Last Allocated Document: SP-130506
Temporary Documents List - Ordered by Agenda Item
Colour Key: |
Agenda Item, Agenda Title |
No Conclusion |
Conclusion Reached |
Document Revised |
Document Withdrawn |
Document Not Handled |
|
The Hyperlinks are to the FTP server: ftp://ftp.3gpp.org/tsg_sa/TSG_SA/TSGS_61/Docs/
Created: 2013-09-12 06:43     START OF LIST
Agenda |
TD |
LongTitle |
Source |
Summary |
Doc_Type |
Doc_For |
Decision |
Rev_By |
Rev_Of |
LS_Source_file |
Comment |
Rx |
1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
2 |
SP-130332 |
Draft agenda for TSG SA meeting #61 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #61 |
Agenda |
Approval |
Approved |
|
|
| The TSG SA Chairman commented that the next meeting agenda should include Rel 13 items following the decisions for Rel 12 inclusion at this meeting and the items moved to Rel 13. The agenda was then approved. |
Y |
3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
4.1 |
SP-130333 |
Draft Report of TSG SA meeting #60 |
TSG SA Secretary |
Draft Report of TSG SA meeting #60 containing revision marks of changes on the distributed draft. |
Report |
Approval |
Approved |
|
|
| The draft report was reviewed and approved. |
Y |
4.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5 |
SP-130408 |
1-week TSG setup |
TSG Chairs |
TSG#63 in March/2014 will be the initial trial for the 1-week setup From TSG#66 (Dec/2014) onwards all TSGs will be arranged on the same week Note: TSG GERAN will still be run separately This slideset pres [...]. |
Discussion |
Presentaton |
Noted |
|
|
|
| Y |
5 |
SP-130394 |
Managing TSG SA and TSG RAN overlapping meetings |
Telefonica |
The present contribution provides discussion material about the trial single-week TSG setup and presents issues relating to companies covering both TSG RAN and TSG SA with a small delegation. |
OTHER |
Discussion |
Noted |
|
|
|
| Y |
5.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
5.2 |
SP-130334 |
Prioritization Input to TSG SA#61 |
SA WG2 Chairman |
At TSG SA#61, TSG SA will review SA WG2 progress and make any decisions necessary to ensure success of approved work and study items. Time Budget vs. Available Time is highlighted as well as updated information [...]. |
DISCUSSION |
Discussion |
Noted |
|
|
| These issues will be discussed in the prioritisation sessions and this contribution was then noted. |
Y |
5.2 |
SP-130335 |
ProSe, GCSE_LTE and UPCON Analysis for Prioritization |
SA WG2 Chairman, SA WG1 Chairman |
To facilitate work rationalization at TSG SA#61, the complex features in SA WG2 work items ProSe, GCSE_LTE and UPCON are analyzed into component functionalities and dependencies, with time budget estimates asso [...]. |
DISCUSSION |
Discussion |
Revised |
SP-130337 |
|
| Revised in SP-130337 |
Y |
5.2 |
SP-130337 |
ProSe, GCSE_LTE and UPCON Analysis for Prioritization |
SA WG2 Chairman, SA WG1 Chairman |
To facilitate work rationalization at TSG SA#61, the complex features in SA WG2 work items ProSe, GCSE_LTE and UPCON are analyzed into component functionalities and dependencies, with time budget estimates asso [...]. |
DISCUSSION |
Discussion |
Noted |
| SP-130335 |
| The SA WG2 Chairman and SA WG1 Chairman were thanked for this analysis, which was then noted. |
Y |
5.2 |
SP-130470 |
Summary of RAN decisions on system level features |
TSG RAN Chairman |
Outline: - Proximity Services (ProSe) - Group Communication (GCSE) - Uplink Congestion Control (UPCON) - Public Safety priorities for Rel 12 - 3GPP-WiFi Radio Interworking - MTC signalling enhancements. [...]. |
DISCUSSION |
Discussion |
Noted |
|
|
| The TSG RAN Chairman was thanked for this contribution, which was then noted. |
Y |
5.2 |
SP-130478 |
LS from TSG RAN: LS on Agreements from TSG RAN on work on Public Safety related use cases in Release 12 |
TSG RAN |
TSG RAN informs RAN WG1, RAN WG2, RAN WG3 and RAN WG4 that the attached document on Public Safety related use cases in Release 12 has been endorsed. |
LS In |
Information |
Noted |
|
| RP-131405 |
| Y |
5.2 |
SP-130483 |
Required clarifications and guidance in view of the RAN prioritization decisions on ProSe and GCSE_LTE |
Motorola Solutions |
Asks for clarifying the guidance on Public Safety prioritization, to be sent to working groups, based on what TSG RAN has provided last week. |
OTHER |
Action |
Noted |
|
|
| This will be taken into account in the prioritisation discussions. This was then noted. |
Y |
5.2 |
SP-130358 |
Release 12 Priorities for Public Safety |
(UK) Home Office |
Presentation of the U.K. Home Office Release 12 Priorities for Public Safety |
Discussion |
Presentation |
Noted |
|
|
|
| Y |
5.2 |
SP-130363 |
Rationale for the Public Safety Priorities for Release 12 |
(UK) Home Office and US Dept of Commerce |
At TSG SA#61, TSG SA will review SA WG2 progress and make any decisions necessary to ensure successful completion of approved work and study items. To facilitate the prioritisation discussion at TSG SA#61, the [...]. |
Discussion |
Discussion |
Noted |
|
|
| Noted. This was provided as further reading for the presentation in SP-130358. |
Y |
5.2 |
SP-130457 |
Prioritisation for Direct Discovery in ProSe/D2D |
Qualcomm Incorporated, China Mobile, China Unicom, Deutsche Telekom, Softbank Mobile, T-Mobile US, Samsung |
In this paper, we consider to the possibility that a down scoping of the ongoing study in Proximity Services WID in SA WG2 is needed. The supporting companies of this paper would like to point out that is impor [...]. |
DISCUSSION |
Discussion |
Noted |
|
|
|
| Y |
5.2 |
SP-130473 |
Release 12 ProSe and GCSE_LTE Prioritization |
Telecom Italia |
This document highlights the sourcing company preference for Rel-12 ProSe and GCSE_LTE prioritization, based on the feature components of described in SP-130337 |
DISCUSSION |
Discussion |
Noted |
|
|
|
| Y |
5.2 |
SP-130364 |
Prioritising EPC support of ProSe communication over WLAN |
Intel, Broadcom, MediaTek, Sony Mobile, ZTE, NEC, InterDigital, III, Radisys, ETRI |
The present contribution proposes that SA WG2 should prioritise the work on EPC support of ProSe communication over WLAN because the feature has potential for benefitting both operators and end users, has minim [...]. |
Discussion |
Discussion |
Revised |
SP-130466 |
|
| Additional supporting companies added and additional modifications in SP-130466 |
Y |
5.2 |
SP-130466 |
Prioritising EPC support of ProSe communication over WLAN |
Intel, Broadcom, MediaTek, Sony Mobile, ZTE, NEC, InterDigital, III, Radisys, ETRI |
The present contribution proposes that SA WG2 should prioritise the work on EPC support of ProSe communication over WLAN because the feature has potential for benefitting both operators and end users, has minim [...]. |
DISCUSSION |
Discussion |
Noted |
| SP-130364 |
|
| Y |
5.2 |
SP-130424 |
UPCON Feature Prioritization Input to TSG SA#61 |
KDDI, NTT DoCoMo, Orange, AT&T, CMCC, China Telecom, Bell Mobility |
At TSG SA#61, TSG SA will review SA WG2 progress and make any decisions necessary to ensure success of approved work and study items. This contribution provides operator views on UPCON prioritization. |
DISCUSSION |
Discussion |
Noted |
|
|
|
| Y |
5.2 |
SP-130472 |
UPCON Feature Prioritization for Rel-12 |
Huawei, Hisilicon |
This contribution provides source companies' view on UPCON prioritization to adapt the Rel-12 timeframe |
DISCUSSION |
Discussion |
Noted |
|
|
|
| Y |
5.2 |
SP-130474 |
UPCON Feature Prioritization |
Telecom Italia |
This document highlights the sourcing company preference for Rel-12 UPCON prioritization, based on the feature components described in SP-130337 |
DISCUSSION |
Discussion |
Noted |
|
|
|
| Y |
5.2 |
SP-130419 |
KPN priority for 3GPP Release 12 |
KPN |
Presentation of KPN priority for 3GPP Release 12 |
DISCUSSION |
Presentation |
Noted |
|
|
|
| Y |
5.2 |
SP-130458 |
Sony's View on ProSe Release-12 Prioritization of SA WG2 at TSG SA#61 |
Sony Europe Ltd, Sony Mobile Communications |
Sony's View on ProSe Release-12 Prioritization of SA WG2 |
DISCUSSION |
Presentation |
Noted |
|
|
|
| Y |
5.2 |
SP-130395 |
SA WG2 work prioritization |
Samsung |
Samsung's View of Prioritization of SA WG2 Features at TSG SA#61 |
DISCUSSION |
Presentation |
Noted |
|
|
|
| Y |
5.2 |
SP-130468 |
Considerations for Release 12 Priorities & the Way forward |
Orange |
Summary: The estimated R12 time budgets required for R12 Priority Features/Functions - The 'Big Tree': < 36.5 TR, 18.5 TS - The Smaller Items: < 11.5 TR, 16 TS -IMS: 3.5 TR, 3 TS - The total: < 51.5 TR, 37.5 TS [...]. |
DISCUSSION |
Discussion |
Noted |
|
|
|
| Y |
5.2 |
SP-130460 |
3GPP Release 12 prioritisation |
Vodafone, Ericsson |
This document highlights the sourcing companies' preference for Rel-12 prioritisation. |
DISCUSSION |
Discussion |
Noted |
|
|
|
| Y |
5.2 |
SP-130485 |
[Draft] SA WG2 Prioritization Output |
SA WG2 Chairman |
Summary of Prioritisation contributions and impacts with respect to the SA WG2 time budget. |
Presentation |
Discussion |
Revised |
SP-130486 |
|
| Delegates were asked to review the slides for further discussion. |
Y |
5.2 |
SP-130486 |
(Updated) SA WG2 Prioritization Output |
SA WG2 Chairman |
Summary of Prioritisation contributions and impacts with respect to the SA WG2 time budget. |
Presentation |
Discussion |
Noted |
| SP-130485 |
| Noted. Results of the off-line discussions were provided in SP-130489 and SP-130490. |
Y |
5.2 |
SP-130500 |
SA WG2 Prioritization Output |
SA WG2 Chairman |
Summary of Prioritisation contributions and impacts with respect to the SA WG2 time budget. |
Presentation |
Discussion |
Revised |
SP-130503 |
|
| This was revised to correct the figure in SP-130503 |
Y |
5.2 |
SP-130503 |
SA WG2 Prioritization Output |
SA WG2 Chairman |
Summary of Prioritisation contributions and impacts with respect to the SA WG2 time budget. |
Presentation |
Discussion |
Revised |
SP-130506 |
SP-130500 |
|
| Y |
5.2 |
SP-130506 |
SA WG2 Prioritization Output |
SA WG2 Chairman |
Summary of Prioritisation contributions and impacts with respect to the SA WG2 time budget. |
Presentation |
Discussion |
Noted and Endorsed |
| SP-130503 |
| Noted and the general work planning for SA WG2 was endorsed. |
Y |
5.2 |
SP-130487 |
Way forward for MTCe SDDTE in Rel-12 |
Alcatel-Lucent, Qualcomm Incorporated, BlackBerry |
While no formal agreements were reached on not proceeding on with the key issue 'Efficient Small Data Transmission' enhancements under the MTCe TR scope for SDDTE, this paper argues that those solutions with a [...]. |
DISCUSSION |
Discussion |
Noted |
|
|
| This was taken into account in the prioritization discussions and was noted. |
Y |
5.2 |
SP-130489 |
UPCON Prioritization Output |
TSG SA Drafting |
UPCON Prioritization Output |
DISCUSSION |
Discussion |
Noted |
|
|
| An LS was drafted to SA WG2 outlining these agreements in SP-130493 and this presentation was noted. |
Y |
5.2 |
SP-130493 |
[DRAFT] LS on Prioritisation of User Plane Congestion Management (UPCON) |
TSG SA |
To: SA WG2 |
LS OUT |
Approval |
Revised |
SP-130499 |
| - |
This was discussed to clarify the text off-line and the LS was revised in SP-130499 |
Y |
5.2 |
SP-130499 |
[DRAFT] LS on Prioritisation of User Plane Congestion Management (UPCON) |
TSG SA |
To: SA WG2 |
LS OUT |
Approval |
Revised |
SP-130502 |
SP-130493 |
- |
This was revised to remove draft in SP-130502 |
Y |
5.2 |
SP-130502 |
LS on Prioritisation of User Plane Congestion Management (UPCON) |
TSG SA |
To: SA WG2 |
LS OUT |
Approval |
Approved |
| SP-130499 |
- |
| Y |
5.2 |
SP-130490 |
SA WG2 Prioritization Offline Discussion |
TSG SA Drafting |
SA WG2 Prioritization Offline Discussion |
DISCUSSION |
Discussion |
Noted |
|
|
| This will be reviewed again at TSG SA#62. |
Y |
5.2 |
SP-130501 |
SA WG2 Budget Agreements vs Meeting time |
SA WG2 Chairman |
- |
DISCUSSION |
Discussion |
Noted |
|
|
|
| Y |
6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.1 |
SP-130409 |
SA WG1 Report to TSG SA#61 |
SA WG1 Chairman |
SA WG1 Chairman's Status Report to TSG SA#61 |
Report |
Presentation |
Noted |
|
|
| The SA WG1 Chairman was thanked for this report, which was noted. |
Y |
7.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.2 |
SP-130336 |
TSG SA WG2 Report and Questions for Advice at TSG SA#61 |
SA WG2 Chairman |
SA WG2 Chairman's Status Report to TSG SA#61 |
Report |
Presentation |
Revised |
SP-130471 |
|
| Revised in SP-130471 |
Y |
7.2 |
SP-130471 |
TSG SA WG2 Report and Questions for Advice at TSG SA#61 |
SA WG2 Chairman |
SA WG2 Chairman's Status Report to TSG SA#61 |
Report |
Presentation |
Noted |
| SP-130336 |
| The SA WG2 Chairman was thanked for this report, which was noted. |
Y |
7.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.3 |
SP-130396 |
SA WG3 Status Report |
SA WG3 Chairman |
SA WG3 Chairman's Status Report to TSG SA#61 |
Report |
Information |
Noted |
|
|
| The SA WG3 Chairman was thanked for this report, which was noted. |
Y |
7.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.4 |
SP-130344 |
SA WG4 Status Report at TSG SA#61 |
SA WG4 Chairman |
SA WG4 Chairman's Status Report to TSG SA#61 |
Report |
Presentation |
Noted |
|
|
| The SA WG4 Chairman was thanked for this report, which was noted. |
Y |
7.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.5 |
SP-130426 |
SA WG5 Status Report |
SA WG5 Chairman |
SA WG5 Chairman's Status Report to TSG SA#61 |
Report |
Presentation |
Revised |
SP-130469 |
|
| Revised to correct references to NSN in SP-130469 |
Y |
7.5 |
SP-130469 |
SA WG5 Status Report |
SA WG5 Chairman |
SA WG5 Chairman's Status Report to TSG SA#61 |
Report |
Presentation |
Noted |
| SP-130426 |
| The SA WG5 Chairman was thanked for this report, which was noted. |
Y |
7.6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.6 |
SP-130475 |
TSG RAN Status Report to TSG SA#61 |
TSG RAN Chairman |
TSG RAN Chairman's report to TSG SA#61 |
Report |
Presentation |
Revised |
SP-130494 |
|
| Revised in SP-130494 |
Y |
7.6 |
SP-130494 |
TSG RAN Status Report to TSG SA#61 |
TSG RAN Chairman |
TSG RAN Chairman's report to TSG SA#61 |
Report |
Presentation |
Noted |
| SP-130475 |
| The TSG RAN Chairman was thanked for this report, which was noted. |
Y |
7.6 |
SP-130476 |
Draft report of TSG RAN meeting #61 |
TSG RAN Secretary (MCC) |
Draft meeting report of TSG RAN Meeting #61, for information. |
Report |
Information |
Noted |
|
|
| This was provided for information and was noted. |
Y |
7.6 |
SP-130479 |
Letter to ITU on Update submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 |
TSG RAN |
ITU-R Working Party 5D (WP 5D) is developing Revision 12 of the Recommendation M.1457 ('Detailed specifications of the terrestrial radio interfaces of IMT-2000 (IMT-2000)'). According to the approved procedure [...]. |
OTHER |
Endorsement |
Version for PCG in SP-130495 |
|
|
| Version for PCG in SP-130495 |
Y |
7.6 |
SP-130495 |
LS to PCG: Letter to ITU on Update submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 |
TSG SA |
ITU-R Working Party 5D (WP 5D) is developing Revision 12 of the Recommendation M.1457 ('Detailed specifications of the terrestrial radio interfaces of IMT-2000 (IMT-2000)'). According to the approved procedure [...]. |
LS OUT |
Approval |
Approved |
|
| - |
Version for PCG in SP-130495 |
Y |
7.6 |
SP-130480 |
Letter to ITU on Liaison statement to External Organizations regarding study on future technology trends for terrestrial IMT Systems |
TSG RAN |
ITU-R Working Party 5D (WP 5D) has started working on a preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS] to look at the future technologies for terrestrial IMT systems. It is planned that WP [...]. |
OTHER |
Endorsement |
Version for PCG in SP-130496 |
|
|
| Version for PCG in SP-130496 |
Y |
7.6 |
SP-130496 |
LS to PCG: Letter to ITU on Liaison statement to External Organizations regarding study on future technology trends for terrestrial IMT Systems |
TSG SA |
ITU-R Working Party 5D (WP 5D) has started working on a preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS] to look at the future technologies for terrestrial IMT systems. It is planned that WP [...]. |
LS OUT |
Approval |
Approved |
|
| - |
Version for PCG in SP-130496 |
Y |
7.6 |
SP-130481 |
Letter to ITU on Liaison Statement to PPDR External Organizations on the technologies for public protection and disaster relief communications associated with work on WRC-15 agenda item 1.3 |
TSG RAN |
ITU-R WP5A sent an LS to 3GPP (see RP-130738 in attachment) indicating that the Group is considering how the evolution in technology has met the requirements of public protection and disaster relief (PPDR) orga [...]. |
OTHER |
Endorsement |
Version for PCG in SP-130497 |
|
|
| For forwarding to the PCG |
Y |
7.6 |
SP-130497 |
LS to PCG: Letter to ITU on Liaison Statement to PPDR External Organizations on the technologies for public protection and disaster relief communications associated with work on WRC-15 agenda item 1.3 |
TSG SA |
ITU-R WP5A sent an LS to 3GPP (see RP-130738 in attachment) indicating that the Group is considering how the evolution in technology has met the requirements of public protection and disaster relief (PPDR) orga [...]. |
LS OUT |
Approval |
Approved |
|
| - |
| Y |
7.6 |
SP-130482 |
Letter to ITU in answer to Liaison statement to external organizations on Study on IMT Vision for 2020 and Beyond |
TSG RAN |
ITU-R Working Party 5D (WP 5D) is developing a new Recommendation ITU-R M.[IMT.VISION] ' Framework and overall objectives of the future development of IMT for 2020 and beyond' . This Recommendation will help en [...]. |
OTHER |
Endorsement |
Version for PCG in SP-130498 |
|
|
| For forwarding to the PCG |
Y |
7.6 |
SP-130498 |
LS to PCG: Letter to ITU in answer to Liaison statement to external organizations on Study on IMT Vision for 2020 and Beyond |
TSG SA |
ITU-R Working Party 5D (WP 5D) is developing a new Recommendation ITU-R M.[IMT.VISION] ' Framework and overall objectives of the future development of IMT for 2020 and beyond' . This Recommendation will help en [...]. |
LS OUT |
Approval |
Approved |
|
| - |
| Y |
7.7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.7 |
SP-130461 |
TSG CT Status report |
TSG CT Chairman |
TSG CT Chairman's report to TSG SA#61 |
Report |
Presentation |
Noted |
|
|
| The TSG CT Chairman was thanked for this report, which was noted. |
Y |
7.7 |
SP-130462 |
TSG CT draft meeting report |
TSG CT Secretary (MCC) |
Draft meeting report of TSG CT Meeting #61, for information. |
Report |
Information |
Noted |
|
|
| This was provided for information and was noted. |
Y |
7.7 |
SP-130463 |
IETF status report |
TSG CT Chairman |
Status of IETF dependencies |
Report |
Presentation |
Noted |
|
|
| The TSG CT Chairman was thanked for this report, which was noted. |
Y |
7.8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
7.8 |
SP-130425 |
TSG GERAN Status Report to TSG SA#61 |
TSG GERAN Chairman |
TSG GERAN Status Report to TSG SA#61 |
Report |
Presentation |
Noted |
|
|
| The TSG GERAN Chairman was thanked for this report, which was noted. |
Y |
8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.4 |
SP-130367 |
5 CRs to 23.167 (EMC1; Rel-7, Rel-8, Rel-9, Rel-10, Rel-11) |
SA WG2 |
23.167 CR0228R2; 23.167 CR0229R2; 23.167 CR0230R2; 23.167 CR0231R2; 23.167 CR0232R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
8.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
8.5 |
SP-130411 |
Stage 1 CRs on TEI8 (on Removal of IMS Operator Determined Barring Outgoing Premium Rate requirements) |
SA WG1 |
22.041 CR0021; 22.041 CR0020; 22.041 CR0019; 22.041 CR0018R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
8.5 |
SP-130431 |
Rel-8 CRs on OAM Maintenance and small Enhancements (OAM8) |
SA WG5 |
32.712 CR0004; 32.712 CR0005; 32.712 CR0006; 32.712 CR0007 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
9 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
9 |
SP-130368 |
3 CRs to 23.272 (TEI9, SAES-CSFB; Rel-9, Rel-10, Rel-11) |
SA WG2 |
23.272 CR0890R2; 23.272 CR0891R1; 23.272 CR0892R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
9 |
SP-130369 |
4 CRs to 23.203 (EHNB; Rel-9, Rel-10, Rel-11, Rel-12) |
SA WG2 |
23.203 CR0836R1; 23.203 CR0837R2; 23.203 CR0838R1; 23.203 CR0839R1 |
CR Pack |
Approval |
Approved |
|
|
| NOTE: The Rel-12 CR is not a mirror CR but is on the same subject and is presented with the Rel-9 CR |
Y |
9 |
SP-130345 |
CRs to TS 26.237 on 'Corrections on SDP Attributes (IMS_PSS_MBMS_US_EXT)' (Release 9 to Release 11) |
SA WG4 |
26.237 CR0075R1; 26.237 CR0076R1; 26.237 CR0077R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
9 |
SP-130346 |
CRs to TS 26.346 on 'Essential Correction to Schedule Fragment MIME Type (PMA-MBS_Ext)' (Release 9 to Release 11) |
SA WG4 |
26.346 CR0328; 26.346 CR0329; 26.346 CR0330 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
9 |
SP-130437 |
Rel-9 CRs on Multimedia Telephony (MMTel) Service and Supplementary Services - Online Charging and completion for Offline Charging(eMMTel-SS-CH) |
SA WG5 |
32.275 CR0045; 32.275 CR0046; 32.275 CR0047 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
9 |
SP-130438 |
Rel-9 CRs on Support of Real-time Transfer of Tariff Information (RTTI) in IMS charging (IMSTSS-RTTI-CH) |
SA WG5 |
32.260 CR0218; 32.260 CR0219; 32.260 CR0220; 32.260 CR0221 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
9 |
SP-130439 |
Rel-9 CRs on SON self-optimization managemen (LTE_SON-OAM) |
SA WG5 |
32.522 CR0140; 32.522 CR0141; 32.522 CR0142R1; 32.523 CR0003R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
10 |
SP-130347 |
CR to TS 26.247 on 'Corrections to DASH (HTTP_SDS)' (Release 10) |
SA WG4 |
26.247 CR0036 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10 |
SP-130348 |
CRs to TS 26.346 on 'Essential Corrections of DASH over MBMS (MBS_Enh)' (Release 10 and Release 11) |
SA WG4 |
26.346 CR0331R3; 26.346 CR0332R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10 |
SP-130432 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
32.423 CR0074R2; 32.423 CR0075R2; 32.526 CR0034; 32.626 CR0005 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10 |
SP-130434 |
Rel-10 CR on Charging Management (CH10) |
SA WG5 |
32.251 CR0286R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10 |
SP-130440 |
Rel-10 CRs on SON Self-optimization management continuation (LTE-SON-OAM_SO) |
SA WG5 |
32.526 CR0031R1; 32.526 CR0032R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.4 |
SP-130370 |
3 CRs to 23.204, 23.272 (SIMTC; Rel-11, Rel-12) |
SA WG2 |
23.204 CR0102R1; 23.204 CR0103R1; 23.272 CR0881R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.4 |
SP-130403 |
Release 11 CRs on Reachability Aspects of SIMTC (SIMTC-Reach) |
SA WG3 |
23.682 CR0075R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.4 |
SP-130405 |
Release 11 CRs on System Improvements to Machine-Type Communications(SIMTC) |
SA WG3 |
WITHDRAWN |
CR Pack |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
N |
11.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.6 |
SP-130371 |
2 CRs to 23.228 (eMPS; Rel-11, Rel-12) |
SA WG2 |
23.228 CR1041R2; 23.228 CR1042R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.8 |
SP-130372 |
2 CRs to 23.401 (NWK-PL2IMS; Rel-11, Rel-12) |
SA WG2 |
23.401 CR2581R2; 23.401 CR2582R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.9 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.10 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.10 |
SP-130373 |
2 CRs to 23.203 (SAPP; Rel-11, Rel-12) |
SA WG2 |
23.203 CR0834R1; 23.203 CR0835R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.11 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.14 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.15 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.16 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.18 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.19 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.20 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.21 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.22 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.23 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.24 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.25 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.26 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.27 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.28 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.28 |
SP-130349 |
CR to TS 26.346 on 'Correction to Reception Reporting Aggregation postReceptionReport timer calculation (EMM-DDE)' (Release 11) |
SA WG4 |
26.346 CR0327 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.29 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.29 |
SP-130350 |
CR to TS 26.247 on 'Corrections to DASH (M3DV)' (Release 11) |
SA WG4 |
26.247 CR0037 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.30 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.31 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.32 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.32 |
SP-130443 |
Rel-11 CRs on Unification of Charging session from SIP AS and SRVCC functions in IMS (UCHIMS_AS-SRVCC) |
SA WG5 |
32.260 CR0213; 32.260 CR0214; 32.299 CR0536; 32.299 CR0537 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.32 |
SP-130464 |
Rel-11 CR on Charging Management (CH11) |
SA WG5 |
32.275 CR0044R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.33 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.33 |
SP-130433 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
28.103 CR0005R1; 28.652 CR0002R1; 28.653 CR0002R1; 28.661 CR0001R3; 28.662 CR0001R3; 28.663 CR0001R1; 28.732 CR0001R1; 32.102 CR0050R1; 32.157 CR0002R1; 32.526 CR0033; 32.526 CR0035; 32.626 CR0006; 32.766 CR005 [...]. |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.33 |
SP-130441 |
Rel-11 CRs on IRP framework enhancements to support Management of Converged Networks(OAM-FMC-IRP) |
SA WG5 |
28.628 CR0005; 28.629 CR0003R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.34 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.35 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
11.35 |
SP-130410 |
Stage 1 CR on TEI11 (on SMSC Usage Restriction in Roaming) |
SA WG1 |
22.088 CR0006R2 |
CR Pack |
Approval |
Noted |
|
|
| This was noted and the revision in SP-130456 was approved. |
Y |
11.35 |
SP-130420 |
Stage 1 CR on TEI11 (on SMSC Usage Restriction in Roaming) |
Orange |
22.088 CR0006R3 |
CR Pack |
Approval |
Revised |
SP-130456 |
|
| Proposed update to SP-130410. |
Y |
11.35 |
SP-130456 |
Stage 1 CRs on TEI11 (on SMSC Usage Restriction in Roaming) |
Orange, Telefonica, Telecom Italia, Vodafone |
22.088 CR0006R4 |
CR Pack |
Approval |
Approved |
| SP-130420 |
| Proposed update to SP-130410. |
Y |
11.35 |
SP-130374 |
4 CRs to 23.060, 23.401 (TEI11; Rel-11, Rel-12) |
SA WG2 |
23.060 CR1803R2; 23.060 CR1802R2; 23.401 CR2570R2; 23.401 CR2569R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.35 |
SP-130375 |
4 CRs to 23.401 (TEI11, SAES; Rel-11, Rel-12) |
SA WG2 |
23.401 CR2493R3; 23.401 CR2528R2; 23.401 CR2575R1; 23.401 CR2576R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.35 |
SP-130376 |
5 CRs to 23.167, 23.272 (TEI11, EMC1, SAES-CSFB; Rel-11) |
SA WG2 |
23.167 CR0234R1; 23.272 CR0882R1; 23.272 CR0883R2; 23.272 CR0889R2; 23.272 CR0893R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.35 |
SP-130377 |
1 CR to 23.272 (TEI11, SAES-CSFB; Rel-11) |
SA WG2 |
23.272 CR0880R2 |
CR Pack |
Approval |
Noted |
|
|
| This was noted and the revision in SP-130362 was approved. |
Y |
11.35 |
SP-130362 |
Revision of SA WG2 agreed CR: 23.272 CR0880R3 (TEI11) |
NSN, NEC |
Update to SA WG2 agreed CR 23.272 CR0880R3 in SP-130377 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.35 |
SP-130378 |
4 CRs to 23.237, 23.401 (TEI11, IMS_EMER_GPRS_EPS-SRVCC, SIPTO; Rel-11, Rel-12) |
SA WG2 |
23.237 CR0466R2; 23.237 CR0467R1; 23.401 CR2583R1; 23.401 CR2584R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.35 |
SP-130351 |
CRs to TS 26.114 on 'Correction of DTMF handling (TEI11)' (Release 11 and Release 12) |
SA WG4 |
26.114 CR0258; 26.114 CR0259 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.35 |
SP-130444 |
Rel-11 CR on TEI (TEI11) |
SA WG5 |
WITHDRAWN |
CR Pack |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
N |
11.36 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12 |
SP-130343 |
LS from SA WG2: LS Reply on LTE-HRPD SON WID conditional approval |
SA WG2 |
SA WG2 would like to thank RAN for the LS in S2-132356/RP-130865 and the information given. SA WG2 discussed the conclusion of TR 37.813 on LTE-HRPD (High Rate Packet Data in 3GPP2) Inter-RAT SON, and the foll [...]. |
LS In |
Information |
Noted |
|
| S2-133082 |
| Y |
12 |
SP-130421 |
LS from RAN WG3: LS Reply on LTE-HRPD SON WID conditional approval |
RAN WG3 |
RAN WG3 would like to thank SA WG2 for the LS on LTE-HRPD SON WID conditional approval. RAN WG3 has reviewed the proposed changes by SA WG2 and would like to confirm that this is in line with RAN WG3 agreements [...]. |
LS In |
Information |
Noted |
|
| R3-131611 |
| Y |
12 |
SP-130422 |
Submission to SA#61 of a technically endorsed CR at SA WG2#98 |
Alcatel-Lucent, Alcatel-Lucent Shanghai, Huawei, Hisilicon, China Telecom, Bell, ZTE, Qualcomm Incorporated, Ericsson |
SA WG2#98 has technically endorsed CR to 23.402 in S2-132960 introducing the description of the S121 interface for Inter-RAT SON between LTE and HRPD. This CR was not agreed but it was technically endorsed due [...]. |
DISCUSSION |
Information |
Noted |
|
|
| This was provided as background to the proposed CR in SP-130423 and was noted. |
Y |
12 |
SP-130423 |
23.402 CR1162R2: Add Interface Description of E-UTRAN-HRPD Inter-RAT SON - technically endorsed at SA WG2#98 |
Alcatel-Lucent, Alcatel-Lucent Shanghai, Huawei, Hisilicon, China Telecom, Bell, ZTE, Qualcomm Incorporated, Ericsson |
23.402 CR1162R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.2 |
SP-130398 |
Revised WID for Web Real Time Communication (WebRTC) Access to IMS |
SA WG3 |
Objective: SA WG1 objectives: The objective of this work item is to specify service requirements for: - the ability for WebRTC clients to access IMS, including for example, reusing IMS client security credentia [...]. |
WID |
Approval |
Noted |
|
|
| This was noted and the revision in SP-130484 was approved. |
Y |
12.2 |
SP-130459 |
Revision of SA WG3 objectives in WebRTC WID |
Alcatel-Lucent, Orange, Huawei, ZTE |
SA WG3 has approved the SA WG3 objectives for the IMS_WebRTC WID in S3-130837, which is being contributed to SA under separate cover for endorsement. The objective related to authentication appears to disallow [...]. |
WID |
Approval |
Revised |
SP-130484 |
|
| Proposed update to SP-130398 |
Y |
12.2 |
SP-130484 |
Revision of SA WG3 objectives in WebRTC WID |
Alcatel-Lucent, Orange, Huawei, ZTE |
SA WG3 has approved the SA WG3 objectives for the IMS_WebRTC WID in S3-130837, which is being contributed to SA under separate cover for endorsement. The objective related to authentication appears to disallow [...]. |
WID |
Approval |
Approved |
| SP-130459 |
| Proposed update to SP-130398 |
Y |
12.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.5 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.9 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.10 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.11 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.13 |
SP-130413 |
Stage 1 CRs on RAN Sharing Enhancements (RSE) |
SA WG1 |
22.101 CR0463R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.14 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.15 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.15 |
SP-130412 |
Stage 1 CRs on Proximity-based Services (ProSE) |
SA WG1 |
22.115 CR0071; 22.278 CR0186; 22.278 CR0187R1; 22.278 CR0188R1; 22.278 CR0189R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.16 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.16 |
SP-130397 |
Revised WID for Group Communication System Enablers for LTE (GCSE_LTE) including security |
SA WG3 |
Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
12.17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.18 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.19 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.20 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.20 |
SP-130379 |
5 CRs to 23.060, 23.401 (LIMONET; Rel-12) |
SA WG2 |
23.060 CR1805R1; 23.060 CR1807R2; 23.401 CR2574R2; 23.401 CR2585R1; 23.401 CR2587R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.20 |
SP-130380 |
1 CR to 23.401 (LIMONET; Rel-12) |
SA WG2 |
23.401 CR2586R1 |
CR Pack |
Approval |
Noted |
|
|
| BlackBerry commented that problems had been discovered after SA WG2 approval of this CR and suggested returning it to SA WG2 for further consideration. This CR was then noted. |
Y |
12.21 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.21 |
SP-130381 |
1 CR to 23.402 (OPIIS; Rel-12) |
SA WG2 |
23.402 CR1166R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.22 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.22 |
SP-130382 |
5 CRs to 23.203 (P4C-F; Rel-12) |
SA WG2 |
23.203 CR0826R2; 23.203 CR0830R1; 23.203 CR0831R2; 23.203 CR0832R2; 23.203 CR0833R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.22 |
SP-130386 |
TR 23.896, version 1.3.1: Technical Report on Support for fixed broadband access network convergence; Stage-2 (Release 12) |
SA WG2 |
Abstract of document: TR 23.896 describes solutions for the Evolved Packet System (EPS) to facilitate policy and charging control in the fixed broadband access network in the convergent scenario where a single [...]. |
TR |
Information |
Noted |
|
|
| Noted. SA WG2 were asked to check the use of specific versions for external references |
Y |
12.22 |
SP-130442 |
Rel-12 CRs on Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_P) |
SA WG5 |
32.240 CR0368R1; 32.251 CR0288R1; 32.251 CR0289R1; 32.251 CR0290R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.23 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.24 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.24 |
SP-130361 |
Standardization of Machine-type Communications |
MCC Work Plan Manager |
Standardization of Machine-type Communications (2013-06) is available at : ftp://www.3gpp.org/Information/WORK_PLAN/Description_Releases/M2M_20130630.zip |
OTHER |
Information |
Noted |
|
|
| This was provided for information and was noted. |
Y |
12.25 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.25 |
SP-130338 |
LS from GSMA and WBA: Wi-Fi Roaming Task Force - Signalling Optimisation |
GSMA and WBA |
The Task Force concluded that one approach to control WLAN authentication signalling is for the operator to be able to set the aggressiveness of the authentication/association attempts of the UE to operator con [...]. |
LS In |
Information |
Noted |
|
| LS 3GPP WFA 26062013 |
| Y |
12.25 |
SP-130339 |
LS from WBA: WBA Carrier Wi-Fi Liaison Statement |
WBA |
The main objective of the WBA project on Carrier Wi-Fi is to create a definition on Carrier Wi-Fi and identify the key components that should be in place in order that operators can have a clear path to develop [...]. |
LS In |
Action |
Response in SP-130504 |
|
| LS_to_3GPP_31072013 |
Response drafted in SP-130491. Final response in SP-130504 |
Y |
12.25 |
SP-130477 |
LS from TSG RAN: Reply LS on WBA Carrier Wi-Fi Liaison Statement |
TSG RAN |
3GPP would like to thank WBA for the LS on WBA Carrier Wi-Fi Liaison Statement. 3GPP RAN has not been using so far the term carrier grade in its work with relation to WLAN technology and has no definition for [...]. |
LS In |
Information |
Noted |
|
| RP-131367 |
A response LS to WBA was drafted in SP-130491. This LS was then noted. |
Y |
12.25 |
SP-130491 |
Reply LS on WBA Carrier Wi-Fi Liaison Statement |
TSG SA |
To: WBA. CC: SA WG1 |
LS OUT |
Approval |
Revised |
SP-130504 |
| - |
Response to SP-130399 |
Y |
12.25 |
SP-130504 |
Reply LS on WBA Carrier Wi-Fi Liaison Statement |
TSG SA |
To: WBA. CC: SA WG1 |
LS OUT |
Approval |
Approved |
| SP-130491 |
- |
| Y |
12.25 |
SP-130387 |
TR 23.865: 'Study on WLAN network selection for 3GPP terminals; Stage 2' for approval |
SA WG2 |
Abstract of document: TR 23.865 describes enhancements to solutions for WLAN network selection. These include enhancements to ANDSF framework and 3GPP WLAN network selection procedures based on Hotspot 2.0 spec [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under TSG SA change control (Release 12). |
Y |
12.25 |
SP-130467 |
Missing policies for ANDSF for WLAN network selection and traffic steering |
Vodafone |
This document proposes to add a WLAN percentage radio signal strength policy to the proposed Release 12 WLANSP ANDSF node and a minimum throughput policy in ANDSF ISMP node as part of the WLAN_NS work in Releas [...]. |
DISCUSSION |
Discussion |
Noted |
|
|
| Noted. It was agreed that the overall time situation will be reviewed to determine whether there is time to consider these items in the normative work. |
Y |
12.25 |
SP-130342 |
LS from SA WG2: Reply LS on WiFi-Alliance Offloading Standards Work |
SA WG2 |
SA WG2 thanks Wi-Fi alliance for sharing its understanding and assessment of the differences on the scope of 3GPP and Wi-Fi Alliance Hotspot 2.0 programs. SA WG2 has discussed these assessments, and provides th [...]. |
LS In |
Information |
Noted |
|
| S2-133081 |
| Y |
12.26 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.27 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.27 |
SP-130383 |
1 CR to 23.203 (ABC; Rel-12) |
SA WG2 |
23.203 CR0823R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.27 |
SP-130436 |
Rel-12 CRs on Charging for Application Based Charging (ABC) |
SA WG5 |
32.240 CR0367R1; 32.251 CR0280R1; 32.251 CR0281R1; 32.251 CR0282R1; 32.251 CR0283R1; 32.251 CR0291; 32.296 CR0032R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.28 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.29 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.29 |
SP-130406 |
Release 12 CRs for IMS media plane security extensions (eMEDIASEC) |
SA WG3 |
33.328 CR0054R1; 33.328 CR0055R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.30 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.31 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.32 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.33 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.33 |
SP-130404 |
Release 12 CRs on Tunnelling of UE Services over Restrictive Access Networks (Stage 2/3) (TURAN) |
SA WG3 |
33.203 CR0199R1; 33.203 CR0201R1; 33.203 CR0202 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.34 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.34 |
SP-130352 |
CRs to TS 26.114 and TS 26.244 on 'Co-ordination of Video Orientation (CVO)' (Release 12) |
SA WG4 |
26.114 CR0257R2; 26.114 CR0260; 26.244 CR0050 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.35 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.36 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.36 |
SP-130353 |
CRs to TS 26.237 on 'IMS-based Streaming and Download Delivery Enhancements (IMS_SDE)' (Release 12) |
SA WG4 |
26.237 CR0079R1; 26.237 CR0080 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.37 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.37 |
SP-130354 |
CRs to TS 26.245, TS 26.247 and TS 26.430 on 'Mobile stereoscopic 3D services extensions (M3DV_Ext)' (Release 12) |
SA WG4 |
26.245 CR0003R1; 26.247 CR0035; 26.430 CR0002R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.38 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.39 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.40 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.40 |
SP-130341 |
LS from CT WG4: Reply LS on End-to-end QoS handling of MTSI |
CT WG4 |
Regarding the new requirements being raised by SA WG4 on End-to-end QoS handling of MTSI, CT WG4 kindly informs SA WG4 that some concerns were expressed by CT WG4 on the wide system impacts this work may imply [...]. |
LS In |
Information |
Noted |
|
| C4-131520 |
Noted. SA WG4 were encouraged to fulfil the actions raised in this LS |
Y |
12.40 |
SP-130355 |
CR to TS 26.114 on 'Procedures for selecting the media sending rate (E2EMTSI)' (Release 12) |
SA WG4 |
26.114 CR0255R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.41 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.41 |
SP-130400 |
Revised WID for Lawful Interception Rel-12 (LI12) |
SA WG3 |
Objective: The objective of this work item is to update lawful interception specifications for the latest Rel-12 architecture and services as described in the above justification. The enhancements to specificat [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
12.41 |
SP-130401 |
Release 12 CRs on Lawful Interception (LI12) |
SA WG3 |
33.106 CR0129; 33.107 CR0128; 33.107 CR0129; 33.107 CR0130; 33.108 CR0212; 33.108 CR0213 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.42 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.42 |
SP-130435 |
Rel-12 CRs on Charging Management (CH12) |
SA WG5 |
32.251 CR0287; 32.260 CR0224R1; 32.295 CR0007R1; 32.296 CR0030R1; 32.296 CR0031R1; 32.298 CR0404R1; 32.298 CR0405; 32.299 CR0532R1; 32.299 CR0533R1; 32.299 CR0539; 32.299 CR0540 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.43 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.43 |
SP-130465 |
Rel-12 CR on Multi-vendor Plug and Play eNB connection to the network(SON-NM-MUPPET) |
SA WG5 |
32.501 CR0006 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.43 |
SP-130445 |
TS 28.601: Telecommunication management; Core Network (CN) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Requirements |
SA WG5 |
Abstract of document: The document describes the NRM IRP requirements for Core Network (CN) and non-3GPP access Interworking System Network Resource Model (NRM) Changes since last presentation to TSG SA Meeting [...]. |
TS |
Information |
Noted |
|
|
|
| Y |
12.43 |
SP-130446 |
TS 28.602: Telecommunication management; Core Network (CN) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
Abstract of document: The document describes an Integration Reference Point (IRP) named as 'Core Network (CN) and non-3GPP access Interworking System Network Resource Model IRP' Changes since last presentation [...]. |
TS |
Information |
Noted |
|
|
|
| Y |
12.43 |
SP-130447 |
TS 28.606: Telecommunication management; Core Network (CN) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
Abstract of document: The document describes the solution set for 'Core Network (CN) and non-3GPP access Interworking System Network Resource Model IRP' Changes since last presentation to TSG SA Meeting #57: Th [...]. |
TS |
Information |
Noted |
|
|
|
| Y |
12.43 |
SP-130448 |
TS 28.611: Telecommunication management; Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Requirements |
SA WG5 |
Abstract of document: The document describes the NRM IRP requirements for Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model (NRM) Changes since last presentation to TSG SA [...]. |
TS |
Information |
Noted |
|
|
|
| Y |
12.43 |
SP-130449 |
TS 28.612: Telecommunication management; Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
Abstract of document: The document describes an Integration Reference Point (IRP) named as 'Evolved Packet Core (EPC) and non-3GPP access Interworking System Network resource Model IRP' Changes since last prese [...]. |
TS |
Information |
Noted |
|
|
|
| Y |
12.43 |
SP-130450 |
TS 28.616: Telecommunication management; Evolved Packet Core (EPC) and non-3GPP access Interworking System Network Resource Model (NRM); Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
Abstract of document: The document describes the solution set for 'Evolved Packet Core (EPC) and non-3GPP access Interworking System Network resource Model IRP' Changes since last presentation to TSG SA Meeting [...]. |
TS |
Information |
Noted |
|
|
|
| Y |
12.43 |
SP-130451 |
TR 32.836: Study on NM Centralized Coverage and Capacity Optimization (CCO) SON Function |
SA WG5 |
Abstract of document: An NM centralized CCO function would help operators in reducing OPEX related to the maintenance and optimization of network coverage and capacity by automating these functions. An NM centr [...]. |
TR |
Information |
Noted |
|
|
|
| Y |
12.43 |
SP-130452 |
TS 32.508: Technical Specification Group Services and System Aspects;Telecommunication Management;
Procedure Flows for Multi-Vendor Plug and Play eNB connection to the Network
|
SA WG5 |
Abstract of document: The present document describes the procedure flows between network entities involved in the Multi-Vendor Plug and Play eNB connection to network. These procedures are based on requirements [...]. |
TS |
Information |
Noted |
|
|
|
| Y |
12.43 |
SP-130453 |
TR 32.841: Study on WLAN Management |
SA WG5 |
Abstract of document: This document describes the study on WLAN management that focuses on WLAN performance monitoring and alarm reporting. Changes since last presentation: First presentation Outstanding Issues [...]. |
TR |
Information |
Noted |
|
|
|
| Y |
12.44 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.44 |
SP-130402 |
Release 12 CRs on Security small Enhancements (SEC12) |
SA WG3 |
33.203 CR0200 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.44 |
SP-130407 |
Release 12 CRs on TEI (TEI12) |
SA WG3 |
33.320 CR0094R3; 33.401 CR0522R1; 33.402 CR0114R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.45 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
12.45 |
SP-130384 |
4 CRs to 23.060, 23.401 (TEI12; Rel-12) |
SA WG2 |
23.060 CR1804R2; 23.060 CR1806R1; 23.401 CR2567R2; 23.401 CR2571R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.45 |
SP-130356 |
CR to TS 26.237 on 'Missing IANA Registration Information and Corrections on SDP Attributes (TEI12)' (Release 12) |
SA WG4 |
26.237 CR0078R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.4 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.5. |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.6 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.6 |
SP-130390 |
New WID on User Location Information reporting improvements |
SA WG2 |
Objective: The objective is to provide normative specification of ULI signalling optimizations according to conclusions of the FS_CNO TR 23.843. |
WID |
Approval |
Noted |
|
|
| Noted. It is assumed the study work will continue and it is understood that the normative work is already budgeted into the SA WG2 work |
Y |
13.7 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.7 |
SP-130340 |
LS from ETSI TC EE: Update on the liaison to 3GPP on Cooperation for Energy Efficiency Measurements |
ETSI TC EE |
Dear all, following the liaison from SA WG5 on 'Cooperation for Energy Efficiency Measurements' (reference: S2-122600) and the joint meeting held in Sophia Antipolis on May 29, 2013 a constant update on the ac [...]. |
LS In |
Information |
Noted |
|
| EE(13)000021 |
| Y |
13.8 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.8 |
SP-130388 |
TR 23.852: 'Study on S2a Mobility based On GTP and WLAN access to EPC (SaMOG); Stage 2' for approval |
SA WG2 |
Abstract of document: TR 23.852 describes solutions to support Trusted WLAN Access with S2a. An S2a option based on GTP and PMIP is described as well as solutions to support S2a based mobility between 3GPP acce [...]. |
TR |
Approval |
Approved |
|
|
|
| Y |
13.8 |
SP-130391 |
New WID on S2a Mobility Based on Trusted WLAN access to EPC |
SA WG2 |
Objective: This work item is intended to specify, in stage 2 normative description, the solution recommended in TR 23.852 clause 9.2 'Conclusions on SaMOG phase 2' for both GTP and PMIP-based S2a. |
WID |
Approval |
Approved |
|
|
|
| Y |
13.9 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.9 |
SP-130389 |
TR 23.890: 'Optimized Offloading to WLAN in 3GPP-RAT mobility' for information and approval |
SA WG2 |
Abstract of document: TR 23.890 describes solutions for optimised offloading to WLAN during 3GPP RAT mobility (FS_WORM). The TR includes one solution which describes some normative enhancements to ANDSF as well [...]. |
TR |
Approval |
Approved |
|
|
|
| Y |
13.9 |
SP-130392 |
Feature WID for optimized offloading to WLAN in 3GPP RAT mobility |
SA WG2 |
Objective: Complete the following changes to technical specifications (where key issues and solutions are as described in TR 23.890): - Solution 1 (Key issue 1): TR 23.890 clause 6.1 o Normative description of [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
13.9 |
SP-130385 |
3 CRs to 23.272, 23.401, 23.402 (WORM; Rel-12) |
SA WG2 |
23.272 CR0885R2; 23.401 CR2578R2; 23.402 CR1170R1 |
CR Pack |
Approval |
Approved |
|
|
| Approved. NOTE: The WORM Work Item is for approval in SP-130392 and these CRs will be presented after the WI |
Y |
13.10 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.11 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.12 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.12 |
SP-130415 |
Revised WID on Study on Application specific Congestion control for Data Communication (FS_ACDC) |
SA WG1 |
Objective: The objective of this study item is to investigate the following aspects: ? Identify the use cases and potential requirements to allow/restrict the communication initiation of particular applications [...]. |
WID |
Approval |
Approved |
|
|
| It was commented that Research in Motion should be BlackBerry. This can be corrected in the Work Plan |
Y |
13.13 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.14 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.15 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.16 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.16 |
SP-130454 |
TR 32.851: Study on OAM aspects of Network Sharing |
SA WG5 |
Abstract of document: This document is aimed at studying the operational use cases and OAM implications of Network Sharing. The conclusion of the study is to create new TS 32.xxx will be created to capture stag [...]. |
TR |
Approval |
Approved |
|
|
| SA WG5 were asked to bring a CR to remove 'hanging paragraphs' at the next meeting. |
Y |
13.17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.18 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.19 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
13.19 |
SP-130455 |
TR 32.859: Study on Alarm Management |
SA WG5 |
Abstract of document: The massive amount of network elements in a mobile system and the variety of network elements and infrastructure equipment creates huge amount of alarms saturating operators alarm manageme [...]. |
TR |
Approval |
Approved |
|
|
| SA WG5 were asked to bring a CR to remove 'hanging paragraphs' at the next meeting. |
Y |
14 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
14 |
SP-130414 |
New WID on Service Exposure and Enablement Support (SEES) |
SA WG1 |
Objective: Stage 1 objectives: Study and specify service requirements for the support of exposing selected 3GPP functions to - M2M service enablement layers (e.g. ETSI TC M2M and oneM2M). Use cases of oneM2M [...]. |
WID |
Approval |
Revised |
SP-130492 |
|
| This WID was revised off-line in SP-130492 |
Y |
14 |
SP-130492 |
New WID on Service Exposure and Enablement Support (SEES) |
SA WG1 |
Objective: Stage 1 objectives: Study and specify service requirements for the support of exposing selected 3GPP functions to - M2M service enablement layers (e.g. ETSI TC M2M and oneM2M). Use cases of oneM2M [...]. |
WID |
Approval |
Revised |
SP-130505 |
SP-130414 |
| Revised in SP-130505 |
Y |
14 |
SP-130505 |
New WID on Service Exposure and Enablement Support (SEES) |
SA WG1 |
Objective: Stage 1 objectives: Study and specify service requirements for the support of exposing selected 3GPP functions to - M2M service enablement layers (e.g. ETSI TC M2M and oneM2M). Use cases of oneM2M [...]. |
WID |
Approval |
Approved |
| SP-130492 |
|
| Y |
14 |
SP-130393 |
New WID on Network Provided Location Information for IMS (TWAN case) |
SA WG2 |
Objective: The intention of this work item is to extend the architecture defined as part of NWK-PL2IMS to allow support of TWAN connected to EPC as IPCAN, to make the TWAN location (cell-Id, e.g. fixed-line id [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
14 |
SP-130427 |
New WID Charging per IP Connectivity Access Network (IP-CAN) Session (CHIPS) |
SA WG5 |
Objective: This feature provides an IP-CAN session level charging context for both on-line and off-line charging over the Gy and Gz reference points in order to achieve the following benefits: 1. There is one [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
14 |
SP-130428 |
New WID Charging using an Alternative Roaming Provider (CHARP) |
SA WG5 |
Objective: To support the EU roaming unbundling, this work item proposes: - Specification of a standard interface, based on Diameter, for the DSP voice call proxy function to the ARP. - Specification of a DSP [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
15 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
15 |
SP-130416 |
New WID on Study on Need for multiple APNs (FS_MAPN) |
SA WG1 |
Objective: The objectives of this study are: - to provide details about the use cases where there is a need of control of APNs; - to identify potential new requirements to fulfil the use cases; - to identify po [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
15 |
SP-130417 |
New WID on Study on Co-ordinated P-GW change for SIPTO (FS_CSIPTO) |
SA WG1 |
Objective: The objective is to study use cases and identify potential requirements for network consideration of a) end-user experience and preferences and b) UE's knowledge of ongoing IP flow types ; regardi [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
15 |
SP-130418 |
New WID on Study on Enhancements for infrastructure based data communication between devices (FS_eICBD) |
SA WG1 |
Objective: The objective of this study item is to study: - Potential enhancements to support secure discovery of UEs of interest - Potential enhancements to support secure optimized end-to-end data communicati [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
15 |
SP-130399 |
New WID Study on Subscriber Privacy Impact in 3GPP (SPI) |
SA WG3 |
Objective: The SA WG3 objectives are as follows: - Identify and understand privacy related key issues impacting 3GPP network - Identify and potentially harmonize privacy requirements, e.g. MDT - Identify existi [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
15 |
SP-130357 |
New Study Item Description on 'HTML5 for a New Presentation Layer in 3GPP Services' (FS_HTM5) |
SA WG4 |
Objective: HTML5 is the new standard for the markup language for the web. HTML5 was revised to provide better support for advanced multimedia technologies while maintaining simple readability and improving comp [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
15 |
SP-130429 |
New WID Study on Lightweight Itf-N (FS_OAM_Itf-Nlight) |
SA WG5 |
Objective: This study item will: 1. Study on profile(s) for the Requirements for lightweight Itf-N. Based on the actual maintenance requirements of operators, select necessary requirements from currently defi [...]. |
WID |
Approval |
Noted |
|
|
| Noted. It was decided to return this to SA WG5 to address the concerns raised and try to come to consensus on the scope of this work |
Y |
15 |
SP-130430 |
New WID Enhancements of OAM aspects of Distributed MLB SON function |
SA WG5 |
Objective: The objective of the study is to - Identify whether D-SON MLB as currently standardized in 3GPP can be improved - In case potential areas of improvement are identified propose possible solutions The [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
16 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
16.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
16.1 |
SP-130359 |
3GPP Work Plan review at Plenary #61 |
MCC Work Plan Manager |
Presentation of 3GPP Work Plan review at Plenary #61 |
Work Plan |
Presentation |
Noted |
|
|
| The MCC Work Plan Manager was thanked for this presentation, which was noted. |
Y |
16.1 |
SP-130360 |
3GPP Releases Descriptions - Rel-11 to Rel-13 |
MCC Work Plan Manager |
3GPP Releases Descriptions - R99 to Rel-13 http://www.3gpp.org/ftp/Information/WORK_PLAN/Description_Releases/ 3GPP Work Plan http://www.3gpp.org/ftp/Information/WORK_PLAN - Contains Release 1999 to Release [...]. |
OTHER |
Information |
Noted |
|
|
| This was provided for information and was noted. |
Y |
16.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
16.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.1 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.1 |
SP-130365 |
CRs to 21.801 on file formats and on the use of coloured fonts |
MCC Support Team Coordinator |
21.801 CR0035R1; 21.801 CR0036; 21.801 CR0037 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
17.2 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
17.2 |
SP-130366 |
MCC Support Team Report |
MCC Support Team Coordinator |
MCC activities Status Report to TSG SA#61 |
Report |
Presentation |
Noted |
|
|
| The MCC Support Team Coordinator was thanked for this presentation, which was noted. |
Y |
18 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
18 |
SP-130488 |
Interleaved setup for 'one week TSG' |
TSG Chairs, Telefonica, Vodafone, NEC |
The present contribution suggests an alternative one-week-TSG setup using interleaving of TSG RAN and TSG SA for consideration. |
DISCUSSION |
Discussion |
Noted |
|
|
| Noted. No change agreed until after 1-week TSGs trial |
Y |
|
Created: 2013-09-12 06:43     END OF LIST
Last Allocated Document: SP-130506