Last Allocated Document: SP-130728
Temporary Documents List - Ordered by Agenda Item
Colour Key: |
Agenda Item, Agenda Title |
No Conclusion |
Conclusion Reached |
Document Revised |
Document Withdrawn |
Document Not Handled |
|
To use hyperlinks, this file must be placed above Folder 'Docs'
Created: 2013-12-13 15:42     START OF LIST
Agenda |
TD |
LongTitle |
Source |
Summary |
Doc_Type |
Doc_For |
Decision |
Rev_By |
Rev_Of |
LS_Source_file |
Comment |
Rx |
1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2 |
SP-130507 |
Draft agenda for TSG SA meeting #62 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #62 |
Agenda |
Approval |
Approved |
|
|
| The draft agenda was reviewed and approved |
Y |
3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4.1 |
SP-130508 |
Draft Report of TSG SA meeting #61 |
TSG SA Secretary |
Draft Report of TSG SA meeting #61 containing revision marks of changes on the distributed draft. |
Report |
Approval |
Approved |
|
|
| This Report was approved |
Y |
4.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.1 |
SP-130591 |
SA WG1 Report to TSG SA#62 |
SA WG1 Chairman |
SA WG1 Chairman's Status Report to TSG SA#62 |
Report |
Presentation |
Noted |
|
|
| The SA WG1 Chairman was thanked for this report, which was noted. |
Y |
7.1 |
SP-130557 |
Proposal for handling WIDs spanning multiple releases |
SA WG1 Chairman |
Proposed update to the process for handling WIDs across releases when the work spans a number of releases. |
OTHER |
Discussion |
Noted |
|
|
| Resolution of such carry-over requirements should be raised to TSG SA where it cannot be resolved in SA WG1 on a case-by-case basis. This was then noted. |
Y |
7.1 |
SP-130558 |
SA WG1 output improvement proposals |
SA WG1 Chairman |
Proposals to improve SA WG1 output for discussion. |
OTHER |
Discussion |
Noted |
|
|
| SA WG1 were encouraged to further discuss the methods to trial in SA WG1 and to enhance the service description aspects of the SA WG1 work. Any issues can be raised at TSG SA. This was then noted. |
Y |
7.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.2 |
SP-130517 |
SA WG2 Status Report |
SA WG2 Chairman |
SA WG2 Chairman's Status Report to TSG SA#62 |
Report |
Information |
Noted |
|
|
| The SA WG2 Chairman was thanked for this report, which was noted. |
Y |
7.2 |
SP-130556 |
SA WG2 Exception Report to TSG SA#62 |
SA WG2 Chairman |
SA WG2 has submitted exception sheets to TSG SA#62. No further Rel-12 P-CRs (for study items or TR phase of work items) or Rel-12 CRs of category B or C will be scheduled on the SA WG2 agenda without a correspo [...]. |
Report |
Approval |
Endorsed |
|
|
| It was agreed that Stage 2 is considered frozen at this meeting, with the SA WG2 exceptions granted at this meeting.
SA WG2 should concentrate on completing work for the agreed exceptions in their forthcoming meetings |
Y |
7.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.3 |
SP-130646 |
SA WG3 Status Report |
SA WG3 Chairman |
SA WG3 Chairman's Status Report to TSG SA#62 |
REPORT |
Information |
Noted |
|
|
| The SA WG3 Chairman was thanked for this report, which was noted. |
Y |
7.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.4 |
SP-130559 |
SA WG4 Status Report at TSG SA#62 |
SA WG4 Chairman |
SA WG4 Chairman's Status Report to TSG SA#62 |
Report |
Presentation |
Noted |
|
|
| The SA WG4 Chairman was thanked for this report, which was noted. |
Y |
7.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.5 |
SP-130606 |
SA WG5 Status Report |
SA WG5 Chairman |
SA WG5 Chairman's Status Report to TSG SA#62 |
Report |
Presentation |
Revised |
SP-130687 |
|
|
| Y |
7.5 |
SP-130687 |
SA WG5 Status Report |
SA WG5 Chairman |
SA WG5 Chairman's Status Report to TSG SA#62 |
Report |
Presentation |
Noted |
| SP-130606 |
| The SA WG5 Chairman was thanked for this report, which was noted. |
Y |
7.5 |
SP-130515 |
LS from SA WG5: LS on Standardization of a Diameter interface for Circuit Switched (CS) Domain Charging |
SA WG5 |
SA WG5 would like to thank The Steering Committee of the Cooperation Platform for the Separate Sale of Roaming Services in the European Union (SteerCo) for their continued dialog on Standardization of a Diamete [...]. |
LS In |
Information |
Noted |
|
| S5-131753 |
This incoming LS was noted |
Y |
7.5 |
SP-130685 |
LS from SA WG5: LS to ETSI ISG NFV on Management of Virtualized Network |
SA WG5 |
SA WG5 has been specifying the requirements, architecture and solutions for provisioning and management of the GSM/UMTS/LTE network (RAN, CN, IMS) and its services since the creation of 3GPP. SA WG5 defines cha [...]. |
LS In |
Information |
Noted |
|
| S5-132242 |
Delegates were asked to come prepared for discussion on this topic at TSG SA#63. This was then noted. |
Y |
7.6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.6 |
SP-130700 |
SA related issues from TSG RAN |
TSG RAN Chairman |
Issues for RAN-SA coordination: RAN enhancements for MTC WI. 3GPP/WiFi radio interworking. Small cell enhancements - dual connectivity. RAN Sharing Enhancements. RAN Aspects of UPCON. LS on to SA WG3/SA WG2 Pr [...]. |
Presentation |
| Noted |
|
|
| This presentation was noted |
Y |
7.6 |
SP-130694 |
LS from TSG RAN: LS on new WLAN/3GPP interworking work item |
TSG RAN |
RAN has approved a new Work Item for WLAN/3GPP interworking, the objective of the work item necessitates interaction with the SA WG2 and CT WG1 groups to incorporate selected RAN assistance parameters into ANDS [...]. |
LS In |
Action |
Response in SP-130719 |
|
| RP-132114 |
A LS to RAN WG2 was drafted in TD SP 130701. Response in SP-130719 |
Y |
7.6 |
SP-130701 |
[DRAFT] LS on new WLAN/3GPP interworking work item |
TSG SA |
To: TSG RAN, RAN WG2, SA WG2, TSG CT, CT WG1 |
LS OUT |
Approval |
Revised |
SP-130711 |
|
| The LS was further discussed off-line in order to be clear on the way forward and the LS was revised in SP-130711 |
Y |
7.6 |
SP-130711 |
[DRAFT] LS on new WLAN/3GPP interworking work item |
TSG SA |
To: TSG RAN, RAN WG2, SA WG2, TSG CT, CT WG1 |
LS OUT |
Approval |
Revised |
SP-130719 |
SP-130701 |
| This was revised to remove 'draft' in SP-130719 |
Y |
7.6 |
SP-130719 |
LS on new WLAN/3GPP interworking work item |
TSG SA |
To: TSG RAN, RAN WG2, SA WG2, TSG CT, CT WG1 |
LS OUT |
Approval |
Approved |
| SP-130711 |
| This outgoing LS was approved |
Y |
7.6 |
SP-130688 |
New WID: System Level Aspects of WLAN/3GPP Radio Interworking |
BlackBerry |
- |
WID |
Approval |
Noted |
|
|
| This was covered by previous discussions and was noted. |
Y |
7.6 |
SP-130689 |
Discussion document for New WID proposal: System Level Aspects for WLAN/3GPP Radio Interworking |
BlackBerry |
This document reviews status and impact on SA WG2 in regard to the New RAN Work Item on WLAN/3GPP Radio Interworking. |
Discussion |
Discussion |
Noted |
|
|
| This was reviewed and noted. |
Y |
7.6 |
SP-130690 |
3GPP-WLAN radio interworking: SA/CT |
BlackBerry |
- |
OTHER |
Presentation |
Noted |
|
|
| This was provided for background information and delegates were asked to read this off-line. This was then noted. |
Y |
7.6 |
SP-130695 |
LS from TSG RAN: LS on Small Cell Enhancement work in RAN |
TSG RAN |
TSG RAN would like to inform TSG SA that a new Work Item on Dual Connectivity for LTE was approved to follow the conclusion of Small Cell Enhancement Study Item from Higher Layer aspects. The detailed study can [...]. |
LS In |
Action |
Response in SP-130720 |
|
| RP-132115 |
An LS was drafted on this in SP-130703. Final response in SP-130720 |
Y |
7.6 |
SP-130703 |
[DRAFT] Reply LS on LS on Small Cell Enhancement work in RAN |
TSG SA |
To: SA WG2, SA WG3, TSG RAN |
LS OUT |
Approval |
Revised |
SP-130712 |
|
| This was further discussed off-line and revised in SP-130712 |
Y |
7.6 |
SP-130712 |
[DRAFT] Reply LS on LS on Small Cell Enhancement work in RAN |
TSG SA |
To: SA WG2, SA WG3, TSG RAN, RAN WG2, RAN WG3 |
LS OUT |
Approval |
Revised |
SP-130720 |
SP-130703 |
| Revised in SP-130720 |
Y |
7.6 |
SP-130720 |
Reply LS on LS on Small Cell Enhancement work in RAN |
TSG SA |
To: SA WG2, SA WG3, TSG RAN, RAN WG2, RAN WG3 |
LS OUT |
Approval |
Approved |
| SP-130712 |
| This outgoing LS was approved |
Y |
7.6 |
SP-130511 |
LS from TSG RAN ITU-R Ad-hoc: 3GPP internal LS on update submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 |
TSG RAN ITU-R Ad-hoc |
ITU-R Working Party 5D (WP 5D) is developing Revision 12 of the Recommendation M.1457 ('Detailed specifications of the terrestrial radio interfaces of IMT-2000 (IMT-2000)') as per RP-130354. According to the p [...]. |
LS In |
Action |
Noted |
|
| RT-130054 |
This incoming LS was noted |
Y |
7.6 |
SP-130604 |
Letter to ITU on final submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 |
TSG RAN ITU-R Ad-hoc |
ITU-R Working Party 5D (WP 5D) is developing Revision 12 of the Recommendation M.1457 ('Detailed specifications of the terrestrial radio interfaces of IMT-2000 (IMT-2000)') )') in line with the schedule communi [...]. |
LS In |
Action |
Noted |
|
|
| Comments also requested from TSG RAN and TSG CT This incoming LS was noted |
Y |
7.6 |
SP-130680 |
LS from TSG CT: Response to Letter to ITU on final submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 |
TSG CT |
TSG CT has reviewed the lists of 3GPP Specifications in the attachments Extract M.1457-11 sec 5.1.2, 'Detailed specification of the radio interface' and Extract M.1457-11 sec 5.3.2, 'Detailed specification of t [...]. |
LS In |
Action |
Noted |
|
| CP-130807 |
This incoming LS was noted |
Y |
7.6 |
SP-130555 |
LS on TSG SA feedback on sec 5.1.2 and sec 5.3.2 of Rec. ITU-R M.1457-11 |
TSG SA |
To: TSG RAN ITU-R Ad Hoc CC: TSG CT. Attachment: Extract of Rec. ITU-R M.1457-11 sec 5.1.2 and sec 5.3.2 with TSG SA feedback |
LS OUT |
Approval |
Approved |
|
|
| This outgoing LS was distributed over e-mail before the meeting and was approved. |
Y |
7.6 |
SP-130692 |
LS from TSG RAN: Letter to ITU on final submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 |
TSG RAN |
This is for review by TSG SA and then forwarding the results to PCG |
LS In |
Action |
Revised |
SP-130704 |
| RP-132048 |
This was revised to make it an outgoing LS for electronic approval by PCG in SP-130704 |
Y |
7.6 |
SP-130704 |
LS to PCG: Letter to ITU on final submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 |
TSG SA |
This is for review by TSG SA and then forwarding the results to PCG |
LS OUT |
Action |
Approved |
| SP-130692 |
- |
For electronic approval by PCG |
Y |
7.6 |
SP-130509 |
LS from ITU-R: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.2012 TO REVISION 2 |
ITU-R WPD |
Working Party 5D thanks the relevant External Organizations for their successful work in regards to the course of action to be taken towards the completion and approval of Revision 1 of Recommendation ITU-R M.2 [...]. |
LS In |
Information |
Noted |
|
| 5D/TEMP/279 |
This incoming LS was noted |
Y |
7.6 |
SP-130679 |
LS from TSG CT: Response to Letter to ITU on Proposed Initial submission of updated material on LTE-Advanced toward Rev. 2 of Rec. ITU-R M.2012 |
TSG CT |
TSG CT has no additional comments to the reply provided by RAN ITU-R ad-hoc group. Action: TSG CT kindly asks TSG SA to take note of this in their consolidated reply to ITU-R. |
LS In |
Action |
Noted |
|
| CP-130806 |
This incoming LS was noted |
Y |
7.6 |
SP-130603 |
Letter to ITU on Proposed Initial submission of updated material on LTE-Advanced toward Rev. 2 of Rec. ITU-R M.2012 |
TSG RAN ITU-R Ad-hoc |
ITU-R Working Party 5D (WP 5D) informed 3GPP on their schedule towards Revision 2 of Recommendation M.2012. In particular, 3GPP is required to indicate its willingness to contribute to the revision by ITU-R WP5 [...]. |
LS In |
Action |
Noted |
|
| RT-130061 |
Comments also requested from TSG RAN and TSG CT This incoming LS was noted |
Y |
7.6 |
SP-130693 |
LS from TSG RAN: Letter to ITU on Proposed Initial submission of updated material on LTE-Advanced toward Rev. 2 of Rec. ITU-R M.2012 |
TSG RAN |
This is for review by TSG SA and then forwarding the results to PCG |
LS In |
Action |
Revised |
SP-130705 |
| RP-132049 |
This was revised to make it an outgoing LS for electronic approval by PCG in SP-130705 |
Y |
7.6 |
SP-130705 |
LS to PCG: Letter to ITU on Proposed Initial submission of updated material on LTE-Advanced toward Rev. 2 of Rec. ITU-R M.2012 |
TSG SA |
This is for review by TSG SA and then forwarding the results to PCG |
LS OUT |
Action |
Approved |
| SP-130693 |
- |
For electronic approval by PCG |
Y |
7.6 |
SP-130682 |
LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS - INVITATION TO REVIEW THE PROPOSED REVISIONS OF RECOMMENDATIONS ITU-R M.2015 AND ITU-R M.2009 |
ITU-R WP5A |
From its May 2012 meeting, Working Party 5A requested input from external organizations that are experts in the area of public protection and disaster relief (PPDR) on the proposed revision of the following doc [...]. |
LS In |
Information |
Noted |
|
| 5A/TEMP/179(Rev.1) |
Related to RAN ITU-R Ad-hoc inputs This incoming LS was noted |
Y |
7.6 |
SP-130697 |
TSG RAN Status Report to TSG SA#62 |
TSG RAN Chairman |
TSG RAN chairman's report for presentation |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
Y |
7.6 |
SP-130698 |
Draft report of TSG RAN meeting #62 |
TSG RAN Secretary (MCC) |
Draft report of TSG RAN meeting #62 |
Report |
Information |
Noted |
|
|
| This Report was noted |
Y |
7.6 |
SP-130699 |
TSG SA impacts due to WLAN/3GPP Radio Interworking |
Intel |
WITHDRAWN |
Discussion |
Discussion |
Withdrawn |
|
|
| WITHDRAWN |
N |
7.7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.7 |
SP-130580 |
Status report of TSG CT#62 |
TSG CT Chairman |
TSG CT Status Report to TSG SA#62. |
Report |
Presentation |
Noted |
|
|
| The TSG CT Chairman was thanked for this report, which was noted. |
Y |
7.7 |
SP-130581 |
Draft meeting report of TSG CT#62 |
TSG CT Secretary |
Draft report of TSG CT meeting #62 |
Report |
Information |
Noted |
|
|
| This was provided for information and was noted. |
Y |
7.7 |
SP-130582 |
IETF Status report |
TSG CT Chairman |
IETF dependencies Status report |
Report |
Presentation |
Noted |
|
|
| The TSG CT Chairman was thanked for this report, which was noted. |
Y |
7.8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.8 |
SP-130586 |
TSG GERAN Status Report to TSG SA#62 |
TSG GERAN Chairman |
TSG GERAN Status Report to TSG SA#62 |
Report |
Presentation |
Noted |
|
|
| The TSG GERAN Chairman was thanked for this report, which was noted. |
Y |
8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.5 |
SP-130560 |
CRs to TS 26.114 on 'Correction of DTMF handling (TEI8)' (Release 8 to Release 10) |
SA WG4 |
26.114 CR0269; 26.114 CR0270R1; 26.114 CR0271R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
8.5 |
SP-130561 |
CRs to TS 26.114 on 'Correction to audio channels requirements (MTSI_eMHI)' (Release 8 to Release 12) |
SA WG4 |
26.114 CR0266; 26.114 CR0267; 26.114 CR0268; 26.114 CR0263R1; 26.114 CR0264R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
8.5 |
SP-130616 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
32.251 CR0296; 32.251 CR0297R1; 32.251 CR0298; 32.251 CR0299; 32.251 CR0300; 32.251 CR0301; 32.251 CR0302; 32.251 CR0303; 32.251 CR0304; 32.251 CR0305R1; 32.251 CR0306R2; 32.251 CR0307R2; 32.251 CR0308R2; 32.25 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
8.5 |
SP-130671 |
Rel-8 CRs on IMS Multimedia Telephony Service (IMS-MMTel) |
SA WG5 |
32.298 CR0418R1; 32.298 CR0419; 32.298 CR0420; 32.298 CR0421; 32.298 CR0422; 32.299 CR0555R1; 32.299 CR0556; 32.299 CR0557; 32.299 CR0558; 32.299 CR0559 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
8.5 |
SP-130672 |
Rel-8 CRs on Multimedia Telephony Service and Supplementary Services (MMTel) offline Charging (MMTel-CH) |
SA WG5 |
32.275 CR0048R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
8.5 |
SP-130676 |
Rel-8 CRs on Charging Management (CH8) Batch2 |
SA WG5 |
32.260 CR0235; 32.260 CR0236; 32.260 CR0237; 32.260 CR0238; 32.260 CR0239; 32.272 CR0030; 32.272 CR0031; 32.272 CR0032; 32.272 CR0033; 32.273 CR0022; 32.273 CR0023; 32.273 CR0024; 32.273 CR0025; 32.298 CR0406R1 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
8.5 |
SP-130677 |
Rel-8 CRs on Charging Management (CH8) Batch3 |
SA WG5 |
32.298 CR0413R1; 32.298 CR0414R1; 32.298 CR0415R1; 32.298 CR0416R1; 32.298 CR0417R1; 32.299 CR0546R2; 32.299 CR0547R2; 32.299 CR0548R2; 32.299 CR0549R3; 32.299 CR0550R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
8.5 |
SP-130668 |
Rel-8 CRs on IMS Multimedia Telephony and Supplementary Services (IMSTSS) |
SA WG5 |
WITHDRAWN |
CR Pack |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
N |
9 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
9 |
SP-130518 |
3 CRs to 23.167: IMS_EMER_GPRS_EPS (Rel-9, Rel-10, Rel-11) |
SA WG2 |
23.167 CR0249R2; 23.167 CR0250R1; 23.167 CR0251R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
9 |
SP-130562 |
CRs to TS 26.346 on 'PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9 to Release 11) |
SA WG4 |
26.346 CR0337R3; 26.346 CR0338R3; 26.346 CR0339R3; 26.346 CR0340R2; 26.346 CR0341R2; 26.346 CR0342R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
9 |
SP-130563 |
CRs to TS 26.131 and TS 26.132 on 'STMR - adaptation to modern form factors (TEI9)' (Release 9 to Release 12) |
SA WG4 |
26.131 CR0058R2; 26.131 CR0059R2; 26.131 CR3060R2; 26.131 CR0061R2; 26.132 CR0064R2; 26.132 CR0065R2; 26.132 CR0066R2; 26.132 CR0067R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
9 |
SP-130612 |
Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) |
SA WG5 |
32.525 CR0002R1; 32.762 CR0098R1; 32.762 CR0099R1; 32.762 CR0100R1; 32.763 CR0029R1; 32.765 CR0019R1; 32.765 CR0020; 32.766 CR0056R1; 32.766 CR0057R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
9 |
SP-130624 |
Rel-9 CRs on Multimedia Telephony (MMTel) Service and Supplementary Services - Online Charging and completion for Offline Charging(eMMTel-SS-CH) |
SA WG5 |
WITHDRAWN |
CR Pack |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
N |
10 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
10 |
SP-130519 |
3 CRs to 23.228: TEI10, IMSProtoc4 (Rel-10, Rel-11, Rel-12) |
SA WG2 |
23.228 CR1053; 23.228 CR1054; 23.228 CR1055 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
10 |
SP-130520 |
2 CRs to 23.272: eMPS (Rel-10, Rel-11) |
SA WG2 |
23.272 CR0904R2; 23.272 CR0905R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
10 |
SP-130564 |
CRs to TS 26.247 on '3GP-DASH MPD Schema Fix (TEI10)' (Release 10 to Release 12) |
SA WG4 |
26.247 CR0045R1; 26.247 CR0046R1; 26.247 CR0047R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
10 |
SP-130565 |
CRs to TS 26.233 and TS 26.247 on ' HTTP-based Streaming and Download Services (HTTP_SDS)' (Release 10 to Release 12) |
SA WG4 |
26.233 CR0009R1; 26.233 CR0010R1; 26.247 CR0039R1; 26.247 CR0040R1; 26.247 CR0041R1; 26.247 CR0048; 26.247 CR0049; 26.247 CR0050 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
10 |
SP-130613 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
32.526 CR0036R1; 32.526 CR0037R1; 32.616 CR0002; 32.616 CR0003; 32.766 CR0058; 32.766 CR0059 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
10 |
SP-130617 |
Rel-10 CRs on Charging Management (CH10) |
SA WG5 |
32.280 CR0026; 32.280 CR0027 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.9 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.10 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.11 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.14 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.15 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.16 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.18 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.19 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.20 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.20 |
SP-130627 |
Rel-11 CRs on Charging for Roaming Architecture for Voice over IMS with Local Breakout (RAVEL-CH) |
SA WG5 |
32.260 CR0240R1; 32.260 CR0241R1; 32.298 CR0424R1; 32.298 CR0425R1; 32.299 CR0564R2; 32.299 CR0565R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.21 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.22 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.23 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.24 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.25 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.25 |
SP-130684 |
Release 11 CRs on Generic Bootstrapping Architecture (GBA) extensions for re-use of SIP Digest credentials (GBA-ext) |
SA WG3 |
33.222 CR0050R1; 33.222 CR0051R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.25 |
SP-130664 |
Rel-11 CRs on Generic Bootstrapping Architecture (GBA) extensions for re-use of SIP Digest credentials (GBA-ext) |
SA WG3 |
WITHDRAWN |
CR Pack |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
N |
11.26 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.27 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.28 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.28 |
SP-130566 |
CRs to TS 26.247, TS 26.346 and TR 26.946 on 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)' (Release 11 and Release 12) |
SA WG4 |
26.247 CR0042; 26.247 CR0043; 26.346 CR0344R1; 26.346 CR0351; 26.946 CR0003 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.29 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.29 |
SP-130567 |
CRs to TS 26.234 on 'SDP attribute frame packing type (M3DV)' (Release 11 and Release 12) |
SA WG4 |
26.234 CR0215R2; 26.234 CR0216R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.30 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.31 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.32 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.32 |
SP-130618 |
Rel-11 CRs on Charging Management (CH11) |
SA WG5 |
32.251 CR0319R1; 32.251 CR0321; 32.299 CR0553R1; 32.299 CR0554; 32.299 CR0566; 32.299 CR0567 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.32 |
SP-130678 |
Rel-11 CRs on Unification of Charging session from SIP AS and SRVCC functions in IMS (UCHIMS_AS-SRVCC) |
SA WG5 |
32.260 CR0233R1; 32.260 CR0234R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.33 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.33 |
SP-130614 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
28.658 CR0006R1; 28.659 CR0005R1; 32.157 CR0003R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.34 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.35 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.35 |
SP-130592 |
Stage 1 CRs on TEI11 (correction on external references) |
SA WG1 |
22.067 CR0009R1; 22.105 CR0056R1; 22.240 CR0009R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.35 |
SP-130521 |
1 CR to 23.216: TEI11, SAES-SRVCC (Rel-11) |
SA WG2 |
23.216 CR0320R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.35 |
SP-130522 |
2 CRs to 23.272: TEI11, SIMTC-Reach (Rel-11, Rel-12) |
SA WG2 |
23.272 CR0898R2; 23.272 CR0899R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.35 |
SP-130523 |
7 CRs to 23.228, 23.251, 23.401, 23.402: TEI11 (Rel-11, Rel-12) |
SA WG2 |
23.251 CR0095R2; 23.228 CR1051R1; 23.228 CR1052R1; 23.401 CR2615; 23.401 CR2616; 23.402 CR1168R1; 23.402 CR1169R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.35 |
SP-130524 |
14 CRs to 23.060, 23.203, 23.401: TEI11, SAES (Rel-11, Rel-12) |
SA WG2 |
23.401 CR2589R1; 23.401 CR2590R1; 23.060 CR1800R8; 23.060 CR1801R5; 23.401 CR2553R6; 23.401 CR2554R4; 23.401 CR2620R3; 23.401 CR2621R3; 23.401 CR2596R2; 23.401 CR2597R2; 23.203 CR0824R6; 23.203 CR0825R4; 23.203 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.35 |
SP-130525 |
8 CRs to 23.272: TEI11, SAES-CSFB (Rel-11, Rel-12) |
SA WG2 |
23.272 CR0886R2; 23.272 CR0901; 23.272 CR0902R1; 23.272 CR0903R1; 23.272 CR0895R2; 23.272 CR0896R2; 23.272 CR0867R5; 23.272 CR0897R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.35 |
SP-130662 |
Rel-11 CRs on TEI (TEI11) |
SA WG3 |
33.221 CR0012R1; 33.980 CR0023R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.35 |
SP-130568 |
CRs on 'Technical Enhancements and Improvements for Release 11 (TEI11)' (Release 11 and Release 12) |
SA WG4 |
26.074 CR0005; 26.114 CR0261R1; 26.114 CR0262R1; 26.132 CR0062; 26.132 CR0063; 26.177 CR0001; 26.237 CR0082R1; 26.237 CR0083R1; 26.243 CR0006; 26.346 CR0349; 26.851 CR0002; 26.944 CR0001; 46.010 CR0002 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
11.36 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.2 |
SP-130543 |
Presentation of TR 23.701 for approval (IMS_WebRTC) |
SA WG2 |
Abstract of document: TR 23.701 contains a study on the potential modifications of the IMS architecture and stage 2 procedures as required by the support of Web Real Time Communication (WebRTC) clients access t [...]. |
TR |
Approval |
Revised |
SP-130706 |
|
| Blackberry commented that section 5 is marked Void and could be removed and hanging paragraphs should be removed. The Rapporteur agreed to clean this up and provided it to the meeting again. This was revised in SP-130706 |
Y |
12.2 |
SP-130706 |
Presentation of TR 23.701 for approval (IMS_WebRTC) |
SA WG2 |
Updated version 1.0.1 |
TR |
Approval |
Approved |
| SP-130543 |
| This TR was approved and placed under Change control (Rel-12) |
Y |
12.2 |
SP-130551 |
Exception sheet for IMS_WebRTC |
SA WG2 |
Abstract of document: The Study phase for IMS_WebRTC has concluded on an architecture to ensure WebRTC Access to IMS. This architecture has been documented in an Annex of the TR 23.701 (presented at SA#62) that [...]. |
Exception Sheet |
Approval |
Approved |
|
|
| This Exception Sheet was approved |
Y |
12.2 |
SP-130648 |
Revised WID for Web Real Time Communication (WebRTC) Access to IMS |
SA WG3 |
Objective: SA WG1 objectives: The objective of this work item is to specify service requirements for: - the ability for WebRTC clients to access IMS, including for example, reusing IMS client security credentia [...]. |
WID |
Approval |
Revised |
SP-130707 |
|
| The completion dates did not match the exception request and was revised in SP-130707 |
Y |
12.2 |
SP-130707 |
Revised WID for Web Real Time Communication (WebRTC) Access to IMS |
SA WG3 |
Objective: SA WG1 objectives: The objective of this work item is to specify service requirements for: - the ability for WebRTC clients to access IMS, including for example, reusing IMS client security credentia [...]. |
WID |
Approval |
Approved |
| SP-130648 |
| This WID was approved |
Y |
12.2 |
SP-130655 |
Work Item Exception fo WebRTC |
SA WG3 |
Abstract of document: The purpose of this system-wide WI is to enable WebRTC access to IMS. Contentious Issues: None. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
Y |
12.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.4 |
SP-130571 |
CRs to TS 26.237 on 'IMS-based Streaming and Download Delivery Enhancements (IMS_SDE)' (Release 12) |
SA WG4 |
26.237 CR0081; 26.237 CR0084 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.4 |
SP-130572 |
TR 26.827 IMS-based Streaming and Download Delivery Enhancements (IMS_SDE) (Release 12), v. 1.0.0 |
SA WG4 |
Abstract of document: At SA#58, the Release 12 Work Item on IMS-based Streaming and Download Delivery Enhancements (IMS_SDE) was agreed. The objectives of this work item include - Identify use cases and requir [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG4 |
Y |
12.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.7 |
SP-130547 |
Presentation of TR 23.862 for approval (MOSAP) |
SA WG2 |
Abstract of document: TR 23.862 describes solutions for interworking between mobile operators and data application providers as per the stage-1 requirements specified in TS 22.278. The TR focused on interworkin [...]. |
TR |
Approval |
Revised |
SP-130714 |
|
| Blackberry commented that there was an editor's notes which refers to work to be done in Rel-12, whereas this is a Rel-12 TR, hanging paragraphs and empty clauses which should be removed. This was revised in SP-130714 |
Y |
12.7 |
SP-130714 |
Presentation of TR 23.862 for approval (MOSAP) |
SA WG2 |
Abstract of document: TR 23.862 describes solutions for interworking between mobile operators and data application providers as per the stage-1 requirements specified in TS 22.278. The TR focused on interworkin [...]. |
TR |
Approval |
Approved |
| SP-130547 |
| This TR was approved and placed under Change control (Rel-12) |
Y |
12.8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.9 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.10 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.11 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.14 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.14 |
SP-130696 |
LS from TSG RAN: Reply LS on ProSe Lawful Interception |
TSG RAN |
RAN WG1 discussed the following requirement that is reported in TS 22.278 [1],: '…When operating ProSe (in both public safety and general cases), the EPS shall be able to support regional or national regulatory [...]. |
LS In |
Action |
Noted |
|
| RP-132107 |
This incoming LS was noted |
Y |
12.14 |
SP-130544 |
Presentation of TR 23.703 for information (ProSe) |
SA WG2 |
Abstract of document: TR 23.703 contains the Stage-2 study and evaluation of possible 3GPP technical system solutions for architectural enhancements needed to support Proximity-based Services (ProSe) based on t [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG2 |
Y |
12.14 |
SP-130640 |
ProSe discovery prioritization at TSG SA#62 |
Deutsche Telekom |
In this contribution it is proposed to use operator's deployment requirements as driving criterion for a further prioritization of the ProSe discovery service in Release 12. In particular it is recommended to c [...]. |
OTHER |
Discussion |
Revised |
SP-130686 |
|
|
| Y |
12.14 |
SP-130686 |
ProSe discovery prioritization at TSG SA#62 |
Deutsche Telekom |
In this contribution it is proposed to use operator's deployment requirements as driving criterion for a further prioritization of the ProSe discovery service in Release 12. In particular it is recommended to c [...]. |
OTHER |
Discussion |
Noted |
| SP-130640 |
| No conclusion could be reached at this time and this was noted. |
Y |
12.14 |
SP-130683 |
ProSe Discovery in Rel-12 |
Alcatel Lucent |
At SA WG2#100 some preliminary agreements on ProSe discovery were reached. These however address only the 'Discovery as an information service' use case and not discovery as a tool for subsequent direct communi [...]. |
Discussion |
Action |
Noted |
|
|
| No conclusion could be reached at this time and this was noted. |
Y |
12.14 |
SP-130549 |
Exception sheet for ProSe WID |
SA WG2 |
Abstract of document: ProSe, based on the interim conclusions of TR 23.703, introduces: - direct discovery over E-UTRA - 1-many communication over E-UTRAN decentralised mode - EPC-level discovery - ProSe UE- N [...]. |
Exception Sheet |
Approval |
Approved |
|
|
| This Exception Sheet was approved |
Y |
12.14 |
SP-130654 |
Work Item Exception for ProSe |
SA WG3 |
Abstract of document: Based on the interim conclusions of TR 23.703, SA WG3 will need to develop security solutions for: - ProSe direct discovery - direct 1:many communication over E-UTRAN - EPC-level discovery [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
Y |
12.14 |
SP-130673 |
Revised WID ProSe |
SA WG3 |
Objective: The SA WG1 objective is to specify service requirements for: - ProSe Discovery over E-UTRA; o within network coverage and o outside network coverage, only for Public Safety Discovery within network [...]. |
WID |
Approval |
Noted |
|
|
| Proposed update in SP-130605 This WID was noted (incorporated into SP-130715) |
Y |
12.14 |
SP-130605 |
Update of ProSe WID to get SA WG2 TS and SA WG3 TR numbers |
Qualcomm Incorporated (Rapporteur) |
This contribution proposes an update of the ProSe WID on top of the SA WG3 approved (S3-131185) in order to include the new SA WG2 TS. |
WID |
Approval |
Revised |
SP-130715 |
|
| The numbers were allocated for the SA WG2 TS as TS 23.303 and for the SA WG3 TR as TR 33.833. The WID was revised to include these numbers and correct the completion dates in SP-130715 |
Y |
12.14 |
SP-130715 |
Update of ProSe WID to get SA WG2 TS and SA WG3 TR numbers |
Qualcomm Incorporated (Rapporteur) |
This contribution proposes an update of the ProSe WID on top of the SA WG3 approved (S3-131185) in order to include the new SA WG2 TS. |
WID |
Approval |
Approved |
| SP-130605 |
| This WID was approved |
Y |
12.15 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.15 |
SP-130545 |
Presentation of TR 23.768 for information (GCSE_LTE) |
SA WG2 |
Abstract of document: TR 23.768 studies the provision of Group Communication System Enablers for LTE (GCSE_LTE) based on GCSE_LTE service requirements defined by SA WG1 in TS 22.468. The study has converged to [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG2 |
Y |
12.15 |
SP-130553 |
Exception sheet for GCSE_LTE |
SA WG2 |
Abstract of document: TR 23.768 studies the provision of Group Communication System Enablers for LTE (GCSE_LTE) based on GCSE_LTE service requirements defined by SA WG1 in TS 22.468. The study has converged to [...]. |
Exception Sheet |
Approval |
Approved |
|
|
| This Exception Sheet was approved |
Y |
12.15 |
SP-130652 |
Work Item Exception for GCSE_LTE |
SA WG3 |
Abstract of document: Based on the work done in SA WG1 TS 22.468 and SA WG2 TR 23.768, the SA WG3 objectives are to identify threats and deduce security requirements for Group Communication in LTE, and to devel [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
Y |
12.16 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.18 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.18 |
SP-130643 |
Updated WID: 'User plane congestion management requirements (UPCON)' |
Verizon, Allot Communications |
Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. |
WID |
Approval |
Noted |
|
|
| It was decided to ask SA WG2 to try to re-scope this work and provide an agreed WID to TSG SA#63. This WID was then noted. |
Y |
12.18 |
SP-130674 |
UPCON Exception Sheet |
KDDI |
WITHDRAWN |
Exception sheet |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
N |
12.18 |
SP-130675 |
UPCON consolidated solution |
KDDI |
WITHDRAWN |
OTHER |
Discussion |
Withdrawn |
|
|
| WITHDRAWN |
N |
12.19 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.19 |
SP-130526 |
10 CRs to 23.060, 23.272, 23.401: LIMONET (Rel-12) |
SA WG2 |
23.060 CR1815R1; 23.060 CR1820R1; 23.060 CR1821R2; 23.272 CR0900R2; 23.401 CR2600R1; 23.401 CR2602R1; 23.401 CR2607R1; 23.401 CR2610; 23.401 CR2611R1; 23.401 CR2612 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.20 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.20 |
SP-130527 |
1 CR to 23.402: OPIIS (Rel-12) |
SA WG2 |
23.402 CR1195R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.21 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.21 |
SP-130528 |
3 CRs to 23.203: P4C-F (Rel-12) |
SA WG2 |
23.203 CR0841R2; 23.203 CR0849R7; 23.203 CR0856R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.21 |
SP-130625 |
Rel-12 CRs on Traffic Detection Function (TDF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (Stage 2/3)(P4C-F-CH_T) |
SA WG5 |
32.240 CR0370R1; 32.251 CR0310R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.21 |
SP-130626 |
Rel-12 CRs on Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_P) |
SA WG5 |
32.240 CR0371R2; 32.251 CR0312R1; 32.251 CR0313R2; 32.251 CR0314R1; 32.251 CR0315R2; 32.251 CR0316R2; 32.251 CR0323R1; 32.251 CR0324R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.22 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.23 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.23 |
SP-130593 |
Stage 1 CR on MTCe-SRM (Removal of group based charging requirements) |
SA WG1 |
22.368 CR0151 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.23 |
SP-130548 |
Presentation of TR 23.887 for approval (MTCe) |
SA WG2 |
Abstract of document: The TR 23.887 studies and evaluates architectural enhancements for Machine Type and other mobile data applications communications (MTCe). System improvements for MTCe are divided into foll [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control (Rel-12) |
Y |
12.23 |
SP-130529 |
3 CRs to 23.060, 23.401, 23.682: MTCe-UEPCOP (Rel-12) |
SA WG2 |
23.060 CR1814R9; 23.401 CR2603R9; 23.682 CR0077R6 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.23 |
SP-130644 |
Updated CR: 23.401 CR2594R8: Core Network assisted eNodeB parameters tuning - MTCe-SDDTE (Rel-12) |
NSN, Ericsson, Huawei, Qualcomm, CATT |
23.401 CR2594R8 |
CR Pack |
Approval |
Revised |
SP-130691 |
|
| Update to 23.401 CR2594R3 in SP-130530 |
Y |
12.23 |
SP-130530 |
3 CRs to 23.401, 23.682: MTCe-SDDTE (Rel-12) |
SA WG2 |
23.401 CR2594R3; 23.682 CR0076R2; 23.682 CR0078R5 |
CR Pack |
Approval |
23.682 CR0076R2; 23.682 CR0078R5 approved. 23.401 CR2594R3 noted |
|
|
| 23.682 CR0076R2; 23.682 CR0078R5 were approved. 23.401 CR2594R3 was noted. |
Y |
12.23 |
SP-130691 |
Updated CR: 23.401 CR2594R9: Core Network assisted eNodeB parameters tuning - MTCe-SDDTE (Rel-12) |
NSN, Ericsson, Huawei, Qualcomm, CATT |
23.401 CR2594R9 |
CR Pack |
Approval |
Revised |
SP-130702 |
SP-130644 |
| Update to 23.401 CR2594R3 in SP-130530 |
Y |
12.23 |
SP-130702 |
Updated CR: 23.401 CR2594R10: Core Network assisted eNodeB parameters tuning - MTCe-SDDTE (Rel-12) |
NSN, Ericsson, Huawei, Qualcomm, CATT, CMCC |
23.401 CR2594R10 |
CR Pack |
Approval |
Revised |
SP-130716 |
SP-130691 |
| This CR was further discussed off-line and revised in SP-130716 |
Y |
12.23 |
SP-130716 |
Updated CR: 23.401 CR2594R11: Core Network assisted eNodeB parameters tuning - MTCe-SDDTE (Rel-12) |
NSN, Ericsson, Huawei, Qualcomm, CATT, CMCC |
23.401 CR2594R11 |
CR Pack |
Approval |
Revised |
SP-130726 |
SP-130702 |
|
| Y |
12.23 |
SP-130726 |
Updated CR: 23.401 CR2594R12: Core Network assisted eNodeB parameters tuning - MTCe-SDDTE (Rel-12) |
NSN, Ericsson, Huawei, Qualcomm, CATT, CMCC |
23.401 CR2594R12 |
CR Pack |
Approval |
Approved |
| SP-130716 |
| This CR Pack was approved |
Y |
12.23 |
SP-130653 |
Work Item Exception for MTCe |
SA WG3 |
Abstract of document: SA WG3 objective is to specify the security architecture enhancements ( i.e., enhancements to the security features and the security mechanisms) to facilitate Machine-Type and other mobile [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
Y |
12.23 |
SP-130589 |
Standardization of Machine-type Communications |
MCC Work Plan Manager |
Standardization of Machine-type Communications |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
Y |
12.24 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.24 |
SP-130510 |
LS from GSMA: Publication of GSMA’s Recommendations for Minimum Wi-Fi Capabilities of Terminals, Version 2.0 |
GSMA TSGWIF |
The GSMA Terminal Steering Group (TSG) wishes to announce the publication of the Recommendations for Minimum Wi-Fi Capabilities of Terminals Version 2.0 (TS.22), inform on next steps and confirm interest to con [...]. |
LS In |
Information |
forwarded to SA WG2 |
|
| TSGWIF_217_Liaison Statement |
This was reviewed and it was decided to forward the LS to SA WG2. |
Y |
12.24 |
SP-130531 |
5 CRs to 23.402, 23.865: WLAN_NS (Rel-12) |
SA WG2 |
23.402 CR1190R4; 23.402 CR1191R7; 23.402 CR1211R1; 23.865 CR0004R3; 23.865 CR0008R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.24 |
SP-130651 |
Work Item Exception fo for WLAN Network Selection for 3GPP Terminals |
SA WG3 |
Abstract of document: The aim of this WID is to work on security impact of WLAN Network Selection for 3GPP Terminals. Contentious Issues: None. |
Exception sheet |
Approval |
Approved until March 2014 |
|
|
| The exception was approved until March 2014. |
Y |
12.25 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.25 |
SP-130538 |
1 CR to 23.002: LTE_HRPD_SON (Rel-12) |
SA WG2 |
23.002 CR0268 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.26 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.26 |
SP-130542 |
New WID on Core Network Overload - User Location Information reporting improvements (CNO_ULI) |
SA WG2 |
Objective: The objective is to provide normative specification of ULI signalling optimizations according to conclusions of the FS_CNO TR 23.843. |
WID |
Approval |
Revised |
SP-130717 |
|
| This was revised accordingly in TD SP 130717 |
Y |
12.26 |
SP-130717 |
New WID on Core Network Overload - User Location Information reporting improvements (CNO_ULI) |
SA WG2 |
Objective: The objective is to provide normative specification of ULI signalling optimizations according to conclusions of the FS_CNO TR 23.843. |
WID |
Approval |
Approved |
| SP-130542 |
| This WID was approved |
Y |
12.26 |
SP-130550 |
Exception sheet for CNO_ULI |
SA WG2 |
Abstract of document: CNO_ULI feature, based on the conclusions of TR 23.843, introduces: 1. The concept of UE dedicated Presence Reporting Area and MME/SGSN predefined Presence Reporting Area as a set of TA/R [...]. |
Exception Sheet |
Approval |
Approved |
|
|
| This Exception Sheet was approved |
Y |
12.26 |
SP-130541 |
3 CRs to 23.060, 23.203, 23.401: CNO_ULI (New WID) (Rel-12) |
SA WG2 |
23.060 CR1827R2; 23.203 CR0854R2; 23.401 CR2629R2 |
CR Pack |
Approval |
Noted |
|
|
| Proposed revision of these CRs in SP-130585 This CR Pack was noted |
Y |
12.26 |
SP-130585 |
3 CRs to 23.060, 23.401: CNO_ULI (New WID) (Rel-12) |
Alcatel-Lucent |
23.060 CR1827R3; 23.203 CR0854R3; 23.401 CR2629R3 |
CR Pack |
Approval |
Approved |
|
|
| Proposed revision of CRs in SP-130541 This CR Pack was approved |
Y |
12.26 |
SP-130583 |
3 CRs to 23.060, 23.203, 23.401: CNO_ULI (New WID) (Rel-12) |
SA WG2 |
23.060 CR1826R3; 23.203 CR0853R4; 23.401 CR2627R4 |
CR Pack |
Approval |
Noted |
|
|
| Proposed revision of CRs in SP-130584 This CR Pack was noted |
Y |
12.26 |
SP-130584 |
3 CRs to 23.060, 23.203, 23.401: CNO_ULI (New WID) (Rel-12) |
Alcatel-Lucent |
23.060 CR1826R4; 23.203 CR0853R5; 23.401 CR2627R5 |
CR Pack |
Approval |
Approved |
|
|
| Proposed revision of CRs in SP-130583 This CR Pack was approved |
Y |
12.27 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.27 |
SP-130537 |
13 CRs to 23.402: eSaMOG (Rel-12) |
SA WG2 |
23.402 CR1177R5; 23.402 CR1180R2; 23.402 CR1183R5; 23.402 CR1188R3; 23.402 CR1196R2; 23.402 CR1201R3; 23.402 CR1202R2; 23.402 CR1205R2; 23.402 CR1207R1; 23.402 CR1209R1; 23.402 CR1210; 23.402 CR1212R1; 23.402 C [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.27 |
SP-130554 |
Exception sheet for eSaMOG |
SA WG2 |
Abstract of document: This WI is an enhancement of Rel-11 SaMOG-WLAN solution avoiding the Rel-11 limitations (except emergency attach) by allowing impacts to the UE, although those impacts should be minimized. [...]. |
Exception Sheet |
Approval |
Approved |
|
|
| This Exception Sheet was approved |
Y |
12.28 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.28 |
SP-130540 |
3 CRs to 23.272, 23.401, 23.402: WORM (Rel-12) |
SA WG2 |
23.272 CR0907R2; 23.401 CR2605R2; 23.402 CR1193R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.29 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.29 |
SP-130539 |
5 CRs to 23.228, 23.402: Netloc_TWAN (Rel-12) |
SA WG2 |
23.203 CR0842R3; 23.228 CR1043R2; 23.228 CR1045R2; 23.402 CR1176R4; 23.402 CR1198R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.29 |
SP-130552 |
Exception sheet for NETLOC_TWAN |
SA WG2 |
Abstract of document: NETLOC_TWAN requests to update the mechanisms defined for Rel-11 for following aspects: 1. Procedures to Transfer the TWAN Location (called TWAN Id) from TWAN to P-CSCF via the PCC - CR to [...]. |
Exception Sheet |
Approval |
Approved |
|
|
| This Exception Sheet was approved |
Y |
12.30 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.31 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.31 |
SP-130532 |
2 CRs to 23.203: ABC (Rel-12) |
SA WG2 |
23.203 CR0840R2; 23.203 CR0855R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.31 |
SP-130620 |
Rel-12 CRs on Charging for Application Based Charging (ABC) |
SA WG5 |
32.251 CR0294R1; 32.251 CR0311R2; 32.251 CR0317R2; 32.251 CR0318R1; 32.251 CR0320R1; 32.251 CR0330R1; 32.251 CR0332R1; 32.296 CR0036R1; 32.298 CR0412R1; 32.298 CR0423R1; 32.299 CR0551R1; 32.299 CR0560R1 [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.32 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.33 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.34 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.34 |
SP-130666 |
Release 12 CRs for IMS media plane security extensions (eMEDIASEC) |
SA WG3 |
33.328 CR0056R1; 33.328 CR0057R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.35 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.36 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.36 |
SP-130663 |
Rel-12 CRs on Security enhancements for usage of Generic Bootstrapping Architecture (GBA) from the browser (Stage 2)(Web_GBA) |
SA WG3 |
33.823 CR0004 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.37 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.37 |
SP-130665 |
Release 12 CRs on Tunnelling of UE Services over Restrictive Access Networks (Stage 2/3) (TURAN) |
SA WG3 |
33.203 CR0204R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.38 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.39 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.39 |
SP-130569 |
Revised WID on 'High Efficiency Video Coding' (HEVC) |
SA WG4 |
Objective: The objective of this Work Item is to specify the support of HEVC in 3GPP services, namely PSS, DASH, MTSI, MMS, MBMS, and IMS Messaging and Presence. This includes: - evaluation of HEVC for each of [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
12.39 |
SP-130570 |
TR 26.906 Evaluation of HEVC for 3GPP Services (HEVC) (Release 12), v1.0.0 |
SA WG4 |
Abstract of document: This document contains the Technical Report (TR) for evaluation of High Efficiency Video Coding (HEVC), i.e. ITU-T Recommendation H.265 | ISO/IEC IS 23008-2, over the 3GPP services. The TR [...]. |
TR |
Information |
Noted |
|
|
| This TR was noted. Companies are invited to review thisTR and send comments to SA WG4 |
Y |
12.40 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.41 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.42 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.42 |
SP-130573 |
CR to TS 26.132 on 'Updates of LTE radio conditions for acoustic testing (ART_LTE-NBWB)' (Release 12) |
SA WG4 |
26.132 CR0068R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.42 |
SP-130642 |
Revised WID 'Charging per IP - Connectivity Access Network (IP-CAN) Session' (CHIPS) |
SA WG5 |
Objective: This feature provides an IP-CAN session level charging context for both on-line and off-line charging over the Gy and Gz reference points in order to achieve the following benefits: 1. There is one s [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
12.42 |
SP-130608 |
Updated WID Charging using an Alternative Roaming Provider (CHARP) |
SA WG5 |
WITHDRAWN |
WID |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
N |
12.43 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.43 |
SP-130575 |
CRs to TS 26.346 on 'MBMS Improvements (MI-EMO)' (Release 12) |
SA WG4 |
26.346 CR0320R8; 26.346 CR0348R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.43 |
SP-130574 |
Revised WID on 'Enhanced MBMS Operation' (MI-EMO) |
SA WG4 |
Objective: The objectives of this work item are to standardise the following aspects of MBMS operation: - Improve MBMS OTA efficiency (e.g. by object bundling, reduction of FLUTE overhead, etc.) - Improve MB [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
12.43 |
SP-130641 |
Revised WID 'Converged Management PM Interface definitions' |
SA WG5 |
Objective: The work item will address (in that priority order): 1. Requirements, Service Level Agreement (SLA), business objectives to be worked in interaction with NGCOR project, 2. Measurement & KPI definiti [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
12.43 |
SP-130636 |
TR 32836: Study on NM Centralized Coverage and Capacity Optimization (CCO) SON Function |
SA WG5 |
WITHDRAWN |
TR |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
N |
12.44 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.44 |
SP-130512 |
LS from SA WG4: Reply LS on End-to-end QoS handling of MTSI |
SA WG4 |
SA WG4 would like to thank CT WG1, CT WG3, CT WG4, and SA WG2 for their reply LSs. Given the potential for the QoS handling work to have system-wide impacts and the need to coordinate this work with other WGs, [...]. |
LS In |
Information |
Noted |
|
| S4-131105 |
This incoming LS was noted |
Y |
12.44 |
SP-130513 |
LS from CT WG1: Reply LS on End-to-end QoS handling of MTSI |
CT WG1 |
CT WG1 thanks SA WG4 on the LS (S4-131105/C1-134005). CT WG1 has reviewed and noted the contents of the LS and the attachments. At present, CT WG1 has no additional comments. CT WG1 wishes to remind SA WG4 tha [...]. |
LS In |
Information |
Noted |
|
| C1-134386 |
This incoming LS was noted |
Y |
12.44 |
SP-130514 |
LS from CT WG3: Reply LS to SA WG4 LS on End-to-end QoS handling of MTSI. |
CT WG3 |
CT WG3 would like to thank SA WG4 for the Reply LS and for having the opportunity to comment on the skeleton and scope of the new Study on Improved end-to-end QoS handling. CT WG3 has reviewed the documents p [...]. |
LS In |
Information |
Noted |
|
| C3-131594 |
This incoming LS was noted |
Y |
12.44 |
SP-130577 |
CR to TS 26.114 on 'E2EMTSI Fixed-mobile interworking (E2EMTSI-S4)' (Release 12) |
SA WG4 |
26.114 CR0272 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.44 |
SP-130576 |
Revised Work Item Description on 'SA4 part of End-to-End Multimedia Telephony Service for IMS (MTSI) extensions' (E2EMTSI-S4) |
SA WG4 |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that [...]. |
WID |
Approval |
Noted |
|
|
| Proposed revision of this WID in SP-130670. This was then noted. |
Y |
12.44 |
SP-130670 |
Revised WID on 'SA WG4 part of End-to-end Multimedia Telephony Service for IMS (MTSI) extensions' (E2EMTSI-S4) |
Ericsson, Orange, Telecom Italia, Deutsche Telecom |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that [...]. |
WID |
Approval |
Approved |
|
|
| Proposed revision of SP-130576 This WID was approved |
Y |
12.45 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.45 |
SP-130650 |
Revised WID for Lawful Interception Rel-12 (LI12) |
SA WG3 |
4 Objective: The objective of this work item is to update lawful interception specifications for the latest Rel-12 architecture and services as described in the above justification. The enhancements to specific [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
12.45 |
SP-130661 |
Release 12 CRs on Lawful Interception (LI12) |
SA WG3 |
33.106 CR0130; 33.106 CR0131; 33.107 CR0131; 33.107 CR0132; 33.107 CR0136; 33.107 CR0133; 33.107 CR0134; 33.108 CR0214; 33.108 CR0215; 33.108 CR0216; 33.108 CR0220; 33.108 CR0217; 33.107 CR0137; 33.107 CR0135; [...]. |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.46 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.46 |
SP-130639 |
TS 32.276: Telecommunication management; Charging management; Voice call service charging |
SA WG5 |
Abstract of document: TS 32.276 specifies the online charging description for Voice Call Service Charging from a Proxy Function. This charging description includes the online charging architecture and scenarios [...]. |
TS |
Information |
Noted |
|
|
| This TS was noted. Companies are invited to review this TS and send comments to SA WG5 |
Y |
12.46 |
SP-130619 |
Rel-12 CRs on Charging Management (CH12) |
SA WG5 |
32.260 CR0226R1; 32.296 CR0033; 32.296 CR0034; 32.296 CR0035; 32.298 CR0411R2; 32.299 CR0552R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.46 |
SP-130621 |
Rel-12 CR on Charging using an Alternative Roaming Provider (CHARP) |
SA WG5 |
32.240 CR0369R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.46 |
SP-130622 |
Rel-12 CR on Charging per IP - Connectivity Access Network (IP-CAN) Session (Stage 2/3) (CHIPS) |
SA WG5 |
32.251 CR0338R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.46 |
SP-130628 |
Rel-12 CRs on Short Message Service - Service Center (SMS-SC) Offline Charging (SMS-SC-CH) |
SA WG5 |
32.274 CR0020R1; 32.274 CR0021; 32.274 CR0022R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.46 |
SP-130610 |
New WID on Charging for IMS centralized service (ICS) control |
SA WG5 |
Objective: The objective of the Work Item is to align the SA WG5 Charging specifications with the Rel-8 Feature WID (SP-070924) and subsequent enhancements under TEIx of the Feature 'IMS Centralized Service co [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
12.47 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.47 |
SP-130615 |
Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) |
SA WG5 |
32.152 CR0018R2; 32.422 CR0260R1; 32.592 CR0030R1; 32.594 CR0003R1; 32.851 CR0001 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.47 |
SP-130629 |
Rel-12 CR on Multi-vendor Plug and Play eNB connection to the network(SON-NM-MUPPET) |
SA WG5 |
32.501 CR0007R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.47 |
SP-130630 |
TS 28601: Telecommunication management; Core Network (CN) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Requirements |
SA WG5 |
Abstract of document: The document describes the NRM IRP requirements for Core Network (CN) and non-3GPP access Interworking System Network Resource Model (NRM). Work done against WT-level Work item in |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
Y |
12.47 |
SP-130631 |
TS 28602: Telecommunication management; Core Network (CN) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
Abstract of document: The document describes an Integration Reference Point (IRP) named as 'Core Network (CN) and non-3GPP access Interworking System Network Resource Model IRP'. Work done against WT-level Work [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
Y |
12.47 |
SP-130632 |
TS 28606: Telecommunication management; Core Network (CN) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
Abstract of document: The document describes the solution set for 'Core Network (CN) and non-3GPP access Interworking System Network Resource Model IRP'. Work done against WT-level Work item in |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
Y |
12.47 |
SP-130633 |
TS 28611: Telecommunication management; Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Requirements |
SA WG5 |
Abstract of document: The document describes the NRM IRP requirements for Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model (NRM). Work done against WT-level Work item in [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
Y |
12.47 |
SP-130634 |
TS 28612: Telecommunication management; Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
Abstract of document: The document describes an Integration Reference Point (IRP) named as 'Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model IRP'. Work done against WT-le [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
Y |
12.47 |
SP-130635 |
TS 28616: Telecommunication management; Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
Abstract of document: The document describes the solution set for 'Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model IRP'. Work done against WT-level Work item in |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
Y |
12.47 |
SP-130637 |
TS 32508: Technical Specification Group Services and System Aspects; Telecommunication Management; Procedure Flows for Multi-Vendor Plug and Play eNB connection to the Network |
SA WG5 |
Abstract of document: The present document describes the procedure flows between network entities involved in the Multi-Vendor Plug and Play eNB connection to network. These procedures are based on requirements [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
Y |
12.47 |
SP-130638 |
TS 32.509: Telecommunication management; Data Formats for multi-vendor plug and play eNB connection to the Network |
SA WG5 |
Abstract of document: The present document describes the data formats used in procedure flows between network entities involved in the Multi-Vendor Plug and Play eNB connection to network. These procedure flows [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under Change control |
Y |
12.47 |
SP-130607 |
New WID on OAM aspects of Network Sharing |
SA WG5 |
Objective 3GPP SA WG5 has performed a study and analyzed different Network sharing scenarios. The outcome of the study is in TR 32.851 'Study on Operations, Administration and Maintenance (OAM) aspects of Netwo [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
12.47 |
SP-130611 |
New WID on Alarm Quality Improvements |
SA WG5 |
Objective: SA WG5 shall analyse if existing 32-series specifications, related to alarm management, can be enhanced with solutions to address the problems identified in TR 32.859. To address the problems identi [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
12.48 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.49 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.49 |
SP-130533 |
12 CRs to 23.002, 23.060, 23.203, 23.228, 23.237, 23.272, 23.401, 23.402: TEI12 (Rel-12) |
SA WG2 |
23.002 CR0269R2; 23.060 CR1825; 23.203 CR0863R1; 23.216 CR0316R4; 23.228 CR1057R2; 23.237 CR0468R1; 23.272 CR0861R7; 23.401 CR2598R4; 23.401 CR2622; 23.401 CR2624; 23.401 CR2625R2; 23.402 CR1173R1 |
CR Pack |
Approval |
All except 23.401 CR2598R4 Approved |
|
|
| A revision of 23.401 CR2598R4 was provided in SP-130669. The other CRs in this pack were approved. |
Y |
12.49 |
SP-130669 |
Updated CR: 23.401 CR2598R6: PGW and SGW Charging alignment in downlink - TEI12 (Rel-12) |
Huawei, Ericsson, Alcatel Lucent, Cisco, Verizon |
23.401 CR2598R6 |
CR Pack |
Approval |
Approved |
|
|
| Update to 23.401 CR2598R4 in SP-130533 This CR Pack was approved |
Y |
12.49 |
SP-130534 |
10 CRs to 23.060, 23.203, 23.246, 23.251, 23.401: TEI12, MBMS_EPS, NIMTC, NWK-PL2IMS, SAES, SAPP (Rel-12) |
SA WG2 |
23.060 CR1819R3; 23.060 CR1822R2; 23.060 CR1830; 23.203 CR0850R3; 23.203 CR0852R1; 23.246 CR0276R3; 23.251 CR0096R5; 23.401 CR2613R2; 23.401 CR2623R5; 23.401 CR2632R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.49 |
SP-130536 |
1 CR to 23.251: TEI12, EHNBF (Rel-12) |
SA WG2 |
23.251 CR0097R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.49 |
SP-130667 |
Release 12 CRs on TEI (TEI12) |
SA WG3 |
33.220 CR0178; 33.223 CR0023R1; 33.234 CR0122R1; 33.401 CR0523; 33.402 CR0115R1 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.49 |
SP-130578 |
CRs on 'Technical Enhancements and Improvements for Release 12 (TEI12)' (Release 12) |
SA WG4 |
26.114 CR0265R1; 26.141 CR0006; 26.234 CR0217; 26.244 CR0051R1; 26.247 CR0044; 26.346 CR0335R3; 26.346 CR0345; 26.346 CR0352 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
12.50 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.50 |
SP-130535 |
5 CRs to 23.002, 23.060, 23.204, 23.271: Dia_SGSN_SMS, Dia_SGSN_GMLC (CT WG4 WI Codes) (Rel-12) |
SA WG2 |
23.002 CR0267R1; 23.002 CR0270R1; 23.060 CR1810R1; 23.204 CR0104; 23.271 CR0400R4 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.2 |
SP-130601 |
Stage 1 CR on RAN Sharing Enhancements (RSE) |
SA WG1 |
22.101 CR0464R2; 22.101 CR0465R3; 22.101 CR0466R3; 22.101 CR0468R2; 22.101 CR0469R3; 22.101 CR0470R3 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
14 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.5 |
SP-130596 |
Updates to the WID on Feasibility Study on Study on Isolated (was 'Resilient') E-UTRAN Operation for Public Safety (FS_IOPS, was FS_REOPS) |
SA WG1 |
Objective: The objective is to study use cases and identify potential requirements for isolated E-UTRAN operation in support of mission critical network operations. Initial scenarios (but not excluding scenario [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
14.6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.9 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.9 |
SP-130546 |
Presentation of TR 23.843 for approval (FS_CNO) |
SA WG2 |
Abstract of document: This Technical Report addresses the stage 2 study for core network signalling overload scenarios and potential general handling solutions, in particular: - Scenarios and problem analysis f [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control (Rel-12) |
Y |
14.10 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.10 |
SP-130516 |
LS from SA WG5: LS on update on the liaison to 3GPP on Cooperation for Energy Efficiency Measurements |
SA WG5 |
SA WG5 would like to thank ETSI TC EE for the Liaison on 'Update on the liaison to 3GPP on Cooperation for Energy Efficiency Measurements'. SA WG5 started to take the action to specify the performance measurem [...]. |
LS In |
Information |
Noted |
|
| S5-131830 |
This incoming LS was noted |
Y |
14.11 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.14 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.14 |
SP-130649 |
New WID Security Assurance Specification for 3GPP Network Products |
SA WG3 |
Objective: There are two separate objectives of this WID. The primary objective is to develop a Security Assurance Specification(s) (SAS) for the MME network product class, starting from the development of a pi [...]. |
WID |
Approval |
Revised |
SP-130718 |
|
| The acronym and unique ID should be added and some editorial updates were proposed. This was revised in SP-130718 |
Y |
14.14 |
SP-130718 |
New WID Security Assurance Specification for 3GPP Network Products |
SA WG3 |
Objective: There are two separate objectives of this WID. The primary objective is to develop a Security Assurance Specification(s) (SAS) for the MME network product class, starting from the development of a pi [...]. |
WID |
Approval |
Approved |
| SP-130649 |
| This WID was approved |
Y |
14.14 |
SP-130657 |
TR 33.805: Study on Security Assurance Methodology for 3GPP Network Products |
SA WG3 |
Abstract of document: The TR 33.805 studies methodologies for specifying network product security assurance and hardening requirements. Network product security assurance and hardening refers to protection agai [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under Change control (Rel-12) |
Y |
14.15 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.16 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.18 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.19 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.20 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.21 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.22 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14.22 |
SP-130623 |
Rel-12 CRs on Alarm Management (FS_OAM_AM) |
SA WG5 |
32.859 CR0001R2; 32.859 CR0002R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
14.23 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
15 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
15 |
SP-130600 |
New WID on Service Requirements Maintenance for Machine-Type Communications (SRMMTC) |
SA WG1 |
Objective 1) to provide upon request clarifications for the service requirements that 3GPP Stage 2 Working Groups are working on in Rel-13. 2) to reconsider existing service requirements in 3GPP TS 22.368 that [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
15 |
SP-130594 |
Stage 1 CR on Service Requirements Maintenance for Machine-Type Communications (SRMMTC) |
SA WG1 |
22.115 CR0072R2 |
CR Pack |
Approval |
Approved |
|
|
| This CR Pack was approved |
Y |
15 |
SP-130595 |
New WID on Mission Critical Push To Talk over LTE (MCPTToLTE) |
SA WG1 |
Objective The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial u [...]. |
WID |
Approval |
Revised |
SP-130721 |
|
| This was revised accordingly in SP-130721 |
Y |
15 |
SP-130721 |
New WID on Mission Critical Push To Talk over LTE (MCPTToLTE) |
SA WG1 |
Objective The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial u [...]. |
WID |
Approval |
Revised |
SP-130728 |
SP-130595 |
| Revised to correct the WID title in SP-130728 |
Y |
15 |
SP-130728 |
New WID on Mission Critical Push To Talk over LTE (MCPTToLTE) |
SA WG1 |
Objective The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial u [...]. |
WID |
Approval |
Approved |
| SP-130721 |
| This WID was approved |
Y |
15 |
SP-130645 |
LS from TCCA CCBG Management Group: Standardisation of Critical Communications over Broadband (v1.1) |
TCCA CCBG Management Group |
TCCA CCBG is working on the future of Critical Communications over Broadband through its UR (Users Requirements) and SA (System Architecture) working groups, in a joint effort by representatives from the Users [...]. |
LS In |
Information |
Noted |
|
| LS TCCA CCBG_02122013.pdf |
This incoming LS was noted. (Update provided in SP-130708) |
Y |
15 |
SP-130708 |
LS from TCCA CCBG Management Group: Standardisation of Critical Communications over Broadband (v1.2) |
TCCA CCBG Management Group |
TCCA CCBG is working on the future of Critical Communications over Broadband through its UR (Users Requirements) and SA (System Architecture) working groups, in a joint effort by representatives from the Users [...]. |
LS In |
Information |
Noted |
|
| LS TCCA CCBG - 09122013 |
Blackberry asked if there was any overlap with the Work Item agreed in SP-130721. It was clarified that this was why globalisation and communication was needed. This LS was then noted. |
Y |
15 |
SP-130709 |
LS from OMA Board: A Communiqué to 3GPP regarding Public Safety and the OMA Push to Talk over Cellular (POC) enabler |
OMA Board |
OMA's members have identified several areas where OMA enablers may contribute to specific services requirements in the Public Safety domain. Members of Governmental agencies from several countries who are charg [...]. |
LS In |
Information |
Noted |
|
| OMA-BOARD-2013-0205R02 |
It was commented that the OMA PoC work does not take requirements from SA WG1 but Public Safety requirements can be expected to come from SA WG1. This LS was noted. |
Y |
15 |
SP-130710 |
[DRAFT] LS on Mission Critical Push To Talk over LTE |
TSG SA |
To: ATIS, TIA TR8-8, ETSI TC TCCE, TCCA CCBG. CC: SA WG1, ETSI TC TCCE WG1 |
LS OUT |
| Revised |
SP-130722 |
|
| This was further discussed off-line and revised in SP-130722 |
Y |
15 |
SP-130722 |
[DRAFT] LS on Mission Critical Push To Talk over LTE |
TSG SA |
To: ATIS, TIA TR8-8, ETSI TC TCCE, TCCA CCBG. CC: SA WG1, ETSI TC TCCE WG1 |
LS OUT |
| Revised |
SP-130727 |
SP-130710 |
|
| Y |
15 |
SP-130727 |
LS on Mission Critical Push To Talk over LTE |
TSG SA |
To: ATIS, TIA TR8-8, ETSI TC TCCE, TCCA CCBG. CC: SA WG1, ETSI TC TCCE WG1 |
LS OUT |
| Approved |
| SP-130722 |
| This outgoing LS was approved |
Y |
15 |
SP-130647 |
New WID 3G Security: Specification of the TUAK algorithm set |
SA WG3 |
Objective SA WG3 Objectives: This work item aims to deliver the complete specification set for a second example algorithm set for the 3GPP authentication and key generation functions as 3GPP Technical Specifica [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
15 |
SP-130658 |
3G Security; Specification of the TUAK Algorithm Set; a Second Example Algorithm Set for the 3GPP Authentication and Key Generation Function f1, f1*, f2, f3, f4, f5, f5*; Document 1: Algorithm Specification |
SA WG3 |
Abstract of document: In 2012, SAGE announced its intention to develop a new 3G authentication and key agreement algorithm set, as an alternative to MILENAGE. This new algorithm set, named TUAK, can be used by [...]. |
TS |
Approval |
Revised |
SP-130723 |
|
| The title was modified to remove '3G Security' in SP-130723 |
Y |
15 |
SP-130723 |
Specification of the TUAK Algorithm Set; a Second Example Algorithm Set for the 3GPP Authentication and Key Generation Function f1, f1*, f2, f3, f4, f5, f5*; Document 1: Algorithm Specification |
SA WG3 |
Abstract of document: In 2012, SAGE announced its intention to develop a new 3G authentication and key agreement algorithm set, as an alternative to MILENAGE. This new algorithm set, named TUAK, can be used by [...]. |
TS |
Approval |
Approved |
| SP-130658 |
| This TS was approved and placed under Change control (Rel-12) |
Y |
15 |
SP-130659 |
3G Security; Specification of the TUAK Algorithm Set; A Second Example Algorithm Set for the 3GPP Authentication and Key Generation Function f1, f1*, f2, f3, f4, f5, f5*; Document 2: Implementers’ Test Data |
SA WG3 |
Abstract of document: In 2012, SAGE announced its intention to develop a new 3G authentication and key agreement algorithm, as an alternative to MILENAGE. This new algorithm, named TUAK, can be used by any oper [...]. |
TS |
Approval |
Revised |
SP-130724 |
|
| The title was modified to remove '3G Security' in SP-130724 |
Y |
15 |
SP-130724 |
Specification of the TUAK Algorithm Set; A Second Example Algorithm Set for the 3GPP Authentication and Key Generation Function f1, f1*, f2, f3, f4, f5, f5*; Document 2: Implementers’ Test Data |
SA WG3 |
Abstract of document: In 2012, SAGE announced its intention to develop a new 3G authentication and key agreement algorithm, as an alternative to MILENAGE. This new algorithm, named TUAK, can be used by any oper [...]. |
TS |
Approval |
Approved |
| SP-130659 |
| This TS was approved and placed under Change control (Rel-12) |
Y |
15 |
SP-130660 |
3G Security; Specification of the TUAK Algorithm Set; A Second Example Algorithm Set for the 3GPP Authentication and Key Generation Function f1, f1*, f2, f3, f4, f5, f5*; Document 3: Design Conformance Test Data |
SA WG3 |
Abstract of document: In 2012, SAGE announced its intention to develop a new 3G authentication and key agreement algorithm, as an alternative to MILENAGE. This new algorithm, named TUAK, can be used by any oper [...]. |
TS |
Approval |
Revised |
SP-130725 |
|
| The title was modified to remove '3G Security' in SP-130725 |
Y |
15 |
SP-130725 |
Specification of the TUAK Algorithm Set; A Second Example Algorithm Set for the 3GPP Authentication and Key Generation Function f1, f1*, f2, f3, f4, f5, f5*; Document 3: Design Conformance Test Data |
SA WG3 |
Abstract of document: In 2012, SAGE announced its intention to develop a new 3G authentication and key agreement algorithm, as an alternative to MILENAGE. This new algorithm, named TUAK, can be used by any oper [...]. |
TS |
Approval |
Approved |
| SP-130660 |
| This TS was approved and placed under Change control (Rel-12) |
Y |
15 |
SP-130602 |
LS from ETSI SAGE: TUAK design rationale |
ETSI SAGE |
SAGE has delivered specifications for the new TUAK algorithm to SA WG3. TUAK is built on top of the well known public hash function called Keccak - precisely the same Keccak that has been through several years [...]. |
LS In |
Information |
Noted |
|
| SAGE(13)10 |
This incoming LS was noted |
Y |
15 |
SP-130656 |
Work Item Exception foTUAK |
SA WG3 |
Abstract of document: In 2012, SAGE announced its intention to develop a new 3G authentication and key agreement algorithm set, as an alternative to MILENAGE. This new algorithm set, named TUAK, can be used by [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Exception sheet was approved |
Y |
15 |
SP-130579 |
New Work Item Description on 'Video Coding Enhancements in IMS Messaging and Presence' (VCEIMP) |
SA WG4 |
Objective: The objectives of this work are: - Mandate H.264 Constrained Baseline Profile level 1.2 for IMS Messaging and Presence video rendering up to a resolution of QVGA and 20fps framerate. - Recommend H.2 [...]. |
WID |
Approval |
Approved |
|
|
| This WID was approved |
Y |
16 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
16 |
SP-130597 |
New WID on Study on Flexible Mobile Service Steering (FS_FMSS) |
SA WG1 |
Objective The objective is to study use cases and propose potential requirements for supporting traffic classification and service chain selection capabilities per operator's policy (e.g., based on user's profi [...]. |
WID |
Approval |
Approved |
|
|
| This Study WID was approved |
Y |
16 |
SP-130599 |
New WID for Study on Multimedia Broadcast Supplement for PWS (FS_MBSP) |
SA WG1 |
Objective The objective is to study scenarios and use cases where a public safety agency in executing its mission, needs to distribute on a large scale timely public safety information to the public where this [...]. |
WID |
Approval |
Approved |
|
|
| This Study WID was approved |
Y |
16 |
SP-130598 |
New WID on Study on Enhanced Calling Information Presentation (FS_ECIP) |
SA WG1 |
Objective This study item will study the use cases and propose potential requirements for enhancing the calling information presentation. This will include: - Type of contents shared in calling information pres [...]. |
WID |
Approval |
Approved |
|
|
| This Study WID was approved |
Y |
16 |
SP-130609 |
New Study Item on Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks |
SA WG5 |
Objective: The objective of this study item is to document missing CDR elements and information with regard to the roaming architecture for Voice over IMS with Local Breakout (RAVEL). The Study shall be relat [...]. |
WID |
Approval |
Approved |
|
|
| This Study WID was approved |
Y |
16 |
SP-130681 |
New WID Study on Application and Partitioning of Itf-N |
SA WG5 |
Objective: 1. Examine IRP requirements in current specifications and identify one or more subsets of these requirements, based on inputs from operators. The necessary requirements should be selected from existi [...]. |
WID |
Approval |
Approved |
|
|
| This Study WID was approved |
Y |
17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.1 |
SP-130587 |
3GPP Work Plan review at Plenary #62 |
MCC Work Plan Manager |
3GPP Work Plan review at Plenary #62 |
Work Plan |
Presentation |
Noted |
|
|
| This contribution was noted |
Y |
17.1 |
SP-130588 |
3GPP Releases Descriptions -Rel-11 to Rel-13 |
MCC Work Plan Manager |
3GPP Releases Descriptions -Rel-11 to Rel-13 |
OTHER |
Information |
Noted |
|
|
| This contribution was noted |
Y |
17.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18.2 |
SP-130590 |
MCC status report |
MCC Specifications Manager |
Report of MCC Activities |
Report |
Presentation |
Noted |
|
|
| This Report was noted |
Y |
|
Created: 2013-12-13 15:42     END OF LIST
Last Allocated Document: SP-130728