Last Allocated Document: SP-140173
Temporary Document List - Ordered by TD
Colour Key: |
No Conclusion |
Conclusion Reached |
Document Revised |
Document Withdrawn |
Document Not Handled |
|
The Hyperlinks are to the FTP server: ftp://ftp.3gpp.org/tsg_sa/TSG_SA/TSGS_63/Docs/
Created: 2014-03-12 12:37     START OF LIST
Agenda |
TD |
LongTitle |
Source |
Summary |
Doc_Type |
Doc_For |
Decision |
Rev_By |
Rev_Of |
LS_Source_file |
Comment |
2 |
SP-140001 |
Draft agenda for TSG SA meeting #63 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #63 |
Agenda |
Approval |
Revised |
SP-140135 |
|
| Revised in SP-140135 |
4.1 |
SP-140002 |
Draft Report of TSG SA meeting #62 |
TSG SA Secretary |
Draft Report of TSG SA meeting #62 containing revision marks of changes on the distributed draft. |
Report |
Approval |
Approved |
|
|
| This Report was approved |
7.4 |
SP-140003 |
SA WG4 Status Report at TSG SA#63 |
SA WG4 Chairman |
SA WG4 chairman's report to TSG SA#63 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
9 |
SP-140004 |
CRs to TS 26.346 on 'Correction for fdtGroupId (PMA-MBS_Ext)' (Release 9 to Release 12) |
SA WG4 |
26.346 CR0356R2; 26.346 CR0357R2; 26.346 CR0358R2; 26.346 CR0359R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
10 |
SP-140005 |
CRs to TS 26.346 on 'Correction to MBMS Protocol Stack (MBS_Enh)' (Release 10 and Release 11) |
SA WG4 |
26.346 CR0353R1; 26.346 CR0354R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
10 |
SP-140006 |
CRs to TS 26.233 and TS 26.247 on ' HTTP-based Streaming and Download Services (HTTP_SDS)' (Release 10 to Release 12) |
SA WG4 |
26.233 CR0011; 26.233 CR0012; 26.247 CR0051R1; 26.247 CR0052R1; 26.247 CR0053R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.4 |
SP-140007 |
Revised WID on 'EVS_codec - Codec for Enhanced Voice Services' (EVS_codec) |
SA WG4 |
Objective The overall objective of this work item is to develop a codec suitable for the Enhanced Voice Service in the EPS. The following objectives should be achieved with the new codec: - Enhanced quality an [...]. |
WID |
Approval |
Revised |
SP-140151 |
|
| This was revised to add the TS numbers in SP-140151 |
12.39 |
SP-140008 |
CR to TS 26.114 on 'IANA Registration Information for RTP Header Extensions (CVO)' (Release 12) |
SA WG4 |
26.114 CR0273 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.40 |
SP-140009 |
CRs to TS 26.114, TS 26.140, TS 26.234, TS 26.244, TS 26.247 and TS 26.346 on 'HEVC Support (HEVC)' (Release 12) |
SA WG4 |
26.114 CR0276R1; 26.140 CR0018; 26.234 CR0218R1; 26.244 CR0052R2; 26.247 CR0055R1; 26.346 CR0365R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.41 |
SP-140010 |
TR 26.827 IMS-based Streaming and Download Delivery Enhancements (IMS_SDE) (Release 12), v. 2.0.0 |
SA WG4 |
Abstract of document: At SA#58, the Release 12 Work Item on IMS-based Streaming and Download Delivery Enhancements (IMS_SDE) was agreed. The objectives of this work item include - Identify use cases and recomm [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.44 |
SP-140011 |
TR 26.848 Enhanced MBMS Operation (MI-EMO) (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: At SA#59, the Release 12 Work Item on MBMS Improvement MBMS Enhancement Operation (MI-EMO) was agreed. The objectives of this work item include - Improve MBMS OTA efficiency (e.g. by obje [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG4 |
12.44 |
SP-140012 |
TR 26.849 MBMS operation on Demand (MooD) (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: The objective of the Rel-12 MI-MooD (MBMS Improvements - MBMS operation on Demand) Work Item is to specify in TS 26.346 (MBMS Protocols and Codecs) the required functionality to enable on- [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG4 |
12.44 |
SP-140013 |
CRs to TS 26.247 and TS 26.346 on 'Enhanced MBMS Operation (MI-EMO)' (Release 12) |
SA WG4 |
26.247 CR0054R1; 26.346 CR0336R6; 26.346 CR0346R5; 26.346 CR0355R1; 26.346 CR0360; 26.346 CR0361R1; 26.346 CR0362R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.45 |
SP-140014 |
CR to TS 26.114 on 'Fixed-mobile interworking (E2EMTSI-S4)' (Release 12) |
SA WG4 |
26.114 CR0275R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.46 |
SP-140015 |
CR to TS 26.141 on 'Video Coding Enhancements in IMS Messaging and Presence (VCEIMP)' (Release 12) |
SA WG4 |
26.141 CR0007R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.51 |
SP-140016 |
CRs to TS 26.346 on 'Technical Enhancements and Improvements for Release 12 (TEI12)' (Release 12) |
SA WG4 |
26.346 CR0363R1; 26.346 CR0364R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
7.3 |
SP-140017 |
SA WG3 Status Report |
SA WG3 Chairman |
SA WG3 chairman's report to TSG SA#63 |
REPORT |
Presentation |
Noted |
|
|
| This REPORT was noted |
12.22 |
SP-140018 |
TR 33.868 Security aspects of Machine-Type Communications (MTC) |
SA WG3 |
Abstract of document: The present document studies the security aspects of security architecture enhancements to facilitate Machine-Type and other mobile data applications Communications enhancements (MTCe). In [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.22 |
SP-140019 |
TS 33.187 Machine-Type (MTC) and other Mobile Data Applications Communications Enhancements |
SA WG3 |
Abstract of document: The present document specifies the security architecture enhancements (i.e., enhancements to the security features and the security mechanisms) to facilitate Machine-Type and other mobile [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.47 |
SP-140020 |
Release 12 CRs on Lawful Interception (LI12) |
SA WG3 |
33.106 CR0132; 33.107 CR0138; 33.107 CR0139; 33.107 CR0140; 33.107 CR0141; 33.108 CR0222 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
9 |
SP-140021 |
Release 9 CRs on 128 bit encryption for GSM and GPRS (A5/4-GEA4) |
SA WG3 |
33.102 CR0258R1; 33.102 CR0259R1; 33.102 CR0260R1; 33.102 CR0261R1; 43.020 CR0031R1; 43.020 CR0032R1; 43.020 CR0033R1; 43.020 CR0034R1 |
CR Pack |
Approval |
Revised |
SP-140130 |
|
| Revised in SP-140130 |
12.38 |
SP-140022 |
Release 12 CR on Tunnelling of UE Services over Restrictive Access Networks (Stage 2/3) (TURAN) |
SA WG3 |
33.203 CR0205R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.33 |
SP-140023 |
Release 12 CR for IMS media plane security extensions (eMEDIASEC) |
SA WG3 |
33.328 CR0058R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.51 |
SP-140024 |
Release 12 CR on TEI (TEI12) |
SA WG3 |
33.402 CR0117R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
7.5 |
SP-140025 |
SA WG5 Status Report |
SA WG5 Chairman |
SA WG5 chairman's report to TSG SA#63 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
12.49 |
SP-140026 |
New WID Radio Planning Tool interface (OAM-RPT) |
SA WG5 |
Objective: The objective is to standardize the interface between a RPT and the applications using the site and antenna data held by the RPT. Focus is on the standardisation of the data (semantics and syntax) to [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.48 |
SP-140027 |
Revised WID Short Message Service - Service Center (SMS-SC) Offline Charging |
SA WG5 |
Objective: Objective of this work item is to specify Offline Charging for the Short Message Service (SMS) from the SMS-SC, for Mobile Originated , and Mobile Terminated Short Message service, Application Origin [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.49 |
SP-140028 |
Revised WID on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization |
SA WG5 |
Objective: To study comprises how the NM centralized CCO function should be enhanced by recommending use cases, the required (potentially new) UE and network-based measurements for an NM centralized CCO functio [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
9 |
SP-140029 |
Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) |
SA WG5 |
32.423 CR0077R1; 32.423 CR0078R1; 32.423 CR0079R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
10 |
SP-140030 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
32.762 CR0101; 32.766 CR0060R1; 32.766 CR0061 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11.33 |
SP-140031 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
28.702 CR0002R1; 28.703 CR0001R1; 32.422 CR0261R1; 32.422 CR0262R1; 32.423 CR0082R1; 32.762 CR0102R2; 32.766 CR0062R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.49 |
SP-140032 |
Rel-12 CR on OAM Maintenance and small Enhancements (OAM12) |
SA WG5 |
32.300 CR0016 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
8.5 |
SP-140033 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
32.298 CR0430; 32.298 CR0436R1; 32.298 CR0437R1; 32.298 CR0438R1; 32.298 CR0439R1; 32.298 CR0440R1; 32.299 CR0571R1; 32.299 CR0572R1; 32.299 CR0573; 32.299 CR0574R1; 32.299 CR0575R1; 32.299 CR0577; 32.299 CR057 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11.32 |
SP-140034 |
Rel-11 CRs on Charging Management (CH11) |
SA WG5 |
32.251 CR0342R1; 32.251 CR0343R1; 32.298 CR0427R1; 32.298 CR0428R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.48 |
SP-140035 |
Rel-12 CR on Charging Management (CH12) |
SA WG5 |
32.260 CR0243R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.30 |
SP-140036 |
Rel-12 CRs on Charging for Application Based Charging (ABC) |
SA WG5 |
32.251 CR0340R1; 32.251 CR0359; 32.251 CR0360 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.48 |
SP-140037 |
Rel-12 CRs on Charging for IMS centralized service (ICS) control (Stage 2/3) (CHICS) |
SA WG5 |
32.250 CR0038R2; 32.298 CR0442R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.48 |
SP-140038 |
Rel-12 CR on Charging per IP - Connectivity Access Network (IP-CAN) Session (Stage 2/3) (CHIPS) |
SA WG5 |
32.251 CR0351R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.20 |
SP-140039 |
Rel-12 CRs on Traffic Detection Function (TDF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (Stage 2/3)(P4C-F-CH_T) |
SA WG5 |
32.251 CR0341R1; 32.299 CR0569R1 |
CR Pack |
Approval |
Revised |
SP-140154 |
|
| This was revised off-line in SP-140154 |
12.20 |
SP-140040 |
Rel-12 CRs on Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_P) |
SA WG5 |
32.251 CR0354R1; 32.251 CR0355R1; 32.251 CR0356R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11.20 |
SP-140041 |
Rel-11 CR on Charging for Roaming Architecture for Voice over IMS with Local Breakout (RAVEL-CH) |
SA WG5 |
32.260 CR0242 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11.4 |
SP-140042 |
Rel-11 CRs on Charging of SIMTC (Stage 2/3) (SIMTC-CH) |
SA WG5 |
32.251 CR0352; 32.251 CR0353 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
14.22 |
SP-140043 |
Rel-12 CR on Study on OAM aspects of Network Sharing (FS_OAM_SHARE) |
SA WG5 |
32.851 CR0003R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
9 |
SP-140044 |
Rel-9 CRs on MBMS support in EPS (MBMS_EPS) |
SA WG5 |
32.251 CR0345R1; 32.251 CR0346R1; 32.251 CR0347R1; 32.251 CR0348R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.48 |
SP-140045 |
Rel-12 CRs on Short Message Service - Service Center (SMS-SC) Offline Charging (SMS-SC-CH) |
SA WG5 |
32.274 CR0024R1; 32.274 CR0027; 32.274 CR0028R1; 32.297 CR0014; 32.298 CR0429; 32.299 CR0576R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
17.1 |
SP-140046 |
3GPP Work Plan review at Plenary #63 |
MCC Work Plan Manager |
Presentation of the 3GPP Work Plan review at Plenary #63 |
WORK PLAN |
Presentation |
Revised |
SP-140173 |
|
|
| 17.1 |
SP-140047 |
3GPP_Carrier Aggregation for LTE |
MCC Work Plan Manager |
The main focus of the present document is on the 3GPP work items on Carrier Aggregation (CA) for LTE. |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
12.22 |
SP-140048 |
Standardization of Machine-type Communications |
MCC Work Plan Manager |
The main focus of the present document is on the M2M Communications work items in 3GPP and ETSI. |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140049 |
3GPP Public Safety (individual to/from authority) communications |
MCC Work Plan Manager |
The present document collects 3GPP work items for supporting Public Safety (individual-to-authority/authority-to-individual) communication, including eCall, PWS, ETWS, etc., so that police/fire-fighters/paramed [...]. |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140050 |
LTE for Public Safety (authority-to-authority) communications |
MCC Work Plan Manager |
The present document collects 3GPP work items to enhance LTE for supporting Public Safety (authority-to-authority) communications, so that police/fire-fighters/paramedics/ambulance and other services can use LT [...]. |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140051 |
3GPP Rel-12_description |
MCC Work Plan Manager |
The present document contains a high-level description of the 3GPP Release 12 Features. Its latest version is available at: http://www.3gpp.org/ftp/Information/WORK_PLAN/Description_Releases/ |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
17.1 |
SP-140052 |
3GPP Rel-13_description |
MCC Work Plan Manager |
The present document contains a high-level description of the 3GPP Release 13 Features. Its latest version is available at: http://www.3gpp.org/ftp/Information/WORK_PLAN/Description_Releases/ |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
12.22 |
SP-140053 |
Release 12 CR on Machine-Type and other mobile data applications Communications Enhancements (MTCe) |
SA WG3 |
23.682 CR0083 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
20 |
SP-140054 |
Charity Park Run/Walk at TSGs #64 |
Running Friends of 3GPP |
Invitation to participate in a Charity Park Run/Walk at TSGs #64 |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
5.2 |
SP-140055 |
NFV: what is there for 3GPP? |
Qualcomm |
Proposal for 3GPP work: If potential architecture work is foreseen, start in rel.13 in SA WG1 in order to identify use cases Ensure SA WG1 completes before moving work to stage-2 groups Implementation methodolo [...]. |
OTHER |
Presentation |
Noted |
|
|
| This contribution was noted |
5.4 |
SP-140056 |
Considerations on RAN-WLAN Interworking |
Qualcomm |
With regards to the ongoing RAN WG2 Work Item on WLAN/3GPP Radio Interworking ([1]), and following the recent RAN WG2 progress ([2,3,4]), this document intends to summarize the main open points requiring some f [...]. |
OTHER |
Discussion |
Noted |
|
|
| This contribution was noted |
18.2 |
SP-140057 |
MCC status report |
Director of MCC |
Report of MCC Activities |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
12.26 |
SP-140058 |
23.402 CR1226R3: Corrections for Initial attach and handover attach call flows for single-connection |
Huawei, Hisilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom Corporation |
23.402 CR1226R3 |
CR Pack |
Approval |
Included in SP-140107 |
|
|
| This was reviewed with the other issues raised in SP-140107 and included in the revision CR Pack. |
5.4 |
SP-140059 |
Way Forward on WLAN Interworking |
Broadcom Corporation |
Broadcom view on the Way Forward on WLAN Interworking |
Way Forwar |
Presentation |
Noted |
|
|
| This contribution was noted |
15 |
SP-140060 |
Revised WID SP-130045 on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization |
SA WG5 |
Objective: Based on the result of the study Rel-12 TR 32.836, specify potential new performance indicators, e.g. UE measurements and/or network measurements to be reported over Itf-N to support the NM centraliz [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
7.2 |
SP-140061 |
SA WG2 chairman's report to SA 63 |
SA WG2 Chairman |
SA WG2 chairman's report to TSG SA#63 |
REPORT |
Presentation |
Noted |
|
|
| This REPORT was noted |
7.2 |
SP-140062 |
SA-RAN Coordination, SA WG2 Considerations |
SA WG2 Chairman |
Work items that require input and coordination from working groups across TSG RAN and TSG SA could benefit from advance planning and earlier completion. |
OTHER |
Discussion |
Noted |
|
|
| This contribution was noted |
7.1 |
SP-140063 |
SA WG1 Report to TSG SA#63 |
SA WG1 Chairman |
SA WG1 chairman's report to TSG SA#63 |
REPORT |
Presentation |
Noted |
|
|
| This REPORT was noted |
12.51 |
SP-140064 |
Stage 1 CRs on TEI12 for Alignment with Stage 2/3 |
SA WG1 |
22.011 CR0200; 22.173 CR0092R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.51 |
SP-140065 |
Stage 1 CRs on TEI12 for MMTEL voice/video and SMS 'prioritisation' |
SA WG1 |
22.011 CR0202; 22.011 CR0198R5 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.2 |
SP-140066 |
Stage 1 CR on RAN Sharing Enhancements (RSE) |
SA WG1 |
22.101 CR0471R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
13.1 |
SP-140067 |
TR 22.853 v.1.0.0 on Service Exposure and Enablement Support (SEES) |
SA WG1 |
Abstract of document: TR 22.853 contains use cases and identifies potential requirements for network information and functionality that the 3GPP network could exposed to 3rd party applications. The goal is to a [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG1 |
15 |
SP-140068 |
New WID on Enhancements to WebRTC interoperability (eWebRTCi) |
SA WG1 |
Objective: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC clients in the following areas: 1. Requirements and use cases originally included for Rel-1 [...]. |
WID |
Approval |
Noted |
|
|
| Proposed update in SP-140138. This was therefore noted. |
15 |
SP-140069 |
New WID on Isolated E-UTRAN Operation for Public Safety (IOPS) |
SA WG1 |
Objective: The SA WG1 objective is to specify service requirements for: - Initiation of an Isolated E-UTRAN for Public Safety use. o Management of a lost backhaul by an eNB. o Detection and creation of an Isola [...]. |
WID |
Approval |
Revised |
SP-140152 |
|
|
| 14.16 |
SP-140070 |
TR 22.806 v.1.0.0 on Application specific Congestion control for Data Communication (FS_ACDC) |
SA WG1 |
Abstract of document: This document provides the feasibility study for Application specific Congestion control for Data Communication (ACDC). ACDC investigates use cases and potential requirements to allow/rest [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG1 |
14.5 |
SP-140071 |
TR 22.897 v.1.0.0 on Isolated E-UTRAN Operation for Public Safety (FS_IOPS) |
SA WG1 |
Abstract of document: The document is the feasibility study for Isolated E-UTRAN Operation for Public Safety (IOPS) with use cases, potential requirements, conclusion and recommendations. In mission critical ne [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG1 |
14.7 |
SP-140072 |
TR 22.828 v.1.0.0 on Co-ordinated P-GW change for SIPTO (FS_CSIPTO) |
SA WG1 |
Abstract of document: This document is the feasibility study for Co-ordinated PGW Change for Selected IP Offload (CSIPTO), with use cases and potential requirements. This TR considers use cases and identifies p [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG1 |
16 |
SP-140073 |
New WID on RAN Sharing Enhancements on GERAN and UTRAN (FS_GUSH) |
SA WG1 |
Objective: The objective of this work item is to study possible requirements for the enhanced sharing of RAN resources in a secure way on GERAN and UTRAN. It will base these on the requirements already produced [...]. |
WID |
Approval |
Approved |
|
|
| This Study WID was approved |
16 |
SP-140074 |
New WID on Service aspects for dealing with User Control over spoofed calls (FS_UC_SPOOF) |
SA WG1 |
Objective: This study aims to examine the use cases and identify potential requirements for handling voice calls where caller information is identified as being unauthenticated or the caller is not authorized t [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
5.4 |
SP-140075 |
System Impacts of WLAN 3GPP Radio Interworking |
BlackBerry UK Ltd. |
During RAN WG2#85, RAN WG2 discussed and assessed the CN and system impacts of the UTRA_LTE_WLAN_interw work item and sent a liaison statement to RAN and SA WG2 based on their agreements [1]. This document prov [...]. |
OTHER |
Discussion |
Noted |
|
|
| This contribution was noted |
7.6 |
SP-140076 |
LS from RAN ITU-R Ad-hoc: 3GPP internal LS on the schedule toward Rev. 2 of Rec. ITU-R M.2012 'Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-Advanced (IMT-Advanced)' |
RAN ITU-R Ad-hoc |
At the Plenaries in December 3GPP received the following Liaison Statement from ITU-R WP5D 'Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2012 to Revision 2'. T [...]. |
LS In |
Action |
Forward to the PCG for endorsement |
|
| RT-140003 |
It was agreed to forward this to the PCG for endorsement. |
6 |
SP-140077 |
LS from ETSI E2NA: Reply LS on Transfer of ETSI TS 182 025 |
ETSI E2NA |
E2NA thanks CT WG1 for their liaison C1-135211 kindly asking ETSI E2NA to transfer ETSI TS 182 025 to CT WG1. E2NA agrees to this request, alsoproposing to transfer the responsibility of all documents related t [...]. |
LS In |
Information |
Response in SP-140171 |
|
| E2NA(14)000019 |
A response LS was drafted to ETSI E2NA in SP-140146. Final response in SP-140171 |
14.13 |
SP-140078 |
LS from ETSI EE: Update on the liaison to 3GPP on Cooperation for Energy Efficiency Measurements |
ETSI EE |
Dear all, following the liaison from TSG SA WG5 on 'Cooperation for Energy Efficiency Measurements' (reference: S2-122600) and the joint meeting held in Sophia Antipolis on May 29, 2013 a constant update on th [...]. |
LS In |
Information |
Noted |
|
| EE(14)000051 |
This incoming LS was noted |
6 |
SP-140079 |
LS from IMTC: LS/r on the reference table of ITU-T Recommendations to be tested for conformity/interoperability, parameters and available test suites |
IMTC |
IMTC would like to thank ITU-T for recognizing IMTC as a testing organization for H.323 interoperability in the reference table of ITU-T Recommendations to be tested for conformance and interoperability (COM11- [...]. |
LS In |
Information |
Noted |
|
| ITUtLiaison-CITreferenceTable |
Related inputs were reviewed and this was then noted. |
6 |
SP-140080 |
LS from OMA Board: A Communiqué to 3GPP regarding Public Safety and the OMA Push to Talk over Cellular (POC) enabler. |
OMA Board |
OMA's members have identified several areas where OMA enablers may contribute to specific services requirements in the Public Safety domain. Members of Governmental agencies from several countries who are charg [...]. |
LS In |
Information |
Withdrawn |
|
| OMA-BOARD-2013-0205R02 |
This LS was previously handled at TSG SA#62 in SP-130709 and was withdrawn |
12.31 |
SP-140081 |
LS from CT WG1: LS on Reply LS on Transfer of ETSI TS 182 025 |
CT WG1 |
CT WG1 proposes to transfer the documents listed in the attached LS (E2NA(14)000019 / C1-140370) to 3GPP. CT WG1 believes the appropriate alloction is to allocate TS 181 019 to SA WG1 and the remainder of the l [...]. |
LS In |
Action |
Noted |
|
| C1-140651 |
This incoming LS was noted |
12.13 |
SP-140082 |
LS from RAN WG1: Reply LS on ProSe Out of Coverage discovery |
RAN WG1 |
RAN WG1 kindly asks RAN plenary to reply to SA WG2 on behalf of RAN WG1. |
LS In |
Information |
Noted |
|
| R1-140950 |
This incoming LS was noted |
5.3 |
SP-140083 |
LS from RAN WG2: Reply LS on system aspects for Small Cell Enhancement work in RAN |
RAN WG2 |
RAN WG2 would like to thank SA WG2 for the LS on system aspects for Small Cell Enhancement work in RAN. RAN WG2 has discussed the issues raised in the LS, and has the following response: 1. Is any extra informa [...]. |
LS In |
Information |
Noted |
|
| R2-140999 |
This incoming LS was noted |
5.3 |
SP-140084 |
LS from RAN WG3: Reply LS on system aspects for Small Cell Enhancement work in RAN |
RAN WG3 |
RAN WG3 would like to thank SA WG2 for the LS on system aspects for Small Cell Enhancement work in RAN and would like to provide answers to the questions raised and provide comments on the working assumptions p [...]. |
LS In |
Information |
Noted |
|
| R3-140486 |
This incoming LS was noted |
13.4 |
SP-140085 |
LS from SA WG1: LS on Mission Critical Push To Talk over LTE |
SA WG1 |
SA WG1 would like to thank TIA for their TIA-4973.201 Requirements for Mission Critical PTT and Related Supplementary Services, Rev R15 specification. As normative work on TSG SA WG1 Mission Critical Push To T [...]. |
LS In |
Information |
Noted |
|
| S1-140149 |
This incoming LS was noted |
12.13 |
SP-140086 |
LS from SA WG2: Reply LS on ProSe Lawful Interception |
SA WG2 |
SA WG2 thanks RAN for the LS S2-130049/RP-132107. SA WG2 would like to provide to the following answer to the question from RAN: [RAN question]: TSG RAN respectfully asks SA WG3-LI, SA WG3 and SA WG2 to pro [...]. |
LS In |
Information |
Noted |
|
| S2-140494 |
This incoming LS was noted |
5.3 |
SP-140087 |
LS from SA WG2: LS on system aspects for Small Cell Enhancement work in RAN |
SA WG2 |
SA WG2 would like to thank SA for the LS on Response to: LS on Small Cell Enhancement work in RAN from SA. SA WG2 analysed the system aspects for Small Cell Enhancement work and came to the following working a [...]. |
LS In |
Information |
Noted |
|
| S2-140537 |
This incoming LS was noted |
6 |
SP-140088 |
Maintenance of I-WLAN specifications |
Broadcom Corporation |
As explained in LS S2-140554 / SP-140089, 3GPP has specified two methods for co-ordinated WLAN access. I-WLAN stage 2 is in 3GPP TS 23.234, and stage 2 for WLAN Interworking is 3GPP TS 23.402. TSG RAN is workin [...]. |
Discussion |
Discussion |
Noted |
|
|
| Related to LS in SP-140089. After some discussion, this was noted and a response LS to SA WG2 drafted in SP-140149. |
6 |
SP-140089 |
LS from SA WG2: LS on Maintenance of I-WLAN Solution |
SA WG2 |
SA WG2 believes that it may be possible to stop maintaining the I-WLAN solution for the following reasons: 1. The ANDSF-based solution that was recently specified in Rel-12 (as part of the WLAN_NS WID) provides [...]. |
LS In |
Action |
Response in SP-140149 |
|
| S2-140554 |
Related discussion paper in SP-140088. A response LS was approved in SP-140149 |
12.13 |
SP-140090 |
LS from SA WG2: LS on ProSe Out of Coverage discovery |
SA WG2 |
TSG SA#62 reconfirmed the guidance to SA WG2 as per SP 130506 where it is requested that work on discovery out of network coverage as well as discovery in network coverage shall be undertaken in the scope of Re [...]. |
LS In |
Information |
Noted |
|
| S2-140560 |
It had been agreed that ProSe Out of Coverage discovery will not be addressed in Rel-12. It was further agreed that SA WG2 should not remove existing text until Rel-12 freeze. This LS was noted. |
5.3 |
SP-140091 |
LS from SA WG3: Response to SP-130720: Reply LS on Small Cell Enhancement work in RAN |
SA WG3 |
SA WG3 thanks SA for the reply LS on small cell enhancements work in RAN. As requested by SA, SA WG3 would like to provide the following summary of potential security impacts that result from solutions 1A and 3 [...]. |
LS In |
Action |
Noted |
|
| S3-140210 |
This incoming LS was noted |
6 |
SP-140092 |
LS from ITU-T Study Group 12: LS/o on End-to-End QoS at ITU |
ITU-T Study Group 12 |
During the meeting of Study Group 12 we reviewed carefully Contribution C-150 'QoS issue in the last ITU-T CTO meeting' which was brought to our attention by KT Corp. Study Group 12 is very active in the area o [...]. |
LS In |
Information |
Noted |
|
| COM 12 - LS 46 |
This was reviewed and related LSs considered. This was then noted. |
13.4 |
SP-140093 |
LS from TIA TR-8.8: LS on Mission Critical Push To Talk over LTE |
TIA TR-8.8 |
The TIA TR-8.8 Broadband Data Committee is pleased to receive the subject document from TSG SA. TR-8.8 has been recently working on project TIA-PN-4973.201 for Mission Critical Push-To-Talk Requirements. This p [...]. |
LS In |
Information |
Noted |
|
| TR88-14-001 |
This incoming LS was noted |
6 |
SP-140094 |
LS from WBA: Liaison Statement to 3GPP on Forum´s alignment |
WBA |
In the past year, the WBA has been working in conjunction with 3GPP to align certain guidelines. In an attempt to remain aligned on these topics, the WBA will be adopting a Forum Alignment Process. This proces [...]. |
LS In |
Information |
Noted |
|
| WBA-LiasionStatement to 3GPP on Forums Alignment |
This incoming LS was noted |
5.2 |
SP-140095 |
Discussion on NFV Relationship to 3GPP |
NEC |
NEC Discussion on NFV Relationship to 3GPP |
Presentation |
Discussion |
Noted |
|
|
| This contribution was noted |
12.26 |
SP-140096 |
LS from SA WG2: LS to SA WG3 on WLCP security aspects |
SA WG2 |
SA WG2 has selected UDP/IP as the transport solution for the SaMOG WLCP protocol (see CR in S2-140464). SA WG2 would like to ask SA WG3 to analyse the security aspects of WLCP. |
LS In |
Information |
Noted |
|
| S2-140550 |
This incoming LS was noted |
9 |
SP-140097 |
3 CRs to 23.167 on IMS_EMER_GPRS_EPS (Rel-9, Rel-10, Rel-11) |
SA WG2 |
23.167 CR0257R1; 23.167 CR0258R1; 23.167 CR0259R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
10 |
SP-140098 |
8 CRs to 23.167, 23.272, 23.401 on TEI10 (Rel-10, Rel-11, Rel-12) |
SA WG2 |
23.167 CR0260; 23.167 CR0261; 23.272 CR0916R2; 23.272 CR0917R2; 23.272 CR0918R2; 23.401 CR2642; 23.401 CR2643; 23.401 CR2644 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11.10 |
SP-140099 |
2 CRs to 23.203 on SAPP (Rel-11, Rel-12) |
SA WG2 |
23.203 CR0867R2; 23.203 CR0868R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
11.35 |
SP-140100 |
6 CRs to 23.060, 23.292 on TEI11 (Rel-11, Rel-12) |
SA WG2 |
23.060 CR1831R1; 23.060 CR1832R1; 23.292 CR0202R2; 23.292 CR0203R2; 23.292 CR0204R1; 23.292 CR0205R1 |
CR Pack |
Approval |
Approved |
|
|
| TS 23.060 CRs: Linked CRs to TS 24.008 (CR 2504, CR 2505) were postponed at TSG CT. This CR Pack was approved |
12.2 |
SP-140101 |
2 CRs to 23.002, 23.228 on IMS_WebRTC (Rel-12) |
SA WG2 |
23.002 CR0272R2; 23.228 CR1058R6 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.14 |
SP-140102 |
1 CR to 23.246 on GCSE_LTE (Rel-12) |
SA WG2 |
23.246 CR0277R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.20 |
SP-140103 |
1 CR to 23.203 on P4C-F (Rel-12) |
SA WG2 |
23.203 CR0865R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.22 |
SP-140104 |
4 CRs to 23.060, 23.401, 23.682 on MTCe_UEPCOP (Rel-12) |
SA WG2 |
23.060 CR1835R3; 23.060 CR1840R1; 23.401 CR2638R3; 23.682 CR0079R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.23 |
SP-140105 |
4 CRs to 23.402 on WLAN_NS (Rel-12) |
SA WG2 |
23.402 CR1224R2; 23.402 CR1236R2; 23.402 CR1238R2; 23.402 CR1228R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.25 |
SP-140106 |
6 CRs to 23.060, 23.203, 23.401 on CNO_ULI (Rel-12) |
SA WG2 |
23.060 CR1833R1; 23.060 CR1834R2; 23.203 CR0864R2; 23.203 CR0875R2; 23.401 CR2635R2; 23.401 CR2637R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.26 |
SP-140107 |
6 CRs to 23.402 on eSaMOG (Rel-12) |
SA WG2 |
23.402 CR1226R2; 23.402 CR1227; 23.402 CR1231R2; 23.402 CR1237R5; 23.402 CR1239R1; 23.402 CR1241R2 |
CR Pack |
Approval |
Revised |
SP-140155 |
|
| Proposed revision of 23.401 CR1226 in SP-140058. Pack revised in SP-140155 |
12.27 |
SP-140108 |
2 CRs to 23.060, 23.401 on WORM (Rel-12) |
SA WG2 |
23.060 CR1829R3; 23.401 CR2636R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.28 |
SP-140109 |
3 CRs to 23.228, 23.402 on NetLoc_TWAN (Rel-12) |
SA WG2 |
23.228 CR1064; 23.402 CR1223R3; 23.402 CR1242R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.30 |
SP-140110 |
2 CRs to 23.203 on ABC (Rel-12) |
SA WG2 |
23.203 CR0866R1; 23.203 CR0869R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.51 |
SP-140111 |
7 CRs to 23.060, 23.228, 23.237, 23.272, 23.401, 23.402 on TEI12 (Rel-12) |
SA WG2 |
23.060 CR1837R1; 23.228 CR1062R1; 23.237 CR0469; 23.272 CR0919; 23.401 CR2634R2; 23.401 CR2641R2; 23.402 CR1230R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.52 |
SP-140112 |
1 CR to 23.002 on HTTP_SDS (Rel-12) |
SA WG2 |
23.002 CR0271R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
12.14 |
SP-140113 |
Updated WID: GCSE_LTE WID updates with TS number and title |
SA WG2 |
Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
12.17 |
SP-140114 |
Updated WID: 'User plane congestion management requirements (UPCON)' |
SA WG2 |
Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. |
WID |
Approval |
Revised |
SP-140153 |
|
|
| 15 |
SP-140115 |
New WID on improvements to CS/PS coordination in UTRAN/GERAN Shared (CSPS_Coord) |
SA WG2 |
Objective The objective is to investigate all use cases for CS/PS coordination for non-supporting UEs. This includes also shared networks not having support for supporting UEs i.e. networks not broadcasting mul [...]. |
WID |
Approval |
Revised |
SP-140168 |
|
|
| 12.13 |
SP-140116 |
TR 23.703 version 2.0.0: 'Study on architecture enhancements to support Proximity-based Services (ProSe) (Release 12)' for Approval |
SA WG2 |
Abstract of document: TR 23.703 contains the Stage-2 study and evaluation of possible 3GPP technical system solutions for architectural enhancements needed to support Proximity-based Services (ProSe) based on t [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.14 |
SP-140117 |
TR 23.768 version 2.0.0: 'Study on architecture enhancements to support Group Communication System Enablers for LTE (GCSE_LTE) (Release 12)' for Approval |
SA WG2 |
Abstract of document: TR 23.768 contains the Stage-2 study and the results of the study and evaluation of possible solutions for architectural enhancements to support Group Communication System Enablers for LTE [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control |
12.14 |
SP-140118 |
TS 23.468 version 1.0.0: 'Group Communication System Enablers for LTE (GCSE_LTE); Stage 2 (Release 12)' for Approval |
SA WG2 |
Abstract of document: TS 23.468 contain the stage 2 specification for architectural enhancements to support Group Communication System Enablers for LTE (GCSE_LTE). The Stage 1 requirements for GCSE_LTE are defi [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
12.13 |
SP-140119 |
TS 23.303 version 1.0.0: 'Architecture enhancements to support proximity services (ProSe)' for Approval |
SA WG2 |
Abstract of document: TS 23.303 contains the Stage-2 specification for architectural enhancements needed to support Proximity-based Services (ProSe) based on the relevant Stage 1 requirements as defined in TS 2 [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
5.2 |
SP-140120 |
NFV/SDN Impacts to 3gpp |
Intel |
Intel view on NFV/SDN Impacts to 3gpp |
OTHER |
Discussion |
Noted |
|
|
| This contribution was noted |
6 |
SP-140121 |
LS from ITU-R WP5D: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ARCHITECTURE AND TOPOLOGY OF IMT NETWORKS |
ITU-R WP5D |
Working Party 5D (WP 5D) wishes to inform the relevant External Organizations that it is commencing development of a working document toward a preliminary draft new Report ITU R M.[IMT.ARCH], 'Architecture and [...]. |
LS In |
Action |
Noted |
|
| 347Rev2e_LS_EOs |
The proposed actions to handle this request were endorsed and the LS was noted. |
5.2 |
SP-140122 |
Considerations on NFV standardization |
China Mobile |
NFV: A new and strong drive for telecommunication evolution |
Discussion |
Presentation |
Noted |
|
|
| This contribution was noted |
5.2 |
SP-140123 |
NFV impacts on 3GPP |
Alcatel-Lucent |
Alcatel-Lucent view on NFV impacts on 3GPP |
Discussion |
Presentation |
Noted |
|
|
| This contribution was noted |
5.2 |
SP-140124 |
NFV in 3GPP |
Huawei, Hisilicon |
Huawei, Hisilicon view on NFV in 3GPP |
Discussion |
Presentation |
Noted |
|
|
| This contribution was noted |
7.7 |
SP-140125 |
Status report of TSG CT#63 |
TSG CT Chairman |
TSG CT Status Report to TSG SA#63 |
Report |
Presentation |
Revised |
SP-140134 |
|
|
| 7.7 |
SP-140126 |
Draft meeting report of TSG CT#63 |
TSG CT Secretary |
Draft report of TSG CT meeting #63 |
Report |
Information |
Noted |
|
|
| This Report was noted |
7.7 |
SP-140127 |
IETF Status report |
TSG CT Chairman |
IETF dependencies Status report |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.5 |
SP-140128 |
Nomination for Convenor of the Multi-SDO Steering Committee |
SA WG5 Chairman |
- |
OTHER |
Discussion |
Endorsed |
|
|
| The proposals contained in the contribution was endorsed for transmission |
5.2 |
SP-140129 |
3GPP and NFV |
Cisco |
Cisco position on 3GPP and NFV |
Discussion |
Presentation |
Noted |
|
|
| This contribution was noted |
9 |
SP-140130 |
Release 9 CRs on 128 bit encryption for GSM and GPRS (A5/4-GEA4) |
SA WG3 |
33.102 CR0258R1; 33.102 CR0259R1; 33.102 CR0260R1; 33.102 CR0261R1; 43.020 CR0031R1; 43.020 CR0032R1; 43.020 CR0033R2; 43.020 CR0034R1 |
CR Pack |
Approval |
Approved |
| SP-140021 |
| This CR Pack was approved |
6 |
SP-140131 |
LS from TSG CT: LS on Transfer of ETSI business trunking specifications |
TSG CT |
TSG CT kindly informs TSG SA that TSG CT approved the attached WID to transfer the following ETSI business trunking specifications to 3GPP: - TS 181 019 (Requirements) - TS 182 023 (Architectural scenarios) - T [...]. |
LS In |
Action |
Endorsed |
|
| CP-140187 |
Endorsed. Response LS was drafted to ETSI E2NA in SP-140146. The WID was updated in SP-140148. |
6 |
SP-140132 |
LS from TSG CT: Comments from CT on LS from ITU on 'Architecture and Topology of IMT Networks' (CP-140175) |
TSG CT |
TSG CT has received an LS (CP-140175) from ITU Working Party 5D which informed 3GPP that they are developing a new Report ITU R M.[IMT.ARCH] on 'Architecture and Topology of IMT Networks'. As part of this docu [...]. |
LS In |
Action |
Noted |
|
| CP-140198 |
The RAN proposal and deadlines were endorsed. The TSG CT proposals in this LS were endorsed. |
5.4 |
SP-140133 |
LS from RAN WG2: LS on CN impacts of RAN WG2 solutions for WLAN/3GPP radio interworking |
RAN WG2 |
RAN WG2 have started the work on the WLAN/3GPP Radio Interworking WI approved by the RAN#62 plenary in RAN WG2#85 meeting in Prague. During this meeting RAN WG2 have made the following agreements which may have [...]. |
LS In |
Information |
Noted |
|
| R2-141026 / RP-140399 |
Forwarded to Joint session by TSG RAN This incoming LS was noted |
7.7 |
SP-140134 |
Status report of TSG CT#63 |
TSG CT Chairman |
TSG CT Status Report to TSG SA#63 |
Report |
Presentation |
Revised |
SP-140139 |
SP-140125 |
|
| 2 |
SP-140135 |
Draft agenda for TSG SA meeting #63 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #63 |
Agenda |
Approval |
Approved |
| SP-140001 |
| The agenda included a time plan for the meeting. The agenda was approved. |
5.2 |
SP-140136 |
LS from ETSI NFV: Reply LS on Management of Virtualised Network |
ETSI NFV |
ETSI ISG NFV thanks TSG SA WG5 for their Liaison Statement on Management of Virtualised Network. ETSI ISG NFV also looks forward to close co-operation with SA WG5 on matters of mutual importance. We would there [...]. |
LS In |
Information |
Response in SP-140160 |
|
| - |
Reply to SP-130685. The presentations on this topic were reviewed and it was decided to send a LS to ETSI NFV to provide the conclusions of the discussions. Response LS drafted in SP-140144 . Final response in SP-140160. |
7.8 |
SP-140137 |
TSG GERAN Status Report to TSG SA#63 |
TSG GERAN Vice Chairman |
TSG GERAN Status Report to TSG SA#63 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
15 |
SP-140138 |
Proposed new WID for enhancements to support webRTC interworking |
Alcatel-Lucent |
Objective: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases originally included for R [...]. |
WID |
Approval |
Revised |
SP-140166 |
|
| Proposed update to SP-140068 |
7.7 |
SP-140139 |
Status report of TSG CT#63 |
TSG CT Chairman |
TSG CT Status Report to TSG SA#63 |
Report |
Presentation |
Revised |
SP-140165 |
SP-140134 |
|
| 13.4 |
SP-140140 |
LS from OMA: LS to TSG SA on MCPTT requirements |
OMA |
Overview: The OMA COM is pleased to receive the TD SP-130727, LS on Mission Critical Push To Talk over LTE, document from TSG SA and SA WG1. OMA COM is currently working on the Push-to-Communicate for Public Sa [...]. |
LS In |
Information |
Noted |
|
| - |
Response to SP-130727. This incoming LS was noted |
5.4 |
SP-140141 |
WID on WLAN Interworking |
TSG SA (Alcatel-Lucent) |
- |
WID |
Approval |
Revised |
SP-140163 |
|
|
| 5.4 |
SP-140142 |
Exception sheet for new WID on WLAN Interworking |
TSG SA (Alcatel-Lucent) |
- |
Exception Sheet |
Approval |
Revised |
SP-140159 |
|
| Wrong document uploaded. Revised in SP-140159 |
5.4 |
SP-140143 |
Time management for new WID on WLAN interworking |
SA WG2 Chairman |
A decision is sought on how SA WG2 will complete their part of WLAN/3GPP Radio Interworking specification. |
OTHER |
Discussion |
Revised |
SP-140164 |
|
|
| 5.2 |
SP-140144 |
LS on 3GPP activities on Network Functions Virtualisation |
TSG SA |
To: ETSI ISG NFV |
LS OUT |
Approval |
Revised |
SP-140156 |
| - |
Response to SP-140136 |
7.6 |
SP-140145 |
LS from TSG RAN: Letter to ITU on Update submission for LTE-Advanced toward Rev. 2 of Rec. ITU-R M.2012 |
TSG RAN |
For 3GPP review: in: TSG SA feedback LS before: March 7, 2014 to: 3GPP PCG Note: You can add further lines like the one above, if necessary. 3GPP group> might be a WG, TSG, PCG or 3GPP ITU-R ad hoc. Formerl [...]. |
LS In |
Action |
Forward to the PCG for endorsement |
|
| RP-140479 |
It was agreed to forward this to the PCG for endorsement. |
6 |
SP-140146 |
Response LS on Transfer of ETSI business trunking specifications |
TSG SA |
To: ETSI NTECH. CC: TSG CT, TSG CT WG1, TSG SA WG1, ETSI E2NA |
LS OUT |
Approval |
Revised |
SP-140171 |
| - |
Revised in SP-140171 |
5.2 |
SP-140147 |
Slides on NFV agreements |
TSG SA Chairman |
- |
OTHER |
Endorsement |
Revised |
SP-140158 |
|
| The slides were reviewed and a number of clarifications and updates proposed. The slides were revised according to agreements in SP-140158 |
6 |
SP-140148 |
Updated TSG CT WID: Transfer of ETSI business trunking specifications |
TSG SA |
Objective: To create versions of the defined business trunking documents in the current release and address any issues of incompatibility with the current feature set of 3GPP IMS (need features added since rele [...]. |
WID |
Approval |
Revised |
SP-140170 |
|
|
| 6 |
SP-140149 |
Reply LS on Maintenance of I-WLAN Solution |
TSG SA |
To: SA WG2, TSG CT, SA WG1, SA WG3, SA WG5, CT WG1, CT WG4, CT WG6 |
LS OUT |
Approval |
Approved |
|
| - |
This outgoing LS was approved |
6 |
SP-140150 |
LS on contact persons and maintenance of 3GPP TS 29.234 |
TSG SA |
To: Wireless Broadband Alliance, GSMA, IEEE. CC: CT WG4 |
LS OUT |
Approval |
Approved |
|
| - |
This outgoing LS was approved |
12.4 |
SP-140151 |
Revised WID on 'EVS_codec - Codec for Enhanced Voice Services' (EVS_codec) |
SA WG4 |
Objective The overall objective of this work item is to develop a codec suitable for the Enhanced Voice Service in the EPS. The following objectives should be achieved with the new codec: - Enhanced quality an [...]. |
WID |
Approval |
Approved |
| SP-140007 |
| This WID was approved |
15 |
SP-140152 |
New WID on Isolated E-UTRAN Operation for Public Safety (IOPS) |
SA WG1 |
Objective: The SA WG1 objective is to specify service requirements for: - Initiation of an Isolated E-UTRAN for Public Safety use. o Management of a lost backhaul by an eNB. o Detection and creation of an Isola [...]. |
WID |
Approval |
Revised |
SP-140167 |
SP-140069 |
| AT&T, T-Mobile USA and Telefonica asked to be added to the supporting companies. Revised in SP-140167 |
12.17 |
SP-140153 |
Updated WID: 'User plane congestion management requirements (UPCON)' |
SA WG2 |
Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. |
WID |
Approval |
Approved |
| SP-140114 |
| This WID was approved |
12.20 |
SP-140154 |
Rel-12 CRs on Traffic Detection Function (TDF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (Stage 2/3)(P4C-F-CH_T) |
SA WG5 |
32.251 CR0341R2; 32.299 CR0569R2 |
CR Pack |
Approval |
Approved |
| SP-140039 |
| This CR Pack was approved |
12.26 |
SP-140155 |
6 CRs to 23.402 on eSaMOG (Rel-12) |
SA WG2 |
23.402 CR1226R3; 23.402 CR1227; 23.402 CR1231R2; 23.402 CR1237R6; 23.402 CR1239R1; 23.402 CR1241R3 |
CR Pack |
Approval |
Approved |
| SP-140107 |
| This CR Pack was approved |
5.2 |
SP-140156 |
LS on 3GPP activities on Network Functions Virtualisation |
TSG SA |
To: ETSI ISG NFV |
LS OUT |
Approval |
Revised |
SP-140160 |
SP-140144 |
- |
A number of comments and clarifications were made and this was revised accordingly in SP-140160 |
19 |
SP-140157 |
Evaluation and next steps on one-week plenaries |
Deutsche Telekom, Telefonica, Orange |
TSG #63 was the first trial to convene the TSG Plenaries in one week with the agreed set-up to facilitate cross TSG coordination and joint sessions for TSG RAN and TSG SA. Action: It is expected that the above [...]. |
OTHER |
Discussion |
Noted |
|
|
| This contribution was noted |
5.2 |
SP-140158 |
Slides on NFV agreements |
TSG SA Chairman |
- |
OTHER |
Endorsement |
Endorsed |
| SP-140147 |
| Endorsed |
5.4 |
SP-140159 |
Work Item Exception for UTRA_LTE_WLAN_interw-SA WG2 |
TSG SA |
SA#63 has agreed to task allow SA WG2 to work on the SA WG2 aspects of WLAN/3GPP Radio Interworking feature based on RAN WG2 agreed parent feature and based on currently achieved RAN WG2 agreements and identifi [...]. |
Exception Sheet |
Approval |
Revised |
SP-140172 |
SP-140142 |
| Some editorial errors and corrections were made and this was revised in SP-140172 |
5.2 |
SP-140160 |
LS on 3GPP activities on Network Functions Virtualisation |
TSG SA |
To: ETSI ISG NFV |
LS OUT |
Approval |
Approved |
| SP-140156 |
- |
This outgoing LS was approved |
7.6 |
SP-140161 |
Status report of TSG RAN#63 |
TSG RAN Chairman |
TSG RAN Status Report to TSG SA#63 |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
7.6 |
SP-140162 |
Draft meeting report of TSG RAN#63 |
TSG RAN Secretary |
Draft report of TSG RAN meeting #63 |
Report |
Information |
Noted |
|
|
| This Report was noted |
5.4 |
SP-140163 |
WID on WLAN Interworking |
TSG SA (Alcatel-Lucent) |
- |
WID |
Approval |
Revised |
SP-140169 |
SP-140141 |
| Revised to remove revision marks in SP-140169 |
5.4 |
SP-140164 |
Time management for new WID on WLAN interworking |
SA WG2 Chairman |
A decision is sought on how SA WG2 will complete their part of WLAN/3GPP Radio Interworking specification. |
OTHER |
Discussion |
Endorsed |
| SP-140143 |
| This contribution was endorsed |
7.7 |
SP-140165 |
Status report of TSG CT#63 |
TSG CT Chairman |
TSG CT Status Report to TSG SA#63 |
Report |
Presentation |
Noted |
| SP-140139 |
| This Report was noted |
15 |
SP-140166 |
Proposed new WID for enhancements to support webRTC interworking |
Alcatel-Lucent |
Objective: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases originally included for R [...]. |
WID |
Approval |
Approved |
| SP-140138 |
| This WID was approved |
15 |
SP-140167 |
New WID on Isolated E-UTRAN Operation for Public Safety (IOPS) |
TSG SA |
Objective: The SA WG1 objective is to specify service requirements for: - Initiation of an Isolated E-UTRAN for Public Safety use. o Management of a lost backhaul by an eNB. o Detection and creation of an Isola [...]. |
WID |
Approval |
Approved |
| SP-140152 |
| This WID was approved |
15 |
SP-140168 |
New WID on improvements to CS/PS coordination in UTRAN/GERAN Shared (CSPS_Coord) |
SA WG2 |
Objective The objective is to investigate all use cases for CS/PS coordination for non-supporting UEs. This includes also shared networks not having support for supporting UEs i.e. networks not broadcasting mul [...]. |
WID |
Approval |
Approved |
| SP-140115 |
| This WID was approved |
5.4 |
SP-140169 |
WID on WLAN Interworking |
TSG SA (Alcatel-Lucent) |
- |
WID |
Approval |
Approved |
| SP-140163 |
| This WID was approved |
6 |
SP-140170 |
Updated TSG CT WID: Transfer of ETSI business trunking specifications |
TSG SA |
Objective: To create versions of the defined business trunking documents in the current release and address any issues of incompatibility with the current feature set of 3GPP IMS (need features added since rele [...]. |
WID |
Approval |
Approved |
| SP-140148 |
| This WID was approved |
6 |
SP-140171 |
Response LS on Transfer of ETSI business trunking specifications |
TSG SA |
To: ETSI NTECH. CC: TSG CT, TSG CT WG1, TSG SA WG1, ETSI E2NA. Attachment: SP-140170 |
LS OUT |
Approval |
Approved |
| SP-140146 |
- |
This outgoing LS was approved |
5.4 |
SP-140172 |
Work Item Exception for UTRA_LTE_WLAN_interw-SA WG2 |
TSG SA |
SA#63 has agreed to task allow SA WG2 to work on the SA WG2 aspects of WLAN/3GPP Radio Interworking feature based on RAN WG2 agreed parent feature and based on currently achieved RAN WG2 agreements and identifi [...]. |
Exception Sheet |
Approval |
Approved |
| SP-140159 |
| This Exception Sheet was approved |
17.1 |
SP-140173 |
3GPP Work Plan review at Plenary #63 |
MCC Work Plan Manager |
Presentation of the 3GPP Work Plan review at Plenary #63 |
WORK PLAN |
Presentation |
Noted |
| SP-140046 |
| This contribution was noted |
|
Created: 2014-03-12 12:37     END OF LIST
Last Allocated Document: SP-140173