | - | - | - |
6.23 | S2-186691 | P-CR | Approval | New solution on returning UE from UTRAN to NG-RAN or E-UTRAN with MSC and UTRAN impact | Intel, Huawei | Rel-16 | FS_5G-SRVCC | Revised in parallel session to S2-187063. | Revised |
6.23 | S2-187063 | P-CR | Approval | New solution on returning UE from UTRAN to NG-RAN or E-UTRAN with MSC and UTRAN impact | Intel, Huawei | Rel-16 | FS_5G-SRVCC | Revision of S2-186691. Revised in parallel session to S2-187119. | Revised |
6.23 | S2-187119 | P-CR | Approval | New solution on returning UE from UTRAN to NG-RAN or E-UTRAN with MSC and UTRAN impact | Intel, Huawei | Rel-16 | FS_5G-SRVCC | Revision of S2-187063. Agreed in parallel session Block approved | Approved |
6.23 | S2-186878 | P-CR | Approval | Returning UE from UTRAN to NR or E-UTRA with existing mechanism | ZTE | Rel-16 | FS_5G-SRVCC | Revised in parallel session to S2-187064. | Revised |
6.23 | S2-187064 | P-CR | Approval | Returning UE from UTRAN to NR or E-UTRA with existing mechanism | ZTE | Rel-16 | FS_5G-SRVCC | Revision of S2-186878. Agreed in parallel session Block approved | Approved |
- | - | - | - | Evaluations and Conclusions | - | - | - | - | - |
6.23 | S2-186609 | P-CR | Approval | Evaluation and conclusion for KI#1 and KI#2 | China Unicom, vivo, Huawei, CAICT, CATT, ZTE, OPPO, Intel, Qualcomm, Lenovo, Motorola Mobility, MediaTek Inc | Rel-16 | FS_5G-SRVCC | Revised in parallel session to S2-187065. Add TS 23.501 to affected list of specs in Key Issue #1 | Revised |
6.23 | S2-187065 | P-CR | Approval | Evaluation and conclusion for KI#1 and KI#2 | China Unicom, vivo, Huawei, CAICT, CATT, ZTE, OPPO, Intel, Qualcomm, Lenovo, Motorola Mobility, MediaTek Inc | Rel-16 | FS_5G-SRVCC | Revision of S2-186609. Agreed in parallel session Block approved | Approved |
6.23 | S2-186793 | P-CR | Approval | Evaluation of Solutions for Key issue 4 | Qualcomm Incorporated | Rel-16 | FS_5G-SRVCC | Revised in parallel session to S2-187066. | Revised |
6.23 | S2-187066 | P-CR | Approval | Evaluation of Solutions for Key issue 4 | Qualcomm Incorporated | Rel-16 | FS_5G-SRVCC | Revision of S2-186793. Revised in parallel session to S2-187120. | Revised |
6.23 | S2-187120 | P-CR | Approval | Evaluation of Solutions for Key issue 4 | Qualcomm Incorporated | Rel-16 | FS_5G-SRVCC | Revision of S2-187066. Agreed in parallel session Block approved | Approved |
6.23 | S2-186565 | P-CR | Approval | Overall evaluation of solutions for Key Issue#3 | Vivo | Rel-16 | FS_5G-SRVCC | Noted in parallel session | Noted |
6.23 | S2-186692 | P-CR | Approval | Evaluation and conclusion of Solutions for Key issue 3 | Intel, Huawei | Rel-16 | FS_5G-SRVCC | Withdrawn | Withdrawn |
6.24 | - | - | - | Study on architecture aspects for using satellite access in 5G (FS_5GSAT_ARCH) | - | - | {Puneet} | - | - |
- | - | - | - | Skeleton, scope | - | - | - | - | - |
6.24 | S2-186470 | P-CR | Approval | TR Skeleton for study on architecture aspects for using satellite access in 5G | Thales | Rel-16 | FS_5GSAT_ARCH | Revised in parallel session to S2-187199. Remove 'and impact Area' from clause 5 title Replace '5.X.2 Impact areas' with '5.X.2 Architectural requirements' | Revised |
6.24 | S2-187199 | P-CR | Approval | TR Skeleton for study on architecture aspects for using satellite access in 5G | Thales | Rel-16 | FS_5GSAT_ARCH | Revision of S2-186470. Agreed in parallel session Block approved | Approved |
6.24 | S2-186471 | P-CR | Approval | References for FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Noted in parallel session | Noted |
6.24 | S2-186472 | P-CR | Approval | Scope of FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revised in parallel session to S2-187200. | Revised |
6.24 | S2-187200 | P-CR | Approval | Scope of FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revision of S2-186472. Revised in parallel session to S2-187235. | Revised |
6.24 | S2-187235 | P-CR | Approval | Scope of FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revision of S2-187200. Revised in parallel session to S2-187245. Change the text as below - 5G Fixed Backhaul between satellite enabled NR-RAN and the 5G Core | Revised |
6.24 | S2-187245 | P-CR | Approval | Scope of FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revision of S2-187235. Agreed in parallel session Block approved | Approved |
- | - | - | - | Key issues | - | - | - | - | - |
6.24 | S2-186644 | P-CR | Approval | Key Issues for FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revised in parallel session to S2-187203. | Revised |
6.24 | S2-187203 | P-CR | Approval | Key Issues for FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revision of S2-186644. Withdrawn | Withdrawn |
- | - | - | - | Solutions | - | - | - | - | - |
6.24 | S2-186473 | P-CR | Approval | Satellite system characteristics to be included in FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revised in parallel session to S2-187201. Annex A (informative): Characteristics of satellite. | Revised |
6.24 | S2-187201 | P-CR | Approval | Satellite system characteristics to be included in FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revision of S2-186473. Revised in parallel session to S2-187236. | Revised |
6.24 | S2-187236 | P-CR | Approval | Satellite system characteristics to be included in FS_5GSAT_ARCH TR | Thales | Rel-16 | FS_5GSAT_ARCH | Revision of S2-187201. Agreed in parallel session Block approved | Approved |
6.24 | S2-186474 | P-CR | Approval | 23.737: Reference Satellite Integration Architectures for FS_5GSAT_ARCH TR | THALES | Rel-16 | FS_5GSAT_ARCH | Presentation, not a P-CR. Related P-CR in S2-187154. Noted in parallel session | Noted |
6.24 | S2-187154 | P-CR | Approval | 23.737: Reference Satellite Integration Architectures for FS_5GSAT_ARCH TR | THALES | Rel-16 | FS_5GSAT_ARCH | Created in parallel session. P-CR corresponding to S2-186474. Revised in parallel session to S2-187202. Annex B (information): Architecture model for integration with 5GC | Revised |
6.24 | S2-187202 | P-CR | Approval | 23.737: Reference Satellite Integration Architectures for FS_5GSAT_ARCH TR | THALES | Rel-16 | FS_5GSAT_ARCH | Revision of S2-187154. Revised in parallel session to S2-187237. | Revised |
6.24 | S2-187237 | P-CR | Approval | 23.737: Reference Satellite Integration Architectures for FS_5GSAT_ARCH TR | THALES | Rel-16 | FS_5GSAT_ARCH | Revision of S2-187202. Revised in parallel session to S2-187246. Using terminology consistently 'Satellite enabled NR-RAN' | Revised |
6.24 | S2-187246 | P-CR | Approval | 23.737: Reference Satellite Integration Architectures for FS_5GSAT_ARCH TR | THALES | Rel-16 | FS_5GSAT_ARCH | Revision of S2-187237. Agreed in parallel session Block approved | Approved |
6.25 | - | - | - | Study on supporting Flexible Local Area Data Network (FS_FLADN) | - | - | {Not_on_agenda} | - | - |
6.26 | - | - | - | Study on system architecture for next generation real time communication services (FS_NG_RTC) | - | - | {Not_on_agenda} | - | - |
6.27 | - | - | - | 5GS Transfer of Policies for Background Data Transfer (xBDT) | - | - | {Not_on_agenda} | - | - |
6.28 | - | - | - | Study on optimisations on UE radio capability signalling (FS_RACS) | - | - | {Puneet} | - | - |
- | - | - | - | Skeleton, scope | - | - | - | - | - |
6.28 | S2-186545 | P-CR | Approval | TR 23.743 skeleton | Qualcomm Incorporated | Rel-16 | FS_RACS | Revised in parallel session to S2-187155. Changing the Title of TR to : Study on optimisations of UE radio capability signalling Updating ToC | Revised |
6.28 | S2-187155 | P-CR | Approval | TR 23.743 skeleton | Qualcomm Incorporated | Rel-16 | FS_RACS | Revision of S2-186545. Agreed in parallel session Block approved | Approved |
6.28 | S2-186546 | P-CR | Approval | Scope of the TR for the study on optimisations on UE radio capability signalling | Qualcomm Incorporated | Rel-16 | FS_RACS | Revised in parallel session to S2-187156. | Revised |
6.28 | S2-187156 | P-CR | Approval | Scope of the TR for the study on optimisations on UE radio capability signalling | Qualcomm Incorporated | Rel-16 | FS_RACS | Revision of S2-186546. Approved | Approved |
- | - | - | - | Key issues | - | - | - | - | - |
6.28 | S2-186547 | P-CR | Approval | Key issue to determine how are the UE capabilities identified | Qualcomm Incorporated, Mediatek, Intel | Rel-16 | FS_RACS | Revised in parallel session, merging S2-186463, to S2-187157. | Revised |
6.28 | S2-187157 | P-CR | Approval | Key issue to determine how are the UE capabilities identified | Qualcomm Incorporated, Mediatek, Intel | Rel-16 | FS_RACS | Revision of S2-186547, merging S2-186463. Approved | Approved |
6.28 | S2-186548 | P-CR | Approval | Key issue to determine where are the UE radio capabilities stored | Qualcomm Incorporated, Mediatek, Intel | Rel-16 | FS_RACS | Revised in parallel session to S2-187158. | Revised |
6.28 | S2-187158 | P-CR | Approval | Key issue to determine where are the UE radio capabilities stored | Qualcomm Incorporated, Mediatek, Intel | Rel-16 | FS_RACS | Revision of S2-186548. Approved | Approved |
6.28 | S2-186710 | P-CR | Approval | New Key Issue for signalling optimization | T-Mobile USA INC | Rel-16 | FS_RACS | Merged into S2-187159 | Merged |
6.28 | S2-186549 | P-CR | Approval | Key issue to determine procedures for UE radio capabilities management | Qualcomm Incorporated, Mediatek, Intel | Rel-16 | FS_RACS | Revised in parallel session, merging S2-186710 and S2-186462, to S2-187159. | Revised |
6.28 | S2-187159 | P-CR | Approval | Key issue to determine procedures for UE radio capabilities management | Qualcomm Incorporated, Mediatek, Intel | Rel-16 | FS_RACS | Revision of S2-186549, merging S2-186710 and S2-186462. Approved | Approved |
6.28 | S2-186462 | P-CR | Approval | New Key Issue: Support Back-forward Compatibility | OPPO | Rel-16 | FS_RACS | Merged into S2-187159 | Merged |
6.28 | S2-186463 | P-CR | Approval | New Key Issue: Support Multiple PLMN and Network Sharing | OPPO | Rel-16 | FS_RACS | Merged into S2-187157 | Merged |
6.28 | S2-186884 | P-CR | Approval | Key issues on the maximum size of UE radio capabilities, and interface capabilities | Vodafone | Rel-16 | FS_RACS | Revised in parallel session to S2-187161. | Revised |
6.28 | S2-187161 | P-CR | Approval | Key issues on the maximum size of UE radio capabilities, and interface capabilities | Vodafone | Rel-16 | FS_RACS | Revision of S2-186884. Revised to S2-187574. | Revised |
6.28 | S2-187574 | P-CR | Approval | Key issues on the maximum size of UE radio capabilities, and interface capabilities | Vodafone | Rel-16 | FS_RACS | Revision of S2-187161. Approved | Approved |
6.28 | S2-187162 | LS OUT | Approval | [DRAFT] LS on maximum size of UE Radio Capabilities and maximum Information Element size on network interfaces | SA WG2 | Rel-16 | FS_RACS | Created in parallel session. Revised to S2-187575. | Revised |
6.28 | S2-187575 | LS OUT | Approval | LS on maximum size of UE Radio Capabilities and maximum Information Element size on network interfaces | SA WG2 | Rel-16 | FS_RACS | Revision of S2-187162. Approved | Approved |
- | - | - | - | Solutions | - | - | - | - | - |
6.28 | S2-186381 | P-CR | Approval | Solution on key issues for FS_RACS | Intel | Rel-16 | FS_RACS | Revised in parallel session to S2-187160. | Revised |
6.28 | S2-187160 | P-CR | Approval | Solution on key issues for FS_RACS | Intel | Rel-16 | FS_RACS | Revision of S2-186381. Revised to S2-187576. | Revised |
6.28 | S2-187576 | P-CR | Approval | Solution on key issues for FS_RACS | Intel | Rel-16 | FS_RACS | Revision of S2-187160. For e-mail approval. Approved | Approved |
6.28 | S2-186550 | P-CR | Approval | Solution for how are the UE radio capabilities identified | Qualcomm Incorporated | Rel-16 | FS_RACS | Not Handled | Not Handled |
6.28 | S2-186432 | P-CR | Approval | Solution using hash-based identification of UE radio capabilities | Deutsche Telekom | Rel-16 | FS_RACS | Not Handled | Not Handled |
6.28 | S2-186551 | P-CR | Approval | Solution for how are the UE radio capabilities managed and signalled | Qualcomm Incorporated | Rel-16 | FS_RACS | Not Handled | Not Handled |
6.29 | - | - | - | Study on User Data Interworking and Coexistence (FS_UDICoM) | - | - | {Frank} | - | - |
6.29 | S2-186625 | SID REVISED | Approval | Updated SID on User Data Interworking, Coexistence and Migration | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Update to SP-180620. Revised in parallel session to S2-187391. | Revised |
6.29 | S2-187391 | SID REVISED | Approval | Updated SID on User Data Interworking, Coexistence and Migration | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-186625. Revised in parallel session to S2-187480. | Revised |
6.29 | S2-187480 | SID REVISED | Approval | Updated SID on User Data Interworking, Coexistence and Migration | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-187391. Agreed in parallel session Block approved | Approved |
6.29 | S2-186363 | P-CR | Approval | 23.732: Proposed skeleton for FS_UDICOM | Vodafone | Rel-16 | FS_UDICoM | Agreed in parallel session Block approved | Approved |
6.29 | S2-186369 | P-CR | Approval | Proposed scope for FS_UDICOM, 23.732 | Vodafone | Rel-16 | FS_UDICoM | Revised in parallel session to S2-187392. | Revised |
6.29 | S2-187392 | P-CR | Approval | Proposed scope for FS_UDICOM, 23.732 | Vodafone | Rel-16 | FS_UDICoM | Revision of S2-186369. Revised in parallel session to S2-187479. | Revised |
6.29 | S2-187479 | P-CR | Approval | Proposed scope for FS_UDICOM, 23.732 | Vodafone | Rel-16 | FS_UDICoM | Revision of S2-187392. Agreed in parallel session Block approved | Approved |
6.29 | S2-186856 | P-CR | Approval | Architecture requirements of data interworking | China Mobile | Rel-16 | FS_UDICoM | Merged off-line into S2-187393. | Merged |
6.29 | S2-187394 | P-CR | Approval | Architecture requirements of data interworking | China Mobile | Rel-16 | FS_UDICoM | Revision of S2-186856. WITHDRAWN | Withdrawn |
6.29 | S2-186917 | P-CR | Approval | Architectural assumptions for 23.732 | Vodafone | Rel-16 | FS_UDICoM | Revised in parallel session, merging S2-186856, to S2-187393. | Revised |
6.29 | S2-187393 | P-CR | Approval | Architectural assumptions for 23.732 | Vodafone | Rel-16 | FS_UDICoM | Revision of S2-186917, merging S2-186856. Revised in parallel session to S2-187481. | Revised |
6.29 | S2-187481 | P-CR | Approval | Architectural assumptions for 23.732 | Vodafone | Rel-16 | FS_UDICoM | Revision of S2-187393. Agreed in parallel session Block approved | Approved |
6.29 | S2-186709 | P-CR | Approval | 2 New Key Issues for HSS UDR Interactions | T-Mobile USA INC | Rel-16 | FS_UDICoM | Revised in parallel session to S2-187395. | Revised |
6.29 | S2-187395 | P-CR | Approval | 2 New Key Issues for HSS UDR Interactions | T-Mobile USA INC | Rel-16 | FS_UDICoM | Revision of S2-186709. Revised in parallel session to S2-187482. | Revised |
6.29 | S2-187482 | P-CR | Approval | 2 New Key Issues for HSS UDR Interactions | T-Mobile USA INC | Rel-16 | FS_UDICoM | Revision of S2-187395. Revised in parallel session to S2-187484. | Revised |
6.29 | S2-187484 | P-CR | Approval | 2 New Key Issues for HSS UDR Interactions | T-Mobile USA INC | Rel-16 | FS_UDICoM | Revision of S2-187482. For e-mail approval. Approved | Approved |
6.29 | S2-186858 | P-CR | Approval | Key issue: Clarification on procedures and required data for UDM/UDR and HSS interworking | China Mobile | Rel-16 | FS_UDICoM | Merged off-line into S2-187397. | Merged |
6.29 | S2-187396 | P-CR | Approval | Key issue: Clarification on procedures and required data for UDM/UDR and HSS interworking | China Mobile | Rel-16 | FS_UDICoM | Revision of S2-186858. WITHDRAWN | Withdrawn |
6.29 | S2-186859 | P-CR | Approval | Key issue: How to interwork between UDM/UDR and HSS | China Mobile | Rel-16 | FS_UDICoM | Revised in parallel session, merging S2-186858, to S2-187397. | Revised |
6.29 | S2-187397 | P-CR | Approval | Key issue: How to interwork between UDM/UDR and HSS | China Mobile, Verizon | Rel-16 | FS_UDICoM | Revision of S2-186859, merging S2-186858. Revised in parallel session to S2-187483. | Revised |
6.29 | S2-187483 | P-CR | Approval | Key issue: How to interwork between UDM/UDR and HSS | China Mobile, Verizon | Rel-16 | FS_UDICoM | Revision of S2-187397. Agreed in parallel session Block approved | Approved |
6.31 | - | - | - | TEI16 Category B/C - Enhancements and Improvements only - 3GPP Packet Access. | - | - | {Puneet} | - | - |
6.31 | S2-186396 | CR | Approval | 23.682 CR0404: Enhancement of network event reporting | Ericsson, Verizon?, Cisco?, Nokia?, Convida?, … | Rel-16 | TEI16 | Confirm Sources!. Revised in parallel session to S2-187143. | Revised |
6.31 | S2-187143 | CR | Approval | 23.682 CR0404R1: Enhancement of network event reporting | Ericsson, Verizon, Nokia, Convida | Rel-16 | TEI16 | Revision of S2-186396. Revised in parallel session to S2-187238. | Revised |
6.31 | S2-187238 | CR | Approval | 23.682 CR0404R2: Enhancement of network event reporting | Ericsson, Verizon, Nokia, Nokia Shanghai Bell, Convida | Rel-16 | TEI16 | Revision of S2-187143. Revised in parallel session to S2-187244. Change 'At reporting …' to 'when reporting …' in clause 5.6.3.x step 2a. Remove changes over changes. NOTE: CR to 23.401 is also needed. | Revised |
6.31 | S2-187244 | CR | Approval | 23.682 CR0404R3: Enhancement of network event reporting | Ericsson, Verizon, Nokia, Nokia Shanghai Bell, Convida | Rel-16 | TEI16 | Revision of S2-187238. Agreed in parallel session Block approved | Agreed |
6.32 | - | - | - | TEI16 Category B/C - Enhancements and Improvements only - PCC/QoS | - | - | {Not_on_agenda} | - | - |
6.33 | - | - | - | TEI16 Category B/C - Enhancements and Improvements only - Non-3GPP Access | - | - | {Not_on_agenda} | - | - |
6.34 | - | - | - | TEI16 Category B/C - Enhancements and Improvements only - IMS, IMS-Related, Emergency, Other | - | - | {Not_on_agenda} | - | - |
7 | - | - | - | Project Planning and Management | - | - | {Frank} | - | - |
7.1 | - | - | - | New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals | - | - | {Frank} | - | - |
7.1 | S2-186370 | DISCUSSION | Discussion | Enhancements to Dual Registration mode of operation | Intel, Qualcomm Inc., Lenovo, Motorola Mobility | Revised to S2-187294. Noted | Noted | ||
7.1 | S2-187294 | LS OUT | Approval | [DRAFT] LS on potential enhancement of DR-mode of operation | SA WG2 | Revision of S2-186370. Revised to S2-187606. | Revised | ||
7.1 | S2-187606 | LS OUT | Approval | [DRAFT] LS on potential enhancement of DR-mode of operation | SA WG2 | Revision of S2-187294. For e-mail approval. e-mail revision 2 approved. Revised to S2-187629. Devaki (Nokia): comments. Haris (QC): provides rev1. Devaki (Nokia): OK with rev1. Guillaume (Mediatek): provides rev2. Saso (Intel): OK with rev1 or rev2. Wanqiang (Huawei): prefers rev2. Kundan (NEC): comments. Shabnam (E///): prefers rev2. Jianhua (Oppo): prefers rev2. | Revised | ||
7.1 | S2-187629 | LS OUT | Approval | LS on potential enhancement of DR-mode of operation | SA WG2 | e-mail revision 2 of S2-187606. Approved | Approved | ||
7.1 | S2-186371 | OTHER | Endorsement | Enhancements for Dual Registration mode of operation | Intel, Qualcomm Inc., Lenovo, Motorola Mobility | Rel-15 | TEI16 | Not Handled | Not Handled |
7.1 | S2-186372 | OTHER | Endorsement | Enhancements for Dual Registration mode of operation | Intel, Qualcomm Inc., Lenovo, Motorola Mobility | Rel-15 | TEI16 | Not Handled | Not Handled |
7.1 | S2-186373 | OTHER | Endorsement | Enhancements for Dual Registration mode of operation | Intel, Qualcomm Inc., Lenovo, Motorola Mobility | Rel-15 | TEI16 | Not Handled | Not Handled |
7.1 | S2-186404 | DISCUSSION | Approval | Introduction of SBI-based SMSGW in 5GC | Ericsson, China Mobile, LG Electronics, CATT | Rel-16 | TEI16 | Revised to S2-187295. | Revised |
7.1 | S2-187295 | DISCUSSION | Approval | Introduction of SBI-based SMSGW in 5GC | Ericsson, China Mobile, LG Electronics, CATT | Rel-16 | TEI16 | Revision of S2-186404. WITHDRAWN | Withdrawn |
7.1 | S2-186694 | DISCUSSION | Information | Status, Plans related to Enable Location Service in Rel-16 | CATT | Not Handled | Not Handled | ||
7.1 | S2-186695 | SID REVISED | Approval | Revised SID: Study on Enhancement to Service Based Architecture for Location Services | CATT, Qualcomm Incorporated, China Telecom, China Mobile, CAICT, China Unicom, Huawei, HiSilicon, Verizon UK Ltd?, ZTE, T-Mobile USA?, AT&T?, Nokia?, Nokia Shanghai Bell?, Ericsson?, Comtech Telecommunications?, Intel? | Rel-16 | FS_eLCS | Confirm Sources!. Revised to S2-187296. | Revised |
7.1 | S2-187296 | SID REVISED | Approval | Revised SID: Study on Enhancement to Service Based Architecture for Location Services | CATT, Qualcomm Incorporated, China Telecom, China Mobile, CAICT, China Unicom, Huawei, HiSilicon, Verizon UK Ltd, ZTE, T-Mobile USA, AT&T, Nokia, Nokia Shanghai Bell, Ericsson, Comtech Telecommunications, Intel | Rel-16 | FS_eLCS | Revision of S2-186695. Approved | Approved |
7.1 | S2-186954 | LS OUT | Approval | [DRAFT] Paging cause from RAN to UE | Intel | Rel-16 | TEI16 | Not Handled | Not Handled |
7.2 | - | - | - | Review of the Work Plan | - | - | {Frank} | - | - |
7.3 | - | - | - | Planning future meetings | - | - | {Frank} | - | - |
8 | - | - | - | AOB | - | - | {Frank} | - | - |
9 | - | - | - | Close of the Meeting | - | - | {Frank} | - | - |
99 | - | - | - | Withdrawn and reserved documents | - | - | {Withdrawn} | - | - |
99 | S2-186352 | CR | Approval | 23.682 CR0403: Periodic TAU/RAU Timer negotiation with PSM | ORANGE | Rel-15 | MTCe-UEPCOP, TEI15 | WITHDRAWN | Withdrawn |
99 | S2-186832 | CR | Approval | 23.401 CR0402R1: Traffic Profile for NB-IoT UE Uu operation optimisation | Huawei, HiSilicon | Rel-15 | NB_IOTenh2-Core | Revision of (unhandled) S2-185326 from S2#127BIS. WITHDRAWN | Withdrawn |
99 | S2-186800 | P-CR | Approval | Key issue on support for type-a networks | Nokia, Nokia Shanghai Bell, Qualcomm | Rel-16 | FS_Vertical_LAN | WITHDRAWN | Withdrawn |
99 | S2-186646 | LS OUT | Approval | [DRAFT] Reply LS on LMF determination that the UE is served by NR | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Response to S2-186337. WITHDRAWN | Withdrawn |
99 | S2-186568 | CR | Approval | 23.502 CR0541: Correction on mobility management back-off timer | vivo | Rel-15 | 5GS_Ph1 | WITHDRAWN | Withdrawn |
99 | S2-186582 | CR | Approval | 23.502 CR0545: UE location report to the SMF by RAN in RRC Inactive State | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | WITHDRAWN | Withdrawn |
99 | S2-186349 | CR | Approval | 23.502 CR0511: Correction of SMF initiated Session Management Policy Modification for Background data transfer | KDDI | Rel-15 | 5GS_Ph1 | WITHDRAWN | Withdrawn |
99 | S2-186457 | CR | Approval | 23.501 CR0469: Update of UPF selection factor for network slice instance | KDDI | Rel-15 | 5GS_Ph1 | WITHDRAWN | Withdrawn |
Created: 2018-07-13 14:38     END OF LIST
Total documents: 1301