List for Meeting: S2-113AH All Sessions
Temporary Documents List - Ordered by Agenda Item
To use hyperlinks, this file must be placed above Folder 'Docs'
CURRENT STATS - OPEN DOCS: Total: 1     CRs: 0     P-CRs: 3     Other: -2
Created: 2016-03-01 14:20     START OF LIST
AI | TD# | Type | Title | Source | Rel | Work Item | Comments | Result |
---|---|---|---|---|---|---|---|---|
1 | - | - | Opening of the meeting | - | - | {Frank} | - | - |
2 | - | - | Approval of the agenda | - | - | {Frank} | - | - |
2 | S2-160933 | Agenda | Draft Agenda for SA WG2#113AH | SA WG2 Chairman | Approved | Approved | ||
2.1 | - | - | IPR Call and Antitrust Reminder | - | - | {Frank} | - | - |
3 | - | - | Meeting reports | - | - | {Frank} | - | - |
4 | - | - | General | - | - | {Frank} | - | - |
5 | - | - | Release 13 | - | - | {S2-113AH} | - | - |
5.6 | - | - | Architecture enhancements for Cellular Internet of Things (CIOT) | - | - | {Frank} | - | - |
5.6 | S2-160934 | LS In | LS from TSG RAN: LS on S1 signalling solutions for non-NB-IoT UEs | TSG RAN (RP-152296) | Rel-13 | NB_IOT-Core | Postponed S2-160052 from meeting #113. Not handled. Postponed to meeting #114 Informs SA WG2 on how RAN schedules work per NBIOT aspects. Can that LS be noted? | Postponed |
5.6 | S2-160936 | LS in | LS from RAN WG2: Reply LS on questions on CIoT | RAN WG2 (R2-160536) | Rel-13 | NB_IOT-Core | Postponed S2-160486 from meeting #113. Not handled. Postponed to meeting #114 Proposed to be noted as CC for SA WG2. | Postponed |
5.6 | S2-160937 | LS in | LS from RAN WG3: LS on questions on NB-IoT | RAN WG3 (R3-160135) | Rel-13 | NB_IOT-Core | Postponed S2-160487 from meeting #113. Response drafted in S2-161117. Final response in S2-161333 | Replied to |
5.6 | S2-160938 | LS in | LS from RAN WG3: LS on CIOT optimization | RAN WG3 (R3-160147) | Rel-13 | NB_IOT | Postponed S2-160489 from meeting #113. Response drafted in S2-161007. Final response in S2-161344 | Replied to |
5.6 | S2-161007 | response | [DRAFT] Reply LS on CIOT optimization | Samsung R&D Institute UK | Rel-13 | NB_IOT, CIoT-CT | Should be type 'LS OUT'. Response to S2-160938. Revised in parallel sessions to S2-161118. | Revised |
5.6 | S2-161118 | LS OUT | [DRAFT] Reply LS on CIOT optimization | SA WG2 | Rel-13 | NB_IOT, CIoT-CT | Revision of S2-161007. Revised to S2-161177. | Revised |
5.6 | S2-161177 | LS OUT | [DRAFT] Reply LS on CIOT optimization | SA WG2 | Rel-13 | NB_IOT, CIoT-CT | Revision of S2-161118. Revised to S2-161334. | Revised |
5.6 | S2-161334 | LS OUT | Reply LS on CIOT optimization | SA WG2 | Rel-13 | NB_IOT | Revision of S2-161177. Revised to S2-161344. Update to : 'SA WG2: response: SA WG2 has discussed this issue and the opinion of SA WG2 has been reflected in approved CRs and in the reply …' Correct meeting location | Revised |
5.6 | S2-161344 | LS OUT | Reply LS on CIOT optimization | SA WG2 | Rel-13 | NB_IOT | Revision of S2-161334. Approved Update to the merged CR's # | Approved |
5.6 | S2-160940 | LS In | LS from RAN WG3: LS on Release of Control Plane for DONAS | RAN WG3 (R3-160140) | Rel-13 | NB_IOT-Core | Postponed S2-160488 from meeting #113. Not handled. Postponed to meeting #114 | Postponed |
5.6 | S2-161088 | LS In | LS from SA WG3: LS on Clarifications on RRC Resume Request | SA WG3 (S3-160337) | Rel-13 | NB_IoT | Responses drafted in S2-161067 and S2-161058. Final response in S2-161260 | Replied to |
5.6 | S2-161058 | LS out | Reply LS on Clarifications on RRC Resume Request | Qualcomm Incorporated | CIoT | Response to S2-161088. Revised to S2-161119. | Revised | |
5.6 | S2-161119 | LS out | Reply LS on Clarifications on RRC Resume Request | Qualcomm Incorporated | - | CIoT | Revision of S2-161058. Revised to S2-161260. | Revised |
5.6 | S2-161120 | LS OUT | [DRAFT] Reply to Existence of CIoT support and NAS protocol details for CIoT | SA WG2 | - | CIoT | Response to S2-161092. Revised to S2-161335. | Revised |
5.6 | S2-161260 | LS out | Reply LS on Clarifications on RRC Resume Request | Qualcomm Incorporated | - | CIoT | Revision of S2-161119. Approved | Approved |
5.6 | S2-161335 | LS OUT | [Draft] Reply LS on Existence of CIoT support and NAS protocol details for CIoT | SA WG2 | - | CIoT-CT | Revision of S2-161120. Revised to S2-161345. cleanup | Revised |
5.6 | S2-161345 | LS OUT | Reply LS on Existence of CIoT support and NAS protocol details for CIoT | SA WG2 | - | CIoT-CT | Revision of S2-161335. Approved | Approved |
5.6 | S2-161090 | LS In | LS from CT WG1: Response to LS on NB-IoT work progress in RAN WG2 | CT WG1 (C1-161187) | Rel-13 | CIoT-CT | Not handled. Postponed to meeting #114 | Postponed |
5.6 | S2-161091 | LS In | LS from CT WG1: LS on per-UE configuration to allow exception reporting | CT WG1 (C1-161430) | Rel-13 | CIOT-CT | Response drafted in S2-161116. Final response in S2-161331 | Replied to |
5.6 | S2-161092 | LS In | LS from CT WG1: Existence of CIoT support and NAS protocol details for CIoT | CT WG1 (C1-161544) | Rel-13 | CIoT-CT | Response drafted in S2-161120. Final response in S2-161345 | Replied to |
5.6 | S2-161067 | response | Response to LS on Clarifications on RRC Resume Request | Ericsson LM | Rel-13 | Should be type 'LS OUT'. Response to S2-161088. WITHDRAWN | Withdrawn | |
5.6 | S2-161093 | LS In | LS from CT WG4: LS on the SGW/PGW Selection | CT WG4 () | Rel-13 | CIoT-CT | Response drafted in S2-161122. Final response in S2-161346 | Replied to |
5.6 | S2-161113 | LS OUT | [DRAFT] Reply to LS on paging in NB-IoT | SA WG2 | - | NB_IOT-Core | Response to S2-161096. Wrong document uploaded. Revised to S2-161279. | Revised |
5.6 | S2-161162 | CR | 23.401 CR2948R8: Introduction of support for NB-IoT | Vodafone | Rel-13 | CIoT | Incorporates agreed draft CRs in S2-161229, S2-161215, part of S2-161257, removal of note 3 (refer S2-160998), S2-161230. This CR was agreed | Agreed |
5.6 | S2-161094 | LS In | LS from CT WG4: LS on Non IP Data Delivery procedures | CT WG4 (C4-161535) | Rel-13 | CIoT | Response drafted in S2-161150. Final response in S2-161347 | Replied to |
5.6 | S2-161279 | LS OUT | [DRAFT] Reply to LS on paging in NB-IoT | SA WG2 | - | NB_IOT-Core | Revision of S2-161113. Revised to S2-161330. | Revised |
5.6 | S2-161095 | CR | 23.401 CR2988: Handover for non-NB-IoT devices using CIoT optimisations | Vodafone | - | CIoT | LATE DOC: Rx 22/02, 15:00. Revised in parallel sessions to S2-161206. | Revised |
5.6 | S2-161114 | CR | 23.401 CR2989: DRX handling for NB-IoT | Vodafone | - | CIoT | Revised to S2-161175. | Revised |
5.6 | S2-161115 | LS OUT | [DRAFT] Reply to S on CIoT optimization for non-NB-IoT UEs | SA WG2 | - | TEI13, CIoT | Response to S2-161097. Revised to S2-161176. | Revised |
5.6 | S2-161122 | LS OUT | [DRAFT] Reply to LS on the SGW/PGW Selection | SA WG2 | Rel-13 | CIoT | Response to S2-161093. Revised to S2-161171. | Revised |
5.6 | S2-161330 | LS OUT | LS on paging in NB-IoT | SA WG2 | - | NB_IOT-Core | Revision of S2-161279. Approved | Approved |
5.6 | S2-161096 | LS In | LS from RAN WG2: LS on paging in NB-IoT | RAN WG2 (R2-161948) | Rel-13 | NB_IOT-Core | Response drafted in S2-161113. Final response in S2-161330 | Replied to |
5.6 | S2-161116 | LS OUT | [DRAFT] Reply to esponse to LS on NB-IoT work progress in RAN WG2 | SA WG2 | - | NB_IOT-Core | Response to S2-161091 and S2-161099. Revised to S2-161173. | Revised |
5.6 | S2-161150 | LS OUT | [DRAFT] Reply LS on Non IP Data Delivery procedures | SA WG2 | - | - | Response to S2-161094. Revised to S2-161172. | Revised |
5.6 | S2-161171 | LS OUT | [DRAFT] Reply to LS on the SGW/PGW Selection | SA WG2 | Rel-13 | CIoT | Revision of S2-161122. Revised to S2-161210. | Revised |
5.6 | S2-161175 | CR | 23.401 CR2989R1: DRX handling for NB-IoT | Vodafone | - | CIoT | Revision of S2-161114. This CR was agreed | Agreed |
5.6 | S2-161176 | LS OUT | [DRAFT] Reply to S on CIoT optimization for non-NB-IoT UEs | SA WG2 | - | TEI13, CIoT | Revision of S2-161115. Revised to S2-161332. | Revised |
5.6 | S2-161206 | CR | 23.401 CR2988R1: Handover for non-NB-IoT devices using CIoT optimisations | Vodafone | - | CIoT | Revision of S2-161095. Revised to S2-161251. | Revised |
5.6 | S2-161097 | LS In | LS from RAN WG2: LS on CIoT optimization for non-NB-IoT UEs | RAN WG2 (R2-162018) | Rel-13 | CIoT | Response drafted in S2-161115, revised to S2-161332 (for e-mail approval) | OPEN |
5.6 | S2-161117 | LS OUT | [DRAFT] Reply to LS on questions on NB-IoT | SA WG2 | - | NB_IOT-Core | Response to S2-160937. Revised to S2-161333. Move SA WG3 and RAN WG2 into TO field | Revised |
5.6 | S2-161172 | LS OUT | [DRAFT] Reply LS on Non IP Data Delivery procedures | SA WG2 | - | - | Revision of S2-161150. Revised to S2-161209. | Revised |
5.6 | S2-161173 | LS OUT | [DRAFT] Reply to esponse to LS on NB-IoT work progress in RAN WG2 | SA WG2 | - | NB_IOT-Core | Revision of S2-161116. Revised to S2-161331. Clean-up; correct answer Q2 to Q1 | Revised |
5.6 | S2-161210 | LS OUT | [DRAFT] Reply to LS on the SGW/PGW Selection | SA WG2 | Rel-13 | CIoT | Revision of S2-161171. Revised to S2-161336. | Revised |
5.6 | S2-161251 | CR | 23.401 CR2988R2: Handover for non-NB-IoT devices using CIoT optimisations | Vodafone | - | CIoT | Revision of S2-161206. This CR was agreed | Agreed |
5.6 | S2-161332 | LS OUT | [DRAFT] Reply to S on CIoT optimization for non-NB-IoT UEs | SA WG2 | Rel-13 | TEI13, CIoT | Revision of S2-161176. For e-mail approval This was left for e-mail approval | OPEN |
5.6 | S2-161098 | LS In | LS from RAN WG2: Reply LS on Clarifications on RRC Resume Request | RAN WG2 (R2-162019) | Rel-13 | NB_IOT-Core | Not handled. Postponed to meeting #114 | Postponed |
5.6 | S2-161159 | CR | 23.401 CR2934R8: Introducing support for Non-IP data for CIoT | Ericsson, Cisco Systems Inc, Intel, ZTE | Rel-13 | CIoT | Merge of agreed draft CRs. Revised to S2-161259. | Revised |
5.6 | S2-161167 | CR | 23.401 CR2930R9: Introduction of solution 18 - suspend and resume procedure | Ericsson, Alcatel-Lucent, Sony, Nokia Networks | Rel-13 | CIoT | Revised to S2-161213. | Revised |
5.6 | S2-161209 | LS OUT | [DRAFT] Reply LS on Non IP Data Delivery procedures | SA WG2 | - | - | Revision of S2-161172. Rev due to potential # clash. Revised to S2-161337. WITHDRAWN | Withdrawn |
5.6 | S2-161331 | LS OUT | Reply LS on NB-IoT work progress in RAN WG2 | SA WG2 | Rel-13 | NB_IOT-Core | Revision of S2-161173. Response to S2-161091 and S2-161099. Approved | Approved |
5.6 | S2-161333 | LS OUT | Reply LS on questions on NB-IoT | SA WG2 | Rel-13 | NB_IoT-Core, CIoT | Revision of S2-161117. Approved | Approved |
5.6 | S2-161336 | LS OUT | Reply LS on the SGW/PGW Selection | SA WG2 | Rel-13 | CIoT, CIoT-CT | Revision of S2-161210. Revised to S2-161346. Attach CR in ZIP file | Revised |
5.6 | S2-161099 | LS In | LS from RAN WG2: Response to LS on NB-IoT work progress in RAN2 | RAN WG2 (R2-162020) | Rel-13 | NB_IOT-Core | Response drafted in S2-161116. Final response in S2-161331 | Replied to |
5.6 | S2-161160 | CR | 23.401 CR2951R9: Introduction of attach procedure changes for CIoT EPS optimization. | Alcatel-Lucent, Vodafone, Qualcomm; Nokia Networks, Cisco Systems Inc., Huawei, China Mobile | Rel-13 | CIoT | Incorporates agreed draft CRs in S2-161257, S2-161221, S2-161256, S2-161227, S2-161059. This CR was agreed | Agreed |
5.6 | S2-161161 | CR | 23.401 CR2959R4: TAU procedure update for CIoT EPS Optimisation | Huawei,HiSilicon, Intel, ZTE | Rel-13 | CIoT | Incorporates agreed draft CRs in S2-161149, S2-161223, align RRC indication name from S2-161257. This CR was agreed | Agreed |
5.6 | S2-161213 | CR | 23.401 CR2930R10: Introduction of solution 18 - suspend and resume procedure | Ericsson, Alcatel-Lucent, Sony, Nokia Networks | Rel-13 | CIoT | Revision of S2-161167. This CR was agreed. Revised to S2-161228. | Revised |
5.6 | S2-161259 | CR | 23.401 CR2934R9: Introducing support for Non-IP data for CIoT | Ericsson, Cisco Systems Inc, Intel, ZTE | Rel-13 | CIoT | Revision of S2-161159. This CR was agreed | Agreed |
5.6 | S2-161337 | LS OUT | [DRAFT] Reply LS on Non IP Data Delivery procedures | SA WG2 | - | - | Revision of S2-161209. Revised to S2-161347. cleanup | Revised |
5.6 | S2-161346 | LS OUT | Reply LS on the SGW/PGW Selection | SA WG2 | Rel-13 | CIoT, CIoT-CT | Revision of S2-161336. Approved | Approved |
5.6 | S2-161228 | CR | 23.401 CR2930R11: Introduction of solution 18 - suspend and resume procedure | Ericsson, Alcatel-Lucent, Sony, Nokia Networks | Rel-13 | CIoT | Revision of S2-161213. This CR was agreed | Agreed |
5.6 | S2-161347 | LS OUT | Reply LS on Non IP Data Delivery procedures | SA WG2 | - | - | Revision of S2-161337. Approved | Approved |
- | - | - | Selection Functions | - | - | - | - | - |
5.6 | S2-160949 | discussion | DNS Procedure Enhancements for CIoT Optimizations | Cisco Systems Inc. | Rel-13 | Noted | Noted | |
5.6 | S2-161062 | discussion | Core Network node selection for CIOT | Qualcomm Incorporated | Noted | Noted | ||
5.6 | S2-161065 | discussion | CN selection for CIoT | Ericsson | Rel-13 | Noted | Noted | |
5.6 | S2-160950 | draftCR | DNS Procedure Enhancements for CIoT Optimizations | Cisco Systems Inc | Rel-13 | CIoT | Revised to S2-161121. | Revised |
5.6 | S2-161121 | draftCR | DNS Procedure Enhancements for CIoT Optimizations | Cisco Systems Inc | Rel-13 | CIoT | Revision of S2-160950. Revised in parallel sessions to S2-161215. | Revised |
5.6 | S2-161215 | draftCR | DNS Procedure Enhancements for CIoT Optimizations | Cisco Systems Inc | Rel-13 | CIoT | Revision of S2-161121. Approved | Approved |
5.6 | S2-161063 | CR | 23.401 CR2987: CIoT EPS Optimisation RRC indication and MME node selection | Qualcomm Incorporated | Rel-13 | CIoT | Revised, merging S2-161024, to S2-161123. | Revised |
5.6 | S2-161123 | CR | 23.401 CR2987R1: CIoT EPS Optimisation RRC indication and MME node selection | Qualcomm Incorporated | Rel-13 | CIoT | Revision of S2-161063, merging S2-161024. Revised to S2-161216. | Revised |
5.6 | S2-161216 | CR | 23.401 CR2987R2: CIoT EPS Optimisation RRC indication and MME node selection | Qualcomm Incorporated | Rel-13 | CIoT | Revision of S2-161123. Revised to S2-161252. | Revised |
5.6 | S2-161252 | CR | 23.401 CR2987R3: CIoT EPS Optimisation RRC indication and MME node selection | Qualcomm Incorporated | Rel-13 | CIoT | Revision of S2-161216. Noted | Noted |
5.6 | S2-161257 | DraftCR | CIoT EPS Optimisation RRC indication and MME node selection | Qualcomm Incorporated | Rel-13 | CIoT | This draft CR will be incorporated into CR 2948 and CR 2951. Approved | Approved |
- | - | - | HLcom | - | - | - | - | - |
5.6 | S2-160952 | CR | 23.401 CR2962R1: Introduction of Control Plane CIoT EPS optimization for HLcom | Sony | Rel-13 | CIoT | Revision of S2-160250 from S2#113. Content merged with S2-161013 in S2-161125 | Merged |
5.6 | S2-161013 | CR | 23.401 CR2982: HLcom feature update for CP optimisation | Huawei, Hisilicon | Rel-13 | CIoT | Revised, merging S2-160952, into S2-161125. | Revised |
5.6 | S2-161125 | CR | 23.401 CR2982R1: HLcom feature update for CP optimisation | Huawei, Hisilicon | Rel-13 | CIoT | Revision of S2-161013, merging S2-160952. Revised to S2-161212. | Revised |
5.6 | S2-161212 | CR | 23.401 CR2982R2: HLcom feature update for CP optimisation | Huawei, Hisilicon | Rel-13 | CIoT | Revision of S2-161125. This CR was agreed | Agreed |
5.6 | S2-161014 | CR | 23.682 CR0166: HLcom update for CIoT CP optimisation | Huawei, Hisilicon | Rel-13 | CIoT | Revised to S2-161126. | Revised |
5.6 | S2-161126 | CR | 23.682 CR0166R1: HLcom update for CIoT CP optimisation | Huawei, Hisilicon | Rel-13 | CIoT | Revision of S2-161014. This CR was agreed | Agreed |
- | - | - | Non-IP bearers | - | - | - | - | - |
5.6 | S2-160960 | discussion | Routing Non-IP Data to/from Multiple UE Applcaitons and Multiple SCS/AS’s | Convida Wireless | Rel-13 | CIoT | Noted | Noted |
5.6 | S2-160962 | draftCR | Updating the NIDD Procedures to Support Multiple Applicaitons | Convida Wireless | Rel-13 | CIoT | Not Handled | Not Handled |
5.6 | S2-160968 | draftCR | Introducing support for Non-IP data for CIoT | Ericsson ( Cisco Systems Inc, Intel, ZTE) | Rel-13 | CIoT | Revision of CR S2-160841 from S2#113. Revised to S2-161163. | Revised |
5.6 | S2-161163 | draftCR | Introducing support for Non-IP data for CIoT | Ericsson ( Cisco Systems Inc, Intel, ZTE) | Rel-13 | CIoT | Revision of S2-160968. Approved | Approved |
5.6 | S2-160969 | draftCR | Introduction of non-IP data delivery via the SCEF for cellular IoT | Ericsson, Intel?, Cisco Systems Inc?, AT&T?, LG Electronics?, Samsung? | Rel-13 | CIoT | Revision of CR S2-160823 from S2#113. Sources need confirmation. Revised to S2-161164. | Revised |
5.6 | S2-161164 | draftCR | Introduction of non-IP data delivery via the SCEF for cellular IoT | Ericsson, Intel?, Cisco Systems Inc?, AT&T?, LG Electronics?, Samsung? | Rel-13 | CIoT | Revision of S2-160969. Revised to S2-161217. | Revised |
5.6 | S2-161217 | draftCR | Introduction of non-IP data delivery via the SCEF for cellular IoT | Ericsson, Intel?, Cisco Systems Inc?, AT&T?, LG Electronics?, Samsung? | Rel-13 | CIoT | Revision of S2-161164. Approved | Approved |
5.6 | S2-161078 | draftCR | Introduction of non-IP data delivery via the SCEF for cellular IoT | Alcatel-Lucent, Nokia Networks, Cisco Systems Inc, Samsung, Intel | Rel-13 | CIoT | Revised in parallel sessions to S2-161165. | Revised |
5.6 | S2-161165 | draftCR | Introduction of non-IP data delivery via the SCEF for cellular IoT | Alcatel-Lucent, Nokia Networks, Cisco Systems Inc, Samsung, Intel | Rel-13 | CIoT | Revision of S2-161078. Revised to S2-161218. | Revised |
5.6 | S2-161218 | draftCR | Introduction of non-IP data delivery via the SCEF for cellular IoT | Alcatel-Lucent, Nokia Networks, Cisco Systems Inc, Samsung, Intel | Rel-13 | CIoT | Revision of S2-161165. Revised to S2-161253. | Revised |
5.6 | S2-161253 | draftCR | Introduction of non-IP data delivery via the SCEF for cellular IoT | Alcatel-Lucent, Nokia Networks, Cisco Systems Inc, Samsung, Intel | Rel-13 | CIoT | Revision of S2-161218. Approved | Approved |
5.6 | S2-161005 | CR | 23.682 CR0165: Update HSS/HLR functionality to support non-IP data delivery via SCEF | Samsung | Rel-13 | CIoT | Revised to S2-161166. | Revised |
5.6 | S2-161166 | CR | 23.682 CR0165R1: Update HSS/HLR functionality to support non-IP data delivery via SCEF | Samsung | Rel-13 | CIoT | Revision of S2-161005. Revised to S2-161220. | Revised |
5.6 | S2-161220 | CR | 23.682 CR0165R2: Update HSS/HLR functionality to support non-IP data delivery via SCEF | Samsung | Rel-13 | CIoT | Revision of S2-161166. This CR was agreed | Agreed |
5.6 | S2-161080 | discussion | SCEF Issues | Alcatel-lucent, Nokia Networks | CIoT | Noted | Noted | |
5.6 | S2-161158 | CR | 23.682 CR0160R3: Introduction of non-IP data delivery via the SCEF for cellular IoT | Intel | Rel-13 | CIoT | Incorporates agreed draft CRs in S2-161253 and S2-161217. This CR was agreed | Agreed |
- | - | - | IRAT handling | - | - | - | - | - |
5.6 | S2-160970 | CR | 23.401 CR2980: Disabling IRAT to and from NB-IOT | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | Rel-13 | CIoT | Revised to S2-161151. | Revised |
5.6 | S2-161151 | CR | 23.401 CR2980R1: Disabling IRAT to and from NB-IOT | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | Rel-13 | CIoT | Revision of S2-160970. Revised to S2-161211. | Revised |
5.6 | S2-161211 | CR | 23.401 CR2980R2: Disabling IRAT to and from NB-IOT | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | Rel-13 | CIoT | Revision of S2-161151. Revised to S2-161219. | Revised |
5.6 | S2-161219 | CR | 23.401 CR2980R3: Disabling IRAT to and from NB-IOT | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | Rel-13 | CIoT | Revision of S2-161211. Revised in parallel sessions to S2-161254. | Revised |
5.6 | S2-161254 | CR | 23.401 CR2980R4: Disabling IRAT to and from NB-IOT | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | Rel-13 | CIoT | Revision of S2-161219. This CR was agreed | Agreed |
- | - | - | Attach procedure | - | - | - | - | - |
5.6 | S2-160974 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization | Ericsson | Rel-13 | CIoT | Revision of CR S2-160836 from S2#113. Revised to S2-161152. | Revised |
5.6 | S2-161152 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization | Ericsson | Rel-13 | CIoT | Revision of S2-160974. Revised to S2-161221. No consensus on following statement: In this release of the specification, UE supporting WB-EUTRAN shall indicate support for S1-U data transfer. 3 companies support to keep this statement. 7 companies object to keeping this statement. Following text will be deleted. 'In this release of the specification, UE supporting WB-EUTRAN shall indicate support for S1-U data transfer.' Changes on AMBR would be reverted. AMBR enforcements may require further discussion in the future meetings. | Revised |
5.6 | S2-161221 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization | Ericsson | Rel-13 | CIoT | Revision of S2-161152. Approved | Approved |
5.6 | S2-161222 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization | Ericsson | Rel-13 | CIoT | This CR will be - 'In this release of the specification, UE supporting WB-EUTRAN shall indicate support for S1-U data transfer'. Noted | Noted |
5.6 | S2-161045 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization | Huawei, HiSilicon | Rel-13 | CIoT | Revision of CR S2-160836 from S2#113. Noted | Noted |
5.6 | S2-161022 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization. | ZTE | Rel-13 | Revised to S2-161207. | Revised | |
5.6 | S2-161207 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization. | ZTE | Rel-13 | - | Revision of S2-161022. Revised to S2-161256. | Revised |
5.6 | S2-161256 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization. | ZTE | Rel-13 | CIoT | Revision of S2-161207. Approved | Approved |
5.6 | S2-161071 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization. | NTT DOCOMO INC. | Rel-13 | LATE DOC: Rx 18/02, 18:10. TD number not updated, Source needs correction. Revised to S2-161208. | Revised | |
5.6 | S2-161208 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization. | NTT DOCOMO INC. | Rel-13 | - | Revision of S2-161071. Revised to S2-161227. | Revised |
5.6 | S2-161227 | draftCR | Introduction of attach procedure changes for CIoT EPS optimization. | NTT DOCOMO INC. | Rel-13 | - | Revision of S2-161208. Approved | Approved |
- | - | - | RAU/TAU procedures | - | - | - | - | - |
5.6 | S2-160973 | draftCR | TAU procedure update for CIoT EPS Optimisation | Ericsson | Rel-13 | CIoT | Revision of CR S2-160837 from S2#113. Revised to S2-161202. | Revised |
5.6 | S2-161202 | draftCR | TAU procedure update for CIoT EPS Optimisation | Ericsson | Rel-13 | CIoT | Revision of S2-160973. This will be brought back in next meeting. WITHDRAWN | Withdrawn |
5.6 | S2-161023 | draftCR | TAU procedure update for CIoT EPS Optimisation | ZTE | Rel-13 | Revised to S2-161203. | Revised | |
5.6 | S2-161203 | draftCR | TAU procedure update for CIoT EPS Optimisation | ZTE | Rel-13 | - | Revision of S2-161023. Revised to S2-161223. | Revised |
5.6 | S2-161223 | draftCR | TAU procedure update for CIoT EPS Optimisation | ZTE | Rel-13 | - | Revision of S2-161203. Approved | Approved |
5.6 | S2-161050 | CR | 23.401 CR2985: RAU procedure update for CIoT EPS Optimisation | Huawei, HiSilicon | Rel-13 | CIoT | Revised to S2-161204. | Revised |
5.6 | S2-161204 | CR | 23.401 CR2985R1: RAU procedure update for CIoT EPS Optimisation | Huawei, HiSilicon | Rel-13 | CIoT | Revision of S2-161050. This CR was agreed | Agreed |
5.6 | S2-161051 | CR | 23.401 CR2986: TAU procedure update with Gn/Gp SGSN for CIoT EPS optimization | Huawei, HiSilicon | Rel-13 | CIoT | Revised to S2-161205. | Revised |
5.6 | S2-161205 | CR | 23.401 CR2986R1: TAU procedure update with Gn/Gp SGSN for CIoT EPS optimization | Huawei, HiSilicon | Rel-13 | CIoT | Revision of S2-161051. Revised to S2-161224. | Revised |
5.6 | S2-161224 | CR | 23.401 CR2986R2: TAU procedure update with Gn/Gp SGSN for CIoT EPS optimization | Huawei, HiSilicon | Rel-13 | CIoT | Revision of S2-161205. Revised to S2-161255. | Revised |
5.6 | S2-161255 | CR | 23.401 CR2986R3: TAU procedure update with Gn/Gp SGSN for CIoT EPS optimization | Huawei, HiSilicon | Rel-13 | CIoT | Revision of S2-161224. This CR was agreed | Agreed |
5.6 | S2-161027 | discussion | Analysis of TAU procedure handling for solution 18 | LG Electronics | Rel-13 | CIoT | Noted | Noted |
5.6 | S2-161028 | draftCR | TAU procedure update for CIoT EPS Optimization | LG Electronics | Rel-13 | CIoT | Not Handled | Not Handled |
- | - | - | Load handling | - | - | - | - | - |
5.6 | S2-160971 | CR | 23.401 CR2981: Support for overload control | Ericsson | Rel-13 | CIoT | Revised to S2-161127. | Revised |
5.6 | S2-161127 | CR | 23.401 CR2981R1: Support for overload control | Ericsson | Rel-13 | CIoT | Revision of S2-160971. Revised to S2-161225. | Revised |
5.6 | S2-161225 | CR | 23.401 CR2981R2: Support for overload control | Ericsson | Rel-13 | CIoT | Revision of S2-161127. Revised to S2-161258. | Revised |
5.6 | S2-161258 | CR | 23.401 CR2981R3: Support for overload control | Ericsson | Rel-13 | CIoT | Revision of S2-161225. This CR was agreed | Agreed |
- | - | - | CP optimisation | - | - | - | - | - |
5.6 | S2-160976 | draftCR | UE Capability Handling for Control Plane CIoT EPS optimization | Ericsson | Rel-13 | CIoT | Revision of CR S2-160769 from S2#113. Revised to S2-161168. | Revised |
5.6 | S2-161168 | CR | 23.401 CR2977R2: UE Capability Handling for Control Plane CIoT EPS optimization | Vodafone | Rel-13 | CIoT | Revision of S2-160976. These changes will be reflected as update to CR 2977 agreed at SA WG2#113 in S2-160769. This CR was agreed | Agreed |
5.6 | S2-161021 | draftCR | UE Capability Handling for Control Plane CIoT EPS optimization | ZTE | Rel-13 | Noted | Noted | |
5.6 | S2-161015 | CR | 23.401 CR2983: Bearer deactivation with Control Plane CIoT optimisation | Huawei, Hisilicon | Rel-13 | CIoT | Noted | Noted |
5.6 | S2-160972 | draftCR | Introduction of Control Plane CIoT EPS optimization | Ericsson | Rel-13 | CIoT | Revision of CR S2-160909 from S2#113. Noted | Noted |
5.6 | S2-160994 | draftCR | Introduction of Control Plane CIoT EPS optimization | Intel | Rel-13 | CIoT | Agreements captured in S2-161227. Noted | Noted |
5.6 | S2-161025 | draftCR | Introduction of Control Plane CIoT EPS optimization | ZTE | Rel-13 | Revised to S2-161169. | Revised | |
5.6 | S2-161169 | draftCR | Introduction of Control Plane CIoT EPS optimization | ZTE | Rel-13 | - | Revised to S2-161214. | Revised |
5.6 | S2-161214 | draftCR | Introduction of Control Plane CIoT EPS optimization | ZTE | Rel-13 | - | Revision of S2-161169. Revised to S2-161226. | Revised |
5.6 | S2-161226 | draftCR | Introduction of Control Plane CIoT EPS optimization | ZTE | Rel-13 | - | Revision of S2-161214. Approved | Approved |
5.6 | S2-161046 | CR | 23.401 CR2942R12: Introduction of Control Plane CIoT EPS optimization | Alcatel-lucent, MediaTek, NEC, Intel,Qualcomm; Nokia Networks, Cisco Systems Inc., Huawei | Rel-13 | CIoT | Revision of S2-160909 from S2#113. LATE DOC: Rx: 18/02, 16:25. Revised to S2-161170. This CR will also incorporate the changes from other draft CRs. CR Author: Alessio Casati This would incorporate agreed draft CRs in S2-161163, S2-161226, S2-161060, S2-161250 | Revised |
5.6 | S2-161170 | CR | 23.401 CR2942R13: Introduction of Control Plane CIoT EPS optimization | Alcatel-lucent, MediaTek, NEC, Intel,Qualcomm; Nokia Networks, Cisco Systems Inc., Huawei | Rel-13 | CIoT | Revision of S2-161046. Incorporates agreed draft CRs in S2-161163, S2-161226, S2-161060, S2-161250. This CR was agreed | Agreed |
- | - | - | UP optimisation | - | - | - | - | - |
5.6 | S2-160979 | discussion | Applicability of UP EPS Optimization for TAU, SMS and communication with SCEF | Ericsson | Rel-13 | CIoT | Agreed as way forward; Verify this is covered in 23.401 CR 2930. Noted | Noted |
- | - | - | NBIOT support | - | - | - | - | - |
5.6 | S2-160975 | draftCR | Introduction of support for NB-IoT | Ericsson | Rel-13 | CIoT | Revision of CR S2-160907 from S2#113. Revised to S2-161124. | Revised |
5.6 | S2-161124 | draftCR | Introduction of support for NB-IoT | Ericsson | Rel-13 | CIoT | Revision of S2-160975. Revised to S2-161229. | Revised |
5.6 | S2-161229 | draftCR | Introduction of support for NB-IoT | Ericsson | Rel-13 | CIoT | Revision of S2-161124. Approved | Approved |
5.6 | S2-161024 | draftCR | Introduction of support for NB-IoT | ZTE | Rel-13 | Merged with S2-161063 into S2-161123 | Merged | |
- | - | - | SMS aspects | - | - | - | - | - |
5.6 | S2-160977 | discussion | EMM signalling for indicating SMS | Ericsson | Rel-13 | CIoT | Noted | Noted |
5.6 | S2-160978 | CR | 23.272 CR0961: SMS support with EPS attach and TAU | Ericsson | Rel-13 | CIoT | For e-mail approval This was left for e-mail approval | |
- | - | - | Bearer aspects | - | - | - | - | - |
5.6 | S2-161047 | discussion | EPS Bearer support for NB-IoT | Huawei, HiSilicon | Rel-13 | CIoT | Noted | Noted |
5.6 | S2-161048 | CR | 23.401 CR2984: One Bearer Support for NB-IoT | Huawei, Hisilicon | Rel-13 | CIoT | Revised to S2-161153. | Revised |
5.6 | S2-161153 | CR | 23.401 CR2984R1: One Bearer Support for NB-IoT | Huawei, Hisilicon | Rel-13 | CIoT | Revision of S2-161048. WITHDRAWN | Withdrawn |
5.6 | S2-161049 | discussion | Issues on enable CP & UP for one EPS bearer | Huawei, HiSilicon | Rel-13 | CIoT | Noted | Noted |
5.6 | S2-161077 | CR | 23.060 CR1999: MTU for non-IP PDN connection | Vodafone | Rel-13 | Noted | Noted | |
5.6 | S2-161087 | draftCR | NB-IoT AMBR aspects in PDN Connection request procedure - update of CR2942 | Vodafone | Rel-13 | Sources need clarification. Revised to S2-161154. | Revised | |
5.6 | S2-161154 | draftCR | NB-IoT AMBR aspects in PDN Connection request procedure - update of CR2942 | Vodafone | Rel-13 | - | Revision of S2-161087. Revised to S2-161230. | Revised |
5.6 | S2-161230 | draftCR | NB-IoT AMBR aspects in PDN Connection request procedure - update of CR2942 | Vodafone | Rel-13 | - | Revision of S2-161154. Approved | Approved |
5.6 | S2-161085 | discussion | Some QoS Aspects of Data via MME | Vodafone | Rel-13 | Noted | Noted | |
5.6 | S2-161079 | discussion | Handling of signalling conflicts with 'data via MME' | Vodafone | Rel-13 | Noted | Noted | |
5.6 | S2-161083 | draftCR | prioritisation of signalling and data aspects - update of CR 2942 | Vodafone | Rel-13 | Sources need clarification. Revised to S2-161155. | Revised | |
5.6 | S2-161155 | draftCR | prioritisation of signalling and data aspects - update of CR 2942 | Vodafone | Rel-13 | - | Revision of S2-161083. Revised to S2-161174. | Revised |
5.6 | S2-161174 | draftCR | prioritisation of signalling and data aspects - update of CR 2942 | Vodafone | Rel-13 | - | Revision of S2-161155. Revised to S2-161250. | Revised |
5.6 | S2-161250 | draftCR | prioritisation of signalling and data aspects - update of CR 2942 | Vodafone | Rel-13 | - | Revision of S2-161174. Approved | Approved |
5.6 | S2-161052 | discussion | On the support of QoS and data/signalling differentiation in CIOT Optimisations | Alcatel-Lucent, Nokia Networks | Rel-13 | LATE DOC: Rx: 18/02, 16:25. Noted QoS support is not provided/considered for control Plane C-IoT EPS optimisations in R13. | Noted | |
- | - | - | ROHC | - | - | - | - | - |
5.6 | S2-161059 | draftCR | Updates on the attach procedure for RoHC | Qualcomm Incorporated, Intel | Rel-13 | CIoT | Approved | Approved |
5.6 | S2-161060 | draftCR | Updates on the CP optimisation for RoHC | Qualcomm Incorporated, Intel | Rel-13 | CIoT | Approved | Approved |
5.6 | S2-161061 | draftCR | Updates on the TAU procedure for RoHC | Qualcomm Incorporated, Intel | Rel-13 | CIoT | Revised to S2-161149. | Revised |
5.6 | S2-161149 | draftCR | Updates on the TAU procedure for RoHC | Qualcomm Incorporated, Intel | Rel-13 | CIoT | Revision of S2-161061. Approved | Approved |
- | - | - | Concluding the TR | - | - | - | - | - |
5.6 | S2-160992 | P-CR | Adding conclusions for the key issue #6 and #7 in TR 23.720 | Intel | Rel-13 | FS_AE_CIoT | Revised to S2-161156. | Revised |
5.6 | S2-161156 | P-CR | Adding conclusions for the key issue #6 and #7 in TR 23.720 | Intel | Rel-13 | FS_AE_CIoT | Revision of S2-160992. Approved | Approved |
5.6 | S2-160993 | TS or TR cover | Presentation of TR 23.720 version 1.3.0 to TSG SA for Approval | Intel | Rel-13 | FS_AE_CIoT | Revised to S2-161157. | Revised |
5.6 | S2-161157 | TS or TR cover | Presentation of TR 23.720 version 1.3.0 to TSG SA for Approval | Intel | Rel-13 | FS_AE_CIoT | Revision of S2-160993. Approved | Approved |
- | - | - | Miscellaneous | - | - | - | - | - |
5.6 | S2-161066 | discussion | Some technical corrections and clarifications to CIOT CRs | NTT DOCOMO | Rel-13 | LATE DOC: Rx 18/02, 18:10. Not Handled | Not Handled | |
5.6 | S2-160998 | draftCR | Draft CR23.401 [2948r8] Removal of "WB-E-UTRA" terminology | MediaTek, Alcatel-Lucent, Nokia Networks | Rel-13 | LATE DOC: Rx 19/02, 02:45. Agreement: Note 3 would be removed under definitions clause. Noted | Noted | |
5.6 | S2-160999 | draftCR | Draft CR 23.401 [2942r11] Removal of "WB-E-UTRA" terminology | MediaTek, Alcatel-Lucent, Nokia Networks | Rel-13 | LATE DOC: Rx 19/02, 02:45 | ||
5.6 | S2-161000 | draftCR | Draft CR 23.401 [2959r3] Removal of "WB-E-UTRA" terminology | MediaTek, Alcatel-Lucent, Nokia Networks | Rel-13 | LATE DOC: Rx 19/02, 02:45 | ||
5.6 | S2-161001 | draftCR | Draft CR 23.401 [2951r8] Removal of "WB-E-UTRA" terminology | MediaTek, Alcatel-Lucent, Nokia Networks | Rel-13 | LATE DOC: Rx 19/02, 02:45 | ||
5.6 | S2-161029 | draftCR | Removal of the Non-IP indication in step 17 of Attach procedure | Huawei, HiSilicon | Rel-13 | CIoT | WITHDRAWN | Withdrawn |
6 | - | - | Release 14 | - | - | {S2-113AH} | - | - |
6.10 | - | - | Study on Architecture for Next Generation System (FS_NexGen) | - | - | {Frank} | - | - |
6.10 | S2-161100 | Discussion | Work Planning Proposal for NexGen Study Item on how to focus study | AT&T | Rel-14 | FS_NextGen | Revised to S2-161128. | Revised |
6.10 | S2-161128 | Discussion | Work Planning Proposal for NexGen Study Item on how to focus study | AT&T | Rel-14 | FS_NextGen | Revision of S2-161100. Revised to S2-161245. | Revised |
6.10 | S2-161245 | Discussion | Work Planning Proposal for NexGen Study Item on how to focus study | AT&T | Rel-14 | FS_NextGen | Revision of S2-161128. Revised to S2-161287. Remove lifecycle | Revised |
6.10 | S2-161287 | Discussion | Work Planning Proposal for NexGen Study Item on how to focus study | AT&T | Rel-14 | FS_NextGen | Revision of S2-161245. Approved | Approved |
6.10 | S2-160935 | LS in | LS from TSG RAN: LS on Scenarios and Requirements for Next Generation Access Technologies | TSG RAN (RPa160083) | Rel-14 | FS_NextGen | Noted | Noted |
6.10 | S2-160958 | LS In | LS from SA WG1: Reply LS on Scenarios and Requirements for Next Generation Access Technologies | SA WG1 (S1-160559) | Rel-14 | FS_SMARTER | Noted Proposed to be noted as CC for SA WG2 | Noted |
6.10 | S2-160941 | DISCUSSION | Work Planning Proposal for NexGen Study Item | AT&T | Rel-14 | FS_NextGen | Not Handled | Not Handled |
- | - | - | Definitions | - | - | - | - | - |
6.10 | S2-160981 | P-CR | Update of the definitions | Ericsson | Rel-14 | FS_NextGen | Not Handled | Not Handled |
6.10 | S2-160997 | P-CR | Definition of scale-in/scale-out | CATT | FS_NextGen | Revised to S2-161102. | Revised | |
6.10 | S2-161102 | P-CR | Definition of scale-in/scale-out | CATT | FS_NextGen | Revision of S2-160997. Noted | Noted | |
6.10 | S2-161017 | P-CR | Terminology related to the Next Generation System | Huawei, HiSilicon, China Unicom | FS_NextGen | Revised to S2-161101. | Revised | |
6.10 | S2-161101 | P-CR | Terminology related to the Next Generation System | Huawei, HiSilicon, China Unicom | FS_NextGen | Revision of S2-161017. Revised to S2-161231. | Revised | |
6.10 | S2-161231 | P-CR | Terminology related to the Next Generation System | Huawei, HiSilicon, China Unicom | FS_NextGen | Revision of S2-161101. Revised to S2-161288. | Revised | |
6.10 | S2-161288 | P-CR | Terminology related to the Next Generation System | Huawei, HiSilicon, China Unicom | FS_NextGen | Revision of S2-161231. Revised to S2-161338. | Revised | |
6.10 | S2-161338 | P-CR | Terminology related to the Next Generation System | Huawei, HiSilicon, China Unicom | FS_NextGen | Revision of S2-161288. For e-mail approval This was left for e-mail approval | OPEN | |
- | - | - | Architectural requirements/assumptions | - | - | - | - | - |
6.10 | S2-160966 | P-CR | Assumptions for Core and Access functional allocation | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161104. | Revised |
6.10 | S2-161104 | P-CR | Assumptions for Core and Access functional allocation | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160966. Revised to S2-161232. | Revised |
6.10 | S2-161232 | P-CR | Assumptions for Core and Access functional allocation | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161104. Revised to S2-161289. | Revised |
6.10 | S2-161289 | P-CR | Assumptions for Core and Access functional allocation | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161232. Revised to S2-161339. Editors Note: Whether the number of UE - NexGen Core signalling association is impacted when a UE is connected to multiple network slices (possibly involving multiple RATs), and/or non-3GPP access, is FFS. And change evo LTE RAT to evo LTE | Revised |
6.10 | S2-161339 | P-CR | Assumptions for Core and Access functional allocation | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161289. Approved | Approved |
6.10 | S2-160980 | P-CR | Architectural requirements, assumptions and principles impact on key issue descriptions | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161105. | Revised |
6.10 | S2-161105 | P-CR | Architectural requirements, assumptions and principles impact on key issue descriptions | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160980. Approved | Approved |
6.10 | S2-161004 | P-CR | Clarification of Multi Access Technologies Support by 5G Core | ZTE | Rel-14 | FS_NextGen | Revised to S2-161106. | Revised |
6.10 | S2-161106 | P-CR | Clarification of Multi Access Technologies Support by 5G Core | ZTE | Rel-14 | FS_NextGen | Revision of S2-161004. Revised to S2-161233. | Revised |
6.10 | S2-161233 | P-CR | Clarification of Multi Access Technologies Support by 5G Core | ZTE | Rel-14 | FS_NextGen | Revision of S2-161106. Noted | Noted |
6.10 | S2-161011 | P-CR | Architecture Requirements for non-IP connectivity and services | Nokia Networks | Rel-14 | FS_NextGen | Revised to S2-161107. | Revised |
6.10 | S2-161107 | P-CR | Architecture Requirements for non-IP connectivity and services | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161011. Revised to S2-161234. | Revised |
6.10 | S2-161234 | P-CR | Architecture Requirements for non-IP connectivity and services | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161107. Approved | Approved |
6.10 | S2-161032 | discussion | Relation of EPC and NexGen core to the RAN architecture: Discussion | NTT DOCOMO, KDDI | Rel-14 | Noted | Noted | |
6.10 | S2-161033 | P-CR | Relation of EPC and NexGen core to the RAN architecture: pCR to High level architectural requirements | NTT DOCOMO, KDDI | Rel-14 | FS_NextGen | Revised to S2-161103. | Revised |
6.10 | S2-161103 | P-CR | Relation of EPC and NexGen core to the RAN architecture: pCR to High level architectural requirements | NTT DOCOMO, KDDI | Rel-14 | FS_NextGen | Revision of S2-161033. WITHDRAWN | Withdrawn |
6.10 | S2-161035 | P-CR | Architecture requirement for leveraging database technology | Huawei, HiSilicon | FS_NextGen | Revised to S2-161108. | Revised | |
6.10 | S2-161108 | P-CR | Architecture requirement for leveraging database technology | Huawei, HiSilicon | FS_NextGen | Revision of S2-161035. Noted | Noted | |
6.10 | S2-161064 | P-CR | 5G Architectural requirement for energy efficiency | Orange, Samsung | Rel-14 | FS_NextGen | Revision of S2-160815 from S2#113. Revised to S2-161109. | Revised |
6.10 | S2-161109 | P-CR | 5G Architectural requirement for energy efficiency | Orange, Samsung | Rel-14 | FS_NextGen | Revision of S2-161064. Revised to S2-161235. | Revised |
6.10 | S2-161235 | P-CR | 5G Architectural requirement for energy efficiency | Orange, Samsung | Rel-14 | FS_NextGen | Revision of S2-161109. Revised to S2-161290. | Revised |
6.10 | S2-161290 | P-CR | 5G Architectural requirement for energy efficiency | Orange, Samsung | Rel-14 | FS_NextGen | Revision of S2-161235. Approved | Approved |
6.10 | S2-161074 | discussion | Discussion paper on definition of NexGen architecture | Qualcomm Incorporated | Rel-14 | Noted | Noted | |
6.10 | S2-161075 | P-CR | Architectural assumptions for NexGen | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revised to S2-161110. | Revised |
6.10 | S2-161110 | P-CR | Architectural assumptions for NexGen | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revision of S2-161075. Revised to S2-161236. | Revised |
6.10 | S2-161236 | P-CR | Architectural assumptions for NexGen | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revision of S2-161110. Revised to S2-161341. Remove: 'which could potentially be an aggregation of RATs' | Revised |
6.10 | S2-161341 | P-CR | Architectural assumptions for NexGen | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revision of S2-161236. Approved | Approved |
6.10 | S2-161076 | P-CR | Key Issue on Traffic Anchoring and Splitting | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revision of S2-160330 from S2#113. Not Handled | Not Handled |
6.10 | S2-161089 | P-CR | Architectural Requirements to Key issue: Support of Network Slicing | ITRI | Rel-14 | FS_NextGen | LATE DOC: Rx 18/02, 19:05. Revised to S2-161111. | Revised |
6.10 | S2-161111 | P-CR | Architectural Requirements to Key issue: Support of Network Slicing | ITRI | Rel-14 | FS_NextGen | Revision of S2-161089. Noted | Noted |
- | - | - | Key issues | - | - | - | - | - |
6.10 | S2-160959 | P-CR | Clarification of the Network Slicing key Issue | China Mobile | Rel-14 | FS_NextGen | Revised to S2-161112. | Revised |
6.10 | S2-161112 | P-CR | Clarification of the Network Slicing key Issue | China Mobile | Rel-14 | FS_NextGen | Revision of S2-160959. Revised to S2-161237. | Revised |
6.10 | S2-161237 | P-CR | Clarification of the Network Slicing key Issue | China Mobile | Rel-14 | FS_NextGen | Revision of S2-161112. WITHDRAWN | Withdrawn |
6.10 | S2-160986 | P-CR | Update of the key issue 'support of network slicing' | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161129. | Revised |
6.10 | S2-161129 | P-CR | Update of the key issue 'support of network slicing' | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160986. Approved | Approved |
6.10 | S2-160996 | P-CR | Update to the key issue of network slicing | CATT | Rel-14 | FS_NextGen | Assumed to be covered under general authentication key issue. Noted | Noted |
6.10 | S2-161003 | P-CR | Clarification of Network Slicing Key Issue for isolation and separation between network slice instances | ZTE | Rel-14 | FS_NextGen | Noted | Noted |
6.10 | S2-160942 | P-CR | Key Issue on Policy Framework | AT&T, Sprint, Deutsche Telekom, Orange, China Mobile | Rel-14 | FS_NextGen | Revised to S2-161131. | Revised |
6.10 | S2-161131 | P-CR | Key Issue on Policy Framework | AT&T, Sprint, Deutsche Telekom, Orange, China Mobile | Rel-14 | FS_NextGen | Revision of S2-160942, merging S2-161016. Revised to S2-161238. Programmable -> configurable, remove text about SLA and note 2 | Revised |
6.10 | S2-161238 | P-CR | Key Issue on Policy Framework | AT&T, Sprint, Deutsche Telekom, Orange, China Mobile | Rel-14 | FS_NextGen | Revision of S2-161131. Approved | Approved |
6.10 | S2-161016 | P-CR | Policy Framework | Huawei, Hisilicon | Rel-14 | FS_NextGen | Merged with S2-160942 into S2-161131 | Merged |
6.10 | S2-160943 | P-CR | Key Issue on Charging | AT&T, Sprint, Deutsche Telekom, Orange | Rel-14 | FS_NextGen | Revised to S2-161132. | Revised |
6.10 | S2-161132 | P-CR | Key Issue on Charging | AT&T, Sprint, Deutsche Telekom, Orange | Rel-14 | FS_NextGen | Revision of S2-160943. Revised to S2-161239. Level -> based, accounting -> charging | Revised |
6.10 | S2-161239 | P-CR | Key Issue on Charging | AT&T, Sprint, Deutsche Telekom, Orange | Rel-14 | FS_NextGen | Revision of S2-161132. Approved | Approved |
6.10 | S2-160944 | P-CR | Key Issue on Authentication Framework | AT&T, Sprint, Deutsche Telekom | Rel-14 | FS_NextGen | Merged with S2-161041 into S2-161133 | Merged |
6.10 | S2-161041 | P-CR | Authentication in NextGen core network: key issue | Huawei, HiSilicon | Rel-14 | FS_NextGen | Revised to S2-161133. | Revised |
6.10 | S2-161133 | P-CR | Authentication in NextGen core network: key issue | Huawei, HiSilicon | Rel-14 | FS_NextGen | Revision of S2-161041, merging S2-160944. Revised to S2-161240. | Revised |
6.10 | S2-161240 | P-CR | Authentication in NextGen core network: key issue | Huawei, HiSilicon | Rel-14 | Revision of S2-161133. Revised to S2-161291. Remove 'unified' and note 2 | Revised | |
6.10 | S2-161291 | P-CR | Authentication in NextGen core network: key issue | Huawei, HiSilicon | Rel-14 | FS_NextGen | Revision of S2-161240. Approved | Approved |
6.10 | S2-160945 | P-CR | Key issue: Vertical service accommodation | China Telecom, CATT, Nokia Networks, Samsung, Huawei, KDDI | Rel-14 | FS_NextGen | Suggested to come back in next meeting, general aim is to consider a common system architecture and to do any tailoring once a clear need is identified. Noted | Noted |
6.10 | S2-160946 | P-CR | Key issue: Information storage and management | China Telecom, CATT, Nokia Networks, Samsung, Huawei | Rel-14 | FS_NextGen | Merged with S2-160954 and S2-161068 into S2-161134 | Merged |
6.10 | S2-160947 | P-CR | Key issue for signalling aggregation | KDDI, China Telecom, ZTE, Sprint, China Unicom, Samsung, ETRI | Rel-14 | FS_NextGen | Larger part is considered a solution. High level req aspect merged with S2-160990 into S2-161135 | Merged |
6.10 | S2-160953 | P-CR | Clarify the Key issue on network capability exposure | China Mobile | Rel-14 | FS_NextGen | Revised to S2-161136. | Revised |
6.10 | S2-161136 | P-CR | Clarify the Key issue on network capability exposure | China Mobile | Rel-14 | FS_NextGen | Revision of S2-160953. Revised to S2-161241. | Revised |
6.10 | S2-161241 | P-CR | Clarify the Key issue on network capability exposure | China Mobile | Rel-14 | FS_NextGen | Revision of S2-161136. Revised to S2-161292. | Revised |
6.10 | S2-161292 | P-CR | Clarify the Key issue on network capability exposure | China Mobile | Rel-14 | FS_NextGen | Revision of S2-161241. Revised to S2-161340. Change to: How to create a network slice based on the requirement of the 3rd party or to customize network function on-demand Editor's Note: whether the above bullet involves possible work of SA WG2 is FFS. | Revised |
6.10 | S2-161340 | P-CR | Clarify the Key issue on network capability exposure | China Mobile | Rel-14 | FS_NextGen | Revision of S2-161292. Approved | Approved |
6.10 | S2-160954 | P-CR | Key issue X: Core Network load re-balancing | KDDI, Intel, Sprint, ETRI | Rel-14 | FS_NextGen | Merged with S2-160946 and S2-161068 into S2-161134 | Merged |
6.10 | S2-160961 | P-CR | Proposal for NexGen System Architecture Key Issue for Critical Communications Support | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revised to S2-161137. | Revised |
6.10 | S2-161137 | P-CR | Proposal for NexGen System Architecture Key Issue for Critical Communications Support | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revision of S2-160961. Approved | Approved |
6.10 | S2-161034 | P-CR | Key Issues on low latency and high reliability service support | Huawei, HiSilicon | FS_NextGen | Revised to S2-161138. | Revised | |
6.10 | S2-161138 | P-CR | Key Issues on low latency and high reliability service support | Huawei, HiSilicon | FS_NextGen | Revision of S2-161034. Approved | Approved | |
6.10 | S2-160963 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Advanced Group Communication | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revised to S2-161139. | Revised |
6.10 | S2-161139 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Advanced Group Communication | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revision of S2-160963. Revised to S2-161293. Remove 'advanced', 'V2X', 'group management' | Revised |
6.10 | S2-161293 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Advanced Group Communication | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revision of S2-161139. Approved | Approved |
6.10 | S2-160964 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Advanced Off-Network Communication | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revised to S2-161140. | Revised |
6.10 | S2-161140 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Advanced Off-Network Communication | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revision of S2-160964. Revised to S2-161294. Remove 'compatible with LTE' | Revised |
6.10 | S2-161294 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Advanced Off-Network Communication | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revision of S2-161140. Approved | Approved |
6.10 | S2-160967 | P-CR | Key issue: 3GPP architecture impacts to support logical CN/RAN split | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161141. | Revised |
6.10 | S2-161141 | P-CR | Key issue: 3GPP architecture impacts to support logical CN/RAN split | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160967, merging S2-161044. Revised to S2-161242. | Revised |
6.10 | S2-161242 | P-CR | Key issue: 3GPP architecture impacts to support logical CN/RAN split | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161141. Revised to S2-161295. | Revised |
6.10 | S2-161295 | P-CR | Key issue: 3GPP architecture impacts to support logical CN/RAN split | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161242. Approved Evolved LTE is agreed as and put under definitions: In the context of this document Evolved LTE is EUTRAN upgraded to interface with the Next Generation Core | Approved |
6.10 | S2-160985 | P-CR | Key issue: Base functions for a QoS framework | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161186. | Revised |
6.10 | S2-161148 | P-CR | Key issue: Base functions for a QoS framework | Ericsson | - | FS_NextGen | Wrong document uploaded. WITHDRAWN | Withdrawn |
6.10 | S2-161186 | P-CR | Key issue: Base functions for a QoS framework | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160985. Revised to S2-161246. | Revised |
6.10 | S2-161246 | P-CR | Key issue: Base functions for a QoS framework | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161186. Revised to S2-161273. | Revised |
6.10 | S2-161273 | P-CR | Key issue: Base functions for a QoS framework | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161246. Approved | Approved |
6.10 | S2-160991 | P-CR | New key issue for NexGen core impacts on IMS | LG Electronics, Telecom Italia, Deutsche Telekom | Rel-14 | FS_NextGen | Revised to S2-161142. | Revised |
6.10 | S2-161142 | P-CR | New key issue for NexGen core impacts on IMS | LG Electronics, Telecom Italia, Deutsche Telekom | Rel-14 | FS_NextGen | Revision of S2-160991. Revised to S2-161243. Keep only first sentence | Revised |
6.10 | S2-161243 | P-CR | New key issue for NexGen core impacts on IMS | LG Electronics, Telecom Italia, Deutsche Telekom | Rel-14 | FS_NextGen | Revision of S2-161142. Approved | Approved |
6.10 | S2-161030 | P-CR | Key Issue on Relay UE in mIoT scenario | Huawei | Rel-14 | FS_NextGen | Merged with S2-161036 into S2-161144 | Merged |
6.10 | S2-161036 | P-CR | 3GPP system aspects to support the connectivity via a relay UE | LG Electronics, Sony Mobile | Rel-14 | FS_NextGen | Revised to S2-161144. | Revised |
6.10 | S2-161144 | P-CR | 3GPP system aspects to support the connectivity via a relay UE | LG Electronics, Sony Mobile | Rel-14 | FS_NextGen | Revision of S2-161036, merging S2-161030. Revised to S2-161247. Remove 1st sentence | Revised |
6.10 | S2-161247 | P-CR | 3GPP system aspects to support the connectivity via a relay UE | LG Electronics, Sony Mobile | Rel-14 | FS_NextGen | Revision of S2-161144. Approved | Approved |
6.10 | S2-161031 | P-CR | Key issue: Mobility framework provides facilities to support service continuity in NexGen architecture | Huawei | Rel-14 | FS_NextGen | Merged with S2-161070 into S2-161146 | Merged |
6.10 | S2-161039 | P-CR | Key issue on 3GPP architecture impacts to reduce power consumption of a device | LG Electronics | Rel-14 | FS_NextGen | Noted | Noted |
6.10 | S2-161040 | P-CR | Key issue on 3GPP architecture impacts to support unified network discovery and selection | LG Electronics | Rel-14 | FS_NextGen | Revised to S2-161178. | Revised |
6.10 | S2-161178 | P-CR | Key issue on 3GPP architecture impacts to support unified network discovery and selection | LG Electronics | Rel-14 | FS_NextGen | Revision of S2-161040. Revised to S2-161248. Remove 'both' 3* | Revised |
6.10 | S2-161248 | P-CR | Key issue on 3GPP architecture impacts to support unified network discovery and selection | LG Electronics | Rel-14 | FS_NextGen | Revision of S2-161178. Approved | Approved |
6.10 | S2-161042 | P-CR | Key Issue on Interworking and Migration | NTT DOCOMO, Intel, Nokia | Rel-14 | FS_NextGen | Revised to S2-161179. | Revised |
6.10 | S2-161179 | P-CR | Key Issue on Interworking and Migration | NTT DOCOMO, Intel, Nokia | Rel-14 | FS_NextGen | Revision of S2-161042, merging S2-161054. Revised to S2-161249. | Revised |
6.10 | S2-161249 | P-CR | Key Issue on Interworking and Migration | NTT DOCOMO, Intel, Nokia | Rel-14 | FS_NextGen | Revision of S2-161179. Approved | Approved |
6.10 | S2-161044 | P-CR | Key Issue on Integration of 3GPP NexGen RAT with NexGen Core | NTT DOCOMO, Nokia, Intel | Rel-14 | FS_NextGen | Merged with S2-160967 into S2-161141 | Merged |
6.10 | S2-161054 | P-CR | Key Issue on Interworking and Migration | Intel | FS_NextGen | Merged with S2-161042 into S2-161179 | Merged | |
6.10 | S2-161068 | P-CR | Key issue on scaling and virtualization support | Cisco, Telecom Italia | Rel-14 | FS_NextGen | Revised to S2-161134. | Revised |
6.10 | S2-161134 | P-CR | Key issue on scaling and virtualization support | Cisco, Telecom Italia | Rel-14 | FS_NextGen | Revision of S2-161068, merging S2-160946 and S2-160954. Revised to S2-161270. | Revised |
6.10 | S2-161270 | P-CR | Key issue on scaling and virtualization support | Cisco, Telecom Italia | Rel-14 | FS_NextGen | Revision of S2-161134. Revised to S2-161296. | Revised |
6.10 | S2-161296 | P-CR | Key issue on scaling and virtualization support | Cisco, Telecom Italia | Rel-14 | FS_NextGen | Revision of S2-161270. Approved | Approved |
6.10 | S2-161070 | P-CR | Update to Key Issue 6 | Intel | FS_NextGen | Revised to S2-161146. | Revised | |
6.10 | S2-161146 | P-CR | Update to Key Issue 6 | Intel | FS_NextGen | Revision of S2-161070, merging S2-161031. Revised to S2-161271. | Revised | |
6.10 | S2-161271 | P-CR | Update to Key Issue 6 | Intel | FS_NextGen | Revision of S2-161146. Revised to S2-161297. Replace 'can be subject to revision' by FFS | Revised | |
6.10 | S2-161297 | P-CR | Update to Key Issue 6 | Intel | FS_NextGen | Revision of S2-161271. Approved | Approved | |
6.10 | S2-161086 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Top-Down NexGen Architecture Characterization | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revised to S2-161180. | Revised |
6.10 | S2-161180 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Top-Down NexGen Architecture Characterization | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revision of S2-161086. Revised to S2-161272. | Revised |
6.10 | S2-161272 | P-CR | Proposal for NexGen System Architecture Key Issue Concerning Top-Down NexGen Architecture Characterization | U.S. Department of Commerce | Rel-14 | FS_NextGen | Revision of S2-161180. WITHDRAWN | Withdrawn |
- | - | - | Solutions | - | - | - | - | - |
6.10 | S2-160951 | P-CR | Solution to key issue 7: Interconnection and Routing Function (IRF) based network function interconnection model | Cisco Systems, Inc., Vodafone, Allot Communications | Rel-14 | FS_NextGen | Revised to S2-161181. | Revised |
6.10 | S2-161181 | P-CR | Solution to key issue 7: Interconnection and Routing Function (IRF) based network function interconnection model | Cisco Systems, Inc., Vodafone, Allot Communications | Rel-14 | FS_NextGen | Revision of S2-160951. Revised to S2-161274. | Revised |
6.10 | S2-161274 | P-CR | Solution to key issue 7: Interconnection and Routing Function (IRF) based network function interconnection model | Cisco Systems, Inc., Vodafone, Allot Communications | Rel-14 | FS_NextGen | Revision of S2-161181. Revised to S2-161298. | Revised |
6.10 | S2-161298 | P-CR | Solution to key issue 7: Interconnection and Routing Function (IRF) based network function interconnection model | Cisco Systems, Inc., Vodafone, Allot Communications | Rel-14 | FS_NextGen | Revision of S2-161274. Approved | Approved |
6.10 | S2-160955 | P-CR | Solution to Session Management | China Mobile | Rel-14 | FS_NextGen | Revised to S2-161182. | Revised |
6.10 | S2-161182 | P-CR | Solution to Session Management | China Mobile | Rel-14 | FS_NextGen | Revision of S2-160955, merging S2-161037. Revised to S2-161299. | Revised |
6.10 | S2-161299 | P-CR | Solution to Session Management | China Mobile | Rel-14 | FS_NextGen | Revision of S2-161182. Approved | Approved |
6.10 | S2-160965 | P-CR | Session management functional baseline | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161183. | Revised |
6.10 | S2-161183 | P-CR | Session management functional baseline | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160965. Revised to S2-161275. | Revised |
6.10 | S2-161275 | P-CR | Session management functional baseline | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161183. Approved | Approved |
6.10 | S2-161072 | P-CR | Solution for Key Issue 4 on Session Management | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revised to S2-161184. | Revised |
6.10 | S2-161184 | P-CR | Solution for Key Issue 4 on Session Management | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revision of S2-161072. WITHDRAWN | Withdrawn |
6.10 | S2-161037 | P-CR | Session management decoupled with attachment | LG Electronics | Rel-14 | FS_NextGen | Merged with S2-160955 into S2-161182 | Merged |
6.10 | S2-161008 | P-CR | Solution: Mobility Framework | Nokia Networks | Rel-14 | FS_NextGen | Revised to S2-161196. | Revised |
6.10 | S2-161196 | P-CR | Solution: Mobility Framework | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161008. Revised to S2-161276. | Revised |
6.10 | S2-161276 | P-CR | Solution: Mobility Framework | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161196. Revised to S2-161323. Removing: UE Monitors Dedicated signaling. No UE Channel feedback; And add 'solution 1' to title | Revised |
6.10 | S2-161323 | P-CR | Solution: Mobility Framework | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161276. Approved | Approved |
6.10 | S2-161057 | P-CR | Solution to Key Issue on Mobility Framework | Intel | FS_NextGen | Revised to S2-161197. | Revised | |
6.10 | S2-161197 | P-CR | Solution to Key Issue on Mobility Framework | Intel | FS_NextGen | Revision of S2-161057. Revised to S2-161321. | Revised | |
6.10 | S2-161321 | P-CR | Solution to Key Issue on Mobility Framework | Intel | FS_NextGen | Revision of S2-161197. Revised to S2-161324. Remove: It is expected that the use of these new RRC states will bring the following advantages: - Reduction of CN signalling load due to the fact that the UE is perceived by the NexGen core to be in permanent NexGen_Connected state, regardless that it may be switching between energy efficient state (RRA_PCH) and active data transmission states (RRC_CONNECTED). - Shorter delay for initial UE access from battery efficient state because there is no need to perform a NAS procedure equivalent to Service Request. - Possibility for use of longer C-eDRX cycles due to the use of UE-driven mobility in RRC_CONNECTED state. | Revised | |
6.10 | S2-161324 | P-CR | Solution to Key Issue on Mobility Framework | Intel | FS_NextGen | Revision of S2-161321. Approved | Approved | |
6.10 | S2-160983 | P-CR | Baseline mobility solution for evolved LTE and 5G RATs | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161198. | Revised |
6.10 | S2-161199 | P-CR | Baseline mobility solution for evolved LTE and 5G RATs | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160983. Revised to S2-161277. | Revised |
6.10 | S2-161277 | P-CR | Baseline mobility solution for evolved LTE and 5G RATs | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161199. Revised to S2-161325. | Revised |
6.10 | S2-161325 | P-CR | Baseline mobility solution for evolved LTE and 5G RATs | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161277. For e-mail approval This was left for e-mail approval | OPEN |
6.10 | S2-160982 | P-CR | Levels of mobility support for mobility management | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161145. | Revised |
6.10 | S2-161145 | P-CR | Levels of mobility support for mobility management | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160982. Revised to S2-161278. | Revised |
6.10 | S2-161278 | P-CR | Levels of mobility support for mobility management | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161145. Approved | Approved |
6.10 | S2-161010 | P-CR | Solution: QoS Framework | Nokia Networks | Rel-14 | FS_NextGen | Revised to S2-161188. | Revised |
6.10 | S2-161188 | P-CR | Solution: QoS Framework | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161010. Noted | Noted |
6.10 | S2-161055 | P-CR | Solution to Key Issue on QoS Framework | Intel | FS_NextGen | Merged with S2-160939 into S2-161185 | Merged | |
6.10 | S2-161073 | P-CR | Solution for Traffic identification for key issue 2 on Qos Framework | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revised to S2-161189. | Revised |
6.10 | S2-161189 | P-CR | Solution for Traffic identification for key issue 2 on Qos Framework | Qualcomm Incorporated | Rel-14 | FS_NextGen | Revision of S2-161073. WITHDRAWN | Withdrawn |
6.10 | S2-160939 | P-CR | Solution to Key Issue on QoS Framework | ORANGE | Rel-14 | FS_NextGen | LATE DOC: Rx 18/02, 17:45. Revised to S2-161185. | Revised |
6.10 | S2-161185 | P-CR | Solution to Key Issue on QoS Framework | ORANGE | Rel-14 | FS_NextGen | Revision of S2-160939, merging S2-161055. Revised to S2-161280. | Revised |
6.10 | S2-161280 | P-CR | Solution to Key Issue on QoS Framework | ORANGE | Rel-14 | FS_NextGen | Revision of S2-161185. Approved | Approved |
6.10 | S2-160956 | P-CR | Solution to Enabling(re)selection of efficient user plane paths | China Mobile | Rel-14 | FS_NextGen | Not Handled | Not Handled |
6.10 | S2-161082 | P-CR | Baseline solution for service continuity with IP anchor relocation | Intel | FS_NextGen | Not Handled | Not Handled | |
6.10 | S2-160984 | P-CR | Solution for optimized UE sleep state and state transitions | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161198. | Revised |
6.10 | S2-161198 | P-CR | Solution for optimized UE sleep state and state transitions | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160984. Approved | Approved |
6.10 | S2-160989 | P-CR | Network slice selection | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161130. | Revised |
6.10 | S2-161130 | P-CR | Network slice selection | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160989. Revised to S2-161281. Reduce to slicing and that to a bullet item | Revised |
6.10 | S2-161281 | P-CR | Network slice selection | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161130. Approved | Approved |
6.10 | S2-161009 | P-CR | Solution: Network Slicing | Nokia Networks | Rel-14 | FS_NextGen | Revised to S2-161193. | Revised |
6.10 | S2-161193 | P-CR | Solution: Network Slicing | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161009. Revised to S2-161282. | Revised |
6.10 | S2-161282 | P-CR | Solution: Network Slicing | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161193. Revised to S2-161322. | Revised |
6.10 | S2-161322 | P-CR | Solution: Network Slicing | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161282. Revised to S2-161326. Rename slices | Revised |
6.10 | S2-161326 | P-CR | Solution: Network Slicing | Nokia Networks | Rel-14 | FS_NextGen | Revision of S2-161322. Approved | Approved |
6.10 | S2-161018 | P-CR | Solutions for key issue 1- Support of Network Slicing | Huawei, HiSilicon, China Unicom | FS_NextGen | Revised to S2-161194. | Revised | |
6.10 | S2-161194 | P-CR | Solutions for key issue 1- Support of Network Slicing | Huawei, HiSilicon, China Unicom | FS_NextGen | Revision of S2-161018. Revised to S2-161283. | Revised | |
6.10 | S2-161283 | P-CR | Solutions for key issue 1- Support of Network Slicing | Huawei, HiSilicon, China Unicom | FS_NextGen | Revision of S2-161194. Revised to S2-161327. | Revised | |
6.10 | S2-161327 | P-CR | Solutions for key issue 1- Support of Network Slicing | Huawei, HiSilicon, China Unicom | FS_NextGen | Revision of S2-161283. Approved | Approved | |
6.10 | S2-161081 | P-CR | Solutions for Key Issue 1 (Support of Network Slicing) | China Mobile | Rel-14 | FS_NextGen | Revised to S2-161192. | Revised |
6.10 | S2-161192 | P-CR | Solutions for Key Issue 1 (Support of Network Slicing) | China Mobile | Rel-14 | FS_NextGen | Revision of S2-161081. Noted | Noted |
6.10 | S2-160988 | P-CR | Multiple network slices per UE | Ericsson | Rel-14 | FS_NextGen | Revised to S2-161190. | Revised |
6.10 | S2-161190 | P-CR | Multiple network slices per UE | Ericsson | Rel-14 | FS_NextGen | Revision of S2-160988. Revised to S2-161284. | Revised |
6.10 | S2-161284 | P-CR | Multiple network slices per UE | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161190. Revised to S2-161342. Update title and intro to potential solution scenarios | Revised |
6.10 | S2-161342 | P-CR | Multiple network slices per UE | Ericsson | Rel-14 | FS_NextGen | Revision of S2-161284. Approved | Approved |
6.10 | S2-161043 | P-CR | Solution to support a UE with simultaneous connections to multiple Network Slices | NTT DOCOMO | Rel-14 | FS_NextGen | Revised to S2-161191. | Revised |
6.10 | S2-161191 | P-CR | Solution to support a UE with simultaneous connections to multiple Network Slices | NTT DOCOMO | Rel-14 | FS_NextGen | Revision of S2-161043. Revised to S2-161285. | Revised |
6.10 | S2-161285 | P-CR | Solution to support a UE with simultaneous connections to multiple Network Slices | NTT DOCOMO | Rel-14 | FS_NextGen | Revision of S2-161191. Revised to S2-161328. | Revised |
6.10 | S2-161328 | P-CR | Solution to support a UE with simultaneous connections to multiple Network Slices | NTT DOCOMO | Rel-14 | FS_NextGen | Revision of S2-161285. Approved | Approved |
6.10 | S2-160990 | P-CR | Congestion Control for Mobility/Session Management | InterDigital | Rel-14 | FS_NextGen | Revised to S2-161135. | Revised |
6.10 | S2-161135 | P-CR | Congestion Control for Mobility/Session Management | InterDigital | Rel-14 | FS_NextGen | Revision of S2-160990, merging S2-160947. Approved | Approved |
6.10 | S2-161002 | P-CR | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core | ZTE | Rel-14 | FS_NextGen | Revised to S2-161200. | Revised |
6.10 | S2-161200 | P-CR | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core | ZTE | Rel-14 | FS_NextGen | Revision of S2-161002. Revised to S2-161286. | Revised |
6.10 | S2-161286 | P-CR | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core | ZTE | Rel-14 | FS_NextGen | Revision of S2-161200. Revised to S2-161329. Rename MRC to MRA | Revised |
6.10 | S2-161329 | P-CR | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core | ZTE | Rel-14 | FS_NextGen | Revision of S2-161286. Revised to S2-161343. | Revised |
6.10 | S2-161343 | P-CR | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core | ZTE | Rel-14 | FS_NextGen | Revision of S2-161329. For e-mail approval This was left for e-mail approval | OPEN |
6.10 | S2-161056 | P-CR | Solution to Key Issue on minimising access dependencies | Intel | FS_NextGen | Not Handled | Not Handled | |
6.10 | S2-161006 | P-CR | Solution for “Key issue on Network Function Granularity and Interconnection between them” | Nokia Networks | Rel-14 | FS_NextGen | Not Handled | Not Handled |
6.10 | S2-161012 | P-CR | Key issue: Identities | Nokia Networks, Alcatel-Lucent | Rel-14 | FS_NextGen | Noted | Noted |
6.10 | S2-161019 | P-CR | Solution for the discovery of Network Functions | Huawei, HiSilicon | FS_NextGen | Not Handled | Not Handled | |
6.10 | S2-161020 | P-CR | Considerations for Session Continuity | Motorola Mobility, Lenovo | Rel-14 | FS_NextGen | Not Handled | Not Handled |
6.10 | S2-161038 | P-CR | Migration solution for next generation core with NAS | LG Electronics | Rel-14 | FS_NextGen | Not Handled | Not Handled |
6.10 | S2-161053 | P-CR | Non-roaming baseline architecture | Intel | FS_NextGen | Not Handled | Not Handled | |
- | - | - | Discussions | - | - | - | - | - |
6.10 | S2-161084 | P-CR | What is access independence? | Intel | FS_NextGen | Not Handled | Not Handled | |
6.10 | S2-160995 | discussion | Lawful Interception related issues and initial concerns for Network Slicing | OTD | Rel-14 | LATE DOC: WITHDRAWN | Withdrawn | |
- | - | - | Withdrawn | - | - | - | - | - |
6.10 | S2-160948 | P-CR | Key issue for Context Awareness to support network elasticity | KDDI Corporation | Rel-14 | FS_NextGen | WITHDRAWN | Withdrawn |
6.10 | S2-160987 | P-CR | RAN related requirements for support of e2e network slicing | Ericsson | Rel-14 | FS_NextGen | WITHDRAWN | Withdrawn |
6.10 | S2-161026 | P-CR | Solution: ConnectionLess RAN-Core Interface | Alcatel-Lucent | Rel-14 | FS_NextGen | WITHDRAWN | Withdrawn |
6.10 | S2-160957 | P-CR | Key Issue on enabling unified authentication for network users and subscribers | ORANGE | Rel-14 | FS_NextGen | WITHDRAWN | Withdrawn |
7 | - | - | Project Planning and Management | - | - | {Frank} | - | - |
7.2 | - | - | Review of the Work Plan | - | - | {Frank} | - | - |
7.2 | S2-161069 | other | SA WG2 Work Planning Worksheet | SA WG2 Chairman | Revised to S2-161244. | Revised | ||
7.2 | S2-161244 | other | SA WG2 Work Planning Worksheet | SA WG2 Chairman | Revision of S2-161069. Noted | Noted | ||
7.3 | - | - | Planning future meetings | - | - | {Frank} | - | - |
8 | - | - | AOB | - | - | {Frank} | - | - |
9 | - | - | Close of the Meeting | - | - | {Frank} | - | - |
99 | - | - | Withdrawn and reserved documents | - | - | {Withdrawn} | - | - |
99 | S2-161147 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161187 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161195 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161201 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161261 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161262 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161263 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161264 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161265 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161266 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161267 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161268 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161269 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161300 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161301 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161302 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161303 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161304 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161305 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161306 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161307 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161308 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161309 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161310 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161311 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161312 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161313 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161314 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161315 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161316 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161317 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161318 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161319 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161320 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
99 | S2-161143 | OTHER | Not used | - | - | - | WITHDRAWN | Withdrawn |
Created: 2016-03-01 14:20     END OF LIST
Total documents: 415