0 | All Agenda Items | S2-120 |
1 | Opening of the meeting | Frank |
2 | Approval of the agenda | Frank |
2.1 | IPR Call and Antitrust Reminder | Frank |
3 | Meeting reports | Frank |
4 | General | Frank |
4.1 | Common issues and Incoming LSs | Frank |
5 | Pre-Rel-15 Essential Corrections | Frank |
5.1 | 3GPP Packet Access Maintenance | Puneet |
5.2 | QoS and PCC Maintenance | Krisztian |
5.3 | Non-3GPP Access Maintenance | Krisztian |
5.4 | IMS and IMS-Related Maintenance | Krisztian |
6 | Release 15 and future releases | Frank |
6.1 | Rel-15 3GPP Packet Access Maintenance - essential corrections | Not_on_agenda |
6.2 | Rel-15 PCC/QoS Maintenance- essential corrections | Not_on_agenda |
6.3 | Rel-15 Non-3GPP Access Maintenance- essential corrections | Not_on_agenda |
6.4 | Rel-15 IMS-Related Maintenance- essential corrections | Not_on_agenda |
6.5 | 5G System Architecture | Frank |
6.5.1 | General aspects, concepts and reference models | Frank |
6.5.2 | Access Control, RM and CM functions and flows | Frank |
6.5.3 | Session management and continuity functions and flows | Frank |
6.5.4 | Security related functions and flows | Frank |
6.5.5 | QoS concept and functionality | Puneet |
6.5.6 | Policy and charging control | Krisztian |
6.5.7 | 3GPP access specific functionality and flows | Frank |
6.5.8 | Specific services support | Puneet |
6.5.9 | Interworking and Migration | Frank |
6.5.10 | Non-3GPP access specific functionality and flows | Krisztian |
6.5.11 | Framework functions | Puneet |
6.5.12 | Support of RRC inactive | Frank |
6.6 | Study on Enhanced Isolated E-UTRAN Operation for Public Safety (FS_IOPS_LB) | Krisztian |
6.7 | Study on Complementary Features for Voice services over WLAN (FS_VoWLAN) | Krisztian |
6.8 | Study for enhanced VoLTE performance (FS_eVoLP) | Krisztian |
6.9 | Study on unlicensed spectrum offloading system enhancements (FS_USOS) | Puneet |
6.10 | Study on architecture enhancements to ProSe UE-to-Network Relay (FS_REAR) | Dario |
6.11 | Northbound APIs for SCEF - SCS/AS Interworking (NAPS) | Puneet |
6.12 | Inclusion of WLAN direct discovery technologies as an alternative for ProSe direct discovery (ProSe_WLAN_DD_Stage2) | Krisztian |
6.13 | PS Data Off Feature Phase 2 | Krisztian |
6.14 | EPC support for Option 3/3a/3x Dual Connectivity with New Radio | Puneet |
6.15 | Study on core network aspects of signalling reduction to enable light connection for LTE | Frank |
7 | Project Planning and Management | Frank |
7.1 | New and Revised Work Items, Cover sheets for completed work items | Frank |
7.2 | Review of the Work Plan | Frank |
7.3 | Planning future meetings | Frank |
8 | AOB | Frank |
9 | Close of the Meeting | Frank |
99 | Withdrawn and reserved documents | Withdrawn |