Last Allocated Document: SP-140887
Temporary Documents List - Ordered by Agenda Item
Colour Key: |
Agenda Item, Agenda Title |
No Conclusion |
Conclusion Reached |
Document Revised |
Proposed for Block Approval |
Proposed for Block Noting |
Document Withdrawn |
Document Not Handled |
|
To use hyperlinks, this file must be placed above Folder 'Docs'
Created: 2014-12-12 17:56     START OF LIST
Agenda |
TD |
LongTitle |
Source |
Summary |
Doc_Type |
Doc_For |
Decision |
Rev_By |
Rev_Of |
LS_Source_file |
Comment |
1 |
- |
Opening of the Meeting |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2 |
- |
Approval of Agenda |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2 |
SP-140643 |
Draft agenda for TSG SA meeting #66 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #66 |
Agenda |
Approval |
Approved |
|
|
| The agenda was reviewed and approved. |
3 |
- |
IPR and Antitrust policy reminder |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4 |
- |
Reports from Previous Meetings |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4.1 |
- |
Report from TSG SA#65 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4.1 |
SP-140644 |
Draft Report of TSG SA meeting #65 |
TSG SA Secretary |
Draft Report of TSG SA meeting #65 containing revision marks of changes on the distributed draft. |
Report |
Approval |
Approved |
|
|
| The report was approved and will be updated to remove revision marks and placed on the FTP server as version 1.0.0. |
4.2 |
- |
Reports from TSG SA ad-hoc meetings and workshops |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5 |
- |
Items for early consideration |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5 |
SP-140765 |
Considerations on Current SA WG2 practices related to work items and study items handling |
Alcatel-Lucent, Ericsson, Qualcomm, Nokia Corporation, Nokia Networks |
This paper discusses some behaviour that is associated to the allocation of a Study Item or Work Item label to an activity in SA WG2 which includes a TR phase. The supporting Companies propose that: 1) It is re [...]. |
OTHER |
Approval |
Endorsed |
|
|
| Endorsed |
5 |
SP-140768 |
Proposal for SA WG2 time planning |
Qualcomm Incorporated |
Proposes an alternative way to manage the SA WG2 time plan from now on by doing prioritisation 'at the source' |
DISCUSSION |
Approval |
Noted |
|
|
| This contribution was noted |
5 |
SP-140770 |
Issue with WebRTC codec |
Qualcomm Incorporated |
Discusses an issue with WebRTC codec VP8 |
DISCUSSION |
Approval |
Noted |
|
|
| 3GPP Working Groups are instructed not to do any work on VP8 until TSG SA review this situation in March 2015 This contribution was noted |
5 |
SP-140859 |
LS from TSG CT: LS on support for non-3GPP codecs in IMS-WebRTC |
TSG CT |
TSG CT Plenary thanks CT WG1 for their LS on codec support in IMS-WebRTC. TSG CT Plenary has discussed the fact that CT WG1 TS 24.371 references draft-ietf-rtcweb-overview-12, which indirectly (by further refer [...]. |
LS In |
Action |
Noted |
|
| CP-141002 |
This incoming LS was noted |
5 |
SP-140661 |
LS from CT WG1: LS on codec support in IMS-WebRTC |
CT WG1 |
CT WG1 intend to include a requirement to conform to draft-ietf-rtcweb-overview and draft-alvestrand-rtcweb-gateway in their specification 3GPP TS 24.371 for WebRTC. CT WG1 wish to draw SA WG4s attention to a [...]. |
LS In |
Information |
Noted |
|
| C1-145032 |
This incoming LS was noted |
5.1 |
- |
Challenges to working agreements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5.2 |
- |
Terms of Reference for SA WG6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5.2 |
SP-140645 |
Draft Terms of Reference for SA WG6 |
SA WG6 Convenor (UK Home Office) |
This paper proposes text for approval as the Terms of Reference for SA WG6. |
ToR |
Approval |
Approved |
|
|
| This ToR was approved. |
5.2 |
SP-140865 |
LS on Establishment of new working group SA WG6 |
TSG SA |
To: OMA, ETSI TC TCCE, TSG CT, SA WG2, SA WG6. CC: TCCA, 3GPP PCG, TSG RAN, CT WG1, CT WG3, CT WG4, CT WG6, SA WG1, SA WG3, SA WG4, SA WG5. Attachment: SP-140645 |
LS OUT |
Approval |
Revised |
SP-140884 |
|
|
| 5.2 |
SP-140884 |
LS on Establishment of new working group SA WG6 |
TSG SA |
To: OMA, ETSI TC TCCE, TSG CT, SA WG2, SA WG6. CC: TCCA, 3GPP PCG, TSG RAN, CT WG1, CT WG3, CT WG4, CT WG6, SA WG1, SA WG3, SA WG4, SA WG5. Attachment: SP-140645 |
LS OUT |
Approval |
Approved |
| SP-140865 |
| This outgoing LS was approved |
5.2 |
SP-140867 |
LS on Request for release of Copyright related to PCPS specifications |
TSG SA |
To: OMA |
LS OUT |
Approval |
Revised |
SP-140885 |
|
|
| 5.2 |
SP-140885 |
LS on Request for release of Copyright related to PCPS specifications |
TSG SA |
To: OMA, PCG |
LS OUT |
Approval |
Approved |
| SP-140867 |
| This outgoing LS was approved |
5.2 |
SP-140744 |
Specific needs of public safety and critical communications users - Consequences on SA WG6 terms of reference |
French Ministry of Interior |
This contribution aims at: 1) providing details on the need for scalable dedicated infrastructure specifically adapted to public safety and critical communications. 2) proposing some comments on SA WG6 ToR. [...]. |
OTHER |
DISCUSSION |
Noted |
|
|
| This was reviewed and noted. |
5.2 |
SP-140832 |
Draft Terms Of Reference for SA WG6 |
BlackBerry UK Ltd |
This paper proposes text for approval as the Terms of Reference for SA WG6. |
OTHER |
Approval |
Noted |
|
|
| This was reviewed and noted. |
5.2 |
SP-140773 |
Input on the ToR for SA WG6 |
Airbus, Airwave Solutions, French Ministry of Interior, Motorola Solutions, P3 Communications, Police of the Netherlands, Sepura PLC, Selex ES, Thales |
This contribution provides comments and proposals on the draft Terms of Reference for SA WG6. (NOTE: Requested TD sources: Airbus, Airwave Solutions, BMI (German Federal Ministry of the Interior), DnK (Direct [...]. |
OTHER |
Discussion |
Noted |
|
|
| This was reviewed and noted. |
5.2 |
SP-140775 |
Input on the ToR for SA WG6 |
Motorola Solutions |
This contribution proposes text for approval as the Terms of Reference for SA WG6 |
OTHER |
Approval |
Noted |
|
|
| This was reviewed and noted. |
5.2 |
SP-140776 |
US Dept of Commerce Views on Terms of Reference for SA WG6 |
U.S. Department of Commerce |
This contribution discusses the views of the US Department of Commerce for the Terms of Reference for SA WG6. |
OTHER |
Discussion |
Noted |
|
|
| This was reviewed and noted. |
5.2 |
SP-140841 |
TCCA Comments regarding SA WG6 ToRs |
TETRA and Critical Communications Association (TCCA) |
This document provides an input from the TCCA to the TSG SA#66 plenary meeting to be held in Maui in December 2014. It takes account of the discussion and conclusions reached during TSG SA#65 as well as of the [...]. |
Discussion |
Presentation |
Noted |
|
|
| This was reviewed and noted. |
5.2 |
SP-140659 |
SA WG6 2015 calendar |
SA WG6 Convenor (UK Home Office) |
This paper provides information on the planned meeting schedule for SA WG6 in 2015 |
OTHER |
Information |
Noted |
|
|
| This was reviewed and noted. |
5.2 |
SP-140656 |
LS from ETSI TC TCCE: LS on 3GPP work organization for Mission Critical Push to Talk |
ETSI TC TCCE |
Thank you for the LS (SP-140640) informing us of the organisation within 3GPP for standardising Mission Critical Push To Talk (PTT) and the formation of Working Group SA WG6. ETSI TC TCCE fully supports forming [...]. |
LS In |
Information |
Noted |
|
| TCCE(14)000082r1 |
This incoming LS was noted |
5.2 |
SP-140845 |
LS from CT WG6: Reply LS to SA on 3GPP work organization for Mission Critical Push to Talk |
CT WG6 |
CT WG6 would like to thank TSG SA for the information about the decision related to creation of a new Working Group for Mission Critical Push to Talk (MCPTT). CT WG6 would like to invite SA and SA6 to take into [...]. |
LS In |
Information |
Noted |
|
| C6-140682 |
This incoming LS was noted |
5.3 |
- |
Release-13 content |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5.3 |
SP-140667 |
Prioritization of SA WG2 work for Release 13 |
SA WG2 Chairman |
SA WG2 work is overloaded for Release 13. Prioritization will enable SA WG2 to complete work and study items before the stage 2 freeze deadline |
OTHER |
Action |
Noted |
|
|
| This contribution was noted |
5.3 |
SP-140745 |
Considerations for Release 13 Priorities |
Orange |
Orange's view on Release 13 priorities |
Discussion |
Presentation |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140766 |
Intel views on focus areas for Rel-13 |
Intel |
Summary: 3GPP focus Area for Rel-13: - Machine to Machine/Internet of Things: AESE (SA WG2), MONTE (SA WG2), GROUPE (SA WG2), DECOR (SA WG2), FS_HLCom (SA WG2), FS_eDRX(SA WG2) - Integration with non-3GPP techn [...]. |
Discussion |
Presentation |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140767 |
Rel-13 Time Schedule and Content |
Samsung, LG Electronics, SK Telecom, KT Corp., LG Uplus, ETRI, Ericsson-LG, Pantech, ITL Inc., MTCC, Humax, KTL, TTA |
As presented at TSG SA #65, Korea has decided to adopt the PS-LTE technology as nationwide broadband public safety network (Doc. SP-140448 by MSIP [1] and RP-140449 by TTA [2]). As such, we would like to inform [...]. |
OTHER |
Discussion |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140769 |
On SA WG2 prioritisation for Rel-13 |
Qualcomm Incorporated |
Proposes a list of high priority items in SA WG2 for Rel-13 |
DISCUSSION |
Approval |
Noted |
|
|
| This contribution was noted |
5.3 |
SP-140772 |
Samsung proposal for Rel-13 work prioritization |
Samsung |
The TSG SA plenary chairman is inviting each company to express their view on Rel-13 WID/SID prioritization. This paper indicates the prioritization ordering of Rel-13 WID/SID from Samsung. |
OTHER |
Discussion |
Noted |
|
|
| This contribution was noted |
5.3 |
SP-140774 |
Rel-13 Priority Items |
Nokia Networks, Nokia Corporation |
Introduction: SA WG2 has made good progress on several work items lately, e.g. UPCON, DECOR, voE_UTRAN_PPD and CS_PS_Coord. However, there are still several other important work items whose timely completion i [...]. |
Discussion |
Presentation |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140778 |
SA WG2 Prioritisation for Release 13 |
LG Electronics |
For prioritization of SA WG2 work items, this paper considers the top priority items for Release 13 |
OTHER |
Discussion |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140777 |
US Dept of Commerce Views on Release 13 Priorities |
U.S. Department of Commerce |
This contribution discusses the views of the US Department of Commerce for prioritization for Release 13. |
OTHER |
Discussion |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140779 |
3GPP Release 13 Priorities |
AT&T |
AT&T's priorities for Release 13 comprise the following areas: -Public Safety - Features needed for producing a set of standards that meet the needs of the Public Safety community. -MTC - Features which enhance [...]. |
Discussion |
Presentation |
Noted |
|
|
| This contribution was noted |
5.3 |
SP-140810 |
Release 13 content |
TeliaSonera |
TeliaSonera's prioritization: Given this set of drivers we have arrived at the following prioritization across the work items in SA WG2 for Rel-13 It is important that the different segments all get a decent [...]. |
OTHER |
DISCUSSION |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140811 |
Priority for 3GPP Release 13 |
KPN |
New Business - AUTOMOTIVE. New Business - HEALTH and SECURITY. TSG SA working items prioritization - M2M: KPN supports new services M2M Group based enhancements (GROUPE) Architecture enhancements for Service Ex [...]. |
Discussion |
Presentation |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140831 |
Rel-13 SA WG2 prioritization |
Ericsson |
Ericsson priority (in no particular order): Main Track: - HLcom - eDRX - DECOR - AESE - eProSe_Ext - eMBMS enhancements - MCPTT - IOPS (dependent on other ongoing work to make sensible conclusions, may need pha [...]. |
OTHER |
DISCUSSION |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140833 |
SA WG2 Planning Process and Rel-13 Prioritisation |
Huawei, HiSilicon |
It is a common situation that with every new release there are more proposals and ideas than resources for studying and specifying. Latest when the end of a release approaches there are questions on how to hand [...]. |
OTHER |
DISCUSSION |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140835 |
Rel-13 High Priority Items Proposal |
NTT DOCOMO |
Proposal for Rel-13 SA WG2 Work Items prioritization |
OTHER |
DISCUSSION |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140836 |
Prioritization of TSG SA items in Rel-13 |
KDDI, Ericsson, Hitachi, Orange |
What is needed for Release 13? FLEXIBILITY: - To provide new services in a timely manner - To strengthen the network resiliency. DIVERSITY: - To handle varieties of call pattern - To catch up with the evolution [...]. |
Discussion |
Presentation |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140839 |
SA WG2 priorities for Rel-13 |
Vodafone |
This document sets out our current views on the prioritisation (and other mechanisms) needed to resolve the current overload issues in SA WG2. We remain open to information and opinions from others which may u [...]. |
OTHER |
DISCUSSION |
Noted |
|
|
| This contribution was noted |
5.3 |
SP-140660 |
SA WG2 Prioritisation of FMSS |
Allot Communications, China Mobile, China Unicom, KDDI, China Telecom, Rogers Communications, Orange, Softbank Mobile, IAESI, Comverse, Sandvine Incorporated, Oracle Corporation, Openet Telecom, Broadcom Corporation, CATR, Intel, ZTE, CATT |
Summary: The cosigning companies believe FMSS Work Item should be given high priority in SA WG2 group |
Discussion |
Presentation |
Noted |
|
|
| This contribution was noted |
5.3 |
SP-140782 |
Prioritization Considerations for NBIFOM for Rel-13 |
ZTE, China Mobile, China Telecom, China Unicom, Broadcom Corp |
Prioritization Considerations for NBIFOM for Rel-13 |
Discussion |
Discussion |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140809 |
Priorities for Release 13 |
General Dynamics UK Ltd. |
TSG SA #66 is an appropriate time to review the prioritization of features for Release 13. Release 12 was formally frozen in September and most work items with exceptions will be declared completed at TSG SA#66 [...]. |
OTHER |
DISCUSSION |
Noted |
|
|
| This contribution was noted |
5.3 |
SP-140834 |
Prioritization of eCSFB |
China Unicom, CATR, ZTE, Huawei, HiSilicon |
This paper propose to prioritize the eCSFB in further SA WG2 agenda in Rel-13 |
Discussion |
Presentation |
Noted |
|
|
| This contribution was noted |
5.3 |
SP-140840 |
On Prioritization of FS_CSIPTO_St2 |
Samsung, Intel, China Telecom, CMCC, CATT, Sony Mobile Communication, ACER, Broadcom Corporation |
Summary: Given that: the FS_CSIPTO_St2 Study Item is well scoped, and CSIPTO enables maximum utilization of SIPTO offloading without any service degradation The cosigning companies believe that the FS_CSIPTO_St [...]. |
OTHER |
Presentation |
Revised |
SP-140861 |
|
|
| 5.3 |
SP-140861 |
On Prioritization of FS_CSIPTO_St2 |
Samsung, Intel, China Telecom, CMCC, CATT, Sony Mobile Communication, ACER, Broadcom Corporation, Sprint, IDCC |
Summary: Given that: the FS_CSIPTO_St2 Study Item is well scoped, and CSIPTO enables maximum utilization of SIPTO offloading without any service degradation The cosigning companies believe that the FS_CSIPTO_St [...]. |
OTHER |
Presentation |
Noted |
| SP-140840 |
| This was presented and noted. |
5.3 |
SP-140843 |
SA WG2 prioritization of Architecture Enhancements for Service Capability Exposure |
China Mobile, CATT, Huawei, Intel |
AESE Proposal for Release 13: We strongly propose that sufficient time shall be allocated to complete the AESE feature whose solution is feasible in commercial use in Release 13. After SA WG2#106 meeting which [...]. |
OTHER |
DISCUSSION |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140743 |
IOPS (Isolated eUTRAN Operation for Public Safety) priority |
French Ministry of Interior |
This contribution aims at discussing priority to be given in 3GPP work to IOPS (Isolated eUTRAN operation for Public Safety) |
OTHER |
DISCUSSION |
Noted |
|
|
| This was presented and noted. |
5.3 |
SP-140863 |
Chairman's synthesis of Release 13 prioritization input |
TSG SA Chairman |
Synthesis of Release 13 prioritization input |
OTHER |
DISCUSSION |
Revised |
SP-140866 |
|
|
| 5.3 |
SP-140866 |
Chairman's synthesis of Release 13 prioritization input |
TSG SA Chairman |
Synthesis of Release 13 prioritization input |
OTHER |
DISCUSSION |
Revised |
SP-140870 |
SP-140863 |
|
| 5.3 |
SP-140870 |
Chairman's synthesis of Release 13 prioritization input |
TSG SA Chairman |
Outline: These slides define priorities for features in the Release 13 pipeline of SA WG2 Other WGs are understood not be overloaded, but they may also use this guidance to prioritize their work, if needed Cat [...]. |
OTHER |
DISCUSSION |
Approved |
| SP-140866 |
| This Rel-13 prioritisation for SA WG2 Work Items was approved |
6 |
- |
General Incoming Liaisons |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6 |
SP-140647 |
Forwarded from TSG GERAN: LS from ITU-T Study Group 17: LS on new work item on simple encryption procedure for IoT device security |
ITU-T Study Group 17 |
ITU-T Study Group 17, Security, coordinates security-related work across all ITU-T Study Groups. Often working in cooperation with other standards development organizations (SDOs) and various ICT industry conso [...]. |
LS In |
Action |
Noted |
|
| COM 17 - LS 152 |
Forwarded from TSG GERAN. Proposed to forward to SA WG3 This incoming LS was noted |
6 |
SP-140648 |
LS from ETSI E2NA: LS on Location of Media Transcoders |
ETSI E2NA |
In November 2012 ETSI EP E2NA sent a Liaison Statement to the groups listed above to collect information about the existence of documents addressing the problem of the location of media transcoding function in [...]. |
LS In |
Information |
Forward to SA WG2 and CT WG3 |
|
| E2NA(14)000179 |
Proposed to forward to SA WG2. Forward to SA WG2 and CT WG3. Noted |
6 |
SP-140649 |
LS from ITU-R Working Party 1A: Working document towards a preliminary draft new ITU-R Report on the Smart Grid project |
ITU-R Working Party 1A |
Working Party 1A wishes to inform the relevant External Organizations of a further development of the document attached to this liaison statement. Working Party 1A would therefore appreciate any comments and ad [...]. |
LS In |
Information |
Response in SP-140874 |
|
| Document 1A/TEMP/61 |
A response was provided in SP-140874 |
6 |
SP-140657 |
LS from oneM2M: Candidate Release Available |
oneM2M |
The Technical Plenary of oneM2M wishes to make you aware that oneM2M, the Global Partnership developing standards for Machine-to-Machine (M2M) communications and the Internet-of-Things (IoT) announced that its [...]. |
LS In |
Information |
Forward to SA WG2, SA WG3, CT WG1, CT WG3 and CT WG4. Noted |
|
| TP-2014-0511 |
It was agreed to forward this to relevant WGs, SA WG2, SA WG3, CT WG1, CT WG3 and CT WG4. This was then noted. |
6 |
SP-140650 |
LS from OMA: LS Response to ETSI TCCE WG4 proposal for joint follow up working session |
OMA |
The OMA COM was pleased to receive LS TCCE04(14)000058 'Proposal for joint follow up working session' from ETSI TC TCCE WG4. OMA COM PCPS agrees that further joint meetings are in order and would like to provid [...]. |
LS In |
Information |
Noted |
|
| OMA-LS_1048-COM |
Proposed to note. Block noted. |
6 |
SP-140651 |
LS from OMA: LS to 3GPP SA3 on TLS |
OMA |
The OMA COM PCPS work area is working on updating OMA PoC v2.1 (Push to Talk over Cellular) to PCPS v1.0 (Push to Communicate for Public Safety). One of the primary objectives of this is to update and align the [...]. |
LS In |
Information |
Noted |
|
| OMA-LS_1049-OMA_COM |
Proposed to note. Block Noted |
6 |
SP-140652 |
LS from OMA: LS to 3GPP on MCPTT |
OMA |
OMA COM PCPS was enthused to hear about the creation of SA6 as 'home for the mission critical communications application' explained in 3GPP TD SP-140640. PCPS is looking forward to getting additional informatio [...]. |
LS In |
Information |
Noted |
|
| OMA-LS_1051-OMA_COM |
Proposed to note. Block Noted |
6 |
SP-140658 |
LS from WBA: Liaison Statement to 3GPP on Community Wi-Fi white paper |
WBA |
The Community Wi-Fi project team would like to share the final version of the Community Wi-Fi white paper with 3GPP. WBA plans to continue working on the Community Wi-Fi topic and welcomes feedback to the curre [...]. |
LS In |
Information |
Noted |
|
| WBA-LiasionStatement to 3GPP |
This was reviewed and noted. |
6 |
SP-140664 |
LS from SA WG2: LS to WBA Update of Rel-12 status on Fixed Mobile Convergence |
SA WG2 |
SA WG2 wishes to thank WBA for information about the publication of its Community Wi-fi whitepaper. SA WG2 would like to bring to WBA attention that SA WG2 specified in cooperation with the Broadband Forum the [...]. |
LS In |
Information |
Noted |
|
| S2-144658 |
This was noted. |
6 |
SP-140665 |
LS from SA WG2: LS to WBA on Update of Rel-12 status on WLAN interworking |
SA WG2 |
SA WG2 thanks WBA for information about the publication of its Carrier Wi-Fi (CWLAN) Guidelines. SA WG2 noticed that the WBA work is based on 3GPP Rel-11 specification. SA WG2 would inform WBA that stage 2 work [...]. |
LS In |
Information |
Noted |
|
| S2-144692 |
This was noted. |
6 |
SP-140850 |
LS from ETSI ISG MEC: Potential collaboration on Mobile-Edge Computing |
ETSI ISG MEC |
The newly formed ETSI ISG Mobile-Edge Compute (MEC) would like to inform 3GPP that at its first meeting, 2nd - 4th December 2014, it has approved an initial set of normative work items based on the concepts inc [...]. |
LS In |
Action |
Response in SP-140868 |
|
| MEC(14)01_025r2 |
Response in SP-140868 |
6 |
SP-140868 |
Reply LS on Potential collaboration on Mobile-Edge Computing |
TSG SA |
To: ETSI ISG MEC |
LS OUT |
Approval |
Approved |
|
|
| This outgoing LS was approved |
7 |
- |
Reports from SA Working Groups and other TSGs |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.1 |
- |
SA WG1 Report and Questions for Advice |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.1 |
SP-140746 |
SA WG1 Report to TSG SA#66 |
SA WG1 Chairman |
Chairman's Report of SA WG1 activities to TSG SA#66 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.2 |
- |
SA WG2 Report and Questions for Advice |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.2 |
SP-140666 |
SA WG2 Chairman's Report to TSG SA#66 |
SA WG2 Chairman |
Chairman's Report of SA WG2 activities to TSG SA#66 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.3 |
- |
SA WG3 Report and Questions for Advice |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.3 |
SP-140812 |
SA WG3 Status Report |
SA WG3 Chairman |
Chairman's Report of SA WG3 activities to TSG SA#66 |
REPORT |
Presentation |
Noted |
|
|
| This REPORT was noted |
7.4 |
- |
SA WG4 Report and Questions for Advice |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.4 |
SP-140718 |
SA WG4 Status Report at TSG SA#66 |
SA WG4 Chairman |
Chairman's Report of SA WG4 activities to TSG SA#66 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.5 |
- |
SA WG5 Report and Questions for Advice |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.5 |
SP-140783 |
SA WG5 Status Report |
SA WG5 Chairman |
Chairman's Report of SA WG5 activities to TSG SA#66 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.5 |
SP-140848 |
LS from ETSI ISG NFV: Status of the Management and Orchestration Group Specification |
ETSI ISG NFV |
ETSI ISG NFV would like to inform SA WG5 that the Management and Orchestration Group Specification has now reached Final Draft status. Version 0.8.1 is openly available from the ETSI Portal at the following add [...]. |
LS In |
Information |
Noted |
|
| NFV(14)000350 |
A response to ETSI NFV IFA from SA WG5 was provided in SP-140853. This incoming LS was noted |
7.5 |
SP-140853 |
LS to ETSI NFV IFA on cooperation between ETSI NFV IFA and SA WG5 |
SA WG5 |
SA WG5 has discussed the cooperation with ETSI NFV IFA at SA WG5#98 Nov 17-21, 2014. The attached presentation provides an update on the SA WG5 work on NFV. It includes information regarding the objectives of [...]. |
LS In |
Information |
Noted |
|
| S5-146365 |
This incoming LS was noted |
7.6 |
- |
TSG RAN report and Questions for Advice |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.6 |
SP-140851 |
TSG RAN Status Report to TSG SA#66 |
TSG RAN Chairman |
RAN Chairman's report for presentation |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.6 |
SP-140852 |
Draft report of TSG RAN meeting #66 |
TSG RAN Secretary (MCC) |
Draft version of the RAN #66 report provided for information |
Report |
Information |
Noted |
|
|
| This Report was noted |
7.6 |
SP-140846 |
LS from ITU-R Working Party 5D: ARCHITECTURE AND TOPOLOGY OF IMT NETWORKS |
ITU-R Working Party 5D |
Working Party 5D (WP 5D) wishes to inform the relevant External Organizations that it is continuing development of a working document toward a preliminary draft new Report ITU R M.[IMT.ARCH], 'Architecture and [...]. |
LS In |
Information |
Noted |
|
| 5D/TEMP/472(Rev.2) |
This incoming LS was noted |
7.6 |
SP-140847 |
LS from ITU-R Working Party 5D: THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.1457 TO REVISION 13 |
ITU-R Working Party 5D |
Introduction: ITU-R Working Party 5D thanks the relevant External Organizations for their successful work in regards to the course of action to be taken towards the completion of Revision 12 of Recommendation I [...]. |
LS In |
Information |
Noted |
|
| 5D/TEMP/473 |
This incoming LS was noted |
7.6 |
SP-140862 |
LS from TSG RAN: DRAFT Letter to ITU on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.1457 to Revision 13 |
TSG RAN |
TSG RAN asks TSG SA to review this draft LTI and provide feedbacks to the PCG. In the footnote of this document, the source PCG doc number has to be updated as soon as it is available. Based on Decision PCG2 [...]. |
LS In |
Action |
Forwarded to PCG in Sp-140873 |
SP-140873 |
| RP-142247 |
This was revised to forward it to the PCG in SP-140873 |
7.6 |
SP-140873 |
Letter to ITU on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.1457 to Revision 13 |
TSG SA |
- |
LS OUT |
Approval |
Approved |
|
|
| This outgoing LS was approved |
7.6 |
SP-140871 |
Draft follow-up reply letter on the completion of the submission of LTE-Advanced toward Revision 2 of Rec. ITU-R M.2012 |
TSG RAN |
This ITU input will become part of ITU deliverable(s): yes Responsible 3GPP group for final output to ITU: 3GPP PCG deadline for the final output to ITU: 20th January 2015 (16:00 hours UTC). For 3GPP revi [...]. |
LS In |
Action |
Revised |
SP-140874 |
| RP-142259 |
This was revised to as a consolidated response LS in SP-140874 |
7.6 |
SP-140874 |
Follow-up reply letter on the completion of the submission of LTE-Advanced toward Revision 2 of Rec. ITU-R M.2012 |
TSG SA |
This ITU input will become part of ITU deliverable(s): yes Responsible 3GPP group for final output to ITU: 3GPP PCG deadline for the final output to ITU: 20th January 2015 (16:00 hours UTC). For 3GPP revi [...]. |
LS OUT |
Action |
Approved |
|
| - |
Response to SP-140649 This outgoing LS was approved |
7.6 |
SP-140854 |
LS from ITU-R Working Party 5D: REPLY LIAISON STATEMENT TO ITU-T STUDY GROUP 15, ITU-R WP 5D, MEF |
ITU-R Working Party 5D |
Working Party 5C (WP 5C) thanks ITU-T Study Group 15, ITU-R WP 5D and MEF for their Liaison Statements (respectively Document 5C/353R1, 5C/352 and 5C/322), providing an update on their activities, especially in [...]. |
LS In |
Information |
Noted |
|
| 5C/TEMP/180(Rev.1) |
This incoming LS was noted |
7.6 |
SP-140872 |
Draft reply letter on Working document towards a preliminary draft new ITU-R Report ITU-R SM.[SMART_GRID] |
TSG RAN |
This ITU input will become part of ITU deliverable(s): yes Responsible 3GPP group for final output to ITU: 3GPP PCG deadline for the final output to ITU: 31 December 2014 (16:00 hours UTC). For 3GPP revie [...]. |
LS In |
Action |
Revised |
SP-140875 |
| RP-142260 |
This was revised to as a consolidated response LS in SP-140875 |
7.6 |
SP-140875 |
Reply letter on Working document towards a preliminary draft new ITU-R Report ITU-R SM.[SMART_GRID] |
TSG RAN |
To: PCG |
LS OUT |
Action |
Approved |
| SP-140872 |
- |
This outgoing LS was approved |
7.6 |
SP-140882 |
LS from TSG RAN: LS on LTE based Vehicular Communication |
TSG RAN |
TSG RAN would like to inform that a potential RAN study on LTE-based V2V solution was discussed in RAN#66. Some companies in RAN think that LTE-based V2V solution should be made available earlier than other V2X [...]. |
LS In |
Action |
Noted |
|
| RP-142312 |
This incoming LS was noted |
7.7 |
- |
TSG CT report and Questions for Advice |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.7 |
SP-140855 |
Status report of TSG CT#66 |
TSG CT Chairman |
TSG CT Status Report to TSG SA#66 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.7 |
SP-140856 |
Draft meeting report of TSG CT#66 |
MCC |
Draft report of TSG CT meeting #66 |
Report |
Information |
Noted |
|
|
| This Report was noted |
7.7 |
SP-140857 |
IETF Status report |
TSG CT Chairman |
IETF dependencies Status report |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.7 |
SP-140654 |
LS from SA WG5: Reply LS from SA WG5 to TSG SA on Maintenance of I-WLAN Solution |
SA WG5 |
SA WG5 thanks TSG SA for the LS on the discontinuation of the maintenance of the I-WLAN feature from Rel-12 onwards and would like to report to TSG SA the related actions carried out in SA WG5. For Charging, [...]. |
LS In |
Action |
Noted |
|
| S5-144380 |
This incoming LS was noted |
7.7 |
SP-140858 |
LS from TSG CT: LS on Evolution of Recommendation E.212 from ITU-T SG |
TSG CT |
TSG CT#66 would like to inform TSG SA that TSG CT discussed and endorsed the attached document, related to the LS from ITU-T SG2 on 'Evolution of Recommendation E.212'. Action: TSG CT kindly asks TSG SA Plenary [...]. |
LS In |
Action |
Revised |
|
| CP-140993 |
Updated for sending to ITU-T in SP-140887 |
7.7 |
SP-140887 |
LS on Evolution of Recommendation E.212 from ITU-T SG |
TSG SA |
TSG CT#66 would like to inform TSG SA that TSG CT discussed and endorsed the attached document, related to the LS from ITU-T SG2 on 'Evolution of Recommendation E.212'. Action: TSG CT kindly asks TSG SA Plenary [...]. |
LS OUT |
Action |
Approved |
| SP-140858 |
- |
This outgoing LS was approved |
7.7 |
SP-140860 |
LS from TSG CT: Reply LS on discontinuance of I-WLAN related TS 29.161 |
TSG CT |
TSG CT Plenary thanks CT WG3 for their LS on discontinuance of I-WLAN related TS 29.161. TSG CT Plenary has discussed this issue and decided to discontinue the I-WLAN related TS 29.161 from Rel-12 onwards. Con [...]. |
LS In |
Information |
Noted |
|
| CP-141001 |
This incoming LS was noted |
7.7 |
SP-140662 |
LS from CT WG3: LS on Discontinuance of I-WLAN related TS 29.161 |
CT WG3 |
Due to the TSG SA plenary guidance to remove I-WLAN from Rel-13, CT WG3 decided to discontinue the I-WLAN related TS 29.161 in Rel-13. Thus, any references to TS 29.161 from other specifications need to be remo [...]. |
LS In |
Information |
Noted |
|
| C3-145271 |
This incoming LS was noted |
7.7 |
SP-140663 |
LS from CT WG4: Reply LS on Maintenance of I-WLAN Solution |
CT WG4 |
CT WG4 thanks TSG SA for their LS on stopping the maintenance of I-WLAN Interworking. CT WG4 has analysed the impacts for stopping the maintenance of I-WLAN Interworking in our CT WG4 specifications and has tak [...]. |
LS In |
Action |
Noted |
|
| C4-142474 |
This incoming LS was noted |
7.8 |
- |
TSG GERAN report and Questions for Advice |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.8 |
SP-140715 |
TSG GERAN Status Report to TSG SA#66 |
TSG GERAN Chairman |
TSG GERAN Chairman's Status Report to TSG SA#66 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
8 |
- |
Documents related to Rel-8 or Earlier Features |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.1 |
- |
Rel-4 CRs (Need to be very well justified!) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.2 |
- |
Rel-5 CRs (Need to be very well justified!) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.3 |
- |
Rel-6 CRs (Need to be very well justified!) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.4 |
- |
Rel-7 CRs (Need to be very well justified!) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.5 |
- |
Rel-8 CRs (Need to be very well justified!) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.5 |
SP-140668 |
6 CRs to 23.203 (SAES: Rel-8, Rel-9, Rel-10, Rel-11, Rel-12, Rel-13) |
SA WG2 |
23.203 CR0934R1; 23.203 CR0935R1; 23.203 CR0936R1; 23.203 CR0937R1; 23.203 CR0938R1; 23.203 CR0939R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
8.5 |
SP-140823 |
Rel-8 CRs on 3GPP System Architecture Evolution Specification - Evolved Packet System (SAES) |
SA WG3 |
33.102 CR0267R1; 33.102 CR0269; 33.102 CR0270; 33.102 CR0271; 33.102 CR0272 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
8.5 |
SP-140719 |
CRs to TS 26.132 on 'Correction of broadband signal level at the hands free reference point (TEI8)' (Release 8 to Release 12) |
SA WG4 |
26.132 CR0075R1; 26.132 CR0076R1; 26.132 CR0077R1; 26.132 CR0078R1; 26.132 CR0079R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
9 |
- |
Rel-9 CRs (Need to be very well justified!) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
9 |
SP-140781 |
Stage 1 CRs on TEI9, eCall on eCall mode of operation |
SA WG1 |
22.101 CR0489R1; 22.101 CR0490; 22.101 CR0491; 22.101 CR0492; 22.101 CR0493 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
9 |
SP-140669 |
5 CRs to 23.401 (TEI9: SAES, Rel-9, Rel-10, Rel-11, Rel-12, Rel-13) |
SA WG2 |
23.401 CR2782R1; 23.401 CR2783R1; 23.401 CR2784R1; 23.401 CR2785R1; 23.401 CR2786R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
9 |
SP-140819 |
Release 9 CRs on Lawful Interception (LI9) |
SA WG3 |
33.108 CR0253; 33.108 CR0254; 33.108 CR0255; 33.108 CR0256 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
9 |
SP-140802 |
Rel-9 CRs on Charging Management (CH9) |
SA WG5 |
32.298 CR0495R1; 32.298 CR0496R1; 32.298 CR0497R1; 32.298 CR0498R1; 32.299 CR0611; 32.299 CR0612; 32.299 CR0613; 32.299 CR0614 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
10 |
- |
Rel-10 CRs (Need to be very well justified!) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
10 |
SP-140670 |
4 CRs to 23.401 (TEI10: Rel-10, Rel-11, Rel-12, Rel-13) |
SA WG2 |
23.401 CR2807R1; 23.401 CR2808R1; 23.401 CR2809R1; 23.401 CR2810R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
10 |
SP-140672 |
4 CRs to 23.401 (NIMTC: Rel-10, Rel-11, Rel-12, Rel-13) |
SA WG2 |
23.401 CR2770R1; 23.401 CR2771R1; 23.401 CR2772R1; 23.401 CR2773R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
10 |
SP-140671 |
7 CRs to 23.203, 23.402 (SAES, TEI10: Rel-10, Rel-11, Rel-12, Rel-13) |
SA WG2 |
23.203 CR0917R2; 23.203 CR0918R2; 23.203 CR0919R2; 23.203 CR0920R2; 23.402 CR1310; 23.402 CR1311; 23.402 CR1312 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
10 |
SP-140720 |
CRs to TS 26.247 on 'Correction on Registration of MIME Type for QoE Reports (HTTP_SDS)' (Release 10 to Release 12) |
SA WG4 |
26.247 CR0065R1; 26.247 CR0066R1; 26.247 CR0067R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
11 |
- |
Rel-11 CRs |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11 |
SP-140674 |
15 CRs to 23.060, 23.203, 23.401 (TEI11: Rel-11, Rel-12, Rel-13) |
SA WG2 |
23.060 CR1876R8; 23.060 CR1877R5; 23.060 CR1907R4; 23.060 CR1922R2; 23.060 CR1923R1; 23.060 CR1924R1; 23.060 CR1933R2; 23.060 CR1934R2; 23.060 CR1935R2; 23.203 CR0902R4; 23.203 CR0903R3; 23.203 CR0904R3; 23.401 [...]. |
CR Pack |
Approval |
Approved except 23.203 CR0903R3 |
|
|
| Company revision of 23.203 CR0903R3 in SP-140837 This CR Pack was approved |
11 |
SP-140837 |
23.203 CR0903 R4: Clarifications for TFT handling |
Huawei, Hisilicon |
23.203 CR0903 R4 |
CR Pack |
Approval |
Approved |
|
|
| Proposed revision of 23.203 CR0903R3 (SP-140674) This CR Pack was approved |
11 |
SP-140747 |
Stage 1 CR on Alignment regarding ACB MOCN-support |
SA WG1 |
22.011 CR0208 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
11 |
SP-140673 |
3 CRs to 23.060 (SIMTC: Rel-11, Rel-12, Rel-13) |
SA WG2 |
23.060 CR1927; 23.060 CR1928; 23.060 CR1929 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
11 |
SP-140675 |
6 CRs to 23.060, 23.401 (TEI11, SAES: Rel-11, Rel-12, Rel-13) |
SA WG2 |
23.060 CR1894R1; 23.060 CR1895R1; 23.060 CR1896R1; 23.401 CR2744; 23.401 CR2745; 23.401 CR2746 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
11 |
SP-140820 |
Release 11 CRs on Lawful Interception (LI11) |
SA WG3 |
33.108 CR0250; 33.108 CR0251 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
11 |
SP-140721 |
CRs to TS 26.132 on 'Correction to UE receiving loudness rating performance test for wideband telephony (Ext_ATS)' (Release 11 and Release 12) |
SA WG4 |
26.132 CR0071; 26.132 CR0072 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
11 |
SP-140797 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
28.659 CR0010R1; 28.659 CR0011; 28.672 CR0003; 28.672 CR0002R1; 28.702 CR0005R1; 28.702 CR0006R2; 28.703 CR0005; 32.103 CR0008R1; 32.103 CR0011; 32.103 CR0012 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
11 |
SP-140803 |
Rel-11 CRs on Charging Management (CH11) |
SA WG5 |
32.260 CR0290R1; 32.260 CR0291R1; 32.260 CR0294R1; 32.260 CR0295R1; 32.260 CR0296; 32.260 CR0297R1; 32.298 CR0504R1; 32.298 CR0505R1; 32.298 CR0507; 32.298 CR0508; 32.299 CR0617; 32.299 CR0618 This was block ap [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12 |
- |
Documents Related to Rel-12 Features |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.1 |
- |
(SEQ_FA) - Sequential Flexible Alerting |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.2 |
- |
(IMS_WebRTC) - Web Real Time Communication (WebRTC) Access to IMS |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.2 |
SP-140676 |
2 CRs to 23.228 (IMS_WebRTC: Rel-12, Rel-13) |
SA WG2 |
23.228 CR1096R1; 23.228 CR1097R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.2 |
SP-140825 |
Release 12 CRs on Web Real Time Communication Access to IMS (IMS_WebRTC) |
SA WG3 |
33.203 CR0227; 33.203 CR0228R1; 33.203 CR0229; 33.203 CR0230R1; 33.203 CR0231R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.3 |
- |
(LangInfo) - Language and Modality Information for communications |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.4 |
- |
(EVS_codec) - Codec for Enhanced Voice Services |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.4 |
SP-140722 |
CRs to TS 26.114 on 'Codec for Enhanced Voice Services (EVS_codec)' (Release 12) |
SA WG4 |
26.114 CR0297R4; 26.114 CR0300R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.4 |
SP-140723 |
CR to TS 26.441 on 'Typographical correction (EVS_codec)' (Release 12) |
SA WG4 |
26.441 CR0001 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.4 |
SP-140724 |
CRs to TS 26.442 on 'Codec for Enhanced Voice Services (EVS); ANSI C code (fixed-point) (EVS_codec)' (Release 12) |
SA WG4 |
26.442 CR0001; 26.442 CR0002; 26.442 CR0003R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.4 |
SP-140725 |
CRs to TS 26.444 on ‘Codec for Enhanced Voice Services (EVS); Test Sequences (EVS_codec)' (Release 12) |
SA WG4 |
26.444 CR0001; 26.444 CR0002R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.4 |
SP-140726 |
CRs to TS 26.445 on ‘Codec for Enhanced Voice Services (EVS); Detailed Algorithmic Description (EVS_codec)' (Release 12) |
SA WG4 |
26.445 CR0001R3; 26.445 CR0002R3 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.4 |
SP-140727 |
CR to TS 26.447 on 'Corrections to the description of the packet loss concealment algorithm (EVS_codec)' (Release 12) |
SA WG4 |
26.447 CR0001R4 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.4 |
SP-140728 |
CR to TS 26.448 on 'Corrections (EVS_codec)' (Release 12) |
SA WG4 |
26.448 CR0001 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.4 |
SP-140729 |
TS 26.443 Codec for Enhanced Voice Services (EVS); ANSI C code (floating-point) (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: The present document contains an electronic copy of the ANSI C floating-point code for the Enhanced Voice Services (EVS) Codec. This ANSI C code is the unique alternative reference specifi [...]. |
TS |
Approval |
Approved |
|
|
| This was block approved |
12.4 |
SP-140730 |
TR 26.952 Codec for Enhanced Voice Services (EVS); Performance Characterization (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: The present document provides information on the Enhanced Voice Services (EVS) codec Selection, Verification and Characterization Phases which were run using the fixed-point code (TS 26.44 [...]. |
TR |
Approval |
Approved |
|
|
| This was block approved |
12.5 |
- |
(IMS_TELEP) - IMS-based Telepresence |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.6 |
- |
(SMURFs) - Service and Media Reachability for Users over Restrictive Firewalls |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.7 |
- |
(MOSAP) - Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.8 |
- |
(IPXSNAT) - IPXS for national interconnect |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.9 |
- |
(INIPUI) - IMS Network-Independent Public User Identities (including FS_INIPUI) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.10 |
- |
(ECTB) - ECT Blind service interactions |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.11 |
- |
(PMOC) - Prevention of mobile-originating signalling and/or data traffic of UE in connected mode |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.12 |
- |
(ESID) - Emergency Session Identification |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.13 |
- |
(IMS_Corp2) - Transfer of ETSI business trunking specifications |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.13 |
SP-140748 |
Stage 1 CR on Transfer of ETSI business trunking specifications (IMS_Corp2) |
SA WG1 |
22.228 CR0208R2; 22.228 CR0209R2 |
CR Pack |
Approval |
Approved |
|
|
| Company revision in SP-140842 This CR Pack was approved |
12.13 |
SP-140842 |
Update to CR0208 and CR0209 to TS 22.228 on Clean up from business trunking transfer (SP-140748) |
Nokia Networks |
22.228 CR0208R3; 22.228 CR0209R3 |
CR Pack |
Approval |
Noted |
|
|
| Revision of CRs in SP-140748 This CR Pack was noted |
12.14 |
- |
(ProSe) - Proximity based Services |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.14 |
SP-140749 |
Stage 1 CRs on Proximty Services (ProSe) |
SA WG1 |
22.278 CR0214; 22.278 CR0215 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.14 |
SP-140677 |
19 CRs to 23.303 (ProSe, TEI12: Rel-12) |
SA WG2 |
23.303 CR0110R4; 23.303 CR0111R3; 23.303 CR0120R2; 23.303 CR0121R2; 23.303 CR0123R1; 23.303 CR0124R2; 23.303 CR0127R2; 23.303 CR0128R1; 23.303 CR0132R4; 23.303 CR0133R4; 23.303 CR0138; 23.303 CR0139R1; 23.303 C [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.14 |
SP-140828 |
Release 12 CRs on Proximity based Services (ProSe) |
SA WG3 |
33.303 CR0019R2; 33.303 CR0020R3; 33.303 CR0023R2; 33.303 CR0035R1; 33.303 CR0037R1; 33.303 CR0038R1; 33.303 CR0039R1; 33.303 CR0040; 33.303 CR0041R1; 33.303 CR0042R1; 33.303 CR0043R1; 33.303 CR0045R1; 33.303 C [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.14 |
SP-140788 |
Work Item Exception for WI ProSe-CH |
SA WG5 |
Abstract of document: Exception sheet for Rel-12 Work Item Proximity-based Services Charging. Task(s) within work which are not complete: CRs to stage 3 charging TSs: introduction of Diameter AVPs and ASN.1 fo [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This was block approved |
12.14 |
SP-140790 |
TS 32.277 Proximity-based Services (ProSe) Charging |
SA WG5 |
Abstract of document: This document specifies the Offline and Online Charging description for the Proximity-based Services (ProSe), based on the stage 2 description of ProSe in TS 23.303. This charging descript [...]. |
TS |
Approval |
Approved |
|
|
| This was block approved |
12.14 |
SP-140808 |
Rel-12 CRs on Charging Aspects of Proximity-based Services (Prose-CH) |
SA WG5 |
32.240 CR0380R1; 32.297 CR0019 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.14 |
SP-140791 |
TR 32.844 Study of charging support of Proximity-based Services (ProSe) Direct Communication for Public Safety use |
SA WG5 |
Abstract of document: The document intends to study the charging architecture for the one-to-many ProSe Direct Communication for ProSe-enabled Public Safety UE. The study covers the ProSe Direct Communication f [...]. |
TR |
Approval |
Approved |
|
|
| This was block approved |
12.15 |
- |
(GCSE_LTE) - Group Communication System Enablers for LTE |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.15 |
SP-140753 |
Stage 1 CR on Group Communication System Enablers for LTE (GCSE_LTE) |
SA WG1 |
22.468 CR0013 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.15 |
SP-140678 |
9 CRs to 23.203, 23.401, 23.246, 23.468 (GCSE_LTE: Rel-12, Rel-13) |
SA WG2 |
23.203 CR0910R4; 23.203 CR0930R2; 23.203 CR0945R2; 23.203 CR0946R2; 23.246 CR0387R4; 23.401 CR2768R1; 23.401 CR2769R2; 23.468 CR0050R1; 23.468 CR0055R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.15 |
SP-140826 |
Release 12 CRs on Group Communication System Enablers for LTE (GCSE_LTE) |
SA WG3 |
33.246 CR0187; 33.246 CR0188R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.16 |
- |
(IMSSat) - IMS access via Digital Video Broadcast - Return Channel via Satellite |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.17 |
- |
(IMS_RegCon) - IMS Registration Control |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.18 |
- |
(SIPTO_SC, LIMONET) - SIPTO Service Continuity, LIPA Mobility and SIPTO at the Local Network |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.19 |
- |
(OPIIS) - Operator Policies for IP Interface Selection |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.20 |
- |
(P4C) - Policy and Charging Control for supporting fixed broadband access networks (including all building blocks in all WGs) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.20 |
SP-140679 |
2 CRs to 23.203 (P4C-F, TEI12: Rel-12, Rel-13) |
SA WG2 |
23.203 CR0956R4; 23.203 CR0964 |
CR Pack |
Approval |
23.203 CR0964 approved |
|
|
| Company revision of 23.203 CR0956R4 in SP-140838. 23.203 CR0964 was approved. |
12.20 |
SP-140838 |
23.203 CR0956 R5: Convergence PCC for fixed access broadband: alignment to SA WG5 conclusion of work |
Huawei, Hisilicon, Allot, Alcatel-Lucent, Orange |
23.203 CR0956R5 |
CR Pack |
Approval |
Approved |
|
|
| Proposed revision of 23.203 CR0956R4 (SP-140679) This CR Pack was approved |
12.21 |
- |
(SMSMI) - SMS submit and delivery without MSISDN in IMS |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.22 |
- |
(MTCe) - Machine-Type and other mobile data applications Communications Enhancements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.22 |
SP-140680 |
2 CRs to 23.401 (MTCe-SDDTE, TEI12: Rel-12, Rel-13) |
SA WG2 |
23.401 CR2751R1; 23.401 CR2752R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.23 |
- |
(WLAN_NS) - WLAN Network Selection for 3GPP Terminals |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.23 |
SP-140681 |
3 CRs to 23.203, 23.228, 23.402, 23.682 (WLAN_NS: Rel-12) |
SA WG2 |
23.402 CR1318R5; 23.402 CR1323R1; 23.402 CR1333R3 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.24 |
- |
(LTE_HRPD_SON) - LTE-HRPD (High Rate Packet Data in 3GPP2) inter-RAT SON |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.25 |
- |
(CNO_ULI) - User Location Information reporting improvements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.25 |
SP-140682 |
1 CR to 23.060 (CNO_ULI, TEI12: Rel-12) |
SA WG2 |
23.060 CR1926 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.26 |
- |
(eSAMOG) - S2a Mobility Based on Trusted WLAN access to EPC |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.26 |
SP-140683 |
3 CRs to 23.402 (eSaMOG, TEI12: Rel-12) |
SA WG2 |
23.402 CR1313; 23.402 CR1320R1; 23.402 CR1326R5 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.26 |
SP-140829 |
Rel-12 CRs on Enhanced S2a Mobility Over trusted WLAN access to EPC (eSaMOG) |
SA WG3 |
33.402 CR0120; 33.402 CR0121; 33.402 CR0122 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.27 |
- |
(WORM) - Optimized offloading to WLAN in 3GPP RAT mobility |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.28 |
- |
(UTRA_LTE_WLAN_interw) - SA2 aspects of WLAN/3GPP Radio Interworking |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.28 |
SP-140684 |
17 CRs to 23.060, 23.401, 23.402 (UTRA_LTE_WLAN_interw-SA WG2: Rel-12, Rel-13) |
SA WG2 |
23.060 CR1903; 23.060 CR1904; 23.060 CR1905R1; 23.060 CR1906R1; 23.060 CR1908R1; 23.060 CR1909R1; 23.401 CR2755; 23.401 CR2756; 23.401 CR2757R1; 23.401 CR2758R1; 23.401 CR2763R2; 23.401 CR2764R1; 23.402 CR1315R [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.29 |
- |
(NETLOC_TWAN) - Network Provided Location Information for IMS (TWAN case) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.30 |
- |
(UMONC) - Usage Monitoring Control PCC Enhancement |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.31 |
- |
(ABC) - Application Based Charging |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.31 |
SP-140807 |
Rel-12 CRs on Application-Based Charging (ABC) |
SA WG5 |
32.251 CR0392R1; 32.299 CR0616R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.32 |
- |
(BusTI) - IMS Business Trunking for IP-PBX in Static Mode of Operation |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.33 |
- |
(PWS_Sec) - Public Warning System Security |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.34 |
- |
(eMEDIASEC) - IMS media plane security extensions (including FS_eMEDIASEC) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.35 |
- |
(SSO_int) - Service requirements for integration of Single Sign-On (SSO) frameworks with 3GPP networks |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.36 |
- |
(Web_GBA) - Security enhancements for usage of GBA from the browser |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.37 |
- |
(SECAS) - Security Assurance Specification for 3GPP Network Products |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.38 |
- |
(STAS) - Specification of the TUAK algorithm set |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.38 |
SP-140814 |
Revised WID 3G Security; Specification of the TUAK algorithm set (STAS) |
SA WG3 |
Objective: SA WG3 Objectives: This work item aims to deliver the complete specification set for a second example algorithm set for the 3GPP authentication and key generation functions as 3GPP Technical Specific [...]. |
WID |
Approval |
Revised |
SP-140876 |
|
|
| 12.38 |
SP-140876 |
Revised WID 3G Security; Specification of the TUAK algorithm set (STAS) |
SA WG3 |
Objective: SA WG3 Objectives: This work item aims to deliver the complete specification set for a second example algorithm set for the 3GPP authentication and key generation functions as 3GPP Technical Specific [...]. |
WID |
Approval |
Approved |
| SP-140814 |
| This WID was approved |
12.38 |
SP-140816 |
TR 35.9xy: Report on the design and evaluation of the Tuak algorithm set: A second example algorithm set for the 3GPP authentication and key generation functions |
SA WG3 |
Abstract of document: SA WG3 has adopted this second example algorithm set for the 3GPP authentication and key generation functions, which includes the algorithm specification itself (which is associated with t [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.38 |
SP-140817 |
TR 35.9ab: Performance evaluation of the Tuak algorithm set |
SA WG3 |
Abstract of document: SA WG3 has adopted this second example algorithm set for the 3GPP authentication and key generation functions, which includes the algorithm specification itself (which is associated with t [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.38 |
SP-140818 |
TR 35.9cd: Security assessment of the Tuak algorithm set |
SA WG3 |
Abstract of document: SA WG3 has adopted this second example algorithm set for the 3GPP authentication and key generation functions, which includes the algorithm specification itself (which is associated with t [...]. |
TR |
Approval |
Revised |
SP-140877 |
|
|
| 12.38 |
SP-140877 |
TR 35.9cd: Security assessment of the Tuak algorithm set |
SA WG3 |
Abstract of document: SA WG3 has adopted this second example algorithm set for the 3GPP authentication and key generation functions, which includes the algorithm specification itself (which is associated with t [...]. |
TR |
Approval |
Approved |
| SP-140818 |
| This TR was approved and placed under Change control |
12.39 |
- |
(TURAN) - Tunneling of UE Services over Restrictive Access Networks |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.40 |
- |
(CVO) - Co-ordination of Video Orientation |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.41 |
- |
(HEVC) - High Efficiency Video Coding |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.42 |
- |
(IMS_SDE) - IMS-based Streaming and Download Delivery Enhancements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.43 |
- |
(M3DV_Ext) - Mobile stereoscopic 3D services extensions |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.44 |
- |
(ART_LTE) - Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.44 |
SP-140731 |
CRs to TS 26.131 and TS 26.132 on 'LTE UE super-wideband and fullband acoustic requirements and test methods (ART_LTE-SUPER)' (Release 12) |
SA WG4 |
26.131 CR0063R2; 26.132 CR0080R2 |
CR Pack |
Approval |
26.131 CR0063R2 approved. |
|
|
| 26.132 CR0080R2 was replaced by Qualcomm in SP-140869. |
12.44 |
SP-140869 |
26.132 CR0081 on 'LTE UE super-wideband and fullband acoustic requirements and test methods (ART_LTE-SUPER)' (Release 12) |
Qualcomm |
26.132 CR0081 |
CR Pack |
Approval |
Approved |
|
|
| Replacement of a CR in SP-140731 This CR Pack was approved |
12.45 |
- |
(MI) - MBMS Improvements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.45 |
SP-140732 |
CRs to TS 26.247, TS 26.346 and TS 26.946 on 'Enhanced MBMS Operation (MI-EMO)' (Release 12) |
SA WG4 |
26.247 CR0075R1; 26.346 CR0427R3; 26.346 CR0433R1; 26.946 CR0006R1; 26.946 CR0007R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.45 |
SP-140734 |
CRs to TS 26.346 on 'MBMS operation on Demand (MI-MooD)' (Release 12) |
SA WG4 |
26.346 CR0425R2; 26.346 CR0432R2 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.45 |
SP-140733 |
TR 26.848 Multimedia Broadcast/Multicast Service (MBMS); Enhanced MBMS Operation (MI-EMO) (Release 12), v. 2.0.0 |
SA WG4 |
Abstract of document: At SA#59, the Release 12 Work Item on MBMS Improvement: Enhanced MBMS Operation (MI-EMO) was agreed. The objectives of this work item include - Improve MBMS OTA efficiency (e.g. by object [...]. |
TR |
Approval |
Approved |
|
|
| This was block approved |
12.45 |
SP-140735 |
TR 26.849 MBMS Improvements; MBMS operation on Demand (MI-MooD) (Release 12), v. 2.0.0 |
SA WG4 |
Abstract of document: The objective of the Rel-12 MI-MooD (MBMS Improvements - MBMS operation on Demand) Work Item is to specify in TS 26.346 (MBMS Protocols and Codecs) the required functionality to enable on- [...]. |
TR |
Approval |
Approved |
|
|
| This was block approved |
12.46 |
- |
(VTRI) - Video Telephony Robustness Improvements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.47 |
- |
(VCEIMP) - Video Coding Enhancements in IMS Messaging and Presence |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.48 |
- |
(LI12) - Lawful Interception in Rel-12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.48 |
SP-140821 |
Release 12 CRs on Lawful Interception (LI12) |
SA WG3 |
33.106 CR0136; 33.107 CR0159; 33.107 CR0160; 33.107 CR0161; 33.107 CR0162; 33.107 CR0163; 33.107 CR0164; 33.108 CR0240; 33.108 CR0241; 33.108 CR0242; 33.108 CR0243; 33.108 CR0244; 33.108 CR0245; 33.108 CR0246; [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.49 |
- |
(CH12) - Charging Management Rel-12 (including all building blocks and work tasks) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.49 |
SP-140804 |
Rel-12 CRs on Charging Management (CH12) Batch 1 |
SA WG5 |
32.240 CR0378; 32.250 CR0042; 32.251 CR0390; 32.260 CR0292; 32.270 CR0028; 32.271 CR0015; 32.272 CR0035R1; 32.273 CR0032; 32.275 CR0059; 32.280 CR0029; 32.295 CR0009; 32.297 CR0018R2; 32.298 CR0499R1; 32.251 CR [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.49 |
SP-140805 |
Rel-12 CRs on Charging Management (CH12) Batch 2 |
SA WG5 |
32.240 CR0379R1; 32.250 CR0041; 32.250 CR0043; 32.251 CR0388; 32.251 CR0391R1; 32.251 CR0393R1; 32.260 CR0293R1; 32.270 CR0029; 32.271 CR0016; 32.272 CR0036; 32.273 CR0033; 32.274 CR0030; 32.275 CR0060; 32.280 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.50 |
- |
(OAM12) - OAM&P Rel-12 (including all building blocks and work tasks) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.50 |
SP-140792 |
TS 28.667 Radio Planning Tool Access (RPTA) IRP – Requirements |
SA WG5 |
Abstract of document: TS 28.667 specifies the Requirements for the Radio Planning Tool Access (RPTA) Integration Reference Point (IRP). Changes since last presentation to TSG SA Meeting #65: The System Context [...]. |
TS |
Approval |
Approved |
|
|
| This was block approved |
12.50 |
SP-140793 |
TS 28.668 Radio Planning Tool (RPT) interface NRM IRP – Information Service (IS) |
SA WG5 |
Abstract of document: TS 28.668 specifies the Information Service (IS) for the Radio Planning Tool Access (RPTA) Integration Reference Point (IRP). Changes since last presentation to TSG SA Meeting #65: The Sys [...]. |
TS |
Approval |
Approved |
|
|
| This was block approved |
12.50 |
SP-140794 |
TS 28.669 Radio Planning Tool (RPT) interface NRM IRP – Solution Set (SS) definitions |
SA WG5 |
Abstract of document: TS 28.669 specifies the Solution Set (SS) definitions for the Radio Planning Tool Access (RPTA) Integration Reference Point (IRP). Changes since last presentation to TSG SA: Presented to S [...]. |
TS |
Approval |
Approved |
|
|
| This was block approved |
12.50 |
SP-140795 |
TS 32.130 Network sharing; Concepts and requirements |
SA WG5 |
Abstract of document: This document defines concepts and requirements for the OA&M of network sharing. Changes since last presentation: The diagram describing the GWCN core network sharing scenario has been co [...]. |
TS |
Approval |
Approved |
|
|
| This was block approved |
12.50 |
SP-140796 |
Rel-12 CRs on Alarm quality improvements (OAM-AMI) |
SA WG5 |
32.111-1 CR0011R1; 32.111-2 CR0073R1; 32.111-6 CR0007R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.50 |
SP-140798 |
Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) |
SA WG5 |
28.390 CR0001R1; 28.611 CR0005R1; 28.612 CR0002R1; 28.616 CR0003R1; 28.628 CR0008R1; 28.658 CR0011R1; 28.659 CR0012; 28.703 CR0006; 32.103 CR0009; 32.103 CR0010; 32.300 CR0017R2; 32.423 CR0093 This was block ap [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.50 |
SP-140800 |
Rel-12 CRs on Network Sharing (OAM-SHARE) |
SA WG5 |
28.651 CR0002; 28.652 CR0008R2; 28.653 CR0009R1; 28.657 CR0003; 32.103 CR0013R2; 32.421 CR0073R1; 32.422 CR0277R1; 32.423 CR0094R1; 32.442 CR0237; 32.500 CR0008R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.51 |
- |
(SEC12) - Small Security Enhancements for Rel-12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.52 |
- |
(TEI12) - TEI Rel-12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.52 |
SP-140685 |
15 CRs to 23.002, 23.060, 23.203, 23.401, 23.402 (TEI12: Rel-12, Rel-13) |
SA WG2 |
23.002 CR0280; 23.002 CR0281; 23.060 CR1917R1; 23.060 CR1918R1; 23.060 CR1925; 23.203 CR0923R4; 23.203 CR0924R4; 23.401 CR2760R1; 23.401 CR2761R1; 23.401 CR2778R1; 23.401 CR2779R1; 23.401 CR2743R2; 23.401 CR278 [...]. |
CR Pack |
Approval |
Approved |
|
|
| Rel-13 mirror to 23.060 CR1925 provided in SP-140717 This CR Pack was approved |
12.52 |
SP-140717 |
23.060 CR1942: Correction of S4-SGSN-Initiated PDP Context Modification Procedure. (TEI12, SAES) |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
This CR is a strict mirror of 23.060 Rel-12 CR1925, that was forgotten at SA WG2#105 in Sapporo. 23.060 CR1942 |
CR Pack |
Approval |
Approved |
|
|
| Rel-13 mirror to 23.060 CR1925 in SP-140685 This CR Pack was approved |
12.52 |
SP-140750 |
Stage 1 CR on TEI12 on Support for network initiated USSD |
SA WG1 |
22.173 CR0101 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.52 |
SP-140780 |
Stage 1 CR on TEI12 on Addition and correction of ITU-T References |
SA WG1 |
22.105 CR0057 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.52 |
SP-140686 |
15 CRs to 23.002, 23.203, 23.228, 23.292, 23.401, 23.216, 23.237, 23.303 (TEI12: Rel-12, Rel-13) |
SA WG2 |
23.002 CR0278R1; 23.002 CR0279R1; 23.203 CR0954R2; 23.203 CR0955R2; 23.228 CR1094R1; 23.228 CR1095R1; 23.292 CR0219R1; 23.292 CR0220R2; 23.401 CR2698R5; 23.401 CR2747R2; 23.401 CR2753R1; 23.401 CR2754R1; 23.216 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.52 |
SP-140830 |
Rel-12 CRs on TEI (TEI12) |
SA WG3 |
33.102 CR0268R1; 33.401 CR0541 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.52 |
SP-140736 |
CRs to TS 26.234 and TS 26.346 on 'Technical Enhancements and Improvements for Release 12 (TEI12)' (Release 12) |
SA WG4 |
26.234 CR0221; 26.346 CR0423R2; 26.346 CR0430 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.53 |
- |
Any other Release 12 documents |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.53 |
SP-140687 |
2 CRs to 23.401 (LTE_SC_enh_dualC-Core, TEI12: Rel-12, Rel-13) |
SA WG2 |
23.401 CR2762R1; 23.401 CR2790R2 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.53 |
SP-140824 |
Rel-12 CRs on Dual connectivity for LTE;Core Part (LTE_SC_enh_dualC-Core) |
SA WG3 |
33.401 CR0544R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
12.53 |
SP-140827 |
Rel-12 CRs on E-UTRA Small cell enhancements - Physical layer aspects (LTE_SC_enh_L1) |
SA WG3 |
33.401 CR0540; 33.401 CR0542R1; 33.401 CR0543R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13 |
- |
Documents Related to Rel-13 and later Features |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13 |
SP-140787 |
Revised WID Study on Compliance of 3GPP SA5 specifications to the NGMN Next Generation Converged Operations Requirements (NGCOR) |
SA WG5 |
Objective: The objectives of this Study are: - Record the detailed gap analysis already performed by SA WG5; - Identify for each requirement the work already done by SA WG5 ; - Discuss and agree on the work rem [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13 |
SP-140789 |
TR 28.821 Fixed Mobile Convergence (FMC) model repertoire |
SA WG5 |
Abstract of document: This TR is a result of the Multi-SDO JWG on Model Alignment which SA WG5 (SA WG5) has developed jointly with TMF and NGMN, and it contains an updated UML Model Repertoire for support of Fi [...]. |
TR |
Approval |
Approved |
|
|
| This was block approved |
13.1 |
- |
(SEES) - Service Exposure and Enablement Support |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.1 |
SP-140752 |
Stage 1 CR on Service Exposure and Enablement Support (SEES) |
SA WG1 |
22.115 CR0074R3 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.2 |
- |
(RSE and FS_RSE) - RAN Sharing Enhancements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.3 |
- |
(SRMMTC) - Service Requirements Maintenance for Machine-Type Communications |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.4 |
- |
(MCPTT) - Mission Critical Push-to-Talk over LTE |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.4 |
SP-140646 |
LS from APT Wireless Group (AWG): Liaison statement regarding scope and status relevant to PPDR work items and study items |
APT Wireless Group (AWG) |
Task Group on PPDR (TG-PPDR) under the APT AWG has developed a number of reports and recommendations relating to PPDR for APT countries. In particular, the following two APT AWG reports provide details of PPDR [...]. |
LS In |
Action |
Response in SP-140886 |
|
| AWG-17/OUT-07 |
Response drafted in SP-140878. Final response in SP-140886 |
13.4 |
SP-140878 |
Response LS to APT Wireless Group (AWG): Liaison statement regarding scope and status relevant to PPDR work items and study items |
TSG SA |
Task Group on PPDR (TG-PPDR) under the APT AWG has developed a number of reports and recommendations relating to PPDR for APT countries. In particular, the following two APT AWG reports provide details of PPDR [...]. |
LS OUT |
Action |
Revised |
SP-140886 |
| - |
Response to SP-140646 |
13.4 |
SP-140886 |
Response LS to APT Wireless Group (AWG): Liaison statement regarding scope and status relevant to PPDR work items and study items |
TSG SA |
Task Group on PPDR (TG-PPDR) under the APT AWG has developed a number of reports and recommendations relating to PPDR for APT countries. In particular, the following two APT AWG reports provide details of PPDR [...]. |
LS OUT |
Action |
Approved |
| SP-140878 |
- |
This outgoing LS was approved |
13.4 |
SP-140653 |
LS from SA WG4: Reply LS on 3GPP work organization for Mission Critical Push to Talk |
SA WG4 |
SA WG4 would like to thank TSG SA for the information (given in LS in SP-140640/S4-141150) about its decision related to Mission Critical Push to Talk (MCPTT) and welcomes the creation of a new working group. A [...]. |
LS In |
Action |
Noted |
|
| S4-141360 |
This incoming LS was noted |
13.4 |
SP-140655 |
LS from SA WG5: LS to SA on 3GPP work organization for Mission Critical Push to Talk |
SA WG5 |
SA WG5 would like to inform TSG SA and OMA about the potential impact on charging framework of SA WG5 while creating the standard for mission critical communication application in the new TSG SA6 group and the [...]. |
LS In |
Information |
Forwarded to SA WG6 |
|
| S5-145393 |
It was agreed to forward this to SA WG6. This was then noted. |
13.4 |
SP-140813 |
Revised WID Mission Critical Push To Talk over LTE (MCPTT) |
SA WG3 |
Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. |
WID |
Approval |
Merged into SP-140864 |
SP-140864 |
|
| SA WG2 Update in SP-140708. Merged with SP-140708 into SP-140864 |
13.4 |
SP-140708 |
Update of MCPTT WID |
SA WG2 |
The SA WG2 objectives are as follows: 1. As part of the TR phase: a) Define the MCPTT architectural requirements at the EPS level (including IMS aspects) based on the service requirements specified by SA WG1 an [...]. |
WID |
Approval |
Revised |
SP-140864 |
|
| SA WG3 Update in SP-140813 |
13.4 |
SP-140864 |
Update of MCPTT WID |
SA WG2 Chairman, SA WG3 Chairman |
Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. |
WID |
Approval |
Revised |
SP-140879 |
SP-140708 |
| Merge of SP-140708 and SP-140813 |
13.4 |
SP-140879 |
Update of MCPTT WID |
SA WG2 Chairman, SA WG3 Chairman |
Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. |
WID |
Approval |
Approved |
| SP-140864 |
| This WID was approved |
13.4 |
SP-140754 |
TS 22.179 v.2.0.0 on Mission Critical Push To Talk over LTE (MCPTT) |
SA WG1 |
Abstract of document: The attached document provides the service requirements for operation of the Mission Critical Push To Talk (MCPTT) service. MCPTT makes use of capabilities included in Group Communication [...]. |
TS |
Approval |
Revised |
SP-140844 |
|
|
| 13.4 |
SP-140844 |
TS 22.179 v.2.1.0 on Mission Critical Push To Talk over LTE (MCPTT) |
MCC |
Abstract of document: The attached document provides the service requirements for operation of the Mission Critical Push To Talk (MCPTT) service. MCPTT makes use of capabilities included in Group Communication [...]. |
TS |
Approval |
Approved |
| SP-140754 |
| This TS was approved and placed under Change control |
13.5 |
- |
(SRM_GCSE_LTE) - Service Requirements Maintenance for Group Communication System Enablers for LTE |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.6 |
- |
(ePROSE, PROSE_EXT) - Enhancements to Proximity-based Services |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.7 |
- |
(ACDC and FS_ACDC) - Application specific Congestion control for Data Communication (including FS phase) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.8 |
- |
(ECIP and FS_ECIP) - Enhanced Calling Information Presentation |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.9 |
- |
(GUSH and FS_GUSH) - RAN Sharing Enhancements on GERAN and UTRAN |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.9 |
SP-140755 |
Stage 1 CR on GERAN UTRAN Sharing Enhancements (GUSH) |
SA WG1 |
22.101 CR0481R2; 22.101 CR0482R2; 22.101 CR0483R2; 22.101 CR0484R1; 22.101 CR0485R1; 22.101 CR0486R3; 22.101 CR0487R2; 22.101 CR0488R3 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.10 |
- |
(CSIPTO and FS_CSIPTO) - Co-ordinated P-GW change for SIPTO (including FS phase) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.11 |
- |
(VoE_UTRAN_PPD) - Voice over E-UTRAN Paging Policy Differentiation |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.11 |
SP-140688 |
2 CRs to 23.228, 23.401 (voE_UTRAN_PPD: Rel-13) |
SA WG2 |
23.228 CR1098R1; 23.401 CR2731R7 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.12 |
- |
(eWebRTCi) - Enhancements to WebRTC interoperability |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.13 |
- |
(IOPS and FS_IOPS) - Isolated E-UTRAN Operation for Public Safety (including FS phase) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.14 |
- |
(FMSS and FS_FMSS) - Flexible Mobile Service Steering |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.14 |
SP-140703 |
Updated WID for Flexible Mobile Service Steering (FMSS) |
SA WG2 |
Objective: The objective in Stage 1 is to define service requirements to enable the 3GPP Core Network to define and modify traffic steering policies that will be used to select required service enablers of the [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13.15 |
- |
(UPCON) - UserPlane Congestion Management |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.15 |
SP-140689 |
11 CRs to 23.060, 23.203, 23.401 (UPCON: Rel-13) |
SA WG2 |
23.060 CR1892R2; 23.060 CR1932R1; 23.203 CR0915; 23.203 CR0916R2; 23.203 CR0926R3; 23.203 CR0927; 23.203 CR0950R2; 23.203 CR0952; 23.203 CR0961R2; 23.401 CR2780R3; 23.401 CR2797 This was block approved [...]. |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.15 |
SP-140697 |
TR 23.705: Study on system enhancements for user plane congestion management (UPCON) |
SA WG2 |
Abstract of document: TR 23.705 contains key issues' definition, solutions, evaluation and conclusion for RAN User Plane Congestion handling. Conclusion on normative standardization for solutions 1.5.5 Off-path [...]. |
TR |
Approval |
Approved |
|
|
| This was block approved |
13.16 |
- |
(DRuMS) - Double Resource Reuse for Multiple Media Sessions |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.16 |
SP-140690 |
3 CRs to 23.203, 23.228 (DRuMS: Rel-13) |
SA WG2 |
23.203 CR0922R2; 23.228 CR1092R1; 23.228 CR1093R2 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.17 |
- |
(DECOR) - Dedicated Core Networks |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.17 |
SP-140696 |
TR 23.707: Architecture Enhancements for Dedicated Core Networks; Stage 2 (DECOR) |
SA WG2 |
Abstract of document: An operator may choose to deploy one (or more) dedicated core networks within a PLMN with each core network dedicated for specific type(s) of subscriber. The present document studies and e [...]. |
TR |
Approval |
Approved |
|
|
| One-step approval This was block approved |
13.17 |
SP-140707 |
Update WID on Dedicated Core Networks (DECOR) |
SA WG2 |
Objective: The objective of this work item is to enable the deployment of dedicated core networks where each dedicated core network is dedicated to UEs sharing the same characteristics. The specific dedicated c [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13.18 |
- |
(NBIFOM) - IP Flow Mobility support for S2a and S2b Interfaces |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.18 |
SP-140699 |
TR 23.861: Network based IP flow mobility (NBIFOM) |
SA WG2 |
Abstract of document: This work item is to define the IFOM functionality for PMIP and GTP-based S2a and S2b over WLAN. The scope of the work is based on the use-cases and service requirements defined in TR 23.8 [...]. |
TR |
Information |
Noted |
|
|
| This TR was provided for information and was noted |
13.19 |
- |
(AESE) - Architecture Enhancements for Service Capability Exposure |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.19 |
SP-140691 |
1 CR to 23.682 (AESE: Rel-13) |
SA WG2 |
23.682 CR0087R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.19 |
SP-140704 |
Correction to AESE WID's expected output and timelines (AESE) |
SA WG2 |
Objective: Objective of this work item is to define stage 2 architecture enhancements wherein 3GPP system provided service capabilities are exposed to application providers, e.g. via OMA-API(s). As part of thi [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13.19 |
SP-140702 |
TR 23.708: Architecture Enhancements for Service Capability Exposure (AESE) |
SA WG2 |
Abstract of document: The TR 23.708 studies and evaluates architecture enhancements for a service capability exposure framework wherein 3GPP system provided service capabilities are exposed via one or more stan [...]. |
TR |
Information |
Noted |
|
|
| This TR was provided for information and was noted |
13.20 |
- |
(MONTE) - Monitoring Enhancements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.20 |
SP-140705 |
Correction to MONTE WID's expected output and timelines (MONTE) |
SA WG2 |
Objective: Objective of this work item is to study and provide stage-2 specification for the following items - - Monitoring as per the service requirements defined in the clause 7.2.8 of TS 22.368 This work ite [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13.20 |
SP-140701 |
TR 23.789: Monitoring Enhancements (MONTE) |
SA WG2 |
Abstract of document: The TR 23.789 studies and evaluates architectural enhancements required for 3GPP systems to provide monitoring service capability as per the service requirements defined in TS 22.368, clau [...]. |
TR |
Information |
Noted |
|
|
| This TR was provided for information and was noted |
13.21 |
- |
(GROUPE) - Group based Enhancements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.21 |
SP-140706 |
Update GROUPE WID |
SA WG2 |
Objective: The objectives of this work item are to study the concept of groups and to study and specify solutions to: - Fulfil the general group based requirements (22.368 clause 7.2.14.1) - Fulfil the group ba [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13.21 |
SP-140698 |
TR 23.769: Technical Specification Group Services and System Aspects; Group based Enhancements (GROUPE) |
SA WG2 |
Abstract of document: The TR 23.769 studies and evaluates architectural enhancements for group based enhancements (GROUPE). System improvements for GROUPE include following key issues - Key issue 1: Message de [...]. |
TR |
Information |
Noted |
|
|
| This TR was provided for information and was noted |
13.22 |
- |
(eCSFB) - Enhanced CSFB |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.22 |
SP-140700 |
TR 23.772: Enhanced Circuit Switched (CS) Fallback (eCSFB) |
SA WG2 |
Abstract of document: The TR 23.772 studies and evaluates architectural enhancements for CSFB procedures to improve CSFB call setup time. In Rel-13, 3.5 slots have been arranged for this topic, and 7 solutions [...]. |
TR |
Information |
Noted |
|
|
| This TR was provided for information and was noted |
13.23 |
- |
(SETA) - SRVCC Enhancements for Transcoding Avoidance |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.23 |
SP-140716 |
TR 23.717: Study on SRVCC enhancements for Transcoding Avoidance (SETA) |
SA WG2 |
Abstract of document: TR 23.717 describes various alternatives to enhance the SRVCC procedures to enable Transcoder free operation (TrFO) where possible and ensure that the proper CS radio resources are reserve [...]. |
TR |
Information |
Noted |
|
|
| This TR was provided for information and was noted |
13.24 |
- |
(CSPS_coord) - Improvements to CS/PS coordination in UTRAN/GERAN Shared Networks |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.24 |
SP-140692 |
4 CRs to 23.251(CSPS_Coord: Rel-13) |
SA WG2 |
23.251 CR0101R2; 23.251 CR0102R1; 23.251 CR0103R1; 23.251 CR0104R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.24 |
SP-140695 |
TR 23.704: Study on CS/PS Coordination in shared network; Stage 2 (CSPS_COORD) |
SA WG2 |
Abstract of document: TR 23.704 contains the Stage-2 study and evaluation of possible solutions for CS/PS coordination issues i.e. scenarios when CS/PS coordination failure result in a UE ending up registered t [...]. |
TR |
Approval |
Approved |
|
|
| This was block approved |
13.25 |
- |
(E2EMTSI) - End-to-end MTSI extensions |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.26 |
- |
(ROI) - Video Enhancements by Region-of-Interest Information Signaling |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.27 |
- |
(TVProf) - TV video profile |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.28 |
- |
(E_LTE_UED) - Enhanced LTE UE delay test methods and requirements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.29 |
- |
(HTML5) - HTML5 Presentation Layer |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.30 |
- |
(EVSoCS) - Support of EVS in 3G Circuit-Switched Networks |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.31 |
- |
(eDASH) - Enhanced DASH |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.31 |
SP-140737 |
CRs to TS 26.244 and TS 26.247 on 'Enhanced DASH (eDASH)' (Release 13) |
SA WG4 |
26.244 CR0053R3; 26.247 CR0074R2 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.32 |
- |
(LI13) - Lawful Interception in Rel-13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.32 |
SP-140815 |
Revised WID Lawful Interception Rel-13 (LI13) |
SA WG3 |
Objective: The objective of this work item is to enhance the 3GPP LI service to accommodate Release 13 service enhancements and extensions. Enhancements to specifications TS 33.106, TS 33.107 and TS 33.108 will [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13.33 |
- |
(CH13) - Charging Management Rel-13 (including all building blocks and work tasks) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.33 |
SP-140785 |
New WID on ULI and release causes for charging enhancement for VoLTE |
SA WG5 |
Objective: Objective of this work item is to specify: - for IMS online and offline charging: introduction of subsequent ULI/UE Time Zone (s), including the one provided at the time of PDN connection release and [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13.33 |
SP-140806 |
Rel-13 CRs on Charging Management (CH13) |
SA WG5 |
32.260 CR0298R1; 32.273 CR0031R2 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.34 |
- |
(OAM13) - OAM&P Rel-13 (including all building blocks and work tasks) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.34 |
SP-140786 |
New WID on Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement |
SA WG5 |
Objective: This Work Item will address enhancing existing MDT functionality to support MBMS MDT. The objective of the work will include support for triggering, configuring and collecting of signalling based Lo [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
13.34 |
SP-140799 |
Rel-13 CRs on OAM Maintenance and small Enhancements (OAM13) |
SA WG5 |
32.155 CR0004R1; 32.425 CR0155R2; 32.453 CR0002R1; 32.591 CR0006R1; 32.591 CR0007R1; 32.591 CR0008R1; 32.592 CR0032R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.35 |
- |
(SEC13) - Small Security Enhancements for Rel-13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.36 |
- |
(TEI13) - TEI Rel-13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.36 |
SP-140751 |
Stage 1 CR on TEI13 on Align the MTC monitoring requirements with Service Exposure requirements |
SA WG1 |
22.368 CR0155; 22.101 CR0494 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.36 |
SP-140693 |
6 CRs to 23.203, 23.228, 23.402, 23.682 (TEI13: Rel-13) |
SA WG2 |
23.203 CR0953R3; 23.203 CR0958R3; 23.203 CR0963R2; 23.228 CR1099; 23.402 CR1329R2; 23.682 CR0089R3 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
13.37 |
- |
Any other Release 13 documents |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.37 |
SP-140694 |
2 CRs to 23.203 (eUMONC: Rel-13) |
SA WG2 |
23.203 CR0921R3; 23.203 CR0925R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
14 |
- |
Documents related to current Study Items |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.1 |
- |
(FS_MAPN) - Study on Need for multiple APNs |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.1 |
SP-140756 |
TR 22.802 v.1.0.0 on Study on Need for multiple APNs (FS_MAPN) |
SA WG1 |
Abstract of document: The scope of this TR is: - to provide details about the use cases where there is a need of control of APNs; - to identify potential new requirements to fulfil the use cases; - to identify [...]. |
TR |
Information |
Noted |
|
|
| This TR was provided for information and was noted |
14.2 |
- |
(FS_eICBD) - Study on Enhancements for infrastructure based data communication between devices |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.3 |
- |
(FS_MBSP) - Multimedia Broadcast Supplement for PWS |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.3 |
SP-140757 |
TR 22.815 v.2.0.0 on Study on Multimedia Broadcast Supplement for PWS (FS_MBSP) |
SA WG1 |
Abstract of document: The work on Public Warning System (PWS) within the 3GPP as standardised since 3GPP Release 9 has focused on delivering text-based warning notifications of limited content to the public at [...]. |
TR |
Approval |
Approved |
|
|
| This was block approved |
14.4 |
- |
(FS_HLCom) - Study on Optimizations to Support High Latency Communications |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.5 |
- |
(FS_ESCAPADES) - Study on IMS enhanced spoofed call prevention and detection |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.6 |
- |
(FS_eULRS) - Study on Enhancements to User Location Reporting Support |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.7 |
- |
(FS_CATS) - Study on Control of Applications when Third party Servers encounter difficulties |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.7 |
SP-140758 |
Revised WID on Study on Control of Applications when Third party Servers encounter difficulties (FS_CATS) |
SA WG1 |
Objective: The objective of this study is to identify potential requirements that will enable the 3GPP network to detect or receive an indication from a third party server of its congestion status or failure st [...]. |
WID |
Approval |
Approved |
|
|
| This was block approved |
14.7 |
SP-140759 |
TR 22.818 v.1.0.0 on Study on Control of Applications when Third party Servers encounter difficulties (FS_CATS) |
SA WG1 |
Abstract of document: This TR identifies potential requirements that will enable the 3GPP network to detect or receive an indication from a third party server of its congestion status or failure status and cont [...]. |
TR |
Information |
Noted |
|
|
| This TR was provided for information and was noted |
14.8 |
- |
(FS_UC_SPOOF) - Service aspects for dealing with User Control over spoofed calls |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.9 |
- |
(FS_CNO) - Study on Core Network Overload solutions |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.10 |
- |
(FS_SEEE) - Study on System Enhancements for Energy Efficiency |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.11 |
- |
(FS_Fire) - Study on Firewall Traversal |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.12 |
- |
(FS_SPOOF) - Study on Security on spoofed call detection and prevention |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.13 |
- |
(FS_SECAM) - Security Assurance Methodology for 3GPP Network Elements |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.14 |
- |
(FS_SPI) - Study on Subscriber Privacy Impact in 3GPP |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.15 |
- |
(FS_IS_DASH) - Study on Improved Support for Dynamic Adaptive Streaming over HTTP |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.16 |
- |
(FS_SEATS) - Study on Enhanced Acoustic Test Specifications |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.17 |
- |
(FS_HTML5) - Study on HTML5 for a New Presentation Layer in 3GPP Services |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.18 |
- |
(FS_OAM_HetNet) - Study on management of Heterogeneous Networks |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.19 |
- |
(FS_OAM_VIRNET) - Study on Network Management of Virtualized Networks |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.20 |
- |
(FS_ D-SON-OAM) - Study on Enhancements of OAM aspects of Distributed MLB SON function |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.21 |
- |
(FS_OAM_AP_Itf-N) - Study on Application and Partitioning of Itf-N |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.22 |
- |
(FS_SON-NM-CCO) - Study on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.22 |
SP-140801 |
Rel-13 CRs on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization (SON-NM-CCO) |
SA WG5 |
28.627 CR0003R1; 28.627 CR0004; 28.627 CR0005; 28.627 CR0007R1; 28.627 CR0008R1 This was block approved |
CR Pack |
Approval |
Approved |
|
|
| This was block approved |
14.23 |
- |
(FS_REVOLTE_IMS_CH) - Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks |
- |
- |
- |
- |
- |
- |
- |
- |
- |
15 |
- |
Proposed New WIDs (not part of an existing feature) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
15 |
SP-140709 |
New WID: Usage Monitoring Control PCC Extension |
SA WG2 |
Objective: This Work item aims to enhance the system to support the following functions as per related conclusions defined in the TR23.858: - Exclude Usage of a Service/Application from IP-CAN session/TDF sessi [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140711 |
New Work Item Description on Services Domain Centralization |
SA WG2 |
Objective: The objective of this work item is to study and specify modifications to the architecture in order to enable all services to be controlled via IMS rather than via CS legacy mechanisms (single service [...]. |
WID |
Approval |
Noted |
|
|
| This WID was noted. ICS emergency call aspects of this could be done under TEI |
15 |
SP-140713 |
New WID on MBMS Enhancements |
SA WG2 |
Objective: 1. Objectives as part of the TR phase: a. Define the architectural requirements in order to scope the work in SA WG2. b. Study possible improvements to allow establishment of MBMS bearers using targe [...]. |
WID |
Approval |
Revised |
SP-140880 |
|
|
| 15 |
SP-140880 |
New Study WID on MBMS Enhancements |
TSG SA |
Study WID |
WID |
Approval |
Revised |
SP-140883 |
SP-140713 |
|
| 15 |
SP-140883 |
New Study WID on MBMS Enhancements |
TSG SA |
Study WID |
WID |
Approval |
Approved |
| SP-140880 |
| This WID was approved |
15 |
SP-140738 |
New WID on 'MTSI Extension on Multi-stream Multiparty Conferencing Media Handling' (MMCMH) |
SA WG4 |
Objective: The main objective of the work item is to specify a backward compatible media handling extensions of 3GPP MTSI TS 26.114 to support Multi-stream Multiparty Conferencing Media Handling. These extensio [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140739 |
New WID on 'Video Telephony Robustness Improvements Extensions' (VTRI_EXT) |
SA WG4 |
Objective: The work will be organized in two phases: 1. Study benefits and needs of additional error resiliency (ER) tools to improve the performance of the Multimedia Telephony Service for IMS under various ch [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140740 |
New WID on 'Acoustic Test methods and Performance Objectives for Speakerphone Performance in Noisy Environments' (ATeMPO_SPINE) |
SA WG4 |
Objective: Develop a test method and performance objectives for objective speech quality in the presence of background noise for speakerphone operation. It is expected the following is defined as an outcome of [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
16 |
- |
Proposed New Study Items (SIDs) |
- |
- |
- |
- |
- |
- |
- |
- |
- |
16 |
SP-140712 |
New Feasibility study on Extended DRX cycle for Power Consumption Optimization |
SA WG2 |
Objective: Objective is to study extending the DRX cycle in idle and connected mode for GERAN, UTRAN and E-UTRAN. . The objective of this work is to continue the work started in Rel-12 in TR 23.887 for Extended [...]. |
WID |
Approval |
Revised |
SP-140881 |
|
| Company revision proposed in SP-140771 |
16 |
SP-140881 |
New Feasibility study on Extended DRX cycle for Power Consumption Optimization |
SA WG2 |
Objective: Objective is to study extending the DRX cycle in idle and connected mode for GERAN, UTRAN and E-UTRAN. . The objective of this work is to continue the work started in Rel-12 in TR 23.887 for Extended [...]. |
WID |
Approval |
Approved |
| SP-140712 |
| This WID was approved |
16 |
SP-140771 |
Feasibility study on Extended DRX cycle for Power Consumption Optimization |
Qualcomm Incorporated, KDDI |
Revised version of SA WG2 approved FS_eDRX SID in order to add as supporting company |
WID |
Approval |
Noted |
|
|
| Update to SA WG2 agreed WID (SP-140712) This WID was noted |
16 |
SP-140710 |
New Study Item on Coordinated P-GW Change for SIPTO |
SA WG2 |
Objective: The objectives of this study item are as follows: a. Define the architectural requirements (based on Stage 1 normative requirements) in order to scope/guide the work in SA WG2, b. Study candidate CSI [...]. |
WID |
Approval |
Noted |
|
|
| This WID was noted |
16 |
SP-140714 |
New Study Item for Isolated E-UTRAN Operation for Public Safety |
SA WG2 |
Objective: The objectives of this study item are as follows: a) Study candidate solution(s) to address the Stage 1 service requirements, in order to support, at least but not necessarily limited to, the minimum [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
16 |
SP-140741 |
New Study Item on 'Video Enhancements in 3GPP Multimedia Services' (FS_VE_3MS) |
SA WG4 |
Objective: This study item has the following objectives: 1) Identify use cases that may benefit from video enhancements in 3GPP multimedia services. 2) Identify potential codec solutions for video enhancements [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
16 |
SP-140742 |
New Study Item on 'Interactivity Support for 3GPP-based Streaming and Download Services' (FS_IS3) |
SA WG4 |
Objective: This study item has the following objectives: 1) Perform fundamental investigations on service interactivity in 3GPP streaming services including: - Defining use cases for PSS and eMBMS service inter [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
16 |
SP-140784 |
New Study on KQI for Service Experience |
SA WG5 |
Objective: The work item will address (in the below priority order): 1. Define service KQI scenarios 2. Define service KQIs corresponding to the identified scenarios 3. Define in the 3GPP network the measurem [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
17 |
- |
Project Management |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.1 |
- |
Review of the work plan |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.1 |
SP-140760 |
Work Plan at TSG#66 |
MCC Work Plan Manager |
Presentation of the 3GPP Work Plan at TSG#66 |
Work Plan |
Presentation |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140761 |
LTE for Public Safety (authority-to-authority) communications |
MCC Work Plan Manager |
LTE for Public Safety (authority-to-authority) communications |
OTHER |
Information |
Withdrawn |
|
|
| Withdrawn |
17.1 |
SP-140762 |
3GPP Carrier Aggregation for LTE |
MCC Work Plan Manager |
3GPP Carrier Aggregation for LTE |
OTHER |
Information |
Withdrawn |
|
|
| Withdrawn |
17.1 |
SP-140763 |
3GPP Rel-12 description |
MCC Work Plan Manager |
3GPP Rel-12 description document |
OTHER |
Information |
Withdrawn |
|
|
| Withdrawn |
17.1 |
SP-140764 |
3GPP Rel-13 description |
MCC Work Plan Manager |
3GPP Rel-13 description document |
OTHER |
Information |
Withdrawn |
|
|
| Withdrawn |
17.2 |
- |
Release contents and planning discussions |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.3 |
- |
Specification Status |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18 |
- |
Project Support |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18.1 |
- |
Improvements to working methods |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18.2 |
- |
MCC Status Report |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18.2 |
SP-140849 |
Support Team report |
MCC Director |
Update of MCC activities |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
|
Created: 2014-12-12 17:56     END OF LIST
Last Allocated Document: SP-140887