List for Meeting: S2-101
Last Allocated Document: S2-140572
Temporary Document List - Ordered by TD
Colour Key: |
---|
No Conclusion |
Conclusion Reached |
Document Revised |
Document Withdrawn |
Document Not Handled |
To use hyperlinks, this file must be placed above Folder 'Docs'
Created: 2014-01-27 15:40     START OF LIST
Chair | Rx | Agenda | Title | TD | Doc_Type | LongTitle | Source | WI | Rev_By | Rev_Of | LS_Source_file | Comment | Decision |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Erik | Y | 2 | Approval of the agenda | S2-140001 | Agenda | Draft Agenda for SA WG2 meeting #101 | SA WG2 Chairman | - | S2-140007 | Revised to S2-140007. | Revised | ||
Erik | Y | 3 | Meeting reports | S2-140002 | REPORT | Draft Report of SA WG2 meeting #100 | SA WG2 Secretary | - | Approved | Approved | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140003 | CR | 23.228 CR1058: IMS_WebRTC architecture and procedures | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140114 | Revised to S2-140114. Revised offline before presentation. | Revised | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140004 | DISCUSSION | Scenario 3 - registration options | Alcatel-Lucent | IMS_WebRTC | Each IMPU block assigned to WWSF is registered once with IMS. Noted in parallel sessions | Noted | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140005 | CR | 23.228 CR1059: IMS_WebRTC Scenario 3 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140396 | Revised in parallel sessions to S2-140396. | Revised | ||
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140006 | CR | 23.402 CR1223: Consistency of 23.402 16 with 23.203 / 33.107 / 29.274 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Netloc_TWAN | S2-140375 | Revised in parallel sessions to S2-140375. | Revised | ||
Erik | Y | 2 | Approval of the agenda | S2-140007 | Agenda | Draft Agenda for SA WG2 meeting #101 | SA WG2 Chairman | - | S2-140340 | S2-140001 | Revision of S2-140001. Revised to S2-140340. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140008 | CR | 23.203 CR0864: Corrections for TDF functionality and for event triggers and re-authorization triggers definitions | Allot Communications | CNO_ULI | S2-140128 | Revised in parallel sessions to S2-140128. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140009 | CR | 23.203 CR0865: Editorial corrections and clarifications | Allot Communications | P4C-F | S2-140401 | Revised in parallel sessions to S2-140401. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140010 | LS OUT | LS Reply on providing parameters to TDF | Allot Communications | ABC | S2-140120 | Response to S2-140055. Revised in parallel sessions to S2-140120. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140011 | CR | 23.203 CR0866: Additional parameter transfer to the TDF for charging reports | Allot Communications | ABC | S2-140121 | Implements the proposal in S2-140010. Revised in parallel sessions to S2-140121. | Revised | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140012 | DISCUSSION | Technical elements for the Choice of the transport of WLCP | Alcatel-Lucent, NSN | eSAMOG | Noted in parallel sessions | Noted | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140013 | LS In | LS from CT WG1: LS on UE Requirements for PSAP callback | CT WG1 | EMC_PC | S2-133868 | C1-132674 | Postponed S2-133868 from meeting #100. This is the fifth SA WG2 meeting we have seen this LS! Response drafted in S2-140339. Final response in S2-140419. | Response in S2-140419. | |
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140014 | LS In | LS from SA WG3: Reply LS on interaction of oneM2M with Underlying Networks | SA WG3 | MTCe | S2-133869 | S3-130842 | Postponed S2-133869 from meeting #100. no action, note? Noted | Noted | |
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140015 | LS In | LS from CT WG1: Reply LS on providing access network information for charging | CT WG1 | IMSProtoc6 | S2-133870 | C1-133548 | Postponed S2-133870 from meeting #100. Response drafted in S2-140323. No response was agreed and this LS was postponed | Postponed | |
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140016 | LS In | LS from CT WG3: LS on bearer binding for the PCC rule with application identifier | CT WG3 | SAPP-CT3 | S2-133871 | C3-131299 | Postponed S2-133871 from meeting #100. Responses drafted in S2-140105 and S2-140338. Noted in parallel sessions | Noted | |
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140017 | LS In | LS from oneM2M: LS on interactions of oneM2M with Underlying Networks | oneM2M | MTCe | S2-133873 | oneM2M-TP-2013-0307R01 | Postponed S2-133873 from meeting #100. SA WG3 response in S2-140273. Response drafted in S2-140285. Final response in S2-140565 | Response in S2-140565 | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140018 | LS In | LS from RAN WG2: Reply LS on Questions to RAN on UPCON | RAN WG2 | UPCON | S2-133874 | R2-133030 | Postponed S2-133874 from meeting #100. Awaits time on the agenda to work on UPCON. Postponed until UPCON is on the agenda. | Postponed | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140019 | LS In | LS from BBF: LS on status of WT-291 work and request of feedback on S2a tunnel setup failure scenario | BBF | P4C-TI | S2-133876 | bbf2013.1051.01 | Postponed S2-133876 from meeting #100. Response drafted in S2-140116. Noted in parallel sessions | Noted | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140020 | LS In | LS from SA WG4: Reply LS on End-to-end QoS handling of MTSI | SA WG4 | E2EMTSI | S2-133877 | S4-131105 | Postponed S2-133877 from meeting #100. Suggestion: A review or response may be initiated in future by interested companies. Noted | Noted | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140021 | LS In | LS from RAN WG1: Response LS on GCSE with eMBMS | RAN WG1 | GCSE_LTE | S2-133880 | R1-134985 | Postponed S2-133880 from meeting #100. Noted | Noted | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140022 | LS In | LS from RAN WG2: Response LS on GCSE with eMBMS | RAN WG2 | FS_LTE_GC | S2-133885 | R2-133728 | Postponed S2-133885 from meeting #100. Related LS in S2-140047. Noted | Noted | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140023 | LS In | LS from RAN WG2: Reply LS on Mitigating excessive signalling from frequent small data | RAN WG2 | MTCe-SDDTE, FS_MTCe_RAN | S2-133886 | R2-133729 | Postponed S2-133886 from meeting #100. note?. Noted in parallel sessions | Noted | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140024 | LS In | LS from RAN WG3: Reply LS on GCSE with eMBMS | RAN WG3 | FS_LTE_GC | S2-133889 | R3-131972 | Postponed S2-133889 from meeting #100. Noted | Noted | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140025 | LS In | LS from CT WG1: LS on default APN operation | CT WG1 | TEI12 | S2-133895 | C1-134393 | Postponed S2-133895 from meeting #100. This LS was postponed. | Postponed | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140026 | LS In | LS from CT WG1: LS on merging ForServiceBased and ForFlowBased ISRP flow distribution containers | CT WG1 | TEI12 | S2-133896 | C1-134394 | Postponed S2-133896 from meeting #100. Response drafted in S2-140214. Noted in parallel sessions | Noted | |
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140027 | LS In | LS from CT WG1: Reply LS on CSFB priority call handling in a network supporting Multimedia Priority Service | CT WG1 | eMPS, eMPS-CN | S2-133899 | C1-134519 | Postponed S2-133899 from meeting #100. Response drafted in S2-140292. Final response in S2-140533. | Response in S2-140533 | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140028 | LS In | LS from CT WG3: Reply LS on new work item on IMS support for RTP / RTCP transport multiplexing | CT WG3 | RTCP_MUX | S2-133901 | C3-131627 | This needed off-line consideration with progress during this meeting. A Response was drafted in S2-140345. Final response in S2-140542 | Response in S2-140542 | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140029 | LS In | LS from WiFi Alliance: Reply to WBA LS on Signaling Optimization | WiFi Alliance | - | S2-133908 | Wi-Fi Alliance LS on HotSpot 2 0 20130802. | Postponed S2-133908 from meeting #100. We cannot handle this LS as we cannot open it. Final LS in S2-140510. | Final LS in S2-140510 | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140030 | LS In | LS from CT WG4: Reply LS on Normative work on overload handling for device triggering | CT WG4 | SDDTE | S2-133912 | C4-131743 | Postponed S2-133912 from meeting #100. Noted in parallel sessions | Noted | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140031 | LS In | LS from GSMA: Publication of GSMA's Recommendations for Minimum Wi-Fi Capabilities of Terminals, Version 2.0 | GSMA TSGWIF | - | S2-133915 | TSGWIF_217 | Postponed S2-133915 from meeting #100. Same LS as in S2-140260. Response drafted in S2-140302. Final response in S2-140553 | Response in S2-140553 | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140032 | LS In | LS from SA WG4: LS to SA WG2 on PSS DASH service | SA WG4 | - | S2-134058 | S4-131258 | Postponed S2-134058 from meeting #100. Responses drafted in S2-140060 and S2-140094. Final response in S2-140122. | Response in S2-140122. | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140033 | LS In | LS from SA WG4: LS on Improved end-to-end QoS handling of MTSI | SA WG4 | E2EMTSI-S4 | S2-134254 | S4-131308 | Postponed S2-134254 from meeting #100. Noted | Noted | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140034 | LS In | LS from SA WG4: Reply LS on new work item on IMS support for RTP / RTCP transport multiplexing | SA WG4 | - | S2-134255 | S4-131309 | Postponed S2-134255 from meeting #100. Noted | Noted | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140035 | LS In | LS from SA WG4: LS Response on Applicability of WI MI-MooD to Service Continuity Requirements for Group Communications | SA WG4 | GCSE_LTE and MI-MooD | S2-134256 | S4-131318 | Postponed S2-134256 from meeting #100. Response drafted in S2-140349. Final response in S2-140522 | Response in S2-140522 | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140036 | LS In | LS from SA WG4: LS on the UE capabilities regarding support of simultaneous MBMS bearer reception | SA WG4 | MI-EMO | S2-134257 | S4-131406 | Postponed S2-134257 from meeting #100. Response was drafted in S2-140344. Final response in S2-140511 | Response in S2-140511 | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140037 | LS In | LS from BBF: Next hop policy rule use case accepted into WT-300 | BBF | P4C | bbf2013.1355.01 | Response drafted in S2-140093. Noted in parallel sessions | Noted | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140038 | LS In | LS from CT WG1: Reply LS on CN impacts in RAN2 solutions for WLAN/3GPP radio interworking (R2-133697) | CT WG1 | FS_UTRA_LTE_WLAN_interw | C1-135140 | Noted | Noted | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140039 | LS In | LS from CT WG3: LS on Conclusions on study on XML based Rx | CT WG3 | - | C3-131903 | Noted | Noted | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140040 | LS In | LS from CT WG3: LS on granularity of the total allowed usage | CT WG3 | PCC-Enh | C3-131921 | Response drafted in S2-140157. Final response in S2-140448 | Response in S2-140448 | ||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140041 | LS In | LS from CT WG4: Reply LS on Roaming Forwarding of signalling for CS fall back | CT WG4 | TEI12 | C4-132287 | Response drafted in S2-140061. Final response in S2-140569 | Response in S2-140569 | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140042 | LS In | LS from GERAN WG2: Reply LS on provisioning of E-UTRA capabilities in GERAN | GERAN WG2 | rSRVCC | GP-131119 | no action. Noted in parallel sessions a CR is expected for the next meeting on PS handover procedures | Noted | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140043 | LS In | LS from RAN: Response LS on the UE capabilities regarding support of simultaneous MBMS bearer reception | RAN WG1 | MI-EMO | R1-136072 | No Action for SA WG2, related to S2-140036. Noted | Noted | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140044 | LS In | LS from RAN WG2: Reply LS on the UE capabilities regarding support of simultaneous MBMS bearer reception | RAN WG2 | MI-EMO | R2-134486 | No Action for SA WG2, related to S2-140036. Response LS drafted in S2-140344. Final response in S2-140511 | Response in S2-140511 | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140045 | LS In | LS from RAN WG2: Reply LS on security aspects of protocol architectures for small cell enhancements | RAN WG2 | FS_LTE_SC_enh_hilayer | R2-134586 | no action, note? This LS was noted. | Noted | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140046 | LS In | LS from RAN WG2: LS on discovery message size | RAN WG2 | FS_LTE_D2D_Prox | R2-134591 | Response drafted in S2-140089. Related contribution in S2-140238. Response drafted in S2-140320. Final response in S2-140568 | Response in S2-140568 | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140047 | LS In | LS from RAN WG2: Response LS on GCSE with eMBMS | RAN WG2 | FS_LTE_GC | R2-134594 | Related LS in S2-140022. It was agreed that the use of GBR and non-GBR is not equivalent. Noted | Noted | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140048 | LS In | LS from RAN WG2: Follow up LS on Provisioning of E-UTRA Radio Capabilities in GERAN | RAN WG2 | rSRVCC-GERAN | R2-134614 | no action, note?. Noted in parallel sessions | Noted | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140049 | LS In | LS from TSG RAN: Reply LS on ProSe Lawful Interception | TSG RAN | FS_LTE_D2D_Prox | RP-132107 | Response drafted in S2-140088, revised to S2-140352. Final response in S2-140494 | Response in S2-140494 | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140050 | LS In | LS from TSG RAN: Response to LS on Further questions on GCSE with eMBMS | TSG RAN | GCSE_LTE | RP-132109 | Related contributions were reviewed. This was then noted. | Noted | ||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140051 | LS In | LS from TSG RAN: LS on new WLAN/3GPP interworking work item | TSG RAN | UTRA_LTE_WLAN_interw-core | RP-132114 | Noted | Noted | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140052 | LS In | LS from TSG RAN: LS on Small Cell Enhancement work in RAN | TSG RAN | LTE_SC_enh_dualC | RP-132115 | Response drafted in S2-140176. Final response in S2-140537 | Response in S2-140537 | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140053 | LS In | LS from SA WG3: Reply LS on security aspects of protocol architectures for small cell enhancements | SA WG3 | FS_LTE_SC_enh_hilayer | S3-131117 | no action, note? This LS was noted. | Noted | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140054 | LS In | LS from SA WG5: LS to SA2 on Gy interface for EPC Roaming LBO scenario | SA WG5 | - | S5-132104 | Response drafted in S2-140301. Final response in S2-140472 | Response in S2-140472 | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140055 | LS In | LS from SA WG5: LS on providing parameters to TDF | SA WG5 | ABC | S5-132107 | Response drafted in S2-140010. Noted in parallel sessions | Noted | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140056 | LS In | LS from SA WG5: Reply LS to CT on Removal of OAM8-Trace from Rel-11 | SA WG5 | OAM7-Trace | S5-132224 | Noted | Noted | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140057 | CR | 23.167 CR0257: Non UE detected emergency call correction when the retry attempt is made in CS domain | Deutsche Telekom, Telecom Italia, Orange | IMS_EMER_GPRS_EPS | S2-140534 | Revised to S2-140534. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140058 | CR | 23.167 CR0258: Non UE detected emergency call correction when the retry attempt is made in CS domain | Deutsche Telekom, Telecom Italia, Orange | IMS_EMER_GPRS_EPS | S2-140535 | Revised to S2-140535. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140059 | CR | 23.167 CR0259: Non UE detected emergency call correction when the retry attempt is made in CS domain | Deutsche Telekom, Telecom Italia, Orange | IMS_EMER_GPRS_EPS | S2-140536 | Revised to S2-140536. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140060 | LS OUT | Reply to SA4 LS on PSS DASH service | Huawei, Hisilicon | FS_IS_DASH | S2-140122 | Response to S2-140032. Revised in parallel sessions to S2-140122. | Revised | ||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140061 | LS OUT | LS response on Roaming Forwarding of signalling for CS fall back | Huawei. Hisilicon | SAES-CSFB | S2-140144 | Response to S2-140041. Revised in parallel sessions to S2-140144. | Revised | ||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140062 | DISCUSSION | Discussion on Roaming forwarding of signalling for CS fall back | Huawei, HiSilicon | SAES-CSFB | Noted in parallel sessions | Noted | |||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140063 | CR | 23.060 CR1831: Corrections to TFT packet filter related descriptions | Huawei, Hisilicon | TEI11, SAES | S2-140371 | Revised in parallel sessions to S2-140371. | Revised | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140064 | CR | 23.060 CR1832: Corrections to TFT packet filter related descriptions | Huawei, Hisilicon | TEI11, SAES | S2-140372 | Revised in parallel sessions to S2-140372. | Revised | ||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140065 | DISCUSSION | Discussion on solutions for the failure of CONF service after eSRVCC | Huawei | TEI12, eSRVCC | Noted in parallel sessions | Noted | |||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140066 | CR | 23.292 CR0201: Solution for the failure of CONF service after eSRVCC | Huawei, Hisilicon | TEI12, eSRVCC | Noted in parallel sessions | Noted | |||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140067 | CR | 23.237 CR0469: Voice + video media fallback to voice media in case of SRVCC in pre-alerting state or alerting phase | Huawei, Hisilicon | TEI12, aSRVCC | This CR was agreed | Agreed | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140068 | CR | 23.401 CR2634: Corrections for the PGW pause of charging functionality | Huawei, Hisilicon | TEI12 | S2-140416 | Revised in parallel sessions to S2-140416. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140069 | CR | 23.401 CR2635: Corrections for presence reporting area based location reporting | Huawei, Hisilicon | CNO_ULI | S2-140130 | Revised in parallel sessions to S2-140130. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140070 | CR | 23.060 CR1833: Corrections for presence reporting area based location reporting | Huawei, Hisilicon | CNO_ULI | S2-140131 | Revised in parallel sessions to S2-140131. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140071 | CR | 23.402 CR1224: Corrections for ISMP restricted rule | Huawei, Hisilicon | TEI12, WLAN_NS | S2-140362 | Revised in parallel sessions to S2-140362. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140072 | CR | 23.401 CR2636: Delayed release of UE IP address during inter-RAT 3GPP PS Handover | Huawei, Hisilicon | TEI12, WORM | S2-140398 | Revised in parallel sessions to S2-140398. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140073 | CR | 23.060 CR1829R1: Addition of a note addressing the behavior of network side during inter-RAT 3GPP PS Handover | Huawei, Hisilicon | TEI12, WORM | S2-140399 | Revised in parallel sessions to S2-140399. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140074 | CR | 23.139 CR0044R1: Clarification of Authentication and Reflective QoS Support for P4C-TI | Huawei, Hisilicon | TEI12, P4C-TI | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140075 | CR | 23.402 CR1225: Clarification of NPLI reporting during optimised HO from cdma2000 HRPD Access to EUTRAN | Huawei, Hisilicon | TEI12, NWK-PL2IMS | Not Handled | - | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140076 | P-CR | Update on Priority and Pre-emption on Group Communication | Huawei, Hisilicon | GCSE_LTE | S2-140380 | Revised to S2-140380. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140077 | P-CR | Handling when the multicast service not available | Huawei, Hisilicon | GCSE_LTE | S2-140445 | Revised, also merging parts of S2-140242 and S2-140223 to S2-140445. | Revised | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140078 | CR | 23.402 CR1226: Corrections for Initial attach and handover attach call flows for single-connection | Huawei, Hisilicon | eSaMOG | S2-140392 | Revised in parallel sessions to S2-140392. | Revised | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140079 | P-CR | Update of Solution D1: Support of different discovery modes | Qualcomm Incorporated | ProSe | S2-140389 | Revised to S2-140389. | Revised | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140080 | P-CR | Direct discovery procedures | Qualcomm Incorporated | ProSe | S2-140356 | Revised in drafting session to S2-140356 | Revised | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140081 | DISCUSSION | Discovery message size | Qualcomm Incorporated | ProSe | Related to LS in S2-130046. Noted | Noted | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140082 | DISCUSSION | ProSe Discovery further conclusions | Qualcomm Incorporated, Deutsche Telekom | ProSe | Noted. An outgoing LS will be drafted in S2-140387 | Noted | |||
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140083 | P-CR | Direct communication one-to-many (decentralised mode) procedures | Qualcomm Incorporated | ProSe | S2-140358 | Revised to S2-140358. | Revised | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140084 | DISCUSSION | Control Plane and User Plane options for PC3 interface | Qualcomm Incorporated | ProSe | Noted | Noted | |||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140085 | P-CR | Way forward on ProSe UE-to-Network Relays | Qualcomm Incorporated | ProSe | S2-140384 | Revised to S2-140384. | Revised | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140086 | P-CR | Evaluation of ProSe Discovery through communication solution | Qualcomm Incorporated | ProSe | S2-140391 | Revised to S2-140391. | Revised | ||
Erik | Y | 6.2.5 | Charging Aspects | S2-140087 | LS OUT | [DRAFT] LS on ProSe charging | Qualcomm Incorporated | ProSe | S2-140470 | Revised to S2-140470. | Revised | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140088 | LS OUT | Reply LS on ProSe Lawful Interception | Qualcomm Incorporated | ProSe | S2-140352 | Response to S2-140049. Revised to S2-140352. | Revised | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140089 | LS OUT | Reply LS on discovery message size | Qualcomm Incorporated | ProSe | Response to S2-140046. This was reviewed off-line taking the other discussion contributions into account. Noted | Noted | |||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140090 | P-CR | Scope for TS 23.303 | Qualcomm Incorporated | ProSe | S2-140353 | Revised to S2-140353. | Revised | ||
Ivano | Y | 6.6 | User Location Information reporting improvements (CNO-ULI) | S2-140091 | CR | 23.401 CR2637: Presence Reporting Area provided by OCS | Ericsson | CNO_ULI | S2-140126 | Revised in parallel sessions to S2-140126. | Revised | ||
Ivano | Y | 6.6 | User Location Information reporting improvements (CNO-ULI) | S2-140092 | CR | 23.060 CR1834: Presence Reporting Area provided by OCS | Ericsson | CNO_ULI | S2-140127 | Revised in parallel sessions to S2-140127. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140093 | LS OUT | Draft reply to LS on Next hop policy rule use case accepted into WT-300 | Ericsson | P4C-F | S2-140119 | Response to S2-140037. Revised in parallel sessions to S2-140119. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140094 | LS OUT | Draft reply to LS on PSS DASH service | Ericsson | FS_IS_DASH | Response to S2-140032. Noted in parallel sessions | Noted | |||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140095 | DISCUSSION | ICS Support for non-enhanced MSC | Ericsson | IMS, ICSRA | Noted in parallel sessions | Noted | |||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140096 | CR | 23.292 CR0202: ICS Indicator to support MSC not enhanced for ICS | Ericsson | TEI11, ICSRA | S2-140138 | Revised in parallel sessions to S2-140138. | Revised | ||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140097 | CR | 23.292 CR0203: ICS Indicator to support MSC not enhanced for ICS | Ericsson | TEI11, ICSRA | S2-140139 | Revised in parallel sessions to S2-140139. | Revised | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140098 | DISCUSSION | Analysis of architectural/system impacts from Dual Connectivity | Ericsson | LTE_SC_enh_dualC | LATE DOC: Rx: 20/01/2014. This was covered by discussions and was noted | Noted | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140099 | CR | 23.002 CR0271: Missing PSS Server information | Telefon AB LM Ericsson | HTTP_SDS | S2-140146 | Revised in parallel sessions to S2-140146. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140100 | CR | 23.682 CR0079: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140147 | Revised in parallel sessions to S2-140147. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140101 | CR | 23.060 CR1835: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140148 | Revised in parallel sessions to S2-140148. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140102 | CR | 23.401 CR2638: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140149 | Revised in parallel sessions to S2-140149. | Revised | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140103 | CR | 23.402 CR1227: Corrections to SaMOG functionality | Ericsson | eSaMOG | Agreed in parallel sessions.. This CR was agreed | Agreed | |||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140104 | DISCUSSION | Consideration for WLCP transport over UDP/IP | Ericsson | eSaMOG | Noted in parallel sessions | Noted | |||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140105 | LS OUT | Reply LS on bearer binding for the PCC rule with application identifier | Ericsson | SAPP | S2-140364 | Response to S2-140016. Revised offline after drafting session to S2-140364. | Revised | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140106 | CR | 23.203 CR0867: Corrections to handling of PCC rules with application identifier | Ericsson | SAPP | S2-140365 | Revised offline after drafting session to S2-140365. | Revised | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140107 | CR | 23.203 CR0868: Corrections to handling of PCC rules with application identifier | Ericsson | SAPP | S2-140368 | Revised in parallel sessions to S2-140368. | Revised | ||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140108 | P-CR | Tentative conclusions for ProSe UE-to-Network Relays | Ericsson, Qualcomm Incorporated, Motorola Solutions | ProSe | This was covered by discussions of other contributions and their revisions in S2-140483 and S2-140484. This was then noted. | Noted | |||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140109 | P-CR | ProSe Architecture Solutions | Ericsson, NSN | ProSe | S2-140440 | Revised to S2-140440. | Revised | ||
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140110 | P-CR | Update for the evaluation of 'Direct one-to-many communication decentralized mode | Ericsson | ProSe | S2-140357 | Revised to S2-140357. | Revised | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140111 | P-CR | Update for the evaluation of discovery procedure | Ericsson | ProSe | S2-140354 | Revised in drafting session to S2-140354 | Revised | ||
Erik | Y | 6.2.6 | ProSe Identities (for Communication and Discovery) | S2-140112 | P-CR | Update for the evaluation of 'Summary of solutions for allocation of identities for network-authorised direct discovery' | Ericsson | ProSe | S2-140355 | Revised in drafting session to S2-140355 | Revised | ||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140113 | WID | Updated WID for UPCON | Verizon, KDDI, AT&T, Sprint, Softbank Mobile, Orange | S2-140346 | Revised to S2-140346. | Revised | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140114 | CR | 23.228 CR1058R1: IMS_WebRTC architecture and procedures | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140123 | S2-140003 | Revision of S2-140003. Revised in parallel sessions to S2-140123. | Revised | |
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140115 | DISCUSSION | SA2 and SA3 Joint meeting on IMS_webRTC: SA2 status | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140132 | Revised in parallel sessions to S2-140132. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140116 | LS OUT | [DRAFT] Reply to LS on status of WT-291 work and request of feedback on S2a tunnel setup failure scenario | SA WG2 | P4C-TI | S2-140451 | S2-133876 | Response to S2-140019. Revised in parallel sessions to S2-140451. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140117 | LS OUT | Response LS to CT WG1 on 'merging ForServiceBased and ForFlowBased ISRP flow distribution containers' | Motorola Mobility | TEI12 | S2-140450 | S2-140214 | Revision of S2-140214. Revised in parallel sessions to S2-140450. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140118 | LS OUT | Response to LS on Publication of GSMA's Recommendations for Minimum Wi-Fi Capabilities of Terminals, Version 2.0 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | TEI12 | S2-140466 | S2-140117 | Revision of S2-140302. Revised in parallel sessions to S2-140466. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140119 | LS OUT | Draft reply to LS on Next hop policy rule use case accepted into WT-300 | Ericsson | P4C-F | S2-140449 | S2-140093 | Revision of S2-140093. Revised in parallel sessions to S2-140449. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140120 | LS OUT | LS Reply on providing parameters to TDF | Allot Communications | ABC | S2-140467 | S2-140010 | Revision of S2-140010. Agreed in parallel sessions. Revised to S2-140467. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140121 | CR | 23.203 CR0866R1: Additional parameter transfer to the TDF for charging reports | Allot Communications | ABC | S2-140011 | Revision of S2-140011. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140122 | LS OUT | Reply to SA4 LS on PSS DASH service | Huawei, Hisilicon | FS_IS_DASH | S2-140060 | Revision of S2-140060.. Approved | Approved | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140123 | CR | 23.228 CR1058R2: IMS_WebRTC architecture and procedures | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140373 | S2-140114 | Revision of S2-140114. Revised in parallel sessions to S2-140373. | Revised | |
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140124 | CR | 23.002 CR0272R1: Adding the IMS WebRTC architecture | ZTE | IMS_WebRTC | S2-140404 | S2-140279 | Revision of S2-140279. Revised in parallel sessions to S2-140404. | Revised | |
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140125 | CR | 23.228 CR1063R1: Terminal based solution for IMS_WebRTC | Broadcom Corporation | IMS_WebRTC | S2-140218 | Revision of S2-140218. Noted in parallel sessions | Noted | ||
Ivano | Y | 6.6 | User Location Information reporting improvements (CNO-ULI) | S2-140126 | CR | 23.401 CR2637R1: Presence Reporting Area provided by OCS | Ericsson | CNO_ULI | S2-140406 | S2-140091 | Revision of S2-140091. Revised in parallel sessions to S2-140406. | Revised | |
Ivano | Y | 6.6 | User Location Information reporting improvements (CNO-ULI) | S2-140127 | CR | 23.060 CR1834R1: Presence Reporting Area provided by OCS | Ericsson | CNO_ULI | S2-140407 | S2-140092 | Revision of S2-140092. Revised in parallel sessions to S2-140407. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140128 | CR | 23.203 CR0864R1: Corrections for TDF functionality and for event triggers and re-authorization triggers definitions | Allot Communications | CNO_ULI | S2-140457 | S2-140008 | Revision of S2-140008. Revised in parallel sessions to S2-140457. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140129 | CR | 23.203 CR0875R1: Corrections of PRA information at initial interactions with PCRF and OCS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CNO_ULI, TEI12 | S2-140459 | S2-140293 | Revision of S2-140293. Revised in parallel sessions to S2-140459. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140130 | CR | 23.401 CR2635R1: Corrections for presence reporting area based location reporting | Huawei, Hisilicon | CNO_ULI | S2-140458 | S2-140069 | Revision of S2-140069. Revised in parallel sessions to S2-140458. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140131 | CR | 23.060 CR1833R1: Corrections for presence reporting area based location reporting | Huawei, Hisilicon | CNO_ULI | S2-140070 | Revision of S2-140070. Agreed in parallel sessions. This CR was agreed | Agreed | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140132 | DISCUSSION | SA2 and SA3 Joint meeting on IMS_webRTC: SA2 status | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140133 | S2-140115 | Revision of S2-140115. Revised in parallel sessions to S2-140133. | Revised | |
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140133 | DISCUSSION | SA2 and SA3 Joint meeting on IMS_webRTC: SA2 status | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140132 | Revision of S2-140132. Noted in parallel sessions | Noted | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140134 | LS OUT | [DRAFT] LS on system aspects for Small Cell Enhancement work in RAN | SA WG2 | LTE_SC_enh_dualC | S2-140422 | S2-140176 | Revision of S2-140176. Revised to S2-140422. | Revised | |
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140135 | LS OUT | [Draft] Reply LS on interaction of oneM2M with underlying networks | SA WG2 | MTCe | S2-140423 | S2-140285 | Revision of S2-140285. Revised to S2-140423. | Revised | |
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140136 | LS OUT | [DRAFT] LS on UE requirements for PSAP callback | SA WG2 | TEI12 | S2-140419 | S2-140339 | Revision of S2-140339. Revised to S2-140419. | Revised | |
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140137 | LS OUT | Reply LS on CSFB priority call handling in a network supporting Multimedia Priority Service | SA WG2 | - | S2-140533 | S2-140292 | Revision of S2-140292. Revised to S2-140533. | Revised | |
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140138 | CR | 23.292 CR0202R1: ICS Indicator to support MSC not enhanced for ICS | Ericsson | TEI11, ICSRA | S2-140515 | S2-140096 | Revision of S2-140096. Revised to S2-140515. | Revised | |
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140139 | CR | 23.292 CR0203R1: ICS Indicator to support MSC not enhanced for ICS | Ericsson | TEI11, ICSRA | S2-140516 | S2-140097 | Revision of S2-140097. Revised to S2-140516. | Revised | |
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140140 | CR | 23.292 CR0204R1: IMS registration via I2 upon Combined Attach via SGs | Orange | TEI11, ICSRA | S2-140324 | Revision of S2-140324. This CR was agreed | Agreed | ||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140141 | CR | 23.292 CR0205R1: IMS registration via I2 upon Combined Attach via SGs | Orange | TEI11, ICSRA | S2-140325 | Revision of S2-140325. This CR was agreed | Agreed | ||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140142 | LS OUT | [DRAFT] LS on LS on solutions for the failure of CONF service after eSRVCC | SA WG2 | TEI12, eSRVCC | S2-140514 | Revised to S2-140514. | Revised | ||
Frank | Y | 6.1.4 | IMS-Related Maintenance, SMSMI, BusTI | S2-140143 | CR | 23.228 CR1062R1: Sh interface supports retrieving of private user identities using the public user identity | NSN | TEI12 | S2-140204 | Revision of S2-140204. This CR was agreed | Agreed | ||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140144 | LS OUT | [DRAFT]LS response on Roaming Forwarding of signalling for CS fall back | SA WG2 | SAES-CSFB | S2-140430 | S2-140061 | Revision of S2-140061. Revised to S2-140430. | Revised | |
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140145 | CR | 23.401 CR2641R1: Fix downlink message delivery failure due to crash with mobility event | ZTE | TEI11, SAES | S2-140431 | S2-140172 | Revision of S2-140172. Revised to S2-140431. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140146 | CR | 23.002 CR0271R1: Missing PSS Server information | Telefon AB LM Ericsson | HTTP_SDS | S2-140420 | S2-140099 | Revision of S2-140099. Revised to S2-140420. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140147 | CR | 23.682 CR0079R1: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140424 | S2-140100 | Revision of S2-140100. Revised to S2-140424. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140148 | CR | 23.060 CR1835R1: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140425 | S2-140101 | Revision of S2-140101. Revised to S2-140425. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140149 | CR | 23.401 CR2638R1: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140426 | S2-140102 | Revision of S2-140102. Revised to S2-140426. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140150 | CR | 23.401 CR2646R1: Clarification and Optimisation for UE Power Saving Mode | InterDigital | MTCe-UEPCOP | S2-140427 | S2-140231 | Revision of S2-140231. Revised to S2-140427. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140151 | CR | 23.060 CR1838R1: Clarification and Optimisation for MS Power Saving Mode | InterDigital | MTCe-UEPCOP | S2-140428 | S2-140232 | Revision of S2-140232. Revised to S2-140428. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140152 | CR | 23.682 CR0081R1: Clarification on Power Saving Mode handling | LG Electronics | MTCe-UEPCOP | S2-140429 | S2-140264 | Revision of S2-140264. Revised to S2-140429. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140153 | CR | 23.682 CR0082R1: Clarification on PSM | ZTE | MTCe-UEPCOP | S2-140280 | Revision of S2-140280. Noted. Should be resubmitted to the SA WG2 meeting #102 | Noted | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140154 | DISCUSSION | Discussion of transfer mechanism of WLCP between the UE and the TWAN | Broadcom Corporation | eSaMOG | Noted in parallel sessions | Noted | |||
Erik | Y | 6.2.8 | ProSe EPC-level Discovery | S2-140155 | DISCUSSION | Clarifications on IMS Option for Authentication and IMS Presence option for Proximity Detection | Broadcom Corporation, NEC, LG Electronics, Intel | ProSe | Noted | Noted | |||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140156 | DISCUSSION | Update of R3 solution for UE to Network relay | Broadcom Corporation | ProSe | Noted | Noted | |||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140157 | LS OUT | Reply LS on granularity of the total allowed usage | ZTE | - | S2-140369 | Response to S2-140040. Revised in parallel sessions to S2-140369. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140158 | CR | 23.203 CR0869: Architecture figure update for ABC | ZTE, Allot communications | ABC | S2-140376 | Revised in parallel sessions to S2-140376. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140159 | CR | 23.401 CR2639: The clarification of reachability management for ISR activated UE applying PSM | HTC | MTCe-UEPCOP | Noted in parallel sessions | Noted | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140160 | CR | 23.060 CR1836: The clarification of reachability management for ISR activated UE applying PSM | HTC | MTCe-UEPCOP | Noted in parallel sessions | Noted | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140161 | P-CR | Evaluation and conclusion proposal for ProSe direct discovery | HTC | ProSe | Not Handled | Not Handled | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140162 | DISCUSSION | Supporting priority services in 1xCSFB | Samsung | TEI10, SAES-CSFB | Noted | Noted | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140163 | CR | 23.272 CR0916: Supporting priority services in 1xCSFB | Samsung | TEI10, SAES-CSFB | S2-140432 | Revised in parallel sessions to S2-140432. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140164 | CR | 23.272 CR0917: Supporting priority services in 1xCSFB | Samsung | TEI10, SAES-CSFB | S2-140485 | Revised in parallel sessions to S2-140485. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140165 | CR | 23.272 CR0918: Supporting priority services in 1xCSFB | Samsung | TEI10, SAES-CSFB | S2-140486 | Revised in parallel sessions to S2-140486. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140166 | P-CR | GC Priority and Pre-emption | ZTE | GCSE_LTE | S2-140381 | Revised to S2-140381. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140167 | P-CR | Additional Information Exchanged on GC2 | ZTE | GCSE_LTE | Noted | Noted | |||
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140168 | P-CR | Direct ProSe communication decentralized mode | ZTE | ProSe | Noted | Noted | |||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140169 | P-CR | Additional conclusion of ProSe UE-to-Network Relays | ZTE | ProSe | Noted | Noted | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140170 | P-CR | Common UE Entity diagram for ProSe Direct Discovery | ZTE | ProSe | Noted | Noted | |||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140171 | CR | 23.401 CR2640: Fix downlink message delivery failure due to crash with mobility event | ZTE | TEI11, SAES | Noted in parallel sessions | Noted | |||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140172 | CR | 23.401 CR2641: Fix downlink message delivery failure due to crash with mobility event | ZTE | TEI11, SAES | S2-140145 | Revised in parallel sessions to S2-140145. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140173 | CR | 23.060 CR1837: Clarify the APN selection when the user locates in HPLMN | ZTE | TEI12 | S2-140421 | Revised in parallel sessions to S2-140421. | Revised | ||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140174 | CR | 23.272 CR0919: Correction of MT procedures in active mode | ZTE | TEI12 | Agreed in parallel sessions.. This CR was agreed | Agreed | |||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140175 | DISCUSSION | System impact for 'Small Cell Enhancement' work in RAN | Huawei, Hisilicon | LTE_SC_enh_dualC | Noted | Noted | |||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140176 | LS OUT | LS on system aspects for Small Cell Enhancement work in RAN | Huawei, Hisilicon | LTE_SC_enh_dualC | S2-140134 | Response to S2-140052 and S2-140262. Revised in parallel sessions to S2-140134. | Revised | ||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140177 | P-CR | Discussion on UE-to-network relay | Huawei, Hisilicon | ProSe | S2-140383 | Revised to S2-140383. | Revised | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140178 | P-CR | Update of solution D13 | Huawei, Hisilicon | ProSe | Noted | Noted | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140179 | P-CR | ProSe direct discovery via Model B mechanism | Huawei, Hisilicon | ProSe | S2-140388 | Revised to S2-140388. | Revised | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140180 | DISCUSSION | Scenario 3 using registration of individual IMPU assigned from a pool of IMPUs | Samsung | IMS_WebRTC | Individual IMPU registration. Not Handled | Not Handled | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140181 | CR | 23.228 CR1060: Introduction of IMS_ WebRTC Scenario 3 | Samsung | IMS_WebRTC | Implements the proposal in S2-140180. Noted in parallel sessions | Noted | |||
Ivano | Y | 5.3 | SAE: 23.402 (including eANDSF, MUPSAP, MAPCON, FlowMob, SMOG), DIDA, LOBSTER, SaMOG_WLAN, BBAI I, II | S2-140182 | CR | 23.401 CR2642: Correction of IETF reference on prefix delegation | NSN, Nokia | TEI10 | Agreed in parallel sessions.. This CR was agreed | Agreed | |||
Ivano | Y | 5.3 | SAE: 23.402 (including eANDSF, MUPSAP, MAPCON, FlowMob, SMOG), DIDA, LOBSTER, SaMOG_WLAN, BBAI I, II | S2-140183 | CR | 23.401 CR2643: Correction of IETF reference on prefix delegation | NSN, Nokia | TEI10 | Agreed in parallel sessions.. This CR was agreed | Agreed | |||
Ivano | Y | 5.3 | SAE: 23.402 (including eANDSF, MUPSAP, MAPCON, FlowMob, SMOG), DIDA, LOBSTER, SaMOG_WLAN, BBAI I, II | S2-140184 | CR | 23.401 CR2644: Correction of IETF reference on prefix delegation | NSN, Nokia | TEI10 | Agreed in parallel sessions.. This CR was agreed | Agreed | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140185 | CR | 23.402 CR1228: ANDSF related corrections | NSN, Nokia | WLAN_NS, OPIIS | S2-140363 | Revised in parallel sessions to S2-140363. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140186 | CR | 23.402 CR1229: Correction on home network selection with ANDSF | NSN, Nokia | WLAN_NS | S2-140360 | Revised in parallel sessions to S2-140360. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140187 | CR | 23.402 CR1230: Removing Source IP address/port from ISRP and IARP | NSN, Nokia | OPIIS, TEI12 | S2-140400 | Revised in parallel sessions to S2-140400. | Revised | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140188 | CR | 23.402 CR1231: Link model related eSaMOG corrections | NSN, Nokia | eSaMOG | S2-140394 | Revised in parallel sessions to S2-140394. | Revised | ||
Erik | Y | 6.2.6 | ProSe Identities (for Communication and Discovery) | S2-140189 | P-CR | Solutions evaluation on direct discovery from ProSe ID view | CATT, Interdigital? | ProSe | It was decided to take agreeable parts of this and merge it with S2-140355. This was then noted. | Noted | |||
Erik | Y | 6.2.6 | ProSe Identities (for Communication and Discovery) | S2-140190 | P-CR | Update solution evaluation part of I3 | CATT | ProSe | S2-140379 | Revised to S2-140379. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140191 | CR | 23.402 CR1232: Update of rules selection and UE behaviour | Huawei, Hisilicon | WLAN_NS | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140192 | CR | 23.402 CR1233: Attribute alignment with HS2.0 | CATT | WLAN_NS | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140193 | CR | 23.402 CR1234: WLANSP rules selection provided from two VPLMNs | CATT | WLAN_NS | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140194 | CR | 23.402 CR1235: The usage of the list of SSIDs not preferred for selection | CATT | WLAN_NS | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140195 | CR | 23.402 CR1236: Adding a condition for selecting 3GPP RPLMN as the most preferred service provider over WLAN access | CATT | WLAN_NS | S2-140402 | Revised in parallel sessions to S2-140402. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140196 | CR | 23.682 CR0080: PSM per RAT | CATT | MTCe-UEPCOP | Noted in parallel sessions | Noted | |||
Erik | Y | 3 | Meeting reports | S2-140197 | REPORT | SA WG2 Chairman's Report on TSG SA#62 | SA WG2 Chairman | - | Noted | Noted | |||
Erik | Y | 8.3 | Planning future meetings | S2-140198 | DISCUSSION | Plan for SA WG2 101bis | SA WG2 Chairman | - | S2-140572 | Revised to S2-140572. | Revised | ||
_Not On Agenda | Y | 8.2 | Review of the Work Plan | S2-140199 | WORK PLAN | Work Plan Update Template for SA#63 | SA WG2 Chairman | - | S2-140571 | Revised to S2-140571. | Revised | ||
Erik | Y | 8.3 | Planning future meetings | S2-140200 | DISCUSSION | 2015 Meeting Calendar | SA WG2 Chairman | - | Noted | Noted | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140201 | DISCUSSION | WIC registration of individual IMPU from a pool of IMPUs | NSN | IMS_WebRTC | Aligned with the proposal in S2-140180. Noted in parallel sessions | Noted | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140202 | DISCUSSION | Describing key characteristics of solutions for Scenario 3 | NSN | IMS_WebRTC | Summarizes the key characteristics of the two registration solutions described in the previous papers. Not Handled | Not Handled | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140203 | CR | 23.228 CR1061: Introduction of Support for WebRTC Scenario 3 | NSN | IMS_WebRTC | Aligned with the proposal in S2-140181 but implemented differently. Noted in parallel sessions | Noted | |||
Frank | Y | 6.1.4 | IMS-Related Maintenance, SMSMI, BusTI | S2-140204 | CR | 23.228 CR1062: Sh interface supports retrieving of private user identities using the public user identity | NSN | TEI12 | S2-140143 | Revised in parallel sessions to S2-140143. | Revised | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140205 | DISCUSSION | Uplink Bearer Binding for PCC Rules with Application Identifier | NSN | SAPP | Not Handled | Not Handled | |||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140206 | CR | 23.203 CR0870: Corrections to handling of PCC rules with application identifier | NSN | SAPP | Noted in parallel sessions | Noted | |||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140207 | CR | 23.203 CR0871: Corrections to handling of PCC rules with application identifier | NSN | SAPP | Noted in parallel sessions | Noted | |||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140208 | CR | 23.203 CR0872: Corrections of service data flow tempates of PCC rules with application identifier | NSN | SAPP | Noted in parallel sessions | Noted | |||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140209 | CR | 23.203 CR0873: Corrections of service data flow tempates of PCC rules with application identifier | NSN | SAPP | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140210 | DISCUSSION | Scenario 3 - Terminating calls for un-registered users | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140211 | CR | 23.402 CR1237: WLCP over UDP | ZTE, LG Electronics, Samsung, Broadcom Corporation, KDDI? | eSaMOG | S2-140377 | Revised offline to S2-140377. | Revised | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140212 | DISCUSSION | Considerations for WLCP Transport | Motorola Mobility | eSaMOG | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140213 | DISCUSSION | On the Merging of IFOM and MAPCON Rules | Motorola Mobility | TEI12 | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140214 | LS OUT | Response LS to CT WG1 on 'merging ForServiceBased and ForFlowBased ISRP flow distribution containers' | Motorola Mobility | TEI12 | S2-140117 | Response to S2-140026. The rationale of the proposal is in S2-140213. Revised in parallel sessions to S2-140117. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140215 | DISCUSSION | Alternative solutions for WLAN selection: I-WLAN and ANDSF | Motorola Mobility | TEI12 | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140216 | LS OUT | Alternative solutions for WLAN selection: I-WLAN and ANDSF | Motorola Mobility | TEI12 | S2-140359 | Revised in parallel sessions to S2-140359. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140217 | CR | 23.402 CR1238: Clarification on WLAN Selection based on WLANSP | Motorola Mobility | WLAN_NS | S2-140361 | Revised in parallel sessions to S2-140361. | Revised | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140218 | CR | 23.228 CR1063: Terminal based solution for IMS_WebRTC | Broadcom Corporation | IMS_WebRTC | S2-140125 | Revised in parallel sessions to S2-140125. | Revised | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140219 | DISCUSSION | Bearer mapping aspects for PCC rules with Application Identifier | Ericsson | SAPP | Not Handled | Not Handled | |||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140220 | CR | 23.401 CR2645: Core Network support of Presence Reporting | Ericsson | TEI12, CNO_ULI | Noted in parallel sessions | Noted | |||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140221 | DISCUSSION | Analysis and proposed response to LS from RAN2 on discovery message size | General Dynamics Broadband UK | ProSe | Related to LS in S2-130046. This was discussed and some comments received. This was then noted. | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140222 | P-CR | Proposed update to TR 23.768 based upon LS response from SA4 on MI-MooD work item | General Dynamics Broadband UK | GCSE_LTE | Noted | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140223 | P-CR | Proposed update to TR 23.768 concerning MBMS bearer pre-emption | General Dynamics Broadband UK | GCSE_LTE | Noted and merged into S2-140445 | Noted | |||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140224 | P-CR | Proposed way forward for allocation of ProSe identifiers over PC3 reference point | InterDigital Communications | ProSe | WITHDRAWN | Withdrawn | |||
Erik | Y | 6.2.6 | ProSe Identities (for Communication and Discovery) | S2-140225 | P-CR | Evaluation of solutions proposing allocation of ProSe Identifiers | InterDigital Communications | ProSe | It was decided to take agreeable parts of this and merge it with S2-140355. This was then noted. | Noted | |||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140226 | P-CR | Proposed way forward for EPC-assisted direct discovery | InterDigital Communications, LG Electronics, HTC | ProSe | S2-140433 | A key decision + related to PC3 UP vs. CP. Revised to S2-140433. | Revised | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140227 | P-CR | ProSe Client functionality during direct discovery | InterDigital Communications | ProSe | Noted | Noted | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140228 | P-CR | UE triggered EPC-assisted direct discovery via control plane PC3 | InterDigital Communications | ProSe | WITHDRAWN | Withdrawn | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140229 | P-CR | UE triggered EPC-assisted direct discovery via user plane PC3 | InterDigital Communications | ProSe | Noted | Noted | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140230 | DISCUSSION | Further clarifications for PSM and interactions with existing functionalities | InterDigital | MTCe-UEPCOP | Noted in parallel sessions | Noted | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140231 | CR | 23.401 CR2646: Clarification and Optimisation for UE Power Saving Mode | InterDigital | MTCe-UEPCOP | S2-140150 | Revised in parallel sessions to S2-140150. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140232 | CR | 23.060 CR1838: Clarification and Optimisation for MS Power Saving Mode | InterDigital | MTCe-UEPCOP | S2-140151 | Revised in parallel sessions to S2-140151. | Revised | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140233 | DISCUSSION | Analysis of SA WG2 impacts related to the study on Small Cell Enhancements in RAN WG2 | Qualcomm Incorporated, Cisco | TEI12 | Noted | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140234 | P-CR | Additional information to be exchanged on the GC2 interface | Motorola Solutions | GCSE_LTE | Noted | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140235 | P-CR | Clarification on the relationships between groups, flows and bearers | Motorola Solutions | GCSE_LTE | S2-140438 | Revised to S2-140438. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140236 | P-CR | USD delivery for idle UEs in areas with pre-established eMBMS bearers | Motorola Solutions | GCSE_LTE | S2-140434 | Revised to S2-140434. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140237 | P-CR | Clarifications on the handling of priorities/pre-emption of group communications | Motorola Solutions | GCSE_LTE | S2-140525 | Revised to S2-140525. | Revised | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140238 | OTHER | Advisory on S2-140046 (incoming LS on discovery message size from RAN WG2) | Motorola Solutions | ProSe | Related to LS in S2-130046. Noted | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140239 | P-CR | Group Management for GCSE, part 1 | NSN | GCSE_LTE | Noted | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140240 | P-CR | Group Management for GCSE, part 2 | NSN | GCSE_LTE | S2-140439 | Revised to S2-140439. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140241 | P-CR | Roaming and USD | NSN | GCSE_LTE | S2-140435 | Revised to S2-140435. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140242 | P-CR | Multicast delivery pre-emption and notification | NSN | GCSE_LTE | Noted and merged into S2-140445. | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140243 | P-CR | GC2 Interface | NSN | GCSE_LTE | S2-140437 | Revised to S2-140437. | Revised | ||
Erik | Y | 6.2.4 | Configuration and Capability Handling | S2-140244 | P-CR | Prose and GCSE, one-to-many | NSN | ProSe, GCSE_LTE | S2-140471 | Revised to S2-140471. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140245 | P-CR | Generic Pre-established MBMS bearer for GCSE | NSN | GCSE_LTE | S2-140447 | Revised to S2-140447. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140246 | P-CR | Solution conclusion for GCSE | NSN | GCSE_LTE | S2-140350 | Revised to S2-140350. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140247 | TS | TS 23.468 skeleton | NSN | GCSE_LTE | S2-140351 | Revised to S2-140351. | Revised | ||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140248 | WID | GCSE_LTE WID updates with TS number and title | NSN (Rapporteur) | GCSE_LTE | S2-140347 | Revised to S2-140347. | Revised | ||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140249 | P-CR | Additional conclusion on UE-to-Network Relay | LG Electronics | ProSe | It was agreed that this is an important issue to solve and a LS should be sent to CT and RAN WGs when an agreed solution is available. Noted | Noted | |||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140250 | CR | 23.402 CR1239: Clarifications on aspect on multi-access PDN Connectivity | LG Electronics | eSaMOG | S2-140395 | Revised in parallel sessions to S2-140395. | Revised | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140251 | DISCUSSION | Proposed conclusion for WLCP Transport | LG Electronics | eSaMOG | Noted in parallel sessions | Noted | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140252 | DISCUSSION | Gateway reselection and IMS Voice | China Telecom, China Unicom, Ericsson, ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, HUAWEI, CATR | LIMONET, SIPTO | Not Handled | Not Handled | |||
Erik | Y | 6.2.5 | Charging Aspects | S2-140253 | P-CR | Conclusion proposal for key issue #13 Charging in ProSe | HTC | ProSe | Noted | Noted | |||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140254 | P-CR | Evaluation and conclusion proposal for PC3 interface | HTC | ProSe | WITHDRAWN | Withdrawn | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140255 | P-CR | Enhancements to Geographical scope | Qualcomm Inc | GCSE_LTE | S2-140436 | Revised to S2-140436. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140256 | P-CR | GCSE Service Information Exchange | Qualcomm Inc | GCSE_LTE | This was merged into S2-140434 and was noted. | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140257 | P-CR | Simulation results for GCSE | Qualcomm Incorporated | GCSE_LTE | Noted | Noted | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140258 | DISCUSSION | Discussion on CSFB optimization | China Unicom | - | Not Handled | Not Handled | |||
Frank | Y | 6.1.4 | IMS-Related Maintenance, SMSMI, BusTI | S2-140259 | CR | 23.204 CR0106: Validity period of Correlation ID | HTC | SMSMI | It was requested off line to Note this document. Noted | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140260 | LS In | LS from GSMA: Publication of GSMA’s Recommendations for Minimum Wi-Fi Capabilities of Terminals, Version 2.0 | GSMA TSGWIF | WLAN_NS | TSGWIF_217_Liaison Statement | Forwarded from TSG SA to SA WG2. Same LS as in S2-140031. Response drafted in S2-140302. Final response in S2-140553 | Response in S2-140553 | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140261 | LS In | LS from TSG SA: Response to: LS on new WLAN/3GPP interworking work item | TSG SA | UTRA_LTE_WLAN_interw-core | SP-130719 | Noted | Noted | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140262 | LS In | LS from TSG SA: Response to: LS on Small Cell Enhancement work in RAN | TSG SA | LTE_SC_enh_dualC | SP-130720 | Response drafted in S2-140176. Final response in S2-140537. | Response in S2-140537. | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140263 | DISCUSSION | Further clarification on Power Saving Mode | LG Electronics | MTCe-UEPCOP | Noted in parallel sessions | Noted | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140264 | CR | 23.682 CR0081: Clarification on Power Saving Mode handling | LG Electronics | MTCe-UEPCOP | S2-140152 | Revised in parallel sessions to S2-140152. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140265 | CR | 23.060 CR1839: ISR handling for Power Saving Mode | LG Electronics | MTCe-UEPCOP | Noted in parallel sessions | Noted | |||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140266 | CR | 23.401 CR2647: ISR handling for Power Saving Mode | LG Electronics | MTCe-UEPCOP | Noted in parallel sessions | Noted | |||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140267 | DISCUSSION | Question on bearer handling for dual connectivity | LG Electronics | LTE_SC_enh_dualC | Noted | Noted | |||
Erik | Y | 6.2.8 | ProSe EPC-level Discovery | S2-140268 | DISCUSSION | Consideration on UE registration procedure via IMS for EPC-level ProSe discovery | LG Electronics | ProSe | Noted | Noted | |||
Erik | Y | 4 | General issues and Incoming LSs | S2-140269 | LS In | LS from oneM2M: LS to 3GPP on support of alternate device triggering scheme for non-SMS capable devices | oneM2M | - | oneM2M-TP-2013-0382R02 | Postpone until there is an MTC-related WID. This LS was postponed until a MTC-related WID is available. | Postponed | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140270 | LS In | LS from WBA: Liaison Statement to 3GPP on Forum´s alignment | WBA | - | WBA-LiasionStatement to 3GPP | Information, no action. Noted | Noted | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140271 | LS In | LS from SA WG3: LS on WebRTC Security Responsibility | SA WG3 | IMS_WebRTC | S3-131193 | Noted in parallel sessions | Noted | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140272 | LS In | LS from SA WG3: LS on parameter synchronization | SA WG3 | - | S3-131152 | For information for SA WG2 only. This LS was noted. | Noted | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140273 | LS In | LS from SA WG3: Reply LS on LS on interactions of oneM2M with Underlying Networks | SA WG3 | - | S3-131155 | SA WG3 response to LS in S2-140017 no action, note?. Noted | Noted | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140274 | P-CR | Update of solution D13 to support model B | LG Electronics | ProSe | Noted | Noted | |||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140275 | CR | 23.402 CR1240: Clarification on IARP-related descriptions. | LG Electronics | OPIIS, WLAN_NS | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140276 | DISCUSSION | Rollback for TAU/RAU reject with PMIP | NTT DOCOMO | TEI12 | Not Handled | Not Handled | |||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140277 | CR | 23.203 CR0874: PCRF handling of GW Control Session Termination | NTT DOCOMO | TEI12 | Not Handled | - | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140278 | DISCUSSION | Discussion on the issue in the scenario 3. | ZTE | IMS_WebRTC | Aligned with the proposal in S2-140180. Noted in parallel sessions | Noted | |||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140279 | CR | 23.002 CR0272: Adding the IMS WebRTC architecture | ZTE | IMS_WebRTC | S2-140124 | Revised in parallel sessions to S2-140124. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140280 | CR | 23.682 CR0082: Clarification on PSM | ZTE | MTCe-UEPCOP | S2-140153 | Revised in parallel sessions to S2-140153. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140281 | CR | 23.401 CR2648: Clarification on PSM | ZTE | MTCe-UEPCOP | S2-140413 | Revised in parallel sessions to S2-140413. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140282 | CR | 23.060 CR1840: Clarification on PSM | ZTE | MTCe-UEPCOP | S2-140417 | Revised in parallel sessions to S2-140417. | Revised | ||
Erik | Y | 6.2.8 | ProSe EPC-level Discovery | S2-140283 | P-CR | Updates to Annex I Section 5.x.5 | ITRI | ProSe | S2-140385 | Revised to S2-140385. | Revised | ||
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140284 | P-CR | Functionality of ProSe decentralized mode one-to-many communication | ITRI | ProSe | It was decided to merge agreeable parts of this into S2-140358 and this was then noted. | Noted | |||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140285 | LS OUT | Reply LS on interaction of oneM2M with underlying networks | NEC | MTCe | S2-140135 | Response to S2-140017. Revised in parallel sessions to S2-140135. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140286 | CR | 23.167 CR0260: Clarification when using a private network for emergency calls | NSN | TEI10 | Agreed in parallel sessions.. This CR was agreed | Agreed | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140287 | CR | 23.167 CR0261: Clarification when using a private network for emergency calls | NSN | TEI10 | Agreed in parallel sessions.. This CR was agreed | Agreed | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140288 | DISCUSSION | Discussion on CSFB priority call handling in an eMLPP network | Alcatel-Lucent | - | This was reviewed and left for further discussion. This was then noted | Noted | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140289 | CR | 23.272 CR0920: CSFB priority call handling in an eMLPP/MPS network | Alcatel-Lucent | TEI10, SAES-CSFB | Not Handled | - | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140290 | CR | 23.272 CR0921: CSFB priority call handling in an eMLPP/MPS network | Alcatel-Lucent | TEI10, SAES-CSFB | Not Handled | - | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140291 | CR | 23.272 CR0922: CSFB priority call handling in an eMLPP/MPS network | Alcatel-Lucent | TEI10, SAES-CSFB | Not Handled | - | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140292 | LS OUT | Reply to LS on CSFB priority call handling in a network supporting Multimedia Priority Service (to S2-133899/C1-134519) | Alcatel-Lucent | - | S2-140137 | Response to S2-140027. This was reviewed and revised off-line to take other contributions into account, in S2-140137 | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140293 | CR | 23.203 CR0875: Corrections of PRA information at initial interactions with PCRF and OCS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CNO_ULI, TEI12 | S2-140129 | Revised in parallel sessions to S2-140129. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140294 | CR | 23.401 CR2649: Corrections of PRA information at initial interactions with PCRF and OCS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CNO_ULI, TEI12 | Noted in parallel sessions | Noted | |||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140295 | CR | 23.060 CR1841: Corrections of PRA information at initial interactions with PCRF and OCS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CNO_ULI, TEI12 | Noted in parallel sessions | Noted | |||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140296 | CR | 23.401 CR2650: Clarification of E-RAB establishment in RAU | Alcatel-Lucent | SAES, TEI11 | Not Handled | - | |||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140297 | CR | 23.401 CR2651: Clarification of E-RAB establishment in RAU | Alcatel-Lucent | SAES, TEI11 | Not Handled | - | |||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140298 | DISCUSSION | Discussion on the need for OCS proxy in the VPLMN for LBO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - | S2-140341 | Revised to S2-140341. Revised offline before presentation | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140299 | CR | 23.203 CR0876: Removal of OCS proxy function | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | SAES, TEI11 | Not Handled | - | |||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140300 | CR | 23.203 CR0877: Removal of OCS proxy function | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | SAES, TEI11 | Not Handled | - | |||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140301 | LS OUT | Draft response to LS to SA2 on Gy interface for EPC Roaming LBO scenario (S5-132104) | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - | S2-140370 | Response to S2-140054. Revised in parallel sessions to S2-140370. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140302 | LS OUT | [DRAFT] LS on Publication of GSMA's Recommendations for Minimum Wi-Fi Capabilities of Terminals, Version 2.0 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - | S2-140118 | Response to S2-140260. Revised in parallel sessions to S2-140118. | Revised | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140303 | CR | 23.402 CR1241: Corrections of eSaMOG Initial Attach | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | eSaMOG, TEI12 | S2-140393 | Revised in parallel sessions to S2-140393. | Revised | ||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140304 | DISCUSSION | Rationale for submitting WID on SA2 aspects of WLAN/3GPP Radio Interworking | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - | Noted | Noted | |||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140305 | WID | WID: SA2 aspects of WLAN/3GPP Radio Interworking | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - | This WID could not be agreed at this time and was noted. | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140306 | P-CR | Many to many GC2 interface | Vodafone | GCSE_LTE | S2-140444 | Revised to S2-140444. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140307 | P-CR | Updates to Solutions 1 and 2 in GCSE TR 23.768 following response LS from RAN in S2-140050 | Vodafone | GCSE_LTE | S2-140348 | Revised to S2-140348. | Revised | ||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140308 | P-CR | Multicast using ProSe UE to Network Relays. | Vodafone | ProSe | S2-140382 | Revised to S2-140382. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140309 | CR | 23.401 CR2652: Correction to Power Save Mode | Vodafone | MTCe-UEPCOP | S2-140414 | Revised in parallel sessions to S2-140414. | Revised | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140310 | CR | 23.060 CR1842: Correction to Power Save Mode | Vodafone | MTCe-UEPCOP | S2-140415 | Revised in parallel sessions to S2-140415. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140311 | DISCUSSION | Evaluation of MT CSFB priority handling | Huawei, HiSilicon, NSN | eMPS | This was reviewed and left for further discussion. This was then noted. | Noted | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140312 | CR | 23.272 CR0923: Correction of CSFB priority and eMLPP handling | Huawei, HiSilicon, NSN | eMPS | S2-140482 | Wrong Source to WG !. Revised in parallel sessions to S2-140482. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140313 | CR | 23.272 CR0924: Correction of CSFB priority and eMLPP handling | Huawei, HiSilicon, NSN | eMPS | S2-140483 | Wrong Source to WG !. Revised in parallel sessions to S2-140483. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140314 | CR | 23.272 CR0925: Correction of CSFB priority and eMLPP handling | Huawei, HiSilicon, NSN | eMPS | S2-140484 | Wrong Source to WG !. Revised in parallel sessions to S2-140484. | Revised | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140315 | DISCUSSION | Proposed conclusion on ProSe direct discovery | Intel, Alcatel-Lucent | ProSe | This was left for further off-line discussion to determine whether any of the evaluation could be used. This was then noted. | Noted | |||
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140316 | P-CR | Introducing ProSe direct communication | Intel, Alcatel-Lucent | ProSe | Noted | Noted | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140317 | P-CR | Introducing ProSe Discovery through Communication (DtC) | Intel, Alcatel-Lucent | ProSe | Not Handled | Not Handled | |||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140318 | P-CR | Introducing ProSe UE-to-Network Relay | Intel, Alcatel-Lucent, Sony | ProSe | Noted | Noted | |||
Erik | Y | 6.2.8 | ProSe EPC-level Discovery | S2-140319 | P-CR | Correction on Proximity Request Validation | Intel, Alcatel-Lucent, Sony | ProSe | S2-140386 | Revised to S2-140386. | Revised | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140320 | LS OUT | LS reply on discovery message size | Intel, Alcatel-Lucent | ProSe | S2-140412 | Response to S2-140046. Revised in a drafting session to S2-140412. | Revised | ||
Erik | Y | 6.2.4 | Configuration and Capability Handling | S2-140321 | P-CR | Conclusion section on configuration | NEC | ProSe | S2-140469 | Revised to S2-140469. | Revised | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140322 | DISCUSSION | Providing access network information for IMS charging | Orange | CH8, IMSProtoc6 | Noted in parallel sessions | Noted | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140323 | LS OUT | Reply LS on providing access network information for charging | Orange | CH8, IMSProtoc6 | S2-140418 | Response to S2-140015. Revised in parallel sessions to S2-140418. | Revised | ||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140324 | CR | 23.292 CR0204: IMS registration via I2 upon Combined Attach via SGs | Orange | TEI11, ICSRA | S2-140140 | Revised in parallel sessions to S2-140140. | Revised | ||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140325 | CR | 23.292 CR0205: IMS registration via I2 upon Combined Attach via SGs | Orange | TEI11, ICSRA | S2-140141 | Revised in parallel sessions to S2-140141. | Revised | ||
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140326 | CR | 23.402 CR1242: Access Network information reporting in case of a TWAN Access | Orange | NetLoc_TWAN | S2-140374 | Revised in parallel sessions to S2-140374. | Revised | ||
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140327 | CR | 23.228 CR1064: Geographical Identifier for TWAN access | Orange | NetLoc_TWAN | Agreed in parallel sessions.. This CR was agreed | Agreed | |||
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140328 | DISCUSSION | Access Network information reporting in case of a TWAN Access | Orange | NetLoc_TWAN | Noted in parallel sessions | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140329 | DISCUSSION | On UL bearer optimizations | Alcatel-Lucent | - | Noted | Noted | |||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140330 | LS OUT | [DRAFT] LS on UL Bearer Optimizations for GCSE in Release 12 | Alcatel-Lucent | - | Noted | Noted | |||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140331 | DISCUSSION | On discovery message size | Alcatel-lucent, Intel | - | Noted | Noted | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140332 | P-CR | Comparison of polling vs. advertisement based methods for discovery | Alcatel lucent, Alcatel-Lucent Shanghai Bell | - | Noted | Noted | |||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140333 | DISCUSSION | CS/PS Coordination in UTRAN/GERAN shared network | Ericsson | - | This was reviewed and noted. | Noted | |||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140334 | WID | New WID on improvements to CS/PS coordination in UTRAN/GERAN Shared | Ericsson | - | S2-140498 | Revised to S2-140498. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140335 | CR | 23.402 CR1243: Clarification on ANDSF Information provisioning in UE | Gemalto, Orange | WLAN_NS | Noted in parallel sessions | Noted | |||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140336 | DISCUSSION | Discussing support of LIPA/SIPTO@LN co-located for Small Cell Enhancement work in RAN | Alcatel-Lucent | TEI12 | Noted | Noted | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140337 | P-CR | Consolidated description of solutions for ProSe Discovery using ProSe Communication capability (D3, D6, D7) | Intel, Alcatel-Lucent | ProSe | S2-140390 | Revised to S2-140390. | Revised | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140338 | LS OUT | Reply LS on bearer binding for the PCC rule with application identifier | NSN | - | LATE REQ: Response to S2-140016. Noted in parallel sessions | Noted | |||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140339 | LS OUT | [DRAFT] LS on UE requirements for PSAP callback | SA WG2 (Huawei) | TEI12 | S2-140136 | S2-134341 | Resubmission of S2-134341. Response to S2-140013. LATE REQ. LATE DOC: : Rx 16/01, 12.30. Revised in parallel sessions to S2-140136. | Revised | |
Erik | Y | 2 | Approval of the agenda | S2-140340 | Agenda | Draft Agenda for SA WG2 meeting #101 | SA WG2 Chairman | - | S2-140342 | S2-140007 | Revision of S2-140007. Revised to S2-140342. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140341 | DISCUSSION | Discussion on the need for OCS proxy in the VPLMN for LBO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - | S2-140298 | Revision of S2-140298. LATE REQ. LATE DOC: Rx 18/01, 15.17. Noted in parallel sessions | Noted | ||
Erik | Y | 2 | Approval of the agenda | S2-140342 | Agenda | Draft Agenda for SA WG2 meeting #101 | SA WG2 Chairman | - | S2-140340 | Revision of S2-140340. Approved | Approved | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140343 | LS OUT | [DRAFT] Reply to Wi-Fi Alliance on LS on Signaling Optimization | SA WG2 | - | S2-140510 | - | Revised to S2-140510. | Revised | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140344 | LS OUT | [DRAFT] Reply LS on the UE capabilities regarding support of simultaneous MBMS bearers | SA WG2 | MI-EMO | S2-140511 | - | Revised to S2-140511. | Revised | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140345 | LS OUT | [DRAFT] Reply LS on new work item on 'IMS support for RTP / RTCP transport multiplexing' | SA WG2 | RTCP_MUX | S2-140512 | - | Revised to S2-140512. | Revised | |
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140346 | WID | Updated WID for UPCON | Verizon, KDDI, at&t, Sprint, Softbank Mobile, Orange, Telecom Italia, NTT DoCoMo, China Telecom | S2-140513 | S2-140113 | Revision of S2-140113. Revised to S2-140513. | Revised | ||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140347 | WID | GCSE_LTE WID updates with TS number and title | NSN (Rapporteur) | GCSE_LTE | S2-140248 | Revision of S2-140248. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140348 | P-CR | Updates to Solutions 1 and 2 in GCSE TR 23.768 following response LS from RAN in S2-140050 | Vodafone | GCSE_LTE | S2-140503 | S2-140307 | Revision of S2-140307. Revised to S2-140503. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140349 | LS OUT | [DRAFT] LS Response on Applicability of MI-MooD to GCSE | SA WG2 | GCSE_LTE and MI-MooD | S2-140504 | S2-140035 | - | Response to S2-140035. Revised to S2-140504. | Revised |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140350 | P-CR | Solution conclusion for GCSE | NSN | GCSE_LTE | S2-140246 | Revision of S2-140246. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140351 | TS | TS 23.468 skeleton | NSN | GCSE_LTE | S2-140247 | Revision of S2-140247. Approved | Approved | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140352 | LS OUT | [DRAFT] Reply LS on ProSe Lawful Interception | SA WG2 | ProSe | S2-140494 | S2-140088 | Revision of S2-140088. Revised to S2-140494. | Revised | |
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140353 | P-CR | Scope for TS 23.303 | Qualcomm Incorporated | ProSe | S2-140495 | S2-140090 | Revision of S2-140090. Revised to S2-140495. | Revised | |
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140354 | P-CR | Update for the evaluation of discovery procedure | Ericsson | ProSe | S2-140111 | Revision of S2-140111. Noted | Noted | ||
Erik | Y | 6.2.6 | ProSe Identities (for Communication and Discovery) | S2-140355 | P-CR | Update for the evaluation of 'Summary of solutions for allocation of identities for network-authorised direct discovery' | Ericsson, CATT | ProSe | S2-140502 | S2-140112 | Revision of S2-140112, merging S2-140189 and S2-140225. Revised to S2-140502. | Revised | |
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140356 | P-CR | Direct discovery procedures | Qualcomm Incorporated | ProSe | S2-140509 | S2-140080 | Revision of S2-140080. Revised to S2-140509. | Revised | |
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140357 | P-CR | Update for the evaluation of 'Direct one-to-many communication decentralized mode | Ericsson | ProSe | S2-140496 | S2-140110 | Revision of S2-140110. Revised to S2-140496. | Revised | |
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140358 | P-CR | Direct communication one-to-many (decentralised mode) procedures | Qualcomm Incorporated | ProSe | S2-140497 | S2-140083 | Revision of S2-140083. Revised to S2-140497. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140359 | LS OUT | [DRAFT] LS on Alternative Solutions for WLAN Selection | Motorola Mobility | TEI12 | S2-140474 | S2-140216 | Revision of S2-140216. Revised in parallel sessions to S2-140474. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140360 | CR | 23.402 CR1229R1: Correction on home network selection with ANDSF | NSN, Nokia | WLAN_NS | S2-140186 | Revision of S2-140186. Noted in parallel sessions | Noted | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140361 | CR | 23.402 CR1238R1: Clarification on WLAN Selection based on WLANSP | Motorola Mobility | WLAN_NS | S2-140452 | S2-140217 | Revision of S2-140217. Revised in parallel sessions to S2-140452. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140362 | CR | 23.402 CR1224R1: Corrections for ISMP restricted rule | Huawei, Hisilicon | TEI12, WLAN_NS | S2-140453 | S2-140071 | Revision of S2-140071. Revised in parallel sessions to S2-140453. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140363 | CR | 23.402 CR1228R1: ANDSF related corrections | NSN, Nokia | WLAN_NS, OPIIS | S2-140185 | Revision of S2-140185. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140364 | LS OUT | Reply LS on bearer binding for the PCC rule with application identifier | Ericsson | SAPP | S2-140366 | S2-140105 | Revision of S2-140105. Revised in parallel sessions to S2-140366. | Revised | |
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140365 | CR | 23.203 CR0867R1: Corrections to handling of PCC rules with application identifier | Ericsson, NSN | SAPP | S2-140367 | S2-140106 | Revision of S2-140106. Revised in parallel sessions to S2-140367. | Revised | |
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140366 | LS OUT | Reply LS on bearer binding for the PCC rule with application identifier | Ericsson | SAPP | S2-140411 | S2-140364 | Revision of S2-140364. Revised in parallel sessions to S2-140411. | Revised | |
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140367 | CR | 23.203 CR0867R2: Corrections to handling of PCC rules with application identifier | Ericsson, NSN | SAPP | S2-140365 | Revision of S2-140365. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140368 | CR | 23.203 CR0868R1: Corrections to handling of PCC rules with application identifier | Ericsson | SAPP | S2-140107 | Revision of S2-140107. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140369 | LS OUT | Reply LS on granularity of the total allowed usage | ZTE | - | S2-140448 | S2-140157 | Revision of S2-140157. Revised in parallel sessions to S2-140448. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140370 | LS OUT | LS on Gy interface for EPC Roaming LBO scenario | SA WG2 | - | S2-140472 | S2-140301 | Revision of S2-140301. Revised to S2-140472. | Revised | |
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140371 | CR | 23.060 CR1831R1: Corrections to TFT packet filter related descriptions | Huawei, Hisilicon | TEI11, SAES | S2-140063 | Revision of S2-140063.. This CR was agreed | Agreed | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140372 | CR | 23.060 CR1832R1: Corrections to TFT packet filter related descriptions | Huawei, Hisilicon | TEI11, SAES | S2-140064 | Revision of S2-140064.. This CR was agreed | Agreed | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140373 | CR | 23.228 CR1058R3: IMS_WebRTC architecture and procedures | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140403 | S2-140123 | Revision of S2-140123. Revised in parallel sessions to S2-140403. | Revised | |
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140374 | CR | 23.402 CR1242R1: Access Network information reporting in case of a TWAN Access | Orange | NetLoc_TWAN | S2-140460 | S2-140326 | Revision of S2-140326. Revised in parallel sessions to S2-140460. | Revised | |
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140375 | CR | 23.402 CR1223R1: Consistency of 23.402 16 with 23.203 / 33.107 / 29.274 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Netloc_TWAN | S2-140405 | S2-140006 | Revision of S2-140006. Revised in parallel sessions to S2-140405. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140376 | CR | 23.203 CR0869R1: Architecture figure update for ABC | ZTE, Allot communications | ABC | S2-140551 | S2-140158 | Revision of S2-140158. Agreed in parallel sessions. Revised to S2-140551. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140377 | CR | 23.402 CR1237R1: WLCP over UDP | ZTE, LG Electronics, Samsung, Broadcom Corporation, KDDI? | eSaMOG | S2-140378 | S2-140211 | Revision of S2-140211. Revised in parallel sessions to S2-140378. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140378 | CR | 23.402 CR1237R2: WLCP over UDP | ZTE, LG Electronics, Samsung, Broadcom Corporation, KDDI? | eSaMOG | S2-140409 | S2-140377 | Revision of S2-140377. Revised in parallel sessions to S2-140409. | Revised | |
Erik | Y | 6.2.6 | ProSe Identities (for Communication and Discovery) | S2-140379 | P-CR | Update solution evaluation part of I3 | CATT | ProSe | S2-140190 | Revision of S2-140190. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140380 | P-CR | Update on Priority and Pre-emption on Group Communication | Huawei, Hisilicon | GCSE_LTE | S2-140076 | Revision of S2-140076. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140381 | P-CR | GC Priority and Pre-emption | ZTE | GCSE_LTE | S2-140487 | S2-140166 | Revision of S2-140166. Revised to S2-140487. | Revised | |
Erik | Y | 6.2.2 | UE to NW Relay | S2-140382 | P-CR | Multicast using ProSe UE to Network Relays. | Vodafone | ProSe | S2-140499 | S2-140308 | Revision of S2-140308. Revised to S2-140499. | Revised | |
Erik | Y | 6.2.2 | UE to NW Relay | S2-140383 | P-CR | Discussion on UE-to-network relay | Huawei, Hisilicon | ProSe | S2-140500 | S2-140177 | Revision of S2-140177. Revised to S2-140500. | Revised | |
Erik | Y | 6.2.2 | UE to NW Relay | S2-140384 | P-CR | Way forward on ProSe UE-to-Network Relays | Qualcomm Incorporated | ProSe | S2-140548 | S2-140085 | Revision of S2-140085. Revised to S2-140548. | Revised | |
Erik | Y | 6.2.8 | ProSe EPC-level Discovery | S2-140385 | P-CR | Updates to Annex I Section 5.x.5 | ITRI | ProSe | S2-140523 | S2-140283 | Revision of S2-140283. Revised to S2-140523. | Revised | |
Erik | Y | 6.2.8 | ProSe EPC-level Discovery | S2-140386 | P-CR | Correction on Proximity Request Validation | Intel, Alcatel-Lucent, Sony | ProSe | S2-140319 | Revision of S2-140319. Approved | Approved | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140387 | LS OUT | [DRAFT] LS on ProSe Discovery | SA WG2 | ProSe | S2-140521 | - | Revised to S2-140521. | Revised | |
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140388 | P-CR | ProSe direct discovery via Model B mechanism | Huawei, Hisilicon | ProSe | S2-140561 | S2-140179 | Revision of S2-140179. Revised to S2-140561. | Revised | |
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140389 | P-CR | Update of Solution D1: Support of different discovery modes | Qualcomm Incorporated | ProSe | S2-140562 | S2-140079 | Revision of S2-140079. Revised to S2-140562. | Revised | |
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140390 | P-CR | Consolidated description of solutions for ProSe Discovery using ProSe Communication capability (D3, D6, D7) | Intel, Alcatel-Lucent | ProSe | S2-140337 | Revision of S2-140337. Approved | Approved | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140391 | P-CR | Evaluation of ProSe Discovery through communication solution | Qualcomm Incorporated | ProSe | S2-140086 | Revision of S2-140086. Noted | Noted | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140392 | CR | 23.402 CR1226R1: Corrections for Initial attach and handover attach call flows for single-connection | Huawei, Hisilicon | eSaMOG | S2-140463 | S2-140078 | Revision of S2-140078. Revised in parallel sessions to S2-140463. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140393 | CR | 23.402 CR1241R1: Corrections of eSaMOG Initial Attach | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | eSaMOG, TEI12 | S2-140479 | S2-140303 | Revision of S2-140303. Revised to S2-140479. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140394 | CR | 23.402 CR1231R1: Link model related eSaMOG corrections | NSN, Nokia | eSaMOG | S2-140480 | S2-140188 | Revision of S2-140188. Revised to S2-140480. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140395 | CR | 23.402 CR1239R1: Clarifications on aspect on multi-access PDN Connectivity | LG Electronics | eSaMOG | S2-140250 | Revision of S2-140250.. This CR was agreed | Agreed | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140396 | CR | 23.228 CR1059R1: IMS_WebRTC Scenario 3 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140005 | Revision of S2-140005. Noted in parallel sessions | Noted | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140397 | LS OUT | LS to SA WG3 on Security aspects of IMS_WebRTC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140408 | Revised in parallel sessions to S2-140408. | Revised | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140398 | CR | 23.401 CR2636R1: Delayed release of UE IP address during inter-RAT 3GPP PS Handover | Huawei, Hisilicon | WORM | S2-140476 | S2-140072 | Revision of S2-140072. Revised to S2-140476. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140399 | CR | 23.060 CR1829R2: Addition of a note addressing the behavior of network side during inter-RAT 3GPP PS Handover | Huawei, Hisilicon | TEI12, WORM | S2-140475 | S2-140073 | Revision of S2-140073. Revised to S2-140475. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140400 | CR | 23.402 CR1230R1: Removing Source IP address/port from ISRP and IARP | NSN, Nokia | OPIIS, TEI12 | S2-140455 | S2-140187 | Revision of S2-140187. Revised in parallel sessions to S2-140455. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140401 | CR | 23.203 CR0865R1: Editorial corrections and clarifications | Allot Communications | P4C-F | S2-140009 | Revision of S2-140009. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140402 | CR | 23.402 CR1236R1: Adding a condition for selecting 3GPP RPLMN as the most preferred service provider over WLAN access | CATT | WLAN_NS | S2-140454 | S2-140195 | Revision of S2-140195. Revised in parallel sessions to S2-140454. | Revised | |
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140403 | CR | 23.228 CR1058R4: IMS_WebRTC architecture and procedures | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | IMS_WebRTC | S2-140549 | S2-140373 | Revision of S2-140373. Revised to S2-140549. | Revised | |
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140404 | CR | 23.002 CR0272R2: Adding the IMS WebRTC architecture | ZTE | IMS_WebRTC | S2-140124 | Revision of S2-140124. This CR was agreed | Agreed | ||
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140405 | CR | 23.402 CR1223R2: Consistency of 23.402 16 with 23.203 / 33.107 / 29.274 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Netloc_TWAN | S2-140461 | S2-140375 | Revision of S2-140375. Revised in parallel sessions to S2-140461. | Revised | |
Ivano | Y | 6.6 | User Location Information reporting improvements (CNO-ULI) | S2-140406 | CR | 23.401 CR2637R2: Presence Reporting Area provided by OCS | Ericsson | CNO_ULI | S2-140126 | Revision of S2-140126. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.6 | User Location Information reporting improvements (CNO-ULI) | S2-140407 | CR | 23.060 CR1834R2: Presence Reporting Area provided by OCS | Ericsson | CNO_ULI | S2-140127 | Revision of S2-140127. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140408 | LS OUT | [DRAFT] LS on security aspects of IMS_webRTC | SA WG2 | IMS_WebRTC | S2-140552 | S2-140397 | Revision of S2-140397. Revised to S2-140552. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140409 | CR | 23.402 CR1237R3: WLCP over UDP | ZTE, LG Electronics, Samsung, Broadcom Corporation, KDDI? | eSaMOG | S2-140462 | S2-140378 | Revision of S2-140378. Revised in parallel sessions to S2-140462. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140410 | LS OUT | LS to SA WG3 on WLCP security aspects | Qualcomm Incorporated | eSaMOG | S2-140465 | Revised in parallel sessions to S2-140465. | Revised | ||
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140411 | LS OUT | Reply LS on bearer binding for the PCC rule with application identifier | Ericsson | SAPP | S2-140366 | Revision of S2-140366. Agreed in parallel sessions.. Approved | Approved | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140412 | LS OUT | LS reply on discovery message size | Intel, Alcatel-Lucent | ProSe | S2-140492 | S2-140320 | Revision of S2-140320 Revised to S2-140492. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140413 | CR | 23.401 CR2648R1: Clarification on PSM | ZTE | MTCe-UEPCOP | S2-140281 | Revision of S2-140281. Noted. Should be resubmitted to the SA WG2 meeting #102 | Noted | ||
Frank | N | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140414 | CR | 23.401 CR2652R1: Correction to Power Save Mode | Vodafone | MTCe-UEPCOP | S2-140309 | Revision of S2-140309. | Withdrawn | ||
Frank | N | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140415 | CR | 23.060 CR1842R1: Correction to Power Save Mode | Vodafone | MTCe-UEPCOP | S2-140310 | Revision of S2-140310. | Withdrawn | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140416 | CR | 23.401 CR2634R1: Corrections for the PGW pause of charging functionality | Huawei, Hisilicon | TEI12 | S2-140541 | S2-140068 | Revision of S2-140068. Revised to S2-140541. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140417 | CR | 23.060 CR1840R1: Clarification on PSM | ZTE | MTCe-UEPCOP | S2-140282 | Revision of S2-140282. This CR was agreed | Agreed | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140418 | LS OUT | Reply LS on providing access network information for charging | Orange | CH8, IMSProtoc6 | S2-140323 | Revision of S2-140323. This response LS was noted. | Noted | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140419 | LS OUT | LS on UE requirements for PSAP callback | SA WG2 | TEI12 | S2-140136 | Revision of S2-140136. Approved | Approved | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140420 | CR | 23.002 CR0271R2: Missing PSS Server information | Telefon AB LM Ericsson | HTTP_SDS | S2-140146 | Revision of S2-140146. Approved | Approved | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140421 | CR | 23.060 CR1837R1: Clarify the APN selection when the user locates in HPLMN | ZTE | TEI12 | S2-140173 | Revision of S2-140173. This CR was agreed | Agreed | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140422 | LS OUT | [DRAFT] LS on system aspects for Small Cell Enhanceme | Huawei, Hisilicon | LTE_SC_enh_dualC | S2-140537 | S2-140134 | Revision of S2-140134. Revised to S2-140537. | Revised | |
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140423 | LS OUT | [Draft] Reply LS on interaction of oneM2M with Underlying Networks | NEC | MTCe | S2-140538 | S2-140135 | Revision of S2-140135. Revised to S2-140538. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140424 | CR | 23.682 CR0079R2: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140539 | S2-140147 | Revision of S2-140147. Revised to S2-140539. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140425 | CR | 23.060 CR1835R2: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140540 | S2-140148 | Revision of S2-140148. Revised to S2-140540. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140426 | CR | 23.401 CR2638R2: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140546 | S2-140149 | Revision of S2-140149. Revised to S2-140546. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140427 | CR | 23.401 CR2646R2: Clarification and Optimisation for UE Power Saving Mode | InterDigital | MTCe-UEPCOP | S2-140150 | Revision of S2-140150. Noted | Noted | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140428 | CR | 23.060 CR1838R2: Clarification and Optimisation for MS Power Saving Mode | InterDigital | MTCe-UEPCOP | S2-140151 | Revision of S2-140151. Noted | Noted | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140429 | CR | 23.682 CR0081R2: Clarification on Power Saving Mode handling | LG Electronics | MTCe-UEPCOP | S2-140152 | Revision of S2-140152. Noted | Noted | ||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140430 | LS OUT | LS response on Roaming Forwarding of signalling for CS fall back | Huawei. Hisilicon | SAES-CSFB | S2-140529 | S2-140144 | Revision of S2-140144. Revised to S2-140529. | Revised | |
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140431 | CR | 23.401 CR2641R2: Fix downlink message delivery failure due to crash with mobility event | ZTE | TEI11, SAES | S2-140145 | Revision of S2-140145.. This CR was agreed | Agreed | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140432 | CR | 23.272 CR0916R1: Supporting priority services in 1xCSFB | Samsung, KDDI, Sprint, Applied Communication Sciences, Office of Emergency Com. | TEI10 | S2-140530 | S2-140163 | Revision of S2-140163. Revised to S2-140530. | Revised | |
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140433 | P-CR | Proposed way forward for EPC-assisted direct discovery | InterDigital Communications, LG Electronics, HTC | ProSe | S2-140226 | Revision of S2-140226. Noted | Noted | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140434 | P-CR | USD delivery for idle UEs in areas with pre-established eMBMS bearers | Motorola Solutions | GCSE_LTE | S2-140236 | Revision of S2-140236. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140435 | P-CR | Roaming and USD | NSN | GCSE_LTE | S2-140241 | Revision of S2-140241. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140436 | P-CR | Enhancements to Geographical scope | Qualcomm Inc | GCSE_LTE | S2-140506 | S2-140255 | Revision of S2-140255. Revised to S2-140506. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140437 | P-CR | GC2 Interface | NSN | GCSE_LTE | S2-140490 | S2-140243 | Revision of S2-140243. Revised to S2-140490. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140438 | P-CR | Clarification on the relationships between groups, flows and bearers | Motorola Solutions | GCSE_LTE | S2-140235 | Revision of S2-140235. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140439 | P-CR | Group Management for GCSE, part 2 | NSN | GCSE_LTE | S2-140491 | S2-140240 | Revision of S2-140240. Revised to S2-140491. | Revised | |
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140440 | P-CR | ProSe Architecture Solutions | Ericsson, NSN | ProSe | S2-140109 | Revision of S2-140109. Approved | Approved | ||
Erik | Y | JM2 | JM-SA2-SA3-2 (ProSe, GCSE_LTE) | S2-140441 | DISCUSSION | GCSE_LTE JM-SA WG2-SA WG3-2. SA WG2 current status | NSN (Rapporteur) | GCSE_LTE | Not Handled | Not Handled | |||
Erik | Y | JM2 | JM-SA2-SA3-2 (ProSe, GCSE_LTE) | S2-140442 | DISCUSSION | ProSe status. SA WG2-SA WG3 JM | Qualcomm Inc. (Rapporteur) | GCSE_LTE | Noted | Noted | |||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140443 | DISCUSSION | On Discovery Message size | Alcatel-Lucent | - | S2-140493 | Revised to S2-140493. | Revised | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140444 | P-CR | Many to many GC2 interface | Vodafone | GCSE_LTE | S2-140508 | S2-140306 | Revision of S2-140306. Revised to S2-140508. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140445 | P-CR | Handling when the multicast service not available | Huawei, Hisilicon | GCSE_LTE | S2-140488 | S2-140077 | Revision of S2-140077. Revised to S2-140488. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140446 | LS OUT | [DRAFT] LS on error handling in eMBMS | SA WG2 | GCSE_LTE | S2-140489 | - | Revised to S2-140489. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140447 | P-CR | Generic Pre-established MBMS bearer for GCSE | NSN | GCSE_LTE | S2-140507 | S2-140245 | Revision of S2-140245. Revised to S2-140507. | Revised | |
Ivano | Y | 5.2 | SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc., SAPP, QoS_SSL, SIRIG | S2-140448 | LS OUT | Reply LS on granularity of the total allowed usage | SA WG2 | - | S2-140369 | Revision of S2-140369.. Approved | Approved | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140449 | LS OUT | Draft reply to LS on Next hop policy rule use case accepted into WT-300 | SA WG2 | P4C-F | S2-140119 | Revision of S2-140119. Agreed in parallel sessions.. Approved | Approved | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140450 | LS OUT | Response LS to CT WG1 on 'merging ForServiceBased and ForFlowBased ISRP flow distribution containers' | Motorola Mobility | TEI12 | S2-140117 | Revision of S2-140117. Agreed in parallel sessions.. Approved | Approved | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140451 | LS OUT | Reply to LS on status of WT-291 work and request of feedback on S2a tunnel setup failure scenario | SA WG2 | P4C-TI | S2-140116 | Revision of S2-140116. Agreed in parallel sessions.. Approved | Approved | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140452 | CR | 23.402 CR1238R2: Clarification on WLAN Selection based on WLANSP | Motorola Mobility | WLAN_NS | S2-140361 | Revision of S2-140361. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140453 | CR | 23.402 CR1224R2: Corrections for ISMP restricted rule | Huawei, Hisilicon | TEI12, WLAN_NS | S2-140362 | Revision of S2-140362. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140454 | CR | 23.402 CR1236R2: Adding a condition for selecting 3GPP RPLMN as the most preferred service provider over WLAN access | CATT | WLAN_NS | S2-140402 | Revision of S2-140402. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140455 | CR | 23.402 CR1230R2: Removing Source IP address/port from ISRP and IARP | NSN, Nokia | OPIIS, TEI12 | S2-140477 | S2-140400 | Revision of S2-140400. Revised to S2-140477. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140456 | LS OUT | [DRAFT] LS on removing source IP port from ISPR and IARP | SA WG2 | - | S2-140478 | Revised to S2-140478. | Revised | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140457 | CR | 23.203 CR0864R2: Corrections for TDF functionality and for event triggers and re-authorization triggers definitions | Allot Communications | CNO_ULI | S2-140128 | Revision of S2-140128. Agreed in parallel sessions. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140458 | CR | 23.401 CR2635R2: Corrections for presence reporting area based location reporting | Huawei, Hisilicon | CNO_ULI | S2-140130 | Revision of S2-140130. Agreed in parallel sessions. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140459 | CR | 23.203 CR0875R2: Corrections of PRA information at initial interactions with PCRF and OCS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CNO_ULI, TEI12 | S2-140129 | Revision of S2-140129. Agreed in parallel sessions. This CR was agreed | Agreed | ||
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140460 | CR | 23.402 CR1242R2: Access Network information reporting in case of a TWAN Access | Orange | NetLoc_TWAN | S2-140374 | Revision of S2-140374. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.8 | Network provided Location information for IMS Trusted WLAN Access Network (TWAN) case (NETLOC_TWAN) | S2-140461 | CR | 23.402 CR1223R3: Consistency of 23.402 16 with 23.203 / 33.107 / 29.274 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Netloc_TWAN | S2-140405 | Revision of S2-140405. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140462 | CR | 23.402 CR1237R4: WLCP over UDP | ZTE, LG Electronics, Samsung, Broadcom Corporation, KDDI? | eSaMOG | S2-140464 | S2-140409 | Revision of S2-140409. Revised in parallel sessions to S2-140464. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140463 | CR | 23.402 CR1226R2: Corrections for Initial attach and handover attach call flows for single-connection | Huawei, Hisilicon | eSaMOG | S2-140392 | Revision of S2-140392. Agreed in parallel sessions.. This CR was agreed | Agreed | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140464 | CR | 23.402 CR1237R5: WLCP over UDP | ZTE, LG Electronics, Samsung, Broadcom Corporation, KDDI, Huawei | eSaMOG | S2-140462 | Revision of S2-140462.. This CR was agreed | Agreed | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140465 | LS OUT | [DRAFT] LS to SA WG3 on WLCP security aspects | SA WG2 | eSaMOG | S2-140550 | S2-140410 | Revision of S2-140410. Revised to S2-140550. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140466 | LS OUT | Response to LS on Publication of GSMA's Recommendations for Minimum Wi-Fi Capabilities of Terminals, Version 2.0 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | TEI12 | S2-140473 | S2-140118 | Revision of S2-140118. Revised to S2-140473. | Revised | |
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140467 | LS OUT | LS Reply on providing parameters to TDF | Allot Communications | ABC | S2-140120 | Revision of S2-140120. Approved | Approved | ||
Erik | Y | JM1 | JM-SA2-SA3-1 (IMS_WebRTC) | S2-140468 | REPORT | Notes for SA WG2 - SA WG3 JM1 | SA WG2 Chairman | IMS_WebRTC | Noted | Noted | |||
Erik | Y | 6.2.4 | Configuration and Capability Handling | S2-140469 | P-CR | Conclusion section on configuration | NEC | ProSe | S2-140501 | S2-140321 | Revision of S2-140321. Revised to S2-140501. | Revised | |
Erik | Y | 6.2.5 | Charging Aspects | S2-140470 | LS OUT | [DRAFT] LS on ProSe charging | SA WG2 | ProSe | S2-140519 | S2-140087 | Revision of S2-140087. Revised to S2-140519. | Revised | |
Erik | Y | 6.2.4 | Configuration and Capability Handling | S2-140471 | P-CR | Prose and GCSE, one-to-many | NSN | ProSe, GCSE_LTE | S2-140244 | Revision of S2-140244. Approved | Approved | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140472 | LS OUT | LS on Gy interface for EPC Roaming LBO scenario | SA WG2 | - | S2-140370 | Revision of S2-140370. Approved | Approved | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140473 | LS OUT | LS on Publication of GSMA's Recommendations for Minimum Wi-Fi Capabilities of Terminals, Version 2.0 | SA WG2 | TEI12 | S2-140553 | S2-140466 | Revision of S2-140466. Revised to S2-140553. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140474 | LS OUT | [DRAFT] LS on Maintenance of I-WLAN Solution | SA WG2 | TEI12 | S2-140554 | S2-140359 | Revision of S2-140359. Revised to S2-140554. | Revised | |
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140475 | CR | 23.060 CR1829R3: Addition of a note addressing the behavior of network side during inter-RAT 3GPP PS Handover | Huawei, Hisilicon | WORM | S2-140399 | Revision of S2-140399. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140476 | CR | 23.401 CR2636R2: Delayed release of UE IP address during inter-RAT 3GPP PS Handover | Huawei, Hisilicon | WORM | S2-140398 | Revision of S2-140398. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140477 | CR | 23.402 CR1230R3: Removing Source IP address/port from ISRP and IARP | NSN, Nokia | OPIIS, TEI12 | S2-140455 | Revision of S2-140455. This CR was agreed | Agreed | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140478 | LS OUT | LS on removing source IP port from ISPR and IARP | SA WG2 | - | S2-140456 | Revision of S2-140456. Approved | Approved | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140479 | CR | 23.402 CR1241R2: Corrections of eSaMOG Initial Attach | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei | eSaMOG | S2-140393 | Revision of S2-140393. This CR was agreed | Agreed | ||
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140480 | CR | 23.402 CR1231R2: Link model related eSaMOG corrections | NSN, Nokia | eSaMOG | S2-140394 | Revision of S2-140394. This CR was agreed | Agreed | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140481 | CR | 23.228 CR1058R6: IMS_WebRTC architecture and procedures | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN, Broadcom Corporation | IMS_WebRTC | S2-140549 | Revision of S2-140549. This CR was agreed | Agreed | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140482 | CR | 23.272 CR0923R1: Correction of CSFB priority and eMLPP handling | Huawei, HiSilicon, NSN | eMPS | S2-140312 | Revision of S2-140312. WITHDRAWN | Withdrawn | ||
Frank | N | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140483 | CR | 23.272 CR0924R1: Correction of CSFB priority and eMLPP handling | Huawei, HiSilicon, NSN | eMPS | S2-140313 | Revision of S2-140313. WITHDRAWN | Withdrawn | ||
Frank | N | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140484 | CR | 23.272 CR0925R1: Correction of CSFB priority and eMLPP handling | Huawei, HiSilicon, NSN | eMPS | S2-140314 | Revision of S2-140314. WITHDRAWN | Withdrawn | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140485 | CR | 23.272 CR0917R1: Supporting priority services in 1xCSFB | Samsung, KDDI, Sprint, Applied Communication Sciences, Office of Emergency Com. | TEI10 | S2-140531 | S2-140164 | Revision of S2-140164. Revised to S2-140531. | Revised | |
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140486 | CR | 23.272 CR0918R1: Supporting priority services in 1xCSFB | Samsung, KDDI, Sprint, Applied Communication Sciences, Office of Emergency Com. | TEI10 | S2-140532 | S2-140165 | Revision of S2-140165. Revised to S2-140532. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140487 | P-CR | GC Priority and Pre-emption | ZTE, CATR | GCSE_LTE | S2-140505 | S2-140381 | Revision of S2-140381. Revised to S2-140505. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140488 | P-CR | Handling when the multicast service not available | Huawei, Hisilicon | GCSE_LTE | S2-140445 | Revision of S2-140445. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140489 | LS OUT | [DRAFT] LS on error handling in eMBMS | SA WG2 | GCSE_LTE | S2-140526 | S2-140446 | - | Revision of S2-140446. Revised to S2-140526. | Revised |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140490 | P-CR | GC2 Interface | NSN | GCSE_LTE | S2-140437 | Revision of S2-140437. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140491 | P-CR | Group Management for GCSE, part 2 | NSN | GCSE_LTE | S2-140527 | S2-140439 | Revision of S2-140439. Revised to S2-140527. | Revised | |
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140492 | LS OUT | [DRAFT] LS reply on discovery message size | SA WG2 | ProSe | S2-140544 | S2-140412 | Revision of S2-140412. Revised to S2-140544. | Revised | |
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140493 | DISCUSSION | On Discovery Message size | Alcatel-Lucent | - | S2-140443 | Revision of S2-140443. This should be discussed and used for the production of the LS in S2-140492. This presentation was then noted. | Noted | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140494 | LS OUT | Reply LS on ProSe Lawful Interception | SA WG2 | ProSe | S2-140352 | Revision of S2-140352. Approved | Approved | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140495 | P-CR | Scope for TS 23.303 | Qualcomm Incorporated | ProSe | S2-140353 | Revision of S2-140353. Approved | Approved | ||
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140496 | P-CR | Update for the evaluation of 'Direct one-to-many communication decentralized mode | Ericsson | ProSe | S2-140543 | S2-140357 | Revision of S2-140357. Revised to S2-140543. | Revised | |
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140497 | P-CR | Direct communication one-to-many (decentralised mode) procedures | Qualcomm Incorporated | ProSe | S2-140518 | S2-140358 | Revision of S2-140358. Revised to S2-140518. | Revised | |
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140498 | WID | New WID on improvements to CS/PS coordination in UTRAN/GERAN Shared | Ericsson | - | S2-140528 | S2-140334 | Revision of S2-140334. Revised to S2-140528. | Revised | |
Erik | Y | 6.2.2 | UE to NW Relay | S2-140499 | P-CR | Multicast using ProSe UE to Network Relays. | Vodafone | ProSe | S2-140382 | Revision of S2-140382. Approved | Approved | ||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140500 | P-CR | Discussion on UE-to-network relay | Huawei, Hisilicon | ProSe | S2-140547 | S2-140383 | Revision of S2-140383. Revised to S2-140547. | Revised | |
Erik | N | 6.2.4 | Configuration and Capability Handling | S2-140501 | P-CR | Conclusion section on configuration | NEC | ProSe | S2-140469 | Revision of S2-140469. Approved | Approved | ||
Erik | N | 6.2.6 | ProSe Identities (for Communication and Discovery) | S2-140502 | P-CR | Update for the evaluation of 'Summary of solutions for allocation of identities for network-authorised direct discovery' | Ericsson, CATT | ProSe | S2-140355 | Revision of S2-140355. WITHDRAWN | Withdrawn | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140503 | P-CR | Updates to Solutions 1 and 2 in GCSE TR 23.768 following response LS from RAN in S2-140050 | Vodafone | GCSE_LTE | S2-140348 | Revision of S2-140348. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140504 | LS OUT | [DRAFT] LS Response on Applicability of MI-MooD to GCSE | SA WG2 | GCSE_LTE and MI-MooD | S2-140522 | S2-140349 | - | Revision of S2-140349. Revised to S2-140522. | Revised |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140505 | P-CR | GC Priority and Pre-emption | ZTE, CATR | GCSE_LTE | S2-140517 | S2-140487 | Revision of S2-140487. Revised to S2-140517. | Revised | |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140506 | P-CR | Enhancements to Geographical scope | Qualcomm Inc | GCSE_LTE | S2-140436 | Revision of S2-140436. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140507 | P-CR | Generic Pre-established MBMS bearer for GCSE | NSN | GCSE_LTE | S2-140447 | Revision of S2-140447. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140508 | P-CR | Many to many GC2 interface | Vodafone | GCSE_LTE | S2-140444 | Revision of S2-140444. Approved | Approved | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140509 | P-CR | Direct discovery procedures | Qualcomm Incorporated | ProSe | S2-140520 | S2-140356 | Revision of S2-140356. Revised to S2-140520. | Revised | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140510 | LS OUT | Reply to Wi-Fi Alliance on LS on Signaling Optimization | SA WG2 | - | S2-140343 | - | Revision of S2-140343. Approved | Approved | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140511 | LS OUT | Reply LS on the UE capabilities regarding support of simultaneous MBMS bearers | SA WG2 | MI-EMO | S2-140344 | - | Response to S2-140036 and S2-140044. Revision of S2-140344. Approved | Approved | |
Erik | Y | 4 | General issues and Incoming LSs | S2-140512 | LS OUT | [DRAFT] Reply LS on new work item on 'IMS support for RTP / RTCP transport multiplexing' | SA WG2 | RTCP_MUX | S2-140542 | S2-140345 | - | Revision of S2-140345. Revised to S2-140542 | Revised |
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140513 | WID | Updated WID: 'User plane congestion management requirements (UPCON)' | Verizon, KDDI, AT&T, Sprint, Softbank Mobile, Orange, Telecom Italia, NTT DoCoMo, China Telecom, China Mobile | S2-140346 | Revision of S2-140346. Approved | Approved | |||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140514 | LS OUT | [DRAFT] LS on LS on solutions for the failure of CONF service after eSRVCC | SA WG2 | TEI12, eSRVCC | S2-140570 | S2-140142 | Revision of S2-140142. Revised to S2-140570. | Revised | |
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140515 | CR | 23.292 CR0202R2: ICS Indicator to support MSC not enhanced for ICS | Ericsson | TEI11, ICSRA | S2-140138 | Revision of S2-140138. This CR was agreed | Agreed | ||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140516 | CR | 23.292 CR0203R2: ICS Indicator to support MSC not enhanced for ICS | Ericsson | TEI11, ICSRA | S2-140139 | Revision of S2-140139. This CR was agreed | Agreed | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140517 | P-CR | GC Priority and Pre-emption | ZTE, CATR | GCSE_LTE | S2-140524 | S2-140505 | Revision of S2-140505. Revised to S2-140524. | Revised | |
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140518 | P-CR | Direct communication one-to-many (decentralised mode) procedures | Qualcomm Incorporated | ProSe | S2-140545 | S2-140497 | Revision of S2-140497. Revised to S2-140545. | Revised | |
Erik | Y | 6.2.5 | Charging Aspects | S2-140519 | LS OUT | LS on ProSe charging | SA WG2 | ProSe | S2-140470 | Revision of S2-140470. Approved | Approved | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140520 | P-CR | Direct discovery procedures | Qualcomm Incorporated | ProSe | S2-140509 | Revision of S2-140509. Approved | Approved | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140521 | LS OUT | [DRAFT] LS on ProSe Discovery | SA WG2 | ProSe | S2-140560 | S2-140387 | - | Revision of S2-140387. Revised to S2-140560. | Revised |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140522 | LS OUT | LS Response on Applicability of MI-MooD to GCSE | SA WG2 | GCSE_LTE and MI-MooD | S2-140504 | - | Revision of S2-140504. Approved | Approved | |
Erik | Y | 6.2.8 | ProSe EPC-level Discovery | S2-140523 | P-CR | Updates to Annex I Section 5.x.5 | ITRI | ProSe | S2-140385 | Revision of S2-140385. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140524 | P-CR | GC Priority and Pre-emption | ZTE, CATR | GCSE_LTE | S2-140517 | Revision of S2-140517. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140525 | P-CR | Clarifications on the handling of priorities/pre-emption of group communications | Motorola Solutions | GCSE_LTE | S2-140237 | Revision of S2-140237. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140526 | LS OUT | [DRAFT] LS on error handling in eMBMS | SA WG2 | GCSE_LTE | S2-140563 | S2-140489 | - | Revision of S2-140489. Revised to S2-140563. | Revised |
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140527 | P-CR | Group Management for GCSE, part 2 | NSN | GCSE_LTE | S2-140491 | Revision of S2-140491. Approved | Approved | ||
Erik | Y | 8.1 | New and Revised Work Items, Cover sheets for completed work items | S2-140528 | WID | New WID on improvements to CS/PS coordination in UTRAN/GERAN Shared | Ericsson | - | S2-140498 | Revision of S2-140498. Approved | Approved | ||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140529 | LS OUT | LS response on Roaming Forwarding of signalling for CS fall back | Huawei. Hisilicon | SAES-CSFB | S2-140564 | S2-140430 | Revision of S2-140430. Revised to S2-140564. | Revised | |
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140530 | CR | 23.272 CR0916R2: Supporting priority services in 1xCSFB | Samsung, KDDI, Sprint, Applied Communication Sciences, Office of Emergency Com. | TEI10 | S2-140432 | Revision of S2-140432. This CR was agreed | Agreed | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140531 | CR | 23.272 CR0917R2: Supporting priority services in 1xCSFB | Samsung, KDDI, Sprint, Applied Communication Sciences, Office of Emergency Com. | TEI10, SAES-CSFB | S2-140485 | Revision of S2-140485. This CR was agreed | Agreed | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140532 | CR | 23.272 CR0918R2: Supporting priority services in 1xCSFB | Samsung, KDDI, Sprint, Applied Communication Sciences, Office of Emergency Com. | TEI10, SAES-CSFB | S2-140486 | Revision of S2-140486. This CR was agreed | Agreed | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140533 | LS OUT | Reply LS on CSFB priority call handling in a network supporting Multimedia Priority Service | SA WG2 | - | S2-140137 | Revision of S2-140137. Approved | Approved | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140534 | CR | 23.167 CR0257R1: Non UE detected emergency call correction when the retry attempt is made in CS domain | Deutsche Telekom, Telecom Italia, Orange | IMS_EMER_GPRS_EPS | S2-140057 | Revision of S2-140057. This CR was agreed | Agreed | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140535 | CR | 23.167 CR0258R1: Non UE detected emergency call correction when the retry attempt is made in CS domain | Deutsche Telekom, Telecom Italia, Orange | IMS_EMER_GPRS_EPS | S2-140058 | Revision of S2-140058. This CR was agreed | Agreed | ||
Frank | Y | 5.4 | Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g. Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC | S2-140536 | CR | 23.167 CR0259R1: Non UE detected emergency call correction when the retry attempt is made in CS domain | Deutsche Telekom, Telecom Italia, Orange | IMS_EMER_GPRS_EPS | S2-140059 | Revision of S2-140059. This CR was agreed | Agreed | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140537 | LS OUT | LS on system aspects for Small Cell Enhanceme | Huawei, Hisilicon | LTE_SC_enh_dualC | S2-140422 | Revision of S2-140422. Approved | Approved | ||
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140538 | LS OUT | [Draft] Reply LS on interaction of oneM2M with Underlying Networks | SA WG2 | MTCe | S2-140565 | S2-140423 | Revision of S2-140423. Revised to S2-140565. | Revised | |
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140539 | CR | 23.682 CR0079R3: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140424 | Revision of S2-140424. This CR was agreed | Agreed | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140540 | CR | 23.060 CR1835R3: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140425 | Revision of S2-140425. This CR was agreed | Agreed | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140541 | CR | 23.401 CR2634R2: Corrections for the PGW pause of charging functionality | Huawei, Hisilicon | TEI12 | S2-140416 | Revision of S2-140416. This CR was agreed | Agreed | ||
Erik | Y | 4 | General issues and Incoming LSs | S2-140542 | LS OUT | Reply LS on new work item on 'IMS support for RTP / RTCP transport multiplexing' | SA WG2 | RTCP_MUX | S2-140512 | - | Revision of S2-140512. Approved | Approved | |
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140543 | P-CR | Update for the evaluation of 'Direct one-to-many communication decentralized mode | Ericsson | ProSe | S2-140496 | Revision of S2-140496. Approved | Approved | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140544 | LS OUT | [DRAFT] LS reply on discovery message size | SA WG2 | ProSe | S2-140566 | S2-140492 | Revision of S2-140492. Revised to S2-140566. | Revised | |
Erik | Y | 6.2.1 | Direct 1:many Communication | S2-140545 | P-CR | Direct communication one-to-many (decentralised mode) procedures | Qualcomm Incorporated | ProSe | S2-140518 | Revision of S2-140518. Approved | Approved | ||
Frank | Y | 6.1.1 | LIMONET, MTCe-SDDTE and MTCe-UEPCOP, CNO, CNO_ULI | S2-140546 | CR | 23.401 CR2638R3: Power Saving Mode applicability | Ericsson | MTCe-UEPCOP | S2-140426 | Revision of S2-140426. This CR was agreed | Agreed | ||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140547 | P-CR | Discussion on UE-to-network relay | Huawei, Hisilicon | ProSe | S2-140500 | Revision of S2-140500. Approved | Approved | ||
Erik | Y | 6.2.2 | UE to NW Relay | S2-140548 | P-CR | Way forward on ProSe UE-to-Network Relays | Qualcomm Incorporated | ProSe | S2-140567 | S2-140384 | Revision of S2-140384. Revised to S2-140567. | Revised | |
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140549 | CR | 23.228 CR1058R5: IMS_WebRTC architecture and procedures | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN, Broadcom Corporation | IMS_WebRTC | S2-140481 | S2-140403 | Revision of S2-140403. Revised to S2-140481. | Revised | |
Ivano | Y | 6.7 | S2a Mobility based On GTP and WLAN access to EPC (eSaMOG) | S2-140550 | LS OUT | LS to SA WG3 on WLCP security aspects | SA WG2 | eSaMOG | S2-140465 | Revision of S2-140465. Approved | Approved | ||
Ivano | Y | 6.1.2 | PCC/QoS Aspects: UMONC, ABC | S2-140551 | CR | 23.203 CR0869R2: Architecture figure update for ABC | ZTE, Allot communications | ABC | S2-140376 | Revision of S2-140376. This CR was agreed | Agreed | ||
Ivano | Y | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140552 | LS OUT | LS on security aspects of IMS_webRTC | SA WG2 | IMS_WebRTC | S2-140408 | Revision of S2-140408. Approved | Approved | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140553 | LS OUT | LS on Publication of GSMA's Recommendations for Minimum Wi-Fi Capabilities of Terminals, Version 2.0 | SA WG2 | TEI12 | S2-140473 | Revision of S2-140473. Approved | Approved | ||
Ivano | Y | 6.1.3 | Non-3GPP Packet Access Maintenance: OPIIS, P4C-F, WLAN_NS , WORM | S2-140554 | LS OUT | LS on Maintenance of I-WLAN Solution | SA WG2 | TEI12 | S2-140474 | Revision of S2-140474. Approved | Approved | ||
Ivano | N | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140555 | NOT USED | Reserved for Ivano's parallel sessions | - | - | WITHDRAWN | Withdrawn | |||
Ivano | N | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140556 | NOT USED | Reserved for Ivano's parallel sessions | - | - | WITHDRAWN | Withdrawn | |||
Ivano | N | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140557 | NOT USED | Reserved for Ivano's parallel sessions | - | - | WITHDRAWN | Withdrawn | |||
Ivano | N | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140558 | NOT USED | Reserved for Ivano's parallel sessions | - | - | WITHDRAWN | Withdrawn | |||
Ivano | N | 6.5 | Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) | S2-140559 | NOT USED | Reserved for Ivano's parallel sessions | - | - | WITHDRAWN | Withdrawn | |||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140560 | LS OUT | LS on ProSe Discovery | SA WG2 | ProSe | S2-140521 | - | Revision of S2-140521. Approved | Approved | |
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140561 | P-CR | ProSe direct discovery via Model B mechanism | Huawei, Hisilicon | ProSe | S2-140388 | Revision of S2-140388. Approved | Approved | ||
Erik | Y | 6.2.7 | ProSe Direct E-UTRA Discovery | S2-140562 | P-CR | Update of Solution D1: Support of different discovery modes | Qualcomm Incorporated | ProSe | S2-140389 | Revision of S2-140389. Approved | Approved | ||
Erik | Y | 6.3 | Group Communication System Enablers for LTE (GCSE_LTE) | S2-140563 | LS OUT | LS on error handling in eMBMS | SA WG2 | GCSE_LTE | S2-140526 | - | Revision of S2-140526. Approved | Approved | |
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140564 | LS OUT | LS response on Roaming Forwarding of signalling for CS fall back | Huawei. Hisilicon | SAES-CSFB | S2-140569 | S2-140529 | Revision of S2-140529. Revised to S2-140569. | Revised | |
Frank | Y | 6.0 | LS Handling for LS on interactions of oneM2M with Underlying Networks and LS on Small Cell Enhancement | S2-140565 | LS OUT | Reply LS on interaction of oneM2M with Underlying Networks | SA WG2 | MTCe | S2-140538 | Revision of S2-140538. Approved | Approved | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140566 | LS OUT | LS reply on discovery message size | SA WG2 | ProSe / FS_LTE_D2D_Prox | S2-140568 | S2-140544 | Revision of S2-140544. Revised to S2-140568. | Revised | |
Erik | Y | 6.2.2 | UE to NW Relay | S2-140567 | P-CR | Way forward on ProSe UE-to-Network Relays | Qualcomm Incorporated | ProSe | S2-140548 | Revision of S2-140548. Approved | Approved | ||
Erik | Y | 6.2.0 | General (Incoming LSs, TS skeleton, etc.) | S2-140568 | LS OUT | LS reply on discovery message size | SA WG2 | ProSe / FS_LTE_D2D_Prox | S2-140566 | Revision of S2-140566. Approved | Approved | ||
Frank | Y | 5.1 | SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, FULL_MOCN-GERAN; GWCN_GERAN | S2-140569 | LS OUT | LS response on Roaming Forwarding of signalling for CS fall back | SA WG2 | SAES-CSFB | S2-140564 | Revision of S2-140564. Approved | Approved | ||
Frank | Y | 5.5 | IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) | S2-140570 | LS OUT | LS on LS on solutions for the failure of CONF service after eSRVCC | SA WG2 | TEI12, eSRVCC | S2-140514 | Revision of S2-140514. Approved | Approved | ||
_Not On Agenda | Y | 8.2 | Review of the Work Plan | S2-140571 | WORK PLAN | Work Plan Update Template for SA#63 | SA WG2 Chairman | - | S2-140199 | Revision of S2-140199. Endorsed and noted. | Endorsed and noted | ||
Erik | Y | 8.3 | Planning future meetings | S2-140572 | DISCUSSION | Plan for SA WG2 101bis | SA WG2 Chairman | - | S2-140198 | Revision of S2-140198. Endorsed and noted. | Endorsed and noted. |
Created: 2014-01-27 15:40     END OF LIST
Last Allocated Document: S2-140572