Last Allocated Document: SP-140887

Temporary Document List - Ordered by TD

Colour Key:
No Conclusion
Conclusion Reached
Document Revised
Proposed for Block Approval
Proposed for Block Noting
Document Withdrawn
Document Not Handled

To use hyperlinks, this file must be placed above Folder 'Docs'

Created: 2014-12-12 17:56     START OF LIST

Agenda TD LongTitle Source Summary Doc_Type Doc_For Decision Rev_By Rev_Of LS_Source_file Comment
2 SP-140643 Draft agenda for TSG SA meeting #66 TSG SA Chairman Draft agenda for TSG SA meeting #66 Agenda Approval Approved The agenda was reviewed and approved.
4.1 SP-140644 Draft Report of TSG SA meeting #65 TSG SA Secretary Draft Report of TSG SA meeting #65 containing revision marks of changes on the distributed draft. Report Approval Approved The report was approved and will be updated to remove revision marks and placed on the FTP server as version 1.0.0.
5.2 SP-140645 Draft Terms of Reference for SA WG6 SA WG6 Convenor (UK Home Office) This paper proposes text for approval as the Terms of Reference for SA WG6. ToR Approval Approved This ToR was approved.
13.4 SP-140646 LS from APT Wireless Group (AWG): Liaison statement regarding scope and status relevant to PPDR work items and study items APT Wireless Group (AWG) Task Group on PPDR (TG-PPDR) under the APT AWG has developed a number of reports and recommendations relating to PPDR for APT countries. In particular, the following two APT AWG reports provide details of PPDR [...]. LS In Action Response in SP-140886 AWG-17/OUT-07 Response drafted in SP-140878. Final response in SP-140886
6 SP-140647 Forwarded from TSG GERAN: LS from ITU-T Study Group 17: LS on new work item on simple encryption procedure for IoT device security ITU-T Study Group 17 ITU-T Study Group 17, Security, coordinates security-related work across all ITU-T Study Groups. Often working in cooperation with other standards development organizations (SDOs) and various ICT industry conso [...]. LS In Action Noted COM 17 - LS 152 Forwarded from TSG GERAN. Proposed to forward to SA WG3 This incoming LS was noted
6 SP-140648 LS from ETSI E2NA: LS on Location of Media Transcoders ETSI E2NA In November 2012 ETSI EP E2NA sent a Liaison Statement to the groups listed above to collect information about the existence of documents addressing the problem of the location of media transcoding function in [...]. LS In Information Forward to SA WG2 and CT WG3 E2NA(14)000179 Proposed to forward to SA WG2. Forward to SA WG2 and CT WG3. Noted
6 SP-140649 LS from ITU-R Working Party 1A: Working document towards a preliminary draft new ITU-R Report on the Smart Grid project ITU-R Working Party 1A Working Party 1A wishes to inform the relevant External Organizations of a further development of the document attached to this liaison statement. Working Party 1A would therefore appreciate any comments and ad [...]. LS In Information Response in SP-140874 Document 1A/TEMP/61 A response was provided in SP-140874
6 SP-140650 LS from OMA: LS Response to ETSI TCCE WG4 proposal for joint follow up working session OMA The OMA COM was pleased to receive LS TCCE04(14)000058 'Proposal for joint follow up working session' from ETSI TC TCCE WG4. OMA COM PCPS agrees that further joint meetings are in order and would like to provid [...]. LS In Information Noted OMA-LS_1048-COM Proposed to note. Block noted.
6 SP-140651 LS from OMA: LS to 3GPP SA3 on TLS OMA The OMA COM PCPS work area is working on updating OMA PoC v2.1 (Push to Talk over Cellular) to PCPS v1.0 (Push to Communicate for Public Safety). One of the primary objectives of this is to update and align the [...]. LS In Information Noted OMA-LS_1049-OMA_COM Proposed to note. Block Noted
6 SP-140652 LS from OMA: LS to 3GPP on MCPTT OMA OMA COM PCPS was enthused to hear about the creation of SA6 as 'home for the mission critical communications application' explained in 3GPP TD SP-140640. PCPS is looking forward to getting additional informatio [...]. LS In Information Noted OMA-LS_1051-OMA_COM Proposed to note. Block Noted
13.4 SP-140653 LS from SA WG4: Reply LS on 3GPP work organization for Mission Critical Push to Talk SA WG4 SA WG4 would like to thank TSG SA for the information (given in LS in SP-140640/S4-141150) about its decision related to Mission Critical Push to Talk (MCPTT) and welcomes the creation of a new working group. A [...]. LS In Action Noted S4-141360 This incoming LS was noted
7.7 SP-140654 LS from SA WG5: Reply LS from SA WG5 to TSG SA on Maintenance of I-WLAN Solution SA WG5 SA WG5 thanks TSG SA for the LS on the discontinuation of the maintenance of the I-WLAN feature from Rel-12 onwards and would like to report to TSG SA the related actions carried out in SA WG5. For Charging, [...]. LS In Action Noted S5-144380 This incoming LS was noted
13.4 SP-140655 LS from SA WG5: LS to SA on 3GPP work organization for Mission Critical Push to Talk SA WG5 SA WG5 would like to inform TSG SA and OMA about the potential impact on charging framework of SA WG5 while creating the standard for mission critical communication application in the new TSG SA6 group and the [...]. LS In Information Forwarded to SA WG6 S5-145393 It was agreed to forward this to SA WG6. This was then noted.
5.2 SP-140656 LS from ETSI TC TCCE: LS on 3GPP work organization for Mission Critical Push to Talk ETSI TC TCCE Thank you for the LS (SP-140640) informing us of the organisation within 3GPP for standardising Mission Critical Push To Talk (PTT) and the formation of Working Group SA WG6. ETSI TC TCCE fully supports forming [...]. LS In Information Noted TCCE(14)000082r1 This incoming LS was noted
6 SP-140657 LS from oneM2M: Candidate Release Available oneM2M The Technical Plenary of oneM2M wishes to make you aware that oneM2M, the Global Partnership developing standards for Machine-to-Machine (M2M) communications and the Internet-of-Things (IoT) announced that its [...]. LS In Information Forward to SA WG2, SA WG3, CT WG1, CT WG3 and CT WG4. Noted TP-2014-0511 It was agreed to forward this to relevant WGs, SA WG2, SA WG3, CT WG1, CT WG3 and CT WG4. This was then noted.
6 SP-140658 LS from WBA: Liaison Statement to 3GPP on Community Wi-Fi white paper WBA The Community Wi-Fi project team would like to share the final version of the Community Wi-Fi white paper with 3GPP. WBA plans to continue working on the Community Wi-Fi topic and welcomes feedback to the curre [...]. LS In Information Noted WBA-LiasionStatement to 3GPP This was reviewed and noted.
5.2 SP-140659 SA WG6 2015 calendar SA WG6 Convenor (UK Home Office) This paper provides information on the planned meeting schedule for SA WG6 in 2015 OTHER Information Noted This was reviewed and noted.
5.3 SP-140660 SA WG2 Prioritisation of FMSS Allot Communications, China Mobile, China Unicom, KDDI, China Telecom, Rogers Communications, Orange, Softbank Mobile, IAESI, Comverse, Sandvine Incorporated, Oracle Corporation, Openet Telecom, Broadcom Corporation, CATR, Intel, ZTE, CATT Summary: The cosigning companies believe FMSS Work Item should be given high priority in SA WG2 group Discussion Presentation Noted This contribution was noted
5 SP-140661 LS from CT WG1: LS on codec support in IMS-WebRTC CT WG1 CT WG1 intend to include a requirement to conform to draft-ietf-rtcweb-overview and draft-alvestrand-rtcweb-gateway in their specification 3GPP TS 24.371 for WebRTC. CT WG1 wish to draw SA WG4s attention to a [...]. LS In Information Noted C1-145032 This incoming LS was noted
7.7 SP-140662 LS from CT WG3: LS on Discontinuance of I-WLAN related TS 29.161 CT WG3 Due to the TSG SA plenary guidance to remove I-WLAN from Rel-13, CT WG3 decided to discontinue the I-WLAN related TS 29.161 in Rel-13. Thus, any references to TS 29.161 from other specifications need to be remo [...]. LS In Information Noted C3-145271 This incoming LS was noted
7.7 SP-140663 LS from CT WG4: Reply LS on Maintenance of I-WLAN Solution CT WG4 CT WG4 thanks TSG SA for their LS on stopping the maintenance of I-WLAN Interworking. CT WG4 has analysed the impacts for stopping the maintenance of I-WLAN Interworking in our CT WG4 specifications and has tak [...]. LS In Action Noted C4-142474 This incoming LS was noted
6 SP-140664 LS from SA WG2: LS to WBA Update of Rel-12 status on Fixed Mobile Convergence SA WG2 SA WG2 wishes to thank WBA for information about the publication of its Community Wi-fi whitepaper. SA WG2 would like to bring to WBA attention that SA WG2 specified in cooperation with the Broadband Forum the [...]. LS In Information Noted S2-144658 This was noted.
6 SP-140665 LS from SA WG2: LS to WBA on Update of Rel-12 status on WLAN interworking SA WG2 SA WG2 thanks WBA for information about the publication of its Carrier Wi-Fi (CWLAN) Guidelines. SA WG2 noticed that the WBA work is based on 3GPP Rel-11 specification. SA WG2 would inform WBA that stage 2 work [...]. LS In Information Noted S2-144692 This was noted.
7.2 SP-140666 SA WG2 Chairman's Report to TSG SA#66 SA WG2 Chairman Chairman's Report of SA WG2 activities to TSG SA#66 Report Presentation Noted This Report was noted
5.3 SP-140667 Prioritization of SA WG2 work for Release 13 SA WG2 Chairman SA WG2 work is overloaded for Release 13. Prioritization will enable SA WG2 to complete work and study items before the stage 2 freeze deadline OTHER Action Noted This contribution was noted
8.5 SP-140668 6 CRs to 23.203 (SAES: Rel-8, Rel-9, Rel-10, Rel-11, Rel-12, Rel-13) SA WG2 23.203 CR0934R1; 23.203 CR0935R1; 23.203 CR0936R1; 23.203 CR0937R1; 23.203 CR0938R1; 23.203 CR0939R1 This was block approved CR Pack Approval Approved This was block approved
9 SP-140669 5 CRs to 23.401 (TEI9: SAES, Rel-9, Rel-10, Rel-11, Rel-12, Rel-13) SA WG2 23.401 CR2782R1; 23.401 CR2783R1; 23.401 CR2784R1; 23.401 CR2785R1; 23.401 CR2786R1 This was block approved CR Pack Approval Approved This was block approved
10 SP-140670 4 CRs to 23.401 (TEI10: Rel-10, Rel-11, Rel-12, Rel-13) SA WG2 23.401 CR2807R1; 23.401 CR2808R1; 23.401 CR2809R1; 23.401 CR2810R1 This was block approved CR Pack Approval Approved This was block approved
10 SP-140671 7 CRs to 23.203, 23.402 (SAES, TEI10: Rel-10, Rel-11, Rel-12, Rel-13) SA WG2 23.203 CR0917R2; 23.203 CR0918R2; 23.203 CR0919R2; 23.203 CR0920R2; 23.402 CR1310; 23.402 CR1311; 23.402 CR1312 This was block approved CR Pack Approval Approved This was block approved
10 SP-140672 4 CRs to 23.401 (NIMTC: Rel-10, Rel-11, Rel-12, Rel-13) SA WG2 23.401 CR2770R1; 23.401 CR2771R1; 23.401 CR2772R1; 23.401 CR2773R1 This was block approved CR Pack Approval Approved This was block approved
11 SP-140673 3 CRs to 23.060 (SIMTC: Rel-11, Rel-12, Rel-13) SA WG2 23.060 CR1927; 23.060 CR1928; 23.060 CR1929 This was block approved CR Pack Approval Approved This was block approved
11 SP-140674 15 CRs to 23.060, 23.203, 23.401 (TEI11: Rel-11, Rel-12, Rel-13) SA WG2 23.060 CR1876R8; 23.060 CR1877R5; 23.060 CR1907R4; 23.060 CR1922R2; 23.060 CR1923R1; 23.060 CR1924R1; 23.060 CR1933R2; 23.060 CR1934R2; 23.060 CR1935R2; 23.203 CR0902R4; 23.203 CR0903R3; 23.203 CR0904R3; 23.401 [...]. CR Pack Approval Approved except 23.203 CR0903R3 Company revision of 23.203 CR0903R3 in SP-140837 This CR Pack was approved
11 SP-140675 6 CRs to 23.060, 23.401 (TEI11, SAES: Rel-11, Rel-12, Rel-13) SA WG2 23.060 CR1894R1; 23.060 CR1895R1; 23.060 CR1896R1; 23.401 CR2744; 23.401 CR2745; 23.401 CR2746 This was block approved CR Pack Approval Approved This was block approved
12.2 SP-140676 2 CRs to 23.228 (IMS_WebRTC: Rel-12, Rel-13) SA WG2 23.228 CR1096R1; 23.228 CR1097R1 This was block approved CR Pack Approval Approved This was block approved
12.14 SP-140677 19 CRs to 23.303 (ProSe, TEI12: Rel-12) SA WG2 23.303 CR0110R4; 23.303 CR0111R3; 23.303 CR0120R2; 23.303 CR0121R2; 23.303 CR0123R1; 23.303 CR0124R2; 23.303 CR0127R2; 23.303 CR0128R1; 23.303 CR0132R4; 23.303 CR0133R4; 23.303 CR0138; 23.303 CR0139R1; 23.303 C [...]. CR Pack Approval Approved This was block approved
12.15 SP-140678 9 CRs to 23.203, 23.401, 23.246, 23.468 (GCSE_LTE: Rel-12, Rel-13) SA WG2 23.203 CR0910R4; 23.203 CR0930R2; 23.203 CR0945R2; 23.203 CR0946R2; 23.246 CR0387R4; 23.401 CR2768R1; 23.401 CR2769R2; 23.468 CR0050R1; 23.468 CR0055R1 This was block approved CR Pack Approval Approved This was block approved
12.20 SP-140679 2 CRs to 23.203 (P4C-F, TEI12: Rel-12, Rel-13) SA WG2 23.203 CR0956R4; 23.203 CR0964 CR Pack Approval 23.203 CR0964 approved Company revision of 23.203 CR0956R4 in SP-140838. 23.203 CR0964 was approved.
12.22 SP-140680 2 CRs to 23.401 (MTCe-SDDTE, TEI12: Rel-12, Rel-13) SA WG2 23.401 CR2751R1; 23.401 CR2752R1 This was block approved CR Pack Approval Approved This was block approved
12.23 SP-140681 3 CRs to 23.203, 23.228, 23.402, 23.682 (WLAN_NS: Rel-12) SA WG2 23.402 CR1318R5; 23.402 CR1323R1; 23.402 CR1333R3 This was block approved CR Pack Approval Approved This was block approved
12.25 SP-140682 1 CR to 23.060 (CNO_ULI, TEI12: Rel-12) SA WG2 23.060 CR1926 This was block approved CR Pack Approval Approved This was block approved
12.26 SP-140683 3 CRs to 23.402 (eSaMOG, TEI12: Rel-12) SA WG2 23.402 CR1313; 23.402 CR1320R1; 23.402 CR1326R5 This was block approved CR Pack Approval Approved This was block approved
12.28 SP-140684 17 CRs to 23.060, 23.401, 23.402 (UTRA_LTE_WLAN_interw-SA WG2: Rel-12, Rel-13) SA WG2 23.060 CR1903; 23.060 CR1904; 23.060 CR1905R1; 23.060 CR1906R1; 23.060 CR1908R1; 23.060 CR1909R1; 23.401 CR2755; 23.401 CR2756; 23.401 CR2757R1; 23.401 CR2758R1; 23.401 CR2763R2; 23.401 CR2764R1; 23.402 CR1315R [...]. CR Pack Approval Approved This was block approved
12.52 SP-140685 15 CRs to 23.002, 23.060, 23.203, 23.401, 23.402 (TEI12: Rel-12, Rel-13) SA WG2 23.002 CR0280; 23.002 CR0281; 23.060 CR1917R1; 23.060 CR1918R1; 23.060 CR1925; 23.203 CR0923R4; 23.203 CR0924R4; 23.401 CR2760R1; 23.401 CR2761R1; 23.401 CR2778R1; 23.401 CR2779R1; 23.401 CR2743R2; 23.401 CR278 [...]. CR Pack Approval Approved Rel-13 mirror to 23.060 CR1925 provided in SP-140717 This CR Pack was approved
12.52 SP-140686 15 CRs to 23.002, 23.203, 23.228, 23.292, 23.401, 23.216, 23.237, 23.303 (TEI12: Rel-12, Rel-13) SA WG2 23.002 CR0278R1; 23.002 CR0279R1; 23.203 CR0954R2; 23.203 CR0955R2; 23.228 CR1094R1; 23.228 CR1095R1; 23.292 CR0219R1; 23.292 CR0220R2; 23.401 CR2698R5; 23.401 CR2747R2; 23.401 CR2753R1; 23.401 CR2754R1; 23.216 [...]. CR Pack Approval Approved This was block approved
12.53 SP-140687 2 CRs to 23.401 (LTE_SC_enh_dualC-Core, TEI12: Rel-12, Rel-13) SA WG2 23.401 CR2762R1; 23.401 CR2790R2 This was block approved CR Pack Approval Approved This was block approved
13.11 SP-140688 2 CRs to 23.228, 23.401 (voE_UTRAN_PPD: Rel-13) SA WG2 23.228 CR1098R1; 23.401 CR2731R7 This was block approved CR Pack Approval Approved This was block approved
13.15 SP-140689 11 CRs to 23.060, 23.203, 23.401 (UPCON: Rel-13) SA WG2 23.060 CR1892R2; 23.060 CR1932R1; 23.203 CR0915; 23.203 CR0916R2; 23.203 CR0926R3; 23.203 CR0927; 23.203 CR0950R2; 23.203 CR0952; 23.203 CR0961R2; 23.401 CR2780R3; 23.401 CR2797 This was block approved [...]. CR Pack Approval Approved This was block approved
13.16 SP-140690 3 CRs to 23.203, 23.228 (DRuMS: Rel-13) SA WG2 23.203 CR0922R2; 23.228 CR1092R1; 23.228 CR1093R2 This was block approved CR Pack Approval Approved This was block approved
13.19 SP-140691 1 CR to 23.682 (AESE: Rel-13) SA WG2 23.682 CR0087R1 This was block approved CR Pack Approval Approved This was block approved
13.24 SP-140692 4 CRs to 23.251(CSPS_Coord: Rel-13) SA WG2 23.251 CR0101R2; 23.251 CR0102R1; 23.251 CR0103R1; 23.251 CR0104R1 This was block approved CR Pack Approval Approved This was block approved
13.36 SP-140693 6 CRs to 23.203, 23.228, 23.402, 23.682 (TEI13: Rel-13) SA WG2 23.203 CR0953R3; 23.203 CR0958R3; 23.203 CR0963R2; 23.228 CR1099; 23.402 CR1329R2; 23.682 CR0089R3 This was block approved CR Pack Approval Approved This was block approved
13.37 SP-140694 2 CRs to 23.203 (eUMONC: Rel-13) SA WG2 23.203 CR0921R3; 23.203 CR0925R1 This was block approved CR Pack Approval Approved This was block approved
13.24 SP-140695 TR 23.704: Study on CS/PS Coordination in shared network; Stage 2 (CSPS_COORD) SA WG2 Abstract of document: TR 23.704 contains the Stage-2 study and evaluation of possible solutions for CS/PS coordination issues i.e. scenarios when CS/PS coordination failure result in a UE ending up registered t [...]. TR Approval Approved This was block approved
13.17 SP-140696 TR 23.707: Architecture Enhancements for Dedicated Core Networks; Stage 2 (DECOR) SA WG2 Abstract of document: An operator may choose to deploy one (or more) dedicated core networks within a PLMN with each core network dedicated for specific type(s) of subscriber. The present document studies and e [...]. TR Approval Approved One-step approval This was block approved
13.15 SP-140697 TR 23.705: Study on system enhancements for user plane congestion management (UPCON) SA WG2 Abstract of document: TR 23.705 contains key issues' definition, solutions, evaluation and conclusion for RAN User Plane Congestion handling. Conclusion on normative standardization for solutions 1.5.5 Off-path [...]. TR Approval Approved This was block approved
13.21 SP-140698 TR 23.769: Technical Specification Group Services and System Aspects; Group based Enhancements (GROUPE) SA WG2 Abstract of document: The TR 23.769 studies and evaluates architectural enhancements for group based enhancements (GROUPE). System improvements for GROUPE include following key issues - Key issue 1: Message de [...]. TR Information Noted This TR was provided for information and was noted
13.18 SP-140699 TR 23.861: Network based IP flow mobility (NBIFOM) SA WG2 Abstract of document: This work item is to define the IFOM functionality for PMIP and GTP-based S2a and S2b over WLAN. The scope of the work is based on the use-cases and service requirements defined in TR 23.8 [...]. TR Information Noted This TR was provided for information and was noted
13.22 SP-140700 TR 23.772: Enhanced Circuit Switched (CS) Fallback (eCSFB) SA WG2 Abstract of document: The TR 23.772 studies and evaluates architectural enhancements for CSFB procedures to improve CSFB call setup time. In Rel-13, 3.5 slots have been arranged for this topic, and 7 solutions [...]. TR Information Noted This TR was provided for information and was noted
13.20 SP-140701 TR 23.789: Monitoring Enhancements (MONTE) SA WG2 Abstract of document: The TR 23.789 studies and evaluates architectural enhancements required for 3GPP systems to provide monitoring service capability as per the service requirements defined in TS 22.368, clau [...]. TR Information Noted This TR was provided for information and was noted
13.19 SP-140702 TR 23.708: Architecture Enhancements for Service Capability Exposure (AESE) SA WG2 Abstract of document: The TR 23.708 studies and evaluates architecture enhancements for a service capability exposure framework wherein 3GPP system provided service capabilities are exposed via one or more stan [...]. TR Information Noted This TR was provided for information and was noted
13.14 SP-140703 Updated WID for Flexible Mobile Service Steering (FMSS) SA WG2 Objective: The objective in Stage 1 is to define service requirements to enable the 3GPP Core Network to define and modify traffic steering policies that will be used to select required service enablers of the [...]. WID Approval Approved This was block approved
13.19 SP-140704 Correction to AESE WID's expected output and timelines (AESE) SA WG2 Objective: Objective of this work item is to define stage 2 architecture enhancements wherein 3GPP system provided service capabilities are exposed to application providers, e.g. via OMA-API(s). As part of thi [...]. WID Approval Approved This was block approved
13.20 SP-140705 Correction to MONTE WID's expected output and timelines (MONTE) SA WG2 Objective: Objective of this work item is to study and provide stage-2 specification for the following items - - Monitoring as per the service requirements defined in the clause 7.2.8 of TS 22.368 This work ite [...]. WID Approval Approved This was block approved
13.21 SP-140706 Update GROUPE WID SA WG2 Objective: The objectives of this work item are to study the concept of groups and to study and specify solutions to: - Fulfil the general group based requirements (22.368 clause 7.2.14.1) - Fulfil the group ba [...]. WID Approval Approved This was block approved
13.17 SP-140707 Update WID on Dedicated Core Networks (DECOR) SA WG2 Objective: The objective of this work item is to enable the deployment of dedicated core networks where each dedicated core network is dedicated to UEs sharing the same characteristics. The specific dedicated c [...]. WID Approval Approved This was block approved
13.4 SP-140708 Update of MCPTT WID SA WG2 The SA WG2 objectives are as follows: 1. As part of the TR phase: a) Define the MCPTT architectural requirements at the EPS level (including IMS aspects) based on the service requirements specified by SA WG1 an [...]. WID Approval Revised SP-140864 SA WG3 Update in SP-140813
15 SP-140709 New WID: Usage Monitoring Control PCC Extension SA WG2 Objective: This Work item aims to enhance the system to support the following functions as per related conclusions defined in the TR23.858: - Exclude Usage of a Service/Application from IP-CAN session/TDF sessi [...]. WID Approval Approved This WID was approved
16 SP-140710 New Study Item on Coordinated P-GW Change for SIPTO SA WG2 Objective: The objectives of this study item are as follows: a. Define the architectural requirements (based on Stage 1 normative requirements) in order to scope/guide the work in SA WG2, b. Study candidate CSI [...]. WID Approval Noted This WID was noted
15 SP-140711 New Work Item Description on Services Domain Centralization SA WG2 Objective: The objective of this work item is to study and specify modifications to the architecture in order to enable all services to be controlled via IMS rather than via CS legacy mechanisms (single service [...]. WID Approval Noted This WID was noted. ICS emergency call aspects of this could be done under TEI
16 SP-140712 New Feasibility study on Extended DRX cycle for Power Consumption Optimization SA WG2 Objective: Objective is to study extending the DRX cycle in idle and connected mode for GERAN, UTRAN and E-UTRAN. . The objective of this work is to continue the work started in Rel-12 in TR 23.887 for Extended [...]. WID Approval Revised SP-140881 Company revision proposed in SP-140771
15 SP-140713 New WID on MBMS Enhancements SA WG2 Objective: 1. Objectives as part of the TR phase: a. Define the architectural requirements in order to scope the work in SA WG2. b. Study possible improvements to allow establishment of MBMS bearers using targe [...]. WID Approval Revised SP-140880
16 SP-140714 New Study Item for Isolated E-UTRAN Operation for Public Safety SA WG2 Objective: The objectives of this study item are as follows: a) Study candidate solution(s) to address the Stage 1 service requirements, in order to support, at least but not necessarily limited to, the minimum [...]. WID Approval Approved This WID was approved
7.8 SP-140715 TSG GERAN Status Report to TSG SA#66 TSG GERAN Chairman TSG GERAN Chairman's Status Report to TSG SA#66 Report Presentation Noted This Report was noted
13.23 SP-140716 TR 23.717: Study on SRVCC enhancements for Transcoding Avoidance (SETA) SA WG2 Abstract of document: TR 23.717 describes various alternatives to enhance the SRVCC procedures to enable Transcoder free operation (TrFO) where possible and ensure that the proper CS radio resources are reserve [...]. TR Information Noted This TR was provided for information and was noted
12.52 SP-140717 23.060 CR1942: Correction of S4-SGSN-Initiated PDP Context Modification Procedure. (TEI12, SAES) Alcatel-Lucent, Alcatel-Lucent Shanghai Bell This CR is a strict mirror of 23.060 Rel-12 CR1925, that was forgotten at SA WG2#105 in Sapporo. 23.060 CR1942 CR Pack Approval Approved Rel-13 mirror to 23.060 CR1925 in SP-140685 This CR Pack was approved
7.4 SP-140718 SA WG4 Status Report at TSG SA#66 SA WG4 Chairman Chairman's Report of SA WG4 activities to TSG SA#66 Report Presentation Noted This Report was noted
8.5 SP-140719 CRs to TS 26.132 on 'Correction of broadband signal level at the hands free reference point (TEI8)' (Release 8 to Release 12) SA WG4 26.132 CR0075R1; 26.132 CR0076R1; 26.132 CR0077R1; 26.132 CR0078R1; 26.132 CR0079R1 This was block approved CR Pack Approval Approved This was block approved
10 SP-140720 CRs to TS 26.247 on 'Correction on Registration of MIME Type for QoE Reports (HTTP_SDS)' (Release 10 to Release 12) SA WG4 26.247 CR0065R1; 26.247 CR0066R1; 26.247 CR0067R1 This was block approved CR Pack Approval Approved This was block approved
11 SP-140721 CRs to TS 26.132 on 'Correction to UE receiving loudness rating performance test for wideband telephony (Ext_ATS)' (Release 11 and Release 12) SA WG4 26.132 CR0071; 26.132 CR0072 This was block approved CR Pack Approval Approved This was block approved
12.4 SP-140722 CRs to TS 26.114 on 'Codec for Enhanced Voice Services (EVS_codec)' (Release 12) SA WG4 26.114 CR0297R4; 26.114 CR0300R1 This was block approved CR Pack Approval Approved This was block approved
12.4 SP-140723 CR to TS 26.441 on 'Typographical correction (EVS_codec)' (Release 12) SA WG4 26.441 CR0001 This was block approved CR Pack Approval Approved This was block approved
12.4 SP-140724 CRs to TS 26.442 on 'Codec for Enhanced Voice Services (EVS); ANSI C code (fixed-point) (EVS_codec)' (Release 12) SA WG4 26.442 CR0001; 26.442 CR0002; 26.442 CR0003R1 This was block approved CR Pack Approval Approved This was block approved
12.4 SP-140725 CRs to TS 26.444 on ‘Codec for Enhanced Voice Services (EVS); Test Sequences (EVS_codec)' (Release 12) SA WG4 26.444 CR0001; 26.444 CR0002R1 This was block approved CR Pack Approval Approved This was block approved
12.4 SP-140726 CRs to TS 26.445 on ‘Codec for Enhanced Voice Services (EVS); Detailed Algorithmic Description (EVS_codec)' (Release 12) SA WG4 26.445 CR0001R3; 26.445 CR0002R3 This was block approved CR Pack Approval Approved This was block approved
12.4 SP-140727 CR to TS 26.447 on 'Corrections to the description of the packet loss concealment algorithm (EVS_codec)' (Release 12) SA WG4 26.447 CR0001R4 This was block approved CR Pack Approval Approved This was block approved
12.4 SP-140728 CR to TS 26.448 on 'Corrections (EVS_codec)' (Release 12) SA WG4 26.448 CR0001 This was block approved CR Pack Approval Approved This was block approved
12.4 SP-140729 TS 26.443 Codec for Enhanced Voice Services (EVS); ANSI C code (floating-point) (Release 12), v. 1.0.0 SA WG4 Abstract of document: The present document contains an electronic copy of the ANSI C floating-point code for the Enhanced Voice Services (EVS) Codec. This ANSI C code is the unique alternative reference specifi [...]. TS Approval Approved This was block approved
12.4 SP-140730 TR 26.952 Codec for Enhanced Voice Services (EVS); Performance Characterization (Release 12), v. 1.0.0 SA WG4 Abstract of document: The present document provides information on the Enhanced Voice Services (EVS) codec Selection, Verification and Characterization Phases which were run using the fixed-point code (TS 26.44 [...]. TR Approval Approved This was block approved
12.44 SP-140731 CRs to TS 26.131 and TS 26.132 on 'LTE UE super-wideband and fullband acoustic requirements and test methods (ART_LTE-SUPER)' (Release 12) SA WG4 26.131 CR0063R2; 26.132 CR0080R2 CR Pack Approval 26.131 CR0063R2 approved. 26.132 CR0080R2 was replaced by Qualcomm in SP-140869.
12.45 SP-140732 CRs to TS 26.247, TS 26.346 and TS 26.946 on 'Enhanced MBMS Operation (MI-EMO)' (Release 12) SA WG4 26.247 CR0075R1; 26.346 CR0427R3; 26.346 CR0433R1; 26.946 CR0006R1; 26.946 CR0007R1 This was block approved CR Pack Approval Approved This was block approved
12.45 SP-140733 TR 26.848 Multimedia Broadcast/Multicast Service (MBMS); Enhanced MBMS Operation (MI-EMO) (Release 12), v. 2.0.0 SA WG4 Abstract of document: At SA#59, the Release 12 Work Item on MBMS Improvement: Enhanced MBMS Operation (MI-EMO) was agreed. The objectives of this work item include - Improve MBMS OTA efficiency (e.g. by object [...]. TR Approval Approved This was block approved
12.45 SP-140734 CRs to TS 26.346 on 'MBMS operation on Demand (MI-MooD)' (Release 12) SA WG4 26.346 CR0425R2; 26.346 CR0432R2 This was block approved CR Pack Approval Approved This was block approved
12.45 SP-140735 TR 26.849 MBMS Improvements; MBMS operation on Demand (MI-MooD) (Release 12), v. 2.0.0 SA WG4 Abstract of document: The objective of the Rel-12 MI-MooD (MBMS Improvements - MBMS operation on Demand) Work Item is to specify in TS 26.346 (MBMS Protocols and Codecs) the required functionality to enable on- [...]. TR Approval Approved This was block approved
12.52 SP-140736 CRs to TS 26.234 and TS 26.346 on 'Technical Enhancements and Improvements for Release 12 (TEI12)' (Release 12) SA WG4 26.234 CR0221; 26.346 CR0423R2; 26.346 CR0430 This was block approved CR Pack Approval Approved This was block approved
13.31 SP-140737 CRs to TS 26.244 and TS 26.247 on 'Enhanced DASH (eDASH)' (Release 13) SA WG4 26.244 CR0053R3; 26.247 CR0074R2 This was block approved CR Pack Approval Approved This was block approved
15 SP-140738 New WID on 'MTSI Extension on Multi-stream Multiparty Conferencing Media Handling' (MMCMH) SA WG4 Objective: The main objective of the work item is to specify a backward compatible media handling extensions of 3GPP MTSI TS 26.114 to support Multi-stream Multiparty Conferencing Media Handling. These extensio [...]. WID Approval Approved This WID was approved
15 SP-140739 New WID on 'Video Telephony Robustness Improvements Extensions' (VTRI_EXT) SA WG4 Objective: The work will be organized in two phases: 1. Study benefits and needs of additional error resiliency (ER) tools to improve the performance of the Multimedia Telephony Service for IMS under various ch [...]. WID Approval Approved This WID was approved
15 SP-140740 New WID on 'Acoustic Test methods and Performance Objectives for Speakerphone Performance in Noisy Environments' (ATeMPO_SPINE) SA WG4 Objective: Develop a test method and performance objectives for objective speech quality in the presence of background noise for speakerphone operation. It is expected the following is defined as an outcome of [...]. WID Approval Approved This WID was approved
16 SP-140741 New Study Item on 'Video Enhancements in 3GPP Multimedia Services' (FS_VE_3MS) SA WG4 Objective: This study item has the following objectives: 1) Identify use cases that may benefit from video enhancements in 3GPP multimedia services. 2) Identify potential codec solutions for video enhancements [...]. WID Approval Approved This WID was approved
16 SP-140742 New Study Item on 'Interactivity Support for 3GPP-based Streaming and Download Services' (FS_IS3) SA WG4 Objective: This study item has the following objectives: 1) Perform fundamental investigations on service interactivity in 3GPP streaming services including: - Defining use cases for PSS and eMBMS service inter [...]. WID Approval Approved This WID was approved
5.3 SP-140743 IOPS (Isolated eUTRAN Operation for Public Safety) priority French Ministry of Interior This contribution aims at discussing priority to be given in 3GPP work to IOPS (Isolated eUTRAN operation for Public Safety) OTHER DISCUSSION Noted This was presented and noted.
5.2 SP-140744 Specific needs of public safety and critical communications users - Consequences on SA WG6 terms of reference French Ministry of Interior This contribution aims at: 1) providing details on the need for scalable dedicated infrastructure specifically adapted to public safety and critical communications. 2) proposing some comments on SA WG6 ToR. [...]. OTHER DISCUSSION Noted This was reviewed and noted.
5.3 SP-140745 Considerations for Release 13 Priorities Orange Orange's view on Release 13 priorities Discussion Presentation Noted This was presented and noted.
7.1 SP-140746 SA WG1 Report to TSG SA#66 SA WG1 Chairman Chairman's Report of SA WG1 activities to TSG SA#66 Report Presentation Noted This Report was noted
11 SP-140747 Stage 1 CR on Alignment regarding ACB MOCN-support SA WG1 22.011 CR0208 This was block approved CR Pack Approval Approved This was block approved
12.13 SP-140748 Stage 1 CR on Transfer of ETSI business trunking specifications (IMS_Corp2) SA WG1 22.228 CR0208R2; 22.228 CR0209R2 CR Pack Approval Approved Company revision in SP-140842 This CR Pack was approved
12.14 SP-140749 Stage 1 CRs on Proximty Services (ProSe) SA WG1 22.278 CR0214; 22.278 CR0215 This was block approved CR Pack Approval Approved This was block approved
12.52 SP-140750 Stage 1 CR on TEI12 on Support for network initiated USSD SA WG1 22.173 CR0101 This was block approved CR Pack Approval Approved This was block approved
13.36 SP-140751 Stage 1 CR on TEI13 on Align the MTC monitoring requirements with Service Exposure requirements SA WG1 22.368 CR0155; 22.101 CR0494 This was block approved CR Pack Approval Approved This was block approved
13.1 SP-140752 Stage 1 CR on Service Exposure and Enablement Support (SEES) SA WG1 22.115 CR0074R3 This was block approved CR Pack Approval Approved This was block approved
12.15 SP-140753 Stage 1 CR on Group Communication System Enablers for LTE (GCSE_LTE) SA WG1 22.468 CR0013 This was block approved CR Pack Approval Approved This was block approved
13.4 SP-140754 TS 22.179 v.2.0.0 on Mission Critical Push To Talk over LTE (MCPTT) SA WG1 Abstract of document: The attached document provides the service requirements for operation of the Mission Critical Push To Talk (MCPTT) service. MCPTT makes use of capabilities included in Group Communication [...]. TS Approval Revised SP-140844
13.9 SP-140755 Stage 1 CR on GERAN UTRAN Sharing Enhancements (GUSH) SA WG1 22.101 CR0481R2; 22.101 CR0482R2; 22.101 CR0483R2; 22.101 CR0484R1; 22.101 CR0485R1; 22.101 CR0486R3; 22.101 CR0487R2; 22.101 CR0488R3 This was block approved CR Pack Approval Approved This was block approved
14.1 SP-140756 TR 22.802 v.1.0.0 on Study on Need for multiple APNs (FS_MAPN) SA WG1 Abstract of document: The scope of this TR is: - to provide details about the use cases where there is a need of control of APNs; - to identify potential new requirements to fulfil the use cases; - to identify [...]. TR Information Noted This TR was provided for information and was noted
14.3 SP-140757 TR 22.815 v.2.0.0 on Study on Multimedia Broadcast Supplement for PWS (FS_MBSP) SA WG1 Abstract of document: The work on Public Warning System (PWS) within the 3GPP as standardised since 3GPP Release 9 has focused on delivering text-based warning notifications of limited content to the public at [...]. TR Approval Approved This was block approved
14.7 SP-140758 Revised WID on Study on Control of Applications when Third party Servers encounter difficulties (FS_CATS) SA WG1 Objective: The objective of this study is to identify potential requirements that will enable the 3GPP network to detect or receive an indication from a third party server of its congestion status or failure st [...]. WID Approval Approved This was block approved
14.7 SP-140759 TR 22.818 v.1.0.0 on Study on Control of Applications when Third party Servers encounter difficulties (FS_CATS) SA WG1 Abstract of document: This TR identifies potential requirements that will enable the 3GPP network to detect or receive an indication from a third party server of its congestion status or failure status and cont [...]. TR Information Noted This TR was provided for information and was noted
17.1 SP-140760 Work Plan at TSG#66 MCC Work Plan Manager Presentation of the 3GPP Work Plan at TSG#66 Work Plan Presentation Noted This contribution was noted
17.1 SP-140761 LTE for Public Safety (authority-to-authority) communications MCC Work Plan Manager LTE for Public Safety (authority-to-authority) communications OTHER Information Withdrawn Withdrawn
17.1 SP-140762 3GPP Carrier Aggregation for LTE MCC Work Plan Manager 3GPP Carrier Aggregation for LTE OTHER Information Withdrawn Withdrawn
17.1 SP-140763 3GPP Rel-12 description MCC Work Plan Manager 3GPP Rel-12 description document OTHER Information Withdrawn Withdrawn
17.1 SP-140764 3GPP Rel-13 description MCC Work Plan Manager 3GPP Rel-13 description document OTHER Information Withdrawn Withdrawn
5 SP-140765 Considerations on Current SA WG2 practices related to work items and study items handling Alcatel-Lucent, Ericsson, Qualcomm, Nokia Corporation, Nokia Networks This paper discusses some behaviour that is associated to the allocation of a Study Item or Work Item label to an activity in SA WG2 which includes a TR phase. The supporting Companies propose that: 1) It is re [...]. OTHER Approval Endorsed Endorsed
5.3 SP-140766 Intel views on focus areas for Rel-13 Intel Summary: 3GPP focus Area for Rel-13: - Machine to Machine/Internet of Things: AESE (SA WG2), MONTE (SA WG2), GROUPE (SA WG2), DECOR (SA WG2), FS_HLCom (SA WG2), FS_eDRX(SA WG2) - Integration with non-3GPP techn [...]. Discussion Presentation Noted This was presented and noted.
5.3 SP-140767 Rel-13 Time Schedule and Content Samsung, LG Electronics, SK Telecom, KT Corp., LG Uplus, ETRI, Ericsson-LG, Pantech, ITL Inc., MTCC, Humax, KTL, TTA As presented at TSG SA #65, Korea has decided to adopt the PS-LTE technology as nationwide broadband public safety network (Doc. SP-140448 by MSIP [1] and RP-140449 by TTA [2]). As such, we would like to inform [...]. OTHER Discussion Noted This was presented and noted.
5 SP-140768 Proposal for SA WG2 time planning Qualcomm Incorporated Proposes an alternative way to manage the SA WG2 time plan from now on by doing prioritisation 'at the source' DISCUSSION Approval Noted This contribution was noted
5.3 SP-140769 On SA WG2 prioritisation for Rel-13 Qualcomm Incorporated Proposes a list of high priority items in SA WG2 for Rel-13 DISCUSSION Approval Noted This contribution was noted
5 SP-140770 Issue with WebRTC codec Qualcomm Incorporated Discusses an issue with WebRTC codec VP8 DISCUSSION Approval Noted 3GPP Working Groups are instructed not to do any work on VP8 until TSG SA review this situation in March 2015 This contribution was noted
16 SP-140771 Feasibility study on Extended DRX cycle for Power Consumption Optimization Qualcomm Incorporated, KDDI Revised version of SA WG2 approved FS_eDRX SID in order to add as supporting company WID Approval Noted Update to SA WG2 agreed WID (SP-140712) This WID was noted
5.3 SP-140772 Samsung proposal for Rel-13 work prioritization Samsung The TSG SA plenary chairman is inviting each company to express their view on Rel-13 WID/SID prioritization. This paper indicates the prioritization ordering of Rel-13 WID/SID from Samsung. OTHER Discussion Noted This contribution was noted
5.2 SP-140773 Input on the ToR for SA WG6 Airbus, Airwave Solutions, French Ministry of Interior, Motorola Solutions, P3 Communications, Police of the Netherlands, Sepura PLC, Selex ES, Thales This contribution provides comments and proposals on the draft Terms of Reference for SA WG6. (NOTE: Requested TD sources: Airbus, Airwave Solutions, BMI (German Federal Ministry of the Interior), DnK (Direct [...]. OTHER Discussion Noted This was reviewed and noted.
5.3 SP-140774 Rel-13 Priority Items Nokia Networks, Nokia Corporation Introduction: SA WG2 has made good progress on several work items lately, e.g. UPCON, DECOR, voE_UTRAN_PPD and CS_PS_Coord. However, there are still several other important work items whose timely completion i [...]. Discussion Presentation Noted This was presented and noted.
5.2 SP-140775 Input on the ToR for SA WG6 Motorola Solutions This contribution proposes text for approval as the Terms of Reference for SA WG6 OTHER Approval Noted This was reviewed and noted.
5.2 SP-140776 US Dept of Commerce Views on Terms of Reference for SA WG6 U.S. Department of Commerce This contribution discusses the views of the US Department of Commerce for the Terms of Reference for SA WG6. OTHER Discussion Noted This was reviewed and noted.
5.3 SP-140777 US Dept of Commerce Views on Release 13 Priorities U.S. Department of Commerce This contribution discusses the views of the US Department of Commerce for prioritization for Release 13. OTHER Discussion Noted This was presented and noted.
5.3 SP-140778 SA WG2 Prioritisation for Release 13 LG Electronics For prioritization of SA WG2 work items, this paper considers the top priority items for Release 13 OTHER Discussion Noted This was presented and noted.
5.3 SP-140779 3GPP Release 13 Priorities AT&T AT&T's priorities for Release 13 comprise the following areas: -Public Safety - Features needed for producing a set of standards that meet the needs of the Public Safety community. -MTC - Features which enhance [...]. Discussion Presentation Noted This contribution was noted
12.52 SP-140780 Stage 1 CR on TEI12 on Addition and correction of ITU-T References SA WG1 22.105 CR0057 This was block approved CR Pack Approval Approved This was block approved
9 SP-140781 Stage 1 CRs on TEI9, eCall on eCall mode of operation SA WG1 22.101 CR0489R1; 22.101 CR0490; 22.101 CR0491; 22.101 CR0492; 22.101 CR0493 This was block approved CR Pack Approval Approved This was block approved
5.3 SP-140782 Prioritization Considerations for NBIFOM for Rel-13 ZTE, China Mobile, China Telecom, China Unicom, Broadcom Corp Prioritization Considerations for NBIFOM for Rel-13 Discussion Discussion Noted This was presented and noted.
7.5 SP-140783 SA WG5 Status Report SA WG5 Chairman Chairman's Report of SA WG5 activities to TSG SA#66 Report Presentation Noted This Report was noted
16 SP-140784 New Study on KQI for Service Experience SA WG5 Objective: The work item will address (in the below priority order): 1. Define service KQI scenarios 2. Define service KQIs corresponding to the identified scenarios 3. Define in the 3GPP network the measurem [...]. WID Approval Approved This WID was approved
13.33 SP-140785 New WID on ULI and release causes for charging enhancement for VoLTE SA WG5 Objective: Objective of this work item is to specify: - for IMS online and offline charging: introduction of subsequent ULI/UE Time Zone (s), including the one provided at the time of PDN connection release and [...]. WID Approval Approved This was block approved
13.34 SP-140786 New WID on Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement SA WG5 Objective: This Work Item will address enhancing existing MDT functionality to support MBMS MDT. The objective of the work will include support for triggering, configuring and collecting of signalling based Lo [...]. WID Approval Approved This was block approved
13 SP-140787 Revised WID Study on Compliance of 3GPP SA5 specifications to the NGMN Next Generation Converged Operations Requirements (NGCOR) SA WG5 Objective: The objectives of this Study are: - Record the detailed gap analysis already performed by SA WG5; - Identify for each requirement the work already done by SA WG5 ; - Discuss and agree on the work rem [...]. WID Approval Approved This was block approved
12.14 SP-140788 Work Item Exception for WI ProSe-CH SA WG5 Abstract of document: Exception sheet for Rel-12 Work Item Proximity-based Services Charging. Task(s) within work which are not complete: CRs to stage 3 charging TSs: introduction of Diameter AVPs and ASN.1 fo [...]. Exception sheet Approval Approved This was block approved
13 SP-140789 TR 28.821 Fixed Mobile Convergence (FMC) model repertoire SA WG5 Abstract of document: This TR is a result of the Multi-SDO JWG on Model Alignment which SA WG5 (SA WG5) has developed jointly with TMF and NGMN, and it contains an updated UML Model Repertoire for support of Fi [...]. TR Approval Approved This was block approved
12.14 SP-140790 TS 32.277 Proximity-based Services (ProSe) Charging SA WG5 Abstract of document: This document specifies the Offline and Online Charging description for the Proximity-based Services (ProSe), based on the stage 2 description of ProSe in TS 23.303. This charging descript [...]. TS Approval Approved This was block approved
12.14 SP-140791 TR 32.844 Study of charging support of Proximity-based Services (ProSe) Direct Communication for Public Safety use SA WG5 Abstract of document: The document intends to study the charging architecture for the one-to-many ProSe Direct Communication for ProSe-enabled Public Safety UE. The study covers the ProSe Direct Communication f [...]. TR Approval Approved This was block approved
12.50 SP-140792 TS 28.667 Radio Planning Tool Access (RPTA) IRP – Requirements SA WG5 Abstract of document: TS 28.667 specifies the Requirements for the Radio Planning Tool Access (RPTA) Integration Reference Point (IRP). Changes since last presentation to TSG SA Meeting #65: The System Context [...]. TS Approval Approved This was block approved
12.50 SP-140793 TS 28.668 Radio Planning Tool (RPT) interface NRM IRP – Information Service (IS) SA WG5 Abstract of document: TS 28.668 specifies the Information Service (IS) for the Radio Planning Tool Access (RPTA) Integration Reference Point (IRP). Changes since last presentation to TSG SA Meeting #65: The Sys [...]. TS Approval Approved This was block approved
12.50 SP-140794 TS 28.669 Radio Planning Tool (RPT) interface NRM IRP – Solution Set (SS) definitions SA WG5 Abstract of document: TS 28.669 specifies the Solution Set (SS) definitions for the Radio Planning Tool Access (RPTA) Integration Reference Point (IRP). Changes since last presentation to TSG SA: Presented to S [...]. TS Approval Approved This was block approved
12.50 SP-140795 TS 32.130 Network sharing; Concepts and requirements SA WG5 Abstract of document: This document defines concepts and requirements for the OA&M of network sharing. Changes since last presentation: The diagram describing the GWCN core network sharing scenario has been co [...]. TS Approval Approved This was block approved
12.50 SP-140796 Rel-12 CRs on Alarm quality improvements (OAM-AMI) SA WG5 32.111-1 CR0011R1; 32.111-2 CR0073R1; 32.111-6 CR0007R1 This was block approved CR Pack Approval Approved This was block approved
11 SP-140797 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) SA WG5 28.659 CR0010R1; 28.659 CR0011; 28.672 CR0003; 28.672 CR0002R1; 28.702 CR0005R1; 28.702 CR0006R2; 28.703 CR0005; 32.103 CR0008R1; 32.103 CR0011; 32.103 CR0012 This was block approved CR Pack Approval Approved This was block approved
12.50 SP-140798 Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) SA WG5 28.390 CR0001R1; 28.611 CR0005R1; 28.612 CR0002R1; 28.616 CR0003R1; 28.628 CR0008R1; 28.658 CR0011R1; 28.659 CR0012; 28.703 CR0006; 32.103 CR0009; 32.103 CR0010; 32.300 CR0017R2; 32.423 CR0093 This was block ap [...]. CR Pack Approval Approved This was block approved
13.34 SP-140799 Rel-13 CRs on OAM Maintenance and small Enhancements (OAM13) SA WG5 32.155 CR0004R1; 32.425 CR0155R2; 32.453 CR0002R1; 32.591 CR0006R1; 32.591 CR0007R1; 32.591 CR0008R1; 32.592 CR0032R1 This was block approved CR Pack Approval Approved This was block approved
12.50 SP-140800 Rel-12 CRs on Network Sharing (OAM-SHARE) SA WG5 28.651 CR0002; 28.652 CR0008R2; 28.653 CR0009R1; 28.657 CR0003; 32.103 CR0013R2; 32.421 CR0073R1; 32.422 CR0277R1; 32.423 CR0094R1; 32.442 CR0237; 32.500 CR0008R1 This was block approved CR Pack Approval Approved This was block approved
14.22 SP-140801 Rel-13 CRs on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization (SON-NM-CCO) SA WG5 28.627 CR0003R1; 28.627 CR0004; 28.627 CR0005; 28.627 CR0007R1; 28.627 CR0008R1 This was block approved CR Pack Approval Approved This was block approved
9 SP-140802 Rel-9 CRs on Charging Management (CH9) SA WG5 32.298 CR0495R1; 32.298 CR0496R1; 32.298 CR0497R1; 32.298 CR0498R1; 32.299 CR0611; 32.299 CR0612; 32.299 CR0613; 32.299 CR0614 This was block approved CR Pack Approval Approved This was block approved
11 SP-140803 Rel-11 CRs on Charging Management (CH11) SA WG5 32.260 CR0290R1; 32.260 CR0291R1; 32.260 CR0294R1; 32.260 CR0295R1; 32.260 CR0296; 32.260 CR0297R1; 32.298 CR0504R1; 32.298 CR0505R1; 32.298 CR0507; 32.298 CR0508; 32.299 CR0617; 32.299 CR0618 This was block ap [...]. CR Pack Approval Approved This was block approved
12.49 SP-140804 Rel-12 CRs on Charging Management (CH12) Batch 1 SA WG5 32.240 CR0378; 32.250 CR0042; 32.251 CR0390; 32.260 CR0292; 32.270 CR0028; 32.271 CR0015; 32.272 CR0035R1; 32.273 CR0032; 32.275 CR0059; 32.280 CR0029; 32.295 CR0009; 32.297 CR0018R2; 32.298 CR0499R1; 32.251 CR [...]. CR Pack Approval Approved This was block approved
12.49 SP-140805 Rel-12 CRs on Charging Management (CH12) Batch 2 SA WG5 32.240 CR0379R1; 32.250 CR0041; 32.250 CR0043; 32.251 CR0388; 32.251 CR0391R1; 32.251 CR0393R1; 32.260 CR0293R1; 32.270 CR0029; 32.271 CR0016; 32.272 CR0036; 32.273 CR0033; 32.274 CR0030; 32.275 CR0060; 32.280 [...]. CR Pack Approval Approved This was block approved
13.33 SP-140806 Rel-13 CRs on Charging Management (CH13) SA WG5 32.260 CR0298R1; 32.273 CR0031R2 This was block approved CR Pack Approval Approved This was block approved
12.31 SP-140807 Rel-12 CRs on Application-Based Charging (ABC) SA WG5 32.251 CR0392R1; 32.299 CR0616R1 This was block approved CR Pack Approval Approved This was block approved
12.14 SP-140808 Rel-12 CRs on Charging Aspects of Proximity-based Services (Prose-CH) SA WG5 32.240 CR0380R1; 32.297 CR0019 This was block approved CR Pack Approval Approved This was block approved
5.3 SP-140809 Priorities for Release 13 General Dynamics UK Ltd. TSG SA #66 is an appropriate time to review the prioritization of features for Release 13. Release 12 was formally frozen in September and most work items with exceptions will be declared completed at TSG SA#66 [...]. OTHER DISCUSSION Noted This contribution was noted
5.3 SP-140810 Release 13 content TeliaSonera TeliaSonera's prioritization: Given this set of drivers we have arrived at the following prioritization across the work items in SA WG2 for Rel-13 It is important that the different segments all get a decent [...]. OTHER DISCUSSION Noted This was presented and noted.
5.3 SP-140811 Priority for 3GPP Release 13 KPN New Business - AUTOMOTIVE. New Business - HEALTH and SECURITY. TSG SA working items prioritization - M2M: KPN supports new services M2M Group based enhancements (GROUPE) Architecture enhancements for Service Ex [...]. Discussion Presentation Noted This was presented and noted.
7.3 SP-140812 SA WG3 Status Report SA WG3 Chairman Chairman's Report of SA WG3 activities to TSG SA#66 REPORT Presentation Noted This REPORT was noted
13.4 SP-140813 Revised WID Mission Critical Push To Talk over LTE (MCPTT) SA WG3 Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. WID Approval Merged into SP-140864 SP-140864 SA WG2 Update in SP-140708. Merged with SP-140708 into SP-140864
12.38 SP-140814 Revised WID 3G Security; Specification of the TUAK algorithm set (STAS) SA WG3 Objective: SA WG3 Objectives: This work item aims to deliver the complete specification set for a second example algorithm set for the 3GPP authentication and key generation functions as 3GPP Technical Specific [...]. WID Approval Revised SP-140876
13.32 SP-140815 Revised WID Lawful Interception Rel-13 (LI13) SA WG3 Objective: The objective of this work item is to enhance the 3GPP LI service to accommodate Release 13 service enhancements and extensions. Enhancements to specifications TS 33.106, TS 33.107 and TS 33.108 will [...]. WID Approval Approved This was block approved
12.38 SP-140816 TR 35.9xy: Report on the design and evaluation of the Tuak algorithm set: A second example algorithm set for the 3GPP authentication and key generation functions SA WG3 Abstract of document: SA WG3 has adopted this second example algorithm set for the 3GPP authentication and key generation functions, which includes the algorithm specification itself (which is associated with t [...]. TR Approval Approved This TR was approved and placed under Change control
12.38 SP-140817 TR 35.9ab: Performance evaluation of the Tuak algorithm set SA WG3 Abstract of document: SA WG3 has adopted this second example algorithm set for the 3GPP authentication and key generation functions, which includes the algorithm specification itself (which is associated with t [...]. TR Approval Approved This TR was approved and placed under Change control
12.38 SP-140818 TR 35.9cd: Security assessment of the Tuak algorithm set SA WG3 Abstract of document: SA WG3 has adopted this second example algorithm set for the 3GPP authentication and key generation functions, which includes the algorithm specification itself (which is associated with t [...]. TR Approval Revised SP-140877
9 SP-140819 Release 9 CRs on Lawful Interception (LI9) SA WG3 33.108 CR0253; 33.108 CR0254; 33.108 CR0255; 33.108 CR0256 This was block approved CR Pack Approval Approved This was block approved
11 SP-140820 Release 11 CRs on Lawful Interception (LI11) SA WG3 33.108 CR0250; 33.108 CR0251 This was block approved CR Pack Approval Approved This was block approved
12.48 SP-140821 Release 12 CRs on Lawful Interception (LI12) SA WG3 33.106 CR0136; 33.107 CR0159; 33.107 CR0160; 33.107 CR0161; 33.107 CR0162; 33.107 CR0163; 33.107 CR0164; 33.108 CR0240; 33.108 CR0241; 33.108 CR0242; 33.108 CR0243; 33.108 CR0244; 33.108 CR0245; 33.108 CR0246; [...]. CR Pack Approval Approved This was block approved
8.5 SP-140823 Rel-8 CRs on 3GPP System Architecture Evolution Specification - Evolved Packet System (SAES) SA WG3 33.102 CR0267R1; 33.102 CR0269; 33.102 CR0270; 33.102 CR0271; 33.102 CR0272 This was block approved CR Pack Approval Approved This was block approved
12.53 SP-140824 Rel-12 CRs on Dual connectivity for LTE;Core Part (LTE_SC_enh_dualC-Core) SA WG3 33.401 CR0544R1 This was block approved CR Pack Approval Approved This was block approved
12.2 SP-140825 Release 12 CRs on Web Real Time Communication Access to IMS (IMS_WebRTC) SA WG3 33.203 CR0227; 33.203 CR0228R1; 33.203 CR0229; 33.203 CR0230R1; 33.203 CR0231R1 This was block approved CR Pack Approval Approved This was block approved
12.15 SP-140826 Release 12 CRs on Group Communication System Enablers for LTE (GCSE_LTE) SA WG3 33.246 CR0187; 33.246 CR0188R1 This was block approved CR Pack Approval Approved This was block approved
12.53 SP-140827 Rel-12 CRs on E-UTRA Small cell enhancements - Physical layer aspects (LTE_SC_enh_L1) SA WG3 33.401 CR0540; 33.401 CR0542R1; 33.401 CR0543R1 This was block approved CR Pack Approval Approved This was block approved
12.14 SP-140828 Release 12 CRs on Proximity based Services (ProSe) SA WG3 33.303 CR0019R2; 33.303 CR0020R3; 33.303 CR0023R2; 33.303 CR0035R1; 33.303 CR0037R1; 33.303 CR0038R1; 33.303 CR0039R1; 33.303 CR0040; 33.303 CR0041R1; 33.303 CR0042R1; 33.303 CR0043R1; 33.303 CR0045R1; 33.303 C [...]. CR Pack Approval Approved This was block approved
12.26 SP-140829 Rel-12 CRs on Enhanced S2a Mobility Over trusted WLAN access to EPC (eSaMOG) SA WG3 33.402 CR0120; 33.402 CR0121; 33.402 CR0122 This was block approved CR Pack Approval Approved This was block approved
12.52 SP-140830 Rel-12 CRs on TEI (TEI12) SA WG3 33.102 CR0268R1; 33.401 CR0541 This was block approved CR Pack Approval Approved This was block approved
5.3 SP-140831 Rel-13 SA WG2 prioritization Ericsson Ericsson priority (in no particular order): Main Track: - HLcom - eDRX - DECOR - AESE - eProSe_Ext - eMBMS enhancements - MCPTT - IOPS (dependent on other ongoing work to make sensible conclusions, may need pha [...]. OTHER DISCUSSION Noted This was presented and noted.
5.2 SP-140832 Draft Terms Of Reference for SA WG6 BlackBerry UK Ltd This paper proposes text for approval as the Terms of Reference for SA WG6. OTHER Approval Noted This was reviewed and noted.
5.3 SP-140833 SA WG2 Planning Process and Rel-13 Prioritisation Huawei, HiSilicon It is a common situation that with every new release there are more proposals and ideas than resources for studying and specifying. Latest when the end of a release approaches there are questions on how to hand [...]. OTHER DISCUSSION Noted This was presented and noted.
5.3 SP-140834 Prioritization of eCSFB China Unicom, CATR, ZTE, Huawei, HiSilicon This paper propose to prioritize the eCSFB in further SA WG2 agenda in Rel-13 Discussion Presentation Noted This contribution was noted
5.3 SP-140835 Rel-13 High Priority Items Proposal NTT DOCOMO Proposal for Rel-13 SA WG2 Work Items prioritization OTHER DISCUSSION Noted This was presented and noted.
5.3 SP-140836 Prioritization of TSG SA items in Rel-13 KDDI, Ericsson, Hitachi, Orange What is needed for Release 13? FLEXIBILITY: - To provide new services in a timely manner - To strengthen the network resiliency. DIVERSITY: - To handle varieties of call pattern - To catch up with the evolution [...]. Discussion Presentation Noted This was presented and noted.
11 SP-140837 23.203 CR0903 R4: Clarifications for TFT handling Huawei, Hisilicon 23.203 CR0903 R4 CR Pack Approval Approved Proposed revision of 23.203 CR0903R3 (SP-140674) This CR Pack was approved
12.20 SP-140838 23.203 CR0956 R5: Convergence PCC for fixed access broadband: alignment to SA WG5 conclusion of work Huawei, Hisilicon, Allot, Alcatel-Lucent, Orange 23.203 CR0956R5 CR Pack Approval Approved Proposed revision of 23.203 CR0956R4 (SP-140679) This CR Pack was approved
5.3 SP-140839 SA WG2 priorities for Rel-13 Vodafone This document sets out our current views on the prioritisation (and other mechanisms) needed to resolve the current overload issues in SA WG2. We remain open to information and opinions from others which may u [...]. OTHER DISCUSSION Noted This contribution was noted
5.3 SP-140840 On Prioritization of FS_CSIPTO_St2 Samsung, Intel, China Telecom, CMCC, CATT, Sony Mobile Communication, ACER, Broadcom Corporation Summary: Given that: the FS_CSIPTO_St2 Study Item is well scoped, and CSIPTO enables maximum utilization of SIPTO offloading without any service degradation The cosigning companies believe that the FS_CSIPTO_St [...]. OTHER Presentation Revised SP-140861
5.2 SP-140841 TCCA Comments regarding SA WG6 ToRs TETRA and Critical Communications Association (TCCA) This document provides an input from the TCCA to the TSG SA#66 plenary meeting to be held in Maui in December 2014. It takes account of the discussion and conclusions reached during TSG SA#65 as well as of the [...]. Discussion Presentation Noted This was reviewed and noted.
12.13 SP-140842 Update to CR0208 and CR0209 to TS 22.228 on Clean up from business trunking transfer (SP-140748) Nokia Networks 22.228 CR0208R3; 22.228 CR0209R3 CR Pack Approval Noted Revision of CRs in SP-140748 This CR Pack was noted
5.3 SP-140843 SA WG2 prioritization of Architecture Enhancements for Service Capability Exposure China Mobile, CATT, Huawei, Intel AESE Proposal for Release 13: We strongly propose that sufficient time shall be allocated to complete the AESE feature whose solution is feasible in commercial use in Release 13. After SA WG2#106 meeting which [...]. OTHER DISCUSSION Noted This was presented and noted.
13.4 SP-140844 TS 22.179 v.2.1.0 on Mission Critical Push To Talk over LTE (MCPTT) MCC Abstract of document: The attached document provides the service requirements for operation of the Mission Critical Push To Talk (MCPTT) service. MCPTT makes use of capabilities included in Group Communication [...]. TS Approval Approved SP-140754 This TS was approved and placed under Change control
5.2 SP-140845 LS from CT WG6: Reply LS to SA on 3GPP work organization for Mission Critical Push to Talk CT WG6 CT WG6 would like to thank TSG SA for the information about the decision related to creation of a new Working Group for Mission Critical Push to Talk (MCPTT). CT WG6 would like to invite SA and SA6 to take into [...]. LS In Information Noted C6-140682 This incoming LS was noted
7.6 SP-140846 LS from ITU-R Working Party 5D: ARCHITECTURE AND TOPOLOGY OF IMT NETWORKS ITU-R Working Party 5D Working Party 5D (WP 5D) wishes to inform the relevant External Organizations that it is continuing development of a working document toward a preliminary draft new Report ITU R M.[IMT.ARCH], 'Architecture and [...]. LS In Information Noted 5D/TEMP/472(Rev.2) This incoming LS was noted
7.6 SP-140847 LS from ITU-R Working Party 5D: THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.1457 TO REVISION 13 ITU-R Working Party 5D Introduction: ITU-R Working Party 5D thanks the relevant External Organizations for their successful work in regards to the course of action to be taken towards the completion of Revision 12 of Recommendation I [...]. LS In Information Noted 5D/TEMP/473 This incoming LS was noted
7.5 SP-140848 LS from ETSI ISG NFV: Status of the Management and Orchestration Group Specification ETSI ISG NFV ETSI ISG NFV would like to inform SA WG5 that the Management and Orchestration Group Specification has now reached Final Draft status. Version 0.8.1 is openly available from the ETSI Portal at the following add [...]. LS In Information Noted NFV(14)000350 A response to ETSI NFV IFA from SA WG5 was provided in SP-140853. This incoming LS was noted
18.2 SP-140849 Support Team report MCC Director Update of MCC activities Report Presentation Noted This Report was noted
6 SP-140850 LS from ETSI ISG MEC: Potential collaboration on Mobile-Edge Computing ETSI ISG MEC The newly formed ETSI ISG Mobile-Edge Compute (MEC) would like to inform 3GPP that at its first meeting, 2nd - 4th December 2014, it has approved an initial set of normative work items based on the concepts inc [...]. LS In Action Response in SP-140868 MEC(14)01_025r2 Response in SP-140868
7.6 SP-140851 TSG RAN Status Report to TSG SA#66 TSG RAN Chairman RAN Chairman's report for presentation Report Presentation Noted This Report was noted
7.6 SP-140852 Draft report of TSG RAN meeting #66 TSG RAN Secretary (MCC) Draft version of the RAN #66 report provided for information Report Information Noted This Report was noted
7.5 SP-140853 LS to ETSI NFV IFA on cooperation between ETSI NFV IFA and SA WG5 SA WG5 SA WG5 has discussed the cooperation with ETSI NFV IFA at SA WG5#98 Nov 17-21, 2014. The attached presentation provides an update on the SA WG5 work on NFV. It includes information regarding the objectives of [...]. LS In Information Noted S5-146365 This incoming LS was noted
7.6 SP-140854 LS from ITU-R Working Party 5D: REPLY LIAISON STATEMENT TO ITU-T STUDY GROUP 15, ITU-R WP 5D, MEF ITU-R Working Party 5D Working Party 5C (WP 5C) thanks ITU-T Study Group 15, ITU-R WP 5D and MEF for their Liaison Statements (respectively Document 5C/353R1, 5C/352 and 5C/322), providing an update on their activities, especially in [...]. LS In Information Noted 5C/TEMP/180(Rev.1) This incoming LS was noted
7.7 SP-140855 Status report of TSG CT#66 TSG CT Chairman TSG CT Status Report to TSG SA#66 Report Presentation Noted This Report was noted
7.7 SP-140856 Draft meeting report of TSG CT#66 MCC Draft report of TSG CT meeting #66 Report Information Noted This Report was noted
7.7 SP-140857 IETF Status report TSG CT Chairman IETF dependencies Status report Report Presentation Noted This Report was noted
7.7 SP-140858 LS from TSG CT: LS on Evolution of Recommendation E.212 from ITU-T SG TSG CT TSG CT#66 would like to inform TSG SA that TSG CT discussed and endorsed the attached document, related to the LS from ITU-T SG2 on 'Evolution of Recommendation E.212'. Action: TSG CT kindly asks TSG SA Plenary [...]. LS In Action Revised CP-140993 Updated for sending to ITU-T in SP-140887
5 SP-140859 LS from TSG CT: LS on support for non-3GPP codecs in IMS-WebRTC TSG CT TSG CT Plenary thanks CT WG1 for their LS on codec support in IMS-WebRTC. TSG CT Plenary has discussed the fact that CT WG1 TS 24.371 references draft-ietf-rtcweb-overview-12, which indirectly (by further refer [...]. LS In Action Noted CP-141002 This incoming LS was noted
7.7 SP-140860 LS from TSG CT: Reply LS on discontinuance of I-WLAN related TS 29.161 TSG CT TSG CT Plenary thanks CT WG3 for their LS on discontinuance of I-WLAN related TS 29.161. TSG CT Plenary has discussed this issue and decided to discontinue the I-WLAN related TS 29.161 from Rel-12 onwards. Con [...]. LS In Information Noted CP-141001 This incoming LS was noted
5.3 SP-140861 On Prioritization of FS_CSIPTO_St2 Samsung, Intel, China Telecom, CMCC, CATT, Sony Mobile Communication, ACER, Broadcom Corporation, Sprint, IDCC Summary: Given that: the FS_CSIPTO_St2 Study Item is well scoped, and CSIPTO enables maximum utilization of SIPTO offloading without any service degradation The cosigning companies believe that the FS_CSIPTO_St [...]. OTHER Presentation Noted SP-140840 This was presented and noted.
7.6 SP-140862 LS from TSG RAN: DRAFT Letter to ITU on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.1457 to Revision 13 TSG RAN TSG RAN asks TSG SA to review this draft LTI and provide feedbacks to the PCG. In the footnote of this document, the source PCG doc number has to be updated as soon as it is available. Based on Decision PCG2 [...]. LS In Action Forwarded to PCG in Sp-140873 SP-140873 RP-142247 This was revised to forward it to the PCG in SP-140873
5.3 SP-140863 Chairman's synthesis of Release 13 prioritization input TSG SA Chairman Synthesis of Release 13 prioritization input OTHER DISCUSSION Revised SP-140866
13.4 SP-140864 Update of MCPTT WID SA WG2 Chairman, SA WG3 Chairman Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. WID Approval Revised SP-140879 SP-140708 Merge of SP-140708 and SP-140813
5.2 SP-140865 LS on Establishment of new working group SA WG6 TSG SA To: OMA, ETSI TC TCCE, TSG CT, SA WG2, SA WG6. CC: TCCA, 3GPP PCG, TSG RAN, CT WG1, CT WG3, CT WG4, CT WG6, SA WG1, SA WG3, SA WG4, SA WG5. Attachment: SP-140645 LS OUT Approval Revised SP-140884
5.3 SP-140866 Chairman's synthesis of Release 13 prioritization input TSG SA Chairman Synthesis of Release 13 prioritization input OTHER DISCUSSION Revised SP-140870 SP-140863
5.2 SP-140867 LS on Request for release of Copyright related to PCPS specifications TSG SA To: OMA LS OUT Approval Revised SP-140885
6 SP-140868 Reply LS on Potential collaboration on Mobile-Edge Computing TSG SA To: ETSI ISG MEC LS OUT Approval Approved This outgoing LS was approved
12.44 SP-140869 26.132 CR0081 on 'LTE UE super-wideband and fullband acoustic requirements and test methods (ART_LTE-SUPER)' (Release 12) Qualcomm 26.132 CR0081 CR Pack Approval Approved Replacement of a CR in SP-140731 This CR Pack was approved
5.3 SP-140870 Chairman's synthesis of Release 13 prioritization input TSG SA Chairman Outline: These slides define priorities for features in the Release 13 pipeline of SA WG2 Other WGs are understood not be overloaded, but they may also use this guidance to prioritize their work, if needed Cat [...]. OTHER DISCUSSION Approved SP-140866 This Rel-13 prioritisation for SA WG2 Work Items was approved
7.6 SP-140871 Draft follow-up reply letter on the completion of the submission of LTE-Advanced toward Revision 2 of Rec. ITU-R M.2012 TSG RAN This ITU input will become part of ITU deliverable(s): yes Responsible 3GPP group for final output to ITU: 3GPP PCG deadline for the final output to ITU: 20th January 2015 (16:00 hours UTC). For 3GPP revi [...]. LS In Action Revised SP-140874 RP-142259 This was revised to as a consolidated response LS in SP-140874
7.6 SP-140872 Draft reply letter on Working document towards a preliminary draft new ITU-R Report ITU-R SM.[SMART_GRID] TSG RAN This ITU input will become part of ITU deliverable(s): yes Responsible 3GPP group for final output to ITU: 3GPP PCG deadline for the final output to ITU: 31 December 2014 (16:00 hours UTC). For 3GPP revie [...]. LS In Action Revised SP-140875 RP-142260 This was revised to as a consolidated response LS in SP-140875
7.6 SP-140873 Letter to ITU on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.1457 to Revision 13 TSG SA - LS OUT Approval Approved This outgoing LS was approved
7.6 SP-140874 Follow-up reply letter on the completion of the submission of LTE-Advanced toward Revision 2 of Rec. ITU-R M.2012 TSG SA This ITU input will become part of ITU deliverable(s): yes Responsible 3GPP group for final output to ITU: 3GPP PCG deadline for the final output to ITU: 20th January 2015 (16:00 hours UTC). For 3GPP revi [...]. LS OUT Action Approved - Response to SP-140649 This outgoing LS was approved
7.6 SP-140875 Reply letter on Working document towards a preliminary draft new ITU-R Report ITU-R SM.[SMART_GRID] TSG RAN To: PCG LS OUT Action Approved SP-140872 - This outgoing LS was approved
12.38 SP-140876 Revised WID 3G Security; Specification of the TUAK algorithm set (STAS) SA WG3 Objective: SA WG3 Objectives: This work item aims to deliver the complete specification set for a second example algorithm set for the 3GPP authentication and key generation functions as 3GPP Technical Specific [...]. WID Approval Approved SP-140814 This WID was approved
12.38 SP-140877 TR 35.9cd: Security assessment of the Tuak algorithm set SA WG3 Abstract of document: SA WG3 has adopted this second example algorithm set for the 3GPP authentication and key generation functions, which includes the algorithm specification itself (which is associated with t [...]. TR Approval Approved SP-140818 This TR was approved and placed under Change control
13.4 SP-140878 Response LS to APT Wireless Group (AWG): Liaison statement regarding scope and status relevant to PPDR work items and study items TSG SA Task Group on PPDR (TG-PPDR) under the APT AWG has developed a number of reports and recommendations relating to PPDR for APT countries. In particular, the following two APT AWG reports provide details of PPDR [...]. LS OUT Action Revised SP-140886 - Response to SP-140646
13.4 SP-140879 Update of MCPTT WID SA WG2 Chairman, SA WG3 Chairman Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. WID Approval Approved SP-140864 This WID was approved
15 SP-140880 New Study WID on MBMS Enhancements TSG SA Study WID WID Approval Revised SP-140883 SP-140713
16 SP-140881 New Feasibility study on Extended DRX cycle for Power Consumption Optimization SA WG2 Objective: Objective is to study extending the DRX cycle in idle and connected mode for GERAN, UTRAN and E-UTRAN. . The objective of this work is to continue the work started in Rel-12 in TR 23.887 for Extended [...]. WID Approval Approved SP-140712 This WID was approved
7.6 SP-140882 LS from TSG RAN: LS on LTE based Vehicular Communication TSG RAN TSG RAN would like to inform that a potential RAN study on LTE-based V2V solution was discussed in RAN#66. Some companies in RAN think that LTE-based V2V solution should be made available earlier than other V2X [...]. LS In Action Noted RP-142312 This incoming LS was noted
15 SP-140883 New Study WID on MBMS Enhancements TSG SA Study WID WID Approval Approved SP-140880 This WID was approved
5.2 SP-140884 LS on Establishment of new working group SA WG6 TSG SA To: OMA, ETSI TC TCCE, TSG CT, SA WG2, SA WG6. CC: TCCA, 3GPP PCG, TSG RAN, CT WG1, CT WG3, CT WG4, CT WG6, SA WG1, SA WG3, SA WG4, SA WG5. Attachment: SP-140645 LS OUT Approval Approved SP-140865 This outgoing LS was approved
5.2 SP-140885 LS on Request for release of Copyright related to PCPS specifications TSG SA To: OMA, PCG LS OUT Approval Approved SP-140867 This outgoing LS was approved
13.4 SP-140886 Response LS to APT Wireless Group (AWG): Liaison statement regarding scope and status relevant to PPDR work items and study items TSG SA Task Group on PPDR (TG-PPDR) under the APT AWG has developed a number of reports and recommendations relating to PPDR for APT countries. In particular, the following two APT AWG reports provide details of PPDR [...]. LS OUT Action Approved SP-140878 - This outgoing LS was approved
7.7 SP-140887 LS on Evolution of Recommendation E.212 from ITU-T SG TSG SA TSG CT#66 would like to inform TSG SA that TSG CT discussed and endorsed the attached document, related to the LS from ITU-T SG2 on 'Evolution of Recommendation E.212'. Action: TSG CT kindly asks TSG SA Plenary [...]. LS OUT Action Approved SP-140858 - This outgoing LS was approved

Created: 2014-12-12 17:56     END OF LIST

Last Allocated Document: SP-140887