Last Allocated Document: SP-130331
Temporary Document List - Ordered by TD
Colour Key: |
No Conclusion |
Conclusion Reached |
Document Revised |
Document Withdrawn |
Document Not Handled |
|
The Hyperlinks are to the FTP server: ftp://ftp.3gpp.org/tsg_sa/TSG_SA/TSGS_60/Docs/
Created: 2013-06-18 17:09     START OF LIST
Agenda |
TD |
LongTitle |
Source |
Summary |
Doc_Type |
Doc_For |
Decision |
Rev_By |
Rev_Of |
LS_Source_file |
Comment |
Rx |
2 |
SP-130162 |
Draft agenda for TSG SA meeting #60 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #60 |
Agenda |
Approval |
Approved |
|
|
| The draft agenda was reviewed and approved. |
Y |
4.1 |
SP-130163 |
Draft Report of TSG SA meeting #59 |
TSG SA Secretary |
Draft Report of TSG SA meeting #59 containing revision marks of changes on the distributed draft. |
Report |
Approval |
Approved |
|
|
| The draft report was reviewed and approved. The revision marks will be accepted and the report placed on the FTP server as version 1.0.0. |
Y |
7.6 |
SP-130164 |
LS on TSG SA feedback to Annex 1 of Rec. ITU-R M.2012 |
TSG SA |
To: TSG RAN ITU-R Ad-Hoc Cc: TSG CT. For e-mail approval before the meeting |
LS OUT |
Approval |
Approved |
|
|
| The document was approved by e-mail before the meeting. |
Y |
6 |
SP-130165 |
LS from Broadband Forum: Performance Measurements Architecture |
Broadband Forum |
The Broadband Forum would like to share the current status and thinking of its efforts related to performance measurement. There are coordinated efforts underway in multiple Broadband Forum working groups under [...]. |
LS In |
Information |
Noted. Forwarded to SA WG5 |
|
| bbf2013.330.03 |
This was noted and will be forwarded to SA WG5. |
Y |
6 |
SP-130166 |
LS from ITU-T SG13: Request for information for the new draft Recommendation Q.1741.9 (referencing of 3GPP Release 11) |
ITU-T SG13 |
ITU-T SG13 'Future networks including cloud computing, mobile and next-generation networks' thanks 3GPP for the input to our referencing Recommendations of Release 1999, Release 4, Release 5, Release 6, Release [...]. |
LS In |
Action |
Noted |
|
| COM 13 - LS 5 (.pdf) |
A list of relevant 3GPP Specifications was provided in SP-130290 which was reviewed. This was then noted. |
Y |
12.23 |
SP-130167 |
LS from TSG GERAN: Reply LS on requesting input on MTCe solutions |
TSG GERAN |
GERAN would like to inform SA WG2 that it has analyzed the potential impacts on the GERAN specifications from increasing the paging cycle where it is assumed that such a feature will result in a substantial dec [...]. |
LS In |
Information |
Noted |
|
| GP-130535 |
This LS was copied to TSG SA for information and was noted. |
Y |
6 |
SP-130168 |
LS from IEEE 802 OmniRAN SG: Interpretations of assumptions in chapter 16 of 3GPP TS 23.402 V11.6.0 (2013-03) on the behavior of a Trusted WLAN Access Network |
IEEE 802 OmniRAN SG |
Dear Colleague: On 16 November 2012, the IEEE 802 Executive Committee chartered the OmniRAN Study Group (SG) to consider the specification of an Open Mobile Network Interface for Omni-Range Area Networks based [...]. |
LS In |
Information |
Noted |
|
| omniran-13-0024-01-ecsg |
This was also addressed to SA WG2 and should be handled by SA WG2 when they have conclusions on the SaMOG work. This was then noted. |
Y |
12.24 |
SP-130169 |
LS from Wi-Fi Alliance: Hotspot 2.0 Release 2 Draft Technical Specification |
Wi-Fi Alliance |
Wi-Fi Alliance would like to inform you of the progress of work in the Hotspot 2.0 Technical Specification that could be of interest to 3GPP TSG SA, SA WG2 and CT WG1. The Hotspot 2.0 Technical Task Group (TTG) [...]. |
LS In |
Information |
Noted |
|
| Wi-Fi Alliance LS on Hotspot 2 0 Rel 2 20130423-v2 |
This was provided to TSG SA for information and was noted. |
Y |
12.24 |
SP-130170 |
LS from NGMN: Draft Liaison Statement from NGMN to GSMA, 3GPP, WFA and WBA |
NGMN |
The main objective of the NGMN project on Heterogeneous Networks Evolution and Operations (P-HEVOR) is the definition of use cases and requirements for fast and appropriate operation of heterogeneous networks. [...]. |
LS In |
Information |
Noted |
|
| 2013_04_04_NGMN-Liaison-P-HEVOR |
MCC were to also provide the information to SA WG2 to determine if there are any impacts on ongoing work or trigger new work. With this, the LS was noted. |
Y |
6 |
SP-130171 |
LS from NGMN: Liaison Letter to 3GPP on Mobile Content Delivery Optimization |
NGMN |
NGMN Alliance is an initiative by a group of leading mobile operators to provide a vision for technology evolution beyond 3G for the competitive delivery of broadband wireless services to increase further end-c [...]. |
LS In |
Information |
Noted |
|
| NGMN-Liaison-LS_NGMN_to_3GPP |
This was reviewed and noted. |
Y |
12.42 |
SP-130172 |
LS from SA WG5: LS on completion of TS 28.390 Fixed Mobile Convergence (FMC) Interface IRP Solution Profiles (SPs) |
SA WG5 |
SA WG5 has completed work on the construction of a 3GPP Solution Profile to support NGCOR Fault Management requirements, as expressed in Next Generation Converged Operations Requirements v1.3. SA WG5 therefore [...]. |
LS In |
Information |
Noted |
|
| S5-130733 |
This was provided for information and was noted. |
Y |
8.4 |
SP-130173 |
LS from SA WG5: LS on IMS service level trace removal of feature from old releases |
SA WG5 |
SA WG5 would like to thank CT WG1 for the LS C1-124915 informing about removal of the IMS Service Level Trace feature due to lack of required IETF functionality. SA WG5 produced the CRs (see attached documents [...]. |
LS In |
Information |
Noted |
|
| S5-130794 |
The TSG CT Chairman reported that CT WG1 will consider removing this from Release 11 and inform SA WG5 of their decision, then SA WG5 can determine whether to remove it from their Rel-11 specifications. This was then noted. |
Y |
16.1 |
SP-130174 |
3GPP Work Plan review at Plenary #60 |
MCC Work Plan manager |
3GPP Work Plan review at Plenary #60 |
Work Plan |
Presentation |
Noted |
|
|
| The MCC coordinator was thanked for this report, which was noted. |
Y |
16.1 |
SP-130175 |
3GPP Releases Descriptions - Rel-11 to Rel-13 |
MCC Work Plan manager |
3GPP Releases Descriptions |
OTHER |
Information |
Noted |
|
|
|
| Y |
12.23 |
SP-130176 |
Standardization of Machine-type Communications |
MCC Work Plan manager |
Standardization of Machine-type Communications |
OTHER |
Information |
Noted |
|
|
| This was provided for information and was noted. |
Y |
13.9 |
SP-130177 |
LS from GSMA and WBA: Wi-Fi Roaming Task Force - Trusted WiFi and IP address preservation |
GSMA and WBA |
Both GSMA and WBA have a strong shared interest to improve the Wi-Fi experience for their respective customers, and to enable data offload and roaming. In April 2011, GSMA and WBA formed a joint taskforce to ad [...]. |
LS In |
Action |
Noted |
|
| LS1 22052013 |
It was noted that the intention is to complete the SaMOG work in the Rel-12 timeframe and assuming decisions can be made in SA WG2 should be on target. This was then noted. |
Y |
13.9 |
SP-130178 |
LS from GSMA and WBA: Wi-Fi Roaming Task Force - Delivery of voice and real time services over Trusted Wi-Fi |
GSMA and WBA |
Both GSMA and WBA have a strong shared interest to improve the Wi-Fi experience for their respective customers, and to enable data offload and roaming. In April 2011, GSMA and WBA formed a joint taskforce to ad [...]. |
LS In |
Action |
Noted |
|
| LS2 22052013 |
This should be considered by SA WG2 and discussed in thei SaMOG sessions. This was then noted. |
Y |
13.9 |
SP-130179 |
LS from Wi-Fi Roaming Task Force: Wi-Fi Roaming Task Force - Roaming impacts |
Wi-Fi Roaming Task Force |
Both GSMA and WBA have a strong shared interest to improve the Wi-Fi experience for their respective customers, and to enable data offload and roaming. In April 2011, GSMA and WBA formed a joint taskforce to ad [...]. |
LS In |
Information |
Noted |
|
| LS3 22052013 |
This was provided for information and was noted. |
Y |
7.4 |
SP-130180 |
SA WG4 Status Report at TSG SA#60 |
SA WG4 Chairman |
SA WG4 Status Report to TSG SA#60 |
Report |
Information |
Noted |
|
|
| The SA WG4 Chairman was thanked for this report, which was noted. |
Y |
9 |
SP-130181 |
CRs to TS 26.114 on 'Correction on ECN Capability Indication in the SDP (LTEimp-Vocoder)' (Release 9 until Release 12) |
SA WG4 |
26.114 CR0247R1; 26.114 CR0248R1; 26.114 CR0249R1; 26.114 CR0250R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
9 |
SP-130182 |
CRs to TS 26.237 on 'Clarification on File Repair Procedure in IMS-based MBMS Download Service (IMS_PSS_MBMS_US_EXT)' (Release 9 until Release 11) |
SA WG4 |
26.237 CR0072R1; 26.237 CR0073R1; 26.237 CR0074R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
9 |
SP-130183 |
CRs to TS 26.234 and TS 26.346 on 'PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9 until Release 11) |
SA WG4 |
26.234 CR0211; 26.234 CR0212; 26.346 CR0321R2; 26.346 CR0322R2; 26.346 CR0323R2; 26.346 CR0324R1; 26.346 CR0325R1; 26.346 CR0326R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10.17 |
SP-130184 |
CRs to TS 26.247 on 'HTTP-based Streaming and Download Services (HTTP_SDS)' (Release 10 and Release 11) |
SA WG4 |
26.247 CR0018R6; 26.247 CR0031; 26.247 CR0025R2; 26.247 CR0026R2; 26.247 CR0027R1; 26.247 CR0028R1; 26.247 CR0029R2; 26.247 CR0030R2 |
CR Pack |
Approval |
Approved |
|
|
| A number of editorial and formatting errors were reported. MCC were asked to correct these editorial errors on implementation of the CRs. These CRs were then approved |
Y |
11.27 |
SP-130185 |
CRs to TS 26.132 on 'Extensions of Acoustic Test Specifications (Ext_ATS)' (Release 11) |
SA WG4 |
26.132 CR0058R1; 26.247 CR0061R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.29 |
SP-130186 |
CR to TS 26.234 on 'Missing RDF schema identification (M3DV)' (Release 11) |
SA WG4 |
26.234 CR0213 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.35 |
SP-130187 |
CR to TS 26.346 on 'Confidentiality Protection of Associated Delivery Procedure Messages (TEI11)' (Release 11) |
SA WG4 |
26.346 CR0306R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.33 |
SP-130188 |
CRs to TS 26.114 and TS 26.234 on 'Co-ordination of Video Orientation (CVO)' (Release 12) |
SA WG4 |
26.114 CR0237R1; 26.114 CR0246R1; 26.234 CR0214 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.37 |
SP-130189 |
CRs to TS 26.131 and TS 26.132 on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE (ART_LTE)' (Release 12) |
SA WG4 |
26.131 CR0056; 26.131 CR0057R1; 26.114 CR0059R1; 26.114 CR0060R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.38 |
SP-130190 |
Revised Work Item Description on 'Enhanced MBMS Operation' (MI-EMO) (BB) |
SA WG4 |
Objective: The objectives of this work item are to standardise the following aspects of MBMS operation: - Improve MBMS OTA efficiency (e.g. by object bundling, reduction of FLUTE overhead, etc.) - Improve MBM [...]. |
WID |
Approval |
Approved |
|
|
| This updated WID was approved. |
Y |
12.44 |
SP-130191 |
CRs to TS 26.114 on 'Technical Enhancements and Improvements Rel-12 (TEI12)' (Release 12) |
SA WG4 |
26.114 CR0253R1; 26.114 CR0254 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
13.15 |
SP-130192 |
TR 26.938 on 'Packet-Switched Streaming Service (PSS): Improved Support for Dynamic Adaptive Streaming over HTTP in 3GPP (Release 12)', v. 1.0.0 (FS_IS_DASH) |
SA WG4 |
Abstract of document: 3GPP's Dynamic Adaptive Streaming over HTTP (DASH) specifications had been developed in Rel-9 and Rel-10 and are available in TS 26.247. Despite being integrated into the PSS architecture, [...]. |
TR |
Information |
Noted |
|
|
| This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG4. |
Y |
7.1 |
SP-130193 |
SA WG1 Report to TSG SA#60 |
SA WG1 Chairman |
SA WG1 Status Report to TSG SA#60 |
Report |
Presentation |
Noted |
|
|
| The SA WG1 Chairman was thanked for this report, which was noted. |
Y |
9 |
SP-130194 |
Stage 1 CRs on TEI9 |
SA WG1 |
22.101 CR0457R1; 22.101 CR0458R2; 22.101 CR0460R2 |
CR Pack |
Approval |
Approved |
SP-130314 |
|
| It was reported that the clauses affected were not correctly listed. These CRs should also show UICC impacted. These CRs were then approved. |
Y |
11.35 |
SP-130195 |
Stage 1 CRs on TEI11 |
SA WG1 |
22.101 CR0452; 22.173 CR0091 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.44 |
SP-130196 |
Stage 1 CRs on TEI12 |
SA WG1 |
22.030 CR0018R1; 22.173 CR0090R2; 22.268 CR0045R2; 22.268 CR0046R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.15 |
SP-130197 |
Revised WID on Group Communication System Enablers for LTE (GCSE_LTE) |
SA WG1 |
Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Revised |
SP-130326 |
|
| The MCC Work Plan manager suggested adding the UID, outlined some corrections needed to the schedule and add the SA WG2 TR number. This was revised in SP130326 |
Y |
12.15 |
SP-130198 |
Presentation of TS 22.468 on Group Communication System Enablers for LTE (GCSE_LTE) |
SA WG1 |
Abstract of document: The present document collects the requirements as relevant to improve the EPC and E-UTRAN for system enablers to the 3GPP system to support Group Communication over LTE for Public Safety a [...]. |
TS |
Approval |
Noted |
|
|
| Proposed MCC revision in SP-130292 |
Y |
12.14 |
SP-130199 |
Stage 1 CRs on Proximity-based Services (ProSE) |
SA WG1 |
21.905 CR0110R2; 22.115 CR0070R1; 22.115 CR0068R3; 22.278 CR0133; 22.278 CR0150R2; 22.278 CR0143R1; 22.278 CR0140R1; 22.278 CR0128R2; 22.278 CR0152R1; 22.278 CR0153R3; 22.278 CR0156R1; 22.278 CR0148R3; 22.278 C [...]. |
CR Pack |
Approval |
Revised |
SP-130315 |
|
|
| Y |
12.2 |
SP-130200 |
Stage 1 CRs on Web Real Time Communication Access to IMS (IMS_WebRTC) |
SA WG1 |
22.228 CR0196R3 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
14 |
SP-130201 |
New WID on RAN Sharing Enhancements (RSE) |
SA WG1 |
Objective: The objective of this work item is to standardize means that complement existing system capabilities for sharing common RAN resources. The work will take into account the following topics - Allocati [...]. |
WID |
Approval |
Noted |
|
|
| A proposed update to this WID was provided by NEC and MCC in SP-130283. This was then noted. |
Y |
12.14 |
SP-130202 |
Stage 1 CRs on Feasibility Study on Proximity-based Services (FS_ProSe) |
SA WG1 |
22.803 CR0064R1 |
CR Pack |
Approval |
Revised |
SP-130316 |
|
|
| Y |
13.6 |
SP-130203 |
TR 22.852 on Feasibility Study on RAN Sharing Enhancements (FS_RSE) |
SA WG1 |
Abstract of document: TR 22.852 provides a study on scenarios and use cases of multiple operators sharing radio network resources and creates potential requirements that complement existing system capabilities [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under TSG SA change control (Release 12). |
Y |
15 |
SP-130204 |
New WID on Feasibility Study on Resilient E-UTRAN Operation for Public Safety (FS_REOPS) |
SA WG1 |
Objective: The objective is to study use cases and identify potential requirements for resilient E-UTRAN operation in support of mission critical network operations. Initial scenarios (but not excluding scenari [...]. |
WID |
Approval |
Noted |
|
|
| A proposed update to this WID was provided by NEC and MCC in SP-130240. This was then noted. |
Y |
17.2 |
SP-130205 |
MCC Support Team Report |
MCC Support Team Coordinator |
Report of the MCC Support Team activities |
Report |
Presentation |
Noted |
|
|
| The MCC Support Team Coordinator was thanked for this report, which was noted. |
Y |
10.11 |
SP-130206 |
LS from CT WG1: Reply LS on UE's inconsistent behaviour when PS Back-off timer is running |
CT WG1 |
CT WG1 thanks SA WG2 for the reply LS in S2-131283/C1-131808. CT WG1 discussed the stage 2 requirments and agreed that the the UE shall not initiate MO SMS and/or user data traffic in GERAN when the UE is back [...]. |
LS In |
Information |
Noted |
|
| C1-132609 |
It was decided to return the CRs to SA WG2 and SA WG2 were asked to respond to the CT WG1 Liaison before reconsidering these CRs. This was then noted. |
Y |
7.6 |
SP-130207 |
LS from RAN WG3: LS on information of progress in the SI on LTE-HRPD SON |
RAN WG3 |
RAN WG3 would like to inform about the final conclusion of the Study on LTE-HRPD (High Rate Packet Data in 3GPP2) Inter RAT SON, which is captured in the attached agreed TR. RAN WG3 expects that no additional [...]. |
LS In |
Information |
Noted |
|
| R3-131134 |
This was reviewed and noted |
Y |
7.8 |
SP-130208 |
TSG GERAN Status Report to TSG SA#59 |
TSG GERAN Chairman |
TSG GERAN Status Report to TSG SA#60 |
Report |
Presentation |
Noted |
|
|
| The TSG GERAN Chairman was thanked for this report, which was noted. |
Y |
7.6 |
SP-130209 |
Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012, 'Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)' |
ITU-R Ad-hoc |
Actions: ITU-R Ad Hoc asks TSG RAN to review the attached annexes and submit the approved version to TSG SA. ITU-R Ad Hoc asks TSG CT to review the attached annexes and provide feedbacks to TSG SA and TSG RAN. [...]. |
OTHER |
Review |
Noted |
|
|
| This was the input to the review in TSG RAN and was noted. |
Y |
7.2 |
SP-130210 |
SA WG2 Report to TSG SA#60 |
SA WG2 Chairman |
SA WG2 Status Report to TSG SA#60 |
Report |
Presentation |
Noted |
|
|
| The SA WG2 Chairman was thanked for this report, which was noted. |
Y |
9 |
SP-130211 |
3 CRs to 23.272 (IMS_EMER_GPRS_EPS - Rel-9, Rel-10, Rel-11) |
SA WG2 |
23.272 CR0869R4; 23.272 CR0870R4; 23.272 CR0871R4 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10.11 |
SP-130212 |
5 CRs to 23.272, 23.401 (NIMTC - Rel-10, Rel-11, Rel-12) |
SA WG2 |
23.272 CR0878; 23.272 CR0879R1; 23.401 CR2522R2; 23.401 CR2523R1; 23.401 CR2524R1 |
CR Pack |
Approval |
23.272 CR0878 and 23.272 CR0879R1 Approved |
|
|
| 23.401 CR2522R2; 23.401 CR2523R1; 23.401 CR2524R1 were returned to SA WG2 for further consideration with the LS from CT WG1. 23.272 CR0878 and 23.272 CR0879R1 were approved. |
Y |
10.25 |
SP-130213 |
8 CRs to 23.251, 23.237, 23.060 (TEI10 - Rel-10, Rel-11, Rel-12) |
SA WG2 |
23.251 CR0092R2; 23.251 CR0093; 23.237 CR0459R1; 23.237 CR0460R1; 23.237 CR0461R1; 23.060 CR1766R4; 23.060 CR1767R2; 23.060 CR1768R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10.26 |
SP-130214 |
2 CRs to 23.216 (eSRVCC - Rel-10, Rel-11) |
SA WG2 |
23.216 CR0313R1; 23.216 CR0314R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.1 |
SP-130215 |
2 CRs to 23.228 (IPXS - Rel-11, Rel-12) |
SA WG2 |
23.228 CR1032; 23.228 CR1033 |
CR Pack |
Approval |
Approved |
|
|
| CT WG1 dependent CRs in CP-130249: 23.218 CR0169R1; 23.218 CR0170R1 |
Y |
11.4 |
SP-130216 |
10 CRs to 23.204, 23.002, 23.401, 23.272, 23.682 (SIMTC, SIMTC-Reach - Rel-11, Rel-12) |
SA WG2 |
23.204 CR0100R1; 23.204 CR0101R1; 23.002 CR0261R2; 23.002 CR0262R2; 23.401 CR2539R1; 23.401 CR2540R1; 23.272 CR0847R3; 23.682 CR0069R4; 23.682 CR0072R3; 23.682 CR0073R1 |
CR Pack |
Approval |
Revised |
SP-130305 |
|
| Revised to remove erroneous CRs in SP-130305 |
Y |
11.5 |
SP-130217 |
2 CRs to 23.203 (BBAI - Rel-11, Rel-12) |
SA WG2 |
23.203 CR0812; 23.203 CR0813 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.8 |
SP-130218 |
6 CRs to 23.203, 23.228 (NWK-PL2IMS - Rel-11, Rel-12) |
SA WG2 |
23.203 CR0803R2; 23.203 CR0804R2; 23.203 CR0818R2; 23.203 CR0819R2; 23.228 CR1038R1; 23.228 CR1040R2 |
CR Pack |
Approval |
Revised |
SP-130306 |
|
| Revised to remove erroneous CRs in SP-130306 |
Y |
11.10 |
SP-130219 |
3 CRs to 23.002, 23.203 (SAPP - Rel-11, Rel-12) |
SA WG2 |
23.002 CR0265; 23.203 CR0809R2; 23.203 CR0810R2 |
CR Pack |
Approval |
Revised |
SP-130307 |
|
| Revised to remove erroneous CRs in SP-130307 |
Y |
11.16 |
SP-130220 |
2 CRs to 23.060 (SIRIG - Rel-11, Rel-12) |
SA WG2 |
23.060 CR1778R3; 23.060 CR1779R3 |
CR Pack |
Approval |
Revised |
SP-130319 |
|
| Editorial corrections were needed and this was revised in SP-130319 |
Y |
11.19 |
SP-130221 |
1 CR to 23.216 (rSRVCC - Rel-11) |
SA WG2 |
23.216 CR0317R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.35 |
SP-130222 |
1 CR to 23.060 (TEI11 - Rel-11) |
SA WG2 |
23.060 CR1784R2 |
CR Pack |
Approval |
Approved |
|
|
| NOTE: The Rel 12 mirror CR is provided by company contribution in SP-130242 |
Y |
11.35 |
SP-130223 |
12 CRs to 23.221, 23.272, 23.203, 23.237, 23.292 (TEI11 - Rel-11, Rel-12) |
SA WG2 |
23.221 CR0148R6; 23.272 CR0872R3; 23.203 CR0783R3; 23.203 CR0798R2; 23.203 CR0805R1; 23.203 CR0806R1; 23.237 CR0462R1; 23.237 CR0463R1; 23.292 CR0199; 23.292 CR0200; 23.292 CR0197R3; 23.292 CR0198R3 |
CR Pack |
Approval |
Approved |
SP-130308 |
|
| Editorial errors were reported which should be corrected by MCC. These CRs were then approved. |
Y |
11.35 |
SP-130224 |
12 CRs to 23.167, 23.216, 23.272, 23.060 (TEI11, Earlier Rel WIs - Rel-11, Rel-12) |
SA WG2 |
23.167 CR0223R1; 23.167 CR0226R2; 23.216 CR0315R1; 23.216 CR0318R1; 23.272 CR0868R2; 23.272 CR0873R2; 23.272 CR0875R2; 23.272 CR0877R2; 23.272 CR0874R2; 23.060 CR1738R2; 23.060 CR1777R1 |
CR Pack |
Approval |
Revised |
SP-130309 |
|
| Revised to remove erroneous CRs in SP-130309 |
Y |
11.35 |
SP-130225 |
12 CRs to 23.060, 23.401, 23.402 (TEI11, Earlier Rel WIs - Rel-11, Rel-12) |
SA WG2 |
23.060 CR1761R1; 23.060 CR1762R2; 23.401 CR2517R1; 23.401 CR2518R1; 23.060 CR1763R2; 23.060 CR1764R2; 23.401 CR2519R2; 23.401 CR2520R2; 23.060 CR1772R1; 23.060 CR1773R1; 23.402 CR1153R1; 23.402 CR1154R1 [...]. |
CR Pack |
Approval |
Approved |
|
|
| (To older Release WIs, but accepted for Rel-11 onwards) |
Y |
12.19 |
SP-130226 |
8 CRs to 23,002, 23.401, 23.060 (LIMONET - Rel-12) |
SA WG2 |
23.002 CR0263R2; 23.401 CR2521R2; 23.401 CR2538R2; 23.060 CR1775R1; 23.401 CR2546R5; 23.060 CR1791R1; 23.401 CR2561; 23.060 CR1795 |
CR Pack |
Approval |
Revised |
SP-130310 |
|
| Revised to remove erroneous CRs in SP-130310 |
Y |
12.20 |
SP-130227 |
1 CR to 23.402 (OPIIS - Rel-12) |
SA WG2 |
23.402 CR1157 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.21 |
SP-130228 |
1 CR to 23.139 (P4C-TI - Rel-12) |
SA WG2 |
23.139 CR0043R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.25 |
SP-130229 |
1 CR to 23.203 (UMONC - Rel-12) |
SA WG2 |
23.203 CR0800R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.26 |
SP-130230 |
3 CRs to 23,002, 23.203 (ABC - Rel-12) |
SA WG2 |
23.002 CR0264R2; 23.203 CR0799R5; 23.203 CR0808R3 |
CR Pack |
Approval |
23.203 CR0808R3 revised. Others approved |
|
|
| The clauses affected were wrong in 23.203 CR0808R3, so this was revised into SP-130329. The remaining CRs in this pack were approved. |
Y |
12.27 |
SP-130231 |
1 CR to 23.228 (BUSTI - Rel-12) |
SA WG2 |
23.228 CR1031R5 |
CR Pack |
Approval |
Approved |
|
|
| External references should be avaoided wherever possible in 3GPP specifications |
Y |
12.44 |
SP-130232 |
11 CRs to 23.237, 23.060, 23.401, 23.236, 23.402 (TEI12 - Rel-12) |
SA WG2 |
23.237 CR0458; 23.060 CR1781R5; 23.401 CR2543R5; 23.060 CR1797R2; 23.401 CR2566R3; 23.236 CR0050R3; 23.401 CR2562R3; 23.060 CR1793R2; 23.401 CR2557R2; 23.401 CR2559R1; 23.402 CR1160R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.21 |
SP-130233 |
TR 23.839: Study on Support of BBF Access Interworking (Release 12) for approval (P4C-TI) |
SA WG2 |
Abstract of document: Based on requirements documented in the stage 1 specifications, this technical report addresses system architecture impacts to support BBF Access Interworking. The study includes multiple [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under TSG SA change control (Release 12). |
Y |
12.23 |
SP-130234 |
TR 23.887: Machine-Type and other Mobile Data Applications Communications Enhancements (Release 12) for information (MTCe) |
SA WG2 |
Abstract of document: The TR 23.887 studies and evaluates architectural enhancements for Machine Type and other mobile data applications communications (MTCe). System improvements for MTCe are divided into foll [...]. |
TR |
Information |
Noted |
|
|
| This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG2. |
Y |
12.24 |
SP-130235 |
TR 23.865: WLAN network selection for 3GPP terminals; Stage 2 (Release 12) for information (WLAN_NS) |
SA WG2 |
Abstract of document: TR 23.865 describes enhancements to solutions for WLAN network selection. These include enhancements to ANDSF framework and 3GPP WLAN network selection procedures based on Hotspot 2.0 spec [...]. |
TR |
Information |
Noted |
|
|
| This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG2. |
Y |
12.27 |
SP-130236 |
TR 23.897: Feasibility study on IMS Business Trunking for IP-PBX in Static Mode of Operation (Release 12) for approval (BusTI) |
SA WG2 |
Abstract of document: Among other aspects, Common IMS requires that the IMS is able to connect with Next Generation Corporate Networks (NGCN), also known as IP-PBXs. Some of the IP-PBXs can be operated in stati [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under TSG SA change control (Release 12). |
Y |
13.7 |
SP-130237 |
TR 23.843: Study on Core Network Overload Solutions; (Release 12) for information (FS_CNO) |
SA WG2 |
Abstract of document: This Technical Report addresses the stage 2 study for core network signalling overload scenarios and potential general handling solutions, in particular: - Scenarios and problem analysis f [...]. |
TR |
Information |
Noted |
|
|
| This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG2. |
Y |
12.2 |
SP-130238 |
Revised WID for Web Real Time Communication (WebRTC) Access to IMS |
SA WG2 |
Objective: SA WG1 objectives: The objective of this work item is to specify service requirements for: - the ability for WebRTC clients to access IMS, including for example, reusing IMS client security credentia [...]. |
WID |
Approval |
Revised |
SP-130325 |
|
| The WID was revised to correct the SA WG1 CR approval dates and add the TR number and UID in SP-130325 |
Y |
12.26 |
SP-130239 |
Revised WID on Application Based Charging |
SA WG2 |
Objective: This Work item aims to enhance the system to support application based charging for the applications detected, enforced and charged by the TDF or by the PCEF enhanced with Application Detection and C [...]. |
WID |
Approval |
Revised |
SP-130328 |
|
| Huawei asked to be removed from the supporting compaies for this update. This was revised in SP-130328 |
Y |
15 |
SP-130240 |
Minor update of proposed new study item FS_REOPS (SP-130204) |
General Dynamics Broadband UK |
This company contribution proposes to update the new study item that was agreed by SA WG1#62 in S1-133305 (SP-130204). Subsequent to SA WG1#62 MCC identified that the 'MMI Aspects' section should not have been [...]. |
WID |
Approval |
Approved |
|
|
| China Mobile asked why this study needs 1 year to complete. This was the expected time to complete. This new Study WID was then approved. |
Y |
9 |
SP-130241 |
3 CRs to 23.272 (TEI9 - Rel-9, Rel-10, Rel-11) |
SA WG2 |
23.272 CR0854R3; 23.272 CR0862R2; 23.272 CR0863R2 |
CR Pack |
Approval |
Approved |
|
|
| Stage 3 CRs have been postponed |
Y |
11.35 |
SP-130242 |
Rel-12 mirror CR: 23.060 CR1798: Incomplete specification text on link MTU size for IPv6 |
Intel, Juniper Networks, Ericsson, ST-Ericsson, Nokia Siemens Networks |
23.060 CR1798 |
CR Pack |
| Approved |
|
|
| Rel-12 mirror CR missing from SP-130222 |
Y |
7.3 |
SP-130243 |
SA WG3 Status Report |
SA WG3 Chairman |
SA WG3 Status Report to TSG SA#60 |
Report |
Presentation |
Noted |
|
|
| The SA WG3 Chairman was thanked for this report, which was noted. |
Y |
12.23 |
SP-130244 |
Revised WID for Machine-Type and other mobile data applications Communications Enhancements (MTCe) |
SA WG3 |
Objective: Stage 1 objectives of this work item are identified in two specific Building Blocks under this WID: - Support for interworking with M2M service enablement (MTCe-SIMSE) - Service Requirement Maintenan [...]. |
WID |
Approval |
Revised |
SP-130327 |
|
| The WID was updated to add TR 23.868 in the affected specifications, in SP-130327 |
Y |
12.32 |
SP-130245 |
Revised WID for Tunnelling of UE Services over Restrictive Access Networks (TURAN) |
SA WG3 |
Objective: The objective of this work item is to provide stage-2 specifications to meet the service requirements for firewall traversal in 3GPP TS 22.228 and 3GPP TS 22.278. For the IMS case (3GPP TS 22.228), [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
12.40 |
SP-130246 |
Revised WID for Lawful Interception Rel-12 (LI12) |
SA WG3 |
4 Objective: The objective of this work item is to update lawful interception specifications for the latest Rel-12 architecture and services as described in the above justification. The enhancements to specific [...]. |
WID |
Approval |
Approved |
|
|
|
| Y |
13.14 |
SP-130247 |
TR 33.805 Study on Security Assurance Methodology for 3GPP Network Elements (SECAM) |
SA WG3 |
Abstract of document: The TR 33.805 studies methodologies for specifying network product security assurance and hardening requirements. Network product security assurance and hardening refers to protection agai [...]. |
TR |
Information |
Noted |
|
|
| This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG3. |
Y |
12.40 |
SP-130248 |
Release 12 CRs on Lawful Interception (LI12) |
SA WG3 |
33.107 CR0126; 33.107 CR0127; 33.108 CR0208; 33.108 CR0209; 33.108 CR0210; 33.108 CR0211 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.31 |
SP-130249 |
Release 12 CRs on Security enhancements for usage of Generic Bootstrapping Architecture (GBA) from the browser (Stage 2) (Web_GBA) |
SA WG3 |
33.220 CR0172R1; 33.222 CR0040R2; 33.222 CR0044R1; 33.222 CR0045R1; 33.222 CR0046; 33.222 CR0047; 33.222 CR0048R1; 33.823 CR0001; 33.823 CR0002R1; 33.823 CR0003 |
CR Pack |
Approval |
Revised |
SP-130301 |
|
|
| Y |
12.43 |
SP-130250 |
Release 12 CRs on Security small Enhancements (SEC12) |
SA WG3 |
33.310 CR0069R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.34 |
SP-130251 |
Release 11 CRs on Security small Enhancements (SEC11) |
SA WG3 |
33.246 CR0171R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10.25 |
SP-130252 |
Release 10 CRs on TEI (TEI10) |
SA WG3 |
33.401 CR0519R1; 33.401 CR0520R1; 33.401 CR0521R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.31 |
SP-130253 |
Release 12 CRs on Security enhancements for usage of GBA from the browser (Web_GBA) |
SA WG3 |
WITHDRAWN |
CR Pack |
Approval |
Withdrawn |
|
|
| WITHDRAWN (same as SP-130249) |
N |
12.32 |
SP-130254 |
Release 12 CRs on Tunnelling of UE Services over Restrictive Access Networks (Stage 2/3) (TURAN) |
SA WG3 |
33.203 CR0198; 33.402 CR0113 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.30 |
SP-130255 |
Release 11 CRs on Study on Single Sign On (SSO) Application Security for IMS - based on SIP Digest (FS_SSO_APS) |
SA WG3 |
33.220 CR0173; 33.220 CR0174; 33.804 CR0003R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.29 |
SP-130256 |
Release 12 CRs for IMS media plane security extensions (eMEDIASEC) |
SA WG3 |
33.328 CR0052R2; 33.328 CR0053R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.4 |
SP-130257 |
Release 11 CRs on System Improvements to Machine-Type Communications(SIMTC) |
SA WG3 |
23.682 CR0074R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.44 |
SP-130258 |
Release 12 CRs on TEI (TEI12) |
SA WG3 |
33.220 CR0175R1; 33.220 CR0176R1; 33.220 CR0177R2; 33.804 CR0004R2 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
7.5 |
SP-130259 |
SA WG5 Status Report |
SA WG5 Chairman |
SA WG5 Status Report to TSG SA#60 |
Report |
Presentation |
Noted |
|
|
| The SA WG5 Chairman was thanked for this report, which was noted. |
Y |
12.26 |
SP-130260 |
Updated WID Application Based Charging (ABC) |
SA WG5 |
Objective This Work item aims to enhance the system to support application based charging for the applications detected, enforced and charged by the TDF or by the PCEF enhanced with Application Detection and C [...]. |
WID |
Approval |
Noted |
|
|
| An update to this WID, including these changes, from SA WG2 was provided in SP-130239 and this was noted. |
Y |
12.21 |
SP-130261 |
New WID PCEF-based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_P) |
SA WG5 |
Objective: Objective of this work task is to provide a charging solution for the fixed broadband access in the convergent scenario where a single operator is deploying both the fixed broadband access and the E [...]. |
WID |
Approval |
Approved |
|
|
| This new WID was approved. |
Y |
12.21 |
SP-130262 |
New WID DF-based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_T) |
SA WG5 |
Objective: The objective of this work task is to provide a converged charging solution for the scenario in which a single operator is deploying or has deployed both fixed broadband access and the Evolved Packe [...]. |
WID |
Approval |
Approved |
|
|
| Allot commented that the TD title is incorrectly spelt as 'DF'. The WID iteself was correct and this new WID was approved. |
Y |
12.42 |
SP-130263 |
New WID Energy Efficiency related Performance Measurements (OAM-PM_EE) |
SA WG5 |
Objective: For the use cases, requirements and/or global KPIs provided by ETSI TC EE related to energy efficiency, by cooperation with 3GPP RAN WG2 and if needed with other 3GPP WGs, to - identify whether or n [...]. |
WID |
Approval |
Approved |
|
|
| It was clarified that SA WG5 could start the work based on ETSI EE input and take any RAN WG2 input into account. With this this WID was approved. |
Y |
8.4 |
SP-130264 |
Rel-7 CRs on OAM Trace Management (OAM7-Trace) |
SA WG5 |
32.101 CR0049; 32.101 CR0050; 32.101 CR0051; 32.101 CR0052; 32.421 CR0067; 32.421 CR0068; 32.421 CR0069; 32.421 CR0070; 32.422 CR0253; 32.422 CR0254; 32.422 CR0255; 32.422 CR0256; 32.441 CR0013; 32.441 CR0014; [...]. |
CR Pack |
Approval |
Revised |
SP-130302 |
|
|
| Y |
9 |
SP-130265 |
Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) |
SA WG5 |
32.423 CR0070R1; 32.423 CR0071R1; 32.423 CR0072R1; 32.426 CR0059R1; 32.426 CR0060R1; 32.426 CR0061R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10.24 |
SP-130266 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
32.416 CR0002; 32.416 CR0003; 32.522 CR0134R1; 32.522 CR0135R1; 32.522 CR0137; 32.522 CR0138; 32.762 CR0096 |
CR Pack |
Approval |
Approved |
|
|
| Approved |
Y |
11.33 |
SP-130267 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
28.623 CR0002R2; 28.628 CR0002R1; 28.628 CR0003; 28.628 CR0004; 28.629 CR0001R1; 28.629 CR0002R1; 28.658 CR0003R1; 28.658 CR0004R2; 28.659 CR0003R1; 28.705 CR0001R2; 32.102 CR0049R1; 32.140 CR0008R2; 32.141 CR0 [...]. |
CR Pack |
Approval |
Revised |
SP-130304 |
|
|
| Y |
12.42 |
SP-130268 |
Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) |
SA WG5 |
32.425 CR0130R1; 32.425 CR0131R1; 32.425 CR0132R1; 32.425 CR0133R1; 32.425 CR0134R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
8.5 |
SP-130269 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
32.299 CR0510; 32.299 CR0511; 32.299 CR0512; 32.299 CR0513; 32.299 CR0514; 32.299 CR0524; 32.299 CR0525; 32.299 CR0526; 32.299 CR0527; 32.299 CR0528 |
CR Pack |
Approval |
Revised |
SP-130303 |
|
|
| Y |
11.32 |
SP-130270 |
Rel-11 CRs on Charging Management (CH11) |
SA WG5 |
32.251 CR0264R1; 32.251 CR0265R1; 32.251 CR0276; 32.251 CR0277; 32.252 CR0011R1; 32.298 CR0393R1; 32.298 CR0397R1; 32.299 CR0501R1; 32.299 CR0502R1; 32.299 CR0505; 32.299 CR0506; 32.299 CR0529R1; 32.299 CR0530R [...]. |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.41 |
SP-130271 |
Rel-12 CRs on Charging Management (CH12) |
SA WG5 |
32.251 CR0272R1; 32.260 CR0210R1; 32.298 CR0396R1; 32.298 CR0398R1; 32.299 CR0517R1; 32.299 CR0531R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.42 |
SP-130272 |
Rel-12 CRs on Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations (OAM-NGMN) |
SA WG5 |
32.111-1 CR0008R1; 32.111-1 CR0010R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
11.4 |
SP-130273 |
Rel-11 CRs on Charging of SIMTC (SIMTC-CH) |
SA WG5 |
32.251 CR0268R1; 32.251 CR0269R1; 32.251 CR0274R1; 32.251 CR0275 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.41 |
SP-130274 |
Rel-12 CRs on Short Message Service - Service Center (SMS-SC) Offline Charging (SMS-SC-CH) |
SA WG5 |
32.274 CR0018R1 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
10.24 |
SP-130275 |
Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) |
SA WG5 |
32.422 CR0258 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.26 |
SP-130276 |
Rel-12 CRs on Application Based Charging (ABC) |
SA WG5 |
32.240 CR0357R1; 32.251 CR0279R1 |
CR Pack |
Approval |
Approved |
|
|
| Colours should be removed on CR implementation. This was then approved. |
Y |
11.8 |
SP-130277 |
Rel-11 CRs on Network Provided Location Information for IMS (NWK-PL2IMS) |
SA WG5 |
32.260 CR0207R2 |
CR Pack |
Approval |
Approved |
|
|
| It was commented that there were 'smart' quotes in the changes. This should be corrected on implementation. This CR was then approved. |
Y |
10.11 |
SP-130278 |
Rel-10 CRs on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) |
SA WG5 |
32.251 CR0273R1 |
CR Pack |
Approval |
Revised |
SP-130317 |
|
| The mirror CRs were missing.This CR was revised to add the mirror CRs in SP-130317 |
Y |
11.20 |
SP-130279 |
Rel-11 CRs on Charging for Roaming Architecture for Voice over IMS with Local Breakout (RAVEL-CH) |
SA WG5 |
32.260 CR0206R1; 32.298 CR0392 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
12.42 |
SP-130280 |
TS 28.390 'Fixed Mobile Convergence (FMC) Interface Integration Reference Point (IRP) Solution Profiles (SPs)' |
SA WG5 |
Abstract of document: This document defines the Fixed Mobile Convergence (FMC) Interface Integration Reference Point (IRP) Solution Profiles (SPs), enabled for Converged Management. Work done against Work Task [...]. |
TS |
Approval |
Approved |
|
|
| This TS was approved and placed under TSG SA change control (Rel-12). |
Y |
13.17 |
SP-130281 |
TR 32.851 'Study of OAM aspects of Network Sharing' |
SA WG5 |
Abstract of document: This document is a study of OAM aspects of Network Sharing. Work done against Work Task-level Work item in SP-130044: UID 560032 Title Study of OAM aspects of Network Sharing Acronym FS_O [...]. |
TR |
Information |
Noted |
|
|
| This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG5. |
Y |
13.20 |
SP-130282 |
TR 32.859 'Study on Alarm Management' |
SA WG5 |
Abstract of document: The massive amount of network elements in a mobile system and the variety of network elements and infrastructure equipment creates huge amount of alarms saturating operators alarm manageme [...]. |
TR |
Information |
Noted |
|
|
| This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG5. |
Y |
14 |
SP-130283 |
Proposed update to New WID on RAN Sharing Enhancements (RSE) |
NEC, MCC |
Objective: The objective of this work item is to standardize means that complement existing system capabilities for sharing common RAN resources. The work will take into account the following topics - Allocati [...]. |
WID |
Approval |
Revised |
SP-130330 |
|
| TeleiaSonera requested to be added as a supporting company. This was revised in SP-130330 |
Y |
7.6 |
SP-130284 |
Overview of ITU Activities |
Telecom Italia |
Overview: - ITU was founded in Paris in 1865 as the International Telegraph Union. It took its present name in 1934, and in 1947 became a specialized agency of the United Nations. - ITU (International Telecommu [...]. |
Report |
Information |
Noted |
|
|
| There were no questions or comments. The TSG SA Chairman thanked the ITU-T Ad-hoc Chairman for this comprehensive presentation which was noted. |
Y |
5 |
SP-130285 |
3GPP Release 12 timeline and features for Public Safety Communications |
Vodafone |
This document looks at the likely timeline for 3GPP Release 12, observes that the work for Public Safety Communications is significantly delayed and proposes some mitigating actions that can be taken by this SA [...]. |
OTHER |
Discussion |
Noted |
|
|
| Actions agreed. Vodafone were thanked for this contribution, which was then noted. |
Y |
7.7 |
SP-130286 |
TSG CT Status report |
TSG CT Chairman |
TSG CT Chairman's report to TSG SA#60 |
Report |
Presentation |
Noted |
|
|
| The TSG CT Chairman was thanked for this report, which was noted. |
Y |
7.7 |
SP-130287 |
TSG CT draft meeting report |
TSG CT Secretary (MCC) |
Draft meeting report of TSG CT Meeting #60, for information. |
Report |
Information |
Noted |
|
|
| This was provided for information and was noted. |
Y |
7.7 |
SP-130288 |
IETF status report |
TSG CT Chairman |
Status of IETF dependencies |
Report |
Presentation |
Noted |
|
|
| The TSG CT Chairman was thanked for this report, which was noted. |
Y |
7.6 |
SP-130289 |
LS from TSG CT: Reply LS on Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012 |
TSG CT |
TSG CT would like to thank ITU-R Adhoc for compiling the TSG CT input on the Annex 1 of Rec. ITU-R M.2012 sent in CP-130203 / RT-130024. TSG CT has reviewed the compiled version of the Annex attached in CP-1302 [...]. |
LS In |
Action |
Noted |
|
|
| This was the TSG CT submission information and was noted. |
Y |
6 |
SP-130290 |
LS from TSG CT: List of 3GPP Specifications to be proposed for the 'dot 9' Release 11 update of ITU-T Recommendation Q.1741 |
TSG CT |
TSG CT has reviewed the List of 3GPP Specifications to be proposed for the 'dot 9' Release 11 update of ITU-T Recommendation Q.1741, CP-130399. TSG CT did not have any issues with the list of specifications. Ac [...]. |
LS In |
Action |
Outgoing LS in S2-130331 |
|
|
| The SA WG Chairmen were asked to check this off-line. This was used as a basis for an outgoing LS in S2-130331 |
Y |
12.24 |
SP-130291 |
LS from WiFi Alliance: Wi-Fi Alliance Offloading Standards Work |
Wi-Fi Alliance Hotspot 2.0 Marketing Task Group |
Wi-Fi Alliance believes that it is important to distinguish 3GPP and WFA offloading standards work in order to highlight differences in the scope of the work done in both organizations. We believe this will hel [...]. |
LS In |
Action |
Noted |
|
| 20130606_WFA_SS_3GPP |
It was decided to allow SA WG2 to review this LS and take any necessary action identified at the next meeting. The TSG CT Chairman reported that he did not expect CT WG1 to take action on this at this time. This LS was then noted. |
Y |
12.15 |
SP-130292 |
Presentation of TS 22.468 on Group Communication System Enablers for LTE (GCSE_LTE) |
MCC |
Abstract of document: The present document collects the requirements as relevant to improve the EPC and E-UTRAN for system enablers to the 3GPP system to support Group Communication over LTE for Public Safety a [...]. |
TS |
Approval |
Approved |
|
|
| The SA WG1 Chairman explained that the changes were removing smart quotes, '-ise' to '-ize'. With this, the TR was approved and placed under TSG SA change control (Release 12). |
Y |
5 |
SP-130293 |
Priority of LTE D2D Discovery |
Deutsche Telekom, NTT DoCoMo, Sprint, China Mobile, KDDI, T-Mobile US, Verizon, Softbank |
During the offline discussion on time allocation in the context of RAN WG1 work the impression was given that proximity discovery would not be given priority. The supporting operators of this paper would like [...]. |
OTHER |
Discussion |
Noted |
|
|
| It was recognised that the discovery work needs to be considered in SA WG1 and this should be reviewed at the next meeting for any necessary prioritisation. This was then noted. |
Y |
13.9 |
SP-130294 |
Network Provided Location Information for IMS (TWAN case) |
Alcatel-Lucent, AT&T |
The intention of this work item is to extend the architecture defined as part of NWK-PL2IMS for making the TWAN location (similar to a cell-Id, e.g. BSSID) the UE is camped on available to the IMS nodes when th [...]. |
WID |
Information |
Noted |
|
|
| The intention of this submission is awareness from a work planning standpoint. This was reviewed and noted. |
Y |
7.6 |
SP-130295 |
LS from TSG RAN: Letter to ITU on the Revision of the Recommendations ITU-R M.1580 and M.1581 |
TSG RAN |
3GPP TSG RAN provides a reply to the 'Liaison statement to external organisations engaged in Recommendation ITU-R M.1457 related to Revision of RECOMMENDATIONS ITU-R M.1580-4 and ITU-R M.1581-4' sent by Working [...]. |
LS In |
Action |
Revised |
SP-130311 |
| RP-130853 |
This was endorsed and the editorial parts will be removed and the content submitted to the PCG. This was updated as an LS to the PCG in SP-130311 |
Y |
7.6 |
SP-130296 |
LS from TSG RAN: Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012 |
TSG RAN |
M.2012, 'Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)', contained in the following annexes to this LTI i. Updated Annex 1 of Rec [...]. |
LS In |
Action |
Revised |
SP-130312 |
| RP-130854 |
This was endorsed and the editorial parts will be removed and the content submitted to the PCG. This was updated as an LS to the PCG in SP-130312 |
Y |
7.6 |
SP-130297 |
LS from TSG RAN: LS on Technical and Operational Aspects of Passive and Active Base Station Antennas for IMT Systems |
TSG RAN |
TSG RAN would like to ask TSG SA and PCG to review and approve the information above for the response to the ITU-R WP 5D LS in RP-121487. |
LS In |
Action |
Revised |
SP-130313 |
| RP-130855 |
This was updated as an LS to the PCG in SP-130313 |
Y |
7.6 |
SP-130298 |
LS from TSG RAN: LS on LTE-HRPD SON WID conditional approval |
TSG RAN |
After completing at RAN#60 the TR 37.813 on LTE-HRPD (High Rate Packet Data in 3GPP2) Inter-RAT SON, attached in RP-130755, TSG RAN would like to inform TSG SA about the conditional approval of the subsequent W [...]. |
LS In |
Action |
Noted |
|
| RP-130865 |
The Condition for the approval of the RAN WID was considered fulfilled and RAN WG3 can commence work on this. This LS was then noted. |
Y |
7.6 |
SP-130299 |
TSG RAN Status Report to TSG SA#60 |
TSG RAN Chairman |
TSG RAN Chairman's report to TSG SA#60 |
Report |
Presentation |
Noted |
|
|
| The TSG RAN Chairman was thanked for this report, which was noted. |
Y |
7.6 |
SP-130300 |
Draft report of TSG RAN meeting #60 |
TSG RAN Secretary (MCC) |
Draft meeting report of TSG RAN Meeting #60, for information. |
Report |
Information |
Noted |
|
|
| This will be provided to the FTP server when available for information. This was noted. |
Y |
12.31 |
SP-130301 |
Release 12 CRs on Security enhancements for usage of Generic Bootstrapping Architecture (GBA) from the browser (Stage 2) (Web_GBA) |
SA WG3 |
33.220 CR0172R1; 33.222 CR0049R2; 33.222 CR0044R1; 33.222 CR0045R1; 33.222 CR0046; 33.222 CR0047; 33.222 CR0048R1; 33.823 CR0001; 33.823 CR0002R1; 33.823 CR0003 |
CR Pack |
Approval |
Approved |
| SP-130249 |
|
| Y |
8.4 |
SP-130302 |
Rel-7 CRs on OAM Trace Management (OAM7-Trace) |
SA WG5 |
32.101 CR0049; 32.101 CR0050; 32.101 CR0051; 32.101 CR0052; 32.421 CR0067; 32.421 CR0068; 32.421 CR0069; 32.421 CR0070; 32.422 CR0253; 32.422 CR0254; 32.422 CR0255; 32.422 CR0256; 32.441 CR0013; 32.441 CR0014; [...]. |
CR Pack |
Approval |
Approved |
| SP-130264 |
| There was an error in the cover table where the revision numbers had not been updated (the CRs themselves had been updated correctly). With this, these CRs were approved. |
Y |
8.5 |
SP-130303 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
32.299 CR0510; 32.299 CR0511; 32.299 CR0512; 32.299 CR0513; 32.299 CR0524; 32.299 CR0525; 32.299 CR0526; 32.299 CR0527; 32.299 CR0528 |
CR Pack |
Approval |
Approved |
| SP-130269 |
| It was explained that a CR was withdrawn from the CR pack as it changed clause numbering which is not allowed in CRs. This mirror CR will be submitted by SA WG5 at the next meeting. These CRs were then approved. |
Y |
11.33 |
SP-130304 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
28.623 CR0002R2; 28.628 CR0002R1; 28.628 CR0003; 28.628 CR0004; 28.629 CR0001R1; 28.629 CR0002R1; 28.658 CR0003R1; 28.658 CR0004R2; 28.659 CR0003R1; 28.705 CR0001R2; 32.102 CR0049R1; 32.140 CR0008R2; 32.141 CR0 [...]. |
CR Pack |
Approval |
Approved |
| SP-130267 |
|
| Y |
11.4 |
SP-130305 |
8 CRs to 23.204, 23.401, 23.272, 23.682 (SIMTC, SIMTC-Reach - Rel 11, Rel 12) |
SA WG2 |
23.002 CR0261R2; 23.002 CR0262R2; 23.401 CR2539R1; 23.401 CR2540R1; 23.272 CR0847R3; 23.682 CR0069R4; 23.682 CR0072R3; 23.682 CR0073R1 |
CR Pack |
Approval |
Approved |
| SP-130216 |
|
| Y |
11.8 |
SP-130306 |
4 CRs to 23.203, 23.228 (NWK-PL2IMS - Rel-11, Rel-12) |
SA WG2 |
23.203 CR0818R2; 23.203 CR0819R2; 23.228 CR1038R1; 23.228 CR1040R2 |
CR Pack |
Approval |
Approved |
| SP-130218 |
|
| Y |
11.10 |
SP-130307 |
1 CR to 23.002, 23.203 (SAPP - Rel-11, Rel-12) |
SA WG2 |
23.002 CR0265 |
CR Pack |
Approval |
Approved |
| SP-130219 |
|
| Y |
11.35 |
SP-130308 |
10 CRs to 23.221, 23.272, 23.203, 23.237, 23.292 (TEI11 - Rel-11, Rel-12) |
SA WG2 |
23.221 CR0148R6; 23.272 CR0872R3; 23.203 CR0783R3; 23.203 CR0798R2; 23.203 CR0805R1; 23.203 CR0806R1; 23.237 CR0462R1; 23.237 CR0463R1; 23.292 CR0199; 23.292 CR0200 |
CR Pack |
Approval |
Withdrawn |
| SP-130223 |
| WITHDRAWN |
Y |
11.35 |
SP-130309 |
6 CRs to 23.167, 23.216, 23.272 (TEI11, Earlier Rel WIs - Rel 11) |
SA WG2 |
23.167 CR0223R1; 23.167 CR0226R2; 23.216 CR0315R1; 23.216 CR0318R1; 23.272 CR0868R2; 23.272 CR0877R2 |
CR Pack |
Approval |
Approved |
| SP-130224 |
|
| Y |
12.19 |
SP-130310 |
4 CRs to 23,002, 23.401, 23.060 (LIMONET - Rel 12) |
SA WG2 |
23.002 CR0263R2; 23.401 CR2546R5; 23.401 CR2561; 23.060 CR1795 |
CR Pack |
Approval |
Approved |
| SP-130226 |
|
| Y |
7.6 |
SP-130311 |
Letter to ITU on the Revision of the Recommendations ITU-R M.1580 and M.1581 |
TSG SA |
To: PCG |
LS OUT |
Action |
Approved |
| SP-130295 |
- |
| Y |
7.6 |
SP-130312 |
Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012 |
TSG SA |
To: PCG |
LS OUT |
Action |
Approved |
| SP-130296 |
- |
| Y |
7.6 |
SP-130313 |
LS on Technical and Operational Aspects of Passive and Active Base Station Antennas for IMT Systems |
TSG SA |
To: PCG |
LS OUT |
Action |
Approved |
| SP-130297 |
- |
| Y |
9 |
SP-130314 |
Stage 1 CRs on TEI9 |
SA WG1 |
22.101 CR0457R1; 22.101 CR0458R2; 22.101 CR0460R2 |
CR Pack |
Approval |
Withdrawn |
| SP-130194 |
| WITHDRAWN |
N |
12.14 |
SP-130315 |
Stage 1 CRs on Proximity-based Services (ProSE) |
SA WG1 |
21.905 CR0110R3; 22.115 CR0070R2; 22.115 CR0068R4; 22.278 CR0133R1; 22.278 CR0150R3; 22.278 CR0143R2; 22.278 CR0140R2; 22.278 CR0128R3; 22.278 CR0152R2; 22.278 CR0153R4; 22.278 CR0156R2; 22.278 CR0148R4; 22.278 [...]. |
CR Pack |
Approval |
Approved |
| SP-130199 |
| It was clarified that these revisions were to mark the UICC as impacted on the CR cover pages. These CRs were approved. |
Y |
12.14 |
SP-130316 |
Stage 1 CRs on Feasibility Study on Proximity-based Services (FS_ProSe) |
SA WG1 |
22.803 CR0064R2 |
CR Pack |
Approval |
Approved |
| SP-130202 |
| It was clarified that this revision was to mark the UICC as impacted on the CR cover page. This CR was approved. |
Y |
10.11 |
SP-130317 |
Rel-10 CRs on Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) |
SA WG5 |
32.251 CR0273R1; 32.251 CR0275; 32.251 CR0274R1 |
CR Pack |
Approval |
Approved |
| SP-130278 |
|
| Y |
11.10 |
SP-130318 |
2 CRs to 23.203 (SAPP - Rel 11, Rel 12) |
SA WG2 |
23.203 CR0809R3; 23.203 CR0810R3 |
CR Pack |
Approval |
Approved |
|
|
| Approved |
Y |
11.16 |
SP-130319 |
2 CRs to 23.060 (SIRIG - Rel-11, Rel-12) |
SA WG2 |
23.060 CR1778R3; 23.060 CR1779R3 |
CR Pack |
Approval |
Approved |
| SP-130220 |
| Approved |
Y |
11.35 |
SP-130320 |
4 CRs to 23.060, 23.272 (TEI11, Earlier Rel WIs - Rel 11) |
SA WG2 |
23.272 CR0873R3; 23.272 CR0875R3; 23.272 CR0874R3; 23.060 CR1738R3; 23.060 CR1777R2 |
CR Pack |
Approval |
Approved |
|
|
| Approved |
Y |
18 |
SP-130321 |
Future TSG meeting dates |
MCC |
Disregarding TSG GERAN, which meets independently of TSGs RAN, CT and SA, dates have been fixed for future TSG plenary meetings and can be found in the attached Excel file. Note that the intention is to move to [...]. |
OTHER |
Information |
Noted |
|
|
| It was agreed to adopt the proposed meeting schedule until the experience of the March 2014 meeting. This was then noted. |
Y |
11.4 |
SP-130322 |
2 CRs to 23.204 (SIMTC, SIMTC-Reach - Rel-11, Rel-12) |
SA WG2 Chairman |
23.204 CR0100R2; 23.204 CR0101R2 |
CR Pack |
Approval |
Approved |
|
|
| Approved |
Y |
11.8 |
SP-130323 |
2 CRs to 23.203 (NWK-PL2IMS - Rel-11, Rel-12) |
SA WG2 Chairman |
23.203 CR0803R3; 23.203 CR0804R3 |
CR Pack |
Approval |
Approved |
|
|
| Approved |
Y |
12.19 |
SP-130324 |
4 CRs to 23,002, 23.401, 23.060 (LIMONET - Rel 12). |
SA WG2 Chairman |
23.060 CR1775R2; 23.060 CR1791R3; 23.401 CR2521R3; 23.401 CR2538R3 |
CR Pack |
| Approved |
|
|
|
| Y |
12.2 |
SP-130325 |
Revised WID for Web Real Time Communication (WebRTC) Access to IMS |
SA WG2 |
Objective: SA WG1 objectives: The objective of this work item is to specify service requirements for: - the ability for WebRTC clients to access IMS, including for example, reusing IMS client security credentia [...]. |
WID |
Approval |
Approved |
| SP-130238 |
|
| Y |
12.15 |
SP-130326 |
Revised WID on Group Communication System Enablers for LTE (GCSE_LTE) |
SA WG1 |
Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Approved |
| SP-130197 |
|
| Y |
12.23 |
SP-130327 |
Revised WID for Machine-Type and other mobile data applications Communications Enhancements (MTCe) |
SA WG3 |
Objective: Stage 1 objectives of this work item are identified in two specific Building Blocks under this WID: - Support for interworking with M2M service enablement (MTCe-SIMSE) - Service Requirement Maintenan [...]. |
WID |
Approval |
Approved |
| SP-130244 |
|
| Y |
12.26 |
SP-130328 |
Revised WID on Application Based Charging |
SA WG2 |
Objective: This Work item aims to enhance the system to support application based charging for the applications detected, enforced and charged by the TDF or by the PCEF enhanced with Application Detection and C [...]. |
WID |
Approval |
Approved |
| SP-130239 |
|
| Y |
12.26 |
SP-130329 |
1 CR to 23.203 (ABC - Rel-12) |
SA WG2 |
23.203 CR0808R4 |
CR Pack |
Approval |
Approved |
|
|
|
| Y |
14 |
SP-130330 |
Proposed update to New WID on RAN Sharing Enhancements (RSE) |
NEC, MCC |
Objective: The objective of this work item is to standardize means that complement existing system capabilities for sharing common RAN resources. The work will take into account the following topics - Allocati [...]. |
WID |
Approval |
Approved |
| SP-130283 |
|
| Y |
6 |
SP-130331 |
List of 3GPP Specifications for the new draft Recommendation Q.1714.9, referencing of 3GPP Release 11 |
TSG SA |
To: ITU-T SG13. CC: TSG CT |
LS OUT |
Action |
Approved |
|
|
|
| Y |
|
Created: 2013-06-18 17:09     END OF LIST
Last Allocated Document: SP-130331