List for Meeting: S2-116 All Sessions

Temporary Documents List - Ordered by Agenda Item

To use hyperlinks, this file must be placed above Folder 'Docs'

CURRENT STATS - OPEN DOCS: Total: 2     CRs: 2     P-CRs: 0     Other: 0

Created: 2016-07-19 13:10     START OF LIST

AI TD# Type Title Source Rel Work Item Comments Result
1 - - Opening of the meeting - - {Frank} - -
1 S2-163725 other Welcome to Vienna The European Friends of 3GPP Noted Noted
2 - - Approval of the agenda - - {Frank} - -
2 S2-163217 Agenda Draft Agenda for SA WG2#116 SA WG2 Chairman Approved Approved
2.1 - - IPR Call and Antitrust Reminder - - {Frank} - -
3 - - Meeting reports - - {Frank} - -
3 S2-163218 REPORT Draft Report of SA WG2 meeting #115 SA WG2 Secretary Approved Approved
4 - - General - - {Frank} - -
4.1 - - Common issues and Incoming LSs - - {Frank} - -
4.1 S2-163268 LS in LS from ETSI NTECH: Liaison Statement to SA WG2 and SA WG5 from ETSI NTECH ETSI NTECH (NTECH(16)15_022 / NTECHAFI(16)15_014) Response drafted in S2-163706. Final response in S2-164274 The main outcome of the study in this report is that it is possible to introduce autonomics (management and control intelligence) in the Core and the Backhaul without impacting the existing 3GPP defined reference points and architecture. Replied to OPEN
4.1 S2-163706 LS OUT Reply LS to ETSI NTECH AFI on Autonomic Networking ORANGE Revised to S2-163730. Revised
4.1 S2-163730 LS OUT Reply LS to ETSI NTECH AFI on Autonomic Networking SA WG2 Revision of S2-163706. Revised to S2-164274. Revised
4.1 S2-164274 LS OUT Reply LS to ETSI NTECH AFI on Autonomic Networking SA WG2 Revision of S2-163730. Approved Approved
4.1 S2-163245 LS In LS from SA WG5: Reply to LS from ETSI NTECH on Autonomic Networking applied to 3GPP Core and Backhaul parts SA WG5 (S5-163233) Noted Noted
5 - - Pre-Rel-14 Essential Corrections - - {Frank} - -
5.1 - - 3GPP Packet Access Maintenance excluding CIOT maintenance - - {Frank} - -
5.1 S2-163228 LS In LS from CT WG1: LS on Target Info for ProSe Group Member Discovery CT WG1 (C1-162915) Rel-13 eProSe-CT Response drafted in S2-163517. Final response in S2-164226 Replied to
5.1 S2-163618 CR 23.303 CR0317: User Info ID's uniqueness for group member discovery Samsung Rel-13 TEI13, eProSe-Ext-SA2 Revised in parallel session to S2-163912. Revised
5.1 S2-163912 CR 23.303 CR0317R1: User Info ID's uniqueness for group member discovery Samsung Rel-13 TEI13, eProSe-Ext-SA2 Revision of S2-163618. Agreed in parallel session Block approved Agreed AGREED
5.1 S2-163517 LS OUT Reply LS on Target Info for ProSe Group Member Discovery Qualcomm Incorporated Rel-13 Response to S2-163228. Revised in parallel session to S2-163913. Revised
5.1 S2-163913 LS OUT Reply LS on Target Info for ProSe Group Member Discovery Qualcomm Incorporated Rel-13 - Revision of S2-163517. Revised in parallel session to S2-164226. Remove 'but other identifiers that can uniquely identify a group at upper layer are also supported' Revised
5.1 S2-164226 LS OUT Reply LS on Target Info for ProSe Group Member Discovery SA WG2 Rel-13 - Revision of S2-163913. Agreed in parallel session Block approved Approved AGREED
5.1 S2-163232 LS In LS from CT WG4: LS on removal of retry-after during monitoring event cancellation CT WG4 (C4-163174) Rel-13 MONTE Noted in parallel session Noted
5.1 S2-163266 CR 23.682 CR0190: Alignment of MONTE Event Suspend / Resume / Cancel procedure with stage 3 Cisco Systems Inc Rel-13 MONTE Agreed in parallel session Block approved Agreed AGREED
5.1 S2-163267 CR 23.682 CR0191: Alignment of MONTE Event Suspend / Resume / Cancel procedure with stage 3 Cisco Systems Inc Rel-14 MONTE Agreed in parallel session Block approved Agreed AGREED
5.1 S2-163236 LS In LS from RAN WG2: LS on RAN WG2 agreements on eDRX Paging Hyper-frame Calculation RAN WG2 (R2-164575) Rel-13 LTE_extDRX-Core Noted in parallel session Noted
5.1 S2-163242 LS In LS from TSG RAN: Reply LS on eDRX Paging Hyper-frame and PTW_Start Calculation TSG RAN (RP-161311) Rel-13 LTE_extDRX-Core Noted in parallel session Noted
5.1 S2-163585 CR 23.682 CR0201: Aligning PTW definition with RAN WG2 Qualcomm Incorporated Rel-13 eDRX Agreed in parallel session Block approved Agreed AGREED
5.1 S2-163586 CR 23.682 CR0202: Aligning PTW definition with RAN WG2 Qualcomm Incorporated Rel-14 eDRX Agreed in parallel session Block approved Agreed AGREED
5.1 S2-163240 LS In LS from RAN WG3: LS on CS/PS coordination in GERAN Shared Networks RAN WG3 (R3-161501) Rel-13 CSPS_Coord-UTRA-Core Noted in parallel session Noted
5.1 S2-163239 LS In LS from RAN WG3: Reply LS on UE context retention at SCTP recovery RAN WG3 (R3-161500) Rel-13 Noted in parallel session Proposed to be noted as CC for SA WG2. Noted
5.1 S2-163263 LS in LS from RAN WG2: LS on eDRX paging timing calculation and security concern RAN WG2 (R2-164582) LTE_extDRX-Core Noted in parallel session Proposed to be noted as CC for SA WG2. Noted
5.1 S2-163360 LS in LS from RAN WG2: LS on Paging window length RAN WG2 (R2-164482) LTE_extDRX-Core, NB_IoT-Core Noted in parallel session Noted
5.1 S2-163523 CR 23.303 CR0316: Clarification on RPAUID Huawei, Hisilicon Rel-13 TEI13, eProSe-Ext-SA2 Noted in parallel session It was agreed to create an Rel-14 version only, which is in S2-163914 Noted
5.1 S2-163914 CR 23.303 CR0319: Clarification on RPAUID Huawei, Hisilicon Rel-14 TEI14, eProSe-Ext-SA2 Created in parallel session. Agreed in parallel session Block approved Agreed AGREED
5.1 S2-163665 CR 23.401 CR3038R1: Operator management of eDRX parameters NTT DOCOMO, KDDI, China Telecom Rel-13 eDRX, TEI13 Revision of S2-162504 from S2#115. Noted in parallel session Agreed to move forward with Rel-14 only Noted
5.1 S2-163668 CR 23.401 CR3088: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei, China Telecom Rel-14 eDRX, TEI13 Revised in parallel session to S2-163915. Revised
5.1 S2-163915 CR 23.401 CR3088R1: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei, China Telecom Rel-14 TEI14, eDRX Revision of S2-163668. Revised in parallel session to S2-164227. Revised
5.1 S2-164227 CR 23.401 CR3088R2: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei, China Telecom Rel-14 TEI14, eDRX Revision of S2-163915. This CR was agreed Agreed
5.1 S2-163666 CR 23.060 CR2005R1: Operator management of eDRX parameters NTT DOCOMO, KDDI Rel-13 eDRX, TEI13 Revision of S2-162505 from S2#115. Noted in parallel session Agreed to move forward with Rel-14 only Noted
5.1 S2-163669 CR 23.060 CR2011: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei Rel-14 eDRX, TEI13 Revised in parallel session to S2-163916. Revised
5.1 S2-163916 CR 23.060 CR2011R1: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei Rel-14 TEI14, eDRX Revision of S2-163669. This CR was agreed Agreed
5.1 S2-163667 CR 23.682 CR0187R1: Operator management of eDRX parameters NTT DOCOMO, KDDI, China Telecom Rel-13 eDRX, TEI13 Revision of S2-162506 from S2#115. Noted in parallel session Agreed to move forward with Rel-14 only Noted
5.1 S2-163670 CR 23.682 CR0205: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei, China Telecom Rel-14 eDRX, TEI13 Revised in parallel session to S2-163917. Revised
5.1 S2-163917 CR 23.682 CR0205R1: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei, China Telecom Rel-14 TEI14, eDRX Revision of S2-163670. This CR was agreed Agreed
5.1 S2-163726 CR 23.060 CR2012: GGSN selection for DECOR at PDP Context Activation NTT DOCOMO, Ericsson Rel-13 TEI13, DECOR LATE REQ. LATE DOC: Rx 07/08, 07:15. Revised in parallel session to S2-163918. Revised
5.1 S2-163918 CR 23.060 CR2012R1: GGSN selection for DECOR at PDP Context Activation NTT DOCOMO, Ericsson Rel-13 TEI13, DECOR Revision of S2-163726. Agreed in parallel session Block approved Agreed AGREED
5.1 S2-163727 CR 23.060 CR2013: GGSN selection for DECOR at PDP Context Activation NTT DOCOMO, Ericsson Rel-14 TEI13, DECOR LATE REQ. LATE DOC: Rx 07/08, 07:15. Revised in parallel session to S2-163919. Revised
5.1 S2-163919 CR 23.060 CR2013R1: GGSN selection for DECOR at PDP Context Activation NTT DOCOMO, Ericsson Rel-14 TEI13, DECOR Revision of S2-163727. Agreed in parallel session Block approved Agreed AGREED
5.1.1 - - 3GPP Packet Access Maintenance on Architecture enhancements for Cellular Internet of Things (CIOT) - - {Puneet} - -
- - - Incoming LSs - - - - -
5.1.1 S2-163223 LS In LS from SA WG3: Reply to: LS on Clarifications on RRC Resume Request SA WG3 (S3-160694) Rel-13 NB_IOT-Core Postponed S2-162735 from S2#115. Noted in parallel session Propose to be noted. Noted
5.1.1 S2-163234 LS In LS from RAN WG2: Reply to: LS on Clarifications on RRC Resume Request RAN WG2 (R2-164414) Rel-13 NB_IOT-Core, TEI13 Noted in parallel session Propose to be noted. Noted
5.1.1 S2-163238 LS In LS from RAN WG3: Response LS on Clarifications on RRC Resume Request RAN WG3 (R3-161426) Rel-13 NB_IOT-Core Noted in parallel session Propose to be noted. Alignment CRs for stage-2 text can be brought at the next meeting. Noted
5.1.1 S2-163229 LS In LS from CT WG1: Reply LS on Active flag handling for Control Plane CIoT Optimization CT WG1 (C1-163115) Rel-13 CIoT-CT Noted in parallel session Noted
5.1.1 S2-163230 LS In LS from CT WG1: Reply LS on Maximum upper layer data packet size for NB-IoT CT WG1 (C1-163141) Rel-13 NB_IOT-Core, CIoT-CT Noted in parallel session For Information. Propose to be noted. Noted
5.1.1 S2-163235 LS In LS from RAN WG2: Response LS on CIoT work progress in RAN WG2 RAN WG2 (R2-164425) Rel-13 TEI13 Noted in parallel session For Information. Propose to be noted. Noted
5.1.1 S2-163237 LS In LS from RAN WG2: Reply LS on NB-IOT NAS retransmission timers RAN WG2 (R2-164578) Rel-13 NB_IOT-Core Postponed to meeting #116BIS Postponed
5.1.1 S2-163243 LS In LS from TSG RAN: LS on Enhanced coverage impacts on NAS timers in eMTC TSG RAN (RP-161312) Rel-13 LTE_MTCe2_L1-Core Postponed to meeting #116BIS Proposed to be noted as CC for SA WG2. Postponed
5.1.1 S2-163559 CR 23.401 CR3069: NAS PDU retransmission strategy for CIoT Optimisation Huawei, HiSilicon Rel-13 CIoT Postponed to meeting #116BIS Related to incoming LS S2-163227. Proposal from CC to postpone the CR to next meeting when CT WG1 has more inputs. Postponed
5.1.1 S2-163560 CR 23.401 CR3070: NAS PDU retransmission strategy for CIoT Optimisation Huawei, HiSilicon Rel-14 CIoT Postponed to meeting #116BIS Related to incoming LS S2-163227 Postponed
5.1.1 S2-163248 LS In LS from SA WG5: LS to CT WG3 for PDP type extension to non-IP PDN type SA WG5 (S5-163274) Rel-13 CIoT-CH Noted in parallel session For Information. Propose to be noted. Noted
5.1.1 S2-163246 LS In LS from SA WG5: LS for enhancements required for charging of PDN connection to SCEF SA WG5 (S5-163259) Rel-13 CIoT-CH Response drafted in S2-163645. Final response in S2-163767 Replied to OPEN
5.1.1 S2-163646 CR 23.682 CR0204: Addition of new parameters to T6a interface Nokia, Alcatel-Lucent Shanghai Bell Rel-13 CIoT Revised in parallel session to S2-163765. Revised
5.1.1 S2-163765 CR 23.682 CR0204R1: Addition of new parameters to T6a interface Nokia, Alcatel-Lucent Shanghai Bell Rel-13 CIoT Revision of S2-163646. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163724 CR 23.682 CR0210: Addition of new parameters to T6a interface Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CIoT LATE REQ. LATE DOC: Rx 06/07, 12:45. Revised in parallel session to S2-163766. Revised
5.1.1 S2-163766 CR 23.682 CR0210R1: Addition of new parameters to T6a interface Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CIoT, NonIP_GPRS Revision of S2-163724. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163645 LS OUT DRAFT reply LS for enhancements required for charging of PDN connection to SCEF Nokia Rel-13 Response to S2-163246. Revised in parallel session to S2-163767. Revised
5.1.1 S2-163767 LS OUT Reply LS for enhancements required for charging of PDN connection to SCEF SA WG2 Rel-13 - Revision of S2-163645. Agreed in parallel session Block approved Approved AGREED
5.1.1 S2-163247 LS In LS from SA WG5: LS to SA WG2 on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose SA WG5 (S5-163271) Rel-13 CIoT-CH Responses drafted in S2-163647 and S2-163719. Final response in S2-163768 Replied to OPEN
5.1.1 S2-163719 LS OUT DRAFT response to SA WG5 'LS on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose' VODAFONE Group Plc Rel-13 Response to S2-163247. Revised in parallel session to S2-163768. Revised
5.1.1 S2-163768 LS OUT Response to SA WG5 'LS on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose' SA WG2 Rel-13 - Revision of S2-163719. Agreed in parallel session Block approved Approved AGREED
5.1.1 S2-163647 LS OUT DRAFT Reply LS for enhancements required for charging of PDN connection to SCEF Nokia Rel-13 Response to S2-163247. Withdrawn in parallel session Draft LS title seems wrong. Withdrawn
- - - Control Plane CIoT EPS optimizations related - - - - -
5.1.1 S2-163468 CR 23.401 CR3057: Clarifying PGW & SCEF role in APN Rate Control Ericsson Rel-13 CIoT Revised in parallel session to S2-163769. Revised
5.1.1 S2-163769 CR 23.401 CR3057R1: Clarifying PGW & SCEF role in APN Rate Control Ericsson Rel-13 CIoT Revision of S2-163468. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163469 CR 23.401 CR3058: Clarifying PGW & SCEF role in APN Rate Control Ericsson Rel-14 CIoT Revised in parallel session to S2-163770. Revised
5.1.1 S2-163770 CR 23.401 CR3058R1: Clarifying PGW & SCEF role in APN Rate Control Ericsson Rel-14 CIoT Revision of S2-163469. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163514 CR 23.401 CR3061: Clarification of new active flag handling for CP CIoT EPS Optimization LG Electronics Rel-13 CIoT Revised in parallel session, merging S2-163459, to S2-163772. Revised
5.1.1 S2-163772 CR 23.401 CR3061R1: Clarification of new active flag handling for CP CIoT EPS Optimization LG Electronics, Telecom Italia, Samsung Rel-13 CIoT Revision of S2-163514, merging S2-163459. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163459 CR 23.401 CR3056: Signalling active flag for Control Plane CIoT EPS optimization Telecom Italia Rel-13 CIoT Merged with S2-163514 into S2-163772 Merge with S2-163514 Merged
5.1.1 S2-163515 CR 23.401 CR3062: Clarification of new active flag handling for CP CIoT EPS Optimization LG Electronics Rel-14 CIoT Revised in parallel session to S2-163773. Revised
5.1.1 S2-163773 CR 23.401 CR3062R1: Clarification of new active flag handling for CP CIoT EPS Optimization LG Electronics, Telecom Italia, Samsung Rel-14 CIoT Revision of S2-163515. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163552 DISCUSSION Discussion on Retrieve of S1-U SGW F-TEID by MME during transfer from CP to UP Huawei, HiSilicon Rel-13 CIoT Revised in parallel session to S2-163758. Revision based on CC discussion. Revised
5.1.1 S2-163758 DISCUSSION Discussion on Retrieve of S1-U SGW F-TEID by MME during transfer from CP to UP Huawei, HiSilicon Rel-13 CIoT Revision of S2-163552. Noted in parallel session Noted
5.1.1 S2-163771 LS OUT [DRAFT] LS on Retrieval of S1-U SGW F-TEID by MME SA WG2 Rel-13 CIoT Created in parallel session. Revised in parallel session to S2-163826. Revised
5.1.1 S2-163826 LS OUT [DRAFT] LS on Retrieval of S1-U SGW F-TEID by MME SA WG2 Rel-13 CIoT Revision of S2-163771. Revised in parallel session to S2-164076. Revised
5.1.1 S2-164076 LS OUT LS on Retrieval of S1-U SGW F-TEID by MME SA WG2 Rel-13 CIoT Revision of S2-163826 Agreed in parallel session. Block approved Approved AGREED
5.1.1 S2-163553 CR 23.401 CR3065: Retrieve of S1-U SGW F-TEID by MME during transfer from CP to UP Huawei, HiSilicon Rel-13 CIoT Not Handled -
5.1.1 S2-163554 CR 23.401 CR3066: Retrieve of S1-U SGW F-TEID by MME during transfer from CP to UP Huawei, HiSilicon Rel-14 CIoT Not Handled -
5.1.1 S2-163568 CR 23.401 CR3075: Changes related to Control Plane to User Plane transition HTC Rel-13 CIoT Noted in parallel session Noted
5.1.1 S2-163604 CR 23.401 CR3079: Handling of transmission of data using control plane during user plane transmission HTC Rel-13 CIoT Noted in parallel session Noted
5.1.1 S2-163569 DISCUSSION Issues related to transmission of exception reporting concurrently with non-exception reporting HTC Rel-13 Noted in parallel session Noted
5.1.1 S2-163570 CR 23.401 CR3076: Handling of simultaneous transfer of exception and non exception reporting HTC Rel-13 CIoT Not Handled -
5.1.1 S2-163634 CR 23.401 CR3084: Release Assistance Information for pair of packets Vodafone Rel-13 CIoT Revised in parallel session to S2-163797. Revised
5.1.1 S2-163797 CR 23.401 CR3084R1: Release Assistance Information for pair of packets Vodafone Rel-13 CIoT Revision of S2-163634. Revised in parallel session to S2-163827. Revised
5.1.1 S2-163827 CR 23.401 CR3084R2: Release Assistance Information for pair of packets Vodafone Rel-13 CIoT Revision of S2-163797. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163635 CR 23.401 CR3085: Release Assistance Information for pair of packets Vodafone Rel-14 CIoT Revised in parallel session to S2-163798. Revised
5.1.1 S2-163798 CR 23.401 CR3085R1: Release Assistance Information for pair of packets Vodafone Rel-14 CIoT Revision of S2-163635. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163563 CR 23.401 CR3073: Priority handling of NAS signalling and CIoT data over NAS Huawei, HiSilicon Rel-13 CIoT Revised in parallel session to S2-163791. Revised
5.1.1 S2-163791 CR 23.401 CR3073R1: Priority handling of NAS signalling and CIoT data over NAS Huawei, HiSilicon Rel-13 CIoT Revision of S2-163563. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163564 CR 23.401 CR3074: Priority handling of NAS signalling and CIoT data over NAS Huawei, HiSilicon Rel-14 CIoT Revised in parallel session to S2-163792. Revised
5.1.1 S2-163792 CR 23.401 CR3074R1: Priority handling of NAS signalling and CIoT data over NAS Huawei, HiSilicon Rel-14 CIoT Revision of S2-163564. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163673 CR 23.401 CR3089: Clarification on S1-U establishment during CP optimization is in use Samsung, Qualcomm Incorporated, Intel Rel-13 CIoT Revised in parallel session to S2-163793. Revised
5.1.1 S2-163793 CR 23.401 CR3089R1: Clarification on S1-U establishment during CP optimization is in use Samsung, Qualcomm Incorporated, Intel Rel-13 CIoT Revision of S2-163673. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163676 CR 23.401 CR3091: Clarification on S1-U establishment during CP optimization is in use Samsung, Qualcomm Incorporated, Intel Rel-14 CIoT Revised in parallel session to S2-163794. Revised
5.1.1 S2-163794 CR 23.401 CR3091R1: Clarification on S1-U establishment during CP optimization is in use Samsung, Qualcomm Incorporated, Intel Rel-14 CIoT Revision of S2-163676 Agreed in parallel session Block approved Agreed AGREED
- - - General - - - - -
5.1.1 S2-163561 CR 23.401 CR3071: Voice related indication for NB-IoT Huawei, HiSilicon Rel-13 CIoT Revised in parallel session to S2-163795. Revised
5.1.1 S2-163795 CR 23.401 CR3071R1: Voice related indication for NB-IoT Huawei, HiSilicon Rel-13 CIoT Revision of S2-163561. Revised in parallel session to S2-163828. Revised
5.1.1 S2-163828 CR 23.401 CR3071R2: Voice related indication for NB-IoT Huawei, HiSilicon Rel-13 CIoT Revision of S2-163795. This CR was agreed Agreed
5.1.1 S2-163562 CR 23.401 CR3072: Voice related indication for NB-IoT Huawei, HiSilicon Rel-14 CIoT Revised in parallel session to S2-163796. Revised
5.1.1 S2-163796 CR 23.401 CR3072R1: Voice related indication for NB-IoT Huawei, HiSilicon Rel-14 CIoT Revision of S2-163562. This CR was agreed Agreed
5.1.1 S2-163615 CR 23.401 CR3080: Selection of MME for coverage enhancement ORANGE, Intel Rel-13 CIoT Revised in parallel session to S2-163816. Revised
5.1.1 S2-163816 CR 23.401 CR3080R1: Selection of MME for coverage enhancement ORANGE, Intel, KDDI Rel-13 CIoT Revision of S2-163615. Noted in parallel session Noted
5.1.1 S2-163616 CR 23.401 CR3081: Selection of MME for coverage enhancement ORANGE, Intel Rel-14 CIoT Revised in parallel session to S2-163817. Revised
5.1.1 S2-163817 CR 23.401 CR3081R1: Selection of MME for coverage enhancement ORANGE, Intel Rel-14 CIoT Revision of S2-163616. This was withdrawn. Withdrawn
5.1.1 S2-163630 CR 23.401 CR3082: Transfer of cell/TAC's RAT type to MME Vodafone Rel-13 CIoT Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163631 CR 23.401 CR3083: Transfer of cell/TAC's RAT type to MME Vodafone Rel-14 CIoT Agreed in parallel session Block approved Agreed AGREED
- - - NIDD related - - - - -
5.1.1 S2-163499 CR 23.682 CR0197: Corrections for Non-IP Data Delivery Procedures ZTE Rel-13 CIoT Revised in parallel session to S2-163818. Revised
5.1.1 S2-163818 CR 23.682 CR0197R1: Corrections for Non-IP Data Delivery Procedures ZTE Rel-13 CIoT Revision of S2-163499. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163502 CR 23.682 CR0198: Corrections for Non-IP Data Delivery Procedures ZTE Rel-14 CIoT Revised in parallel session to S2-163819. Revised
5.1.1 S2-163819 CR 23.682 CR0198R1: Corrections for Non-IP Data Delivery Procedures ZTE Rel-14 CIoT Revision of S2-163502 Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163636 CR 23.682 CR0203: Alignment of NIDD procedures at T6a interface with 29.128 Nokia, Alcatel-Lucent Shanghai Bell Rel-13 CIoT Revised in parallel session to S2-163820. Revised
5.1.1 S2-163820 CR 23.682 CR0203R1: Alignment of NIDD procedures at T6a interface with 29.128 Nokia, Alcatel-Lucent Shanghai Bell Rel-13 CIoT Revision of S2-163636 Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163722 CR 23.682 CR0208: Alignment of NIDD procedures at T6a interface with 29.128 Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CIoT LATE REQ. LATE DOC: Rx 06/07, 12:45. Revised in parallel session to S2-163821. Revised
5.1.1 S2-163821 CR 23.682 CR0208R1: Alignment of NIDD procedures at T6a interface with 29.128 Nokia, Alcatel-Lucent Shanghai Bell Rel-14 CIoT Revision of S2-163722. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163637 CR 23.682 CR0188R3: Removal of payload from NIDD Submit Response Nokia, Alcatel-Lucent Shanghai Bell, AT&T, Verizon UK Ltd, Convida Wireless Rel-13 CIoT Revised in parallel session to S2-163822. Revised
5.1.1 S2-163822 CR 23.682 CR0188R4: Removal of payload from NIDD Submit Response Nokia, Alcatel-Lucent Shanghai Bell, AT&T, Verizon UK Ltd, Convida Wireless Rel-13 CIoT Revision of S2-163637. Revised in parallel session to S2-164074. Revised
5.1.1 S2-164074 CR 23.682 CR0188R5: Removal of payload from NIDD Submit Response Nokia, Alcatel-Lucent Shanghai Bell, AT&T, Verizon UK Ltd, Convida Wireless Rel-13 CIoT Revision of S2-163822. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-164072 LS OUT LS on MT NIDD procedures at the T6a/T6b interface SA WG2 - CIoT Revised in parallel session to S2-164073. Revised
5.1.1 S2-164073 LS OUT LS on MT NIDD procedures at the T6a/T6b interface SA WG2 - CIoT Revision of S2-164072. Agreed in parallel session Block approved Approved AGREED
5.1.1 S2-163723 CR 23.682 CR0209: Removal of payload from NIDD Submit Response Nokia, Alcatel-Lucent Shanghai Bell, AT&T, Verizon UK Ltd, Convida Wireless Rel-14 CIoT LATE REQ. LATE DOC: Rx 06/07, 12:45. Revised in parallel session to S2-163823. Revised
5.1.1 S2-163823 CR 23.682 CR0209R1: Removal of payload from NIDD Submit Response Nokia, Alcatel-Lucent Shanghai Bell, AT&T, Verizon UK Ltd, Convida Wireless, Ericsson Rel-14 CIoT, NonIP_GPRS Revision of S2-163723. Revised in parallel session to S2-164075. Revised
5.1.1 S2-164075 CR 23.682 CR0209R2: Removal of payload from NIDD Submit Response Nokia, Alcatel-Lucent Shanghai Bell, AT&T, Verizon UK Ltd, Convida Wireless, Ericsson Rel-14 CIoT, NonIP_GPRS Revision of S2-163823. Revised in parallel session to S2-164084. Revised
5.1.1 S2-164084 CR 23.682 CR0209R3: Removal of payload from NIDD Submit Response Nokia, Alcatel-Lucent Shanghai Bell, AT&T, Verizon UK Ltd, Convida Wireless, Ericsson Rel-14 CIoT, NonIP_GPRS Revision of S2-164075. Agreed in parallel session Block approved Agreed AGREED
- - - eDRX for NB-IoT - - - - -
5.1.1 S2-163555 CR 23.401 CR3067: Updates of eDRX for NB-IoT Huawei, HiSilicon Rel-13 CIoT Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163556 CR 23.401 CR3068: Updates of eDRX for NB-IoT Huawei, HiSilicon Rel-14 CIoT Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163557 CR 23.682 CR0199: Updates of eDRX for NB-IoT Huawei, HiSilicon Rel-13 CIoT Revised in parallel session to S2-164088. Revised
5.1.1 S2-164088 CR 23.682 CR0199R1: Updates of eDRX for NB-IoT Huawei, HiSilicon Rel-13 CIoT Revision of S2-163557. Agreed in parallel session Block approved Agreed AGREED
5.1.1 S2-163558 CR 23.682 CR0200: Updates of eDRX for NB-IoT Huawei, HiSilicon Rel-14 CIoT Revised in parallel session to S2-163825. Revised
5.1.1 S2-163825 CR 23.682 CR0200R1: Updates of eDRX for NB-IoT Huawei, HiSilicon Rel-14 CIoT Revision of S2-163558. Agreed in parallel session Block approved Agreed AGREED
- - - Late/Withdrawn - - - - -
5.2 - - QoS and PCC Maintenance - - {Shabnam} - -
5.2 S2-163231 LS In LS from CT WG3: LS on Transfer of traffic steering policy control information for TSSF CT WG3 (C3-161309) Rel-13 FMSS-CT Postponed in parallel session. Postponed, SA WG2 technical discussion needed. Possible SA WG2 CR/DP to address SA WG2 limitation. Not a consensus yet. Postponed
5.2 S2-163335 CR 23.203 CR1039: Setting the RR identifier alignment with stage 3 Ericsson Rel-14 NBIFOM Revised in parallel session to S2-164054. Revised
5.2 S2-164054 CR 23.203 CR1039R1: Setting the RR identifier alignment with stage 3 Ericsson Rel-14 NBIFOM Revision of S2-163335. This CR was agreed Agreed
5.2 S2-163336 CR 23.203 CR1040: Setting the RR identifier alignment with stage 3 Ericsson Rel-13 NBIFOM Revised in parallel session to S2-164053. Revised
5.2 S2-164053 CR 23.203 CR1040R1: Setting the RR identifier alignment with stage 3 Ericsson Rel-13 NBIFOM Revision of S2-163336. Revised in parallel session to S2-164232. Revised
5.2 S2-164232 CR 23.203 CR1040R2: Setting the RR identifier alignment with stage 3 Ericsson Rel-13 NBIFOM Revision of S2-164053. Agreed in parallel session Block approved Agreed AGREED
5.2 S2-163478 CR 23.203 CR1044: Details of PCEF Routing Rule operations Huawei, HiSilicon Rel-13 NBIFOM Revised in parallel session to S2-164050. Revised
5.2 S2-164050 CR 23.203 CR1044R1: Details of PCEF Routing Rule operations Huawei, HiSilicon Rel-13 NBIFOM Revision of S2-163478. Revised in parallel session to S2-164055. Revised
5.2 S2-164055 CR 23.203 CR1044R2: Details of PCEF Routing Rule operations Huawei, HiSilicon Rel-13 NBIFOM Revision of S2-164050. Agreed in parallel session Block approved Agreed AGREED
5.2 S2-163479 CR 23.203 CR1045: Details of PCEF Routing Rule operations Huawei, HiSilicon Rel-14 NBIFOM Revised in parallel session to S2-164056. Revised
5.2 S2-164056 CR 23.203 CR1045R1: Details of PCEF Routing Rule operations Huawei, HiSilicon Rel-14 NBIFOM Revision of S2-163479. Agreed in parallel session Block approved Agreed AGREED
5.2 S2-163591 DISCUSSION Way forward on Priority Sharing feature Motorola Solutions Rel-13 Noted in parallel session Noted
5.3 - - Non-3GPP Access Maintenance - - {Krisztian} - -
- - - I-WLAN - - - - -
5.3 S2-163661 LS In LS from TSG SA: LS on I-WLAN handling and specification withdrawal TSG SA (SP-160508) Postponed to meeting SA WG2#116BIS Postponed
5.3 S2-163464 CR 23.234 CR0175: Creating stub version of TS 23.234 Qualcomm Incorporated Rel-13 TEI13 Revised in parallel session to S2-163855. Revised
5.3 S2-163855 CR 23.234 CR0175R1: Creating stub version of TS 23.234 Qualcomm Incorporated Rel-13 TEI13 Revision of S2-163464. Agreed in parallel session Block approved Agreed AGREED
- - - NBIFOM - - - - -
5.3 S2-163219 LS In LS from CT WG4: LS on Network-initiated release of NB-IFOM PDN connections CT WG4 (C4-162255) Rel-13 NB IFOM Postponed S2-162279 from S2#115. Response drafted in S2-163649. Postponed to meeting SA WG2#116BIS Postponed
5.3 S2-163385 CR 23.402 CR2959: Network-initiated release of NB-IFOM PDN connections Qualcomm Incorporated Rel-13 NBIFOM This was withdrawn in parallel session. Withdrawn
5.3 S2-163375 CR 23.161 CR0022: Clarifications and Corrections for NBIFOM Huawei, HiSilicon Rel-13 NBIFOM Revised in parallel session to S2-163856. Revised
5.3 S2-163856 CR 23.161 CR0022R1: Clarifications and Corrections for NBIFOM Huawei, HiSilicon Rel-13 NBIFOM Revision of S2-163375. Revised in parallel session to S2-164248. Revised
5.3 S2-164248 CR 23.161 CR0022R2: Clarifications and Corrections for NBIFOM Huawei, HiSilicon Rel-13 NBIFOM Revision of S2-163856. Agreed in parallel session Block approved Agreed AGREED
5.3 S2-163650 CR 23.401 CR3086: Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 TEI13 LATE DOC: Rx 07/07, 19:15. Revised in parallel session to S2-163853. Revised
5.3 S2-163853 CR 23.401 CR3086R1: Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 TEI13 Revision of S2-163650. This was withdrawn. Withdrawn
5.3 S2-163852 CR 23.161 CR0023: Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 TEI13, NBIFOM Created in parallel session. Revised in parallel session to S2-164120. Revised
5.3 S2-164120 CR 23.161 CR0023R1: Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 TEI13, NBIFOM Revision of S2-163852. Revised in parallel session to S2-164228. Correct rev number, more updates may be needed in future Revised
5.3 S2-164228 CR 23.161 CR0023R2: Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 TEI13, NBIFOM Revision of S2-164120. Agreed in parallel session Block approved Agreed AGREED
5.3 S2-163651 CR 23.402 CR2963: Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 TEI13 LATE DOC: Rx 07/07, 19:15. Reviewed in parallel session. Noted in parallel session Noted
5.3 S2-163652 CR 23.060 CR2010: Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 TEI13 LATE DOC: Rx 07/07, 19:15. Reviewed in parallel session. Noted in parallel session Noted
5.3 S2-163649 LS OUT [DRAFT] LS Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 Response to S2-163219. LATE DOC: Rx 07/07, 19:15. Revised in parallel session to S2-163854. Revised
5.3 S2-163854 LS OUT [DRAFT] LS Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 - Revision of S2-163649. Revised in parallel session to S2-164121. Revised
5.3 S2-164121 LS OUT [DRAFT] LS Network-initiated release of NB-IFOM PDN connections Nokia, Alcatel-Lucent Shanghai Bell Rel-13 - Revision of S2-163854. This was withdrawn. Withdrawn
5.4 - - IMS and IMS-Related Maintenance - - {Shabnam} - -
5.4 S2-163279 CR 23.292 CR0230: Correcting the Figure Label for Communication Completion Originated at Served User call flow Ericsson Rel-13 TEI13 Agreed in parallel session Block approved Agreed AGREED
5.4 S2-163280 DISCUSSION LI Requirements for non-3GPP Access Ericsson Rel-13 TEI13, SEW1 Noted in parallel session Noted
5.4 S2-163281 CR 23.228 CR1150: NPLI for untrusted WLAN access in IMS for LI purposes Ericsson Rel-13 TEI13, SEW1 Revised in parallel session to S2-164043. Revised
5.4 S2-164043 CR 23.228 CR1150R1: NPLI for untrusted WLAN access in IMS for LI purposes Ericsson Rel-13 TEI13, SEW1 Revision of S2-163281. Revised in parallel session to S2-164057. Revised
5.4 S2-164057 CR 23.228 CR1150R2: NPLI for untrusted WLAN access in IMS for LI purposes Ericsson Rel-13 TEI13, SEW1 Revision of S2-164043. Agreed in parallel session Block approved Agreed AGREED
5.4 S2-163282 CR 23.228 CR1151: NPLI for untrusted WLAN access in IMS for LI purposes Ericsson Rel-14 TEI13, SEW1 Revised in parallel session to S2-164044. Revised
5.4 S2-164044 CR 23.228 CR1151R1: NPLI for untrusted WLAN access in IMS for LI purposes Ericsson Rel-14 TEI13, SEW1 Revision of S2-163282. Revised in parallel session to S2-164058. Revised
5.4 S2-164058 CR 23.228 CR1151R2: NPLI for untrusted WLAN access in IMS for LI purposes Ericsson Rel-14 TEI13, SEW1 Revision of S2-164044. Agreed in parallel session Block approved Agreed AGREED
5.4 S2-163330 CR 23.203 CR1037: Provisioning of the Source port and ePDG IP address Ericsson Rel-14 TEI13, SEW1 Revised in parallel session to S2-164046. Revised
5.4 S2-164046 CR 23.203 CR1037R1: Provisioning of the Source port and ePDG IP address Ericsson Rel-14 TEI13, SEW1 Revision of S2-163330. Agreed in parallel session Block approved Agreed AGREED
5.4 S2-163331 CR 23.203 CR1038: Provisioning of the Source port and ePDG IP address Ericsson Rel-13 TEI13, SEW1 Revised in parallel session to S2-164045. Revised
5.4 S2-164045 CR 23.203 CR1038R1: Provisioning of the Source port and ePDG IP address Ericsson Rel-13 TEI13, SEW1 Revision of S2-163331. Agreed in parallel session Block approved Agreed AGREED
5.4 S2-163332 CR 23.402 CR2956: Source TCP port provided over S2b Ericsson Rel-14 TEI13, SEW1 Agreed in parallel session Block approved Agreed AGREED
5.4 S2-163333 CR 23.402 CR2957: Source TCP port provided over S2b Ericsson Rel-13 TEI13, SEW1 Agreed in parallel session Block approved Agreed AGREED
5.5 - - Study on architecture enhancements of cellular systems for ultra low complexity and low throughput Internet of Things (FS_AE_CIoT) - - {Not_on_agenda} - -
6 - - Release 14 - - {Frank} - -
6.1 - - Rel-14 3GPP Packet Access Maintenance - essential corrections - - {Frank} - -
6.1 S2-163364 LS in LS from SA WG4: LS on Multiple RoHC Contexts for MMCMH SA WG4 (S4-160725) MMCMH_Enh Noted in parallel session Proposed to be noted as CC for SA WG2. Noted
6.1 S2-163884 LS OUT [DRAFT] Response to LS from SA WG4 on progress of FS_xMBMS study item Motorola Solutions FS_xMBMS Response to S2-163365. Noted in parallel session Noted
6.2 - - Rel-14 PCC/QoS Maintenance - essential corrections - - {Shabnam} - -
6.3 - - Rel-14 Non-3GPP Access Maintenance - essential corrections - - {Krisztian} - -
6.4 - - Rel-14 IMS-Related Maintenance - essential corrections - - {Shabnam} - -
6.4 S2-163461 DISCUSSION Support of SRVCC for eCall Over IMS Qualcomm Incorporated Rel-14 EIEI Noted in parallel session Noted
6.4 S2-163462 CR 23.216 CR0341: Support of SRVCC for eCall Over IMS Qualcomm Incorporated Rel-14 EIEI Agreed in parallel session Block approved Agreed AGREED
6.4 S2-163463 CR 23.237 CR0490: Support of SRVCC for eCall Over IMS Qualcomm Incorporated Rel-14 EIEI Postponed in parallel session Postponed
6.4 S2-163227 LS In LS from CT WG1: LS on eCall over IMS questions CT WG1 (C1-162773) Rel-14 EIEI-CT Noted in parallel session Noted
6.4 S2-163220 LS In LS from SA WG4: LS on SETA SA WG4 (S4-160526) Rel-14 FS_SETA_S4 Postponed S2-162294 from S2#115. Postponed in parallel session to meeting SA WG2#116BIS Postponed
6.4 S2-163277 CR 23.167 CR0297: Editorial change to Transfer of Updated MSD for eCall Over IMS call flow Ericsson Rel-14 EIEI Revised in parallel session to S2-164047. Revised
6.4 S2-164047 CR 23.167 CR0297R1: Editorial change to Transfer of Updated MSD for eCall Over IMS call flow Ericsson Rel-14 EIEI Revision of S2-163277. Agreed in parallel session Block approved Agreed AGREED
6.4 S2-163278 CR 23.167 CR0298: Clarifications when inband is used by a UE to convey MSD Ericsson Rel-14 EIEI Revised in parallel session to S2-164048. Revised
6.4 S2-164048 CR 23.167 CR0298R1: Clarifications when inband is used by a UE to convey MSD Ericsson LM Rel-14 EIEI Revision of S2-163278. Agreed in parallel session Block approved Agreed AGREED
6.4 S2-163283 CR 23.216 CR0337R2: Enhancements to enhanced SRVCC Ericsson, Panasonic, Orange Rel-14 TEI14, eSRVCC Revision of S2-162929 from SA2#115 (reserved as revision of S2-162420). Postponed in parallel session Postponed
6.4 S2-163284 CR 23.216 CR0338: Enhancements to enhanced SRVCC - section 6.2.2.2 Ericsson Rel-14 TEI14, eSRVCC Not Handled -
6.4 S2-163285 CR 23.216 CR0339: Enhancements to enhanced SRVCC - Section 6.3.2.1 Ericsson Rel-14 TEI14, eSRVCC Not Handled -
6.4 S2-163286 CR 23.216 CR0340: Enhancements to enhanced SRVCC - Section 6.3.2.2. Ericsson Rel-14 TEI14, eSRVCC Not Handled -
6.4 S2-163532 DISCUSSION Enhancements to enhanced SRVCC and SETA Nokia Rel-14 eSRVCC, TEI14 Noted in parallel session Working assumption to attempt to work in capturing both ReInvite & mid way negotiation in Annex (normative?), specification(s) to impact is TBD/FFS. Other solutions/options to address this issue is not excluded. Noted
6.4 S2-163535 CR 23.237 CR0491: IMS Selected Codec re-negotiation for SRVCC Nokia Rel-14 TEI14, eSRVCC Not Handled -
6.5 - - Support of Emergency services over WLAN (SEW2) - - {Krisztian} - -
- - - Location, emergency ePDG selection - - - - -
6.5 S2-163257 CR 23.167 CR0296: Support for dispatchable civic location for indoor environments for North American Comtech TCS, AT&T Rel-14 SEW2 Revised in parallel session to S2-163863. Revised
6.5 S2-163863 CR 23.167 CR0296R1: Support for dispatchable civic location for indoor environments for North American Comtech TCS, AT&T Rel-14 SEW2 Revision of S2-163257. Revised in parallel session to S2-164220. Revised
6.5 S2-164220 CR 23.167 CR0296R2: Support for dispatchable civic location for indoor environments for North American Comtech TCS, AT&T Rel-14 SEW2 Revision of S2-163863. Agreed in parallel session Block approved Agreed AGREED
6.5 S2-163379 CR 23.402 CR2958: Clarifications of ePDG Selection for Emergency Services Huawei, HiSilicon Rel-14 SEW2 Revised in parallel session to S2-163864. Revised
6.5 S2-163864 CR 23.402 CR2958R1: Clarifications of ePDG Selection for Emergency Services Huawei, HiSilicon, Rogers Communications Rel-14 SEW2 Revision of S2-163379. Revised in parallel session to S2-164221. Remove changes in cover sheet and changes on changes Revised
6.5 S2-164221 CR 23.402 CR2958R2: Clarifications of ePDG Selection for Emergency Services Huawei, HiSilicon, Rogers Communications Rel-14 SEW2 Revision of S2-163864. Agreed in parallel session Block approved Agreed AGREED
6.5 S2-163598 LS OUT [DRAFT] LS to SA WG3: Improvement to EAP authentication procedure for supporting Emergency Service on WLAN Huawei, HiSilicon Rel-14 SEW2 Revised in parallel session to S2-163865. Revised
6.5 S2-163865 LS OUT [DRAFT] LS to SA WG3: Improvement to EAP authentication procedure for supporting Emergency Service on WLAN SA WG2 Rel-14 SEW2 Revision of S2-163598. Revised to S2-164273. Revised
6.5 S2-164273 LS OUT LS on Improvement to authentication procedure for supporting Emergency Service on WLAN SA WG2 Rel-14 SEW2 Revision of S2-163865. Approved Approved
- - - Untrusted WLAN procedures - - - - -
6.5 S2-163595 CR 23.402 CR2960: S2b additional PDN connection for ES Huawei, HiSilicon Rel-14 SEW2 Merged with S2-163653 into S2-163866 Merged
6.5 S2-163653 CR 23.402 CR2964: Support of emergency services when UE attached to regular services for untrusted WLAN Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revised in parallel session, merging S2-163595, to S2-163866. Revised
6.5 S2-163866 CR 23.402 CR2964R1: Support of emergency services when UE attached to regular services for untrusted WLAN Nokia, Alcatel-Lucent Shanghai Bell, Huawei, Hisilicon, Deutsche Telekom Rel-14 SEW2 Revision of S2-163653, merging S2-163595. Revised in parallel session to S2-164222. Add word 'additional' So that it becomes 'An UE attached for emergency services shall not initiate any additional PDN Connectivity Request procedure'. Revised
6.5 S2-164222 CR 23.402 CR2964R2: Support of emergency services when UE attached to regular services for untrusted WLAN Nokia, Alcatel-Lucent Shanghai Bell, Huawei, Hisilicon, Deutsche Telekom Rel-14 SEW2 Revision of S2-163866. Agreed in parallel session Block approved Agreed AGREED
- - - Trusted WLAN procedures - - - - -
6.5 S2-163654 CR 23.402 CR2965: Introduction of emergency services for trusted WLAN and roaming cases Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revised in parallel session to S2-163867. Revised
6.5 S2-163867 CR 23.402 CR2965R1: Introduction of emergency services for trusted WLAN and roaming cases Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-163654. Revised in parallel session to S2-164223. Remove 'in case of untrusted WLAN' from 'To get EPC access for emergency services in case of untrusted WLAN, the UE shall select an ePDG that supports emergency services. This is defined in clause 4.5.4a. Then the UE executes the procedure of Initial attach for S2b emergency services described in clause 7.2.5' Add word 'additional' So that it becomes 'An UE attached for emergency services shall not initiate any additional PDN Connectivity Request procedure. Revised
6.5 S2-164223 CR 23.402 CR2965R2: Introduction of emergency services for trusted WLAN and roaming cases Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-163867. Agreed in parallel session Block approved Agreed AGREED
6.5 S2-163596 CR 23.402 CR2961: Initial Attach procedure for ES for S2a GTP Huawei, HiSilicon Rel-14 SEW2 Revised in parallel session to S2-163868. Revised
6.5 S2-163868 CR 23.402 CR2961R1: Initial Attach procedure for ES for S2a GTP Huawei, HiSilicon Rel-14 SEW2 Revision of S2-163596. Revised in parallel session to S2-164224. Revised
6.5 S2-164224 CR 23.402 CR2961R2: Initial Attach procedure for ES for S2a GTP Huawei, HiSilicon Rel-14 SEW2 Revision of S2-163868. Revised in parallel session to S2-164234. Revised
6.5 S2-164234 CR 23.402 CR2961R3: Initial Attach procedure for ES for S2a GTP Huawei, HiSilicon Rel-14 SEW2 Revision of S2-164224. Agreed in parallel session Block approved Agreed AGREED
6.5 S2-163597 CR 23.402 CR2962: Emergency PDN connection establishment procedure for S2a GTP Huawei, HiSilicon Rel-14 SEW2 This was withdrawn. Withdrawn
- - - WLAN-3GPP service continuity - - - - -
6.5 S2-163655 CR 23.402 CR2966: Support of emergency services continuity between WLAN and 3GPP access Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revised in parallel session to S2-163869. Revised
6.5 S2-163869 CR 23.402 CR2966R1: Support of emergency services continuity between WLAN and 3GPP access Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-163655. Revised in parallel session to S2-164225. Revised
6.5 S2-164225 CR 23.402 CR2966R2: Support of emergency services continuity between WLAN and 3GPP access Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-163869. Agreed in parallel session Block approved Agreed AGREED
6.5 S2-163656 CR 23.401 CR3087: Handling of handovers for emergency sessions over WLAN Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revised in parallel session to S2-163870. Revised
6.5 S2-163870 CR 23.401 CR3087R1: Handling of handovers for emergency sessions over WLAN Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SEW2 Revision of S2-163656. Agreed in parallel session Block approved Agreed AGREED
6.6 - - S8 Home Routing Architecture for VoLTE (V8) - - {Krisztian} - -
6.6 S2-163306 CR 23.203 CR1035: Provision of EPC-level identities for IMS emergency sessions over Rx Intel, NTT DOCOMO Rel-14 V8 Revised in parallel session to S2-163857. - Move the NOTE to the second change - Add co-signers Revised
6.6 S2-163857 CR 23.203 CR1035R1: Provision of EPC-level identities for IMS emergency sessions over Rx Intel, NTT DOCOMO, Deutsche Telekom, Huawei, Nokia, ZTE, Ericsson, KDDI Rel-14 V8 Revision of S2-163306. Agreed in parallel session Block approved Agreed AGREED
6.6 S2-163411 CR 23.167 CR0300: Capturing solution for non UE detectable emergency call for S8 Home routing NEC, NTT DOCOMO Rel-14 V8 Revised in parallel session to S2-163858. Revised
6.6 S2-163858 CR 23.167 CR0300R1: Capturing solution for non UE detectable emergency call for S8 Home routing NEC, NTT DOCOMO Rel-14 V8 Revision of S2-163411. Wrong document uploaded. Revised in parallel session to S2-164122. Revised
6.6 S2-164122 CR 23.167 CR0300R2: Capturing solution for non UE detectable emergency call for S8 Home routing NEC, NTT DOCOMO Rel-14 V8 Revision of S2-163858. Revised in parallel session to S2-164124. Revised
6.6 S2-164124 CR 23.167 CR0300R3: Capturing solution for non UE detectable emergency call for S8 Home routing NEC, NTT DOCOMO Rel-14 V8 Revision of S2-164122. Agreed in parallel session Block approved Agreed AGREED
6.6 S2-163413 CR 23.228 CR1152: Handling of Local Number Translation for roaming users in deployments without IMS-level roaming interfaces NEC, NTT DOCOMO Rel-14 V8 Revised in parallel session to S2-163859. Revised
6.6 S2-163859 CR 23.228 CR1152R1: Handling of Local Number Translation for roaming users in deployments without IMS-level roaming interfaces NEC, NTT DOCOMO Rel-14 V8 Revision of S2-163413. Revised in parallel session to S2-164123. Revised
6.6 S2-164123 CR 23.228 CR1152R2: Handling of Local Number Translation for roaming users in deployments without IMS-level roaming interfaces NEC, NTT DOCOMO Rel-14 V8 Revision of S2-163859. Agreed in parallel session Block approved Agreed AGREED
6.6 S2-163540 CR 23.228 CR1155: Inter-PLMN Mobility support clarification for V8 Nokia Rel-14 V8 Revised in parallel session to S2-163860. - Delete the text: 'when UE is roaming. Inter-PLMN mobility is only supported if UE performs another IMS Initial Registration due to change of IP address when roaming into another PLMN' Revised
6.6 S2-163860 CR 23.228 CR1155R1: Inter-PLMN Mobility support clarification for V8 Nokia Rel-14 V8 Revision of S2-163540. Agreed in parallel session Block approved Agreed AGREED
6.7 - - FS on Enhancements of Dedicated Core Networks selection mechanism (FS_eDecor) & normative work (eDECOR) - - {Puneet} - -
6.7 S2-163480 P-CR eDecor Key Issue 3 - Solution for Load Balancing within DCN NEC, ZTE, Nokia FS_eDecor Agreed in parallel session Block approved Approved AGREED
6.7 S2-163694 P-CR Evaluation & Conclusion of Key Issue 2 Huawei, Hisilicon, InterDigital FS_eDecor Noted in parallel session Noted
6.7 S2-163318 P-CR Conclusion for eDECOR TR Ericsson FS_eDecor Revision of S2-162377 from S2#115. Revised in parallel session to S2-163784. Show of hands on way forward for key issue#2 - Solution#8 Support: 3 Object: 5 Solution#9 Support: 6 Object:1 Based on further discussion objection to solution#9 was withdrawn It is agreed to use solution #9 as normative way forward for key the issue#2 Revised
6.7 S2-163784 P-CR Conclusion for eDECOR TR Ericsson, KDDI, LG Electronics - FS_eDecor Revision of S2-163318. Agreed in parallel session Block approved Approved AGREED
6.7 S2-163587 CR 23.401 CR3078: Clarification on usage of default standardized or PLMN specific DCN-ID. Qualcomm Incorporated Rel-14 CIoT Revised in parallel session to S2-163785. Revised
6.7 S2-163785 CR 23.401 CR3078R1: Clarification on usage of default standardized or PLMN specific DCN-ID. Qualcomm Incorporated Rel-14 eDecor Revision of S2-163587. Agreed in parallel session Block approved Agreed AGREED
6.7 S2-163420 CR 23.401 CR3054: Update of network initiated Dedicated Core Network Reselection procedure CATT Rel-14 eDECOR Noted in parallel session Further changes are needed to align with solution#7 as per TR conclusion. This will be brought back in the next meeting along with CRs to other impacted specifications. Noted
6.7 S2-163542 CR 23.401 CR3063: Relation between the Usage Type and DCN ID Huawei, HiSilicon Rel-14 eDecor Revised in parallel session to S2-163786. Revised
6.7 S2-163786 CR 23.401 CR3063R1: Relation between the Usage Type and DCN ID Huawei, HiSilicon Rel-14 eDecor Revision of S2-163542. Agreed in parallel session Block approved Agreed AGREED
6.7 S2-163543 CR 23.401 CR3064: The DCN ID related serving PLMN information Huawei, HiSilicon Rel-14 eDecor Revised in parallel session to S2-163787. Revised
6.7 S2-163787 CR 23.401 CR3064R1: The DCN ID related serving PLMN information Huawei, HiSilicon Rel-14 eDecor Revision of S2-163543. Revised in parallel session to S2-163832. Revised
6.7 S2-163832 CR 23.401 CR3064R2: The DCN ID related serving PLMN information Huawei, HiSilicon Rel-14 eDecor Revision of S2-163787. Agreed in parallel session Block approved Agreed AGREED
6.7 S2-163482 CR 23.401 CR3059: Load balancing for MMEs with multiple DCN support NEC, ZTE Rel-14 eDecor Revised in parallel session to S2-163788. Revised
6.7 S2-163788 CR 23.401 CR3059R1: Load balancing for MMEs with multiple DCN support NEC, ZTE, Nokia, ALU-SB Rel-14 eDecor Revision of S2-163482. Agreed in parallel session Block approved Agreed AGREED
6.7 S2-163614 CR 23.236 CR0054: Load balancing for SGSNs with multiple DCN support ZTE Corporation, NEC Rel-14 eDecor Revised in parallel session to S2-163789. Revised
6.7 S2-163789 CR 23.236 CR0054R1: Load balancing for SGSNs with multiple DCN support ZTE Corporation, NEC,Nokia, Alcatel-Lucent Shanghai Bell Rel-14 eDecor Revision of S2-163614. Agreed in parallel session Block approved Agreed AGREED
6.7 S2-163675 CR 23.401 CR3090: The information for servicing node selection in eDECOR CATT Rel-14 eDECOR Revised in parallel session to S2-163790. Revised
6.7 S2-163790 CR 23.401 CR3090R1: The information for servicing node selection in eDECOR CATT Rel-14 eDECOR Revision of S2-163675. Noted in parallel session Noted
6.8 - - Control and User Plane Separation of EPC nodes (CUPS) - - {Mirko} - -
- - - LS OUT - - - - -
6.8 S2-163477 LS OUT Conclusion on lawful interception in split EPC architecture Huawei Rel-14 CUPS Revised in parallel session to S2-163959. Revised
6.8 S2-163959 LS OUT Conclusion on lawful interception in split EPC architecture Huawei Rel-14 CUPS Revision of S2-163477. Revised in parallel session to S2-164013. Revised
6.8 S2-164013 LS OUT Conclusion on lawful interception in split EPC architecture SA WG2 Rel-14 CUPS Revision of S2-163959. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163627 LS OUT Guidance and requests for work related to control and user plane split EPC architecture Cisco Systems, Inc. Rel-14 Revised in parallel session to S2-163960. Revised
6.8 S2-163960 LS OUT Guidance and requests for work related to control and user plane split EPC architecture Cisco Systems, Inc. Rel-14 - Revision of S2-163627. Revised in parallel session to S2-164014. Revised
6.8 S2-164014 LS OUT LS on Guidance and requests for work related to control and user plane split EPC architecture SA WG2 Rel-14 - Revision of S2-163960. Agreed in parallel session Block approved Approved AGREED
- - - Skeleton and section 1 - 4 of new TS - - - - -
6.8 S2-163471 P-CR CUPS TS skeleton Huawei CUPS Revised in parallel session to S2-163961. Revised
6.8 S2-163961 P-CR CUPS TS skeleton Huawei - CUPS Revision of S2-163471. Revised in parallel session to S2-164015. Revised
6.8 S2-164015 P-CR CUPS TS skeleton Huawei - CUPS Revision of S2-163961. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163472 P-CR Scope section of CUPS TS Huawei CUPS Revised in parallel session to S2-163962. Revised
6.8 S2-163962 P-CR Scope section of CUPS TS Huawei - CUPS Revision of S2-163472. Revised in parallel session to S2-164016. Revised
6.8 S2-164016 P-CR Scope section of CUPS TS Huawei - CUPS Revision of S2-163962. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163473 P-CR Definitions and abbreviations Huawei CUPS Revised in parallel session to S2-163963. Revised
6.8 S2-163963 P-CR Definitions and abbreviations Huawei - CUPS Revision of S2-163473. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163573 P-CR CUPS architecture and reference points Samsung CUPS Merged with S2-163657 into S2-163964. Merged
6.8 S2-163657 P-CR Architecture reference model Nokia, Alcatel Lucent Shanghai Bell CUPS Revised in parallel session, merging S2-163573, to S2-163964. Revised
6.8 S2-163964 P-CR Architecture reference model Nokia, Alcatel Lucent Shanghai Bell, Samsung - CUPS Revision of S2-163657, merging S2-163573. Revised in parallel session to S2-164208. Revised
6.8 S2-164208 P-CR Architecture reference model Nokia, Alcatel Lucent Shanghai Bell, Samsung - CUPS Revision of S2-163964. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163474 P-CR High level functions section Huawei CUPS Revised in parallel session to S2-163965. Revised
6.8 S2-163965 P-CR High level functions section Huawei - CUPS Revision of S2-163474. Revised in parallel session to S2-164209. Revised
6.8 S2-164209 P-CR High level functions section Huawei - CUPS Revision of S2-163965. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163269 P-CR Network elements description Allot Communications CUPS Revised in parallel session to S2-163966. Revised
6.8 S2-163966 P-CR Network elements description Allot Communications - CUPS Revision of S2-163269. Agreed in parallel session Block approved Approved AGREED
- - - Section 7 of new TS - Parameters - - - - -
6.8 S2-163475 P-CR Parameters section Huawei CUPS Noted in parallel session Noted
- - - Section 5 of new TS - Functionality - - - - -
6.8 S2-163270 P-CR Charging and Usage Monitoring handling Allot Communications CUPS Revised in parallel session to S2-163967. Revised
6.8 S2-163967 P-CR Charging and Usage Monitoring handling Allot Communications, Cisco Systems, Inc. - CUPS Revision of S2-163270. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163323 P-CR GTP-U IP address and TEID allocation Ericsson CUPS Revised in parallel session to S2-163968. Revised
6.8 S2-163968 P-CR GTP-U IP address and TEID allocation Ericsson - CUPS Revision of S2-163323. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163324 P-CR Control of user plane forwarding Ericsson CUPS Revised in parallel session to S2-163969. Revised
6.8 S2-163969 P-CR Control of user plane forwarding Ericsson - CUPS Revision of S2-163324. Revised in parallel session to S2-164210. Revised
6.8 S2-164210 P-CR Control of user plane forwarding Ericsson - CUPS Revision of S2-163969. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163448 P-CR Functional Description of Bearer and APN policing Nokia, Alcatel-Lucent Shanghai Bell CUPS Revised in parallel session to S2-163970. Revised
6.8 S2-163970 P-CR Functional Description of Bearer and APN policing Nokia, Alcatel-Lucent Shanghai Bell - CUPS Revision of S2-163448. Revised in parallel session to S2-164211. Revised
6.8 S2-164211 P-CR Functional Description of Bearer and APN policing Nokia, Alcatel-Lucent Shanghai Bell - CUPS Revision of S2-163970. Revised to S2-164270. Revised
6.8 S2-164270 P-CR Functional Description of Bearer and APN policing Nokia, Alcatel-Lucent Shanghai Bell - CUPS Revision of S2-164211. Approved Approved
6.8 S2-163449 P-CR Functional Description of PCC related functions Nokia Networks CUPS Noted in parallel session Noted
6.8 S2-163493 P-CR Functional Description of Packet Screening Nokia, Alcatel-Lucent Shanghai Bell CUPS Noted in parallel session Noted
6.8 S2-163495 P-CR Support for IP address management functionality Cisco Systems, Inc. CUPS Revised in parallel session to S2-163971. Revised
6.8 S2-163971 P-CR Support for IP address management functionality Cisco Systems, Inc. - CUPS Revision of S2-163495. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163702 DISCUSSION Discussion on Extended Buffering and Normal Mode Buffering Huawei, HiSilicon, China Mobile, Samsung, China Telecom Noted in parallel session Noted
6.8 S2-163574 P-CR Extended buffering during PSM Samsung CUPS Merged with S2-163659 into S2-163972 Merged
6.8 S2-163575 P-CR 3GPP specific information at the user plane function Samsung CUPS Revised in parallel session to S2-163973. Revised
6.8 S2-163973 P-CR 3GPP specific information at the user plane function Samsung - CUPS Revision of S2-163575. Revised in parallel session to S2-164212. Revised
6.8 S2-164212 P-CR 3GPP specific information at the user plane function Samsung - CUPS Revision of S2-163973. Approved Approved
6.8 S2-163658 P-CR Selection mechanism for UP entity Nokia, Allot Communications, Alcatel-Lucent Shanghai Bell CUPS Noted in parallel session Noted
6.8 S2-163659 P-CR Idle state packet Serving GW buffering function Nokia, Alcatel Lucent Shanghai Bell CUPS Revised in parallel session, merging S2-163574, to S2-163972. Revised
6.8 S2-163972 P-CR Idle state packet Serving GW buffering function Nokia, Alcatel Lucent Shanghai Bell, Samsung - CUPS Revision of S2-163659, merging S2-163574. Revised in parallel session to S2-164213. Revised
6.8 S2-164213 P-CR Idle state packet Serving GW buffering function Nokia, Alcatel Lucent Shanghai Bell, Samsung - CUPS Revision of S2-163972. Revised to S2-164268. Revised
6.8 S2-164268 P-CR Idle state packet Serving GW buffering function Nokia, Alcatel Lucent Shanghai Bell - CUPS Revision of S2-164213. Approved Approved
6.8 S2-163700 P-CR Proposing Other Functionalities than Those in Function Split Tables Huawei, HiSilicon CUPS Revised in parallel session to S2-164009. Revised
6.8 S2-164009 P-CR Proposing Other Functionalities than Those in Function Split Tables Huawei, HiSilicon - CUPS Revision of S2-163700. Revised in parallel session to S2-164214. Revised
6.8 S2-164214 P-CR Proposing Other Functionalities than Those in Function Split Tables Huawei, HiSilicon - CUPS Revision of S2-164009. Approved Approved
- - - Section 6 of new TS - Flows - - - - -
6.8 S2-163703 P-CR Introduction of Sx Session Management Procedures into TS 23.214 Huawei, HiSilicon CUPS Revised in parallel session to S2-164011. Revised
6.8 S2-164011 P-CR Introduction of Sx Session Management Procedures into TS 23.214 Huawei, HiSilicon - CUPS Revision of S2-163703. Revised in parallel session to S2-164215. Revised
6.8 S2-164215 P-CR Introduction of Sx Session Management Procedures into TS 23.214 Huawei, HiSilicon - CUPS Revision of S2-164011. Revised to S2-164269. Revised
6.8 S2-164269 P-CR Introduction of Sx Session Management Procedures into TS 23.214 Huawei, HiSilicon - CUPS Revision of S2-164215. Approved Approved
6.8 S2-163476 DISCUSSION Example for updating 23.401 with references to the new TS Huawei CUPS Noted in parallel session Noted
6.8 S2-163496 P-CR CP and UP function interaction call flows Cisco Systems, Inc. CUPS Revised in parallel session to S2-164010. Revised
6.8 S2-164010 P-CR CP and UP function interaction call flows Cisco Systems, Inc. - CUPS Revision of S2-163496. Agreed in parallel session Block approved Approved AGREED
6.8 S2-163701 P-CR Introduction of Sx Reporting Procedures into TS 23.214 Huawei, HiSilicon CUPS Revised in parallel session to S2-164012. Revised
6.8 S2-164012 P-CR Introduction of Sx Reporting Procedures into TS 23.214 Huawei, HiSilicon - CUPS Revision of S2-163701. Revised in parallel session to S2-164216. Revised
6.8 S2-164216 P-CR Introduction of Sx Reporting Procedures into TS 23.214 Huawei, HiSilicon - CUPS Revision of S2-164012. Agreed in parallel session Block approved Approved AGREED
6.9 - - Improvement of awareness of user location change (AULC) - - {Krisztian} - -
6.9 S2-163317 CR 23.401 CR3025R1: Activation of a set of PRAs Ericsson Rel-14 AULC Revision of S2-162380 from S2#115. Merged with S2-163683 into S2-163849 Merged
6.9 S2-163683 CR 23.401 CR3050R1: Support of Multiple PRAs Huawei, HiSilicon, China Unicom Rel-14 AULC Revised in parallel session, merging S2-163317, to S2-163849. Revised
6.9 S2-163849 CR 23.401 CR3050R2: Support of Multiple PRAs Huawei, HiSilicon, China Unicom, Orange Rel-14 AULC Revision of S2-163683, merging S2-163317 and S2-163432. Revised in parallel session to S2-163881. Revised
6.9 S2-163881 CR 23.401 CR3050R3: Support of Multiple PRAs Huawei, HiSilicon, China Unicom, Orange, Intel Rel-14 AULC Revision of S2-163849. Endorsed as a basis and may be developed further next meeting Endorsed
6.9 S2-163381 CR 23.237 CR0489: Robust Call Setup for VoLTE subscriber in LTE Huawei, HiSilicon, Intel, Deutsche Telekom, China Mobile, Teliasonera, China Unicom, China Telecom, Orange, CATR,CATT, MediaTek Inc, Telekom Austria AG, Telecom Italia Rel-14 RobVoLTE Revision of S2-163849 Revised OPEN
6.9 S2-163684 CR 23.060 CR2006R1: Support of Multiple PRAs Huawei, HiSilicon, China Unicom Rel-14 AULC Revision of S2-162698 from S2#115. Revised in parallel session, merging S2-163428, to S2-163850. Revised
6.9 S2-163850 CR 23.060 CR2006R2: Support of Multiple PRAs Huawei, HiSilicon, China Unicom, Orange Rel-14 AULC Revision of S2-163684, merging S2-163428. Revised in parallel session to S2-163882. Revised
6.9 S2-163882 CR 23.060 CR2006R3: Support of Multiple PRAs Huawei, HiSilicon, China Unicom, Orange, Intel Rel-14 AULC Revision of S2-163850. Endorsed as a basis and may be developed further next meeting. Endorsed
6.9 S2-163328 CR 23.203 CR1025R1: Reporting entering or leaving a set of PRAs Ericsson, Allot Communications Rel-14 AULC Revision of S2-162387 from S2#115. Reviewed in parallel session. Revised in parallel session to S2-163883. Revised
6.9 S2-163883 CR 23.203 CR1025R2: Reporting entering or leaving a set of PRAs Ericsson, Allot Communications Rel-14 AULC Revision of S2-163328. Revised in parallel session to S2-164231. Revised
6.9 S2-164231 CR 23.203 CR1025R3: Reporting entering or leaving a set of PRAs Ericsson, Allot Communications Rel-14 AULC Revision of S2-163883. Agreed in parallel session Block approved Agreed AGREED
6.9 S2-163428 CR 23.060 CR2008: Dynamic resource handling for PRAs ORANGE Rel-14 AULC Merged with S2-163684 into S2-163850 Merged
6.9 S2-163432 CR 23.401 CR3055: Dynamic resource handling for PRAs ORANGE Rel-14 AULC Merged with S2-163684 into S2-163849 Merged
6.9 S2-163433 CR 23.203 CR1042: Dynamic resource handling for PRAs ORANGE Rel-14 AULC Merged with S2-163684 into S2-163848 Merged
6.9 S2-163682 CR 23.203 CR1031R1: Support of Multiple PRAs Huawei, HiSilicon, China Unicom Rel-14 AULC Revision of (postponed) S2-162695 from S2#115. Revised in parallel session, merging S2-163433, to S2-163848. Revised
6.9 S2-163848 CR 23.203 CR1031R2: Support of Multiple PRAs Huawei, HiSilicon, China Unicom, Orange Rel-14 AULC Revision of S2-163682, merging S2-163433. Revised in parallel session to S2-164119. Revised
6.9 S2-164119 CR 23.203 CR1031R3: Support of Multiple PRAs Huawei, HiSilicon, China Unicom, Orange, Intel Rel-14 AULC Revision of S2-163848. Endorsed as a basis and may be developed further next meeting Endorsed OPEN
6.10 - - Study on Architecture for Next Generation System (FS_NextGen) - - {Frank} - -
6.10.0 - - Input for TR clauses 1-4 and new proposed key issues - - {Frank} - -
6.10.0 S2-163490 P-CR Capturing Architecture Options in the TR NTT DOCOMO FS_NextGen Revised to S2-163732. Revised
6.10.0 S2-163732 P-CR Capturing Architecture Options in the TR NTT DOCOMO, MediaTek Inc. FS_NextGen Revision of S2-163490. Revised to S2-164200. Revised
6.10.0 S2-164200 P-CR Capturing Architecture Options in the TR NTT DOCOMO, MediaTek Inc. FS_NextGen Revision of S2-163732. Approved Approved
6.10.0 S2-163536 P-CR NG RAN definition update Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised to S2-163733. Revised
6.10.0 S2-163733 P-CR NG RAN definition update Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-163536. Revised to S2-164201. Revised
6.10.0 S2-164201 P-CR NG RAN definition update Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revision of S2-163733. Agreed in parallel session Block approved Approved AGREED
6.10.0 S2-163271 LS in LS from GSMA Network 2020: Liaison Statement on 5G Capabilities and Requirements GSMA Network 2020 (N2020_001) Noted Noted
6.10.0 S2-163728 LS in LS from NGNM Alliance: Key capabilities and issues to be addressed for 5G NGNM Alliance (160708 Liaison NGMN BPG_to 3GPP) Noted Noted
6.10.0 S2-163386 P-CR Additional architectural requirements for support of WLAN Qualcomm Incorporated FS_NextGen Revised to S2-163885. Revised
6.10.0 S2-163885 P-CR Additional architectural requirements for support of WLAN Qualcomm Incorporated FS_NextGen Revision of S2-163386. Agreed in parallel session Block approved Approved AGREED
6.10.0 S2-163454 SID revised Changes to 'NG System' definition BT Plc Rel-14 FS_NextGen This is a pCR, not 'SID revised'. Revised to S2-163886. Revised
6.10.0 S2-163886 P-CR Changes to 'NG System' definition BT Plc FS_NextGen Revision of S2-163454. Agreed in parallel session Block approved Approved AGREED
6.10.0 S2-163455 SID revised Multi-access converged NG core architecture BT Plc Rel-14 FS_NextGen This is a pCR, not 'SID revised'. Revised to S2-163887. Revised
6.10.0 S2-163887 P-CR Multi-access converged NG core architecture BT Plc FS_NextGen Revision of S2-163455. Revised to S2-164112. Revised
6.10.0 S2-164112 P-CR Multi-access converged NG core architecture BT Plc FS_NextGen Revision of S2-163887. Agreed in parallel session Block approved Approved AGREED
6.10.0 S2-163387 P-CR Architecture requirement for support of location services Qualcomm Incorporated FS_NextGen Revised to S2-163888. Revised
6.10.0 S2-163888 P-CR Architecture requirement for support of location services Qualcomm Incorporated FS_NextGen Revision of S2-163387. Agreed in parallel session Block approved Approved AGREED
6.10.0 S2-163522 P-CR New Key Issue: Congestion and access control for Next Generation Network Architecture LG Electronics FS_NextGen Revised to S2-163889. Revised
6.10.0 S2-163889 P-CR New Key Issue: Congestion and access control for Next Generation Network Architecture LG Electronics FS_NextGen Revision of S2-163522. Revised to S2-164113. Revised
6.10.0 S2-164113 P-CR New Key Issue: Congestion and access control for Next Generation Network Architecture LG Electronics FS_NextGen Revision of S2-163889. Agreed in parallel session. Revised to S2-164257. Revised
6.10.0 S2-164257 P-CR New Key Issue: Congestion and access control for Next Generation Network Architecture LG Electronics FS_NextGen Revision of S2-164113. Approved Approved
6.10.0 S2-163625 P-CR Introduction of PDU Session of Non-IP Type CATT FS_NextGen Revised to S2-163890. Revised
6.10.0 S2-163890 P-CR Introduction of PDU Session of Non-IP Type CATT FS_NextGen Revision of S2-163625. Agreed in parallel session Block approved Approved AGREED
6.10.0 S2-163662 P-CR Update of the initial high level architecture CATT FS_NextGen Noted Noted
6.10.0 S2-163362 P-CR NS abbreviation 23.799 clean up ORANGE FS_NextGen Agreed in parallel session Block approved Approved AGREED
6.10.0 S2-163256 P-CR Summary of pre-SA2#116 email discussion of NextGen Topic 04 (clause 3 of TR 23.799, Definitions and Abbreviations) U.S. Department of Commerce FS_NextGen Discussion document, not a pCR. Noted Noted
6.10.0 S2-163259 P-CR Advancement of NextGen Definitions U.S. Department of Commerce FS_NextGen Revised to S2-163891. Revised
6.10.0 S2-163891 P-CR Advancement of NextGen Definitions U.S. Department of Commerce FS_NextGen Revision of S2-163259. Revised to S2-164114. Revised
6.10.0 S2-164114 P-CR Advancement of NextGen Definitions U.S. Department of Commerce FS_NextGen Revision of S2-163891. Revised to S2-164238. Revised
6.10.0 S2-164238 P-CR Advancement of NextGen Definitions U.S. Department of Commerce FS_NextGen Revision of S2-164114. Agreed in parallel session Block approved Approved AGREED
6.10.1 - - Updates and solutions for key issue 1: Support of network slicing - - {Frank} - -
- - - General - - - - -
6.10.1 S2-163299 P-CR Update of WT for Network Slicing China Telecom FS_NextGen Revised to S2-163974. Revised
6.10.1 S2-163974 P-CR Update of WT for Network Slicing China Telecom, ZTE FS_NextGen Revision of S2-163299. Agreed in parallel session Block approved Approved AGREED
6.10.1 S2-163508 P-CR Summary of email discussion on Slicing WT1 (i.e. NS_WT_#1) assuming one UE - one slice and fully separated slices (i.e. a basic model) ZTE FS_NextGen This is a Report, not a pCR. Noted Noted
6.10.1 S2-163601 P-CR Email discussion on KI#1 (Support of network slicing) WT#3 (Network slicing architecture) Huawei FS_NextGen LATE DOC: Rx 11/07, 08:40. This is a Report, not a pCR. Noted Noted
6.10.1 S2-163503 P-CR Updating definition of Network Slice Cisco Systems Inc. FS_NextGen Revised to S2-163975. Revised
6.10.1 S2-163975 P-CR Updating definition of Network Slice Cisco Systems Inc. FS_NextGen Revision of S2-163503. Revised to S2-164115. Revised
6.10.1 S2-164115 P-CR Updating definition of Network Slice Cisco Systems Inc. FS_NextGen Revision of S2-163975. Approved Approved
- - - Updates for solution 2 - - - - -
6.10.1 S2-163507 P-CR Merged Proposal for Network Slice Selection Nokia, ETRI, Samsung, KDDI, KPN, Interdigital, Oracle, CATT, ZTE, Qualcomm Incorporated FS_NextGen Revised to S2-163976. Revised
6.10.1 S2-163976 P-CR Merged Proposal for Network Slice Selection Nokia, ETRI, Samsung, KDDI, KPN, Interdigital, Oracle, CATT, ZTE, Qualcomm Incorporated FS_NextGen Revision of S2-163507. Revised to S2-164111. Revised
6.10.1 S2-164111 P-CR Merged Proposal for Network Slice Selection Nokia, ETRI, Samsung, KDDI, KPN, Interdigital, Oracle, CATT, ZTE, Qualcomm Incorporated FS_NextGen Revision of S2-163976. Revised to S2-164116. Revised
6.10.1 S2-164116 P-CR Merged Proposal for Network Slice Selection Nokia, ETRI, Samsung, KDDI, KPN, Interdigital, Oracle, CATT, ZTE, Qualcomm Incorporated FS_NextGen Revision of S2-164111. Agreed in parallel session Block approved Approved AGREED
6.10.1 S2-163572 P-CR RAT Selection according to selected NSI Samsung FS_NextGen Revised, merging parts of S2-163686, to S2-163977. Revised
6.10.1 S2-163977 P-CR RAT Selection according to selected NSI Samsung FS_NextGen Revision of S2-163572, merging parts of S2-163686. This was withdrawn. Withdrawn
6.10.1 S2-163686 P-CR Update of solution for support of multiple connections to multiple network slices to efficiently support multiple 3rd parties Samsung FS_NextGen Merged with S2-163572 into S2-163977. Merged
- - - New solutions for slice selection/association - - - - -
6.10.1 S2-163338 P-CR Solution for selection of a network slice instance Ericsson FS_NextGen Revision of S2-162491 from S2#115. Revised to S2-163978. Revised
6.10.1 S2-163978 P-CR Solution for selection of a network slice instance Ericsson FS_NextGen Revision of S2-163338. Revised to S2-164258. Revised
6.10.1 S2-164258 P-CR Solution for selection of a network slice instance Ericsson FS_NextGen Revision of S2-163978. Approved Approved
6.10.1 S2-163344 P-CR Network slicing selection solution based on Slice ID China Mobile, CATT, CATR FS_NextGen Revised to S2-163979. Revised
6.10.1 S2-163979 P-CR Network slicing selection solution based on Slice ID China Mobile, CATT, CATR FS_NextGen Revision of S2-163344. Revised to S2-164139. Revised
6.10.1 S2-164139 P-CR Network slicing selection solution based on Slice ID China Mobile, CATT, CATR FS_NextGen Revision of S2-163979. Agreed in parallel session Block approved Approved AGREED
6.10.1 S2-163380 P-CR Service Triggered Network Slice Selection Procedure CATT FS_NextGen Revised to S2-163980. Revised
6.10.1 S2-163980 P-CR Service Triggered Network Slice Selection Procedure CATT FS_NextGen Revision of S2-163380. Revised to S2-164202. Revised
6.10.1 S2-164202 P-CR Service Triggered Network Slice Selection Procedure CATT FS_NextGen Revision of S2-163980. Noted Noted
6.10.1 S2-163399 P-CR Solution: Network Slice Selection based on Usage Class Motorola Mobility, Lenovo, Broadcom FS_NextGen Revision of S2-162327 from S2#115. Revised to S2-163981. Revised
6.10.1 S2-163981 P-CR Solution: Network Slice Selection based on Usage Class Motorola Mobility, Lenovo, Broadcom FS_NextGen Revision of S2-163399. Agreed in parallel session Block approved Approved AGREED
- - - Updates for solution 3 - - - - -
6.10.1 S2-163446 P-CR Update of Network Slicing Solution 1.3 NTT DOCOMO FS_NextGen Revised to S2-163982. Revised
6.10.1 S2-163982 P-CR Update of Network Slicing Solution 1.3 NTT DOCOMO, LG Electronics Inc.?, ITRI? FS_NextGen Revision of S2-163446. Revised to S2-164156. Revised
6.10.1 S2-164156 P-CR Update of Network Slicing Solution 1.3 NTT DOCOMO, LG Electronics Inc., ITRI FS_NextGen Revision of S2-163982. Agreed in parallel session Block approved Approved AGREED
6.10.1 S2-163705 P-CR Updates to Solution 6.1.3: Location of NSSF and CPSF ITRI FS_NextGen Not Handled Not Handled
6.10.1 S2-163707 P-CR Updates to Solution 6.1.3: Support of multiple connections to multiple Network Slices ITRI FS_NextGen Not Handled Not Handled
- - - Updates for solution 1 - - - - -
6.10.1 S2-163429 P-CR Update of Solution 6.1.1 Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.1 S2-163544 P-CR Update of Solution 6.1.1: The required identities for network slice selection Huawei, HiSilicon FS_NextGen Not Handled Not Handled
- - - Interim agreements in slice selection - - - - -
6.10.1 S2-163663 P-CR Update the interim agreements on network slicing CATT FS_NextGen Not Handled Not Handled
- - - Authentication/authorisation for slices - - - - -
6.10.1 S2-163395 P-CR Network Slice Selection considering Authentication and Authorization LG Electronics Inc. FS_NextGen Not Handled Not Handled
- - - New/updated solutions related to multiple slices per UE or functions shared by slices - - - - -
6.10.1 S2-163400 P-CR Solution: Simultaneous Access to Multiple Independent Network Slices Motorola Mobility, Lenovo, Broadcom FS_NextGen Revision of S2-162314 from S2#115. Not Handled Not Handled
- - - Interim agreements related to multiple slices per UE or functions shared by slices - - - - -
6.10.1 S2-163339 P-CR Interim Agreements on common network functions Ericsson FS_NextGen Revision of S2-162490 from S2#115. Not Handled Not Handled
- - - Other - - - - -
6.10.1 S2-163367 P-CR Solution on Network slice instance re-selection LG Electronics FS_NextGen Revision of S2-162628 from S2#115. Not Handled Not Handled
6.10.1 S2-163366 P-CR Control plane interface for MM and SM support in Network Slices LG Electronics FS_NextGen Revision of S2-162629 from S2#115. Not Handled Not Handled
6.10.1 S2-163401 P-CR Network Slices in NFV Deployments Motorola Mobility, Lenovo FS_NextGen Not Handled Not Handled
6.10.1 S2-163470 P-CR Impacts on the NG architecture due to network slicing Ericsson FS_NextGen LATE DOC: Rx 11/07, 08:50. Not Handled Not Handled
6.10.2 - - Updates and solutions for key issue 2: QoS framework - - {Puneet} - -
- - - Email Discussion Summary - - - - -
6.10.2 S2-163427 DISCUSSION Summary of email discussion on QoS framework Intel (email discussion convenor) Rel-14 Noted in parallel session Noted
6.10.2 S2-163407 DISCUSSION KI#2 - MediaTek views on QoS Framework (email discussion) MediaTek Rel-14 Noted Merge with S2-163427 Noted
- - - Updates to existing solutions - - - - -
6.10.2 S2-163254 P-CR Update on solution 2.6 ZTE Corporation, CATR FS_NextGen Agreed in parallel session Block approved Approved AGREED
6.10.2 S2-163276 P-CR Update of Solution 2.1: QoS functions and distribution Ericsson FS_NextGen Revised in parallel session to S2-163744. Revised
6.10.2 S2-163744 P-CR Update of Solution 2.1: QoS functions and distribution Ericsson - FS_NextGen Revision of S2-163276. Revised in parallel session to S2-164089. Revised
6.10.2 S2-164089 P-CR Update of Solution 2.1: QoS functions and distribution Ericsson - FS_NextGen Revision of S2-163744. Agreed in parallel session Block approved Approved AGREED
6.10.2 S2-163388 P-CR Solution for key issue 2: QoS packet differentiation in AN based on CN input Qualcomm Incorporated FS_NextGen Revised in parallel session to S2-163745. Revised
6.10.2 S2-163745 P-CR Solution for key issue 2: QoS packet differentiation in AN based on CN input Qualcomm Incorporated - FS_NextGen Revision of S2-163388. Revised in parallel session to S2-164090. Revised
6.10.2 S2-164090 P-CR Solution for key issue 2: QoS packet differentiation in AN based on CN input Qualcomm Incorporated - FS_NextGen Revision of S2-163745. Agreed in parallel session Block approved Approved AGREED
6.10.2 S2-163520 P-CR Update the solution 6.2.1.1: Relation between PDU Flow and Service Data Flow ETRI FS_NextGen Noted in parallel session Noted
6.10.2 S2-163672 P-CR Update to solution 2.2 Intel FS_NextGen Revised in parallel session, merging S2-163704, to S2-163746. Revised
6.10.2 S2-163746 P-CR Update to solution 2.2 Intel, Samsung - FS_NextGen Revision of S2-163672, merging S2-163704. Revised in parallel session to S2-164091. Revised
6.10.2 S2-164091 P-CR Update to solution 2.2 Intel, Samsung - FS_NextGen Revision of S2-163746. Agreed in parallel session Block approved Approved AGREED
6.10.2 S2-163521 P-CR Update the solution 6.2.2: flow based QoS framework ETRI FS_NextGen Noted in parallel session Noted
6.10.2 S2-163602 P-CR QoS parameter - Packet Delay Budget Samsung FS_NextGen Revised in S2-163704 Revised
6.10.2 S2-163704 P-CR QoS parameter - Packet Delay Budget Samsung FS_NextGen Revision of S2-163602. Merged with S2-163672 into S2-163746. Will be merged into S2-163746 Indicating default packet delay budget as part of FPI and override with CP signalling Merged
6.10.2 S2-163695 P-CR QoS Parameter - Flow Inactivity Time Samsung FS_NextGen Noted Noted
6.10.2 S2-163533 P-CR Context Aware QoS Framework for GBR services Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised in parallel session to S2-163799. Revised
6.10.2 S2-163799 P-CR Context Aware QoS Framework for GBR services Nokia, Alcatel-Lucent Shanghai Bell - FS_NextGen Revision of S2-163533. Agreed in parallel session Block approved Approved AGREED
6.10.2 S2-163696 P-CR Implicit UE Requested QoS Update Samsung FS_NextGen Revised in parallel session to S2-163800. Revised
6.10.2 S2-163800 P-CR Implicit UE Requested QoS Update Samsung, Qualcomm Incorporated - FS_NextGen Revision of S2-163696. Agreed in parallel session Block approved Approved AGREED
6.10.2 S2-163698 P-CR Multi-RAT QoS Samsung FS_NextGen Noted Noted
- - - New Solutions - - - - -
6.10.2 S2-163262 P-CR Application based UL traffic identification ZTE Corporation, CATR FS_NextGen Revised in parallel session to S2-163801. Revised
6.10.2 S2-163801 P-CR Application based UL traffic identification ZTE Corporation, CATR - FS_NextGen Revision of S2-163262. Agreed in parallel session Block approved Approved AGREED
6.10.2 S2-163397 P-CR NextGen Bearer based QoS control mechanism Huawei, HiSilicon FS_NextGen Revised in parallel session to S2-163802. Revised
6.10.2 S2-163802 P-CR NextGen Bearer based QoS control mechanism Huawei, HiSilicon - FS_NextGen Revision of S2-163397. Revised in parallel session to S2-164092. Revised
6.10.2 S2-164092 P-CR NextGen Bearer based QoS control mechanism Huawei, HiSilicon - FS_NextGen Revision of S2-163802. Agreed in parallel session Block approved Approved AGREED
6.10.2 S2-163581 P-CR Position of QoS marking in flow based QoS solution LG Electronics FS_NextGen Noted Noted
- - - Interim Conclusions - - - - -
6.10.2 S2-163671 P-CR Interim agreements on QoS Framework Intel FS_NextGen Revised in parallel session to S2-163742. Revised
6.10.2 S2-163742 P-CR Interim agreements on QoS Framework Drafting (Intel) - FS_NextGen Revision of S2-163671. Revised in parallel session to S2-164093. Revised
6.10.2 S2-164093 P-CR Interim agreements on QoS Framework Intel (Drafting) - FS_NextGen Revision of S2-163742. Nokia objected to the addition of bullet 3a as part of interim conclusions. Revised to S2-164276. Revised
6.10.2 S2-164276 P-CR Interim agreements on QoS Framework Intel (Drafting session) - FS_NextGen Revision of S2-164093. Approved Approved
6.10.2 S2-163743 P-CR QoS Framework agreements Drafting session (Intel) - FS_NextGen Revised in parallel session to S2-163803. Revised
6.10.2 S2-163803 P-CR QoS Framework agreements Drafting session (Intel) - FS_NextGen Revision of S2-163743. Revised to S2-164275. Revised
6.10.2 S2-164275 P-CR QoS Framework agreements Intel (Drafting session) - FS_NextGen Revision of S2-163803. Approved Approved
6.10.2 S2-163337 P-CR Update of QoS Interim agreements Ericsson FS_NextGen Noted in parallel session Noted
6.10.3 - - Updates and solutions for key issue 3: Mobility Management framework - - {Frank} - -
- - - General - - - - -
6.10.3 S2-163531 P-CR Outcome of email discussions to identify where handover is handled Nokia FS_NextGen Revised to S2-163991. Revised
6.10.3 S2-163991 P-CR Outcome of email discussions to identify where handover is handled Nokia (Email discussion convenor) FS_NextGen Revision of S2-163531. Agreed in parallel session Block approved Approved AGREED
- - - On WT1 access control / registration management, somehow incl. RAN and/or CN idle state - - - - -
6.10.3 S2-163466 other Summary of email discussion on MM WT1 access control / registration management Ericsson FS_NextGen Noted Noted
6.10.3 S2-163467 P-CR Updates to section 8.1 based on the email discussion on MM WT1 access control / registration management Ericsson FS_NextGen Revised to S2-163992. Revised
6.10.3 S2-163992 P-CR Updates to section 8.1 based on the email discussion on MM WT1 access control / registration management Ericsson FS_NextGen Revision of S2-163467. Left open for review in the main plenary session. Revised to S2-164203. Revised
6.10.3 S2-164203 P-CR Updates to section 8.1 based on the email discussion on MM WT1 access control / registration management Ericsson FS_NextGen Revision of S2-163992. Approved Approved
6.10.3 S2-163697 DISCUSSION On the need for CN_Idle state in the NextGen system Intel Noted Noted
6.10.3 S2-163623 P-CR RAN Specific Paging for UE in CN connected mode CATT FS_NextGen Revised to S2-163993. Revised
6.10.3 S2-163993 P-CR RAN Specific Paging for UE in CN connected mode CATT FS_NextGen Revision of S2-163623. Agreed in parallel session Block approved Approved AGREED
- - - On WT2 Reachability management - - - - -
6.10.3 S2-163497 P-CR Summary of email discussion on UE Reachability Management NTT DOCOMO INC. FS_NextGen Revised to S2-163994. Revised
6.10.3 S2-163994 P-CR Summary of email discussion on UE Reachability Management NTT DOCOMO (email discussion convenor) FS_NextGen Revision of S2-163497. Agreed in parallel session Block approved Approved AGREED
6.10.3 S2-163460 P-CR Solution for dynamic mobility management Telecom Italia FS_NextGen Revised to S2-163995. Revised
6.10.3 S2-163995 P-CR Solution for dynamic mobility management Telecom Italia, ZTE FS_NextGen Revision of S2-163460. Revised to S2-164070. Revised
6.10.3 S2-164070 P-CR Solution for dynamic mobility management Telecom Italia, ZTE, LG Electronics FS_NextGen Revision of S2-163995. Revised to S2-164239. Revised
6.10.3 S2-164239 P-CR Solution for dynamic mobility management Telecom Italia, ZTE, LG Electronics FS_NextGen Revision of S2-164070. Approved Approved
6.10.3 S2-163486 P-CR Solution for UE reachability in power saving state Intel FS_NextGen Revised to S2-163996. Revised
6.10.3 S2-163996 P-CR Solution for UE reachability in power saving state Intel FS_NextGen Revision of S2-163486. Agreed in parallel session Block approved Approved AGREED
6.10.3 S2-163545 P-CR Solution: Location tracking in NextGen system Huawei, HiSilicon FS_NextGen Revised to S2-163997. Revised
6.10.3 S2-163997 P-CR Solution: Location tracking in NextGen system Huawei, HiSilicon FS_NextGen Revision of S2-163545. Agreed in parallel session Block approved Approved AGREED
- - - Solutions including registration and reachability management - - - - -
6.10.3 S2-163272 P-CR Updates to Solution 3.2 Ericsson FS_NextGen Revised to S2-163998. Revised
6.10.3 S2-163998 P-CR Updates to Solution 3.2 Ericsson FS_NextGen Revision of S2-163272. Agreed in parallel session Block approved Approved AGREED
6.10.3 S2-163512 P-CR Solution update '6.3.7: NextGen State Model' LG Electronics Inc. FS_NextGen Agreed in parallel session Block approved Approved AGREED
- - - On mobility level - - - - -
6.10.3 S2-163418 P-CR Summary of email discussion on mobility levels CATT FS_NextGen Noted Noted
6.10.3 S2-163423 P-CR Discussion on mobility levels CATT FS_NextGen Report and proposals, not a pCR. Noted Noted
6.10.3 S2-163421 P-CR Interim agreements on mobility levels CATT, Telecom Italia, Ericsson, Nokia, Huawei, ETRI, LG Electronics Inc., CMCC FS_NextGen Revised to S2-163999. Revised
6.10.3 S2-163999 P-CR Interim agreements on mobility levels CATT, Telecom Italia, Ericsson, Nokia, Huawei, ETRI, LG Electronics Inc., CMCC FS_NextGen Revision of S2-163421. Agreed in parallel session Block approved Approved AGREED
6.10.3 S2-163624 P-CR Update to Interim agreements on NextGen RAN and NextGen Core functional allocation CATT FS_NextGen Noted Noted
6.10.3 S2-163424 P-CR Solution on determining UE mobility level CATT FS_NextGen Revised to S2-164000. Revised
6.10.3 S2-164000 P-CR Solution on determining UE mobility level CATT FS_NextGen Revision of S2-163424. Revised to S2-164071. Revised
6.10.3 S2-164071 P-CR Solution on determining UE mobility level CATT FS_NextGen Revision of S2-164000. Agreed in parallel session Block approved Approved AGREED
6.10.3 S2-163273 P-CR Update of Solution on Mobility levels using Mobility and Session Classes Ericsson FS_NextGen Revised to S2-164001. Revised
6.10.3 S2-164001 P-CR Update of Solution on Mobility levels using Mobility and Session Classes Ericsson FS_NextGen Revision of S2-163273. Agreed in parallel session Block approved Approved AGREED
6.10.3 S2-163274 P-CR Clarification of Session Classes Ericsson FS_NextGen Revised to S2-164002. Revised
6.10.3 S2-164002 P-CR Clarification of Session Classes Ericsson FS_NextGen Revision of S2-163274. Revised to S2-164102. Revised
6.10.3 S2-164102 P-CR Clarification of Session Classes Ericsson FS_NextGen Revision of S2-164002. Approved Approved
6.10.3 S2-163509 P-CR Solution to support different level of mobility InterDigital FS_NextGen Revised to S2-164003. Revised
6.10.3 S2-164003 P-CR Solution to support different level of mobility InterDigital FS_NextGen Revision of S2-163509. Revised to S2-164103. Revised
6.10.3 S2-164103 P-CR Solution to support different level of mobility InterDigital FS_NextGen Revision of S2-164003. Approved Approved
6.10.3 S2-163511 P-CR Solution for Key Issue 3 'Limited & Unlimited UE mobility level' LG Electronics Inc. FS_NextGen Revised to S2-164004. Revised
6.10.3 S2-164004 P-CR Solution for Key Issue 3 'Limited & Unlimited UE mobility level' LG Electronics FS_NextGen Revision of S2-163511. Agreed in parallel session Block approved Approved AGREED
6.10.3 S2-163530 P-CR Solution for Idle-Mode Mobility levels Nokia, Alcatel-Lucent Shanghai Bell, NTT DOCOMO FS_NextGen Revised, merging S2-163617, to S2-164064. Revised
6.10.3 S2-164064 P-CR Solution for Idle-Mode Mobility levels Nokia, Alcatel-Lucent Shanghai Bell, NTT DOCOMO, Samsung FS_NextGen Revision of S2-163530, merging S2-163617. Revised to S2-164204. Revised
6.10.3 S2-164204 P-CR Solution for Idle-Mode Mobility levels Nokia, Alcatel-Lucent Shanghai Bell, NTT DOCOMO, Samsung FS_NextGen Revision of S2-164064. Agreed in parallel session Block approved Approved AGREED
6.10.3 S2-163617 P-CR Mobility Level associate to the UE's terminal type Samsung FS_NextGen Merged with S2-163530 into S2-164064. Merged
- - - Other new solutions - - - - -
6.10.3 S2-163510 P-CR Solution for Key issue 3 'UE requested resource usage preference' LG Electronics Inc. FS_NextGen Noted Noted
6.10.3 S2-163297 P-CR Assignment of CP and UP network functions during an MM procedure Samsung FS_NextGen Revised to S2-164041. Revised
6.10.3 S2-164041 P-CR Assignment of CP and UP network functions during an MM procedure Samsung FS_NextGen Revision of S2-163297. Revised to S2-164104. Revised
6.10.3 S2-164104 P-CR Assignment of CP and UP network functions during an MM procedure Samsung FS_NextGen Revision of S2-164041. This was withdrawn. Withdrawn
- - - SM - MM relation - - - - -
6.10.4 - - Updates and solutions for key issue 4: Session management - - {Frank} - -
- - - SM model: basic procedure/UP model - - - - -
6.10.4 S2-163326 P-CR User Plane format solutions Ericsson FS_NextGen Merged with S2-163347, S2-163608 and S2-163609 in S2-163932 Revised
6.10.4 S2-163932 P-CR User Plane format solutions Ericsson, China Mobile?, KDDI? FS_NextGen Revision of S2-163326, merging with S2-163347, S2-163608 and S2-163609. Revised to S2-164205. Revised
6.10.4 S2-164205 P-CR User Plane format solutions Ericsson, China Mobile, KDDI, Nokia, ITRI, ZTE FS_NextGen Revision of S2-163932. Revised to S2-164250. Revised
6.10.4 S2-164250 P-CR User Plane format solutions Ericsson, China Mobile, KDDI, Nokia, ITRI, ZTE FS_NextGen Revision of S2-164205. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163347 P-CR SM UP model proposal China Mobile FS_NextGen This was merged with S2-163326, S2-163608 and S2-163609 into S2-163932. Merged
6.10.4 S2-163608 P-CR On tunnelling to carry User plane flows within the NG Core and on NG3 Nokia, Intel, Cisco Systems Inc., ZTE, Alcatel-Shanghai Bell FS_NextGen This was merged with S2-163326, S2-163347 and S2-163609 into S2-163932. Merged
6.10.4 S2-163609 P-CR On usage of aggregate tunnelling over NG3 Nokia, Alcatel-Shanghai Bell FS_NextGen This was merged with S2-163326, S2-163347 and S2-163608 into S2-163932. Merged
6.10.4 S2-163430 P-CR Session management for URLLC session Huawei, HiSilicon FS_NextGen Revised to S2-163933. Revised
6.10.4 S2-163933 P-CR Session management for URLLC session Huawei, HiSilicon FS_NextGen Revision of S2-163430. Noted in parallel session Noted
6.10.4 S2-163576 P-CR Determination of session duration Samsung FS_NextGen Revised to S2-163934. Revised
6.10.4 S2-163934 P-CR Determination of session duration Samsung FS_NextGen Revision of S2-163576. Noted in parallel session Noted
6.10.4 S2-163578 P-CR Correction/rewording of text in section 6.4.2.2 Samsung FS_NextGen Revised to S2-163935. Revised
6.10.4 S2-163935 P-CR Correction/rewording of text in section 6.4.2.2 Samsung FS_NextGen Revision of S2-163578. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163678 P-CR Update solution 4.2: Session setup procedures NTT DOCOMO FS_NextGen Revised to S2-164068. Revised
6.10.4 S2-164068 P-CR Update solution 4.2: Session setup procedures NTT DOCOMO FS_NextGen Revision of S2-163678. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163566 P-CR Session connection state for NextGen system Huawei, HiSilicon FS_NextGen Not Handled Not Handled
- - - SM model: multi-PDU sessions/UP GW - - - - -
6.10.4 S2-163315 P-CR Updates to Solution 4.4 on multi-homed PDU sessions Ericsson FS_NextGen Merged with S2-163606 into S2-163936. Merged
6.10.4 S2-163606 P-CR Role of the common UP-GW in case of multi-homed (IPv6) PDU Session Nokia, Alcatel-Shanghai Bell FS_NextGen Revised to S2-163936. Revised
6.10.4 S2-163936 P-CR Role of the common UP-GW in case of multi-homed (IPv6) PDU Session Nokia , Alcatel-Shanghai Bell, Ericsson? FS_NextGen Revision of S2-163606, merging S2-163315. Sources should be confirmed. Revised to S2-164118. Revised
6.10.4 S2-164118 P-CR Role of the common UP-GW in case of multi-homed (IPv6) PDU Session Nokia , Alcatel-Shanghai Bell, Ericsson? FS_NextGen Revision of S2-163936. Revised to S2-164157. Revised
6.10.4 S2-164157 P-CR Role of the common UP-GW in case of multi-homed (IPv6) PDU Session Nokia , Alcatel-Shanghai Bell, Ericsson FS_NextGen Revision of S2-164118. Revised to S2-164251. Revised
6.10.4 S2-164251 P-CR Role of the common UP-GW in case of multi-homed (IPv6) PDU Session Nokia , Alcatel-Shanghai Bell, Ericsson FS_NextGen Revision of S2-164157. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163253 P-CR Session Management model with UL-CL in RAN ZTE Corporation, CATR FS_NextGen Revised to S2-164022. Revised
6.10.4 S2-164022 P-CR Session Management model with UL-CL in RAN ZTE Corporation, CATR FS_NextGen Revision of S2-163253. Revised to S2-164105. Revised
6.10.4 S2-164105 P-CR Session Management model with UL-CL in RAN ZTE Corporation, CATR FS_NextGen Revision of S2-164022. This was withdrawn Withdrawn
6.10.4 S2-163610 P-CR Session management with flexible UP GW(s) assignment NEC FS_NextGen Revised to S2-163937. Revised
6.10.4 S2-163937 P-CR Session management with flexible UP GW(s) assignment NEC FS_NextGen Revision of S2-163610. Revised to S2-164206. Revised
6.10.4 S2-164206 P-CR Session management with flexible UP GW(s) assignment NEC FS_NextGen Revision of S2-163937. Revised to S2-164252. Revised
6.10.4 S2-164252 P-CR Session management with flexible UP GW(s) assignment NEC FS_NextGen Revision of S2-164206. Agreed in parallel session Block approved Approved AGREED
- - - SM - MM relation - - - - -
6.10.4 S2-163409 P-CR Common interface for MM and SM function CATT FS_NextGen Revised to S2-163944. Revised
6.10.4 S2-163944 P-CR Common interface for MM and SM function CATT FS_NextGen Revision of S2-163409. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163550 P-CR NAS&S1 entry function for SM and MM separation Huawei, HiSilicon FS_NextGen Revised to S2-163943. Revised
6.10.4 S2-163943 P-CR NAS&S1 entry function for SM and MM separation Huawei, HiSilicon FS_NextGen Revision of S2-163550. Revised to S2-164106. Revised
6.10.4 S2-164106 P-CR NAS&S1 entry function for SM and MM separation Huawei, HiSilicon FS_NextGen Revision of S2-163943. Revised to S2-164253. Revised
6.10.4 S2-164253 P-CR NAS&S1 entry function for SM and MM separation Huawei, HiSilicon FS_NextGen Revision of S2-164106. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163417 P-CR Interaction information between MM and SM CATT FS_NextGen Revised, merging S2-163547, to S2-164005. Revised
6.10.4 S2-164005 P-CR Interaction information between MM and SM Huawei, HiSilicon, CATT FS_NextGen Revision of S2-163417, merging S2-163547. Revised to S2-164107. Revised
6.10.4 S2-164107 P-CR Interaction information between MM and SM Huawei, HiSilicon, CATT FS_NextGen Revision of S2-164005. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163605 P-CR Relationship between Mobility Management and Session Management Nokia, Alcatel-Shanghai Bell FS_NextGen Revised to S2-164006. Revised
6.10.4 S2-164006 P-CR Relationship between Mobility Management and Session Management Nokia, Alcatel-Shanghai Bell, CATT FS_NextGen Revision of S2-163605. Revised to S2-164108. Revised
6.10.4 S2-164108 P-CR Relationship between Mobility Management and Session Management Nokia, Alcatel-Shanghai Bell, CATT FS_NextGen Revision of S2-164006. Revised to S2-164254. Revised
6.10.4 S2-164254 P-CR Relationship between Mobility Management and Session Management Nokia, Alcatel-Shanghai Bell, CATT FS_NextGen Revision of S2-164108. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163547 P-CR Solution for key issue 4 - the interaction between MM and SM Huawei, HiSilicon FS_NextGen Merged with S2-163417 in S2-164005. Merged
6.10.4 S2-163415 P-CR MM and SM selection function CATT FS_NextGen Not Handled Not Handled
- - - Small data - - - - -
6.10.4 S2-163312 P-CR Solution for Infrequent Small Data Ericsson FS_NextGen Revised to S2-164007. Revised
6.10.4 S2-164007 P-CR Solution for Infrequent Small Data Ericsson FS_NextGen Revision of S2-163312. Revised to S2-164109. Revised
6.10.4 S2-164109 P-CR Solution for Infrequent Small Data Ericsson FS_NextGen Revision of S2-164007. Revised to S2-164249. Revised
6.10.4 S2-164249 P-CR Solution for Infrequent Small Data Ericsson FS_NextGen Revision of S2-164109. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163431 P-CR small data mechanism Huawei, HiSilicon FS_NextGen Revised to S2-164008. Revised
6.10.4 S2-164008 P-CR small data mechanism Huawei, HiSilicon, LG Electronics FS_NextGen Revision of S2-163431. The wrong was document uploaded. so this was revised again, in S2-164110 Revised
6.10.4 S2-164110 P-CR small data mechanism Huawei, HiSilicon, LG Electronics FS_NextGen Revision of S2-164008. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163546 P-CR Update of Solution 4.7: Infrequent small user data transfer Huawei, HiSilicon FS_NextGen Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163607 P-CR Updates to solution 4.8: for Data transmission with Connectionless RAN-Core interface Nokia, Alcatel-Shanghai Bell FS_NextGen Revised to S2-164069. Revised
6.10.4 S2-164069 P-CR Updates to solution 4.8: for Data transmission with Connectionless RAN-Core interface Nokia, Alcatel-Shanghai Bell FS_NextGen Revision of S2-163607. Revised to S2-164255. Revised
6.10.4 S2-164255 P-CR Updates to solution 4.8: for Data transmission with Connectionless RAN-Core interface Nokia, Alcatel-Shanghai Bell FS_NextGen Revision of S2-164069. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163389 P-CR Support of infrequent small user data transfer in solution 3.5 Qualcomm Incorporated FS_NextGen Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163579 P-CR Connection-less UP and DL PDU transfer Samsung FS_NextGen This was withdrawn. Withdrawn
- - - Connected via multiple accesses - - - - -
6.10.4 S2-163368 P-CR Summary of email discussion about SM WT#5 (UE connected via multiple accesses) LG Electronics FS_NextGen This is a report or discussion document, not a pCR. Noted Noted
6.10.4 S2-163369 P-CR SM WT update proposal based on email discussion about SM WT#5 LG Electronics FS_NextGen Revised to S2-164065. Revised
6.10.4 S2-164065 P-CR SM WT update proposal based on email discussion about SM WT#5 LG Electronics (email discussion convenor) FS_NextGen Revision of S2-163369. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163370 P-CR Solution - Session Management on the PDU session(s) via different accesses LG Electronics FS_NextGen Revised to S2-164066. Revised
6.10.4 S2-164066 P-CR Solution - Session Management on the PDU session(s) via different accesses LG Electronics FS_NextGen Revision of S2-163370. Agreed in parallel session Block approved Approved AGREED
6.10.4 S2-163371 P-CR Proposal on Interim agreements for Session Management LG Electronics FS_NextGen Revised to S2-164067. Revised
6.10.4 S2-164067 P-CR Proposal on Interim agreements for Session Management LG Electronics FS_NextGen Revision of S2-163371. Revised to S2-164256. Revised
6.10.4 S2-164256 P-CR Proposal on Interim agreements for Session Management LG Electronics FS_NextGen Revision of S2-164067. Agreed in parallel session Block approved Approved AGREED
- - - other - - - - -
6.10.4 S2-163577 P-CR Session maintenance procedures Samsung FS_NextGen Not Handled Not Handled
6.10.5 - - Updates and solutions for key issue 5: Enabling (re)selection of efficient user plane paths - - {Magnus} - -
6.10.5 S2-163345 P-CR Consolidate the KIs #5 and #6 and the WTs China Mobile FS_NextGen Agreed in parallel session Block approved Approved AGREED
6.10.5 S2-163425 P-CR Update of solution 6.5.1 CATT FS_NextGen Revised to S2-163983. Revised
6.10.5 S2-163983 P-CR Update of solution 6.5.1 CATT FS_NextGen Revision of S2-163425. Agreed in parallel session Block approved Approved AGREED
6.10.5 S2-163298 P-CR Update of Solution 5.3 Samsung FS_NextGen Revised to S2-163984. Revised
6.10.5 S2-163984 P-CR Update of Solution 5.3 Samsung FS_NextGen Revision of S2-163298. Agreed in parallel session Block approved Approved AGREED
6.10.5 S2-163313 P-CR Updates to Solution 5.2 on (re)selection of efficient user plane paths Ericsson FS_NextGen Revised to S2-163986. Revised
6.10.5 S2-163986 P-CR Updates to Solution 5.2 on (re)selection of efficient user plane paths Ericsson FS_NextGen Revision of S2-163313. Approved Approved
6.10.5 S2-163692 P-CR Clarifications for solution 5.2 Cisco Systems, Inc. FS_NextGen Revised to S2-163985. Revised
6.10.5 S2-163985 P-CR Clarifications for solution 5.2 Cisco Systems, Inc. FS_NextGen Revision of S2-163692. Revised to S2-164158. Revised
6.10.5 S2-164158 P-CR Clarifications for solution 5.2 Cisco Systems, Inc. FS_NextGen Revision of S2-163985. Agreed in parallel session Block approved Approved AGREED
6.10.5 S2-163491 P-CR Dedicated bearers based user plane optimization NTT DOCOMO FS_NextGen Revised to S2-163987. Revised
6.10.5 S2-163987 P-CR Multiple tunnels based user plane optimization NTT DOCOMO, ZTE FS_NextGen Revision of S2-163491. Revised to S2-164259. Revised
6.10.5 S2-164259 P-CR Dedicated bearers based user plane optimization NTT DOCOMO, ZTE FS_NextGen Revision of S2-163987. Approved Approved
6.10.5 S2-163600 P-CR Application-aware UP Path (Re)selection Huawei, HiSilicon, CATR FS_NextGen Revised to S2-163988. Revised
6.10.5 S2-163988 P-CR Application-aware UP Path (Re)selection Huawei, HiSilicon, CATR FS_NextGen Revision of S2-163600. Revised to S2-164159. Revised
6.10.5 S2-164159 P-CR Application-aware UP Path (Re)selection Huawei, HiSilicon, CATR FS_NextGen Revision of S2-163988. Revised to S2-164240. Revised
6.10.5 S2-164240 P-CR Application-aware UP Path (Re)selection Huawei, HiSilicon, CATR FS_NextGen Revision of S2-164159. Approved Approved
6.10.6 - - Updates and solutions for key issue 6: Support for session and service continuity - - {Magnus} - -
6.10.6 S2-163316 P-CR Updates to Solution 6.1 on efficient SSC mode 2 and 3 Ericsson FS_NextGen Revised to S2-163989. Revised
6.10.6 S2-163989 P-CR Updates to Solution 6.1 on efficient SSC mode 2 and 3 Ericsson FS_NextGen Revision of S2-163316. Revised to S2-164260. Revised
6.10.6 S2-164260 P-CR Updates to Solution 6.1 on efficient SSC mode 2 and 3 Ericsson FS_NextGen Revision of S2-163989. Approved Approved
6.10.6 S2-163506 P-CR Network triggered SSC mode update for an ongoing PDU session InterDigital FS_NextGen This was left open for off-line discussion to try to obtain support from other companies. Noted Noted
6.10.6 S2-163410 P-CR Interim conclusions for key issues 5 and 6 (support for session and service continuity and efficient user plane path) Cisco Systems, Inc. FS_NextGen Revised to S2-163990. Revised
6.10.6 S2-163990 P-CR Interim conclusions for key issues 5 and 6 (support for session and service continuity and efficient user plane path) Cisco Systems, Inc. FS_NextGen Revision of S2-163410. Revised to S2-164160. Revised
6.10.6 S2-164160 P-CR Interim conclusions for key issues 5 and 6 (support for session and service continuity and efficient user plane path) Cisco Systems, Inc. FS_NextGen Revision of S2-163990. This was withdrawn. Withdrawn
6.10.6 S2-163580 P-CR Support of service continuity using tunnelling between UP Entities LG Electronics FS_NextGen Not Handled Not Handled
6.10.6 S2-163664 P-CR Add a trigger for PDU session release CATT FS_NextGen Not Handled Not Handled
6.10.6 S2-163314 P-CR Updates to Solution 6.1 on Session and service continuity framework Ericsson FS_NextGen Not Handled Not Handled
6.10.7 - - Updates and solutions for key issue 7: Network function granularity and interactions between them - - {Magnus} - -
6.10.7 S2-163255 P-CR Interconnection function ZTE Corporation, CATR FS_NextGen Revised in parallel session to S2-163924. Open for clarifying the need for it offline Revised
6.10.7 S2-163924 P-CR Interconnection function ZTE Corporation, CATR - FS_NextGen Revision of S2-163255. Revised to S2-164241. Revised
6.10.7 S2-164241 P-CR Interconnection function ZTE Corporation, CATR - FS_NextGen Revision of S2-163924. Revised to S2-164261. Revised
6.10.7 S2-164261 P-CR Interconnection function ZTE Corporation, CATR - FS_NextGen Revision of S2-164241. Approved Approved
6.10.7 S2-163361 P-CR Solution for Key Issue 7 The Interconnection of Modular Network Functions Orange, NEC, Telenor, Interdigital FS_NextGen Revised in parallel session to S2-163920. Revised
6.10.7 S2-163920 P-CR Solution for Key Issue 7 The Interconnection of Modular Network Functions Orange, NEC, Telenor, Interdigital - FS_NextGen Revision of S2-163361. Revised to S2-164117. Revised
6.10.7 S2-164117 P-CR Solution for Key Issue 7 The Interconnection of Modular Network Functions Orange, NEC, Telenor, Interdigital - FS_NextGen Revision of S2-163920. Agreed in parallel session Block approved Approved AGREED
6.10.7 S2-163534 P-CR Solution for 'Key issue on Network Function Granularity and Interconnection between them' Nokia, Alcatel-Lucent Shanghai Bell FS_NextGen Revised in parallel session to S2-163921. Revised
6.10.7 S2-163921 P-CR Solution for 'Key issue on Network Function Granularity and Interconnection between them' Nokia, Alcatel-Lucent Shanghai Bell - FS_NextGen Revision of S2-163534. This was withdrawn. Withdrawn
6.10.7 S2-163548 P-CR New work task to key issue 7 - The NF granularity Huawei, HiSilicon, China Mobile FS_NextGen Noted in parallel session As it was agreed to consider NF granularity only in the context of overall architecture proposals it is considered as not needed. Noted
6.10.7 S2-163549 P-CR Solution for key issue 7- the NF discovery across PLMNs Huawei, HiSilicon, China Mobile FS_NextGen Revised in parallel session to S2-163922. Revised
6.10.7 S2-163922 P-CR Solution for key issue 7- the NF discovery across PLMNs Huawei, HiSilicon, China Mobile - FS_NextGen Revision of S2-163549. Revised to S2-164161. Revised
6.10.7 S2-164161 P-CR Solution for key issue 7- the NF discovery across PLMNs Huawei, HiSilicon, China Mobile - FS_NextGen Revision of S2-163922. Agreed in parallel session Block approved Approved AGREED
6.10.7 S2-163500 P-CR Updates to Solution 7.3 Ericsson FS_NextGen Revised in parallel session to S2-163923. Revised
6.10.7 S2-163923 P-CR Updates to Solution 7.3 Ericsson - FS_NextGen Revision of S2-163500. Revised to S2-164242. Revised
6.10.7 S2-164242 P-CR Updates to Solution 7.3 Ericsson - FS_NextGen Revision of S2-163923. Approved Approved
6.10.8 - - Updates and solutions for key issue 8: Next Generation core and access - functional division and interface - - {Frank} - -
6.10.8 S2-163346 P-CR WTs on KI#8 China Mobile FS_NextGen Revised to S2-164023. Revised
6.10.8 S2-164023 P-CR WTs on KI#8 China Mobile FS_NextGen Revision of S2-163346. Agreed in parallel session Block approved Approved AGREED
6.10.8 S2-163412 P-CR Update to Solution 8.2 Intel, ETRI FS_NextGen Revised to S2-164024. Revised
6.10.8 S2-164024 P-CR Update to Solution 8.2 Intel, ETRI FS_NextGen Revision of S2-163412. Revised to S2-164162. Revised
6.10.8 S2-164162 P-CR Update to Solution 8.2 Intel, ETRI, Broadcom, InterDigital FS_NextGen Revision of S2-164024. Revised to S2-164243. Revised
6.10.8 S2-164243 P-CR Update to Solution 8.2 Intel, ETRI, Broadcom, InterDigital FS_NextGen Revision of S2-164162. Agreed in parallel session Block approved Approved AGREED
6.10.8 S2-163505 P-CR Architecture for support of untrusted WLAN Qualcomm Incorporated FS_NextGen Revised to S2-164025. Revised
6.10.8 S2-164025 P-CR Architecture for support of untrusted WLAN Qualcomm Incorporated, Broadcom FS_NextGen Revision of S2-163505. Revised to S2-164183. Revised
6.10.8 S2-164183 P-CR Architecture for support of untrusted WLAN Qualcomm Incorporated, Broadcom FS_NextGen Revision of S2-164025. Revised to S2-164244. Revised
6.10.8 S2-164244 P-CR Architecture for support of untrusted WLAN Qualcomm Incorporated, Broadcom, Motorola Mobility, Lenovo FS_NextGen Revision of S2-164183. Approved Approved
6.10.8 S2-163717 P-CR Update of Solution 6.8.4 ETRI FS_NextGen Revised to S2-164026. Revised
6.10.8 S2-164026 P-CR Update of Solution 6.8.4 ETRI FS_NextGen Revision of S2-163717. Agreed in parallel session Block approved Approved AGREED
6.10.9 - - Updates and solutions for key issue 9: 3GPP architecture impacts to support network capability exposure - - {Not_on_agenda} - -
6.10.10 - - Updates and solutions for key issue 10: Policy Framework - - {Frank} - -
6.10.10 S2-163251 P-CR Policy Framework: list of Work Tasks Allot Communications, NTT DOCOMO FS_NextGen Revised to S2-164033. Revised
6.10.10 S2-164033 P-CR Policy Framework: list of Work Tasks Allot Communications, NTT DOCOMO FS_NextGen Revision of S2-163251. Agreed in parallel session Block approved Approved AGREED
6.10.10 S2-163252 P-CR Policy Framework key issue solution Allot Communications, Openet, KDDI, Rogers Communications FS_NextGen Revised to S2-164034. Revised
6.10.10 S2-164034 P-CR Policy Framework key issue solution Allot Communications, Openet, KDDI, Rogers Communications FS_NextGen Revision of S2-163252. Revised to S2-164184. Revised
6.10.10 S2-164184 P-CR Policy Framework key issue solution Allot Communications, Openet, KDDI, Rogers Communications FS_NextGen Revision of S2-164034. Agreed in parallel session Block approved Approved AGREED
6.10.10 S2-163405 P-CR Analytics-based Policy Motorola Mobility, Lenovo FS_NextGen Revised to S2-164035. Revised
6.10.10 S2-164035 P-CR Analytics-based Policy Motorola Mobility, Lenovo FS_NextGen Revision of S2-163405. Revised to S2-164185. Revised
6.10.10 S2-164185 P-CR Analytics-based Policy Motorola Mobility, Lenovo FS_NextGen Revision of S2-164035. Agreed in parallel session Block approved Approved AGREED
6.10.10 S2-163685 P-CR Solution to Key Issue on Policy Framework Huawei, HiSilicon FS_NextGen Revised to S2-164036. Revised
6.10.10 S2-164036 P-CR Solution to Key Issue on Policy Framework Huawei, HiSilicon FS_NextGen Revision of S2-163685. Revised to S2-164262. Revised
6.10.10 S2-164262 P-CR Solution to Key Issue on Policy Framework Huawei, HiSilicon FS_NextGen Revision of S2-164036. Approved Approved
6.10.11 - - Updates and solutions for key issue 11: Charging - - {Not_on_agenda} - -
6.10.12 - - Updates and solutions for key issue 12: Security framework - - {Frank} - -
6.10.12 S2-163221 LS In LS from NGMN Alliance: 5G Security Recommendations Package #1 NGMN Alliance (160506 Liaison NGMN P1 Security to 3GPP-package1) Postponed S2-162313 from S2#115. Noted Noted
6.10.12 S2-163244 LS In LS from SA WG3: Reply LS on Next Generation Security Requirements for RAN SA WG3 (S3-160833) Rel-14 FS_NSA A response was drafted in S2-163699. Final response in S2-164280 Replied to OPEN
6.10.12 S2-163699 LS OUT DRAFT Response to Reply LS on 'Next Generation' Security Requirements for RAN VODAFONE Group Plc Rel-14 Response to S2-163244. Revised, merging S2-163327, to S2-164037. Revised
6.10.12 S2-164037 LS OUT DRAFT LS on 'Next Generation' Security Requirements SA WG2 Rel-14 Revision of S2-163699, merging S2-163327. Revised to S2-164245. Revised
6.10.12 S2-164245 LS OUT DRAFT LS on 'Next Generation' Security Requirements SA WG2 Rel-14 Revision of S2-164037. Revised to S2-164263. Revised
6.10.12 S2-164263 LS OUT LS on 'Next Generation' Security Requirements SA WG2 Rel-14 Revision of S2-164245. TDs were referenced as TR not available yet. Revised to S2-164280. Revised
6.10.12 S2-164280 LS OUT LS on 'Next Generation' Security Requirements SA WG2 Rel-14 Revision of S2-164263. Approved Approved
6.10.12 S2-163327 LS OUT DRAFT LS on Security aspect of NextGen system Ericsson Rel-14 FS_NextGen Merged with S2-163699 into S2-164037. Merged
6.10.12 S2-163325 P-CR Update of Solution 12.1 for key issue 12 on Authentication and Security Architecture Ericsson, Qualcomm Incorporated FS_NextGen Revised to S2-164038. Revised
6.10.12 S2-164038 P-CR Update of Solution 12.1 for key issue 12 on Authentication and Security Architecture Ericsson, Qualcomm Incorporated FS_NextGen Revision of S2-163325. Revised to S2-164186. Revised
6.10.12 S2-164186 P-CR Update of Solution 12.1 for key issue 12 on Authentication and Security Architecture Ericsson, Qualcomm Incorporated FS_NextGen Revision of S2-164038. Agreed in parallel session Block approved Approved AGREED
6.10.12 S2-163398 P-CR ME Identity Confidentiality Huawei, HiSilicon FS_NextGen Revised to S2-164039. Revised
6.10.12 S2-164039 P-CR ME Identity Confidentiality Huawei, HiSilicon FS_NextGen Revision of S2-163398. Revised to S2-164187. Revised
6.10.12 S2-164187 P-CR ME Identity Confidentiality Huawei, HiSilicon FS_NextGen Revision of S2-164039. Agreed in parallel session Block approved Approved AGREED
6.10.12 S2-163524 P-CR Updates of solution for key issue 12 on Authentication Framework - supporting multiple slices Samsung FS_NextGen Revised to S2-164040. Revised
6.10.12 S2-164040 P-CR Updates of solution for key issue 12 on Authentication Framework - supporting multiple slices Samsung FS_NextGen Revision of S2-163524. Revised to S2-164188. Revised
6.10.12 S2-164188 P-CR Updates of solution for key issue 12 on Authentication Framework - supporting multiple slices Samsung, LG Electronics FS_NextGen Revision of S2-164040. Revised to S2-164264. Revised
6.10.12 S2-164264 P-CR Updates of solution for key issue 12 on Authentication Framework - supporting multiple slices Samsung, LG Electronics FS_NextGen Revision of S2-164188. Revised to S2-164271. Revised
6.10.12 S2-164271 P-CR Updates of solution for key issue 12 on Authentication Framework - supporting multiple slices Samsung, LG Electronics FS_NextGen Revision of S2-164264. Approved Approved
6.10.12 S2-163526 P-CR Remote provisioning general solution for Massive IOT devices Huawei, Hisilicon FS_NextGen Not Handled Not Handled
6.10.12 S2-163599 P-CR Security for UE connecting to multiple slice Huawei, HiSilicon FS_NextGen Not Handled Not Handled
6.10.13 - - Updates and solutions for key issue 13: Broadcast/Multicast Capabilities - - {Not_on_agenda} - -
6.10.14 - - Updates and solutions for key issue 14: Support for Off-Network Communication - - {Not_on_agenda} - -
6.10.15 - - Updates and solutions for key issue 15: NextGen core support for IMS - - {Not_on_agenda} - -
6.10.16 - - Updates and solutions for key issue 16: 3GPP system aspects to support the connectivity via a relay UE - - {Not_on_agenda} - -
6.10.17 - - Updates and solutions for key issue 17: 3GPP architecture impacts to support network discovery and selection - - {Frank} - -
6.10.17 S2-163504 P-CR Network Discovery and Selection Work Task Proposal Broadcom FS_NextGen Revised to S2-164031. Revised
6.10.17 S2-164031 P-CR Network Discovery and Selection Work Task Proposal Broadcom, LG Electronics FS_NextGen Revision of S2-163504. Agreed in parallel session Block approved Approved AGREED
6.10.17 S2-163390 P-CR Solution for key issue 17 on Network Discovery and Selection in idle mode Qualcomm Incorporated FS_NextGen Revised, merging S2-163582, to S2-164032. Revised
6.10.17 S2-164032 P-CR Solution for key issue 17 on Network Discovery and Selection in idle mode Qualcomm Incorporated, Broadcom, Samsung FS_NextGen Revision of S2-163390, merging S2-163582. Revised to S2-164199. Revised
6.10.17 S2-164199 P-CR Solution for key issue 17 on Network Discovery and Selection in idle mode Qualcomm Incorporated, Broadcom, Samsung, LG Electronics FS_NextGen Revision of S2-164032. Agreed in parallel session Block approved Approved AGREED
6.10.17 S2-163582 P-CR Solution for Network discovery and selection LG Electronics FS_NextGen Merged with S2-163390 into S2-164032. Merged
6.10.18 - - Updates and solutions for key issue 18: Interworking and Migration - - {Frank} - -
6.10.18 S2-163392 P-CR Summary of email discussion on Key Issue 18 on Interworking and Migration Qualcomm Incorporated FS_NextGen Agreed in parallel session Block approved Consider only proposed annex A under 6.10.0. Remainder under 6.10.18 Approved AGREED
6.10.18 S2-163408 DISCUSSION KI#18: Deployment options MediaTek Inc. This was merged with the Annex A part of S2-163490 into S2-163732. Merged
6.10.18 S2-163348 DISCUSSION Migration and Interworking Aspects AT&T Revised, merging S2-163372, to S2-164017. Revised
6.10.18 S2-164017 P-CR Migration and Interworking Aspects AT&T FS_NextGen Revision of S2-163348, merging S2-163373. Noted. The structure of this proposal was considered suitable as a basis for continuing discussions on this topic Noted
6.10.18 S2-163372 DISCUSSION Discussion on the forward compatibility of non-standalone NR capable UE LG Electronics FS_NextGen Noted Noted
6.10.18 S2-163373 P-CR Architecture principle and Key issue#18 update for non-standalone NR capable UE LG Electronics FS_NextGen Merged with S2-163348 into S2-164017. Merged
6.10.18 S2-163374 P-CR Solution - The forward compatibility of non-standalone NR capable UE LG Electronics FS_NextGen Merged with S2-163391 into S2-164018. Merged
6.10.18 S2-163391 P-CR Solution for interworking and migration Qualcomm Incorporated, NTT Docomo FS_NextGen Revised, merging S2-163374, to S2-164018. Revised
6.10.18 S2-164018 P-CR Solution for interworking and migration Qualcomm Incorporated, NTT Docomo, Broadcom FS_NextGen Revision of S2-163391, merging S2-163374. Revised to S2-164189. Revised
6.10.18 S2-164189 P-CR Solution for interworking and migration Qualcomm Incorporated, NTT Docomo, Broadcom FS_NextGen Revision of S2-164018. Revised to S2-164246. Revised
6.10.18 S2-164246 P-CR Solution for interworking and migration Qualcomm Incorporated, NTT Docomo, Broadcom FS_NextGen Revision of S2-164189. Approved Approved
6.10.18 S2-163481 P-CR Solution for interworking and migration Intel FS_NextGen Revision of S2-161828 from S2#114. Revised to S2-164019. Revised
6.10.18 S2-164019 P-CR Solution for interworking and migration Intel FS_NextGen Revision of S2-163481. Revised to S2-164247. Revised
6.10.18 S2-164247 P-CR Solution for interworking and migration Intel FS_NextGen Revision of S2-164019. Approved Approved
6.10.18 S2-163501 P-CR Next Gen Interworking and Migration: Scenarios, Requirements and Architecture Ericsson FS_NextGen Revised to S2-164020. Revised
6.10.18 S2-164020 P-CR Next Gen Interworking and Migration: Scenarios, Requirements and Architecture Ericsson FS_NextGen Revision of S2-163501. Revised to S2-164190 and S2-164191. Revised
6.10.18 S2-164190 P-CR Next Gen Interworking and Migration: Solutions Ericsson FS_NextGen Revision of S2-164020. Approved Approved
6.10.18 S2-164191 P-CR Next Gen Interworking and Migration: Scenarios Ericsson FS_NextGen Revision of S2-164020. Noted Noted
6.10.18 S2-163620 P-CR Solution for key issue 18: Interworking between the NextGen Core and EPC Samsung FS_NextGen Revised to S2-164021. Revised
6.10.18 S2-164021 P-CR Solution for key issue 18: Interworking between the NextGen Core and EPC Samsung FS_NextGen Revision of S2-163620. Agreed in parallel session Block approved Approved AGREED
6.10.18 S2-163693 DISCUSSION Migration path to NR/NGC NTT DOCOMO Rel-14 Not Handled Not Handled
6.10.19 - - Updates and solutions for key issue 19: Architecture impacts when using virtual environments - - {Not_on_agenda} - -
6.10.20 - - Updates and solutions for key issue 20: Traffic Steering, Switching and Splitting between 3GPP and non-3GPP Accesses - - {Frank} - -
6.10.20 S2-163403 P-CR Work Tasks for Access Traffic Steering, Switching and Split (ATSSS) Motorola Mobility, Lenovo FS_NextGen Revised to S2-164027. Revised
6.10.20 S2-164027 P-CR Work Tasks for Access Traffic Steering, Switching and Split (ATSSS) Motorola Mobility, Lenovo FS_NextGen Revision of S2-163403. Revised to S2-164192. Revised
6.10.20 S2-164192 P-CR Work Tasks for Access Traffic Steering, Switching and Split (ATSSS) Motorola Mobility, Lenovo FS_NextGen Revision of S2-164027. Agreed in parallel session Block approved Approved AGREED
6.10.20 S2-163304 P-CR Key Issue 20 solution - User Data Path Management Orange, Telefonica FS_NextGen Noted Noted
6.10.20 S2-163393 P-CR Solution for key issue 20 on Access Traffic Steering and Switching Qualcomm Incorporated FS_NextGen Revised to S2-164028. Revised
6.10.20 S2-164028 P-CR Solution for key issue 20 on Access Traffic Steering and Switching Qualcomm Incorporated, LG?, Broadcom FS_NextGen Revision of S2-163393. Revised to S2-164265. Revised
6.10.20 S2-164265 P-CR Solution for key issue 20 on Access Traffic Steering and Switching Qualcomm Incorporated, LG?, Broadcom FS_NextGen Revision of S2-164028. Approved Approved
6.10.20 S2-163404 P-CR Solution for ATSSS Motorola Mobility, Lenovo, Broadcom FS_NextGen Revised to S2-164029. Revised
6.10.20 S2-164029 P-CR Solution for ATSSS Motorola Mobility, Lenovo, Broadcom FS_NextGen Revision of S2-163404. Revised to S2-164193. Revised
6.10.20 S2-164193 P-CR Solution for ATSSS Motorola Mobility, Lenovo, Broadcom FS_NextGen Revision of S2-164029. Approved Approved
6.10.20 S2-163628 P-CR Solution for ATSSS and Multiple Access PDU Sessions Intel FS_NextGen Revised to S2-164030. Revised
6.10.20 S2-164030 P-CR Solution for ATSSS and Multiple Access PDU Sessions Intel FS_NextGen Revision of S2-163628. Revised to S2-164194. Revised
6.10.20 S2-164194 P-CR Solution for ATSSS and Multiple Access PDU Sessions Intel FS_NextGen Revision of S2-164030. Approved Approved
6.10.20 S2-163584 P-CR Solution for Traffic Switching, Steering, and Splitting Samsung Electronics Co., Ltd FS_NextGen LATE DOC: Withdrawn (not provided). Withdrawn
6.10.21 - - Updates and solutions for key issue 21: Minimal connectivity within extreme rural deployments - - {Not_on_agenda} - -
6.10.22 - - Input for TR clause 7 - - {Frank} - -
6.10.22 S2-163265 P-CR Consolidated overall CN architecture option Cisco Systems, Inc., AT&T, Sprint, Allot Communications FS_NextGen Revised to S2-163939. Revised
6.10.22 S2-163939 P-CR Consolidated overall CN architecture option Cisco Systems, Inc., ATT, Sprint, Allot Communications, Vodafone FS_NextGen Revision of S2-163265. Revised to S2-164195. Revised
6.10.22 S2-164195 P-CR Consolidated overall CN architecture option Cisco Systems, Inc., ATT, Sprint, Allot Communications, Vodafone, Interdigital, Deutsche Telekom AG FS_NextGen Revision of S2-163939. Approved Approved
6.10.22 S2-163343 P-CR Network Architecture reference model China Mobile FS_NextGen Revised to S2-163938. Revised
6.10.22 S2-163938 P-CR Network Architecture reference model China Mobile, CATR, CATT FS_NextGen Revision of S2-163343. Revised to S2-163940. Revised
6.10.22 S2-163940 P-CR Network Architecture reference model China Mobile, CATR, CATT, KPN, Deutsche Telekom AG?, AT&T FS_NextGen Revision of S2-163938. Revised to S2-164196. Revised
6.10.22 S2-164196 P-CR Network Architecture reference model China Mobile, CATR, CATT, KPN, Deutsche Telekom AG, AT&T FS_NextGen Revision of S2-163940. Agreed in parallel session Block approved Approved AGREED
6.10.22 S2-163529 P-CR Next Generation Network Architecture Nokia, Ericsson, Verizon, Samsung, Cisco Systems, Inc., Intel, LG Electronics, Alcatel-Lucent Shanghai Bell. FS_NextGen Revised to S2-163941. Revised
6.10.22 S2-163941 P-CR Next Generation Network Architecture Nokia, Ericsson, Verizon, Samsung, Cisco Systems, Inc., Intel, LG Electronics, Alcatel-Lucent Shanghai Bell, ETRI FS_NextGen Revision of S2-163529. Revised to S2-164197. Revised
6.10.22 S2-164197 P-CR Next Generation Network Architecture Nokia, Ericsson, Verizon, Samsung, Cisco Systems, Inc., Intel, LG Electronics, Alcatel-Lucent Shanghai Bell, ETRI, ZTE FS_NextGen Revision of S2-163941. Approved Approved
6.10.22 S2-163708 DISCUSSION Proposal on NextGen Architecture_x00B_Top-Down Approach Deutsche Telekom AG Rel-14 Revised to S2-163729. Revised
6.10.22 S2-163729 DISCUSSION Proposal on NextGen Architecture_x00B_Top-Down Approach Deutsche Telekom AG, Telefonica Rel-14 Revision of S2-163708. A P-CR was drafted in S2-163942. This presentation was then noted. Noted
6.10.22 S2-163942 P-CR Proposal on overall high-level NextGen Architecture Deutsche Telekom AG FS_NextGen Revised to S2-164198. Revised
6.10.22 S2-164198 P-CR Proposal on overall high-level NextGen Architecture Deutsche Telekom AG FS_NextGen Revision of S2-163942. Revised to S2-164278. Revised
6.10.22 S2-164278 P-CR Proposal on overall high-level NextGen Architecture Deutsche Telekom AG FS_NextGen Revision of S2-164198. Approved Approved
6.11 - - Study on Service Domain Centralization (FS_SeDoC) - - {Chris} - -
- - - Conclusions - - - - -
6.11 S2-163349 DISCUSSION Discussion on way forward for FS_SeDoC T-Mobile USA Inc. Rel-14 Noted in parallel session Noted
6.11 S2-163351 P-CR Conclusion proposals for FS_SeDoC T-Mobile USA Inc. FS_SeDoC Revised in parallel session, merging S2-163713, to S2-163892 Conclude: Sedoc Annex to 23.292, SeDoC Registration Normative Annex, and do normative work for Emergency calls Revised
6.11 S2-163892 P-CR Conclusion proposals for FS_SeDoC T-Mobile USA Inc. - FS_SeDoC Revision of S2-163351, merging S2-163713. Revised in parallel session to S2-163901. Reorder conclusion for key issue 1/3/4 to go under informative Annex Conclusion. Revised
6.11 S2-163901 P-CR Conclusion proposals for FS_SeDoC T-Mobile USA Inc. - FS_SeDoC Revision of S2-163892. Agreed in parallel session Block approved Approved AGREED
6.11 S2-163422 P-CR Evaluation and Conclusion NEC FS_SeDoC Noted in parallel session Noted
6.11 S2-163713 P-CR Conclusion for SeDoC roaming to SeDoC Deutsche Telekom AG FS_SeDoC Merged with S2-163351 into S2-163892 Merged
6.11 S2-163353 P-CR Alternative conclusion proposals for FS_SeDoC T-Mobile USA Inc. FS_SeDoC Noted in parallel session Noted
- - - Key Solution Updates - - - - -
6.11 S2-163711 P-CR Solution 11 - fix editor's note by providing flows Deutsche Telekom AG FS_SeDoC Revised in parallel session to S2-163893. Revised
6.11 S2-163893 P-CR Solution 11 - fix editor's note by providing flows Deutsche Telekom AG - FS_SeDoC Revision of S2-163711. Agreed in parallel session Block approved Approved AGREED
6.11 S2-163720 P-CR Solution 10 update Deutsche Telekom AG FS_SeDoC Revised in parallel session to S2-163897. Revised
6.11 S2-163897 P-CR Solution 10 update Deutsche Telekom AG - FS_SeDoC Revision of S2-163720. Revised in parallel session to S2-163902. Revised
6.11 S2-163902 P-CR Solution 10 update Deutsche Telekom AG - FS_SeDoC Revision of S2-163897. Agreed in parallel session Block approved Approved AGREED
- - - Solution Updates - - - - -
6.11 S2-163354 P-CR Editorial fixes to figure 6.2.2.1 T-Mobile USA Inc. FS_SeDoC Noted in parallel session Noted
6.11 S2-163416 P-CR Update of solution #1, #2 and #4 NEC FS_SeDoC Agreed in parallel session Block approved Approved AGREED
6.11 S2-163660 P-CR TR 23.719 corrections Deutsche Telekom AG FS_SeDoC Noted in parallel session Noted
6.11 S2-163674 P-CR Update of solution 4 for eCall Deutsche Telekom AG FS_SeDoC Revised in parallel session to S2-163898. Revised
6.11 S2-163898 P-CR Update of solution 4 for eCall Deutsche Telekom AG - FS_SeDoC Revision of S2-163674. Agreed in parallel session Block approved Approved AGREED
- - - Evaluations - - - - -
6.11 S2-163350 P-CR Overall Evaluations T-Mobile USA Inc. FS_SeDoC This was withdrawn in parallel session. Withdrawn
6.11 S2-163357 P-CR Evaluation of Solution 3 T-Mobile USA Inc. FS_SeDoC Re-submission of S2-162593. This was withdrawn in parallel session. Withdrawn
6.11 S2-163358 P-CR Evaluation of Solution 6 T-Mobile USA Inc. FS_SeDoC Re-submission of S2-162594. This was withdrawn in parallel session. Withdrawn
6.11 S2-163359 P-CR Evaluation of Solution 7 T-Mobile USA Inc. FS_SeDoC Re-submission of S2-162596. This was withdrawn in parallel session. Withdrawn
- - - Overall Solutions - - - - -
6.11 S2-163352 P-CR Annex - Overall Solution T-Mobile USA Inc. FS_SeDoC Noted in parallel session Noted
6.11 S2-163414 CR 23.292 CR0231: Introduction of Service Domain Centralization feature NEC Rel-14 SeDoC This was withdrawn in parallel session. Withdrawn
- - - Work Planning - - - - -
6.11 S2-163355 TS or TR cover TR 23.719 Cover Sheet T-Mobile USA Inc. Rel-14 FS_SeDoC Revised in parallel session to S2-163899. Revised
6.11 S2-163899 TS or TR cover TR 23.719 Cover Sheet T-Mobile USA Inc. Rel-14 FS_SeDoC Revision of S2-163355. Revised in parallel session to S2-163903. Revised
6.11 S2-163903 TS or TR cover TR 23.719 Cover Sheet T-Mobile USA Inc. Rel-14 FS_SeDoC Revision of S2-163899. Revised in parallel session to S2-164233 Revised
6.11 S2-164233 TS or TR cover TR 23.719 Cover Sheet T-Mobile USA Inc. Rel-14 FS_SeDoC Revision of S2-163903. Approved Approved
6.11 S2-163356 WID new WID for SeDoC T-Mobile USA Rel-14 FS_SeDoC Revised in parallel session to S2-163900. Revised
6.11 S2-163900 WID new WID for SeDoC T-Mobile USA, Deutsche Telekom AG Rel-14 FS_SeDoC Revision of S2-163356. Revised in parallel session to S2-163904. Revised
6.11 S2-163904 WID new WID for SeDoC T-Mobile USA, Deutsche Telekom AG Rel-14 FS_SeDoC Revision of S2-163900. Agreed in parallel session Block approved Approved AGREED
6.12 - - Sponsored data connectivity improvements (SDCI) - - {Krisztian} - -
6.12 S2-163376 CR 23.002 CR0293: Adding new network entity and reference points for SDCI Huawei, HiSilicon, China Unicom Rel-14 SDCI Revised in parallel session to S2-163834. Revised
6.12 S2-163834 CR 23.002 CR0293R1: Adding new network entity and reference points for SDCI Huawei, HiSilicon, China Unicom Rel-14 SDCI Revision of S2-163376. Revised in parallel session to S2-163875. Revised
6.12 S2-163875 CR 23.002 CR0293R2: Adding new network entity and reference points for SDCI Huawei, HiSilicon, China Unicom Rel-14 SDCI Revision of S2-163834. Agreed in parallel session Block approved Agreed AGREED
6.12 S2-163613 CR 23.002 CR0294: Architecture enhancement for SDCI ZTE Corporation Rel-14 SDCI Revised in parallel session to S2-163835. Revised
6.12 S2-163835 CR 23.002 CR0294R1: Architecture enhancement for SDCI ZTE Corporation Rel-14 SDCI Revision of S2-163613. Agreed in parallel session Block approved Agreed AGREED
6.12 S2-163377 CR 23.203 CR1041: Architecture enhancement to support SDCI_23203 Huawei, HiSilicon, China Unicom Rel-14 SDCI Revised in parallel session to S2-163836. Revised
6.12 S2-163836 CR 23.203 CR1041R1: Architecture enhancement to support SDCI_23203 Huawei, HiSilicon, China Unicom Rel-14 SDCI Revision of S2-163377. Revised in parallel session to S2-163876. Revised
6.12 S2-163876 CR 23.203 CR1041R2: Architecture enhancement to support SDCI_23203 Huawei, HiSilicon, China Unicom Rel-14 SDCI Revision of S2-163836. Agreed in parallel session Block approved Agreed AGREED
6.12 S2-163378 CR 23.682 CR0194: Adding reference point description between SCEF and PFDF Huawei, China Mobile, China Unicom Rel-14 SDCI Revised in parallel session to S2-163837. Revised
6.12 S2-163837 CR 23.682 CR0194R1: Adding reference point description between SCEF and PFDF Huawei, China Mobile, China Unicom Rel-14 SDCI Revision of S2-163378. Revised in parallel session to S2-163877. Revised
6.12 S2-163877 CR 23.682 CR0194R2: Adding reference point description between SCEF and PFDF Huawei, China Mobile, China Unicom Rel-14 SDCI Revision of S2-163837. Agreed in parallel session Block approved Agreed AGREED
6.12 S2-163612 CR 23.203 CR1046: Packet flow descriptions information for SDCI ZTE Corporation Rel-14 SDCI Merged with S2-163329 into S2-163838 Merged
6.12 S2-163249 CR 23.203 CR1032: Support of sponsored data connectivity for TDF Allot Communications, Openet Rel-14 SDCI Agreed in parallel session Block approved Agreed AGREED
6.12 S2-163250 CR 23.203 CR1033: Encrypted traffic detection by using domain name matching Allot Communications, Ericsson, Openet Rel-14 SDCI Revised in parallel session to S2-163839. Revised
6.12 S2-163839 CR 23.203 CR1033R1: Encrypted traffic detection by using domain name matching Allot Communications, Ericsson, Openet Rel-14 SDCI Revision of S2-163250. Agreed in parallel session Block approved Agreed AGREED
6.12 S2-163258 CR 23.682 CR0189: Provisioning PFD via SCEF China Mobile, Huawei Rel-14 SDCI Revised in parallel session to S2-163840. Revised
6.12 S2-163840 CR 23.682 CR0189R1: Provisioning PFD via SCEF China Mobile Rel-14 SDCI Revision of S2-163258. Revised in parallel session to S2-163878. Revised
6.12 S2-163878 CR 23.682 CR0189R2: Provisioning PFD via SCEF China Mobile Rel-14 SDCI Revision of S2-163840. Revised in parallel session to S2-164217. Revised
6.12 S2-164217 CR 23.682 CR0189R3: Provisioning PFD via SCEF China Mobile, Huawei, China Unicom Rel-14 SDCI Revision of S2-163878. This CR was agreed Agreed
6.12 S2-163329 CR 23.203 CR1036: Management of PFDs to PCEF/TDF Ericsson Rel-14 SDCI Revised in parallel session, merging S2-163612, to S2-163838. Revised
6.12 S2-163838 CR 23.203 CR1036R1: Management of PFDs to PCEF/TDF Ericsson, ZTE Rel-14 SDCI Revision of S2-163329, merging S2-163612. Revised in parallel session to S2-163879. Revised
6.12 S2-163879 CR 23.203 CR1036R2: Management of PFDs to PCEF/TDF Ericsson, ZTE Rel-14 SDCI Revision of S2-163838. Revised in parallel session to S2-164218. Revised
6.12 S2-164218 CR 23.203 CR1036R3: Management of PFDs to PCEF/TDF Ericsson, ZTE Rel-14 SDCI Revision of S2-163879. This CR was agreed Agreed
6.12 S2-163447 CR 23.203 CR1043: PFD retrieval and the procedures for sponsored data connectivity inhancement Nokia, Alcatel-Lucent Shanghai Bell Rel-14 SDCI Revised in parallel session to S2-163841. Revised
6.12 S2-163841 CR 23.203 CR1043R1: PFD retrieval and the procedures for sponsored data connectivity inhancement Nokia, Alcatel-Lucent Shanghai Bell, ZTE Rel-14 SDCI Revision of S2-163447. Revised in parallel session to S2-163880. Revised
6.12 S2-163880 CR 23.203 CR1043R2: PFD retrieval and the procedures for sponsored data connectivity inhancement Nokia, Alcatel-Lucent Shanghai Bell, ZTE Rel-14 SDCI Revision of S2-163841. Revised in parallel session to S2-164219. Revised
6.12 S2-164219 CR 23.203 CR1043R3: PFD retrieval and the procedures for sponsored data connectivity inhancement Nokia, Alcatel-Lucent Shanghai Bell, ZTE Rel-14 SDCI Revision of S2-163880. Revised to S2-164266. Revised
6.12 S2-164266 CR 23.203 CR1043R4: PFD retrieval and the procedures for sponsored data connectivity inhancement Nokia, Alcatel-Lucent Shanghai Bell, ZTE Rel-14 SDCI Revision of S2-164219. This CR was agreed Agreed
6.12 S2-163626 CR 23.203 CR1047: 23.203 Annex N Update for Sponsored Data Connectivity without AF Openet, Allot Communications Rel-14 SDCI LATE DOC: Rx 05/07, 17:55. Not Handled -
6.12 S2-163629 CR 23.203 CR1048: 23.203 New Informative Annex on External Packet Flow Description Management Openet, Allot Communications Rel-14 SDCI LATE DOC: Rx 05/07, 17:55. Not Handled -
6.13 - - Study on architecture enhancements for LTE support of V2X services (FS_V2XARC) and normative work (V2XARC) - - {Puneet} - -
- - - Incoming LS - - - - -
6.13 S2-163224 LS In LS from SA WG3: Reply LS on V2X message characteristics SA WG3 (S3-160777) Rel-14 FS_V2XLTE Postponed S2-162738 from S2#115. Noted in parallel session Noted
6.13 S2-163225 LS In LS from SA WG3: Clarification to privacy requirements SA WG3 (S3-160789) Rel-14 FS_V2XLTE Postponed S2-162739 from S2#115. Noted in parallel session Noted
6.13 S2-163222 LS In LS from SA WG1: Reply LS on Clarification to privacy requirements SA WG1 (S1-161586) Rel-14 V2X Postponed S2-162407 from S2#115. Noted in parallel session Noted
6.13 S2-163233 LS In LS from RAN WG1: LS on Priority for V2V RAN WG1 (R1-165814) Rel-14 LTE_SL_V2V Noted in parallel session Noted
6.13 S2-163226 LS In LS from SA WG1: Reply LS on EPC procedures for providing eNB with V2X authorization information SA WG1 (S1-161587) Rel-14 V2XLTE Postponed S2-162741 from S2#115. Noted in parallel session Noted
6.13 S2-163241 LS In LS from RAN WG3: LS on V2V Authorization RAN WG3 (R3-161540) Rel-14 LTE_SL_V2V Noted in parallel session Noted
6.13 S2-163721 LS In LS from RAN WG2: Reply LS on EPC procedures for providing eNB with V2X authorization information RAN WG2 () Noted in parallel session Noted
- - - New solutions - - - - -
6.13 S2-163687 P-CR V2V data path selection Samsung FS_V2XARC Revised in parallel session to S2-163747. Revised
6.13 S2-163747 P-CR V2V data path selection Samsung - FS_V2XARC Revision of S2-163687. Revised in parallel session to S2-163809. Revised
6.13 S2-163809 P-CR V2V data path selection Samsung - FS_V2XARC Revision of S2-163747. Agreed in parallel session Block approved Approved AGREED
6.13 S2-163709 P-CR Overlapping MBMS Service Areas ITRI FS_V2XARC Noted in parallel session This issue is under discussion in RAN WG3. SA WG2 will wait for RAN WG3 to make conclusion on this. Noted
6.13 S2-163710 P-CR Selective UE reception for V2X messages ITRI FS_V2XARC Revised in parallel session to S2-163748. Focus to add Key Issue only in the TR Revised
6.13 S2-163748 P-CR Selective UE reception for V2X messages ITRI - FS_V2XARC Revision of S2-163710. Noted in parallel session Focus to add Key Issue only in the TR. It is concluded that this key issue will not be handled in this Release and this will be captured under conclusion paper in S2-163782 Noted
- - - Conclusion for KI#1 - - - - -
6.13 S2-163440 P-CR Solution 1 conclusion LG Electronics FS_V2XARC Agreed in parallel session Block approved Approved AGREED
- - - Solution updates/conclusion for KI#6a - - - - -
6.13 S2-163310 P-CR Geo Location handling in V2X server Ericsson, Qualcomm, Nokia FS_V2XARC Revised in parallel session to S2-163749. Revised
6.13 S2-163749 P-CR Geo Location handling in V2X server Ericsson, Qualcomm, Nokia - FS_V2XARC Revision of S2-163310. Agreed in parallel session Block approved Approved AGREED
6.13 S2-163436 P-CR Solution 9 conclusion LG Electronics FS_V2XARC Noted in parallel session Noted
6.13 S2-163437 P-CR Solution 10 update LG Electronics, ZTE FS_V2XARC Revised in parallel session to S2-163750. Revised
6.13 S2-163750 P-CR Solution 10 update LG Electronics, ZTE - FS_V2XARC Revision of S2-163437. This was withdrawn. Withdrawn
6.13 S2-163641 P-CR Discussion on the Cell-Ids usage in V2X UE and AS ZTE FS_V2XARC Noted in parallel session Noted
- - - Solution updates/conclusion for KI#6b - - - - -
6.13 S2-163458 P-CR Further details for the LME based V2X solution Huawei, Hisilicon, Nokia FS_V2XARC Revised in parallel session to S2-163751. Revised
6.13 S2-163751 P-CR Further details for the LME based V2X solution Huawei, Hisilicon, Nokia - FS_V2XARC Revision of S2-163458. Agreed in parallel session Block approved Approved AGREED
6.13 S2-163438 P-CR Solution: Latency improvements for eMBMS with L.MBMS based on implementation LG Electronics FS_V2XARC Revised in parallel session to S2-163752. Revised
6.13 S2-163752 P-CR Solution: Latency improvements for eMBMS with L.MBMS based on implementation LG Electronics - FS_V2XARC Revision of S2-163438. Revised in parallel session to S2-163810. Revised
6.13 S2-163810 P-CR Solution: Latency improvements for eMBMS with L.MBMS based on implementation LG Electronics - FS_V2XARC Revision of S2-163752. Agreed in parallel session Block approved Approved AGREED
6.13 S2-163311 P-CR Discussion for LME based V2X solution and localized MBMS solution Ericsson, ZTE FS_V2XARC Noted in parallel session Noted
6.13 S2-163456 DISCUSSION Local MBMS options Nokia, Huawei, Hisilicon Rel-14 FS_V2XARC Noted in parallel session Noted
6.13 S2-163528 P-CR Evaluation and conclusion proposal for localized eMBMS V2x solutions Huawei, Hisilicon, Nokia FS_V2XARC Not Handled Not Handled
6.13 S2-163753 P-CR Way forward proposal for localized eMBMS V2X solutions LG Electronics (Rapporteur) - FS_V2XARC Created in parallel session. Revised in parallel session to S2-163783. Revised
6.13 S2-163783 P-CR Way forward proposal for localized eMBMS V2X solutions LG Electronics (Rapporteur) - FS_V2XARC Revision of S2-163753. Revised in parallel session to S2-163808. It is agreed to conclude on option#1 for localized eMBMS V2X solutions Revised
6.13 S2-163808 P-CR Way forward proposal for localized eMBMS V2X solutions LG Electronics (Rapporteur) - FS_V2XARC Revision of S2-163783. Noted in parallel session Noted
6.13 S2-163439 LS OUT [DRAFT] LS on conclusion for Localized MBMS LG Electronics Rel-14 FS_V2XARC Not Handled Not Handled
- - - KI update, Solution updates/conclusion for KI#6c - - - - -
6.13 S2-163494 P-CR Modify key issue #6c: Local V2X server discovery KPN, Huawei?, E///?, Samsung? FS_V2XARC Revised in S2-163633 Revised
6.13 S2-163633 P-CR Modify key issue 6c: Local V2X server discovery KPN, Huawei, Hisilicon, CATT, Ericsson?, Qualcomm?, LGE? FS_V2XARC Revision of S2-163494. Remove '?' from Sources. Revised in parallel session to S2-163754. Revised
6.13 S2-163754 P-CR Modify key issue 6c: Local V2X server discovery KPN, Huawei, Hisilicon, CATT, Ericsson?, Qualcomm? Nokia? LGE? DT? Orange? ZTE? - FS_V2XARC Revision of S2-163633. Revised in parallel session to S2-163811. Revised
6.13 S2-163811 P-CR Modify key issue 6c: Local V2X server discovery KPN, Huawei, Hisilicon, CATT - FS_V2XARC Revision of S2-163754. Approved Approved
6.13 S2-163642 P-CR Discussion and solution on the local server discovery ZTE FS_V2XARC Revised in parallel session to S2-163755. Revised
6.13 S2-163755 P-CR Discussion and solution on the local server discovery ZTE - FS_V2XARC Revision of S2-163642. Noted in parallel session Noted
6.13 S2-163714 P-CR Conclusion for local V2X server discovery LG Electronics FS_V2XARC Revised in parallel session to S2-163756. Revised
6.13 S2-163756 P-CR Conclusion for local V2X server discovery LG Electronics - FS_V2XARC Revision of S2-163714. Revised in parallel session to S2-164085. Revised
6.13 S2-164085 P-CR Conclusion for local V2X server discovery LG Electronics - FS_V2XARC Revision of S2-163756. Agreed in parallel session Block approved Approved AGREED
- - - Unicast local routing related - - - - -
6.13 S2-163319 P-CR Comparison SIPTO@LN standalone GW and Solution #5 Ericsson, LG Electronics, SK Telecom, KT Corp. FS_V2XARC Revision of S2-162878 from S2#115. Revised in parallel session to S2-163757. Revised
6.13 S2-163757 P-CR Comparison SIPTO@LN standalone GW and Solution #5 Ericsson, LG Electronics, SK Telecom, KT Corp. - FS_V2XARC Revision of S2-163319. Revised to S2-164277. Revised
6.13 S2-164277 P-CR Comparison SIPTO@LN standalone GW and Solution #5 Ericsson, LG Electronics, SK Telecom, KT Corp. - FS_V2XARC Revision of S2-163757. Approved Approved
6.13 S2-163648 P-CR Way forward on the V2X Message Offload (VMO) solution Intel FS_V2XARC Noted in parallel session Noted
- - - Update to Annex - - - - -
6.13 S2-163498 P-CR Hybrid deployment option for V2X using PC5 based and LTE-Uu based architectures ZTE FS_V2XARC Revised in parallel session to S2-163774. This is informative Annex in TR and intended not to change the solution 2 in the TR. Revised
6.13 S2-163774 P-CR Hybrid deployment option for V2X using PC5 based and LTE-Uu based architectures ZTE - FS_V2XARC Revision of S2-163498. Revised in parallel session to S2-163812. Revised
6.13 S2-163812 P-CR Hybrid deployment option for V2X using PC5 based and LTE-Uu based architectures ZTE - FS_V2XARC Revision of S2-163774. Agreed in parallel session Block approved Approved AGREED
- - - Overall TR conclusion - - - - -
6.13 S2-163441 P-CR TR conclusion LG Electronics FS_V2XARC Revised in parallel session to S2-163782. Revised
6.13 S2-163782 P-CR TR conclusion LG Electronics - FS_V2XARC Revision of S2-163441. Agreed in parallel session Block approved Approved AGREED
- - - TR Cover Sheet - - - - -
6.13 S2-163435 TS or TR cover Cover Sheet for TR 23.785 to TSG SA for approval LG Electronics Rel-14 FS_V2XARC Not Handled Not Handled
- - - V2XARC - - - - -
6.13 S2-163442 P-CR V2XARC TS 23.285 Skeleton LG Electronics V2XARC Revised in parallel session to S2-163775. Revised
6.13 S2-163775 P-CR V2XARC TS 23.285 Skeleton Rapporteur (LG Electronics) - V2XARC Revision of S2-163442. Revised in parallel session to S2-163813. Revised
6.13 S2-163813 P-CR V2XARC TS 23.285 Skeleton LG Electronics - V2XARC Revision of S2-163775. Agreed in parallel session Block approved Approved AGREED
6.13 S2-163445 P-CR TS 23.285 scope LG Electronics V2XARC Revised in parallel session to S2-163776. Revised
6.13 S2-163776 P-CR TS 23.285 scope LG Electronics - V2XARC Revision of S2-163445. Revised in parallel session to S2-163814. Revised
6.13 S2-163814 P-CR TS 23.285 scope LG Electronics - V2XARC Revision of S2-163776. Agreed in parallel session Block approved Approved AGREED
6.13 S2-163516 P-CR V2X architecture principles to TS 23.285 Qualcomm Incorporated, LG Electronics, ?? V2XARC Remove '??' from sources. Revised in parallel session to S2-163777. Revised
6.13 S2-163777 P-CR V2X architecture principles to TS 23.285 Qualcomm Incorporated, LG Electronics - V2XARC Revision of S2-163516. Revised in parallel session to S2-163815. Revised
6.13 S2-163815 P-CR V2X architecture principles to TS 23.285 Qualcomm Incorporated, LG Electronics - V2XARC Revision of S2-163777. Agreed in parallel session Block approved Approved AGREED
6.13 S2-163443 P-CR PC5 and LTE-Uu based V2X architecture reference model to TS 23.285 LG Electronics V2XARC Revised in parallel session to S2-163778. Revised
6.13 S2-163778 P-CR PC5 and LTE-Uu based V2X architecture reference model to TS 23.285 LG Electronics - V2XARC Revision of S2-163443. Agreed in parallel session Block approved Approved AGREED
6.13 S2-163527 P-CR eMBMS and LTE-Uu based V2X architecture Huawei, HiSilicon V2XARC Revised in parallel session to S2-163779. Revised
6.13 S2-163779 P-CR eMBMS and LTE-Uu based V2X architecture Huawei, HiSilicon - V2XARC Revision of S2-163527. Revised in parallel session to S2-164086. Revised
6.13 S2-164086 P-CR eMBMS and LTE-Uu based V2X architecture Huawei, HiSilicon - V2XARC Revision of S2-163779. Approved Approved
6.13 S2-163525 P-CR V2X authorization and parameter provision Huawei, Hisilicon V2XARC Revised in parallel session to S2-163780. Revised
6.13 S2-163780 P-CR V2X authorization and parameter provision Huawei, Hisilicon - V2XARC Revision of S2-163525. Approved Approved
6.13 S2-163444 P-CR PC5 based V2X message tx/rx to TS 23.285 LG Electronics V2XARC Revised in parallel session to S2-163781. Revised
6.13 S2-163781 P-CR PC5 based V2X message 5/rx to TS 23.285 LG Electronics - V2XARC Revision of S2-163444. Approved Approved
6.13 S2-163518 CR 23.303 CR0315: PC5-U stack update for the support of V2X Communication Qualcomm Incorporated Rel-14 V2XARC Noted in parallel session Protocol Stack for V2X would be documented in the new TS for V2X Noted
6.13 S2-163519 P-CR Solution for V2X Communications over PC5 -high level function and protocol stacks Qualcomm Incorporated, ?? V2XARC Remove '??' from sources. Noted in parallel session Noted
6.14 - - Study on PS Data off function (FS_PS_DATA_OFF) - - {Krisztian} - -
- - - TR skeleton, Scope - - - - -
6.14 S2-163426 draft TR TR 23702 skeleton ORANGE Rel-14 FS_PS_DATA_OFF Agreed in parallel session Block approved Approved AGREED
6.14 S2-163434 P-CR Scope of the study on Data Off Orange FS_PS_DATA_OFF Revised in parallel session to S2-163842. Revised
6.14 S2-163842 P-CR Scope of the study on Data Off Orange - FS_PS_DATA_OFF Revision of S2-163434. Agreed in parallel session Block approved Approved AGREED
- - - Key issues - - - - -
6.14 S2-163632 DISCUSSION DP for study on Data Off ORANGE Rel-14 FS_PS_DATA_OFF Noted in parallel session Noted
6.14 S2-163287 P-CR 3GPP Dat off Key Issues Ericsson FS_PS_DATA_OFF Revised in parallel session, merging S2-163300, to S2-163843. Revised
6.14 S2-163843 P-CR 3GPP Dat off Key Issues Ericsson - FS_PS_DATA_OFF Revision of S2-163287, merging S2-163300. Revised in parallel session to S2-164125. Revised
6.14 S2-164125 P-CR 3GPP Dat off Key Issues Ericsson - FS_PS_DATA_OFF Revision of S2-163843. Agreed in parallel session Block approved Approved AGREED
6.14 S2-163300 P-CR new key issues for PS Data Off Intel FS_PS_DATA_OFF Merged with S2-163287 into S2-163843 Merged
- - - Solutions - - - - -
6.14 S2-163288 P-CR 3GPP PS data off - Solution for Key issue 1 Ericsson FS_PS_DATA_OFF Revised in parallel session, merging S2-163289, to S2-163844. Revised
6.14 S2-163844 P-CR 3GPP PS data off - Solution for Key issue 1 Ericsson - FS_PS_DATA_OFF Revision of S2-163288, merging S2-163289. Revised in parallel session to S2-164126. Revised
6.14 S2-164126 P-CR 3GPP PS data off - Solution for Key issue 1 Ericsson - FS_PS_DATA_OFF Revision of S2-163844. Agreed in parallel session Block approved Approved AGREED
6.14 S2-163289 P-CR 3GPP PS data off - Solution for Key issue 2 Ericsson FS_PS_DATA_OFF Merged with S2-163288 into S2-163844 Merged
6.14 S2-163290 P-CR 3GPP PS data off - Solution for Key issue 3 Ericsson FS_PS_DATA_OFF Revised in parallel session to S2-163846. Revised
6.14 S2-163846 P-CR 3GPP PS data off - Solution for Key issue 3 Ericsson - FS_PS_DATA_OFF Revision of S2-163290. Revised in parallel session to S2-164127. Revised
6.14 S2-164127 P-CR 3GPP PS data off - Solution for Key issue 3 Ericsson - FS_PS_DATA_OFF Revision of S2-163846. Agreed in parallel session Block approved Approved AGREED
6.14 S2-163291 P-CR 3GPP PS data off - Solution for Key issues 4 and 5 Ericsson FS_PS_DATA_OFF Revised in parallel session to S2-163847. Revised
6.14 S2-163847 P-CR 3GPP PS data off - Solution for Key issues 4 and 5 Ericsson - FS_PS_DATA_OFF Revision of S2-163291. Revised in parallel session to S2-164128. Revised
6.14 S2-164128 P-CR 3GPP PS data off - Solution for Key issues 4 and 5 Ericsson - FS_PS_DATA_OFF Revision of S2-163847. Agreed in parallel session Block approved Approved AGREED
6.14 S2-163292 P-CR 3GPP PS data off - Solution for Key issues 4 and 6 Ericsson FS_PS_DATA_OFF Revised in parallel session to S2-163873. Revised
6.14 S2-163873 P-CR 3GPP PS data off - Solution for Key issues 4 and 6 Ericsson - FS_PS_DATA_OFF Revision of S2-163292. Revised in parallel session to S2-164129. Revised
6.14 S2-164129 P-CR 3GPP PS data off - Solution for Key issues 4 and 6 Ericsson - FS_PS_DATA_OFF Revision of S2-163873. Agreed in parallel session Block approved Approved AGREED
6.14 S2-163301 P-CR Solution for downlink traffic controlling in EPC using PCC Intel FS_PS_DATA_OFF Revised in parallel session to S2-163874. Revised
6.14 S2-163874 P-CR Solution for downlink traffic controlling in EPC using PCC Intel - FS_PS_DATA_OFF Revision of S2-163301. Noted in parallel session Noted
6.14 S2-163302 P-CR Solution for UE to report 3GPP PS Data Off status to core network Intel FS_PS_DATA_OFF Revised in parallel session, merging S2-163383, to S2-163845. Revised
6.14 S2-163845 P-CR Solution for UE to report 3GPP PS Data Off status to core network Intel, Huawei - FS_PS_DATA_OFF Revision of S2-163302, merging S2-163383. Revised in parallel session to S2-164130. Revised
6.14 S2-164130 P-CR Solution for UE to report 3GPP PS Data Off status to core network Intel, Huawei - FS_PS_DATA_OFF Revision of S2-163845. Agreed in parallel session Block approved Approved AGREED
6.14 S2-163382 P-CR Discussion on downlink traffic handling in EPC Huawei, HiSilicon FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-163383 P-CR Solution for how UE to report PS Data Off status to EPC Huawei, HiSilicon FS_PS_DATA_OFF Merged with S2-163302 into S2-163845. Merged
6.14 S2-163621 P-CR Solution for key issues 3 and 5 Orange FS_PS_DATA_OFF Not Handled Not Handled
6.14 S2-163690 P-CR PS data off using SCEF Samsung FS_PS_DATA_OFF This was withdrawn. Withdrawn
6.15 - - Study on extended architecture support for Cellular Internet of Things (FS_CIoT_Ext) - - {Puneet} - -
- - - TR Skeleton, Scope - - - - -
6.15 S2-163293 draft TR TR 23.730 Skeleton Intel Rel-14 FS_CIoT_Ext Agreed in parallel session Block approved Approved AGREED
6.15 S2-163294 P-CR TR 23.730 Scope Intel FS_CIoT_Ext Revised in parallel session to S2-163734. Revised
6.15 S2-163734 P-CR TR 23.730 Scope Intel - FS_CIoT_Ext Revision of S2-163294. Agreed in parallel session Block approved Approved AGREED
- - - Key Issues - - - - -
6.15 S2-163295 P-CR Key Issue - Authorization of Coverage Enhancements Intel FS_CIoT_Ext Revised in parallel session, merging S2-163740, to S2-163735. Revised
6.15 S2-163735 P-CR Key Issue - Authorization of Coverage Enhancements Intel - FS_CIoT_Ext Revision of S2-163295, merging S2-163340. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163340 P-CR Key issue on Authorization of use of Coverage Enhancement Ericsson FS_CIoT_Ext Merged with S2-163295 into S2-163735 Merge with S2-163295 Merged
6.15 S2-163296 P-CR Key Issue - Reliable communication service between UE and SCEF Intel FS_CIoT_Ext Revised in parallel session to S2-163736. Revised
6.15 S2-163736 P-CR Key Issue - Reliable communication service between UE and SCEF Intel - FS_CIoT_Ext Revision of S2-163296. Revised in parallel session to S2-163829. Revised
6.15 S2-163829 P-CR Key Issue - Reliable communication service between UE and SCEF Intel - FS_CIoT_Ext Revision of S2-163736. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163394 P-CR Key Issue - Reuse of Location Services architecture for Control plane CIoT EPS optimization Intel, AT&T FS_CIoT_Ext Revised in parallel session to S2-163737. Revised
6.15 S2-163737 P-CR Key Issue - Reuse of Location Services architecture for Control plane CIoT EPS optimization Intel, AT&T - FS_CIoT_Ext Revision of S2-163394. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163483 P-CR Key Issue #X - CN overload protection from data transfer via control plane CIoT EPS optimizations NEC FS_CIoT_Ext Revised in parallel session to S2-163738. Revised
6.15 S2-163738 P-CR Key Issue #X - CN overload protection from data transfer via control plane CIoT EPS optimizations NEC - FS_CIoT_Ext Revision of S2-163483. Revised in parallel session to S2-163830. Revised
6.15 S2-163830 P-CR Key Issue #X - CN overload protection from data transfer via control plane CIoT EPS optimizations NEC - FS_CIoT_Ext Revision of S2-163738. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163622 P-CR Key Issue - Idle Mode Inter-RAT Mobility CATT FS_CIoT_Ext Merged with S2-163712 into S2-163739 Merged
6.15 S2-163677 P-CR Key issue: reuse of existing multicast broadcast service Samsung FS_CIoT_Ext Revised in parallel session to S2-163740. Revised
6.15 S2-163740 P-CR Key issue: reuse of existing multicast broadcast service Samsung - FS_CIoT_Ext Revision of S2-163677. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163689 P-CR Inter UE QoS for NB-IoT Control Plane Optimisation Vodafone FS_CIoT_Ext Revised in parallel session to S2-163741. Key Issue + Solution. (Revision should capture only Key issue on UE QoS for NB-IoT). Solution in S2-163689 will be looked under solution. After discussion of the solution it is agreed to include the proposed solution for the TR. Revised
6.15 S2-163741 P-CR Inter UE QoS for NB-IoT Control Plane Optimisation Vodafone - FS_CIoT_Ext Revision of S2-163689. Revised in parallel session to S2-164077. Revised
6.15 S2-164077 P-CR Inter UE QoS for NB-IoT Control Plane Optimisation Vodafone - FS_CIoT_Ext Revision of S2-163741. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163712 P-CR Inter-RAT Idle Mode Mobility to and from NB-IoT Vodafone FS_CIoT_Ext Revised in parallel session, merging S2-163622 to S2-163739. Key Issue + Solution. (Revision should capture only Key issue on iRAT mobility). Solution in S2-163712 will be looked under solution. After discussion of the solution it is agreed to include the proposed solution for the TR. Revised
6.15 S2-163739 P-CR Inter-RAT Idle Mode Mobility to and from NB-IoT Vodafone, CATT - FS_CIoT_Ext Revision of S2-163712, merging S2-163622. Revised in parallel session to S2-164078. Revised
6.15 S2-164078 P-CR Inter-RAT Idle Mode Mobility to and from NB-IoT Vodafone, CATT - FS_CIoT_Ext Revision of S2-163739. Agreed in parallel session Block approved Approved AGREED
- - - Solutions - - - - -
6.15 S2-163303 P-CR Solution for Key issue - Authorization of Coverage Enhancements Intel FS_CIoT_Ext Revised in parallel session to S2-163759. Revised
6.15 S2-163759 P-CR Solution for Key issue - Authorization of Coverage Enhancements Intel - FS_CIoT_Ext Revision of S2-163303. Revised in parallel session to S2-164079. Revised
6.15 S2-164079 P-CR Solution for Key issue - Authorization of Coverage Enhancements Intel - FS_CIoT_Ext Revision of S2-163759. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163341 P-CR Solution for key issue on Authorization of use of Coverage Enhancement - UE configuration Ericsson FS_CIoT_Ext Revised in parallel session to S2-163760. Revised
6.15 S2-163760 P-CR Solution for key issue on Authorization of use of Coverage Enhancement - UE configuration Ericsson - FS_CIoT_Ext Revision of S2-163341. Revised in parallel session to S2-164080. Revised
6.15 S2-164080 P-CR Solution for key issue on Authorization of use of Coverage Enhancement - UE configuration Ericsson - FS_CIoT_Ext Revision of S2-163760. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163342 P-CR Solution for key issue on Authorization of use of Coverage Enhancement - subscription based enforcement Ericsson FS_CIoT_Ext Revised in parallel session, merging S2-163565, to S2-163761. Revised
6.15 S2-163761 P-CR Solution for key issue on Authorization of use of Coverage Enhancement - subscription based enforcement Ericsson - FS_CIoT_Ext Revision of S2-163342, merging S2-163565. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163565 P-CR Authorization of use of Coverage Enhancement functionality Huawei, HiSilicon FS_CIoT_Ext Merged in parallel session with S2-163342 in S2-163761 Merged
6.15 S2-163396 P-CR Solution for Key issue - Reliable delivery of data between UE and SCEF Intel FS_CIoT_Ext Revised in parallel session to S2-163762. Revised
6.15 S2-163762 P-CR Solution for Key issue - Reliable delivery of data between UE and SCEF Intel - FS_CIoT_Ext Revision of S2-163396. Revised in parallel session to S2-164081. Revised
6.15 S2-164081 P-CR Solution for Key issue - Reliable delivery of data between UE and SCEF Intel - FS_CIoT_Ext Revision of S2-163762. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163484 P-CR Key Issue CN overload protection from data transfer via control plane CIoT EPS optimizations - solution 1 NEC FS_CIoT_Ext Revised in parallel session to S2-163763. Revised
6.15 S2-163763 P-CR Key Issue CN overload protection from data transfer via control plane CIoT EPS optimizations - solution 1 NEC - FS_CIoT_Ext Revision of S2-163484. Revised in parallel session to S2-164082. Revised
6.15 S2-164082 P-CR Key Issue CN overload protection from data transfer via control plane CIoT EPS optimizations - solution 1 NEC - FS_CIoT_Ext Revision of S2-163763. Agreed in parallel session Block approved Approved AGREED
6.15 S2-163485 P-CR Key Issue CN overload protection from data transfer via control plane CIoT EPS optimizations - solution 2. NEC FS_CIoT_Ext Revised in parallel session to S2-163764. Revised
6.15 S2-163764 P-CR Key Issue CN overload protection from data transfer via control plane CIoT EPS optimizations - solution 2. NEC - FS_CIoT_Ext Revision of S2-163485. Revised in parallel session to S2-164083. Revised
6.15 S2-164083 P-CR Key Issue CN overload protection from data transfer via control plane CIoT EPS optimizations - solution 2. NEC - FS_CIoT_Ext Revision of S2-163764. Wrong document uploaded. Revised in parallel session to S2-164087. Revised
6.15 S2-164087 P-CR Key Issue CN overload protection from data transfer via control plane CIoT EPS optimizations - solution 2. NEC - FS_CIoT_Ext Revision of S2-164083. Agreed in parallel session Block approved Approved AGREED
6.16 - - Group based enhancements in the network capability exposure functions (GENCEF) - - {Puneet} - -
6.16 S2-163334 CR 23.682 CR0193: Monitoring event configuration for a group of UEs via PCRF Ericsson Rel-14 GENCEF Revised in parallel session to S2-163805. Revised
6.16 S2-163805 CR 23.682 CR0193R1: Monitoring event configuration for a group of UEs via PCRF Ericsson Rel-14 GENCEF Revision of S2-163334. Revised in parallel session to S2-163833. Revised
6.16 S2-163833 CR 23.682 CR0193R2: Monitoring event configuration for a group of UEs via PCRF Ericsson Rel-14 GENCEF Revision of S2-163805. Agreed in parallel session Block approved Agreed AGREED
6.16 S2-163465 CR 23.682 CR0195: Group Communication Pattern Provisioning Convida Wireless Rel-14 GENCEF Revised in parallel session to S2-163804. Revised
6.16 S2-163804 CR 23.682 CR0195R1: Group Communication Pattern Provisioning Convida Wireless Rel-14 GENCEF Revision of S2-163465. Agreed in parallel session Block approved Agreed AGREED
6.16 S2-163679 DISCUSSION Discussion Paper on MONTE enhancement for group basis Samsung, ZTE Rel-14 Noted in parallel session Needs further discussion. This will be brought back in the next meeting. Noted
6.16 S2-163680 CR 23.682 CR0206: Group based MONTE Event Configuration via HSS Samsung Rel-14 GENCEF Not Handled -
6.16 S2-163681 CR 23.682 CR0207: Group request indication in the monitoring type Samsung Rel-14 GENCEF Not Handled -
6.17 - - Robust Call Setup for VoLTE subscriber in LTE (RobVoLTE) - - {Chris} - -
6.17 S2-163638 DISCUSSION Discussion on the P-CSCF and SCC AS behaviour for the RobVoLTE ZTE RobVoLTE Noted in parallel session Noted
6.17 S2-163639 CR 23.292 CR0232: Clarification on the T-ADS with the falied resources allocation. ZTE Rel-14 RobVoLTE Revised in parallel session to S2-163895. Revised
6.17 S2-163895 CR 23.292 CR0232R1: Clarification on the T-ADS with the falied resources allocation. ZTE Rel-14 RobVoLTE Revision of S2-163639. Corrupt file. Revised in parallel session to S2-163905. Revised
6.17 S2-163905 CR 23.292 CR0232R2: Clarification on the T-ADS with the falied resources allocation. ZTE Rel-14 RobVoLTE Revision of S2-163895. Corrupt file. Revised in parallel session to S2-163908. Revised
6.17 S2-163908 CR 23.292 CR0232R3: Clarification on the T-ADS with the falied resources allocation. ZTE Rel-14 RobVoLTE Revision of S2-163905. Revised in parallel session to S2-163909. Revised
6.17 S2-163909 CR 23.292 CR0232R4: Clarification on the T-ADS with the falied resources allocation. ZTE Rel-14 RobVoLTE Revision of S2-163908. Revised in parallel session to S2-164229. New added text becomes 'For delivery of an incoming session to non ICS UE, the SCC AS may deliver the session in other domain if the call delivery in the originally selected domain fails, e.g. delivers the call in CS domain when session establishment in the PS domain does not succeed'. Add Huawei. Revised
6.17 S2-164229 CR 23.292 CR0232R5: Clarification on the T-ADS with the falied resources allocation. ZTE, Huawei Rel-14 RobVoLTE Revision of S2-163909. Agreed in parallel session Block approved Agreed AGREED
6.17 S2-163640 CR 23.237 CR0492: clarification on the failed resources allocation for MT ZTE Rel-14 RobVoLTE Merged with S2-163381 into S2-163894 Merged
6.17 S2-163894 CR 23.237 CR0489R1: Robust Call Setup for VoLTE subscriber in LTE Huawei, HiSilicon, Intel, Deutsche Telekom, China Mobile, Teliasonera, China Unicom, China Telecom, Orange, CATR,CATT, MediaTek Inc, Telekom Austria AG, Telecom Italia, KPN, ZTE Rel-14 RobVoLTE Revision of S2-163381, merging S2-163640. Revised in parallel session to S2-163906. Revised
6.17 S2-163906 CR 23.237 CR0489R2: Robust Call Setup for VoLTE subscriber in LTE Huawei, HiSilicon, Intel, Deutsche Telekom, China Mobile, Teliasonera, China Unicom, China Telecom, Orange, CATR,CATT, MediaTek Inc, Telekom Austria AG, Telecom Italia, KPN, ZTE Rel-14 RobVoLTE Revision of S2-163894. Agreed in parallel session Block approved Agreed AGREED
6.17 S2-163384 CR 23.228 CR1148R1: Support for P-CSCF sending a response to UE or IMS network when receiving Bearer Setup Request Rejection for QCI=1 Huawei, HiSilicon, Intel, Deutsche Telekom, China Mobile, Teliasonera, China Unicom, China Telecom, Orange, CATR, CATT, MediaTek Inc, Telekom Austria AG, Telecom Italia Rel-14 RobVoLTE Revision of S2-162452 from S2#115. Revised in parallel session to S2-163896. Revised
6.17 S2-163896 CR 23.228 CR1148R2: Support for P-CSCF sending a response to UE or IMS network when receiving Bearer Setup Request Rejection for QCI=1 Huawei, HiSilicon, Intel, Deutsche Telekom, China Mobile, Teliasonera, China Unicom, China Telecom, Orange, CATR, CATT, MediaTek Inc, Telekom Austria AG, Telecom Italia, KPN Rel-14 RobVoLTE Revision of S2-163384. Revised in parallel session to S2-163907. Revised
6.17 S2-163907 CR 23.228 CR1148R3: Support for P-CSCF sending a response to UE or IMS network when receiving Bearer Setup Request Rejection for QCI=1 Huawei, HiSilicon, Intel, Deutsche Telekom, China Mobile, Teliasonera, China Unicom, China Telecom, Orange, CATR, CATT, MediaTek Inc, Telekom Austria AG, Telecom Italia, KPN Rel-14 RobVoLTE Revision of S2-163896. Agreed in parallel session Block approved Agreed AGREED
6.18 - - Study on Enhanced Isolated E-UTRAN Operation for Public Safety (FS_IOPS_LB) - - {Not_on_agenda} - -
6.19 - - Study on System Architecture Enhancements to eMBMS for TV Video Service (FS_AE_enTV) - - {Haris} - -
6.19 S2-163365 LS in LS from SA WG4: LS on progress of FS_xMBMS study item SA WG4 (S4-160837) FS_xMBMS Response drafted in S2-163718 and S2-163884 (both noted). Postponed to meeting SA WG2#116BIS. Postponed
6.19 S2-163718 LS OUT Draft response to LS on progress of FS_xMBMS study item SAMSUNG Electronics Co., Ltd. Rel-14 Response to S2-163365. LATE DOC: Rx 08/07, 21:55. Noted in parallel session Noted
- - - Key Issue #2 - - - - -
6.19 S2-163450 P-CR Considerations on the Receive Only Mode Huawei, Hisilicon FS_AE_enTV Noted in parallel session Noted
6.19 S2-163955 LS OUT [DRAFT] LS to RAN WG2 on Receive Only Mode RAN impacts SA WG2 - FS_AE_enTV Created in parallel session. Revised in parallel session to S2-164141. Revised
6.19 S2-164141 LS OUT LS on RAN impacts from Receive Only Mode UE SA WG2 - FS_AE_enTV Revision of S2-163955. Agreed in parallel session Block approved Approved AGREED
- - - Key Issue #3 - - - - -
6.19 S2-163307 P-CR Evaluation & selection of SEN with MBSFN synchronization area within each PLMN (Option B) Ericsson, Qualcomm FS_AE_enTV Agreed in parallel session Block approved Approved AGREED
- - - Key Issue #5 - - - - -
6.19 S2-163308 P-CR Removing editor's notes from Unicast solution Ericsson FS_AE_enTV Revised in parallel session to S2-163956. Revised
6.19 S2-163956 P-CR Removing editor's notes from Unicast solution Ericsson - FS_AE_enTV Revision of S2-163308. Agreed in parallel session Block approved Approved AGREED
6.19 S2-163309 P-CR Update Unicast Soln impacted areas & way forward Ericsson FS_AE_enTV Revised in parallel session to S2-163957. Revised
6.19 S2-163957 P-CR Update Unicast Soln impacted areas & way forward Ericsson, AT&T - FS_AE_enTV Revision of S2-163309. Agreed in parallel session Block approved Approved AGREED
6.19 S2-163611 P-CR Solution for Managed TV Services in EPS Huawei, Hisilicon FS_AE_enTV Revised in parallel session to S2-163947. Revised
6.19 S2-163947 P-CR Solution for Managed TV Services in EPS Huawei, Hisilicon - FS_AE_enTV Revision of S2-163611. Revised in parallel session to S2-163958. Revised
6.19 S2-163958 P-CR Solution for Managed TV Services in EPS Huawei, Hisilicon - FS_AE_enTV Revision of S2-163947. This was withdrawn. Withdrawn
- - - Key Issues #4 & #6 - - - - -
6.19 S2-163451 P-CR SCEF based eMBMS TV service exposure Huawei, Hisilicon FS_AE_enTV Revised in parallel session to S2-163946. Revised
6.19 S2-163946 P-CR SCEF based eMBMS TV service exposure Huawei, Hisilicon - FS_AE_enTV Revision of S2-163451. Revised in parallel session to S2-163949. Revised
6.19 S2-163949 P-CR SCEF based eMBMS TV service exposure Huawei, Hisilicon - FS_AE_enTV Revision of S2-163946. Revised in parallel session to S2-164140. Revised
6.19 S2-164140 P-CR SCEF based eMBMS TV service exposure Huawei, Hisilicon - FS_AE_enTV Revision of S2-163949. Agreed in parallel session Block approved Approved
6.19 S2-163452 P-CR Evaluation of solutions for Key Issue 4 and Key Issue 6 Huawei, Hisilicon FS_AE_enTV Revised in parallel session to S2-163950. Revised
6.19 S2-163950 P-CR Evaluation of solutions for Key Issue 4 and Key Issue 6 Huawei, Hisilicon - FS_AE_enTV Revision of S2-163452. Agreed in parallel session Block approved Approved AGREED
6.19 S2-163453 P-CR Support for non-Real time TV service solution Huawei, Hisilicon FS_AE_enTV Noted in parallel session Noted
6.19 S2-163588 P-CR Evaluation of external interface to content provider via BM-SC (Solution #3) Qualcomm Incorporated FS_AE_enTV Revised in parallel session to S2-163951. Revised
6.19 S2-163951 P-CR Evaluation of external interface to content provider via BM-SC (Solution #3) Qualcomm Incorporated - FS_AE_enTV Revision of S2-163588. Agreed in parallel session Block approved Approved AGREED
6.19 S2-163715 P-CR Solution for Key issue #6: Exposure of eMBMS service and transport capabilities to 3rd party Samsung FS_AE_enTV Revised in parallel session to S2-163948. Revised
6.19 S2-163948 P-CR Solution for Key issue #6: Exposure of eMBMS service and transport capabilities to 3rd party Samsung - FS_AE_enTV Revision of S2-163715. Revised in parallel session to S2-163952. Revised
6.19 S2-163952 P-CR Solution for Key issue #6: Exposure of eMBMS service and transport capabilities to 3rd party Samsung - FS_AE_enTV Revision of S2-163948. Agreed in parallel session Block approved Rapporteur to fix the headers while implementing the TR Approved AGREED
6.19 S2-163716 P-CR Additional Functionality requirements in Solution #3 - 'New standard reference point between BM-SC and Content Provider for TV service Samsung FS_AE_enTV Revised in parallel session to S2-163953. Revised
6.19 S2-163953 P-CR Additional Functionality requirements in Solution #3 - 'New standard reference point between BM-SC and Content Provider for TV service Samsung - FS_AE_enTV Revision of S2-163716. Agreed in parallel session Block approved Approved AGREED
6.19 S2-163945 LS OUT [DRAFT] LS on external interface for TV services SA WG2 - - Created in drafting session. Revised in parallel session to S2-163954. Revised
6.19 S2-163954 LS OUT [DRAFT] LS on external interface for TV services SA WG2 - - Revision of S2-163945. Revised in parallel session to S2-164143. Revised
6.19 S2-164143 LS OUT [DRAFT] LS on external interface for TV services SA WG2 - - Revision of S2-163954. Revised in parallel session to S2-164145. Revised
6.19 S2-164145 LS OUT LS on external interface for TV services SA WG2 - - Revision of S2-164143. Agreed in parallel session Block approved Approved AGREED
- - - WID proposal - - - - -
6.19 S2-163589 WID new New WID proposal for Architectural Enhancements for TV service Qualcomm Incorporated, EBU, BBC, IRT Rel-14 Revised in parallel session to S2-164042. Revised
6.19 S2-164042 WID new New WID proposal for Architectural Enhancements for TV service Qualcomm Incorporated, EBU, BBC, IRT Rel-14 - Revision of S2-163589. Revised in parallel session to S2-164144. Revised
6.19 S2-164144 WID new New WID proposal for Architectural Enhancements for TV service Qualcomm Incorporated, EBU, BBC, IRT, TeliaSonera, Ericsson, Nokia, One2many, AT&T, Samsung Rel-14 - Revision of S2-164042. Agreed in parallel session Block approved Approved AGREED
6.20 - - Non-IP for Cellular Internet of Things for 2G/3G-GPRS (NonIP_GPRS) - - {Puneet} - -
6.20 S2-163320 CR 23.401 CR3052: Adding support for NonIP & SCEF in GERAN Ericsson Rel-14 NonIP_GPRS Revised in parallel session to S2-163806. Revised
6.20 S2-163806 CR 23.401 CR3052R1: Adding support for NonIP & SCEF in GERAN Ericsson Rel-14 NonIP_GPRS Revision of S2-163320. Agreed in parallel session Block approved Agreed AGREED
6.20 S2-163321 CR 23.060 CR2007: Introduction and update of CIoT GSM Optimization Ericsson Rel-14 NonIP_GPRS Revised in parallel session to S2-163807. Revised
6.20 S2-163807 CR 23.060 CR2007R1: Introduction and update of CIoT GSM Optimization Ericsson Rel-14 NonIP_GPRS Revision of S2-163321. Revised in parallel session to S2-163831. Revised
6.20 S2-163831 CR 23.060 CR2007R2: Introduction and update of CIoT GSM Optimization Ericsson Rel-14 NonIP_GPRS Revision of S2-163807. Agreed in parallel session Block approved Agreed AGREED
6.20 S2-163322 CR 23.682 CR0192: Cleanup and alignment of CIoT specs Ericsson Rel-14 NonIP_GPRS Revised in parallel session to S2-163824. Removing changes under 5.13.4 Revised
6.20 S2-163824 CR 23.682 CR0192R1: Cleanup and alignment of CIoT specs Ericsson Rel-14 NonIP_GPRS Revision of S2-163322. Agreed in parallel session Block approved Agreed AGREED
6.21 - - Study on Complementary Features for Voice services over WLAN (FS_VoWLAN) - - {Not_on_agenda} - -
6.22 - - T-ADS supporting WLAN Access (TADS_WLAN) - - {Krisztian} - -
6.22 S2-163567 DISCUSSION Discussion on T-ADS supporting WLAN access China Mobile Rel-14 Noted in parallel session Noted
6.22 S2-163643 DISCUSSION Discussion on T-ADS over WLAN access ZTE TADS_WLAN Noted in parallel session Noted
6.22 S2-163592 CR 23.221 CR0168R1: T-ADS factors to support WLAN access China Mobile Rel-14 TADS_WLAN Revision of S2-162618 from S2#115. Double allocation (same as S2-163593). Revised in parallel session to S2-163871. Revised
6.22 S2-163871 CR 23.221 CR0168R3: T-ADS factors to support WLAN access China Mobile, ZTE Rel-14 TADS_WLAN Revision of S2-163592. Noted in parallel session Noted
6.22 S2-163594 CR 23.292 CR0229R1: Extend T-ADS to support WLAN access China Mobile Rel-14 TADS_WLAN Revision of S2-162621 from S2#115. Revised in parallel session, merging S2-163644, to S2-163872. Revised
6.22 S2-163872 CR 23.292 CR0229R2: Extend T-ADS to support WLAN access China Mobile Rel-14 TADS_WLAN Revision of S2-163594, merging S2-163644. Noted in parallel session Noted
6.22 S2-163644 CR 23.292 CR0233: Enhance T-ADS to support VoWiFI. ZTE Rel-14 TADS_WLAN Merged with S2-163594 into S2-163872 Merged
6.23 - - Enhancement to FMSS (eFMSS) - - {Shabnam} - -
6.23 S2-164052 LS OUT [DRAFT] LS to SA WG5-CH on implication on charging from eFMSS SA WG2 - - Revised to S2-164272. Revised
6.23 S2-164272 LS OUT [DRAFT] LS to SA WG5-CH on implication on charging from eFMSS SA WG2 - - Revision of S2-164052. Revised to S2-164279. Revised
6.23 S2-164279 LS OUT LS to SA WG5-CH on implication on charging from eFMSS SA WG2 - - Revision of S2-164272. Approved Approved
6.23 S2-163260 DISCUSSION Discussion on eFMSS solution ZTE, China Telecom Rel-14 eFMSS Not Handled For Soln 2, select option 3. Need to ensure Service ID/Charging ID config/coordination needed. Not Handled
6.23 S2-163261 CR 23.203 CR1034: Support of traffic steering control for 3rd party service function ZTE, China Telecom Rel-14 eFMSS Revised in parallel session to S2-164049. Revised
6.23 S2-164049 CR 23.203 CR1034R1: Support of traffic steering control for 3rd party service function ZTE, China Telecom Rel-14 eFMSS Revision of S2-163261. Revised in parallel session to S2-164051. Revised
6.23 S2-164051 CR 23.203 CR1034R2: Support of traffic steering control for 3rd party service function ZTE, China Telecom, Allot Communications Rel-14 eFMSS Revision of S2-164049. Revised in parallel session to S2-164230. Revised
6.23 S2-164230 CR 23.203 CR1034R3: Support of traffic steering control for 3rd party service function ZTE, China Telecom, Allot Communications, China Mobile, Nokia, Alcatel Lucent Shanghai Bell Rel-14 eFMSS Revision of S2-164051. Revised to S2-164267. Revised
6.23 S2-164267 CR 23.203 CR1034R4: Support of traffic steering control for 3rd party service function ZTE, China Telecom, Allot Communications, China Mobile, Nokia, Alcatel Lucent Shanghai Bell Rel-14 eFMSS Revision of S2-164230. This CR was agreed Agreed
6.24 - - 3GPP Packet Access Maintenance - minor corrections - - {Not_on_agenda} - -
6.25 - - PCC/QoS Maintenance - minor corrections - - {Not_on_agenda} - -
6.26 - - Non-3GPP Access Maintenance - minor corrections - - {Not_on_agenda} - -
6.27 - - IMS-Related Maintenance - minor corrections - - {Not_on_agenda} - -
6.28 - - TEI14 Category B/C - Enhancements and Improvements only. 3GPP Packet Access - - {Not_on_agenda} - -
6.29 - - TEI14 Category B/C - Enhancements and Improvements only. PCC/QoS - - {Not_on_agenda} - -
6.30 - - TEI14 Category B/C - Enhancements and Improvements only. Non-3GPP Access - - {Not_on_agenda} - -
6.31 - - TEI14 Category B/C - Enhancements and Improvements only. IMS, IMS-Related, Emergency, Other - - {Krisztian} - -
6.31 S2-163305 CR 23.167 CR0299: Indication for support of anonymous IMS emergency sessions Intel, Telecom Italia, Qualcomm Incorporated, NTT DOCOMO, Ericsson Rel-14 TEI14 Revised in parallel session to S2-163861. - add cosigners - change 'might' to 'can' in 2 occurrences - Change 'in previous releases of specification' to 'in pre-Rel-14 versions of specification' Revised
6.31 S2-163861 CR 23.167 CR0299R1: Indication for support of anonymous IMS emergency sessions Intel, Telecom Italia, Qualcomm Incorporated, NTT DOCOMO, Ericsson, Deutsche Telekom, KDDI Rel-14 TEI14 Revision of S2-163305. Agreed in parallel session Block approved Agreed AGREED
6.31 S2-163363 CR 23.167 CR0282R3: Providing subscriber ID in case of anonymous emergency calls Nokia Networks, Deutsche Telekom Rel-14 TEI14, IESE Revision of S2-160382 from S2#113. Revised in parallel session to S2-163862. Fix editorials on the cover page Revised
6.31 S2-163862 CR 23.167 CR0282R4: Providing subscriber ID in case of anonymous emergency calls Nokia, Deutsche Telekom Rel-14 TEI14, IESE Revision of S2-163363. Agreed in parallel session Block approved Agreed AGREED
6.31 S2-163538 CR 23.228 CR1153: TCP transport for data channels towards the WIC Nokia Rel-14 TEI14 Postponed to the next meeting (no TEI14 allocated at this meeting other than V8 related) Postponed
6.31 S2-163539 CR 23.228 CR1154: WebRTC Media plane optimization with DTLS termination Nokia Rel-14 TEI14 Postponed to the next meeting (no TEI14 allocated at this meeting other than V8 related) Postponed
6.31 S2-163541 CR 23.228 CR1156: Support of RTP/RTCP multiplexing for WebRTC Nokia Rel-14 TEI14 Postponed to the next meeting (no TEI14 allocated at this meeting other than V8 related) Postponed
7 - - Project Planning and Management - - {Frank} - -
7.1 - - New and Revised Work Items, Cover sheets for completed work items - - {Frank} - -
7.2 - - Review of the Work Plan - - {Frank} - -
7.2 S2-163691 other TSG endorsed Timeline for New Radio and NextGen SA WG2 Chairman Noted Noted
7.2 S2-163537 P-CR NextGen Phase 1 priority features Nokia, Verizon, AT&T, Qualcomm, Ericsson, China Mobile, Vodafone, NTT DoCoMo FS_NextGen Revised to S2-163731. Revised
7.2 S2-163731 P-CR NextGen Phase 1 priority features Nokia, Verizon, AT&T, Qualcomm, Ericsson, China Mobile, Vodafone, NTT DoCoMo FS_NextGen Revision of S2-163537. Revised to S2-164063. Revised
7.2 S2-164063 P-CR NextGen Phase 1 priority features Nokia, Verizon, AT&T, Qualcomm, Ericsson, China Mobile, Vodafone, NTT DoCoMo FS_NextGen Revision of S2-163731. Revised to S2-164207. Revised
7.2 S2-164207 P-CR NextGen Phase 1 priority features Nokia, Verizon, AT&T, Qualcomm, Ericsson, China Mobile, Vodafone, NTT DoCoMo FS_NextGen Revision of S2-164063. Endorsed Endorsed
7.2 S2-163688 other SA WG2 Work Planning Worksheet SA WG2 Chairman Endorsed for the planning of the next meeting agenda Endorsed
7.3 - - Planning future meetings - - {Frank} - -
8 - - AOB - - {Frank} - -
8 S2-163492 DISCUSSION IMS paging type differentiation for PS domain Intel, TeliaSonera Not Handled Not Handled
9 - - Close of the Meeting - - {Frank} - -
99 - - Withdrawn and reserved documents - - {Withdrawn} - -
99 S2-163571 CR 23.401 CR3077: Clarification to the IRAT handover procedure HTC Corporation Rel-13 CIoT WITHDRAWN Withdrawn
99 S2-163603 DISCUSSION Handling of transmission of data using control plane during user plane transmission HTC Corporation Rel-13 WITHDRAWN Withdrawn
99 S2-163419 CR 23.401 CR3053: Update of network initiated Dedicated Core Network Reselection procedure CATT Rel-14 eDECOR Duplicate TD request. WITHDRAWN Withdrawn
99 S2-163583 P-CR QoS based on Network Slice Granularity CATT FS_NextGen LATE DOC: WITHDRAWN Withdrawn
99 S2-163619 CR 23.303 CR0318: User Info ID's uniqueness for group member discovery Samsung Rel-13 eProSe-Ext-SA2 Duplicate TD request. WITHDRAWN Withdrawn
99 S2-163457 SID revised Multi-access for Next Generation Core BT Group Plc Rel-14 FS_NextGen WITHDRAWN Withdrawn
99 S2-163593 CR 23.221 CR0168R2: T-ADS factors to support WLAN access China Mobile Com. Corporation Rel-14 TADS_WLAN Revision of S2-162618 from S2#115. Double allocation (same as S2-163592). WITHDRAWN Withdrawn
99 S2-163275 P-CR Mobility procedure Ericsson FS_NextGen WITHDRAWN Withdrawn
99 S2-163513 P-CR Solution update for Key issue 3 'Simplified mobility states for stationary UE and MO data transmission only UE' LG Electronics Inc. FS_NextGen WITHDRAWN Withdrawn
99 S2-163551 P-CR Handover in MM and SM separation scenario Huawei, HiSilicon FS_NextGen WITHDRAWN Withdrawn
99 S2-163487 CR 23.401 CR3060: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei, China Telecom Rel-14 TEI14, eDRX WITHDRAWN Withdrawn
99 S2-163488 CR 23.060 CR2009: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei Rel-14 TEI14, eDRX WITHDRAWN Withdrawn
99 S2-163489 CR 23.682 CR0196: Operator management of eDRX parameters NTT DOCOMO, KDDI, Huawei, China Telecom Rel-14 TEI14, eDRX WITHDRAWN Withdrawn
99 S2-163406 DISCUSSION KI#3: Update to Solution 3.7 MediaTek Inc. Rel-14 WITHDRAWN Withdrawn
99 S2-163402 DISCUSSION Key Issue 18 on Interworking and Migration MediaTek Inc. WITHDRAWN Withdrawn
99 S2-163590 CR 23.221 CR0169: T-ADS factors to support WLAN access China Mobile Com. Corporation Rel-14 TADS_WLAN WITHDRAWN Withdrawn
99 S2-163264 LS in LS from ETSI NTECH: LS OUT to SA WG5 and SA WG2 on GANA instantiation in the Core and Backhaul network parts of the 3GPP Architecture ETSI NTECH (NTECH(16)14_019 r1) WITHDRAWN - Already handled (noted) at S2#115 Withdrawn

Created: 2016-07-19 13:10     END OF LIST

Total documents: 1000