IPR call reminder:
“I draw
your attention to your obligations under the 3GPP Partner Organizations’ IPR
policies. Every Individual Member organization is obliged to declare to the
Partner Organization or Organizations of which it is a member any IPR owned
by the Individual Member or any other organization which is or is likely to
become essential to the work of 3GPP. Delegates
are asked to take note that they are thereby invited:
|
Antitrust policy Reminder:
“I also
draw your attention to the fact that 3GPP activities are subject to all
applicable antitrust and competition laws and that compliance with said laws
is therefore required of any participant of this TSG/WG meeting including the
Chairman and Vice Chairman. In case of question I recommend that you contact
your legal counsel. The
leadership shall conduct the present meeting with impartiality and in the
interests of 3GPP. Furthermore,
I would like to remind you that timely submission of work items in advance of
TSG/WG meetings is important to allow for full and fair consideration of such
matters.” |
List for Meeting: S2-126 All Sessions
Temporary Documents List - Ordered by Agenda Item
To use hyperlinks, this file must be placed above Folder 'Docs'
CURRENT STATS - OPEN DOCS: Total: 40     CRs: 4     P-CRs: 25     Other: 11
Created: 2018-03-05 16:20     START OF LIST
AI | TD# | Type | Doc For | Title | Source | Rel | Work Item | Comments | Result |
---|---|---|---|---|---|---|---|---|---|
1 | - | - | - | Opening of the meeting | - | - | {Frank} | - | - |
2 | - | - | - | Approval of the agenda | - | - | {Frank} | - | - |
2 | S2-181417 | AGENDA | Approval | Draft Agenda for SA WG2#126 | SA WG2 Chairman | Approved. | Approved | ||
2.1 | - | - | - | IPR Call and Antitrust Reminder | - | - | {Frank} | - | - |
- | - | - | - | IPR Call | - | - | - | - | - |
- | - | - | - | Antitrust Reminder | - | - | - | - | - |
3 | - | - | - | Meeting reports | - | - | {Frank} | - | - |
3 | S2-181418 | REPORT | Approval | Draft Report of SA WG2 meeting #125 | SA WG2 Secretary | Approved. | Approved | ||
4 | - | - | - | General | - | - | {Frank} | - | - |
4.1 | - | - | - | Common issues and Incoming LSs | - | - | {Frank} | - | - |
4.1 | S2-182034 | DISCUSSION | Discussion | Editorial Discussion on References to TS23.501 & TS23.228 in Definitions | T-Mobile USA INC (Rapporteur) | FS_eIMS5G | Noted. | Noted | |
5 | - | - | - | Pre-Rel-15 Essential Corrections | - | - | {Frank} | - | - |
5.1 | - | - | - | 3GPP Packet Access Maintenance | - | - | {Puneet} | - | - |
- | - | - | - | CIoT/CIoT-Ext | - | - | - | - | - |
5.1 | S2-181426 | LS In | Action | LS from RAN WG3: Reply LS on Paging failures for CE Capable UEs | RAN WG3 (R3-175045) | Postponed S2-180039 from S2#125. Response already sent at SA WG2#125 in S2-181370. | Replied to | ||
5.1 | S2-181711 | CR | Approval | 23.401 CR3388R4: Paging failure for CE-capable UEs after 2G/3G to 4G idle-mode mobility | Intel, NTT DOCOMO, Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | Rel-15 | TEI15 | Revised in parallel session to S2-182322. | Revised |
5.1 | S2-182322 | CR | Approval | 23.401 CR3388R5: Paging failure for CE-capable UEs after 2G/3G to 4G idle-mode mobility | Intel, NTT DOCOMO, Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | Rel-15 | TEI15 | Revision of S2-181711. Agreed in parallel session with one objection from Ericsson. This CR was agreed with an objection from Ericsson. | Agreed |
5.1 | S2-182239 | CR | Approval | 23.401 CR3390R3: CIoT Attach correction | Nokia, Nokia Shanghai Bell | Rel-15 | CIoT | Revision of approved CR S2-181371. Also provided in S2-182240. Revised in S2-182271. | Revised |
5.1 | S2-182271 | CR | Approval | 23.401 CR3390R5: CIoT Attach correction | Nokia, Nokia Shanghai Bell | Rel-15 | CIoT | Revision of S2-182239. Revised in parallel session to S2-182366. | Revised |
5.1 | S2-182366 | CR | Approval | 23.401 CR3390R6: CIoT Attach correction | Nokia, Nokia Shanghai Bell | Rel-15 | CIoT | Revision of S2-182271. Pending RAN WG3 feedback. This was withdrawn (not provided). The originally agreed CR from SA WG2#125 (S2-181371) was no longer agreed and was noted. | Withdrawn |
5.1 | S2-181940 | CR | Approval | 23.401 CR3406: Correction to eNB Control Plane Relocation Indication procedure | Huawei, HiSilicon | Rel-14 | TEI14, CIoT | Revised in parallel session to S2-182323. | Revised |
5.1 | S2-182323 | CR | Approval | 23.401 CR3406R1: Correction to eNB Control Plane Relocation Indication procedure | Huawei, HiSilicon | Rel-14 | TEI14, CIoT | Revision of S2-181940. Agreed in parallel session. Block approved. | Agreed |
5.1 | S2-181941 | CR | Approval | 23.401 CR3407: Correction to eNB Control Plane Relocation Indication procedure | Huawei, HiSilicon | Rel-15 | TEI15, CIoT | Revised in parallel session to S2-182324. | Revised |
5.1 | S2-182324 | CR | Approval | 23.401 CR3407R1: Correction to eNB Control Plane Relocation Indication procedure | Huawei, HiSilicon | Rel-15 | TEI15, CIoT | Revision of S2-181941. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | Other | - | - | - | - | - |
5.1 | S2-181421 | LS In | Action | LS from 5GAA WG2: LS on V1 and V2 reference points | 5GAA WG2 (5GAA_A-170278) | Postponed S2-180021 from S2#125. Response drafted in S2-181814. Final response in S2-182579 | Replied to | ||
5.1 | S2-181489 | LS In | Information | LS from SA WG6: Reply LS on V1 and V2 reference points | SA WG6 (S6-180196) | Rel-16 | Noted in parallel session. | Noted | |
5.1 | S2-181814 | LS OUT | Approval | [DRAFT] Reply LS on V1 and V2 reference points | LG Electronics | Rel-14 | V2XARC | Response to S2-181421. Revised in parallel session to S2-182571. LS to TSG SA instead of to 5GAA | Revised |
5.1 | S2-182571 | LS OUT | Approval | [DRAFT] Reply LS on V1 and V2 reference points | SA WG2 | Rel-14 | V2XARC | Revision of S2-181814. Revised in parallel session to S2-182579. | Revised |
5.1 | S2-182579 | LS OUT | Approval | Reply LS on V1 and V2 reference points | SA WG2 | Rel-14 | V2XARC | Revision of S2-182571. Agreed in parallel session. Block approved. | Approved |
5.1 | S2-181452 | LS In | Action | LS from CT WG1: LS on encrypting broadcasted positioning data and LS on provisioning of positioning assistance data via LPPa for broadcast | CT WG1 (C1-180643) | Rel-15 | LCS_LTE_acc_enh-Core | Reply drafted in S2-182369. Final response in S2-182415 | Replied to |
5.1 | S2-182826 | LS In | Action | LS from CT WG4: LS on encrypting broadcasted positioning data and on provisioning of positioning assistance data via LPPa for broadcast | CT WG4 (C4-182150) | Rel-15 | LCS_LTE_acc_enh-Core | Reply drafted in S2-182369. Final response in S2-182415 | Replied to |
5.2 | - | - | - | QoS and PCC Maintenance | - | - | {Mirko} | - | - |
5.3 | - | - | - | Non-3GPP Access Maintenance | - | - | {Krisztian} | - | - |
5.3 | S2-181942 | CR | Approval | 23.402 CR2988: Correction to 4G non-3GPP location issue | Huawei, HiSilicon | Rel-13 | SEW1 | Agreed in parallel session. Block approved. | Agreed |
5.3 | S2-181943 | CR | Approval | 23.402 CR2989: Correction to 4G non-3GPP location issue | Huawei, HiSilicon | Rel-14 | SEW1 | Agreed in parallel session. Block approved. | Agreed |
5.3 | S2-181944 | CR | Approval | 23.402 CR2990: Correction to 4G non-3GPP location issue | Huawei, HiSilicon | Rel-15 | SEW1 | Agreed in parallel session. Block approved. | Agreed |
5.4 | - | - | - | IMS and IMS-Related Maintenance | - | - | {Krisztian} | - | - |
5.4 | S2-181838 | LS In | Action | LS from SA WG4: LS on Dynamic PLR Allocation in eVoLP | SA WG4 (S4-180219) | Noted in parallel session. | Noted | ||
6 | - | - | - | Release 15 and future releases | - | - | {Frank} | - | - |
6.1 | - | - | - | Rel-15 3GPP Packet Acc. Maint. - essential corrections - excl. R15 5GS | - | - | {Puneet} | - | - |
- | - | - | - | NAPS | - | - | - | - | - |
6.1 | S2-182242 | DISCUSSION | Agreement | Alignment with RAN and CT WG1 on fetching of UE Radio Capability and handling of S1AP Connection Establishment Indication | Ericsson | Rel-15 | CIoT_Ext | Noted in parallel session. | Noted |
6.1 | S2-182240 | CR | Approval | 23.401 CR3390R4: CIoT Attach correction | Ericsson | Rel-15 | CIoT, TEI15 | Revision of approved CR S2-181371. Also provided in S2-182239. Pending RAN WG3 feedback. Merged into S2-182271. | Merged |
6.1 | S2-181441 | LS In | Action | LS from CT WG3: LS on Usage of Monitoring Duration | CT WG3 (C3-180286) | Rel-15 | NAPS-CT | Response drafted in S2-181969. Final response in S2-182397 | Replied to |
6.1 | S2-181968 | CR | Approval | 23.682 CR0387: Correction to the Usage of Monitoring Duration | Huawei, HiSilicon | Rel-15 | TEI15, NAPS | Revised in parallel session to S2-182374. | Revised |
6.1 | S2-182374 | CR | Approval | 23.682 CR0387R1: Correction to the Usage of Monitoring Duration | Huawei, HiSilicon | Rel-15 | TEI15, NAPS | Revision of S2-181968. Agreed in parallel session. Block approved. | Agreed |
6.1 | S2-181969 | LS OUT | Approval | [DRAFT] Reply LS on Usage of Monitoring Durations | Huawei, HiSilicon | Response to S2-181441. Revised in parallel session to S2-182327. | Revised | ||
6.1 | S2-182327 | LS OUT | Approval | Reply LS on Usage of Monitoring Duration | SA WG2 | - | - | Revision of S2-181969. Revised in parallel session to S2-182397. | Revised |
6.1 | S2-182397 | LS OUT | Approval | Reply LS on Usage of Monitoring Duration | SA WG2 | - | - | Revision of S2-182327. Agreed in parallel session. Block approved. | Approved |
6.1 | S2-181442 | LS In | Action | LS from CT WG3: LS on Requirement of Group Message Delivery via MBMS | CT WG3 (C3-180292) | Rel-15 | NAPS-CT | Responses drafted in S2-181864 and S2-181971. Final response in S2-182398 | Replied to |
6.1 | S2-181970 | CR | Approval | 23.682 CR0388: Clarification of Group Message Delivery via MBMS | Huawei, HiSilicon | Rel-15 | TEI15, NAPS | Noted in parallel session. | Noted |
6.1 | S2-181864 | LS OUT | Approval | [DRAFT] Reply LS on Requirement of Group Message Delivery via MBMS | Qualcomm Incorporated | Rel-15 | NAPS-CT | Response to S2-181442. Noted in parallel session. | Noted |
6.1 | S2-181971 | LS OUT | Approval | [DRAFT] Reply LS on Group Message Delivery via MBMS | Huawei, HiSilicon | Response to S2-181442. Revised in parallel session to S2-182328. | Revised | ||
6.1 | S2-182328 | LS OUT | Approval | Reply LS on Group Message Delivery via MBMS | SA WG2 | - | - | Revision of S2-181971. Revised in parallel session to S2-182398. | Revised |
6.1 | S2-182398 | LS OUT | Approval | Reply LS on Group Message Delivery via MBMS | SA WG2 | - | - | Revision of S2-182328. Agreed in parallel session. Block approved. | Approved |
6.1 | S2-181444 | LS In | Action | LS from CT WG3: LS on Resource Identifiers for T8 | CT WG3 (C3-180358) | Rel-15 | NAPS-CT | Postponed in parallel session. | Postponed |
6.1 | S2-181445 | LS In | Action | LS from CT WG3: LS on T8 Destination Address | CT WG3 (C3-180372) | Rel-15 | NAPS-CT | Postponed in parallel session. | Postponed |
6.1 | S2-181909 | CR | Approval | 23.682 CR0384: Corrections of Group Message Delivery via NIDD | Ericsson | Rel-15 | TEI15, NAPS | Revised in parallel session to S2-182364. | Revised |
6.1 | S2-182364 | CR | Approval | 23.682 CR0384R1: Corrections of Group Message Delivery via NIDD | Ericsson | Rel-15 | TEI15, NAPS | Revision of S2-181909. Revised in parallel session to S2-182399. | Revised |
6.1 | S2-182399 | CR | Approval | 23.682 CR0384R2: Corrections of Group Message Delivery via NIDD | Ericsson | Rel-15 | TEI15, NAPS | Revision of S2-182364. Revised in parallel session to S2-182416. | Revised |
6.1 | S2-182416 | CR | Approval | 23.682 CR0384R3: Corrections of Group Message Delivery via NIDD | Ericsson | Rel-15 | TEI15, NAPS | Revision of S2-182399. Revised to S2-182995. | Revised |
6.1 | S2-182995 | CR | Approval | 23.682 CR0384R4: Corrections of Group Message Delivery via NIDD | Ericsson | Rel-15 | TEI15, NAPS | Revision of S2-182416. Revised to S2-183017. | Revised |
6.1 | S2-183017 | CR | Approval | 23.682 CR0384R5: Corrections of Group Message Delivery via NIDD | Ericsson | Rel-15 | NAPS | Revision of S2-182995. This CR was agreed. | Agreed |
6.1 | S2-181910 | CR | Approval | 23.682 CR0385: Group NIDD configuration | Ericsson | Rel-15 | TEI15, NAPS | Postponed in parallel session. | Postponed |
- | - | - | - | CIoT/CIoT-Ext | - | - | - | - | - |
6.1 | S2-181433 | LS In | Action | LS from CT WG1: LS on service gap control with resume for non-supporting UE | CT WG1 (C1-180389) | Rel-15 | TEI15 | Postponed in parallel session. | Postponed |
6.1 | S2-181434 | LS In | Action | LS from CT WG1: Reply LS on EDT procedures and AS NAS interaction | CT WG1 (C1-180638) | Rel-15 | NB_IOTenh2-Core, LTE_eMTC4-Core | Noted in parallel session. | Noted |
6.1 | S2-181432 | LS In | Action | LS from GSMA Packet IoTTF: LS reply to SA WG2 on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | GSMA Packet IoTTF (IOTTF17 Doc003) | Postponed S2-181137 from S2#125. Responses drafted in S2-181860 and S2-181866. Postponed | Postponed | ||
6.1 | S2-181858 | CR | Approval | 23.401 CR3402: Introduction ot LTE-M RAT-type and Identification of LTE-M UE and traffic in the EPC | Nokia, Nokia Shanghai Bell | Rel-15 | CIoT, TEI15 | Merged into S2-182362. | Merged |
6.1 | S2-182244 | CR | Approval | 23.203 CR1117: Introduction of LTE-M RAT type and identification of LTE-M UE and traffic in the EPS | Nokia, Nokia Shanghai Bell | Rel-15 | CIoT, TEI15 | Postponed in parallel session. | Postponed |
6.1 | S2-182245 | CR | Approval | 23.682 CR0389: Introduction of LTE-M RAT type and identification of LTE-M UE and traffic in the EPS | Nokia, Nokia Shanghai Bell | Rel-15 | CIoT, TEI15 | Postponed in parallel session. | Postponed |
6.1 | S2-181865 | CR | Approval | 23.401 CR3404: Identification of LTE-M (eMTC) traffic | Qualcomm Incorporated | Rel-15 | TEI15 | Revised in parallel session to S2-182362. | Revised |
6.1 | S2-182362 | CR | Endorsement | 23.401 CR3404R1: Identification of LTE-M (eMTC) traffic | Qualcomm Incorporated | Rel-15 | TEI15 | Revision of S2-181865. Revised in parallel session to S2-182372. | Revised |
6.1 | S2-182372 | CR | Endorsement | 23.401 CR3404R2: Identification of LTE-M (eMTC) traffic | Qualcomm Incorporated | Rel-15 | TEI15 | Revision of S2-182362. For Technical Endorsement. Revised in parallel session to S2-182412. | Revised |
6.1 | S2-182412 | CR | Endorsement | 23.401 CR3404R3: Identification of LTE-M (eMTC) traffic | Qualcomm Incorporated | Rel-15 | TEI15 | Revision of S2-182372. Endorsed in parallel session. Block endorsed. | Endorsed |
6.1 | S2-182363 | LS OUT | Approval | [DRAFT] LS on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | SA WG2 | Rel-15 | TEI15 | Created in parallel session. Revised in parallel session to S2-182373. | Revised |
6.1 | S2-182373 | LS OUT | Approval | [DRAFT] LS on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | SA WG2 | Rel-15 | TEI15 | Revision of S2-182363. Revised in parallel session to S2-182411. | Revised |
6.1 | S2-182411 | LS OUT | Approval | LS on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | SA WG2 | Rel-15 | TEI15 | Revision of S2-182373. Agreed in parallel session. Block approved. | Approved |
6.1 | S2-181860 | LS OUT | Approval | [DRAFT] LS reply on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | Nokia, Nokia Shanghai Bell | Rel-15 | Response to S2-181432. Not Handled | Not Handled | |
6.1 | S2-181866 | LS OUT | Approval | [DRAFT] Reply LS on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | Qualcomm Incorporated | Rel-15 | TEI15 | Response to S2-181432. Not Handled | Not Handled |
6.1 | S2-181945 | DISCUSSION | Decision | APN Rate Control after PDN connection release and re-establishment | Huawei, HiSilicon | Rel-15 | Noted in parallel session. | Noted | |
6.1 | S2-181946 | CR | Approval | 23.401 CR3408: Correction of APN Rate Control for PDN connection release and re-establishment | Huawei, HiSilicon | Rel-15 | TEI15, CIoT | Not Handled | Not Handled |
6.1 | S2-181947 | CR | Approval | 23.682 CR0386: Correction of APN Rate Control for PDN connection release and re-establishment | Huawei, HiSilicon | Rel-15 | TEI15, CIoT | Not Handled | Not Handled |
- | - | - | - | CAPIF | - | - | - | - | - |
6.1 | S2-181428 | LS In | Action | LS from SA WG6: LS on Integration of northbound APIs with CAPIF | SA WG6 (S6-171851) | Postponed S2-180051 from S2#125. Postponed | Postponed | ||
6.1 | S2-181443 | LS In | Information | LS from CT WG3: LS on usage of CAPIF for xMB APIs | CT WG3 (C3-180353) | CAPIF | Noted in parallel session. | Noted | |
6.1 | S2-181842 | LS In | Information | LS from SA WG4: Reply LS on usage of CAPIF for xMB APIs | SA WG4 (S4-180315) | Rel-16 | CAPIF4xMB | Noted in parallel session. | Noted |
6.1 | S2-182052 | DISCUSSION | Decision | Common API Framework (CAPIF) integration with SCEF and NEF | Intel | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.1 | S2-182246 | DISCUSSION | Decision | CAPIF integration with 3GPP northbound APIs | Huawei, Samsung | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.1 | S2-181988 | CR | Approval | 23.501 CR0124: Supporting Common API framework for NEF | Convida Wireless LLC, Qualcomm Incorporated, Intel, AT&T, Nokia, Nokia Shanghai Bell, Samsung | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181353. Revised in parallel session to S2-182325. | Revised |
6.1 | S2-182325 | CR | Approval | 23.501 CR0124R1: Supporting Common API framework for NEF | Convida Wireless LLC, Qualcomm Incorporated, Intel, AT&T, Nokia, Nokia Shanghai Bell, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-181988. Revised in parallel session to S2-182413. | Revised |
6.1 | S2-182413 | CR | Approval | 23.501 CR0124R2: Supporting Common API framework for NEF | Convida Wireless LLC, Qualcomm Incorporated, Intel, AT&T, Nokia, Nokia Shanghai Bell, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182325. Agreed in parallel session. Revised to S2-183003. | Revised |
6.1 | S2-183003 | CR | Approval | 23.501 CR0124R3: Supporting Common API framework for NEF | Convida Wireless LLC, Qualcomm Incorporated, Intel, AT&T, Nokia, Nokia Shanghai Bell, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182413. This CR was agreed. | Agreed |
6.1 | S2-182047 | CR | Approval | 23.682 CR0382R2: Supporting Common API framework for SCEF | Convida Wireless LLC, Qualcomm Incorporated, AT&T, Intel, Nokia, Nokia Shanghai Bell, Samsung | Rel-15 | NAPS | Revision of agreed CR S2-181264 from S2#125. Revised in parallel session to S2-182326. | Revised |
6.1 | S2-182326 | CR | Approval | 23.682 CR0382R3: Supporting Common API framework for SCEF | Convida Wireless LLC, Qualcomm Incorporated, AT&T, Intel, Nokia, Nokia Shanghai Bell, Samsung | Rel-15 | NAPS | Revision of S2-182047. Revised in parallel session to S2-182414. | Revised |
6.1 | S2-182414 | CR | Approval | 23.682 CR0382R4: Supporting Common API framework for SCEF | Convida Wireless LLC, Qualcomm Incorporated, AT&T, Intel, Nokia, Nokia Shanghai Bell, Samsung | Rel-15 | NAPS | Revision of S2-182326. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | Others | - | - | - | - | - |
6.1 | S2-181491 | LS In | Action | LS from SA WG6: LS on signalling plane registration for the MC service UE for migration scenario | SA WG6 (S6-180223) | Rel-15 | MCSMI | Noted in parallel session. | Noted |
6.1 | S2-181840 | LS In | Information | LS from SA WG4: Reply LS on FEC and ROHC for mission critical services over MBMS | SA WG4 (S4-180275) | Rel-15 | FRASE | Noted in parallel session. | Noted |
6.1 | S2-181862 | CR | Approval | 23.401 CR3403: Alignment with stage-3 reporting and access restriction for unlicensed spectrum | Qualcomm Incorporated | Rel-15 | USOS | Revised in parallel session to S2-182367. | Revised |
6.1 | S2-182367 | CR | Approval | 23.401 CR3403R1: Alignment with stage-3 reporting and access restriction for unlicensed spectrum | Qualcomm Incorporated | Rel-15 | USOS | Revision of S2-181862. Agreed in parallel session. Block approved. | Agreed |
6.1 | S2-181863 | CR | Approval | 23.271 CR0432: Addition of Broadcast of Assistance Data for E-UTRAN | Qualcomm Incorporated, Ericsson | Rel-15 | TEI15 | Revised in parallel session to S2-182368. | Revised |
6.1 | S2-182368 | CR | Endorsement | 23.271 CR0432R1: Addition of Broadcast of Assistance Data for E-UTRAN | Qualcomm Incorporated, Ericsson | Rel-15 | TEI15 | Revision of S2-181863. For Technical Endorsement. Endorsed in parallel session. Block endorsed. | Endorsed |
6.1 | S2-182369 | LS OUT | Approval | [DRAFT] LS on encrypting broadcasted positioning data and LS on provisioning of positioning assistance data via LPPa for broadcast | SA WG2 | Rel-15 | TEI15 | Created in parallel session. Response to S2-181452 and S2-182826. Revised in parallel session to S2-182415. | Revised |
6.1 | S2-182415 | LS OUT | Approval | LS on encrypting broadcasted positioning data and LS on provisioning of positioning assistance data via LPPa for broadcast | SA WG2 | Rel-15 | TEI15 | Revision of S2-182369. Agreed in parallel session. Block approved. | Approved |
6.1 | S2-181867 | CR | Approval | 23.401 CR3405: Missing identification of step in clause 5.3.8.4 | Qualcomm Incorporated | Rel-15 | EDCE5 | Revised in parallel session to S2-182370. | Revised |
6.1 | S2-182370 | CR | Approval | 23.401 CR3405R1: Missing identification of step in clause 5.3.8.4 | Qualcomm Incorporated | Rel-15 | EDCE5 | Revision of S2-181867. Agreed in parallel session. Block approved. | Agreed |
6.2 | - | - | - | Rel-15 PCC/QoS Maintenance- essential corrections - excl. R15 5GS | - | - | {Mirko} | - | - |
6.3 | - | - | - | Rel-15 Non-3GPP Access Maint. - essential corrections - excl. R15 5GS | - | - | {Krisztian} | - | - |
6.4 | - | - | - | Rel-15 IMS-Related Maintenance- essential corrections - excl. R15 5GS | - | - | {Krisztian} | - | - |
6.4 | S2-182134 | LS In | Information | LS from SA WG1: LS on UE WLAN MAC address inclusion in E911 location information | SA WG1 (S1-180298) | Response drafted in S2-182283. Not Handled | Not Handled REPLY OPEN | ||
6.4 | S2-181724 | CR | Approval | 23.167 CR0322: Inclusion of UE's WiFi MAC address in emergency calls | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | LATE DOC: Rx 20/02, 17:41. Postponed in parallel session. | Postponed |
6.4 | S2-181732 | LS OUT | Approval | Reply LS on UE WLAN MAC address inclusion in E911 location information | Nokia France | Rel-15 | Response to S2-182134. Revised to S2-182283. | Revised | |
6.4 | S2-182283 | LS OUT | Approval | Reply LS on UE WLAN MAC address inclusion in E911 location information | Nokia France | Rel-15 | Revision of S2-181732. Response to S2-182134. LATE DOC: Rx 22/02, 18:20. Revised in parallel session to S2-182456. | Revised | |
6.4 | S2-182456 | LS OUT | Approval | [DRAFT] LS on UE WLAN MAC address inclusion in E911 location information | SA WG2 | Rel-15 | - | Revision of S2-182283. Revised to S2-183019. | Revised |
6.4 | S2-183019 | LS OUT | Approval | [DRAFT] LS on UE WLAN MAC address inclusion in E911 location information | SA WG2 | Rel-15 | - | Revision of S2-182456. This was left for e-mail approval. | OPEN |
6.5 | - | - | - | Rel-15 maintenance - 5G System Architecture | - | - | {Frank} | - | - |
6.5.1 | - | - | - | General aspects, concepts and reference models | - | - | {Frank} | - | - |
6.5.1 | S2-181849 | CR | Approval | 23.502 CR0151: Correction to UE Registration | Telecom Italia, ZTE, Oracle, Huawei | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181289. Agreed in parallel session. Block approved. NSSAI in Register as endorsed DCR? | Agreed |
6.5.1 | S2-181520 | CR | Approval | 23.501 CR0020: Correction to handling of S-NSSAI mapping information | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180743. LATE DOC: Rx 20/02, 17:14. Revised in parallel session to S2-182545. NSSAI mapping as DCR? 'DRAFT' in title | Revised |
6.5.1 | S2-182545 | CR | Approval | 23.501 CR0020R1: Correction to handling of S-NSSAI mapping information | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revision of S2-181520. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181585 | CR | Approval | 23.501 CR0039: Clarify NSSF discovery | Huawei, HiSilicon, Telecom Italia | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181346. Agreed in parallel session. Block approved. NSSF disc as DCR | Agreed |
6.5.1 | S2-181614 | CR | Approval | 23.501 CR0047: Slice selection cleanup | Ericsson, Huawei | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181347. Revised in parallel session to S2-182546. Slice IW as DCR? Changes on changes | Revised |
6.5.1 | S2-182546 | CR | Approval | 23.501 CR0047R1: Slice selection cleanup | Ericsson, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-181614. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181631 | CR | Approval | 23.502 CR0074: Slice selection cleanup | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181345. Agreed in parallel session. Block approved. Slice selection as DCR? | Agreed |
6.5.1 | S2-181586 | CR | Approval | 23.501 CR0040: Change subscribed S-NSSAI in UE to configured NSSAI of HPLMN | Huawei, HiSilicon, Telecom Italia, ETRI | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181344. Revised in parallel session to S2-182547. NSSAI mapping as endorsed DCR S2-181344, tick UE? | Revised |
6.5.1 | S2-182547 | CR | Approval | 23.501 CR0040R1: Change subscribed S-NSSAI in UE to configured NSSAI of HPLMN | Huawei, HiSilicon, Telecom Italia, ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-181586. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182233 | CR | Approval | 23.501 CR0183: Mapping of Requested NSSAI clarification | Samsung | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182548. NSSAI mapping as endorsed DCR S2-181344 + changes | Revised |
6.5.1 | S2-182548 | CR | Approval | 23.501 CR0183R1: Mapping of Requested NSSAI clarification | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182233. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181468 | CR | Approval | 23.501 CR0007: Correction to rejected NSSAI | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. NSSAI rejected as DCR? | Agreed |
6.5.1 | S2-182232 | CR | Approval | 23.501 CR0182: NSSAI clarification | Samsung | Rel-15 | 5GS_Ph1 | Noted in parallel session. NSSAI rejected as DCR + changes | Noted |
6.5.1 | S2-181857 | CR | Approval | 23.501 CR0106: 5GS support for network slicing | Telecom Italia, China Mobile, Nokia, Nokia Shanghai Bell, Orange, AT&T, SK Telecom, Verizon, Deutsche Telekom, Charter Communication | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182549. Slice support | Revised |
6.5.1 | S2-182549 | CR | Approval | 23.501 CR0106R1: 5GS support for network slicing | Telecom Italia, China Mobile, Nokia, Nokia Shanghai Bell, Orange, AT&T, SK Telecom, Verizon, Deutsche Telekom, Charter Communication | Rel-15 | 5GS_Ph1 | Revision of S2-181857. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181466 | CR | Approval | 23.501 CR0006: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo | Rel-15 | 5GS_Ph1 | Revised in S2-182277. | Revised |
6.5.1 | S2-182277 | CR | Approval | 23.501 CR0006R1: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo, Lenovo | Rel-15 | 5GS_Ph1 | Revision of S2-181466. Revised in parallel session to S2-182550. NSSAI & Access | Revised |
6.5.1 | S2-182550 | CR | Approval | 23.501 CR0006R2: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo, Lenovo, Motorola Mobility, Orange, ZTE, Sprint, KDDI, NTT DoCoMo, Samsung, vivo, LG Electronics, NEC, Sony, Oracle, Cisco, China Mobile, T-Mob??&???& | Rel-15 | 5GS_Ph1 | Revision of S2-182277. Revised to S2-182828. | Revised |
6.5.1 | S2-182828 | CR | Approval | 23.501 CR0006R3: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo, Lenovo, Motorola Mobility, Orange, ZTE, Sprint, KDDI, NTT DoCoMo, Samsung, vivo, LG Electronics, NEC, Sony, Oracle, Cisco, China Mobile, T-Mob??&???& | Rel-15 | 5GS_Ph1 | Revision of S2-182550. Revised to S2-182914. | Revised |
6.5.1 | S2-182914 | CR | Approval | 23.501 CR0006R4: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo, Lenovo, Motorola Mobility, Orange, ZTE, Sprint, KDDI, NTT DoCoMo, Samsung, vivo, LG Electronics, NEC, Sony, Oracle, Cisco, China Mobile, T-Mob??&???& | Rel-15 | 5GS_Ph1 | Revision of S2-182828. This CR was agreed. | Agreed |
6.5.1 | S2-181467 | CR | Approval | 23.502 CR0006: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo | Rel-15 | 5GS_Ph1 | Revised in S2-182278. | Revised |
6.5.1 | S2-182278 | CR | Approval | 23.502 CR0006R1: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo, Lenovo | Rel-15 | 5GS_Ph1 | Revision of S2-181467. Revised off-line to S2-182759. NSSAI & Access | Revised |
6.5.1 | S2-182759 | CR | Approval | 23.502 CR0006R2: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo, Lenovo, Motorola Mobility, Orange, ZTE, Sprint, KDDI, NTT DoCoMo, Samsung, vivo, LG Electronics, NEC, Sony, Oracle, Cisco, China Mobile, T-Mob??&???& | Rel-15 | 5GS_Ph1 | Revision of S2-182278. Revised to S2-182827. | Revised |
6.5.1 | S2-182827 | CR | Approval | 23.502 CR0006R3: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo, Lenovo, Motorola Mobility, Orange, ZTE, Sprint, KDDI, NTT DoCoMo, Samsung, vivo, LG Electronics, NEC, Sony, Oracle, Cisco, China Mobile, T-Mob??&???& | Rel-15 | 5GS_Ph1 | Revision of S2-182759. Revised to S2-182915. | Revised |
6.5.1 | S2-182915 | CR | Approval | 23.502 CR0006R4: Allowed NSSAI and Access Type | MediaTek Inc., Nokia, Nokia Shanghai Bell, Intel Corporation, Qualcomm Incorporated, Telecom Italia, AT&T, Oppo, Lenovo, Motorola Mobility, Orange, ZTE, Sprint, KDDI, NTT DoCoMo, Samsung, vivo, LG Electronics, NEC, Sony, Oracle, Cisco, China Mobile, T-Mob??&???& | Rel-15 | 5GS_Ph1 | Revision of S2-182827. This CR was agreed. | Agreed |
6.5.1 | S2-182180 | DISCUSSION | Discussion | Allowed NSSAI per PLMN or per Access Type | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled NSSAI & accesses | Not Handled |
6.5.1 | S2-182249 | CR | Approval | 23.501 CR0185: Clarification on handling of Allowed NSSAI when the UE registers to a PLMN over more thatn one Access Type | InterDigital Inc, | Rel-15 | 5GS_Ph1 | Not Handled NSSAI & Access | Not Handled |
6.5.1 | S2-182629 | Discussion | Discussion | Offline effort on Allowed NSSAI for UEs with more than one Access Type | Drafting group | Rel-15 | 5GS_Ph1 | Created in parallel session. Revised in parallel session to S2-182639. | Revised |
6.5.1 | S2-182639 | Discussion | Discussion | Offline effort on Allowed NSSAI for UEs with more than one Access Type | Drafting group | Rel-15 | 5GS_Ph1 | Revision of S2-182629. Withdrawn (not provided). | Withdrawn |
6.5.1 | S2-182181 | CR | Approval | 23.501 CR0167: Clarification on Allowed NSSAI when registered over several accesses simultaneously | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of unhandled DRAFTCR S2-180127. Not Handled NSSAI & accesses | Not Handled |
6.5.1 | S2-181717 | DISCUSSION | Discussion | The SMF and PGW-C addresses in inter-system mobility | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Not Handled Slice IW | Not Handled |
6.5.1 | S2-181897 | CR | Approval | 23.502 CR0162: EPC to 5GC mobility with N26 | Ericsson, Huawei | Rel-15 | 5GS_Ph1 | Not Handled Slice IW | Not Handled |
6.5.1 | S2-182007 | CR | Approval | 23.501 CR0131: Clarifying the use of DNNs/APNs for slicing and interworking | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Not Handled Slice IW | Not Handled |
6.5.1 | S2-181665 | CR | Approval | 23.501 CR0065: Revisit of multiple PDU Sessions with same DN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled Slice IW | Not Handled |
6.5.1 | S2-182254 | CR | Approval | 23.501 CR0187: Select the same SMF+UPF for PDU sessions of the same DNN within one slice | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Cover sheet shows 23.502!. Revised to S2-182771. Slice IW | Revised |
6.5.1 | S2-182771 | CR | Approval | 23.501 CR0187R1: Select the same SMF+UPF for PDU sessions of the same DNN within one slice | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182254. Revised to S2-182829. | Revised |
6.5.1 | S2-182829 | CR | Approval | 23.501 CR0187R2: Select the same SMF+UPF for PDU sessions of the same DNN within one slice | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182771. Revised off-line to S2-182864. | Revised |
6.5.1 | S2-182864 | CR | Approval | 23.501 CR0187R3: Select the same SMF+UPF for PDU sessions of the same DNN within one slice | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182829. Revised to S2-182917. | Revised |
6.5.1 | S2-182917 | CR | Approval | 23.501 CR0187R4: Select the same SMF+UPF for PDU sessions of the same DNN within one slice | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182864. Revised to S2-182949. | Revised |
6.5.1 | S2-182949 | CR | Approval | 23.501 CR0187R5: Select the same SMF+UPF for PDU sessions of the same DNN within one slice | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182917. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182784 | Discussion | Discussion | Summary of Slicing interworking drafting session | Drafting group | Option 2 adopted as way forward. Noted in parallel session. | Noted | ||
6.5.1 | S2-181541 | CR | Approval | 23.501 CR0024: Mobility from EPC to 5GC | ZTE | Rel-15 | 5GS_Ph1 | Revision of not handled DRAFTCR S2-180638. Agreed in parallel session. Block approved. Slice IW | Agreed |
6.5.1 | S2-181542 | CR | Approval | 23.502 CR0038: Mobility from EPC to 5GC | ZTE | Rel-15 | 5GS_Ph1 | Revision of not handled DRAFTCR S2-180639. Agreed in parallel session. Block approved. Slice IW | Agreed |
6.5.1 | S2-182201 | CR | Approval | 23.501 CR0178: Update Establishing a PDU session in a Network Slice in various scenario | China Telecom, Huawei | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182551. NSSAI & URSP | Revised |
6.5.1 | S2-182551 | CR | Approval | 23.501 CR0178R1: Update Establishing a PDU session in a Network Slice in various scenario | China Telecom, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182201. Revised to S2-182918. | Revised |
6.5.1 | S2-182918 | CR | Approval | 23.501 CR0178R2: Update Establishing a PDU session in a Network Slice in various scenario | China Telecom, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182551. Revised to S2-182948. | Revised |
6.5.1 | S2-182948 | CR | Approval | 23.501 CR0178R3: Update Establishing a PDU session in a Network Slice in various scenario | China Telecom, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182918. Withdrawn (not provided). | Withdrawn |
6.5.1 | S2-181740 | CR | Approval | 23.501 CR0081: Removal of Allowed NSSAI indication to RAN | Ericsson | Rel-15 | 5GS_Ph1 | Postponed in parallel session. NSSAI allowed to RAN. Postponed and an LS asks RAN | Postponed |
6.5.1 | S2-182640 | LS OUT | Approval | [DRAFT] LS on Allowed NSSAI indication to RAN | SA WG2 | - | Created in parallel session. Revised off-line to S2-182916. | Revised | |
6.5.1 | S2-182916 | LS OUT | Approval | [DRAFT] LS on Allowed NSSAI indication to RAN | SA WG2 | - | Revision of S2-182640. Revised to S2-182926. | Revised | |
6.5.1 | S2-182926 | LS OUT | Approval | [DRAFT] LS on Allowed NSSAI indication to RAN | SA WG2 | - | Revision of S2-182916. Revised off-line to S2-182952. | Revised | |
6.5.1 | S2-182952 | LS OUT | Approval | [DRAFT] LS on Allowed NSSAI indication to RAN | SA WG2 | - | Revision of S2-182926. Revised to S2-182981. | Revised | |
6.5.1 | S2-182981 | LS OUT | Approval | [DRAFT] LS on Allowed NSSAI indication to RAN | SA WG2 | - | Revision of S2-182952. Revised to S2-183009. | Revised | |
6.5.1 | S2-183009 | LS OUT | Approval | [DRAFT] LS on Allowed NSSAI indication to RAN | SA WG2 | - | Revision of S2-182981. Revised to S2-183025. | Revised | |
6.5.1 | S2-183025 | LS OUT | Approval | LS on Allowed NSSAI indication to RAN | SA WG2 | - | Revision of S2-183009. Approved. | Approved | |
6.5.1 | S2-182125 | CR | Approval | 23.501 CR0154: Clarification on the association of an S-NSSAI to a given application | Telecom Italia | Rel-15 | 5GS_Ph1 | Revised to S2-182758. NSSAI for application | Revised |
6.5.1 | S2-182758 | CR | Approval | 23.501 CR0154R1: Clarification on the association of an S-NSSAI to a given application | Telecom Italia | Rel-15 | 5GS_Ph1 | Revision of S2-182125. Revised to S2-182838. | Revised |
6.5.1 | S2-182838 | CR | Approval | 23.501 CR0154R2: Clarification on the association of an S-NSSAI to a given application | Telecom Italia | Rel-15 | 5GS_Ph1 | Revision of S2-182758. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181893 | CR | Approval | 23.501 CR0115: Correction of NSSAI handling | Ericsson | Rel-15 | 5GS_Ph1 | Revised to S2-182760. NSSAI for PDU session and others | Revised |
6.5.1 | S2-182760 | CR | Approval | 23.501 CR0115R1: Correction of NSSAI handling | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181893. Revised to S2-182919. | Revised |
6.5.1 | S2-182919 | CR | Approval | 23.501 CR0115R2: Correction of NSSAI handling | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182760. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182182 | CR | Approval | 23.502 CR0223: S-NSSAI in the PDU Session Establishment Accept for roaming scenario | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182761. NSSAI PDU session roam | Revised |
6.5.1 | S2-182761 | CR | Approval | 23.502 CR0223R1: S-NSSAI in the PDU Session Establishment Accept for roaming scenario | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182182. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182183 | CR | Approval | 23.501 CR0168: Clarification of UE Requested NSSAI | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of noted DRAFTCR S2-181342. Revised to S2-182762. NSSAI requested | Revised |
6.5.1 | S2-182762 | CR | Approval | 23.501 CR0168R1: Clarification of UE Requested NSSAI | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182183. Revised to S2-182830. | Revised |
6.5.1 | S2-182830 | CR | Approval | 23.501 CR0168R2: Clarification of UE Requested NSSAI | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182762. Revised to S2-182920. | Revised |
6.5.1 | S2-182920 | CR | Approval | 23.501 CR0168R3: Clarification of UE Requested NSSAI | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182830. Revised to S2-182951. | Revised |
6.5.1 | S2-182951 | CR | Approval | 23.501 CR0168R4: Clarification of UE Requested NSSAI | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182920. Revised to S2-182982. | Revised |
6.5.1 | S2-182982 | CR | Approval | 23.501 CR0168R5: Clarification of UE Requested NSSAI | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182951. This CR was agreed. | Agreed |
6.5.1 | S2-181781 | CR | Approval | 23.501 CR0095: Clarifications of Subscribed and Configured S-NSSAI update | ZTE, Oracle | Rel-15 | 5GS_Ph1 | Revised off-line to S2-182739. NSSAI subscribed, configured, no CR# in cover, changes on changes | Revised |
6.5.1 | S2-182739 | CR | Approval | 23.501 CR0095R1: Clarifications of Subscribed and Configured S-NSSAI update | ZTE, Oracle | Rel-15 | 5GS_Ph1 | Revision of S2-181781. Revised to S2-182763. | Revised |
6.5.1 | S2-182763 | CR | Approval | 23.501 CR0095R2: Clarifications of Subscribed and Configured S-NSSAI update | ZTE, Oracle | Rel-15 | 5GS_Ph1 | Revision of S2-182739. Revised to S2-182839. | Revised |
6.5.1 | S2-182839 | CR | Approval | 23.501 CR0095R3: Clarifications of Subscribed and Configured S-NSSAI update | ZTE, Oracle | Rel-15 | 5GS_Ph1 | Revision of S2-182763. Revised to S2-182921. | Revised |
6.5.1 | S2-182921 | CR | Approval | 23.501 CR0095R4: Clarifications of Subscribed and Configured S-NSSAI update | ZTE, Oracle | Rel-15 | 5GS_Ph1 | Revision of S2-182839. Revised to S2-182983. | Revised |
6.5.1 | S2-182983 | CR | Approval | 23.501 CR0095R5: Clarifications of Subscribed and Configured S-NSSAI update | ZTE, Oracle | Rel-15 | 5GS_Ph1 | Revision of S2-182921. This CR was agreed. | Agreed |
6.5.1 | S2-181894 | CR | Approval | 23.501 CR0116: Slice Availability update | Ericsson | Rel-15 | 5GS_Ph1 | Revised to S2-182832. Slice availability | Revised |
6.5.1 | S2-182832 | CR | Approval | 23.501 CR0116R1: Slice Availability update | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181894. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182219 | CR | Approval | 23.501 CR0179: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson | Rel-15 | 5GS_Ph1 | Revised to S2-182764. Slice configuration information change | Revised |
6.5.1 | S2-182764 | CR | Approval | 23.501 CR0179R1: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182219. Revised to S2-182831. | Revised |
6.5.1 | S2-182831 | CR | Approval | 23.501 CR0179R2: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182764. Revised off-line to S2-182857. | Revised |
6.5.1 | S2-182857 | CR | Approval | 23.501 CR0179R3: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182831. Revised to S2-182922. | Revised |
6.5.1 | S2-182922 | CR | Approval | 23.501 CR0179R4: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182857. Revised to S2-182950. | Revised |
6.5.1 | S2-182950 | CR | Approval | 23.501 CR0179R5: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182922. Revised to S2-182984. | Revised |
6.5.1 | S2-182984 | CR | Approval | 23.501 CR0179R6: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson, Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182950. This CR was agreed. | Agreed |
6.5.1 | S2-182220 | CR | Approval | 23.502 CR0228: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson | Rel-15 | 5GS_Ph1 | Revised to S2-182765. Slice configuration information change | Revised |
6.5.1 | S2-182765 | CR | Approval | 23.502 CR0228R1: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182220. Revised to S2-182833. | Revised |
6.5.1 | S2-182833 | CR | Approval | 23.502 CR0228R2: Slicing configuration update | Motorola Mobility, Lenovo, ZTE, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182765. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181853 | DISCUSSION | Approval | Discussion for Slice change | LG Electronics | Rel-15 | 5GS_Ph1 | Not Handled Slice change | Not Handled |
6.5.1 | S2-181854 | CR | Approval | 23.501 CR0104: Clarification on modification of the set of network slices for a UE | LG Electronics | Rel-15 | 5GS_Ph1 | Revised to S2-182766. Slice change | Revised |
6.5.1 | S2-182766 | CR | Approval | 23.501 CR0104R1: Clarification on modification of the set of network slices for a UE | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-181854. Revised to S2-182834. | Revised |
6.5.1 | S2-182834 | CR | Approval | 23.501 CR0104R2: Clarification on modification of the set of network slices for a UE | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-182766. Revised to S2-182923. | Revised |
6.5.1 | S2-182923 | CR | Approval | 23.501 CR0104R3: Clarification on modification of the set of network slices for a UE | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-182834. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182279 | CR | Approval | 23.501 CR0191: Clarification of configured NSSAI and NSSP update | China Mobile | Rel-15 | 5GS_Ph1 | LATE DOC: Rx 20/02, 16:57. No CR number. Merged into S2-182252. NSSAI & URSP | Merged |
6.5.1 | S2-182132 | CR | Approval | 23.501 CR0155: Update of UE Network slicing configuration | Telecom Italia | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-182279, to S2-182552. Slice change | Revised |
6.5.1 | S2-182552 | CR | Approval | 23.501 CR0155R1: Update of UE Network slicing configuration | Telecom Italia, China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182132, merging S2-182279. Revised to S2-182835. | Revised |
6.5.1 | S2-182835 | CR | Approval | 23.501 CR0155R2: Update of UE Network slicing configuration | Telecom Italia, China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182552. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181883 | CR | Approval | 23.502 CR0158: Clarification on NSSAI configuration | OPPO, Telecom Italia, Qualcomm | Rel-15 | 5GS_Ph1 | Revised to S2-182767. Slice change | Revised |
6.5.1 | S2-182767 | CR | Approval | 23.502 CR0158R1: Clarification on NSSAI configuration | OPPO, Telecom Italia, Qualcomm, Intel | Rel-15 | 5GS_Ph1 | Revision of S2-181883. Revised to S2-182840. | Revised |
6.5.1 | S2-182840 | CR | Approval | 23.502 CR0158R2: Clarification on NSSAI configuration | OPPO, Telecom Italia, Qualcomm, Intel | Rel-15 | 5GS_Ph1 | Revision of S2-182767. Revised to S2-182924. | Revised |
6.5.1 | S2-182924 | CR | Approval | 23.502 CR0158R3: Clarification on NSSAI configuration | OPPO, Telecom Italia, Qualcomm, Intel | Rel-15 | 5GS_Ph1 | Revision of S2-182840. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182040 | CR | Approval | 23.502 CR0191: Clarification on modification of the set of network slices for a UE | LG Electronics | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. Slice change | Agreed |
6.5.1 | S2-182133 | CR | Approval | 23.502 CR0214: Update of UE Network slicing configuration | Telecom Italia | Rel-15 | 5GS_Ph1 | Withdrawn in parallel session. Slice change | Withdrawn |
6.5.1 | S2-181836 | CR | Approval | 23.501 CR0102: Sending of congested S-NSSAI during AN signalling connection Establishment | NEC Corporation | Rel-15 | 5GS_Ph1 | Revised to S2-182768. Slice congestion AN | Revised |
6.5.1 | S2-182768 | CR | Approval | 23.501 CR0102R1: Sending of congested S-NSSAI during AN signalling connection Establishment | NEC Corporation | Rel-15 | 5GS_Ph1 | Revision of S2-181836. Revised to S2-182836. | Revised |
6.5.1 | S2-182836 | CR | Approval | 23.501 CR0102R2: Sending of congested S-NSSAI during AN signalling connection Establishment | NEC Corporation | Rel-15 | 5GS_Ph1 | Revision of S2-182768. Revised to S2-182925. | Revised |
6.5.1 | S2-182925 | CR | Approval | 23.501 CR0102R3: Sending of congested S-NSSAI during AN signalling connection Establishment | NEC Corporation | Rel-15 | 5GS_Ph1 | Revision of S2-182836. Revised to S2-182985. | Revised |
6.5.1 | S2-182985 | CR | Approval | 23.501 CR0102R4: Sending of congested S-NSSAI during AN signalling connection Establishment | NEC Corporation | Rel-15 | 5GS_Ph1 | Revision of S2-182925. This CR was agreed. | Agreed |
6.5.1 | S2-181837 | CR | Approval | 23.501 CR0103: Sending S-NSSAI in AN signalling during service request procedure | NEC Corporation | Rel-15 | 5GS_Ph1 | Revised to S2-182769. Slice congestion AN | Revised |
6.5.1 | S2-182769 | CR | Approval | 23.501 CR0103R1: Sending S-NSSAI in AN signalling during service request procedure | NEC Corporation | Rel-15 | 5GS_Ph1 | Revision of S2-181837. Postponed in parallel session. | Postponed |
6.5.1 | S2-181843 | CR | Approval | 23.502 CR0145: Sending S-NSSAI in AN signaling during service request procedure-23.502 | NEC Corporation | Rel-15 | 5GS_Ph1 | Not Handled Slice congestion AN | Not Handled |
6.5.1 | S2-182250 | CR | Approval | 23.501 CR0186: Fix the notion of Default AMF in the Network Slicing section | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-182770. Slice default AMF | Revised |
6.5.1 | S2-182770 | CR | Approval | 23.501 CR0186R1: Fix the notion of Default AMF in the Network Slicing section | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182250. Withdrawn (not provided). | Withdrawn |
6.5.1 | S2-182006 | CR | Approval | 23.502 CR0182: Xn handover and slice unavailability | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | CR cover sheet shows 23.501! Noted in parallel session. Slice handover | Noted |
6.5.1 | S2-181972 | DISCUSSION | Decision | On Configuration of the UE for Network slicing | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Noted in parallel session. Slice UE configuration | Noted |
6.5.1 | S2-182642 | CR | Approval | 23.502 CR0237: Correction to PDU Session Establishment procedure | Telecom Italia | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181470 | CR | Approval | 23.501 CR0009: Clarification of SUCI | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. SUCI def as DRC? | Agreed |
6.5.1 | S2-181616 | CR | Approval | 23.501 CR0049: Replacing PUI with GPSI | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180228. Agreed in parallel session. Block approved. GPSI as DCR? | Agreed |
6.5.1 | S2-181625 | CR | Approval | 23.502 CR0068: Replacing PUI with GPSI | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180229. Agreed in parallel session. Block approved. GPSI as DCR? | Agreed |
6.5.1 | S2-181633 | CR | Approval | 23.502 CR0076: Alignment of terminology and general cleanup | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180099. Revised in parallel session to S2-182630. Terminology clean-up as DCR? | Revised |
6.5.1 | S2-182630 | CR | Approval | 23.502 CR0076R1: Alignment of terminology and general cleanup | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181633. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181471 | CR | Approval | 23.501 CR0010: Miscellaneous editorial corrections (capitalization, messages, procedures etc.) | MediaTek Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. Various as endorsed DCR | Agreed |
6.5.1 | S2-181752 | CR | Approval | 23.501 CR0082: Updates to TS 23.501 Scope | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180466. Revised in parallel session to S2-182631. Scope 23.501 as DCR, editorial issue, tick RAN? | Revised |
6.5.1 | S2-182631 | CR | Approval | 23.501 CR0082R1: Updates to TS 23.501 Scope | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181752. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182095 | CR | Approval | 23.501 CR0146: Network sharing for supporting RRC redirection procedure | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181101. Agreed in parallel session. Block approved. sharing as DCR | Agreed |
6.5.1 | S2-181753 | CR | Approval | 23.501 CR0083: Fixes for CP protocol stack | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180515. Revised in parallel session to S2-182632. CP stack as DCR? Cover sheet | Revised |
6.5.1 | S2-182632 | CR | Approval | 23.501 CR0083R1: Fixes for CP protocol stack | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181753. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181742 | CR | Approval | 23.502 CR0110: Network sharing PLMN handling | Ericsson | Rel-15 | 5GS_Ph1 | Revision of revised DRAFTCR S2-180202. No CR number. Revised in parallel session to S2-182633. Sharing as DCR with and without further changes | Revised |
6.5.1 | S2-182633 | CR | Approval | 23.502 CR0110R1: Network sharing PLMN handling | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181742. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-181639 | CR | Approval | 23.501 CR0056: Network sharing prioritised PLMN handling | Ericsson, Qualcomm Inc., Intel, AT&T, Vodafone | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181348. Revised in parallel session to S2-182634. Sharing as endorsed DCR, cover sheet | Revised |
6.5.1 | S2-182634 | CR | Approval | 23.501 CR0056R1: Network sharing prioritised PLMN handling | Ericsson, Qualcomm Inc., Intel, AT&T, Vodafone | Rel-15 | 5GS_Ph1 | Revision of S2-181639. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182004 | CR | Approval | 23.501 CR0130: Clarification on PLMN selection in network sharing scenario | HUAWEI, HiSilicon | Rel-15 | 5GS_Ph1 | Opened in parallel session to discuss further offline. WITHDRAWN. Further changes to S2-181639 | Withdrawn |
6.5.1 | S2-181464 | CR | Approval | 23.501 CR0005: Correction of the definitions of Allowed NSSAI and Configured NSSAI | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. Defs, as endorsed DCR | Agreed |
6.5.1 | S2-181900 | CR | Approval | 23.502 CR0163: Re-use of definitions and abbreviations specified in TS 23.503 | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182641. Def ref. Change 'or' to 'and'. | Revised |
6.5.1 | S2-182641 | CR | Approval | 23.502 CR0163R1: Re-use of definitions and abbreviations specified in TS 23.503 | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181900. Agreed in parallel session. Block approved. | Agreed |
6.5.1 | S2-182042 | DISCUSSION | Information | 23.501 EN resolution | Nokia, Nokia Shanghai Bell (Rapporteur) | Rel-15 | 5GS_Ph1 | Noted in parallel session. Editor notes. Is some basis for future proposals | Noted |
6.5.1 | S2-182234 | DISCUSSION | Approval | EN resolution | Ericsson Inc. | Rel-15 | 5GS_Ph1 | This was withdrawn (not provided). Editor notes missing | Withdrawn |
6.5.1 | S2-182059 | CR | Approval | 23.501 CR0138: Edge Computing Clarification | Intel | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. Edge computing | Agreed |
6.5.1 | S2-182264 | CR | Approval | 23.501 CR0189: Subscription Permanent Identifier | Orange, Telecom Italia, AT&T, Ericsson, DT | Rel-15 | 5GS_Ph1 | Revision of postponed DRAFTCR S2-181102. Revised in parallel session to S2-182635. SUPI | Revised |
6.5.1 | S2-182635 | CR | Approval | 23.501 CR0189R1: Subscription Permanent Identifier | ORANGE, Telecom Italia, AT&T, Ericsson, Deutsche Telekom | Rel-15 | 5GS_Ph1 | Revision of S2-182264. Agreed in parallel session. Revised to S2-183007. | Revised |
6.5.1 | S2-183007 | CR | Approval | 23.501 CR0189R2: Subscription Permanent Identifier | ORANGE, Telecom Italia, AT&T, Ericsson, Deutsche Telekom | Rel-15 | 5GS_Ph1 | Revision of S2-182635. This CR was agreed. | Agreed |
6.5.1 | S2-182179 | CR | Approval | 23.501 CR0166: Update Roaming reference architectures | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of unhandled DRAFTCR S2-180662. Agreed in parallel session. Block approved. Ref figure | Agreed |
6.5.1 | S2-181734 | CR | Approval | 23.502 CR0147: Fixing the wrong usage of 'relocation' | ORANGE | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. Terminology edit | Agreed |
6.5.1 | S2-181488 | LS In | Action | LS from SA WG5: LS on alignment of clarification of network slicing and sharing concepts | SA WG5 (S5-181529) | Rel-15 | 5GS_Ph1 | Response drafted in S2-181898. Final response in S2-182837 sharing | Replied to |
6.5.1 | S2-181898 | LS OUT | Approval | [DRAFT] Reply LS on alignment of clarification of network slicing and sharing concepts | Ericsson | Rel-15 | 5GS_Ph1 | Response to S2-181488. Revised in parallel session to S2-182636. sharing | Revised |
6.5.1 | S2-182636 | LS OUT | Approval | [DRAFT] Reply LS on alignment of clarification of network slicing and sharing concepts | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-181898. Revised to S2-182837. | Revised |
6.5.1 | S2-182837 | LS OUT | Approval | Reply LS on alignment of clarification of network slicing and sharing concepts | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182636. Agreed in parallel session. Block approved. | Approved |
6.5.1 | S2-182057 | CR | Approval | 23.501 CR0137: Network Sharing and Interworking with EPS- TS 23.501 | Intel, Huawei | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182637. Sharing & IW, tick ME? | Revised |
6.5.1 | S2-182637 | CR | Approval | 23.501 CR0137R1: Network Sharing and Interworking with EPS- TS 23.501 | Intel, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182057. Revised to S2-182927. | Revised |
6.5.1 | S2-182927 | CR | Approval | 23.501 CR0137R2: Network Sharing and Interworking with EPS- TS 23.501 | Intel, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182637. This CR was agreed. | Agreed |
6.5.1 | S2-182058 | CR | Approval | 23.502 CR0194: Clarification on N26 based HO procedure for the case of Network Sharing and Interworking with EPS- TS 23.502 | Intel | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182638. Sharing & IW, typo 'contex' | Revised |
6.5.1 | S2-182638 | CR | Approval | 23.502 CR0194R1: Clarification on N26 based HO procedure for the case of Network Sharing and Interworking with EPS- TS 23.502 | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-182058. Merged into S2-182633. | Merged |
6.5.1 | S2-182977 | Discussion | Endorsement | Outstanding issue for Allowed NSSAI | MediaTek | SA WG2 should endeavour to resolve the issue at the next meeting. | Endorsed | ||
6.5.2 | - | - | - | Common Access Control, RM and CM functions and procedure flows | - | - | {Frank} | - | - |
6.5.2 | S2-181496 | CR | Approval | 23.501 CR0014: Clarification on UE specific DRX parameter from old AMF to new AMF | Samsung | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180721. Agreed in parallel session. Block approved. DRX as DCR | Agreed |
6.5.2 | S2-181559 | CR | Approval | 23.501 CR0031: UE specific DRX parameter negotiation between UE and AMF | Huawei, HiSilicon, Ericsson, MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181395. Agreed in parallel session. Block approved. DRX as DCR | Agreed |
6.5.2 | S2-181560 | CR | Approval | 23.502 CR0047: UE specific DRX parameter negotiation between UE and AMF | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181312. Agreed in parallel session. Block approved. DRX as DCR | Agreed |
6.5.2 | S2-181506 | CR | Approval | 23.501 CR0017: Use of identifiers for mobility between GERAN/UTRAN and 5GS | Intel | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181256. Agreed in parallel session. Block approved. as DCR | Agreed |
6.5.2 | S2-181617 | CR | Approval | 23.501 CR0050: Idle and connected state terminology cleanup | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180104. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.2 | S2-181623 | CR | Approval | 23.502 CR0066: Editorial correction to section 4.12.8 | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180928. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.2 | S2-181629 | CR | Approval | 23.502 CR0072: Idle and connected state terminology cleanup | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180105. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.2 | S2-182088 | CR | Approval | 23.501 CR0144: Management of service area restriction | Samsung | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181258. Revised to S2-182713. As DCR, change mark in cover, Serv Area Restr in upper and lower case | Revised |
6.5.2 | S2-182713 | CR | Approval | 23.501 CR0144R1: Management of service area restriction | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182088. Revised to S2-182966. | Revised |
6.5.2 | S2-182966 | CR | Approval | 23.501 CR0144R2: Management of service area restriction | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182713. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-182159 | CR | Approval | 23.501 CR0162: Clarification of signalling with higher priority | KPN | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181185. Agreed in parallel session. Revised to S2-183006. As DCR? | Revised |
6.5.2 | S2-183006 | CR | Approval | 23.501 CR0162R1: Clarification of signalling with higher priority | KPN | Rel-15 | 5GS_Ph1 | Revision of S2-182159. This was left for e-mail approval. | OPEN |
6.5.2 | S2-182111 | CR | Approval | 23.502 CR0209: UE context removal in UDM during deregistration procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181255. Revised to S2-182715. as DRC | Revised |
6.5.2 | S2-182715 | CR | Approval | 23.502 CR0209R1: UE context removal in UDM during deregistration procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182111. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-182229 | CR | Approval | 23.502 CR0230: Update of Reachability procedrues | Lenovo, Motorola Mobility | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180744. Revised to S2-182716. As DCR | Revised |
6.5.2 | S2-182716 | CR | Approval | 23.502 CR0230R1: Update of Reachability procedrues | Lenovo, Motorola Mobility | Rel-15 | 5GS_Ph1 | Revision of S2-182229. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-181455 | CR | Approval | 23.502 CR0003: Clean-up of the registration procedure | Nokia, Nokia Shanghai Bell, Samsung, Ericsson, ZTE | Rel-15 | 5GS_Ph1 | Revision of approved draftCR S2-181310. Revised to S2-182714. As DCR + changes | Revised |
6.5.2 | S2-182714 | CR | Approval | 23.502 CR0003R1: Clean-up of the registration procedure | Nokia, Nokia Shanghai Bell, Samsung, Ericsson, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181455. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-181527 | CR | Approval | 23.502 CR0032: Clarification related to Subscription data type | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181340. Agreed in parallel session. Block approved. Subscr as DCR + changes | Agreed |
6.5.2 | S2-181540 | CR | Approval | 23.502 CR0037: Alignment of Namf_MT_EnableUEReachability service operation | ZTE,China Mobile | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180642. Agreed in parallel session. Block approved. As DCR + changes | Agreed |
6.5.2 | S2-181423 | LS In | Action | LS from CT WG1: LS on Mobility management congestion control | CT WG1 (C1-175413) | Postponed S2-180027 from S2#125. Responses drafted in S2-181462 and S2-182236. Final response in S2-182718 | Replied to | ||
6.5.2 | S2-182060 | CR | Approval | 23.502 CR0195: Clarification on AMF behaviour due to Subscriber Data Change in UDM - TS 23.502 | Intel | Rel-15 | 5GS_Ph1 | Revised to S2-182717. Subscriber data update | Revised |
6.5.2 | S2-182717 | CR | Approval | 23.502 CR0195R1: Clarification on AMF behaviour due to Subscriber Data Change in UDM - TS 23.502 | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-182060. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-181461 | DISCUSSION | Agreement | Handling of MM back-off timer | MediaTek Inc. | Rel-15 | Noted in parallel session. | Noted | |
6.5.2 | S2-181463 | CR | Approval | 23.501 CR0004: Handling of MM Back-off timer for N3GPP Access | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-181462 | LS OUT | Approval | Draft Reply LS on Mobility Management congestion control | MediaTek Inc. | Rel-15 | 5GS_Ph1-CT | Response to S2-181423. Merged into S2-182718. | Merged |
6.5.2 | S2-182236 | LS OUT | Approval | [DRAFT] Reply LS on mobility management congestion control | Qualcomm Japan Inc | Rel-15 | Response to S2-181423. Revised, merging S2-181462, to S2-182718. | Revised | |
6.5.2 | S2-182718 | LS OUT | Approval | Reply LS on mobility management congestion control | SA WG2 | Rel-15 | Revision of S2-182236, merging S2-181462. Agreed in parallel session. Block approved. | Approved | |
6.5.2 | S2-181438 | LS In | Action | LS from CT WG1: LS on DNN or S-NSSAI based congestion control performed at AMF | CT WG1 (C1-180743) | Rel-15 | 5GS_Ph1-CT | Responses drafted in S2-181899, S2-182002, S2-182022 and S2-182097. Final response in S2-182865 | Replied to |
6.5.2 | S2-181695 | CR | Approval | 23.501 CR0072: Clarification for S-NSSAI based congestion Control | Intel | Rel-15 | 5GS_Ph1 | Revised to S2-182719. | Revised |
6.5.2 | S2-182719 | CR | Approval | 23.501 CR0072R1: Clarification for S-NSSAI based congestion Control | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-181695. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-182003 | CR | Approval | 23.501 CR0129: Correction for congestion control | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182720. | Revised |
6.5.2 | S2-182720 | CR | Approval | 23.501 CR0129R1: Correction for congestion control | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182003. Revised in parallel session to S2-182819. Change twice to 'If S-NSSAI based congestion control is activated at AMF e.g. configured by OAM ...' | Revised |
6.5.2 | S2-182819 | CR | Approval | 23.501 CR0129R2: Correction for congestion control | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182720. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-182102 | CR | Approval | 23.501 CR0149: Clarification of SM congestion control | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised to S2-182721. | Revised |
6.5.2 | S2-182721 | CR | Approval | 23.501 CR0149R1: Clarification of SM congestion control | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182102. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-181899 | LS OUT | Approval | [DRAFT] Reply LS on DNN or S-NSSAI based congestion control performed at AMF | Ericsson | Rel-15 | 5GS_Ph1 | Response to S2-181438. Revised, merging S2-182002, S2-182022 and S2-182097, to S2-182722. | Revised |
6.5.2 | S2-182722 | LS OUT | Approval | [DRAFT] Reply LS on DNN or S-NSSAI based congestion control performed at AMF | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-181899, merging S2-182002, S2-182022 and S2-182097. Revised to S2-182865. | Revised |
6.5.2 | S2-182865 | LS OUT | Approval | Reply LS on DNN or S-NSSAI based congestion control performed at AMF | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182722. Agreed in parallel session. Block approved. | Approved |
6.5.2 | S2-182002 | LS OUT | Approval | [DRAFT] LS Response on DNN or S-NSSAI based congestion control performed at AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Response to S2-181438. Merged into S2-182722. | Merged |
6.5.2 | S2-182022 | LS OUT | Approval | [DRAFT] Reply LS on DNN or S-NSSAI based congestion control performed at AMF | InterDigital Communications | 5GS_Ph1 | Response to S2-181438. Merged into S2-182722. | Merged | |
6.5.2 | S2-182097 | LS OUT | Approval | [DRAFT] Reply LS on DNN or S-NSSAI based congestion control performed at AMF | Qualcomm Europe Inc.(Italy) | 5GS_Ph1 | Response to S2-181438. Merged into S2-182722. | Merged | |
6.5.2 | S2-181439 | LS In | Information | LS from CT WG1: Reply LS on PLMN and RAT selection policies for roaming | CT WG1 (C1-180761) | Rel-15 | 5GS_Ph1-CT | Response drafted in S2-182287. Final response in S2-182723 | Replied to |
6.5.2 | S2-182287 | LS OUT | Approval | [DRAFT] Reply LS on PLMN and RAT selection policies for roaming | SA WG2 | Rel-15 | 5GS_Ph1-CT | LATE DOC: Response to S2-181439. Revised to S2-182723. | Revised |
6.5.2 | S2-182723 | LS OUT | Approval | Reply LS on PLMN and RAT selection policies for roaming | SA WG2 | Rel-15 | 5GS_Ph1-CT | Revision of S2-182287. Agreed in parallel session. Block approved. | Approved |
6.5.2 | S2-181449 | LS In | Action | LS from RAN WG2: Reply LS on maximum idle mode DRX value | RAN WG2 (R2-1801660) | Rel-15 | NR_newRAT-Core | Postponed in parallel session. | Postponed |
6.5.2 | S2-181482 | LS In | Action | LS from RAN WG3: LS on Extending TAC for NR and NG-RAN | RAN WG3 (R3-180634) | Rel-15 | NR_newRAT-Core | Postponed in parallel session. | Postponed |
6.5.2 | S2-181485 | LS In | Action | LS from RAN WG3: LS on introducing explicit per-UE TNLA binding release in NGAP | RAN WG3 (R3-180646) | Rel-15 | 5GS_Ph1 / NR_newRAT | Response drafted in S2-181763. Final response in S2-182821 | Replied to |
6.5.2 | S2-181762 | DISCUSSION | Approval | TNL A Binding Release | Nokia, Nokia Shanghai Bell, AT&T, NTT DOCOMO, Verizon | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.2 | S2-181763 | LS OUT | Approval | Reply LS on introducing explicit per-UE TNLA binding release in NGAP | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Response to S2-181485. Revised to S2-182724. | Revised |
6.5.2 | S2-182724 | LS OUT | Approval | Reply LS on introducing explicit per-UE TNLA binding release in NGAP | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181763. Revised in parallel session to S2-182821. | Revised |
6.5.2 | S2-182821 | LS OUT | Approval | Reply LS on introducing explicit per-UE TNLA binding release in NGAP | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182724. Agreed in parallel session. Block approved. | Approved |
6.5.2 | S2-181543 | CR | Approval | 23.501 CR0025: AMF Load Re-Balancing for CONNECTE UE | ZTE | Rel-15 | 5GS_Ph1 | Revised to S2-182725. AMF load balance, typos | Revised |
6.5.2 | S2-182725 | CR | Approval | 23.501 CR0025R1: AMF Load Re-Balancing for CONNECTE UE | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181543. Revised to S2-182891. | Revised |
6.5.2 | S2-182891 | CR | Approval | 23.501 CR0025R2: AMF Load Re-Balancing for CONNECTE UE | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182725. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-182170 | CR | Approval | 23.501 CR0163: Local deactivation of MICO mode for emergency services | Vivo | Rel-15 | 5GS_Ph1 | Noted in parallel session. mico | Noted |
6.5.2 | S2-181658 | CR | Approval | 23.501 CR0064: UE mobility event notification | Samsung, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-182726. Mobility notify documentation | Revised |
6.5.2 | S2-182726 | CR | Approval | 23.501 CR0064R1: UE mobility event notification | Samsung, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181658. Revised in parallel session, merging S2-181510, to S2-182820. | Revised |
6.5.2 | S2-182820 | CR | Approval | 23.501 CR0064R2: UE mobility event notification | Samsung, Nokia, Nokia Shanghai Bell, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-182726, merging S2-181510. Revised to S2-182892. | Revised |
6.5.2 | S2-182892 | CR | Approval | 23.501 CR0064R3: UE mobility event notification | Samsung, Nokia, Nokia Shanghai Bell, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-182820. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-181719 | CR | Approval | 23.501 CR0076: Non-Allowed Area as criterion for Cell Reselection or trigger for PLMN Selection | Intel, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. Non –allowed area | Agreed |
6.5.2 | S2-181895 | CR | Approval | 23.502 CR0160: Correction of used Registration Type | Ericsson | Rel-15 | 5GS_Ph1 | Revised to S2-182727. Registration type | Revised |
6.5.2 | S2-182727 | CR | Approval | 23.502 CR0160R1: Correction of used Registration Type | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181895. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-181992 | CR | Approval | 23.501 CR0125: Clarification on the management of service area restrictions | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182728. Area restrictions | Revised |
6.5.2 | S2-182728 | CR | Approval | 23.501 CR0125R1: Clarification on the management of service area restrictions | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181992. Withdrawn (not provided). | Withdrawn |
6.5.2 | S2-181764 | CR | Approval | 23.501 CR0089: GUTI unique across AMFs in an AMF SET | Nokia, Nokia Shanghai Bell, Verizon, AT&T, Telecom Italia, NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revised to S2-182772. Temp ID AMF set | Revised |
6.5.2 | S2-182772 | CR | Approval | 23.501 CR0089R1: GUTI unique across AMFs in an AMF SET | Nokia, Nokia Shanghai Bell, Verizon, AT&T, Telecom Italia, NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-181764. Revised to S2-182963. | Revised |
6.5.2 | S2-182963 | CR | Approval | 23.501 CR0089R2: GUTI unique across AMFs in an AMF SET | Nokia, Nokia Shanghai Bell, Verizon, AT&T, Telecom Italia, NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-182772. Revised to S2-182986. | Revised |
6.5.2 | S2-182986 | CR | Approval | 23.501 CR0089R3: GUTI unique across AMFs in an AMF SET | Nokia, Nokia Shanghai Bell, Verizon, AT&T, Telecom Italia, NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-182963. Revised to S2-183012. | Revised |
6.5.2 | S2-183012 | CR | Approval | 23.501 CR0089R4: GUTI unique across AMFs in an AMF SET | Nokia, Nokia Shanghai Bell, Verizon, AT&T, Telecom Italia, NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-182986. This CR was agreed. | Agreed |
6.5.2 | S2-181889 | DISCUSSION | Approval | 5GS Temporary Identifiers and mapping - Requirements | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session. Temp ID mapping | Noted |
6.5.2 | S2-181890 | DISCUSSION | Approval | 5GS Temporary Identifiers and mapping - solution proposal | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session. Temp ID mapping | Noted |
6.5.2 | S2-181891 | CR | Approval | 23.501 CR0114: 5GS Temporary Identifiers and mapping | Ericsson | Rel-15 | 5GS_Ph1 | This was postponed in parallel session. Temp ID mapping | Postponed |
6.5.2 | S2-181892 | LS OUT | Approval | [DRAFT] LS on 5GS Temporary Identifiers and mapping | Ericsson | Rel-15 | 5GS_Ph1 | Not Handled Temp ID mapping | Not Handled |
6.5.2 | S2-182773 | LS OUT | Approval | [DRAFT] LS on 5G-S-TMSI code space | SA WG2 | Rel-15 | 5GS_Ph1 | Created in parallel session. Revised to S2-182895. | Revised |
6.5.2 | S2-182895 | LS OUT | Approval | [DRAFT] LS on 5G-S-TMSI code space | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182773. Revised to S2-182964. | Revised |
6.5.2 | S2-182964 | LS OUT | Approval | LS on 5G-S-TMSI code space | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182895. Agreed in parallel session. Block approved. | Approved |
6.5.2 | S2-182000 | CR | Approval | 23.501 CR0128: Mapping between 4G GUTI and 5G GUTI | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled Temp ID mapping | Not Handled |
6.5.2 | S2-181977 | CR | Approval | 23.502 CR0170: Correction of UDR usage in MM related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revised to S2-182774. UDM UDR changes on changes | Revised |
6.5.2 | S2-182774 | CR | Approval | 23.502 CR0170R1: Correction of UDR usage in MM related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-181977. Revised to S2-182893. | Revised |
6.5.2 | S2-182893 | CR | Approval | 23.502 CR0170R2: Correction of UDR usage in MM related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182774. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-181996 | CR | Approval | 23.501 CR0127: Clarification on NAS-MM protocol | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Withdrawn in parallel session. Solved by S2-181753? | Withdrawn |
6.5.2 | S2-182038 | CR | Approval | 23.502 CR0190: Service Request - AS Security Setup | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-182775. AS security | Revised |
6.5.2 | S2-182775 | CR | Approval | 23.502 CR0190R1: Service Request - AS Security Setup | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182038. Revised in parallel session to S2-182825. | Revised |
6.5.2 | S2-182825 | CR | Approval | 23.502 CR0190R2: Service Request - AS Security Setup | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182775. Revised to S2-182894. | Revised |
6.5.2 | S2-182894 | CR | Approval | 23.502 CR0190R3: Service Request - AS Security Setup | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182825. Noted in parallel session. | Noted |
6.5.2 | S2-182092 | CR | Approval | 23.501 CR0145: Clarification on TAI list assignment for different 5G RATs | Samsung | Rel-15 | 5GS_Ph1 | Revised to S2-182776. TAI list, change marks in cover | Revised |
6.5.2 | S2-182776 | CR | Approval | 23.501 CR0145R1: Clarification on TAI list assignment for different 5G RATs | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182092. Revised to S2-182965. | Revised |
6.5.2 | S2-182965 | CR | Approval | 23.501 CR0145R2: Clarification on TAI list assignment for different 5G RATs | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182776. This CR was agreed. | Agreed |
6.5.2 | S2-182178 | CR | Approval | 23.501 CR0165: Usage of Unified access control in priority mechanisms | KPN | Rel-15 | 5GS_Ph1 | Revised, merging S2-181979, to S2-182777. Unified access control | Revised |
6.5.2 | S2-182777 | CR | Approval | 23.501 CR0165R1: Usage of Unified access control in priority mechanisms | KPN | Rel-15 | 5GS_Ph1 | Revision of S2-182178, merging S2-181979. Agreed in parallel session. Block approved. | Agreed |
6.5.2 | S2-182171 | CR | Approval | 23.502 CR0222: Notification response | Vivo | Rel-15 | 5GS_Ph1 | This was withdrawn. Notification | Withdrawn |
6.5.3 | - | - | - | Session management and continuity functions and flows | - | - | {Frank} | - | - |
6.5.3 | S2-181454 | CR | Approval | 23.502 CR0002: Corrections to PDU session establishment / modification procedure | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of endorsed draftCR S2-181171. Revised to S2-182693. As DCR + additions | Revised |
6.5.3 | S2-182693 | CR | Approval | 23.502 CR0002R1: Corrections to PDU session establishment / modification procedure | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181454. Revised to S2-182841. | Revised |
6.5.3 | S2-182841 | CR | Approval | 23.502 CR0002R2: Corrections to PDU session establishment / modification procedure | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182693. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181457 | CR | Approval | 23.502 CR0005: Using NRF for UPF discovery | Nokia, Nokia Shanghai Bell, Cisco, | Rel-15 | 5GS_Ph1 | Revision of approved draftCR S2-181396. Revised to S2-182694. UPF disc | Revised |
6.5.3 | S2-182694 | CR | Approval | 23.502 CR0005R1: Using NRF for UPF discovery | Nokia, Nokia Shanghai Bell, Cisco, | Rel-15 | 5GS_Ph1 | Revision of S2-181457. Revised to S2-182969. | Revised |
6.5.3 | S2-182969 | CR | Approval | 23.502 CR0005R2: Using NRF for UPF discovery | Nokia, Nokia Shanghai Bell, Cisco, | Rel-15 | 5GS_Ph1 | Revision of S2-182694. Revised to S2-182987. | Revised |
6.5.3 | S2-182987 | CR | Approval | 23.502 CR0005R3: Using NRF for UPF discovery | Nokia, Nokia Shanghai Bell, Cisco, | Rel-15 | 5GS_Ph1 | Revision of S2-182969. This CR was agreed. | Agreed |
6.5.3 | S2-181493 | CR | Approval | 23.502 CR0013: SMF behaviour based on LADN notification | CATT | Rel-15 | 5GS_Ph1 | Revision of part endorsed DraftCR S2-180546. Revised to S2-182695. as endorsed part of DCR LADN | Revised |
6.5.3 | S2-182695 | CR | Approval | 23.502 CR0013R1: SMF behaviour based on LADN notification | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-181493. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181494 | CR | Approval | 23.502 CR0014: Clarification on Internal Event Exposure | CATT | Rel-15 | 5GS_Ph1 | Revision of endorsed DraftCR S2-181116. Agreed in parallel session. Block approved. as endorsed DCR; open question whether term 'presence in LADN' needs an update; why rev1? | Agreed |
6.5.3 | S2-181507 | CR | Approval | 23.501 CR0018: Remaining IP address/prefix lifetime with SSC mode 3 | Intel | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180372. Revised to S2-182696. As DCR? Cover | Revised |
6.5.3 | S2-182696 | CR | Approval | 23.501 CR0018R1: Remaining IP address/prefix lifetime with SSC mode 3 | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-181507. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181510 | CR | Approval | 23.501 CR0019: Clarification on mobility event subscription transfer | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181276. Merged into S2-182820. as DCR, MM event suscr transfer | Merged |
6.5.3 | S2-181547 | CR | Approval | 23.502 CR0040: Clarification on PDU Session Release timer provided to the UE for 'SSC mode 3' | Huawei, HiSilicon, Intel, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181278. Agreed in parallel session. Block approved. as DCR, Session release timer | Agreed |
6.5.3 | S2-181548 | CR | Approval | 23.502 CR0041: Generalize exposure of Mobility Events from AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181107. Revised to S2-182697. as DCR; MM event exp, 'Area Of Interest' upper case? | Revised |
6.5.3 | S2-182697 | CR | Approval | 23.502 CR0041R1: Generalize exposure of Mobility Events from AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181548. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181549 | CR | Approval | 23.502 CR0042: Align the UE location presence status of LADN Session into Network Triggered Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181108. Revised to S2-182698. as DCR; LADN update, does it parse? | Revised |
6.5.3 | S2-182698 | CR | Approval | 23.502 CR0042R1: Align the UE location presence status of LADN Session into Network Triggered Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181549. Revised to S2-182851. | Revised |
6.5.3 | S2-182851 | CR | Approval | 23.502 CR0042R2: Align the UE location presence status of LADN Session into Network Triggered Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182698. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181550 | CR | Approval | 23.502 CR0043: Correction on AF influence on traffic routing | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180265. Agreed in parallel session. Block approved. as DCR, AF influence | Agreed |
6.5.3 | S2-181551 | CR | Approval | 23.502 CR0044: Correction to RAN Initiated QoS Flow Mobility Procedure for Dual Connectivity | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181169. Agreed in parallel session. Block approved. as DCR, Dual conn | Agreed |
6.5.3 | S2-181552 | CR | Approval | 23.501 CR0026: Update on Traffic Detection Information | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181170. Agreed in parallel session. Block approved. as DCR, Traffic detection | Agreed |
6.5.3 | S2-181553 | CR | Approval | 23.501 CR0027: Proposal of Specifying Packet Detection Rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180603. Agreed in parallel session. Block approved. as DCR, Traffic/packet detection | Agreed |
6.5.3 | S2-181554 | CR | Approval | 23.501 CR0028: Relation between the SSC mode the PDU type | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180490. Revised to S2-182699. as DCR, SSC modes, tick UE? | Revised |
6.5.3 | S2-182699 | CR | Approval | 23.501 CR0028R1: Relation between the SSC mode the PDU type | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181554. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181582 | CR | Approval | 23.501 CR0037: Correction to AF influence on traffic routing | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181168. Revised to S2-182700. as DCR, AF influence | Revised |
6.5.3 | S2-182700 | CR | Approval | 23.501 CR0037R1: Correction to AF influence on traffic routing | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181582. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181583 | CR | Approval | 23.501 CR0038: Clarifications to AF influence on traffic routing | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181167. Agreed in parallel session. Block approved. as endorsed DCR, AF influence | Agreed |
6.5.3 | S2-181610 | CR | Approval | 23.501 CR0044: Corrections to UPF selection and resolution of related Editor's Note | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181397. Agreed in parallel session. Block approved. As DCR?, UPF selection | Agreed |
6.5.3 | S2-181638 | CR | Approval | 23.502 CR0078: Application Trigger procedure updates | Ericsson, Convida Wireless LLC | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181357. Revised to S2-182701. As DCR? Appl trigger, changes on changes | Revised |
6.5.3 | S2-182701 | CR | Approval | 23.502 CR0078R1: Application Trigger procedure updates | Ericsson, Convida Wireless LLC | Rel-15 | 5GS_Ph1 | Revision of S2-181638. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181850 | CR | Approval | 23.502 CR0152: Corrections to SMF selection | Telecom Italia, ZTE, Oracle, NTT DOCOMO, Vodafone, Orange, Huawei, Ericsson, Deutsche Telekom | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181277. Agreed in parallel session. Block approved. As DCR, only cover sheet updates? | Agreed |
6.5.3 | S2-182093 | CR | Approval | 23.502 CR0206: PDU session ID in PDU session management procedure | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180539. Revised to S2-182702. As endorsed, cover, upper case | Revised |
6.5.3 | S2-182702 | CR | Approval | 23.502 CR0206R1: PDU session ID in PDU session management procedure | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182093. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181989 | CR | Approval | 23.502 CR0175: Correction of UDR usage in SM related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revision of revised DRAFTCR S2-181272 (S2-181397 was approved). Revised to S2-182703. As endorsed DCR with further changes? | Revised |
6.5.3 | S2-182703 | CR | Approval | 23.502 CR0175R1: Correction of UDR usage in SM related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-181989. Revised to S2-182842. | Revised |
6.5.3 | S2-182842 | CR | Approval | 23.502 CR0175R2: Correction of UDR usage in SM related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182703. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181481 | LS In | Information | LS from IETF DMM: Reply LS on indicating service continuity usage of the additional IPv6 prefix in Router Advertisement | IETF DMM (LS_from_IETF_DMM) | Response to S2-179625. Response drafted in S2-182064. Final response in S2-182967 SSC modes | Replied to | ||
6.5.3 | S2-181680 | CR | Approval | 23.501 CR0069: SSC mode of the additional PSA in an IPv6 multi-homed PDU Session | Intel | Rel-15 | 5GS_Ph1 | Revised to S2-182704. SSC mode | Revised |
6.5.3 | S2-182704 | CR | Approval | 23.501 CR0069R1: SSC mode of the additional PSA in an IPv6 multi-homed PDU Session | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-181680. Withdrawn in parallel session. | Withdrawn |
6.5.3 | S2-181681 | CR | Approval | 23.502 CR0095: SSC mode of the additional PSA in an IPv6 multi-homed PDU Session | Intel | Rel-15 | 5GS_Ph1 | Not Handled SSC mode | Not Handled |
6.5.3 | S2-182064 | LS OUT | Approval | [DRAFT] LS on indicating service continuity usage of the additional IPv6 prefix in Router Advertisement | Intel | Rel-15 | Response to S2-181481. Revised to S2-182705. | Revised | |
6.5.3 | S2-182705 | LS OUT | Approval | [DRAFT] LS on indicating service continuity usage of the additional IPv6 prefix in Router Advertisement | Intel | Rel-15 | Revision of S2-182064. Revised to S2-182844. | Revised | |
6.5.3 | S2-182844 | LS OUT | Approval | [DRAFT] LS on indicating service continuity usage of the additional IPv6 prefix in Router Advertisement | SA WG2 | Rel-15 | Revision of S2-182705. Revised to S2-182967. | Revised | |
6.5.3 | S2-182967 | LS OUT | Approval | LS on indicating service continuity usage of the additional IPv6 prefix in Router Advertisement | SA WG2 | Rel-15 | Revision of S2-182844. Agreed in parallel session. Block approved. | Approved | |
6.5.3 | S2-181447 | LS In | Action | LS from CT WG4: Reply LS on transparent relay between SMF in the VPLMN and SMF in the HPLMN | CT WG4 (C4-181383) | Rel-15 | 5GS_ph1 | Noted in parallel session. | Noted |
6.5.3 | S2-181870 | CR | Approval | 23.502 CR0155: Transparent relay between V-SMF and H-SMF in case of different feature support | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised to S2-182706. | Revised |
6.5.3 | S2-182706 | CR | Approval | 23.502 CR0155R1: Transparent relay between V-SMF and H-SMF in case of different feature support | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-181870. Revised to S2-182843. | Revised |
6.5.3 | S2-182843 | CR | Approval | 23.502 CR0155R2: Transparent relay between V-SMF and H-SMF in case of different feature support | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182706. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182225 | DISCUSSION | Agreement | Addition of PDU Session Type IPv4v6 | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.3 | S2-182226 | CR | Approval | 23.501 CR0181: Addition of PDU Session type IPv4v6 | NTT DOCOMO, KDDI, Deutsche Telekom, Nokia, Vodafone, Telecom Italia, AT&T, ZTE, NEC, Cisco, LG Electronics, Telstra | Rel-15 | 5GS_Ph1 | Revised to S2-182707. | Revised |
6.5.3 | S2-182707 | CR | Approval | 23.501 CR0181R1: Addition of PDU Session type IPv4v6 | NTT DOCOMO, KDDI, Deutsche Telekom, Nokia, Vodafone, Telecom Italia, AT&T, ZTE, NEC, Cisco, LG Electronics, Telstra | Rel-15 | 5GS_Ph1 | Revision of S2-182226. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182227 | CR | Approval | 23.502 CR0229: Addition of PDU Session type IPv4v6 | NTT DOCOMO, KDDI, Deutsche Telekom, Nokia, Vodafone, Telecom Italia, AT&T, ZTE, NEC, Cisco, LG Electronics, Telstra | Rel-15 | 5GS_Ph1 | Revised to S2-182708. | Revised |
6.5.3 | S2-182708 | CR | Approval | 23.502 CR0229R1: Addition of PDU Session type IPv4v6 | NTT DOCOMO, KDDI, Deutsche Telekom, Nokia, Vodafone, Telecom Italia, AT&T, ZTE, NEC, Cisco, LG Electronics, Telstra | Rel-15 | 5GS_Ph1 | Revision of S2-182227. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182228 | CR | Approval | 23.503 CR0036: Addition of PDU Session type IPv4v6 | NTT DOCOMO, KDDI, Deutsche Telekom, Nokia, Vodafone, Telecom Italia, AT&T, ZTE, NEC, Cisco, LG Electronics, Telstra | Rel-15 | 5GS_Ph1 | Revised to S2-182709. | Revised |
6.5.3 | S2-182709 | CR | Approval | 23.503 CR0036R1: Addition of PDU Session type IPv4v6 | NTT DOCOMO, KDDI, Deutsche Telekom, Nokia, Vodafone, Telecom Italia, AT&T, ZTE, NEC, Cisco, LG Electronics, Telstra | Rel-15 | 5GS_Ph1 | Revision of S2-182228. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181533 | CR | Approval | 23.501 CR0021: Wildcard DNN subscription | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-182710. DNN wildcard subscription | Revised |
6.5.3 | S2-182710 | CR | Approval | 23.501 CR0021R1: Wildcard DNN subscription | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181533. Revised to S2-182845. | Revised |
6.5.3 | S2-182845 | CR | Approval | 23.501 CR0021R2: Wildcard DNN subscription | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182710. Revised to S2-182853. | Revised |
6.5.3 | S2-182853 | CR | Approval | 23.501 CR0021R3: Wildcard DNN subscription | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182845. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181704 | CR | Approval | 23.502 CR0105: Selection mode transfer over N11 and N16 (wildcard DNN) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-182711. DNN wildcard subscription | Revised |
6.5.3 | S2-182711 | CR | Approval | 23.502 CR0105R1: Selection mode transfer over N11 and N16 (wildcard DNN) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181704. Revised to S2-182846. | Revised |
6.5.3 | S2-182846 | CR | Approval | 23.502 CR0105R2: Selection mode transfer over N11 and N16 (wildcard DNN) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182711. Revised to S2-182970. | Revised |
6.5.3 | S2-182970 | CR | Approval | 23.502 CR0105R3: Selection mode transfer over N11 and N16 (wildcard DNN) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182846. Revised to S2-182989. | Revised |
6.5.3 | S2-182989 | CR | Approval | 23.502 CR0105R4: Selection mode transfer over N11 and N16 (wildcard DNN) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182970. This CR was agreed. | Agreed |
6.5.3 | S2-181672 | CR | Approval | 23.502 CR0092: Correction on DNN management | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182712. DNN handling | Revised |
6.5.3 | S2-182712 | CR | Approval | 23.502 CR0092R1: Correction on DNN management | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181672. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181659 | DISCUSSION | Agreement | Discussion - Roaming support for LADN | Samsung, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-182275 | DISCUSSION | Discussion | Discussion on aspects for LADN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-181535 | CR | Approval | 23.501 CR0022: Clarification in LADN clause 5.6.5 - TS 23.501 | Nokia, Nokia Shanghai Bell, Samsung, Ericsson? | Rel-15 | 5GS_Ph1 | Revision of noted DRAFTCR S2-181111. Confirm sources. No CR number. Revised off-line to S2-182814. LADN updates | Revised |
6.5.3 | S2-182814 | CR | Approval | 23.501 CR0022R1: Clarification in LADN clause 5.6.5 - TS 23.501 | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181535. Revised to S2-182847. | Revised |
6.5.3 | S2-182847 | CR | Approval | 23.501 CR0022R2: Clarification in LADN clause 5.6.5 - TS 23.501 | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182814. Wrong document uploaded. Revised in S2-182971. | Revised |
6.5.3 | S2-182971 | CR | Approval | 23.501 CR0022R3: Clarification in LADN clause 5.6.5 - TS 23.501 | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182847. Revised to S2-182972. | Revised |
6.5.3 | S2-182972 | CR | Approval | 23.501 CR0022R4: Clarification in LADN clause 5.6.5 - TS 23.501 | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182971. This CR was agreed. | Agreed |
6.5.3 | S2-181823 | CR | Approval | 23.501 CR0100: Roaming support for LADN | Samsung, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-181983 | CR | Approval | 23.501 CR0123: Corrections to LADN configuration and signalling | Ericsson | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-182286 | Discussion | Approval | Discussion on LADN options | Intel | Rel-15 | 5GS_Ph1 | LATE DOC: Rx 23/02, 17:50. Not Handled | Not Handled |
6.5.3 | S2-182062 | CR | Approval | 23.501 CR0139: LADN Clarification - 23.501 | Intel | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-182276 | CR | Approval | 23.501 CR0190: Correction on aspects for LADN | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-181848 | CR | Approval | 23.502 CR0150: LADN Signaling to SMF | Sony, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated, Ericsson | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-182063 | CR | Approval | 23.502 CR0197: LADN Clarification - 23.502 | Intel | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-181522 | CR | Approval | 23.502 CR0031: Simplify the LADN PDU Session handling | CATT | Rel-15 | 5GS_Ph1 | Not Handled LADN | Not Handled |
6.5.3 | S2-182061 | CR | Approval | 23.502 CR0196: Address missing information to enable direct notification from SMF to AF in AF influence procedure | Intel | Rel-15 | 5GS_Ph1 | Noted in parallel session. AF influence | Noted |
6.5.3 | S2-182091 | CR | Approval | 23.502 CR0205: Alignment CR for Application Function influence on traffic routing procedure | ETRI | Rel-15 | 5GS_Ph1 | Revised to S2-182795. AF influence | Revised |
6.5.3 | S2-182795 | CR | Approval | 23.502 CR0205R1: Alignment CR for Application Function influence on traffic routing procedure | ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-182091. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182104 | CR | Approval | 23.501 CR0150: Updates to AF influence on traffic routing | Samsung | Rel-15 | 5GS_Ph1 | Revised to S2-182796. AF influence, WI code, '(AF)' added without rev marks? | Revised |
6.5.3 | S2-182796 | CR | Approval | 23.501 CR0150R1: Updates to AF influence on traffic routing | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182104. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181706 | CR | Approval | 23.502 CR0107: Correcting the support of charging Characteristics | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-182797. Charging characteristics | Revised |
6.5.3 | S2-182797 | CR | Approval | 23.502 CR0107R1: Correcting the support of charging Characteristics | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181706. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181716 | CR | Approval | 23.501 CR0075: Correcting the support of charging Characteristics | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Wrong CR number!. Revised to S2-182798. Charging characteristics | Revised |
6.5.3 | S2-182798 | CR | Approval | 23.501 CR0075R1: Correcting the support of charging Characteristics | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181716. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181825 | CR | Approval | 23.502 CR0138: Clarification on Location reporting procedures | ZTE | Rel-15 | 5GS_Ph1 | Revised to S2-182799. Loc report | Revised |
6.5.3 | S2-182799 | CR | Approval | 23.502 CR0138R1: Clarification on Location reporting procedures | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181825. Revised to S2-182848. | Revised |
6.5.3 | S2-182848 | CR | Approval | 23.502 CR0138R2: Clarification on Location reporting procedures | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182799. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181855 | CR | Approval | 23.501 CR0105: UE support for Multi-homed IPv6 PDU Session | Intel, Qualcomm Inc., MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revised to S2-182800. Multi homing | Revised |
6.5.3 | S2-182800 | CR | Approval | 23.501 CR0105R1: UE support for Multi-homed IPv6 PDU Session | Intel, Qualcomm Inc., MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revision of S2-181855. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181856 | CR | Approval | 23.502 CR0153: UE support for Multi-homed IPv6 PDU Session | Intel, Qualcomm Inc., MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revised to S2-182801. Multi homing | Revised |
6.5.3 | S2-182801 | CR | Approval | 23.502 CR0153R1: UE support for Multi-homed IPv6 PDU Session | Intel, Qualcomm Inc., MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revision of S2-181856. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181670 | CR | Approval | 23.502 CR0090: N4 reporting for PDU Session Inactivity | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182802. N4 | Revised |
6.5.3 | S2-182802 | CR | Approval | 23.502 CR0090R1: N4 reporting for PDU Session Inactivity | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181670. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182191 | CR | Approval | 23.501 CR0174: Proposal of QER, URR and FAR | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182803. N4 | Revised |
6.5.3 | S2-182803 | CR | Approval | 23.501 CR0174R1: Proposal of QER, URR and FAR | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182191. Revised to S2-182968. | Revised |
6.5.3 | S2-182968 | CR | Approval | 23.501 CR0174R2: Proposal of QER, URR and FAR | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182803. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182187 | CR | Approval | 23.501 CR0171: N4 user plane path | Huawei | Rel-15 | 5GS_Ph1 | Revised to S2-182804. N4 | Revised |
6.5.3 | S2-182804 | CR | Approval | 23.501 CR0171R1: N4 user plane path | Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182187. Revised to S2-182849. | Revised |
6.5.3 | S2-182849 | CR | Approval | 23.501 CR0171R2: N4 user plane path | Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182804. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182029 | DISCUSSION | Discussion | Discussion on IMS P-CSCF Discovery in 5GC | T-Mobile USA INC | 5GS_Ph1 | Not Handled | Not Handled | |
6.5.3 | S2-182030 | CR | Approval | 23.502 CR0189: P--CSCF Discovery for IMS in 5GC using IP-CAN method | T-Mobile USA, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-182805. P-CSCF, Check discussion first under 6.5.8 | Revised |
6.5.3 | S2-182805 | CR | Approval | 23.502 CR0189R1: P--CSCF Discovery for IMS in 5GC using IP-CAN method | T-Mobile USA, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182030. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181460 | CR | Approval | 23.501 CR0003: Configuration information the UE may exchange with the SMF during the lifetime of a PDU session | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of unhandled draftCR S2-180054. Revised to S2-182806. P-CSCF restoration | Revised |
6.5.3 | S2-182806 | CR | Approval | 23.501 CR0003R1: Configuration information the UE may exchange with the SMF during the lifetime of a PDU session | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181460. Revised to S2-182850. | Revised |
6.5.3 | S2-182850 | CR | Approval | 23.501 CR0003R2: Configuration information the UE may exchange with the SMF during the lifetime of a PDU session | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182806. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181669 | CR | Approval | 23.502 CR0089: Correction on Secondary authorization or authentication procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182807. Secondary auth | Revised |
6.5.3 | S2-182807 | CR | Approval | 23.502 CR0089R1: Correction on Secondary authorization or authentication procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181669. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181673 | CR | Approval | 23.502 CR0093: Correction to CN-initiated selective deactivation of UP connection of an existing PDU Session | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Not Handled Session deactivation | Not Handled |
6.5.3 | S2-181668 | CR | Approval | 23.502 CR0088: Corrections of PDU session establishment procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182808. Session establishment updates | Revised |
6.5.3 | S2-182808 | CR | Approval | 23.502 CR0088R1: Corrections of PDU session establishment procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181668. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181671 | CR | Approval | 23.502 CR0091: Update PDU Session Modification procedures | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182809. Session modification | Revised |
6.5.3 | S2-182809 | CR | Approval | 23.502 CR0091R1: Update PDU Session Modification procedures | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181671. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181667 | CR | Approval | 23.502 CR0087: Operation type in Nsmf_PDUSession_UpdateSMContext Request | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182810. SMF services | Revised |
6.5.3 | S2-182810 | CR | Approval | 23.502 CR0087R1: Operation type in Nsmf_PDUSession_UpdateSMContext Request | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181667. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-181859 | CR | Approval | 23.502 CR0154: Adding the missing GPSI parameter in SMF | Sony | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. SMF services update | Agreed |
6.5.3 | S2-182190 | CR | Approval | 23.501 CR0173: SSC Mode Selection | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182811. SSC mode | Revised |
6.5.3 | S2-182811 | CR | Approval | 23.501 CR0173R1: SSC Mode Selection | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182190. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182106 | CR | Approval | 23.501 CR0151: Updates to description of CN Tunnel Info | Samsung | Rel-15 | 5GS_Ph1 | Revised to S2-182812. Tunnel handling, WI code, parts of cover lost? | Revised |
6.5.3 | S2-182812 | CR | Approval | 23.501 CR0151R1: Updates to description of CN Tunnel Info | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182106. Revised to S2-182852. | Revised |
6.5.3 | S2-182852 | CR | Approval | 23.501 CR0151R2: Updates to description of CN Tunnel Info | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182812. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182188 | DISCUSSION | Discussion | Proposal of Sequence Number Marking in the User Plane Packet | Huawei, HiSilicon, SK Telecom | Rel-15 | 5GS_Ph1 | Not Handled UP sequence | Not Handled |
6.5.3 | S2-182189 | CR | Approval | 23.501 CR0172: Proposal of Sequence Number Marking in the User Plane Function | Huawei, HiSilicon, SK Telecom | Rel-15 | 5GS_Ph1 | Withdrawn in parallel session. UP sequence | Withdrawn |
6.5.3 | S2-181459 | CR | Approval | 23.501 CR0002: Using NRF for UPF discovery | Nokia, Nokia Shanghai Bell, cisco, | Rel-15 | 5GS_Ph1 | Revision of unhandled draftCR S2-180241. Revised to S2-182813. UPF disc, '6.3.3' added without rev marks | Revised |
6.5.3 | S2-182813 | CR | Approval | 23.501 CR0002R1: Using NRF for UPF discovery | Nokia, Nokia Shanghai Bell, cisco, | Rel-15 | 5GS_Ph1 | Revision of S2-181459. Revised to S2-182973. | Revised |
6.5.3 | S2-182973 | CR | Approval | 23.501 CR0002R2: Using NRF for UPF discovery | Nokia, Nokia Shanghai Bell, cisco, | Rel-15 | 5GS_Ph1 | Revision of S2-182813. Agreed in parallel session. Block approved. | Agreed |
6.5.3 | S2-182172 | CR | Approval | 23.501 CR0164: Re-activation of PDU sessions based on UE policy | Vivo | Rel-15 | 5GS_Ph1 | This was withdrawn. UE policies, WI code | Withdrawn |
6.5.4 | - | - | - | Security related functions and flows | - | - | {Frank} | - | - |
6.5.4 | S2-181778 | CR | Approval | 23.501 CR0094: Configure AMF to periodically re-allocate 5G-GUTI | Apple, Inc. | Rel-15 | 5GS_Ph1 | Postponed in parallel session. | Postponed |
6.5.4 | S2-181779 | CR | Approval | 23.502 CR0120: Configure AMF to periodically re-allocate 5G-GUTI | Apple, Inc. | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.4 | S2-181677 | CR | Approval | 23.501 CR0066: Architectural solution for User Plane (UP) Security policy and User Plane Integrity Protection | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated?, Ericsson? | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181304. Confirm sources. Revised in S2-182005. | Revised |
6.5.4 | S2-182005 | CR | Approval | 23.501 CR0066R1: Architectural solution for User Plane (UP) Security policy and User Plane Integrity Protection | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-181677 (Revision of endorsed DRAFTCR S2-181304). Revised to S2-182785. | Revised |
6.5.4 | S2-182785 | CR | Approval | 23.501 CR0066R2: Architectural solution for User Plane (UP) Security policy and User Plane Integrity Protection | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182005. Revised to S2-182897. | Revised |
6.5.4 | S2-182897 | CR | Approval | 23.501 CR0066R3: Architectural solution for User Plane (UP) Security policy and User Plane Integrity Protection | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182785. Revised to S2-182990. | Revised |
6.5.4 | S2-182990 | CR | Approval | 23.501 CR0066R4: Architectural solution for User Plane (UP) Security policy and User Plane Integrity Protection | Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182897. This CR was agreed. | Agreed |
6.5.4 | S2-182009 | CR | Approval | 23.502 CR0184: User plane security policy | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of endorsed principles DRAFTCR S2-181261. Revised to S2-182786. | Revised |
6.5.4 | S2-182786 | CR | Approval | 23.502 CR0184R1: User plane security policy | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182009. Revised to S2-182991. | Revised |
6.5.4 | S2-182991 | CR | Approval | 23.502 CR0184R2: User plane security policy | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182786. This CR was agreed. | Agreed |
6.5.4 | S2-181852 | LS In | Action | LS from RAN WG3: Reply LS on User Plane Security Policy | RAN WG3 (R3-180637) | Rel-15 | Update of S2-181483 to add attachments. Noted in parallel session. | Noted | |
6.5.4 | S2-181427 | LS In | Action | LS from SA WG3: LS on User Plane Security Policy | SA WG3 (S3-173520) | Postponed S2-180049 from S2#125. Response drafted in S2-182012. | REPLY OPEN | ||
6.5.4 | S2-181419 | LS In | Action | LS from RAN WG2: LS on usage of user plane integrity protection for DRB | RAN WG2 (R2-1712051) | Postponed S2-180007 from S2#125. Response drafted in S2-182012. | REPLY OPEN | ||
6.5.4 | S2-181420 | LS In | Action | LS from RAN WG2: LS on maximum data rate of user plane integrity protected data | RAN WG2 (R2-1714125) | Postponed S2-180015 from S2#125. Response drafted in S2-182012. | REPLY OPEN | ||
6.5.4 | S2-182012 | LS OUT | Approval | [DRAFT] LS response on User Plane Security Policy | SA WG2 | Rel-15 | Revision of postponed LS OUT S2-181259. Response to S2-181427, S2-181419 and S2-181420. Revised to S2-182787. | Revised | |
6.5.4 | S2-182787 | LS OUT | Approval | [DRAFT] LS response on User Plane Security Policy | SA WG2 | Rel-15 | Revision of S2-182012. This was left for e-mail approval. | OPEN | |
6.5.4 | S2-181436 | LS In | Information | LS from CT WG1: LS on selectively disabling legacy radio access | CT WG1 (C1-180711) | Rel-16 | 5GS_Ph2 | Noted in parallel session. | Noted |
6.5.4 | S2-181451 | LS In | Information | LS from SA WG3: LS on SBI Design and its Security Implications | SA WG3 (S3-180389) | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.4 | S2-182138 | LS In | Information | LS from SA WG1: Reply LS on selectively disabling legacy radio technologies | SA WG1 (S1-180634) | Rel-16 | TEI16 | Noted in parallel session. | Noted |
6.5.4 | S2-181611 | CR | Approval | 23.501 CR0045: Updates to the Security Edge Protection Proxy description | Ericsson, Telecom Italia | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181398. Revised to S2-182788. | Revised |
6.5.4 | S2-182788 | CR | Approval | 23.501 CR0045R1: Updates to the Security Edge Protection Proxy description | Ericsson, Telecom Italia | Rel-15 | 5GS_Ph1 | Revision of S2-181611. Agreed in parallel session. Block approved. | Agreed |
6.5.4 | S2-182248 | DISCUSSION | Agreement | Clarification on inter-PLMN Control Plane signaling | Deutsche Telekom AG | Rel-15 | Noted in parallel session. | Noted | |
6.5.5 | - | - | - | QoS concept and functionality | - | - | {Frank} | - | - |
- | - | - | - | QoS concept and functionality | - | - | - | - | - |
6.5.5 | S2-181472 | CR | Approval | 23.501 CR0011: Corrections to RQoS logic when receiving DL packet with RQI | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.5 | S2-182738 | Discussion | Endorsement | Discussion on Reflective QoS | Drafting group | 5GS_Ph1 | Revised to S2-182743. | Revised | |
6.5.5 | S2-182743 | Discussion | Endorsement | Discussion on Reflective QoS | Drafting group | 5GS_Ph1 | Revision of S2-182738. Proposal endorsed. | Endorsed | |
6.5.5 | S2-181568 | CR | Approval | 23.502 CR0052: Correction on Notification control for GBR QoS flow | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181193. Revised to S2-182744. As DCR | Revised |
6.5.5 | S2-182744 | CR | Approval | 23.502 CR0052R1: Correction on Notification control for GBR QoS flow | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181568. Agreed in parallel session. Block approved. | Agreed |
6.5.5 | S2-181569 | CR | Approval | 23.503 CR0004: Correction on Notification control for GBR QoS flow | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180309. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.5 | S2-181570 | CR | Approval | 23.502 CR0053: Reflective QoS Timer transmission during PDU Session establishment | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181155. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.5 | S2-181571 | CR | Approval | 23.503 CR0005: Addition of Reflective QoS Timer in PDU session related policy information | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181156. Revised to S2-182731. As DCR with small changes. The addition to the table and section is however moved to a different place and the note is reworded. | Revised |
6.5.5 | S2-182731 | CR | Approval | 23.503 CR0005R1: Addition of Reflective QoS Timer in PDU session related policy information | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181571. Agreed in parallel session. Block approved. | Agreed |
6.5.5 | S2-181572 | CR | Approval | 23.501 CR0035: Corrections and clarifications for the usage of Packet Filter Set | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181152. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.5 | S2-181620 | CR | Approval | 23.501 CR0053: Traffic mapping information that disallows uplink packets | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181151. Revised to S2-182732. As DCR with small changes. Some wording improvements in 5.7.1.4 | Revised |
6.5.5 | S2-182732 | CR | Approval | 23.501 CR0053R1: Traffic mapping information that disallows uplink packets | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181620. Agreed in parallel session. Block approved. | Agreed |
6.5.5 | S2-181621 | CR | Approval | 23.501 CR0054: Clean-up of Characteristics signalling | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181194. Revised to S2-182733. As DCR | Revised |
6.5.5 | S2-182733 | CR | Approval | 23.501 CR0054R1: Clean-up of Characteristics signalling | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181621. Agreed in parallel session. Block approved. | Agreed |
6.5.5 | S2-181588 | CR | Approval | 23.501 CR0042: Clarification on non-Standardized 5QI provided over N2 interface | CATT | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.5 | S2-181626 | CR | Approval | 23.502 CR0069: Traffic mapping information that disallows uplink packets | Ericsson | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180221. Agreed in parallel session. Block approved. As endorsed DCR. | Agreed |
6.5.5 | S2-181655 | CR | Approval | 23.501 CR0062: QFI in N9 | Samsung | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180246. Agreed in parallel session. Block approved. As DCR. | Agreed |
6.5.5 | S2-181759 | CR | Approval | 23.501 CR0087: 5G QoS fixes for URLLC services related attributes - PDB, PER, MDB, 5QI | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of revised DRAFTCR S2-181195 (the revision in S2-181281 was approved). Revised to S2-182745. As DCR. (although approved DCR was in S2-181281) | Revised |
6.5.5 | S2-182745 | CR | Approval | 23.501 CR0087R1: 5G QoS fixes for URLLC services related attributes - PDB, PER, MDB, 5QI | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181759. Revised to S2-182854. | Revised |
6.5.5 | S2-182854 | CR | Approval | 23.501 CR0087R2: 5G QoS fixes for URLLC services related attributes - PDB, PER, MDB, 5QI | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182745. Agreed in parallel session. Block approved. | Agreed |
6.5.5 | S2-181737 | DRAFTCR | Approval | 23.501: 5G QoS fixes for URLLC services related attributes - PDB, PER, MDB, 5QI | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181281. Not Handled Relation to S2-181759/S2-181281 not clear (only cover sheet and third change seems to be different compared to S2-181281) | Not Handled |
6.5.5 | S2-182021 | CR | Approval | 23.501 CR0133: Correction for the usage of RQI bit | InterDigital Inc. | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. As DCR | Agreed |
- | - | - | - | Averaging window and QFI size | - | - | - | - | - |
6.5.5 | S2-181425 | LS In | Information | LS from RAN WG2: Reply LS on LS on default values for 5GS QoS averaging window for standardised 5QIs | RAN WG2 (R2-1714245) | Postponed S2-180036 from S2#125. Noted in parallel session. | Noted | ||
6.5.5 | S2-181490 | LS In | Action | LS from SA WG6: Reply LS to SA WG2 on default values for 5GS QoS averaging window | SA WG6 (S6-180222) | Rel-15 | 5GS_Ph1 | Postponed in parallel session. | Postponed |
6.5.5 | S2-181839 | LS In | Action | LS from SA WG4: Reply LS on default values for 5GS QoS averaging window for standardised 5QIs | SA WG4 (S4-180254) | Noted in parallel session. | Noted | ||
6.5.5 | S2-182194 | CR | Approval | 23.501 CR0175: Remove QFI equals 5QI option | Samsung | Rel-15 | 5GS_Ph1 | Revised to S2-182734. | Revised |
6.5.5 | S2-182734 | CR | Approval | 23.501 CR0175R1: Remove QFI equals 5QI option | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182194. Withdrawn (not provided). | Withdrawn |
6.5.5 | S2-181902 | DISCUSSION | Agreement | Discussion on options to limit the size of QFI to 6 bits in RAN | Ericsson | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-182186 | DISCUSSION | Discussion | Discussion of impacts of 6 bits for QFI | Samsung | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
- | - | - | - | Notification control | - | - | - | - | - |
6.5.5 | S2-181448 | LS In | Action | LS from RAN WG2: LS on QoS | RAN WG2 (R2-1801645) | Rel-15 | NR_newRAT | Response drafted in S2-181904. Final response in S2-182856 | Replied to |
6.5.5 | S2-181589 | CR | Approval | 23.501 CR0043: Clarification on Notification Control | CATT | Rel-15 | 5GS_Ph1 | Merged into S2-182736. | Merged |
6.5.5 | S2-181739 | CR | Approval | 23.501 CR0080: Clarification on Notification Control | Ericsson | Rel-15 | 5GS_Ph1 | Merged into S2-182855. | Merged |
6.5.5 | S2-181760 | CR | Approval | 23.501 CR0088: QoS Notification control and Release | Nokia, Nokia Shanghai Bell, Mediatek | Rel-15 | 5GS_Ph1 | Revised, merging S2-181589, to S2-182736. | Revised |
6.5.5 | S2-182736 | CR | Approval | 23.501 CR0088R1: QoS Notification control and Release | Nokia, Nokia Shanghai Bell, Mediatek | Rel-15 | 5GS_Ph1 | Revision of S2-181760, merging S2-181589. Revised off-line, merging S2-181739, to S2-182855. | Revised |
6.5.5 | S2-182855 | CR | Approval | 23.501 CR0088R2: QoS Notification control and Release | Nokia, Nokia Shanghai Bell, Mediatek, Ericsson, CATT | Rel-15 | 5GS_Ph1 | Revision of S2-182736, merging S2-181739. Revised to S2-182859. | Revised |
6.5.5 | S2-182859 | CR | Approval | 23.501 CR0088R3: QoS Notification control and Release | Nokia, Nokia Shanghai Bell, Mediatek, Ericsson, CATT | Rel-15 | 5GS_Ph1 | Revision of S2-182855. Revised to S2-182862. | Revised |
6.5.5 | S2-182862 | CR | Approval | 23.501 CR0088R4: QoS Notification control and Release | Nokia, Nokia Shanghai Bell, Mediatek, Ericsson, CATT | Rel-15 | 5GS_Ph1 | Revision of S2-182859. Agreed in parallel session. Block approved. | Agreed |
6.5.5 | S2-181741 | LS OUT | Approval | Draft LS reply to LS from RAN WG2: LS on QoS | Ericsson | Rel-15 | 5GS_Ph1 | Response to S2-181448. Revised to S2-182735. | Revised |
6.5.5 | S2-182735 | LS OUT | Approval | [DRAFT] LS reply to LS from RAN WG2: LS on QoS | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-181741. Revised to S2-182856. | Revised |
6.5.5 | S2-182856 | LS OUT | Approval | LS reply to LS from RAN WG2: LS on QoS | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182735. Agreed in parallel session. Block approved. | Approved |
6.5.5 | S2-181761 | LS OUT | Approval | Reply LS on QoS | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Response to S2-181448. Not Handled | Not Handled |
6.5.5 | S2-181775 | CR | Approval | 23.502 CR0119: QoS Notification control and Release - TS 23.502 | Nokia, Nokia Shanghai Bell, Mediatek | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-182077 | CR | Approval | 23.501 CR0142: Removal of notification control | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-182079 | CR | Approval | 23.502 CR0201: Removal of notification control | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-182198 | CR | Approval | 23.501 CR0176: Allow removal of QoS Flow by RAN after notification sent to SMF | Samsung | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
- | - | - | - | Reflective QoS | - | - | - | - | - |
6.5.5 | S2-181475 | CR | Approval | 23.501 CR0012: Reflective QoS support indication at PDU Session Establishment / Modification | MediaTek Inc. | Rel-15 | 5GS_Ph1 | This was left for off-line discussion. Noted in parallel session. | Noted |
6.5.5 | S2-182184 | CR | Approval | 23.501 CR0169: Temporary restriction of Reflective QoS | Intel | Rel-15 | 5GS_Ph1 | This was left for off-line discussion. This was postponed in parallel session. | Postponed |
6.5.5 | S2-181476 | CR | Approval | 23.502 CR0007: Reflective QoS support indication at PDU Session Establishment / Modification | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-182185 | CR | Approval | 23.502 CR0224: Temporary restriction of Reflective QoS | Intel | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-181473 | LS OUT | Approval | Draft LS to CT WG1 on Number of concurrent QoS rules/packet filters | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-181474 | DISCUSSION | Agreement | UE Impact of Reflective QoS | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Withdrawn (not provided). | Withdrawn |
- | - | - | - | Various topics | - | - | - | - | - |
6.5.5 | S2-181644 | CR | Approval | 23.503 CR0014: Traffic mapping information that disallows uplink packets | Ericsson | Rel-15 | 5GS_Ph1 | Revision of not handled DRAFTCR S2-180222. Agreed in parallel session. Block approved. | Agreed |
6.5.5 | S2-181903 | CR | Approval | 23.501 CR0117: Use of priority parameters in scheduling | Ericsson | Rel-15 | 5GS_Ph1 | This was left for off-line discussion and revised in S2-182737. Revised to S2-182737. | Revised |
6.5.5 | S2-182737 | CR | Approval | 23.501 CR0117R1: Use of priority parameters in scheduling | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181903. Withdrawn (not provided). | Withdrawn |
6.5.5 | S2-181735 | DISCUSSION | Agreement | Discussion on Max Data Burst Volume for GBR QoS Flows | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.5 | S2-181736 | CR | Approval | 23.501 CR0079: Introduction of Maximum Data Burst Volume for all GBR flows | Ericsson | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.5 | S2-181738 | DISCUSSION | Agreement | Implications from UE Max Data Burst Volume enforcement | Ericsson | Rel-15 | 5GS_Ph1 | LATE DOC: Rx 25/02, 15:20. Not Handled | Not Handled |
6.5.5 | S2-182036 | CR | Approval | 23.501 CR0134: Clarifications for QoS Framework | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised to S2-182741. | Revised |
6.5.5 | S2-182741 | CR | Approval | 23.501 CR0134R1: Clarifications for QoS Framework | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182036. Revised to S2-182858. | Revised |
6.5.5 | S2-182858 | CR | Approval | 23.501 CR0134R2: Clarifications for QoS Framework | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182741. Revised to S2-182863. | Revised |
6.5.5 | S2-182863 | CR | Approval | 23.501 CR0134R3: Clarifications for QoS Framework | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182858. Revised to S2-182992. | Revised |
6.5.5 | S2-182992 | CR | Approval | 23.501 CR0134R4: Clarifications for QoS Framework | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182863. Revised to S2-183013. | Revised |
6.5.5 | S2-183013 | CR | Approval | 23.501 CR0134R5: Clarifications for QoS Framework | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182992. This CR was agreed. | Agreed |
6.5.5 | S2-181841 | LS In | Action | LS from SA WG4: LS on QoS for Live Uplink Streaming (FLUS) | SA WG4 (S4-180301) | Rel-15 | FLUS | Postponed in parallel session. | Postponed |
6.5.5 | S2-181904 | LS OUT | Approval | [DRAFT] LS reply to LS from SA WG4: QoS for Live Uplink Streaming (FLUS) | Ericsson | Rel-15 | 5GS_Ph1 | Response to S2-181448. LATE DOC: Rx 22/02, 19:30. Revised to S2-182742. | Revised |
6.5.5 | S2-182742 | LS OUT | Approval | [DRAFT] LS reply to LS from SA WG4: QoS for Live Uplink Streaming (FLUS) | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181904. Withdrawn (not provided). | Withdrawn |
6.5.6 | - | - | - | Policy and charging control | - | - | {Krisztian} | - | - |
6.5.6.1 | - | - | - | PCC aspects related to AMF and UE policies | - | - | {Mirko} | - | - |
- | - | - | - | Approved DCRs | - | - | - | - | - |
6.5.6.1 | S2-181499 | CR | Approval | 23.503 CR0001: Clarification on PCF interaction | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181051. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.6.1 | S2-181500 | CR | Approval | 23.501 CR0015: Clarification on PCF selection | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181049. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.6.1 | S2-181528 | CR | Approval | 23.502 CR0033: Clarification on PCF association | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181050. Revised in parallel session to S2-182604. As DCR with small update of last change (clause 5.2.2.2.11) | Revised |
6.5.6.1 | S2-182604 | CR | Approval | 23.502 CR0033R1: Clarification on PCF association | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-181528. Revised in parallel session to S2-182615. | Revised |
6.5.6.1 | S2-182615 | CR | Approval | 23.502 CR0033R2: Clarification on PCF association | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-182604. Agreed in parallel session. Block approved. | Agreed |
6.5.6.1 | S2-181573 | CR | Approval | 23.502 CR0054: Correction on the Policy association procedure during AMF relocation | Huawei, HiSilicon, Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181400. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.6.1 | S2-181574 | CR | Approval | 23.502 CR0055: PCF selection for AMF during inter NG-RAN node N2 based handover | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180998. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.6.1 | S2-181612 | CR | Approval | 23.503 CR0011: UE policies granularity and UE assistance for policy evaluation. | Ericsson, NEC, Lenovo | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181399. Revised in parallel session to S2-182605. As DCR with editorial changes | Revised |
6.5.6.1 | S2-182605 | CR | Approval | 23.503 CR0011R1: UE policies granularity and UE assistance for policy evaluation. | Ericsson, NEC, Lenovo | Rel-15 | 5GS_Ph1 | Revision of S2-181612. Agreed in parallel session. Revised to S2-183005. | Revised |
6.5.6.1 | S2-183005 | CR | Approval | 23.503 CR0011R2: UE policies granularity and UE assistance for policy evaluation. | Ericsson, NEC, Lenovo | Rel-15 | 5GS_Ph1 | Revision of S2-182605. This CR was agreed. | Agreed |
6.5.6.1 | S2-181632 | CR | Approval | 23.502 CR0075: Proposed resolution of Editor´s Notes in 23.502 | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181052. Revised in parallel session to S2-182606. As DCR? | Revised |
6.5.6.1 | S2-182606 | CR | Approval | 23.502 CR0075R1: Proposed resolution of Editor´s Notes in 23.502 | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181632. Agreed in parallel session. Block approved. | Agreed |
6.5.6.1 | S2-181676 | CR | Approval | 23.502 CR0094: Mobility restrictions (service area) when roaming | NEC | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181053. Revised in parallel session to S2-182607. As DCR | Revised |
6.5.6.1 | S2-182607 | CR | Approval | 23.502 CR0094R1: Mobility restrictions (service area) when roaming | NEC | Rel-15 | 5GS_Ph1 | Revision of S2-181676. Agreed in parallel session. Block approved. | Agreed |
6.5.6.1 | S2-181580 | CR | Approval | 23.503 CR0008: Additional PDU Session Type in Route Selection Descriptor | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181041. Revised in S2-181697. | Revised |
6.5.6.1 | S2-181697 | CR | Approval | 23.503 CR0008R1: Description of components in URSP | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181580. Agreed in parallel session. Block approved. As DCR (with editorial changes) | Agreed |
6.5.6.1 | S2-181888 | CR | Approval | 23.502 CR0159: 23.502: UE assisted UE policies calculation in PCF | Ericsson, NEC | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180965. Revised in parallel session to S2-182608. As DCR with editorial changes | Revised |
6.5.6.1 | S2-182608 | CR | Approval | 23.502 CR0159R1: 23.502: UE assisted UE policies calculation in PCF | Ericsson, NEC | Rel-15 | 5GS_Ph1 | Revision of S2-181888. Agreed in parallel session. Block approved. | Agreed |
6.5.6.1 | S2-182163 | CR | Approval | 23.502 CR0220: Clarification on PCF association | LG Electronics, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181050. Noted in parallel session. As DCR with changes:. 4.2.2.2.2-1: Registration, Step 14: clarifies that AMF selects both the V-PCF and H-PCF for the roaming case | Noted |
- | - | - | - | UE policy delivery | - | - | - | - | - |
6.5.6.1 | S2-181437 | LS In | Action | LS from CT WG1: LS on UE policy delivery | CT WG1 (C1-180712) | Rel-15 | 5GS_Ph1-CT | Response drafted in S2-182076. Final response in S2-182619 | Replied to |
6.5.6.1 | S2-182076 | LS OUT | Approval | [DRAFT] Response LS on UE policy delivery | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Response to S2-181437. Revised in parallel session to S2-182617. | Revised |
6.5.6.1 | S2-182617 | LS OUT | Approval | [DRAFT] Response LS on UE policy delivery | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182076. Revised in parallel session to S2-182619. | Revised |
6.5.6.1 | S2-182619 | LS OUT | Approval | Response LS on UE policy delivery | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182617. Approved. | Approved |
6.5.6.1 | S2-181685 | LS OUT | Approval | Draft LS reply to CT WG1 on UE policies | Ericsson | Rel-15 | 5GS_Ph1 | Response to S2-181437. Not Handled | Not Handled |
6.5.6.1 | S2-182054 | DISCUSSION | Approval | UE Policy delivery mechanism for 5GC | Qualcomm Incorporated, InterDigital Inc., CATT, | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.6.1 | S2-181688 | DISCUSSION | Agreement | Procedures for management of UE access selection and PDU session selection related information | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.6.1 | S2-181687 | CR | Approval | 23.502 CR0098: UE polices ack from UE | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182609. | Revised |
6.5.6.1 | S2-182609 | CR | Approval | 23.502 CR0098R1: UE polices ack from UE | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181687. Revised in parallel session to S2-182616. | Revised |
6.5.6.1 | S2-182616 | CR | Approval | 23.502 CR0098R2: UE polices ack from UE | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182609. Revised in parallel session to S2-182623. | Revised |
6.5.6.1 | S2-182623 | CR | Approval | 23.502 CR0098R3: UE polices ack from UE | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182616. Agreed in parallel session. Block approved. | Agreed |
6.5.6.1 | S2-182056 | CR | Approval | 23.503 CR0027: UE Policy delivery clarifications | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.6.1 | S2-182075 | CR | Approval | 23.502 CR0200: UE Policy delivery procedure clarifications | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
- | - | - | - | Npcf_AMPolicyControl service | - | - | - | - | - |
6.5.6.1 | S2-181794 | CR | Approval | 23.502 CR0125: Updates to PCF-AMF interface ( Npcf_AMPolicyControl service) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182464. | Revised |
6.5.6.1 | S2-182464 | CR | Approval | 23.502 CR0125R1: Updates to PCF-AMF interface ( Npcf_AMPolicyControl service) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181794. Revised to S2-183018. | Revised |
6.5.6.1 | S2-183018 | CR | Approval | 23.502 CR0125R2: Updates to PCF-AMF interface ( Npcf_AMPolicyControl service) | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182464. This was left for e-mail approval. | OPEN |
6.5.6.1 | S2-181807 | CR | Approval | 23.502 CR0133: Update of Npcf_AMPolicyControl service | Oracle, ZTE, Ericsson, Sandvine, Openet | Rel-15 | 5GS_Ph1 | No CR number. Revised in parallel session to S2-182465. | Revised |
6.5.6.1 | S2-182465 | CR | Approval | 23.502 CR0133R1: Update of Npcf_AMPolicyControl service | Oracle, ZTE, Ericsson, Sandvine, Openet | Rel-15 | 5GS_Ph1 | Revision of S2-181807. Withdrawn in parallel session. | Withdrawn |
6.5.6.1 | S2-181975 | CR | Approval | 23.502 CR0168: Clarification of UDR usage in policy related procedures | China Mobile, Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-182149, to S2-182610. | Revised |
6.5.6.1 | S2-182610 | CR | Approval | 23.502 CR0168R1: Clarification of UDR usage in policy related procedures | China Mobile, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181975, merging S2-182149. Revised in parallel session to S2-182620. | Revised |
6.5.6.1 | S2-182620 | CR | Approval | 23.502 CR0168R2: Clarification of UDR usage in policy related procedures | China Mobile, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182610. Revised in parallel session to S2-182624. | Revised |
6.5.6.1 | S2-182624 | CR | Approval | 23.502 CR0168R3: Clarification of UDR usage in policy related procedures | China Mobile, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182620. Agreed in parallel session. Block approved. | Agreed |
6.5.6.1 | S2-182149 | CR | Approval | 23.502 CR0217: UE Policy Delivery | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Merged into S2-182610. | Merged |
6.5.6.1 | S2-182258 | DISCUSSION | Discussion | Comments to S2-181807_Update of Npcf_AMPolicyControl service | Deutsche Telekom AG | Rel-15 | Withdrawn (not provided). | Withdrawn | |
- | - | - | - | URSP details | - | - | - | - | - |
6.5.6.1 | S2-181660 | CR | Approval | 23.503 CR0017: Default URSP Rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182611. | Revised |
6.5.6.1 | S2-182611 | CR | Approval | 23.503 CR0017R1: Default URSP Rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181660. Revised in parallel session to S2-182621. | Revised |
6.5.6.1 | S2-182621 | CR | Approval | 23.503 CR0017R2: Default URSP Rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182611. Revised to S2-182997. | Revised |
6.5.6.1 | S2-182997 | CR | Approval | 23.503 CR0017R3: Default URSP Rule | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182621. This CR was agreed. | Agreed |
6.5.6.1 | S2-181661 | CR | Approval | 23.503 CR0018: UE selects a PDU Session based on URSP | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-182035, to S2-182612. | Revised |
6.5.6.1 | S2-182612 | CR | Approval | 23.503 CR0018R1: UE selects a PDU Session based on URSP | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181661, merging S2-182035. Revised in parallel session to S2-182626. | Revised |
6.5.6.1 | S2-182626 | CR | Approval | 23.503 CR0018R2: UE selects a PDU Session based on URSP | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182612. Agreed in parallel session. Block approved. | Agreed |
6.5.6.1 | S2-182035 | CR | Approval | 23.503 CR0026: Clarifying UE procedure for routing traffic using the URSP policies | Motorola Mobility, Lenovo | Rel-15 | 5GS_Ph1 | Merged in S2-182612. | Merged |
6.5.6.1 | S2-181662 | CR | Approval | 23.503 CR0019: Additional PDU Session Type in Route Selection Descriptor | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Revised to S2-183008. | Revised |
6.5.6.1 | S2-183008 | CR | Approval | 23.503 CR0019R1: Additional PDU Session Type in Route Selection Descriptor | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181662. This was left for e-mail approval. | OPEN |
6.5.6.1 | S2-181784 | CR | Approval | 23.503 CR0021: Update of UDR policy related subscription | Oracle, ZTE | Rel-15 | 5GS_Ph1 | No CR number. Revised in parallel session to S2-182613. | Revised |
6.5.6.1 | S2-182613 | CR | Approval | 23.503 CR0021R1: Update of UDR policy related subscription | Oracle, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181784. Revised in parallel session to S2-182625. | Revised |
6.5.6.1 | S2-182625 | CR | Approval | 23.503 CR0021R2: Update of UDR policy related subscription | Oracle, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182613. Agreed in parallel session. Revised to S2-183010. | Revised |
6.5.6.1 | S2-183010 | CR | Approval | 23.503 CR0021R3: Update of UDR policy related subscription | Oracle, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182625. This CR was agreed. | Agreed |
- | - | - | - | Other topics | - | - | - | - | - |
6.5.6.1 | S2-181793 | CR | Approval | 23.502 CR0124: Updates to the EPS IWK message flow for PCC procedures | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182614. | Revised |
6.5.6.1 | S2-182614 | CR | Approval | 23.502 CR0124R1: Updates to the EPS IWK message flow for PCC procedures | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181793. This was postponed. | Postponed |
6.5.6.2 | - | - | - | PCC aspects related to SMF/SM policies | - | - | {Krisztian} | - | - |
- | - | - | - | Approved DCRs | - | - | - | - | - |
6.5.6.2 | S2-181480 | CR | Approval | 23.502 CR0011: Correction of Npcf_BDTPolicyControl (background data transfer) | KDDI | Rel-15 | 5GS_Ph1 | Revision of endorsed draftCR S2-181008. Revised in parallel session to S2-182441. As DCR with small changes | Revised |
6.5.6.2 | S2-182441 | CR | Approval | 23.502 CR0011R1: Correction of Npcf_BDTPolicyControl (background data transfer) | KDDI | Rel-15 | 5GS_Ph1 | Revision of S2-181480. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181575 | CR | Approval | 23.502 CR0056: Correction on PCF selection in SMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181388. Revised in parallel session, merging S2-182169, to S2-182442. As DCR with small alignments in section 4.3.2.2.1 step 3 and 4.3.2.2.2 step 3a | Revised |
6.5.6.2 | S2-182442 | CR | Approval | 23.502 CR0056R1: Correction on PCF selection in SMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181575, merging S2-182169. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182169 | CR | Approval | 23.502 CR0221: Correction on PCF selection in SMF | Huawei?, HiSilicon?, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181388. Confirm sources. Merged into S2-182442. As DCR with changes but in conflict to 1575. What are the changes compared to S2-181388 and S2-181575? | Merged |
6.5.6.2 | S2-181576 | CR | Approval | 23.503 CR0006: Removal of editor's notes and addition of references to empty sections | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180989. Revised in parallel session to S2-182443. As DCR | Revised |
6.5.6.2 | S2-182443 | CR | Approval | 23.503 CR0006R1: Removal of editor's notes and addition of references to empty sections | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181576. Revised in parallel session to S2-182873. | Revised |
6.5.6.2 | S2-182873 | CR | Approval | 23.503 CR0006R2: Removal of editor's notes and addition of references to empty sections | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182443. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181577 | CR | Approval | 23.503 CR0007: Influence of additional non-standardized QoS parameters on QoS Flow Binding | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181055. Revised in parallel session to S2-182444. As DCR with changes:. Beside some wording updates, the structure of section 6.1.3.2.4 is changed so that the parameters relevant for binding are mentioned only once. In addition, the PCC rule table is updated by making the 5QI and ARP mandatory and the other binding parameters optional. | Revised |
6.5.6.2 | S2-182444 | CR | Approval | 23.503 CR0007R1: Influence of additional non-standardized QoS parameters on QoS Flow Binding | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181577. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181604 | CR | Approval | 23.503 CR0010: QoS rule generation | CATT | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181056. Revised in parallel session to S2-182445. As DCR. Add brackets into first sentence so that the reference can be understood | Revised |
6.5.6.2 | S2-182445 | CR | Approval | 23.503 CR0010R1: QoS rule generation | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-181604. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181634 | CR | Approval | 23.503 CR0012: Resource reservation for services sharing priority | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181391. Revised in parallel session to S2-182446. As DCR. Add other comments: Same as agreed draftCR in S2-181391 | Revised |
6.5.6.2 | S2-182446 | CR | Approval | 23.503 CR0012R1: Resource reservation for services sharing priority | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181634. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181635 | CR | Approval | 23.503 CR0013: Add Nocs service in service base representation architecture | Ericsson | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180211. Revised in parallel session to S2-182447. As DCR with changes:. Change OCS and OFCS by CHF due to alignment with S2-181487 (LS from SA WG5 on Response on 5G Specification of PSy). Update cover sheet (i.e. remove Nocs statements). Some occurrences of OCS are still in (e.g. abbreviation). Add also the reference point between SMF and CHF now | Revised |
6.5.6.2 | S2-182447 | CR | Approval | 23.503 CR0013R1: Add Nocs service in service base representation architecture | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181635. Revised in parallel session to S2-182874. | Revised |
6.5.6.2 | S2-182874 | CR | Approval | 23.503 CR0013R2: Add Nocs service in service base representation architecture | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182447. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181790 | CR | Approval | 23.503 CR0022: 23.503: Remove EN related with EPC IWK | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180982. Revised in parallel session to S2-182449. As DCR. Update cover sheet (version?, date, clauses affected, corresponding CR?). Clean up the cover page | Revised |
6.5.6.2 | S2-182449 | CR | Approval | 23.503 CR0022R1: 23.503: Remove EN related with EPC IWK | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181790. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181791 | CR | Approval | 23.503 CR0023: 23.503: Remove some ENs | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180988. Agreed in parallel session. Block approved. As DCR. Update cover sheet (version? , date) | Agreed |
6.5.6.2 | S2-181627 | CR | Approval | 23.502 CR0070: Add Nocs_SpendingLimitControl service, service operations and information flows | Ericsson | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180210. Revised in parallel session to S2-182450. As DCR? | Revised |
6.5.6.2 | S2-182450 | CR | Approval | 23.502 CR0070R1: Add Nocs_SpendingLimitControl service, service operations and information flows | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181627. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181615 | CR | Approval | 23.501 CR0048: Resource reservation for services sharing priority | Ericsson | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180995. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | Incoming LS | - | - | - | - | - |
6.5.6.2 | S2-181487 | LS In | Action | LS from SA WG5: LS reply to LS from SA WG2 to SA WG5 on Response on 5G Specification of PSy | SA WG5 (S5-181452) | Rel-15 | 5GS_Ph1 | Response drafted in S2-181789. Final response in S2-182875 | |
6.5.6.2 | S2-181440 | LS In | Action | LS from CT WG3: LS on Reply on 5G Specification of N28 interface | CT WG3 (C3-180174) | Rel-15 | 5GS_Ph1-CT | Response drafted in S2-181789. Final response in S2-182875 | Replied to |
6.5.6.2 | S2-181789 | LS OUT | Approval | [DRAFT] LS reply on Response on 5G Specification of PSy and LS on Reply on 5G Specification of N28 interface | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Response to S2-181487 and S2-181440. Revised in parallel session to S2-182448. | Revised |
6.5.6.2 | S2-182448 | LS OUT | Approval | LS reply on Response on 5G Specification of PSy and LS on Reply on 5G Specification of N28 interface | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-181789. Revised in parallel session to S2-182875. Add attachments. Remove rev marks. Add meeting location. | Revised |
6.5.6.2 | S2-182875 | LS OUT | Approval | LS reply on Response on 5G Specification of PSy and LS on Reply on 5G Specification of N28 interface | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182448. Agreed in parallel session. Block approved. | Approved |
6.5.6.2 | S2-181446 | LS In | Information | LS from CT WG4: Reply to LS on 5G Charging Study Phase 1 on N4 | CT WG4 (C4-181381) | Rel-15 | FS_5GS_Ph1_CH | Noted in parallel session. | Noted |
6.5.6.2 | S2-181486 | LS In | Information | LS from SA WG5: LS reply to reply to LS on 5G Charging Study Phase 1 on N4 | SA WG5 (S5-181302) | Rel-15 | Noted in parallel session. | Noted | |
- | - | - | - | Session binding | - | - | - | - | - |
6.5.6.2 | S2-181534 | CR | Approval | 23.503 CR0002: Remove EN related with Session binding | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-182143, to S2-182451. | Revised |
6.5.6.2 | S2-182451 | CR | Approval | 23.503 CR0002R1: Remove EN related with Session binding | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181534, merging S2-182143. Revised to S2-182998. | Revised |
6.5.6.2 | S2-182998 | CR | Approval | 23.503 CR0002R2: Remove EN related with Session binding | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182451. Revised to S2-183021. | Revised |
6.5.6.2 | S2-183021 | CR | Approval | 23.503 CR0002R3: Remove EN related with Session binding | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182998. This CR was agreed. | Agreed |
6.5.6.2 | S2-181678 | CR | Approval | 23.501 CR0067: Session binding for Ethernet PDU Session Type | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-182147, to S2-182452. | Revised |
6.5.6.2 | S2-182452 | CR | Approval | 23.501 CR0067R1: Session binding for Ethernet PDU Session Type | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181678, merging S2-182147. Revised to S2-182999. | Revised |
6.5.6.2 | S2-182999 | CR | Approval | 23.501 CR0067R2: Session binding for Ethernet PDU Session Type | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182452. Revised to S2-183020. | Revised |
6.5.6.2 | S2-183020 | CR | Approval | 23.501 CR0067R3: Session binding for Ethernet PDU Session Type | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182999. This was left for e-mail approval. | OPEN |
6.5.6.2 | S2-181698 | CR | Approval | 23.502 CR0101: Cleaning up binding in BSF after PDU session termination | Cisco Systems | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182453. | Revised |
6.5.6.2 | S2-182453 | CR | Approval | 23.502 CR0101R1: Cleaning up binding in BSF after PDU session termination | Cisco Systems | Rel-15 | 5GS_Ph1 | Revision of S2-181698. Revised in parallel session to S2-182872. Move new changes in step 4 in 1st flow and step 5 in 2nd flow into a separate paragraph. Change 'IP prefix' to 'IP address/prefix' in last sentence of step 4 in 1st flow. | Revised |
6.5.6.2 | S2-182872 | CR | Approval | 23.502 CR0101R2: Cleaning up binding in BSF after PDU session termination | Cisco Systems | Rel-15 | 5GS_Ph1 | Revision of S2-182453. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181973 | CR | Approval | 23.501 CR0120: Clean up the description of BSF | China Mobile | Rel-15 | 5GS_Ph1 | No CR number. Merged into S2-182454. | Merged |
6.5.6.2 | S2-182143 | CR | Approval | 23.503 CR0030: Clean up for BSF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Merged into S2-182451. | Merged |
6.5.6.2 | S2-182144 | CR | Approval | 23.501 CR0158: Clean up for BSF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-181973, to S2-182454. | Revised |
6.5.6.2 | S2-182454 | CR | Approval | 23.501 CR0158R1: Clean up for BSF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182144, merging S2-181973. Revised in parallel session to S2-182877. | Revised |
6.5.6.2 | S2-182877 | CR | Approval | 23.501 CR0158R2: Clean up for BSF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182454. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182145 | DISCUSSION | Discussion | Discussion on Session Binding Mechanism for non-IP PDU Session | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.6.2 | S2-182146 | CR | Approval | 23.503 CR0031: Session Binding mechanism for non-IP PDU Session | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182455. | Revised |
6.5.6.2 | S2-182455 | CR | Approval | 23.503 CR0031R1: Session Binding mechanism for non-IP PDU Session | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182146. Revised in parallel session to S2-182889. Change the wording as: 'The UE MAC address change event trigger shall trigger a SMF interaction with the PCF in case a new UE MAC address is detected or a used MAC address is inactive for a specific period during the lifetime of the Ethernet type PDU session.' | Revised |
6.5.6.2 | S2-182889 | CR | Approval | 23.503 CR0031R2: Session Binding mechanism for non-IP PDU Session | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182455. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182147 | CR | Approval | 23.501 CR0159: Session Binding mechanism for non-IP PDU Session | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Merged into S2-182452. | Merged |
6.5.6.2 | S2-182212 | CR | Approval | 23.503 CR0035: Clarification on AF using legacy Rx binding with relevant PCF | China Mobile | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182470. | Revised |
6.5.6.2 | S2-182470 | CR | Approval | 23.503 CR0035R1: Clarification on AF using legacy Rx binding with relevant PCF | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182212. Revised in parallel session to S2-182890. | Revised |
6.5.6.2 | S2-182890 | CR | Approval | 23.503 CR0035R2: Clarification on AF using legacy Rx binding with relevant PCF | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182470. Revised in parallel session to S2-182941. | Revised |
6.5.6.2 | S2-182941 | CR | Approval | 23.503 CR0035R3: Clarification on AF using legacy Rx binding with relevant PCF | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182890. Revised off-line to S2-182988. | Revised |
6.5.6.2 | S2-182988 | CR | Approval | 23.503 CR0035R4: Clarification on AF using legacy Rx binding with relevant PCF | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182941. Revised to S2-183000. | Revised |
6.5.6.2 | S2-183000 | CR | Approval | 23.503 CR0035R5: Clarification on AF using legacy Rx binding with relevant PCF | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182988. This CR was agreed. | Agreed |
- | - | - | - | Npcf_SMPolicyControl service | - | - | - | - | - |
6.5.6.2 | S2-181424 | LS In | Action | LS from CT WG3: LS on Clarification on Npcf_SMPolicyControl service | CT WG3 (C3-176376) | Postponed S2-180029 from S2#125. Response drafted in S2-181686. | REPLY OPEN | ||
6.5.6.2 | S2-181686 | LS OUT | Approval | [DRAFT] LS reply on Clarification on Npcf_SMPolicyControl service | Ericsson | Rel-15 | 5GS_Ph1 | Response to S2-181424. Revised in parallel session to S2-182887. | Revised |
6.5.6.2 | S2-182887 | LS OUT | Approval | [DRAFT] LS reply on Clarification on Npcf_SMPolicyControl service | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181686. Revised in parallel session to S2-182940. | Revised |
6.5.6.2 | S2-182940 | LS OUT | Approval | [DRAFT] LS reply on Clarification on Npcf_SMPolicyControl service | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182887. Revised to S2-183022. | Revised |
6.5.6.2 | S2-183022 | LS OUT | Approval | [DRAFT] LS reply on Clarification on Npcf_SMPolicyControl service | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182940. This was left for e-mail approval. | OPEN |
6.5.6.2 | S2-181801 | DISCUSSION | Approval | Policy authorization triggers | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.6.2 | S2-181786 | DISCUSSION | Endorsement | Discussion on optimizations for PCF services | Oracle, ZTE, Ericsson, Sandvine, Openet | Rel-15 | Noted in parallel session. | Noted | |
6.5.6.2 | S2-181689 | CR | Approval | 23.503 CR0020: Clarification on the handling of event triggers | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182461. | Revised |
6.5.6.2 | S2-182461 | CR | Approval | 23.503 CR0020R1: Clarification on the handling of event triggers | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181689. Revised in parallel session to S2-182928. | Revised |
6.5.6.2 | S2-182928 | CR | Approval | 23.503 CR0020R2: Clarification on the handling of event triggers | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182461. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181705 | CR | Approval | 23.502 CR0106: Update to PCF-SMF interface: the Npcf_PDUSessionPolicy service | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-181788 and S2-182155, to S2-182462. | Revised |
6.5.6.2 | S2-182462 | CR | Approval | 23.502 CR0106R1: Update to PCF-SMF interface: the Npcf_PDUSessionPolicy service | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181705, merging S2-181788 and S2-182155. Revised in parallel session to S2-182529. | Revised |
6.5.6.2 | S2-182529 | CR | Approval | 23.502 CR0106R2: Update to PCF-SMF interface: the Npcf_PDUSessionPolicy service | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182462. Revised in parallel session to S2-182876. | Revised |
6.5.6.2 | S2-182876 | CR | Approval | 23.502 CR0106R3: Update to PCF-SMF interface: the Npcf_PDUSessionPolicy service | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182529. Revised in parallel session to S2-182943. | Revised |
6.5.6.2 | S2-182943 | CR | Approval | 23.502 CR0106R4: Update to PCF-SMF interface: the Npcf_PDUSessionPolicy service | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182876. Revised to S2-183001. | Revised |
6.5.6.2 | S2-183001 | CR | Approval | 23.502 CR0106R5: Update to PCF-SMF interface: the Npcf_PDUSessionPolicy service | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182943. Revised to S2-183023. | Revised |
6.5.6.2 | S2-183023 | CR | Approval | 23.502 CR0106R6: Update to PCF-SMF interface: the Npcf_PDUSessionPolicy service | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-183001. Revised to S2-183027. | Revised |
6.5.6.2 | S2-183027 | CR | Approval | 23.502 CR0106R7: Update to PCF-SMF interface: the Npcf_PDUSessionPolicy service | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-183023. This CR was agreed. | Agreed |
6.5.6.2 | S2-181787 | CR | Approval | 23.502 CR0122: Update of Npcf_SMPolicyControl service | Oracle, ZTE, Ericsson, Sandvine, Openet | Rel-15 | 5GS_Ph1 | No CR number. Revised in parallel session to S2-182463. | Revised |
6.5.6.2 | S2-182463 | CR | Approval | 23.502 CR0122R1: Update of Npcf_SMPolicyControl service | Oracle, ZTE, Ericsson, Sandvine, Openet | Rel-15 | 5GS_Ph1 | Revision of S2-181787. Revised in parallel session to S2-182929. | Revised |
6.5.6.2 | S2-182929 | CR | Approval | 23.502 CR0122R2: Update of Npcf_SMPolicyControl service | Oracle, ZTE, Ericsson, Sandvine, Openet | Rel-15 | 5GS_Ph1 | Revision of S2-182463. Revised in parallel session to S2-182937. | Revised |
6.5.6.2 | S2-182937 | CR | Approval | 23.502 CR0122R3: Update of Npcf_SMPolicyControl service | Oracle, ZTE, Ericsson, Sandvine, Openet | Rel-15 | 5GS_Ph1 | Revision of S2-182929. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181788 | CR | Approval | 23.502 CR0123: Update of Session Management Policy Establishment procedure | Oracle, ZTE, Ericsson, Sandvine, Openet | Rel-15 | 5GS_Ph1 | No CR number. Merged into S2-182462. | Merged |
6.5.6.2 | S2-182155 | CR | Approval | 23.502 CR0218: Clarify policy update procedures | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Merged into S2-182462. | Merged |
6.5.6.2 | S2-182261 | DISCUSSION | Agreement | Comments to S2-181787 and S2-181788 | Deutsche Telekom AG | Rel-15 | Withdrawn (not provided). | Withdrawn | |
6.5.6.2 | S2-182553 | LS In | Action | LS from CT WG3: LS on Questions on Events related to Service Data Flows in the Nsmf_EventExposure service | CT WG3 (C3-181219) | Rel-15 | 5GS_Ph1 | Postponed | Postponed |
- | - | - | - | Other topics | - | - | - | - | - |
6.5.6.2 | S2-181545 | CR | Approval | 23.502 CR0039: Update of PCF behavior for background data transfer | KDDI, TOYOTA ITC | Rel-15 | 5GS_Ph1 | Merged into S2-182466. | Merged |
6.5.6.2 | S2-182024 | CR | Approval | 23.502 CR0188: Activating a Background Data Transfer Policy | Convida Wireless LLC, Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-181545, to S2-182466. | Revised |
6.5.6.2 | S2-182466 | CR | Approval | 23.502 CR0188R1: Activating a Background Data Transfer Policy | Convida Wireless LLC, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182024, merging S2-181545. Revised in parallel session to S2-182930. Remove highlights. In step 4, change: 'the PCF may retrieve it from the UDR' to 'the PCF shall retrieve it from the UDR'. | Revised |
6.5.6.2 | S2-182930 | CR | Approval | 23.502 CR0188R2: Activating a Background Data Transfer Policy | Convida Wireless LLC, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182466. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181546 | CR | Approval | 23.503 CR0003: Correction of background data transfer for TS 23.503 | KDDI | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182467. Fix the cover sheet | Revised |
6.5.6.2 | S2-182467 | CR | Approval | 23.503 CR0003R1: Correction of background data transfer for TS 23.503 | KDDI | Rel-15 | 5GS_Ph1 | Revision of S2-181546. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181643 | CR | Approval | 23.501 CR0058: Moving Network Analytics functionality into 23.501 | Ericsson, KDDI, AT&T | Rel-15 | 5GS_Ph1 | Revision of not handled DRAFTCR S2-180078. Revised in parallel session to S2-182468. Remove the last sentence of the 1st change. Fix the cover page | Revised |
6.5.6.2 | S2-182468 | CR | Approval | 23.501 CR0058R1: Moving Network Analytics functionality into 23.501 | Ericsson, KDDI, AT&T | Rel-15 | 5GS_Ph1 | Revision of S2-181643. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181646 | CR | Approval | 23.503 CR0016: Moving Network Analytics functionality into 23.501 | Ericsson, KDDI, AT&T | Rel-15 | 5GS_Ph1 | Revision of not handled DRAFTCR S2-180080. Revised in parallel session to S2-182469. | Revised |
6.5.6.2 | S2-182469 | CR | Approval | 23.503 CR0016R1: Moving Network Analytics functionality into 23.501 | Ericsson, KDDI, AT&T | Rel-15 | 5GS_Ph1 | Revision of S2-181646. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181699 | CR | Approval | 23.502 CR0102: Update the Npcf_Policy Authorization Create Service Definition | Cisco Systems | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.6.2 | S2-181700 | CR | Approval | 23.502 CR0103: Npcf_Policy Authorization Delete Service Description Correction | Cisco Systems | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.6.2 | S2-181792 | CR | Approval | 23.503 CR0024: AF subscription to network events and events reporting | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182471. | Revised |
6.5.6.2 | S2-182471 | CR | Approval | 23.503 CR0024R1: AF subscription to network events and events reporting | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181792. Revised in parallel session to S2-182931. | Revised |
6.5.6.2 | S2-182931 | CR | Approval | 23.503 CR0024R2: AF subscription to network events and events reporting | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182471. Revised in parallel session to S2-182942. Change' event trigger' to 'policy control request trigger' Remove highlights. | Revised |
6.5.6.2 | S2-182942 | CR | Approval | 23.503 CR0024R3: AF subscription to network events and events reporting | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182931. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181795 | CR | Approval | 23.502 CR0126: PCF subscribes to AMF events for SM policies | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.6.2 | S2-182078 | CR | Approval | 23.503 CR0029: PCF subscribes to AMF events for SM policies | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.6.2 | S2-181935 | CR | Approval | 23.503 CR0025: Corrections to description of session management related policy enforcement | Ericsson | Rel-15 | 5GS_Ph1 | Revision of unhandled DRAFTCR S2-180408. Revised in parallel session to S2-182522. | Revised |
6.5.6.2 | S2-182522 | CR | Approval | 23.503 CR0025R1: Corrections to description of session management related policy enforcement | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181935. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182148 | CR | Approval | 23.502 CR0216: Clean up for PCC related flows | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182523. | Revised |
6.5.6.2 | S2-182523 | CR | Approval | 23.502 CR0216R1: Clean up for PCC related flows | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182148. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182150 | CR | Approval | 23.503 CR0032: Clarification on enforcement of Application Detection Control | Huawei | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182524. | Revised |
6.5.6.2 | S2-182524 | CR | Approval | 23.503 CR0032R1: Clarification on enforcement of Application Detection Control | Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182150. Revised in parallel session to S2-182932. Remove the highlights. | Revised |
6.5.6.2 | S2-182932 | CR | Approval | 23.503 CR0032R2: Clarification on enforcement of Application Detection Control | Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182524. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182151 | CR | Approval | 23.501 CR0160: Clarification on Area of Interest for Presence Area Reporting | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-181796, to S2-182525. | Revised |
6.5.6.2 | S2-182525 | CR | Approval | 23.501 CR0160R1: Clarification on Area of Interest for Presence Area Reporting | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182151, merging S2-181796. Revised in parallel session to S2-182933. | Revised |
6.5.6.2 | S2-182933 | CR | Approval | 23.501 CR0160R2: Clarification on Area of Interest for Presence Area Reporting | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182525. Revised in parallel session to S2-182938. Fix editorial comments. | Revised |
6.5.6.2 | S2-182938 | CR | Approval | 23.501 CR0160R3: Clarification on Area of Interest for Presence Area Reporting | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182933. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-181796 | CR | Approval | 23.501 CR0096: 23.501: Add the description on the support of PRA | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of postponed DRAFTCR S2-180269. No CR number. Merged into S2-182525. | Merged |
6.5.6.2 | S2-182152 | CR | Approval | 23.503 CR0033: Resolve the Editor's Note on Presence Reporting Area | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182526. | Revised |
6.5.6.2 | S2-182526 | CR | Approval | 23.503 CR0033R1: Resolve the Editor's Note on Presence Reporting Area | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182152. Revised in parallel session to S2-182934. Delete 'The AMF may activate or deactivate the reporting for the PRAs as specified in TS 23.501 [2].' Reinstate NOTE 3. | Revised |
6.5.6.2 | S2-182934 | CR | Approval | 23.503 CR0033R2: Resolve the Editor's Note on Presence Reporting Area | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182526. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182153 | CR | Approval | 23.501 CR0161: Correction to Providing AF request to multiple PCFs | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182527. | Revised |
6.5.6.2 | S2-182527 | CR | Approval | 23.501 CR0161R1: Correction to Providing AF request to multiple PCFs | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182153. Revised in parallel session to S2-182935. | Revised |
6.5.6.2 | S2-182935 | CR | Approval | 23.501 CR0161R2: Correction to Providing AF request to multiple PCFs | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182527. Revised in parallel session to S2-182939. Remove the highlights. | Revised |
6.5.6.2 | S2-182939 | CR | Approval | 23.501 CR0161R3: Correction to Providing AF request to multiple PCFs | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182935. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182154 | CR | Approval | 23.503 CR0034: Update of event trigger section | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182528. | Revised |
6.5.6.2 | S2-182528 | CR | Approval | 23.503 CR0034R1: Update of event trigger section | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182154. Revised in parallel session to S2-182936. Remove Word comments. | Revised |
6.5.6.2 | S2-182936 | CR | Approval | 23.503 CR0034R2: Update of event trigger section | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182528. Agreed in parallel session. Block approved. | Agreed |
6.5.6.2 | S2-182156 | CR | Approval | 23.502 CR0219: Editorial modifications in procedures related to PDU session anchor addition or removal | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | - | - | - | 3GPP access specific functionality and flows | - | - | {Frank} | - | - |
6.5.7.1 | S2-181979 | CR | Approval | 23.501 CR0121: Aligning the use of Access Control | Vencore Labs, OEC, AT&T | Rel-15 | 5GS_Ph1 | Merged into S2-182777. UAC | Merged |
6.5.7.1 | S2-181578 | CR | Approval | 23.501 CR0036: Update Paging Policy Differentiation | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180675. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.7.1 | S2-181579 | CR | Approval | 23.502 CR0057: Update Paging Policy Differentiation in Network triggered Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180676. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.7.1 | S2-181622 | CR | Approval | 23.502 CR0065: Resolution of ENs in Service Request procedures | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181192. Agreed in parallel session. Block approved. As DCR? | Agreed |
6.5.7.1 | S2-181492 | CR | Approval | 23.502 CR0012: Multiple request of Location Reporting for Area of Interest | Samsung | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181149. Agreed in parallel session. Block approved. As DCR? | Agreed |
6.5.7.1 | S2-181495 | CR | Approval | 23.501 CR0013: Paging Policy Differentiation correction | CATT | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181144. Agreed in parallel session. Block approved. As DCR? Rev1? | Agreed |
6.5.7.1 | S2-181558 | CR | Approval | 23.502 CR0046: Cleanup of the service request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181279. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.7.1 | S2-181561 | CR | Approval | 23.502 CR0048: Update of handover cancel procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181138. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.7.1 | S2-181563 | CR | Approval | 23.501 CR0033: Control of the Messages triggering Paging at AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181141. Agreed in parallel session. Block approved. As DCR? | Agreed |
6.5.7.1 | S2-181564 | CR | Approval | 23.502 CR0049: Control of the Messages triggering Paging at AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181402. Revised, merging S2-182815, to S2-182861. As DCR? | Revised |
6.5.7.1 | S2-182861 | CR | Approval | 23.502 CR0049R1: Control of the Messages triggering Paging at AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181564, merging S2-182815. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-181565 | CR | Approval | 23.502 CR0050: Clarification for Area of validity in NW triggered SR procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181147. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.7.1 | S2-181618 | CR | Approval | 23.501 CR0051: NAS congestion control update | Ericsson | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180239. Agreed in parallel session. Block approved. As DCR? | Agreed |
6.5.7.1 | S2-181871 | CR | Approval | 23.502 CR0156: Preservation of GBR QoS Flows upon redirection | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180387. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.7.1 | S2-181938 | CR | Approval | 23.502 CR0167: Correction for UE location in Xn based HO procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181139. Revised to S2-182778. As DCR, cover sheet | Revised |
6.5.7.1 | S2-182778 | CR | Approval | 23.502 CR0167R1: Correction for UE location in Xn based HO procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-181938. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-182011 | CR | Approval | 23.502 CR0185: Service Request procedure corrections | Vodafone | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181308. Agreed in parallel session. Block approved. As DCR? | Agreed |
6.5.7.1 | S2-182221 | CR | Approval | 23.501 CR0180: Update of Mobility Restrictions | Lenovo, Motorola Mobility | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180737. Revised to S2-182780. As DCR, cat D? | Revised |
6.5.7.1 | S2-182780 | CR | Approval | 23.501 CR0180R1: Update of Mobility Restrictions | Lenovo, Motorola Mobility | Rel-15 | 5GS_Ph1 | Revision of S2-182221. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-181515 | CR | Approval | 23.502 CR0027: Update to N2 Handover procedure | CATT | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182816. N2 HOV | Revised |
6.5.7.1 | S2-182816 | CR | Approval | 23.502 CR0027R1: Update to N2 Handover procedure | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-181515. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-181991 | CR | Approval | 23.502 CR0176: Clarification on handover procedure for home-routed roaming scenario | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182779. N2 HOV | Revised |
6.5.7.1 | S2-182779 | CR | Approval | 23.502 CR0176R1: Clarification on handover procedure for home-routed roaming scenario | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181991. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-181993 | CR | Approval | 23.502 CR0177: Correction to inter NG-RAN node N2 based handover | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. N2 HOV | Agreed |
6.5.7.1 | S2-181997 | CR | Approval | 23.502 CR0179: Correction on N4 Session Modification Request in Handover procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182781. Xn HOV, LADN | Revised |
6.5.7.1 | S2-182781 | CR | Approval | 23.502 CR0179R1: Correction on N4 Session Modification Request in Handover procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181997. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-181976 | CR | Approval | 23.502 CR0169: Procedures to support paging priority handling | Vencore Labs, OEC, AT&T | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182815. Paging prio | Revised |
6.5.7.1 | S2-182815 | CR | Approval | 23.502 CR0169R1: Procedures to support paging priority handling | Vencore Labs, OEC, AT&T | Rel-15 | 5GS_Ph1 | Revision of S2-181976. Merged into S2-182861. | Merged |
6.5.7.1 | S2-181998 | CR | Approval | 23.502 CR0180: Correction on Service Request procedure when UE establishes a signalling connection only | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised to S2-182782. SR | Revised |
6.5.7.1 | S2-182782 | CR | Approval | 23.502 CR0180R1: Correction on Service Request procedure when UE establishes a signalling connection only | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181998. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-182008 | CR | Approval | 23.502 CR0183: Aligning 23.502 onto 29.244 about PPD | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. SR PPD | Agreed |
6.5.7.1 | S2-182014 | CR | Approval | 23.502 CR0186: New cause for UP reactivation failure in Service Request procedure | InterDigital Inc. | Rel-15 | 5GS_Ph1 | Revised to S2-182783. SR reactivation | Revised |
6.5.7.1 | S2-182783 | CR | Approval | 23.502 CR0186R1: New cause for UP reactivation failure in Service Request procedure | InterDigital Inc. | Rel-15 | 5GS_Ph1 | Revision of S2-182014. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-182020 | CR | Approval | 23.502 CR0187: Rejection of UP activation during the Registration procedure | InterDigital Communications | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182817. Registration reactivation | Revised |
6.5.7.1 | S2-182817 | CR | Approval | 23.502 CR0187R1: Rejection of UP activation during the Registration procedure | InterDigital Communications | Rel-15 | 5GS_Ph1 | Revision of S2-182020. Revised to S2-182896. | Revised |
6.5.7.1 | S2-182896 | CR | Approval | 23.502 CR0187R2: Rejection of UP activation during the Registration procedure | InterDigital Communications | Rel-15 | 5GS_Ph1 | Revision of S2-182817. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-181999 | CR | Approval | 23.502 CR0181: Clarify how to send end marker during HO procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182818. End marker | Revised |
6.5.7.1 | S2-182818 | CR | Approval | 23.502 CR0181R1: Clarify how to send end marker during HO procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181999. Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-182100 | CR | Approval | 23.501 CR0148: Service reject when UE is in Non-Allowed area | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Noted in parallel session. Non-allowed area | Noted |
6.5.7.1 | S2-182103 | CR | Approval | 23.502 CR0208: Reject Cause in Service Accept message | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Noted in parallel session. Activation. It is assumed that stage 3 has to manage the different error cases | Noted |
6.5.7.1 | S2-182110 | CR | Approval | 23.501 CR0152: Clarification on RRM Description | Samsung | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
6.5.7.1 | S2-181868 | DISCUSSION | Approval | Paging cause to the UE | Qualcomm Incorporated, Intel | Rel-15 | 5GS_Ph1 | Noted in parallel session. Paging cause | Noted |
6.5.7.1 | S2-181869 | LS OUT | Approval | [DRAFT] LS on Paging cause from RAN to UE | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Not Handled Paging cause | Not Handled |
6.5.7.5 | - | - | - | RRC_inactive related | - | - | {Frank} | - | - |
6.5.7.5 | S2-181562 | CR | Approval | 23.501 CR0032: Clarification of the interworking between 5G and GERAN/UTRAN/E-UTRAN when UE is in RRC-inactive state. | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180876. WITHDRAWN. As DCR | Withdrawn |
6.5.7.5 | S2-181679 | CR | Approval | 23.501 CR0068: CN assistance information enhancement | NEC, Sony | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181403. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.7.5 | S2-182048 | CR | Approval | 23.501 CR0136: Clarification on location reporting for LADN in RRC Inactive clause 5.3.3.2.5 - TS 23.501 | ETRI | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180595. Revised in parallel session to S2-182748. As DCR, cat C? Cat F, IEs with upper case | Revised |
6.5.7.5 | S2-182748 | CR | Approval | 23.501 CR0136R1: Clarification on location reporting for LADN in RRC Inactive clause 5.3.3.2.5 - TS 23.501 | ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-182048. Agreed in parallel session. Block approved. | Agreed |
6.5.7.5 | S2-182051 | CR | Approval | 23.502 CR0192: Location reporting procedure for LADN in RRC Inactive state - TS 23.502 | ETRI | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181235. Revised in parallel session to S2-182749. As DCR, cat C? Cat F, IEs with upper case | Revised |
6.5.7.5 | S2-182749 | CR | Approval | 23.502 CR0192R1: Location reporting procedure for LADN in RRC Inactive state - TS 23.502 | ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-182051. Agreed in parallel session. Block approved. | Agreed |
6.5.7.5 | S2-182238 | CR | Approval | 23.501 CR0184: Clarification of the interworking between 5G and GERAN/UTRAN/E-UTRAN when UE is in RRC-inactive state. | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180876. Revised in parallel session to S2-182757. Further changed DCR? | Revised |
6.5.7.5 | S2-182757 | CR | Approval | 23.501 CR0184R1: Clarification of the interworking between 5G and GERAN/UTRAN/E-UTRAN when UE is in RRC-inactive state. | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182238. Revised in parallel session to S2-182824. | Revised |
6.5.7.5 | S2-182824 | CR | Approval | 23.501 CR0184R2: Clarification of the interworking between 5G and GERAN/UTRAN/E-UTRAN when UE is in RRC-inactive state. | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182757. Agreed in parallel session. Block approved. | Agreed |
6.5.7.5 | S2-181912 | CR | Approval | 23.501 CR0177: 23.501: UE specific DRX parameters for CM-CONNECTED with Inactive state | OPPO | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182750. | Revised |
6.5.7.5 | S2-182750 | CR | Approval | 23.501 CR0177R1: 23.501: UE specific DRX parameters for CM-CONNECTED with Inactive state | OPPO | Rel-15 | 5GS_Ph1 | Revision of S2-181912. Agreed in parallel session. Block approved. | Agreed |
6.5.7.5 | S2-181994 | CR | Approval | 23.502 CR0178: Clarification of the AN release condition in AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | 23.501, not 23.502 CR!. Revised in parallel session to S2-182822. | Revised |
6.5.7.5 | S2-182822 | CR | Approval | 23.501 CR0195: Clarification of the AN release condition in AMF | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181994. New CR number: 0195. Withdrawn (not provided). | Withdrawn |
6.5.7.5 | S2-181995 | CR | Approval | 23.501 CR0126: Clarification on NAS recovery procedure in RRC Inactive | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182823. | Revised |
6.5.7.5 | S2-182823 | CR | Approval | 23.501 CR0126R1: Clarification on NAS recovery procedure in RRC Inactive | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181995. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | - | - | - | Specific services support | - | - | {Puneet} | - | - |
- | - | - | - | Voice/Emergency | - | - | - | - | - |
6.5.8 | S2-181637 | CR | Approval | 23.502 CR0077: EPS Fallback for voice | Ericsson, Charter Communications, Comcast, Huawei, ZTE, Nokia | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181211. Noted in parallel session. | Noted |
6.5.8 | S2-181756 | CR | Approval | 23.501 CR0086: Fixes for Emergency Services and Emergency Services using Fallback | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180890. Revised in parallel session to S2-182304. | Revised |
6.5.8 | S2-182304 | CR | Approval | 23.501 CR0086R1: Fixes for Emergency Services and Emergency Services using Fallback | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181756. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181757 | CR | Approval | 23.502 CR0112: Fixes for Emergency Services using Fallback procedure | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180891. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181773 | CR | Approval | 23.501 CR0092: Corrections to Emergency Services | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181372. Merged into S2-182305. | Merged |
6.5.8 | S2-181469 | CR | Approval | 23.501 CR0008: Correction to Emergency Fallback | MediaTek Inc. | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-181773, S2-181774 and S2-181648, to S2-182305. | Revised |
6.5.8 | S2-182305 | CR | Approval | 23.501 CR0008R1: Correction to Emergency Fallback | MediaTek Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181469, merging S2-181773, S2-181774 and S2-181648. Revised in parallel session to S2-182376. | Revised |
6.5.8 | S2-182376 | CR | Approval | 23.501 CR0008R2: Correction to Emergency Fallback | MediaTek Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182305. This CR was agreed. | Agreed |
6.5.8 | S2-181539 | CR | Approval | 23.502 CR0036: Clarification on the Emergency HO indication for EPS fallback | ZTE | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181220. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181879 | CR | Approval | 23.167 CR0325: Addition of Emergency Services Support using Fallback to Domain Selection Rules | Qualcomm Incorporated, MediaTek Inc., Nokia, Nokia Shanghai Bell, Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182306. | Revised |
6.5.8 | S2-182306 | CR | Approval | 23.167 CR0325R1: Addition of Emergency Services Support using Fallback to Domain Selection Rules | Qualcomm Incorporated, MediaTek Inc., Nokia, Nokia Shanghai Bell, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181879. Revised in parallel session to S2-182377. | Revised |
6.5.8 | S2-182377 | CR | Approval | 23.167 CR0325R2: Addition of Emergency Services Support using Fallback to Domain Selection Rules | Qualcomm Incorporated, MediaTek Inc., Nokia, Nokia Shanghai Bell, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182306. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181690 | CR | Approval | 23.501 CR0071: Interworking without N26 related corrections | Ericsson | Rel-15 | 5GS_Ph1 | Revised to S2-182288. | Revised |
6.5.8 | S2-182288 | CR | Approval | 23.501 CR0071R1: Interworking without N26 related corrections | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181690. LATE DOC: Revised in parallel session to S2-182308. | Revised |
6.5.8 | S2-182308 | CR | Approval | 23.501 CR0071R2: Interworking without N26 related corrections | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182288. Revised in parallel session to S2-182378. | Revised |
6.5.8 | S2-182378 | CR | Approval | 23.501 CR0071R3: Interworking without N26 related corrections | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182308. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181691 | CR | Approval | 23.502 CR0099: Interworking without N26 related corrections | Ericsson | Rel-15 | 5GS_Ph1 | Revised to S2-182289. | Revised |
6.5.8 | S2-182289 | CR | Approval | 23.502 CR0099R1: Interworking without N26 related corrections | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181691. LATE DOC: Revised in parallel session to S2-182309. | Revised |
6.5.8 | S2-182309 | CR | Approval | 23.502 CR0099R2: Interworking without N26 related corrections | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182289. Revised in parallel session to S2-182379. | Revised |
6.5.8 | S2-182379 | CR | Approval | 23.502 CR0099R3: Interworking without N26 related corrections | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182309. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181636 | CR | Approval | 23.501 CR0055: EPS Fallback for voice | Ericsson, Charter Communications, Comcast, Huawei, ZTE | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181210. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181692 | DRAFTCR | Approval | 23.502: EPS Fallback for voice further enhancements | Ericsson | Rel-15 | 5GS_Ph1 | Should be a CR for this meeting. Revised as CR to S2-182290. | Revised |
6.5.8 | S2-182290 | CR | Approval | 23.502 CR0234: 23.502: EPS Fallback for voice further enhancements | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-181692. LATE DOC: Revised in parallel session to S2-182303. | Revised |
6.5.8 | S2-182303 | CR | Approval | 23.502 CR0234R1: 23.502: EPS Fallback for voice further enhancements | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182290. Revised in parallel session to S2-182380. | Revised |
6.5.8 | S2-182380 | CR | Approval | 23.502 CR0234R2: 23.502: EPS Fallback for voice further enhancements | Ericsson, Charter Communications, Qualcomm Inc., Nokia, Nokia Shanghai Bell, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182303. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181648 | CR | Approval | 23.501 CR0059: Correction on conditions for service request for emergency services fallback | Vivo | Rel-15 | 5GS_Ph1 | Merged into S2-182305. | Merged |
6.5.8 | S2-181649 | CR | Approval | 23.502 CR0082: Call flow for the PDU session setup for emergency with Emergency Service Support indicator | Vivo | Rel-15 | 5GS_Ph1 | Will be checked offline if anything can be agreed. Revised in parallel session to S2-182375. | Revised |
6.5.8 | S2-182375 | CR | Approval | 23.502 CR0082R1: Call flow for the PDU session setup for emergency with Emergency Service Support indicator | Vivo | Rel-15 | 5GS_Ph1 | Revision of S2-181649. Revised in parallel session to S2-182381. | Revised |
6.5.8 | S2-182381 | CR | Approval | 23.502 CR0082R2: Call flow for the PDU session setup for emergency with Emergency Service Support indicator | Vivo | Rel-15 | 5GS_Ph1 | Revision of S2-182375. This CR was agreed. | Agreed |
6.5.8 | S2-181720 | CR | Approval | 23.501 CR0077: Correction to the use of Redirection in EPS fallback for emergency services | Intel | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182310. | Revised |
6.5.8 | S2-182310 | CR | Approval | 23.501 CR0077R1: Correction to the use of Redirection in EPS fallback for emergency services | Intel | Rel-15 | 5GS_Ph1 | Revision of S2-181720. This CR was agreed. | Agreed |
6.5.8 | S2-181774 | CR | Approval | 23.501 CR0093: Emergency Services Fallback | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Merged into S2-182305. | Merged |
6.5.8 | S2-181934 | CR | Approval | 23.501 CR0170: Emergency Services Support indication per RAT | OPPO, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182307. | Revised |
6.5.8 | S2-182307 | CR | Approval | 23.501 CR0170R1: Emergency Services Support indication per RAT | OPPO, Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181934. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181830 | CR | Approval | 23.501 CR0101: Adding UE Emergency EPS fallback capability to network | ZTE | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.8 | S2-181831 | CR | Approval | 23.502 CR0141: Adding UE Emergency EPS fallback capability to network | ZTE | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.8 | S2-181650 | CR | Approval | 23.501 CR0060: Indicating IMS voice over PS session supported W.R.T. the HO attach capability of the UE | Vivo | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.8 | S2-181873 | CR | Approval | 23.501 CR0107: UE Core Network Capability handling | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182334. | Revised |
6.5.8 | S2-182334 | CR | Approval | 23.501 CR0107R1: UE Core Network Capability handling | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-181873. Revised in parallel session to S2-182382. | Revised |
6.5.8 | S2-182382 | CR | Approval | 23.501 CR0107R2: UE Core Network Capability handling | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182334. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181872 | CR | Approval | 23.502 CR0157: Handling of UE Core Network Capability and indication of UE support for Handover Attach to NG-RAN | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182335. | Revised |
6.5.8 | S2-182335 | CR | Approval | 23.502 CR0157R1: Handling of UE Core Network Capability and indication of UE support for Handover Attach to NG-RAN | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-181872. Revised in parallel session to S2-182385. | Revised |
6.5.8 | S2-182385 | CR | Approval | 23.502 CR0157R2: Handling of UE Core Network Capability and indication of UE support for Handover Attach to NG-RAN | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182335. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181884 | CR | Approval | 23.501 CR0112: Returning back to NG-RAN in case of EPS Fallback -23.501 | OPPO | Rel-15 | 5GS_Ph1 | No CR number. Noted in parallel session. CR# is 0112; coversheet needs to be fixed. | Noted |
6.5.8 | S2-181886 | CR | Approval | 23.501 CR0113: Returning back to NG-RAN in case of EPS fallback - 23502 | OPPO | Rel-15 | 5GS_Ph1 | No CR number. 23.502, not 23.501 CR!. Noted in parallel session. | Noted |
6.5.8 | S2-182065 | CR | Approval | 23.501 CR0140: Supporting Fast Return to 5GS after EPS fallback - TS 23.501 | Intel, Huawei | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.8 | S2-182066 | CR | Approval | 23.502 CR0198: Supporting Fast Return to 5GS after EPS fallback - TS 23.502 | Intel | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
- | - | - | - | SMS | - | - | - | - | - |
6.5.8 | S2-181980 | CR | Approval | 23.502 CR0171: Correction of UDR usage in specific service related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182336. | Revised |
6.5.8 | S2-182336 | CR | Approval | 23.502 CR0171R1: Correction of UDR usage in specific service related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-181980. Revised in parallel session to S2-182386. | Revised |
6.5.8 | S2-182386 | CR | Approval | 23.502 CR0171R2: Correction of UDR usage in specific service related procedures | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182336. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181501 | CR | Approval | 23.501 CR0016: Adding the new clause about SMSF selection | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180301. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181521 | CR | Approval | 23.502 CR0030: Clarification on SMS related Subscription data | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181217. Revised in parallel session to S2-182337. | Revised |
6.5.8 | S2-182337 | CR | Approval | 23.502 CR0030R1: Clarification on SMS related Subscription data | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-181521. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181599 | CR | Approval | 23.502 CR0062: SMSF address deactivation and activation in AMF | China Mobile | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180355. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181600 | CR | Approval | 23.502 CR0063: Correction on SMSF Nsmsf_SMService_Activate service operation | China Mobile | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180356. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181816 | CR | Approval | 23.501 CR0099: Removal of MT SMS domain selection by SMSF | LG Electronics, Charter Communications | Rel-15 | 5GS_Ph1 | Noted. | Noted |
6.5.8 | S2-181817 | CR | Approval | 23.502 CR0135: Removal of MT SMS domain selection by SMSF | LG Electronics, Charter Communications | Rel-15 | 5GS_Ph1 | Noted. | Noted |
6.5.8 | S2-181597 | CR | Approval | 23.204 CR0109R1: MT SMS domain selection by IP-SM-GW | LG Electronics | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181978 | CR | Approval | 23.204 CR0110: Addition of description on SMSF address | Huawei | Rel-15 | 5GS_Ph1 | Revised in S2-182256. | Revised |
6.5.8 | S2-182256 | CR | Approval | 23.204 CR0110R1: Addition of description on SMSF address | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181978. Revised in parallel session to S2-182338. | Revised |
6.5.8 | S2-182338 | CR | Approval | 23.204 CR0110R2: Addition of description on SMSF address | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182256. This CR was agreed. | Agreed |
6.5.8 | S2-181818 | CR | Approval | 23.502 CR0136: Clarification on SMSF registration/deregistration with UDM | LG Electronics | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | IMS | - | - | - | - | - |
6.5.8 | S2-181613 | CR | Approval | 23.501 CR0046: Homogeneous support for IMS voice over PS Session supported indication | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180424. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181619 | CR | Approval | 23.501 CR0052: Complete of IMS Emergency support in 5G including slice and local numbers | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181214. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181628 | CR | Approval | 23.502 CR0071: Correction/cleanup of IMS Emergency support | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180866. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181601 | CR | Approval | 23.502 CR0064: Update on UE context in AMF to support query for terminating domain selection for IMS voice | China Mobile | Rel-15 | 5GS_Ph1 | Postponed in parallel session. | Postponed |
6.5.8 | S2-181874 | CR | Approval | 23.167 CR0324: Delivery of local emergency numbers in NAS | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182339. Change CR cat to 'F' | Revised |
6.5.8 | S2-182339 | CR | Approval | 23.167 CR0324R1: Delivery of local emergency numbers in NAS | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-181874. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181875 | CR | Approval | 23.501 CR0108: ECall over IMS supported over E-UTRA only | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | T-ADS related | - | - | - | - | - |
6.5.8 | S2-181718 | DISCUSSION | Discussion | T-ADS with dual registered UE, discussion | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.8 | S2-181876 | DISCUSSION | Approval | Way Forward on T-ADS for Dual Registration UEs | Qualcomm Incorporated, Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.8 | S2-181936 | CR | Approval | 23.501 CR0119: T-ADS with dual registered UE | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of unhandled DRAFTCR S2-180747. No CR number. Not Handled | Not Handled |
6.5.8 | S2-181877 | CR | Approval | 23.501 CR0109: Domain selection for UE in Dual Registration mode | Qualcomm Incorporated, Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182341. | Revised |
6.5.8 | S2-182341 | CR | Approval | 23.501 CR0109R1: Domain selection for UE in Dual Registration mode | Qualcomm Incorporated, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181877. Revised in parallel session to S2-182383. | Revised |
6.5.8 | S2-182383 | CR | Approval | 23.501 CR0109R2: Domain selection for UE in Dual Registration mode | Qualcomm Incorporated, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182341. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-181878 | CR | Approval | 23.228 CR1188: IMS registration procedures for UE in Dual Registration mode | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182342. | Revised |
6.5.8 | S2-182342 | CR | Approval | 23.228 CR1188R1: IMS registration procedures for UE in Dual Registration mode | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-181878. Revised in parallel session to S2-182384. | Revised |
6.5.8 | S2-182384 | CR | Approval | 23.228 CR1188R2: IMS registration procedures for UE in Dual Registration mode | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182342. Agreed in parallel session. Block approved. | Agreed |
6.5.8 | S2-182262 | CR | Approval | 23.221 CR0176: T-ADS for UE operating in Dual Registration mode | Intel | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
- | - | - | - | LCS | - | - | - | - | - |
6.5.8 | S2-181630 | CR | Approval | 23.502 CR0073: LCS Correction of identities | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180870. Revised in parallel session to S2-182340. Change SA WG2 WG2 to SA WG2 in the coversheet | Revised |
6.5.8 | S2-182340 | CR | Approval | 23.502 CR0073R1: LCS Correction of identities | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181630. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | - | - | - | Interworking and Migration | - | - | {Irfan} | - | - |
- | - | - | - | Approved draftCRs from SA2#125 | - | - | - | - | - |
6.5.9 | S2-181511 | CR | Approval | 23.502 CR0023: Sending EBI to the NG-RAN | CATT | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180649. Revised in parallel session to S2-182649. | Revised |
6.5.9 | S2-182649 | CR | Approval | 23.502 CR0023R1: Sending EBI to the NG-RAN | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-181511. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181512 | CR | Approval | 23.502 CR0024: Indirect data forwarding in home routed roaming case | CATT | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180805. Revised in parallel session to S2-182650. | Revised |
6.5.9 | S2-182650 | CR | Approval | 23.502 CR0024R1: Indirect data forwarding in home routed roaming case | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-181512. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181513 | CR | Approval | 23.502 CR0025: Interaction between SMF and UPF during the inter-system change | CATT | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180806. Revised in parallel session to S2-182651. | Revised |
6.5.9 | S2-182651 | CR | Approval | 23.502 CR0025R1: Interaction between SMF and UPF during the inter-system change | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-181513. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181536 | CR | Approval | 23.502 CR0034: Slicing handling for EPS to 5GS Mobility without N26 | ZTE | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180640. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181537 | CR | Approval | 23.502 CR0035: Keeping EBI transfer alignment | ZTE | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180780. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181538 | CR | Approval | 23.501 CR0023: Clean up on the interworking without 26 indication | ZTE | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180791. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181592 | CR | Approval | 23.502 CR0059: Update Handover procedures in clause 4.11.1.2 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180794. Revised in S2-182108. | Revised |
6.5.9 | S2-182108 | CR | Approval | 23.502 CR0059R1: Update Handover procedures in clause 4.11.1.2 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181592. Revised in parallel session to S2-182652. | Revised |
6.5.9 | S2-182652 | CR | Approval | 23.502 CR0059R2: Update Handover procedures in clause 4.11.1.2 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182108. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181593 | CR | Approval | 23.502 CR0060: Clean up FFSs in 4.11.1.2.2 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180812. Revised in S2-182107. | Revised |
6.5.9 | S2-182107 | CR | Approval | 23.502 CR0060R1: Clean up FFSs in 4.11.1.2.2 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181593. Revised in parallel session to S2-182653. | Revised |
6.5.9 | S2-182653 | CR | Approval | 23.502 CR0060R2: Clean up FFSs in 4.11.1.2.2 | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182107. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181594 | CR | Approval | 23.502 CR0061: A new annex for session parameters mapping from EPS to 5GS | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180807. Revised in S2-182098. | Revised |
6.5.9 | S2-182098 | CR | Approval | 23.502 CR0061R1: A new annex for session parameters mapping from EPS to 5GS | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181594. Revised in parallel session, merging S2-181663, to S2-182654. | Revised |
6.5.9 | S2-182654 | CR | Approval | 23.502 CR0061R2: A new annex for session parameters mapping from EPS to 5GS | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182098, merging S2-181663. Revised in parallel session to S2-182684. | Revised |
6.5.9 | S2-182684 | CR | Approval | 23.502 CR0061R3: A new annex for session parameters mapping from EPS to 5GS | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182654. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181663 | CR | Approval | 23.502 CR0084: Clarification on the mapping between the GBR QoS flow and GBR didicated EPS bearer | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Merged into S2-182654. QoS mapping | Merged |
6.5.9 | S2-181754 | CR | Approval | 23.501 CR0084: EPC to 5GC Migration fixes for Option 7 | Nokia, Nokia Shanghai Bell, AT&T | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180797. Revised in parallel session to S2-182655. | Revised |
6.5.9 | S2-182655 | CR | Approval | 23.501 CR0084R1: EPC to 5GC Migration fixes for Option 7 | Nokia, Nokia Shanghai Bell, AT&T | Rel-15 | 5GS_Ph1 | Revision of S2-181754. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181755 | CR | Approval | 23.501 CR0085: EPS Interworking: 5G-S-TMSI derivation and context retrieval | Nokia, Nokia Shanghai Bell, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180799. Revised in parallel session to S2-182656. | Revised |
6.5.9 | S2-182656 | CR | Approval | 23.501 CR0085R1: EPS Interworking: 5G-S-TMSI derivation and context retrieval | Nokia, Nokia Shanghai Bell, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-181755. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181642 | CR | Approval | 23.502 CR0080: Clarifying inclusion of TAU messages in Registration Request | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180776. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181806 | CR | Approval | 23.502 CR0132: MME and AMF registration in HSS+UDM | Cisco | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180804. Revised in parallel session to S2-182658. | Revised |
6.5.9 | S2-182658 | CR | Approval | 23.502 CR0132R1: MME and AMF registration in HSS+UDM | Cisco | Rel-15 | 5GS_Ph1 | Revision of S2-181806. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-182089 | CR | Approval | 23.502 CR0203: Clarifications on EPS to 5GS handover procedure using N26 | China Mobile | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180811. Revised in parallel session to S2-182659. | Revised |
6.5.9 | S2-182659 | CR | Approval | 23.502 CR0203R1: Clarifications on EPS to 5GS handover procedure using N26 | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182089. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-182090 | CR | Approval | 23.502 CR0204: Request Type in PDN connectivity request for SRM interworking | Samsung | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180809. Revised in parallel session to S2-182660. | Revised |
6.5.9 | S2-182660 | CR | Approval | 23.502 CR0204R1: Request Type in PDN connectivity request for SRM interworking | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182090. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-182096 | CR | Approval | 23.501 CR0147: Selection of NAS procedures for E-UTRA | Samsung | Rel-15 | 5GS_Ph1 | Revision of postponed DRAFTCR S2-180077. Revised in parallel session, merging S2-181881, to S2-182663. | Revised |
6.5.9 | S2-182663 | CR | Approval | 23.501 CR0147R1: Selection of NAS procedures for E-UTRA | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182096, merging S2-181881. Revised in parallel session to S2-182685. | Revised |
6.5.9 | S2-182685 | CR | Approval | 23.501 CR0147R2: Selection of NAS procedures for E-UTRA | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182663. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-182251 | CR | Approval | 23.502 CR0231: 23.502 Clarification of mobility procedure from EPS to 5GS without N26 interface | Orange | Rel-15 | 5GS_Ph1 | Revision of revised DRAFTCR S2-180808 (revision in S2-181404 was approved). Revised in parallel session to S2-182645. | Revised |
6.5.9 | S2-182645 | CR | Approval | 23.502 CR0231R1: 23.502 Clarification of mobility procedure from EPS to 5GS without N26 interface | Orange | Rel-15 | 5GS_Ph1 | Revision of S2-182251. Merged into S2-182954. | Merged |
6.5.9 | S2-182281 | CR | Approval | 23.501 CR0192: Clarification of interworking procedures without N26 interface | Orange | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180790. Revised in parallel session to S2-182643. | Revised |
6.5.9 | S2-182643 | CR | Approval | 23.501 CR0192R1: Clarification of interworking procedures without N26 interface | Orange | Rel-15 | 5GS_Ph1 | Revision of S2-182281. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-182282 | CR | Approval | 23.501 CR0193: Clarification on the use of indicators for the support of interworking without N26 and interworking with N26 | Orange | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180814. Noted in parallel session. | Noted |
6.5.9 | S2-182644 | CR | Approval | 23.501 CR0194: Clarification on the use of indicator for the support of interworking without N26 | Orange | Rel-15 | 5GS_Ph1 | Created in parallel session. Revised in parallel session to S2-182686. | Revised |
6.5.9 | S2-182686 | CR | Approval | 23.501 CR0194R1: Clarification on the use of indicator for the support of interworking without N26 | Orange | Rel-15 | 5GS_Ph1 | Revision of S2-182644. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | General (with N26) | - | - | - | - | - |
6.5.9 | S2-181435 | LS In | Action | LS from CT WG1: LS on CN selection | CT WG1 (C1-180710) | Rel-15 | 5GS_Ph1-CT | Noted in parallel session. | Noted |
6.5.9 | S2-181881 | CR | Approval | 23.501 CR0111: Removal of NOTE related to camping on E-UTRA that connects to 5GC | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Merged into S2-182663. | Merged |
6.5.9 | S2-181744 | CR | Approval | 23.401 CR3395: Remove 5GS related impact from TS 23.401 | Ericsson | Rel-15 | 5GS_Ph1 | Merged into S2-182648. | Merged |
6.5.9 | S2-181808 | CR | Approval | 23.401 CR3398: Interworking aspects of EPS with 5GS are captured in 23.501 and 23.502 | Cisco Systems | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-181744 and S2-181835, to S2-182648. | Revised |
6.5.9 | S2-182648 | CR | Approval | 23.401 CR3398R1: Interworking aspects of EPS with 5GS are captured in 23.501 and 23.502 | Cisco Systems | Rel-15 | 5GS_Ph1 | Revision of S2-181808, merging S2-181744 and S2-181835. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181835 | CR | Approval | 23.401 CR3401: Removing the EPS enhancement for the 5GS and adding a new clause to clarify the EPS enhancement is in the 5G spec. | ZTE | Rel-15 | 5GS_Ph1 | Merged into S2-182648. | Merged |
6.5.9 | S2-181743 | CR | Approval | 23.502 CR0111: Move 5GS related impact from TS 23.401 to TS 23.502 | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-181896, to S2-182646. | Revised |
6.5.9 | S2-182646 | CR | Approval | 23.502 CR0111R1: Move 5GS related impact from TS 23.401 to TS 23.502 | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181743, merging S2-181896. Revised in parallel session to S2-182687. | Revised |
6.5.9 | S2-182687 | CR | Approval | 23.502 CR0111R2: Move 5GS related impact from TS 23.401 to TS 23.502 | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182646. Revised in parallel session to S2-182954. | Revised |
6.5.9 | S2-182954 | CR | Approval | 23.502 CR0111R3: Move 5GS related impact from TS 23.401 to TS 23.502 | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182687. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-182142 | CR | Approval | 23.502 CR0215: Capturing impacts to 23.401 procedure for interworking with 5GC | Cisco Systems Belgium | Rel-15 | 5GS_Ph1 | LATE DOC: Rx 26/02, 02:40. Revised in parallel session to S2-182647. | Revised |
6.5.9 | S2-182647 | CR | Approval | 23.502 CR0215R1: Capturing impacts to 23.401 procedure for interworking with 5GC | Cisco Systems Belgium | Rel-15 | 5GS_Ph1 | Revision of S2-182142. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181982 | CR | Approval | 23.501 CR0122: User Plane management to support interworking with EPS | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182664. Tunnel information | Revised |
6.5.9 | S2-182664 | CR | Approval | 23.501 CR0122R1: User Plane management to support interworking with EPS | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181982. Revised in parallel session to S2-182689. | Revised |
6.5.9 | S2-182689 | CR | Approval | 23.501 CR0122R2: User Plane management to support interworking with EPS | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-182664. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181765 | CR | Approval | 23.501 CR0090: Partitioning of Identifier space to ensure success of Context retrieval for EPS Interworking | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182665. GUMMEI conflict | Revised |
6.5.9 | S2-182665 | CR | Approval | 23.501 CR0090R1: Partitioning of Identifier space to ensure success of Context retrieval for EPS Interworking | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181765. Agreed in parallel session. Block approved. Network sharing impacts, if missing, to be captured in next meeting | Agreed |
- | - | - | - | With N26 both directions | - | - | - | - | - |
6.5.9 | S2-181478 | CR | Approval | 23.502 CR0009: QoS clarifications for EPC interworking | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182662. DCR. QoS Delete | Revised |
6.5.9 | S2-182662 | CR | Approval | 23.502 CR0009R1: QoS clarifications for EPC interworking | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-181478. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181514 | CR | Approval | 23.502 CR0026: Direct forwarding flag for handover from EPS to 5GS | CATT | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182683. Data forwarding | Revised |
6.5.9 | S2-182683 | CR | Approval | 23.502 CR0026R1: Direct forwarding flag for handover from EPS to 5GS | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-181514. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | With N26 4G -> 5G | - | - | - | - | - |
6.5.9 | S2-182037 | DISCUSSION | Approval | EPS Interworking - Clarity SMF Registration | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Decision on this topic is expected to be taken on Monday of SA WG2#127. Noted in parallel session. UDM registration | Noted |
6.5.9 | S2-181772 | CR | Approval | 23.502 CR0118: EPS Interworking - Fixes for EPS to 5GS Mobility | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session, merging S2-181516, to S2-182666. V-SMF | Revised |
6.5.9 | S2-182666 | CR | Approval | 23.502 CR0118R1: EPS Interworking - Fixes for EPS to 5GS Mobility | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181772, merging S2-181516. Revised in parallel session to S2-182691. | Revised |
6.5.9 | S2-182691 | CR | Approval | 23.502 CR0118R2: EPS Interworking - Fixes for EPS to 5GS Mobility | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182666. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181477 | CR | Approval | 23.502 CR0008: Corrections to the Inter-system mobility procedures | NTT DOCOMO, LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182661. PDU Session to activated. V-SMF correction | Revised |
6.5.9 | S2-182661 | CR | Approval | 23.502 CR0008R2: Corrections to the Inter-system mobility procedures | NTT DOCOMO, LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-181477. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181516 | CR | Approval | 23.502 CR0028: Clarification on inter-system change from EPS to 5GS | CATT | Rel-15 | 5GS_Ph1 | Merged into S2-182666. V-SMF | Merged |
6.5.9 | S2-181771 | CR | Approval | 23.502 CR0117: EPS Interworking - Fixes for EPS->5GS HO | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182667. V-SMF | Revised |
6.5.9 | S2-182667 | CR | Approval | 23.502 CR0117R1: EPS Interworking - Fixes for EPS->5GS HO | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181771. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181749 | CR | Approval | 23.502 CR0149: Correction of handover procedure from 4G to 5G in Single Registration mode | ORANGE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182668. Editorial | Revised |
6.5.9 | S2-182668 | CR | Approval | 23.502 CR0149R1: Correction of handover procedure from 4G to 5G in Single Registration mode | ORANGE | Rel-15 | 5GS_Ph1 | Revision of S2-181749. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | With N26 5G -> 4G | - | - | - | - | - |
6.5.9 | S2-181479 | CR | Approval | 23.502 CR0010: EPS bearer ID allocation update | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181769 | CR | Approval | 23.502 CR0115: EPS Interworking - EPS Bearer ID allocation for HR session | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182670. EBI allocation | Revised |
6.5.9 | S2-182670 | CR | Approval | 23.502 CR0115R1: EPS Interworking - EPS Bearer ID allocation for HR session | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181769. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181834 | CR | Approval | 23.502 CR0144: Modification on the EBI revocation and ARP change | ZTE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182673. EBI withdraw | Revised |
6.5.9 | S2-182673 | CR | Approval | 23.502 CR0144R1: Modification on the EBI revocation and ARP change | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181834. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-182255 | CR | Approval | 23.501 CR0188: EPS bearer context handling for N26 case | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | This is a 23.502 CR! Revised in parallel session as a new 23.502 CR to S2-182672. EBI allocation+ Tunnel | Revised |
6.5.9 | S2-182672 | CR | Approval | 23.502 CR0238: EPS bearer context handling for N26 case | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182255. Revised in parallel session to S2-182690. | Revised |
6.5.9 | S2-182690 | CR | Approval | 23.502 CR0238R1: EPS bearer context handling for N26 case | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182672. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181710 | CR | Approval | 23.502 CR0108: Handling of mapped EPS QoS parameters in IWK with EPC | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182674. QoS mapping | Revised |
6.5.9 | S2-182674 | CR | Approval | 23.502 CR0108R1: Handling of mapped EPS QoS parameters in IWK with EPC | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181710. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181833 | CR | Approval | 23.502 CR0143: Clarification on the SM EPS bearer context from v-SMF | ZTE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182671. V-SMF | Revised |
6.5.9 | S2-182671 | CR | Approval | 23.502 CR0143R1: Clarification on the SM EPS bearer context from v-SMF | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181833. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181519 | CR | Approval | 23.502 CR0029: Clarification on keeping NAS signalling connection | CATT | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182677. TAU related | Revised |
6.5.9 | S2-182677 | CR | Approval | 23.502 CR0029R1: Clarification on keeping NAS signalling connection | CATT | Rel-15 | 5GS_Ph1 | Revision of S2-181519. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181832 | CR | Approval | 23.502 CR0142: Clarification on how the AMF initiates inter or intra system handover to E-UTRAN connect to both EPC and 5GC. | ZTE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182678. Migration | Revised |
6.5.9 | S2-182678 | CR | Approval | 23.502 CR0142R1: Clarification on how the AMF initiates inter or intra system handover to E-UTRAN connect to both EPC and 5GC. | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181832. Revised in parallel session to S2-182692. | Revised |
6.5.9 | S2-182692 | CR | Approval | 23.502 CR0142R2: Clarification on how the AMF initiates inter or intra system handover to E-UTRAN connect to both EPC and 5GC. | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182678. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181880 | CR | Approval | 23.501 CR0110: MICO and interworking with EPC | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182679. Migration | Revised |
6.5.9 | S2-182679 | CR | Approval | 23.501 CR0110R1: MICO and interworking with EPC | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-181880. Revised in parallel session to S2-182953. | Revised |
6.5.9 | S2-182953 | CR | Approval | 23.501 CR0110R2: MICO and interworking with EPC | Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182679. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181770 | CR | Approval | 23.502 CR0116: EPS Interworking - Fixes for 5GS->EPS HO | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182680. V-SMF. Data forwarding | Revised |
6.5.9 | S2-182680 | CR | Approval | 23.502 CR0116R1: EPS Interworking - Fixes for 5GS->EPS HO | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181770. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181800 | CR | Approval | 23.502 CR0127: 23.502 Correction on 5GS to EPS handover using N26 interface | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182669. Editorial | Revised |
6.5.9 | S2-182669 | CR | Approval | 23.502 CR0127R1: 23.502 Correction on 5GS to EPS handover using N26 interface | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181800. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181664 | CR | Approval | 23.502 CR0085: Update 5GS and EPS handover procedures | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182681. Editorial | Revised |
6.5.9 | S2-182681 | CR | Approval | 23.502 CR0085R1: Update 5GS and EPS handover procedures | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181664. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181768 | CR | Approval | 23.502 CR0114: EPS Interworking - Fixes for 5GS to EPS Mobility | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182682. TAU related | Revised |
6.5.9 | S2-182682 | CR | Approval | 23.502 CR0114R1: EPS Interworking - Fixes for 5GS to EPS Mobility | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181768. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | Without N26 | - | - | - | - | - |
6.5.9 | S2-181682 | CR | Approval | 23.501 CR0070: Inter-PLMN mobility when N26 is not used | Intel | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. TAU , E-PLMN | Agreed |
6.5.9 | S2-181809 | DISCUSSION | Discussion | Discussion on session handling for interworking without N26 | LG Electronics | Rel-15 | 5GS_Ph1 | Noted in parallel session. Indication support IWK. Proposed way forward: UE tries in EPC and learns by failure. | Noted |
6.5.9 | S2-181810 | CR | Approval | 23.501 CR0098: Session handling for interworking without N26 | LG Electronics | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.9 | S2-181811 | CR | Approval | 23.502 CR0134: Session handling for interworking without N26 | LG Electronics | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.5.9 | S2-181693 | CR | Approval | 23.502 CR0100: Different Corrections of text and references | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182675. | Revised |
6.5.9 | S2-182675 | CR | Approval | 23.502 CR0100R1: Different Corrections of text and references | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181693. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181829 | CR | Approval | 23.502 CR0140: Clarification and alignment on the NG-RAN behavoir for EPS/RAT fallback | ZTE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182676. | Revised |
6.5.9 | S2-182676 | CR | Approval | 23.502 CR0140R1: Clarification and alignment on the NG-RAN behavoir for EPS/RAT fallback | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181829. Agreed in parallel session. Block approved. | Agreed |
6.5.9 | S2-181896 | CR | Approval | 23.502 CR0161: Adding text to empty General clause | Ericsson | Rel-15 | 5GS_Ph1 | Merged into S2-182646. Editorial | Merged |
6.5.10 | - | - | - | Non-3GPP access specific functionality and flows | - | - | {Krisztian} | - | - |
- | - | - | - | Incoming LS | - | - | - | - | - |
6.5.10 | S2-181484 | LS In | Action | LS from RAN WG3: Reply LS on supporting non-3GPP access in NGAP | RAN WG3 (R3-180639) | Rel-15 | NR_newRAT-Core | Response drafted in S2-182013. Final response in S2-182535 | Replied to |
6.5.10 | S2-182013 | LS OUT | Approval | [DRAFT] Reply LS on supporting non-3GPP access in NGAP | Nokia, Nokia Shanghai Bell | Rel-15 | NR_newRAT-Core | Response to S2-181484. Revised in parallel session to S2-182485. | Revised |
6.5.10 | S2-182485 | LS OUT | Approval | Reply LS on supporting non-3GPP access in NGAP | SA WG2 | Rel-15 | NR_newRAT-Core | Revision of S2-182013. Revised in parallel session to S2-182535. Remove rev marks. | Revised |
6.5.10 | S2-182535 | LS OUT | Approval | Reply LS on supporting non-3GPP access in NGAP | SA WG2 | Rel-15 | NR_newRAT-Core | Revision of S2-182485. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | Approved DCRs | - | - | - | - | - |
6.5.10 | S2-181497 | CR | Approval | 23.502 CR0015: Clarification on 5G-GUTI in EPS to 5GS Mobility Registration Procedure using N26 | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181380. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181498 | CR | Approval | 23.502 CR0016: Adding missing text about UE policies related to Service Request including the List Of Allowed PDU Sessions | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180948. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181508 | CR | Approval | 23.502 CR0021: Clarification on handover applicability between 3GPP and non-3GPP accesses | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-180947. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181509 | CR | Approval | 23.502 CR0022: Clarification on paging when it is related with both 3GPP and non-3GPP PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181019. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181566 | CR | Approval | 23.502 CR0051: Revision on Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181026. Wrong CR number! Revised in parallel session to S2-182486. | Revised |
6.5.10 | S2-182486 | CR | Approval | 23.502 CR0051R1: Revision on Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181566. Revised in parallel session to S2-182536. Remove change on change. initiates -> initiate. | Revised |
6.5.10 | S2-182536 | CR | Approval | 23.502 CR0051R2: Revision on Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182486. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181567 | CR | Approval | 23.501 CR0034: Alighnment with TS23.502 on Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181027. Wrong CR number! Revised in parallel session to S2-182487. | Revised |
6.5.10 | S2-182487 | CR | Approval | 23.501 CR0034R1: Alighnment with TS23.502 on Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181567. Revised in parallel session to S2-182537. Fix cover page. | Revised |
6.5.10 | S2-182537 | CR | Approval | 23.501 CR0034R2: Alighnment with TS23.502 on Service Request procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182487. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181640 | CR | Approval | 23.502 CR0079: Specification of AN Parameters for Non-3GPP Access | Motorola Mobility, Lenovo | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180930. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181641 | CR | Approval | 23.501 CR0057: Corrections to Combined N3IWF/ePDG Selection | Motorola Mobility, Lenovo, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180931. Revised in parallel session to S2-182500. | Revised |
6.5.10 | S2-182500 | CR | Approval | 23.501 CR0057R1: Corrections to Combined N3IWF/ePDG Selection | Motorola Mobility, Lenovo, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-181641. Revised in parallel session to S2-182538. | Revised |
6.5.10 | S2-182538 | CR | Approval | 23.501 CR0057R2: Corrections to Combined N3IWF/ePDG Selection | Motorola Mobility, Lenovo, Qualcomm Incorporated | Rel-15 | 5GS_Ph1 | Revision of S2-182500. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-182116 | CR | Approval | 23.501 CR0153: Editorial corrections in clause 5.3.2.4 Support of a UE registered over both 3GPP and Non-3GPP access | ETRI | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181014. Revised in parallel session to S2-182488. | Revised |
6.5.10 | S2-182488 | CR | Approval | 23.501 CR0153R1: Editorial corrections in clause 5.3.2.4 Support of a UE registered over both 3GPP and Non-3GPP access | ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-182116. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-182119 | CR | Approval | 23.502 CR0212: Updating Network Triggered Service Request to support selective re-activation of PDU session over non-3GPP access | ETRI | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181021. Revised in parallel session to S2-182489. | Revised |
6.5.10 | S2-182489 | CR | Approval | 23.502 CR0212R1: Updating Network Triggered Service Request to support selective re-activation of PDU session over non-3GPP access | ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-182119. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | Registration | - | - | - | - | - |
6.5.10 | S2-181722 | DISCUSSION | Discussion | Discussion on alignment of non-3GPP & 3GPP registration procedures | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.10 | S2-181723 | CR | Approval | 23.502 CR0109: Alignment of non-3GPP & 3GPP registration procedures | Nokia, Nokia Shanghai Bell, Motorola Mobility, Lenovo | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182512. | Revised |
6.5.10 | S2-182512 | CR | Approval | 23.502 CR0109R1: Alignment of non-3GPP & 3GPP registration procedures | Nokia, Nokia Shanghai Bell, Motorola Mobility, Lenovo | Rel-15 | 5GS_Ph1 | Revision of S2-181723. Revised in parallel session to S2-182539. | Revised |
6.5.10 | S2-182539 | CR | Approval | 23.502 CR0109R2: Alignment of non-3GPP & 3GPP registration procedures | Nokia, Nokia Shanghai Bell, Motorola Mobility, Lenovo | Rel-15 | 5GS_Ph1 | Revision of S2-182512. Revised in parallel session to S2-182870. In step 13, replace 'any NAS' with 'the NAS Registration Accept'. | Revised |
6.5.10 | S2-182870 | CR | Approval | 23.502 CR0109R3: Alignment of non-3GPP & 3GPP registration procedures | Nokia, Nokia Shanghai Bell, Motorola Mobility, Lenovo | Rel-15 | 5GS_Ph1 | Revision of S2-182539. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181819 | CR | Approval | 23.502 CR0137: UDM for Registration procedure for untrusted non-3GPP access | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182513. Delete 'new' in front of 'AMF'. Move the new sentence to the bottom. | Revised |
6.5.10 | S2-182513 | CR | Approval | 23.502 CR0137R1: UDM for Registration procedure for untrusted non-3GPP access | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-181819. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | Location | - | - | - | - | - |
6.5.10 | S2-181721 | CR | Approval | 23.501 CR0078: Network Provided Location for non-3GPP access | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182514. | Revised |
6.5.10 | S2-182514 | CR | Approval | 23.501 CR0078R1: Network Provided Location for non-3GPP access | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181721. Revised in parallel session to S2-182540. | Revised |
6.5.10 | S2-182540 | CR | Approval | 23.501 CR0078R2: Network Provided Location for non-3GPP access | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182514. Agreed in parallel session. Block approved. | Agreed |
- | - | - | - | Session Management | - | - | - | - | - |
6.5.10 | S2-182045 | DISCUSSION | Discussion | Discussion on paging for DL signaling associated with non-3GPP PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.10 | S2-182046 | CR | Approval | 23.501 CR0135: DL signalling handling for non-3GPP PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182515. | Revised |
6.5.10 | S2-182515 | CR | Approval | 23.501 CR0135R1: DL signalling handling for non-3GPP PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-182046. Revised in parallel session to S2-182866. Fix typo on cover sheet. | Revised |
6.5.10 | S2-182866 | CR | Approval | 23.501 CR0135R2: DL signalling handling for non-3GPP PDU Session | LG Electronics | Rel-15 | 5GS_Ph1 | Revision of S2-182515. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-182516 | LS OUT | Approval | [DRAFT] LS on downlink signalling pending over non-3GPP access | SA WG2 | Rel-15 | 5GS_Ph1 | Created in parallel session. Revised in parallel session to S2-182867. | Revised |
6.5.10 | S2-182867 | LS OUT | Approval | [DRAFT] Reply LS on 5G service request procedure | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182516. Revised in parallel session to S2-182869. | Revised |
6.5.10 | S2-182869 | LS OUT | Approval | [DRAFT] Reply LS on 5G service request procedure | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182867. Revised in parallel session to S2-182871. | Revised |
6.5.10 | S2-182871 | LS OUT | Approval | [DRAFT] Reply LS on 5G service request procedure | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182869. Revised to S2-183024. | Revised |
6.5.10 | S2-183024 | LS OUT | Approval | Reply LS on 5G service request procedure | SA WG2 | Rel-15 | 5GS_Ph1 | Revision of S2-182871. Approved. | Approved |
6.5.10 | S2-181929 | CR | Approval | 23.501 CR0118: Update of NW-triggered Service Request for N3GPP-only PDU session | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.10 | S2-181930 | CR | Approval | 23.502 CR0164: Update of NW-triggered Service Request for N3GPP-only PDU session | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.10 | S2-182120 | CR | Approval | 23.502 CR0213: Editorial corrections in clause 4.2.3.3 Network Triggered Service Request | ETRI | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182517. Change to Cat F, remove 'editorial' from cover page | Revised |
6.5.10 | S2-182517 | CR | Approval | 23.502 CR0213R1: Editorial corrections in clause 4.2.3.3 Network Triggered Service Request | ETRI | Rel-15 | 5GS_Ph1 | Revision of S2-182120. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181931 | CR | Approval | 23.502 CR0165: Update of the Serivice Request Procedure | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.5.10 | S2-181937 | CR | Approval | 23.502 CR0166: Correction to the UE Requested PDU Session Establishment via Untrusted non-3GPP Access Procedure | Convida Wireless LLC, Ericsson | Rel-15 | 5GS_Ph1 | TD number error. Revised in parallel session to S2-182518. Remove highlight | Revised |
6.5.10 | S2-182518 | CR | Approval | 23.502 CR0166R1: Correction to the UE Requested PDU Session Establishment via Untrusted non-3GPP Access Procedure | Convida Wireless LLC, Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181937. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-182113 | CR | Approval | 23.502 CR0210: Correction on non-3GPP Service request procedure | Samsung | Rel-15 | 5GS_Ph1 | No CR number. Revised in parallel session to S2-182519. | Revised |
6.5.10 | S2-182519 | CR | Approval | 23.502 CR0210R1: Correction on non-3GPP Service request procedure | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182113. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-182114 | CR | Approval | 23.502 CR0211: Indication for Non-geographically selected AMF | Samsung | Rel-15 | 5GS_Ph1 | No CR number. Revised in parallel session to S2-182520. | Revised |
6.5.10 | S2-182520 | CR | Approval | 23.502 CR0211R1: Indication for Non-geographically selected AMF | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182114. Revised in parallel session to S2-182868. Fix 'consequences if not approved'. | Revised |
6.5.10 | S2-182868 | CR | Approval | 23.502 CR0211R2: Indication for Non-geographically selected AMF | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-182520. Agreed in parallel session. Block approved. | Agreed |
6.5.10 | S2-181826 | CR | Approval | 23.502 CR0139: Correction to handovers between 3GPP and non-3GPP | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182521. | Revised |
6.5.10 | S2-182521 | CR | Approval | 23.502 CR0139R1: Correction to handovers between 3GPP and non-3GPP | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181826. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | - | - | - | Framework functions | - | - | {Frank} | - | - |
6.5.11 | S2-181453 | CR | Approval | 23.502 CR0001: Corrections on the specification of Network Exposure services | Nokia, Nokia Shanghai Bell, ZTE,,? ? ? | Rel-15 | 5GS_Ph1 | Revision of approved draftCR S2-181268. Confirm sources. Revised in parallel session, merging S2-181804, to S2-182554. As DCR + further changes, cover | Revised |
6.5.11 | S2-182554 | CR | Approval | 23.502 CR0001R1: Corrections on the specification of Network Exposure services | Nokia, Nokia Shanghai Bell, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-181453, merging S2-181804. Revised, merging S2-182207, to S2-182790. | Revised |
6.5.11 | S2-182790 | CR | Approval | 23.502 CR0001R2: Corrections on the specification of Network Exposure services | Nokia, Nokia Shanghai Bell, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182554, merging S2-182207. Revised in parallel session to S2-182898. | Revised |
6.5.11 | S2-182898 | CR | Approval | 23.502 CR0001R3: Corrections on the specification of Network Exposure services | Nokia, Nokia Shanghai Bell, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182790. Revised to S2-182993. | Revised |
6.5.11 | S2-182993 | CR | Approval | 23.502 CR0001R4: Corrections on the specification of Network Exposure services | Nokia, Nokia Shanghai Bell, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182898. Revised to S2-183014. | Revised |
6.5.11 | S2-183014 | CR | Approval | 23.502 CR0001R5: Corrections on the specification of Network Exposure services | Nokia, Nokia Shanghai Bell, ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182993. This CR was agreed. | Agreed |
6.5.11 | S2-181504 | CR | Approval | 23.502 CR0019: Update of NEF service for background data transfer | KDDI, Convida Wireless LLC, TOYOTA ITC, Huawei | Rel-15 | 5GS_Ph1 | Revision of endorsed DraftCR S2-180071. Revised in parallel session to S2-182555. As DCR + further changes | Revised |
6.5.11 | S2-182555 | CR | Approval | 23.502 CR0019R1: Update of NEF service for background data transfer | KDDI, Convida Wireless LLC, TOYOTA ITC, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-181504. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181505 | CR | Approval | 23.502 CR0020: Update of NEF service for PFD management | KDDI, China Unicom | Rel-15 | 5GS_Ph1 | Revision of endorsed DraftCR S2-180072. Revised in parallel session to S2-182556. As endorsed DCR? Changes on changes | Revised |
6.5.11 | S2-182556 | CR | Approval | 23.502 CR0020R1: Update of NEF service for PFD management | KDDI, China Unicom | Rel-15 | 5GS_Ph1 | Revision of S2-181505. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181555 | CR | Approval | 23.501 CR0029: Clarification on Use of List of Parameter Values to Match in Event Filters | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181128. 23.502, not 23.501 CR!. Revised to S2-182557. As DCR | Revised |
6.5.11 | S2-182557 | CR | Approval | 23.502 CR0235: Clarification on Use of List of Parameter Values to Match in Event Filters | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181555. Revised to S2-182791. | Revised |
6.5.11 | S2-182791 | CR | Approval | 23.502 CR0235R1: Clarification on Use of List of Parameter Values to Match in Event Filters | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182557. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181556 | CR | Approval | 23.501 CR0030: Clarification on the services for External Parameter Provisioning | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181355. 23.502, not 23.501 CR!. Revised to S2-182558. As DCR | Revised |
6.5.11 | S2-182558 | CR | Approval | 23.502 CR0236: Clarification on the services for External Parameter Provisioning | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181556. Revised in parallel session to S2-182899. | Revised |
6.5.11 | S2-182899 | CR | Approval | 23.502 CR0236R1: Clarification on the services for External Parameter Provisioning | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182558. Revised in parallel session to S2-182903. Note becomes: NOTE: For non-roaming case and no authorisation or validation by the UDM required, the NEF can directly forward the external parameter to the UDR via Nudr_DM_Update Request message. And in this case, the UDR responds to NEF via Nudr_DM_Update Response message. | Revised |
6.5.11 | S2-182903 | CR | Approval | 23.502 CR0236R2: Clarification on the services for External Parameter Provisioning | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182899. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181557 | CR | Approval | 23.502 CR0045: Clarification on UDM service consumption order of UECM and SDM | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181134. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.11 | S2-181584 | CR | Approval | 23.502 CR0058: NEF service definitions for AF influence | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181356. Revised in parallel session to S2-182559. As DCR | Revised |
6.5.11 | S2-182559 | CR | Approval | 23.502 CR0058R1: NEF service definitions for AF influence | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181584. Revised to S2-182794. | Revised |
6.5.11 | S2-182794 | CR | Approval | 23.502 CR0058R2: NEF service definitions for AF influence | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182559. Revised in parallel session to S2-182900. Fix formatting | Revised |
6.5.11 | S2-182900 | CR | Approval | 23.502 CR0058R3: NEF service definitions for AF influence | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182794. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181624 | CR | Approval | 23.502 CR0067: Nudm SDM service Subscription Data types updates | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181132. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.11 | S2-181654 | CR | Approval | 23.501 CR0061: Clarification on UDR | Samsung, Deutsche Telekom | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180242. Revised in parallel session to S2-182560. As DCR | Revised |
6.5.11 | S2-182560 | CR | Approval | 23.501 CR0061R1: Clarification on UDR | Samsung, Deutsche Telekom | Rel-15 | 5GS_Ph1 | Revision of S2-181654. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181656 | CR | Approval | 23.501 CR0063: NF Service Discovery | Samsung, Huawei | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181269. Revised in parallel session to S2-182561. As DCR + changes, cat C? | Revised |
6.5.11 | S2-182561 | CR | Approval | 23.501 CR0063R1: NF Service Discovery | Samsung, Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-181656. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181657 | CR | Approval | 23.502 CR0083: NF Service Discovery Corrections in 23.502 | Samsung | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181127. Revised in parallel session to S2-182562. As DCR, cat C? | Revised |
6.5.11 | S2-182562 | CR | Approval | 23.502 CR0083R1: NF Service Discovery Corrections in 23.502 | Samsung | Rel-15 | 5GS_Ph1 | Revision of S2-181657. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181684 | CR | Approval | 23.502 CR0097: Update Service operation required imputs | OTD | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180179. Revised in parallel session to S2-182563. As DCR, WI code, cat, spec version, text format | Revised |
6.5.11 | S2-182563 | CR | Approval | 23.502 CR0097R1: Update Service operation required imputs | OTD | Rel-15 | 5GS_Ph1 | Revision of S2-181684. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181696 | CR | Approval | 23.501 CR0073: Non-roaming Architecture for Network Exposure Function in reference point representation | Intel | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-181354. Agreed in parallel session. Block approved. As DCR + changes | Agreed |
6.5.11 | S2-181702 | CR | Approval | 23.502 CR0104: Updates of NSSF Services | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of endorsed DRAFTCR S2-180706. Revised in parallel session to S2-182564. As DCR, cat | Revised |
6.5.11 | S2-182564 | CR | Approval | 23.502 CR0104R1: Updates of NSSF Services | NTT DOCOMO | Rel-15 | 5GS_Ph1 | Revision of S2-181702. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181805 | CR | Approval | 23.502 CR0131: Nudm_SDM 'Access and Mobility Subscription data' update | Ericsson | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. UDM data, collision | Agreed |
6.5.11 | S2-181758 | CR | Approval | 23.502 CR0113: Fixes for UDM/UDR services | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181133. Revised in parallel session to S2-182565. As DCR? | Revised |
6.5.11 | S2-182565 | CR | Approval | 23.502 CR0113R1: Fixes for UDM/UDR services | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181758. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181783 | CR | Approval | 23.502 CR0121: Update Nnrf_NFDiscovery service based on the UE IP address | China Mobile | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181405. No CR number. Revised in parallel session to S2-182566. As DCR, CR# ? | Revised |
6.5.11 | S2-182566 | CR | Approval | 23.502 CR0121R1: Update Nnrf_NFDiscovery service based on the UE IP address | China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-181783. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181804 | CR | Approval | 23.502 CR0130: Nudr_DM service operations input parameter (Subs/Notif) | Ericsson | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181268. Merged into S2-182554. As DCR? Merge? Changes on changes | Merged |
6.5.11 | S2-181847 | CR | Approval | 23.502 CR0148: Corrections to NRF and NSSF services | Telecom Italia, ZTE, Oracle, Huawei | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181267. Agreed in parallel session. Block approved. As DCR | Agreed |
6.5.11 | S2-181587 | CR | Approval | 23.501 CR0041: UDM discovery clarifications | Ericsson | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182567. As DCR, source to TSG | Revised |
6.5.11 | S2-182567 | CR | Approval | 23.501 CR0041R1: UDM discovery clarifications | Ericsson | Rel-15 | 5GS_Ph1 | Revision of S2-181587. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-182207 | CR | Approval | 23.502 CR0225: Clarification on subscription service for one time reporting | China Mobile | Rel-15 | 5GS_Ph1 | Merged into S2-182790. Exposure update | Merged |
6.5.11 | S2-181703 | CR | Approval | 23.501 CR0074: NSSF service update | NTT DOCOMO, Telecom Italia, ZTE, China Mobile | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182568. NSSF services | Revised |
6.5.11 | S2-182568 | CR | Approval | 23.501 CR0074R1: NSSF service update | NTT DOCOMO, Telecom Italia, ZTE, China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-181703. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181766 | CR | Approval | 23.501 CR0091: UDM Discovery with SUPI as input | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | TD number error. No CR number. Revised in parallel session to S2-182569. UDM disc, CR#, tdoc# | Revised |
6.5.11 | S2-182569 | CR | Approval | 23.501 CR0091R1: UDM Discovery with SUPI as input | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-181766. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181802 | CR | Approval | 23.502 CR0128: Nudm SDM service operations input parameter update | Ericsson, China Mobile | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182570. UDM services | Revised |
6.5.11 | S2-182570 | CR | Approval | 23.502 CR0128R1: Nudm SDM service operations input parameter update | Ericsson, China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-181802. Revised to S2-182792. | Revised |
6.5.11 | S2-182792 | CR | Approval | 23.502 CR0128R2: Nudm SDM service operations input parameter update | Ericsson, China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182570. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181803 | CR | Approval | 23.502 CR0129: Nudr_DM service operations input parameter update | Ericsson, China Mobile | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182601. UDR services | Revised |
6.5.11 | S2-182601 | CR | Approval | 23.502 CR0129R1: Nudr_DM service operations input parameter update | Ericsson, China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-181803. Revised to S2-182793. | Revised |
6.5.11 | S2-182793 | CR | Approval | 23.502 CR0129R2: Nudr_DM service operations input parameter update | Ericsson, China Mobile | Rel-15 | 5GS_Ph1 | Revision of S2-182601. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-181985 | CR | Approval | 23.502 CR0172: Correction for the invocation of Nudm_UECM_Deregistration service operation | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revised in S2-182195. | Revised |
6.5.11 | S2-182195 | CR | Approval | 23.502 CR0172R1: Correction for the invocation of Nudm_UECM_Deregistration service operation | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-181985. Revised in parallel session to S2-182602. UDM services, rev marks | Revised |
6.5.11 | S2-182602 | CR | Approval | 23.502 CR0172R2: Correction for the invocation of Nudm_UECM_Deregistration service operation | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | Revision of S2-182195. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-182055 | CR | Approval | 23.502 CR0193: Exposure of Mobility Events from AMF | ZTE | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182603. | Revised |
6.5.11 | S2-182603 | CR | Approval | 23.502 CR0193R1: Exposure of Mobility Events from AMF | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182055. Revised in parallel session to S2-182901. | Revised |
6.5.11 | S2-182901 | CR | Approval | 23.502 CR0193R2: Exposure of Mobility Events from AMF | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182603. Agreed in parallel session. Revised to S2-183004. | Revised |
6.5.11 | S2-183004 | CR | Approval | 23.502 CR0193R3: Exposure of Mobility Events from AMF | ZTE | Rel-15 | 5GS_Ph1 | Revision of S2-182901. This CR was agreed. | Agreed |
6.5.11 | S2-182141 | CR | Approval | 23.501 CR0157: SBA scope clarification | Huawei | Rel-15 | 5GS_Ph1 | Revised to S2-182789. | Revised |
6.5.11 | S2-182789 | CR | Approval | 23.501 CR0157R1: SBA scope clarification | Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182141. Revised in parallel session to S2-182902. | Revised |
6.5.11 | S2-182902 | CR | Approval | 23.501 CR0157R2: SBA scope clarification | Huawei | Rel-15 | 5GS_Ph1 | Revision of S2-182789. Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-182215 | CR | Approval | 23.502 CR0226: Clarification on Nnwdaf_EventsSubscription_Unsubscribe service operation | China Mobile | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
6.5.11 | S2-182217 | CR | Approval | 23.502 CR0227: Clarification on Network data analytics procedure | China Mobile | Rel-15 | 5GS_Ph1 | Agreed in parallel session. Block approved. | Agreed |
6.6 | - | - | - | Study on architecture enhancements for 3GPP support of advanced V2X services (FS_eV2XARC) | - | - | {LaeYoung} | - | - |
- | - | - | - | eV2X architecture | - | - | - | - | - |
6.6 | S2-182053 | P-CR | Approval | Variants of eV2X architecture for eV2X UE provisioning/authorization | Qualcomm Incorporated, LG Electronics, Intel | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-182572. | Revised |
6.6 | S2-182572 | P-CR | Approval | Variants of eV2X architecture for eV2X UE provisioning/authorization | Qualcomm Incorporated, LG Electronics, Intel | Rel-16 | FS_eV2XARC | Revision of S2-182053. Revised in parallel session to S2-182580. | Revised |
6.6 | S2-182580 | P-CR | Approval | Variants of eV2X architecture for eV2X UE provisioning/authorization | Qualcomm Incorporated, LG Electronics, Intel | Rel-16 | FS_eV2XARC | Revision of S2-182572. Agreed in parallel session. Block approved. | Approved |
6.6 | S2-182067 | P-CR | Approval | Alternative Architecture for 5GS V2X | Intel, LG Electronics | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-182573. | Revised |
6.6 | S2-182573 | P-CR | Approval | Alternative Architecture for 5GS V2X | Intel, LG Electronics | Rel-16 | FS_eV2XARC | Revision of S2-182067. This was left for e-mail approval. | OPEN |
6.6 | S2-182168 | P-CR | Approval | 5GS eV2X architecture discussion and proposal | ZTE | Rel-16 | FS_eV2XARC | Noted in parallel session. | Noted |
- | - | - | - | New key issues | - | - | - | - | - |
6.6 | S2-181746 | P-CR | Approval | Key issue of Service Authorization for eV2X over NR_Uu | Ericsson | Rel-16 | FS_eV2XARC | Revised in parallel session, merging S2-181954, to S2-182574. | Revised |
6.6 | S2-182574 | P-CR | Approval | Key issue of Service Authorization for eV2X over NR_Uu | Ericsson | Rel-16 | FS_eV2XARC | Revision of S2-181746, merging S2-181954. Agreed in parallel session. Block approved. | Approved |
6.6 | S2-181954 | P-CR | Approval | Extension of KI#5 to Uu reference point | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Merged into S2-182574. | Merged |
6.6 | S2-182050 | P-CR | Approval | New key issue for eV2X system migration and interworking | Qualcomm Incorporated, LG Electronics, Intel | Rel-16 | FS_eV2XARC | Revised in parallel session, merging S2-182167, to S2-182575. | Revised |
6.6 | S2-182575 | P-CR | Approval | New key issue for eV2X system migration and interworking | Qualcomm Incorporated, LG Electronics, Intel, ZTE | Rel-16 | FS_eV2XARC | Revision of S2-182050, merging S2-182167. Revised in parallel session to S2-182581. | Revised |
6.6 | S2-182581 | P-CR | Approval | New key issue for eV2X system migration and interworking | Qualcomm Incorporated, LG Electronics, Intel, ZTE | Rel-16 | FS_eV2XARC | Revision of S2-182575. This was left for e-mail approval. | OPEN |
6.6 | S2-182167 | P-CR | Approval | New key issue: 5GS eV2X system interworking with EPS | ZTE | Rel-16 | FS_eV2XARC | Merged into S2-182575. | Merged |
- | - | - | - | Updates to existing key issues | - | - | - | - | - |
6.6 | S2-181950 | P-CR | Approval | Clarification of Key Issue #3: QoS Support for eV2X over Uu interface | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-182576. | Revised |
6.6 | S2-182576 | P-CR | Approval | Clarification of Key Issue #3: QoS Support for eV2X over Uu interface | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-181950. Revised in parallel session to S2-182582. | Revised |
6.6 | S2-182582 | P-CR | Approval | Clarification of Key Issue #3: QoS Support for eV2X over Uu interface | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-182576. This was left for e-mail approval. | OPEN |
6.6 | S2-182023 | P-CR | Approval | Update to Key Issue # 4 | InterDigital Inc. | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-182577. | Revised |
6.6 | S2-182577 | P-CR | Approval | Update to Key Issue # 4 | InterDigital Inc. | Rel-16 | FS_eV2XARC | Revision of S2-182023. Agreed in parallel session. Block approved. | Approved |
6.6 | S2-181822 | P-CR | Approval | Update to key issue#10 | LG Electronics | Rel-16 | FS_eV2XARC | Agreed in parallel session. Block approved. | Approved |
6.6 | S2-181952 | P-CR | Approval | Extension of KI#10: V2X message transmission/reception over NR-Uu reference point | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-182583. | Revised |
6.6 | S2-182583 | P-CR | Approval | Extension of KI#10: V2X message transmission/reception over NR-Uu reference point | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-181952. This was left for e-mail approval. | OPEN |
- | - | - | - | Solutions for Key Issue #3 | - | - | - | - | - |
6.6 | S2-181948 | P-CR | Approval | Solution for eV2X QoS Support Key Issue | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revised in parallel session to S2-182578. | Revised |
6.6 | S2-182578 | P-CR | Approval | Solution for eV2X QoS Support Key Issue | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-181948. Revised in parallel session to S2-182584. | Revised |
6.6 | S2-182584 | P-CR | Approval | Solution for eV2X QoS Support Key Issue | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Revision of S2-182578. Agreed in parallel session. Block approved. | Approved |
6.6 | S2-181951 | P-CR | Approval | Solution for KI#3: Enhancements for QoS Monitoring and Control | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
- | - | - | - | Solution for Key Issue #4 | - | - | - | - | - |
6.6 | S2-182161 | P-CR | Approval | Solution for Key Issue #4: Re-use PPPP mechanism for enhanced V2X | Motorola Mobility, Lenovo | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
- | - | - | - | Solutions for Key Issue #5 | - | - | - | - | - |
6.6 | S2-181525 | P-CR | Approval | Solution on Service Authorization and Provisioning to UE | CATT | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-181745 | P-CR | Approval | Solutions for KI#5 and KI#6 Service Authorisation | Ericsson | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-182068 | P-CR | Approval | Solution for key issue #5 | Intel, LG Electronics | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-182252 | P-CR | Approval | Solution for KI#5: Service Provisioning to UE for eV2X communications | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
- | - | - | - | Solutions for Key Issue #6 | - | - | - | - | - |
6.6 | S2-181526 | P-CR | Approval | Solution on Service Authorization to NG-RAN | CATT | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-181820 | P-CR | Approval | Solution to key issue#6 | LG Electronics | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-182069 | P-CR | Approval | Solution for key issue #6 | Intel | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
- | - | - | - | Solution for Key Issue #7 | - | - | - | - | - |
6.6 | S2-181949 | P-CR | Approval | Clarification on Key Issue: Network Slicing for eV2X and initial solution | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
- | - | - | - | Solutions for Key Issue #8 | - | - | - | - | - |
6.6 | S2-181821 | P-CR | Approval | Solution to key issue#8 | LG Electronics, NTT DOCOMO | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.6 | S2-181953 | P-CR | Approval | Solution for KI#8: NEF Selection for Mobility Support | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | Not Handled | Not Handled |
6.7 | - | - | - | Study on the Wireless and Wireline Convergence for the 5G system architecture (FS_5WWC) | - | - | {Krisztian} | - | - |
- | - | - | - | Trusted Non-3GPP Access | - | - | - | - | - |
6.7 | S2-182124 | P-CR | Approval | New Key Issue for Trusted Non-3GPP Access: Support of UEs without NAS | Motorola Mobility, Lenovo | Rel-16 | FS_5WWC | Revised in parallel session to S2-182490. | Revised |
6.7 | S2-182490 | P-CR | Approval | New Key Issue for Trusted Non-3GPP Access: Support of UEs without NAS | Motorola Mobility, Lenovo | Rel-16 | FS_5WWC | Revision of S2-182124. Revised in parallel session to S2-182878. Delete 'non-3GPP access (primarily via'. Delete 'S2b, or S2c' | Revised |
6.7 | S2-182878 | P-CR | Approval | New Key Issue for Trusted Non-3GPP Access: Support of UEs without NAS | Motorola Mobility, Lenovo | Rel-16 | FS_5WWC | Revision of S2-182490. Agreed in parallel session. Block approved. | Approved |
6.7 | S2-181581 | P-CR | Approval | Support of Trusted Non-3GPP Access | Motorola Mobility, Lenovo, Broadcom | Rel-16 | FS_5WWC | Revised in parallel session to S2-182491. | Revised |
6.7 | S2-182491 | P-CR | Approval | Support of Trusted Non-3GPP Access | Motorola Mobility, Lenovo, Broadcom | Rel-16 | FS_5WWC | Revision of S2-181581. Agreed in parallel session. Block approved. | Approved |
6.7 | S2-181595 | P-CR | Approval | Update architecture for Trusted N3GPP Accesses | CATT | Rel-16 | FS_5WWC | Noted in parallel session. | Noted |
6.7 | S2-182200 | P-CR | Approval | Architectural Update for Trusted non-3GPP Access | Intel | Rel-16 | FS_5WWC | Revised in parallel session to S2-182492. | Revised |
6.7 | S2-182492 | P-CR | Approval | Architectural Update for Trusted non-3GPP Access | Intel | Rel-16 | FS_5WWC | Revision of S2-182200. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | General | - | - | - | - | - |
6.7 | S2-181917 | DISCUSSION | Discussion | Considerations on 5WWC SID | Huawei, HiSilicon | FS_5WWC | Noted in parallel session. | Noted | |
6.7 | S2-181918 | SID REVISED | Approval | 5WWC SID revision | Huawei | Rel-16 | FS_5WWC | Revised in parallel session to S2-182493 and handled under agenda item 7.1. | Revised |
6.7 | S2-181429 | LS In | Action | LS from BBF: 5G-FMC - First release of BBF study results | BBF (BBF LIAISE-120) | Postponed S2-180772 from S2#125. Responses drafted in S2-181920 and S2-181921. | REPLY OPEN | ||
6.7 | S2-181920 | LS OUT | Approval | [DRAFT] LS to BBF on general status of work | Huawei, Hisilicon | FS_5WWC | Response to S2-181429. Revised in parallel session to S2-182494. | Revised | |
6.7 | S2-182494 | LS OUT | Approval | [DRAFT] LS to BBF on general status of work | SA WG2 | - | FS_5WWC | Revision of S2-181920. Revised in parallel session to S2-182879. | Revised |
6.7 | S2-182879 | LS OUT | Approval | [DRAFT] LS to BBF on general status of work | SA WG2 | - | FS_5WWC | Revision of S2-182494. This was left for e-mail approval. | OPEN |
6.7 | S2-181921 | LS OUT | Approval | [DRAFT] LS to BBF on slicing | Huawei, Hisilicon | FS_5WWC | Response to S2-181429. Revised in parallel session to S2-182495. | Revised | |
6.7 | S2-182495 | LS OUT | Approval | [DRAFT] LS to BBF on slicing | Huawei, Hisilicon | - | FS_5WWC | Revision of S2-181921. This was left for e-mail approval. | OPEN |
6.7 | S2-182270 | P-CR | Approval | Definition of additional scenario principles | Deutsche Telekom AG | Rel-16 | FS_5WWC | Revised in parallel session, merging S2-181932, to S2-182496. | Revised |
6.7 | S2-182496 | P-CR | Approval | Definition of additional scenario principles | Deutsche Telekom AG | Rel-16 | FS_5WWC | Revision of S2-182270, merging S2-181932. Revised in parallel session to S2-182880. | Revised |
6.7 | S2-182880 | P-CR | Approval | Definition of additional scenario principles | Deutsche Telekom AG | Rel-16 | FS_5WWC | Revision of S2-182496. This was left for e-mail approval. | OPEN |
6.7 | S2-181932 | P-CR | Approval | Definition of scenario principles | Rapporteur (Huawei) | Rel-16 | FS_5WWC | Merged into S2-182496. | Merged |
- | - | - | - | Solution architecture | - | - | - | - | - |
6.7 | S2-181924 | P-CR | Approval | Solution #1: Architecture revision | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revised in parallel session to S2-182497. | Revised |
6.7 | S2-182497 | P-CR | Approval | Solution #1: Architecture revision | Huawei, HiSilicon | Rel-16 | FS_5WWC | Revision of S2-181924. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | NAS & registration | - | - | - | - | - |
6.7 | S2-181981 | P-CR | Approval | NAS and Security for 5G-RG on Wireline Access | Ericsson | Rel-16 | FS_5WWC | Revised in parallel session, merging S2-181919, to S2-182498. | Revised |
6.7 | S2-182498 | P-CR | Approval | NAS and Security for 5G-RG on Wireline Access | Ericsson | Rel-16 | FS_5WWC | Revision of S2-181981, merging S2-181919. Revised in parallel session to S2-182881. In step 6, delete 'EAP' and replace 'EAP method' with 'authentication method'. | Revised |
6.7 | S2-182881 | P-CR | Approval | NAS and Security for 5G-RG on Wireline Access | Ericsson | Rel-16 | FS_5WWC | Revision of S2-182498. Agreed in parallel session. Block approved. | Approved |
6.7 | S2-182117 | P-CR | Approval | Solution for 5G-RG Registration to 5GC | Motorola Mobility, Lenovo | Rel-16 | FS_5WWC | Revised in parallel session to S2-182499. | Revised |
6.7 | S2-182499 | P-CR | Approval | Solution for 5G-RG Registration to 5GC | Motorola Mobility, Lenovo | Rel-16 | FS_5WWC | Revision of S2-182117. Revised in parallel session to S2-182882. Add: Editor's Note: the protocol between the 5G-RG and the W-5GAN will be decided by BBF. Change '5G Access Gateway Function' to 'Fixed Access Gateway Function'. Replace 'TS 23.402' with 'TS 23.502'. | Revised |
6.7 | S2-182882 | P-CR | Approval | Solution for 5G-RG Registration to 5GC | Motorola Mobility, Lenovo | Rel-16 | FS_5WWC | Revision of S2-182499. Agreed in parallel session. Block approved. | Approved |
6.7 | S2-181922 | P-CR | Approval | Solution for KI#1 on NAS transport | Huawei, HiSilicon | Rel-16 | FS_5WWC | Noted in parallel session. | Noted |
6.7 | S2-181919 | P-CR | Approval | 5G-RG registration procedure | Huawei | Rel-16 | FS_5WWC | Merged into S2-182498. | Merged |
- | - | - | - | Solutions | - | - | - | - | - |
6.7 | S2-181530 | P-CR | Approval | 23.716 solutions: PDU Session Type | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5WWC | Noted in parallel session. | Noted |
6.7 | S2-181529 | P-CR | Approval | 23.716 solutions: IPV6 address allocation mechanisms for RGW | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-181531 | P-CR | Approval | 23.716 solutions: Support of IPTV | Nokia, Nokia Shanghai Bell | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-181926 | P-CR | Approval | KI#5: Registration Management | Huawei, HiSilicon | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-181927 | P-CR | Approval | KI#5: Connection Management | Huawei, HiSilicon | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-181925 | P-CR | Approval | KI#5: PDU session procedures | Huawei, HiSilicon | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-182193 | P-CR | Approval | Solution of Key Issue 5.2.9 for 5G-RG as a UE-to-Network Relay | Intel | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-181923 | P-CR | Approval | KI#5: handover solution for wireline AN | Huawei, HiSilicon | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.7 | S2-182196 | P-CR | Approval | Hybrid Access Transport Model for key issue 5.2.10 | Intel | Rel-16 | FS_5WWC | Not Handled | Not Handled |
6.8 | - | - | - | Study on Access Traffic Steering, Switch and Splitting support in the 5G system architecture (FS_ATSSS) | - | - | {Krisztian} | - | - |
- | - | - | - | General | - | - | - | - | - |
6.8 | S2-182202 | P-CR | Approval | Update for the references and abbreviations of ATSSS | China Telecom | Rel-16 | FS_ATSSS | Agreed in parallel session. Block approved. | Approved |
6.8 | S2-182041 | P-CR | Approval | ATSSS Architectural Assumptions - Homogenous support of ATSSS | LG Electronics | Rel-16 | FS_ATSSS | Noted in parallel session. | Noted |
- | - | - | - | Key Issues | - | - | - | - | - |
6.8 | S2-182122 | P-CR | Approval | Updates on Key Issue #3 and #4 | ETRI | Rel-16 | FS_ATSSS | Noted in parallel session. | Noted |
6.8 | S2-182203 | P-CR | Approval | Update on Key Issue 5: Multi-access PDU sessions | China Telecom | Rel-16 | FS_ATSSS | Revised in parallel session to S2-182501. | Revised |
6.8 | S2-182501 | P-CR | Approval | Update on Key Issue 5: Multi-access PDU sessions | China Telecom | Rel-16 | FS_ATSSS | Revision of S2-182203. Agreed in parallel session. Block approved. | Approved |
6.8 | S2-182016 | P-CR | Approval | Update on ATSSS Key Issue #5 | InterDigital Inc. | Rel-16 | FS_ATSSS | Noted in parallel session. | Noted |
6.8 | S2-182204 | P-CR | Approval | New Key Issue : Policy rule for ATSSS | China Telecom | Rel-16 | FS_ATSSS | Noted in parallel session. | Noted |
- | - | - | - | Update of existing solutions | - | - | - | - | - |
6.8 | S2-182039 | P-CR | Approval | Architectural Extension for ATSSS Solution 1 | Broadcom | Rel-16 | FS_ATSSS | Revised in parallel session to S2-182502. | Revised |
6.8 | S2-182502 | P-CR | Approval | Architectural Extension for ATSSS Solution 1 | Broadcom | Rel-16 | FS_ATSSS | Revision of S2-182039. Revised in parallel session to S2-182883. Replace '5G-NA' with '5G-AN' in 6.1.2.1. | Revised |
6.8 | S2-182883 | P-CR | Approval | Architectural Extension for ATSSS Solution 1 | Broadcom | Rel-16 | FS_ATSSS | Revision of S2-182502. Agreed in parallel session. Block approved. | Approved |
6.8 | S2-182099 | P-CR | Approval | ATSSS architecture updates | Samsung | Rel-16 | FS_ATSSS | Revised in parallel session to S2-182503. | Revised |
6.8 | S2-182503 | P-CR | Approval | ATSSS architecture updates | Samsung | Rel-16 | FS_ATSSS | Revision of S2-182099. Revised in parallel session to S2-182884. Replace 'ATSSS capability is discovered' with 'ATSSS capability may be discovered' in 6.1.1. | Revised |
6.8 | S2-182884 | P-CR | Approval | ATSSS architecture updates | Samsung | Rel-16 | FS_ATSSS | Revision of S2-182503. Agreed in parallel session. Block approved. | Approved |
6.8 | S2-182101 | P-CR | Approval | ATSSS operations modes | Samsung | Rel-16 | FS_ATSSS | Noted in parallel session. | Noted |
6.8 | S2-182121 | P-CR | Approval | Update of solution 2 | Motorola Mobility, Lenovo | Rel-16 | FS_ATSSS | Revised in parallel session to S2-182504. | Revised |
6.8 | S2-182504 | P-CR | Approval | Update of solution 2 | Motorola Mobility, Lenovo | Rel-16 | FS_ATSSS | Revision of S2-182121. Agreed in parallel session. Block approved. | Approved |
6.8 | S2-182231 | P-CR | Approval | Update the existing solution to Support of Multi-Access PDU Sessions | ITRI | Rel-16 | FS_ATSSS | Revised in parallel session to S2-182505. | Revised |
6.8 | S2-182505 | P-CR | Approval | Update the existing solution to Support of Multi-Access PDU Sessions | ITRI | Rel-16 | FS_ATSSS | Revision of S2-182231. Agreed in parallel session. Block approved. | Approved |
6.8 | S2-182243 | P-CR | Approval | MA-PDU session release operations | ITRI | Rel-16 | FS_ATSSS | Noted in parallel session. | Noted |
6.8 | S2-181861 | P-CR | Approval | Solution: NCP Based Solution Improvement | OPPO | Rel-16 | FS_ATSSS | Revised in parallel session to S2-182506. | Revised |
6.8 | S2-182506 | P-CR | Approval | Solution: NCP Based Solution Improvement | OPPO | Rel-16 | FS_ATSSS | Revision of S2-181861. Revised in parallel session to S2-182885. | Revised |
6.8 | S2-182885 | P-CR | Approval | Solution: NCP Based Solution Improvement | OPPO | Rel-16 | FS_ATSSS | Revision of S2-182506. Agreed in parallel session. Block approved. | Approved |
6.8 | S2-181928 | P-CR | Approval | Solution 3: Multi-access PDU Session Establishment with NCP | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revised in parallel session to S2-182507. | Revised |
6.8 | S2-182507 | P-CR | Approval | Solution 3: Multi-access PDU Session Establishment with NCP | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revision of S2-181928. Revised in parallel session to S2-182886. | Revised |
6.8 | S2-182886 | P-CR | Approval | Solution 3: Multi-access PDU Session Establishment with NCP | Huawei, HiSilicon | Rel-16 | FS_ATSSS | Revision of S2-182507. This was left for e-mail approval. | OPEN |
- | - | - | - | New solutions | - | - | - | - | - |
6.8 | S2-182043 | P-CR | Approval | ATSSS Solution - Multi-Access PDU Session Establishment | LG Electronics | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-182015 | P-CR | Approval | UE Requested Multi-access PDU Session Establishment | InterDigital Inc. | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-182017 | P-CR | Approval | Network-controlled Traffic Steering for Multi-access PDU Session | InterDigital Inc. | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-181544 | P-CR | Approval | QoS flow handling for MA PDU | ZTE | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-181596 | P-CR | Approval | Multi-access PDU session support for Non-IP type PDU sessions | CATT | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-182044 | P-CR | Approval | ATSSS Solution - Differentiation of 3GPP RATs in ATSSS Rule | LG Electronics | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-182197 | P-CR | Approval | Solution for the differentiation of 3GPP RATs in ATSSS rule | Intel | Rel-16 | FS_ATSSS | Not Handled | Not Handled |
6.8 | S2-182123 | P-CR | Approval | Proposed Solution for Multi-access PDU Session | ETRI | Rel-16 | FS_ATSSS | LATE DOC: Rx 20/02, 17:20. Not Handled | Not Handled |
6.9 | - | - | - | Study on Cellular IoT support and evolution for the 5G System (FS_CIoT_5G) | - | - | {Puneet} | - | - |
- | - | - | - | Updates to existing Key Issues | - | - | - | - | - |
6.9 | S2-181607 | P-CR | Approval | Key Issue on non3gpp access support | Samsung | Rel-16 | FS_CIoT_5G | Noted in parallel session. | Noted |
6.9 | S2-181776 | P-CR | Approval | Correction to Key Issue 4: Power Saving Functions | BlackBerry UK Ltd, Intel, Convida Wireless | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182313. | Revised |
6.9 | S2-182313 | P-CR | Approval | Correction to Key Issue 4: Power Saving Functions | BlackBerry UK Ltd, Intel, Convida Wireless | Rel-16 | FS_CIoT_5G | Revision of S2-181776. Agreed in parallel session. Block approved. | Approved |
6.9 | S2-181715 | P-CR | Approval | Updates to KI#12 Inter-RAT mobility support to/from NB-IoT | CATT | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182314. | Revised |
6.9 | S2-182314 | P-CR | Approval | Updates to KI#12 Inter-RAT mobility support to/from NB-IoT | CATT | Rel-16 | FS_CIoT_5G | Revision of S2-181715. Revised in parallel session to S2-182387. | Revised |
6.9 | S2-182387 | P-CR | Approval | Updates to KI#12 Inter-RAT mobility support to/from NB-IoT | CATT | Rel-16 | FS_CIoT_5G | Revision of S2-182314. This was left for e-mail approval. | OPEN |
6.9 | S2-182213 | P-CR | Approval | Addition of SMS Delivery for Key Issues 1 and 2 | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182315. | Revised |
6.9 | S2-182315 | P-CR | Approval | Addition of SMS Delivery for Key Issues 1 and 2 | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Revision of S2-182213. Withdrawn (not provided). | Withdrawn |
6.9 | S2-182112 | P-CR | Approval | Support of Exception Reporting | Samsung | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182316. | Revised |
6.9 | S2-182316 | P-CR | Approval | Support of Exception Reporting | Samsung | Rel-16 | FS_CIoT_5G | Revision of S2-182112. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | New Key Issues | - | - | - | - | - |
6.9 | S2-181844 | P-CR | Approval | Key Issue on Remote provisioning of 3GPP credentials | ORANGE, Telecom Italia, Telenor, AT&T, KDDI, NTT DOCOMO, China Mobile, Telstra | Rel-16 | FS_CIoT_5G | Noted in parallel session. | Noted |
6.9 | S2-182280 | P-CR | Approval | Key Issue on restricted connectivity for remote provisioning of IoT UEs | Qualcomm Incorporated, Convida Wireless LLC, Motorola Mobility, Lenovo | Rel-16 | FS_CIoT_5G | Noted in parallel session. | Noted |
6.9 | S2-181956 | P-CR | Approval | Key Issue on Expected UE Behaviour | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182317. | Revised |
6.9 | S2-182317 | P-CR | Approval | Key Issue on Expected UE Behaviour | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of S2-181956. Revised in parallel session to S2-182388. | Revised |
6.9 | S2-182388 | P-CR | Approval | Key Issue on Expected UE Behaviour | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of S2-182317. Agreed in parallel session. Block approved. | Approved |
6.9 | S2-181955 | P-CR | Approval | Key Issue on Support Multiple QoS Flows for Unstructured PDU Session | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of unhandled DRAFTCR S2-180140. Will be discussed offline if any agreement is feasible. Revised in parallel session to S2-182365. | Revised |
6.9 | S2-182365 | P-CR | Approval | Key Issue on Support Multiple QoS Flows for Unstructured PDU Session | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of S2-181955. Revised in parallel session to S2-182389. | Revised |
6.9 | S2-182389 | P-CR | Approval | Key Issue on Support Multiple QoS Flows for Unstructured PDU Session | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of S2-182365. Revised off-line to S2-182975. | Revised |
6.9 | S2-182975 | P-CR | Approval | Key Issue on Support Multiple QoS Flows for Unstructured PDU Session | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revision of S2-182389. This was left for e-mail approval. | OPEN |
6.9 | S2-182018 | P-CR | Approval | KI: Support for small data transmission with variable frequency | InterDigital Communications | Rel-16 | FS_CIoT_5G | Noted in parallel session. | Noted |
- | - | - | - | Solutions to KI#1 Infrequent SDT | - | - | - | - | - |
6.9 | S2-182210 | P-CR | Approval | Infrequent small data via NAS-SM | Qualcomm Incorporated, Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Revised in parallel session, merging S2-181885, to S2-182318. | Revised |
6.9 | S2-182318 | P-CR | Approval | Infrequent small data via NAS-SM | Qualcomm Incorporated, Huawei, HiSilicon, Convida Wireless LLC, NEC | Rel-16 | FS_CIoT_5G | Revision of S2-182210, merging S2-181885. Revised in parallel session to S2-182390. | Revised |
6.9 | S2-182390 | P-CR | Approval | Infrequent small data via NAS-SM | Qualcomm Incorporated, Huawei, HiSilicon, Convida Wireless LLC, NEC | Rel-16 | FS_CIoT_5G | Revision of S2-182318. This was left for e-mail approval. | OPEN |
6.9 | S2-181591 | P-CR | Approval | Solution for infrequent small data transfer through NAS and a direct interface between AMF and UPF | CATT | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182319. Merge with S2-182210 | Revised |
6.9 | S2-182319 | P-CR | Approval | Solution for infrequent small data transfer through NAS and a direct interface between AMF and UPF | CATT | Rel-16 | FS_CIoT_5G | Revision of S2-181591. Revised in parallel session to S2-182391. | Revised |
6.9 | S2-182391 | P-CR | Approval | Solution for infrequent small data transfer through NAS and a direct interface between AMF and UPF | CATT | Rel-16 | FS_CIoT_5G | Revision of S2-182319. Revised off-line to S2-183002. | Revised |
6.9 | S2-183002 | P-CR | Approval | Solution for infrequent small data transfer through NAS and a direct interface between AMF and UPF | CATT | Rel-16 | FS_CIoT_5G | Revision of S2-182391. This was left for e-mail approval. | OPEN |
6.9 | S2-181885 | P-CR | Approval | Solution for KI1: Infrequent small data transmission via NAS PDU | OPPO | Rel-16 | FS_CIoT_5G | Merged into S2-182318. Merge with S2-182210 | Merged |
6.9 | S2-182087 | P-CR | Approval | Solution on infrequent small data transmission | China Mobile | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182320. Merge with S2-182210 | Revised |
6.9 | S2-182320 | P-CR | Approval | Solution on infrequent small data transmission | China Mobile | Rel-16 | FS_CIoT_5G | Revision of S2-182087. Revised in parallel session to S2-182392. | Revised |
6.9 | S2-182392 | P-CR | Approval | Solution on infrequent small data transmission | China Mobile | Rel-16 | FS_CIoT_5G | Revision of S2-182320. This was left for e-mail approval. | OPEN |
6.9 | S2-182049 | P-CR | Approval | Solution for KI#1 and KI#8: Reliable Small Data Delivery via NEF | Intel | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182321. | Revised |
6.9 | S2-182321 | P-CR | Approval | Solution for KI#1 and KI#8: Reliable Small Data Delivery via NEF | Intel | Rel-16 | FS_CIoT_5G | Revision of S2-182049. Revised in parallel session to S2-182393. | Revised |
6.9 | S2-182393 | P-CR | Approval | Solution for KI#1 and KI#8: Reliable Small Data Delivery via NEF | Intel | Rel-16 | FS_CIoT_5G | Revision of S2-182321. This was left for e-mail approval. | OPEN |
6.9 | S2-182237 | P-CR | Approval | Infrequent Small Data user plane transmission for CIoT | Ericsson | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182331. | Revised |
6.9 | S2-182331 | P-CR | Approval | Infrequent Small Data user plane transmission for CIoT | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-182237. Revised in parallel session to S2-182394. | Revised |
6.9 | S2-182394 | P-CR | Approval | Infrequent Small Data user plane transmission for CIoT | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-182331. This was left for e-mail approval. | OPEN |
6.9 | S2-181828 | P-CR | Approval | Solution for Control Plane migration to 5GS | Sony | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182332. | Revised |
6.9 | S2-182332 | P-CR | Approval | Solution for Control Plane migration to 5GS | Sony | Rel-16 | FS_CIoT_5G | Revision of S2-181828. Revised in parallel session to S2-182395. | Revised |
6.9 | S2-182395 | P-CR | Approval | Solution for Control Plane migration to 5GS | Sony | Rel-16 | FS_CIoT_5G | Revision of S2-182332. This was left for e-mail approval. | OPEN |
- | - | - | - | Solutions to KI#2: Frequent SDT | - | - | - | - | - |
6.9 | S2-181905 | P-CR | Approval | Small data frequent communication | Ericsson | Rel-16 | FS_CIoT_5G | Revised in parallel session to S2-182333. | Revised |
6.9 | S2-182333 | P-CR | Approval | Small data frequent communication | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-181905. Revised in parallel session to S2-182396. | Revised |
6.9 | S2-182396 | P-CR | Approval | Small data frequent communication | Ericsson | Rel-16 | FS_CIoT_5G | Revision of S2-182333. This was left for e-mail approval. | OPEN |
6.9 | S2-182019 | P-CR | Approval | Solution: RRC Inactive for frequent small data transmission | InterDigital Communications | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Solutions to KI#4: Power Saving | - | - | - | - | - |
6.9 | S2-181827 | P-CR | Approval | Solution for KI4 track 2: Power Saving Functions | Sony | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-181907 | P-CR | Approval | Power Saving Mode | Ericsson | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-182206 | P-CR | Approval | Solution of High latency communication and Power Saving Function | Intel | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-181959 | P-CR | Approval | Solution for KI#4: MICO mode enhanced with Active Timer | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-182259 | P-CR | Approval | Enhanced MICO for power saving solution | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Not Handled Merge with S2-181959 | Not Handled |
6.9 | S2-181846 | P-CR | Approval | Solution proposal 'Adjustable periodic Registration Update' for UE power saving | LG Electronics | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-181960 | P-CR | Approval | Solution for KI#4: MICO Mode Management for Expected Application Behaviour | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Solutions to KI#3: HLCom | - | - | - | - | - |
6.9 | S2-181524 | P-CR | Approval | Solution on extended buffering | CATT | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-181906 | P-CR | Approval | Solution for High latency communication | Ericsson | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-181958 | P-CR | Approval | Solution for KI#3: Extended buffering in 5GC | Huawei, HiSilicon | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-182266 | P-CR | Approval | HLCom: Extended buffering at UPF of MT data for user plane | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Solutions to KI#5: UE Tx Power saving | - | - | - | - | - |
6.9 | S2-181887 | P-CR | Approval | Solution for KI5: Delay UL transmission for MO case | OPPO | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-182082 | P-CR | Approval | Key Issue #5 Solution: MO Data Buffering | Convida Wireless LLC, NEC | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-181911 | P-CR | Approval | Solution for KI5: Delay Paging Response for MT case | OPPO | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.9 | S2-182164 | P-CR | Approval | Paging for delay tolerant applications in the UE | NEC | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Solutions to KI#6: Management for Enhanced Coverage | - | - | - | - | - |
6.9 | S2-181694 | P-CR | Approval | Solution for KI#6 - Management for Enhanced Coverage | Intel | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Solutions to KI#9: Common Northbound APIs | - | - | - | - | - |
6.9 | S2-181939 | P-CR | Approval | Key Issue #9 Solution: SCEF+NEF Node | Convida Wireless LLC, AT&T | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
- | - | - | - | Solutions to other Key Issues | - | - | - | - | - |
6.9 | S2-181957 | P-CR | Approval | Solution for Key Issue on Expected UE Behaviour | Huawei, HiSilicon, Convida Wireless LLC | Rel-16 | FS_CIoT_5G | Not Handled | Not Handled |
6.10 | - | - | - | Study on encrypted traffic detection and verification (FS_ENTRADE) | - | - | {Krisztian} | - | - |
- | - | - | - | Key Issues | - | - | - | - | - |
6.10 | S2-181733 | P-CR | Approval | New key issue: Exposure of the information for encrypted traffic detection outside 3GPP network | KDDI | Rel-16 | FS_ENTRADE | Noted in parallel session. | Noted |
6.10 | S2-182157 | P-CR | Approval | Proposal of encrypted data verification | Huawei, HiSilicon | Rel-16 | FS_ENTRADE | Revised in parallel session to S2-182481. | Revised |
6.10 | S2-182481 | P-CR | Approval | Proposal of encrypted data verification | Huawei, HiSilicon | Rel-16 | FS_ENTRADE | Revision of S2-182157. Approved. | Approved |
- | - | - | - | Solutions | - | - | - | - | - |
6.10 | S2-182118 | P-CR | Approval | UE-based Solution for Encrypted Traffic Detection | Motorola Mobility, Lenovo | Rel-16 | FS_ENTRADE | Revised in parallel session to S2-182482. | Revised |
6.10 | S2-182482 | P-CR | Approval | UE-based Solution for Encrypted Traffic Detection | Motorola Mobility, Lenovo | Rel-16 | FS_ENTRADE | Revision of S2-182118. Approved. | Approved |
6.10 | S2-182158 | P-CR | Approval | Encrypted traffic data detection and verification | Huawei, HiSilicon | Rel-16 | FS_ENTRADE | Revised in parallel session to S2-182483. | Revised |
6.10 | S2-182483 | P-CR | Approval | Encrypted traffic data detection and verification | Huawei, HiSilicon | Rel-16 | FS_ENTRADE | Revision of S2-182158. Revised to S2-182976. | Revised |
6.10 | S2-182976 | P-CR | Approval | Encrypted traffic data detection and verification | Huawei, HiSilicon | Rel-16 | FS_ENTRADE | Revision of S2-182483. This was left for e-mail approval. | OPEN |
6.10 | S2-182208 | P-CR | Approval | Solution of Encrypted Traffic Detection for key issue#1 with agreement between AF and MNO | Intel | Rel-16 | FS_ENTRADE | Revised in parallel session to S2-182484. | Revised |
6.10 | S2-182484 | P-CR | Approval | Solution of Encrypted Traffic Detection for key issue#1 with agreement between AF and MNO | Intel | Rel-16 | FS_ENTRADE | Revision of S2-182208. This was left for e-mail approval. | OPEN |
6.10 | S2-182209 | P-CR | Approval | Solution of Encrypted Traffic Detection for key issue#2 without agreement between AF and MNO | Intel | Rel-16 | FS_ENTRADE | Not Handled | Not Handled |
6.10 | S2-181747 | P-CR | Approval | Solution Key Issue #1 Encrypted traffic detection and verification in the presence of an agreement between AS and MNO | Sandvine | Rel-16 | FS_ENTRADE | Not Handled | Not Handled |
6.10 | S2-181974 | P-CR | Approval | Solution for UE assisted encrypted traffic detection | OPPO, China Unicom | Rel-16 | FS_ENTRADE | Not Handled | Not Handled |
6.10 | S2-182083 | P-CR | Approval | Traffic identification and verification for key issues #1 and #2 | Qualcomm Tech. Netherlands B.V | Rel-16 | FS_ENTRADE | Withdrawn (not provided). | Withdrawn |
6.11 | - | - | - | Study of enablers for Network Automation for 5G (FS_eNA) | - | - | {Puneet} | - | - |
- | - | - | - | TR Fix/Assumptions | - | - | - | - | - |
6.11 | S2-181963 | P-CR | Approval | Editorial Revision for TR 23.791 | Huawei, HiSilicon | Rel-16 | FS_eNA | Revised in parallel session to S2-182344. | Revised |
6.11 | S2-182344 | P-CR | Approval | Editorial Revision for TR 23.791 | Huawei, HiSilicon | Rel-16 | FS_eNA | Revision of S2-181963. Agreed in parallel session. Block approved. | Approved |
6.11 | S2-181964 | P-CR | Approval | Update on the architecture assumption for TR 23.791 | Huawei, HiSilicon | Rel-16 | FS_eNA | Revised in parallel session to S2-182345. | Revised |
6.11 | S2-182345 | P-CR | Approval | Update on the architecture assumption for TR 23.791 | Huawei, HiSilicon | Rel-16 | FS_eNA | Revision of S2-181964. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | Update to existing use cases | - | - | - | - | - |
6.11 | S2-181517 | DISCUSSION | Discussion | Discussion on customizing mobility management | CATT | FS_eNA | Noted in parallel session. | Noted | |
6.11 | S2-181518 | P-CR | Approval | Update to the use case on customizing mobility management | CATT | Rel-16 | FS_eNA | Revised in parallel session, merging S2-182347, to S2-182346. | Revised |
6.11 | S2-182346 | P-CR | Approval | Update to the use case on customizing mobility management | CATT | Rel-16 | FS_eNA | Revision of S2-181518, merging S2-182347. Agreed in parallel session. Block approved. | Approved |
6.11 | S2-182218 | P-CR | Approval | Update to use case 4 on using NWDA output to customize mobility management | Lenovo, Motorola Mobility | Rel-16 | FS_eNA | Revised in parallel session to S2-182347. | Revised |
6.11 | S2-182347 | P-CR | Approval | Update to use case 4 on using NWDA output to customize mobility management | Lenovo, Motorola Mobility | Rel-16 | FS_eNA | Revision of S2-182218. Merged into S2-182346. | Merged |
6.11 | S2-182241 | P-CR | Approval | Discussion on the use case of TS 23.791 | China Telecom | Rel-16 | FS_eNA | Revised in parallel session to S2-182348. | Revised |
6.11 | S2-182348 | P-CR | Approval | Discussion on the use case of TS 23.791 | China Telecom | Rel-16 | FS_eNA | Revision of S2-182241. Agreed in parallel session. Block approved. | Approved |
6.11 | S2-181785 | P-CR | Approval | Key issues: Update and new key Issue | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Revised in parallel session to S2-182349. | Revised |
6.11 | S2-182349 | P-CR | Approval | Key issues: Update and new key Issue | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Revision of S2-181785. This was left for e-mail approval. | OPEN |
6.11 | S2-181966 | P-CR | Approval | Update to Use Case NWDA-Assisted Traffic Handling | Huawei, HiSilicon | Rel-16 | FS_eNA | Noted in parallel session. | Noted |
- | - | - | - | New use cases | - | - | - | - | - |
6.11 | S2-181731 | P-CR | Approval | NWDA assisted Determination of Transfer Policy | KDDI, TOYOTA ITC | Rel-16 | FS_eNA | Revised in parallel session to S2-182350. | Revised |
6.11 | S2-182350 | P-CR | Approval | NWDA assisted Determination of Transfer Policy | KDDI, TOYOTA ITC | Rel-16 | FS_eNA | Revision of S2-181731. Revised in parallel session to S2-182401. Change transfer policy to policy and add following bullet: - How information is made available to NWDAF for the data analysis. | Revised |
6.11 | S2-182401 | P-CR | Approval | NWDA assisted Determination of Transfer Policy | KDDI, TOYOTA ITC | Rel-16 | FS_eNA | Revision of S2-182350. Wrong document uploaded. Revised to S2-182974. | Revised |
6.11 | S2-182974 | P-CR | Approval | NWDA assisted Determination of Transfer Policy | KDDI, TOYOTA ITC | Rel-16 | FS_eNA | Revision of S2-182401. Agreed in parallel session. Block approved. | Approved |
6.11 | S2-181962 | P-CR | Approval | Use Case: Dynamic QoS Adjustment | Huawei, HiSilicon, CATR | Rel-16 | FS_eNA | Revised in parallel session to S2-182351. | Revised |
6.11 | S2-182351 | P-CR | Approval | Use Case: Dynamic QoS Adjustment | Huawei, HiSilicon, CATR | Rel-16 | FS_eNA | Revision of S2-181962. Revised in parallel session to S2-182402. | Revised |
6.11 | S2-182402 | P-CR | Approval | Use Case: Dynamic QoS Adjustment | Huawei, HiSilicon, CATR | Rel-16 | FS_eNA | Revision of S2-182351. Agreed in parallel session. Block approved. | Approved |
6.11 | S2-182070 | P-CR | Approval | New use case on NWDAF assisting edge computing | Intel | Rel-16 | FS_eNA | Revised in parallel session to S2-182352. | Revised |
6.11 | S2-182352 | P-CR | Approval | New use case on NWDAF assisting edge computing | Intel | Rel-16 | FS_eNA | Revision of S2-182070. Revised in parallel session to S2-182403. | Revised |
6.11 | S2-182403 | P-CR | Approval | New use case on NWDAF assisting edge computing | Intel | Rel-16 | FS_eNA | Revision of S2-182352. Agreed in parallel session. Block approved. | Approved |
6.11 | S2-182086 | P-CR | Approval | Use Case on mIoT behaviour data collection and analysis | China Mobile | Rel-16 | FS_eNA | Revised in parallel session to S2-182353. | Revised |
6.11 | S2-182353 | P-CR | Approval | Use Case on mIoT behaviour data collection and analysis | China Mobile | Rel-16 | FS_eNA | Revision of S2-182086. Revised in parallel session to S2-182404. | Revised |
6.11 | S2-182404 | P-CR | Approval | Use Case on mIoT behaviour data collection and analysis | China Mobile | Rel-16 | FS_eNA | Revision of S2-182353. Agreed in parallel session. Block approved. | Approved |
6.11 | S2-182139 | P-CR | Approval | Key issue on Analytic Exposure to AF | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Revised in parallel session to S2-182354. | Revised |
6.11 | S2-182354 | P-CR | Approval | Key issue on Analytic Exposure to AF | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Revision of S2-182139. Revised in parallel session to S2-182405. | Revised |
6.11 | S2-182405 | P-CR | Approval | Key issue on Analytic Exposure to AF | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eNA | Revision of S2-182354. This was left for e-mail approval. | OPEN |
6.11 | S2-181965 | P-CR | Approval | Use Case: Network Information Exposure to Ues | Huawei, HiSilicon | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.11 | S2-181967 | P-CR | Approval | Use Case: NWDA-assisted detection of situations in E2E QoS Profiles | Huawei, HiSilicon | Rel-16 | FS_eNA | Not Handled | Not Handled |
6.12 | - | - | - | Study on Enhancing Topology of SMF and UPF in 5G Networks (FS_ETSUN) | - | - | {Krisztian} | - | - |
- | - | - | - | Key Issues | - | - | - | - | - |
6.12 | S2-181701 | P-CR | Approval | KI: Handling AF influence traffic on traffic routing | NTT DOCOMO, Nokia, Nokia Shanghai Bell, NEC | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182472. | Revised |
6.12 | S2-182472 | P-CR | Approval | KI: Handling AF influence traffic on traffic routing | NTT DOCOMO, Nokia, Nokia Shanghai Bell, NEC | Rel-16 | FS_ETSUN | Revision of S2-181701. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | Solutions | - | - | - | - | - |
6.12 | S2-181984 | P-CR | Approval | ETSUN Solution to key issues 1 and 4 | Ericsson | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182473. | Revised |
6.12 | S2-182473 | P-CR | Approval | ETSUN Solution to key issues 1 and 4 | Ericsson | Rel-16 | FS_ETSUN | Revision of S2-181984. Agreed in parallel session. Block approved. | Approved |
6.12 | S2-182273 | P-CR | Approval | Solution supporting addition and relocation of I-SMF | Samsung | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182474. | Revised |
6.12 | S2-182474 | P-CR | Approval | Solution supporting addition and relocation of I-SMF | Samsung | Rel-16 | FS_ETSUN | Revision of S2-182273. Agreed in parallel session. Block approved. | Approved |
6.12 | S2-181523 | P-CR | Approval | ETSUN solution for objective 1 | CATT | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182475. | Revised |
6.12 | S2-182475 | P-CR | Approval | ETSUN solution for objective 1 | CATT | Rel-16 | FS_ETSUN | Revision of S2-181523. Revised in parallel session to S2-182530. | Revised |
6.12 | S2-182530 | P-CR | Approval | ETSUN solution for objective 1 | CATT | Rel-16 | FS_ETSUN | Revision of S2-182475. Revised in parallel session to S2-182533. | Revised |
6.12 | S2-182533 | P-CR | Approval | ETSUN solution for objective 1 | CATT | Rel-16 | FS_ETSUN | Revision of S2-182530. Agreed in parallel session. Block approved. | Approved |
6.12 | S2-181675 | P-CR | Approval | Candidate Solution for ETSUN Objective 1 | SoftBank | Rel-16 | FS_ETSUN | Noted in parallel session. | Noted |
6.12 | S2-182026 | P-CR | Approval | Solution for Key Issue 2: IP Address Reservation for UPF | T-Mobile USA INC | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182476. | Revised |
6.12 | S2-182476 | P-CR | Approval | Solution for Key Issue 2: IP Address Reservation for UPF | T-Mobile USA INC | Rel-16 | FS_ETSUN | Revision of S2-182026. Revised in parallel session to S2-182531. | Revised |
6.12 | S2-182531 | P-CR | Approval | Solution for Key Issue 2: IP Address Reservation for UPF | T-Mobile USA INC | Rel-16 | FS_ETSUN | Revision of S2-182476. Revised in parallel session to S2-182534. | Revised |
6.12 | S2-182534 | P-CR | Approval | Solution for Key Issue 2: IP Address Reservation for UPF | T-Mobile USA INC | Rel-16 | FS_ETSUN | Revision of S2-182531. Agreed in parallel session. Block approved. | Approved |
6.12 | S2-182222 | P-CR | Approval | Solution: IP address allocation | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182477. | Revised |
6.12 | S2-182477 | P-CR | Approval | Solution: IP address allocation | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-182222. Agreed in parallel session. Block approved. | Approved |
6.12 | S2-181532 | P-CR | Approval | 23.726 solutions: IP@ allocation by the UP | Nokia, Nokia Shanghai Bell | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182478. | Revised |
6.12 | S2-182478 | P-CR | Approval | 23.726 solutions: IP@ allocation by the UP | Nokia, Nokia Shanghai Bell | Rel-16 | FS_ETSUN | Revision of S2-181532. Agreed in parallel session. Block approved. | Approved |
6.12 | S2-182223 | P-CR | Approval | Solution to support ULCL/BP insertion | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182479. | Revised |
6.12 | S2-182479 | P-CR | Approval | Solution to support ULCL/BP insertion | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-182223. Revised in parallel session to S2-182532. | Revised |
6.12 | S2-182532 | P-CR | Approval | Solution to support ULCL/BP insertion | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-182479. Agreed in parallel session. Block approved. | Approved |
6.12 | S2-182224 | P-CR | Approval | Solution to support SMF selection/reselection for inter administrative mobility | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revised in parallel session to S2-182480. | Revised |
6.12 | S2-182480 | P-CR | Approval | Solution to support SMF selection/reselection for inter administrative mobility | Huawei, HiSilicon | Rel-16 | FS_ETSUN | Revision of S2-182224. Agreed in parallel session. Block approved. | Approved |
6.13 | - | - | - | Study on Enhancement to the 5GC Location Services (FS_eLCS) | - | - | {Puneet} | - | - |
- | - | - | - | General | - | - | - | - | - |
6.13 | S2-181713 | P-CR | Approval | Update Reference TR/TS into the TR23.731 | CATT | Rel-16 | FS_eLCS | Agreed in parallel session. Block approved. | Approved |
- | - | - | - | Update to existing KIs | - | - | - | - | - |
6.13 | S2-181914 | P-CR | Approval | Add roaming to Key Issues 7 | Ericsson | Rel-16 | FS_eLCS | Revised in parallel session to S2-182291. | Revised |
6.13 | S2-182291 | P-CR | Approval | Add roaming to Key Issues 7 | Ericsson | Rel-16 | FS_eLCS | Revision of S2-181914. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | New KIs | - | - | - | - | - |
6.13 | S2-181916 | P-CR | Approval | Key issues for eLCS on support eLTE positioning methods | Ericsson | Rel-16 | FS_eLCS | Revised in parallel session to S2-182292. | Revised |
6.13 | S2-182292 | P-CR | Approval | Key issues for eLCS on support eLTE positioning methods | Ericsson | Rel-16 | FS_eLCS | Revision of S2-181916. Agreed in parallel session. Block approved. | Approved |
6.13 | S2-181933 | P-CR | Approval | Key issues for eLCS on support NR positioning methods | Ericsson | Rel-16 | FS_eLCS | Revised in parallel session to S2-182293. | Revised |
6.13 | S2-182293 | P-CR | Approval | Key issues for eLCS on support NR positioning methods | Ericsson | Rel-16 | FS_eLCS | Revision of S2-181933. Revised in parallel session to S2-182406. | Revised |
6.13 | S2-182406 | P-CR | Approval | Key issues for eLCS on support NR positioning methods | Ericsson | Rel-16 | FS_eLCS | Revision of S2-182293. Agreed in parallel session. Block approved. | Approved |
6.13 | S2-182080 | P-CR | Approval | Key Issue on Support of EPS Location Services | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revised in parallel session to S2-182294. | Revised |
6.13 | S2-182294 | P-CR | Approval | Key Issue on Support of EPS Location Services | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-182080. Revised in parallel session to S2-182407. | Revised |
6.13 | S2-182407 | P-CR | Approval | Key Issue on Support of EPS Location Services | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-182294. This was left for e-mail approval. | OPEN |
6.13 | S2-182131 | P-CR | Approval | New KI proposal: Coordination of positioning signalling transmitted via CP and UP | Huawei, HiSilicon | Rel-16 | FS_eLCS | Revised in parallel session to S2-182295. | Revised |
6.13 | S2-182295 | P-CR | Approval | New KI proposal: Coordination of positioning signalling transmitted via CP and UP | Huawei, HiSilicon | Rel-16 | FS_eLCS | Revision of S2-182131. Agreed in parallel session. Block approved. | Approved |
6.13 | S2-182216 | P-CR | Approval | Key Issue: Non-3GPP access support for LCS | Lenovo, Motorola Mobility | Rel-16 | FS_eLCS | Revised in parallel session to S2-182296. | Revised |
6.13 | S2-182296 | P-CR | Approval | Key Issue: Non-3GPP access support for LCS | Lenovo, Motorola Mobility | Rel-16 | FS_eLCS | Revision of S2-182216. Revised in parallel session to S2-182408. | Revised |
6.13 | S2-182408 | P-CR | Approval | Key Issue: Non-3GPP access support for LCS | Lenovo, Motorola Mobility | Rel-16 | FS_eLCS | Revision of S2-182296. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | Solutions | - | - | - | - | - |
6.13 | S2-181598 | P-CR | Approval | Solution for privacy verification | CATT | Rel-16 | FS_eLCS | Revised in parallel session to S2-182297. | Revised |
6.13 | S2-182297 | P-CR | Approval | Solution for privacy verification | CATT | Rel-16 | FS_eLCS | Revision of S2-181598. Revised in parallel session to S2-182409. | Revised |
6.13 | S2-182409 | P-CR | Approval | Solution for privacy verification | CATT | Rel-16 | FS_eLCS | Revision of S2-182297. This was left for e-mail approval. | OPEN |
6.13 | S2-181651 | P-CR | Approval | Solution for KI4: 5GC-MT-LR with privacy check | Vivo | Rel-16 | FS_eLCS | Revised in parallel session to S2-182298. | Revised |
6.13 | S2-182298 | P-CR | Approval | Solution for KI4: 5GC-MT-LR with privacy check | Vivo | Rel-16 | FS_eLCS | Revision of S2-181651. Agreed in parallel session. Block approved. | Approved |
6.13 | S2-181714 | P-CR | Approval | 5GS LCS Functionality and Allocation to 5GS elements for Key Issue #1 | CATT | Rel-16 | FS_eLCS | Revised in parallel session to S2-182299. | Revised |
6.13 | S2-182299 | P-CR | Approval | 5GS LCS Functionality and Allocation to 5GS elements for Key Issue #1 | CATT | Rel-16 | FS_eLCS | Revision of S2-181714. Agreed in parallel session. Block approved. | Approved |
6.13 | S2-182081 | P-CR | Approval | Addition of an LMF Based Location Solution | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revised in parallel session to S2-182300. | Revised |
6.13 | S2-182300 | P-CR | Approval | Addition of an LMF Based Location Solution | Qualcomm Incorporated | Rel-16 | FS_eLCS | Revision of S2-182081. Agreed in parallel session. Block approved. | Approved |
6.13 | S2-182126 | P-CR | Approval | Enhancement to LCS architecture | Huawei, HiSilicon | Rel-16 | FS_eLCS | Revised in parallel session to S2-182301. | Revised |
6.13 | S2-182301 | P-CR | Approval | Enhancement to LCS architecture | Huawei, HiSilicon | Rel-16 | FS_eLCS | Revision of S2-182126. Revised in parallel session to S2-182410. | Revised |
6.13 | S2-182410 | P-CR | Approval | Enhancement to LCS architecture | Huawei, HiSilicon | Rel-16 | FS_eLCS | Revision of S2-182301. Agreed in parallel session. Block approved. | Approved |
6.13 | S2-182130 | P-CR | Approval | Introduction to the Solution for key issue on support of low LCS latency | Huawei, HiSilicon | Rel-16 | FS_eLCS | Revised in parallel session to S2-182302. | Revised |
6.13 | S2-182302 | P-CR | Approval | Introduction to the Solution for key issue on support of low LCS latency | Huawei, HiSilicon | Rel-16 | FS_eLCS | Revision of S2-182130. Agreed in parallel session. Block approved. | Approved |
6.13 | S2-182127 | P-CR | Approval | Solution for position via user plane transmission | Huawei, HiSilicon | Rel-16 | FS_eLCS | Not Handled | Not Handled |
6.13 | S2-182128 | P-CR | Approval | Solution for Slicing dependent location service | Huawei, HiSilicon | Rel-16 | FS_eLCS | Not Handled | Not Handled |
6.13 | S2-182129 | P-CR | Approval | Solution for location service exposure | Huawei, HiSilicon | Rel-16 | FS_eLCS | LATE DOC: Rx 20/02, 16:44. Not Handled | Not Handled |
6.14 | - | - | - | Study on Enhanced IMS to 5GC Integration (FS_eIMS5G) | - | - | {Krisztian} | - | - |
- | - | - | - | General | - | - | - | - | - |
6.14 | S2-182031 | P-CR | Approval | Editorial Clean-up of TR | T-Mobile USA INC | Rel-16 | FS_eIMS5G | Revised in parallel session to S2-182457. | Revised |
6.14 | S2-182457 | P-CR | Approval | Editorial Clean-up of TR | T-Mobile USA INC | Rel-16 | FS_eIMS5G | Revision of S2-182031. Agreed in parallel session. Block approved. | Approved |
- | - | - | - | New Key Issues | - | - | - | - | - |
6.14 | S2-181730 | P-CR | Approval | EIMS5G addition of a key issue | Nokia, Nokia Shanghai Bell | Rel-16 | FS_eIMS5G | Noted in parallel session. | Noted |
- | - | - | - | Solutions for local routing | - | - | - | - | - |
6.14 | S2-181609 | P-CR | Approval | 23.794: High-level solution proposals for routing of IMS traffic via a localised UPF | Intel | Rel-16 | FS_eIMS5G | Revised in parallel session to S2-182458. | Revised |
6.14 | S2-182458 | P-CR | Approval | 23.794: High-level solution proposals for routing of IMS traffic via a localised UPF | Intel | Rel-16 | FS_eIMS5G | Revision of S2-181609. Revised in parallel session to S2-182417. | Revised |
6.14 | S2-182417 | P-CR | Approval | 23.794: High-level solution proposals for routing of IMS traffic via a localised UPF | Intel | Rel-16 | FS_eIMS5G | Revision of S2-182458. This was left for e-mail approval. | OPEN |
6.14 | S2-182032 | P-CR | Approval | Solution placing entire IMS in the localized network | T-Mobile USA INC | Rel-16 | FS_eIMS5G | Revised in parallel session to S2-182459. | Revised |
6.14 | S2-182459 | P-CR | Approval | Solution placing entire IMS in the localized network | T-Mobile USA INC | Rel-16 | FS_eIMS5G | Revision of S2-182032. Revised in parallel session to S2-182418. | Revised |
6.14 | S2-182418 | P-CR | Approval | Solution placing entire IMS in the localized network | T-Mobile USA INC | Rel-16 | FS_eIMS5G | Revision of S2-182459. Agreed in parallel session. Block approved. | Approved |
6.14 | S2-182033 | P-CR | Approval | Solutions for local routing IMS traffic using 'AF Influence of routing' | T-Mobile USA INC | Rel-16 | FS_eIMS5G | Revised in parallel session to S2-182460. | Revised |
6.14 | S2-182460 | P-CR | Approval | Solutions for local routing IMS traffic using 'AF Influence of routing' | T-Mobile USA INC | Rel-16 | FS_eIMS5G | Revision of S2-182033. Revised in parallel session to S2-182419. | Revised |
6.14 | S2-182419 | P-CR | Approval | Solutions for local routing IMS traffic using 'AF Influence of routing' | T-Mobile USA INC | Rel-16 | FS_eIMS5G | Revision of S2-182460. Agreed in parallel session. Block approved. | Approved |
6.14 | S2-182177 | P-CR | Approval | Solution for IMS traffic local routing | Huawei, HiSilicon | Rel-16 | FS_eIMS5G | Revised in parallel session to S2-182359. | Revised |
6.14 | S2-182359 | P-CR | Approval | Solution for IMS traffic local routing | Huawei, HiSilicon | Rel-16 | FS_eIMS5G | Revision of S2-182177. Revised to S2-182979. | Revised |
6.14 | S2-182979 | P-CR | Approval | Solution for IMS traffic local routing | Huawei, HiSilicon | Rel-16 | FS_eIMS5G | Revision of S2-182359. This was left for e-mail approval. | OPEN |
6.14 | S2-182214 | P-CR | Approval | Solution to key issue#1 | LG Electronics | Rel-16 | FS_eIMS5G | Revised in parallel session to S2-182360. | Revised |
6.14 | S2-182360 | P-CR | Approval | Solution to key issue#1 | LG Electronics | Rel-16 | FS_eIMS5G | Revision of S2-182214. Approved. | Approved |
- | - | - | - | Solutions for slicing | - | - | - | - | - |
6.14 | S2-182162 | P-CR | Approval | AF influence on network slice selection for IMS services | Motorola Mobility, Lenovo | Rel-16 | FS_eIMS5G | Revised in parallel session to S2-182361. | Revised |
6.14 | S2-182361 | P-CR | Approval | AF influence on network slice selection for IMS services | Motorola Mobility, Lenovo | Rel-16 | FS_eIMS5G | Revision of S2-182162. Revised to S2-182980. | Revised |
6.14 | S2-182980 | P-CR | Approval | AF influence on network slice selection for IMS services | Motorola Mobility, Lenovo | Rel-16 | FS_eIMS5G | Revision of S2-182361. This was left for e-mail approval. | OPEN |
6.14 | S2-182165 | P-CR | Approval | Solution for key issue 3: Network Slicing and IMS | ZTE | Rel-16 | FS_eIMS5G | Not Handled | Not Handled |
6.14 | S2-182176 | P-CR | Approval | Solution for Network Slicing and IMS Scenario 2 | Huawei, HiSilicon | Rel-16 | FS_eIMS5G | Not Handled | Not Handled |
- | - | - | - | Solutions for SBA | - | - | - | - | - |
6.14 | S2-182166 | P-CR | Approval | Solution for key issue 7: How can IMS utilize services provided by Npcf | ZTE | Rel-16 | FS_eIMS5G | Not Handled | Not Handled |
6.14 | S2-182173 | P-CR | Approval | Solution for utilizing services provided by 5GC | Huawei, HiSilicon | Rel-16 | FS_eIMS5G | Not Handled | Not Handled |
6.14 | S2-182174 | P-CR | Approval | Consideration on SBA-based Sh | Huawei, HiSilicon | Rel-16 | FS_eIMS5G | Not Handled | Not Handled |
6.14 | S2-182175 | P-CR | Approval | Solution for KI on Discovery of Network Functions | Huawei, HiSilicon | Rel-16 | FS_eIMS5G | Not Handled | Not Handled |
6.15 | - | - | - | WID on increasing the maximum number of LTE bearers (INOBEAR) | - | - | {Puneet} | - | - |
6.15 | S2-181608 | DISCUSSION | Discussion | Summary of Telstra CRs for INOBEAR | Telstra Corporation Limited | Rel-15 | Noted in parallel session. | Noted | |
6.15 | S2-181780 | CR | Approval | 23.401 CR3396: Feature definition for supporting 15 EPS bearers | Telstra, AT&T, Ericsson, Samsung | Rel-15 | INOBEAR | Revised in parallel session to S2-182311. | Revised |
6.15 | S2-182311 | CR | Approval | 23.401 CR3396R1: Feature definition for supporting 15 EPS bearers | Telstra, AT&T, Ericsson, Samsung | Rel-15 | INOBEAR | Revision of S2-181780. Revised in parallel session to S2-182329. | Revised |
6.15 | S2-182329 | CR | Approval | 23.401 CR3396R2: Feature definition for supporting 15 EPS bearers | Telstra, AT&T, Ericsson, Samsung | Rel-15 | INOBEAR | Revision of S2-182311. Revised in parallel session to S2-182400. | Revised |
6.15 | S2-182400 | CR | Approval | 23.401 CR3396R3: Feature definition for supporting 15 EPS bearers | Telstra, AT&T, Ericsson, Samsung | Rel-15 | INOBEAR | Revision of S2-182329. This CR was agreed. | Agreed |
6.15 | S2-182312 | LS OUT | Approval | [DRAFT] LS on INOBEAR | SA WG2 | Rel-15 | INOBEAR | Created in parallel session. Revised in parallel session to S2-182330. | Revised |
6.15 | S2-182330 | LS OUT | Approval | [DRAFT] LS on INOBEAR | SA WG2 | Rel-15 | INOBEAR | Revision of S2-182312. Revised in parallel session to S2-182343. | Revised |
6.15 | S2-182343 | LS OUT | Approval | [DRAFT] LS on INOBEAR | SA WG2 | Rel-15 | INOBEAR | Revision of S2-182330. Revised in parallel session to S2-182355. | Revised |
6.15 | S2-182355 | LS OUT | Approval | LS on INOBEAR | SA WG2 | Rel-15 | INOBEAR | Revision of S2-182343. Agreed in parallel session. Approved on overnight e-mail. To be put on overnight email approval | Approved |
6.15 | S2-181652 | DISCUSSION | Agreement | Priority handling for KI4 | Vivo | Rel-15 | INOBEAR | Noted in parallel session. | Noted |
6.15 | S2-181653 | DISCUSSION | Agreement | EBI principle in the NW supporting INOBEAR | Vivo | Rel-15 | INOBEAR | Noted in parallel session. | Noted |
6.15 | S2-182027 | DISCUSSION | Discussion | Prioritization methods for handling reduction of bearers | T-Mobile USA INC | INOBEAR | Noted in parallel session. | Noted | |
6.15 | S2-181712 | DISCUSSION | Endorsement | Updates to INOBEAR assumptions, key issues and way forward | CATT, China Mobile | INOBEAR | Noted in parallel session Proposal #1 would be reflected in LS out in S2-182330 | Noted | |
6.15 | S2-181824 | DISCUSSION | Approval | Discussion on bearer handling when node capability is not known | ZTE | Rel-15 | INOBEAR | Noted in parallel session. | Noted |
6.15 | S2-181782 | CR | Approval | 23.401 CR3397: Mobility management related procedure updates for INOBEAR | Telstra, AT&T, Samsung, Ericsson | Rel-15 | INOBEAR | Not Handled | Not Handled |
6.15 | S2-181812 | CR | Approval | 23.401 CR3399: Handover related updates for INOBEAR | Telstra, AT&T, Ericsson, Samsung | Rel-15 | INOBEAR | Not Handled | Not Handled |
6.15 | S2-181813 | CR | Approval | 23.401 CR3400: Session management related procedure updates for INOBEAR | Telstra, AT&T, Ericsson, Samsung | Rel-15 | INOBEAR | Not Handled | Not Handled |
6.15 | S2-181815 | CR | Approval | 23.167 CR0323: Emergency call related update for INOBEAR | Telstra, AT&T, Samsung, Ericsson | Rel-15 | INOBEAR | Not Handled | Not Handled |
6.15 | S2-181851 | CR | Approval | 23.402 CR2987: Non-3GPP access related aspects for INOBEAR | Telstra, AT&T, Ericsson, Samsung | Rel-15 | INOBEAR | Not Handled | Not Handled |
6.15 | S2-182028 | CR | Approval | 23.401 CR3409: PGW Allocation of Bearer IDs to accommodate non-ubiquitous 15 bearer support | T-Mobile USA | Rel-15 | INOBEAR | Not Handled | Not Handled |
6.15 | S2-182211 | DISCUSSION | Discussion | INOBEAR assumptions, key issues and way forward | Rapporteur (Samsung) | Rel-15 | INOBEAR | Revision of endorsed Discussion document S2-181208. Not Handled | Not Handled |
6.16 | - | - | - | Study on System enhancements for Provision of Access to Restricted Local Operator Services by Unauthenticated UEs (FS_PARLOS_SA2) | - | - | {Krisztian} | - | - |
- | - | - | - | Incoming LS | - | - | - | - | - |
6.16 | S2-181450 | LS In | Action | LS from SA WG3: Reply LS on clarification on Restricted Operator Services | SA WG3 (S3-180347) | Rel-15 | FS_PARLOS_SA2 | Noted in parallel session. | Noted |
6.16 | S2-182136 | LS In | Action | LS from SA WG1: LS on clarification on Restricted Operator Services | SA WG1 (S1-180602) | Rel-16 | FS_PARLOS_SA2 | Noted in parallel session. | Noted |
- | - | - | - | Architectural assumptions | - | - | - | - | - |
6.16 | S2-181726 | P-CR | Approval | Update of RLOS architectural assumptions | Nokia, Nokia Shanghai Bell | Rel-15 | FS_PARLOS_SA2 | Revised in parallel session to S2-182508. | Revised |
6.16 | S2-182508 | P-CR | Approval | Update of RLOS architectural assumptions | Nokia, Nokia Shanghai Bell | Rel-15 | FS_PARLOS_SA2 | Revision of S2-181726. Approved. | Approved |
- | - | - | - | Key Issues | - | - | - | - | - |
6.16 | S2-181727 | P-CR | Approval | Update of RLOS key issues | Nokia, Nokia Shanghai Bell | Rel-15 | FS_PARLOS_SA2 | Revised in parallel session to S2-182509. | Revised |
6.16 | S2-182509 | P-CR | Approval | Update of RLOS key issues | Nokia, Nokia Shanghai Bell | Rel-15 | FS_PARLOS_SA2 | Revision of S2-181727. Revised in parallel session to S2-182888. | Revised |
6.16 | S2-182888 | P-CR | Approval | Update of RLOS key issues | Nokia, Nokia Shanghai Bell | Rel-15 | FS_PARLOS_SA2 | Revision of S2-182509. Approved. | Approved |
- | - | - | - | Solutions | - | - | - | - | - |
6.16 | S2-181882 | P-CR | Approval | Solution for Restricted IMS Local Operator Services | Qualcomm Incorporated | Rel-15 | FS_PARLOS_SA2 | Revised in parallel session to S2-182510. | Revised |
6.16 | S2-182510 | P-CR | Approval | Solution for Restricted IMS Local Operator Services | Qualcomm Incorporated | Rel-15 | FS_PARLOS_SA2 | Revision of S2-181882. Approved. | Approved |
6.16 | S2-181707 | P-CR | Approval | Solution to Key issue #EPC-1 | Ericsson | Rel-15 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-181708 | P-CR | Approval | Solution to Key issue #EPC-3 | Ericsson | Rel-15 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-182274 | P-CR | Approval | Solution for initial RLOS access | Motorola Mobility, Lenovo | Rel-15 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-181728 | P-CR | Approval | Solution: EPC procedures for RLOS | Nokia, Nokia Shanghai Bell, Verizon | Rel-15 | FS_PARLOS_SA2 | Revised in parallel session to S2-182511. | Revised |
6.16 | S2-182511 | P-CR | Approval | Solution: EPC procedures for RLOS | Nokia, Nokia Shanghai Bell, Verizon | Rel-15 | FS_PARLOS_SA2 | Revision of S2-181728. Approved. | Approved |
6.16 | S2-182192 | P-CR | Approval | Solution for RLOS attach procedure | NEC Corporation | Rel-15 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-182115 | P-CR | Approval | Solution for EPC#4 Support of authenticated UEs | Samsung | Rel-15 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-181799 | P-CR | Approval | 23.715: Solution to Key issue #EPC-6 Collection of charging information | Ericsson | Rel-15 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-181709 | P-CR | Approval | Solution to Key issue IMS-1, IMS-2, and IMS-3 | Ericsson | Rel-15 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.16 | S2-181729 | P-CR | Approval | Solution: IMS procedures for RLOS | Nokia, Nokia Shanghai Bell, Verizon | Rel-15 | FS_PARLOS_SA2 | Not Handled | Not Handled |
6.17 | - | - | - | Study on EPC support for Mobility with Low Latency Communication (FS_LLC_Mob) | - | - | {Frank} | - | - |
6.17 | S2-181748 | P-CR | Approval | PGW Initiated Low Latency PDN Connection Mobility | Cisco Systems, Vodafone | Rel-16 | FS_LLC_Mob | Revised in parallel session to S2-182746. | Revised |
6.17 | S2-182746 | P-CR | Approval | PGW Initiated Low Latency PDN Connection Mobility | Cisco Systems, Vodafone | Rel-16 | FS_LLC_Mob | Revision of S2-181748. Revised to S2-182978. | Revised |
6.17 | S2-182978 | P-CR | Approval | PGW Initiated Low Latency PDN Connection Mobility | Cisco Systems, Vodafone | Rel-16 | FS_LLC_Mob | Revision of S2-182746. This was left for e-mail approval. | OPEN |
6.17 | S2-182199 | P-CR | Approval | Triggering S/PGW-U reselection | Vodafone | Rel-16 | FS_LLC_Mob | Revised in parallel session to S2-182747. | Revised |
6.17 | S2-182747 | P-CR | Approval | Triggering S/PGW-U reselection | Vodafone | Rel-16 | FS_LLC_Mob | Revision of S2-182199. Approved. | Approved |
6.17 | S2-182272 | P-CR | Approval | Update to Solution #1 | Intel | Rel-16 | FS_LLC_Mob | Agreed in parallel session. Block approved. | Approved |
6.18 | - | - | - | EPC support for E-UTRAN URLLC (EPS_URLLC) | - | - | {Frank} | - | - |
6.18 | S2-182137 | LS In | Action | LS from SA WG1: Reply LS on URLLC | SA WG1 (S1-180628) | Rel-15 | Response drafted in S2-182730. Final response in S2-183015. | Replied to | |
6.18 | S2-182025 | CR | Approval | 23.203 CR1116: QCIs for URLLC | Vodafone | Rel-15 | EPS_URLLC | Revised to S2-182729. | Revised |
6.18 | S2-182729 | CR | Approval | 23.203 CR1116R1: QCIs for URLLC | Vodafone | Rel-15 | EPS_URLLC | Revision of S2-182025. Agreed in parallel session. Block approved. | Agreed |
6.18 | S2-182730 | LS OUT | Approval | [DRAFT] Reply LS on URLLC | SA WG2 | Rel-15 | Created in parallel session. Response to S2-182137. Revised to S2-183011. | Revised | |
6.18 | S2-183011 | LS OUT | Approval | [DRAFT] Reply LS on URLLC | SA WG2 | Rel-15 | Revision of S2-182730. Revised to S2-183015. | Revised | |
6.18 | S2-183015 | LS OUT | Approval | Reply LS on URLLC | SA WG2 | Rel-15 | Revision of S2-183011. Approved. | Approved | |
6.19 | - | - | - | Study on core network aspects of signalling reduction to enable light connection for LTE (FS_LC) | - | - | {Not_on_agenda} | - | - |
6.21 | - | - | - | TEI16 Category B/C - Enhancements and Improvements only - 3GPP Packet Access | - | - | {Puneet} | - | - |
6.21 | S2-182235 | CR | Approval | 23.401 CR3392R1: MME handling of unsupported APN | Nokia, Nokia Shanghai Bell, Verizon, Ericsson | Rel-15 | TEI15 | Revision of postponed DRAFTCR S2-180647. Revised in parallel session to S2-182371. | Revised |
6.21 | S2-182371 | CR | Approval | 23.401 CR3392R2: MME handling of unsupported APN | Nokia, Nokia Shanghai Bell, Verizon, Ericsson | Rel-15 | TEI15 | Revision of S2-182235. Agreed in parallel session. Block approved. | Agreed |
6.22 | - | - | - | TEI16 Category B/C - Enhancements and Improvements only - PCC/QoS | - | - | {Not_on_agenda} | - | - |
6.23 | - | - | - | TEI16 Category B/C - Enhancements and Improvements only - Non-3GPP Access | - | - | {Not_on_agenda} | - | - |
6.24 | - | - | - | TEI16 Category B/C - Enhancements and Improvements only - IMS, IMS-Related, Emergency, Other | - | - | {Puneet} | - | - |
6.24 | S2-182285 | LS In | Information | LS from GSMA RILTE: LS on PS Data Off for 5G | GSMA RILTE (RILTE64_117) | Noted in parallel session. | Noted | ||
6.24 | S2-181797 | DISCUSSION | Decision | 23.501 Data Off in 5GS | Ericsson | Rel-15 | 5GS_Ph1 | Noted in parallel session. | Noted |
6.24 | S2-181798 | CR | Approval | 23.501 CR0097: 23.501 Data Off in 5GS | Ericsson | Rel-15 | 5GS_Ph1 | Not Handled | Not Handled |
6.24 | S2-182071 | DISCUSSION | Discussion | Potential Enhancement to support 3GPP PS DATA OFF Feature in 5GS | Intel | Noted in parallel session. | Noted | ||
6.24 | S2-182072 | CR | Approval | 23.501 CR0141: Supporting 3GPP PS Data Off in 5GS | Intel, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Huawei, HiSilicon, ZTE, OPPO | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182356. | Revised |
6.24 | S2-182356 | CR | Approval | 23.501 CR0141R1: Supporting 3GPP PS Data Off in 5GS | Intel, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Huawei, HiSilicon, ZTE, OPPO | Rel-15 | 5GS_Ph1 | Revision of S2-182072. This CR was agreed. | Agreed |
6.24 | S2-182073 | CR | Approval | 23.502 CR0199: Supporting 3GPP PS Data Off in 5GS | Intel, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Huawei, HiSilicon, ZTE, OPPO | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182357. | Revised |
6.24 | S2-182357 | CR | Approval | 23.502 CR0199R1: Supporting 3GPP PS Data Off in 5GS | Intel, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Huawei, HiSilicon, ZTE, OPPO | Rel-15 | 5GS_Ph1 | Revision of S2-182073. This CR was agreed. | Agreed |
6.24 | S2-182074 | CR | Approval | 23.503 CR0028: Supporting 3GPP PS Data Off in 5GS | Intel, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Huawei, HiSilicon, ZTE, OPPO | Rel-15 | 5GS_Ph1 | Revised in parallel session to S2-182358. | Revised |
6.24 | S2-182358 | CR | Approval | 23.503 CR0028R1: Supporting 3GPP PS Data Off in 5GS | Intel, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Huawei, HiSilicon, ZTE, OPPO | Rel-15 | 5GS_Ph1 | Revision of S2-182074. Revised to S2-182996. | Revised |
6.24 | S2-182996 | CR | Approval | 23.503 CR0028R2: Supporting 3GPP PS Data Off in 5GS | Intel, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Huawei, HiSilicon, ZTE, OPPO | Rel-15 | 5GS_Ph1 | Revision of S2-182358. This CR was agreed. | Agreed |
7 | - | - | - | Project Planning and Management | - | - | {Frank} | - | - |
7.1 | - | - | - | New and Revised Work Items, Cover sheets for completed work items, TEI16 proposals | - | - | {Frank} | - | - |
7.1 | S2-181422 | LS In | Information | LS from NGNM Alliance: LS reply to ETSI ISG NFV on lifecycle management for 3GPP service based architecture | NGNM Alliance (NGNM-171124) | Postponed S2-180022 from S2#125. Noted. | Noted | ||
7.1 | S2-181431 | LS In | Information | LS from NGNM: NGMN White Paper on Service-based Architecture in 5G | NGNM (180105 Liaison NGMN) | Postponed S2-181110 from S2#125. Noted. | Noted | ||
7.1 | S2-181990 | SID NEW | Approval | New SID for Enhancements to the Service-Based 5G System Architecture | Deutsche Telekom, China Mobile, AT&T, NTT Docomo, Sprint, Vodafone, KDDI, Verizon, CATT, BT Plc, Interdigital, Telecom Italia, China Telecom, SK Telecom, Telia Company AB, Ericsson, ZTE, KT, Orange, CATR, NEC | Revised to S2-182541. | Revised | ||
7.1 | S2-182541 | SID NEW | Approval | New SID for Enhancements to the Service-Based 5G System Architecture | Deutsche Telekom, China Mobile, AT&T, NTT Docomo, Sprint, Vodafone, KDDI, Verizon, CATT, BT Plc, Interdigital, Telecom Italia, China Telecom, SK Telecom, Telia Company AB, Ericsson, ZTE, KT, Orange, CATR, NEC | Revision of S2-181990. Revised to S2-182904. | Revised | ||
7.1 | S2-182904 | SID NEW | Approval | New SID for Enhancements to the Service-Based 5G System Architecture | Deutsche Telekom, China Mobile, AT&T, NTT Docomo, Sprint, Vodafone, KDDI, Verizon, CATT, BT Plc, Interdigital, Telecom Italia, China Telecom, SK Telecom, Telia Company AB, Ericsson, ZTE, KT, Orange, CATR, NEC | - | - | Revision of S2-182541. Approved. | Approved |
7.1 | S2-181674 | SID NEW | Approval | New SID: Enhancement of URLLC supporting in 5G | Huawei, China Telecom, CATR, Telecom Italia, InterDigital, CATT, China Mobile, China Unicom, HiSilicon, III, Deutsche Telekom, NEC, Orange, NTT Docomo, Sprint, AT&T, Verizon, KDDI, ITRI, Oppo | Revised to S2-182542. | Revised | ||
7.1 | S2-182542 | SID NEW | Approval | New SID: Enhancement of URLLC supporting in 5G | Huawei, China Telecom, CATR, Telecom Italia, InterDigital, CATT, China Mobile, China Unicom, HiSilicon, III, Deutsche Telekom, NEC, Orange, NTT Docomo, Sprint, AT&T, Verizon, KDDI, ITRI, Oppo | Revision of S2-181674. Revised to S2-182905. | Revised | ||
7.1 | S2-182905 | SID NEW | Approval | New SID: Enhancement of URLLC supporting in 5G | Huawei, China Telecom, CATR, Telecom Italia, InterDigital, CATT, China Mobile, China Unicom, HiSilicon, III, Deutsche Telekom, NEC, Orange, NTT Docomo, Sprint, AT&T, Verizon, KDDI, ITRI, Oppo | - | - | Revision of S2-182542. Approved. | Approved |
7.1 | S2-181767 | SID NEW | Approval | New SID on Enhanced support of Vertical and LAN Services | Nokia, Nokia Shanghai Bell, Qualcomm, SK Telecom, Telecom Italia, Siemens, Robert Bosch GmbH, Charter Communications, Comcast, NTT DoCoMo, KDDI, Samsung | Revised to S2-182543. | Revised | ||
7.1 | S2-182543 | SID NEW | Approval | New SID on Enhanced support of Vertical and LAN Services | Nokia, Nokia Shanghai Bell, Qualcomm, SK Telecom, Telecom Italia, Siemens, Robert Bosch GmbH, Charter Communications, Comcast, NTT DoCoMo, KDDI, Samsung | Revision of S2-181767. Revised off-line to S2-182860. | Revised | ||
7.1 | S2-182860 | SID NEW | Approval | New SID on Enhanced support of Vertical and LAN Services | Nokia, Nokia Shanghai Bell, Qualcomm, SK Telecom, Telecom Italia, Siemens, Robert Bosch GmbH, Charter Communications, Comcast, NTT DoCoMo, KDDI, Samsung | Revision of S2-182543. Revised to S2-182906. | Revised | ||
7.1 | S2-182906 | SID NEW | Approval | New SID on Enhanced support of Vertical and LAN Services | Nokia, Nokia Shanghai Bell, Qualcomm, SK Telecom, Telecom Italia, Siemens, Robert Bosch GmbH, Charter Communications, Comcast, NTT DoCoMo, KDDI, Samsung | - | - | Revision of S2-182860. Withdrawn (not provided). | Withdrawn |
7.1 | S2-182135 | LS In | Action | LS from SA WG1: LS on support of Voice Service Continuity from 5G System to UTRAN CS | SA WG1 (S1-180595) | Rel-16 | 5GVSC | Noted. | Noted |
7.1 | S2-181777 | SID NEW | Approval | New SID - Study for single radio voice continuity from 5GS to 3G | China Unicom, Huawei | Rel-16 | Revised to S2-182544. | Revised | |
7.1 | S2-182544 | SID NEW | Approval | New SID - Study for single radio voice continuity from 5GS to 3G | China Unicom, Huawei | Rel-16 | Revision of S2-181777. Revised to S2-182907. | Revised | |
7.1 | S2-182907 | SID NEW | Approval | New SID - Study for single radio voice continuity from 5GS to 3G | China Unicom, Huawei | Rel-16 | - | Revision of S2-182544. Revised to S2-182912. | Revised |
7.1 | S2-182912 | SID NEW | Approval | New SID - Study for single radio voice continuity from 5GS to 3G | China Unicom, Huawei | Rel-16 | - | Revision of S2-182907. Approved. Deutsche Telekom objected to this as they consider the Scope of the work too limited. | Approved |
7.1 | S2-182205 | SID NEW | Approval | Study on Application Awareness Interworking between LTE and NR | China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO | Rel-16 | S2-179533. Revised to S2-182284. | Revised | |
7.1 | S2-182284 | SID NEW | Approval | Study on Application Awareness Interworking between LTE and NR | China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO | Rel-16 | Revision of S2-182205. LATE DOC: Rx 25/02, 21:20. Revised off-line to S2-182740. | Revised | |
7.1 | S2-182740 | SID NEW | Approval | Study on Application Awareness Interworking between LTE and NR | China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO | Rel-16 | 5GS_Ph1 | Revision of S2-182284. Revised to S2-182751. | Revised |
7.1 | S2-182751 | SID NEW | Approval | Study on Application Awareness Interworking between LTE and NR | China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO | Rel-16 | 5GS_Ph1 | Revision of S2-182740. Revised to S2-182908. | Revised |
7.1 | S2-182908 | SID NEW | Approval | Study on Application Awareness Interworking between LTE and NR | China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO | Rel-16 | 5GS_Ph1 | Revision of S2-182751. Revised to S2-182994. | Revised |
7.1 | S2-182994 | SID NEW | Approval | Study on Application Awareness Interworking between LTE and NR | China Telecom, China Mobile, China Unicom, Sprint, CATR, Huawei, Samsung, CATT, ZTE, OPPO | Rel-16 | 5GS_Ph1 | Revision of S2-182908. Approved. | Approved |
7.1 | S2-181961 | SID NEW | Approval | 5GMBS Study Item proposal | Huawei, HiSilicon | Revised to S2-182752. | Revised | ||
7.1 | S2-182752 | SID NEW | Approval | 5GMBS Study Item proposal | Huawei, HiSilicon | Revision of S2-181961. This was postponed. | Postponed | ||
7.1 | S2-181725 | SID REVISED | Approval | Update of PARLOS SID | SA WG2 | Rel-15 | FS_PARLOS_SA2 | Revised to S2-182753. | Revised |
7.1 | S2-182753 | SID REVISED | Approval | Update of PARLOS SID | SA WG2 | Rel-15 | FS_PARLOS_SA2 | Revision of S2-181725. Approved. | Approved |
7.1 | S2-181750 | SID NEW | Approval | Study on Network Slicing Phase-2 | ZTE, Oracle, Telecom Italia, ETRI, Nokia, Nokia Shanghai Bell, Verizon, Convida Wireless, Interdigital, NTT DoCoMo(?), NEC(?), | Rel-16 | Confirm sources. Revised to S2-182754. | Revised | |
7.1 | S2-182754 | SID NEW | Approval | Study on Network Slicing Phase-2 | ZTE, Oracle, Telecom Italia, ETRI, Nokia, Nokia Shanghai Bell, Verizon, Convida Wireless, Interdigital, KDDI, NTT DoCoMo, NEC, AT&T, Ericsson | Rel-16 | Revision of S2-181750. Revised in parallel session to S2-182909. | Revised | |
7.1 | S2-182909 | SID NEW | Approval | Study on Network Slicing Phase-2 | ZTE, Oracle, Telecom Italia, ETRI, Nokia, Nokia Shanghai Bell, Verizon, Convida Wireless, Interdigital, KDDI, NTT DoCoMo, NEC, AT&T, Ericsson | Rel-16 | - | Revision of S2-182754. Revised to S2-182913. | Revised |
7.1 | S2-182913 | SID NEW | Approval | Study on Network Slicing Phase-2 | ZTE, Oracle, Telecom Italia, ETRI, Nokia, Nokia Shanghai Bell, Verizon, Convida Wireless, Interdigital, KDDI, NTT DoCoMo, NEC, AT&T, Ericsson | Rel-16 | - | Revision of S2-182909. Approved. | Approved |
7.1 | S2-181430 | LS In | Action | LS from GSMA PACKET: LS on the definition of the Mx functionality in support of the S8HR architecture | GSMA PACKET (PACKET_96_113) | Postponed S2-180773 from S2#125. It was decided to allow 0.5 session for this at the SA WG2#127BIS meeting in May 2018. This LS was then noted. | Noted | ||
7.1 | S2-181901 | DISCUSSION | Approval | Enhanced SRVCC for S8HR | Ericsson, Vodafone, Deutsche Telekom, NTT DoCoMo | Rel-16 | Not Handled | Not Handled | |
7.1 | S2-182109 | SID NEW | Information | New SID on supporting Flexible Local Area Data Network | LG Electronics | Rel-16 | Noted. | Noted | |
7.1 | S2-182269 | SID NEW | Approval | Study on enhancement of systems using EPS for Ultra Reliability using commodity equipment | Vodafone | Rel-16 | Revised to S2-182755. | Revised | |
7.1 | S2-182755 | SID NEW | Approval | Study on enhancement of systems using EPS for Ultra Reliability using commodity equipment | Vodafone | Rel-16 | Revision of S2-182269. Revised to S2-182910. | Revised | |
7.1 | S2-182910 | SID NEW | Approval | Study on enhancement of systems using EPS for Ultra Reliability using commodity equipment | Vodafone | Rel-16 | - | Revision of S2-182755. Approved. | Approved |
7.1 | S2-182105 | DISCUSSION | Discussion | Enabling core network sharing in Rel-16 | NICT | Rel-16 | 5GS_Ph1 | Noted. | Noted |
7.1 | S2-182230 | DISCUSSION | Discussion | Discussion on Handover Enhancement | OPPO | Noted. | Noted | ||
7.1 | S2-182493 | SID REVISED | Approval | 5WWC SID revision | Huawei | Rel-16 | FS_5WWC | Revision of S2-181918. Revised to S2-182911. | Revised |
7.1 | S2-182911 | SID REVISED | Approval | 5WWC SID revision | Huawei | Rel-16 | FS_5WWC | Revision of S2-182493. Faulty file uploaded. Revised to S2-183016. | Revised |
7.1 | S2-183016 | SID REVISED | Approval | 5WWC SID revision | Huawei | Rel-16 | FS_5WWC | Revision of S2-182911. Revised to S2-183026. | Revised |
7.1 | S2-183026 | SID REVISED | Approval | 5WWC SID revision | Huawei | Rel-16 | FS_5WWC | Revision of S2-183016. Approved. | Approved |
7.2 | - | - | - | Review of the Work Plan | - | - | {Frank} | - | - |
7.2 | S2-182247 | OTHER | Endorsement | SA WG2 Work Planning Worksheet | SA WG2 Chairman (HuaWei) | Revised to S2-182756. | Revised | ||
7.2 | S2-182756 | OTHER | Endorsement | SA WG2 Work Planning Worksheet | SA WG2 Chairman (HuaWei) | Revision of S2-182247. Endorsed. | Endorsed | ||
7.2 | S2-182267 | OTHER | Endorsement | Work planning proposal | SA WG2 Chairman (HuaWei) | This was reviewed and endorsed. | Endorsed | ||
7.3 | - | - | - | Planning future meetings | - | - | {Frank} | - | - |
8 | - | - | - | AOB | - | - | {Frank} | - | - |
8 | S2-182257 | OTHER | Information | Working Process and Procedures | SA WG2 Chairman (HuaWei) | Noted. | Noted | ||
9 | - | - | - | Close of the Meeting | - | - | {Frank} | - | - |
99 | - | - | - | Withdrawn and reserved documents | - | - | {Withdrawn} | - | - |
99 | S2-182622 | CR | Approval | 23.502 CR0124R2: Updates to the EPS IWK message flow for PCC procedures | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of S2-182614. Withdrawn. | Withdrawn |
99 | S2-182160 | DISCUSSION | Discussion | Creating and editing figures in our specifications | Cisco Systems Belgium | Rel-15 | WITHDRAWN. | Withdrawn | |
99 | S2-182085 | CR | Approval | 23.502 CR0202: Sending of wait time to the UE during non-3GPP related procedure | NEC Corporation | Rel-15 | 5GS_Ph1 | WITHDRAWN. | Withdrawn |
99 | S2-181845 | CR | Approval | 23.502 CR0146: Sending S-NSSAI to RAN during PDU session establishment | NEC Corporation | Rel-15 | 5GS_Ph1 | WITHDRAWN. missing | Withdrawn |
99 | S2-181465 | DISCUSSION | Agreement | Allowed NSSAI and Access Type | MediaTek Inc. | Rel-15 | 5GS_Ph1 | WITHDRAWN. NSSAI & Access | Withdrawn |
99 | S2-181458 | CR | Approval | 23.501 CR0001: Configuration information the UE may exchange with the SMF during the lifetime of a PDU session | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Revision of unhandled draftCR S2-180054. WITHDRAWN. | Withdrawn |
99 | S2-182268 | P-CR | Approval | Restricted connectivity to allow IoT UE remote provisioning | Motorola Mobility, Lenovo, Sprint | Rel-16 | FS_CIoT_5G | WITHDRAWN. | Withdrawn |
99 | S2-181908 | CR | Approval | 23.682 CR0383: Guard Time missing in Group Message Delivery via NIDD | Ericsson | Rel-15 | TEI15, NAPS | WITHDRAWN. | Withdrawn |
99 | S2-181751 | DRAFTCR | Approval | 23.501: Clarifications of Subscribed and Configured S-NSSAI update | ZTE Corporation, Telecom Italia, Oracle | Rel-15 | 5GS_Ph1 | Should be a CR for this meeting. WITHDRAWN. | Withdrawn |
99 | S2-182094 | CR | Approval | 23.502 CR0207: Network sharing for supporting RRC redirection procedure | Qualcomm Europe Inc.(Italy) | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181101. WITHDRAWN. | Withdrawn |
99 | S2-181602 | DRAFTCR | Approval | 23.501: Local deactivation of MICO mode for emergency services | vivo | Rel-15 | 5GS_Ph1 | Should be a CR for this meeting. WITHDRAWN. | Withdrawn |
99 | S2-181603 | DRAFTCR | Approval | 23.502: Notification response | vivo | Rel-15 | 5GS_Ph1 | Should be a CR for this meeting. WITHDRAWN. | Withdrawn |
99 | S2-182001 | DISCUSSION | Discussion | Discussion for DNN or S-NSSAI based Congestion Control | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | WITHDRAWN. | Withdrawn |
99 | S2-181456 | CR | Approval | 23.502 CR0004: Configuration information the UE may exchange with the SMF during the lifetime of a PDU session | Nokia, Nokia Shanghai Bell | Rel-15 | 5GS_Ph1 | Withdrawn (replaced by S2-181460). | Withdrawn |
99 | S2-181605 | DRAFTCR | Approval | 23.501: Re-activation of PDU sessions based on UE policy | vivo | Rel-15 | 5GS_Ph1 | Should be a CR for this meeting. WITHDRAWN. | Withdrawn |
99 | S2-181606 | DRAFTCR | Approval | 23.501: Re-activation of PDU sessions based on UE policy | vivo | Rel-15 | 5GS_Ph1 | Should be a CR for this meeting. WITHDRAWN. | Withdrawn |
99 | S2-181666 | CR | Approval | 23.502 CR0086: N4 reporting for PDU Session Inactivity | Huawei, HiSilicon | Rel-15 | 5GS_Ph1 | WITHDRAWN. | Withdrawn |
99 | S2-181483 | LS In | Action | LS from RAN WG3: Reply LS on User Plane Security Policy | RAN WG3 (R3-180637) | Rel-15 | NR_newRAT-Core | Revised to add attachments in S2-181852. WITHDRAWN. | Withdrawn |
99 | S2-181502 | CR | Approval | 23.502 CR0017: Update of NEF service for background data transfer | KDDI, Convida Wireless LLC, TOYOTA ITC, Huawei | Rel-15 | 5GS_Ph1 | Revision of Endorsed DraftCR S2-180071. WITHDRAWN. | Withdrawn |
99 | S2-181503 | CR | Approval | 23.502 CR0018: Update of NEF service for PFD management | KDDI, China Unicom | Rel-15 | 5GS_Ph1 | Revision of endorsed DraftCR S2-180072. WITHDRAWN. | Withdrawn |
99 | S2-181590 | CR | Approval | 23.503 CR0009: QoS rule generation | CATT | Rel-15 | 5GS_Ph1 | Revision of approved DraftCR S2-181056. WITHDRAWN. | Withdrawn |
99 | S2-181645 | CR | Approval | 23.503 CR0015: Corrections to description of session management related policy enforcement | Ericsson | Rel-15 | 5GS_Ph1 | Revision of not handled DRAFTCR S2-180408. WITHDRAWN. | Withdrawn |
99 | S2-181647 | CR | Approval | 23.502 CR0081: Moving Network Analytics functionality into 23.501 | Ericsson, AT&T | Rel-15 | 5GS_Ph1 | Revision of not handled DRAFTCR S2-180079. WITHDRAWN. | Withdrawn |
99 | S2-182010 | CR | Approval | 23.501 CR0132: Service Request procedure corrections | Vodafone GmbH | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-181308. WITHDRAWN. | Withdrawn |
99 | S2-181915 | DRAFTCR | Approval | 23.501: UE behavior clarification for Emergency Service | OPPO | Rel-15 | 5GS_Ph1 | Should be a CR for this meeting. WITHDRAWN. | Withdrawn |
99 | S2-182260 | CR | Approval | 23.502 CR0232: Clarification of interworking procedures without N26 interface | orange | Rel-15 | 5GS_Ph1 | Revision of approved DRAFTCR S2-180790. WITHDRAWN. | Withdrawn |
99 | S2-182263 | CR | Approval | 23.502 CR0233: Clarification on the use of indicators for the support of interworking without N26 and interworking with N26 | Orange | Rel-15 | 5GS_Ph1 | Revision of revised DRAFTCR S2-180793 (revision approved in S2-180814). WITHDRAWN. | Withdrawn |
99 | S2-182084 | CR | Approval | 23.501 CR0143: Sending wait time for non-3GPP related procedure | NEC Corporation | Rel-15 | 5GS_Ph1 | WITHDRAWN. | Withdrawn |
99 | S2-181683 | CR | Approval | 23.502 CR0096: Change to Required Inputs for Update service operation | OTD | Rel-15 | 5GS_Ph1 | WITHDRAWN. | Withdrawn |
99 | S2-181986 | CR | Approval | 23.502 CR0173: Clarification of definition of endpoint address | Huawei, Hisilicon | Rel-15 | 5GS_Ph1 | WITHDRAWN. | Withdrawn |
99 | S2-181987 | CR | Approval | 23.502 CR0174: SBA scope clarification | Huawei, Hisilicon | Rel-15 | 5GS_Ph1 | WITHDRAWN. | Withdrawn |
99 | S2-182140 | CR | Approval | 23.501 CR0156: Clarification of definition of endpoint address | Huawei, Hisilicon | Rel-15 | 5GS_Ph1 | WITHDRAWN. | Withdrawn |
99 | S2-182253 | P-CR | Approval | Solution for KI#8: Application Server and Local UPF (ULCL+PSA) relocation for Remote Driving | Huawei, HiSilicon | Rel-16 | FS_eV2XARC | WITHDRAWN. | Withdrawn |
99 | S2-182265 | P-CR | Approval | Key Issue on restricted connectivity for remote provisioning of IoT UEs | Qualcomm Incorporated | Rel-16 | FS_CIoT_5G | WITHDRAWN. | Withdrawn |
99 | S2-181913 | SID NEW | Approval | New SID on enhancement of URLLC supporting in 5GC | Huawei, China Telecom, CATR, Telecom Italia, InterDigital, CATT, China Mobile, China Unicom, HiSilicon, III, Deutsche Telekom, NEC, Orange, NTT Docomo, Sprint, AT&T, Verizon, KDDI, ITRI, Oppo | Revision of postponed S2-181074. WITHDRAWN. | Withdrawn |
Created: 2018-03-05 16:20     END OF LIST
Total documents: 1557