List for Meeting: S2-117 All Sessions
Temporary Documents List - Ordered by Agenda Item
To use hyperlinks, this file must be placed above Folder 'Docs'
CURRENT STATS - OPEN DOCS: Total: 1     CRs: 0     P-CRs: 0     Other: 1
Created: 2016-10-28 09:07     START OF LIST
AI | TD# | Type | Title | Source | Rel | Work Item | Comments | Result |
---|---|---|---|---|---|---|---|---|
1 | - | - | Opening of the meeting | - | - | {Frank} | - | - |
1 | S2-165883 | OTHER | Welcome to Kaohsiung | TAICS, Mediatek, Chunghwa Telecom, ITRI | Noted | Noted | ||
2 | - | - | Approval of the agenda | - | - | {Frank} | - | - |
2 | S2-165473 | Agenda | Draft Agenda for SA WG2#117 | SA WG2 Chairman | Approved. The schedule will be updated on the local 'drafts' folder throughout the meeting. | Approved | ||
2.1 | - | - | IPR Call and Antitrust Reminder | - | - | {Frank} | - | - |
3 | - | - | Meeting reports | - | - | {Frank} | - | - |
3 | S2-165474 | REPORT | Draft Report of SA WG2 meeting #116BIS | SA WG2 Secretary | Approved | Approved | ||
4 | - | - | General | - | - | {Frank} | - | - |
4.1 | - | - | Common issues and Incoming LSs | - | - | {Frank} | - | - |
4.1 | S2-165484 | LS In | LS from TSG SA: Completion of SA WG3-LI Study TR 33.827 on S8HR | TSG SA (SP-160744) | Rel-14 | FS_LIV8 | Responses drafted in S2-165850 on IMS aspect under AI 6.4 and S2-165882 on SGW aspect under AI 6.1. Final response in S2-166231 | Replied to |
4.1 | S2-166058 | LS In | LS from RAN WG3: LS on Flexible eNB-ID and Cell-ID in E-UTRAN | RAN WG3 (R3-162637) | Rel-14 | LTE_FNBID-Core | Not Handled. Postponed to meeting #118. | Postponed |
5 | - | - | Pre-Rel-14 Essential Corrections | - | - | {Frank} | - | - |
5.1 | - | - | 3GPP Packet Access Maintenance excluding CIOT maintenance | - | - | {Frank} | - | - |
5.1.1 | - | - | 3GPP Packet Access Maintenance on Architecture enhancements for Cellular Internet of Things (CIOT) | - | - | {Puneet} | - | - |
- | - | - | LSs | - | - | - | - | - |
5.1.1 | S2-165478 | LS In | LS from ETSI TC LI: LI in the CIoT | ETSI TC LI (LI(16)P43040r1) | CIoT | Noted in parallel session SA WG2 expect SA WG3 will take lead on this and if anything needs to be done from SA WG2 side, SA WG3 will come back to SA WG2. | Noted | |
5.1.1 | S2-165481 | LS In | LS from SA WG5: Reply LS to SA WG2, CT WG4 Response LSs on Control Plane CIoT Optimisation Indicator propagated to PGW for charging purpose | SA WG5 (S5-165280) | Rel-13 | CIoT | Noted in parallel session | Noted |
5.1.1 | S2-165482 | LS In | LS from ITU-T JCA-IoT SC&C: LS on recent work by JCA-IoT and SC&C | ITU-T JCA-IoT SC&C (sp15-jca-iotandsc&c-oLS-0003) | Noted in parallel session SA WG2 expect TSG SA will provide response based on the existing work plan. | Noted | ||
- | - | - | CIoT optimizations related | - | - | - | - | - |
5.1.1 | S2-165670 | CR | 23.401 CR3136: Clarifying the UE behaviour for switch to UP | Qualcomm Incorporated | Rel-13 | CIoT | Noted in parallel session | Noted |
5.1.1 | S2-165671 | CR | 23.401 CR3137: Clarifying the UE behaviour for switch to UP | Qualcomm Incorporated | Rel-14 | CIoT | Revised in parallel session to S2-166003. | Revised |
5.1.1 | S2-166003 | CR | 23.401 CR3137R1: Clarifying the UE behaviour for switch to UP | Qualcomm Incorporated | Rel-14 | CIoT | Revision of S2-165671. Agreed in parallel session Block approved | Agreed |
5.1.1 | S2-165674 | CR | 23.401 CR3138: Correction of handling of resume cause | Intel | Rel-13 | CIoT | Agreed in parallel session Block approved | Agreed |
5.1.1 | S2-165675 | CR | 23.401 CR3139: Correction of handling of resume cause | Intel | Rel-14 | CIoT | Agreed in parallel session Block approved | Agreed |
5.1.1 | S2-165736 | CR | 23.401 CR3140: APN Rate Control and emergency bearer service | HTC | Rel-13 | CIoT | Revised in parallel session to S2-166004. | Revised |
5.1.1 | S2-166004 | CR | 23.401 CR3140R1: APN Rate Control and emergency bearer service | HTC | Rel-13 | CIoT | Revision of S2-165736. Revised in parallel session to S2-166194. | Revised |
5.1.1 | S2-166194 | CR | 23.401 CR3140R2: APN Rate Control and emergency bearer service | HTC | Rel-13 | CIoT | Revision of S2-166004. Agreed in parallel session Block approved | Agreed |
5.1.1 | S2-165737 | CR | 23.401 CR3141: APN rate control and emergency bearer service | HTC | Rel-14 | CIoT | Revised in parallel session, merging S2-165738, to S2-166005. | Revised |
5.1.1 | S2-166005 | CR | 23.401 CR3141R1: APN rate control and emergency bearer service | HTC | Rel-14 | CIoT | Revision of S2-165737, merging S2-165738. Agreed in parallel session Block approved | Agreed |
5.1.1 | S2-165738 | CR | 23.401 CR3142: Clarification to the APN rate control procedure | HTC | Rel-14 | CIoT | Merged with S2-165737 into S2-166005 | Merged |
5.1.1 | S2-165857 | CR | 23.401 CR3144: Missing indirect forwarding tunnel deletion in TAU with SGW change | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CIoT | Revised in parallel session to S2-166006. | Revised |
5.1.1 | S2-166006 | CR | 23.401 CR3144R1: Missing indirect forwarding tunnel deletion in TAU with SGW change | Nokia, Alcatel-Lucent Shanghai Bell, Ericsson | Rel-14 | CIoT | Revision of S2-165857. Revised in parallel session to S2-166197. | Revised |
5.1.1 | S2-166197 | CR | 23.401 CR3144R2: Missing indirect forwarding tunnel deletion in TAU with SGW change | Nokia, Alcatel-Lucent Shanghai Bell, Ericsson | Rel-14 | HLcom | Revision of S2-166006. Agreed in parallel session Block approved | Agreed |
- | - | - | NIDD procedure related | - | - | - | - | - |
5.1.1 | S2-165707 | CR | 23.682 CR0237: SCEF Behavior when MT NIDD Causes a Trigger | Convida Wireless, Oracle | Rel-14 | CIoT | Revised in parallel session to S2-166007. | Revised |
5.1.1 | S2-166007 | CR | 23.682 CR0237R1: SCEF Behavior when MT NIDD Causes a Trigger | Convida Wireless, Oracle | Rel-14 | CIoT | Revision of S2-165707. Agreed in parallel session Block approved | Agreed |
5.1.1 | S2-165759 | CR | 23.682 CR0241: Corrections for MT NIDD procedure to handle multiple non-IP data | NEC | Rel-13 | CIoT | Revised in parallel session to S2-166008. | Revised |
5.1.1 | S2-166008 | CR | 23.682 CR0241R1: Corrections for MT NIDD procedure to handle multiple non-IP data | NEC | Rel-13 | CIoT | Revision of S2-165759. Revised in parallel session to S2-166195. | Revised |
5.1.1 | S2-166195 | CR | 23.682 CR0241R2: Corrections for MT NIDD procedure to handle multiple non-IP data | NEC | Rel-13 | CIoT | Revision of S2-166008. Revised to S2-166267. | Revised |
5.1.1 | S2-166267 | CR | 23.682 CR0241R3: Corrections for MT NIDD procedure to handle multiple non-IP data | NEC | Rel-13 | CIoT | Revision of S2-166195. This CR was agreed | Agreed |
5.1.1 | S2-165760 | CR | 23.682 CR0242: Corrections for MT NIDD procedure to handle multiple non-IP data | NEC | Rel-14 | CIoT | Revised in parallel session to S2-166009. | Revised |
5.1.1 | S2-166009 | CR | 23.682 CR0242R1: Corrections for MT NIDD procedure to handle multiple non-IP data | NEC | Rel-14 | CIoT | Revision of S2-165760. Revised in parallel session to S2-166196. | Revised |
5.1.1 | S2-166196 | CR | 23.682 CR0242R2: Corrections for MT NIDD procedure to handle multiple non-IP data | NEC | Rel-14 | CIoT | Revision of S2-166009. Revised to S2-166268. | Revised |
5.1.1 | S2-166268 | CR | 23.682 CR0242R3: Corrections for MT NIDD procedure to handle multiple non-IP data | NEC | Rel-14 | CIoT | Revision of S2-166196. This CR was agreed | Agreed |
5.1.1 | S2-165852 | CR | 23.682 CR0243: Correction of T6a connection establishment parameters | Nokia, Alcatel-Lucent Shanghai Bell | Rel-13 | CIoT | Left open in parallel session. Noted in parallel session | Noted |
5.1.1 | S2-165855 | CR | 23.682 CR0244: Correction of T6a Connection Establishment parameters | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CIoT | Left open in parallel session. Noted in parallel session | Noted |
5.2 | - | - | QoS and PCC Maintenance | - | - | {Shabnam} | - | - |
5.2 | S2-165726 | CR | 23.203 CR1069: Remove 'same media type' requirement for Priority Sharing | Motorola Solutions, Airwave | Rel-13 | TEI13, MCPTT | No need for TEI13 WI Code. Revised in parallel session to S2-166088. SA WG2#118 may have additional discussion related to issues not yet addressed in this CR. But this CR stands on its own and will not affect the status of this CR due to unaddressed issues. | Revised |
5.2 | S2-166088 | CR | 23.203 CR1069R1: Remove 'same media type' requirement for Priority Sharing | Motorola Solutions, Airwave | Rel-13 | MCPTT | Revision of S2-165726. Agreed in parallel session Block approved | Agreed |
5.2 | S2-165727 | CR | 23.203 CR1070: Remove 'same media type' requirement for Priority Sharing | Motorola Solutions, Airwave | Rel-14 | MCPTT | Revised in parallel session to S2-166089. | Revised |
5.2 | S2-166089 | CR | 23.203 CR1070R1: Remove 'same media type' requirement for Priority Sharing | Motorola Solutions, Airwave | Rel-14 | MCPTT | Revision of S2-165727. Agreed in parallel session Block approved | Agreed |
5.3 | - | - | Non-3GPP Access Maintenance | - | - | {Krisztian} | - | - |
5.3 | S2-165476 | LS In | LS from RAN WG2: LS on NBIFOM and steering command | RAN WG2 (R2-165949) | Rel-13 | LTE_WLAN_radio-Core | Revision of S2-164931. Not Handled. Postponed to meeting #118 | Postponed |
5.3 | S2-165553 | CR | 23.161 CR0024: NBIFOM with RAN Controlled WLAN Interworking | Ericsson | Rel-13 | NBIFOM | Revised in parallel session to S2-165934. | Revised |
5.3 | S2-165934 | CR | 23.161 CR0024R1: NBIFOM with RAN Controlled WLAN Interworking | Ericsson, Intel | Rel-13 | NBIFOM | Revision of S2-165553. Revised in parallel session to S2-166229. Add clauses affected and Broadcom as source | Revised |
5.3 | S2-166229 | CR | 23.161 CR0024R2: NBIFOM with RAN Controlled WLAN Interworking | Ericsson, Intel, Broadcom | Rel-13 | NBIFOM | Revision of S2-165934. Agreed in parallel session Block approved | Agreed |
5.3 | S2-165841 | CR | 23.161 CR0025: Correction related to RAN rules | Intel | Rel-13 | NBIFOM | Noted in parallel session | Noted |
5.3 | S2-165493 | CR | 23.401 CR3130: Corrections for allowing seamless handovers of emergency sessions to WLAN | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | SEW2 | Revised in parallel session to S2-165935. | Revised |
5.3 | S2-165935 | CR | 23.401 CR3130R1: Corrections for allowing seamless handovers of emergency sessions to WLAN | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | SEW2 | Revision of S2-165493. Agreed in parallel session Block approved | Agreed |
5.3 | S2-165494 | CR | 23.402 CR2967: Correction of emergency services continuity between WLAN and 3GPP access | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | SEW2 | Revised in parallel session to S2-165936. | Revised |
5.3 | S2-165936 | CR | 23.402 CR2967R1: Correction of emergency services continuity between WLAN and 3GPP access | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | SEW2 | Revision of S2-165494. Revised in parallel session to S2-166230. | Revised |
5.3 | S2-166230 | CR | 23.402 CR2967R2: Correction of emergency services continuity between WLAN and 3GPP access | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | SEW2 | Revision of S2-165936. Revised to S2-166266. | Revised |
5.3 | S2-166266 | CR | 23.402 CR2967R3: Correction of emergency services continuity between WLAN and 3GPP access | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | SEW2 | Revision of S2-166230. This CR was agreed | Agreed |
5.4 | - | - | IMS and IMS-Related Maintenance | - | - | {Krisztian} | - | - |
5.4 | S2-165510 | CR | 23.228 CR1161: Editorial change reflecting IMS being access agnostic | Ericsson | Rel-13 | TEI13 | Revised in parallel session to S2-165937. Undelete the word 'services'. | Revised |
5.4 | S2-165937 | CR | 23.228 CR1161R1: Editorial change reflecting IMS being access agnostic | Ericsson | Rel-13 | TEI13 | Revision of S2-165510. Agreed in parallel session Block approved | Agreed |
5.4 | S2-165511 | CR | 23.228 CR1162: Editorial changes and inclusion of Mp Reference Point and missing reference point P-CSCF - I-CSCF | Ericsson | Rel-13 | TEI13 | Revised in parallel session to S2-165939. Reference Point used for IMS media transport IP network services. Change Mb reference point definition to 'Reference Point used for IMS media transport IP network services'. | Revised |
5.4 | S2-165939 | CR | 23.228 CR1162R1: Editorial changes and inclusion of Mp Reference Point and missing reference point P-CSCF - I-CSCF | Ericsson | Rel-13 | TEI13 | Revision of S2-165511. Agreed in parallel session Block approved | Agreed |
5.4 | S2-165512 | CR | 23.228 CR1163: Editorial change reflecting IMS being access agnostic | Ericsson | Rel-14 | TEI14 | CR WI Code should be TEI13. Revised in parallel session to S2-165938. Undelete the word 'services'. Change WI code to TEI13 | Revised |
5.4 | S2-165938 | CR | 23.228 CR1163R1: Editorial change reflecting IMS being access agnostic | Ericsson | Rel-14 | TEI13 | Revision of S2-165512. Agreed in parallel session Block approved | Agreed |
5.4 | S2-165513 | CR | 23.228 CR1164: Editorial changes and inclusion of Mp Reference Point and missing reference point P-CSCF - I-CSCF | Ericsson | Rel-14 | TEI14 | CR WI Code should be TEI13. Revised in parallel session to S2-165940. Change Mb reference point definition to 'Reference Point used for IMS media transport IP network services' Change WI code to TEI13 | Revised |
5.4 | S2-165940 | CR | 23.228 CR1164R1: Editorial changes and inclusion of Mp Reference Point and missing reference point P-CSCF - I-CSCF | Ericsson | Rel-14 | TEI13 | Revision of S2-165513. Agreed in parallel session Block approved | Agreed |
5.4 | S2-165792 | CR | 23.292 CR0234R1: ICS MSC with I2 and T-ADS handling interaction | Nokia | Rel-13 | TEI13, SAES-CSFB | Merged in parallel session with S2-165818 into S2-165941 | Merged |
5.4 | S2-165794 | CR | 23.292 CR0240: ICS MSC with I2 and T-ADS handling interaction | Nokia | Rel-14 | TEI13, SAES-CSFB | Merged in parallel session with S2-165819 into S2-165942 | Merged |
5.4 | S2-165817 | DISCUSSION | Discussion on the MT via I2 | ZTE | ICSRA | Noted in parallel session | Noted | |
5.4 | S2-165818 | CR | 23.292 CR0241: Mobile terminating via I2 while the UE moves the a new MSC. | ZTE | Rel-13 | TEI13, ICSRA | Revised in parallel session, merging S2-165792, to S2-165941. | Revised |
5.4 | S2-165941 | CR | 23.292 CR0241R1: Mobile terminating via I2 while the UE moves the a new MSC. | ZTE, Nokia | Rel-13 | TEI13, ICSRA | Revision of S2-165818, merging S2-165792. Postponed in parallel session The CR is accepted as a working draft, it will be further enhanced and completed at the next meeting | Postponed |
5.4 | S2-165819 | CR | 23.292 CR0242: Mobile terminating via I2 while the UE moves the a new MSC. | ZTE | Rel-14 | TEI13, ICSRA | Revised in parallel session, merging S2-165794, to S2-165942. | Revised |
5.4 | S2-165942 | CR | 23.292 CR0242R1: Mobile terminating via I2 while the UE moves the a new MSC. | ZTE, Nokia | Rel-14 | TEI13, ICSRA | Revision of S2-165819, merging S2-165794. Postponed in parallel session The CR is accepted as a working draft, it will be further enhanced and completed at the next meeting | Postponed |
5.5 | - | - | Study on architecture enhancements of cellular systems for ultra low complexity and low throughput Internet of Things (FS_AE_CIoT) | - | - | {Not_on_agenda} | - | - |
6 | - | - | Release 14 | - | - | {Frank} | - | - |
6.1 | - | - | Rel-14 3GPP Packet Access Maintenance - essential corrections | - | - | {Frank} | - | - |
6.1 | S2-165908 | LS In | LS from RAN WG2: LS on The progress and questions for the light connection | RAN WG2 (R2-167314) | Rel-14 | LTE_LIGHT_CON-Core | LATE DOC: Rx 16/10, 11:30. Not Handled. Postponed to meeting #118 | Postponed |
6.1 | S2-165882 | LS OUT | Draft Response LS to 'Completion of SA WG3-LI Study TR 33.827 on S8HR' | Vodafone | Rel-14 | Response to S2-165484. Merged with S2-165850 Merge in IMS part reply (S2-165850), still FFS whether SGW part will be in the reply | Merged | |
6.1 | S2-165480 | LS In | LS from SA WG4: Reply LS on external interface for TV services | SA WG4 (S4-161129) | Rel-14 | FS_AE_enTV | Noted in parallel session | Noted |
6.1 | S2-165475 | LS In | LS from RAN WG2: Reply LS on Multiple RoHC Contexts for MMCMH | RAN WG2 (R2-165936) | Rel-14 | MMCMH_Enh | Revision of S2-164930. Noted in parallel session | Noted |
6.1 | S2-165540 | DISCUSSION | EPS bearer release for ProSe UE-to-Network Relay | ASUSTeK | Rel-14 | eProSe-Ext-SA2 | Moved from 6.28 (not on agenda). Noted in parallel session | Noted |
6.1 | S2-165541 | CR | 23.303 CR0321: EPS bearer release for ProSe UE-to-Network Relay | ASUSTeK | Rel-14 | eProSe-Ext-SA2 | Moved from 6.28 (not on agenda). Revised in parallel session to S2-166019. Cat A. New note clarifying that it is for implementation. | Revised |
6.1 | S2-166019 | CR | 23.303 CR0321R1: EPS bearer release for ProSe UE-to-Network Relay | ASUSTeK | Rel-14 | eProSe-Ext-SA2 | Revision of S2-165541. This CR was agreed | Agreed |
6.1 | S2-166020 | CR | 23.303 CR0322: EPS bearer release for ProSe UE-to-Network Relay | ASUSTeK | Rel-13 | eProSe-Ext-SA2 | Created in parallel session. This CR was agreed | Agreed |
6.1 | S2-165700 | CR | 23.246 CR0405: Corrections of MBMS Shared Network | Huawei, HiSilicon | Rel-14 | AE_enTV | Revised in parallel session to S2-166021. | Revised |
6.1 | S2-166021 | CR | 23.246 CR0405R1: Corrections of MBMS Shared Network | Huawei, HiSilicon | Rel-14 | AE_enTV | Revision of S2-165700. This CR was agreed | Agreed |
6.1 | S2-165859 | CR | 23.682 CR0245: Active Time correction in UE Power Save Mode | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | TEI14 | Revised in parallel session to S2-166022. | Revised |
6.1 | S2-166022 | CR | 23.682 CR0245R1: Active Time correction in UE Power Save Mode | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | TEI13 | Revision of S2-165859. This CR was agreed | Agreed |
6.1 | S2-166023 | CR | 23.682 CR0246: Active Time correction in UE Power Save Mode | Nokia, Alcatel-Lucent Shanghai Bell | Rel-13 | TEI13 | Created in parallel session. This CR was agreed | Agreed |
6.2 | - | - | Rel-14 PCC/QoS Maintenance - essential corrections | - | - | {Shabnam} | - | - |
6.2 | S2-165479 | LS In | LS from SA WG4: LS on QCI for CLUE Messages | SA WG4 (S4-161022) | Response drafted in parallel session in S2-166090. Final response in S2-166287 | Replied to | ||
6.2 | S2-166090 | LS OUT | Reply LS on QCI for CLUE Messages | SA WG2 | - | - | Created in parallel session. Response to S2-165479. This was left for e-mail approval. Revision 1 approved. Revised to S2-166287. Shabnam (Ericsson) provides rev1. [Email forwarded by Maurice]. Sherry (Nokia) fine with rev1 S2 166090 rev1 APPROVED | Revised |
6.2 | S2-166287 | LS OUT | Reply LS on QCI for CLUE Messages | SA WG2 | - | - | Response to S2-165479. e-mail revision 1 of S2-166090. Approved | Approved |
6.2 | S2-165664 | DISCUSSION | SDCI Pull and Push Mode Optimization | Nokia | Rel-14 | SDCI | Noted in parallel session It is considered stage 3/error handling issue, as such no stage 2 changes required. IF needed, stage 3 makes final decision. | Noted |
6.2 | S2-165665 | CR | 23.203 CR1067: Optimization for push mode and combination of pull and push mode | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | SDCI | Noted in parallel session | Noted |
6.2 | S2-165699 | CR | 23.203 CR1068: QCI or/and ARP of the Default EPS Bearer change at a certain time on Gx | Verizon, Oracle, Nokia | Rel-14 | TEI14 | Revised in parallel session to S2-166091. Two questions: Rel-14 Cat B, and meeting time for Nov to address Cat B. - Rework the whole soln. - Deferred Rules use - Handling of priority/MPS services | Revised |
6.2 | S2-166091 | CR | 23.203 CR1068R1: QCI or/and ARP of the Default EPS Bearer change at a certain time on Gx | Verizon, Oracle, Nokia | Rel-14 | TEI14 | Revision of S2-165699. WITHDRAWN (not provided) | Withdrawn |
6.3 | - | - | Rel-14 Non-3GPP Access Maintenance - essential corrections | - | - | {Krisztian} | - | - |
6.4 | - | - | Rel-14 IMS-Related Maintenance - essential corrections | - | - | {Krisztian} | - | - |
6.4 | S2-165903 | LS In | LS from ETSI STQ: LS on IMS settings for UE testing | ETSI STQ (STQ(16)053_032) | LATE DOC: Rx 16/10, 11:00. Not Handled. Postponed to meeting #118. | Postponed | ||
6.4 | S2-165573 | LS OUT | [Draft] Additional information on Emergency numbers in IR.21 | TELECOM ITALIA S.p.A. | V8 | Response to S2-164307 (already replied to at S2#116BIS in S2-165433). Revised in parallel session to S2-165943. | Revised | |
6.4 | S2-165943 | LS OUT | [Draft] Additional information on Emergency numbers in IR.21 | TELECOM ITALIA S.p.A. | - | V8 | Revision of S2-165573. Revised in parallel session to S2-165966. Delete 'value' from Service Category | Revised |
6.4 | S2-165966 | LS OUT | Additional information on Emergency numbers in IR.21 | SA WG2 | - | V8 | Revision of S2-165943. Agreed in parallel session Block approved | Approved |
6.4 | S2-165849 | CR | 23.167 CR0306: Correction from IMPI to IMPU | NTT DOCOMO | Rel-14 | V8 | Revised in parallel session to S2-165945. Change IMPU to public user identity Change another instance of IMPI to public user identity in step 9 | Revised |
6.4 | S2-165945 | CR | 23.167 CR0306R1: Correction from IMPI to IMPU | NTT DOCOMO | Rel-14 | V8 | Revision of S2-165849. Agreed in parallel session Block approved | Agreed |
6.4 | S2-165850 | LS OUT | Completion of SA WG3-LI Study TR 33.827 on S8HR | NTT DOCOMO | Rel-14 | V8 | Response to S2-165484. Revised in parallel session to S2-165946. | Revised |
6.4 | S2-165946 | LS OUT | Completion of SA WG3-LI Study TR 33.827 on S8HR | NTT DOCOMO | Rel-14 | V8 | Revision of S2-165850. Revised in parallel session to S2-166160. | Revised |
6.4 | S2-166160 | LS OUT | Completion of SA WG3-LI Study TR 33.827 on S8HR | NTT DOCOMO | Rel-14 | V8 | Revision of S2-165946. Revised in parallel session to S2-166231. Editorial cleanup | Revised |
6.4 | S2-166231 | LS OUT | Completion of SA WG3-LI Study TR 33.827 on S8HR | NTT DOCOMO | Rel-14 | V8 | Revision of S2-166160. Agreed in parallel session Block approved | Approved |
6.4 | S2-165635 | CR | 23.237 CR0498: Robust Call Setup for VoLTE subscriber in LTE | Huawei, HiSilicon | Rel-14 | RobVoLTE | Revised in parallel session to S2-165944. Undelete step 10 Label previous step as step 8-9 | Revised |
6.4 | S2-165944 | CR | 23.237 CR0498R1: Robust Call Setup for VoLTE subscriber in LTE | Huawei, HiSilicon | Rel-14 | RobVoLTE | Revision of S2-165635. Agreed in parallel session Block approved | Agreed |
6.4 | S2-165652 | CR | 23.292 CR0239: Correction of ICS IWF behaviour for inbound roamers | NEC | Rel-14 | SeDoC | Revised in parallel session to S2-165923. | Revised |
6.4 | S2-165923 | CR | 23.292 CR0239R1: Correction of ICS IWF behaviour for inbound roamers | NEC, Deutsche Telekom AG | Rel-14 | SeDoC | Revision of S2-165652. Agreed in parallel session Block approved | Agreed |
6.4 | S2-165796 | CR | 23.167 CR0305: Update with SEW2 capabilities | Nokia | Rel-14 | SEW2 | Revised in parallel session to S2-165947. Change the NOTE: This Annex only applies to EPC access over S2a or S2b. | Revised |
6.4 | S2-165947 | CR | 23.167 CR0305R1: Update with SEW2 capabilities | Nokia | Rel-14 | SEW2 | Revision of S2-165796. Agreed in parallel session Block approved | Agreed |
6.4 | S2-165798 | CR | 23.237 CR0499: DRVCC for emergency call with S2a/S2b only | Nokia | Rel-14 | SEW2 | Agreed in parallel session Block approved | Agreed |
6.5 | - | - | Support of Emergency services over WLAN (SEW2) | - | - | {Not_on_agenda} | - | - |
6.6 | - | - | S8 Home Routing Architecture for VoLTE (V8) | - | - | {Not_on_agenda} | - | - |
6.7 | - | - | Enhancements of Dedicated Core Networks selection mechanism (eDECOR) | - | - | {Not_on_agenda} | - | - |
6.8 | - | - | Control and User Plane Separation of EPC nodes (CUPS) | - | - | {Mirko} | - | - |
- | - | - | Section 7 of TS - Parameters | - | - | - | - | - |
6.8 | S2-165876 | DISCUSSION | Discussion on Sx Parameters | Huawei | Rel-14 | CUPS | Noted in parallel session | Noted |
6.8 | S2-165877 | CR | 23.214 CR0011: Sx Parameters | Huawei, HiSilicon | Rel-14 | CUPS | Revised in parallel session to S2-166071. | Revised |
6.8 | S2-166071 | CR | 23.214 CR0011R1: Sx Parameters | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-165877. WITHDRAWN (not provided) | Withdrawn |
6.8 | S2-165554 | CR | 23.214 CR0004: Sx parameter corrections | Ericsson | Rel-14 | CUPS | Revised in parallel session to S2-166059. | Revised |
6.8 | S2-166059 | CR | 23.214 CR0004R1: Sx parameter corrections | Ericsson | Rel-14 | CUPS | Revision of S2-165554. Revised in parallel session to S2-166177. | Revised |
6.8 | S2-166177 | CR | 23.214 CR0004R2: Sx parameter corrections | Ericsson | Rel-14 | CUPS | Revision of S2-166059. Revised in parallel session to S2-166179. | Revised |
6.8 | S2-166179 | CR | 23.214 CR0004R3: Sx parameter corrections | Ericsson | Rel-14 | CUPS | Revision of S2-166177. Revised to S2-166273. | Revised |
6.8 | S2-166273 | CR | 23.214 CR0004R4: Sx parameter corrections | Ericsson | Rel-14 | CUPS | Revision of S2-166179. This CR was agreed | Agreed |
6.8 | S2-165495 | DISCUSSION | Controlling the UP to buffer, drop or duplicate data packets | Nokia, Alcatel-Lucent Shanghai Bell | Noted in parallel session | Noted | ||
6.8 | S2-165496 | CR | 23.214 CR0001: Controlling the UP to buffer, drop or duplicate data packets | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revised in parallel session to S2-166060. | Revised |
6.8 | S2-166060 | CR | 23.214 CR0001R1: Controlling the UP to buffer, drop or duplicate data packets | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-165496. Revised in parallel session to S2-166176. | Revised |
6.8 | S2-166176 | CR | 23.214 CR0001R2: Controlling the UP to buffer, drop or duplicate data packets | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-166060. Noted in parallel session | Noted |
- | - | - | Section 5 of TS - FTEID & buffering | - | - | - | - | - |
6.8 | S2-165556 | DISCUSSION | Discussion on mandatory support for TEID management and UP buffering | Ericsson | Rel-14 | CUPS | Noted in parallel session | Noted |
6.8 | S2-165875 | CR | 23.214 CR0010: Buffering and F-TEIDu Allocation | Huawei, HiSilicon, CMCC, ZTE, Ericsson, Nokia, China Unicom, China Telecom, Intel | Rel-14 | CUPS | Revised in parallel session to S2-166061. | Revised |
6.8 | S2-166061 | CR | 23.214 CR0010R1: Buffering and F-TEIDu Allocation | Huawei, HiSilicon, CMCC, ZTE, Ericsson, Nokia, China Unicom, China Telecom, Intel | Rel-14 | CUPS | Revision of S2-165875. Revised in parallel session to S2-166175. | Revised |
6.8 | S2-166175 | CR | 23.214 CR0010R2: Buffering and F-TEIDu Allocation | Huawei, HiSilicon, CMCC, ZTE, Ericsson, Nokia, China Unicom, China Telecom, Intel | Rel-14 | CUPS | Revision of S2-166061. Agreed in parallel session Block approved | Agreed |
6.8 | S2-165498 | DISCUSSION | Discussion on buffering in the user plane | Nokia, Alcatel-Lucent Shanghai Bell | Noted in parallel session | Noted | ||
6.8 | S2-165499 | CR | 23.214 CR0003: Corrections to buffering in the user plane | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revised in parallel session to S2-166062. | Revised |
6.8 | S2-166062 | CR | 23.214 CR0003R1: Corrections to buffering in the user plane | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-165499. Revised in parallel session to S2-166174. | Revised |
6.8 | S2-166174 | CR | 23.214 CR0003R2: Corrections to buffering in the user plane | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-166062. Agreed in parallel session Block approved | Agreed |
- | - | - | Section 5 of TS - UP function selection | - | - | - | - | - |
6.8 | S2-165497 | CR | 23.214 CR0002: Corrections to User Plane selection function | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revised in parallel session to S2-166064. | Revised |
6.8 | S2-166064 | CR | 23.214 CR0002R1: Corrections to User Plane selection function | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-165497. Revised in parallel session to S2-166078. | Revised |
6.8 | S2-166078 | CR | 23.214 CR0002R2: Corrections to User Plane selection function | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-166064. Agreed in parallel session Block approved | Agreed |
6.8 | S2-165746 | CR | 23.214 CR0007: Update to UP Selection Section | Samsung | Rel-14 | CUPS | Revised in parallel session to S2-166063. | Revised |
6.8 | S2-166063 | CR | 23.214 CR0007R1: Update to UP Selection Section | Samsung | Rel-14 | CUPS | Revision of S2-165746. Revised in parallel session to S2-166077. | Revised |
6.8 | S2-166077 | CR | 23.214 CR0007R2: Update to UP Selection Section | Samsung | Rel-14 | CUPS | Revision of S2-166063. Agreed in parallel session Block approved | Agreed |
6.8 | S2-165888 | CR | 23.214 CR0014: Solution of TDF-U Selection in case of Unsolicited Reporting | Huawei, HiSilicon | Rel-14 | CUPS | Revised in parallel session to S2-166065. | Revised |
6.8 | S2-166065 | CR | 23.214 CR0014R1: Solution of TDF-U Selection in case of Unsolicited Reporting | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-165888. Revised in parallel session to S2-166076. | Revised |
6.8 | S2-166076 | CR | 23.214 CR0014R2: Solution of TDF-U Selection in case of Unsolicited Reporting | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-166065. Revised in parallel session to S2-166215. | Revised |
6.8 | S2-166215 | CR | 23.214 CR0014R3: Solution of TDF-U Selection in case of Unsolicited Reporting | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-166076. Agreed in parallel session Block approved | Agreed |
- | - | - | Section 5 of TS - other functionality | - | - | - | - | - |
6.8 | S2-165663 | CR | 23.214 CR0006: Update to PCC/ADC related functions | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revised in parallel session to S2-166066. | Revised |
6.8 | S2-166066 | CR | 23.214 CR0006R1: Update to PCC/ADC related functions | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-165663. Revised in parallel session to S2-166178. | Revised |
6.8 | S2-166178 | CR | 23.214 CR0006R2: Update to PCC/ADC related functions | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-166066. Revised in parallel session to S2-166214. | Revised |
6.8 | S2-166214 | CR | 23.214 CR0006R3: Update to PCC/ADC related functions | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Revision of S2-166178. This CR was agreed | Agreed |
6.8 | S2-165886 | CR | 23.214 CR0012: Support of PGW Pause of Charging | Huawei, HiSilicon | Rel-14 | CUPS | Revised in parallel session to S2-166067. | Revised |
6.8 | S2-166067 | CR | 23.214 CR0012R1: Support of PGW Pause of Charging | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-165886. Revised in parallel session to S2-166075. | Revised |
6.8 | S2-166075 | CR | 23.214 CR0012R2: Support of PGW Pause of Charging | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-166067. Revised in parallel session to S2-166213. | Revised |
6.8 | S2-166213 | CR | 23.214 CR0012R3: Support of PGW Pause of Charging | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-166075. Agreed in parallel session Block approved | Agreed |
- | - | - | Section 6 of TS - Flows | - | - | - | - | - |
6.8 | S2-165750 | CR | 23.214 CR0008: Text updates for 3GPP TS 23.401 call flows | Samsung | Rel-14 | CUPS | Revised in parallel session to S2-166068. | Revised |
6.8 | S2-166068 | CR | 23.214 CR0008R1: Text updates for 3GPP TS 23.401 call flows | Samsung | Rel-14 | CUPS | Revision of S2-165750. Revised in parallel session to S2-166074. | Revised |
6.8 | S2-166074 | CR | 23.214 CR0008R2: Text updates for 3GPP TS 23.401 call flows | Samsung | Rel-14 | CUPS | Revision of S2-166068. Agreed in parallel session Block approved | Agreed |
6.8 | S2-165753 | CR | 23.214 CR0009: Text updates for 3GPP TS 23.402 call flows | Samsung | Rel-14 | CUPS | Revised in parallel session to S2-166069. | Revised |
6.8 | S2-166069 | CR | 23.214 CR0009R1: Text updates for 3GPP TS 23.402 call flows | Samsung | Rel-14 | CUPS | Revision of S2-165753. Revised in parallel session to S2-166073. | Revised |
6.8 | S2-166073 | CR | 23.214 CR0009R2: Text updates for 3GPP TS 23.402 call flows | Samsung | Rel-14 | CUPS | Revision of S2-166069. Agreed in parallel session Block approved | Agreed |
6.8 | S2-165887 | CR | 23.214 CR0013: Sx Session Level Reporting Procedure Update | Huawei, HiSilicon | Rel-14 | CUPS | Revised in parallel session to S2-166070. | Revised |
6.8 | S2-166070 | CR | 23.214 CR0013R1: Sx Session Level Reporting Procedure Update | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-165887. Revised in parallel session to S2-166072. | Revised |
6.8 | S2-166072 | CR | 23.214 CR0013R2: Sx Session Level Reporting Procedure Update | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-166070. Agreed in parallel session. Revised to S2-166274. | Revised |
6.8 | S2-166274 | CR | 23.214 CR0013R3: Sx Session Level Reporting Procedure Update | Huawei, HiSilicon | Rel-14 | CUPS | Revision of S2-166072. This was left for e-mail approval. e-mail approved. This CR was agreed | Agreed |
- | - | - | Impact of other Rel-14 features | - | - | - | - | - |
6.8 | S2-165555 | DISCUSSION | CUPS and SDCI interactions | Ericsson | Rel-14 | CUPS | Noted in parallel session | Noted |
6.8 | S2-165661 | DISCUSSION | Functional split for SDCI | Nokia | Rel-14 | CUPS | Noted in parallel session | Noted |
6.8 | S2-165662 | CR | 23.214 CR0005: SDCI support | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 | CUPS | Noted in parallel session Working assumption to terminate Gw/Gwn with the PFDF at the CP function | Noted |
6.9 | - | - | Improvement of awareness of user location change (AULC) | - | - | {Not_on_agenda} | - | - |
6.10 | - | - | Study on Architecture for Next Generation System (FS_NextGen) | - | - | {Frank} | - | - |
6.10 | S2-165774 | LS IN | LS from ETSI NFV: LS OUT on NFV-based solutions for next generation mobile networks | ETSI NFV (NFV(16)000324r4) | This LS was postponed to meeting SA WG2#118. | Postponed | ||
6.10 | S2-165477 | LS In | LS from SA WG1: LS on 5G work alignment | SA WG1 (S1-162544) | Rel-15 | SMARTER | Revision of S2-164972. Response drafted in S2-165915. Final response in S2-166238. | Replied to |
6.10 | S2-165915 | LS OUT | [DRAFT] LS reply on 5G work alignment | SA WG2 | FS_NextGen, SMARTER | Response to S2-165477. Revised to S2-166238. | Revised | |
6.10 | S2-166238 | LS OUT | LS reply on 5G work alignment | SA WG2 | FS_NextGen, SMARTER | Revision of S2-165915. Agreed in parallel session Block approved | Approved | |
6.10 | S2-165489 | LS In | LS from ITU-R WP 4B: INVITATION TO CONSIDER INTEGRATION OF SATELLITE-BASED SOLUTIONS INTO IMT-2020 NETWORKS | ITU-R WP 4B (4B/TEMP/17) | Noted | Noted | ||
6.10 | S2-165491 | LS In | LS from SA WG3: LS on NG authentication functions | SA WG3 (S3-161509) | FS_NSA | Noted | Noted | |
6.10 | S2-165492 | LS In | LS from SA WG3: Update on definitions of identifiers | SA WG3 (S3-161527) | Rel-14 | FS_NSA | Noted | Noted |
6.10 | S2-165640 | P-CR | Correction of implementation error | LG Electronics | FS_NextGen | Approved | Approved | |
6.10 | S2-165566 | LS OUT | LS to GSMA on NextGen Roaming | AT&T | Rel-14 | Revised to S2-165916. | Revised | |
6.10 | S2-165916 | LS OUT | [DRAFT] LS to GSMA on Next Generation Roaming | SA WG2 | Rel-14 | Revision of S2-165566. Revised to S2-166239. | Revised | |
6.10 | S2-166239 | LS OUT | [DRAFT] LS to GSMA on Next Generation Roaming | SA WG2 | Rel-14 | Revision of S2-165916. This was left for e-mail approval. e-mail revision 2 approved. Revised to S2-166290. LaeYoung (LGE) provides rev1 Devaki (Nokia) provides rev1 Irfan (NTT DCM) rename Devaki's rev1 to rev2 S2 166239 rev2 APPROVED | Revised | |
6.10 | S2-166290 | LS OUT | LS to GSMA on Next Generation Roaming | SA WG2 | Rel-14 | e-mail revision 2 of S2-166239. Approved | Approved | |
6.10 | S2-165483 | LS In | LS from TSG SA: Reply LS on Cooperation on NGS FMC | TSG SA (SP-160743) | Rel-14 | FS_NextGen | Noted | Noted |
6.10 | S2-166145 | OTHER | NextGen questions for conclusion | Rapporteurs (Nokia) | FS_NextGen | Revised to S2-166147. | Revised | |
6.10 | S2-166147 | OTHER | NextGen questions for conclusion | Drafting convenor (Nokia) | FS_NextGen | Revision of S2-166145. Revised to S2-166172. | Revised | |
6.10 | S2-166172 | OTHER | NextGen questions for conclusion - updated during Thu Q1 session | Rapporteurs (Nokia) | FS_NextGen | Revision of S2-166147. Endorsed and the agreements were extracted for inclusion in the TR in S2-166173 | Endorsed | |
6.10 | S2-166173 | P-CR | Interim agreements Extracted from Show of hands on Thursday, October 20 | Nokia | FS_NextGen | Revised to S2-166237. | Revised | |
6.10 | S2-166237 | P-CR | Interim agreements Extracted from Show of hands on Thursday, October 20 | Rapporteurs (Nokia) | FS_NextGen | Revision of S2-166173. Agreed in parallel session Block approved | Approved | |
6.10.0 | - | - | Input for TR clauses 1-4 and new proposed key issues | - | - | {Not_on_agenda} | - | - |
6.10.1 | - | - | Updates and solutions for key issue 1: Support of network slicing | - | - | {Frank} | - | - |
6.10.1 | S2-166051 | DISCUSSION | Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing | Drafting Editor (Nokia) | FS_NextGen | Created in drafting session. Revised to S2-166097. | Revised | |
6.10.1 | S2-166097 | DISCUSSION | Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing | Drafting Editor (Nokia) | FS_NextGen | Revision of S2-166051. Revised in drafting session to S2-166024. | Revised | |
6.10.1 | S2-166024 | DISCUSSION | Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing | Drafting Editor (Nokia) | - | FS_NextGen | Revision of S2-166097. Not Handled | Not Handled |
6.10.1 | S2-166146 | DISCUSSION | Update to section 8.1.Interim Agreements based on drafting at SA WG2#117 | Editor (Nokia) | FS_NextGen | Created at the meeting. Revised to S2-166210. | Revised | |
6.10.1 | S2-166210 | DISCUSSION | Update to section 8.1.Interim Agreements based on drafting at SA WG2#117 | Editor (Nokia) | FS_NextGen | Revision of S2-166146. Agreed in parallel session Block approved | Approved | |
6.10.1 | S2-165904 | LS In | LS from NGMN: Update to NGMN Description of Network Slicing Concept | NGMN (161010 Liaison NGMN P1 NW Slicing v1 0.) | LATE DOC: Rx 16/10, 11:00. Incorrect attachment. Resubmitted in S2-166087. | Withdrawn | ||
6.10.1 | S2-166087 | LS In | LS from NGMN: Update to NGMN Description of Network Slicing Concept | NGMN (161010 Liaison NGMN P1 NW Slicing v1 0.) | LATE DOC: Rx 18/10, 11:20. Replacement of S2-165904 with correct attachment (161010 Network Slicing framework v1.0.8.docx). Not Handled. Postponed to meeting #118. | Postponed | ||
6.10.1 | S2-166055 | DISCUSSION | Observations on Network Slicing Approaches | Qualcomm Inc. | FS_NextGen | Created at meeting. Not Handled | Not Handled | |
6.10.1 | S2-165696 | DISCUSSION | Network slicing way forward | Nokia, ZTE, Telecom Italia, KDDI, Interdigital, SAMSUNG, ETRI, KPN | Rel-14 | Not Handled | Not Handled | |
6.10.1 | S2-165616 | P-CR | Deprioritizing Group A architecture for network slicing | LG Electronics Inc., SK Telecom | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165698 | P-CR | Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing | Nokia, Telecom Italia, ZTE, InterDigital, KDDI, Samsung, ETRI, KPN | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165762 | P-CR | Way forward on Solutions for Key Issue 1 on Network Slicing | Qualcomm Incorporated | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165485 | DISCUSSION | Recommended principles for network slicing | MediaTek Inc. | Rel-14 | Not Handled | Not Handled | |
6.10.1 | S2-165684 | P-CR | Interim Agreements - Network Slicing | Sprint, KDDI, ZTE, Interdigital, Telecom Italia, ETRI | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165659 | P-CR | update of interim agreements on network slicing solution aspects | China Mobile | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165641 | P-CR | Slice ID usage and clarification | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165690 | P-CR | Update of interim agreements on network slicing | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165570 | P-CR | Recommendations to address Network Slicing Solutions design differences | ETRI, ZTE Corporation | FS_NextGen | LATE DOC: Rx 11/10, 19:40. Not Handled | Not Handled | |
6.10.1 | S2-165756 | P-CR | Interim Agreements for network slicing | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165572 | P-CR | Interim conclusions on Network Slicing | Intel | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165624 | P-CR | PDU session identification over Multiple Slice | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165802 | P-CR | Interim agreement: Determination of NSSAI based on UE policy | Motorola Mobility, Lenovo | FS_NextGen | Revised to S2-166098. | Revised | |
6.10.1 | S2-166098 | P-CR | Interim agreement: Determination of NSSAI based on UE policy | Motorola Mobility, Lenovo | FS_NextGen | Revision of S2-165802. WITHDRAWN (not provided) | Withdrawn | |
6.10.1 | S2-165834 | P-CR | Interim agreements on network slicing | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165842 | P-CR | The Granularity of Network Slicing | CATT | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165879 | P-CR | Possible RAN use cases for slicing and other RAN impacts for RAN coordination | Nokia | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165725 | P-CR | Update of Network Slicing definitions | NTT DOCOMO, NEC | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165654 | P-CR | Evaluation of roaming solution in 6.1.1 | Huawei, HiSilicon, CATR | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165617 | P-CR | Evaluation on solution 1.3 | LG Electronics Inc. | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165618 | P-CR | Evaluation on solution 1.9 | LG Electronics Inc. | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165619 | P-CR | Evaluation on solution 1.11 | LG Electronics Inc. | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165580 | P-CR | Update to Solution 6.1.2 for Network Slicing | InterDigital, ZTE, Telecom Italia | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165851 | P-CR | Update on solution 1.2: Configuration of MDD in the UE for 3rd Party NW Slice | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165853 | P-CR | Update on solution 1.2: Extending the Slice Type components of an MDD vector | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165754 | P-CR | Home-routed PDU Session Request Procedure in roaming Network slicing support | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165691 | P-CR | Update of Network slicing solution | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165724 | P-CR | Update of Network Slicing Solution 1.3 | NTT DOCOMO | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165897 | P-CR | Update to 6.1.3.2 Function description | ITRI | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165898 | P-CR | Update to Solution 6.1.3: Reselection in Common Control Plane Function | ITRI | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165797 | P-CR | Update to solution 6.1.3 | CATT | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165660 | P-CR | clarification of network slice ID in solution 1.6 | China Mobile | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165615 | P-CR | Clarification and evaluation on Solution 1.8 | LG Electronics Inc. | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165826 | P-CR | Network slice roaming support | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.1 | S2-165910 | DISCUSSION | Defining the LI Function for Network Slicing Solutions | OTD | FS_NextGen | LATE REQ. LATE DOC: Rx: 16/10, 11:50. Not Handled | Not Handled | |
6.10.1 | S2-166079 | LS In | LS from NGMN Alliance Project P1: NGMN Paper on Edge Computing | NGMN Alliance Project P1 (161010 Liaison NGMN P1 NW Slicing v1 0) | LATE DOC: Rx 18/10, 08:00. Not Handled. Postponed to meeting #118. | Postponed | ||
6.10.2 | - | - | Updates and solutions for key issue 2: QoS framework | - | - | {Puneet} | - | - |
- | - | - | Overall Agreements | - | - | - | - | - |
6.10.2 | S2-165788 | P-CR | Way forward proposal to progress the work on QoS | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | This is a way forward proposal and not a P-CR. Noted in parallel session | Noted | |
6.10.2 | S2-165782 | P-CR | Some QoS features - Way forward proposal | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Noted in parallel session | Noted | |
6.10.2 | S2-165835 | DISCUSSION | Way forward on NextGen QoS Framework | Intel | Noted | Noted | ||
6.10.2 | S2-165836 | P-CR | Update to interim agreements for QoS framework | Intel | FS_NextGen | Revised in parallel session to S2-165967. | Revised | |
6.10.2 | S2-165967 | P-CR | Update to interim agreements for QoS framework | Intel | - | FS_NextGen | Revision of S2-165836. Revised in parallel session to S2-166000. | Revised |
6.10.2 | S2-166000 | P-CR | Update to interim agreements for QoS framework | Intel | - | FS_NextGen | Revision of S2-165967. Revised in parallel session to S2-166184. | Revised |
6.10.2 | S2-166184 | P-CR | Update to interim agreements for QoS framework | Intel | - | FS_NextGen | Revision of S2-166000. Revised to S2-166271. | Revised |
6.10.2 | S2-166271 | P-CR | Update to interim agreements for QoS framework | Intel | - | FS_NextGen | Revision of S2-166184. This was left for e-mail approval. e-mail revision 4 approved. Revised to S2-166293. Devaki (Nokia) provides rev1 Saso (Intel) comments. Cannot accept rev1. Stefano (Qualcomm) provides rev2 Saso (Intel) provides rev3 Peter (Ericsson) comments Devaki (Nokia) comments Devaki (Nokia) comments Devaki (Nokia) comments Saso (Intel) comments Devaki (Nokia) comments Saso (Intel) provides rev4 Stefano (Qualcomm) comments Devaki (Nokia) comments Saso (Intel) comments. Do not accept rev1 or rev2 Devaki (Nokia) comments. Can live with latest rev. Saso (Intel) comments. Asks Devaki if rev3 or rev4 is acceptable? Devaki (Nokia) prefers rev4 Saso (Intel) OK with rev4 Irfan (NTT DCM) comments Karl-Heinz (DT) comments Saso (Intel) comments S2 166271 rev4 APPROVED | Revised |
6.10.2 | S2-166293 | P-CR | Update to interim agreements for QoS framework | Intel | - | FS_NextGen | e-mail revision 4 of S2-166271. Approved | Approved |
6.10.2 | S2-165776 | P-CR | Interim agreements for QoS framework | Nokia, Alcatel-Lucent Shanghai Bell, AT&T | FS_NextGen | Revised in parallel session, merging S2-165765and S2-165649, in S2-165968 | Revised | |
6.10.2 | S2-165968 | P-CR | Interim agreements for QoS framework | Nokia, Alcatel-Lucent Shanghai Bell, AT&T | - | FS_NextGen | Revision of S2-165776, merging S2-165765 and S2-165649. Revised in parallel session to S2-166185. | Revised |
6.10.2 | S2-166185 | P-CR | Interim agreements for QoS framework | Nokia, Alcatel-Lucent Shanghai Bell, AT&T | - | FS_NextGen | Revision of S2-165968. Approved | Approved |
- | - | - | Interim Agreements specific to reflective QoS | - | - | - | - | - |
6.10.2 | S2-165539 | P-CR | Interim Agreement on Reflective QoS | Ericsson | FS_NextGen | Revised in parallel session to S2-165969. | Revised | |
6.10.2 | S2-165969 | P-CR | Interim Agreement on Reflective QoS | Ericsson | - | FS_NextGen | Revision of S2-165539. Revised in parallel session to S2-166186. | Revised |
6.10.2 | S2-166186 | P-CR | Interim Agreement on Reflective QoS | Ericsson | - | FS_NextGen | Revision of S2-165969. Approved | Approved |
6.10.2 | S2-165648 | P-CR | Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos | Huawei, HiSilicon | FS_NextGen | Revised in parallel session to S2-165970. | Revised | |
6.10.2 | S2-165970 | P-CR | Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos | Huawei, HiSilicon | - | FS_NextGen | Revision of S2-165648. Revised in parallel session to S2-166187. | Revised |
6.10.2 | S2-166187 | P-CR | Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos | Huawei, HiSilicon | - | FS_NextGen | Revision of S2-165970. Revised to S2-166272. | Revised |
6.10.2 | S2-166272 | P-CR | Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos | Huawei, HiSilicon | - | FS_NextGen | Revision of S2-166187. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166294. Saso (Intel) provides rev1 for 6272 but with wrong document # 6227 in the email subject. Puneet (Intel) Fixes email subject with the correct document # 6272 Devaki (Nokia) comments Chunshan (Huawei) comments Irfan (NTT DCM) comments Chunshan (Huawei) comments Peter (Ericsson) comments S2 166272 rev1 APPROVED | Revised |
6.10.2 | S2-166294 | P-CR | Packet Filter with Wildcards and Update the Interim Agreement on Reflective Qos | Huawei, HiSilicon | - | FS_NextGen | e-mail revision 1 of S2-166272. Approved | Approved |
6.10.2 | S2-165653 | P-CR | Update to Interim agreements on QoS framework - Reflective QoS | China Mobile | FS_NextGen | Revised in parallel session to S2-165995. | Revised | |
6.10.2 | S2-165995 | P-CR | Update to Interim agreements on QoS framework - Reflective QoS | China Mobile | - | FS_NextGen | Revision of S2-165653. Noted in parallel session | Noted |
6.10.2 | S2-165800 | P-CR | Interim agreement on reflective QoS | LG Electronics | FS_NextGen | Revised in parallel session, merging S2-165653, to S2-165971. | Revised | |
6.10.2 | S2-165971 | P-CR | Interim agreement on reflective QoS | LG Electronics, China Mobile | - | FS_NextGen | Revision of S2-165800. Noted in parallel session | Noted |
- | - | - | Additional Agreements | - | - | - | - | - |
6.10.2 | S2-165763 | P-CR | Additional interim agreements for QoS flow classification | Qualcomm Inc. | FS_NextGen | Revised in parallel session to S2-165996. | Revised | |
6.10.2 | S2-165996 | P-CR | Additional interim agreements for QoS flow classification | Qualcomm Inc. | - | FS_NextGen | Revision of S2-165763. WITHDRAWN (not provided) | Withdrawn |
6.10.2 | S2-165764 | P-CR | Additional interim agreements for QoS establishment | Qualcomm Inc. | FS_NextGen | Revised in parallel session to S2-165997. | Revised | |
6.10.2 | S2-165997 | P-CR | Additional interim agreements for QoS establishment | Qualcomm Inc. | - | FS_NextGen | Revision of S2-165764. Revised in parallel session to S2-166188. | Revised |
6.10.2 | S2-166188 | P-CR | Additional interim agreements for QoS establishment | Qualcomm Inc. | - | FS_NextGen | Revision of S2-165997. Agreed in parallel session Block approved | Approved |
6.10.2 | S2-165765 | P-CR | Additional interim agreement for QoS on DNN-AMBR | Qualcomm Inc. | FS_NextGen | Merged in parallel session with S2-165776 into S2-165968. | Merged | |
6.10.2 | S2-165806 | P-CR | AMBR enforcement | ZTE Corporation | FS_NextGen | Revised in parallel session to S2-165998. | Revised | |
6.10.2 | S2-165998 | P-CR | AMBR enforcement | ZTE Corporation | - | FS_NextGen | Revision of S2-165806. Revised in parallel session to S2-166189. | Revised |
6.10.2 | S2-166189 | P-CR | AMBR enforcement | ZTE Corporation | - | FS_NextGen | Revision of S2-165998. Revised to S2-166269. | Revised |
6.10.2 | S2-166269 | P-CR | AMBR enforcement | ZTE Corporation | - | FS_NextGen | Revision of S2-166189. This was left for e-mail approval. e-mail approved | Approved |
6.10.2 | S2-165649 | P-CR | Update Interim Agreements on Key Issue #2 QoS | Huawei, HiSilicon | FS_NextGen | Merged in parallel session with S2-165776 into S2-165968. | Merged | |
6.10.2 | S2-165837 | LS OUT | [DRAFT] LS on NextGen QoS interim agreements | Intel | Revised in parallel session to S2-165999. | Revised | ||
6.10.2 | S2-165999 | LS OUT | [DRAFT] LS on NextGen QoS interim agreements | Intel | - | - | Revision of S2-165837. Revised in parallel session to S2-166190. | Revised |
6.10.2 | S2-166190 | LS OUT | [DRAFT] LS on NextGen QoS interim agreements | Intel | - | - | Revision of S2-165999. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166289. Devaki (Nokia) provides new rev Saso (Intel) updates the file name to rev1 S2 166190 rev1 APPROVED | Revised |
6.10.2 | S2-166289 | LS OUT | LS on NextGen QoS interim agreements | SA WG2 | - | - | e-mail revision 1 of S2-166190. Approved | Approved |
- | - | - | Solution Evaluation | - | - | - | - | - |
6.10.2 | S2-165846 | P-CR | Reviewing the benefit of Flow based QoS | NTT DOCOMO | FS_NextGen | Noted in parallel session | Noted | |
6.10.2 | S2-165847 | P-CR | Additional interim agreements for Key Issues 2 and 4 | NTT DOCOMO | FS_NextGen | Noted in parallel session | Noted | |
6.10.2 | S2-165843 | P-CR | Evaluation of solution 6.2.2. | NTT DOCOMO | FS_NextGen | Not Handled | Not Handled | |
- | - | - | Updates to solutions | - | - | - | - | - |
6.10.2 | S2-165538 | P-CR | QoS: Clarifications and updates of solution 2.1 | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.2 | S2-165686 | P-CR | Input to solution 5 for KI 2 on Dynamic QoS | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.2 | S2-165808 | P-CR | Clarification on UE AMBR when MM and SM are split | ZTE Corporation | FS_NextGen | Not Handled | Not Handled | |
6.10.2 | S2-165856 | P-CR | Update to 6.2.4 : clarification and solution evaluation | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.2 | S2-165872 | P-CR | RAN triggered FPI change | CATT | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | - | - | Updates and solutions for key issue 3: Mobility Management framework | - | - | {Frank} | - | - |
6.10.3 | S2-165785 | DISCUSSION | Way forward proposal to progress the work on MM | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revised to S2-166080. | Revised | |
6.10.3 | S2-166080 | DISCUSSION | Way forward proposal to progress the work on MM | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-165785. WITHDRAWN (not provided) | Withdrawn | |
6.10.3 | S2-165528 | P-CR | Interim agreements on Reachability | Ericsson | FS_NextGen | Revised, merging S2-165677, to S2-166082. | Revised | |
6.10.3 | S2-166082 | P-CR | Interim agreements on Reachability | Ericsson, Nokia | FS_NextGen | Revision of S2-165528, merging S2-165677. Revised to S2-166220. | Revised | |
6.10.3 | S2-166220 | P-CR | Interim agreements on Reachability | Ericsson, Nokia | FS_NextGen | Revision of S2-166082. Approved | Approved | |
6.10.3 | S2-165677 | P-CR | Interim agreements to support MO only mode | Sony | FS_NextGen | This was merged with S2-165528 into S2-166082. | Merged | |
6.10.3 | S2-165830 | P-CR | Update of solution 6.3.6 and interim agreements for power saving | Huawei, HiSilicon | FS_NextGen | Revised to S2-166081. | Revised | |
6.10.3 | S2-166081 | P-CR | Update of solution 6.3.6 and interim agreements for power saving | Huawei, HiSilicon | FS_NextGen | Revision of S2-165830. Revised to S2-166221. | Revised | |
6.10.3 | S2-166221 | P-CR | Update of solution 6.3.6 and interim agreements for power saving | Huawei, HiSilicon | FS_NextGen | Revision of S2-166081. WITHDRAWN (not provided) | Withdrawn | |
6.10.3 | S2-165526 | P-CR | Clarification of Interim Agreements on Mobility on Demand | Ericsson, MediaTek Inc. | FS_NextGen | Revised to S2-166083. | Revised | |
6.10.3 | S2-166083 | P-CR | Clarification of Interim Agreements on Mobility on Demand | Ericsson, MediaTek Inc., Nokia | FS_NextGen | Revision of S2-165526. Revised to S2-166222. | Revised | |
6.10.3 | S2-166222 | P-CR | Clarification of Interim Agreements on Mobility on Demand | Ericsson, MediaTek Inc., Nokia | FS_NextGen | Revision of S2-166083. Approved | Approved | |
6.10.3 | S2-165761 | P-CR | Separation of Mobility levels and Mobility restrictions | Sony, Ericsson, MediaTek Inc, Qualcomm Incorporated | FS_NextGen | Revised to S2-166084. | Revised | |
6.10.3 | S2-166084 | P-CR | Separation of Mobility levels and Mobility restrictions | Sony, Ericsson, MediaTek Inc, Qualcomm Incorporated | FS_NextGen | Revision of S2-165761. Agreed in parallel session Block approved | Approved | |
6.10.3 | S2-165791 | P-CR | Update to interim agreements regarding MM | CATT, CATR | FS_NextGen | Merged into a consolidated proposal in S2-166085. | Merged | |
6.10.3 | S2-165533 | P-CR | Interim Agreements on Mobility Pattern | Ericsson, MediaTek Inc., Sony | FS_NextGen | Merged into a consolidated proposal in S2-166085. | Merged | |
6.10.3 | S2-165720 | P-CR | Clarifications and proposed way forward on Mobility Management Parameters - Key issue #3 | Qualcomm Incorporated, MediaTek Inc. | FS_NextGen | Parts merged into a consolidated proposal in S2-166085. Further discussed off-line and revised, merging S2-165622, in S2-166116 | Revised | |
6.10.3 | S2-166116 | P-CR | Clarifications and proposed way forward on Mobility Management Parameters - Key issue #3 | Qualcomm Incorporated, MediaTek Inc. | FS_NextGen | Revision of S2-165720, merging S2-165622. Revised to S2-166223. | Revised | |
6.10.3 | S2-166223 | P-CR | Clarifications and proposed way forward on Mobility Management Parameters - Key issue #3 | Qualcomm Incorporated, MediaTek Inc. | FS_NextGen | Revision of S2-166116. Approved | Approved | |
6.10.3 | S2-165829 | P-CR | Update of interim agreements on mobility on demand | Huawei, HiSilicon | FS_NextGen | Merged into a consolidated proposal in S2-166085. | Merged | |
6.10.3 | S2-165863 | P-CR | Proposed MMF evaluation criteria and MMF conclusions | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Merged into a consolidated proposal in S2-166085. | Merged | |
6.10.3 | S2-165532 | P-CR | Interim Agreements on Mobility Restriction | Ericsson | FS_NextGen | Merged into S2-166085 | Merged | |
6.10.3 | S2-165804 | P-CR | Interim Agreements on Mobility Management Behaviours | Samsung | FS_NextGen | Merged into S2-166085 | Merged | |
6.10.3 | S2-165678 | P-CR | Interim agreements based on solution 6.3.11 and 6.3.21 | Sony | FS_NextGen | Merged into S2-166085 | Merged | |
6.10.3 | S2-166085 | P-CR | Consolidated proposals on Interim Agreements on Mobility Pattern | Editors | FS_NextGen | Created in off-line drafting. Revised to S2-166236. | Revised | |
6.10.3 | S2-166236 | P-CR | Consolidated proposals on Interim Agreements on Mobility Pattern | Editors | FS_NextGen | Revision of S2-166085. Revised to S2-166275. | Revised | |
6.10.3 | S2-166275 | P-CR | Consolidated proposals on Interim Agreements on Mobility Pattern | CATT | FS_NextGen | Revision of S2-166236. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166295. Peter (Ericsson) provides rev1 Hannu (Nokia) comments. Ask why we need 6275? Hucheng (CATT) fine with rev1 Hucheng (CATT) comments Hannu (Nokia) comments Lars (Sony) fine with rev1 S2 166275 rev1 APPROVED | Revised | |
6.10.3 | S2-166295 | P-CR | Consolidated proposals on Interim Agreements on Mobility Pattern | CATT | FS_NextGen | e-mail revision 1 of S2-166275. Approved | Approved | |
6.10.3 | S2-165622 | P-CR | Interim agreement on mobility management parameters | LG Electronics | FS_NextGen | Merged with S2-165720 into S2-166116 | Merged | |
6.10.3 | S2-165621 | P-CR | Interim agreement on paging area management | LG Electronics | FS_NextGen | Revised to S2-166117. | Revised | |
6.10.3 | S2-166117 | P-CR | Interim agreement on paging area management | LG Electronics | FS_NextGen | Revision of S2-165621. Revised to S2-166224. | Revised | |
6.10.3 | S2-166224 | P-CR | Interim agreement on paging area management | LG Electronics | FS_NextGen | Revision of S2-166117. Revised to S2-166276. | Revised | |
6.10.3 | S2-166276 | P-CR | Interim agreement on paging area management | LG Electronics | FS_NextGen | Revision of S2-166224. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166296. Syed (NTT DCM) provides rev1 Jinsook (LGE) fine with rev1 Lars (Sony) fine with rev1 Wanqiang (Huawei) fine with rev1 S2 166276 rev1 APPROVED | Revised | |
6.10.3 | S2-166296 | P-CR | Interim agreement on paging area management | LG Electronics | FS_NextGen | e-mail revision 1 of S2-166276. Approved | Approved | |
6.10.3 | S2-165825 | P-CR | Way Forward on UE reachability management | CATT | FS_NextGen | Revised to S2-166119. | Revised | |
6.10.3 | S2-166119 | P-CR | Way Forward on UE reachability management | CATT | FS_NextGen | Revision of S2-165825. Revised to S2-166225. | Revised | |
6.10.3 | S2-166225 | P-CR | Way Forward on UE reachability management | CATT | FS_NextGen | Revision of S2-166119. Revised to S2-166277. | Revised | |
6.10.3 | S2-166277 | P-CR | Way Forward on UE reachability management | CATT | FS_NextGen | Revision of S2-166225. This was left for e-mail approval. e-mail revision 1 approved. Revised to S2-166297. Syed (NTT DCM) provides rev1 Ming (CATT) provides rev2 Syed (NTT DCM) comments Peter (Ericsson) comments. Propose changes but no revision was provided. Antoine (Orange) comments Antoine (Orange) provides rev3 Syed (NTT DCM) comments Antoine (Orange) provides rev4 Syed (NTT DCM) Ok with rev4 Lars (Sony) cannto agree with rev3 and rev4. OK with rev1 or rev2 Ming (CATT) suggests to go with rev1 S2 166277 rev1 APPROVED | Revised | |
6.10.3 | S2-166297 | P-CR | Way Forward on UE reachability management | CATT | FS_NextGen | e-mail revision 1 of S2-166277. Approved | Approved | |
6.10.3 | S2-165814 | P-CR | Updated Solution 3.10 for CN Assisted Paging Retry | ETRI | FS_NextGen | Revised to S2-166120. | Revised | |
6.10.3 | S2-166120 | P-CR | Updated Solution 3.10 for CN Assisted Paging Retry | ETRI | FS_NextGen | Revision of S2-165814. Revised to S2-166226. | Revised | |
6.10.3 | S2-166226 | P-CR | Updated Solution 3.10 for CN Assisted Paging Retry | ETRI | FS_NextGen | Revision of S2-166120. Approved | Approved | |
6.10.3 | S2-165688 | P-CR | UE reachability management in Inactive mode | Ericsson | FS_NextGen | Revised to S2-166121. | Revised | |
6.10.3 | S2-166121 | P-CR | UE reachability management in Inactive mode | Ericsson | FS_NextGen | Revision of S2-165688. Revised to S2-166227. | Revised | |
6.10.3 | S2-166227 | P-CR | UE reachability management in Inactive mode | Ericsson | FS_NextGen | Revision of S2-166121. Approved | Approved | |
6.10.3 | S2-165627 | P-CR | Solution evaluation 6.3.12 'Solution for UE reachability in power saving state' | LG Electronics | FS_NextGen | Revised to S2-166122. | Revised | |
6.10.3 | S2-166122 | P-CR | Solution evaluation 6.3.12 'Solution for UE reachability in power saving state' | LG Electronics | FS_NextGen | Revision of S2-165627. Agreed in parallel session Block approved | Approved | |
6.10.3 | S2-165697 | P-CR | Update of Dynamic Mobility Management | Deutsche Telekom, Telecom Italia, BT | FS_NextGen | Revised to S2-166123. | Revised | |
6.10.3 | S2-166123 | P-CR | Update of Dynamic Mobility Management | Deutsche Telekom, Telecom Italia, BT | FS_NextGen | Revision of S2-165697. WITHDRAWN (not provided) | Withdrawn | |
6.10.3 | S2-165783 | P-CR | Intra-RAT Handover procedure | CATT, CATR | FS_NextGen | Revised to S2-166124. | Revised | |
6.10.3 | S2-166124 | P-CR | Intra-RAT Handover procedure | CATT, CATR | FS_NextGen | Revision of S2-165783. Agreed in parallel session Block approved | Approved | |
6.10.3 | S2-165862 | P-CR | Addition of lightweight UE Status Update procedure at NG1 | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revised to S2-166125. | Revised | |
6.10.3 | S2-166125 | P-CR | Addition of lightweight UE Status Update procedure at NG1 | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-165862. Agreed in parallel session Block approved | Approved | |
6.10.3 | S2-165839 | P-CR | Multiple level Tracking area management and update the interim agreement on mobility management | Huawei, HiSilicon, China Mobile, China Unicom, China Telecom, CATR | FS_NextGen | Revised to S2-166228. | Revised | |
6.10.3 | S2-166228 | P-CR | Multiple level Tracking area management and update the interim agreement on mobility management | Huawei, HiSilicon, China Mobile, China Unicom, China Telecom, CATR | FS_NextGen | Revision of S2-165839. Revised to S2-166278. | Revised | |
6.10.3 | S2-166278 | P-CR | Multiple level Tracking area management and update the interim agreement on mobility management | Huawei, HiSilicon, China Mobile, China Unicom, China Telecom, CATR | FS_NextGen | Revision of S2-166228. Approved | Approved | |
6.10.3 | S2-165687 | P-CR | Input on RAN Paging and functional division | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165628 | P-CR | Solution evaluation '6.3.8: Simplified mobility states for stationary UE and MO data transmission only UE' | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165527 | P-CR | Alignment of solution 3.9 | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165790 | P-CR | Discussion on mobility on demand | CATT, CATR | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165623 | P-CR | Solution update & evaluation 6.3.16 Limited & Unlimited UE mobility level | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165529 | P-CR | Clarifications of Mobility procedure | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165732 | P-CR | Update the solution 6.3.19 | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165795 | P-CR | An alternative to Activate RRC_inactive_connected state | CATT | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165530 | P-CR | Clarification of Solution 3.20 | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165620 | P-CR | Solution update & evaluation 6.3.23 Two layers Tracking Area handling | LG Electronics, SK Telecom | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165629 | P-CR | New solution on 'Mobility framework for non-3GPP access' | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165828 | P-CR | Update of Solution 6.3.24 Mobility pattern based mobility management | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165695 | P-CR | New Solution: UE-driven mobility handling during active sessions | Deutsche Telekom, Telecom Italia, SK Telecom | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165779 | P-CR | Connected mode MM for multiple parallel sessions | NTT DOCOMO | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165781 | P-CR | Enhanced X2-based handover with multiple parallel PDN connections | NTT DOCOMO | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165784 | P-CR | TUPF relocation during the HO procedure | CATT | FS_NextGen | Not Handled | Not Handled | |
6.10.3 | S2-165803 | P-CR | NG3-based Handover procedure | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | - | - | Updates and solutions for key issue 4: Session management | - | - | {Frank} | - | - |
6.10.4 | S2-165559 | P-CR | PDU Session IP version handling | Ericsson | FS_NextGen | Revised to S2-166049. | Revised | |
6.10.4 | S2-166049 | P-CR | PDU Session IP version handling | Ericsson | FS_NextGen | Revision of S2-165559. Revised to S2-166240. | Revised | |
6.10.4 | S2-166240 | P-CR | PDU Session IP version handling | Ericsson | FS_NextGen | Revision of S2-166049. Revised to S2-166279. | Revised | |
6.10.4 | S2-166279 | P-CR | PDU Session IP version handling | Ericsson | FS_NextGen | Revision of S2-166240. Approved | Approved | |
6.10.4 | S2-165588 | P-CR | Interim agreement for MMF-SMF split and Update of Solution 4.16 (Signalling layer integrity between MM and SM entities) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revised to S2-166052. | Revised | |
6.10.4 | S2-166052 | P-CR | Interim agreement for MMF-SMF split and Update of Solution 4.16 (Signalling layer integrity between MM and SM entities) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-165588. Revised to S2-166280. | Revised | |
6.10.4 | S2-166280 | P-CR | Interim agreement for MMF-SMF split and Update of Solution 4.16 (Signalling layer integrity between MM and SM entities) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-166052. This was left for e-mail approval. e-mail revision 5 approved. Revised to S2-166298. Laurent (Nokia) provides rev1 Irfan (NTT DCM) provides rev2 Stefano (Qualcomm) provides rev3 Thouraya (Orange) provides rev4 Laurent (Nokia) prefers rev3 Fenqin (Huawei) provides rev4 Fenqin (Huawei) renames his rev4 to rev5 S2 166280 rev5 APPROVED | Revised | |
6.10.4 | S2-166298 | P-CR | Interim agreement for MMF-SMF split and Update of Solution 4.16 (Signalling layer integrity between MM and SM entities) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | e-mail revision 5 of S2-166280. Approved | Approved | |
6.10.4 | S2-165693 | P-CR | Update to Interim Agreements on MM and SM interaction | Deutsche Telekom AG | FS_NextGen | Noted in parallel session | Noted | |
6.10.4 | S2-165642 | P-CR | SM and MM decoupling | Huawei, HiSilicon | FS_NextGen | Response contribution in S2-165911. Noted in parallel session | Noted | |
6.10.4 | S2-165911 | DISCUSSION | Reply / answer to S2-165642: SM and MM decoupling | Nokia | FS_NextGen | LATE REQ. LATE DOC: Rx 17/10, 08:20. Not Handled | Not Handled | |
6.10.4 | S2-165596 | P-CR | Evaluation on subscription information access in MM-SM split architecture | LG Electronics | FS_NextGen | Revised, merging S2-165589, to S2-166053. | Revised | |
6.10.4 | S2-166053 | P-CR | Evaluation on subscription information access in MM-SM split architecture | LG Electronics | FS_NextGen | Revision of S2-165596, merging S2-165589. Agreed in parallel session Block approved | Approved | |
6.10.4 | S2-165557 | P-CR | Solution updates to MM-SM split | Ericsson | FS_NextGen | Revised to S2-166054. | Revised | |
6.10.4 | S2-166054 | P-CR | Solution updates to MM-SM split | Ericsson | FS_NextGen | Revision of S2-165557. Agreed in parallel session Block approved | Approved | |
6.10.4 | S2-165589 | P-CR | MM-SM split: SMF access to subscription data | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Merged with S2-165596 into S2-166053 | Merged | |
6.10.4 | S2-165749 | P-CR | Interim agreement on infrequent small data transmission transferring NextGen system | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165656 | P-CR | Update of Solution 6.4.19 with evaluation and update interim agreement | Huawei, HiSilicon, CATR | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165676 | P-CR | Interim agreement to use UP for small data transfer | Sony, Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165831 | P-CR | Interim agreement on the infrequent small data transferring | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165594 | P-CR | Principle and Interim agreements on non-3GPP access aspects | LG Electronics | FS_NextGen | Postponed | Postponed | |
6.10.4 | S2-165682 | P-CR | Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) | Huawei | FS_NextGen | Revised, merging S2-165881, to S2-166108. | Revised | |
6.10.4 | S2-166108 | P-CR | Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) | Huawei, LGE, BT | FS_NextGen | Revision of S2-165682, merging S2-165881. Revised to S2-166241. | Revised | |
6.10.4 | S2-166241 | P-CR | Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) | Huawei, LGE, BT | FS_NextGen | Revision of S2-166108. Revised off-line in S2-166260. | Revised | |
6.10.4 | S2-166260 | P-CR | Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) | Huawei, LGE, BT | FS_NextGen | Revision of S2-166241. This was left for e-mail approval. e-mail revision 5 approved. Revised to S2-166291. Laurent (Nokia) provides rev1 Marco (Huawei) provides rev2 Irfan (NTT DCM) provides rev3 Stefano (Qualcomm) provides rev4 Marco (Huawei) provides rev5 Saso (Intel) comments to change text but no revision was provided Marco ((Huawei) provides rev6 after the revision deadline at 10/26, 2329 PDT.Puneet commented that rev6 cannot be considered as it is provided after the revision deadline. S2 166260 rev5 APPROVED | Revised | |
6.10.4 | S2-166291 | P-CR | Solution evaluation and selection for UE simultaneously connected to 3GPP and N3GPP (sol 4.20 and 4.24) | Huawei, LGE, BT | FS_NextGen | e-mail revision 5 of S2-166260. Approved | Approved | |
6.10.4 | S2-165646 | P-CR | Update the Interim agreement on session management and the solution 4.23. | Huawei, HiSilicon | FS_NextGen | Postponed | Postponed | |
6.10.4 | S2-165560 | P-CR | Interim conclusions on user plane format | Ericsson | FS_NextGen | Revised to S2-166111. | Revised | |
6.10.4 | S2-166111 | P-CR | Interim conclusions on user plane format | Ericsson, Huawei | FS_NextGen | Revision of S2-165560. Revised to S2-166242. | Revised | |
6.10.4 | S2-166242 | P-CR | Interim conclusions on user plane format | Ericsson | FS_NextGen | Revision of S2-166111. Agreed in parallel session Block approved | Approved | |
6.10.4 | S2-165655 | P-CR | Updates of per node-level tunnel model and interim agreement | Huawei, HiSilicon, China Mobile, CATR | FS_NextGen | Revised, merging S2-165507 and S2-165751, to S2-166110. | Revised | |
6.10.4 | S2-166110 | P-CR | Updates of per node-level tunnel model and interim agreement | Huawei, HiSilicon, China Mobile, CATR | FS_NextGen | Revision of S2-165655, merging S2-165507 and S2-165751. WITHDRAWN | Withdrawn | |
6.10.4 | S2-165718 | P-CR | Updated interim agreements on session management | NEC, NTT DOCOMO | FS_NextGen | Revised to S2-166109. | Revised | |
6.10.4 | S2-166109 | P-CR | Updated interim agreements on session management | NEC, NTT DOCOMO | FS_NextGen | Revision of S2-165718. Revised to S2-166281. | Revised | |
6.10.4 | S2-166281 | P-CR | Updated interim agreements on session management | NEC, NTT DOCOMO | FS_NextGen | Revision of S2-166109. Approved | Approved | |
6.10.4 | S2-165507 | P-CR | update and evaluation of Solution 4.11 (work task1) | KDDI, ETRI, China Mobile, KPN | FS_NextGen | Merged with S2-165655 into S2-166110 | Merged | |
6.10.4 | S2-165751 | P-CR | Solution update of UP protocol model - Per Node-level Tunnel | LG Electronics | FS_NextGen | Merged with S2-165655 into S2-166110. | Merged | |
6.10.4 | S2-165586 | P-CR | Interim agreement and Update of Solution 4.2: Session setup procedures (Home Routed) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revised to S2-166112. | Revised | |
6.10.4 | S2-166112 | P-CR | Interim agreement and Update of Solution 4.2: Session setup procedures (Home Routed) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-165586. Revised to S2-166243. | Revised | |
6.10.4 | S2-166243 | P-CR | Interim agreement and Update of Solution 4.2: Session setup procedures (Home Routed) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-166112. Approved | Approved | |
6.10.4 | S2-165890 | P-CR | Interim Agreements of Key Issue 4 | Huawei, HiSilicon | FS_NextGen | Postponed | Postponed | |
6.10.4 | S2-165766 | P-CR | Way forward on Key Issue 4 on Session Management for WT1 and WT2 | Qualcomm Inc. | FS_NextGen | Revised to S2-166113. | Revised | |
6.10.4 | S2-166113 | P-CR | Way forward on Key Issue 4 on Session Management for WT1 and WT2 | Qualcomm Inc. | FS_NextGen | Revision of S2-165766. Revised to S2-166245. | Revised | |
6.10.4 | S2-166245 | P-CR | Way forward on Key Issue 4 on Session Management for WT1 and WT2 | Qualcomm Inc. | FS_NextGen | Revision of S2-166113. Agreed in parallel session Block approved | Approved | |
6.10.4 | S2-165585 | P-CR | Interim Agreements on Session Management (Key Issue #4) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revised to S2-166114. | Revised | |
6.10.4 | S2-166114 | P-CR | Interim Agreements on Session Management (Key Issue #4) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-165585. Revised to S2-166244. | Revised | |
6.10.4 | S2-166244 | P-CR | Interim Agreements on Session Management (Key Issue #4) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-166114. Agreed in parallel session Block approved | Approved | |
6.10.4 | S2-165833 | P-CR | Clarification for SM Selection by MM | ETRI, ZTE, Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165742 | P-CR | Evaluation update of Solution 4.7: Infrequent small data transfer | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165745 | P-CR | Evaluation of Solution 4.8: for Data transmission with ConnectionLess RAN-Core interface | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165747 | P-CR | Evaluation of Solution 4.18: Solution for Infrequent Small Data | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165748 | P-CR | Solution update and evaluation of Solution 4.19: Infrequent small user data transfer via control plane | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165558 | P-CR | Updates to solution 6.6.3: Multi-homing over multiple PDU sessions with network-provided routing rules | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165757 | P-CR | Session management for connectionless transmission | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165845 | P-CR | Clarifications and evaluation for Per QoS class tunnel protocol model | NTT DOCOMO | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165844 | P-CR | Use of DC with Solution 4.10. | NTT DOCOMO | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165587 | P-CR | Update of Solution 4.13: how to choose which of the UP-GW IP anchors visible to the UE is to be used as the most preferred default router | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165758 | P-CR | Session management for network based ultra-reliable transmission | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165733 | P-CR | Update on solution 4.16: the interaction between MM and SM | Samsung, ETRI | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165773 | P-CR | Update to Solution 4.16: the interaction between MM and SM | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165561 | P-CR | Update to Solution 4.18 for Infrequent Small Data | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165597 | P-CR | Clarification and evaluation about solution 4.20 (Session Management on the PDU session(s) via different accesses) | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165866 | P-CR | Delete an editor's note in solution 4.21 | CATT | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165719 | P-CR | Updates to Solution 4.22 | NEC | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165730 | P-CR | Update of solution 4.21 and 4.22 relating to paging | Samsung, ETRI | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165595 | P-CR | Update of Solution 4.23: Asynchronous Session Management Model | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165598 | P-CR | Clarification and evaluation about solution 4.24 (Session Management with individual CP function per access network) | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165546 | P-CR | Update to Solution 4.25: Local Area Data Network | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.4 | S2-165865 | P-CR | Routing of the SM message | CATT | FS_NextGen | Not Handled | Not Handled | |
6.10.5 | - | - | Void | - | - | {Not_on_agenda} | - | - |
6.10.6 | - | - | Updates and solutions for key issue 6: Support for session and service continuity and efficient user plan path | - | - | {Magnus} | - | - |
- | - | - | Voice | - | - | - | - | - |
- | - | - | Interim Agreements | - | - | - | - | - |
6.10.6 | S2-165579 | P-CR | Updated Interim Agreements related to selection/reselection of U-plane function | KDDI, Sprint, China Unicom | FS_NextGen | Merged with S2-165889 into S2-166094 | Merged | |
6.10.6 | S2-165590 | P-CR | Interim Agreements on Session Management (Key Issue 5 and 6) | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revised, merging S2-165626 and S2-165780, to S2-166086. | Revised | |
6.10.6 | S2-166086 | P-CR | Interim Agreements on Session Management (Key Issue 5 and 6) | Nokia, Alcatel-Lucent Shanghai Bell, LGE | FS_NextGen | Revision of S2-165590, merging S2-165626, S2-165780 and S2-165811. Revised to S2-166246. | Revised | |
6.10.6 | S2-166246 | P-CR | Interim Agreements on Session Management (Key Issue 5 and 6) | Nokia, Alcatel-Lucent Shanghai Bell, LGE, Intel | FS_NextGen | Revision of S2-166086. Approved | Approved | |
6.10.6 | S2-165626 | P-CR | Interim agreement on Session and Service Continuity | LG Electronics | FS_NextGen | Merged with S2-165590 into S2-166086. | Merged | |
6.10.6 | S2-165780 | P-CR | Interim agreement on SSC mode to support Key issue 6 | CATT | FS_NextGen | Merged with S2-165590 into S2-166086. | Merged | |
6.10.6 | S2-165799 | P-CR | Interim agreement on how the UE determines the SSC mode | Motorola Mobility, Lenovo | FS_NextGen | Revised to S2-166093. | Revised | |
6.10.6 | S2-166093 | P-CR | Interim agreement on how the UE determines the SSC mode | Motorola Mobility, Lenovo | FS_NextGen | Revision of S2-165799. Revised to S2-166247. | Revised | |
6.10.6 | S2-166247 | P-CR | Interim agreement on how the UE determines the SSC mode | Motorola Mobility, Lenovo | FS_NextGen | Revision of S2-166093. Agreed in parallel session Block approved | Approved | |
6.10.6 | S2-165889 | P-CR | Interim Agreements for KI 6 | Huawei, HiSilicon | FS_NextGen | Revised to S2-166094. | Revised | |
6.10.6 | S2-166094 | P-CR | Interim Agreements for KI 6 | Huawei, HiSilicon, KDDI, Sprint | FS_NextGen | Revision of S2-165889, merging S2-165579. Revised to S2-166248. | Revised | |
6.10.6 | S2-166248 | P-CR | Interim Agreements for KI 6 | Huawei, HiSilicon, KDDI, Sprint | FS_NextGen | Revision of S2-166094. Agreed in parallel session Block approved | Approved | |
6.10.6 | S2-165811 | P-CR | Relationship between SSC mode and SM models | ZTE Corporation | FS_NextGen | Merged with S2-165590 into S2-166086. | Merged | |
- | - | - | Updates | - | - | - | - | - |
6.10.6 | S2-165547 | P-CR | Update to Solution 5.1 - Session continuity to enable (re) selection of efficient user plane paths | InterDigital | FS_NextGen | Revised to S2-166095. | Revised | |
6.10.6 | S2-166095 | P-CR | Update to Solution 5.1 - Session continuity to enable (re) selection of efficient user plane paths | InterDigital | FS_NextGen | Revision of S2-165547. Error in uploaded document. Revised in S2-166235. | Revised | |
6.10.6 | S2-166235 | P-CR | Update to Solution 5.1 - Session continuity to enable (re) selection of efficient user plane paths | InterDigital | FS_NextGen | Revision of S2-166095. Revised to S2-166249. | Revised | |
6.10.6 | S2-166249 | P-CR | Update to Solution 5.1 - Session continuity to enable (re) selection of efficient user plane paths | InterDigital | FS_NextGen | Revision of S2-166235. Approved | Approved | |
6.10.6 | S2-165591 | P-CR | Updates to solution 6.6.1 | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revised to S2-166096. | Revised | |
6.10.6 | S2-166096 | P-CR | Updates to solution 6.6.1 | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-165591. Revised to S2-166250. | Revised | |
6.10.6 | S2-166250 | P-CR | Updates to solution 6.6.1 | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-166096. Agreed in parallel session Block approved | Approved | |
6.10.6 | S2-165611 | P-CR | Update of enable efficient user plane paths | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165612 | P-CR | Update of Multiple Tunnel based traffic offload | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165625 | P-CR | Update on solution 6.6.1 | LG Electronics, SK Telecom | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165658 | P-CR | Clarification on the UL UP function for traffic branching | China Mobile | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165715 | P-CR | UE triggered SSC mode update (update to solution 6.6.1) | Interdigital | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165743 | P-CR | Updates to Session Continuity Section | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165777 | P-CR | SSC mode update call flows | CATT | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165599 | P-CR | Evaluation of Solution 4.14, 5.2 and 5.4 | KDDI, Sprint | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165805 | P-CR | Update to Solution 5.2 | Samsung | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165809 | P-CR | Clarification on the SSC mode | ZTE Corporation | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165854 | P-CR | Update of solution 6.5.4. | NTT DOCOMO, ZTE, CATR | FS_NextGen | Not Handled | Not Handled | |
6.10.6 | S2-165873 | P-CR | solution 6.1 update for SSC mode 3 | Orange | FS_NextGen | Not Handled | Not Handled | |
6.10.7 | - | - | Updates and solutions for key issue 7: Network function granularity and interactions between them | - | - | {Frank} | - | - |
6.10.7 | S2-165643 | P-CR | Interim agreements for KI 7 | Huawei, HiSilicon, Sprint, CATR | FS_NextGen | Revised, merging S2-165810, to S2-166140. | Revised | |
6.10.7 | S2-166140 | P-CR | Interim agreements for KI 7 | Huawei, HiSilicon, Sprint, CATR, ZTE | FS_NextGen | Revision of S2-165643, merging S2-165810. Revised to S2-166255. | Revised | |
6.10.7 | S2-166255 | P-CR | Interim agreements for KI 7 | Huawei, HiSilicon, Sprint, CATR, ZTE | FS_NextGen | Revision of S2-166140. Approved | Approved | |
6.10.7 | S2-165644 | P-CR | Interface for interconnection | Huawei, HiSilicon, China mobile, CATR, Telecom Italia, Deutsche Telekom | FS_NextGen | Revised to S2-166141. | Revised | |
6.10.7 | S2-166141 | P-CR | Interface for interconnection | Huawei, HiSilicon, China mobile, CATR, Telecom Italia, Deutsche Telekom | FS_NextGen | Revision of S2-165644. Revised to S2-166253. | Revised | |
6.10.7 | S2-166253 | P-CR | Interface for interconnection | Huawei, HiSilicon, China mobile, CATR, Telecom Italia, Deutsche Telekom | FS_NextGen | Revision of S2-166141. Revised to S2-166256. | Revised | |
6.10.7 | S2-166256 | P-CR | Interface for interconnection | Huawei, HiSilicon, China mobile, CATR, Telecom Italia, Deutsche Telekom, AT&T | FS_NextGen | Revision of S2-166253. Approved | Approved | |
6.10.7 | S2-165775 | P-CR | Interim agreements for control plane interconnection model | Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, Deutsche Telekom, AT&T, Verizon, China Mobile, Oracle | FS_NextGen | Revised to S2-166143. | Revised | |
6.10.7 | S2-166143 | P-CR | Interim agreements for control plane interconnection model | Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, Deutsche Telekom, AT&T, Verizon, China Mobile, Oracle | FS_NextGen | Revision of S2-165775. WITHDRAWN (not provided) | Withdrawn | |
6.10.7 | S2-165801 | P-CR | Interim agreements for KI 7 | Cisco Systems, Inc., Ericsson | FS_NextGen | Response contribution in S2-165902. Revised to S2-166144. | Revised | |
6.10.7 | S2-166144 | P-CR | Interim agreements for KI 7 | Cisco Systems, Inc., Ericsson, NTT DoCoMo, ZTE | FS_NextGen | Revision of S2-165801. Revised to S2-166257. | Revised | |
6.10.7 | S2-166257 | P-CR | Interim agreements for KI 7 | Cisco Systems, Inc., Ericsson, NTT DoCoMo, ZTE | FS_NextGen | Revision of S2-166144. Merged with S2-166258 into S2-166284 | Merged | |
6.10.7 | S2-165772 | P-CR | Updates on solution for Control plane interconnection model with a data layer | Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, AT&T, China Mobile, Oracle, TeliaSonera | FS_NextGen | Revised to S2-166142. | Revised | |
6.10.7 | S2-166142 | P-CR | Updates on solution for Control plane interconnection model with a data layer | Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, AT&T, China Mobile, Oracle, TeliaSonera, T-Mobile US, Deutsche Telekom | FS_NextGen | Revision of S2-165772. Revised to S2-166258. | Revised | |
6.10.7 | S2-166258 | P-CR | Updates on solution for Control plane interconnection model with a data layer | Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, AT&T, China Mobile, Oracle, TeliaSonera, T-Mobile US, Deutsche Telekom | FS_NextGen | Revision of S2-166142. Revised, merging parts of S2-166257 to S2-166284. | Revised | |
6.10.7 | S2-166284 | P-CR | Updates on solution for Control plane interconnection model with a data layer | Nokia, Alcatel-Lucent Shanghai Bell, Telecom Italia, AT&T, China Mobile, Oracle, TeliaSonera, T-Mobile US, Deutsche Telekom | FS_NextGen | Revision of S2-166258, merging parts of S2-166257. Not Handled. It was decided that this should be done by the Rapporteur when implementing the TR. | Not Handled | |
6.10.7 | S2-165810 | P-CR | Clarification on the direct interaction | ZTE Corporation | FS_NextGen | Merged with S2-165643 in S2-166140 | Merged | |
6.10.7 | S2-165902 | DISCUSSION | Response to 'Interim agreements for KI 7' proposal in S2-165801 | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | LATE REQ. LATE DOC: Rx 17/10, 00:50. Not Handled | Not Handled | |
6.10.7 | S2-166056 | DISCUSSION | Reply to S2-165902 | Cisco Systems, Inc., Ericsson, NTT DoCoMo, ZTE | FS_NextGen | Created at meeting. Not Handled | Not Handled | |
6.10.8 | - | - | Updates and solutions for key issue 8: Next Generation core and access – functional division and interface | - | - | {Magnus} | - | - |
6.10.8 | S2-165711 | P-CR | Interim Agreements on common AN-CN interface | Motorola Mobility, Lenovo, Broadcom | FS_NextGen | Revised to S2-166099. | Revised | |
6.10.8 | S2-166099 | P-CR | Interim Agreements on common AN-CN interface | Motorola Mobility, Lenovo, Broadcom | FS_NextGen | Revision of S2-165711. Revised to S2-166126. Motorola Mobility commented that this revision takes into account proposals in S2-165767, S2-165992 and S2-165895. | Revised | |
6.10.8 | S2-166126 | P-CR | Interim Agreements on common AN-CN interface | Motorola Mobility, Lenovo, Broadcom, Qualcomm Incorporated, Intel, Nokia | FS_NextGen | Revision of S2-166099. Revised to S2-166252. | Revised | |
6.10.8 | S2-166252 | P-CR | Interim Agreements on common AN-CN interface | Motorola Mobility, Lenovo, Broadcom, Qualcomm Incorporated, Intel, Nokia | FS_NextGen | Revision of S2-166126. Approved | Approved | |
6.10.8 | S2-165592 | P-CR | Untrusted access to NGC: update to solution 8.6 and Interim agreement | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | The Interim agreement part was merged into S2-166126. Revised to S2-166128. | Revised | |
6.10.8 | S2-166128 | P-CR | Untrusted access to NGC: update to solution 8.6 and Interim agreement | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-165592. Revised to S2-166251. | Revised | |
6.10.8 | S2-166251 | P-CR | Untrusted access to NGC: update to solution 8.6 and Interim agreement | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-166128. Revised to S2-166282. | Revised | |
6.10.8 | S2-166282 | P-CR | Untrusted access to NGC: update to solution 8.6 and Interim agreement | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-166251. Approved | Approved | |
6.10.8 | S2-165681 | P-CR | Working assumptions proposal for N3GPP | Huawei, HiSilicon | FS_NextGen | Merged into S2-166126 | Merged | |
6.10.8 | S2-165767 | P-CR | Way forward on support of non-3GPP access and update to solution 8.6 for support of untrusted non-3GPP access | Qualcomm Inc. | FS_NextGen | The Interim agreement part was merged into S2-166126. Revised, merging S2-165562, to S2-166129. | Revised | |
6.10.8 | S2-166129 | P-CR | Way forward on support of non-3GPP access and update to solution 8.6 for support of untrusted non-3GPP access | Qualcomm Inc., LG Electronics | FS_NextGen | Revision of S2-165767, merging S2-165562. Revised to S2-166254. | Revised | |
6.10.8 | S2-166254 | P-CR | Way forward on support of non-3GPP access and update to solution 8.6 for support of untrusted non-3GPP access | Qualcomm Inc., LG Electronics | FS_NextGen | Revision of S2-166129. Revised to S2-166283. | Revised | |
6.10.8 | S2-166283 | P-CR | Way forward on support of non-3GPP access and update to solution 8.6 for support of untrusted non-3GPP access | Qualcomm Inc., LG Electronics | FS_NextGen | Revision of S2-166254. Approved | Approved | |
6.10.8 | S2-165824 | P-CR | Some Interim Agreements on KI#8 | CATT, CATR | FS_NextGen | Revised to S2-166127. | Revised | |
6.10.8 | S2-166127 | P-CR | Some Interim Agreements on KI#8 | CATT,CATR, LG Electronics | FS_NextGen | Revision of S2-165824. Agreed in parallel session Block approved | Approved | |
6.10.8 | S2-165827 | P-CR | Interim agreements on the interface between UE and Next Generation Core | LG Electronics | FS_NextGen | Noted in parallel session | Noted | |
6.10.8 | S2-165895 | DISCUSSION | Way forward on accomplishing a single AN-CN interface | Intel | FS_NextGen | Noted in parallel session | Noted | |
6.10.8 | S2-165562 | P-CR | Update to Solution 8.6 | Ericsson | FS_NextGen | Merged with S2-165767 into S2-166129 | Merged | |
6.10.8 | S2-165650 | P-CR | Solution: Standalone non-3GPP access via NG2/NG3 | Motorola Mobility, Lenovo, Broadcom, CMCC | FS_NextGen | Revised to S2-166130. | Revised | |
6.10.8 | S2-166130 | P-CR | Solution: Standalone non-3GPP access via NG2/NG3 | Motorola Mobility, Lenovo, Broadcom, CMCC, Rogers | FS_NextGen | Revision of S2-165650. Approved | Approved | |
6.10.8 | S2-165680 | P-CR | Solution of carrying NAS directly as IKEv2 parameter for untrusted WLAN access | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.8 | S2-165735 | P-CR | Update of Solution 8.3 | ETRI | FS_NextGen | Not Handled | Not Handled | |
6.10.8 | S2-165880 | P-CR | Update to Solution 8.2 | Intel | FS_NextGen | Not Handled | Not Handled | |
6.10.8 | S2-165787 | P-CR | Evaluation on Solution 8.5: Alternative C for the interface between UE and Next Generation Core | LG Electronics | FS_NextGen | Not Handled | Not Handled | |
6.10.9 | - | - | Updates and solutions for key issue 9: 3GPP architecture impacts to support network capability exposure | - | - | {Not_on_agenda} | - | - |
6.10.10 | - | - | Updates and solutions for key issue 10: Policy Framework | - | - | {Frank} | - | - |
6.10.10 | S2-165536 | P-CR | Interim agreements on the Policy Framework | Ericsson, ZTE, Oracle | FS_NextGen | Revised to S2-166133. | Revised | |
6.10.10 | S2-166133 | P-CR | Interim agreements on the Policy Framework | Ericsson, ZTE, Oracle | FS_NextGen | Revision of S2-165536. This was left for e-mail approval. e-mail approved | Approved | |
6.10.10 | S2-165534 | P-CR | Updates in Policy Reference Architecture to reflect roaming aspects | Ericsson | FS_NextGen | Revised to S2-166134. | Revised | |
6.10.10 | S2-166134 | P-CR | Updates in Policy Reference Architecture to reflect roaming aspects | Ericsson | FS_NextGen | Revision of S2-165534. WITHDRAWN (not provided) | Withdrawn | |
6.10.10 | S2-165535 | P-CR | Discussion on the need to send policies to the UE | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.10 | S2-165537 | P-CR | On the need on an interface between Policy and SDM | Ericsson | FS_NextGen | Revised to S2-166135. | Revised | |
6.10.10 | S2-166135 | P-CR | On the need on an interface between Policy and SDM | Ericsson | FS_NextGen | Revision of S2-165537. Postponed | Postponed | |
6.10.10 | S2-165647 | P-CR | TSSF and Policy | Huawei, HiSilicon | FS_NextGen | Agreed in parallel session Block approved | Approved | |
6.10.10 | S2-165740 | P-CR | solution for enhanced encrypted traffic detection | China Telecom, Alibaba | FS_NextGen | Revised to S2-166136. | Revised | |
6.10.10 | S2-166136 | P-CR | solution for enhanced encrypted traffic detection | China Telecom, Alibaba | FS_NextGen | Revision of S2-165740. Approved | Approved | |
6.10.10 | S2-165878 | P-CR | Policy on RAT/Frequency Selection Priority | Huawei, HiSilicon | FS_NextGen | Revised to S2-166137. | Revised | |
6.10.10 | S2-166137 | P-CR | Policy on RAT/Frequency Selection Priority | Huawei, HiSilicon, NICT, Nokia | FS_NextGen | Revision of S2-165878. Revised to S2-166259. | Revised | |
6.10.10 | S2-166259 | P-CR | Policy on RAT/Frequency Selection Priority | Huawei, HiSilicon, NICT, Nokia | FS_NextGen | Revision of S2-166137. This was left for e-mail approval. e-mail approved | Approved | |
6.10.10 | S2-165771 | P-CR | Updates to Overall architecture option #6 | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revised to S2-166138. | Revised | |
6.10.10 | S2-166138 | P-CR | Updates to Overall architecture option #6 | Nokia, Alcatel-Lucent Shanghai Bell | FS_NextGen | Revision of S2-165771. Approved | Approved | |
6.10.10 | S2-165569 | P-CR | Discussions and proposals on the considerations of Policy Control Framework for Network Slicing support | ZTE Corporation, Oracle, Telecom Italia, ETRI | FS_NextGen | LATE DOC: Rx 11/10, 19:40. Revised to S2-166139. | Revised | |
6.10.10 | S2-166139 | P-CR | Discussions and proposals on the considerations of Policy Control Framework for Network Slicing support | ZTE, Oracle, Telecom Italia, ETRI, KDDI, NEC, Sandvine | FS_NextGen | Revision of S2-165569. Approved | Approved | |
6.10.10 | S2-165712 | DISCUSSION | Discussion Paper on NextGen Support of Dynamic Policy Control | U.S. Department of Commerce | Rel-14 | FS_NextGen | Noted in parallel session | Noted |
6.10.11 | - | - | Updates and solutions for key issue 11: Charging | - | - | {Not_on_agenda} | - | - |
6.10.12 | - | - | Updates and solutions for key issue 12: Security framework | - | - | {Not_on_agenda} | - | - |
6.10.13 | - | - | Updates and solutions for key issue 13: Broadcast/Multicast Capabilities | - | - | {Not_on_agenda} | - | - |
6.10.14 | - | - | Updates and solutions for key issue 14: Support for Off-Network Communication | - | - | {Not_on_agenda} | - | - |
6.10.15 | - | - | Updates and solutions for key issue 15: NextGen core support for IMS | - | - | {Not_on_agenda} | - | - |
6.10.16 | - | - | Updates and solutions for key issue 16: 3GPP system aspects to support the connectivity via a relay UE | - | - | {Not_on_agenda} | - | - |
6.10.17 | - | - | Updates and solutions for key issue 17: 3GPP architecture impacts to support network discovery and selection | - | - | {Magnus} | - | - |
6.10.17 | S2-165542 | DISCUSSION | A new solution for key issue 17 (introductory slides) | NICT, ATR | Rel-14 | FS_NextGen | Not Handled | Not Handled |
6.10.17 | S2-165543 | DISCUSSION | A new solution for key issue 17 (proposed text) | NICT, ATR | Rel-14 | FS_NextGen | Not Handled | Not Handled |
6.10.17 | S2-165685 | P-CR | Network Discovery and Selection for 3GPP access technologies | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10.17 | S2-165768 | P-CR | Update and evaluation of solution 6.17.1 for Key Issue 17 on Network Discovery and Selection in idle mode | Qualcomm Incorporated | FS_NextGen | Not Handled | Not Handled | |
6.10.17 | S2-165769 | P-CR | Proposed way forward for Key Issue 17 on Network Discovery and Selection | Qualcomm Incorporated | FS_NextGen | Not Handled | Not Handled | |
6.10.17 | S2-165870 | P-CR | Solution to KI 17: PLMN+RAT discovery and selection | Nokia | FS_NextGen | Not Handled | Not Handled | |
6.10.17 | S2-165871 | P-CR | Interim agreements on KI 17: Network discovery and selection | Nokia | FS_NextGen | Not Handled | Not Handled | |
6.10.18 | - | - | Updates and solutions for key issue 18: Interworking and Migration | - | - | {Frank} | - | - |
6.10.18 | S2-165868 | P-CR | Updates on interworking and migration solution 18.2: Overall | Nokia, Qualcomm Incorporated, KDDI | FS_NextGen | Revised to S2-166100. | Revised | |
6.10.18 | S2-166100 | P-CR | Updates on interworking and migration solution 18.2: Overall | Nokia, Qualcomm Incorporated, KDDI, Huawei | FS_NextGen | Revision of S2-165868. Approved | Approved | |
6.10.18 | S2-165869 | P-CR | Updates on interworking and migration solution 18.2: Call flows | Nokia, KDDI, Qualcomm Incorporated | FS_NextGen | Revised to S2-166101. | Revised | |
6.10.18 | S2-166101 | P-CR | Updates on interworking and migration solution 18.2: Call flows | Nokia, KDDI, Qualcomm Incorporated, Huawei | FS_NextGen | Revision of S2-165869. Approved | Approved | |
6.10.18 | S2-165657 | P-CR | Solution for single radio based lightweight interworking and migration | Huawei | FS_NextGen | Revised to S2-166102. Merged S2-165657 into S2-166100 and S2-166102 | Merged | |
6.10.18 | S2-166102 | P-CR | Solution for single radio based lightweight interworking and migration | Huawei | FS_NextGen | Revision of S2-165657. It was decided to merge S2-165657 into S2-166100 and S2-166102 and S2-166102 was withdrawn. | Withdrawn | |
6.10.18 | S2-165583 | P-CR | Update to solution 18.4 | China Telecom | FS_NextGen | Agreed in parallel session Block approved | Approved | |
6.10.18 | S2-165867 | P-CR | Update to Solution 18.4 | Intel | FS_NextGen | Revised, merging S2-165874, to S2-166103. | Revised | |
6.10.18 | S2-166103 | P-CR | Update to Solution 18.4 | Intel, Samsung | FS_NextGen | Revision of S2-165867, merging S2-165874. Revised to S2-166261. | Revised | |
6.10.18 | S2-166261 | P-CR | Update to Solution 18.4 | Intel, Samsung | FS_NextGen | Revision of S2-166103. This was left for e-mail approval. e-mail revision 2 approved. Revised to S2-166292. Irfan (NTT DCM) provides rev1 Haris (Qualcomm) provides rev2 Saso (Intel) comments S2 166261 rev2 APPROVED | Revised | |
6.10.18 | S2-166292 | P-CR | Update to Solution 18.4 | Intel, Samsung | FS_NextGen | e-mail revision 2 of S2-166261. Approved | Approved | |
6.10.18 | S2-165874 | P-CR | An NGC/EPC Interworking Solution | Samsung, KT, Telecom Italia, SKT | FS_NextGen | Merged with S2-165867 into S2-166103 | Merged | |
6.10.18 | S2-165593 | P-CR | Migration solution with Evolved E-UTRAN to operate EPC and NextGen Core simultaneously | LG Electronics, SK Telecom | FS_NextGen | Revision of S2-164423 from S2#116BIS (Not Handled). Revised to S2-166105. | Revised | |
6.10.18 | S2-166105 | P-CR | Migration solution with Evolved E-UTRAN to operate EPC and NextGen Core simultaneously | LG Electronics, SK Telecom | FS_NextGen | Revision of S2-165593. Revised to S2-166262. | Revised | |
6.10.18 | S2-166262 | P-CR | Migration solution with Evolved E-UTRAN to operate EPC and NextGen Core simultaneously | LG Electronics, SK Telecom | FS_NextGen | Revision of S2-166105. Approved | Approved | |
6.10.18 | S2-165667 | P-CR | Way forward on EPC-NG Core Interworking | Qualcomm Incorporated, Huawei, Nokia | FS_NextGen | Revised to S2-166104. | Revised | |
6.10.18 | S2-166104 | P-CR | Way forward on EPC-NG Core Interworking | Qualcomm Incorporated, Huawei, Nokia | FS_NextGen | Revision of S2-165667. Revised to S2-166263. | Revised | |
6.10.18 | S2-166263 | P-CR | Way forward on EPC-NG Core Interworking | Qualcomm Incorporated, Huawei, Nokia | FS_NextGen | Revision of S2-166104. This was left for e-mail approval. e-mail approved | Approved | |
6.10.18 | S2-165668 | P-CR | Way forward on migration from option 3 to NG Core | Qualcomm Incorporated, Ericsson, NTT Docomo, AT&T, MediaTek, KDDI, Rogers Communications Canada, Nokia, KT, Vodafone, Apple | FS_NextGen | Revised to S2-166106. | Revised | |
6.10.18 | S2-166106 | P-CR | Way forward on migration from option 3 to NG Core | Qualcomm Incorporated, Ericsson, NTT Docomo, AT&T, MediaTek, KDDI, Rogers Communications Canada, Nokia, KT, Vodafone, Apple | FS_NextGen | Revision of S2-165668. Approved | Approved | |
6.10.18 | S2-165840 | P-CR | Interim Agreements on Key Issue #18 | China Telecom | FS_NextGen | LATE DOC: Rx 14/10, 08:45. Not Handled | Not Handled | |
6.10.18 | S2-165672 | LS OUT | [DRAFT] LS on migration from Option 3 to NextGen Core | Qualcomm Incorporated | Rel-14 | Revised to S2-166107. | Revised | |
6.10.18 | S2-166107 | LS OUT | [DRAFT] LS on migration from Option 3 to NextGen Core | Qualcomm Incorporated | Rel-14 | Revision of S2-165672. This was left for e-mail approval. e-mail revision 3 approved. Revised to S2-166288. Hyunsook (LGE) provides rev1 Guillaume (MediaTek) provides rev2 Sung (Nokia) provides rev3 Haris (Qualcomm) supports rev2 and cannot accept rev1 Hyunsook (LGE) can accept rev2 or rev3 Sung (Nokia) approval version should be rev3 Haris (Qualcomm) OK wither rev3 S2 166107 rev3 APPROVED | Revised | |
6.10.18 | S2-166288 | LS OUT | LS on migration from Option 3 to NextGen Core | SA WG2 | Rel-14 | e-mail revision 3 of S2-166107. Approved | Approved | |
6.10.18 | S2-165565 | P-CR | Input to multiple Key Issues: NextGen core support for IMS | Ericsson, AT&T? | FS_NextGen | Confirm sources | ||
6.10.18 | S2-165848 | P-CR | Multimedia calls fallback from NextGen system to EPS | NTT DOCOMO | FS_NextGen | Not Handled | Not Handled | |
6.10.19 | - | - | Updates and solutions for key issue 19: Architecture impacts when using virtual environments | - | - | {Frank} | - | - |
6.10.19 | S2-165884 | P-CR | Key Issue #19: EPC/NGCN updates for 'virtualisation' | Vodafone | FS_NextGen | Revised to S2-166132. | Revised | |
6.10.19 | S2-166132 | P-CR | Key Issue #19: EPC/NGCN updates for 'virtualisation' | Vodafone | FS_NextGen | Revision of S2-165884. Revised to S2-166264. | Revised | |
6.10.19 | S2-166264 | P-CR | Key Issue #19: EPC/NGCN updates for 'virtualisation' | Vodafone, Deutsche Telekom AG | FS_NextGen | Revision of S2-166132. This was left for e-mail approval. e-mail approved | Approved | |
6.10.20 | - | - | Updates and solutions for key issue 20: Traffic Steering, Switching and Splitting between 3GPP and non-3GPP Accesses | - | - | {Not_on_agenda} | - | - |
6.10.21 | - | - | Updates and solutions for key issue 21: Minimal connectivity within extreme rural deployments | - | - | {Not_on_agenda} | - | - |
6.10.22 | - | - | Input for TR clause 7 (Overall architecture proposals) | - | - | {Frank} | - | - |
6.10.22 | S2-165651 | P-CR | Consolidate overall architecture based on existing architecture options | China Mobile, AT&T, Telecom Italia, Sprint, ZTE, CATR | FS_NextGen | Revised to S2-166017, merging S2-165778. | Revised | |
6.10.22 | S2-166017 | P-CR | Agreement on the overall architecture | Editor (China Mobile) | FS_NextGen | Revision of S2-165651, merging S2-165778. Revised to S2-166171. | Revised | |
6.10.22 | S2-166171 | P-CR | Agreement on the overall architecture | China Mobile, AT&T, Telecom Italia, Sprint, ZTE, CATR, Broadcom, Deutsche Telekom | FS_NextGen | Revision of S2-166017. Revised, merging part of S2-166018, to S2-166265. | Revised | |
6.10.22 | S2-166265 | P-CR | Agreement on the overall architecture | China Mobile, AT&T, Telecom Italia, Sprint, ZTE, CATR, Broadcom, Deutsche Telekom | FS_NextGen | Revision of S2-166171, merging part of S2-166018. Approved | Approved | |
6.10.22 | S2-165694 | P-CR | Interim Agreements on Consolidated Architecture Options | Deutsche Telekom | FS_NextGen | Revised to S2-166018. | Revised | |
6.10.22 | S2-166018 | P-CR | Interim Agreements on Consolidated Architecture Options | Deutsche Telekom | FS_NextGen | Revision of S2-165694. Principles merged with S2-166171 into S2-166265 | Merged | |
6.10.22 | S2-165778 | P-CR | Interim agreements on Overall architecture aspects | Nokia | FS_NextGen | Merged with S2-165651 into S2-166017. | Merged | |
6.10.22 | S2-165770 | P-CR | Updates to Overall architecture option #6 | Nokia, Alcatel-Lucent Shanghai Bell, Verizon, Cisco, Samsung, Intel, LGE | FS_NextGen | Revised to S2-166149. | Revised | |
6.10.22 | S2-166149 | P-CR | Updates to Overall architecture option #6 | Nokia, Alcatel-Lucent Shanghai Bell, Verizon, Cisco, Samsung, Intel, LGE, British Telecom. | FS_NextGen | Revision of S2-165770. Approved | Approved | |
6.10.22 | S2-165564 | P-CR | Next Generation Network Architecture: Soln 6 | Ericsson | FS_NextGen | Noted in parallel session | Noted | |
6.10.22 | S2-165692 | P-CR | Update of Consolidated Architecture Option 4 | Deutsche Telekom AG | FS_NextGen | Agreed in parallel session Block approved | Approved | |
6.10.22 | S2-165881 | P-CR | Update to consolidate architecture option 6 | BT | FS_NextGen | Merged with S2-165682 into S2-166108 | Merged | |
6.10.22 | S2-165645 | P-CR | Solution: Consolidated architecture option X | Huawei, Hisilicon, CATR | FS_NextGen | Revised to S2-166170. | Revised | |
6.10.22 | S2-166170 | P-CR | Solution: Consolidated architecture option X | Huawei, Hisilicon, CATR | FS_NextGen | Revision of S2-165645. Approved | Approved | |
6.10.22 | S2-165563 | P-CR | Next Generation Network Architecture: Soln 3 | Ericsson | FS_NextGen | Not Handled | Not Handled | |
6.10.22 | S2-165807 | P-CR | Architecture for concurrent access to same Data Network | ZTE Corporation | FS_NextGen | Not Handled | Not Handled | |
6.10.22 | S2-166050 | DISCUSSION | Service-based architecture: What does it mean for NextGen ? | Huawei | FS_NextGen | Created in drafting session. Not Handled | Not Handled | |
6.11 | - | - | Service Domain Centralization (SeDoC) | - | - | {Not_on_agenda} | - | - |
6.12 | - | - | Sponsored data connectivity improvements (SDCI) | - | - | {Not_on_agenda} | - | - |
6.13 | - | - | Architecture enhancements for LTE support of V2X services (V2XARC) | - | - | {LaeYoung} | - | - |
- | - | - | Incoming LS | - | - | - | - | - |
6.13 | S2-165490 | LS In | LS from RAN WG1: LS on RAN WG1 agreements for LTE-based V2X | RAN WG1 (R1-168026) | Rel-14 | LTE_V2X-Core | Noted in parallel session | Noted |
6.13 | S2-165906 | LS In | LS from RAN WG2: Response LS on Multiple TMGIs for support of small and variable MBMS areas. | RAN WG2 (R2-167291) | Rel-14 | LTE_V2X-Core | LATE DOC: Rx 16/10, 11:30. Noted in parallel session | Noted |
- | - | - | Cat B | - | - | - | - | - |
6.13 | S2-165584 | CR | 23.285 CR0002: Introducing reliability parameter on PC5 QoS handling | Huawei, HiSilicon | Rel-14 | V2XARC | Noted in parallel session | Noted |
6.13 | S2-165631 | CR | 23.285 CR0004: Mapping between PPPP and latency for autonomous resources selection mode | Huawei, Hisilicon, LG Electronics, Ericsson | Rel-14 | V2XARC | Revised in parallel session to S2-166029. | Revised |
6.13 | S2-166029 | CR | 23.285 CR0004R1: Mapping between PPPP and latency for autonomous resources selection mode | Huawei, Hisilicon, LG Electronics, Ericsson | Rel-14 | V2XARC | Revision of S2-165631. Agreed in parallel session Block approved | Agreed |
- | - | - | Cat F | - | - | - | - | - |
6.13 | S2-165508 | DISCUSSION | V2x message transport mechanism over LTE-Uu reference point | Ericsson | Rel-14 | V2XARC | Noted in parallel session | Noted |
6.13 | S2-165509 | CR | 23.285 CR0001: V2X message handling over LTE Uu | Ericsson | Rel-14 | V2XARC | Revised in parallel session to S2-166030. | Revised |
6.13 | S2-166030 | CR | 23.285 CR0001R1: V2X message handling over LTE Uu | Ericsson | Rel-14 | V2XARC | Revision of S2-165509. Revised in parallel session to S2-166038. | Revised |
6.13 | S2-166038 | CR | 23.285 CR0001R2: V2X message handling over LTE Uu | Ericsson | Rel-14 | V2XARC | Revision of S2-166030. Agreed in parallel session Block approved | Agreed |
6.13 | S2-165716 | DISCUSSION | USD definitions for V2X communication | Qualcomm Incorporated, xxx | Source needs correction. Noted in parallel session | Noted | ||
6.13 | S2-165717 | CR | 23.285 CR0012: Definition of the USD for Uu based V2X communication and V2X Application Server discovery | Qualcomm Incorporated, | Rel-14 | V2XARC | Revised in parallel session to S2-166031. | Revised |
6.13 | S2-166031 | CR | 23.285 CR0012R1: Definition of the USD for Uu based V2X communication and V2X Application Server discovery | Qualcomm Incorporated | Rel-14 | V2XARC | Revision of S2-165717. Agreed in parallel session Block approved | Agreed |
6.13 | S2-165789 | DISCUSSION | V2X USD with E-CGI | Nokia | Rel-14 | V2XARC | Noted in parallel session | Noted |
- | - | - | Cat B | - | - | - | - | - |
6.13 | S2-165630 | CR | 23.285 CR0003: Update of V2X impacts to EPC procedures | Huawei, Hisilicon, LG Electronics | Rel-14 | V2XARC | Revised in parallel session to S2-166032. | Revised |
6.13 | S2-166032 | CR | 23.285 CR0003R1: Update of V2X impacts to EPC procedures | Huawei, Hisilicon, LG Electronics, Ericsson | Rel-14 | V2XARC | Revision of S2-165630. Agreed in parallel session Block approved | Agreed |
6.13 | S2-165636 | CR | 23.285 CR0006: Subscription to V2X services | LG Electronics | Rel-14 | V2XARC | Revised in parallel session to S2-166033. | Revised |
6.13 | S2-166033 | CR | 23.285 CR0006R1: Subscription to V2X services | LG Electronics | Rel-14 | V2XARC | Revision of S2-165636. Agreed in parallel session Block approved | Agreed |
6.13 | S2-165679 | CR | 23.285 CR0009: Uplink distribution deployment option | KPN, LG Electronics | Rel-14 | V2XARC | Revised in parallel session to S2-166034. | Revised |
6.13 | S2-166034 | CR | 23.285 CR0009R1: Uplink distribution deployment option | KPN, LG Electronics | Rel-14 | V2XARC | Revision of S2-165679. Agreed in parallel session Block approved | Agreed |
- | - | - | Cat F | - | - | - | - | - |
6.13 | S2-165632 | CR | 23.285 CR0005: Update of Functional entities description | Huawei, Hisilicon | Rel-14 | V2XARC | Revised in parallel session to S2-166035. | Revised |
6.13 | S2-166035 | CR | 23.285 CR0005R1: Update of Functional entities description | Huawei, Hisilicon | Rel-14 | V2XARC | Revision of S2-165632. Revised in parallel session to S2-166039. | Revised |
6.13 | S2-166039 | CR | 23.285 CR0005R2: Update of Functional entities description | Huawei, Hisilicon | Rel-14 | V2XARC | Revision of S2-166035. Agreed in parallel session Block approved | Agreed |
6.13 | S2-165638 | CR | 23.285 CR0008: PC5-U stack instance for V2X use | LG Electronics | Rel-14 | V2XARC | Noted in parallel session | Noted |
6.13 | S2-165713 | CR | 23.285 CR0010: Clarification on location mapping at V2X Application Server | Qualcomm Incorporated, Ericsson, | Rel-14 | V2XARC | Revised in parallel session to S2-166036. | Revised |
6.13 | S2-166036 | CR | 23.285 CR0010R1: Clarification on location mapping at V2X Application Server | Qualcomm Incorporated, Ericsson, | Rel-14 | V2XARC | Revision of S2-165713. Agreed in parallel session Block approved | Agreed |
6.13 | S2-165714 | CR | 23.285 CR0011: Clarification on V2X message reception using MBMS Receive Only Mode | Qualcomm Incorporated, | Rel-14 | V2XARC | Revised in parallel session to S2-166037. | Revised |
6.13 | S2-166037 | CR | 23.285 CR0011R1: Clarification on V2X message reception using MBMS Receive Only Mode | Qualcomm Incorporated | Rel-14 | V2XARC | Revision of S2-165714. Noted in parallel session | Noted |
6.13 | S2-165637 | CR | 23.285 CR0007: Clarification on MBMS for LTE-Uu based V2X architecture reference model | LG Electronics | Rel-14 | V2XARC | Agreed in parallel session Block approved | Agreed |
6.14 | - | - | Study on PS Data off function (FS_PS_DATA_OFF) and related normative work (PS_DATA_OFF) | - | - | {Krisztian} | - | - |
- | - | - | Architectural Requirements, update of existing key issues, new key issues | - | - | - | - | - |
6.14 | S2-165600 | P-CR | New architecture requirement | Intel, Huawei | FS_PS_DATA_OFF | Noted in parallel session | Noted | |
6.14 | S2-165601 | P-CR | Key issue #4 update | Intel, Huawei | FS_PS_DATA_OFF | Revised in parallel session to S2-165917. | Revised | |
6.14 | S2-165917 | P-CR | Key issue #4 update | Intel, Huawei | - | FS_PS_DATA_OFF | Revision of S2-165601. Agreed in parallel session Block approved | Approved |
6.14 | S2-165639 | P-CR | New key issue - informing OTT about the UE's status | Alibaba | FS_PS_DATA_OFF | Noted in parallel session | Noted | |
- | - | - | Solutions to Key issue 1 | - | - | - | - | - |
6.14 | S2-165514 | P-CR | New Solution 1.5 for Key issue 1 | Ericsson | FS_PS_DATA_OFF | Revised in parallel session to S2-165918. | Revised | |
6.14 | S2-165918 | P-CR | New Solution 1.5 for Key issue 1 | Ericsson | - | FS_PS_DATA_OFF | Revision of S2-165514. Agreed in parallel session Block approved | Approved |
6.14 | S2-165516 | P-CR | Update to Solution 1.4 | Ericsson | FS_PS_DATA_OFF | Revised in parallel session to S2-165919. | Revised | |
6.14 | S2-165919 | P-CR | Update to Solution 1.4 | Ericsson | - | FS_PS_DATA_OFF | Revision of S2-165516. Noted in parallel session | Noted |
6.14 | S2-165813 | P-CR | New solution based on PCO for Key Issue#1 | Nokia, Alcatel-Lucent Shanghai Bell | FS_PS_DATA_OFF | Merged in parallel sessions with S2-165581 into S2-165922 | Merged | |
6.14 | S2-165920 | P-CR | New solution based on PCO for Key Issue#1 | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | WITHDRAWN | Withdrawn |
6.14 | S2-165921 | LS OUT | [DRAFT] LS on PS Data Off | SA WG2 | Rel-14 | FS_PS_DATA_OFF | Created in parallel session. Revised in parallel session to S2-165926. | Revised |
6.14 | S2-165926 | LS OUT | [DRAFT] LS on PS Data Off | SA WG2 | Rel-14 | FS_PS_DATA_OFF | Revision of S2-165921. Revised in parallel session to S2-165933. | Revised |
6.14 | S2-165933 | LS OUT | LS on PS Data Off | SA WG2 | Rel-14 | FS_PS_DATA_OFF | Revision of S2-165926. Agreed in parallel session. Revised to S2-166118. | Revised |
6.14 | S2-166118 | LS OUT | LS on PS Data Off | SA WG2 | Rel-14 | FS_PS_DATA_OFF | Revision of S2-165933. e-mail approved and sent to CT WG1 | Approved |
6.14 | S2-166131 | LS In | LS from CT WG1: Reply LS on PS Data Off | CT WG1 (C1-164562) | Rel-14 | FS_PS_DATA_OFF | Reply from CT WG1 in response to S2-166118. Noted in parallel session | Noted |
6.14 | S2-165581 | P-CR | New solution for key issue #1 | Huawei, HiSilicon, Intel | FS_PS_DATA_OFF | Revised in parallel session to S2-165922. | Revised | |
6.14 | S2-165922 | P-CR | New solution for key issue #1 | Huawei, HiSilicon, Intel, Nokia, Alcatel-Lucent Shanghai Bell, Orange, Deutsche Telekom, Alibaba | - | FS_PS_DATA_OFF | Revision of S2-165581, merging S2-165813. Revised in parallel session to S2-165958. | Revised |
6.14 | S2-165958 | P-CR | New solution for key issue #1 | Huawei, HiSilicon, Intel, Nokia, Alcatel-Lucent Shanghai Bell, Orange, Deutsche Telekom, Alibaba | - | FS_PS_DATA_OFF | Revision of S2-165922. Agreed in parallel session Block approved | Approved |
6.14 | S2-165574 | P-CR | Solution for Key issue 1 - Using USSD/USSI and ADD | BlackBerry UK Ltd | FS_PS_DATA_OFF | Revised in parallel session to S2-165924. | Revised | |
6.14 | S2-165924 | P-CR | Solution for Key issue 1 - Using USSD/USSI and ADD | BlackBerry UK Ltd | - | FS_PS_DATA_OFF | Revision of S2-165574. Revised in parallel session to S2-165959. | Revised |
6.14 | S2-165959 | P-CR | Solution for Key issue 1 - Using USSD/USSI and ADD | BlackBerry UK Ltd | - | FS_PS_DATA_OFF | Revision of S2-165924. Agreed in parallel session Block approved | Approved |
- | - | - | Solutions to Key issue 2 | - | - | - | - | - |
6.14 | S2-165515 | P-CR | New Solution 2.5 for Key issue 2 | Ericsson | FS_PS_DATA_OFF | Revised in parallel session to S2-165925. | Revised | |
6.14 | S2-165925 | P-CR | New Solution 2.5 for Key issue 2 | Ericsson | - | FS_PS_DATA_OFF | Revision of S2-165515. Agreed in parallel session Block approved | Approved |
6.14 | S2-165517 | P-CR | Update to Solution 2.3 | Ericsson | FS_PS_DATA_OFF | Agreed in parallel session Block approved | Approved | |
6.14 | S2-165552 | P-CR | New extendable solutions with no UE modem and no VPLMN impact for early deployment | Nokia, Alcatel-Lucent Shanghai Bell | FS_PS_DATA_OFF | Revised in parallel session to S2-165927. | Revised | |
6.14 | S2-165927 | P-CR | New extendable solutions for early deployments | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165552. Revised in parallel session to S2-165960. | Revised |
6.14 | S2-165960 | P-CR | New extendable solutions with no UE modem and no VPLMN impact for early deployment | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165927. Revised in parallel session to S2-166161. Add the word 'provisioning' after 'UICC'. | Revised |
6.14 | S2-166161 | P-CR | New extendable solutions with no UE modem and no VPLMN impact for early deployment | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165960. Agreed in parallel session Block approved | Approved |
6.14 | S2-165576 | P-CR | Solution for Key issue 2 - Making UE aware of 3GPP PS Data Off exempt services using USSD/USSI | BlackBerry UK Ltd | FS_PS_DATA_OFF | Revised in parallel session to S2-165928. | Revised | |
6.14 | S2-165928 | P-CR | Solution for Key issue 2 - Making UE aware of 3GPP PS Data Off exempt services using USSD/USSI | BlackBerry UK Ltd | - | FS_PS_DATA_OFF | Revision of S2-165576. Revised in parallel session to S2-165961. | Revised |
6.14 | S2-165961 | P-CR | Solution for Key issue 2 - Making UE aware of 3GPP PS Data Off exempt services using USSD/USSI | BlackBerry UK Ltd | - | FS_PS_DATA_OFF | Revision of S2-165928. Revised in parallel session to S2-165965. | Revised |
6.14 | S2-165965 | P-CR | Solution for Key issue 2 - Making UE aware of 3GPP PS Data Off exempt services using USSD/USSI | BlackBerry UK Ltd | - | FS_PS_DATA_OFF | Revision of S2-165961. Agreed in parallel session Block approved | Approved |
6.14 | S2-165602 | P-CR | Update and evaluation for solution #2.2 | Intel, Huawei | FS_PS_DATA_OFF | Revised in parallel session to S2-165929. Remove evaluation | Revised | |
6.14 | S2-165929 | P-CR | Update and evaluation for solution #2.2 | Intel, Huawei | - | FS_PS_DATA_OFF | Revision of S2-165602. Agreed in parallel session Block approved | Approved |
- | - | - | Solutions to Key issue 3 | - | - | - | - | - |
6.14 | S2-165518 | P-CR | Update to Solution 3.4 | Ericsson | FS_PS_DATA_OFF | Revised in parallel session to S2-165930. | Revised | |
6.14 | S2-165930 | P-CR | Update to Solution 3.4 | Ericsson | - | FS_PS_DATA_OFF | Revision of S2-165518. Revised in parallel session to S2-165962. | Revised |
6.14 | S2-165962 | P-CR | Update to Solution 3.4 | Ericsson | - | FS_PS_DATA_OFF | Revision of S2-165930. Agreed in parallel session Block approved | Approved |
6.14 | S2-165815 | P-CR | New KI#3 solution: Solution using HSS knowledge of PS Data Off UE status avoiding VPLMN impacts for early deployments | Nokia, Alcatel-Lucent Shanghai Bell | FS_PS_DATA_OFF | Revised in parallel session to S2-165931. | Revised | |
6.14 | S2-165931 | P-CR | New KI#3 solution: Solution using HSS knowledge of PS Data Off UE status avoiding VPLMN impacts for early deployments | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165815. Agreed in parallel session Block approved | Approved |
6.14 | S2-165816 | P-CR | New KI#3 solution using PCO for carrying PS Data Off UE status avoiding VPLMN impacts for early deployments | Nokia, Alcatel-Lucent Shanghai Bell | FS_PS_DATA_OFF | Revised in parallel session to S2-165932. | Revised | |
6.14 | S2-165932 | P-CR | New KI#3 solution using PCO for carrying PS Data Off UE status avoiding VPLMN impacts for early deployments | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165816. Revised in parallel session to S2-165963. | Revised |
6.14 | S2-165963 | P-CR | New KI#3 solution using PCO for carrying PS Data Off UE status avoiding VPLMN impacts for early deployments | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165932. Revised in parallel session to S2-166162. | Revised |
6.14 | S2-166162 | P-CR | New KI#3 solution using PCO for carrying PS Data Off UE status avoiding VPLMN impacts for early deployments | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165963. Agreed in parallel session Block approved | Approved |
6.14 | S2-165582 | P-CR | Update on solution 3.3 | Huawei, HiSilicon | FS_PS_DATA_OFF | Agreed in parallel session Block approved | Approved | |
6.14 | S2-165603 | P-CR | Update and evaluation for solution #3.2 | Intel, Huawei | FS_PS_DATA_OFF | Revised in parallel session to S2-165948. | Revised | |
6.14 | S2-165948 | P-CR | Update and evaluation for solution #3.2 | Intel, Huawei | - | FS_PS_DATA_OFF | Revision of S2-165603. Agreed in parallel session Block approved | Approved |
- | - | - | Solutions to Key issue 4 | - | - | - | - | - |
6.14 | S2-165577 | P-CR | Key issue 4 solution 4.2 - correction of implementation errors | BlackBerry UK Ltd | FS_PS_DATA_OFF | Agreed in parallel session Block approved | Approved | |
6.14 | S2-165519 | P-CR | Update to Solution 4.4 | Ericsson | FS_PS_DATA_OFF | Revised in parallel session to S2-165949. | Revised | |
6.14 | S2-165949 | P-CR | Update to Solution 4.4 | Ericsson | - | FS_PS_DATA_OFF | Revision of S2-165519. Agreed in parallel session Block approved | Approved |
6.14 | S2-165578 | P-CR | Solution for Key Issue 4 - Control of other SIP based services and non SIP based services | BlackBerry UK Ltd | FS_PS_DATA_OFF | Revised in parallel session to S2-165950. | Revised | |
6.14 | S2-165950 | P-CR | Solution for Key Issue 4 - Control of other SIP based services and non SIP based services | BlackBerry UK Ltd | - | FS_PS_DATA_OFF | Revision of S2-165578. WITHDRAWN (not provided) | Withdrawn |
6.14 | S2-165604 | P-CR | Update on solutions for key issue #4 | Intel, Huawei | FS_PS_DATA_OFF | Noted in parallel session | Noted | |
6.14 | S2-165605 | P-CR | New solution for key issue #4 | Intel, Huawei, China Unicom | FS_PS_DATA_OFF | Noted in parallel session | Noted | |
6.14 | S2-165820 | P-CR | Update to solution 4.4 | ZTE | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165821 | P-CR | Update to solution 4.5 | ZTE | FS_PS_DATA_OFF | Not Handled | Not Handled | |
- | - | - | Evaluations and conclusions | - | - | - | - | - |
6.14 | S2-165500 | DISCUSSION | Comparison and evaluation of Data Off solutions | Nokia | FS_PS_DATA_OFF | Noted in parallel session | Noted | |
6.14 | S2-165501 | P-CR | Data Off evaluation and way forward | Nokia, Alcatel-Lucent Shanghai Bell | FS_PS_DATA_OFF | LATE DOC: Rx: 11/10, 17:15. Revised in parallel session to S2-165951. | Revised | |
6.14 | S2-165951 | P-CR | Data Off evaluation and way forward | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165501. Revised in parallel session to S2-165964. | Revised |
6.14 | S2-165964 | P-CR | Data Off way forward | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165951. Revised in parallel session to S2-166164. | Revised |
6.14 | S2-166164 | P-CR | Data Off evaluation and way forward | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_PS_DATA_OFF | Revision of S2-165964. Agreed in parallel session Block approved | Approved |
6.14 | S2-165669 | P-CR | Evaluation of PS data off solutions | Qualcomm Incorporated | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165520 | P-CR | Evaluation Criteria | Ericsson | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165575 | P-CR | Key Issue 1 - conclusions | BlackBerry UK Ltd | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165607 | P-CR | Overall evaluation for key issue #1 | Intel | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165608 | P-CR | Overall evaluation for key issue #2 | Intel | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165609 | P-CR | Overall evaluation for key issue #3 | Intel | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165610 | P-CR | Overall evaluation for key issue #4 | Intel | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165606 | P-CR | Conclusion for 3GPP PS Data Off | Intel, China Unicom | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165822 | P-CR | Discussion on evaluation criteria for key issue 1 | ZTE | FS_PS_DATA_OFF | Not Handled | Not Handled | |
6.14 | S2-165823 | P-CR | Discussion on USSD-based solution for key issue 1 | ZTE | FS_PS_DATA_OFF | Not Handled | Not Handled | |
- | - | - | Outgoing LS | - | - | - | - | - |
6.14 | S2-165858 | DISCUSSION | DP on Data Off LS to SA WG3 | Deutsche Telekom AG | Rel-14 | FS_PS_DATA_OFF | ||
6.14 | S2-165861 | LS OUT | [DRAFT] LS on PS Data Off function | Deutsche Telekom AG | Rel-14 | FS_PS_DATA_OFF | ||
6.15 | - | - | Study on extended architecture support for Cellular Internet of Things (FS_CIoT_Ext) and related normative work (CIoT_Ext) | - | - | {Puneet} | - | - |
6.15 | S2-165909 | LS In | LS from RAN WG2: LS on mobility enhancements for eNB-IoT | RAN WG2 (R2-167315) | Rel-14 | NB_IOTenh-Core | LATE DOC: Rx 16/10, 11:30. This was postponed to SA WG2 meeting #118. SA WG2 will wait for CT WG1 response on this. | Postponed |
6.15 | S2-166115 | LS In | LS from RAN WG1: LS on collisions between SC-PTM and Paging in NB-IoT | RAN WG1 (R1-1611034) | Rel-14 | NB_IOTenh | LATE DOC: Rx 18/10, 20:20. Not Handled. Postponed to meeting #118. | Postponed |
- | - | - | Key Issue #2 | - | - | - | - | - |
6.15 | S2-165702 | DISCUSSION | Considerations on UE-SCEF reliable communications | Huawei, HiSilicon, Neul Limited | Noted in parallel session | Noted | ||
6.15 | S2-165521 | P-CR | Evaluation & Conclusion Key issue #2 | Ericsson | FS_CIoT_Ext | Opened in parallel session. Revised to S2-166270. | Revised | |
6.15 | S2-166270 | P-CR | Evaluation & Conclusion Key issue #2 | Ericsson | FS_CIoT_Ext | Revision of S2-165521. This was left for e-mail approval. Noted Mike (Convida Wireless) comments and objects to the original version Mike (Convida Wireless) provides rev1 Dario (Huawei) provides rev1_Hua Mike (Convida Wireless) cannot accept rev1_Hua. Comments. Peter (Ericsson) comments Dario (Huawei) comments Mike (Convida Wireless) comments Puneet (Intel) Asks if any rev is acceptable? NOTED | Noted | |
6.15 | S2-165708 | P-CR | Concluding Key Issue 2 | Convida Wireless | CIoT_Ext | Opened in parallel session. This was postponed to the next meeting. | Postponed | |
- | - | - | Key Issue #3 | - | - | - | - | - |
6.15 | S2-165721 | P-CR | Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT - Key issue #3 | Qualcomm Incorporated | CIoT_Ext | Revised in parallel session to S2-165972. | Revised | |
6.15 | S2-165972 | P-CR | Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT - Key issue #3 | Qualcomm Incorporated | - | CIoT_Ext | Revision of S2-165721. Revised in parallel session to S2-166010. | Revised |
6.15 | S2-166010 | P-CR | Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT - Key issue #3 | Qualcomm Incorporated | - | CIoT_Ext | Revision of S2-165972. Agreed in parallel session Block approved | Approved |
6.15 | S2-165973 | LS OUT | [DRAFT] LS on Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT | SA WG2 | - | - | Created in parallel session. Revised in parallel session to S2-166011. | Revised |
6.15 | S2-166011 | LS OUT | [DRAFT] LS on Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT | SA WG2 | - | - | Revision of S2-165973. This was left for e-mail approval. e-mail approved. Revised to remove 'draft' in S2-166285 | Revised |
6.15 | S2-166285 | LS OUT | LS on Handling of UE E-UTRAN capabilities when UE is camping on NB-IoT | SA WG2 | - | - | e-mail revision of S2-166011. Approved | Approved |
6.15 | S2-165893 | P-CR | Aspects of Handling of UE WB-E-UTRAN capabilities when UE is camping on NB-IoT - Key issue #3 | Vodafone | FS_CIoT_Ext | Merged with S2-165972 into S2-165974 Will be merged as part of solution 3 in S2-165972 | Merged | |
- | - | - | Key Issue #4 | - | - | - | - | - |
6.15 | S2-165722 | P-CR | Solution for Reuse of MBMS - Key issue #4 | Qualcomm Incorporated | CIoT_Ext | Revised in parallel session, merging S2-165893, to S2-165974. | Revised | |
6.15 | S2-165974 | P-CR | Solution for Reuse of MBMS - Key issue #4 | Qualcomm Incorporated | - | CIoT_Ext | Revision of S2-165722, merging S2-165893. Agreed in parallel session Block approved | Approved |
6.15 | S2-165703 | P-CR | Solution on coverage enhancement for multicast | Huawei, HiSilicon | CIoT_Ext | Noted in parallel session SA WG2 will wait for RAN WG2 to progress the work and if SA WG2 needs to do anything it will be triggered by RAN WG2. | Noted | |
6.15 | S2-165709 | P-CR | Concluding Key Issue 4 | Convida Wireless | CIoT_Ext | Revised in parallel session to S2-165975. Remove conclusions | Revised | |
6.15 | S2-165975 | P-CR | Concluding Key Issue 4 | Convida Wireless | - | CIoT_Ext | Revision of S2-165709. Agreed in parallel session Block approved | Approved |
- | - | - | Key Issue #5 | - | - | - | - | - |
6.15 | S2-165728 | P-CR | Addition of Impacts and Evaluations for Location Services Solutions | Qualcomm Incorporated | FS_CIoT_Ext | Revised in parallel session to S2-165976. Remove conclusions. | Revised | |
6.15 | S2-165976 | P-CR | Addition of Impacts and Evaluations for Location Services Solutions | Qualcomm Incorporated | - | FS_CIoT_Ext | Revision of S2-165728. Revised in parallel session to S2-166013. | Revised |
6.15 | S2-166013 | P-CR | Addition of Impacts and Evaluations for Location Services Solutions | Qualcomm Incorporated | - | FS_CIoT_Ext | Revision of S2-165976. Revised in parallel session to S2-166200. | Revised |
6.15 | S2-166200 | P-CR | Addition of Impacts and Evaluations for Location Services Solutions | Qualcomm Incorporated | - | FS_CIoT_Ext | Revision of S2-166013. Agreed in parallel session Block approved | Approved |
6.15 | S2-165704 | P-CR | Solution on coverage enhancement for location services | Huawei, HiSilicon | CIoT_Ext | Revised in parallel session to S2-165977. | Revised | |
6.15 | S2-165977 | P-CR | Solution on coverage enhancement for location services | Huawei, HiSilicon | - | CIoT_Ext | Revision of S2-165704. Agreed in parallel session Block approved | Approved |
6.15 | S2-165864 | P-CR | Evaluation & Conclusion Key issue #5 | Ericsson LM | FS_CIoT_Ext | LATE DOC: WITHDRAWN (not provided) | Withdrawn | |
- | - | - | Key Issue #6 | - | - | - | - | - |
6.15 | S2-165705 | P-CR | Update to Solution 14 for Key Issue 6 (Inter-UE QoS) - Option 1 | Huawei, HiSilicon | CIoT_Ext | Revised in parallel session to S2-165978. | Revised | |
6.15 | S2-165978 | P-CR | Update to Solution 14 for Key Issue 6 (Inter-UE QoS) - Option 1 | Huawei, HiSilicon | - | CIoT_Ext | Revision of S2-165705. Revised in parallel session to S2-166014. | Revised |
6.15 | S2-166014 | P-CR | Update to Solution 14 for Key Issue 6 (Inter-UE QoS) - Option 1 | Huawei, HiSilicon | - | CIoT_Ext | Revision of S2-165978. Agreed in parallel session Block approved | Approved |
6.15 | S2-165706 | P-CR | Update to Solution 14 for Key Issue 6 (Inter-UE QoS) - Option 2 | Huawei, HiSilicon | CIoT_Ext | Noted in parallel session | Noted | |
6.15 | S2-165689 | P-CR | Input to evaluation and conclusion on sol 15 for KI 6 | Ericsson | FS_NextGen | Revised in parallel session to S2-165981. | Revised | |
6.15 | S2-165981 | P-CR | Input to evaluation and conclusion on sol 15 for KI 6 | Ericsson | - | FS_NextGen | Revision of S2-165689. Revised in parallel session to S2-166015. | Revised |
6.15 | S2-166015 | P-CR | Input to evaluation and conclusion on sol 15 for KI 6 | Ericsson | - | FS_NextGen | Revision of S2-165981. Agreed in parallel session Block approved | Approved |
6.15 | S2-165755 | P-CR | Solution evaluation and conclusion for Key issue #6 - 'Inter UE QoS for NB-IoT Control Plane Optimisation'. | Qualcomm Incorporated | FS_CIoT_Ext | Opened in parallel session. Noted in parallel session | Noted | |
6.15 | S2-165885 | P-CR | Solution 15 as Conclusion on key Issue#6 | Vodafone | CIoT_Ext | Revised in parallel session to S2-166016. | Revised | |
6.15 | S2-166016 | P-CR | Solution 15 as Conclusion on key Issue#6 | Vodafone | - | CIoT_Ext | Revision of S2-165885. Agreed in parallel session Block approved | Approved |
6.15 | S2-165905 | LS In | LS from RAN WG2: Reply LS on overload control for CP CIoT EPS optimization | RAN WG2 (R2-167290) | Rel-14 | FS_CIoT_Ext | LATE DOC: Rx 16/10, 11:30. Not Handled. Postponed to meeting #118 | Postponed |
6.15 | S2-166057 | LS In | LS from RAN WG3: Reply LS on overload control for CP CIoT EPS optimization | RAN WG3 (R3-162613) | Rel-14 | FS_CIoT_Ext | Response drafted in S2-165982 (withdrawn). Postponed to meeting #118 | Postponed |
6.15 | S2-165982 | LS OUT | Reply LS to RAN WG2 and RAN WG3 on overload control for CP CIoT EPS optimization | SA WG2 | - | - | Created in parallel session. Response to S2-166057. WITHDRAWN | Withdrawn |
- | - | - | Key Issue #7 | - | - | - | - | - |
6.15 | S2-165567 | P-CR | CN Overload Control for Control Plane Only PDN Connection | Intel | FS_CIoT_Ext | Merged in parallel session with S2-166180 into S2-166201 | Merged | |
6.15 | S2-165983 | P-CR | CN Overload Control for Control Plane Only PDN Connection | Intel | - | FS_CIoT_Ext | Revision of S2-165567. WITHDRAWN | Withdrawn |
6.15 | S2-165729 | P-CR | Clarifications on UE/MME behaviour for CN Overload Control for CP Optimization | Qualcomm Incorporated | FS_CIoT_Ext | Revised in parallel session to S2-165984. | Revised | |
6.15 | S2-165984 | P-CR | Clarifications on UE/MME behaviour for CN Overload Control for CP Optimization | Qualcomm Incorporated | - | FS_CIoT_Ext | Revision of S2-165729. Revised in parallel session to S2-166180. | Revised |
6.15 | S2-166180 | P-CR | Clarifications on UE/MME behaviour for CN Overload Control for CP Optimization | Qualcomm Incorporated, Intel | - | FS_CIoT_Ext | Revision of S2-165984. Revised in parallel session, merging S2-165567, to S2-166201. | Revised |
6.15 | S2-166201 | P-CR | Clarifications on UE/MME behaviour for CN Overload Control for CP Optimization | Qualcomm Incorporated, Intel | - | FS_CIoT_Ext | Revision of S2-166180, merging S2-165567. Agreed in parallel session Block approved | Approved |
6.15 | S2-165723 | P-CR | Backward compatibility in CN Overload Control for CP Optimization | Qualcomm Incorporated | FS_CIoT_Ext | Agreed in parallel session Block approved | Approved | |
6.15 | S2-165860 | P-CR | Control Plane back-off timer solutions | Nokia, Alcatel-Lucent Shanghai Bell | FS_CIoT_Ext | Noted in parallel session | Noted | |
6.15 | S2-165550 | P-CR | CIoT_Correction to KI7 solution 9 | NEC | FS_CIoT_Ext | Revised in parallel session to S2-166012. Offline discussion on changes needed | Revised | |
6.15 | S2-166012 | P-CR | CIoT_Correction to KI7 solution 9 | NEC | - | FS_CIoT_Ext | Revision of S2-165550. Revised in parallel session to S2-166181. | Revised |
6.15 | S2-166181 | P-CR | CIoT_Correction to KI7 solution 9 | NEC | - | FS_CIoT_Ext | Revision of S2-166012. Agreed in parallel session Block approved | Approved |
6.15 | S2-165524 | P-CR | Conclusion solution 9 - Overload Start | Ericsson | FS_CIoT_Ext | Revised in parallel session to S2-165985. | Revised | |
6.15 | S2-165985 | P-CR | Conclusion solution 9 - Overload Start | Ericsson | - | FS_CIoT_Ext | Revision of S2-165524. Revised in parallel session to S2-166199. | Revised |
6.15 | S2-166199 | P-CR | Conclusion solution 9 - Overload Start | Ericsson | - | FS_CIoT_Ext | Revision of S2-165985. Agreed in parallel session Block approved | Approved |
- | - | - | Normative work for Key Issue #1 | - | - | - | - | - |
6.15 | S2-165907 | LS In | LS from RAN WG2: Response LS on Enhanced Coverage authorization impact on cell and PLMN selection procedures | RAN WG2 (R2-167294) | Rel-14 | FS_CIoT_Ext | LATE DOC: Rx 16/10, 11:30. Response drafted in S2-165986. Final response in S2-166286 | Replied to OPEN |
6.15 | S2-166148 | LS In | LS from CT WG1: LS on Enhanced Coverage authorization impact on cell and PLMN selection procedures | CT WG1 (C1-164700) | Rel-14 | CIOT-CT | LATE DOC: Rx 20/10, 11:20. Response drafted in S2-165986. Final response in S2-166286 | Replied to |
6.15 | S2-165986 | LS OUT | [DRAFT] Response LS on Enhanced Coverage authorization impact on cell and PLMN selection procedures | SA WG2 | - | - | Created in parallel session. Response to S2-165907 and S2-166148. This was left for e-mail approval. Revision 8 approved. Revised to S2-166286. Guillaume (MediaTek) provides rev1 Guillaume (MediaTek) provides rev2 Miguel (Qualcomm) OK with rev2 Chris (Vodafone) provides rev3 Haris (Qualcomm) provides rev4 Guillaume (MediaTek) provides rev4 Haris (Qualcomm) renames Guillaume's rev4 to rev5 Karl-Heinz (DT) comments Antoine (Orange) provides rev6 Puneet (Intel) provides rev6 Puneet (Intel) provides rev7 Haris (Qualcomm) provides rev8 Miguel (Qualcomm) provides rev9 Puneet (Intel) comments Miguel (Qualcomm) OK with reverting to rev8 Puneet (Intel) prefers rev8 Guillaume (MediaTek) OK with rev8 S2 165986 rev8 APPROVED | Revised |
6.15 | S2-166286 | LS OUT | Response LS on Enhanced Coverage authorization impact on cell and PLMN selection procedures | SA WG2 | - | - | Response to S2-165907 and S2-166148. e-mail revision 8 of S2-165986. Approved | Approved |
6.15 | S2-165568 | CR | 23.401 CR3135: Authorization of use of Coverage Enhancement | Intel | Rel-14 | CIoT_Ext | Revised in parallel session to S2-165987. | Revised |
6.15 | S2-165987 | CR | 23.401 CR3135R1: Authorization of use of Coverage Enhancement | Intel | Rel-14 | CIoT_Ext | Revision of S2-165568. Postponed | Postponed |
6.15 | S2-165741 | CR | 23.060 CR2015: Authorization of use of Coverage Enhancement | Intel | Rel-14 | CIoT_Ext | Wrong TS number on CR: Should be 23.060! Revised in parallel session to S2-165988. | Revised |
6.15 | S2-165988 | CR | 23.060 CR2015R1: Authorization of use of Coverage Enhancement | Intel, Orange | Rel-14 | CIoT_Ext | Revision of S2-165741. Postponed | Postponed |
6.15 | S2-165571 | CR | 23.682 CR0235: Support of Enhanced Coverage Authorization Control via SCEF | Intel | Rel-14 | CIoT_Ext | Revised in parallel session to S2-165989. | Revised |
6.15 | S2-165989 | CR | 23.682 CR0235R1: Support of Enhanced Coverage Authorization Control via SCEF | Intel | Rel-14 | CIoT_Ext | Revision of S2-165571. Postponed | Postponed |
- | - | - | Normative work for Key Issue #2 | - | - | - | - | - |
6.15 | S2-165522 | CR | 23.401 CR3131: Reliable UE delivery based on hop by hop ack (5c) | Ericsson | Rel-14 | CIoT_Ext | Revised in parallel session to S2-165992. | Revised |
6.15 | S2-165992 | CR | 23.401 CR3131R1: Reliable UE delivery based on hop by hop ack (5c) | Ericsson | Rel-14 | CIoT_Ext | Revision of S2-165522. Postponed | Postponed |
6.15 | S2-165523 | CR | 23.682 CR0234: Reliable UE delivery based on hop by hop ack (5c) | Ericsson | Rel-14 | CIoT_Ext | Revised in parallel session to S2-165993. | Revised |
6.15 | S2-165993 | CR | 23.682 CR0234R1: Reliable UE delivery based on hop by hop ack (5c) | Ericsson | Rel-14 | CIoT_Ext | Revision of S2-165523. Postponed | Postponed |
6.15 | S2-165710 | CR | 23.682 CR0238: CIoT Data Delivery Service | Convida Wireless | Rel-14 | CIoT | Revised in parallel session to S2-165994. | Revised |
6.15 | S2-165994 | CR | 23.682 CR0238R1: CIoT Data Delivery Service | Convida Wireless | Rel-14 | CIoT | Revision of S2-165710. Postponed | Postponed |
- | - | - | Normative work for Key Issue #6 | - | - | - | - | - |
6.15 | S2-165891 | CR | 23.401 CR3092R1: Inter UE QoS for NB-IoT control plane CIoT EPS optimisation | Vodafone | Rel-14 | CIoT_Ext | CR needs to be re-written to version 14.1.0. Not Handled | - |
- | - | - | Normative work for Key Issue #7 | - | - | - | - | - |
6.15 | S2-165525 | CR | 23.401 CR3132: Overload Start message for control plane data only | Ericsson | Rel-14 | CIoT_Ext | Merged in parallel session with S2-165549 into S2-165991. | Merged |
6.15 | S2-165549 | CR | 23.401 CR3134: CIoT_KI7_sol9 - Overload Start for control plane data | NEC | Rel-14 | CIoT_Ext | Revised in parallel session, merging S2-165549, to S2-165991. | Revised |
6.15 | S2-165991 | CR | 23.401 CR3134R1: CIoT_KI7_sol9 - Overload Start for control plane data | NEC | Rel-14 | CIoT_Ext | Revision of S2-165549, merging S2-165525. Noted in parallel session | Noted |
6.15 | S2-165548 | CR | 23.401 CR3133: CIoT_KI7_sol8 - Control Plane data back-off timer | NEC | Rel-14 | CIoT_Ext | Merged in parallel session with S2-165744 into S2-165990. | Merged |
6.15 | S2-165744 | CR | 23.401 CR3143: Control Plane data back-off timer introduction | Qualcomm Incorporated | Rel-14 | CIoT | Revised in parallel session, merging S2-165548, in S2-165990 | Revised |
6.15 | S2-165990 | CR | 23.401 CR3143R1: Control Plane data back-off timer introduction | Qualcomm Incorporated, NEC, Intel, Samsung | Rel-14 | CIoT | Revision of S2-165744, merging S2-165548. Revised in parallel session to S2-166198. | Revised |
6.15 | S2-166198 | CR | 23.401 CR3143R2: Control Plane data back-off timer introduction | Qualcomm Incorporated, NEC, Intel, Samsung | Rel-14 | CIoT | Revision of S2-165990. Agreed in parallel session Block approved | Agreed |
- | - | - | Show of Hands | - | - | - | - | - |
6.15 | S2-166001 | Other | FS_CIoT_Ext: Indicative show of hands | Rapporteur (Intel) | - | FS_CIoT_Ext | Revised in parallel session to S2-166002. | Revised |
6.15 | S2-166002 | Other | FS_CIoT_Ext: Indicative show of hands | Rapporteur (Intel) | - | FS_CIoT_Ext | Revision of S2-166001. Revised in parallel session to S2-166191. | Revised |
6.15 | S2-166191 | Other | FS_CIoT_Ext: Indicative show of hands | Rapporteur (Intel) | - | FS_CIoT_Ext | Revision of S2-166002. Noted in parallel session | Noted |
6.16 | - | - | Group based enhancements in the network capability exposure functions (GENCEF) | - | - | {Puneet} | - | - |
6.16 | S2-165614 | DISCUSSION | Discussion and evaluation on the solution of GENCEF | Huawei, HiSilicon | Rel-14 | GENCEF | Not Handled | Not Handled |
6.16 | S2-165613 | CR | 23.682 CR0236: Using individual SCEF reference ID during the group-based monitoring event configuration procedure | Huawei, HiSilicon | Rel-14 | GENCEF | Not Handled | - |
6.16 | S2-165731 | CR | 23.682 CR0239: Enhancements to monitoring event configuration and reporting procedures for group of UEs | ZTE | Rel-14 | GENCEF | Revised in parallel session to S2-165980. | Revised |
6.16 | S2-165980 | CR | 23.682 CR0239R1: Enhancements to monitoring event configuration and reporting procedures for group of UEs | ZTE | Rel-14 | GENCEF | Revision of S2-165731. Revised in parallel session to S2-166182. | Revised |
6.16 | S2-166182 | CR | 23.682 CR0239R2: Enhancements to monitoring event configuration and reporting procedures for group of UEs | ZTE | Rel-14 | GENCEF | Revision of S2-165980. Revised in parallel session to S2-166192. | Revised |
6.16 | S2-166192 | CR | 23.682 CR0239R3: Enhancements to monitoring event configuration and reporting procedures for group of UEs | ZTE | Rel-14 | GENCEF | Revision of S2-166182. Agreed in parallel session Block approved | Agreed |
6.16 | S2-165734 | CR | 23.682 CR0240: Group monitoring event configuration and reporting for UEs - Solution Option 1A | ZTE | Rel-14 | GENCEF | Not Handled | - |
6.16 | S2-165899 | CR | 23.682 CR0227R3: Group based MONTE Event Configuration via HSS | Samsung | Rel-14 | GENCEF | Revision of S2-165237 (Technically endorsed at S2#116BIS). LATE DOC: Rx 17/10, 09:15. Revised in parallel session to S2-165979. | Revised |
6.16 | S2-165979 | CR | 23.682 CR0227R4: Group based MONTE Event Configuration via HSS | Samsung | Rel-14 | GENCEF | Revision of S2-165899. Revised in parallel session to S2-166183. | Revised |
6.16 | S2-166183 | CR | 23.682 CR0227R5: Group based MONTE Event Configuration via HSS | Samsung | Rel-14 | GENCEF | Revision of S2-165979. Revised in parallel session to S2-166193. | Revised |
6.16 | S2-166193 | CR | 23.682 CR0227R6: Group based MONTE Event Configuration via HSS | Samsung | Rel-14 | GENCEF | Revision of S2-166183. Agreed in parallel session Block approved | Agreed |
6.17 | - | - | Robust Call Setup for VoLTE subscriber in LTE (RobVoLTE) | - | - | {Not_on_agenda} | - | - |
6.18 | - | - | Study on Enhanced Isolated E-UTRAN Operation for Public Safety (FS_IOPS_LB) | - | - | {Krisztian} | - | - |
6.18 | S2-165892 | P-CR | New Key Issue: Transition of a E-UTRAN site between full isolation and limited backhaul | Orange | FS_IOPS_LB | Revised in parallel session to S2-165955. | Revised | |
6.18 | S2-165955 | P-CR | New Key Issue: Transition of a E-UTRAN site between full isolation and limited backhaul | Orange | - | FS_IOPS_LB | Revision of S2-165892. Agreed in parallel session Block approved | Approved |
6.18 | S2-165894 | P-CR | New Key Issue: Admission of a Public Safety UE not known in the E-UTRAN site | Orange | FS_IOPS_LB | Revised in parallel session to S2-165956. | Revised | |
6.18 | S2-165956 | P-CR | Admission of a Public Safety UE not known in the E-UTRAN site | Orange | - | FS_IOPS_LB | Revision of S2-165894. Agreed in parallel session Block approved | Approved |
6.18 | S2-165896 | P-CR | Solution: IOPS network using the backhaul for authentication only | Orange | FS_IOPS_LB | Revised in parallel session to S2-165957. | Revised | |
6.18 | S2-165957 | P-CR | New solution: IOPS network using the backhaul for authentication only | Orange | - | FS_IOPS_LB | Revision of S2-165896. Agreed in parallel session Block approved | Approved |
6.19 | - | - | System Architecture Enhancements to eMBMS for TV Video Service (AE_enTV) and related normative work | - | - | {Not_on_agenda} | - | - |
6.20 | - | - | Non-IP for Cellular Internet of Things for 2G/3G-GPRS (NonIP_GPRS) | - | - | {Not_on_agenda} | - | - |
6.21 | - | - | Study on Complementary Features for Voice services over WLAN (FS_VoWLAN) | - | - | {Krisztian} | - | - |
6.21 | S2-165502 | P-CR | TR 23.751 skeleton | Nokia, Alcatel-Lucent Shanghai Bell | FS_VoWLAN | Agreed in parallel session Block approved | Approved | |
6.21 | S2-165503 | P-CR | TR 23.751 scope | Nokia, Alcatel-Lucent Shanghai Bell | FS_VoWLAN | Agreed in parallel session Block approved | Approved | |
6.21 | S2-165504 | P-CR | New Key Issues on QoS differentiation in the user plane | Nokia, Alcatel-Lucent Shanghai Bell | FS_VoWLAN | Revised in parallel session to S2-165952. | Revised | |
6.21 | S2-165952 | P-CR | New Key Issues on QoS differentiation in the user plane | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_VoWLAN | Revision of S2-165504. Revised in parallel session to S2-166026. | Revised |
6.21 | S2-166026 | P-CR | New Key Issues on QoS differentiation in the user plane | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_VoWLAN | Revision of S2-165952. Approved | Approved |
6.21 | S2-165505 | P-CR | New Key Issue on determining QoS for the uplink traffic | Nokia, Alcatel-Lucent Shanghai Bell | FS_VoWLAN | Revised in parallel session to S2-165953. | Revised | |
6.21 | S2-165953 | P-CR | New Key Issue on determining QoS for the uplink traffic | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_VoWLAN | Revision of S2-165505. Revised in parallel session to S2-166027. | Revised |
6.21 | S2-166027 | P-CR | New Key Issue on determining QoS for the uplink traffic | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_VoWLAN | Revision of S2-165953. Approved | Approved |
6.21 | S2-165506 | P-CR | Solution for User Plane QoS differentiation in untrusted WLAN case | Nokia, Alcatel-Lucent Shanghai Bell | FS_VoWLAN | Revised in parallel session to S2-165954. | Revised | |
6.21 | S2-165954 | P-CR | Solution for User Plane QoS differentiation in untrusted WLAN case | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_VoWLAN | Revision of S2-165506. Revised in parallel session to S2-166163. | Revised |
6.21 | S2-166163 | P-CR | Solution for User Plane QoS differentiation in untrusted WLAN case | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_VoWLAN | Revision of S2-165954. Revised in parallel session to S2-166028. | Revised |
6.21 | S2-166028 | P-CR | Solution for User Plane QoS differentiation in untrusted WLAN case | Nokia, Alcatel-Lucent Shanghai Bell | - | FS_VoWLAN | Revision of S2-166163. Approved | Approved |
6.22 | - | - | T-ADS supporting WLAN Access (TADS_WLAN) | - | - | {Not_on_agenda} | - | - |
6.23 | - | - | Enhancement to FMSS (eFMSS) | - | - | {Not_on_agenda} | - | - |
6.24 | - | - | 3GPP Packet Access Maintenance - minor corrections | - | - | {Not_on_agenda} | - | - |
6.25 | - | - | PCC/QoS Maintenance - minor corrections | - | - | {Not_on_agenda} | - | - |
6.26 | - | - | Non-3GPP Access Maintenance - minor corrections | - | - | {Not_on_agenda} | - | - |
6.27 | - | - | IMS-Related Maintenance - minor corrections | - | - | {Not_on_agenda} | - | - |
6.28 | - | - | TEI14 Category B/C - Enhancements and Improvements only (3GPP Packet Access) | - | - | {Not_on_agenda} | - | - |
6.29 | - | - | TEI14 Category B/C - Enhancements and Improvements only (PCC/QoS) | - | - | {Not_on_agenda} | - | - |
6.30 | - | - | TEI14 Category B/C - Enhancements and Improvements only (Non-3GPP Access) | - | - | {Not_on_agenda} | - | - |
6.31 | - | - | TEI14 Category B/C - Enhancements and Improvements only (IMS, IMS-Related, Emergency, Other) | - | - | {Not_on_agenda} | - | - |
7 | - | - | Project Planning and Management | - | - | {Frank} | - | - |
7.1 | - | - | New and Revised Work Items, Cover sheets for completed work items | - | - | {Frank} | - | - |
7.1 | S2-165633 | SID NEW | New SID on enhanced VoLTE performance | Huawei, HiSilicon, China Telecom, Qualcomm Incorporated, China Mobile, China Unicom, T-Mobile USA INC, Telekom Austria AG, Teliasonera, Intel, AT&T, Telecom Italia | Revised to S2-165912. | Revised | ||
7.1 | S2-165912 | SID NEW | New SID on enhanced VoLTE performance | Huawei, HiSilicon, China Telecom, Qualcomm Incorporated, China Mobile, China Unicom, T-Mobile USA INC, Telekom Austria AG, Teliasonera, Intel, AT&T, Telecom Italia | Revision of S2-165633. Approved | Approved | ||
7.1 | S2-165634 | DISCUSSION | Discussion for codec dependent triggering of PS Handover | HUAWEI TECHNOLOGIES CO., LTD | Not Handled | Not Handled | ||
7.1 | S2-165666 | DISCUSSION | On RAN awareness of codec information | Qualcomm Incorporated | Rel-15 | Not Handled | Not Handled | |
7.1 | S2-165673 | SID NEW | Study on Unlicensed spectrum offloading system enhancements | Qualcomm Incorporated, Intel, KDDI | Rel-15 | Revised to S2-165913. | Revised | |
7.1 | S2-165913 | SID NEW | Study on Unlicensed spectrum offloading system enhancements | Qualcomm Incorporated, Intel, KDDI, NEC, Convidia Wireless, ATT, Nokia | Rel-15 | Revision of S2-165673. Revised to S2-166211. | Revised | |
7.1 | S2-166211 | SID NEW | Study on Unlicensed spectrum offloading system enhancements | Qualcomm Incorporated, Intel, KDDI, NEC, Convida Wireless, ATT, Nokia | Rel-15 | Revision of S2-165913. Approved | Approved | |
7.1 | S2-165701 | SID NEW | New SID on architecture enhancements to ProSe UE-to-Network Relay for Wearables | Huawei, HiSilicon, LG Electronics, Nokia, Convida Wireless, KPN, Sony | Revised to S2-165914. | Revised | ||
7.1 | S2-165914 | SID NEW | New SID on architecture enhancements to ProSe UE-to-Network Relay | Huawei, HiSilicon, Qualcomm Incorporated, LG Electronics, Nokia, Convida Wireless, KPN, Sony, Intel, China Mobile, AT&T, ITRI, Samsung, InterDigital, China Unicom | Revision of S2-165701. Revised to S2-166212. | Revised | ||
7.1 | S2-166212 | SID NEW | New SID on architecture enhancements to ProSe UE-to-Network Relay | Huawei, HiSilicon, Qualcomm Incorporated, LG Electronics, Nokia, Convida Wireless, KPN, Sony, Intel, China Mobile, AT&T, ITRI, Samsung, InterDigital, China Unicom, Vodafone | Revision of S2-165914. Approved | Approved | ||
7.1 | S2-165544 | DISCUSSION | Proposed Way Forward of NextGen for R15 | China Mobile (Rapporteurs) | Rel-15 | Noted | Noted | |
7.1 | S2-165793 | P-CR | Proposed working strategy to organize NextGen normative work | ZTE | FS_NextGen | LATE DOC: Rx 11/10, 19:40. Noted | Noted | |
7.1 | S2-165545 | WID new | DRAFT Proposed WID for normative work of NextGen in R15 | China Mobile, Nokia | Rel-15 | Not Handled | Not Handled | |
7.1 | S2-165786 | DISCUSSION | Structuring the TS work and phase 2 of the NextGen study | Huawei, HiSilicon | Rel-15 | LATE DOC: Rx 16/10, 22:00. Noted | Noted | |
7.1 | S2-165900 | DISCUSSION | Proposed structure of the Rel-15 NextGen work | Ericsson | LATE REQ. LATE DOC: WITHDRAWN (not provided) | Withdrawn | ||
7.1 | S2-165901 | WID NEW | New WID: Architecture for Next Generation System | Ericsson | LATE REQ. LATE DOC: Rx 17/10, 11:35. Not Handled | Not Handled | ||
7.2 | - | - | Review of the Work Plan | - | - | {Frank} | - | - |
7.3 | - | - | Planning future meetings | - | - | {Frank} | - | - |
7.3 | S2-166025 | Other | Identifying relevant questions for taking conclusions on NG study | SA WG2 Chairman | - | - | This proposal was endorsed. | Endorsed |
7.3 | S2-165838 | OTHER | Scope of SA WG2#118-bis | SA WG2 Chairman | The reduced scope for the next meeting was endorsed. | Endorsed | ||
8 | - | - | AOB | - | - | {Frank} | - | - |
9 | - | - | Close of the Meeting | - | - | {Frank} | - | - |
99 | - | - | Withdrawn and reserved documents | - | - | {Withdrawn} | - | - |
99 | S2-165832 | P-CR | Update of Solution 6.5.5: Application-aware UP Path (Re)selection | Huawei, HiSilicon | FS_NextGen | WITHDRAWN | Withdrawn | |
99 | S2-165739 | DISCUSSION | Proposed strategy to organize NextGen normative work | ZTE Corporation | Rel-14 | WITHDRAWN | Withdrawn | |
99 | S2-165551 | P-CR | Proposal of Evaluation Criteria for Solution of Key Issue 1 | KDDI, ZTE, Sprint, InterDigital, LG Electronics, CATT, ETRI, Oracle, Sandvine, Samsung | FS_NextGen | WITHDRAWN | Withdrawn | |
99 | S2-165488 | DISCUSSION | KI#3 - Further considerations on mobility | MediaTek Inc. | Rel-14 | WITHDRAWN | Withdrawn | |
99 | S2-165752 | P-CR | Update of UP function selection in multiple PDU sessions | LG Electronics Inc. | FS_NextGen | WITHDRAWN | Withdrawn | |
99 | S2-165487 | DISCUSSION | KI#18 - Migration Scenarios | MediaTek Inc. | Rel-14 | WITHDRAWN | Withdrawn | |
99 | S2-165812 | P-CR | Clarification for SM Selection by MM | ETRI, ZTE, Samsung | FS_NextGen | WITHDRAWN | Withdrawn | |
99 | S2-165531 | P-CR | Separation of Mobility levels and Mobility restrictions | Ericsson | FS_NextGen | WITHDRAWN | Withdrawn | |
99 | S2-165683 | P-CR | Clarification on NG1 and NAS Termination | Huawei, HiSilicon | FS_NextGen | WITHDRAWN | Withdrawn |
Created: 2016-10-28 09:07     END OF LIST
Total documents: 785