AGENDA S2-123
0 All Agenda Items S2-123
1 Opening of the meeting Frank
2 Approval of the agenda Frank
2.1 IPR Call and Antitrust Reminder Frank
3 Meeting reports Frank
4 General Frank
4.1 Common issues and Incoming LSs Frank
4.2 Voting on alternative solutions for 5G registration via untrusted non-3GPP access Frank
5 Pre-Rel-15 Essential Corrections Frank
5.1 3GPP Packet Access Maintenance Puneet
5.2 QoS and PCC Maintenance Krisztian
5.3 Non-3GPP Access Maintenance Krisztian
5.4 IMS and IMS-Related Maintenance Krisztian
6 Release 15 and future releases Frank
6.1 Rel-15 3GPP Packet Access Maintenance - essential corrections Puneet
6.2 Rel-15 PCC/QoS Maintenance- essential corrections Krisztian
6.3 Rel-15 Non-3GPP Access Maintenance- essential corrections Frank
6.4 Rel-15 IMS-Related Maintenance- essential corrections Krisztian
6.5 5G System Architecture Frank
6.5.1 General aspects, concepts and reference models Frank
6.5.2 Common Access Control, RM and CM functions and procedure flows Frank
6.5.3 Session management and continuity functions and flows Frank
6.5.4 Security related functions and flows Frank
6.5.5 QoS concept and functionality Frank
6.5.6 Policy and charging control Krisztian
6.5.7 3GPP access specific functionality and flows - not for tdocs, use sub-items Puneet
6.5.7.1 3GPP access specifics of RM and CM states. Registration area management and area restriction handling. 3GPP access specific aspects of the registration management procedure Puneet
6.5.7.2 MICO related Puneet
6.5.7.3 Handover procedures and related Puneet
6.5.7.4 Service Request procedures and related, including selective activation of UP connections Puneet
6.5.7.5 RRC_inactive related Puneet
6.5.8 Specific services support Puneet
6.5.9 Interworking and Migration Puneet
6.5.10 Non-3GPP access specific functionality and flows Krisztian
6.5.11 Framework functions Frank
6.6 Study on architecture enhancements for 3GPP support of advanced V2X services (FS_eV2XARC) Not_on_agenda
6.7 Study on the Wireless and Wireline Convergence for the 5G system architecture (FS_5WWC) Not_on_agenda
6.8 Study for enhanced VoLTE performance (FS_eVoLP) Krisztian
6.9 Unlicensed spectrum offloading system enhancements (USOS) Not_on_agenda
6.10 Study on architecture enhancements to ProSe UE-to-Network Relay (FS_REAR) Dario
6.11 EPC support for E-UTRAN URLLC (EPS_URLLC) Frank
6.12 Study on Access Traffic Steering, Switch and Splitting support in the 5G system architecture (FS_ATSSS) Not_on_agenda
6.13 PS Data Off Feature Phase 2 (PS_DATA_OFF2) Krisztian
6.14 EPC support for Option 3/3a/3x Dual Connectivity with New Radio (EDCE5) Frank
6.15 Study on core network aspects of signalling reduction to enable light connection for LTE Not_on_agenda
6.16 Study on System enhancements for Provision of Access to Restricted Local Operator Services by Unauthenticated UEs (FS_PARLOS_SA2) Not_on_agenda
6.21 TEI15 Category B/C - Enhancements and Improvements only 3GPP Packet Access Puneet
6.22 TEI15 Category B/C - Enhancements and Improvements only. PCC/QoS Not_on_agenda
6.23 TEI14 Category B/C - Enhancements and Improvements only. Non-3GPP Access Not_on_agenda
6.24 TEI15 Category B/C - Enhancements and Improvements only. IMS, IMS-Related, Emergency, Other Krisztian
7 Project Planning and Management Frank
7.1 New and Revised Work Items, Cover sheets for completed work items, TEI15 proposals Frank
7.2 Review of the Work Plan Frank
7.3 Planning future meetings Frank
8 AOB Frank
9 Close of the Meeting Frank
99 Withdrawn and reserved documents Withdrawn