Chairman's notes

 

IPR call reminder:

“I draw your attention to your obligations under the 3GPP Partner Organizations’ IPR policies. Every Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a member any IPR owned by the Individual Member or any other organization which is or is likely to become essential to the work of 3GPP.

Delegates are asked to take note that they are thereby invited:

  • to investigate whether their organization or any other organization owns IPRs which are, or are likely to become Essential in respect of the work of 3GPP.
  • to notify their respective Organizational Partners of all potential IPRs, e.g., for ETSI, by means of the IPR Information Statement and the Licensing declaration forms"

 

Antitrust policy Reminder:

“I also draw your attention to the fact that 3GPP activities are subject to all applicable antitrust and competition laws and that compliance with said laws is therefore required of any participant of this TSG/WG meeting including the Chairman and Vice Chairman. In case of question I recommend that you contact your legal counsel.

The leadership shall conduct the present meeting with impartiality and in the interests of 3GPP.

Furthermore, I would like to remind you that timely submission of work items in advance of TSG/WG meetings is important to allow for full and fair consideration of such matters.”

 

 

List for Meeting: All Sessions
Temporary Documents List - Ordered by Agenda Item
AI TD# Type Doc For Subject Source Rel Comments e-mail_Discussion Result
0 - - - All Agenda Items - - Docs:=0 -
0.1 - - - Executive Summary - - Docs:=0 -
1 - - - Opening of the Meeting - - Docs:=0 -
1.1 - - - Welcome Speech - - Docs:=0 -
1.2 - - - Introduction - - Docs:=0 -
1.3 - - - IPR & Antitrust reminders - - Docs:=0 -
1.4 - - - Approval of Agenda - - Docs:=1 -
1.4 SP-221003 AGENDA Approval Agenda & Procedures & Time Schedule for TSG SA#98-e TSG SA Chair CC#1: The agenda was approved. Approved
1.5 - - - Report from previous TSG SA meetings - - Docs:=1 -
1.5 SP-221004 REPORT Approval Draft report of TSG SA meeting #97-e TSG SA Secretary CC#1 The report was approved. Approved
1.6 - - - Reports from TSG SA ad-hoc meetings and workshops - - Docs:=0 -
2 - - - Liaisons Statements - - Docs:=0 -
2.1 - - - Incoming LSs - proposed to note - - Docs:=17 -
2.1 - - - Block 1 (to note) - - Docs:=17 -
2.1 SP-221006 LS In Information LS from 5G ACIA: 5G Edge Computing Use Cases & Requirements 5G ACIA (2022_09_06_LS_004) CC#3: Block noted Noted
2.1 SP-221007 LS In Action LS from IETF LPWAN WG: Liaison statement from the IETF LPWAN WG to 3GPP IETF LPWAN WG (LS_from_IETF_1796) CC#3: Block noted Noted
2.1 SP-221009 LS In Information LS from GSMA OPAG: 3GPP TR 23.700-98 V1.2.0 Analysis GSMA OPAG (OPAG_41_Doc_04) CC#3: Block noted Noted
2.1 SP-221023 LS In Information LS from SA WG6: LS on Reply LS on 3GPP TR 23.700-98 V1.2.0 Analysis SA WG6 (S6-223613) Rel-18 CC#3: Block noted Noted
2.1 SP-221011 LS In Information LS from GSMA OPG: LS reply to 3GPP SA2 on shared EHE and HR PDU session with SBO in V-PLMN GSMA OPG (OPG_112_Doc_03) CC#3: Block noted Noted
2.1 SP-221012 LS In Information LS from ITU-R WP5D: DEVELOPMENT OF A NEW REPORT ITU-R M.[IMT.MULTIMEDIA] Capabilities of the terrestrial component of IMT-2020 for multimedia communications ITU-R WP5D (R19-WP5D-221010-TD-0746) CC#3: Block noted Noted
2.1 SP-221013 LS In Information LS from ITU-T SG3: LS/r on feedback to ITU-T SG 3 regarding the Technical Report on IMT2020-Related Policy Considering MVNOs under development in Question 3 of SG3 ITU-T SG3 (SG3-LS14) CC#3: Block noted Noted
2.1 SP-221015 LS In Information LS from SA WG2: Reply LS on the scope of resource efficiency for MBS reception in RAN sharing scenario SA WG2 (S2-2211171) Rel-18 CC#3: Block noted Noted
2.1 SP-221018 LS In Information LS from SA WG5: Reply LS on possibility of providing per UE speed and orientation on FS_eNA_Ph3 SA WG5 (S5-226547) Rel-18 CC#3: Block noted Noted
2.1 SP-221019 LS In Information LS from SA WG5: LS reply to GSMA on LS on customer acceptance of limited QoS degradation to save energy in the network SA WG5 (S5-227038) Rel-18 CC#3: Block noted Noted
2.1 SP-221020 LS In Information LS from SA WG6: Reply LS on Re-use of CAPIF by ETSI MEC SA WG6 (S6-223027) Rel-18 CC#3: Block noted Noted
2.1 SP-221021 LS In Information LS from SA WG6: Reply LS on Clarification of Edge Node Sharing SA WG6 (S6-223506) Rel-18 CC#3: Block noted Noted
2.1 SP-221024 LS In Information LS from ITU-T Working Party 1/13: LS on the initiation of the new work item Y.AN-Arch-fw: 'Architecture Framework for Autonomous Networks' ITU-T Working Party 1/13 (SG13-LS37) CC#3: Block noted Noted
2.1 SP-221025 LS In Information CAPIF extensions requested by ETSI ISG MEC SA WG6 (S6-223628) Rel-18 CC#3: Block noted Noted
2.1 SP-221268 LS In Action LS from ITU-T JCA-IMT2020: LS on Invitation to update the information in the IMT-2020 and beyond roadmap ITU-T JCA-IMT2020 (JCA-IMT2020-O-025-LS12) CC#3: Block noted Noted
2.1 SP-221272 LS In Information LS from ITU-T SG13: LS on the new work item Y.Arch_NGNe_ncp 'Architectural evolution of NGN control plane by applying SDN technology' ITU-T SG13 (SG13-LS43) Revised to add attachment in SP-221283 Revised
2.1 SP-221283 LS In Information LS from ITU-T SG13: LS on the new work item Y.Arch_NGNe_ncp 'Architectural evolution of NGN control plane by applying SDN technology' ITU-T SG13 (SG13-LS43) CC#3: Block noted Noted
2.2 - - - Incoming LSs which need an outgoing LS - - Docs:=18 -
2.2 SP-221005 LS In Action LS from 5G ACIA: 5G capabilities exposure for factories of the future - identified gaps 5G ACIA (2022_09_06_5G-ACIA-LS_05) Response drafted in SP-221289. CC#1: Reply open. CC#3: Reply open. CC#4: Postponed. Addressed WGs were asked to provide responses to TSG SA. Huawei (Patrice) proposes to postpone this LS and its proposed reply in SP-221289 to the next meeting, to be able to provide a unified answer from the WGs in March.
Rainer (Nokia) is ok to postpone the LS.
Postponed
2.2 SP-221289 LS OUT Approval [DRAFT] Reply LS on 5G capabilities exposure for factories of the future identified gaps Huawei Technologies Rel-18 Response to SP-221005. CC#4: Postponed Haris (Qualcomm) proposes revision
Rainer (Nokia) agrees with Haris (Qualcomm), does not accept the reply LS as is.
Krister (Ericsson) are open to discuss a high level response from SA. In addition. it is clear that this is also very much related to SA3, which should be reflected in an LS response.
Huawei (Patrice) prefers to postpone both the incoming LS in SP-221005 and the proposed reply in SP-221289 (which will need to be updated based on the input from the WGs).
Postponed
2.2 SP-221027 LS In Action LS from 5GAA WG4, WG1, WG2: LS on QoS Sustainability analytics and V2X service adaptations 5GAA WG4, WG1, WG2 (5GAA_S-220077) Merged response provided in SP-221212. CC#1: Final response in SP-221320 Replied to
2.2 SP-221014 LS In Action Reply LS on QoS Sustainability analytics and V2X service adaptations SA WG1 (S1-223734) Rel-18 CC#1: A combined response was proposed in SP-221212.. CC#3: Noted Noted
2.2 SP-221016 LS In Action LS from SA WG2: Reply LS on QoS Sustainability analytics and V2X service adaptations SA WG2 (S2-2211411) Rel-18 CC#1: A combined response was proposed in SP-221212.. CC#3: Noted Noted
2.2 SP-221212 LS OUT Approval [DRAFT] Reply LS on QoS Sustainability analytics and V2X service adaptations Qualcomm, Oppo Rel-18 CC#3: _rev3 approved. Revised to SP-221320. Mehrdad (MediaTek Inc.) provides comments for SP-221212 and proposes a revision or alternatively to send the SA1 part of the LS back to SA1 for further discussion and alignment .
Yang (OPPO) provides rev1.
LaeYoung (LGE) provides editorial comment on rev1.
LaeYoung (LGE) provides editorial comment on rev2.
Haris (Qualcomm) provides rev2
Nokia provides comments on rev2.
Mehrdad (MediaTek Inc.) replies to Nokia.
Haris (Qualcomm) replies to Nokia
Yang (OPPO) replies
Krister (Ericsson) provides comments and supports that all text provided by SA1 and SA2 are maintained in the merged LS from SA.
Nokia is ok with keeping SA1 provided answer in the consolidated SA reply to 5GAA.
Samsung is ok with the SA1 text and suggests minor wording re-ordering.
Yang (OPPO) provides rev3
Revised
2.2 SP-221320 LS OUT Approval Reply LS on QoS Sustainability analytics and V2X service adaptations TSG SA Rel-18 Revision of SP-221212_rev3. Approved Approved
2.2 SP-221028 LS In Action LS from GSMA OPAG: Network federation interface for Telco edge consideration GSMA OPAG (OPAG_34_Doc_06) Resubmission of (noted) SP-220725. WG responses provided in SP-221017, SP-221022, SP-221026. Company response in SP-221271. CC#1: Reply open. CC#3: Final response in SP-221321 Replied to
2.2 SP-221017 LS In Action LS from SA WG3: Reply LS on Network federation interface for Telco edge consideration SA WG3 (S3-223914) Rel-18 Response drafted in SP-221271. CC#1: Noted Noted
2.2 SP-221022 LS In Action LS from SA WG6: Reply LS on Network federation interface for Telco edge consideration for a consolidated reply SA WG6 (S6-223553) Rel-18 CC#1: Noted Noted
2.2 SP-221026 LS In Action Reply LS to S5-226028 on Network federation interface for Telco edge consideration and proposals to answer GSMA LSs 5-226016 and S5-226017 from SA SA WG5 (S5-227039) Rel-18 CC#1: Noted Noted
2.2 SP-221271 LS OUT Approval [DRAFT] Reply LS on Network federation interface for Telco edge consideration Huawei Telecommunication India Rel-18 Response to SP-221028 and SP-221022. CC#3: _rev2 approved. Revised to SP-221321.
Alessio(Nokia) provides r01
Huawei asks for clarification for the need for providing the additional feedback - 'In addition, 3GPP considers that 'Edge Node Sharing' refers only to the case where compute resources are offered by the Partner OP to the Leading OP.' - from 3GPP to GSMA OPG and suggests not to add this additional feedback in the LS reply.
Alessio (nokia) still requests the added text
Huawei replies to Nokia and Ericsson and can live with Rev1.
Krister (Ericsson) would like to see the sentence on edge network sharing included in the LS response.
Revised
2.2 SP-221321 LS OUT Approval Reply LS on Network federation interface for Telco edge consideration TSG SA Rel-18 Revision of SP-221271_rev2. Approved Approved
2.2 SP-221010 LS In Information LS from GSMA OPG: LS on GSMA OPG PRDs publication GSMA OPG (OPG_111_Doc_03) CC#1: Noted Noted
2.2 SP-221008 LS In Information LS from ETSI ISG MEC: LS reply to GSMA OPAG on E/WBI ETSI ISG MEC (MEC(22)000430r2) CC#1: Noted Noted
2.2 SP-221302 LS In Action LS from 5G ACIA: Use Cases and requirements for industrial factory applications 5G ACIA (2022_12_09_LS_006) CC#1: Response drafted in SP-221303. CC#3: Final response in S2-221322 Replied to
2.2 SP-221303 LS OUT Approval [DRAFT] Reply LS to Use Cases and requirements for industrial factory applications Lenovo Created at CC#1. Response to SP-221302. CC#3: _rev1 approved. Revised to SP-221322. Dimitris (Lenovo) provides initial draft reply LS
LaeYoung (LGE) provides updated version to DRAFTS folder.
Dimitris (Lenovo) asks whether SA2/SA1 should be included in CC
Rainer (Nokia) provides revision.
LaeYoung (LGE) is fine to keep SA1/SA2 in the CC list and with the updates from Rainer (Nokia).
Rainer (Nokia) replies.
Dimitris (Lenovo) comments
Rainer (Nokia) prefers to keep SA1 in Cc.
Ling (Siemens) supports including SA1/SA2 in the CC list and provides an updated version.
Shuang (Huawei) clarifies Ling's (Siemens) update was not 100% accurate, suggest its removal.
We still prefer to keep SA1 out of CC list.
Rainer (Nokia) comments.
Dimitris (Lenovo) provides a further revision in the DRAFTS
Krister (Ericsson) can live with the last draft provided by Lenovo. As there is no action for the receivers in CC, we think SA1 can be included for information as well.
Shuang (Huawei) thanks everyone for the nice discussion that are needed. It is good to have shared view that no additional SA1 SI/WI is resulted from this LS/WI063@5G-ACIA, based on which I am ok to include SA1 in CC if majority of the companies prefer so.

Further, we are content with the rest of the content in the last revision from Lenovo. Thanks Dimitris for putting things together.
Rainer (Nokia) is of with latest version from Lenovo.
Ling (Siemens) provides comments.
Dimitris (Lenovo) provides a new revision to address Siemens comments
Shuang (Huawei) asks questions for clarification w.r.t. v2.
Krister (Ericsson) do not think we should start to add more text as proposed in ver2 and objects. We support previous version where we already converged on the text.
Haris (Qualcomm) proposes to approve rev2 or postpone
Dimitris (Lenovo) is ok with the suggestions proposed
Shuang (Huawei) share the same view.
LaeYoung (LGE) shares similar view with Ericsson, Nokia, Qualcomm and Lenovo.
Tony (China Telecom) thanks for discussion.
Any publicly available information on the related work and background in 5G-ACIA, for us to understand how 3GPP should respond to this LS?
Based on the LS, it's NO stage 1 gap or additional work is identified. Good to understand any potential work would be only for stage 2 or 3.
I also agree with Krister (Ericsson) that v2 does not seem to add any clarify and we can live with the previous by Lenovo, Nokia, Huawei and prefer to include SA1 in the loop.
Dimitris (Lenovo) provides rev1 in revision folder
Rainer (Nokia) is ok with rev1.
Revised
2.2 SP-221322 LS OUT Approval Reply LS on Use Cases and requirements for industrial factory applications TSG SA Revision of SP-221303_rev1. Approved Approved
2.2 - - - Block 2 (No 'action' LSs to note) - - Docs:=0 -
3 - - - Items for early consideration - - Docs:=0 -
3.1 - - - Challenges to working agreements - - Docs:=0 -
3.2 - - - Issues highlighted for early treatment - - Docs:=0 -
3.3 - - - Discussion papers on work in Rel-17 and earlier - - Docs:=0 -
3.4 - - - Discussion papers on work in Rel-18 - - Docs:=0 -
3.5 - - - Discussion papers on work in Rel-19 and later (includes discussion on Rel-19 process) - - Docs:=2 -
3.5 SP-221278 DISCUSSION Discussion Rel-19 analysis of Integrated Sensing and Communication and the related Impacts towards 5GS China Mobile Com. Corporation CC#4: Noted Noted
3.5 SP-221291 DISCUSSION Discussion Discussion on Integrated Sensing and Communication in Rel-19 Xiaomi EV Technology Rel-19 CC#4: Noted Noted
4 - - - Reporting from SA Working Groups, other TSGs, and Others - - Docs:=0 -
4.1 - - - SA WG1 reporting - - Docs:=1 -
4.1 SP-221256 REPORT Presentation SA WG1 report to SA#98e SA WG1 Chair CC#3: Noted Noted
4.2 - - - SA WG2 reporting - - Docs:=1 -
4.2 SP-221060 REPORT Presentation SA WG2 Chair Status Report to TSG SA#98-e SA WG2 Chair CC#3: Noted Noted
4.3 - - - SA WG3 reporting - - Docs:=1 -
4.3 SP-221204 REPORT Presentation SA WG3 Report to SA#98e SA WG3 Chair CC#3: Noted Noted
4.4 - - - SA WG4 reporting - - Docs:=2 -
4.4 SP-221284 REPORT Presentation SA WG4 Chair Status Report to TSG SA#98-e SA WG4 Chair CC#3: Noted Noted
4.4 SP-221038 OTHER Information IVAS Design Constraints (IVAS-4) SA WG4 Rel-18 CC#3: Noted Noted
4.5 - - - SA WG5 reporting - - Docs:=1 -
4.5 SP-221275 REPORT Presentation SA WG5 report SA WG5 Chair CC#3: Noted Noted
4.6 - - - SA WG6 reporting - - Docs:=1 -
4.6 SP-221216 REPORT Presentation SA WG6 status report to TSG SA#98 SA WG6 Chair CC#3: Noted Noted
4.7 - - - TSG RAN reporting and RAN ITU-R Ad Hoc Matters - - Docs:=4 -
4.7 SP-221350 REPORT Presentation Status report of TSG RAN#98-e TSG RAN Chair CC#5: Noted Noted
4.7 SP-221304 LS In Action LS from TSG RAN: DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2012 to Revision 6 TSG RAN (RP-223439) CC#5: This was endorsed for forwarding to the PCG for review and transmission to ITU-R WP5D. Endorsed
4.7 SP-221305 LS In Action LS from TSG RAN: DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision 2 – 5G SRIT TSG RAN (RP-223440) CC#5: This was endorsed for forwarding to the PCG for review and transmission to ITU-R WP5D. Endorsed
4.7 SP-221306 LS In Action LS from TSG RAN: DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision 2 – 5G RIT TSG RAN (RP-223441) CC#5: This was endorsed for forwarding to the PCG for review and transmission to ITU-R WP5D. Endorsed
4.8 - - - TSG CT reporting - - Docs:=4 -
4.8 SP-221314 REPORT Presentation Status report of TSG CT#98-e TSG CT Chair CC#5: Noted Noted
4.8 SP-221309 LS In Information LS from TSG CT: LS on Tracking IANA assignment requests TSG CT (CP-223275) CC#5: Noted Noted
4.8 SP-221313 REPORT Information Draft report of TSG CT#98-e TSG CT Secretary (MCC) CC#5: Noted Noted
4.8 SP-221312 REPORT Presentation IETF Status report TSG CT Chair CC#5: Noted Noted
4.9 - - - Reports from external bodies (provided by Liaison persons) - - Docs:=0 -
4.10 - - - Other reports - - Docs:=0 -
5 - - - Cross TSG Coordination - - Docs:=0 -
5.1 - - - General Cross TSG Coordination - - Docs:=0 -
5.2 - - - Rel-18 Focus Areas Status Reports & Issues - - Docs:=0 -
5.3 - - - Input to Joint RAN/SA meeting (not applicable for SA#98-e) - - Docs:=0 -
6 - - - Work Item Descriptions, Study Item Descriptions, Specifications - - Docs:=0 -
6.1 - - - New Release 18 Study Item Descriptions - - Docs:=3 -
6.1 - - - Block 3 (to approve / note) - - Docs:=3 -
6.1 SP-221160 SID NEW Approval New Study on CHF Segmentation SA WG5 CC#3: Block approved Approved
6.1 SP-221161 SID NEW Approval New Study on Structure of Charging for Verticals SA WG5 CC#3: Block approved Approved
6.1 SP-221162 SID NEW Approval New Study on charging aspects of Satellite in 5GS SA WG5 CC#3: Block approved Approved
6.2 - - - New Release 18 Work Item Descriptions - - Docs:=38 -
6.2 SP-221034 WID NEW Approval WID on Enhanced Multiparty RTT SA WG4 Rel-18 CC#4: _rev1 was approved. Revised to SP-221346. Alain Sultan (Work Plan manager, MCC) provides comments to some of the new WIDs presented to SA#98.
In summary, these comments propose to change the title of SA2's proposed WIDs in SP-221130; SP-221131; SP-221132; SP-221133; SP-221134; SP-221136; SP-221137. The change consists in clearly stating 'Stage 2 for XXX' rather than using a variety of different wordings (e.g. 'Architectural enhancements for', 'Architecture Enhancement to support'). Acronyms are unchanged.
He also reminded that most SA2 WIDs were provided without any target completion date to SA#98e. Even though this was done on purpose by SA2, the final version of all WIDs approved at SA#98 shall mention a target completion date.
About SA4's WID in SP-221034: 'Enhanced Multiparty RTT', eMP_RTT, both the title and the acronym are proposed to be improved since 'RTT' is not explicated and word 'enhanced' is used in an ambiguous context.
Revised
6.2 SP-221346 WID NEW Approval WID on Multiparty Real-Time Text SA WG4 Rel-18 Revision of SP-221034_rev1. This WID NEW was approved Approved
6.2 SP-221130 WID NEW Approval New WID on Further Architecture Enhancement for UAV and UAM. SA WG2 Rel-18 CC#3: _rev2 approved. Revised to SP-221323. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Alain Sultan (Work Plan manager, MCC) provides comments to some of the new WIDs presented to SA#98.
In summary, these comments propose to change the title of SA2's proposed WIDs in SP-221130; SP-221131; SP-221132; SP-221133; SP-221134; SP-221136; SP-221137. The change consists in clearly stating 'Stage 2 for XXX' rather than using a variety of different wordings (e.g. 'Architectural enhancements for', 'Architecture Enhancement to support'). Acronyms are unchanged.
He also reminded that most SA2 WIDs were provided without any target completion date to SA#98e. Even though this was done on purpose by SA2, the final version of all WIDs approved at SA#98 shall mention a target completion date.
About SA4's WID in SP-221034: 'Enhanced Multiparty RTT', eMP_RTT, both the title and the acronym are proposed to be improved since 'RTT' is not explicated and word 'enhanced' is used in an ambiguous context.
Revised
6.2 SP-221323 WID NEW Approval New WID on Further Architecture Enhancement for UAV and UAM. SA WG2 Rel-18 Revision of SP-221130_rev2. This WID NEW was approved Approved
6.2 SP-221131 WID NEW Approval New WID on Architectural enhancements for 5G multicast-broadcast services Phase 2 (5MBS_Ph2) SA WG2 Rel-18 Companion CR Pack provided. CC#3: _rev2 approved. Revised to SP-221324. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Alain Sultan (Work Plan manager, MCC) provides comments to some of the new WIDs presented to SA#98.
In summary, these comments propose to change the title of SA2's proposed WIDs in SP-221130; SP-221131; SP-221132; SP-221133; SP-221134; SP-221136; SP-221137. The change consists in clearly stating 'Stage 2 for XXX' rather than using a variety of different wordings (e.g. 'Architectural enhancements for', 'Architecture Enhancement to support'). Acronyms are unchanged.
He also reminded that most SA2 WIDs were provided without any target completion date to SA#98e. Even though this was done on purpose by SA2, the final version of all WIDs approved at SA#98 shall mention a target completion date.
About SA4's WID in SP-221034: 'Enhanced Multiparty RTT', eMP_RTT, both the title and the acronym are proposed to be improved since 'RTT' is not explicated and word 'enhanced' is used in an ambiguous context.
Revised
6.2 SP-221324 WID NEW Approval New WID on Architectural enhancements for 5G multicast-broadcast services Phase 2 (5MBS_Ph2) SA WG2 Rel-18 Revision of SP-221131_rev2. This WID NEW was approved Approved
6.2 SP-221133 WID NEW Approval New WID on Architecture Enhancement to support Ranging based services and sidelink positioning (Ranging_SL) SA WG2 Rel-18 CC#3: _rev2 approved. Revised to SP-221325. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Alain Sultan (Work Plan manager, MCC) provides comments to some of the new WIDs presented to SA#98.
In summary, these comments propose to change the title of SA2's proposed WIDs in SP-221130; SP-221131; SP-221132; SP-221133; SP-221134; SP-221136; SP-221137. The change consists in clearly stating 'Stage 2 for XXX' rather than using a variety of different wordings (e.g. 'Architectural enhancements for', 'Architecture Enhancement to support'). Acronyms are unchanged.
He also reminded that most SA2 WIDs were provided without any target completion date to SA#98e. Even though this was done on purpose by SA2, the final version of all WIDs approved at SA#98 shall mention a target completion date.
About SA4's WID in SP-221034: 'Enhanced Multiparty RTT', eMP_RTT, both the title and the acronym are proposed to be improved since 'RTT' is not explicated and word 'enhanced' is used in an ambiguous context.
Revised
6.2 SP-221325 WID NEW Approval New WID on Architecture Enhancement to support Ranging based services and sidelink positioning (Ranging_SL) SA WG2 Rel-18 Revision of SP-221133_rev2. This WID NEW was approved Approved
6.2 SP-221134 WID NEW Approval New WID: Architecture Enhancements for XR and media services (XRM) SA WG2 Rel-18 CC#3: _rev2 approved. Revised to SP-221326. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Alain Sultan (Work Plan manager, MCC) provides comments to some of the new WIDs presented to SA#98.
In summary, these comments propose to change the title of SA2's proposed WIDs in SP-221130; SP-221131; SP-221132; SP-221133; SP-221134; SP-221136; SP-221137. The change consists in clearly stating 'Stage 2 for XXX' rather than using a variety of different wordings (e.g. 'Architectural enhancements for', 'Architecture Enhancement to support'). Acronyms are unchanged.
He also reminded that most SA2 WIDs were provided without any target completion date to SA#98e. Even though this was done on purpose by SA2, the final version of all WIDs approved at SA#98 shall mention a target completion date.
About SA4's WID in SP-221034: 'Enhanced Multiparty RTT', eMP_RTT, both the title and the acronym are proposed to be improved since 'RTT' is not explicated and word 'enhanced' is used in an ambiguous context.
Revised
6.2 SP-221326 WID NEW Approval New WID: Architecture Enhancements for XR and media services (XRM) SA WG2 Rel-18 Revision of SP-221134_rev2. This WID NEW was approved Approved
6.2 SP-221135 WID NEW Approval New WID: Enhancement of Network Slicing Phase 3 (eNS_Ph3) SA WG2 Rel-18 Companion CR Pack provided. CC#3: _rev3 approved. Revised to SP-221327. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revision request: Krisztian (Apple) requests to add Apple as a supporting company for eNS_Ph3.
Revised
6.2 SP-221327 WID NEW Approval New WID: Enhancement of Network Slicing Phase 3 (eNS_Ph3) SA WG2 Rel-18 Revision of SP-221135_rev3. This WID NEW was approved Approved
6.2 SP-221136 WID NEW Approval New WID on Architecture Enhancements for Vehicle Mounted Relays SA WG2 Rel-18 Companion CR Pack provided. CC#3: _rev2 approved. Revised to SP-221328. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Alain Sultan (Work Plan manager, MCC) provides comments to some of the new WIDs presented to SA#98.
In summary, these comments propose to change the title of SA2's proposed WIDs in SP-221130; SP-221131; SP-221132; SP-221133; SP-221134; SP-221136; SP-221137. The change consists in clearly stating 'Stage 2 for XXX' rather than using a variety of different wordings (e.g. 'Architectural enhancements for', 'Architecture Enhancement to support'). Acronyms are unchanged.
He also reminded that most SA2 WIDs were provided without any target completion date to SA#98e. Even though this was done on purpose by SA2, the final version of all WIDs approved at SA#98 shall mention a target completion date.
About SA4's WID in SP-221034: 'Enhanced Multiparty RTT', eMP_RTT, both the title and the acronym are proposed to be improved since 'RTT' is not explicated and word 'enhanced' is used in an ambiguous context.
Revised
6.2 SP-221328 WID NEW Approval New WID on Architecture Enhancements for Vehicle Mounted Relays SA WG2 Rel-18 Revision of SP-221136_rev2. This WID NEW was approved Approved
6.2 SP-221137 WID NEW Approval New WID on System Support for AI/ML-based Services (AIMLsys) SA WG2 Rel-18 Companion CR Pack provided. CC#3: _rev2 approved. Revised to SP-221329. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Alain Sultan (Work Plan manager, MCC) provides comments to some of the new WIDs presented to SA#98.
In summary, these comments propose to change the title of SA2's proposed WIDs in SP-221130; SP-221131; SP-221132; SP-221133; SP-221134; SP-221136; SP-221137. The change consists in clearly stating 'Stage 2 for XXX' rather than using a variety of different wordings (e.g. 'Architectural enhancements for', 'Architecture Enhancement to support'). Acronyms are unchanged.
He also reminded that most SA2 WIDs were provided without any target completion date to SA#98e. Even though this was done on purpose by SA2, the final version of all WIDs approved at SA#98 shall mention a target completion date.
About SA4's WID in SP-221034: 'Enhanced Multiparty RTT', eMP_RTT, both the title and the acronym are proposed to be improved since 'RTT' is not explicated and word 'enhanced' is used in an ambiguous context.
Revised
6.2 SP-221329 WID NEW Approval New WID on System Support for AI/ML-based Services (AIMLsys) SA WG2 Rel-18 Revision of SP-221137_rev2. This WID NEW was approved Approved
6.2 SP-221095 CR PACK Approval CRs on DUMMY_5MBS_Ph2 (Rel-18) SA WG2 Related to WID NEW at this meeting. CC#2: This CR Pack was approved. Approved
6.2 SP-221139 CR PACK Approval CRs on DUMMY_eNA_Ph3 (Rel-18) SA WG2 Related to WID NEW at this meeting. CC#2: This CR Pack was approved. Approved
6.2 SP-221096 CR PACK Approval CRs on DUMMY_AIMLsys (Rel-18) SA WG2 Related to WID NEW at this meeting. CC#2: This CR Pack was approved. Approved
6.2 SP-221141 CR PACK Approval CRs on DUMMY_VMR (Rel-18) SA WG2 Related to WID NEW at this meeting. CC#2: This CR Pack was approved. Approved
6.2 SP-221140 CR PACK Approval CRs on DUMMY_eNS_Ph3 (Rel-18) SA WG2 Related to WID NEW at this meeting. CC#2: This CR Pack was approved. Approved
6.2 SP-221156 CR PACK Approval Rel-18 CRs on Security Aspects of the 5G Service Based Architecture SA WG3 Related to WID NEW at this meeting. CC#2: This CR Pack was approved. Approved
6.2 - - - Block 3 (to approve / note) - - Docs:=16 -
6.2 SP-221138 WID NEW Approval New WID on Enablers for Network Automation for 5G - phase 3 (eNA_Ph3) SA WG2 Rel-18 Companion CR Pack provided. CC#3: _rev2 Block approved. Revised to SP-221345. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.2 SP-221345 WID NEW Approval New WID on Enablers for Network Automation for 5G - phase 3 (eNA_Ph3) SA WG2 Rel-18 Revision of SP-221138_rev2. This WID NEW was approved Approved
6.2 SP-221145 WID NEW Approval New WID on Security Aspects of the 5G Service Based Architecture Phase 2 SA WG3 Companion CR Pack provided. CC#3: Block approved Approved
6.2 SP-221033 WID NEW Approval WID on 5GMS Audio codec for 5G-Advanced SA WG4 Rel-18 CC#3: Block approved Approved
6.2 SP-221129 WID NEW Approval New WID: Personal IoT Networks. SA WG2 Rel-18 CC#3: _rev2 Block approved. Revised to SP-221343. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.2 SP-221343 WID NEW Approval New WID: Personal IoT Networks. SA WG2 Rel-18 Revision of SP-221129_rev2. This WID NEW was approved Approved
6.2 SP-221132 WID NEW Approval New WID: 5GC/EPC enhancement for satellite access Phase 2 (5GSAT_Ph2) SA WG2 Rel-18 CC#3: _rev2 Block approved. Revised to SP-221344. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Alain Sultan (Work Plan manager, MCC) provides comments to some of the new WIDs presented to SA#98.
In summary, these comments propose to change the title of SA2's proposed WIDs in SP-221130; SP-221131; SP-221132; SP-221133; SP-221134; SP-221136; SP-221137. The change consists in clearly stating 'Stage 2 for XXX' rather than using a variety of different wordings (e.g. 'Architectural enhancements for', 'Architecture Enhancement to support'). Acronyms are unchanged.
He also reminded that most SA2 WIDs were provided without any target completion date to SA#98e. Even though this was done on purpose by SA2, the final version of all WIDs approved at SA#98 shall mention a target completion date.
About SA4's WID in SP-221034: 'Enhanced Multiparty RTT', eMP_RTT, both the title and the acronym are proposed to be improved since 'RTT' is not explicated and word 'enhanced' is used in an ambiguous context.
Revised
6.2 SP-221344 WID NEW Approval New WID: 5GC/EPC enhancement for satellite access Phase 2 (5GSAT_Ph2) SA WG2 Rel-18 Revision of SP-221132_rev2. This WID NEW was approved Approved
6.2 SP-221143 WID NEW Approval New WID on DTLS protocol profile for AKMA and GBA SA WG3 CC#3: Block approved Approved
6.2 SP-221146 WID NEW Approval New WID on IETF OSCORE protocol profiles for GBA and AKMA SA WG3 CC#3: Block approved Approved
6.2 SP-221147 WID NEW Approval New WID on Security aspect of home network triggered primary authentication SA WG3 CC#3: Block approved Approved
6.2 SP-221159 WID NEW Approval New WID on Charging Aspects of Network Slicing Phase 2 SA WG5 CC#3: Block approved Approved
6.2 SP-221163 WID NEW Approval New WID on Management of Trace/MDT phase 2 SA WG5 CC#3: Block approved Approved
6.2 SP-221234 WID NEW Approval New WID on 5G-enabled fused location service capability exposure SA WG6 Rel-18 CC#3: Block approved Approved
6.2 SP-221235 WID NEW Approval New WID on Mission Critical ad hoc group Communications SA WG6 Rel-18 CC#3: Block approved Approved
6.2 SP-221236 WID NEW Approval New WID on Application layer support for Personal IoT Network SA WG6 Rel-18 CC#3: Block approved Approved
6.3 - - - Revised Release 18 Study Item Descriptions and Work Item Descriptions - - Docs:=31 -
6.3 SP-221118 WID REVISED Approval Revised WID on Proximity-based Services in 5GS Phase 2 SA WG2 Rel-18 Revision of SP-220806. Company alternative proposed in SP-221206. CC#2: This was considered as revised in SP-221206. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221206 WID REVISED Approval Revised WID on Proximity-based Services in 5GS Phase 2 CATT, OPPO Rel-18 Revision of S2-2208493. CC#2: This WID REVISED was approved Approved
6.3 SP-221277 WID REVISED Approval Updated WID: Support for 5WWC, Phase 2 Nokia, Nokia Shanghai Bell Rel-18 Update of approved WID in SP-220904. CC#4: _rev5 approved. Revised to SP-221347. Ericsson objects to the original submitted version and proposes to align the WI with what is concluded so far & scope of the KIs, please see revision proposal below
Huawei agrees with Ericsson's proposal and prefers option 2
Samsung requests for clarification on PCF notifying AMF after completing the delivery of WLANSP/ANDSP rules to UE.
Qualcomm comments and prefers Option 1
laurent(Nokia) answers to Qualcomm with a question
Qualcomm (Sebastian) replies to Nokia
Ericsson comments
Huawei (Marco) comments
Saso (Intel) proposes to replace 'each' with 'the'.
laurent(Nokia) provides a r01 and a r02 (based on Saso's remark)
Sebastian (Qualcomm) provides additional comments
Sebastian (Qualcomm) comments and suggests to note the WID update and first properly conclude the related key issue in the January SA2 meeting first
laurent(Nokia) delaying looks does not help for 5WWC to conclude on TNGF case but let's see. Answering to Sebastian and providing r3
Huawei (Marco) if this is the only way to progress for TNGF support of slice in R18, we can live with rev3
laurent(Nokia) providing r4
Huawei (Marco) are ok with rev04
Sebastian (Qualcomm) is fine with rev4
laurent(Nokia) providing r5
Ericsson as well accepts r05.
Revised
6.3 SP-221347 WID REVISED Approval Updated WID: Support for 5WWC, Phase 2 Nokia, Nokia Shanghai Bell Rel-18 Revision of SP-221277_rev5. This WID REVISED was approved Approved
6.3 SP-221226 SID REVISED Approval Revised WID for Study on application layer support for V2X services; Phase 3 SA WG6 Rel-18 Changes Title and Acronym - misaligns with Work Plan UID 930014 ! CC#3: Noted Noted
6.3 SP-221230 WID REVISED Approval Revised WID on Service Enabler Architecture Layer for Verticals Phase 3 SA WG6 Rel-18 Changes Title and Acronym - misaligns with Work Plan UID 940024 ! CC#3: Noted Noted
6.3 - - - Block 3 (to approve / note) - - Docs:=25 -
6.3 SP-221032 WID REVISED Approval WID on immersive Real-time Communication for WebRTC SA WG4 Rel-18 CC#3: Block approved Approved
6.3 SP-221119 WID REVISED Approval Revised WID on Access Traffic Steering, Switching and Splitting support in the 5G system architecture; Phase 3. SA WG2 Rel-18 Revision of SP-220813. CC#3: _rev2 Block approved. Revised to SP-221334. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221334 WID REVISED Approval Revised WID on Access Traffic Steering, Switching and Splitting support in the 5G system architecture; Phase 3. SA WG2 Rel-18 Revision of SP-221119_rev2. This WID REVISED was approved Approved
6.3 SP-221120 WID REVISED Approval Revised WID on 5G AM Policy. SA WG2 Rel-18 Revision of SP-220807. CC#3: _rev2 Block approved. Revised to SP-221335. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221335 WID REVISED Approval Revised WID on 5G AM Policy. SA WG2 Rel-18 Revision of SP-221120_rev2. This WID REVISED was approved Approved
6.3 SP-221121 WID REVISED Approval Revised WID: 5G System Enabler for Service Function Chaining. SA WG2 Rel-18 Revision of SP-220802. CC#3: _rev2 Block approved. Revised to SP-221336. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221336 WID REVISED Approval Revised WID: 5G System Enabler for Service Function Chaining. SA WG2 Rel-18 Revision of SP-221121_rev2. This WID REVISED was approved Approved
6.3 SP-221122 WID REVISED Approval Revised WID: Edge Computing Phase 2. SA WG2 Rel-18 Revision of SP-220987. CC#3: _rev2 Block approved. Revised to SP-221337. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221337 WID REVISED Approval Revised WID: Edge Computing Phase 2. SA WG2 Rel-18 Revision of SP-221122_rev2. This WID REVISED was approved Approved
6.3 SP-221123 WID REVISED Approval Revised WID on Enhancement to the 5GC LoCation Services Phase 3. SA WG2 Rel-18 Revision of SP-220811. CC#3: _rev2 Block approved. Revised to SP-221338. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221338 WID REVISED Approval Revised WID on Enhancement to the 5GC LoCation Services Phase 3. SA WG2 Rel-18 Revision of SP-221123_rev2. This WID REVISED was approved Approved
6.3 SP-221124 WID REVISED Approval Revised WID on generic group management, exposure and communication enhancements SA WG2 Rel-18 Revision of SP-220989. CC#3: _rev2 Block approved. Revised to SP-221339. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221339 WID REVISED Approval Revised WID on generic group management, exposure and communication enhancements SA WG2 Rel-18 Revision of SP-221124_rev2. This WID REVISED was approved Approved
6.3 SP-221125 WID REVISED Approval Revised WID: Enhanced support of Non-Public Networks Phase 2 (eNPN_Ph2) SA WG2 Rel-18 Revision of SP-220805. CC#3: _rev2 Block approved. Revised to SP-221340. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221340 WID REVISED Approval Revised WID: Enhanced support of Non-Public Networks Phase 2 (eNPN_Ph2) SA WG2 Rel-18 Revision of SP-221125_rev2. This WID REVISED was approved Approved
6.3 SP-221126 WID REVISED Approval Revised WID on Timing Resiliency and URLLC enhancements (TRS_URLLC) SA WG2 Rel-18 Revision of SP-220814. CC#3: _rev2 Block approved. Revised to SP-221341. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221341 WID REVISED Approval Revised WID on Timing Resiliency and URLLC enhancements (TRS_URLLC) SA WG2 Rel-18 Revision of SP-221126_rev2. This WID REVISED was approved Approved
6.3 SP-221127 WID REVISED Approval Revised WID on Enhancement of 5G UE Policy (eUEPO) SA WG2 Rel-18 Revision of SP-220980. CC#3: _rev2 Block approved. Revised to SP-221342. Maurice Pope (MCC) provides _rev1 to correct the TSG SA#98 Meeting date to '13-19 December 2022'.
LaeYoung (LGE) comments 2021 should be 2022.
Maurice Pope (MCC) provides _rev2 to further correct the TSG SA#98 Meeting year to '2022'.
Revised
6.3 SP-221342 WID REVISED Approval Revised WID on Enhancement of 5G UE Policy (eUEPO) SA WG2 Rel-18 Revision of SP-221127_rev2. This WID REVISED was approved Approved
6.3 SP-221144 SID REVISED Approval Revised SID on Security aspects for 5WWC Phase 2 SA WG3 Rel-18 CC#3: Block approved Approved
6.3 SP-221228 WID REVISED Approval Revised WID on architecture for UAS Applications, Phase 2 SA WG6 Rel-18 CC#3: Block approved Approved
6.3 SP-221229 WID REVISED Approval Revised WID on application layer support for V2X services; Phase 3 SA WG6 Rel-18 CC#3: Block approved Approved
6.3 SP-221231 WID REVISED Approval Revised WID on architecture for enabling Edge Applications Phase 2 SA WG6 Rel-18 CC#3: Block approved Approved
6.3 SP-221232 WID REVISED Approval Revised WID on SEAL data delivery enabler for vertical applications SA WG6 Rel-18 CC#3: Block approved Approved
6.3 SP-221233 WID REVISED Approval Revised WID Application layer support for Factories of the Future SA WG6 Rel-18 CC#3: Block approved Approved
6.4 - - - New Release 19 Study Item Descriptions - - Docs:=0 -
6.4 - - - Block 3 (to approve / note) - - Docs:=32 -
6.5 - - - New Release 19 Work Item Descriptions - - Docs:=4 -
6.5 SP-221264 CR PACK Approval Stage 1 CR on the new WID MeasureData SA WG1 Rel-19 Related to WID NEW in SP-221263. (no need to present/discuss - only needs update of DUMMY-WID name). CC#3: This CR Pack was approved. Approved
6.5 SP-221035 SID NEW Approval Feasibility Study on Diverse audio Capturing system for End-user Devices SA WG4 Rel-19 Update to supporting companies requested. CC#3: _rev1 approved. Revised to SP-221330. Revision request: Frédéric Gabin (Dolby Laboratories Inc.) indicated that Dolby Laboratories Inc. supports this new Study Item FS_DaCED and provided a revision with the corresponding update to the list of supporting companies. Revised
6.5 SP-221330 SID NEW Approval Feasibility Study on Diverse audio Capturing system for End-user Devices SA WG4 Rel-19 Revision of SP-221035_rev1. This SID NEW was approved Approved
6.5 - - - Block 3 (to approve / note) - - Docs:=1 -
6.5 SP-221263 WID NEW Approval New WID on Measurement Data Collection (MeasureData) SA WG1 Rel-19 Companion CR Pack in SP-221264. CC#3: Block approved Approved
6.6 - - - Revised Release 19 Study Item and Work Item Descriptions - - Docs:=0 -
6.6 - - - Block 3 (to approve / note) - - Docs:=26 -
6.7 - - - Specifications for Information - - Docs:=17 -
6.7 SP-221199 TS OR TR COVER Agreement Update Cover sheet for presentation of TR 23.700-62 to TSG SA#98 China Mobile (Rapporteur) Rel-18 This proposes to change SP-221112 to 'for information' and reduce to 98% completion. CC#3: Noted Noted
6.7 SP-221112 DRAFT TR Information Presentation of TR 23.700-62 to TSG SA#98E for approval SA WG2 Rel-18 Proposed replacement TR Cover sheet to submit for information in SP-221199 (i.e. to note this TR). CC#3: Noted Noted
6.7 - - - Block 3 (to approve / note) - - Docs:=15 -
6.7 SP-221037 DRAFT TR Information Presentation of Technical report to TSG: TR 26.806 v1.0.0; Study on Tethering AR Glasses – Architectures, QoS and Media Aspects SA WG4 Rel-18 CC#3: Block noted Noted
6.7 SP-221099 DRAFT TR Information Presentation of TR 23.700-86 to TSG SA#98E for information SA WG2 Rel-18 CC#3: Block noted Noted
6.7 SP-221103 DRAFT TR Information Presentation of TR 23.700-88 to TSG SA#98E for information SA WG2 Rel-18 CC#3: Block noted Noted
6.7 SP-221104 DRAFT TR Information Presentation of TR 23.700-74 to TSG SA#98E for information SA WG2 Rel-18 CC#3: Block noted Noted
6.7 SP-221105 DRAFT TR Information Presentation of TR 23.700-08 to TSG SA#98E for information SA WG2 Rel-18 CC#3: Block noted Noted
6.7 SP-221107 DRAFT TR Information Presentation of TR 23.700-85 to TSG SA#98E for information SA WG2 Rel-18 CC#3: Block noted Noted
6.7 SP-221164 DRAFT TR Information TR 28.908 'Study on Artificial Intelligence/Machine Learning (AI/ ML) management' SA WG5 Rel-18 Revised to SP-221213 Revised
6.7 SP-221213 DRAFT TR Information TR 28.908 'Study on Artificial Intelligence/Machine Learning (AI/ ML) management' SA WG5 Rel-18 CC#3: Block noted Noted
6.7 SP-221203 DRAFT TS Information Presentation of Technical Specification to TSG: TS 26.506 v 1.0.0 SA WG4 Rel-18 CC#3: Block noted Noted
6.7 SP-221217 DRAFT TR Information Presentation of TR 23.700-38 v1.0.0 for Information SA WG6 Rel-18 CC#3: Block noted Noted
6.7 SP-221218 DRAFT TS Information Presentation of TS 23.433 v1.0.0 for Information SA WG6 Rel-18 CC#3: Block noted Noted
6.7 SP-221266 DRAFT TR Information TR 22.851 v.1.0.0 on 'Study on Network Sharing Aspects' (FS_NetShare) for information SA WG1 Rel-19 CC#3: Block noted Noted
6.7 SP-221267 DRAFT TR Information TR 22.840 v.1.0.0 on 'Study on Ambient power-enabled Internet of Things' (FS_Ambient_IoT) for information SA WG1 Rel-19 CC#3: Block noted Noted
6.7 SP-221205 TS OR TR COVER Information Cover sheet for presentation of TR 23.700-87 to TSG SA#98E China Mobile Com. Corporation Rel-18 CC#3: Block noted Noted
6.7 SP-221276 TS OR TR COVER Information Presentation of Report to TSG: TR 23.700-17, Version 1.1.1 Nokia, Nokia Shanghai Bell Rel-18 CC#3: Block noted Noted
6.8 - - - Specifications for Approval / for Information and Approval - - Docs:=29 -
6.8 SP-221265 DRAFT TR Approval TR 22.877 v.1.0.0 on 'Study on roaming value added services (FS_RVAS)' for one-step approval SA WG1 Rel-19 CC#3: This DRAFT TR was approved Approved
6.8 SP-221253 LS OUT Approval [DRAFT] LS to GSMA 5GMRR on finalisation of Study on Roaming Value-Added Services Deutsche Telekom AG Rel-19 CC#3: _rev1 approved. Revised to SP-221331. Revised
6.8 SP-221331 LS OUT Approval LS to GSMA 5GMRR on finalisation of Study on Roaming Value-Added Services TSG SA Rel-19 Revision of SP-221253_rev1. Approved Approved
6.8 SP-221097 DRAFT TR Approval Presentation of TR 23.700-28 to TSG SA#98E for approval SA WG2 Rel-18 Rapporteur updated version in SP-221198. CC#3: This was considered revised in SP-221198. Revised
6.8 SP-221198 DRAFT TR Approval Presentation of TR 23.700-28 v2.1.0 (removing Editos's note) to TSG SA#98E for approval THALES Rel-18 Update to SP-221097. CC#3: This DRAFT TR was approved Approved
6.8 SP-221111 DRAFT TR Approval Presentation of TR 23.700-47 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: This DRAFT TR was approved Approved
6.8 SP-221270 DRAFT TR Approval Presentation of TR 23.700-96 to TSG SA#98E for approval CATT Rel-18 CC#3: This DRAFT TR was approved Approved
6.8 - - - Block 3 (to approve / note) - - Docs:=22 -
6.8 SP-221036 DRAFT TR Approval Presentation of Technical Report to TSG: TR 26.857 v 2.0.0 on 5G Media Service Enablers SA WG4 Rel-18 CC#3: Block approved Approved
6.8 SP-221098 DRAFT TR Approval Presentation of TR 23.700-27 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221100 DRAFT TR Approval Presentation of TR 23.700-58 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221101 DRAFT TR Approval Presentation of TR 23.700-25to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221102 DRAFT TR Approval Presentation of TR 23.700-80 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221106 DRAFT TR Approval Presentation of TR 23.700-18 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221108 DRAFT TR Approval Presentation of TR 23.700-71 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221109 DRAFT TR Approval Presentation of TR 23.700-41 to TSG SA98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221110 DRAFT TR Approval Presentation of TR 23.700-33 to TSG SA98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221113 DRAFT TR Approval Presentation of TR 23.700-53 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221114 DRAFT TR Approval Presentation of TR 23.700-48 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221115 DRAFT TR Approval Presentation of TR 23.700-05 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221116 DRAFT TR Approval Presentation of TR 23.700-81 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221117 DRAFT TR Approval Presentation of TR 23.700-60 to TSG SA#98E for approval SA WG2 Rel-18 CC#3: Block approved Approved
6.8 SP-221165 DRAFT TR Approval TR 28.838 'Study on measurement data collection to support RAN intelligence' SA WG5 Rel-18 CC#3: Block approved Approved
6.8 SP-221219 DRAFT TR Approval Presentation of TR 23.700-78 v1.0.0 for Approval SA WG6 Rel-18 CC#3: Block approved Approved
6.8 SP-221220 DRAFT TR Approval Presentation of TR 23.700-34 v2.0.0 for Approval SA WG6 Rel-18 CC#3: Block approved Approved
6.8 SP-221221 DRAFT TR Approval Presentation of TR 23.700-55 v2.0.0 for Approval SA WG6 Rel-18 CC#3: Block approved Approved
6.8 SP-221222 DRAFT TR Approval Presentation of TR 23.700-64 v2.0.0 for Approval SA WG6 Rel-18 CC#3: Block approved Approved
6.8 SP-221223 DRAFT TR Approval Presentation of TR 23.700-76 v2.0.0 for Approval SA WG6 Rel-18 CC#3: Block approved Approved
6.8 SP-221224 DRAFT TR Approval Presentation of TR 23.700-95 v2.0.0 for Approval SA WG6 Rel-18 CC#3: Block approved Approved
6.8 SP-221225 DRAFT TR Approval Presentation of TR 23.700-98 v2.0.0 for Approval SA WG6 Rel-18 CC#3: Block approved Approved
7 - - - Release Planning - - Docs:=0 -
7.1 - - - General Release Planning issues - - Docs:=0 -
7.2 - - - Issues related to Release 17 and earlier planning (nothing expected here) - - Docs:=0 -
7.3 - - - Release 18 Planning (schedule, prioritization, etc.) - - Docs:=15 -
7.3 SP-221215 DISCUSSION Approval Rel-18/ Rel-19 Planning MediaTek Inc. Rel-18 _rev1 updated in CC#2 and revised to SP-221310. Mehrdad (MediaTek Inc.) provides rev1 in line with offline discussions with several companies. Revised
7.3 SP-221310 DISCUSSION Approval Rel-18/ Rel-19 Planning MediaTek Inc. Rel-18 Revision of SP-221215_rev1. CC#2: Endorsed.
CC#3: _rev1 Revised to SP-221318
Revised
7.3 SP-221318 DISCUSSION Approval A guidance to SA WG2 on Rel-18 study/work items SA WG2 Chair Rel-18 Based on Revision of SP-221310_rev1. CC#4: _rev1 endorsed. Revised to SP-221349. Puneet (SA2 Chair) provides 1318.
Mehrdad (MediaTek Inc.) replies to SA2 Chair.
Jinguo(ZTE) provides comments on bullet 3 and bullet 4.
Tricci (OPPO) thanks SA2 chairs and MediaTek prior comments and would like to provide OPPO's comments.
Puneet (SA2 Chair) replies to Mehrdad(MediaTek).
Shabnam (Ericsson) provides some input/views.
LaeYoung (LGE) provides comments on 1) to 3) in this paper and 3) in 1310.
Wenruo(Huawei) support to have clear guidance to SA2
Lars (Sony) provides comments on bullet 2 and bullet 3.
Biao (China Telecom) provides comment on bullet 3.
Nokia provides comments to SA guidance to SA2 on Rel-18 study/work items.
Puneet (SA2 Chair) provides 1318_rev1
Revised
7.3 SP-221349 DISCUSSION Approval A guidance to SA WG2 on Rel-18 study/work items SA WG2 Chair Rel-18 Revision of SP-221318_rev1. Endorsed Endorsed
7.3 SP-221311 DISCUSSION Approval RAN Planning TSG RAN Chair, RAN WG1 Chair, RAN WG2 Chair, RAN WG3 Chair, RAN WG4 Chair, RAN WG5 Chair Rel-18 Created at meeting. Joint SA-RAN-CT CC: Noted Noted
7.3 SP-221315 DISCUSSION Endorsement 3GPP SA, RAN, CT Rel-18 Timeline TSG SA Chair Rel-18 Created at meeting. Joint SA-RAN-CT CC: _rev1 revised to SP-221317. Revised
7.3 SP-221317 DISCUSSION Endorsement 3GPP SA, RAN, CT Rel-18 Timeline TSG SA Chair Rel-18 Revision of SP-221315_rev1. Endirsed in Joint SA-RAN-CT CC. Endorsed
7.3 SP-221254 DISCUSSION Endorsement Proposal on Release 18 timeline Deutsche Telekom AG, T-Mobile USA, KPN, Spark, Telecom Italia, Telstra, Vodafone Rel-18 CC#2: Noted Proposed noted Noted
7.3 SP-221282 DISCUSSION Discussion Rel-18 & Rel-19 Planning HuaWei Technologies Co., Ltd Rel-18 CC#2: Noted. CC#4: Noted Proposed noted Huawei (Wenruo) provides rev1
Huawei (Wenruo) provides rev2
Noted
7.3 SP-221290 DISCUSSION Endorsement Proposal on Rel-18 timeline and Rel-19 Planning China Mobile Rel-18 CC#2: Noted. CC#4: Noted Proposed noted Noted
7.3 SP-221292 DISCUSSION Endorsement Rel-18 stage 2 freeze considerations Nokia, Nokia Shanghai Bell, Kontron Transportation France, UIC, Ericsson Rel-18 CC#2: Noted Proposed noted Noted
7.3 SP-221296 DISCUSSION Endorsement SA WG2 Chair inputs on Rel-18 Progress SA WG2 Chair CC#2: Noted Proposed noted Noted
7.3 SP-221307 DISCUSSION Endorsement Proposal for Rel-18 Timeline (SA perspective) without shift of freeze dates TSG SA Chair Rel-18 Created at meeting. CC#2: Noted Noted
7.3 SP-221308 DISCUSSION Discussion TSG CT view on Rel-18 Planning TSG CT Chair Rel-18 Created at meeting. CC#2: Noted Noted
7.3 SP-221319 REPORT Information Notes from Joint SGs SA-RAN-CT Rel-18 Timeline Conference Call TSG SA Secretary Rel-18 CC#4: Noted Noted
7.4 - - - Release 19 Planning (schedule, prioritization, etc.) - - Docs:=7 -
7.4 SP-221214 DISCUSSION Discussion Considerations on future Release planning MediaTek Inc. Rel-19 Revision of SP-220898. CC#4: Noted Noted
7.4 SP-221257 DISCUSSION Approval Timeline for Rel-19 Stage 1 SA WG1 Chair Rel-19 The overall 3GPP Rel-19 Timeline is not yet determined. This was then noted. Noted
7.4 SP-221293 DISCUSSION Discussion Basic Principles for TSG SA Release Content Planning Apple, MediaTek, OPPO, InterDigital, Samsung, Nokia, Nokia Shanghai Bell CC#4: No agreement on these principles could be found. This was postponed. Puneet (SA2 Chair) provides 1318_rev1 Postponed
7.4 SP-221300 DISCUSSION Discussion Release 19 work planning considerations. OPPO LATE REQ. LATE DOC: Rx 08/12, 07:30. CC#4: Endorsed: Rel-19 timeline will be decided in coordination between all 3 TSGs not later than June 2023. Noted Thank you Oppo for your proposal, I have a question on timing
Tricci (OPPO) thanks FirstNet for question and would like to response.
Noted
7.4 SP-221316 DISCUSSION Presentation Release 19 Planning Components and Relative Timelines TSG SA Vice Chair CC#4: Postponed Postponed
7.4 SP-221351 DISCUSSION Endorsement Rel-19 Planning Huawei, Hisilicon Rel-19 For discussion in CC#5. CC#5: _Rev3, which was endorsed. Revised to SP-221353. Revised
7.4 SP-221353 DISCUSSION Endorsement Rel-19 Planning Huawei, Hisilicon Rel-19 Revision of SP-221351_Rev3. CC#5: Endorsed Endorsed
8 - - - Rel-8 CRs - - Docs:=0 -
9 - - - Rel-9 CRs - - Docs:=0 -
10 - - - Rel-10 CRs - - Docs:=0 -
11 - - - Rel-11 CRs - - Docs:=0 -
12 - - - Rel-12 CRs - - Docs:=0 -
13 - - - Rel-13 CRs - - Docs:=1 -
13 SP-221150 CR PACK Approval Rel-13 CRs on Security of MCPTT SA WG3 CC#2: This CR Pack was approved. Approved
14 - - - Rel-14 CRs - - Docs:=1 -
14 SP-221151 CR PACK Approval Rel-14 CRs on Security of the Mission Critical Service SA WG3 CC#2: This CR Pack was approved. Approved
15 - - - Rel-15 CRs - - Docs:=3 -
15 SP-221149 CR PACK Approval Rel-15 CRs on Security aspects of CAPIF SA WG3 CC#2: This CR Pack was approved. Approved
15 SP-221173 CR PACK Approval Rel-15 CRs on TEI SA WG5 CC#2: This CR Pack was approved. Approved
15 SP-221178 CR PACK Approval Rel-15 CRs on Management and orchestration of 5G networks and network slicing SA WG5 CC#2: This CR Pack was approved. Approved
16 - - - Rel-16 CRs - - Docs:=24 -
16 SP-221279 CR Approval 28.541 CR0842R2 (Rel-16, 'F'): Rel-16 CR TS 28.541 Correct periodicityList Ericsson Rel-16 Update of 28.541 CR0842R1 in CR Pack SP-221182. CC#2: This CR was approved Approved
16 SP-221280 CR Approval 28.541 CR0841R2 (Rel-17, 'A'): Rel-17 CR TS 28.541 Correct periodicityList Ericsson Rel-17 Update of 28.541 CR0841R1 in CR Pack SP-221182. CC#2: This CR was approved Approved
16 SP-221281 CR Approval 28.541 CR0840R2 (Rel-18, 'A'): Rel-18 CR TS 28.541 Correct periodicityList Ericsson Rel-18 Update of 28.541 CR0840R1 in CR Pack SP-221182. CC#2: This CR was approved Approved
16 SP-221297 CR Approval 28.541 CR0839R1 (Rel-16, 'F'): Rel-16 CR TS 28.541 Correct kPIList Ericsson Rel-16 Update of 28.541 CR0839 in CR Pack SP-221182. CC#2: This CR was approved Approved
16 SP-221298 CR Approval 28.541 CR0838R1 (Rel-17, 'A'): Rel-17 CR TS 28.541 Correct kPIList Ericsson Rel-17 Update of 28.541 CR0838 in CR Pack SP-221182. CC#2: This CR was approved Approved
16 SP-221299 CR Approval 28.541 CR0837R1 (Rel-18, 'A'): Rel-18 CR TS 28.541 Correct kPIList Ericsson Rel-18 Update of 28.541 CR0837 in CR Pack SP-221182. CC#2: This CR was approved Approved
16 SP-221182 CR PACK Approval Rel-16 CRs on Management Aspects of 5G Service-Level Agreement SA WG5 Company revisions of 28.541 CR0842R1 in SP-221279, 28.541 CR0841R1 in SP-221280, 28.541 CR0840R1 in SP-221281. Company revisions of 28.541 CR0839 in SP-221297, 28.541 CR0838 in SP-221298, 28.541 CR08437 in SP-221299. CC#2: Partially approved It was found in the SA preparation that 6 of the SA5-agreed CRs in CR pack SP-221182 (S5-226791/2/3 and S5-226587/8/9) were lacking stage 3 / Forge related information, therefore the author company Ericsson has prepared and submitted revised versions of these CRs with the missing information provided to SA#98-e. The new company CRs are found in SP-221279-81 and SP-221297-99. It is advised by MCC that SA decides whether to approve the SA WG5 versions in SP-221182 or the company submitted revised proposals. MCC has taken the CR Pack SP-221182 out of block approval. Partially approved
16 - - - Block 4 (to approve) - - Docs:=17 -
16 SP-221061 CR PACK Approval CRs on 5G_URLLC (Rel-16, Rel-17) SA WG2 CC#3: Block approved Approved
16 SP-221062 CR PACK Approval CRs on 5WWC (Rel-16, Rel-17) SA WG2 CC#3: Block approved Approved
16 SP-221063 CR PACK Approval CRs on TEI16 (Rel-16, Rel-17) SA WG2 CC#3: Block approved Approved
16 SP-221029 CR PACK Approval Rel-16 CRs on Lawful Interception SA WG3-LI Rel-16 CC#3: Block approved Approved
16 SP-221148 CR PACK Approval Rel-16 CRs on Security Assurance Specification for 5G SA WG3 CC#3: Block approved Approved
16 SP-221154 CR PACK Approval Rel-16 CRs on Security for 5G_eSBA SA WG3 CC#3: Block approved Approved
16 SP-221039 CR PACK Approval CR Pack on 5G_MEDIA_MTSI_ext SA WG4 Rel-16 CC#3: Block approved Approved
16 SP-221040 CR PACK Approval CR Pack on TEI16 SA WG4 Rel-16 CC#3: Block approved Approved
16 SP-221041 CR PACK Approval CR Pack on AE_enTV-S4, TEI16 SA WG4 Rel-16 CC#3: Block approved Approved
16 SP-221042 CR PACK Approval CR Pack on 5GMS3 SA WG4 Rel-16 CC#3: Block approved Approved
16 SP-221169 CR PACK Approval Rel-16 Crs on TEI Batch 1 SA WG5 CC#3: Block approved Approved
16 SP-221170 CR PACK Approval Rel-16 Crs on TEI Batch 2 SA WG5 CC#3: Block approved Approved
16 SP-221171 CR PACK Approval Rel-16 Crs on TEI Batch 3 SA WG5 CC#3: Block approved Approved
16 SP-221192 CR PACK Approval Rel-16 CRs on Network Exposure Charging in 5G System Architecture SA WG5 CC#3: Block approved Approved
16 SP-221195 CR PACK Approval Rel-16 CRs on Nchf Online and Offline charging services SA WG5 CC#3: Block approved Approved
16 SP-221196 CR PACK Approval Rel-16 CRs on Management of MDT in 5G SA WG5 CC#3: Block approved Approved
16 SP-221200 CR PACK Approval Rel-16 CRs on NRM enhancements SA WG5 CC#3: Block approved Approved
17 - - - Rel-17 CRs - - Docs:=60 -
17 SP-221295 CR Approval 23.502 CR3657 (Rel-17, 'F'): Aerial Subscription Update Qualcomm, Nokia, Nokia Shanghai Bell Rel-17 Replacement of 23.502 CR3586R1 in CR Pack SP-221075. Dependency on TSG CT decision on Stage 3 CRs CP-223230 and CP-223231. CC#2: SP-221295_rev1 was approved (to be revised by MCC). Revised to SP-221332. Haris (Qualcomm) provides rev1
Ericsson indicates that SA plenary needs to make the decision between CR Pack in 1075 vs. revised 1295/1294 submitted.
Lenovo seeks a clarification whether (A) the whole CR Pack in 1075 has be exchanged by the revised 1295/1294, or (B) only the SA2 CRs S2-2209275 and S2-2209276 from CR Pack in 1075 are to be exchanged by the revised 1295/1294? Lenovo's understanding is (B).
Samsung clarifies to Lenovo and answers that Lenovo understanding is correct. Only S2-2209275 and S2-2209276 need to be exchanged with 1295/1294.
Revised
17 SP-221332 CR Approval 23.502 CR3657R1 (Rel-17, 'F'): Aerial Service Availability Update using UCU Qualcomm, Nokia, Nokia Shanghai Bell Rel-17 Revision of SP-221295_rev1. This CR was approved Approved
17 SP-221294 CR Approval 23.256 CR0072 (Rel-17, 'F'): Aerial Subscription Update using UCU Qualcomm, Nokia, Nokia Shanghai Bell Rel-17 Replacement of 23.256 CR0070R1 in CR Pack SP-221075. Dependency on TSG CT decision on Stage 3 CRs CP-223230 and CP-223231. CC#2: _rev2 was approved (to be revised by MCC). Revised to SP-221333. Haris (Qualcomm) provides rev1
LaeYoung (LGE) comments on rev1.
Ericsson indicates that SA plenary needs to make the decision between CR Pack in 1075 vs. revised 1295/1294 submitted.
Lenovo seeks a clarification whether (A) the whole CR Pack in 1075 has be exchanged by the revised 1295/1294, or (B) only the SA2 CRs S2-2209275 and S2-2209276 from CR Pack in 1075 are to be exchanged by the revised 1295/1294? Lenovo's understanding is (B).
Samsung clarifies to Lenovo and answers that Lenovo understanding is correct. Only S2-2209275 and S2-2209276 need to be exchanged with 1295/1294.
Haris (Qualcomm) provides rev2
LaeYoung (LGE) is OK with rev2.
Wanqiang (Huawei) provides a revision comment.
Ashok (Samsung) comments
Revised
17 SP-221333 CR Approval 23.256 CR0072R1 (Rel-17, 'F'): Aerial Service Availability Update using UCU Qualcomm, Nokia, Nokia Shanghai Bell Rel-17 Revision of SP-221294_rev2. This CR was approved Approved
17 SP-221075 CR PACK Approval CRs on ID_UAS (Rel-17) SA WG2 Alternative CR to 23.256 CR0070R1 in SP-221294. CC#2: Partially approved Ericsson indicates that SA plenary needs to make the decision between CR Pack in 1075 vs. revised 1295/1294 submitted.
Lenovo seeks a clarification whether (A) the whole CR Pack in 1075 has be exchanged by the revised 1295/1294, or (B) only the SA2 CRs S2-2209275 and S2-2209276 from CR Pack in 1075 are to be exchanged by the revised 1295/1294? Lenovo's understanding is (B).
Samsung clarifies to Lenovo and answers that Lenovo understanding is correct. Only S2-2209275 and S2-2209276 need to be exchanged with 1295/1294.
Partially approved
17 SP-221058 CR Approval 26.260 CR0004R2 (Rel-18, 'D'): Corrections to TS 26.260 Clause 4 Qualcomm Incorporated Rel-18 Revision of S4-221518 in SP-221047. Moved to AI 17 to handle together. CC#2: This CR was approved Approved
17 SP-221047 CR PACK Approval CR Pack on ATIAS SA WG4 Rel-17 Company revision proposed in SP-221058. CC#2: Noted Noted
17 SP-221059 CR Approval 26.517 CR0003R3 (Rel-17, 'F'): [5MBP3] Alignment of User Service Announcement with Stage 2 Ericsson LM,, Huawei, HiSilicon, BBC Rel-17 Revision of S4-221498 in SP-221044. CC#2: This CR was approved. Approved
17 SP-221208 DISCUSSION Approval Proposed way forward for update of aerial subscription information (ID_UAS) Qualcomm Incorporated, Nokia, Nokia Shanghai Bell Rel-17 CC#2: Noted Noted
17 SP-221044 CR PACK Approval CR Pack on 5MBP3 SA WG4 Rel-17 Company revision proposed in SP-221059. CC#2: Noted Noted
17 SP-221273 CR Approval 26.114 CR0538R2 (Rel-18, 'A'): CR to TS 26.114 Add slice scope into the QoE configuration Huawei, HiSilicon Rel-18 Revision of 26.114 CR0538R1 in CR Pack SP-221054 (correction to a Rel-18 mirror CR). CC#2: This CR was approved Approved
17 SP-221054 CR PACK Approval CR Pack on NR_QoE_enh-Core SA WG4 Rel-17 Revision of 26.114 CR0538R1 proposed in SP-221273 as it should be a Rel-18 mirror CR to CR0532R2. CC#2: Partially approved Partially approved
17 SP-221211 CR Approval 23.247 CR0140R1 (Rel-17, 'F'): Alignment with stage-3 for USD and service announcement Qualcomm Incorporated, Ericsson, Samsung, ATT, Deutsche Telekom, Orange, Telecom Italia Rel-17 CR was noted at S2#153-e due to no consensus. CC#4: Postponed. A technical vote will be arranged for this at TSG SA#99. Huawei objects to the CR as we discussed in SA2.
CBN objects this CR.
Haris (Qualcomm) responds and asks the CR to be discussed in GTW
Biao(China Telecom) provides comment.
Krister (Ericsson) points out the 3GPP work principle of alignment of stage 2 specifications to stage 3 specifications when stage 3 is completed in a frozen release is important to not have inconsistent specifications.
Biao(China Telecom) respond to Krister(Ericsson) about the alignment issue in 3GPP.
Postponed
17 SP-221255 CR Approval 23.288 CR0596 (Rel-17, 'F'): Correction on SMCCE Analytics LG Electronics, Ericsson Rel-17 CC#2: This CR was approved Approved
17 SP-221288 CR Approval 23.503 CR0751R3 (Rel-17, 'F'): Clarifications for QoS monitoring control Huawei, HiSilicon, Nokia, Nokia Shanghai Bell Rel-17 Revision of SA WG2 Endorsed 23.503 CR0751R2. CC#4: _rev1 was approved. Revised to SP-221348. Ericsson objects to the original submitted version and provides revision in the Drafts folder, which was also shared in SA2 email list.
Huawei provides rev1 with updates agreed during offline discussion.
Revised
17 SP-221348 CR Approval 23.503 CR0751R4 (Rel-17, 'F'): Clarifications for QoS monitoring control Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson Rel-17 Revision of SP-221288_rev1. This CR was approved Approved
17 - - - Block 4 (to approve) - - Docs:=44 -
17 SP-221064 CR PACK Approval CR on 5G_eLCS_Ph2 (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221065 CR PACK Approval CRs on 5G_ProSe (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221066 CR PACK Approval CR on NRslice (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221067 CR PACK Approval CR on EDGEAPP (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221068 CR PACK Approval CRs on 5MBS (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221069 CR PACK Approval CRs on eEDGE_5GC (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221070 CR PACK Approval CRs on eNA_Ph2 (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221071 CR PACK Approval CRs on eNPN (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221072 CR PACK Approval CR on eNS_Ph2 (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221073 CR PACK Approval CR on eNS2_SEC (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221074 CR PACK Approval CR on eV2XARC_Ph2 (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221076 CR PACK Approval CRs on IIoT (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221077 CR PACK Approval CRs on IoT_SAT_ARCH_EPS (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221078 CR PACK Approval CR on MINT (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221079 CR PACK Approval CRs on TEI17_5GS_Ph1 (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221080 CR PACK Approval CRs on TEI17 (Rel-17) SA WG2 CC#3: Block approved Approved
17 SP-221030 CR PACK Approval Rel-17 CRs on Lawful Interception SA WG3-LI Rel-17 CC#3: Block approved Approved
17 SP-221043 CR PACK Approval CR Pack on 5GMS3 SA WG4 Rel-17 CC#3: Block approved Approved
17 SP-221045 CR PACK Approval CR Pack on 5MBUSA SA WG4 Rel-17 CC#3: Block approved Approved
17 SP-221046 CR PACK Approval CR Pack on AE_enTV-S4, TEI17 SA WG4 Rel-17 CC#3: Block approved Approved
17 SP-221049 CR PACK Approval CR Pack on EVS_codec-SA4 SA WG4 Rel-17 CC#3: Block approved Approved
17 SP-221051 CR PACK Approval CR Pack on HInT SA WG4 Rel-17 CC#3: Block approved Approved
17 SP-221053 CR PACK Approval CR Pack on ITT4RT SA WG4 Rel-17 CC#3: Block approved Approved
17 SP-221055 CR PACK Approval CR Pack on TEI17 SA WG4 Rel-17 CC#3: Block approved Approved
17 SP-221152 CR PACK Approval Rel-17 CRs on Security Aspects of Proximity based Services in 5GS SA WG3 CC#3: Block approved Approved
17 SP-221153 CR PACK Approval Rel-17 CRs on Security aspects of Uncrewed Aerial Systems SA WG3 CC#3: Block approved Approved
17 SP-221155 CR PACK Approval Rel-17 CRs on TEI SA WG3 CC#3: Block approved Approved
17 SP-221157 CR PACK Approval Rel-17 CRs on Security Assurance Specification for 5G (eSCAS_5G) SA WG3 CC#3: Block approved Approved
17 SP-221158 CR PACK Approval Rel-17 CRs on Security Aspects of Enhancements of Support for Edge Computing in 5GC SA WG3 CC#3: Block approved Approved
17 SP-221166 CR PACK Approval Rel-17 CRs on Enhancements of Management Data Analytics Service SA WG5 CC#3: Block approved Approved
17 SP-221167 CR PACK Approval Rel-17 Crs on TEI Batch 1 SA WG5 CC#3: Block approved Approved
17 SP-221168 CR PACK Approval Rel-17 Crs on TEI Batch 2 SA WG5 CC#3: Block approved Approved
17 SP-221175 CR PACK Approval Rel-17 CRs on Intent driven management service for mobile network SA WG5 CC#3: Block approved Approved
17 SP-221180 CR PACK Approval Rel-17 CRs on Management Aspects of 5G Network Sharing SA WG5 CC#3: Block approved Approved
17 SP-221181 CR PACK Approval Rel-17 CRs on Enhancements of Self-Organizing Networks (SON) for 5G networks SA WG5 CC#3: Block approved Approved
17 SP-221185 CR PACK Approval Rel-17 CRs on Enhancements of 5G performance measurements and KPIs SA WG5 CC#3: Block approved Approved
17 SP-221186 CR PACK Approval Rel-17 CRs on Management data collection control and discovery SA WG5 CC#3: Block approved Approved
17 SP-221187 CR PACK Approval Rel-17 CRs on Additional NRM features SA WG5 CC#3: Block approved Approved
17 SP-221190 CR PACK Approval Rel-17 CRs on Charging aspects of Edge Computing SA WG5 CC#3: Block approved Approved
17 SP-221191 CR PACK Approval Rel-17 CRs on Charging aspects of Proximity-based Services in 5GS SA WG5 CC#3: Block approved Approved
17 SP-221193 CR PACK Approval Rel-17 CRs on IMS Charging in 5G System Architecture SA WG5 CC#3: Block approved Approved
17 SP-221197 CR PACK Approval Rel-17 CRs on Management of MDT enhancement in 5G SA WG5 CC#3: Block approved Approved
17 SP-221237 CR PACK Approval Rel-17 CRs to TS 23255 for UASAPP SA WG6 Rel-17 CC#3: Block approved Approved
17 SP-221238 CR PACK Approval Rel-17 CRs to TS 23558 for EDGEAPP SA WG6 Rel-17 CC#3: Block approved Approved
18 - - - Rel-18 CRs - - Docs:=0 -
18.1 - - - SA WG1 Rel-18 CRs - - Docs:=3 -
18.1 - - - Block 4 (to approve) - - Docs:=3 -
18.1 SP-221258 CR PACK Approval Stage 1 CRs on SENSE SA WG1 Rel-18 CC#3: Block approved Approved
18.1 SP-221259 CR PACK Approval Stage 1 editorial CRs on TS 22.261 SA WG1 CC#3: Block approved Approved
18.1 SP-221262 CR PACK Approval Stage 1 CRs on TEI18 SA WG1 Rel-18 CC#3: Block approved Approved
18.2 - - - SA WG2 Rel-18 CRs - - Docs:=13 -
18.2 - - - Block 4 (to approve) - - Docs:=13 -
18.2 SP-221081 CR PACK Approval CRs on 5G_eLCS_Ph3 (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221082 CR PACK Approval CRs on 5G_ProSe_Ph2 (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221083 CR PACK Approval CRs on 5GSATB (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221084 CR PACK Approval CRs on 5WWC_Ph2 (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221085 CR PACK Approval CRs on AMP (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221086 CR PACK Approval CRs on EDGE_Ph2 (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221087 CR PACK Approval CRs on eNPN_Ph2 (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221089 CR PACK Approval CRs on GMEC (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221090 CR PACK Approval CRs on NR_REDCAP_Ph2 (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221091 CR PACK Approval CRs on SUECR (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221092 CR PACK Approval CRs on TRS_URLLC (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221093 CR PACK Approval CRs on UPEAS (Rel-18) SA WG2 CC#3: Block approved Approved
18.2 SP-221094 CR PACK Approval CRs on TEI18 (Rel-18) SA WG2 CC#3: Block approved Approved
18.3 - - - SA WG3 and SA WG3 LI Rel-18 CRs - - Docs:=1 -
18.3 - - - Block 4 (to approve) - - Docs:=1 -
18.3 SP-221031 CR PACK Approval Rel-18 CRs on Lawful Interception SA WG3-LI Rel-18 CC#3: Block approved Approved
18.4 - - - SA WG4 Rel-18 CRs - - Docs:=4 -
18.4 - - - Block 4 (to approve) - - Docs:=4 -
18.4 SP-221048 CR PACK Approval CR Pack on eUET SA WG4 Rel-18 CC#3: Block approved Approved
18.4 SP-221052 CR PACK Approval CR Pack on IBACS SA WG4 Rel-18 CC#3: Block approved Approved
18.4 SP-221056 CR PACK Approval CR Pack on TEI18 SA WG4 Rel-18 CC#3: Block approved Approved
18.4 SP-221057 CR PACK Approval CR Pack on 5GMS_Ph2 SA WG4 Rel-19 CC#3: Block approved Approved
18.5 - - - SA WG5 Rel-18 CRs - - Docs:=11 -
18.5 SP-221201 CR Approval 32.291 CR0451R1 (Rel-18, 'F'): Rel-18 CR 32.291 Update OpenAPI version Huawei, Ericsson, MATRIXX Software Rel-18 Revision of CR in CR Pack SP-221172. Incorrect CR Number on cover sheet - CR states 0450! Revised to SP-221274 Revised
18.5 SP-221274 CR Approval 32.291 CR0451R2 (Rel-18, 'F'): Rel-18 CR 32.291 Update OpenAPI version Huawei, Ericsson, MATRIXX Software Rel-18 Revision of SP-221201. Revision of CR in CR Pack SP-221172. CC#2: This CR was approved Approved
18.5 SP-221172 CR PACK Approval Rel-18 CRs on TEI SA WG5 Revision of 32.291 CR 0451 provided in SP-221274. CC#2: Partially approved MCC commented on this CR. They advised against bringing empty clauses with editor's notes into specifications under change control, especially if they end up not being addressed when the Release is frozen.
The company contribution SP-221274 will replace S5-226873 (32291_CR0451) of the CR pack SP-221172.
SA5 Charging chair suggests to send the CR back to SA5.
This suggestion is related to CR S5-226711 (CR0448rev1).
Partially approved
18.5 SP-221183 CR PACK Approval Rel-18 CRs on 5G performance measurements and KPIs phase 3 SA WG5 Request to withdraw 28.658 CR0062. CC#2: Partially approved Nokia and SA5 chair asks to withdraw S5-226190 'Rel-18 CR TS 28.658 Enhancing EUtranRelation with NR cell as source cell' in CR pack SP-221183 because of formal errors found on the cover page.
Nokia confirms that we are ok to not approve CR S5-226190 from CR pack SP-221183.
Partially approved
18.5 - - - Block 4 (to approve) - - Docs:=7 -
18.5 SP-221174 CR PACK Approval Rel-18 CRs on Enhancements of EE for 5G Phase 2 SA WG5 CC#3: Block approved Approved
18.5 SP-221176 CR PACK Approval Rel-18 CRs on Enhancement of QoE Measurement Collection SA WG5 CC#3: Block approved Approved
18.5 SP-221177 CR PACK Approval Rel-18 CRs on Network slice provisioning enhancement SA WG5 CC#3: Block approved Approved
18.5 SP-221184 CR PACK Approval Rel-18 CRs on Enhanced Edge Computing Management SA WG5 CC#3: Block approved Approved
18.5 SP-221188 CR PACK Approval Rel-18 CRs on Additional NRM features phase 2 SA WG5 CC#3: Block approved Approved
18.5 SP-221189 CR PACK Approval Rel-18 CRs on Methodology for deprecation SA WG5 CC#3: Block approved Approved
18.5 SP-221194 CR PACK Approval Rel-18 CRs on Multimedia Messaging Service Charging using service-based interface SA WG5 CC#3: Block approved Approved
18.6 - - - SA WG6 Rel-18 CRs - - Docs:=12 -
18.6 SP-221242 CR PACK Approval Rel-18 CRs to TS 23558 for EDGEAPP_Ph2 SA WG6 Rel-18 Moved out of Block Approval due to comment on S6-223621 by Qualcomm. CC#3: 23.558 CR0138R4 postponed. Other CRs approved. Partially approved Haris (Qualcomm) provides comments for CR S6-223621 in CR pack SP-221242 and proposes revision or alternatively to send the CR back to SA6 for further discussion
Samsung prefers to send the CR back to SA6. Besides SMS delivery method, we believe additional aspects need to be considered and the impact on EDGE-1/4 reference points.
Ericsson agrees with Samsung to send the CR back to SA6 for proper updates.
Partially approved
18.6 - - - Block 4 (to approve) - - Docs:=11 -
18.6 SP-221239 CR PACK Approval Rel-18 CR to TS 23222 for TEI18 SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221240 CR PACK Approval Rel-18 CRs to TS 23554 for 5GMARCH_Ph2 SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221241 CR PACK Approval Rel-18 CRs to TS 23379 for MC_AHGC SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221243 CR PACK Approval Rel-18 CR to TS 23280 for enh4MCPTT SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221244 CR PACK Approval Rel-18 CRs to TS 23434 for eSEAL2 SA WG6 Rel-18 CRs using eSEAL_Ph2, but WI Code is SEAL_Ph3. CC#3: Block approved Approved
18.6 SP-221247 CR PACK Approval Rel-18 CRs to TS 23280 for Irail SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221248 CR PACK Approval Rel-18 CRs to TS 23289 for MCOver5MBS SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221249 CR PACK Approval Rel-18 CR to TS 23434 for SEALDD SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221250 CR PACK Approval Rel-18 CRs to TS 23222 for SNAAPP SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221251 CR PACK Approval Rel-18 CRs to TS 23255 for UASAPP_Ph2 SA WG6 Rel-18 CC#3: Block approved Approved
18.6 SP-221252 CR PACK Approval Rel-18 CRs to TS 23286 for V2XAPP_Ph3 SA WG6 Rel-18 CC#3: Block approved Approved
19 - - - Rel-19 CRs - - Docs:=1 -
19 - - - Block 4 (to approve) - - Docs:=1 -
19 SP-221260 CR PACK Approval Stage 1 CRs on TEI19 SA WG1 Rel-19 CC#3: Block approved Approved
20 - - - CRs related to Study Items - - Docs:=5 -
20 - - - Block 4 (to approve) - - Docs:=5 -
20 SP-221088 CR PACK Approval CR on FS_REDCAP_Ph2 (Rel-18) SA WG2 CC#3: Block approved Approved
20 SP-221050 CR PACK Approval CR Pack on FS_Audio_5GSTAR SA WG4 Rel-18 CC#3: Block approved Approved
20 SP-221245 CR PACK Approval Rel-18 CR to TR 23700-36 for FS_ADAES SA WG6 Rel-18 CC#3: Block approved Approved
20 SP-221246 CR PACK Approval Rel-18 CRs to TR 23700-99 for FS_NSCALE SA WG6 Rel-18 CC#3: Block approved Approved
20 SP-221261 CR PACK Approval Stage 1 CRs on FS_FRMCS_Ph5 SA WG1 Rel-19 CC#3: Block approved Approved
21 - - - Project Management & TSG SA owned specifications - - Docs:=0 -
21.1 - - - General project management issues - - Docs:=0 -
21.2 - - - E-Meeting Procedures (TSG SA, SA WGs) - - Docs:=0 -
21.3 - - - Review of the work plan - - Docs:=2 -
21.3 SP-221285 WORK PLAN Presentation Work Plan review at TSG#98e ETSI MCC (Work Plan Manager) CC#5: _Rev2 Noted. Revised to SP-221352. Revised
21.3 SP-221352 WORK PLAN Presentation Work Plan review at TSG#98e ETSI MCC (Work Plan Manager) Revision of SP-221285_rev2. Noted Noted
21.4 - - - Specification Status - - Docs:=0 -
21.5 - - - Work Item Summaries for TR 21.91x - - Docs:=3 -
21.5 - - - Block 5 (to approve / endorse) - - Docs:=3 -
21.5 SP-221202 WI SUMMARY Endorsement Summary for Adapting BEST for use in 5G networks KPN Rel-17 CC#3: Block endorsed Endorsed
21.5 SP-221269 WI SUMMARY Endorsement WI Summary - 5MBUSA 5G Multicast-Broadcast User Service Architecture TELUS Rel-17 CC#3: Block endorsed Endorsed
21.5 SP-221286 DRAFT TR Approval TR 21.917 v.2.0.0 on Release 17 summary for Approval ETSI MCC (Work Plan Manager) Rel-17 CC#3: Block approved Approved
21.6 - - - Improvements to working methods & CRs against 3GPP TSG SA owned Specifications - - Docs:=2 -
21.6 SP-221287 OTHER Approval Proposed new WID template ETSI MCC (Work Plan Manager) CC#5: _rev1 approved. Revised to SP-221354. Revised
21.6 SP-221354 OTHER Approval Proposed new WID template ETSI MCC (Work Plan Manager) Revision of SP-221287_rev1. Approved Approved
21.7 - - - MCC Status Report - - Docs:=1 -
21.7 SP-221301 Report Presentation MCC activity Report to TSG SA#98-e MCC Director CC#5: Noted Noted
21.8 - - - Future Meeting schedule - - Docs:=0 -
22 - - - Any Other Business - - Docs:=0 -
23 - - - Close of Meeting - - Docs:=0 -
99 - - - WITHDRAWN ITEMS - - Docs:=7 -
99 SP-221207 LS OUT Approval [DRAFT] Proposed merge LS - SA WG1 and SA WG2 Reply LS to 5GAA on QoS Sustainability analytics and V2X service adaptations OPPO WITHDRAWN Withdrawn
99 SP-221209 CR Approval 23.256 CR0070R2 (Rel-17, 'F'): Aerial Subscription Update Qualcomm Rel-17 Revision of 23.256 CR0070R1 in CR Pack SP-221075. WITHDRAWN Withdrawn
99 SP-221210 CR Approval 23.502 CR3586R2 (Rel-17, 'F'): Aerial Subscription Update Qualcomm Rel-17 Revision of 23.502 CR3586R1 in CR Pack SP-221075. WITHDRAWN Withdrawn
99 SP-221179 CR PACK Approval Rel-18 CRs on Additional NRM features phase 2 SA WG5 WITHDRAWN Withdrawn
99 SP-221142 CR PACK Approval Reserved for SA WG2 CR Pack SA WG2 WITHDRAWN Withdrawn
99 SP-221128 WID NEW Approval New WID on Architectural enhancements for 5G multicast-broadcast services Phase 2 (5MBS_Ph2). SA WG2 Rel-18 WITHDRAWN - Correct WID in SP-221131 Withdrawn
99 SP-221227 WID REVISED Approval Revised WID on Enhanced Service Enabler Architecture Layer for Verticals Phase 2 SA WG6 Rel-18 WITHDRAWN Withdrawn
Created:      END OF LIST
OPEN documents: 0
Parallel Agreed: 0
Approved/Endorsed: 218
Agreed: 0
Replied to LSs: 3
Noted: 72
Merged: 0
For e-mail approval: 0
Postponed: 5
Withdrawn: 7
Total documents: 352