AI TD# Type Title Source Rel Work Item Comments Result
1 - - Opening of the meeting - - {Frank} - -
1 S2-165883 OTHER Welcome to Kaohsiung TAICS, Mediatek, Chunghwa Telecom, ITRI Noted Noted
2 - - Approval of the agenda - - {Frank} - -
2 S2-165473 Agenda Draft Agenda for SA WG2#117 SA WG2 Chairman Approved. The schedule will be updated on the local 'drafts' folder throughout the meeting. Approved
2.1 - - IPR Call and Antitrust Reminder - - {Frank} - -
3 - - Meeting reports - - {Frank} - -
3 S2-165474 REPORT Draft Report of SA WG2 meeting #116BIS SA WG2 Secretary Approved Approved
4 - - General - - {Frank} - -
4.1 - - Common issues and Incoming LSs - - {Frank} - -
4.1 S2-165484 LS In LS from TSG SA: Completion of SA WG3-LI Study TR 33.827 on S8HR TSG SA (SP-160744) Rel-14 FS_LIV8 Responses drafted in S2-165850 on IMS aspect under AI 6.4 and S2-165882 on SGW aspect under AI 6.1. Final response in S2-166231 Replied to
4.1 S2-166058 LS In LS from RAN WG3: LS on Flexible eNB-ID and Cell-ID in E-UTRAN RAN WG3 (R3-162637) Rel-14 LTE_FNBID-Core Not Handled. Postponed to meeting #118. Postponed
5 - - Pre-Rel-14 Essential Corrections - - {Frank} - -
5.1 - - 3GPP Packet Access Maintenance excluding CIOT maintenance - - {Frank} - -
5.1.1 - - 3GPP Packet Access Maintenance on Architecture enhancements for Cellular Internet of Things (CIOT) - - {Puneet} - -
- - - LSs - - - - -
5.1.1 S2-165478 LS In LS from ETSI TC LI: LI in the CIoT ETSI TC LI (LI(16)P43040r1) CIoT Noted in parallel session SA WG2 expect SA WG3 will take lead on this and if anything needs to be done from SA WG2 side, SA WG3 will come back to SA WG2. Noted
5.1.1 S2-165481 LS In LS from SA WG5: Reply LS to SA WG2, CT WG4 Response LSs on Control Plane CIoT Optimisation Indicator propagated to PGW for charging purpose SA WG5 (S5-165280) Rel-13 CIoT Noted in parallel session Noted
5.1.1 S2-165482 LS In LS from ITU-T JCA-IoT SC&C: LS on recent work by JCA-IoT and SC&C ITU-T JCA-IoT SC&C (sp15-jca-iotandsc&c-oLS-0003) Noted in parallel session SA WG2 expect TSG SA will provide response based on the existing work plan. Noted
- - - CIoT optimizations related - - - - -
5.1.1 S2-165670 CR 23.401 CR3136: Clarifying the UE behaviour for switch to UP Qualcomm Incorporated Rel-13 CIoT Noted in parallel session Noted
5.1.1 S2-165671 CR 23.401 CR3137: Clarifying the UE behaviour for switch to UP Qualcomm Incorporated Rel-14 CIoT Revised in parallel session to S2-166003. Revised
5.1.1 S2-166003 CR 23.401 CR3137R1: Clarifying the UE behaviour for switch to UP Qualcomm Incorporated Rel-14 CIoT Revision of S2-165671. Agreed in parallel session Block approved Agreed
5.1.1 S2-165674 CR 23.401 CR3138: Correction of handling of resume cause Intel Rel-13 CIoT Agreed in parallel session Block approved Agreed
5.1.1 S2-165675 CR 23.401 CR3139: Correction of handling of resume cause Intel Rel-14 CIoT Agreed in parallel session Block approved Agreed
5.1.1 S2-165736 CR 23.401 CR3140: APN Rate Control and emergency bearer service HTC Rel-13 CIoT Revised in parallel session to S2-166004. Revised
5.1.1 S2-166004 CR 23.401 CR3140R1: APN Rate Control and emergency bearer service HTC Rel-13 CIoT Revision of S2-165736. Revised in parallel session to S2-166194. Revised
5.1.1 S2-166194 CR 23.401 CR3140R2: APN Rate Control and emergency bearer service HTC Rel-13 CIoT Revision of S2-166004. Agreed in parallel session Block approved Agreed
5.1.1 S2-165737 CR 23.401 CR3141: APN rate control and emergency bearer service HTC Rel-14 CIoT Revised in parallel session, merging S2-165738, to S2-166005. Revised
5.1.1 S2-166005 CR 23.401 CR3141R1: APN rate control and emergency bearer service HTC Rel-14 CIoT Revision of S2-165737, merging S2-165738. Agreed in parallel session Block approved Agreed
5.1.1 S2-165738 CR 23.401 CR3142: Clarification to the APN rate control procedure HTC Rel-14 CIoT Merged with S2-165737 into S2-166005 Merged
5.1.1 S2-165857 CR 23.401 CR3144: Missing indirect forwarding tunnel deletion in TAU with SGW change Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CIoT Revised in parallel session to S2-166006. Revised
5.1.1 S2-166006 CR 23.401 CR3144R1: Missing indirect forwarding tunnel deletion in TAU with SGW change Nokia, Alcatel-Lucent Shanghai Bell, Ericsson Rel-14 CIoT Revision of S2-165857. Revised in parallel session to S2-166197. Revised
5.1.1 S2-166197 CR 23.401 CR3144R2: Missing indirect forwarding tunnel deletion in TAU with SGW change Nokia, Alcatel-Lucent Shanghai Bell, Ericsson Rel-14 HLcom Revision of S2-166006. Agreed in parallel session Block approved Agreed
- - - NIDD procedure related - - - - -
5.1.1 S2-165707 CR 23.682 CR0237: SCEF Behavior when MT NIDD Causes a Trigger Convida Wireless, Oracle Rel-14 CIoT Revised in parallel session to S2-166007. Revised
5.1.1 S2-166007 CR 23.682 CR0237R1: SCEF Behavior when MT NIDD Causes a Trigger Convida Wireless, Oracle Rel-14 CIoT Revision of S2-165707. Agreed in parallel session Block approved Agreed
5.1.1 S2-165759 CR 23.682 CR0241: Corrections for MT NIDD procedure to handle multiple non-IP data NEC Rel-13 CIoT Revised in parallel session to S2-166008. Revised
5.1.1 S2-166008 CR 23.682 CR0241R1: Corrections for MT NIDD procedure to handle multiple non-IP data NEC Rel-13 CIoT Revision of S2-165759. Revised in parallel session to S2-166195. Revised
5.1.1 S2-166195 CR 23.682 CR0241R2: Corrections for MT NIDD procedure to handle multiple non-IP data NEC Rel-13 CIoT Revision of S2-166008. Revised to S2-166267. Revised
5.1.1 S2-166267 CR 23.682 CR0241R3: Corrections for MT NIDD procedure to handle multiple non-IP data NEC Rel-13 CIoT Revision of S2-166195. This CR was agreed Agreed
5.1.1 S2-165760 CR 23.682 CR0242: Corrections for MT NIDD procedure to handle multiple non-IP data NEC Rel-14 CIoT Revised in parallel session to S2-166009. Revised
5.1.1 S2-166009 CR 23.682 CR0242R1: Corrections for MT NIDD procedure to handle multiple non-IP data NEC Rel-14 CIoT Revision of S2-165760. Revised in parallel session to S2-166196. Revised
5.1.1 S2-166196 CR 23.682 CR0242R2: Corrections for MT NIDD procedure to handle multiple non-IP data NEC Rel-14 CIoT Revision of S2-166009. Revised to S2-166268. Revised
5.1.1 S2-166268 CR 23.682 CR0242R3: Corrections for MT NIDD procedure to handle multiple non-IP data NEC Rel-14 CIoT Revision of S2-166196. This CR was agreed Agreed
5.1.1 S2-165852 CR 23.682 CR0243: Correction of T6a connection establishment parameters Nokia, Alcatel-Lucent Shanghai Bell Rel-13 CIoT Left open in parallel session. Noted in parallel session Noted
5.1.1 S2-165855 CR 23.682 CR0244: Correction of T6a Connection Establishment parameters Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CIoT Left open in parallel session. Noted in parallel session Noted
5.2 - - QoS and PCC Maintenance - - {Shabnam} - -
5.2 S2-165726 CR 23.203 CR1069: Remove 'same media type' requirement for Priority Sharing Motorola Solutions, Airwave Rel-13 TEI13, MCPTT No need for TEI13 WI Code. Revised in parallel session to S2-166088. SA WG2#118 may have additional discussion related to issues not yet addressed in this CR. But this CR stands on its own and will not affect the status of this CR due to unaddressed issues. Revised
5.2 S2-166088 CR 23.203 CR1069R1: Remove 'same media type' requirement for Priority Sharing Motorola Solutions, Airwave Rel-13 MCPTT Revision of S2-165726. Agreed in parallel session Block approved Agreed
5.2 S2-165727 CR 23.203 CR1070: Remove 'same media type' requirement for Priority Sharing Motorola Solutions, Airwave Rel-14 MCPTT Revised in parallel session to S2-166089. Revised
5.2 S2-166089 CR 23.203 CR1070R1: Remove 'same media type' requirement for Priority Sharing Motorola Solutions, Airwave Rel-14 MCPTT Revision of S2-165727. Agreed in parallel session Block approved Agreed
5.3 - - Non-3GPP Access Maintenance - - {Krisztian} - -
5.3 S2-165476 LS In LS from RAN WG2: LS on NBIFOM and steering command RAN WG2 (R2-165949) Rel-13 LTE_WLAN_radio-Core Revision of S2-164931. Not Handled. Postponed to meeting #118 Postponed
5.3 S2-165553 CR 23.161 CR0024: NBIFOM with RAN Controlled WLAN Interworking Ericsson Rel-13 NBIFOM Revised in parallel session to S2-165934. Revised
5.3 S2-165934 CR 23.161 CR0024R1: NBIFOM with RAN Controlled WLAN Interworking Ericsson, Intel Rel-13 NBIFOM Revision of S2-165553. Revised in parallel session to S2-166229. Add clauses affected and Broadcom as source Revised
5.3 S2-166229 CR 23.161 CR0024R2: NBIFOM with RAN Controlled WLAN Interworking Ericsson, Intel, Broadcom Rel-13 NBIFOM Revision of S2-165934. Agreed in parallel session Block approved Agreed
5.3 S2-165841 CR 23.161 CR0025: Correction related to RAN rules Intel Rel-13 NBIFOM Noted in parallel session Noted
5.3 S2-165493 CR 23.401 CR3130: Corrections for allowing seamless handovers of emergency sessions to WLAN Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revised in parallel session to S2-165935. Revised
5.3 S2-165935 CR 23.401 CR3130R1: Corrections for allowing seamless handovers of emergency sessions to WLAN Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-165493. Agreed in parallel session Block approved Agreed
5.3 S2-165494 CR 23.402 CR2967: Correction of emergency services continuity between WLAN and 3GPP access Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revised in parallel session to S2-165936. Revised
5.3 S2-165936 CR 23.402 CR2967R1: Correction of emergency services continuity between WLAN and 3GPP access Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-165494. Revised in parallel session to S2-166230. Revised
5.3 S2-166230 CR 23.402 CR2967R2: Correction of emergency services continuity between WLAN and 3GPP access Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-165936. Revised to S2-166266. Revised
5.3 S2-166266 CR 23.402 CR2967R3: Correction of emergency services continuity between WLAN and 3GPP access Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-166230. This CR was agreed Agreed
5.4 - - IMS and IMS-Related Maintenance - - {Krisztian} - -
5.4 S2-165510 CR 23.228 CR1161: Editorial change reflecting IMS being access agnostic Ericsson Rel-13 TEI13 Revised in parallel session to S2-165937. Undelete the word 'services'. Revised
5.4 S2-165937 CR 23.228 CR1161R1: Editorial change reflecting IMS being access agnostic Ericsson Rel-13 TEI13 Revision of S2-165510. Agreed in parallel session Block approved Agreed
5.4 S2-165511 CR 23.228 CR1162: Editorial changes and inclusion of Mp Reference Point and missing reference point P-CSCF - I-CSCF Ericsson Rel-13 TEI13 Revised in parallel session to S2-165939. Reference Point used for IMS media transport IP network services. Change Mb reference point definition to 'Reference Point used for IMS media transport IP network services'. Revised
5.4 S2-165939 CR 23.228 CR1162R1: Editorial changes and inclusion of Mp Reference Point and missing reference point P-CSCF - I-CSCF Ericsson Rel-13 TEI13 Revision of S2-165511. Agreed in parallel session Block approved Agreed
5.4 S2-165512 CR 23.228 CR1163: Editorial change reflecting IMS being access agnostic Ericsson Rel-14 TEI14 CR WI Code should be TEI13. Revised in parallel session to S2-165938. Undelete the word 'services'. Change WI code to TEI13 Revised
5.4 S2-165938 CR 23.228 CR1163R1: Editorial change reflecting IMS being access agnostic Ericsson Rel-14 TEI13 Revision of S2-165512. Agreed in parallel session Block approved Agreed
5.4 S2-165513 CR 23.228 CR1164: Editorial changes and inclusion of Mp Reference Point and missing reference point P-CSCF - I-CSCF Ericsson Rel-14 TEI14 CR WI Code should be TEI13. Revised in parallel session to S2-165940. Change Mb reference point definition to 'Reference Point used for IMS media transport IP network services' Change WI code to TEI13 Revised
5.4 S2-165940 CR 23.228 CR1164R1: Editorial changes and inclusion of Mp Reference Point and missing reference point P-CSCF - I-CSCF Ericsson Rel-14 TEI13 Revision of S2-165513. Agreed in parallel session Block approved Agreed
5.4 S2-165792 CR 23.292 CR0234R1: ICS MSC with I2 and T-ADS handling interaction Nokia Rel-13 TEI13, SAES-CSFB Merged in parallel session with S2-165818 into S2-165941 Merged
5.4 S2-165794 CR 23.292 CR0240: ICS MSC with I2 and T-ADS handling interaction Nokia Rel-14 TEI13, SAES-CSFB Merged in parallel session with S2-165819 into S2-165942 Merged
5.4 S2-165817 DISCUSSION Discussion on the MT via I2 ZTE ICSRA Noted in parallel session Noted
5.4 S2-165818 CR 23.292 CR0241: Mobile terminating via I2 while the UE moves the a new MSC. ZTE Rel-13 TEI13, ICSRA Revised in parallel session, merging S2-165792, to S2-165941. Revised
5.4 S2-165941 CR 23.292 CR0241R1: Mobile terminating via I2 while the UE moves the a new MSC. ZTE, Nokia Rel-13 TEI13, ICSRA Revision of S2-165818, merging S2-165792. Postponed in parallel session The CR is accepted as a working draft, it will be further enhanced and completed at the next meeting Postponed
5.4 S2-165819 CR 23.292 CR0242: Mobile terminating via I2 while the UE moves the a new MSC. ZTE Rel-14 TEI13, ICSRA Revised in parallel session, merging S2-165794, to S2-165942. Revised
5.4 S2-165942 CR 23.292 CR0242R1: Mobile terminating via I2 while the UE moves the a new MSC. ZTE, Nokia Rel-14 TEI13, ICSRA Revision of S2-165819, merging S2-165794. Postponed in parallel session The CR is accepted as a working draft, it will be further enhanced and completed at the next meeting Postponed
5.5 - - Study on architecture enhancements of cellular systems for ultra low complexity and low throughput Internet of Things (FS_AE_CIoT) - - {Not_on_agenda} - -
6 - - Release 14 - - {Frank} - -
6.1 - - Rel-14 3GPP Packet Access Maintenance - essential corrections - - {Frank} - -
6.1 S2-165908 LS In LS from RAN WG2: LS on The progress and questions for the light connection RAN WG2 (R2-167314) Rel-14 LTE_LIGHT_CON-Core LATE DOC: Rx 16/10, 11:30. Not Handled. Postponed to meeting #118 Postponed
6.1 S2-165882 LS OUT Draft Response LS to 'Completion of SA WG3-LI Study TR 33.827 on S8HR' Vodafone Rel-14 Response to S2-165484. Merged with S2-165850 Merge in IMS part reply (S2-165850), still FFS whether SGW part will be in the reply Merged
6.1 S2-165480 LS In LS from SA WG4: Reply LS on external interface for TV services SA WG4 (S4-161129) Rel-14 FS_AE_enTV Noted in parallel session Noted
6.1 S2-165475 LS In LS from RAN WG2: Reply LS on Multiple RoHC Contexts for MMCMH RAN WG2 (R2-165936) Rel-14 MMCMH_Enh Revision of S2-164930. Noted in parallel session Noted
6.1 S2-165540 DISCUSSION EPS bearer release for ProSe UE-to-Network Relay ASUSTeK Rel-14 eProSe-Ext-SA2 Moved from 6.28 (not on agenda). Noted in parallel session Noted
6.1 S2-165541 CR 23.303 CR0321: EPS bearer release for ProSe UE-to-Network Relay ASUSTeK Rel-14 eProSe-Ext-SA2 Moved from 6.28 (not on agenda). Revised in parallel session to S2-166019. Cat A. New note clarifying that it is for implementation. Revised
6.1 S2-166019 CR 23.303 CR0321R1: EPS bearer release for ProSe UE-to-Network Relay ASUSTeK Rel-14 eProSe-Ext-SA2 Revision of S2-165541. This CR was agreed Agreed
6.1 S2-166020 CR 23.303 CR0322: EPS bearer release for ProSe UE-to-Network Relay ASUSTeK Rel-13 eProSe-Ext-SA2 Created in parallel session. This CR was agreed Agreed
6.1 S2-165700 CR 23.246 CR0405: Corrections of MBMS Shared Network Huawei, HiSilicon Rel-14 AE_enTV Revised in parallel session to S2-166021. Revised
6.1 S2-166021 CR 23.246 CR0405R1: Corrections of MBMS Shared Network Huawei, HiSilicon Rel-14 AE_enTV Revision of S2-165700. This CR was agreed Agreed
6.1 S2-165859 CR 23.682 CR0245: Active Time correction in UE Power Save Mode Nokia, Alcatel-Lucent Shanghai Bell Rel-14 TEI14 Revised in parallel session to S2-166022. Revised
6.1 S2-166022 CR 23.682 CR0245R1: Active Time correction in UE Power Save Mode Nokia, Alcatel-Lucent Shanghai Bell Rel-14 TEI13 Revision of S2-165859. This CR was agreed Agreed
6.1 S2-166023 CR 23.682 CR0246: Active Time correction in UE Power Save Mode Nokia, Alcatel-Lucent Shanghai Bell Rel-13 TEI13 Created in parallel session. This CR was agreed Agreed
6.2 - - Rel-14 PCC/QoS Maintenance - essential corrections - - {Shabnam} - -
6.2 S2-165479 LS In LS from SA WG4: LS on QCI for CLUE Messages SA WG4 (S4-161022) Response drafted in parallel session in S2-166090. Final response in S2-166287 Replied to
6.2 S2-166090 LS OUT Reply LS on QCI for CLUE Messages SA WG2 - - Created in parallel session. Response to S2-165479. This was left for e-mail approval. Revision 1 approved. Revised to S2-166287. Shabnam (Ericsson) provides rev1. [Email forwarded by Maurice]. Sherry (Nokia) fine with rev1 S2 166090 rev1 APPROVED Revised
6.2 S2-166287 LS OUT Reply LS on QCI for CLUE Messages SA WG2 - - Response to S2-165479. e-mail revision 1 of S2-166090. Approved Approved
6.2 S2-165664 DISCUSSION SDCI Pull and Push Mode Optimization Nokia Rel-14 SDCI Noted in parallel session It is considered stage 3/error handling issue, as such no stage 2 changes required. IF needed, stage 3 makes final decision. Noted
6.2 S2-165665 CR 23.203 CR1067: Optimization for push mode and combination of pull and push mode Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SDCI Noted in parallel session Noted
6.2 S2-165699 CR 23.203 CR1068: QCI or/and ARP of the Default EPS Bearer change at a certain time on Gx Verizon, Oracle, Nokia Rel-14 TEI14 Revised in parallel session to S2-166091. Two questions: Rel-14 Cat B, and meeting time for Nov to address Cat B. - Rework the whole soln. - Deferred Rules use - Handling of priority/MPS services Revised
6.2 S2-166091 CR 23.203 CR1068R1: QCI or/and ARP of the Default EPS Bearer change at a certain time on Gx Verizon, Oracle, Nokia Rel-14 TEI14 Revision of S2-165699. WITHDRAWN (not provided) Withdrawn
6.3 - - Rel-14 Non-3GPP Access Maintenance - essential corrections - - {Krisztian} - -
6.4 - - Rel-14 IMS-Related Maintenance - essential corrections - - {Krisztian} - -
6.4 S2-165903 LS In LS from ETSI STQ: LS on IMS settings for UE testing ETSI STQ (STQ(16)053_032) LATE DOC: Rx 16/10, 11:00. Not Handled. Postponed to meeting #118. Postponed
6.4 S2-165573 LS OUT [Draft] Additional information on Emergency numbers in IR.21 TELECOM ITALIA S.p.A. V8 Response to S2-164307 (already replied to at S2#116BIS in S2-165433). Revised in parallel session to S2-165943. Revised
6.4 S2-165943 LS OUT [Draft] Additional information on Emergency numbers in IR.21 TELECOM ITALIA S.p.A. - V8 Revision of S2-165573. Revised in parallel session to S2-165966. Delete 'value' from Service Category Revised
6.4 S2-165966 LS OUT Additional information on Emergency numbers in IR.21 SA WG2 - V8 Revision of S2-165943. Agreed in parallel session Block approved Approved
6.4 S2-165849 CR 23.167 CR0306: Correction from IMPI to IMPU NTT DOCOMO Rel-14 V8 Revised in parallel session to S2-165945. Change IMPU to public user identity Change another instance of IMPI to public user identity in step 9 Revised
6.4 S2-165945 CR 23.167 CR0306R1: Correction from IMPI to IMPU NTT DOCOMO Rel-14 V8 Revision of S2-165849. Agreed in parallel session Block approved Agreed
6.4 S2-165850 LS OUT Completion of SA WG3-LI Study TR 33.827 on S8HR NTT DOCOMO Rel-14 V8 Response to S2-165484. Revised in parallel session to S2-165946. Revised
6.4 S2-165946 LS OUT Completion of SA WG3-LI Study TR 33.827 on S8HR NTT DOCOMO Rel-14 V8 Revision of S2-165850. Revised in parallel session to S2-166160. Revised
6.4 S2-166160 LS OUT Completion of SA WG3-LI Study TR 33.827 on S8HR NTT DOCOMO Rel-14 V8 Revision of S2-165946. Revised in parallel session to S2-166231. Editorial cleanup Revised
6.4 S2-166231 LS OUT Completion of SA WG3-LI Study TR 33.827 on S8HR NTT DOCOMO Rel-14 V8 Revision of S2-166160. Agreed in parallel session Block approved Approved
6.4 S2-165635 CR 23.237 CR0498: Robust Call Setup for VoLTE subscriber in LTE Huawei, HiSilicon Rel-14 RobVoLTE Revised in parallel session to S2-165944. Undelete step 10 Label previous step as step 8-9 Revised
6.4 S2-165944 CR 23.237 CR0498R1: Robust Call Setup for VoLTE subscriber in LTE Huawei, HiSilicon Rel-14 RobVoLTE Revision of S2-165635. Agreed in parallel session Block approved Agreed
6.4 S2-165652 CR 23.292 CR0239: Correction of ICS IWF behaviour for inbound roamers NEC Rel-14 SeDoC Revised in parallel session to S2-165923. Revised
6.4 S2-165923 CR 23.292 CR0239R1: Correction of ICS IWF behaviour for inbound roamers NEC, Deutsche Telekom AG Rel-14 SeDoC Revision of S2-165652. Agreed in parallel session Block approved Agreed
6.4 S2-165796 CR 23.167 CR0305: Update with SEW2 capabilities Nokia Rel-14 SEW2 Revised in parallel session to S2-165947. Change the NOTE: This Annex only applies to EPC access over S2a or S2b. Revised
6.4 S2-165947 CR 23.167 CR0305R1: Update with SEW2 capabilities Nokia Rel-14 SEW2 Revision of S2-165796. Agreed in parallel session Block approved Agreed
6.4 S2-165798 CR 23.237 CR0499: DRVCC for emergency call with S2a/S2b only Nokia Rel-14 SEW2 Agreed in parallel session Block approved Agreed
6.5 - - Support of Emergency services over WLAN (SEW2) - - {Not_on_agenda} - -
6.6 - - S8 Home Routing Architecture for VoLTE (V8) - - {Not_on_agenda} - -
6.7 - - Enhancements of Dedicated Core Networks selection mechanism (eDECOR) - - {Not_on_agenda} - -
6.8 - - Control and User Plane Separation of EPC nodes (CUPS) - - {Mirko} - -
- - - Section 7 of TS - Parameters - - - - -
6.8 S2-165876 DISCUSSION Discussion on Sx Parameters Huawei Rel-14 CUPS Noted in parallel session Noted
6.8 S2-165877 CR 23.214 CR0011: Sx Parameters Huawei, HiSilicon Rel-14 CUPS Revised in parallel session to S2-166071. Revised
6.8 S2-166071 CR 23.214 CR0011R1: Sx Parameters Huawei, HiSilicon Rel-14 CUPS Revision of S2-165877. WITHDRAWN (not provided) Withdrawn
6.8 S2-165554 CR 23.214 CR0004: Sx parameter corrections Ericsson Rel-14 CUPS Revised in parallel session to S2-166059. Revised
6.8 S2-166059 CR 23.214 CR0004R1: Sx parameter corrections Ericsson Rel-14 CUPS Revision of S2-165554. Revised in parallel session to S2-166177. Revised
6.8 S2-166177 CR 23.214 CR0004R2: Sx parameter corrections Ericsson Rel-14 CUPS Revision of S2-166059. Revised in parallel session to S2-166179. Revised
6.8 S2-166179 CR 23.214 CR0004R3: Sx parameter corrections Ericsson Rel-14 CUPS Revision of S2-166177. Revised to S2-166273. Revised
6.8 S2-166273 CR 23.214 CR0004R4: Sx parameter corrections Ericsson Rel-14 CUPS Revision of S2-166179. This CR was agreed Agreed
6.8 S2-165495 DISCUSSION Controlling the UP to buffer, drop or duplicate data packets Nokia, Alcatel-Lucent Shanghai Bell Noted in parallel session Noted
6.8 S2-165496 CR 23.214 CR0001: Controlling the UP to buffer, drop or duplicate data packets Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revised in parallel session to S2-166060. Revised
6.8 S2-166060 CR 23.214 CR0001R1: Controlling the UP to buffer, drop or duplicate data packets Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-165496. Revised in parallel session to S2-166176. Revised
6.8 S2-166176 CR 23.214 CR0001R2: Controlling the UP to buffer, drop or duplicate data packets Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-166060. Noted in parallel session Noted
- - - Section 5 of TS - FTEID & buffering - - - - -
6.8 S2-165556 DISCUSSION Discussion on mandatory support for TEID management and UP buffering Ericsson Rel-14 CUPS Noted in parallel session Noted
6.8 S2-165875 CR 23.214 CR0010: Buffering and F-TEIDu Allocation Huawei, HiSilicon, CMCC, ZTE, Ericsson, Nokia, China Unicom, China Telecom, Intel Rel-14 CUPS Revised in parallel session to S2-166061. Revised
6.8 S2-166061 CR 23.214 CR0010R1: Buffering and F-TEIDu Allocation Huawei, HiSilicon, CMCC, ZTE, Ericsson, Nokia, China Unicom, China Telecom, Intel Rel-14 CUPS Revision of S2-165875. Revised in parallel session to S2-166175. Revised
6.8 S2-166175 CR 23.214 CR0010R2: Buffering and F-TEIDu Allocation Huawei, HiSilicon, CMCC, ZTE, Ericsson, Nokia, China Unicom, China Telecom, Intel Rel-14 CUPS Revision of S2-166061. Agreed in parallel session Block approved Agreed
6.8 S2-165498 DISCUSSION Discussion on buffering in the user plane Nokia, Alcatel-Lucent Shanghai Bell Noted in parallel session Noted
6.8 S2-165499 CR 23.214 CR0003: Corrections to buffering in the user plane Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revised in parallel session to S2-166062. Revised
6.8 S2-166062 CR 23.214 CR0003R1: Corrections to buffering in the user plane Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-165499. Revised in parallel session to S2-166174. Revised
6.8 S2-166174 CR 23.214 CR0003R2: Corrections to buffering in the user plane Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-166062. Agreed in parallel session Block approved Agreed
- - - Section 5 of TS - UP function selection - - - - -
6.8 S2-165497 CR 23.214 CR0002: Corrections to User Plane selection function Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revised in parallel session to S2-166064. Revised
6.8 S2-166064 CR 23.214 CR0002R1: Corrections to User Plane selection function Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-165497. Revised in parallel session to S2-166078. Revised
6.8 S2-166078 CR 23.214 CR0002R2: Corrections to User Plane selection function Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-166064. Agreed in parallel session Block approved Agreed
6.8 S2-165746 CR 23.214 CR0007: Update to UP Selection Section Samsung Rel-14 CUPS Revised in parallel session to S2-166063. Revised
6.8 S2-166063 CR 23.214 CR0007R1: Update to UP Selection Section Samsung Rel-14 CUPS Revision of S2-165746. Revised in parallel session to S2-166077. Revised
6.8 S2-166077 CR 23.214 CR0007R2: Update to UP Selection Section Samsung Rel-14 CUPS Revision of S2-166063. Agreed in parallel session Block approved Agreed
6.8 S2-165888 CR 23.214 CR0014: Solution of TDF-U Selection in case of Unsolicited Reporting Huawei, HiSilicon Rel-14 CUPS Revised in parallel session to S2-166065. Revised
6.8 S2-166065 CR 23.214 CR0014R1: Solution of TDF-U Selection in case of Unsolicited Reporting Huawei, HiSilicon Rel-14 CUPS Revision of S2-165888. Revised in parallel session to S2-166076. Revised
6.8 S2-166076 CR 23.214 CR0014R2: Solution of TDF-U Selection in case of Unsolicited Reporting Huawei, HiSilicon Rel-14 CUPS Revision of S2-166065. Revised in parallel session to S2-166215. Revised
6.8 S2-166215 CR 23.214 CR0014R3: Solution of TDF-U Selection in case of Unsolicited Reporting Huawei, HiSilicon Rel-14 CUPS Revision of S2-166076. Agreed in parallel session Block approved Agreed
- - - Section 5 of TS - other functionality - - - - -
6.8 S2-165663 CR 23.214 CR0006: Update to PCC/ADC related functions Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revised in parallel session to S2-166066. Revised
6.8 S2-166066 CR 23.214 CR0006R1: Update to PCC/ADC related functions Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-165663. Revised in parallel session to S2-166178. Revised
6.8 S2-166178 CR 23.214 CR0006R2: Update to PCC/ADC related functions Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-166066. Revised in parallel session to S2-166214. Revised
6.8 S2-166214 CR 23.214 CR0006R3: Update to PCC/ADC related functions Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Revision of S2-166178. This CR was agreed Agreed
6.8 S2-165886 CR 23.214 CR0012: Support of PGW Pause of Charging Huawei, HiSilicon Rel-14 CUPS Revised in parallel session to S2-166067. Revised
6.8 S2-166067 CR 23.214 CR0012R1: Support of PGW Pause of Charging Huawei, HiSilicon Rel-14 CUPS Revision of S2-165886. Revised in parallel session to S2-166075. Revised
6.8 S2-166075 CR 23.214 CR0012R2: Support of PGW Pause of Charging Huawei, HiSilicon Rel-14 CUPS Revision of S2-166067. Revised in parallel session to S2-166213. Revised
6.8 S2-166213 CR 23.214 CR0012R3: Support of PGW Pause of Charging Huawei, HiSilicon Rel-14 CUPS Revision of S2-166075. Agreed in parallel session Block approved Agreed
- - - Section 6 of TS - Flows - - - - -
6.8 S2-165750 CR 23.214 CR0008: Text updates for 3GPP TS 23.401 call flows Samsung Rel-14 CUPS Revised in parallel session to S2-166068. Revised
6.8 S2-166068 CR 23.214 CR0008R1: Text updates for 3GPP TS 23.401 call flows Samsung Rel-14 CUPS Revision of S2-165750. Revised in parallel session to S2-166074. Revised
6.8 S2-166074 CR 23.214 CR0008R2: Text updates for 3GPP TS 23.401 call flows Samsung Rel-14 CUPS Revision of S2-166068. Agreed in parallel session Block approved Agreed
6.8 S2-165753 CR 23.214 CR0009: Text updates for 3GPP TS 23.402 call flows Samsung Rel-14 CUPS Revised in parallel session to S2-166069. Revised
6.8 S2-166069 CR 23.214 CR0009R1: Text updates for 3GPP TS 23.402 call flows Samsung Rel-14 CUPS Revision of S2-165753. Revised in parallel session to S2-166073. Revised
6.8 S2-166073 CR 23.214 CR0009R2: Text updates for 3GPP TS 23.402 call flows Samsung Rel-14 CUPS Revision of S2-166069. Agreed in parallel session Block approved Agreed
6.8 S2-165887 CR 23.214 CR0013: Sx Session Level Reporting Procedure Update Huawei, HiSilicon Rel-14 CUPS Revised in parallel session to S2-166070. Revised
6.8 S2-166070 CR 23.214 CR0013R1: Sx Session Level Reporting Procedure Update Huawei, HiSilicon Rel-14 CUPS Revision of S2-165887. Revised in parallel session to S2-166072. Revised
6.8 S2-166072 CR 23.214 CR0013R2: Sx Session Level Reporting Procedure Update Huawei, HiSilicon Rel-14 CUPS Revision of S2-166070. Agreed in parallel session. Revised to S2-166274. Revised
6.8 S2-166274 CR 23.214 CR0013R3: Sx Session Level Reporting Procedure Update Huawei, HiSilicon Rel-14 CUPS Revision of S2-166072. This was left for e-mail approval. e-mail approved. This CR was agreed Agreed
- - - Impact of other Rel-14 features - - - - -
6.8 S2-165555 DISCUSSION CUPS and SDCI interactions Ericsson Rel-14 CUPS Noted in parallel session Noted
6.8 S2-165661 DISCUSSION Functional split for SDCI Nokia Rel-14 CUPS Noted in parallel session Noted
6.8 S2-165662 CR 23.214 CR0005: SDCI support Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CUPS Noted in parallel session Working assumption to terminate Gw/Gwn with the PFDF at the CP function Noted
6.9 - - Improvement of awareness of user location change (AULC) - - {Not_on_agenda} - -
6.10 - - Study on Architecture for Next Generation System (FS_NextGen) - - {Frank} - -
6.10 S2-165774 LS IN LS from ETSI NFV: LS OUT on NFV-based solutions for next generation mobile networks ETSI NFV (NFV(16)000324r4) This LS was postponed to meeting SA WG2#118. Postponed
6.10 S2-165477 LS In LS from SA WG1: LS on 5G work alignment SA WG1 (S1-162544) Rel-15 SMARTER Revision of S2-164972. Response drafted in S2-165915. Final response in S2-166238. Replied to
6.10 S2-165915 LS OUT [DRAFT] LS reply on 5G work alignment SA WG2 FS_NextGen, SMARTER Response to S2-165477. Revised to S2-166238. Revised
6.10 S2-166238 LS OUT LS reply on 5G work alignment SA WG2 FS_NextGen, SMARTER Revision of S2-165915. Agreed in parallel session Block approved Approved
6.10 S2-165489 LS In LS from ITU-R WP 4B: INVITATION TO CONSIDER INTEGRATION OF SATELLITE-BASED SOLUTIONS INTO IMT-2020 NETWORKS ITU-R WP 4B (4B/TEMP/17) Noted Noted
6.10 S2-165491 LS In LS from SA WG3: LS on NG authentication functions SA WG3 (S3-161509) FS_NSA Noted Noted
6.10 S2-165492 LS In LS from SA WG3: Update on definitions of identifiers SA WG3 (S3-161527) Rel-14 FS_NSA Noted Noted
6.10 S2-165640 P-CR Correction of implementation error LG Electronics FS_NextGen Approved Approved
6.10 S2-165566 LS OUT LS to GSMA on NextGen Roaming AT&T Rel-14 Revised to S2-165916. Revised
6.10 S2-165916 LS OUT [DRAFT] LS to GSMA on Next Generation Roaming SA WG2 Rel-14 Revision of S2-165566. Revised to S2-166239. Revised
6.10 S2-166239 LS OUT [DRAFT] LS to GSMA on Next Generation Roaming SA WG2 Rel-14 Revision of S2-165916. This was left for e-mail approval. e-mail revision 2 approved. Revised to S2-166290. LaeYoung (LGE) provides rev1 Devaki (Nokia) provides rev1 Irfan (NTT DCM) rename Devaki's rev1 to rev2 S2 166239 rev2 APPROVED Revised
6.10 S2-166290 LS OUT LS to GSMA on Next Generation Roaming SA WG2 Rel-14 e-mail revision 2 of S2-166239. Approved Approved
6.10 S2-165483 LS In LS from TSG SA: Reply LS on Cooperation on NGS FMC TSG SA (SP-160743) Rel-14 FS_NextGen Noted Noted
6.10 S2-166145 OTHER NextGen questions for conclusion Rapporteurs (Nokia) FS_NextGen Revised to S2-166147. Revised
6.10 S2-166147 OTHER NextGen questions for conclusion Drafting convenor (Nokia) FS_NextGen Revision of S2-166145. Revised to S2-166172. Revised
6.10 S2-166172 OTHER NextGen questions for conclusion - updated during Thu Q1 session Rapporteurs (Nokia) FS_NextGen Revision of S2-166147. Endorsed and the agreements were extracted for inclusion in the TR in S2-166173 Endorsed
6.10 S2-166173 P-CR Interim agreements Extracted from Show of hands on Thursday, October 20 Nokia FS_NextGen Revised to S2-166237. Revised
6.10 S2-166237 P-CR Interim agreements Extracted from Show of hands on Thursday, October 20 Rapporteurs (Nokia) FS_NextGen Revision of S2-166173. Agreed in parallel session Block approved Approved
6.10.0 - - Input for TR clauses 1-4 and new proposed key issues - - {Not_on_agenda} - -
6.10.1 - - Updates and solutions for key issue 1: Support of network slicing - - {Frank} - -
6.10.1 S2-166051 DISCUSSION Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing Drafting Editor (Nokia) FS_NextGen Created in drafting session. Revised to S2-166097. Revised
6.10.1 S2-166097 DISCUSSION Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing Drafting Editor (Nokia) FS_NextGen Revision of S2-166051. Revised in drafting session to S2-166024. Revised
6.10.1 S2-166024 DISCUSSION Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing Drafting Editor (Nokia) - FS_NextGen Revision of S2-166097. Not Handled Not Handled
6.10.1 S2-166146 DISCUSSION Update to section 8.1.Interim Agreements based on drafting at SA WG2#117 Editor (Nokia) FS_NextGen Created at the meeting. Revised to S2-166210. Revised
6.10.1 S2-166210 DISCUSSION Update to section 8.1.Interim Agreements based on drafting at SA WG2#117 Editor (Nokia) FS_NextGen Revision of S2-166146. Agreed in parallel session Block approved Approved
6.10.1 S2-165904 LS In LS from NGMN: Update to NGMN Description of Network Slicing Concept NGMN (161010 Liaison NGMN P1 NW Slicing v1 0.) LATE DOC: Rx 16/10, 11:00. Incorrect attachment. Resubmitted in S2-166087. Withdrawn
6.10.1 S2-166087 LS In LS from NGMN: Update to NGMN Description of Network Slicing Concept NGMN (161010 Liaison NGMN P1 NW Slicing v1 0.) LATE DOC: Rx 18/10, 11:20. Replacement of S2-165904 with correct attachment (161010 Network Slicing framework v1.0.8.docx). Not Handled. Postponed to meeting #118. Postponed
6.10.1 S2-166055 DISCUSSION Observations on Network Slicing Approaches Qualcomm Inc. FS_NextGen Created at meeting. Not Handled Not Handled
6.10.1 S2-165696 DISCUSSION Network slicing way forward Nokia, ZTE, Telecom Italia, KDDI, Interdigital, SAMSUNG, ETRI, KPN Rel-14 Not Handled Not Handled
6.10.1 S2-165616 P-CR Deprioritizing Group A architecture for network slicing LG Electronics Inc., SK Telecom FS_NextGen Not Handled Not Handled
6.10.1 S2-165698 P-CR Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing Nokia, Telecom Italia, ZTE, InterDigital, KDDI, Samsung, ETRI, KPN FS_NextGen Not Handled Not Handled
6.10.1 S2-165762 P-CR Way forward on Solutions for Key Issue 1 on Network Slicing Qualcomm Incorporated FS_NextGen Not Handled Not Handled
6.10.1 S2-165485 DISCUSSION Recommended principles for network slicing MediaTek Inc. Rel-14 Not Handled Not Handled
6.10.1 S2-165684 P-CR Interim Agreements - Network Slicing Sprint, KDDI, ZTE, Interdigital, Telecom Italia, ETRI FS_NextGen Not Handled Not Handled
6.10.1 S2-165659 P-CR update of interim agreements on network slicing solution aspects China Mobile FS_NextGen Not Handled Not Handled
6.10.1 S2-165641 P-CR Slice ID usage and clarification Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.1 S2-165690 P-CR Update of interim agreements on network slicing Ericsson FS_NextGen Not Handled Not Handled
6.10.1 S2-165570 P-CR Recommendations to address Network Slicing Solutions design differences ETRI, ZTE Corporation FS_NextGen LATE DOC: Rx 11/10, 19:40. Not Handled Not Handled
6.10.1 S2-165756 P-CR Interim Agreements for network slicing Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.1 S2-165572 P-CR Interim conclusions on Network Slicing Intel FS_NextGen Not Handled Not Handled
6.10.1 S2-165624 P-CR PDU session identification over Multiple Slice LG Electronics FS_NextGen Not Handled Not Handled
6.10.1 S2-165802 P-CR Interim agreement: Determination of NSSAI based on UE policy Motorola Mobility, Lenovo FS_NextGen Revised to S2-166098. Revised
6.10.1 S2-166098 P-CR Interim agreement: Determination of NSSAI based on UE policy Motorola Mobility, Lenovo FS_NextGen Revision of S2-165802. WITHDRAWN (not provided) Withdrawn
6.10.1 S2-165834 P-CR Interim agreements on network slicing Samsung FS_NextGen Not Handled Not Handled
6.10.1 S2-165842 P-CR The Granularity of Network Slicing CATT FS_NextGen Not Handled Not Handled
6.10.1 S2-165879 P-CR Possible RAN use cases for slicing and other RAN impacts for RAN coordination Nokia FS_NextGen Not Handled Not Handled
6.10.1 S2-165725 P-CR Update of Network Slicing definitions NTT DOCOMO, NEC FS_NextGen Not Handled Not Handled
6.10.1 S2-165654 P-CR Evaluation of roaming solution in 6.1.1 Huawei, HiSilicon, CATR FS_NextGen Not Handled Not Handled
6.10.1 S2-165617 P-CR Evaluation on solution 1.3 LG Electronics Inc. FS_NextGen Not Handled Not Handled
6.10.1 S2-165618 P-CR Evaluation on solution 1.9 LG Electronics Inc. FS_NextGen Not Handled Not Handled
6.10.1 S2-165619 P-CR Evaluation on solution 1.11 LG Electronics Inc. FS_NextGen Not Handled Not Handled
6.10.1 S2-165580 P-CR Update to Solution 6.1.2 for Network Slicing InterDigital, ZTE, Telecom Italia FS_NextGen Not Handled Not Handled
6.10.1 S2-165851 P-CR Update on solution 1.2: Configuration of MDD in the UE for 3rd Party NW Slice Samsung FS_NextGen Not Handled Not Handled
6.10.1 S2-165853 P-CR Update on solution 1.2: Extending the Slice Type components of an MDD vector Samsung FS_NextGen Not Handled Not Handled
6.10.1 S2-165754 P-CR Home-routed PDU Session Request Procedure in roaming Network slicing support Samsung FS_NextGen Not Handled Not Handled
6.10.1 S2-165691 P-CR Update of Network slicing solution Ericsson FS_NextGen Not Handled Not Handled
6.10.1 S2-165724 P-CR Update of Network Slicing Solution 1.3 NTT DOCOMO FS_NextGen Not Handled Not Handled
6.10.1 S2-165897 P-CR Update to 6.1.3.2 Function description ITRI FS_NextGen Not Handled Not Handled
6.10.1 S2-165898 P-CR Update to Solution 6.1.3: Reselection in Common Control Plane Function ITRI FS_NextGen Not Handled Not Handled
6.10.1 S2-165797 P-CR Update to solution 6.1.3 CATT FS_NextGen Not Handled Not Handled
6.10.1 S2-165660 P-CR clarification of network slice ID in solution 1.6 China Mobile FS_NextGen Not Handled Not Handled
6.10.1 S2-165615 P-CR Clarification and evaluation on Solution 1.8 LG Electronics Inc. FS_NextGen Not Handled Not Handled
6.10.1 S2-165826 P-CR Network slice roaming support Samsung FS_NextGen Not Handled Not Handled
6.10.1 S2-165910 DISCUSSION Defining the LI Function for Network Slicing Solutions OTD FS_NextGen LATE REQ. LATE DOC: Rx: 16/10, 11:50. Not Handled Not Handled
6.10.1 S2-166079 LS In LS from NGMN Alliance Project P1: NGMN Paper on Edge Computing NGMN Alliance Project P1 (161010 Liaison NGMN P1 NW Slicing v1 0) LATE DOC: Rx 18/10, 08:00. Not Handled. Postponed to meeting #118. Postponed
6.10.2 - - Updates and solutions for key issue 2: QoS framework - - {Puneet} - -
- - - Overall Agreements - - - - -
6.10.2 S2-165788 P-CR Way forward proposal to progress the work on QoS Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen This is a way forward proposal and not a P-CR. Noted in parallel session Noted
6.10.2 S2-165782 P-CR Some QoS features - Way forward proposal Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Noted in parallel session Noted
6.10.2 S2-165835 DISCUSSION Way forward on NextGen QoS Framework Intel Noted Noted
6.10.2 S2-165836 P-CR Update to interim agreements for QoS framework Intel FS_NextGen Revised in parallel session to S2-165967. Revised
6.10.2 S2-165967 P-CR Update to interim agreements for QoS framework Intel - FS_NextGen Revision of S2-165836. Revised in parallel session to S2-166000. Revised
6.10.2 S2-166000 P-CR Update to interim agreements for QoS framework Intel - FS_NextGen Revision of S2-165967. Revised in parallel session to S2-166184. Revised
6.10.2 S2-166184 P-CR Update to interim agreements for QoS framework Intel - FS_NextGen Revision of S2-166000. Revised to S2-166271. Revised
6.10.2 S2-166271 P-CR Update to interim agreements for QoS framework Intel - FS_NextGen Revision of S2-166184. This was left for e-mail approval. e-mail revision 4 approved. Revised to S2-166293. Devaki (Nokia) provides rev1 Saso (Intel) comments. Cannot accept rev1. Stefano (Qualcomm) provides rev2 Saso (Intel) provides rev3 Peter (Ericsson) comments Devaki (Nokia) comments Devaki (Nokia) comments Devaki (Nokia) comments Saso (Intel) comments Devaki (Nokia) comments Saso (Intel) provides rev4 Stefano (Qualcomm) comments Devaki (Nokia) comments Saso (Intel) comments. Do not accept rev1 or rev2 Devaki (Nokia) comments. Can live with latest rev. Saso (Intel) comments. Asks Devaki if rev3 or rev4 is acceptable? Devaki (Nokia) prefers rev4 Saso (Intel) OK with rev4 Irfan (NTT DCM) comments Karl-Heinz (DT) comments Saso (Intel) comments S2 166271 rev4 APPROVED Revised
6.10.2 S2-166293 P-CR Update to interim agreements for QoS framework Intel - FS_NextGen e-mail revision 4 of S2-166271. Approved Approved
6.10.2 S2-165776 P-CR Interim agreements for QoS framework Nokia, Alcatel-Lucent Shanghai Bell, AT&T FS_NextGen Revised in parallel session, merging S2-165765and S2-165649, in S2-165968 Revised
6.10.2 S2-165968 P-CR Interim agreements for QoS framework Nokia, Alcatel-Lucent Shanghai Bell, AT&T - FS_NextGen Revision of S2-165776, merging S2-165765 and S2-165649. Revised in parallel session to S2-166185. Revised
6.10.2 S2-166185 P-CR Interim agreements for QoS framework Nokia, Alcatel-Lucent Shanghai Bell, AT&T - FS_NextGen Revision of S2-165968. Approved Approved
- - - Interim Agreements specific to reflective QoS - - - - -
6.10.2 S2-165539 P-CR Interim Agreement on Reflective QoS Ericsson FS_NextGen Revised in parallel session to S2-165969. Revised
6.10.2 S2-165969 P-CR Interim Agreement on Reflective QoS Ericsson - FS_NextGen Revision of S2-165539. Revised in parallel session to S2-166186. Revised
6.10.2 S2-166186 P-CR Interim Agreement on Reflective QoS Ericsson - FS_NextGen Revision of S2-165969. Approved Approved
6.10.2 S2-165648 P-CR Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos Huawei, HiSilicon FS_NextGen Revised in parallel session to S2-165970. Revised
6.10.2 S2-165970 P-CR Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos Huawei, HiSilicon - FS_NextGen Revision of S2-165648. Revised in parallel session to S2-166187. Revised
6.10.2 S2-166187 P-CR Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos Huawei, HiSilicon - FS_NextGen Revision of S2-165970. Revised to S2-166272. Revised
6.10.2 S2-166272 P-CR Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos Huawei, HiSilicon - FS_NextGen Revision of S2-166187. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166294. Saso (Intel) provides rev1 for 6272 but with wrong document # 6227 in the email subject. Puneet (Intel) Fixes email subject with the correct document # 6272 Devaki (Nokia) comments Chunshan (Huawei) comments Irfan (NTT DCM) comments Chunshan (Huawei) comments Peter (Ericsson) comments S2 166272 rev1 APPROVED Revised
6.10.2 S2-166294 P-CR Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos Huawei, HiSilicon - FS_NextGen e-mail revision 1 of S2-166272. Approved Approved
6.10.2 S2-165653 P-CR Update to Interim agreements on QoS framework - Reflective QoS China Mobile FS_NextGen Revised in parallel session to S2-165995. Revised
6.10.2 S2-165995 P-CR Update to Interim agreements on QoS framework - Reflective QoS China Mobile - FS_NextGen Revision of S2-165653. Noted in parallel session Noted
6.10.2 S2-165800 P-CR Interim agreement on reflective QoS LG Electronics FS_NextGen Revised in parallel session, merging S2-165653, to S2-165971. Revised
6.10.2 S2-165971 P-CR Interim agreement on reflective QoS LG Electronics, China Mobile - FS_NextGen Revision of S2-165800. Noted in parallel session Noted
- - - Additional Agreements - - - - -
6.10.2 S2-165763 P-CR Additional interim agreements for QoS flow classification Qualcomm Inc. FS_NextGen Revised in parallel session to S2-165996. Revised
6.10.2 S2-165996 P-CR Additional interim agreements for QoS flow classification Qualcomm Inc. - FS_NextGen Revision of S2-165763. WITHDRAWN (not provided) Withdrawn
6.10.2 S2-165764 P-CR Additional interim agreements for QoS establishment Qualcomm Inc. FS_NextGen Revised in parallel session to S2-165997. Revised
6.10.2 S2-165997 P-CR Additional interim agreements for QoS establishment Qualcomm Inc. - FS_NextGen Revision of S2-165764. Revised in parallel session to S2-166188. Revised
6.10.2 S2-166188 P-CR Additional interim agreements for QoS establishment Qualcomm Inc. - FS_NextGen Revision of S2-165997. Agreed in parallel session Block approved Approved
6.10.2 S2-165765 P-CR Additional interim agreement for QoS on DNN-AMBR Qualcomm Inc. FS_NextGen Merged in parallel session with S2-165776 into S2-165968. Merged
6.10.2 S2-165806 P-CR AMBR enforcement ZTE Corporation FS_NextGen Revised in parallel session to S2-165998. Revised
6.10.2 S2-165998 P-CR AMBR enforcement ZTE Corporation - FS_NextGen Revision of S2-165806. Revised in parallel session to S2-166189. Revised
6.10.2 S2-166189 P-CR AMBR enforcement ZTE Corporation - FS_NextGen Revision of S2-165998. Revised to S2-166269. Revised
6.10.2 S2-166269 P-CR AMBR enforcement ZTE Corporation - FS_NextGen Revision of S2-166189. This was left for e-mail approval. e-mail approved Approved
6.10.2 S2-165649 P-CR Update Interim Agreements on Key Issue #2 QoS Huawei, HiSilicon FS_NextGen Merged in parallel session with S2-165776 into S2-165968. Merged
6.10.2 S2-165837 LS OUT [DRAFT] LS on NextGen QoS interim agreements Intel Revised in parallel session to S2-165999. Revised
6.10.2 S2-165999 LS OUT [DRAFT] LS on NextGen QoS interim agreements Intel - - Revision of S2-165837. Revised in parallel session to S2-166190. Revised
6.10.2 S2-166190 LS OUT [DRAFT] LS on NextGen QoS interim agreements Intel - - Revision of S2-165999. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166289. Devaki (Nokia) provides new rev Saso (Intel) updates the file name to rev1 S2 166190 rev1 APPROVED Revised
6.10.2 S2-166289 LS OUT LS on NextGen QoS interim agreements SA WG2 - - e-mail revision 1 of S2-166190. Approved Approved
- - - Solution Evaluation - - - - -
6.10.2 S2-165846 P-CR Reviewing the benefit of Flow based QoS NTT DOCOMO FS_NextGen Noted in parallel session Noted
6.10.2 S2-165847 P-CR Additional interim agreements for Key Issues 2 and 4 NTT DOCOMO FS_NextGen Noted in parallel session Noted
6.10.2 S2-165843 P-CR Evaluation of solution 6.2.2. NTT DOCOMO FS_NextGen Not Handled Not Handled
- - - Updates to solutions - - - - -
6.10.2 S2-165538 P-CR QoS: Clarifications and updates of solution 2.1 Ericsson FS_NextGen Not Handled Not Handled
6.10.2 S2-165686 P-CR Input to solution 5 for KI 2 on Dynamic QoS Ericsson FS_NextGen Not Handled Not Handled
6.10.2 S2-165808 P-CR Clarification on UE AMBR when MM and SM are split ZTE Corporation FS_NextGen Not Handled Not Handled
6.10.2 S2-165856 P-CR Update to 6.2.4 : clarification and solution evaluation Samsung FS_NextGen Not Handled Not Handled
6.10.2 S2-165872 P-CR RAN triggered FPI change CATT FS_NextGen Not Handled Not Handled
6.10.3 - - Updates and solutions for key issue 3: Mobility Management framework - - {Frank} - -
6.10.3 S2-165785 DISCUSSION Way forward proposal to progress the work on MM Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised to S2-166080. Revised
6.10.3 S2-166080 DISCUSSION Way forward proposal to progress the work on MM Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-165785. WITHDRAWN (not provided) Withdrawn
6.10.3 S2-165528 P-CR Interim agreements on Reachability Ericsson FS_NextGen Revised, merging S2-165677, to S2-166082. Revised
6.10.3 S2-166082 P-CR Interim agreements on Reachability Ericsson, Nokia FS_NextGen Revision of S2-165528, merging S2-165677. Revised to S2-166220. Revised
6.10.3 S2-166220 P-CR Interim agreements on Reachability Ericsson, Nokia FS_NextGen Revision of S2-166082. Approved Approved
6.10.3 S2-165677 P-CR Interim agreements to support MO only mode Sony FS_NextGen This was merged with S2-165528 into S2-166082. Merged
6.10.3 S2-165830 P-CR Update of solution 6.3.6 and interim agreements for power saving Huawei, HiSilicon FS_NextGen Revised to S2-166081. Revised
6.10.3 S2-166081 P-CR Update of solution 6.3.6 and interim agreements for power saving Huawei, HiSilicon FS_NextGen Revision of S2-165830. Revised to S2-166221. Revised
6.10.3 S2-166221 P-CR Update of solution 6.3.6 and interim agreements for power saving Huawei, HiSilicon FS_NextGen Revision of S2-166081. WITHDRAWN (not provided) Withdrawn
6.10.3 S2-165526 P-CR Clarification of Interim Agreements on Mobility on Demand Ericsson, MediaTek Inc. FS_NextGen Revised to S2-166083. Revised
6.10.3 S2-166083 P-CR Clarification of Interim Agreements on Mobility on Demand Ericsson, MediaTek Inc., Nokia FS_NextGen Revision of S2-165526. Revised to S2-166222. Revised
6.10.3 S2-166222 P-CR Clarification of Interim Agreements on Mobility on Demand Ericsson, MediaTek Inc., Nokia FS_NextGen Revision of S2-166083. Approved Approved
6.10.3 S2-165761 P-CR Separation of Mobility levels and Mobility restrictions Sony, Ericsson, MediaTek Inc, Qualcomm Incorporated FS_NextGen Revised to S2-166084. Revised
6.10.3 S2-166084 P-CR Separation of Mobility levels and Mobility restrictions Sony, Ericsson, MediaTek Inc, Qualcomm Incorporated FS_NextGen Revision of S2-165761. Agreed in parallel session Block approved Approved
6.10.3 S2-165791 P-CR Update to interim agreements regarding MM CATT, CATR FS_NextGen Merged into a consolidated proposal in S2-166085. Merged
6.10.3 S2-165533 P-CR Interim Agreements on Mobility Pattern Ericsson, MediaTek Inc., Sony FS_NextGen Merged into a consolidated proposal in S2-166085. Merged
6.10.3 S2-165720 P-CR Clarifications and proposed way forward on Mobility Management Parameters - Key issue #3 Qualcomm Incorporated, MediaTek Inc. FS_NextGen Parts merged into a consolidated proposal in S2-166085. Further discussed off-line and revised, merging S2-165622, in S2-166116 Revised
6.10.3 S2-166116 P-CR Clarifications and proposed way forward on Mobility Management Parameters - Key issue #3 Qualcomm Incorporated, MediaTek Inc. FS_NextGen Revision of S2-165720, merging S2-165622. Revised to S2-166223. Revised
6.10.3 S2-166223 P-CR Clarifications and proposed way forward on Mobility Management Parameters - Key issue #3 Qualcomm Incorporated, MediaTek Inc. FS_NextGen Revision of S2-166116. Approved Approved
6.10.3 S2-165829 P-CR Update of interim agreements on mobility on demand Huawei, HiSilicon FS_NextGen Merged into a consolidated proposal in S2-166085. Merged
6.10.3 S2-165863 P-CR Proposed MMF evaluation criteria and MMF conclusions Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Merged into a consolidated proposal in S2-166085. Merged
6.10.3 S2-165532 P-CR Interim Agreements on Mobility Restriction Ericsson FS_NextGen Merged into S2-166085 Merged
6.10.3 S2-165804 P-CR Interim Agreements on Mobility Management Behaviours Samsung FS_NextGen Merged into S2-166085 Merged
6.10.3 S2-165678 P-CR Interim agreements based on solution 6.3.11 and 6.3.21 Sony FS_NextGen Merged into S2-166085 Merged
6.10.3 S2-166085 P-CR Consolidated proposals on Interim Agreements on Mobility Pattern Editors FS_NextGen Created in off-line drafting. Revised to S2-166236. Revised
6.10.3 S2-166236 P-CR Consolidated proposals on Interim Agreements on Mobility Pattern Editors FS_NextGen Revision of S2-166085. Revised to S2-166275. Revised
6.10.3 S2-166275 P-CR Consolidated proposals on Interim Agreements on Mobility Pattern CATT FS_NextGen Revision of S2-166236. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166295. Peter (Ericsson) provides rev1 Hannu (Nokia) comments. Ask why we need 6275? Hucheng (CATT) fine with rev1 Hucheng (CATT) comments Hannu (Nokia) comments Lars (Sony) fine with rev1 S2 166275 rev1 APPROVED Revised
6.10.3 S2-166295 P-CR Consolidated proposals on Interim Agreements on Mobility Pattern CATT FS_NextGen e-mail revision 1 of S2-166275. Approved Approved
6.10.3 S2-165622 P-CR Interim agreement on mobility management parameters LG Electronics FS_NextGen Merged with S2-165720 into S2-166116 Merged
6.10.3 S2-165621 P-CR Interim agreement on paging area management LG Electronics FS_NextGen Revised to S2-166117. Revised
6.10.3 S2-166117 P-CR Interim agreement on paging area management LG Electronics FS_NextGen Revision of S2-165621. Revised to S2-166224. Revised
6.10.3 S2-166224 P-CR Interim agreement on paging area management LG Electronics FS_NextGen Revision of S2-166117. Revised to S2-166276. Revised
6.10.3 S2-166276 P-CR Interim agreement on paging area management LG Electronics FS_NextGen Revision of S2-166224. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166296. Syed (NTT DCM) provides rev1 Jinsook (LGE) fine with rev1 Lars (Sony) fine with rev1 Wanqiang (Huawei) fine with rev1 S2 166276 rev1 APPROVED Revised
6.10.3 S2-166296 P-CR Interim agreement on paging area management LG Electronics FS_NextGen e-mail revision 1 of S2-166276. Approved Approved
6.10.3 S2-165825 P-CR Way Forward on UE reachability management CATT FS_NextGen Revised to S2-166119. Revised
6.10.3 S2-166119 P-CR Way Forward on UE reachability management CATT FS_NextGen Revision of S2-165825. Revised to S2-166225. Revised
6.10.3 S2-166225 P-CR Way Forward on UE reachability management CATT FS_NextGen Revision of S2-166119. Revised to S2-166277. Revised
6.10.3 S2-166277 P-CR Way Forward on UE reachability management CATT FS_NextGen Revision of S2-166225. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166297. Syed (NTT DCM) provides rev1 Ming (CATT) provides rev2 Syed (NTT DCM) comments Peter (Ericsson) comments. Propose changes but no revision was provided. Antoine (Orange) comments Antoine (Orange) provides rev3 Syed (NTT DCM) comments Antoine (Orange) provides rev4 Syed (NTT DCM) Ok with rev4 Lars (Sony) cannto agree with rev3 and rev4. OK with rev1 or rev2 Ming (CATT) suggests to go with rev1 S2 166277 rev1 APPROVED Revised
6.10.3 S2-166297 P-CR Way Forward on UE reachability management CATT FS_NextGen e-mail revision 1 of S2-166277. Approved Approved
6.10.3 S2-165814 P-CR Updated Solution 3.10 for CN Assisted Paging Retry ETRI FS_NextGen Revised to S2-166120. Revised
6.10.3 S2-166120 P-CR Updated Solution 3.10 for CN Assisted Paging Retry ETRI FS_NextGen Revision of S2-165814. Revised to S2-166226. Revised
6.10.3 S2-166226 P-CR Updated Solution 3.10 for CN Assisted Paging Retry ETRI FS_NextGen Revision of S2-166120. Approved Approved
6.10.3 S2-165688 P-CR UE reachability management in Inactive mode Ericsson FS_NextGen Revised to S2-166121. Revised
6.10.3 S2-166121 P-CR UE reachability management in Inactive mode Ericsson FS_NextGen Revision of S2-165688. Revised to S2-166227. Revised
6.10.3 S2-166227 P-CR UE reachability management in Inactive mode Ericsson FS_NextGen Revision of S2-166121. Approved Approved
6.10.3 S2-165627 P-CR Solution evaluation 6.3.12 'Solution for UE reachability in power saving state' LG Electronics FS_NextGen Revised to S2-166122. Revised
6.10.3 S2-166122 P-CR Solution evaluation 6.3.12 'Solution for UE reachability in power saving state' LG Electronics FS_NextGen Revision of S2-165627. Agreed in parallel session Block approved Approved
6.10.3 S2-165697 P-CR Update of Dynamic Mobility Management Deutsche Telekom, Telecom Italia, BT FS_NextGen Revised to S2-166123. Revised
6.10.3 S2-166123 P-CR Update of Dynamic Mobility Management Deutsche Telekom, Telecom Italia, BT FS_NextGen Revision of S2-165697. WITHDRAWN (not provided) Withdrawn
6.10.3 S2-165783 P-CR Intra-RAT Handover procedure CATT, CATR FS_NextGen Revised to S2-166124. Revised
6.10.3 S2-166124 P-CR Intra-RAT Handover procedure CATT, CATR FS_NextGen Revision of S2-165783. Agreed in parallel session Block approved Approved
6.10.3 S2-165862 P-CR Addition of lightweight UE Status Update procedure at NG1 Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised to S2-166125. Revised
6.10.3 S2-166125 P-CR Addition of lightweight UE Status Update procedure at NG1 Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-165862. Agreed in parallel session Block approved Approved
6.10.3 S2-165839 P-CR Multiple level Tracking area management and update the interim agreement on mobility management Huawei, HiSilicon, China Mobile, China Unicom, China Telecom, CATR FS_NextGen Revised to S2-166228. Revised
6.10.3 S2-166228 P-CR Multiple level Tracking area management and update the interim agreement on mobility management Huawei, HiSilicon, China Mobile, China Unicom, China Telecom, CATR FS_NextGen Revision of S2-165839. Revised to S2-166278. Revised
6.10.3 S2-166278 P-CR Multiple level Tracking area management and update the interim agreement on mobility management Huawei, HiSilicon, China Mobile, China Unicom, China Telecom, CATR FS_NextGen Revision of S2-166228. Approved Approved
6.10.3 S2-165687 P-CR Input on RAN Paging and functional division Ericsson FS_NextGen Not Handled Not Handled
6.10.3 S2-165628 P-CR Solution evaluation '6.3.8: Simplified mobility states for stationary UE and MO data transmission only UE' LG Electronics FS_NextGen Not Handled Not Handled
6.10.3 S2-165527 P-CR Alignment of solution 3.9 Ericsson FS_NextGen Not Handled Not Handled
6.10.3 S2-165790 P-CR Discussion on mobility on demand CATT, CATR FS_NextGen Not Handled Not Handled
6.10.3 S2-165623 P-CR Solution update & evaluation 6.3.16 Limited & Unlimited UE mobility level LG Electronics FS_NextGen Not Handled Not Handled
6.10.3 S2-165529 P-CR Clarifications of Mobility procedure Ericsson FS_NextGen Not Handled Not Handled
6.10.3 S2-165732 P-CR Update the solution 6.3.19 Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.3 S2-165795 P-CR An alternative to Activate RRC_inactive_connected state CATT FS_NextGen Not Handled Not Handled
6.10.3 S2-165530 P-CR Clarification of Solution 3.20 Ericsson FS_NextGen Not Handled Not Handled
6.10.3 S2-165620 P-CR Solution update & evaluation 6.3.23 Two layers Tracking Area handling LG Electronics, SK Telecom FS_NextGen Not Handled Not Handled
6.10.3 S2-165629 P-CR New solution on 'Mobility framework for non-3GPP access' LG Electronics FS_NextGen Not Handled Not Handled
6.10.3 S2-165828 P-CR Update of Solution 6.3.24 Mobility pattern based mobility management Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.3 S2-165695 P-CR New Solution: UE-driven mobility handling during active sessions Deutsche Telekom, Telecom Italia, SK Telecom FS_NextGen Not Handled Not Handled
6.10.3 S2-165779 P-CR Connected mode MM for multiple parallel sessions NTT DOCOMO FS_NextGen Not Handled Not Handled
6.10.3 S2-165781 P-CR Enhanced X2-based handover with multiple parallel PDN connections NTT DOCOMO FS_NextGen Not Handled Not Handled
6.10.3 S2-165784 P-CR TUPF relocation during the HO procedure CATT FS_NextGen Not Handled Not Handled
6.10.3 S2-165803 P-CR NG3-based Handover procedure Samsung FS_NextGen Not Handled Not Handled
6.10.4 - - Updates and solutions for key issue 4: Session management - - {Frank} - -
6.10.4 S2-165559 P-CR PDU Session IP version handling Ericsson FS_NextGen Revised to S2-166049. Revised
6.10.4 S2-166049 P-CR PDU Session IP version handling Ericsson FS_NextGen Revision of S2-165559. Revised to S2-166240. Revised
6.10.4 S2-166240 P-CR PDU Session IP version handling Ericsson FS_NextGen Revision of S2-166049. Revised to S2-166279. Revised
6.10.4 S2-166279 P-CR PDU Session IP version handling Ericsson FS_NextGen Revision of S2-166240. Approved Approved
6.10.4 S2-165588 P-CR Interim agreement for MMF-SMF split and Update of Solution 4.16 (Signalling layer integrity between MM and SM entities) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised to S2-166052. Revised
6.10.4 S2-166052 P-CR Interim agreement for MMF-SMF split and Update of Solution 4.16 (Signalling layer integrity between MM and SM entities) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-165588. Revised to S2-166280. Revised
6.10.4 S2-166280 P-CR Interim agreement for MMF-SMF split and Update of Solution 4.16 (Signalling layer integrity between MM and SM entities) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-166052. This was left for e-mail approval. e-mail revision 5 approved. Revised to S2-166298. Laurent (Nokia) provides rev1 Irfan (NTT DCM) provides rev2 Stefano (Qualcomm) provides rev3 Thouraya (Orange) provides rev4 Laurent (Nokia) prefers rev3 Fenqin (Huawei) provides rev4 Fenqin (Huawei) renames his rev4 to rev5 S2 166280 rev5 APPROVED Revised
6.10.4 S2-166298 P-CR Interim agreement for MMF-SMF split and Update of Solution 4.16 (Signalling layer integrity between MM and SM entities) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen e-mail revision 5 of S2-166280. Approved Approved
6.10.4 S2-165693 P-CR Update to Interim Agreements on MM and SM interaction Deutsche Telekom AG FS_NextGen Noted in parallel session Noted
6.10.4 S2-165642 P-CR SM and MM decoupling Huawei, HiSilicon FS_NextGen Response contribution in S2-165911. Noted in parallel session Noted
6.10.4 S2-165911 DISCUSSION Reply / answer to S2-165642: SM and MM decoupling Nokia FS_NextGen LATE REQ. LATE DOC: Rx 17/10, 08:20. Not Handled Not Handled
6.10.4 S2-165596 P-CR Evaluation on subscription information access in MM-SM split architecture LG Electronics FS_NextGen Revised, merging S2-165589, to S2-166053. Revised
6.10.4 S2-166053 P-CR Evaluation on subscription information access in MM-SM split architecture LG Electronics FS_NextGen Revision of S2-165596, merging S2-165589. Agreed in parallel session Block approved Approved
6.10.4 S2-165557 P-CR Solution updates to MM-SM split Ericsson FS_NextGen Revised to S2-166054. Revised
6.10.4 S2-166054 P-CR Solution updates to MM-SM split Ericsson FS_NextGen Revision of S2-165557. Agreed in parallel session Block approved Approved
6.10.4 S2-165589 P-CR MM-SM split: SMF access to subscription data Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Merged with S2-165596 into S2-166053 Merged
6.10.4 S2-165749 P-CR Interim agreement on infrequent small data transmission transferring NextGen system LG Electronics FS_NextGen Not Handled Not Handled
6.10.4 S2-165656 P-CR Update of Solution 6.4.19 with evaluation and update interim agreement Huawei, HiSilicon, CATR FS_NextGen Not Handled Not Handled
6.10.4 S2-165676 P-CR Interim agreement to use UP for small data transfer Sony, Ericsson FS_NextGen Not Handled Not Handled
6.10.4 S2-165831 P-CR Interim agreement on the infrequent small data transferring Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.4 S2-165594 P-CR Principle and Interim agreements on non-3GPP access aspects LG Electronics FS_NextGen Postponed Postponed
6.10.4 S2-165682 P-CR Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) Huawei FS_NextGen Revised, merging S2-165881, to S2-166108. Revised
6.10.4 S2-166108 P-CR Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) Huawei, LGE, BT FS_NextGen Revision of S2-165682, merging S2-165881. Revised to S2-166241. Revised
6.10.4 S2-166241 P-CR Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) Huawei, LGE, BT FS_NextGen Revision of S2-166108. Revised off-line in S2-166260. Revised
6.10.4 S2-166260 P-CR Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) Huawei, LGE, BT FS_NextGen Revision of S2-166241. This was left for e-mail approval. e-mail revision 5 approved. Revised to S2-166291. Laurent (Nokia) provides rev1 Marco (Huawei) provides rev2 Irfan (NTT DCM) provides rev3 Stefano (Qualcomm) provides rev4 Marco (Huawei) provides rev5 Saso (Intel) comments to change text but no revision was provided Marco ((Huawei) provides rev6 after the revision deadline at 10/26, 2329 PDT.Puneet commented that rev6 cannot be considered as it is provided after the revision deadline. S2 166260 rev5 APPROVED Revised
6.10.4 S2-166291 P-CR Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) Huawei, LGE, BT FS_NextGen e-mail revision 5 of S2-166260. Approved Approved
6.10.4 S2-165646 P-CR Update the Interim agreement on session management and the solution 4.23. Huawei, HiSilicon FS_NextGen Postponed Postponed
6.10.4 S2-165560 P-CR Interim conclusions on user plane format Ericsson FS_NextGen Revised to S2-166111. Revised
6.10.4 S2-166111 P-CR Interim conclusions on user plane format Ericsson, Huawei FS_NextGen Revision of S2-165560. Revised to S2-166242. Revised
6.10.4 S2-166242 P-CR Interim conclusions on user plane format Ericsson FS_NextGen Revision of S2-166111. Agreed in parallel session Block approved Approved
6.10.4 S2-165655 P-CR Updates of per node-level tunnel model and interim agreement Huawei, HiSilicon, China Mobile, CATR FS_NextGen Revised, merging S2-165507 and S2-165751, to S2-166110. Revised
6.10.4 S2-166110 P-CR Updates of per node-level tunnel model and interim agreement Huawei, HiSilicon, China Mobile, CATR FS_NextGen Revision of S2-165655, merging S2-165507 and S2-165751. WITHDRAWN Withdrawn
6.10.4 S2-165718 P-CR Updated interim agreements on session management NEC, NTT DOCOMO FS_NextGen Revised to S2-166109. Revised
6.10.4 S2-166109 P-CR Updated interim agreements on session management NEC, NTT DOCOMO FS_NextGen Revision of S2-165718. Revised to S2-166281. Revised
6.10.4 S2-166281 P-CR Updated interim agreements on session management NEC, NTT DOCOMO FS_NextGen Revision of S2-166109. Approved Approved
6.10.4 S2-165507 P-CR update and evaluation of Solution 4.11 (work task1) KDDI, ETRI, China Mobile, KPN FS_NextGen Merged with S2-165655 into S2-166110 Merged
6.10.4 S2-165751 P-CR Solution update of UP protocol model - Per Node-level Tunnel LG Electronics FS_NextGen Merged with S2-165655 into S2-166110. Merged
6.10.4 S2-165586 P-CR Interim agreement and Update of Solution 4.2: Session setup procedures (Home Routed) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised to S2-166112. Revised
6.10.4 S2-166112 P-CR Interim agreement and Update of Solution 4.2: Session setup procedures (Home Routed) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-165586. Revised to S2-166243. Revised
6.10.4 S2-166243 P-CR Interim agreement and Update of Solution 4.2: Session setup procedures (Home Routed) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-166112. Approved Approved
6.10.4 S2-165890 P-CR Interim Agreements of Key Issue 4 Huawei, HiSilicon FS_NextGen Postponed Postponed
6.10.4 S2-165766 P-CR Way forward on Key Issue 4 on Session Management for WT1 and WT2 Qualcomm Inc. FS_NextGen Revised to S2-166113. Revised
6.10.4 S2-166113 P-CR Way forward on Key Issue 4 on Session Management for WT1 and WT2 Qualcomm Inc. FS_NextGen Revision of S2-165766. Revised to S2-166245. Revised
6.10.4 S2-166245 P-CR Way forward on Key Issue 4 on Session Management for WT1 and WT2 Qualcomm Inc. FS_NextGen Revision of S2-166113. Agreed in parallel session Block approved Approved
6.10.4 S2-165585 P-CR Interim Agreements on Session Management (Key Issue #4) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised to S2-166114. Revised
6.10.4 S2-166114 P-CR Interim Agreements on Session Management (Key Issue #4) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-165585. Revised to S2-166244. Revised
6.10.4 S2-166244 P-CR Interim Agreements on Session Management (Key Issue #4) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-166114. Agreed in parallel session Block approved Approved
6.10.4 S2-165833 P-CR Clarification for SM Selection by MM ETRI, ZTE, Samsung FS_NextGen Not Handled Not Handled
6.10.4 S2-165742 P-CR Evaluation update of Solution 4.7: Infrequent small data transfer LG Electronics FS_NextGen Not Handled Not Handled
6.10.4 S2-165745 P-CR Evaluation of Solution 4.8: for Data transmission with ConnectionLess RAN-Core interface LG Electronics FS_NextGen Not Handled Not Handled
6.10.4 S2-165747 P-CR Evaluation of Solution 4.18: Solution for Infrequent Small Data LG Electronics FS_NextGen Not Handled Not Handled
6.10.4 S2-165748 P-CR Solution update and evaluation of Solution 4.19: Infrequent small user data transfer via control plane LG Electronics FS_NextGen Not Handled Not Handled
6.10.4 S2-165558 P-CR Updates to solution 6.6.3: Multi-homing over multiple PDU sessions with network-provided routing rules Ericsson FS_NextGen Not Handled Not Handled
6.10.4 S2-165757 P-CR Session management for connectionless transmission Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.4 S2-165845 P-CR Clarifications and evaluation for Per QoS class tunnel protocol model NTT DOCOMO FS_NextGen Not Handled Not Handled
6.10.4 S2-165844 P-CR Use of DC with Solution 4.10. NTT DOCOMO FS_NextGen Not Handled Not Handled
6.10.4 S2-165587 P-CR Update of Solution 4.13: how to choose which of the UP-GW IP anchors visible to the UE is to be used as the most preferred default router Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Not Handled Not Handled
6.10.4 S2-165758 P-CR Session management for network based ultra-reliable transmission Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.4 S2-165733 P-CR Update on solution 4.16: the interaction between MM and SM Samsung, ETRI FS_NextGen Not Handled Not Handled
6.10.4 S2-165773 P-CR Update to Solution 4.16: the interaction between MM and SM Samsung FS_NextGen Not Handled Not Handled
6.10.4 S2-165561 P-CR Update to Solution 4.18 for Infrequent Small Data Ericsson FS_NextGen Not Handled Not Handled
6.10.4 S2-165597 P-CR Clarification and evaluation about solution 4.20 (Session Management on the PDU session(s) via different accesses) LG Electronics FS_NextGen Not Handled Not Handled
6.10.4 S2-165866 P-CR Delete an editor's note in solution 4.21 CATT FS_NextGen Not Handled Not Handled
6.10.4 S2-165719 P-CR Updates to Solution 4.22 NEC FS_NextGen Not Handled Not Handled
6.10.4 S2-165730 P-CR Update of solution 4.21 and 4.22 relating to paging Samsung, ETRI FS_NextGen Not Handled Not Handled
6.10.4 S2-165595 P-CR Update of Solution 4.23: Asynchronous Session Management Model LG Electronics FS_NextGen Not Handled Not Handled
6.10.4 S2-165598 P-CR Clarification and evaluation about solution 4.24 (Session Management with individual CP function per access network) LG Electronics FS_NextGen Not Handled Not Handled
6.10.4 S2-165546 P-CR Update to Solution 4.25: Local Area Data Network Samsung FS_NextGen Not Handled Not Handled
6.10.4 S2-165865 P-CR Routing of the SM message CATT FS_NextGen Not Handled Not Handled
6.10.5 - - Void - - {Not_on_agenda} - -
6.10.6 - - Updates and solutions for key issue 6: Support for session and service continuity and efficient user plan path - - {Magnus} - -
- - - Voice - - - - -
- - - Interim Agreements - - - - -
6.10.6 S2-165579 P-CR Updated Interim Agreements related to selection/reselection of U-plane function KDDI, Sprint, China Unicom FS_NextGen Merged with S2-165889 into S2-166094 Merged
6.10.6 S2-165590 P-CR Interim Agreements on Session Management (Key Issue 5 and 6) Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised, merging S2-165626 and S2-165780, to S2-166086. Revised
6.10.6 S2-166086 P-CR Interim Agreements on Session Management (Key Issue 5 and 6) Nokia, Alcatel-Lucent Shanghai Bell, LGE FS_NextGen Revision of S2-165590, merging S2-165626, S2-165780 and S2-165811. Revised to S2-166246. Revised
6.10.6 S2-166246 P-CR Interim Agreements on Session Management (Key Issue 5 and 6) Nokia, Alcatel-Lucent Shanghai Bell, LGE, Intel FS_NextGen Revision of S2-166086. Approved Approved
6.10.6 S2-165626 P-CR Interim agreement on Session and Service Continuity LG Electronics FS_NextGen Merged with S2-165590 into S2-166086. Merged
6.10.6 S2-165780 P-CR Interim agreement on SSC mode to support Key issue 6 CATT FS_NextGen Merged with S2-165590 into S2-166086. Merged
6.10.6 S2-165799 P-CR Interim agreement on how the UE determines the SSC mode Motorola Mobility, Lenovo FS_NextGen Revised to S2-166093. Revised
6.10.6 S2-166093 P-CR Interim agreement on how the UE determines the SSC mode Motorola Mobility, Lenovo FS_NextGen Revision of S2-165799. Revised to S2-166247. Revised
6.10.6 S2-166247 P-CR Interim agreement on how the UE determines the SSC mode Motorola Mobility, Lenovo FS_NextGen Revision of S2-166093. Agreed in parallel session Block approved Approved
6.10.6 S2-165889 P-CR Interim Agreements for KI 6 Huawei, HiSilicon FS_NextGen Revised to S2-166094. Revised
6.10.6 S2-166094 P-CR Interim Agreements for KI 6 Huawei, HiSilicon, KDDI, Sprint FS_NextGen Revision of S2-165889, merging S2-165579. Revised to S2-166248. Revised
6.10.6 S2-166248 P-CR Interim Agreements for KI 6 Huawei, HiSilicon, KDDI, Sprint FS_NextGen Revision of S2-166094. Agreed in parallel session Block approved Approved
6.10.6 S2-165811 P-CR Relationship between SSC mode and SM models ZTE Corporation FS_NextGen Merged with S2-165590 into S2-166086. Merged
- - - Updates - - - - -
6.10.6 S2-165547 P-CR Update to Solution 5.1 - Session continuity to enable (re) selection of efficient user plane paths InterDigital FS_NextGen Revised to S2-166095. Revised
6.10.6 S2-166095 P-CR Update to Solution 5.1 - Session continuity to enable (re) selection of efficient user plane paths InterDigital FS_NextGen Revision of S2-165547. Error in uploaded document. Revised in S2-166235. Revised
6.10.6 S2-166235 P-CR Update to Solution 5.1 - Session continuity to enable (re) selection of efficient user plane paths InterDigital FS_NextGen Revision of S2-166095. Revised to S2-166249. Revised
6.10.6 S2-166249 P-CR Update to Solution 5.1 - Session continuity to enable (re) selection of efficient user plane paths InterDigital FS_NextGen Revision of S2-166235. Approved Approved
6.10.6 S2-165591 P-CR Updates to solution 6.6.1 Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised to S2-166096. Revised
6.10.6 S2-166096 P-CR Updates to solution 6.6.1 Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-165591. Revised to S2-166250. Revised
6.10.6 S2-166250 P-CR Updates to solution 6.6.1 Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-166096. Agreed in parallel session Block approved Approved
6.10.6 S2-165611 P-CR Update of enable efficient user plane paths Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.6 S2-165612 P-CR Update of Multiple Tunnel based traffic offload Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.6 S2-165625 P-CR Update on solution 6.6.1 LG Electronics, SK Telecom FS_NextGen Not Handled Not Handled
6.10.6 S2-165658 P-CR Clarification on the UL UP function for traffic branching China Mobile FS_NextGen Not Handled Not Handled
6.10.6 S2-165715 P-CR UE triggered SSC mode update (update to solution 6.6.1) Interdigital FS_NextGen Not Handled Not Handled
6.10.6 S2-165743 P-CR Updates to Session Continuity Section Samsung FS_NextGen Not Handled Not Handled
6.10.6 S2-165777 P-CR SSC mode update call flows CATT FS_NextGen Not Handled Not Handled
6.10.6 S2-165599 P-CR Evaluation of Solution 4.14, 5.2 and 5.4 KDDI, Sprint FS_NextGen Not Handled Not Handled
6.10.6 S2-165805 P-CR Update to Solution 5.2 Samsung FS_NextGen Not Handled Not Handled
6.10.6 S2-165809 P-CR Clarification on the SSC mode ZTE Corporation FS_NextGen Not Handled Not Handled
6.10.6 S2-165854 P-CR Update of solution 6.5.4. NTT DOCOMO, ZTE, CATR FS_NextGen Not Handled Not Handled
6.10.6 S2-165873 P-CR solution 6.1 update for SSC mode 3 Orange FS_NextGen Not Handled Not Handled
6.10.7 - - Updates and solutions for key issue 7: Network function granularity and interactions between them - - {Frank} - -
6.10.7 S2-165643 P-CR Interim agreements for KI 7 Huawei, HiSilicon, Sprint, CATR FS_NextGen Revised, merging S2-165810, to S2-166140. Revised
6.10.7 S2-166140 P-CR Interim agreements for KI 7 Huawei, HiSilicon, Sprint, CATR, ZTE FS_NextGen Revision of S2-165643, merging S2-165810. Revised to S2-166255. Revised
6.10.7 S2-166255 P-CR Interim agreements for KI 7 Huawei, HiSilicon, Sprint, CATR, ZTE FS_NextGen Revision of S2-166140. Approved Approved
6.10.7 S2-165644 P-CR Interface for interconnection Huawei, HiSilicon, China mobile, CATR, Telecom Italia, Deutsche Telekom FS_NextGen Revised to S2-166141. Revised
6.10.7 S2-166141 P-CR Interface for interconnection Huawei, HiSilicon, China mobile, CATR, Telecom Italia, Deutsche Telekom FS_NextGen Revision of S2-165644. Revised to S2-166253. Revised
6.10.7 S2-166253 P-CR Interface for interconnection Huawei, HiSilicon, China mobile, CATR, Telecom Italia, Deutsche Telekom FS_NextGen Revision of S2-166141. Revised to S2-166256. Revised
6.10.7 S2-166256 P-CR Interface for interconnection Huawei, HiSilicon, China mobile, CATR, Telecom Italia, Deutsche Telekom, AT&T FS_NextGen Revision of S2-166253. Approved Approved
6.10.7 S2-165775 P-CR Interim agreements for control plane interconnection model Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, Deutsche Telekom, AT&T, Verizon, China Mobile, Oracle FS_NextGen Revised to S2-166143. Revised
6.10.7 S2-166143 P-CR Interim agreements for control plane interconnection model Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, Deutsche Telekom, AT&T, Verizon, China Mobile, Oracle FS_NextGen Revision of S2-165775. WITHDRAWN (not provided) Withdrawn
6.10.7 S2-165801 P-CR Interim agreements for KI 7 Cisco Systems, Inc., Ericsson FS_NextGen Response contribution in S2-165902. Revised to S2-166144. Revised
6.10.7 S2-166144 P-CR Interim agreements for KI 7 Cisco Systems, Inc., Ericsson, NTT DoCoMo, ZTE FS_NextGen Revision of S2-165801. Revised to S2-166257. Revised
6.10.7 S2-166257 P-CR Interim agreements for KI 7 Cisco Systems, Inc., Ericsson, NTT DoCoMo, ZTE FS_NextGen Revision of S2-166144. Merged with S2-166258 into S2-166284 Merged
6.10.7 S2-165772 P-CR Updates on solution for Control plane interconnection model with a data layer Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, AT&T, China Mobile, Oracle, TeliaSonera FS_NextGen Revised to S2-166142. Revised
6.10.7 S2-166142 P-CR Updates on solution for Control plane interconnection model with a data layer Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, AT&T, China Mobile, Oracle, TeliaSonera, T-Mobile US, Deutsche Telekom FS_NextGen Revision of S2-165772. Revised to S2-166258. Revised
6.10.7 S2-166258 P-CR Updates on solution for Control plane interconnection model with a data layer Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, AT&T, China Mobile, Oracle, TeliaSonera, T-Mobile US, Deutsche Telekom FS_NextGen Revision of S2-166142. Revised, merging parts of S2-166257 to S2-166284. Revised
6.10.7 S2-166284 P-CR Updates on solution for Control plane interconnection model with a data layer Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, AT&T, China Mobile, Oracle, TeliaSonera, T-Mobile US, Deutsche Telekom FS_NextGen Revision of S2-166258, merging parts of S2-166257. Not Handled. It was decided that this should be done by the Rapporteur when implementing the TR. Not Handled
6.10.7 S2-165810 P-CR Clarification on the direct interaction ZTE Corporation FS_NextGen Merged with S2-165643 in S2-166140 Merged
6.10.7 S2-165902 DISCUSSION Response to 'Interim agreements for KI 7' proposal in S2-165801 Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen LATE REQ. LATE DOC: Rx 17/10, 00:50. Not Handled Not Handled
6.10.7 S2-166056 DISCUSSION Reply to S2-165902 Cisco Systems, Inc., Ericsson, NTT DoCoMo, ZTE FS_NextGen Created at meeting. Not Handled Not Handled
6.10.8 - - Updates and solutions for key issue 8: Next Generation core and access – functional division and interface - - {Magnus} - -
6.10.8 S2-165711 P-CR Interim Agreements on common AN-CN interface Motorola Mobility, Lenovo, Broadcom FS_NextGen Revised to S2-166099. Revised
6.10.8 S2-166099 P-CR Interim Agreements on common AN-CN interface Motorola Mobility, Lenovo, Broadcom FS_NextGen Revision of S2-165711. Revised to S2-166126. Motorola Mobility commented that this revision takes into account proposals in S2-165767, S2-165992 and S2-165895. Revised
6.10.8 S2-166126 P-CR Interim Agreements on common AN-CN interface Motorola Mobility, Lenovo, Broadcom, Qualcomm Incorporated, Intel, Nokia FS_NextGen Revision of S2-166099. Revised to S2-166252. Revised
6.10.8 S2-166252 P-CR Interim Agreements on common AN-CN interface Motorola Mobility, Lenovo, Broadcom, Qualcomm Incorporated, Intel, Nokia FS_NextGen Revision of S2-166126. Approved Approved
6.10.8 S2-165592 P-CR Untrusted access to NGC: update to solution 8.6 and Interim agreement Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen The Interim agreement part was merged into S2-166126. Revised to S2-166128. Revised
6.10.8 S2-166128 P-CR Untrusted access to NGC: update to solution 8.6 and Interim agreement Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-165592. Revised to S2-166251. Revised
6.10.8 S2-166251 P-CR Untrusted access to NGC: update to solution 8.6 and Interim agreement Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-166128. Revised to S2-166282. Revised
6.10.8 S2-166282 P-CR Untrusted access to NGC: update to solution 8.6 and Interim agreement Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-166251. Approved Approved
6.10.8 S2-165681 P-CR Working assumptions proposal for N3GPP Huawei, HiSilicon FS_NextGen Merged into S2-166126 Merged
6.10.8 S2-165767 P-CR Way forward on support of non-3GPP access and update to solution 8.6 for support of untrusted non-3GPP access Qualcomm Inc. FS_NextGen The Interim agreement part was merged into S2-166126. Revised, merging S2-165562, to S2-166129. Revised
6.10.8 S2-166129 P-CR Way forward on support of non-3GPP access and update to solution 8.6 for support of untrusted non-3GPP access Qualcomm Inc., LG Electronics FS_NextGen Revision of S2-165767, merging S2-165562. Revised to S2-166254. Revised
6.10.8 S2-166254 P-CR Way forward on support of non-3GPP access and update to solution 8.6 for support of untrusted non-3GPP access Qualcomm Inc., LG Electronics FS_NextGen Revision of S2-166129. Revised to S2-166283. Revised
6.10.8 S2-166283 P-CR Way forward on support of non-3GPP access and update to solution 8.6 for support of untrusted non-3GPP access Qualcomm Inc., LG Electronics FS_NextGen Revision of S2-166254. Approved Approved
6.10.8 S2-165824 P-CR Some Interim Agreements on KI#8 CATT, CATR FS_NextGen Revised to S2-166127. Revised
6.10.8 S2-166127 P-CR Some Interim Agreements on KI#8 CATT,CATR, LG Electronics FS_NextGen Revision of S2-165824. Agreed in parallel session Block approved Approved
6.10.8 S2-165827 P-CR Interim agreements on the interface between UE and Next Generation Core LG Electronics FS_NextGen Noted in parallel session Noted
6.10.8 S2-165895 DISCUSSION Way forward on accomplishing a single AN-CN interface Intel FS_NextGen Noted in parallel session Noted
6.10.8 S2-165562 P-CR Update to Solution 8.6 Ericsson FS_NextGen Merged with S2-165767 into S2-166129 Merged
6.10.8 S2-165650 P-CR Solution: Standalone non-3GPP access via NG2/NG3 Motorola Mobility, Lenovo, Broadcom, CMCC FS_NextGen Revised to S2-166130. Revised
6.10.8 S2-166130 P-CR Solution: Standalone non-3GPP access via NG2/NG3 Motorola Mobility, Lenovo, Broadcom, CMCC, Rogers FS_NextGen Revision of S2-165650. Approved Approved
6.10.8 S2-165680 P-CR Solution of carrying NAS directly as IKEv2 parameter for untrusted WLAN access Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.8 S2-165735 P-CR Update of Solution 8.3 ETRI FS_NextGen Not Handled Not Handled
6.10.8 S2-165880 P-CR Update to Solution 8.2 Intel FS_NextGen Not Handled Not Handled
6.10.8 S2-165787 P-CR Evaluation on Solution 8.5: Alternative C for the interface between UE and Next Generation Core LG Electronics FS_NextGen Not Handled Not Handled
6.10.9 - - Updates and solutions for key issue 9: 3GPP architecture impacts to support network capability exposure - - {Not_on_agenda} - -
6.10.10 - - Updates and solutions for key issue 10: Policy Framework - - {Frank} - -
6.10.10 S2-165536 P-CR Interim agreements on the Policy Framework Ericsson, ZTE, Oracle FS_NextGen Revised to S2-166133. Revised
6.10.10 S2-166133 P-CR Interim agreements on the Policy Framework Ericsson, ZTE, Oracle FS_NextGen Revision of S2-165536. This was left for e-mail approval. e-mail approved Approved
6.10.10 S2-165534 P-CR Updates in Policy Reference Architecture to reflect roaming aspects Ericsson FS_NextGen Revised to S2-166134. Revised
6.10.10 S2-166134 P-CR Updates in Policy Reference Architecture to reflect roaming aspects Ericsson FS_NextGen Revision of S2-165534. WITHDRAWN (not provided) Withdrawn
6.10.10 S2-165535 P-CR Discussion on the need to send policies to the UE Ericsson FS_NextGen Not Handled Not Handled
6.10.10 S2-165537 P-CR On the need on an interface between Policy and SDM Ericsson FS_NextGen Revised to S2-166135. Revised
6.10.10 S2-166135 P-CR On the need on an interface between Policy and SDM Ericsson FS_NextGen Revision of S2-165537. Postponed Postponed
6.10.10 S2-165647 P-CR TSSF and Policy Huawei, HiSilicon FS_NextGen Agreed in parallel session Block approved Approved
6.10.10 S2-165740 P-CR solution for enhanced encrypted traffic detection China Telecom, Alibaba FS_NextGen Revised to S2-166136. Revised
6.10.10 S2-166136 P-CR solution for enhanced encrypted traffic detection China Telecom, Alibaba FS_NextGen Revision of S2-165740. Approved Approved
6.10.10 S2-165878 P-CR Policy on RAT/Frequency Selection Priority Huawei, HiSilicon FS_NextGen Revised to S2-166137. Revised
6.10.10 S2-166137 P-CR Policy on RAT/Frequency Selection Priority Huawei, HiSilicon, NICT, Nokia FS_NextGen Revision of S2-165878. Revised to S2-166259. Revised
6.10.10 S2-166259 P-CR Policy on RAT/Frequency Selection Priority Huawei, HiSilicon, NICT, Nokia FS_NextGen Revision of S2-166137. This was left for e-mail approval. e-mail approved Approved
6.10.10 S2-165771 P-CR Updates to Overall architecture option #6 Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised to S2-166138. Revised
6.10.10 S2-166138 P-CR Updates to Overall architecture option #6 Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-165771. Approved Approved
6.10.10 S2-165569 P-CR Discussions and proposals on the considerations of Policy Control Framework for Network Slicing support ZTE Corporation, Oracle, Telecom Italia, ETRI FS_NextGen LATE DOC: Rx 11/10, 19:40. Revised to S2-166139. Revised
6.10.10 S2-166139 P-CR Discussions and proposals on the considerations of Policy Control Framework for Network Slicing support ZTE, Oracle, Telecom Italia, ETRI, KDDI, NEC, Sandvine FS_NextGen Revision of S2-165569. Approved Approved
6.10.10 S2-165712 DISCUSSION Discussion Paper on NextGen Support of Dynamic Policy Control U.S. Department of Commerce Rel-14 FS_NextGen Noted in parallel session Noted
6.10.11 - - Updates and solutions for key issue 11: Charging - - {Not_on_agenda} - -
6.10.12 - - Updates and solutions for key issue 12: Security framework - - {Not_on_agenda} - -
6.10.13 - - Updates and solutions for key issue 13: Broadcast/Multicast Capabilities - - {Not_on_agenda} - -
6.10.14 - - Updates and solutions for key issue 14: Support for Off-Network Communication - - {Not_on_agenda} - -
6.10.15 - - Updates and solutions for key issue 15: NextGen core support for IMS - - {Not_on_agenda} - -
6.10.16 - - Updates and solutions for key issue 16: 3GPP system aspects to support the connectivity via a relay UE - - {Not_on_agenda} - -
6.10.17 - - Updates and solutions for key issue 17: 3GPP architecture impacts to support network discovery and selection - - {Magnus} - -
6.10.17 S2-165542 DISCUSSION A new solution for key issue 17 (introductory slides) NICT, ATR Rel-14 FS_NextGen Not Handled Not Handled
6.10.17 S2-165543 DISCUSSION A new solution for key issue 17 (proposed text) NICT, ATR Rel-14 FS_NextGen Not Handled Not Handled
6.10.17 S2-165685 P-CR Network Discovery and Selection for 3GPP access technologies Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.17 S2-165768 P-CR Update and evaluation of solution 6.17.1 for Key Issue 17 on Network Discovery and Selection in idle mode Qualcomm Incorporated FS_NextGen Not Handled Not Handled
6.10.17 S2-165769 P-CR Proposed way forward for Key Issue 17 on Network Discovery and Selection Qualcomm Incorporated FS_NextGen Not Handled Not Handled
6.10.17 S2-165870 P-CR Solution to KI 17: PLMN+RAT discovery and selection Nokia FS_NextGen Not Handled Not Handled
6.10.17 S2-165871 P-CR Interim agreements on KI 17: Network discovery and selection Nokia FS_NextGen Not Handled Not Handled
6.10.18 - - Updates and solutions for key issue 18: Interworking and Migration - - {Frank} - -
6.10.18 S2-165868 P-CR Updates on interworking and migration solution 18.2: Overall Nokia, Qualcomm Incorporated, KDDI FS_NextGen Revised to S2-166100. Revised
6.10.18 S2-166100 P-CR Updates on interworking and migration solution 18.2: Overall Nokia, Qualcomm Incorporated, KDDI, Huawei FS_NextGen Revision of S2-165868. Approved Approved
6.10.18 S2-165869 P-CR Updates on interworking and migration solution 18.2: Call flows Nokia, KDDI, Qualcomm Incorporated FS_NextGen Revised to S2-166101. Revised
6.10.18 S2-166101 P-CR Updates on interworking and migration solution 18.2: Call flows Nokia, KDDI, Qualcomm Incorporated, Huawei FS_NextGen Revision of S2-165869. Approved Approved
6.10.18 S2-165657 P-CR Solution for single radio based lightweight interworking and migration Huawei FS_NextGen Revised to S2-166102. Merged S2-165657 into S2-166100 and S2-166102 Merged
6.10.18 S2-166102 P-CR Solution for single radio based lightweight interworking and migration Huawei FS_NextGen Revision of S2-165657. It was decided to merge S2-165657 into S2-166100 and S2-166102 and S2-166102 was withdrawn. Withdrawn
6.10.18 S2-165583 P-CR Update to solution 18.4 China Telecom FS_NextGen Agreed in parallel session Block approved Approved
6.10.18 S2-165867 P-CR Update to Solution 18.4 Intel FS_NextGen Revised, merging S2-165874, to S2-166103. Revised
6.10.18 S2-166103 P-CR Update to Solution 18.4 Intel, Samsung FS_NextGen Revision of S2-165867, merging S2-165874. Revised to S2-166261. Revised
6.10.18 S2-166261 P-CR Update to Solution 18.4 Intel, Samsung FS_NextGen Revision of S2-166103. This was left for e-mail approval. e-mail revision 2 approved. Revised to S2-166292. Irfan (NTT DCM) provides rev1 Haris (Qualcomm) provides rev2 Saso (Intel) comments S2 166261 rev2 APPROVED Revised
6.10.18 S2-166292 P-CR Update to Solution 18.4 Intel, Samsung FS_NextGen e-mail revision 2 of S2-166261. Approved Approved
6.10.18 S2-165874 P-CR An NGC/EPC Interworking Solution Samsung, KT, Telecom Italia, SKT FS_NextGen Merged with S2-165867 into S2-166103 Merged
6.10.18 S2-165593 P-CR Migration solution with Evolved E-UTRAN to operate EPC and NextGen Core simultaneously LG Electronics, SK Telecom FS_NextGen Revision of S2-164423 from S2#116BIS (Not Handled). Revised to S2-166105. Revised
6.10.18 S2-166105 P-CR Migration solution with Evolved E-UTRAN to operate EPC and NextGen Core simultaneously LG Electronics, SK Telecom FS_NextGen Revision of S2-165593. Revised to S2-166262. Revised
6.10.18 S2-166262 P-CR Migration solution with Evolved E-UTRAN to operate EPC and NextGen Core simultaneously LG Electronics, SK Telecom FS_NextGen Revision of S2-166105. Approved Approved
6.10.18 S2-165667 P-CR Way forward on EPC-NG Core Interworking Qualcomm Incorporated, Huawei, Nokia FS_NextGen Revised to S2-166104. Revised
6.10.18 S2-166104 P-CR Way forward on EPC-NG Core Interworking Qualcomm Incorporated, Huawei, Nokia FS_NextGen Revision of S2-165667. Revised to S2-166263. Revised
6.10.18 S2-166263 P-CR Way forward on EPC-NG Core Interworking Qualcomm Incorporated, Huawei, Nokia FS_NextGen Revision of S2-166104. This was left for e-mail approval. e-mail approved Approved
6.10.18 S2-165668 P-CR Way forward on migration from option 3 to NG Core Qualcomm Incorporated, Ericsson, NTT Docomo, AT&T, MediaTek, KDDI, Rogers Communications Canada, Nokia, KT, Vodafone, Apple FS_NextGen Revised to S2-166106. Revised
6.10.18 S2-166106 P-CR Way forward on migration from option 3 to NG Core Qualcomm Incorporated, Ericsson, NTT Docomo, AT&T, MediaTek, KDDI, Rogers Communications Canada, Nokia, KT, Vodafone, Apple FS_NextGen Revision of S2-165668. Approved Approved
6.10.18 S2-165840 P-CR Interim Agreements on Key Issue #18 China Telecom FS_NextGen LATE DOC: Rx 14/10, 08:45. Not Handled Not Handled
6.10.18 S2-165672 LS OUT [DRAFT] LS on migration from Option 3 to NextGen Core Qualcomm Incorporated Rel-14 Revised to S2-166107. Revised
6.10.18 S2-166107 LS OUT [DRAFT] LS on migration from Option 3 to NextGen Core Qualcomm Incorporated Rel-14 Revision of S2-165672. This was left for e-mail approval. e-mail revision 3 approved. Revised to S2-166288. Hyunsook (LGE) provides rev1 Guillaume (MediaTek) provides rev2 Sung (Nokia) provides rev3 Haris (Qualcomm) supports rev2 and cannot accept rev1 Hyunsook (LGE) can accept rev2 or rev3 Sung (Nokia) approval version should be rev3 Haris (Qualcomm) OK wither rev3 S2 166107 rev3 APPROVED Revised
6.10.18 S2-166288 LS OUT LS on migration from Option 3 to NextGen Core SA WG2 Rel-14 e-mail revision 3 of S2-166107. Approved Approved
6.10.18 S2-165565 P-CR Input to multiple Key Issues: NextGen core support for IMS Ericsson, AT&T? FS_NextGen Confirm sources
6.10.18 S2-165848 P-CR Multimedia calls fallback from NextGen system to EPS NTT DOCOMO FS_NextGen Not Handled Not Handled
6.10.19 - - Updates and solutions for key issue 19: Architecture impacts when using virtual environments - - {Frank} - -
6.10.19 S2-165884 P-CR Key Issue #19: EPC/NGCN updates for 'virtualisation' Vodafone FS_NextGen Revised to S2-166132. Revised
6.10.19 S2-166132 P-CR Key Issue #19: EPC/NGCN updates for 'virtualisation' Vodafone FS_NextGen Revision of S2-165884. Revised to S2-166264. Revised
6.10.19 S2-166264 P-CR Key Issue #19: EPC/NGCN updates for 'virtualisation' Vodafone, Deutsche Telekom AG FS_NextGen Revision of S2-166132. This was left for e-mail approval. e-mail approved Approved
6.10.20 - - Updates and solutions for key issue 20: Traffic Steering, Switching and Splitting between 3GPP and non-3GPP Accesses - - {Not_on_agenda} - -
6.10.21 - - Updates and solutions for key issue 21: Minimal connectivity within extreme rural deployments - - {Not_on_agenda} - -
6.10.22 - - Input for TR clause 7 (Overall architecture proposals) - - {Frank} - -
6.10.22 S2-165651 P-CR Consolidate overall architecture based on existing architecture options China Mobile, AT&T, Telecom Italia, Sprint, ZTE, CATR FS_NextGen Revised to S2-166017, merging S2-165778. Revised
6.10.22 S2-166017 P-CR Agreement on the overall architecture Editor (China Mobile) FS_NextGen Revision of S2-165651, merging S2-165778. Revised to S2-166171. Revised
6.10.22 S2-166171 P-CR Agreement on the overall architecture China Mobile, AT&T, Telecom Italia, Sprint, ZTE, CATR, Broadcom, Deutsche Telekom FS_NextGen Revision of S2-166017. Revised, merging part of S2-166018, to S2-166265. Revised
6.10.22 S2-166265 P-CR Agreement on the overall architecture China Mobile, AT&T, Telecom Italia, Sprint, ZTE, CATR, Broadcom, Deutsche Telekom FS_NextGen Revision of S2-166171, merging part of S2-166018. Approved Approved
6.10.22 S2-165694 P-CR Interim Agreements on Consolidated Architecture Options Deutsche Telekom FS_NextGen Revised to S2-166018. Revised
6.10.22 S2-166018 P-CR Interim Agreements on Consolidated Architecture Options Deutsche Telekom FS_NextGen Revision of S2-165694. Principles merged with S2-166171 into S2-166265 Merged
6.10.22 S2-165778 P-CR Interim agreements on Overall architecture aspects Nokia FS_NextGen Merged with S2-165651 into S2-166017. Merged
6.10.22 S2-165770 P-CR Updates to Overall architecture option #6 Nokia, Alcatel-Lucent Shanghai Bell, Verizon, Cisco, Samsung, Intel, LGE FS_NextGen Revised to S2-166149. Revised
6.10.22 S2-166149 P-CR Updates to Overall architecture option #6 Nokia, Alcatel-Lucent Shanghai Bell, Verizon, Cisco, Samsung, Intel, LGE, British Telecom. FS_NextGen Revision of S2-165770. Approved Approved
6.10.22 S2-165564 P-CR Next Generation Network Architecture: Soln 6 Ericsson FS_NextGen Noted in parallel session Noted
6.10.22 S2-165692 P-CR Update of Consolidated Architecture Option 4 Deutsche Telekom AG FS_NextGen Agreed in parallel session Block approved Approved
6.10.22 S2-165881 P-CR Update to consolidate architecture option 6 BT FS_NextGen Merged with S2-165682 into S2-166108 Merged
6.10.22 S2-165645 P-CR Solution: Consolidated architecture option X Huawei, Hisilicon, CATR FS_NextGen Revised to S2-166170. Revised
6.10.22 S2-166170 P-CR Solution: Consolidated architecture option X Huawei, Hisilicon, CATR FS_NextGen Revision of S2-165645. Approved Approved
6.10.22 S2-165563 P-CR Next Generation Network Architecture: Soln 3 Ericsson FS_NextGen Not Handled Not Handled
6.10.22 S2-165807 P-CR Architecture for concurrent access to same Data Network ZTE Corporation FS_NextGen Not Handled Not Handled
6.10.22 S2-166050 DISCUSSION Service-based architecture: What does it mean for NextGen ? Huawei FS_NextGen Created in drafting session. Not Handled Not Handled
6.11 - - Service Domain Centralization (SeDoC) - - {Not_on_agenda} - -
6.12 - - Sponsored data connectivity improvements (SDCI) - - {Not_on_agenda} - -
6.13 - - Architecture enhancements for LTE support of V2X services (V2XARC) - - {LaeYoung} - -
- - - Incoming LS - - - - -
6.13 S2-165490 LS In LS from RAN WG1: LS on RAN WG1 agreements for LTE-based V2X RAN WG1 (R1-168026) Rel-14 LTE_V2X-Core Noted in parallel session Noted
6.13 S2-165906 LS In LS from RAN WG2: Response LS on Multiple TMGIs for support of small and variable MBMS areas. RAN WG2 (R2-167291) Rel-14 LTE_V2X-Core LATE DOC: Rx 16/10, 11:30. Noted in parallel session Noted
- - - Cat B - - - - -
6.13 S2-165584 CR 23.285 CR0002: Introducing reliability parameter on PC5 QoS handling Huawei, HiSilicon Rel-14 V2XARC Noted in parallel session Noted
6.13 S2-165631 CR 23.285 CR0004: Mapping between PPPP and latency for autonomous resources selection mode Huawei, Hisilicon, LG Electronics, Ericsson Rel-14 V2XARC Revised in parallel session to S2-166029. Revised
6.13 S2-166029 CR 23.285 CR0004R1: Mapping between PPPP and latency for autonomous resources selection mode Huawei, Hisilicon, LG Electronics, Ericsson Rel-14 V2XARC Revision of S2-165631. Agreed in parallel session Block approved Agreed
- - - Cat F - - - - -
6.13 S2-165508 DISCUSSION V2x message transport mechanism over LTE-Uu reference point Ericsson Rel-14 V2XARC Noted in parallel session Noted
6.13 S2-165509 CR 23.285 CR0001: V2X message handling over LTE Uu Ericsson Rel-14 V2XARC Revised in parallel session to S2-166030. Revised
6.13 S2-166030 CR 23.285 CR0001R1: V2X message handling over LTE Uu Ericsson Rel-14 V2XARC Revision of S2-165509. Revised in parallel session to S2-166038. Revised
6.13 S2-166038 CR 23.285 CR0001R2: V2X message handling over LTE Uu Ericsson Rel-14 V2XARC Revision of S2-166030. Agreed in parallel session Block approved Agreed
6.13 S2-165716 DISCUSSION USD definitions for V2X communication Qualcomm Incorporated, xxx Source needs correction. Noted in parallel session Noted
6.13 S2-165717 CR 23.285 CR0012: Definition of the USD for Uu based V2X communication and V2X Application Server discovery Qualcomm Incorporated, Rel-14 V2XARC Revised in parallel session to S2-166031. Revised
6.13 S2-166031 CR 23.285 CR0012R1: Definition of the USD for Uu based V2X communication and V2X Application Server discovery Qualcomm Incorporated Rel-14 V2XARC Revision of S2-165717. Agreed in parallel session Block approved Agreed
6.13 S2-165789 DISCUSSION V2X USD with E-CGI Nokia Rel-14 V2XARC Noted in parallel session Noted
- - - Cat B - - - - -
6.13 S2-165630 CR 23.285 CR0003: Update of V2X impacts to EPC procedures Huawei, Hisilicon, LG Electronics Rel-14 V2XARC Revised in parallel session to S2-166032. Revised
6.13 S2-166032 CR 23.285 CR0003R1: Update of V2X impacts to EPC procedures Huawei, Hisilicon, LG Electronics, Ericsson Rel-14 V2XARC Revision of S2-165630. Agreed in parallel session Block approved Agreed
6.13 S2-165636 CR 23.285 CR0006: Subscription to V2X services LG Electronics Rel-14 V2XARC Revised in parallel session to S2-166033. Revised
6.13 S2-166033 CR 23.285 CR0006R1: Subscription to V2X services LG Electronics Rel-14 V2XARC Revision of S2-165636. Agreed in parallel session Block approved Agreed
6.13 S2-165679 CR 23.285 CR0009: Uplink distribution deployment option KPN, LG Electronics Rel-14 V2XARC Revised in parallel session to S2-166034. Revised
6.13 S2-166034 CR 23.285 CR0009R1: Uplink distribution deployment option KPN, LG Electronics Rel-14 V2XARC Revision of S2-165679. Agreed in parallel session Block approved Agreed
- - - Cat F - - - - -
6.13 S2-165632 CR 23.285 CR0005: Update of Functional entities description Huawei, Hisilicon Rel-14 V2XARC Revised in parallel session to S2-166035. Revised
6.13 S2-166035 CR 23.285 CR0005R1: Update of Functional entities description Huawei, Hisilicon Rel-14 V2XARC Revision of S2-165632. Revised in parallel session to S2-166039. Revised
6.13 S2-166039 CR 23.285 CR0005R2: Update of Functional entities description Huawei, Hisilicon Rel-14 V2XARC Revision of S2-166035. Agreed in parallel session Block approved Agreed
6.13 S2-165638 CR 23.285 CR0008: PC5-U stack instance for V2X use LG Electronics Rel-14 V2XARC Noted in parallel session Noted
6.13 S2-165713 CR 23.285 CR0010: Clarification on location mapping at V2X Application Server Qualcomm Incorporated, Ericsson, Rel-14 V2XARC Revised in parallel session to S2-166036. Revised
6.13 S2-166036 CR 23.285 CR0010R1: Clarification on location mapping at V2X Application Server Qualcomm Incorporated, Ericsson, Rel-14 V2XARC Revision of S2-165713. Agreed in parallel session Block approved Agreed
6.13 S2-165714 CR 23.285 CR0011: Clarification on V2X message reception using MBMS Receive Only Mode Qualcomm Incorporated, Rel-14 V2XARC Revised in parallel session to S2-166037. Revised
6.13 S2-166037 CR 23.285 CR0011R1: Clarification on V2X message reception using MBMS Receive Only Mode Qualcomm Incorporated Rel-14 V2XARC Revision of S2-165714. Noted in parallel session Noted
6.13 S2-165637 CR 23.285 CR0007: Clarification on MBMS for LTE-Uu based V2X architecture reference model LG Electronics Rel-14 V2XARC Agreed in parallel session Block approved Agreed
6.14 - - Study on PS Data off function (FS_PS_DATA_OFF) and related normative work (PS_DATA_OFF) - - {Krisztian} - -
- - - Architectural Requirements, update of existing key issues, new key issues - - - - -
6.14 S2-165600 P-CR New architecture requirement Intel, Huawei FS_PS_DATA_OFF Noted in parallel session Noted
6.14 S2-165601 P-CR Key issue #4 update Intel, Huawei FS_PS_DATA_OFF Revised in parallel session to S2-165917. Revised
6.14 S2-165917 P-CR Key issue #4 update Intel, Huawei - FS_PS_DATA_OFF Revision of S2-165601. Agreed in parallel session Block approved Approved
6.14 S2-165639 P-CR New key issue - informing OTT about the UE's status Alibaba FS_PS_DATA_OFF Noted in parallel session Noted
- - - Solutions to Key issue 1 - - - - -
6.14 S2-165514 P-CR New Solution 1.5 for Key issue 1 Ericsson FS_PS_DATA_OFF Revised in parallel session to S2-165918. Revised
6.14 S2-165918 P-CR New Solution 1.5 for Key issue 1 Ericsson - FS_PS_DATA_OFF Revision of S2-165514. Agreed in parallel session Block approved Approved
6.14 S2-165516 P-CR Update to Solution 1.4 Ericsson FS_PS_DATA_OFF Revised in parallel session to S2-165919. Revised
6.14 S2-165919 P-CR Update to Solution 1.4 Ericsson - FS_PS_DATA_OFF Revision of S2-165516. Noted in parallel session Noted
6.14 S2-165813 P-CR New solution based on PCO for Key Issue#1 Nokia, Alcatel-Lucent Shanghai Bell FS_PS_DATA_OFF Merged in parallel sessions with S2-165581 into S2-165922 Merged
6.14 S2-165920 P-CR New solution based on PCO for Key Issue#1 Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF WITHDRAWN Withdrawn
6.14 S2-165921 LS OUT [DRAFT] LS on PS Data Off SA WG2 Rel-14 FS_PS_DATA_OFF Created in parallel session. Revised in parallel session to S2-165926. Revised
6.14 S2-165926 LS OUT [DRAFT] LS on PS Data Off SA WG2 Rel-14 FS_PS_DATA_OFF Revision of S2-165921. Revised in parallel session to S2-165933. Revised
6.14 S2-165933 LS OUT LS on PS Data Off SA WG2 Rel-14 FS_PS_DATA_OFF Revision of S2-165926. Agreed in parallel session. Revised to S2-166118. Revised
6.14 S2-166118 LS OUT LS on PS Data Off SA WG2 Rel-14 FS_PS_DATA_OFF Revision of S2-165933. e-mail approved and sent to CT WG1 Approved
6.14 S2-166131 LS In LS from CT WG1: Reply LS on PS Data Off CT WG1 (C1-164562) Rel-14 FS_PS_DATA_OFF Reply from CT WG1 in response to S2-166118. Noted in parallel session Noted
6.14 S2-165581 P-CR New solution for key issue #1 Huawei, HiSilicon, Intel FS_PS_DATA_OFF Revised in parallel session to S2-165922. Revised
6.14 S2-165922 P-CR New solution for key issue #1 Huawei, HiSilicon, Intel, Nokia, Alcatel-Lucent Shanghai Bell, Orange, Deutsche Telekom, Alibaba - FS_PS_DATA_OFF Revision of S2-165581, merging S2-165813. Revised in parallel session to S2-165958. Revised
6.14 S2-165958 P-CR New solution for key issue #1 Huawei, HiSilicon, Intel, Nokia, Alcatel-Lucent Shanghai Bell, Orange, Deutsche Telekom, Alibaba - FS_PS_DATA_OFF Revision of S2-165922. Agreed in parallel session Block approved Approved
6.14 S2-165574 P-CR Solution for Key issue 1 - Using USSD/USSI and ADD BlackBerry UK Ltd FS_PS_DATA_OFF Revised in parallel session to S2-165924. Revised
6.14 S2-165924 P-CR Solution for Key issue 1 - Using USSD/USSI and ADD BlackBerry UK Ltd - FS_PS_DATA_OFF Revision of S2-165574. Revised in parallel session to S2-165959. Revised
6.14 S2-165959 P-CR Solution for Key issue 1 - Using USSD/USSI and ADD BlackBerry UK Ltd - FS_PS_DATA_OFF Revision of S2-165924. Agreed in parallel session Block approved Approved
- - - Solutions to Key issue 2 - - - - -
6.14 S2-165515 P-CR New Solution 2.5 for Key issue 2 Ericsson FS_PS_DATA_OFF Revised in parallel session to S2-165925. Revised
6.14 S2-165925 P-CR New Solution 2.5 for Key issue 2 Ericsson - FS_PS_DATA_OFF Revision of S2-165515. Agreed in parallel session Block approved Approved
6.14 S2-165517 P-CR Update to Solution 2.3 Ericsson FS_PS_DATA_OFF Agreed in parallel session Block approved Approved
6.14 S2-165552 P-CR New extendable solutions with no UE modem and no VPLMN impact for early deployment Nokia, Alcatel-Lucent Shanghai Bell FS_PS_DATA_OFF Revised in parallel session to S2-165927. Revised
6.14 S2-165927 P-CR New extendable solutions for early deployments Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165552. Revised in parallel session to S2-165960. Revised
6.14 S2-165960 P-CR New extendable solutions with no UE modem and no VPLMN impact for early deployment Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165927. Revised in parallel session to S2-166161. Add the word 'provisioning' after 'UICC'. Revised
6.14 S2-166161 P-CR New extendable solutions with no UE modem and no VPLMN impact for early deployment Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165960. Agreed in parallel session Block approved Approved
6.14 S2-165576 P-CR Solution for Key issue 2 - Making UE aware of 3GPP PS Data Off exempt services using USSD/USSI BlackBerry UK Ltd FS_PS_DATA_OFF Revised in parallel session to S2-165928. Revised
6.14 S2-165928 P-CR Solution for Key issue 2 - Making UE aware of 3GPP PS Data Off exempt services using USSD/USSI BlackBerry UK Ltd - FS_PS_DATA_OFF Revision of S2-165576. Revised in parallel session to S2-165961. Revised
6.14 S2-165961 P-CR Solution for Key issue 2 - Making UE aware of 3GPP PS Data Off exempt services using USSD/USSI BlackBerry UK Ltd - FS_PS_DATA_OFF Revision of S2-165928. Revised in parallel session to S2-165965. Revised
6.14 S2-165965 P-CR Solution for Key issue 2 - Making UE aware of 3GPP PS Data Off exempt services using USSD/USSI BlackBerry UK Ltd - FS_PS_DATA_OFF Revision of S2-165961. Agreed in parallel session Block approved Approved
6.14 S2-165602 P-CR Update and evaluation for solution #2.2 Intel, Huawei FS_PS_DATA_OFF Revised in parallel session to S2-165929. Remove evaluation Revised
6.14 S2-165929 P-CR Update and evaluation for solution #2.2 Intel, Huawei - FS_PS_DATA_OFF Revision of S2-165602. Agreed in parallel session Block approved Approved
- - - Solutions to Key issue 3 - - - - -
6.14 S2-165518 P-CR Update to Solution 3.4 Ericsson FS_PS_DATA_OFF Revised in parallel session to S2-165930. Revised
6.14 S2-165930 P-CR Update to Solution 3.4 Ericsson - FS_PS_DATA_OFF Revision of S2-165518. Revised in parallel session to S2-165962. Revised
6.14 S2-165962 P-CR Update to Solution 3.4 Ericsson - FS_PS_DATA_OFF Revision of S2-165930. Agreed in parallel session Block approved Approved
6.14 S2-165815 P-CR New KI#3 solution: Solution using HSS knowledge of PS Data Off UE status avoiding VPLMN impacts for early deployments Nokia, Alcatel-Lucent Shanghai Bell FS_PS_DATA_OFF Revised in parallel session to S2-165931. Revised
6.14 S2-165931 P-CR New KI#3 solution: Solution using HSS knowledge of PS Data Off UE status avoiding VPLMN impacts for early deployments Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165815. Agreed in parallel session Block approved Approved
6.14 S2-165816 P-CR New KI#3 solution using PCO for carrying PS Data Off UE status avoiding VPLMN impacts for early deployments Nokia, Alcatel-Lucent Shanghai Bell FS_PS_DATA_OFF Revised in parallel session to S2-165932. Revised
6.14 S2-165932 P-CR New KI#3 solution using PCO for carrying PS Data Off UE status avoiding VPLMN impacts for early deployments Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165816. Revised in parallel session to S2-165963. Revised
6.14 S2-165963 P-CR New KI#3 solution using PCO for carrying PS Data Off UE status avoiding VPLMN impacts for early deployments Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165932. Revised in parallel session to S2-166162. Revised
6.14 S2-166162 P-CR New KI#3 solution using PCO for carrying PS Data Off UE status avoiding VPLMN impacts for early deployments Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165963. Agreed in parallel session Block approved Approved
6.14 S2-165582 P-CR Update on solution 3.3 Huawei, HiSilicon FS_PS_DATA_OFF Agreed in parallel session Block approved Approved
6.14 S2-165603 P-CR Update and evaluation for solution #3.2 Intel, Huawei FS_PS_DATA_OFF Revised in parallel session to S2-165948. Revised
6.14 S2-165948 P-CR Update and evaluation for solution #3.2 Intel, Huawei - FS_PS_DATA_OFF Revision of S2-165603. Agreed in parallel session Block approved Approved
- - - Solutions to Key issue 4 - - - - -
6.14 S2-165577 P-CR Key issue 4 solution 4.2 - correction of implementation errors BlackBerry UK Ltd FS_PS_DATA_OFF Agreed in parallel session Block approved Approved
6.14 S2-165519 P-CR Update to Solution 4.4 Ericsson FS_PS_DATA_OFF Revised in parallel session to S2-165949. Revised
6.14 S2-165949 P-CR Update to Solution 4.4 Ericsson - FS_PS_DATA_OFF Revision of S2-165519. Agreed in parallel session Block approved Approved
6.14 S2-165578 P-CR Solution for Key Issue 4 - Control of other SIP based services and non SIP based services BlackBerry UK Ltd FS_PS_DATA_OFF Revised in parallel session to S2-165950. Revised
6.14 S2-165950 P-CR Solution for Key Issue 4 - Control of other SIP based services and non SIP based services BlackBerry UK Ltd - FS_PS_DATA_OFF Revision of S2-165578. WITHDRAWN (not provided) Withdrawn
6.14 S2-165604 P-CR Update on solutions for key issue #4 Intel, Huawei FS_PS_DATA_OFF Noted in parallel session Noted
6.14 S2-165605 P-CR New solution for key issue #4 Intel, Huawei, China Unicom FS_PS_DATA_OFF Noted in parallel session Noted
6.14 S2-165820 P-CR Update to solution 4.4 ZTE FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165821 P-CR Update to solution 4.5 ZTE FS_PS_DATA_OFF Not Handled Not Handled
- - - Evaluations and conclusions - - - - -
6.14 S2-165500 DISCUSSION Comparison and evaluation of Data Off solutions Nokia FS_PS_DATA_OFF Noted in parallel session Noted
6.14 S2-165501 P-CR Data Off evaluation and way forward Nokia, Alcatel-Lucent Shanghai Bell FS_PS_DATA_OFF LATE DOC: Rx: 11/10, 17:15. Revised in parallel session to S2-165951. Revised
6.14 S2-165951 P-CR Data Off evaluation and way forward Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165501. Revised in parallel session to S2-165964. Revised
6.14 S2-165964 P-CR Data Off way forward Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165951. Revised in parallel session to S2-166164. Revised
6.14 S2-166164 P-CR Data Off evaluation and way forward Nokia, Alcatel-Lucent Shanghai Bell - FS_PS_DATA_OFF Revision of S2-165964. Agreed in parallel session Block approved Approved
6.14 S2-165669 P-CR Evaluation of PS data off solutions Qualcomm Incorporated FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165520 P-CR Evaluation Criteria Ericsson FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165575 P-CR Key Issue 1 - conclusions BlackBerry UK Ltd FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165607 P-CR Overall evaluation for key issue #1 Intel FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165608 P-CR Overall evaluation for key issue #2 Intel FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165609 P-CR Overall evaluation for key issue #3 Intel FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165610 P-CR Overall evaluation for key issue #4 Intel FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165606 P-CR Conclusion for 3GPP PS Data Off Intel, China Unicom FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165822 P-CR Discussion on evaluation criteria for key issue 1 ZTE FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-165823 P-CR Discussion on USSD-based solution for key issue 1 ZTE FS_PS_DATA_OFF Not Handled Not Handled
- - - Outgoing LS - - - - -
6.14 S2-165858 DISCUSSION DP on Data Off LS to SA WG3 Deutsche Telekom AG Rel-14 FS_PS_DATA_OFF
6.14 S2-165861 LS OUT [DRAFT] LS on PS Data Off function Deutsche Telekom AG Rel-14 FS_PS_DATA_OFF
6.15 - - Study on extended architecture support for Cellular Internet of Things (FS_CIoT_Ext) and related normative work (CIoT_Ext) - - {Puneet} - -
6.15 S2-165909 LS In LS from RAN WG2: LS on mobility enhancements for eNB-IoT RAN WG2 (R2-167315) Rel-14 NB_IOTenh-Core LATE DOC: Rx 16/10, 11:30. This was postponed to SA WG2 meeting #118. SA WG2 will wait for CT WG1 response on this. Postponed
6.15 S2-166115 LS In LS from RAN WG1: LS on collisions between SC-PTM and Paging in NB-IoT RAN WG1 (R1-1611034) Rel-14 NB_IOTenh LATE DOC: Rx 18/10, 20:20. Not Handled. Postponed to meeting #118. Postponed
- - - Key Issue #2 - - - - -
6.15 S2-165702 DISCUSSION Considerations on UE-SCEF reliable communications Huawei, HiSilicon, Neul Limited Noted in parallel session Noted
6.15 S2-165521 P-CR Evaluation & Conclusion Key issue #2 Ericsson FS_CIoT_Ext Opened in parallel session. Revised to S2-166270. Revised
6.15 S2-166270 P-CR Evaluation & Conclusion Key issue #2 Ericsson FS_CIoT_Ext Revision of S2-165521. This was left for e-mail approval. Noted Mike (Convida Wireless) comments and objects to the original version Mike (Convida Wireless) provides rev1 Dario (Huawei) provides rev1_Hua Mike (Convida Wireless) cannot accept rev1_Hua. Comments. Peter (Ericsson) comments Dario (Huawei) comments Mike (Convida Wireless) comments Puneet (Intel) Asks if any rev is acceptable? NOTED Noted
6.15 S2-165708 P-CR Concluding Key Issue 2 Convida Wireless CIoT_Ext Opened in parallel session. This was postponed to the next meeting. Postponed
- - - Key Issue #3 - - - - -
6.15 S2-165721 P-CR Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT - Key issue #3 Qualcomm Incorporated CIoT_Ext Revised in parallel session to S2-165972. Revised
6.15 S2-165972 P-CR Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT - Key issue #3 Qualcomm Incorporated - CIoT_Ext Revision of S2-165721. Revised in parallel session to S2-166010. Revised
6.15 S2-166010 P-CR Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT - Key issue #3 Qualcomm Incorporated - CIoT_Ext Revision of S2-165972. Agreed in parallel session Block approved Approved
6.15 S2-165973 LS OUT [DRAFT] LS on Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT SA WG2 - - Created in parallel session. Revised in parallel session to S2-166011. Revised
6.15 S2-166011 LS OUT [DRAFT] LS on Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT SA WG2 - - Revision of S2-165973. This was left for e-mail approval. e-mail approved. Revised to remove 'draft' in S2-166285 Revised
6.15 S2-166285 LS OUT LS on Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT SA WG2 - - e-mail revision of S2-166011. Approved Approved
6.15 S2-165893 P-CR Aspects of Handling of UE WB-E-UTRAN capabilities when UE is camping on NB-IoT - Key issue #3 Vodafone FS_CIoT_Ext Merged with S2-165972 into S2-165974 Will be merged as part of solution 3 in S2-165972 Merged
- - - Key Issue #4 - - - - -
6.15 S2-165722 P-CR Solution for Reuse of MBMS - Key issue #4 Qualcomm Incorporated CIoT_Ext Revised in parallel session, merging S2-165893, to S2-165974. Revised
6.15 S2-165974 P-CR Solution for Reuse of MBMS - Key issue #4 Qualcomm Incorporated - CIoT_Ext Revision of S2-165722, merging S2-165893. Agreed in parallel session Block approved Approved
6.15 S2-165703 P-CR Solution on coverage enhancement for multicast Huawei, HiSilicon CIoT_Ext Noted in parallel session SA WG2 will wait for RAN WG2 to progress the work and if SA WG2 needs to do anything it will be triggered by RAN WG2. Noted
6.15 S2-165709 P-CR Concluding Key Issue 4 Convida Wireless CIoT_Ext Revised in parallel session to S2-165975. Remove conclusions Revised
6.15 S2-165975 P-CR Concluding Key Issue 4 Convida Wireless - CIoT_Ext Revision of S2-165709. Agreed in parallel session Block approved Approved
- - - Key Issue #5 - - - - -
6.15 S2-165728 P-CR Addition of Impacts and Evaluations for Location Services Solutions Qualcomm Incorporated FS_CIoT_Ext Revised in parallel session to S2-165976. Remove conclusions. Revised
6.15 S2-165976 P-CR Addition of Impacts and Evaluations for Location Services Solutions Qualcomm Incorporated - FS_CIoT_Ext Revision of S2-165728. Revised in parallel session to S2-166013. Revised
6.15 S2-166013 P-CR Addition of Impacts and Evaluations for Location Services Solutions Qualcomm Incorporated - FS_CIoT_Ext Revision of S2-165976. Revised in parallel session to S2-166200. Revised
6.15 S2-166200 P-CR Addition of Impacts and Evaluations for Location Services Solutions Qualcomm Incorporated - FS_CIoT_Ext Revision of S2-166013. Agreed in parallel session Block approved Approved
6.15 S2-165704 P-CR Solution on coverage enhancement for location services Huawei, HiSilicon CIoT_Ext Revised in parallel session to S2-165977. Revised
6.15 S2-165977 P-CR Solution on coverage enhancement for location services Huawei, HiSilicon - CIoT_Ext Revision of S2-165704. Agreed in parallel session Block approved Approved
6.15 S2-165864 P-CR Evaluation & Conclusion Key issue #5 Ericsson LM FS_CIoT_Ext LATE DOC: WITHDRAWN (not provided) Withdrawn
- - - Key Issue #6 - - - - -
6.15 S2-165705 P-CR Update to Solution 14 for Key Issue 6 (Inter-UE QoS) - Option 1 Huawei, HiSilicon CIoT_Ext Revised in parallel session to S2-165978. Revised
6.15 S2-165978 P-CR Update to Solution 14 for Key Issue 6 (Inter-UE QoS) - Option 1 Huawei, HiSilicon - CIoT_Ext Revision of S2-165705. Revised in parallel session to S2-166014. Revised
6.15 S2-166014 P-CR Update to Solution 14 for Key Issue 6 (Inter-UE QoS) - Option 1 Huawei, HiSilicon - CIoT_Ext Revision of S2-165978. Agreed in parallel session Block approved Approved
6.15 S2-165706 P-CR Update to Solution 14 for Key Issue 6 (Inter-UE QoS) - Option 2 Huawei, HiSilicon CIoT_Ext Noted in parallel session Noted
6.15 S2-165689 P-CR Input to evaluation and conclusion on sol 15 for KI 6 Ericsson FS_NextGen Revised in parallel session to S2-165981. Revised
6.15 S2-165981 P-CR Input to evaluation and conclusion on sol 15 for KI 6 Ericsson - FS_NextGen Revision of S2-165689. Revised in parallel session to S2-166015. Revised
6.15 S2-166015 P-CR Input to evaluation and conclusion on sol 15 for KI 6 Ericsson - FS_NextGen Revision of S2-165981. Agreed in parallel session Block approved Approved
6.15 S2-165755 P-CR Solution evaluation and conclusion for Key issue #6 - 'Inter UE QoS for NB-IoT Control Plane Optimisation'. Qualcomm Incorporated FS_CIoT_Ext Opened in parallel session. Noted in parallel session Noted
6.15 S2-165885 P-CR Solution 15 as Conclusion on key Issue#6 Vodafone CIoT_Ext Revised in parallel session to S2-166016. Revised
6.15 S2-166016 P-CR Solution 15 as Conclusion on key Issue#6 Vodafone - CIoT_Ext Revision of S2-165885. Agreed in parallel session Block approved Approved
6.15 S2-165905 LS In LS from RAN WG2: Reply LS on overload control for CP CIoT EPS optimization RAN WG2 (R2-167290) Rel-14 FS_CIoT_Ext LATE DOC: Rx 16/10, 11:30. Not Handled. Postponed to meeting #118 Postponed
6.15 S2-166057 LS In LS from RAN WG3: Reply LS on overload control for CP CIoT EPS optimization RAN WG3 (R3-162613) Rel-14 FS_CIoT_Ext Response drafted in S2-165982 (withdrawn). Postponed to meeting #118 Postponed
6.15 S2-165982 LS OUT Reply LS to RAN WG2 and RAN WG3 on overload control for CP CIoT EPS optimization SA WG2 - - Created in parallel session. Response to S2-166057. WITHDRAWN Withdrawn
- - - Key Issue #7 - - - - -
6.15 S2-165567 P-CR CN Overload Control for Control Plane Only PDN Connection Intel FS_CIoT_Ext Merged in parallel session with S2-166180 into S2-166201 Merged
6.15 S2-165983 P-CR CN Overload Control for Control Plane Only PDN Connection Intel - FS_CIoT_Ext Revision of S2-165567. WITHDRAWN Withdrawn
6.15 S2-165729 P-CR Clarifications on UE/MME behaviour for CN Overload Control for CP Optimization Qualcomm Incorporated FS_CIoT_Ext Revised in parallel session to S2-165984. Revised
6.15 S2-165984 P-CR Clarifications on UE/MME behaviour for CN Overload Control for CP Optimization Qualcomm Incorporated - FS_CIoT_Ext Revision of S2-165729. Revised in parallel session to S2-166180. Revised
6.15 S2-166180 P-CR Clarifications on UE/MME behaviour for CN Overload Control for CP Optimization Qualcomm Incorporated, Intel - FS_CIoT_Ext Revision of S2-165984. Revised in parallel session, merging S2-165567, to S2-166201. Revised
6.15 S2-166201 P-CR Clarifications on UE/MME behaviour for CN Overload Control for CP Optimization Qualcomm Incorporated, Intel - FS_CIoT_Ext Revision of S2-166180, merging S2-165567. Agreed in parallel session Block approved Approved
6.15 S2-165723 P-CR Backward compatibility in CN Overload Control for CP Optimization Qualcomm Incorporated FS_CIoT_Ext Agreed in parallel session Block approved Approved
6.15 S2-165860 P-CR Control Plane back-off timer solutions Nokia, Alcatel-Lucent Shanghai Bell FS_CIoT_Ext Noted in parallel session Noted
6.15 S2-165550 P-CR CIoT_Correction to KI7 solution 9 NEC FS_CIoT_Ext Revised in parallel session to S2-166012. Offline discussion on changes needed Revised
6.15 S2-166012 P-CR CIoT_Correction to KI7 solution 9 NEC - FS_CIoT_Ext Revision of S2-165550. Revised in parallel session to S2-166181. Revised
6.15 S2-166181 P-CR CIoT_Correction to KI7 solution 9 NEC - FS_CIoT_Ext Revision of S2-166012. Agreed in parallel session Block approved Approved
6.15 S2-165524 P-CR Conclusion solution 9 - Overload Start Ericsson FS_CIoT_Ext Revised in parallel session to S2-165985. Revised
6.15 S2-165985 P-CR Conclusion solution 9 - Overload Start Ericsson - FS_CIoT_Ext Revision of S2-165524. Revised in parallel session to S2-166199. Revised
6.15 S2-166199 P-CR Conclusion solution 9 - Overload Start Ericsson - FS_CIoT_Ext Revision of S2-165985. Agreed in parallel session Block approved Approved
- - - Normative work for Key Issue #1 - - - - -
6.15 S2-165907 LS In LS from RAN WG2: Response LS on Enhanced Coverage authorization impact on cell and PLMN selection procedures RAN WG2 (R2-167294) Rel-14 FS_CIoT_Ext LATE DOC: Rx 16/10, 11:30. Response drafted in S2-165986. Final response in S2-166286 Replied to OPEN
6.15 S2-166148 LS In LS from CT WG1: LS on Enhanced Coverage authorization impact on cell and PLMN selection procedures CT WG1 (C1-164700) Rel-14 CIOT-CT LATE DOC: Rx 20/10, 11:20. Response drafted in S2-165986. Final response in S2-166286 Replied to
6.15 S2-165986 LS OUT [DRAFT] Response LS on Enhanced Coverage authorization impact on cell and PLMN selection procedures SA WG2 - - Created in parallel session. Response to S2-165907 and S2-166148. This was left for e-mail approval. Revision 8 approved. Revised to S2-166286. Guillaume (MediaTek) provides rev1 Guillaume (MediaTek) provides rev2 Miguel (Qualcomm) OK with rev2 Chris (Vodafone) provides rev3 Haris (Qualcomm) provides rev4 Guillaume (MediaTek) provides rev4 Haris (Qualcomm) renames Guillaume's rev4 to rev5 Karl-Heinz (DT) comments Antoine (Orange) provides rev6 Puneet (Intel) provides rev6 Puneet (Intel) provides rev7 Haris (Qualcomm) provides rev8 Miguel (Qualcomm) provides rev9 Puneet (Intel) comments Miguel (Qualcomm) OK with reverting to rev8 Puneet (Intel) prefers rev8 Guillaume (MediaTek) OK with rev8 S2 165986 rev8 APPROVED Revised
6.15 S2-166286 LS OUT Response LS on Enhanced Coverage authorization impact on cell and PLMN selection procedures SA WG2 - - Response to S2-165907 and S2-166148. e-mail revision 8 of S2-165986. Approved Approved
6.15 S2-165568 CR 23.401 CR3135: Authorization of use of Coverage Enhancement Intel Rel-14 CIoT_Ext Revised in parallel session to S2-165987. Revised
6.15 S2-165987 CR 23.401 CR3135R1: Authorization of use of Coverage Enhancement Intel Rel-14 CIoT_Ext Revision of S2-165568. Postponed Postponed
6.15 S2-165741 CR 23.060 CR2015: Authorization of use of Coverage Enhancement Intel Rel-14 CIoT_Ext Wrong TS number on CR: Should be 23.060! Revised in parallel session to S2-165988. Revised
6.15 S2-165988 CR 23.060 CR2015R1: Authorization of use of Coverage Enhancement Intel, Orange Rel-14 CIoT_Ext Revision of S2-165741. Postponed Postponed
6.15 S2-165571 CR 23.682 CR0235: Support of Enhanced Coverage Authorization Control via SCEF Intel Rel-14 CIoT_Ext Revised in parallel session to S2-165989. Revised
6.15 S2-165989 CR 23.682 CR0235R1: Support of Enhanced Coverage Authorization Control via SCEF Intel Rel-14 CIoT_Ext Revision of S2-165571. Postponed Postponed
- - - Normative work for Key Issue #2 - - - - -
6.15 S2-165522 CR 23.401 CR3131: Reliable UE delivery based on hop by hop ack (5c) Ericsson Rel-14 CIoT_Ext Revised in parallel session to S2-165992. Revised
6.15 S2-165992 CR 23.401 CR3131R1: Reliable UE delivery based on hop by hop ack (5c) Ericsson Rel-14 CIoT_Ext Revision of S2-165522. Postponed Postponed
6.15 S2-165523 CR 23.682 CR0234: Reliable UE delivery based on hop by hop ack (5c) Ericsson Rel-14 CIoT_Ext Revised in parallel session to S2-165993. Revised
6.15 S2-165993 CR 23.682 CR0234R1: Reliable UE delivery based on hop by hop ack (5c) Ericsson Rel-14 CIoT_Ext Revision of S2-165523. Postponed Postponed
6.15 S2-165710 CR 23.682 CR0238: CIoT Data Delivery Service Convida Wireless Rel-14 CIoT Revised in parallel session to S2-165994. Revised
6.15 S2-165994 CR 23.682 CR0238R1: CIoT Data Delivery Service Convida Wireless Rel-14 CIoT Revision of S2-165710. Postponed Postponed
- - - Normative work for Key Issue #6 - - - - -
6.15 S2-165891 CR 23.401 CR3092R1: Inter UE QoS for NB-IoT control plane CIoT EPS optimisation Vodafone Rel-14 CIoT_Ext CR needs to be re-written to version 14.1.0. Not Handled -
- - - Normative work for Key Issue #7 - - - - -
6.15 S2-165525 CR 23.401 CR3132: Overload Start message for control plane data only Ericsson Rel-14 CIoT_Ext Merged in parallel session with S2-165549 into S2-165991. Merged
6.15 S2-165549 CR 23.401 CR3134: CIoT_KI7_sol9 - Overload Start for control plane data NEC Rel-14 CIoT_Ext Revised in parallel session, merging S2-165549, to S2-165991. Revised
6.15 S2-165991 CR 23.401 CR3134R1: CIoT_KI7_sol9 - Overload Start for control plane data NEC Rel-14 CIoT_Ext Revision of S2-165549, merging S2-165525. Noted in parallel session Noted
6.15 S2-165548 CR 23.401 CR3133: CIoT_KI7_sol8 - Control Plane data back-off timer NEC Rel-14 CIoT_Ext Merged in parallel session with S2-165744 into S2-165990. Merged
6.15 S2-165744 CR 23.401 CR3143: Control Plane data back-off timer introduction Qualcomm Incorporated Rel-14 CIoT Revised in parallel session, merging S2-165548, in S2-165990 Revised
6.15 S2-165990 CR 23.401 CR3143R1: Control Plane data back-off timer introduction Qualcomm Incorporated, NEC, Intel, Samsung Rel-14 CIoT Revision of S2-165744, merging S2-165548. Revised in parallel session to S2-166198. Revised
6.15 S2-166198 CR 23.401 CR3143R2: Control Plane data back-off timer introduction Qualcomm Incorporated, NEC, Intel, Samsung Rel-14 CIoT Revision of S2-165990. Agreed in parallel session Block approved Agreed
- - - Show of Hands - - - - -
6.15 S2-166001 Other FS_CIoT_Ext: Indicative show of hands Rapporteur (Intel) - FS_CIoT_Ext Revised in parallel session to S2-166002. Revised
6.15 S2-166002 Other FS_CIoT_Ext: Indicative show of hands Rapporteur (Intel) - FS_CIoT_Ext Revision of S2-166001. Revised in parallel session to S2-166191. Revised
6.15 S2-166191 Other FS_CIoT_Ext: Indicative show of hands Rapporteur (Intel) - FS_CIoT_Ext Revision of S2-166002. Noted in parallel session Noted
6.16 - - Group based enhancements in the network capability exposure functions (GENCEF) - - {Puneet} - -
6.16 S2-165614 DISCUSSION Discussion and evaluation on the solution of GENCEF Huawei, HiSilicon Rel-14 GENCEF Not Handled Not Handled
6.16 S2-165613 CR 23.682 CR0236: Using individual SCEF reference ID during the group-based monitoring event configuration procedure Huawei, HiSilicon Rel-14 GENCEF Not Handled -
6.16 S2-165731 CR 23.682 CR0239: Enhancements to monitoring event configuration and reporting procedures for group of UEs ZTE Rel-14 GENCEF Revised in parallel session to S2-165980. Revised
6.16 S2-165980 CR 23.682 CR0239R1: Enhancements to monitoring event configuration and reporting procedures for group of UEs ZTE Rel-14 GENCEF Revision of S2-165731. Revised in parallel session to S2-166182. Revised
6.16 S2-166182 CR 23.682 CR0239R2: Enhancements to monitoring event configuration and reporting procedures for group of UEs ZTE Rel-14 GENCEF Revision of S2-165980. Revised in parallel session to S2-166192. Revised
6.16 S2-166192 CR 23.682 CR0239R3: Enhancements to monitoring event configuration and reporting procedures for group of UEs ZTE Rel-14 GENCEF Revision of S2-166182. Agreed in parallel session Block approved Agreed
6.16 S2-165734 CR 23.682 CR0240: Group monitoring event configuration and reporting for UEs - Solution Option 1A ZTE Rel-14 GENCEF Not Handled -
6.16 S2-165899 CR 23.682 CR0227R3: Group based MONTE Event Configuration via HSS Samsung Rel-14 GENCEF Revision of S2-165237 (Technically endorsed at S2#116BIS). LATE DOC: Rx 17/10, 09:15. Revised in parallel session to S2-165979. Revised
6.16 S2-165979 CR 23.682 CR0227R4: Group based MONTE Event Configuration via HSS Samsung Rel-14 GENCEF Revision of S2-165899. Revised in parallel session to S2-166183. Revised
6.16 S2-166183 CR 23.682 CR0227R5: Group based MONTE Event Configuration via HSS Samsung Rel-14 GENCEF Revision of S2-165979. Revised in parallel session to S2-166193. Revised
6.16 S2-166193 CR 23.682 CR0227R6: Group based MONTE Event Configuration via HSS Samsung Rel-14 GENCEF Revision of S2-166183. Agreed in parallel session Block approved Agreed
6.17 - - Robust Call Setup for VoLTE subscriber in LTE (RobVoLTE) - - {Not_on_agenda} - -
6.18 - - Study on Enhanced Isolated E-UTRAN Operation for Public Safety (FS_IOPS_LB) - - {Krisztian} - -
6.18 S2-165892 P-CR New Key Issue: Transition of a E-UTRAN site between full isolation and limited backhaul Orange FS_IOPS_LB Revised in parallel session to S2-165955. Revised
6.18 S2-165955 P-CR New Key Issue: Transition of a E-UTRAN site between full isolation and limited backhaul Orange - FS_IOPS_LB Revision of S2-165892. Agreed in parallel session Block approved Approved
6.18 S2-165894 P-CR New Key Issue: Admission of a Public Safety UE not known in the E-UTRAN site Orange FS_IOPS_LB Revised in parallel session to S2-165956. Revised
6.18 S2-165956 P-CR Admission of a Public Safety UE not known in the E-UTRAN site Orange - FS_IOPS_LB Revision of S2-165894. Agreed in parallel session Block approved Approved
6.18 S2-165896 P-CR Solution: IOPS network using the backhaul for authentication only Orange FS_IOPS_LB Revised in parallel session to S2-165957. Revised
6.18 S2-165957 P-CR New solution: IOPS network using the backhaul for authentication only Orange - FS_IOPS_LB Revision of S2-165896. Agreed in parallel session Block approved Approved
6.19 - - System Architecture Enhancements to eMBMS for TV Video Service (AE_enTV) and related normative work - - {Not_on_agenda} - -
6.20 - - Non-IP for Cellular Internet of Things for 2G/3G-GPRS (NonIP_GPRS) - - {Not_on_agenda} - -
6.21 - - Study on Complementary Features for Voice services over WLAN (FS_VoWLAN) - - {Krisztian} - -
6.21 S2-165502 P-CR TR 23.751 skeleton Nokia, Alcatel-Lucent Shanghai Bell FS_VoWLAN Agreed in parallel session Block approved Approved
6.21 S2-165503 P-CR TR 23.751 scope Nokia, Alcatel-Lucent Shanghai Bell FS_VoWLAN Agreed in parallel session Block approved Approved
6.21 S2-165504 P-CR New Key Issues on QoS differentiation in the user plane Nokia, Alcatel-Lucent Shanghai Bell FS_VoWLAN Revised in parallel session to S2-165952. Revised
6.21 S2-165952 P-CR New Key Issues on QoS differentiation in the user plane Nokia, Alcatel-Lucent Shanghai Bell - FS_VoWLAN Revision of S2-165504. Revised in parallel session to S2-166026. Revised
6.21 S2-166026 P-CR New Key Issues on QoS differentiation in the user plane Nokia, Alcatel-Lucent Shanghai Bell - FS_VoWLAN Revision of S2-165952. Approved Approved
6.21 S2-165505 P-CR New Key Issue on determining QoS for the uplink traffic Nokia, Alcatel-Lucent Shanghai Bell FS_VoWLAN Revised in parallel session to S2-165953. Revised
6.21 S2-165953 P-CR New Key Issue on determining QoS for the uplink traffic Nokia, Alcatel-Lucent Shanghai Bell - FS_VoWLAN Revision of S2-165505. Revised in parallel session to S2-166027. Revised
6.21 S2-166027 P-CR New Key Issue on determining QoS for the uplink traffic Nokia, Alcatel-Lucent Shanghai Bell - FS_VoWLAN Revision of S2-165953. Approved Approved
6.21 S2-165506 P-CR Solution for User Plane QoS differentiation in untrusted WLAN case Nokia, Alcatel-Lucent Shanghai Bell FS_VoWLAN Revised in parallel session to S2-165954. Revised
6.21 S2-165954 P-CR Solution for User Plane QoS differentiation in untrusted WLAN case Nokia, Alcatel-Lucent Shanghai Bell - FS_VoWLAN Revision of S2-165506. Revised in parallel session to S2-166163. Revised
6.21 S2-166163 P-CR Solution for User Plane QoS differentiation in untrusted WLAN case Nokia, Alcatel-Lucent Shanghai Bell - FS_VoWLAN Revision of S2-165954. Revised in parallel session to S2-166028. Revised
6.21 S2-166028 P-CR Solution for User Plane QoS differentiation in untrusted WLAN case Nokia, Alcatel-Lucent Shanghai Bell - FS_VoWLAN Revision of S2-166163. Approved Approved
6.22 - - T-ADS supporting WLAN Access (TADS_WLAN) - - {Not_on_agenda} - -
6.23 - - Enhancement to FMSS (eFMSS) - - {Not_on_agenda} - -
6.24 - - 3GPP Packet Access Maintenance - minor corrections - - {Not_on_agenda} - -
6.25 - - PCC/QoS Maintenance - minor corrections - - {Not_on_agenda} - -
6.26 - - Non-3GPP Access Maintenance - minor corrections - - {Not_on_agenda} - -
6.27 - - IMS-Related Maintenance - minor corrections - - {Not_on_agenda} - -
6.28 - - TEI14 Category B/C - Enhancements and Improvements only (3GPP Packet Access) - - {Not_on_agenda} - -
6.29 - - TEI14 Category B/C - Enhancements and Improvements only (PCC/QoS) - - {Not_on_agenda} - -
6.30 - - TEI14 Category B/C - Enhancements and Improvements only (Non-3GPP Access) - - {Not_on_agenda} - -
6.31 - - TEI14 Category B/C - Enhancements and Improvements only (IMS, IMS-Related, Emergency, Other) - - {Not_on_agenda} - -
7 - - Project Planning and Management - - {Frank} - -
7.1 - - New and Revised Work Items, Cover sheets for completed work items - - {Frank} - -
7.1 S2-165633 SID NEW New SID on enhanced VoLTE performance Huawei, HiSilicon, China Telecom, Qualcomm Incorporated, China Mobile, China Unicom, T-Mobile USA INC, Telekom Austria AG, Teliasonera, Intel, AT&T, Telecom Italia Revised to S2-165912. Revised
7.1 S2-165912 SID NEW New SID on enhanced VoLTE performance Huawei, HiSilicon, China Telecom, Qualcomm Incorporated, China Mobile, China Unicom, T-Mobile USA INC, Telekom Austria AG, Teliasonera, Intel, AT&T, Telecom Italia Revision of S2-165633. Approved Approved
7.1 S2-165634 DISCUSSION Discussion for codec dependent triggering of PS Handover HUAWEI TECHNOLOGIES CO., LTD Not Handled Not Handled
7.1 S2-165666 DISCUSSION On RAN awareness of codec information Qualcomm Incorporated Rel-15 Not Handled Not Handled
7.1 S2-165673 SID NEW Study on Unlicensed spectrum offloading system enhancements Qualcomm Incorporated, Intel, KDDI Rel-15 Revised to S2-165913. Revised
7.1 S2-165913 SID NEW Study on Unlicensed spectrum offloading system enhancements Qualcomm Incorporated, Intel, KDDI, NEC, Convidia Wireless, ATT, Nokia Rel-15 Revision of S2-165673. Revised to S2-166211. Revised
7.1 S2-166211 SID NEW Study on Unlicensed spectrum offloading system enhancements Qualcomm Incorporated, Intel, KDDI, NEC, Convida Wireless, ATT, Nokia Rel-15 Revision of S2-165913. Approved Approved
7.1 S2-165701 SID NEW New SID on architecture enhancements to ProSe UE-to-Network Relay for Wearables Huawei, HiSilicon, LG Electronics, Nokia, Convida Wireless, KPN, Sony Revised to S2-165914. Revised
7.1 S2-165914 SID NEW New SID on architecture enhancements to ProSe UE-to-Network Relay Huawei, HiSilicon, Qualcomm Incorporated, LG Electronics, Nokia, Convida Wireless, KPN, Sony, Intel, China Mobile, AT&T, ITRI, Samsung, InterDigital, China Unicom Revision of S2-165701. Revised to S2-166212. Revised
7.1 S2-166212 SID NEW New SID on architecture enhancements to ProSe UE-to-Network Relay Huawei, HiSilicon, Qualcomm Incorporated, LG Electronics, Nokia, Convida Wireless, KPN, Sony, Intel, China Mobile, AT&T, ITRI, Samsung, InterDigital, China Unicom, Vodafone Revision of S2-165914. Approved Approved
7.1 S2-165544 DISCUSSION Proposed Way Forward of NextGen for R15 China Mobile (Rapporteurs) Rel-15 Noted Noted
7.1 S2-165793 P-CR Proposed working strategy to organize NextGen normative work ZTE FS_NextGen LATE DOC: Rx 11/10, 19:40. Noted Noted
7.1 S2-165545 WID new DRAFT Proposed WID for normative work of NextGen in R15 China Mobile, Nokia Rel-15 Not Handled Not Handled
7.1 S2-165786 DISCUSSION Structuring the TS work and phase 2 of the NextGen study Huawei, HiSilicon Rel-15 LATE DOC: Rx 16/10, 22:00. Noted Noted
7.1 S2-165900 DISCUSSION Proposed structure of the Rel-15 NextGen work Ericsson LATE REQ. LATE DOC: WITHDRAWN (not provided) Withdrawn
7.1 S2-165901 WID NEW New WID: Architecture for Next Generation System Ericsson LATE REQ. LATE DOC: Rx 17/10, 11:35. Not Handled Not Handled
7.2 - - Review of the Work Plan - - {Frank} - -
7.3 - - Planning future meetings - - {Frank} - -
7.3 S2-166025 Other Identifying relevant questions for taking conclusions on NG study SA WG2 Chairman - - This proposal was endorsed. Endorsed
7.3 S2-165838 OTHER Scope of SA WG2#118-bis SA WG2 Chairman The reduced scope for the next meeting was endorsed. Endorsed
8 - - AOB - - {Frank} - -
9 - - Close of the Meeting - - {Frank} - -
99 - - Withdrawn and reserved documents - - {Withdrawn} - -
99 S2-165832 P-CR Update of Solution 6.5.5: Application-aware UP Path (Re)selection Huawei, HiSilicon FS_NextGen WITHDRAWN Withdrawn
99 S2-165739 DISCUSSION Proposed strategy to organize NextGen normative work ZTE Corporation Rel-14 WITHDRAWN Withdrawn
99 S2-165551 P-CR Proposal of Evaluation Criteria for Solution of Key Issue 1 KDDI, ZTE, Sprint, InterDigital, LG Electronics, CATT, ETRI, Oracle, Sandvine, Samsung FS_NextGen WITHDRAWN Withdrawn
99 S2-165488 DISCUSSION KI#3 - Further considerations on mobility MediaTek Inc. Rel-14 WITHDRAWN Withdrawn
99 S2-165752 P-CR Update of UP function selection in multiple PDU sessions LG Electronics Inc. FS_NextGen WITHDRAWN Withdrawn
99 S2-165487 DISCUSSION KI#18 - Migration Scenarios MediaTek Inc. Rel-14 WITHDRAWN Withdrawn
99 S2-165812 P-CR Clarification for SM Selection by MM ETRI, ZTE, Samsung FS_NextGen WITHDRAWN Withdrawn
99 S2-165531 P-CR Separation of Mobility levels and Mobility restrictions Ericsson FS_NextGen WITHDRAWN Withdrawn
99 S2-165683 P-CR Clarification on NG1 and NAS Termination Huawei, HiSilicon FS_NextGen WITHDRAWN Withdrawn