Last Allocated Document: SP-140642
Temporary Document List - Ordered by TD
Colour Key: |
No Conclusion |
Conclusion Reached |
Document Revised |
Document Withdrawn |
Document Not Handled |
|
The Hyperlinks are to the FTP server: ftp://ftp.3gpp.org/tsg_sa/TSG_SA/TSGS_65/Docs/
Created: 2014-10-08 09:51     START OF LIST
Agenda |
TD |
LongTitle |
Source |
Summary |
Doc_Type |
Doc_For |
Decision |
Rev_By |
Rev_Of |
LS_Source_file |
Comment |
2 |
SP-140404 |
Draft agenda for TSG SA meeting #65 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #65 |
Agenda |
Approval |
Revised |
SP-140531 |
|
|
| 4.1 |
SP-140405 |
Draft Report of TSG SA meeting #64 |
TSG SA Secretary |
Draft Report of TSG SA meeting #64 containing revision marks of changes on the distributed draft. |
Report |
Approval |
Approved |
|
|
| The report was reviewed and approved. |
7.6 |
SP-140406 |
LS from ITU-R: Working document towards a preliminary draft new ITU-R Report on the Smart Grid project |
ITU-R |
Working Party 1A wishes to inform the relevant External Organizations of a further development of the document attached to this liaison statement. Working Party 1A would therefore appreciate any comments and ad [...]. |
LS In |
Information |
Postponed |
|
| 1A/TEMP/61 |
This was postponed to TSG SA meeting #66 |
7.6 |
SP-140407 |
LS from ITU-R: ARCHITECTURE AND TOPOLOGY OF IMT NETWORKS |
ITU-R |
Working Party 5D (WP 5D) wishes to inform the relevant External Organizations that it is continuing development of a working document toward a preliminary draft new Report ITU R M.[IMT.ARCH], 'Architecture and [...]. |
LS In |
Information |
Response in SP-140626 |
|
| 5D/TEMP/404 |
This was reviewed and a response LS provided in SP-140626. |
7.6 |
SP-140408 |
LS from ITU-R: LIAISON STATEMENT TO GCS PROPONENTS AND TRANSPOSING ORGANIZATIONS ON THE PROVISION OF TRANSPOSITION REFERENCES AND CERTIFICATION C FOR DRAFT REVISION 12 OF RECOMMENDATION ITU-R M.1457 |
ITU-R |
Working Party 5D thanks the relevant GCS Proponents for their successful work in regards to completion of the milestone identified by Item 8 of Table 1 for the draft Revision 12 update of Recommendation ITU-R M [...]. |
LS In |
Information |
Forwarded to PCG in SP-140408 |
|
| 5D/TEMP/407 |
A LS to forward this to the PCG was provided in SP-140627. |
13.4 |
SP-140409 |
LS from TIA: TD SP-130727 - LS on Mission Critical Push To Talk over LTE |
TIA |
The TIA TR-8.8 Broadband Data Committee is pleased to receive the subject document from TSG SA. TR-8.8 has been recently working on project TIA-4973.211 Requirements for the Mission Critical Priority and QoS Co [...]. |
LS In |
Information |
Noted |
|
| TR88-14-0033 |
This incoming LS was noted |
7.6 |
SP-140410 |
LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE WORK PLAN, TIMELINE, PROCESS AND DELIVERABLES FOR THE FUTURE DEVELOPMENT OF INTERNATIONAL MOBILE TELECOMMUNICATIONS (IMT) |
ITU-R |
Working Party 5D is studying the definition of a work plan, timeline, process and required deliverables for the future development of IMT, necessary to provide by 2020 timeframe the expected ITU-R outcome of ev [...]. |
LS In |
Action |
LS to PCG in SP-140628 |
|
| 5D/TEMP/455 |
An LS to the PCG was provided in SP-140628. |
13.1 |
SP-140411 |
LS from OMA: Liaison about OMA activities on NetAPIs and Service Exposure Framework |
OMA |
This liaison statement includes updated information about Open Mobile Alliance (OMA) activities related to Network APIs, announcing three new Work Items just approved, and seek for future collaboration. 3 Concl [...]. |
LS In |
Information |
Noted |
|
| OMA-LS_1012-ARC_WG |
This incoming LS was noted |
12.15 |
SP-140412 |
LS from CT WG1: New QCIs for MCPTT Signalling and Voice |
CT WG1 |
CT WG1 would like to inform RAN WG2 that CT WG1 has agreed the attached CR that introduces new QCI(s) for MCPTT feature based on SA WG2 agreed CR (S2-142925 CR #0901). In case, RAN WG2 has any feedback on the n [...]. |
LS In |
Information |
Noted |
|
| C1-143362 |
This incoming LS was noted |
5 |
SP-140413 |
LS from SA WG2: LS Response on MCPTT Work |
SA WG2 |
SA WG 2 thanks TSG SA for its LS on MCPTT work. The following initial conclusions are provided by SA WG2 for TSG SA's consideration: - SA WG2's development of candidate MCPTT architecture solutions and conclu [...]. |
LS In |
Information |
Noted |
|
| S2-142870 |
This LS was reviewed and noted. |
12.28 |
SP-140414 |
LS from SA WG2: Reply LS on WLAN/3GPP Radio Interworking |
SA WG2 |
SA WG2 would like to thank RAN WG2 for the LS (S2-142303/R2-142955) on WLAN/3GPP radio interworking. SA WG2 discussed the actions required from RAN WG2: Action 1: RAN WG2 kindly asks SA WG2/CT WG1 to include i [...]. |
LS In |
Information |
Noted |
|
| S2-142943 |
This incoming LS was noted |
7.2 |
SP-140415 |
SA WG2 chairman's report to TSG SA#65 |
SA WG2 Chairman |
SA WG2 Chairman's report of SA WG2 activities |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.2 |
SP-140416 |
Release 13 Prioritization |
SA WG2 Chairman |
TSG SA is asked to decide how to prioritize SA WG2 work so that it fits in available time resources during the Release 13 time frame. |
Report |
Approval |
Noted |
|
|
| This Report was noted |
11 |
SP-140417 |
3 CRs to 23.060 (NIMTC, Rel-10, Rel-11, Rel-12) |
SA WG2 |
23.060 CR1884R1; 23.060 CR1885R1; 23.060 CR1886R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.2 |
SP-140418 |
6 CRs to 23.228 (IMS_WebRTC, Rel-12) |
SA WG2 |
23.228 CR1083R2; 23.228 CR1086R1; 23.228 CR1087R2; 23.228 CR1088R2; 23.228 CR1090; 23.228 CR1091R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.14 |
SP-140419 |
11 CRs to 23.303 (ProSe, Rel-12) |
SA WG2 |
23.303 CR0067R1; 23.303 CR0071R2; 23.303 CR0079R3; 23.303 CR0095R1; 23.303 CR0099R1; 23.303 CR0100R2; 23.303 CR0101; 23.303 CR0102R4; 23.303 CR0103R3; 23.303 CR0104R2; 23.303 CR0108R1 |
CR Pack |
Approval |
Approved, except 23.303 CR0102R4 |
|
|
| Proposed revision of 23203 CR0102R4 in SP-140598. Approved, except 23.303 CR0102R4 |
12.15 |
SP-140420 |
3 CRs to 23.203, 23.468 (GCSE_LTE, Rel-12) |
SA WG2 |
23.203 CR0901R4; 23.468 CR0022R2; 23.468 CR0044R1 |
CR Pack |
Approval |
Approved |
|
|
| Mirror CR to 23203 CR0901R4 provided in SP-140441 This CR Pack was approved |
12.25 |
SP-140421 |
4 CRs to 23.060, 23.203, 23.401 (CNO_ULI, Rel-12) |
SA WG2 |
23.060 CR1878R2; 23.203 CR0906R2; 23.203 CR0907R2; 23.401 CR2727R2 |
CR Pack |
Approval |
23.203 CR0906R2 and 23.203 CR0907R2 were approved |
|
|
| Revision of 23.060 CR1878R2 and 23.401 CR2727R2 proposed in SP-140490 23.203 CR0906R2 and 23.203 CR0907R2 were approved. |
12.26 |
SP-140422 |
1 CR to 23.402 (eSaMOG, Rel-12) |
SA WG2 |
23.402 CR1296R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.28 |
SP-140423 |
1 CR to 23.402 (UTRA_LTE_WLAN_interw-Core, Rel-12) |
SA WG2 |
23.402 CR1306R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.28 |
SP-140424 |
7 CRs to 23.060, 23.401, 23.402 (UTRA_LTE_WLAN_interw-SA2, Rel-12) |
SA WG2 |
23.060 CR1880; 23.060 CR1883R2; 23.401 CR2735R3; 23.402 CR1302R2; 23.402 CR1303R1; 23.402 CR1305R3; 23.402 CR1308R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.52 |
SP-140425 |
3 CRs to 23.139, 23.246, 23.272 (TEI12, earlier WI Codes, Rel-12) |
SA WG2 |
23.139 CR0045R1; 23.246 CR0384R1; 23.272 CR0938 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.52 |
SP-140426 |
2 CRs to 23.234, 23.402 (TEI12, Rel-12) |
SA WG2 |
23.234 CR0172R2; 23.402 CR1300R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.53 |
SP-140427 |
2 CRs to 23.401, 23.402 (GOCMe, Rel-12) |
SA WG2 |
23.401 CR2722R1; 23.402 CR1299R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.12 |
SP-140428 |
8 CRs to 23.002, 23.060, 23.203, 23.401 (UPCON, Rel-13) |
SA WG2 |
23.002 CR0277R2; 23.060 CR1879R3; 23.060 CR1882; 23.203 CR0896R2; 23.203 CR0897R2; 23.203 CR0899R2; 23.401 CR2728R2; 23.401 CR2733R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.27 |
SP-140429 |
1 CR to 23.401 (TEI13, Rel-13) |
SA WG2 |
23.401 CR2723R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.9 |
SP-140430 |
1 CR to 23.228 (voE_UTRAN_PPD, Rel-13) |
SA WG2 |
23.228 CR1073R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.13 |
SP-140431 |
2 CRs to 23.203, 23.228 (DRuMS, Rel-13) |
SA WG2 |
23.203 CR0908R2; 23.228 CR1084R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.12 |
SP-140432 |
Presentation of 23.705 version 1.0.0: Study on system enhancements for user plane congestion management (Release 13) |
SA WG2 |
Abstract of document: TR 23.705 contains key issues' definition, solutions, evaluation and conclusion for RAN User Plane Congestion handling. Conclusion on normative standardization for solutions 1.5.5 Off-path [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG2 |
12.15 |
SP-140433 |
Updated WID: GCSE_LTE WID change of Rapporteur |
SA WG2 |
Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
13.12 |
SP-140434 |
Updated WID: Revised User Plane Congestion management WID |
SA WG2 |
Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. |
WID |
Approval |
Revised |
SP-140625 |
|
| Revised to correct TD number on documents in SP-140625 |
13.4 |
SP-140435 |
Updated WID: Update of MCPTT WID |
SA WG2 |
Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140436 |
New WID for SRVCC Enhancements for Transcoding Avoidance |
SA WG2 |
Objective: The objectives of this work item is to enhance the chances for an end-to-end transcoder free operation (TrFo) where possible, and/ or ensure that the proper CS radio resources are reserved for optima [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
16 |
SP-140437 |
New Study WID on Optimizations to Support High Latency Communications |
SA WG2 |
Objective: The objective of this study item is to study possible enhancements that facilitate for applications to use 3GPP constrained devices over the 3GPP IP connectivity and being able to support large numbe [...]. |
WID |
Approval |
Revised |
SP-140635 |
|
|
| 6 |
SP-140438 |
LS from ITU-T SG2: LS on Evolution of Recommendation E.212 |
ITU-T SG2 |
ITU-T Study Group 2 has started a study on Evolution of Recommendation E.212 in order to take into account new services and providers. Attached is a first draft revision of Recommendation E.212 (TD 0405-GEN), o [...]. |
LS In |
Action |
Noted |
|
| ITU-T_COM2-LS055 |
Additional Attachment in SP-140451 This incoming LS was noted |
14.20 |
SP-140439 |
LS from ETSI ISG NFV: Outgoing LS to TSG SA WG5 on Availability of the NFV ISG Management and Orchestration GS |
ETSI ISG NFV |
ETSI ISG NFV would like to inform TSG SA WG5 that the latest draft copy of the Management and Orchestration Group Specification, v061, is now openly available from the ETSI Portal at the following address; http [...]. |
LS In |
Information |
Noted |
|
| NFV(14)000117 |
This incoming LS was noted |
6 |
SP-140440 |
LS from ETSI ISG NFV: Outgoing LS: Availability of the ETSI ISG NFV deliverables |
ETSI ISG NFV |
ETSI NFV ISG would like to inform your group(s) that the latest draft versions of the following documents are now available on the ETSI Portal at the following link: http://docbox.etsi.org/ISG/NFV/Open/Latest_D [...]. |
LS In |
Information |
Noted |
|
| NFV(14)000140r1 |
This incoming LS was noted |
12.15 |
SP-140441 |
23.203 CR0914: QCI values for Public Safety Services (GCSE_LTE, Rel-13) |
Vodafone |
23.203 CR0914 |
CR Pack |
Approval |
Approved |
|
|
| Mirror CR to Rel-12 CR (23203 CR0901R4) in SP-140420 This CR Pack was approved |
12.14 |
SP-140442 |
23.303 CR0102R5: Precedence of ProSe configuration information (ProSe, Rel-12) |
Ericsson, Qualcomm Incorporated, Huawei, Telefonica |
23.303 CR0102R5 |
CR Pack |
Approval |
Revised |
SP-140598 |
|
| Proposed update to 23.303 CR0102R4 in SP-140419 |
17.2 |
SP-140443 |
Closure of early Releases |
MCC Specifications Manager |
This contribution proposes the closure of one or more of the earliest 3GPP Releases remaining open. Decisions on each candidate Release are sought from each TSG. |
OTHER |
Discussion |
Approved |
|
|
| This proposal was approved and was agreed that all releases up to Release 7 are closed. |
18.2 |
SP-140444 |
Support Team report |
MCC Director |
Update of MCC activities |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
17.3 |
SP-140445 |
Correction of implementation error of 21.900 CR0045 |
MCC Specifications Manager |
21.900 CR0047 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
17.3 |
SP-140446 |
Encourage allocation of CR numbers at first sight (21.900 CR0043R2) |
MCC Specifications Manager |
21.900 CR0043R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
17.3 |
SP-140447 |
UML tool in 21.801 |
MCC Specifications Manager |
21.801 CR0039R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
5 |
SP-140448 |
LS from MSIP: Request on prioritization and expeditious completion of 3GPP Work Items and Study Items related to Public Safety LTE |
Korean Ministry of Science, ICT and Future Planning (MSIP) |
MSIP in Korea strongly urge the continued prioritization and expeditious completion of 3GPP Release 13 Work Items and Study Items that directly impact the availability of PS-LTE. This prompt action is going to [...]. |
LS In |
Approval |
Noted |
|
| 20140826_MSIP_Liasion_Statesment_V4_SA_Final-R2 |
This was reviewed and noted. |
5 |
SP-140449 |
3GPP Work Items for Public Safety LTE and PPDR Broadband network in Korea |
TTA, ETRI |
3GPP LTE supports most of the Korean 37 functional requirements, it doesn't still support several items, especially including Direct Communication / MS Repeater, Standalone BS Operation Mode and Group call. The [...]. |
DISCUSSION |
Approval |
Noted |
|
|
| This was discussed and noted. |
14.3 |
SP-140450 |
LS from CCSA TC5: LIAISON STATEMENT ON SAME (Softnet Arichtecture for Mobile) |
CCSA TC5 |
CCSA/TC5/WG9 has been working on the study of Softnet Arichtecture for Mobile(SAME) since July 2013. In the SAME study item three key issues are being discussed: on-demand network resource assigment, flexible s [...]. |
LS In |
Action |
Noted |
|
| CCSA TC5 WG9 |
This incoming LS was noted |
6 |
SP-140451 |
Attachment to LS from ITU-T SG2: Suggested changes to E.212 after June 2014 ITU-T SG2 meeting |
ITU-T SG2 |
Additional Attachment to LS in SP-140438: Suggested changes to E.212 after June 2014 ITU-T SG2 meeting |
OTHER |
| Noted |
|
|
| Attachment to SP-140438 This contribution was noted |
5 |
SP-140452 |
Outcome of Critical Communication workshop |
TSG SA Chairman |
Presentation of the outcome of a Critical Communication workshop |
OTHER |
Presentation |
Noted |
|
|
| This was presented and noted. |
7.4 |
SP-140453 |
SA WG4 Status Report at TSG SA#65 |
SA WG4 Chairman |
SA WG4 Chairman's report of SA WG4 activities |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
10 |
SP-140454 |
CRs to TS 26.114 on 'Correction to GBR, MBR, and RTCP BW in Video QoS Profiles (TEI10)' (Release 10 to Release 12) |
SA WG4 |
26.114 CR0284R1; 26.114 CR0285R1; 26.114 CR0286R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11 |
SP-140455 |
CRs to TS 26.268 on 'Update to Codec Inversion Detection Algorithm (TEI11)' (Release 11 and Release 12) |
SA WG4 |
26.268 CR0031R1; 26.268 CR0032R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11 |
SP-140456 |
CRs to TS 26.346 on 'Media- and Session-level FEC Redundancy Level Declaration (EMM-DDE)' (Release 11 and Release 12) |
SA WG4 |
26.346 CR0417R1; 26.346 CR0418R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.4 |
SP-140457 |
TS 26.441 Codec for Enhanced Voice Services (EVS); General Overview (Release 12), v. 2.0.0 |
SA WG4 |
Abstract of document: The present document is an introduction to the audio processing parts of the Enhanced Voice Services coder. A general overview of the audio processing functions is given, with reference to [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140458 |
TS 26.442 Codec for Enhanced Voice Services (EVS); ANSI C code (fixed-point) (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: The present document contains an electronic copy of the ANSI C code for the Enhanced Voice Services (EVS) Codec. The ANSI C code is necessary for a bit exact implementation of the EVS Code [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140459 |
TS 26.444 Codec for Enhanced Voice Services (EVS); Test Sequences (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: This present document specifies the digital test sequences for the codec for Enhanced Voice Services. These sequences test for a bit-exact implementation of the Enhanced Voice Services tra [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140460 |
TS 26.445 Codec for Enhanced Voice Services (EVS); Detailed Algorithmic Description (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: The present document is a detailed description of the signal processing algorithms of the Enhanced Voice Services coder. The detailed mapping from 20ms input blocks of audio samples in 16 [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140461 |
TS 26.446 Codec for Enhanced Voice Services (EVS); AMR-WB Backward Compatible Functions (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: This document specifies the AMR-WB interoperable functions of the EVS coder. The present document is a high level overview of the functionality with reference to the Codec Detailed Algorit [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140462 |
TS 26.447 Codec for Enhanced Voice Services (EVS); Error Concealment of Lost Packets (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: This document defines a frame loss concealment procedure, also termed frame substitution and muting procedure, which is executed by the Enhanced Voice Services (EVS) decoder when one or mo [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140463 |
TS 26.448 Codec for Enhanced Voice Services (EVS); Jitter Buffer Management (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: This present document defines the Jitter Buffer Management solution of the Codec for Enhanced Voice Services (EVS). Jitter Buffers are required in packet-based communications, such as 3GPP [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140464 |
TS 26.449 Codec for Enhanced Voice Services (EVS); Comfort Noise Generation (CNG) Aspects (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: This document gives an overview for the requirements of the background acoustic noise evaluation, noise parameter encoding/decoding and comfort noise generation for the Enhanced Voice Serv [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140465 |
TS 26.450 Codec for Enhanced Voice Services (EVS); Discontinuous Transmission (DTX) (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: The present document is a summary of the discontinuous transmission (DTX) function of the EVS codec. The DTX algorithms are described in TS 26.445. This document points to the appropriate [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140466 |
TS 26.451 Codec for Enhanced Voice Services (EVS); Voice Activity Detection (VAD) (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: This document specifies the Voice Activity Detector (VAD) to be used in the Discontinuous Transmission (DTX) of the EVS Codec. Although the main application of the VAD algorithm is the det [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.4 |
SP-140467 |
Exception sheet for the WI EVS_codec |
SA WG4 |
Abstract of document: The normative parts of the fixed point implementation of the EVS Codec will be available without this Work Item Exception but the EVS RTP payload format (Annex A of TS 26.445), the floatin [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
12.4 |
SP-140468 |
CR to TS 26.114 on 'Introducing EVS into MTSI (EVS_codec)' (Release 12) |
SA WG4 |
26.114 CR0296R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.44 |
SP-140469 |
CRs to TS 26.131 and TS 26.132 on 'LTE UE delay requirements and test methods (ART_LTE-UED)' (Release 12) |
SA WG4 |
26.131 CR0062R1; 26.132 CR0070R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.44 |
SP-140470 |
Exception sheet for the WI ART_LTE |
SA WG4 |
Abstract of document: ART_LTE WI is divided in three building blocks. Two of the building blocks: ART_LTE-NBWB and ART_LTE-UED, related to acoustic and delay test methods and requirements for narrowband and wid [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
12.45 |
SP-140471 |
Exception sheet for the WI MI |
SA WG4 |
Abstract of document: In order to complete the MI-EMO Building Block WI, the Technical Report and the specification TS26.346 will be updated addressing the following issues: - Improve MBMS OTA efficiency by ref [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
12.45 |
SP-140472 |
CRs to TS 26.346 on 'Enhanced MBMS Operation (MI-EMO)' (Release 12) |
SA WG4 |
26.346 CR0383R4; 26.346 CR0419R2; 26.346 CR0424 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.45 |
SP-140473 |
CRs to TS 26.346 on 'MBMS operation on Demand (MI-MooD)' (Release 12) |
SA WG4 |
26.346 CR0421R3; 26.346 CR0422R2; 26.346 CR0429R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.21 |
SP-140474 |
Revised WID on 'End-to-end Multimedia Telephony Service for IMS (MTSI) extensions' (E2EMTSI) |
SA WG4 |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that i [...]. |
WID |
Approval |
Noted |
|
|
| A company revision was provided in SP-140600. |
13.21 |
SP-140475 |
CR to TS 26.114 on 'Requirements for end-to-end video rate adaptation (E2EMTSI-S4)' (Release 12) |
SA WG4 |
26.114 CR0283R3 |
CR Pack |
Approval |
Noted |
|
|
| A company contribution correcting this CR was provided in SP-140596. This was then noted. |
12.52 |
SP-140476 |
CRs to TS 26.114 and TS 26.346 on 'Technical Enhancements and Improvements for Release 12 (TEI12)' (Release 12) |
SA WG4 |
26.114 CR0289R1; 26.346 CR0290R1; 26.346 CR0426R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.53 |
SP-140477 |
CR to TS 26.114 on 'Errors in the computation of b=AS for AMR and AMR-WB (M3A)' (Release 12) |
SA WG4 |
26.114 CR0288R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.46 |
SP-140478 |
CR to TS 26.114 on 'Video telephony robustness improvements (VTRI)' (Release 12) |
SA WG4 |
26.114 CR0287R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
14.16 |
SP-140479 |
TR 26.938 Improved Support for Dynamic Adaptive Streaming over HTTP in 3GPP (FS_IS_DASH) (Release 12), v. 2.0.0 |
SA WG4 |
Abstract of document: 3GPP's Dynamic Adaptive Streaming over HTTP (DASH) specifications had been developed in Rel-9 and Rel-10 jointly with MPEG. The specification is available in TS 26.247. Experiences from in [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
14.18 |
SP-140480 |
TR 26.907 HTML5 for a new Presentation Layer in 3GPP Services (FS_HTML5) (Release 12), v. 2.0.0 |
SA WG4 |
Abstract of document: HTML5 was specified with the target of creating convergence among a wide range of interoperable browsers, which resulted from proprietary extensions of earlier HTML versions to fill identi [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
15 |
SP-140481 |
New Work Item on 'TV video profile' (TVProf) |
SA WG4 |
Objective: The objective of this Work Item is to produce a technical specification which defines a limited set of operation points for TV services in order to enable a consistent service offering within 3GPP, b [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140482 |
New WID on 'Enhanced LTE UE delay test methods and requirements' (E_LTE_UED) |
SA WG4 |
Objective: The objective of this work item is to enhance the LTE UE delay test cases and requirements to cover at least the following issues: - Support of DTX in test equipment - Support of LTE radio optimizati [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140483 |
New WID on 'Media Handling Aspects of IMS-based Telepresence' (IMS_TELEP_S4) |
SA WG4 |
Objective: The objective of this Work Item is to specify the media handling aspects of IMS-based telepresence in 3GPP services. The study phase of the work item will investigate the following: - Media codecs ( [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140484 |
New WID on 'HTML5 Presentation Layer' (HTML5) |
SA WG4 |
Objective: The objectives of this work item have been derived from TR 26.907. The following aspects need to be addressed: - Define a common scene description solution using HTML5 - Specify the features and AP [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140485 |
New WID on 'Support of EVS in 3G Circuit-Switched Networks' (EVSoCS) |
SA WG4 |
Objective: On the service side, we propose 3GPP to start working on CS support of EVS over UTRAN (3G WCDMA). The objective of this Work Item is to enable users of 3G services to benefit from the enhanced user [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140486 |
New WID on 'Enhanced DASH' (eDASH) |
SA WG4 |
Objective: The objective of the work item is to address relevant enhancements for DASH-based services in 3GPP services and networks. The work item addresses normative aspects and operational guidelines to addre [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
15 |
SP-140487 |
New WID on 'SA4 part of QoS End-to-end Multimedia Telephony Service for IMS (MTSI) extensions' (QOSE2EMTSI-S4) |
SA WG4 |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: Improve end-to-end QoS handling by: Before starting normative work on QoS handli [...]. |
WID |
Approval |
Noted |
|
|
| Proposed replacement in SP-140601 This WID was noted |
5 |
SP-140488 |
Roadmap for critical communication application |
French MoI |
This contribution proposes to discuss a roadmap for Critical Communication Application and define the next steps to be done for building the standard in 3GPP |
OTHER |
Discussion |
Noted |
|
|
| Discussed and noted. |
5 |
SP-140489 |
Video services for critical communications |
French MoI |
This contribution proposes a first split for the work on video services. |
OTHER |
Discussion |
Noted |
|
|
| Discussed and noted. |
12.25 |
SP-140490 |
Updated CRs to 23.060 and 23.401 on 'Clarifications for PRA reporting' (CNO_ULI, Rel-12) |
Alcatel-Lucent, Huawei, HiSilicon |
23.060 CR1878R3; 23.401 CR2727R3 |
CR Pack |
Approval |
Approved |
|
|
| Proposed revision of 2 CRs in SP-140421 This CR Pack was approved |
7.8 |
SP-140491 |
TSG GERAN Status Report to TSG SA#65 |
TSG GERAN Chairman |
TSG GERAN Status Report to TSG SA#65 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
5 |
SP-140492 |
MCPTT Work Organization |
TSG SA Chairman, TSG CT Chairman |
It is proposed to create a new Working Group in 3GPP to take responsibility for MCPTT application level work: stage 1 service description, stage 2 architecture, stage 2.5 details (flows, functional split, funct [...]. |
OTHER |
Decision |
Noted |
|
|
| Discussed and noted |
7.1 |
SP-140493 |
SA WG1 Report to TSG SA#65 |
SA WG1 Chairman |
SA WG1 Chairman's report of SA WG1 activities |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
12.52 |
SP-140494 |
Stage 1 CR on TEI12 for Deletion of UPCON Requirements for Release 12 |
SA WG1 |
22.101 CR0475 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.14 |
SP-140495 |
Stage 1 CR on ProSe stage-1 alignment with stage 2&3 |
SA WG1 |
22.278 CR0213R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.15 |
SP-140496 |
Stage 1 CRs on GCSE_LTE |
SA WG1 |
22.468 CR0005R1; 22.468 CR0006R1; 22.468 CR0010; 22.468 CR0011R2; 22.468 CR0012 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.52 |
SP-140497 |
Stage 1 CR on TEI12 for ME-generated supervisory tones for voice over IMS |
SA WG1 |
22.173 CR0099R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.14 |
SP-140498 |
Stage 1 CR on ProSe Operation in Limited Service Mode |
SA WG1 |
22.278 CR0212R5 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.13 |
SP-140499 |
Stage 1 CRs on Transfer of ETSI business trunking specifications (IMS_Corp2) |
SA WG1 |
22.228 CR0204R1; 22.228 CR0205R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.13 |
SP-140500 |
TS 22.519 v.2.0.0 on Transfer of ETSI business trunking specifications (IMS_Corp2) |
SA WG1 |
Abstract of document: This document is the result of transferring the technical contents of ETSI TS 181 019 to a 3GPP TS for ongoing maintenance. A 3GPP version of the defined business trunking document has bee [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
13.1 |
SP-140501 |
Stage 1 CRs on Service Exposure and Enablement Support (SEES) |
SA WG1 |
22.101 CR0473R5; 22.115 CR0073R5 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.4 |
SP-140502 |
Exception Sheet for Mission Critical Push To Talk over LTE (MCPTT) |
SA WG1 |
Abstract of document: The TS specifies the stage 1 requirements for a Push to Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial uses (e [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
13.4 |
SP-140503 |
TS 22.179 v.1.0.0 on Mission Critical Push To Talk over LTE (MCPTT) |
SA WG1 |
Abstract of document: The TS specifies the Stage 1 requirements for a Push to Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial uses (e [...]. |
TS |
Information |
Noted |
|
|
| This TS was noted. Companies are invited to review thisTS and send comments to SA WG1 |
13.10 |
SP-140504 |
Stage 1 CR on Enhancements to WebRTC interoperability (eWebRTCi) |
SA WG1 |
22.228 CR0206R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.10 |
SP-140505 |
Revised WID on Enhancements to WebRTC interoperability (eWebRTCi) |
SA WG1 |
Objective: SA WG1 objectives: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases origin [...]. |
WID |
Approval |
Merged into SP-140630 |
SP-140630 |
|
|
| 13.11 |
SP-140506 |
TS 22.346 v.1.0.0 on Isolated E-UTRAN Operation for Public Safety (IOPS) for one-step approval |
SA WG1 |
Abstract of document: TS 22.346 addresses service requirements of Isolated E-UTRAN Operation for Public Safety (IOPS). Ensuring the continued ability of Public Safety users to communicate within mission critic [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
13.7 |
SP-140507 |
Stage 1 CR on Application specific Congestion control for Data Communication (ACDC) |
SA WG1 |
22.011 CR0206R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.8 |
SP-140508 |
Stage 1 CR on Co-ordinated P-GW change for SIPTO (CSIPTO) |
SA WG1 |
22.101 CR0476R4 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.8 |
SP-140509 |
Revised WID on Co-ordinated P-GW change for SIPTO (CSIPTO) |
SA WG1 |
Objective: The SA WG1 objective is to define system requirements for coordinated selective IP traffic offload that minimises service disruption by taking into account UE's knowledge of the IP flow characteristi [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
14.3 |
SP-140510 |
Stage 1 CRs on Flexible Mobile Service Steering (FMSS) |
SA WG1 |
22.101 CR0479R1; 22.101 CR0478R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
14.3 |
SP-140511 |
New WID on Flexible Mobile Service Steering (FMSS) |
SA WG1 |
Objective: The objective is to define service requirements to enable the 3GPP Core Network to define and modify traffic steering policies that will be used to select required service enablers of the operator de [...]. |
WID |
Approval |
Revised |
SP-140632 |
|
| NEC asked to be added as a supporting company for this WID. |
14.5 |
SP-140512 |
Stage 1 CRs on Enhanced Calling Information Presentation (ECIP) |
SA WG1 |
22.182 CR0023R3; 22.183 CR0002R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
14.5 |
SP-140513 |
New WID on Enhanced Calling Information Presentation (ECIP) |
SA WG1 |
Objective: The objective of this work item is to update the stage 1 CAT and CRS specifications (TS 22.182 and TS 22.183 respectively) with the enhancements introduced in TR 22.810, which include: - Support of a [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
14.6 |
SP-140514 |
New WID on GERAN UTRAN Sharing Enhancements (GUSH) |
SA WG1 |
Objective: The objective of this work item is to standardise means that complement existing system capabilities for sharing common 2G and 3G RAN resources. The work will take into account the following topics: [...]. |
WID |
Approval |
Revised |
SP-140633 |
|
|
| 14.6 |
SP-140515 |
Exception Sheet for GERAN UTRAN Sharing Enhancements (GUSH) |
SA WG1 |
Abstract of document: This work will standardise means that complement existing system capabilities for sharing common 2G and 3G RAN resources. The work will take into account the topics itemised in the tasks l [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
13.7 |
SP-140516 |
Stage 1 CRs on Application specific Congestion control for Data Communication (FS_ACDC) |
SA WG1 |
22.806 CR0002; 22.806 CR0001R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
14.2 |
SP-140517 |
TR 22.807 v.2.0.0 on Enhancements for infrastructure based data communication between devices (FS_eICBD) |
SA WG1 |
Abstract of document: In the study on enhancements for infrastructure based data communication between devices requirements four new service components were identified: - Dynamic assignment/revocation of global [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
14.3 |
SP-140518 |
TR 22.808 v.2.0.0 on Flexible Mobile Service Steering (FS_FMSS) |
SA WG1 |
Abstract of document: In order to realize efficient and flexible mobile service steering in the operator deployed (S)Gi-LAN, the network operator uses information (e.g. user profile, network operator's policies [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
14.4 |
SP-140519 |
TR 22.815 v.1.0.0 on Multimedia Broadcast Supplement for PWS (FS_MBSP) |
SA WG1 |
Abstract of document: The work on Public Warning System (PWS) within the 3GPP as standardised since 3GPP Release 9 has focused on delivering text-based warning notifications of limited content to the public at [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG1 |
14.5 |
SP-140520 |
TR 22.810 v.2.0.0 on Enhanced Calling Information Presentation (FS_ECIP) |
SA WG1 |
Abstract of document: TR 22.810 contains use cases and identifies potential requirements for enhanced call information presentation. It concludes that the enhanced requirements introduced by ECIP be added to TS [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
14.6 |
SP-140521 |
Stage 1 CRs on RAN Sharing Enhancements on GERAN and UTRAN (FS_GUSH) |
SA WG1 |
22.852 CR0013R1; 22.852 CR0014R1; 22.852 CR0015R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
14.9 |
SP-140522 |
TR 22.898 v.1.0.0 on Service aspects for dealing with User Control over spoofed calls (FS_UC_SPOOF) |
SA WG1 |
Abstract of document: The TR studies new service capabilities and enhancements to existing service capabilities needed to allow the called party to control spoofed calls New service network capabilities and enh [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG1 |
12.52 |
SP-140523 |
Stage 1 CRs on TEI12 for I-WLAN clean-up |
SA WG1 |
22.011 CR0204R1; 22.011 CR0205R1; 22.278 CR0209R1; 22.278 CR0210R1; 22.234 CR0032R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
5 |
SP-140524 |
Mission Critical Standards Development |
Motorola Solutions |
Way forward proposal: Global Mission Critical Needs: - Global Mission Critical LTE transport layer and application layer Mission Critical standards - Application layer standards that work with a multitude of na [...]. |
Presentation |
Discussion |
Noted |
|
|
| Discussed and noted |
17.1 |
SP-140525 |
3GPP Work Plan review at Plenary #65 |
MCC Work Plan Manager |
- |
OTHER |
Presentation |
Revised |
SP-140641 |
|
|
| 12.22 |
SP-140526 |
Standardization of Machine-type Communications |
MCC Work Plan Manager |
Status of Standardization of Machine-type Communications |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140527 |
LTE for Public Safety (authority-to-authority) communications |
MCC Work Plan Manager |
Status of LTE for Public Safety (authority-to-authority) communications |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140528 |
3GPP Rel-12_description |
MCC Work Plan Manager |
Latest Rel-12 description document |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140529 |
3GPP Rel-13_description |
MCC Work Plan Manager |
Latest Rel-13 description document |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140530 |
3GPP_Carrier Aggregation for LTE |
MCC Work Plan Manager |
Status of Carrier Aggregation for LTE. |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
2 |
SP-140531 |
Draft agenda for TSG SA meeting #65 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #65 |
Agenda |
Approval |
Approved |
| SP-140404 |
| The agenda was reviewed and approved. |
5 |
SP-140532 |
Proposal for the formation of an interim Critical Communications Standards Group |
ETSI TC TCCE Chairman |
At the recent joint Critical Communications workshop, held between representatives of 3GPP, OMA and ETSI TCCE, it was agreed that there was a pressing need for a centralised specialist group to undertake the de [...]. |
OTHER |
Discussion |
Noted |
|
|
| Discussed and noted |
5 |
SP-140533 |
Critical Communications Priorities |
TETRA and Critical Communications Association (TCCA) |
TCCA fully supports the creation of a separate dedicated group for MCPTT. However, we wish to remind 3GPP that the original requirement was for Mission Critical Data services over LTE and this has not changed. [...]. |
OTHER |
Discussion |
Noted |
|
|
| Discussed and noted. |
7.5 |
SP-140534 |
SA WG5 Status Report |
SA WG5 Chairman |
SA WG5 Chairman's report of SA WG5 activities |
Report |
Presentation |
Revised |
SP-140617 |
|
|
| 12.50 |
SP-140535 |
Revised WID WLAN Management |
SA WG5 |
Objective: SA WG5 has studied the impacts on Type-2 interface in supporting WLAN that is documented in TR 32.841 'Study on WLAN management'. This work item is to accomplish the following objectives, by taking i [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.50 |
SP-140536 |
Revised Study on WLAN Management |
SA WG5 |
Objective: The objective for this study item is to: 1. Study WLAN impacts to Type-2 management |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.50 |
SP-140537 |
Revised WID Energy Efficiency related Performance Measurements |
SA WG5 |
Objective: For the use cases, requirements and/or global KPIs provided by ETSI TC EE related to energy efficiency, by cooperation with RAN WG2 and if needed with other 3GPP WGs, to - identify whether or not the [...]. |
WID |
Approval |
Revised |
SP-140612 |
|
|
| 12.50 |
SP-140538 |
Revised WID Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations |
SA WG5 |
Objective: The objectives of this WI are: - Record the detailed gap analysis already performed by SA WG5 - Identify for each requirement the work already done by SA WG5 (WIs, CRs, etc) - Discuss and agree on th [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.50 |
SP-140539 |
Revised WID Study on Compliance of 3GPP SA5 specifications to the NGMN Next Generation Converged Operations Requirements (NGCOR |
SA WG5 |
Objective: The objectives of this Study are: - Record the detailed gap analysis already performed by SA WG5; - Identify for each requirement the work already done by SA WG5 ; - Discuss and agree on the work rem [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.50 |
SP-140540 |
Revised WID Converged Management PM Interface definitions |
SA WG5 |
Objective: The work item will address (in that priority order): 1. Requirements, Service Level Agreement (SLA), business objectives to be worked in interaction with NGCOR project, 2. Measurement & KPI definitio [...]. |
WID |
Approval |
Revised |
SP-140613 |
|
|
| 12.25 |
SP-140541 |
New WID Charging aspects of Core Network Overload – User Location Information reporting improvements |
SA WG5 |
Objective: The objective of this work item is to specify the charging aspects corresponding to the 'Presence Reporting Area' reporting functionality specified in TS 23.401, TS 23.060 and TS 23.203: - For PGW/TD [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.50 |
SP-140542 |
Revised WID Network Management for 3GPP Interworking WLAN |
SA WG5 |
Objective: The objectives for this work item are to: - Specify NRM IRP requirements for EPC and non-3GPP access network interworking; - Specify NRMs for EPC and non-3GPP access network interworking including th [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.14 |
SP-140543 |
Exception sheet for Charging Aspects of Proximity Based Services |
SA WG5 |
Abstract of document: Exception sheet for Rel-12 Work Item Proximity-based Services Charging. Contentious Issues: None. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved. It was agreed that the exception is also granted to work on TR 32.844. |
12.50 |
SP-140544 |
Exception sheet for Alarm Quality Improvements |
SA WG5 |
Abstract of document: Exception sheet for Rel-12 Work Item Alarm quality improvements targeting implementation of recommendations from the Alarm Management study TR32.859, into existing Fault Management Standa [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
12.50 |
SP-140545 |
Exception sheet for OAM aspects of Network Sharing |
SA WG5 |
Abstract of document: New TS 32.130 identifies network sharing management scenarios and requirements. In addition, this Work Item provides updates to the specifications listed above for the support of OAM capab [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
12.50 |
SP-140546 |
Exception sheet for Radio Planning Tool (RPT) interface |
SA WG5 |
Abstract of document: The objective is to standardize the interface between a RPT and the applications using the site and antenna data held by the RPT. Focus is on the standardisation of the data (semantics and [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
12.50 |
SP-140547 |
TS 28.402 on Network Management for 3GPP Interworking WLAN (PM part) |
SA WG5 |
Abstract of document: This document defines the Performance measurements for Evolved Packet Core (EPC) and non-3GPP access Interworking System. Work done against Feature-level Work item in SP-140542: UID 53005 [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.50 |
SP-140548 |
TR 32.841 on WLAN impacts to Type-2 management interface to the 3GPP Network Manager |
SA WG5 |
Abstract of document: This document is intended to enable operators to use a 3GPP OAM system to monitor WLAN performance measurements and alarms that are essential to evaluate the performance of WLAN offloading [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
14.23 |
SP-140549 |
TR 32.836 on Study on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization |
SA WG5 |
Abstract of document: An NM centralized CCO function would help operators in reducing OPEX related to the maintenance and optimization of network coverage and capacity by automating these functions. An NM centr [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.14 |
SP-140550 |
TR 32.844 on Charging support for ProSe one-to-many Direct Communication for Public Safety use |
SA WG5 |
Abstract of document: The document intends to study the charging architecture for the one-to-many ProSe Direct Communication for ProSe-enabled Public Safety UE. The study covers the ProSe Direct Communication f [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG5 |
12.14 |
SP-140551 |
TS 32.277 on Charging Aspects of Proximity-based Services |
SA WG5 |
Abstract of document: This document specifies the Offline and Online Charging description for the Proximity-based Services (ProSe), based on the stage 2 description of ProSe in TS 23.303. This charging descript [...]. |
TS |
Information |
Noted |
|
|
| This TS was noted. Companies are invited to review thisTS and send comments to SA WG5 |
12.50 |
SP-140552 |
TS 28.667 Radio Planning Tool Access (RPTA) IRP - Requirements |
SA WG5 |
Abstract of document: TS 28.667 specifies the Requirements for the Radio Planning Tool (RPT) Access (RPTA) Integration Reference Point (IRP). Work done against WT-level Work item in SP-140026: UID 630012 Title [...]. |
TS |
Information |
Noted |
|
|
| This TS was noted. Companies are invited to review thisTS and send comments to SA WG5 |
12.50 |
SP-140553 |
TR 28.820 on FMC FNOM Umbrella Operation Model (UOM) |
SA WG5 |
Abstract of document: This TR is a result of the Multi-SDO JWG on Model Alignment which TSG SA WG5 (SA WG5) has developed jointly with TMF and NGMN, and it contains a generic Umbrella Operation Model for Fixed [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.50 |
SP-140554 |
TS 32.130 on OAM aspects of Network Sharing - Concepts and high-level requirements |
SA WG5 |
Abstract of document: This document defines concepts and requirements for the OA&M of network sharing. Work done against Feature-level Work item in SP-130607: UID 620057 Title OAM aspects of network sharing Ac [...]. |
TS |
Information |
Noted |
|
|
| This TS was noted. Companies are invited to review thisTS and send comments to SA WG5 |
12.50 |
SP-140555 |
TS 28.668 Radio Planning Tool Access (RPTA) IRP - Information Service (IS) |
SA WG5 |
Abstract of document: TS 28.668 specifies the Information Service (IS) for the Radio Planning Tool (RPT) Access (RPTA) Integration Reference Point (IRP). Work done against WT-level Work item in SP-140026: UID [...]. |
TS |
Information |
Noted |
|
|
| This TS was noted. Companies are invited to review thisTS and send comments to SA WG5 |
8.4 |
SP-140557 |
Rel-7 CRs on OAM Maintenance and small Enhancements (OAM7) |
SA WG5 |
32.405 CR0072R1; 32.405 CR0073R1; 32.405 CR0074R1; 32.405 CR0075; 32.405 CR0076; 32.406 CR0011R1; 32.406 CR0012R1; 32.406 CR0013R1; 32.406 CR0014; 32.406 CR0015 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11 |
SP-140558 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
28.653 CR0006; 28.655 CR0004; 28.658 CR0009; 28.702 CR0004; 32.153 CR0004; 32.442 CR0232 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.50 |
SP-140559 |
Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) Batch 1 |
SA WG5 |
32.111-6 CR0006; 32.126 CR0002; 32.306 CR0003; 32.316 CR0001; 32.326 CR0002; 32.336 CR0001; 32.346 CR0001; 32.356 CR0001; 32.366 CR0001; 32.376 CR0002; 32.386 CR0002; 32.396 CR0003; 32.416 CR0004; 32.446 CR0058 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.50 |
SP-140560 |
Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) Batch 2 |
SA WG5 |
28.611 CR0004; 28.623 CR0005; 28.626 CR0003; 28.629 CR0006; 28.633 CR0003; 28.653 CR0007; 28.656 CR0005; 28.659 CR0009; 28.663 CR0004; 28.673 CR0003; 28.676 CR0003; 28.703 CR0004; 28.706 CR0003; 28.709 CR0003; [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
8.5 |
SP-140561 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
32.260 CR0272; 32.260 CR0273; 32.260 CR0274; 32.260 CR0275; 32.260 CR0276; 32.275 CR0053R1; 32.275 CR0054R1; 32.275 CR0055R1; 32.275 CR0056R1; 32.275 CR0058R1; 32.298 CR0471R1; 32.298 CR0472R1; 32.298 CR0473R1; [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11 |
SP-140562 |
Rel-11 CRs on Charging Management (CH11) |
SA WG5 |
32.260 CR0283R1; 32.260 CR0284R1; 32.298 CR0476R1; 32.298 CR0494 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.49 |
SP-140563 |
Rel-12 CRs on Charging Management (CH12) Batch 1 |
SA WG5 |
32.240 CR0377R1; 32.251 CR0380R1; 32.251 CR0382R1; 32.260 CR0279; 32.296 CR0038R2; 32.297 CR0016R1; 32.298 CR0479R1; 32.298 CR0486R1; 32.298 CR0490; 32.298 CR0492R1; 32.299 CR0603R1; 32.299 CR0609R2; 32.298 CR0 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.49 |
SP-140564 |
Rel-12 CRs on Charging Management (CH12) Batch 2 |
SA WG5 |
32.240 CR0376R1; 32.250 CR0040R1; 32.251 CR0379R1; 32.260 CR0271R1; 32.270 CR0027R1; 32.271 CR0014R1; 32.272 CR0034R1; 32.273 CR0027R1; 32.274 CR0029R1; 32.275 CR0057R1; 32.280 CR0028R1; 32.295 CR0008R1; 32.296 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.25 |
SP-140565 |
Rel-12 CRs on Charging aspects of Core Network Overload – User Location Information reporting improvements (CNO_ULI-CH) |
SA WG5 |
32.251 CR0378R1; 32.298 CR0470R1; 32.299 CR0596R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.49 |
SP-140566 |
Rel-12 CRs on Charging per IP - Connectivity Access Network (IP-CAN) Session (Stage 2/3) (CHIPS) |
SA WG5 |
32.251 CR0384 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.20 |
SP-140567 |
Rel-12 CRs on Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_P) |
SA WG5 |
32.251 CR0381R1; 32.251 CR0383R1; 32.298 CR0484R1; 32.298 CR0485; 32.298 CR0489R2; 32.299 CR0604 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11 |
SP-140568 |
Rel-11 CRs on Charging for Network-provided Location information for IMS (NWK-PL2IMS_CH) |
SA WG5 |
32.260 CR0277R1; 32.260 CR0278R1; 32.298 CR0487R1; 32.298 CR0488R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
9 |
SP-140569 |
Rel-9 CRs on MBMS support in EPS (MBMS_EPS) |
SA WG5 |
32.273 CR0028R1; 32.273 CR0029R1; 32.273 CR0030R1; 32.299 CR0605R1; 32.299 CR0606R1; 32.299 CR0607R1; 32.299 CR0608R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11 |
SP-140570 |
Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) |
SA WG5 |
32.422 CR0271R1; 32.422 CR0272R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.50 |
SP-140571 |
Rel-12 CRs on Radio Planning Tool (RPT) interface (OAM-RPTi) |
SA WG5 |
32.101 CR0056; 32.101 CR0057 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
7.3 |
SP-140572 |
SA WG3 Status Report |
SA WG3 Chairman |
SA WG3 Chairman's report of SA WG3 activities |
REPORT |
Presentation |
Noted |
|
|
| This REPORT was noted |
12.14 |
SP-140573 |
Revised WID: Enhancements to Proximity-based Services – Extensions |
SA WG3 |
Objective: The SA WG2 objectives are as follows: 1. As part of the TR phase a. Study architecture enhancements in order to support: i. Restricted ProSe Direct Discovery for non-Public Safety use; ii. ProSe Dire [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.14 |
SP-140574 |
Revised WID: Proximity-based Services (ProSe) |
SA WG3 |
Objective: The SA WG1 objective is to specify service requirements for: - ProSe Discovery over E-UTRA; o within network coverage and o outside network coverage, only for Public Safety Discovery within network c [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.14 |
SP-140575 |
Revised WID: Study on Security for Proximity-based Services |
SA WG3 |
Objective: The purpose of this study item is consider the security aspects of Proximity Services and document possible security solutions that may later be added to normative specification under other work item [...]. |
WID |
Approval |
Revised |
SP-140629 |
|
| Revised in SP-140629 as a new Study WID (see agenda item 13.6) |
12.35 |
SP-140576 |
Revised WID: Study on Security aspects of Integration of Single Sign-On (SSO) frameworks with 3GPP networks |
SA WG3 |
Objective: The objective of this Study Item is to investigate the security aspects of the service requirements specified by SA WG1 in TS 22.101, clause 26, on the integration of SSO frameworks with 3GPP network [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
13.10 |
SP-140577 |
Revised WID: Enhancements to WEBRTC interoperability |
SA WG3 |
Objective SA WG1 objectives: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases original [...]. |
WID |
Approval |
Revised |
SP-140630 |
|
| Revised into SP-140630 |
13.23 |
SP-140578 |
Revised WID: Lawful Interception Rel-13 |
SA WG3 |
Objective: The objective of this work item is to enhance the 3GPP LI service to accommodate Release 13 service enhancements and extensions. Enhancements to specifications TS 33.106, TS 33.107 and TS 33.108 will [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
13.19 |
SP-140579 |
Revised WID: Enhanced CSFB (Circuit Switched Fall Back) |
SA WG3 |
Objective: SA WG2 objectives: Investigate and describe how the CSFB procedures can be enhanced or improved for shortening CSFB call setup time (e.g., by reusing existing operations, it may be possible to enhanc [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
16 |
SP-140580 |
New WID: Study on IMS enhanced spoofed call prevention and detection |
SA WG3 |
Objective: The objective of this study is to evaluate the IETF STIR active drafts for use in 3GPP networks for spoofed call detection and make recommendations on what aspects of IETF STIR active drafts should b [...]. |
WID |
Approval |
Revised |
SP-140611 |
|
|
| 14.13 |
SP-140581 |
TR 33.831: Study on Security on Spoofed Call Detection and Prevention |
SA WG3 |
Abstract of document: The TR 33.831 studies the means to identify calls with spoofed Calling Line Identification terminating in the CS domain. CLI spoofing ranges from harmless hoax to criminal activities like [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.2 |
SP-140582 |
TR 33.871: Web Real Time Communication (WebRTC) Access to IMS |
SA WG3 |
Abstract of document: TR 33.871 contains a study on security for WebRTC access to IMS, based on the architecture and stage 2 procedures defined in Annex U of TS 23.228. The document is addressing: - WebRTC IMS [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control. SA WG3 to check reference [7] |
12.33 |
SP-140583 |
TR 33.969: Security aspects of Public Warning System |
SA WG3 |
Abstract of document: TR 33.969 contains a study on security features and mechanisms for protection against false Base Stations broadcasting False Warning Notifications. Work done against Feature-level Work it [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.14 |
SP-140584 |
Exception Sheet on Security for Proximity Services |
SA WG3 |
Abstract of document: This document contains the normative specification TS 33.303 on Security for Proximity-based Services including: 1) security for direct discovery, 2) EPC-level discovery and 3) one-to-m [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
11 |
SP-140585 |
Release 11 CRs on Lawful Interception (LI11) |
SA WG3 |
33.107 CR0155; 33.107 CR0156; 33.108 CR0231; 33.108 CR0230 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.48 |
SP-140586 |
Release 12 CRs on Lawful Interception (LI12) |
SA WG3 |
33.106 CR0133; 33.106 CR0134; 33.106 CR0135; 33.107 CR0150; 33.107 CR0151; 33.107 CR0152; 33.107 CR0153; 33.107 CR0154; 33.107 CR0157; 33.107 CR0158; 33.108 CR0228R1; 33.108 CR0229; 33.108 CR0232; 33.108 CR0233 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.34 |
SP-140587 |
Rel-12 CRs on Extended IMS media plane security features (eMEDIASEC) |
SA WG3 |
33.328 CR0061R1; 33.328 CR0062 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.2 |
SP-140588 |
Release 12 CRs on Web Real Time Communication Access to IMS (IMS_WebRTC) |
SA WG3 |
33.203 CR0221R1; 33.203 CR0222; 33.203 CR0223; 33.203 CR0224R1; 33.203 CR0225R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.5 |
SP-140589 |
Release 12 CRs on Group Communication System Enablers for LTE (GCSE_LTE) |
SA WG3 |
33.246 CR0178; 33.246 CR0179R1; 33.246 CR0180R1; 33.246 CR0181R1; 33.246 CR0182; 33.246 CR0184R1; 33.888 CR0001R1; 33.888 CR0002R1; 33.888 CR0003R1; 33.888 CR0004R1; 33.888 CR0005R1; 33.888 CR0006 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.53 |
SP-140590 |
Rel-12 CRs on E-UTRA Small cell enhancements - Physical layer aspects (LTE_SC_enh_L1) |
SA WG3 |
33.401 CR0526R1; 33.401 CR0532R1; 33.401 CR0535R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.14 |
SP-140591 |
Release 12 CRs on Proximity based Services (ProSe) |
SA WG3 |
33.303 CR0001R1; 33.303 CR0002R1; 33.303 CR0003R2; 33.303 CR0004R1; 33.303 CR0005R1; 33.303 CR0006R1; 33.303 CR0007; 33.303 CR0008R1; 33.303 CR0009R1; 33.303 CR0011R1; 33.303 CR0012R2; 33.303 CR0014R1; 33.303 C [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.26 |
SP-140592 |
Rel-12 CRs on Enhanced S2a Mobility Over trusted WLAN access to EPC (eSaMOG) |
SA WG3 |
33.402 CR0119R1 |
CR Pack |
Approval |
Revised |
SP-140636 |
|
| The SA WG3 was asked to check the need for this off-line. |
12.52 |
SP-140593 |
Rel-12 CRs on TEI (TEI12) |
SA WG3 |
33.203 CR0216R1; 33.203 CR0217R1; 33.203 CR0218R1; 33.234 CR0123; 33.310 CR0075R1; 33.310 CR0076R1; 33.310 CR0077R1; 33.310 CR0078; 33.310 CR0079; 33.320 CR0095R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.21 |
SP-140594 |
Revised WID: End-to-end Multimedia Telephony Service for IMS (MTSI) extensions |
Ericsson, ORANGE, Deutsche Telekom AG, TELECOM ITALIA S.p.A. |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that i [...]. |
WID |
Approval |
Revised |
SP-140600 |
|
| Proposed replacement of SP-140474. Revised to include clean and Revision marked versions in SP-140600 |
15 |
SP-140595 |
New WID on QoS End-to-end Multimedia Telephony Service for IMS (MTSI) extensions |
Ericsson, ORANGE, Deutsche Telekom AG, TELECOM ITALIA S.p.A. |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: Improve end-to-end QoS handling by: Before starting normative work on QoS handlin [...]. |
WID |
Approval |
Revised |
SP-140601 |
|
| Proposed replacement of SP-140487. Revised to include clean and Revision marked versions in SP-140601 |
13.21 |
SP-140596 |
CR 26.114-0283 rev 4 Requirements for End-to-end Video Rate Adaptation (Rel-12) |
Ericsson, Qualcomm Incorporated |
26.114 CR0283R4 |
CR Pack |
Approval |
Approved |
|
|
| Proposed revision of CR in SP-140475 This CR Pack was approved |
11 |
SP-140597 |
Rel-11 CRs on IRP framework enhancements to support Management of Converged Networks (OAM-FMC-IRP) |
SA WG5 |
32.156 CR0002 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.14 |
SP-140598 |
23.303 CR0102R6: Precedence of ProSe configuration information (ProSe, Rel-12) |
Ericsson, Qualcomm Incorporated, Huawei |
23.303 CR0102R6 |
CR Pack |
Approval |
Approved |
| SP-140442 |
| Proposed update to 23.303 CR0102R4 in SP-140419 This CR Pack was approved. Further alignment may be needed based on RAN WG2 results from their next meeting. |
5 |
SP-140599 |
On MCPTT work organization |
Alcatel-Lucent |
This paper discusses possible ways to accommodate the MCPTT work in 3GPP and proposes a way forward |
OTHER |
Discussion |
Noted |
|
|
| Discussed and noted |
13.21 |
SP-140600 |
Revised WID: End-to-end Multimedia Telephony Service for IMS (MTSI) extensions |
Ericsson, ORANGE, Deutsche Telekom AG, TELECOM ITALIA S.p.A. |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that i [...]. |
WID |
Approval |
Approved |
| SP-140594 |
| Proposed replacement of SP-140474 This WID was approved |
15 |
SP-140601 |
New WID on QoS End-to-end Multimedia Telephony Service for IMS (MTSI) extensions |
Ericsson, ORANGE, Deutsche Telekom AG, TELECOM ITALIA S.p.A. |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: Improve end-to-end QoS handling by: Before starting normative work on QoS handlin [...]. |
WID |
Approval |
Approved |
| SP-140595 |
| Proposed replacement of SP-140487 This WID was approved |
7.2 |
SP-140602 |
Prioritization and Slot Allocation for TEI-13 Cat B/C for 3GPP Access in SA WG2 |
NTT DOCOMO |
In conjunction with SA WG2 Release Prioritization SP-140416, this paper requests adequate time slot assigned for TEI-13 Cat B/C for 3GPP access in SA WG2 |
Discussion |
Decision |
Noted |
|
|
| This contribution was noted |
6 |
SP-140603 |
LS from ITU-T Study Group 12 on Proposed organization of a co-located workshop ITU-T SG12 QSDG / 3GPP / ETSI TB STQ on Quality of Service (QoS) and Quality of Experience (QoE) of 'big data' services in 3G/4G Mobile Networks |
ITU-T Study Group 12 |
From TD 500 Rev. 3 (GEN/12) Progress Report on the QSDG Activities and Work plan of year 2015, there is one proposed workshop on Performance, Quality of Service (QoS) and Quality of Experience (QoE) scheduled f [...]. |
LS In |
Action |
Response in SP-140639 |
|
| TD 536 rev 1 |
Response drafted in SP-140624. Final response in SP-140639. |
7.7 |
SP-140604 |
Status report of TSG CT#65 |
TSG CT Chairman |
TSG CT Status Report to TSG SA#65 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.7 |
SP-140605 |
Draft meeting report of TSG CT#65 |
MCC |
Draft report of TSG CT meeting #65 |
Report |
Information |
Noted |
|
|
| This Report was noted |
7.7 |
SP-140606 |
IETF Status report |
TSG CT Chairman |
IETF dependencies Status report |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.6 |
SP-140607 |
LS from TSG CT: Reply LS on Liaison statement to External Organizations on Architecture and Topology of IMT Networks |
TSG CT |
TSG CT had no comments to the current proposal. Action: TSG CT asks TSG SA to take note of this in their consolidated reply to ITU-R |
LS In |
Action |
Noted |
|
| CP-140728 |
This LS was reviewed and noted. |
7.6 |
SP-140608 |
LS from TSG CT: Reply LS LIAISON STATEMENT TO GCS PROPONENTS AND TRANSPOSING ORGANIZATIONS ON THE PROVISION OF TRANSPOSITION REFERENCES AND CERTIFICATION C FOR DRAFT REVISION 12 OF RECOMMENDATION ITU-R M.1457 |
TSG CT |
TSG CT had no comments to the current proposal. Action: TSG CT asks TSG SA to take note of this in their consolidated reply to ITU-R |
LS In |
Action |
Noted |
|
| CP-140729 |
This LS was reviewed and noted. |
7.6 |
SP-140609 |
LS from TSG CT: Reply LS to LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE WORK PLAN, TIMELINE, PROCESS AND DELIVERABLES FOR THE FUTURE DEVELOPMENT OF INTERNATIONAL MOBILE TELECOMMUNICATIONS (IMT) |
TSG CT |
TSG CT had no comments to the current proposal. Action: TSG CT asks TSG SA to take note of this in their consolidated reply to ITU-R |
LS In |
Action |
Noted |
|
| CP-140730 |
This incoming LS was noted |
5 |
SP-140610 |
MCPTT way forward |
Blackberry |
This paper outlines the BlackBerry view on critical communications and how to progress the MCPTT work in 3GPP. |
Discussion |
Approval |
Noted |
|
|
| Discussed and noted |
16 |
SP-140611 |
New WID: Study on IMS enhanced spoofed call prevention and detection |
SA WG3 |
Objective: The objective of this study is to evaluate the IETF STIR active drafts for use in 3GPP networks for spoofed call detection and make recommendations on what aspects of IETF STIR active drafts should b [...]. |
WID |
Approval |
Approved |
| SP-140580 |
| This WID was approved |
12.50 |
SP-140612 |
Revised WID Energy Efficiency related Performance Measurements |
SA WG5 |
Objective: For the use cases, requirements and/or global KPIs provided by ETSI TC EE related to energy efficiency, by cooperation with RAN WG2 and if needed with other 3GPP WGs, to - identify whether or not the [...]. |
WID |
Approval |
Approved |
| SP-140537 |
| This WID was approved |
12.50 |
SP-140613 |
Revised WID Converged Management PM Interface definitions |
SA WG5 |
Objective: The work item will address (in that priority order): 1. Requirements, Service Level Agreement (SLA), business objectives to be worked in interaction with NGCOR project, 2. Measurement & KPI definitio [...]. |
WID |
Approval |
Approved |
| SP-140540 |
| This WID was approved |
12.50 |
SP-140614 |
Rel-12 CRs on Network Management for 3GPP Interworking WLAN (OAM-IWLAN) |
SA WG5 |
28.612 CR0001R1; 28.616 CR0002R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
5 |
SP-140615 |
MCPTT Work Schedule and Coordination Considerations |
SA WG2 Chairman, TSG SA Chairman, TSG CT Chairman |
This paper explores work scheduling and coordination implications of stage 2 work on the MCPTT item in the form of a cross-TSG 3GPP-wide plan. |
OTHER |
Discussion |
Noted |
|
|
| Discussed and noted. |
5 |
SP-140616 |
Development of MCPTT in 3GPP |
(U.K) Home Office |
Suggestions and assumptions for doing the MCPTT work in 3GPP, along with some proposed next steps. |
OTHER |
Discussion |
Noted |
|
|
| Discussed and noted. |
7.5 |
SP-140617 |
SA WG5 Status Report |
SA WG5 Chairman |
SA WG5 Chairman's report of SA WG5 activities |
Report |
Presentation |
Noted |
| SP-140534 |
| This Report was noted |
7.6 |
SP-140618 |
TSG RAN Status Report to TSG SA#65 |
TSG RAN Chairman |
TSG RAN chairman's report for presentation |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.6 |
SP-140619 |
Draft report of TSG RAN meeting #65 |
TSG RAN Secretary (MCC) |
Draft version of the TSG RAN #65 report provided for information |
Report |
Information |
Noted |
|
|
| This Report was noted |
7.6 |
SP-140620 |
LS from TSG RAN: Draft Letter to ITU on LS on Architecture and Topology of IMT Networks |
TSG RAN |
ITU-R Working Party 5D (WP 5D) asked 3GPP to provide a description of the Architecture and Topology of IMT Networks (UTRA and E-UTRA radio access networks and relevant Core Networks in 3GPP case). 3GPP provided [...]. |
LS In |
Action |
Response in SP-140626 |
|
| RP-141647 |
Response LS was provided in SP-140626 to inform the ITU-R of this (to be forwarded by the ITU-R Ad-Hoc Group Chairman) |
7.6 |
SP-140621 |
LS from TSG RAN: Draft Letter to ITU on LS to GCS Proponents and Transposing Organizations on the provision of transposition references and Certification C for Draft Revision 12 of Recommendation ITU-R M.1457 |
TSG RAN |
ITU-R Working Party 5D (WP 5D) asked 3GPP to review the current draft of M.1457 (Revision 12) 'Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2000 (IMT-20 [...]. |
LS In |
Action |
Forwarded to PCG in SP-140627 |
|
| RP-141648 |
An LS to the PCG was provided in SP-140627. |
7.6 |
SP-140622 |
LS from TSG RAN: Draft Letter to ITU on the work plan, timeline, process and deliverables for the future development of International Mobile Telecommunications (IMT) |
TSG RAN |
ITU-R Working Party 5D (WP 5D) provided 3GPP the work plan, timeline, process and deliverables for the future development of International Mobile Telecommunications (IMT). The answer below states that: - 3GPP [...]. |
LS In |
Action |
Response LS in SP-140628 |
|
| RP-141650 |
Response LS in SP-140628 |
5 |
SP-140623 |
Summary output of break-out drafting session on MCPTT |
TSG SA Chairman, TSG SA Chairman, TSG CT Chairman |
The following guidance was considered for the temporary ad-hoc activity with regards to SP-0140xxx: Temporary ad-hoc aspects: 3GPP encourages OMA and ETSI to continue working together, alongside interested 3GPP [...]. |
OTHER |
Discussion |
Noted |
|
|
| LS drafted in SP-140634. This document was then noted. |
6 |
SP-140624 |
[DRAFT] Reply LS on Proposed organization of a co-located workshop ITU-T SG12 QSDG / 3GPP / ETSI TB STQ on Quality of Service (QoS) and Quality of Experience (QoE) of 'big data' services in 3G/4G Mobile Networks |
TSG SA |
To: ITU-T SG12 QSDG, ETSI TB STQ |
LS OUT |
Approval |
Revised |
SP-140639 |
|
| This was reviewed and revised to remove 'draft' in SP-140639 |
13.12 |
SP-140625 |
Updated WID: Revised User Plane Congestion management WID |
SA WG2 |
Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. |
WID |
Approval |
Revised |
SP-140631 |
SP-140434 |
|
| 7.6 |
SP-140626 |
Letter to ITU on LS on Architecture and Topology of IMT Networks |
TSG SA |
- |
LS OUT |
Approval |
Approved |
|
|
| This outgoing LS was approved |
7.6 |
SP-140627 |
LS Forwarded to PCG: Draft Letter to ITU on LS to GCS Proponents and Transposing Organizations on the provision of transposition references and Certification C for Draft Revision 12 of Recommendation ITU-R M.1457 |
TSG SA |
To: PCG |
LS OUT |
Approval |
Approved |
|
|
| This outgoing LS was approved |
7.6 |
SP-140628 |
LS Forwarded to PCG: Draft Letter to ITU on the work plan, timeline, process and deliverables for the future development of International Mobile Telecommunications (IMT) |
TSG SA |
To: PCG |
LS OUT |
Approval |
Approved |
|
|
| This outgoing LS was approved |
13.6 |
SP-140629 |
New WID: Study on Security for Proximity-based Services |
SA WG3 |
Objective: The purpose of this study item is consider the security aspects of Proximity Services and document possible security solutions that may later be added to normative specification under other work item [...]. |
WID |
Approval |
Approved |
| SP-140575 |
| This WID was approved |
13.10 |
SP-140630 |
Revised WID on Enhancements to WebRTC interoperability (eWebRTCi) |
SA WG1, SA WG3 |
Objective: SA WG1 objectives: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases origin [...]. |
WID |
Approval |
Approved |
| SP-140505 |
| This WID was approved |
13.12 |
SP-140631 |
Updated WID: Revised User Plane Congestion management WID |
SA WG2 |
Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. |
WID |
Approval |
Approved |
| SP-140625 |
| This WID was approved |
14.3 |
SP-140632 |
New WID on Flexible Mobile Service Steering (FMSS) |
SA WG1 |
Objective: The objective is to define service requirements to enable the 3GPP Core Network to define and modify traffic steering policies that will be used to select required service enablers of the operator de [...]. |
WID |
Approval |
Revised |
SP-140638 |
SP-140511 |
| Some editorial errors were made and this was revised in SP-14638 |
14.6 |
SP-140633 |
New WID on GERAN UTRAN Sharing Enhancements (GUSH) |
SA WG1 |
Objective: The objective of this work item is to standardise means that complement existing system capabilities for sharing common 2G and 3G RAN resources. The work will take into account the following topics: [...]. |
WID |
Approval |
Revised |
SP-140637 |
SP-140514 |
| Some editorial errors were made and this was revised in SP-14637 |
5 |
SP-140634 |
[DRAFT] LS on 3GPP work organization for Mission Critical Push to Talk |
TSG SA |
To: OMA, ETSI TCCE, TSG CT, SA WG1, SA WG2, SA WG3, SA WG4, SA WG5 CC: TSG RAN |
LS OUT |
Approval |
Revised |
SP-140640 |
|
|
| 16 |
SP-140635 |
New Study WID on Optimizations to Support High Latency Communications |
TSG SA |
Objective: The objective of this study item is to study possible enhancements that facilitate for applications to use 3GPP constrained devices over the 3GPP IP connectivity and being able to support large numbe [...]. |
WID |
Approval |
Approved |
| SP-140437 |
| This WID was approved |
12.26 |
SP-140636 |
Rel-12 CRs on Enhanced S2a Mobility Over trusted WLAN access to EPC (eSaMOG) |
TSG SA |
33.402 CR0119R1 |
CR Pack |
Approval |
Approved |
| SP-140592 |
| This CR Pack was approved |
14.6 |
SP-140637 |
New WID on GERAN UTRAN Sharing Enhancements (GUSH) |
SA WG1 |
Objective: The objective of this work item is to standardise means that complement existing system capabilities for sharing common 2G and 3G RAN resources. The work will take into account the following topics: [...]. |
WID |
Approval |
Approved |
| SP-140633 |
| This WID was approved |
14.3 |
SP-140638 |
New WID on Flexible Mobile Service Steering (FMSS) |
SA WG1 |
Objective: The objective is to define service requirements to enable the 3GPP Core Network to define and modify traffic steering policies that will be used to select required service enablers of the operator de [...]. |
WID |
Approval |
Approved |
| SP-140632 |
| This WID was approved |
6 |
SP-140639 |
Reply LS on Proposed organization of a co-located workshop ITU-T SG12 QSDG / 3GPP / ETSI TB STQ on Quality of Service (QoS) and Quality of Experience (QoE) of 'big data' services in 3G/4G Mobile Networks |
TSG SA |
To: ITU-T SG12 QSDG, ETSI TB STQ |
LS OUT |
Approval |
Approved |
| SP-140624 |
| This outgoing LS was approved |
5 |
SP-140640 |
LS on 3GPP work organization for Mission Critical Push to Talk |
TSG SA |
To: OMA, ETSI TC TCCE, TSG CT, SA WG2. CC: , TSG RAN, CT WG1, CT WG3, CT WG4, CT WG6, SA WG1, SA WG2, SA WG3, SA WG4, SA WG5, PCG, TCCA |
LS OUT |
Approval |
Approved |
| SP-140634 |
| This outgoing LS was approved |
17.1 |
SP-140641 |
3GPP Work Plan review at Plenary #65 |
MCC Work Plan Manager |
- |
OTHER |
Presentation |
Noted |
| SP-140525 |
| This contribution was noted |
7.6 |
SP-140642 |
Draft Letter to ITU on Comments on Working document towards a Handbook on Global Trends in IMT ITU-R M.[IMT.HANDBOOK] |
TSG RAN |
For e-mail approval and forwarding to PCG. |
LS In |
Approval |
e-mail agreed. Forwarded to PCG |
|
|
| For e-mail approval and forwarding to PCG. |
|
Created: 2014-10-08 09:51     END OF LIST
Last Allocated Document: SP-140642