Last Allocated Document: SP-130161
Temporary Document List - Ordered by TD
Colour Key: |
Available, No Conclusion |
Not Available, No Conclusion |
Not Available, Conclusion Reached |
Available, Conclusion Reached |
Document Revised |
Document Withdrawn |
Document Not Handled |
|
The Hyperlinks are to the FTP server: ftp://ftp.3gpp.org/tsg_sa/TSG_SA/TSGS_59/Docs/
Created: 2013-03-05 12:33     START OF LIST
Agenda |
TD |
LongTitle |
Source |
Summary |
Doc_Type |
Doc_For |
Decision |
Rev_By |
Rev_Of |
LS_Source_file |
Comment |
2 |
SP-130001 |
Draft agenda for TSG SA meeting #59 |
TSG SA Chairman |
Draft agenda for TSG SA meeting #59 |
Agenda |
Approval |
Approved |
|
|
| The agenda was reviewed and approved. |
4.1 |
SP-130002 |
Draft Report of TSG SA meeting #58 |
TSG SA Secretary |
Draft Report of TSG SA meeting #58 containing revision marks of changes on the distributed draft. |
Report |
Approval |
Approved |
|
|
| Approved. The revision marks will also be accepted and the report placed on the FTP server as version 1.0.0. |
6 |
SP-130003 |
LS from ETSI TC INT: Liaison Regarding MSF/ETSI/GSMA RCS VoLTE Interoperability Event |
ETSI TC INT |
ETSI Plugtests are interoperability test events that cover a wide range of telecommunications, Internet, broadcasting and multimedia converging standards. For more information, please visit: www.etsi.org/plugte [...]. |
LS In |
Action |
Noted |
|
| INT(12)000167r1 |
Companies were asked to take this information into account internally and contact ETSI TC INT if they have an interest in the testing work. This was then noted. |
12.11 |
SP-130004 |
LS from TCCA CCBG System Architecture Group: Additional Public Safety Use Cases |
TCCA CCBG System Architecture Group |
TCCA CCBG SA is continuing its work on the definition of use cases that are relevant to Critical Communication and that should be taken into consideration by 3GPP SA WG1 for : - The Group Communication System E [...]. |
LS In |
Information |
Noted |
|
| LS TCCA CCBG SA - GCSE-LTE |
| 12.21 |
SP-130005 |
LS from oneM2M TP: Service Layer interworking with 3GPP/3GPP2 defined networks |
oneM2M TP |
oneM2M is a partnership project, established in order to cooperate in the production of globally applicable, M2M Service Layer specifications, including Technical Specifications and Technical Reports related to [...]. |
LS In |
Action |
Noted |
|
| oneM2M-TP-2012-0087 |
Cross-coordination between companies was considered the best way to continue and information should be sent to oneM2M TP from 3GPP only when relevant. This LS was then noted. |
11.19 |
SP-130006 |
LS from RAN WG2: Response LS on Size of E-UTRA Radio Capabilities |
RAN WG2 |
RAN WG2 thanks SA WG2 for the LS on Size of E-UTRA Radio Capabilities, and would like to inform the CT WG1 and CT WG4 of the discussion held at RAN WG2#81 meeting. Furthermore, RAN WG2 thanks GERAN WG2 for the [...]. |
LS In |
Information |
Noted |
|
| R2-130868 |
| 12.11 |
SP-130007 |
LS from SA WG1: LS on status of GCSE_LTE and ProSe work in SA1. |
SA WG1 |
SA WG1 would like to inform TSG SA of the status of the two work items above after the SA WG1 GCSE and ProSe Ad Hoc and SA WG1#61meetings in Prague, January 2013. On GCSE_LTE the progress has been as follows: W [...]. |
LS In |
Information |
Noted |
|
| S1-131322 |
| 12.21 |
SP-130008 |
LS from SA WG2: LS on requesting input on MTCe solutions |
SA WG2 |
SA WG2 is working on the MTCe (Machine-Type and other mobile data applications Communications Enhancements) work item. SA#58 has prioritized MTCe-SDDTE (Small Data and Device Triggering Enhancements) and MTCe-U [...]. |
LS In |
Information |
Noted |
|
| S2-130645 |
This LS was reviewed and noted. |
6 |
SP-130009 |
LS from SA WG2: LS on providing information on transcoding functions in 3GPP standards |
SA WG2 |
SA WG2 have some generic guidelines within its specifications around how the transcoding should be used, such as in Annex I.3.3 and Annex P of TS 23.228 (http://www.3gpp.org/ftp/specs/archive/23_series/23.228/) [...]. |
LS In |
Action |
Noted |
|
| S2-130698 |
For response to SP-120891 / SP-130137 (LS from E2NA). This was reviewed and noted. |
13.8 |
SP-130010 |
LS from SA WG5: LS on Cooperation for Energy Efficiency Measurement |
SA WG5 |
SA WG5 would like to thank ETSI TC-EE for the Liaison on 'Cooperation for Energy Efficiency Measurements' and is also keen on the cooperation with ETSI on this topic. To reiterate and summarize SA WG5 understan [...]. |
LS In |
Information |
Noted |
| SP-120705 |
S5-130355 |
This was a follow-up to the LS received at TSG SA#58 in SP-120705. This LS was noted. |
6 |
SP-130011 |
LS from Wi-Fi Alliance: Hotspot 2.0 Release 2 Draft Technical Specification |
Wi-Fi Alliance |
Wi-Fi Alliance would like to inform you of the progress of work in the Hotspot 2.0 Technical Specification that could be of interest to 3GPP TSG SA and SA WG2. The Hotspot 2.0 Technical Task Group (TTG) has com [...]. |
LS In |
Information |
Noted |
|
| Wi-Fi Alliance LS on Hotspot 2 0 Rel 2 20130102 |
This was reviewed and noted. |
7.4 |
SP-130012 |
SA WG4 Status Report at TSG SA#59 |
SA WG4 Chairman |
Report of SA WG4 activities |
Report |
Information |
Noted |
|
|
| There were no questions and no actions from SA WG4. The SA WG4 Chairman was thanked for this report, which was then noted. |
8.5 |
SP-130013 |
CRs to TS 26.114 on 'Negotiation of AVPF and CCM feedback messages for video (MTSI_eMHI)' (Release 8 until Release 12) |
SA WG4 |
26.114 CR0233R1; 26.114 CR0234R1; 26.114 CR0235R1; 26.114 CR0236R1; 26.114 CR0238R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 9 |
SP-130014 |
CRs to TS 26.346 on 'PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9 until Release 11) |
SA WG4 |
26.346 CR0288R5; 26.346 CR0308; 26.346 CR0309; 26.346 CR0310; 26.346 CR0311; 26.346 CR0312; 26.346 CR0313; 26.346 CR0314R2; 26.346 CR0315R2; 26.346 CR0316R2; 26.346 CR0317R2; 26.346 CR0318R2; 26.346 CR0319R2 [...]. |
CR Pack |
Approval |
Approved |
|
|
|
| 10.17 |
SP-130015 |
CRs to TS 26.247 on 'HTTP-based Streaming and Download Services (HTTP_SDS)' (Release 10 and Release 11) |
SA WG4 |
26.247 CR0021R1; 26.247 CR0023R1; 26.247 CR0024R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 10.18 |
SP-130016 |
CRs to TS 26.346 on 'Encrypted DASH contents delivered over MBMS (MBS_Enh)' (Release 10 and Release 11) |
SA WG4 |
26.346 CR0263R6; 26.346 CR0264R6 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.27 |
SP-130017 |
CRs to TS 26.131 and TS 26.132 on 'Extensions of Acoustic Test Specifications in TS 26.131 and TS 26.132 (Ext_ATS)' (Release 11) |
SA WG4 |
26.131 CR0055R1; 26.132 CR0056; 26.132 CR0057R1 |
CR Pack |
Approval |
Approved |
|
|
| Morpho Cards GmbH asked where the related CRs listed in the 'Other affected specifications' were for 51.010. This should be checked to determine whether core specification update is needed. With this, these CRs were approved. |
11.28 |
SP-130018 |
TR 26.947 Multimedia Broadcast/Multicast Service (MBMS): Selection and Characterisation of Application Layer FEC (Release 11), v. 2.0.0 |
SA WG4 |
Abstract of document: This Technical Report documents the progress of the work item to investigate and evaluate proposed FEC technologies. The document includes details on the use of FEC in MBMS, specifically i [...]. |
TR |
Approval |
Approved |
|
|
| This TR was approved and placed under TSG SA change control (Rel-11). |
11.28 |
SP-130019 |
CRs to TS 26.247 and TR 26.851 on 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)' (Release 11) |
SA WG4 |
26.247 CR0022R1; 26.851 CR0001R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.28 |
SP-130020 |
CR to TS 26.346 on 'MBMS Filter Description fragment MIME Type (EMM-DDE)' (Release 11) |
SA WG4 |
26.346 CR0307R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.35 |
SP-130021 |
CRs to TS 26.114 and TS 26.346 on 'TEI Rel-11 (TEI11)' (Release 11) |
SA WG4 |
26.114 CR0239R2; 26.114 CR0240R2; 26.346 CR0306R1 |
CR Pack |
Approval |
26.114 CR0239R2 and 26.114 CR0240R2 were approved. |
|
|
| 26.346 CR0306 was proposed for sending back to SA WG4 in SP-130144. 26.114 CR0239R2 and 26.114 CR0240R2 were approved. |
12.30 |
SP-130022 |
CRs to TS 26.114, TS 26.234 and TS 26.244 on 'Coordination of Video Orientation (CVO)' (Release 12) |
SA WG4 |
26.114 CR0241R2; 26.114 CR0243R3; 26.114 CR0245R1; 26.234 CR0204R5; 26.244 CR0049R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.39 |
SP-130023 |
CR to TS 26.114 on 'Video Intra-Refreshing using SIP INFO (TEI12)' (Release 12) |
SA WG4 |
26.114 CR0244R2 |
CR Pack |
Approval |
Approved |
|
|
|
| 14 |
SP-130024 |
New Work Item Description on 'MBMS Improvements' (MI) (Feature) |
SA WG4 |
Objective: There are no technical objectives under this work item. The objective of this work item is to complete the following building blocks: - MBMS operation on Demand (MooD) - Enhanced MBMS Operation (EMO) [...]. |
WID |
Approval |
Approved |
|
|
|
| 14 |
SP-130025 |
New Work Item Description on 'Enhanced MBMS Operation' (MI-EMO) (BB) |
SA WG4 |
Objective: The objectives of this work item are to standardise the following aspects of MBMS operation: - Improve MBMS OTA efficiency (e.g. by object bundling, reduction of FLUTE overhead, etc.) - Improve MBMS [...]. |
WID |
Approval |
Not approved |
|
|
|
| 14 |
SP-130026 |
New Work Item Description on 'MBMS operation on Demand' (MI-MooD) (BB) |
SA WG4 |
Objective: The objective of this work item is to standardise the minimum additional functionality over the existing standard necessary to enable on-demand provisioning of MBMS in response to high uptake of a un [...]. |
WID |
Approval |
Approved |
|
|
|
| 14 |
SP-130027 |
New Work Item Description on 'End-to-end MTSI extensions' (E2EMTSI) (Feature) |
SA WG4 |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that i [...]. |
WID |
Approval |
Revised |
SP-130160 |
|
| Telecom Italia asked to be added to the supporting companies. This was revised accordingly in SP-130160 |
15 |
SP-130028 |
New Study Item Description on 'Study of Enhanced Acoustic Test Specifications' (SEATS) |
SA WG4 |
Objective: The objective of this study item is to produce a technical report that will first and foremost, address the existing items presently designated as 'for further study' in TS 26.131 and TS 26.132. The [...]. |
WID |
Approval |
Approved |
|
|
|
| 7.3 |
SP-130029 |
SA WG3 Status Report |
SA WG3 Chairman |
Report of SA WG3 activities |
Report |
Information |
Revised |
SP-130142 |
|
|
| 12.11 |
SP-130030 |
Revised WID Proximity-based Services (ProSe) |
SA WG3 |
Objective: The SA WG1 objective is to specify service requirements for: - ProSe Discovery over E-UTRA; o within network coverage and o outside network coverage, only for Public Safety Discovery within network c [...]. |
WID |
Approval |
Approved |
|
|
| This updated WID was approved. |
12.35 |
SP-130031 |
Revised WID Lawful Interception Release 12 |
SA WG3 |
Objective: The objective of this work item is to update lawful interception specifications for the latest Rel-12 architecture and services as described in the above justification. The enhancements to specificat [...]. |
WID |
Approval |
Revised |
SP-130159 |
|
| It was noticed that there was white text after MTCe in the justification clause 'Local Call Local Switch'. This should be removed. The WID was revised accordingly in SP-130159 |
5 |
SP-130032 |
Revised WID Web Real Time Communication (WebRTC) Access to IMS |
SA WG3 |
Objective: The objective of this work item is to specify service requirements for: - the ability for WebRTC clients to access IMS, including for example, reusing IMS client security credentials and/or public id [...]. |
WID |
Approval |
Noted |
|
|
| An alternative proposal was provided in SP-130130. This WID was noted. |
12.26 |
SP-130033 |
TR 33.829 Extended IP Multimedia Subsystem (IMS) media plane security features |
SA WG3 |
Abstract of document: Rel-9 MEDIASEC work resulted in the specification of solutions for media protection over the access network (e2m) and peer-to-peer (e2e) TS 33.328. For the peer-to-peer (e2e) media plane s [...]. |
TR |
Approval |
Approved |
|
|
|
| 12.35 |
SP-130034 |
Release 12 CRs on Lawful Interception (LI12) |
SA WG3 |
33.106 CR0019; 33.107 CR0124; 33.107 CR0125; 33.108 CR0205; 33.108 CR0206; 33.108 CR0207 |
CR Pack |
Approval |
Approved |
|
|
| SA WG3 should check the external references used to determine whether specific versions should be referred to. With this, these CRs were approved. |
12.28 |
SP-130035 |
Release 12 CRs on Security enhancements for usage of Generic Bootstrapping Architecture (GBA) from the browser (Stage 2) (Web_GBA) |
SA WG3 |
33.222 CR0039R1; 33.222 CR0040R1; 33.222 CR0041R1; 33.222 CR0042R1 |
CR Pack |
Approval |
Revised |
SP-130138 |
|
|
| 12.38 |
SP-130036 |
Release 12 CR on Security small Enhancements (SEC12) |
SA WG3 |
33.220 CR0171R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.34 |
SP-130037 |
Release 11 CRs on Security small Enhancements (SEC11) |
SA WG3 |
43.020 CR0029; 43.020 CR0030 |
CR Pack |
Approval |
Approved |
|
|
|
| 10.25 |
SP-130038 |
Release 10 CRs on TEI (TEI10) |
SA WG3 |
33.401 CR0516R1; 33.401 CR0517R1; 33.401 CR0518R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.35 |
SP-130039 |
Release 11 CRs on TEI (TEI11) |
SA WG3 |
33.224 CR0005R1; 33.224 CR0006 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.26 |
SP-130040 |
Release 12 CRs for IMS media plane security extensions (eMEDIASEC) |
SA WG3 |
33.328 CR0047R1; 33.328 CR0048R1; 33.328 CR0049R1; 33.328 CR0050R1; 33.328 CR0051R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 7.5 |
SP-130041 |
SA WG5 Status Report |
SA WG5 Chairman |
Report of SA WG5 activities |
Report |
Presentation |
Revised |
SP-130141 |
|
|
| 12.37 |
SP-130042 |
Revised WID on WLAN Management |
SA WG5 |
Objective: The objectives for this work item are to: 1. Study WLAN impacts to Type-2 management 2. Specify the WLAN Network Resource Model for Type-2 interface (that is intended to support fault and performance [...]. |
WID |
Approval |
Approved |
|
|
|
| 12.37 |
SP-130043 |
Revised WID on Converged Management PM Interface definitions |
SA WG5 |
Objective: The work item will address (in that priority order): 1. Requirements, Service Level Agreement (SLA), business objectives to be worked in interaction with NGCOR project, 2. Measurement & KPI definitio [...]. |
WID |
Approval |
Approved |
|
|
|
| 13.20 |
SP-130044 |
Revised WID on Study on OAM aspects of Network Sharing |
SA WG5 |
Objective The objectives of this study are: - Identify the most important Network sharing scenarios and use cases for Management Impact - Capture the impact of equivalent PLMN identities in existing definitions [...]. |
WID |
Approval |
Approved |
|
|
|
| 12.37 |
SP-130045 |
Revised WID on Enhanced NM Centralised Coverage and Capacity Optimisation |
SA WG5 |
Objective: The NM centralised CCO function should be enhanced by: 1. Refine the description for NM centralised CCO. The description of the NM Centralised CCO function and the necessary standard support over Itf [...]. |
WID |
Approval |
Approved |
|
|
|
| 13.22 |
SP-130046 |
Revised WID on Study on Heterogeneous Networks management |
SA WG5 |
Objective: The objective is to study new paradigms for management over Itf-N: o Collect requirements and use cases for management of heterogeneous networks o Study management methods which may be suitable for h [...]. |
WID |
Approval |
Approved |
|
|
|
| 10.24 |
SP-130047 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
32.422 CR0249; 32.422 CR0250; 32.656 CR0009R1; 32.656 CR0010R1; 32.762 CR0093R1; 32.762 CR0094R1; 32.766 CR0050R1; 32.766 CR0051R1 |
CR Pack |
Approval |
Revised |
SP-130140 |
|
|
| 11.33 |
SP-130048 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
28.658 CR0001; 28.659 CR0001R1; 32.150 CR0023R1; 32.421 CR0066R1; 32.422 CR0248R3; 32.422 CR0251R1; 32.522 CR0132R2; 32.526 CR0029 |
CR Pack |
Approval |
Approved |
|
|
|
| 9 |
SP-130049 |
Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) |
SA WG5 |
32.312 CR0010; 32.312 CR0011; 32.312 CR0012; 32.362 CR0007R1; 32.362 CR0008R1; 32.362 CR0009R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 8.5 |
SP-130050 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
32.299 CR0492R1; 32.299 CR0493R1; 32.299 CR0494R1; 32.299 CR0495R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 9 |
SP-130051 |
Rel-9 CRs on Charging Management (CH9) |
SA WG5 |
32.260 CR0200R1; 32.260 CR0201R1; 32.260 CR0202R1; 32.298 CR0385; 32.298 CR0386; 32.298 CR0387 |
CR Pack |
Approval |
Approved |
|
|
|
| 10.23 |
SP-130052 |
Rel-10 CRs on Charging Management (CH10) |
SA WG5 |
32.298 CR0388; 32.298 CR0389 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.36 |
SP-130053 |
Rel-12 CRs on Charging Management (CH12) |
SA WG5 |
32.299 CR0485R1; 32.299 CR0489R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.32 |
SP-130054 |
Rel-11 CRs on Charging Management (CH11) |
SA WG5 |
32.250 CR0036R1; 32.251 CR0262R1; 32.251 CR0263R1; 32.260 CR0199R1; 32.260 CR0203R1; 32.260 CR0205R1; 32.271 CR0013R1; 32.275 CR0043R1; 32.298 CR0384R1; 32.299 CR0491R1; 32.299 CR0496 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.36 |
SP-130055 |
Rel-12 CRs on Short Message Service - Service Center (SMS-SC) Offline Charging (SMS-SC-CH) |
SA WG5 |
32.240 CR0354R1; 32.274 CR0017R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130056 |
Rel-11 CRs on LTE Self-Organizing Networks (SON) coordination management (OAM-SON-LTE_COORD) |
SA WG5 |
32.522 CR0104R7; 32.522 CR0133R2; 32.526 CR0024R1; 32.762 CR0095R2; 32.766 CR0044R2; 32.766 CR0052R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130057 |
Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) |
SA WG5 |
28.652 CR0001R1; 28.653 CR0001; 28.658 CR0002R1; 28.659 CR0002; 32.423 CR0069; 32.442 CR0231R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.37 |
SP-130058 |
Rel-12 CR on Converged Management Model Alignment (Phase 2) (OAM-MODAL) |
SA WG5 |
32.602 CR0013R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.3 |
SP-130059 |
Rel-11 CR on QoS Control Based on Subscriber Spending Limits (QoS_SSL) |
SA WG5 |
32.296 CR0029R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130060 |
Rel-11 CRs on IRP framework enhancements to support Management of Converged Networks (OAM-FMC-IRP) |
SA WG5 |
28.628 CR0001; 32.300 CR0014R1; 32.602 CR0012R1; 32.103 CR0004R1 |
CR Pack |
Approval |
Revised |
SP-130139 |
|
|
| 11.33 |
SP-130061 |
Rel-11 CRs on Inter-RAT Energy Saving Management (OAM-IRAT-ESM) |
SA WG5 |
WITHDRAWN |
CR Pack |
Approval |
Withdrawn |
|
|
| WITHDRAWN |
11.32 |
SP-130062 |
Rel-11 CRs on Transit Inter Operator Identifier for IMS Interconnection Charging in multi operator environment (IOI_IMS_CH) |
SA WG5 |
32.240 CR0353R3; 32.260 CR0183R3; 32.298 CR0366R2; 32.299 CR0488R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.20 |
SP-130063 |
Rel-11 CR on Charging for Roaming Architecture for Voice over IMS with Local Breakout (RAVEL-CH) |
SA WG5 |
32.260 CR0204R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130064 |
28.620 Fixed Mobile Convergence (FMC) Federated Network Information Model (FNIM) Umbrella Information Model (UIM) |
SA WG5 |
Abstract of document: This document defines common model elements applicable for both wire-line and wireless networks, and in the 3GPP 28-series this defines the base classes for all class definitions in all NR [...]. |
TS |
Approval |
Approved |
|
|
| Morpho Cards GmbH asked whether the references to TMF specifications were done consistently and unambiguously. This should be checked by SA WG5 and corrected if necessary. This TR was approved and placed under TSG SA change control (Rel-11). |
11.33 |
SP-130065 |
28.735 Signalling Transport Network (STN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
Abstract of document: This document defines the Signalling Transport Network (STN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS), enabled for FMC. It is base [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130066 |
28.736 Signalling Transport Network (STN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
Abstract of document: This document defines the Signalling Transport Network (STN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (IS), enabled for FMC. It is based on th [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130067 |
28.701 Core Network (CN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
Abstract of document: This document defines the Core Network (CN) Network Resource Model (NRM) Integration Reference Point (IRP);Requirements, enabled for FMC. It is based the on existing Core Network NRM IRP R [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130068 |
28.702 Core Network (CN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
Abstract of document: This document defines the Core Network (CN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS), enabled for FMC. It is based the on existing Core Netw [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130069 |
28.703 Core Network (CN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
Abstract of document: This document defines the Core Network (CN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions, enabled for FMC. It is based the on existing Core [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130070 |
28.751 Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
Abstract of document: This document defines the Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements, enabled for Converged Management. It is based on the e [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130071 |
28.752 Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
Abstract of document: This document defines the Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS), enabled for Converged Management. It is ba [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130072 |
28.753 Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
Abstract of document: This document defines the Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions, enabled for Converged Management. It [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130073 |
28.654 GSM/EDGE Radio Access Network (GERAN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
Abstract of document: This document defines the GSM/EDGE Radio Access Network (GERAN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements, enabled for Converged Management. It is based [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130074 |
28.655 GSM/EDGE Radio Access Network (GERAN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
Abstract of document: This document defines the GSM/EDGE Radio Access Network (GERAN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS), enabled for Converged Management. [...]. |
TS |
Approval |
Approved |
|
|
|
| 11.33 |
SP-130075 |
28.656 GSM/EDGE Radio Access Network (GERAN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
Abstract of document: This document defines the GSM/EDGE Radio Access Network (GERAN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions, enabled for Converged Managem [...]. |
TS |
Approval |
Approved |
|
|
|
| 6 |
SP-130076 |
LS from ITU-T SG 16: LS on Consent of High Efficiency Video Coding (HEVC) |
TU-T SG 16 |
We are pleased to inform you that the development of the High Efficiency Video Coding (HEVC) specification has been completed. HEVC received Consent at the January 2013 meeting of ITU-T SG16, and is currently a [...]. |
LS In |
Information |
Noted. forward to SA WG4 |
|
| COM 16 - LS 27 |
It was decided to forward this to SA WG4 for consideration. This was then noted. |
7.2 |
SP-130077 |
SA WG2 Status Report |
SA WG2 Chairman |
Report of SA WG2 activities |
Report |
Presentation |
Noted |
|
|
| The SA WG2 Chairman was thanked for this report, which was then noted. |
8.5 |
SP-130078 |
4 CRs to 23.060 on Restricting Inter RAT handover and release-with-redirection from GERAN to E-UTRAN (Rel-8, Rel-9, Rel-10, Rel-11, SAES) |
SA WG2 |
23.060 CR1740; 23.060 CR1741; 23.060 CR1742; 23.060 CR1743 |
CR Pack |
Approval |
Approved |
|
|
|
| 9 |
SP-130079 |
3 CRs to 23.271: Use of non-dialable callback number at SR-VCC handover of emergency call (Rel-9, Rel-10, Rel-11, TEI9) |
SA WG2 |
23.271 CR0397; 23.271 CR0398; 23.271 CR0399 |
CR Pack |
Approval |
Approved |
|
|
|
| 10.5 |
SP-130080 |
2 CRs to 23.272: Priority setting for 1xCSFB correction (Rel-10, Rel-11, eMPS) |
SA WG2 |
23.272 CR0855; 23.272 CR0856 |
CR Pack |
Approval |
Approved |
|
|
|
| 10.25 |
SP-130081 |
4 CRs to 23.272 and 23.401 (Rel-10, Rel-11, TEI10, SAES-CSFB) |
SA WG2 |
23.272 CR0849; 23.272 CR0850; 23.401 CR2497R2; 23.401 CR2498R2 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.5 |
SP-130082 |
5 CRs to 23.139 and 23.203 (Rel-11, BBAI) |
SA WG2 |
23.139 CR0037R2; 23.139 CR0039R1; 23.203 CR0792; 23.203 CR0785R2; 23.203 CR0786R2 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.8 |
SP-130083 |
3 CRs to 23.060, 23.203 and 23.401 (Rel-11, NWK-PL2IMS) |
SA WG2 |
23.060 CR1733R4; 23.203 CR0791R2; 23.401 CR2490R5 |
CR Pack |
Approval |
Approved |
|
|
| Note: Related to Rel 8 to Rel 10 CRs in SP-130100 |
11.11 |
SP-130084 |
1 CR to 23.216 (Rel-11, vSRVCC) |
SA WG2 |
23.216 CR0310R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.17 |
SP-130085 |
4 CRs to 23.251 and 23.272 (Rel-11, Full_MOCN-GERAN) |
SA WG2 |
23.251 CR0086R2; 23.251 CR0087R2; 23.251 CR0089R4; 23.272 CR0848 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.18 |
SP-130086 |
2 CRs to 23.203 and 23.402 (Rel-11, SaMOG_WLAN) |
SA WG2 |
23.203 CR0790R2; 23.402 CR1148 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.19 |
SP-130087 |
2 CRs to 23.237 (Rel-11, rSRVCC) |
SA WG2 |
23.237 CR0456; 23.237 CR0457 |
CR Pack |
Approval |
Approved |
|
|
|
| 11.35 |
SP-130088 |
6 CRs to 23.060, 23.216, 23.203, 23.292 and 23.401 (Rel-11, TEI11, SAES, NWK-PL2IMS) |
SA WG2 |
23.060 CR1744R2; 23.216 CR0311R1; 23.292 CR0195R1; 23.292 CR0196R1; 23.401 CR2501R2 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.17 |
SP-130089 |
4 CRs to 23.060 and 23.401 (Rel-12, LIMONET) |
SA WG2 |
23.060 CR1751R2; 23.060 CR1756R2; 23.401 CR2507R2; 23.401 CR2508R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.18 |
SP-130090 |
1 CR to 23.402 (Rel-12, OPIIS) |
SA WG2 |
23.402 CR1152R2 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.20 |
SP-130091 |
1 CR to 23.402 (Rel-12, SMSMI) |
SA WG2 |
23.204 CR0097R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.23 |
SP-130092 |
2 CRs to 23.203 (Rel-12, UMONC) |
SA WG2 |
23.203 CR0782R1; 23.203 CR0784R2 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.39 |
SP-130093 |
3 CRs to 23.060, 23.228 and 23.401 (Rel-12, TEI12) |
SA WG2 |
23.060 CR1757R3; 23.228 CR1028; 23.401 CR2509R3 |
CR Pack |
Approval |
Approved |
|
|
|
| 13.13 |
SP-130094 |
Presentation of TR 23.800 version 2.0.0: Study on Application Based Charging; Stage 2 (Release 12) |
SA WG2 |
Abstract of document: TR 23.800 defines key issues and studies PCEF/TDF charging solutions for the network usage of services and applications when TDF performs application detection and control. Both online and [...]. |
TR |
Approval |
Approved |
|
|
|
| 12.17 |
SP-130095 |
Presentation of TR 23.859 version 1.0.0: LIPA Mobility and SIPTO at the Local Network; (Release 12) |
SA WG2 |
Abstract of document: TR 23.859 is started at the Rel-11 with the objective to study the LIPA Mobility and SIPTO at the Local Network two parts. In Rel-12 the work objective has been revised and the work comple [...]. |
TR |
Approval |
Approved |
|
|
| 'one-step' approval |
12.19 |
SP-130096 |
Presentation of TR 23.896 version 1.0.0: Technical Report on Support for fixed broadband access network convergence; Stage-2 (Release 12) |
SA WG2 |
Abstract of document: This Technical Report addresses the stage 2 study for the Evolved Packet System (EPS) to facilitate policy and charging control for the fixed broadband access network in the convergent sce [...]. |
TR |
Information |
Noted |
|
|
|
| 13.9 |
SP-130097 |
Presentation of TR 23.852 version 1.4.1: Study on S2a Mobility based On GTP & WLAN access to EPC (SaMOG); Stage 2 (Release 12) |
SA WG2 |
Abstract of document: The TR describes the study of stage 2 requirements and solutions for EPC interworking with Trusted WLAN Access networks. The TR includes both the SaMOG study performed as part of Rel-11 as [...]. |
TR |
Information |
Noted |
|
|
|
| 12.12 |
SP-130098 |
WID proposal for Group Communication System Enablers for LTE (Update to SA WG1 WID SP-120876) |
SA WG2 |
Objective: The SA WG1 objective shall specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Noted |
|
|
| An updated proposal in SP-130122 was used. This was then noted. |
14 |
SP-130099 |
New Feature WID on Application Based Charging |
SA WG2 |
Objective: This Work item aims to enhance the system to support application based charging for the applications detected, enforced and charged by the TDF or by the PCEF enhanced with Application Detection and C [...]. |
WID |
Approval |
Approved |
|
|
| It was noted that SA WG5 are likely to add their objectives to this WID. This WID was approved. |
8.5 |
SP-130100 |
6 CRs to 23.060 and 23.401 on ULI age removal (Rel-8, Rel-9, Rel-10, Rel-11, SAES) |
SA WG2 |
23.060 CR1758; 23.060 CR1759; 23.060 CR1760; 23.401 CR2510R2; 23.401 CR2511; 23.401 CR2512 |
CR Pack |
Approval |
Approved |
|
|
| Note: Related to Rel-11 CRs in SP-130083 |
17.2 |
SP-130101 |
MCC Support Team Report |
MCC Support Team Coordinator |
Report of the MCC Support Team activities |
Report |
Presentation |
Noted |
|
|
|
| 5 |
SP-130102 |
Draft Work Prioritization input to TSG SA#59 |
SA WG2 Chairman |
AAs requested due to the outcome of the Release 12 workshop at TSG SA#58, SA WG2 provides budget figures for all approved features and study items. This document further assesses the total amount of available t [...]. |
OTHER |
Discussion |
Noted |
|
|
| SA WG2 were asked to progress the work as suggested in SP-130102 in terms of sessions and parallel working and to bring updated information and details of the larger functions sub-functionalities to the next TSG SA meeting. |
7.1 |
SP-130103 |
Status Report from SA WG1 to TSG SA#59 |
SA WG1 Chairman |
Report of SA WG1 activities |
Report |
Presentation |
Noted |
|
|
| The SA WG1 Chairman was thanked for this report, which was then noted. |
12.21 |
SP-130104 |
Stage 1 CRs on MTCe-SRM |
SA WG1 |
22.368 CR0146R2; 22.368 CR0147R2 |
CR Pack |
Approval |
Approved |
|
|
| Morpho Cards GmbH commented that 22.368 CR0147R2 does not include the affected clause in the list of clauses affected. This was noted in this report and the CRs were then approved. |
12.21 |
SP-130105 |
Updated WID on MTCe-SRM |
SA WG1 |
Objective: One objective of this WID is to provide clarifications upon request from Stage 2 groups for the service requirements that Stage 2 groups are working on in Release 12. The items for which this applies [...]. |
WID |
Approval |
Approved |
|
|
| The SA WG3 Chairman commented that no consensus for this had yet been reached. This updated WID was then approved. |
12.15 |
SP-130106 |
Stage 1 CR on UPCON |
SA WG1 |
22.101 CR0444 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.3 |
SP-130107 |
Stage 1 CR on LangInfo |
SA WG1 |
22.228 0188 1 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.3 |
SP-130108 |
Updated WID on LangInfo |
SA WG1 |
Objective: The SA WG1 objective of this work item is to specify requirements for negotiation of the user's desired language and modality (spoken, signed…). |
WID |
Approval |
Approved |
|
|
| This updated WID was approved. |
12.21 |
SP-130109 |
Stage 1 CR on MTCe-SIMSE |
SA WG1 |
22.368 CR0148R2 |
CR Pack |
Approval |
Approved |
|
|
| The SA WG1 Chairman reported that the affected specification version is 12.1.0 not 12.0.0 but text in CR is correct. With this, the CR was approved. |
14 |
SP-130110 |
Stage 1 CR on PMOC (Prevention of mobile-originating signalling and/or data traffic of UE in connected mode) |
SA WG1 |
22.011 CR0194R2 |
CR Pack |
Approval |
Approved |
|
|
|
| 14 |
SP-130111 |
New WID on PMOC |
SA WG1 |
Objective: The objective is to specify service requirements for: - Prevention of mobile-originating signalling and/or data traffic of UEs in E-UTRAN in connected mode based on the criteria for the access barrin [...]. |
WID |
Approval |
Approved |
|
|
|
| 14 |
SP-130112 |
Stage 1 CR on ESID (Emergency session identification) |
SA WG1 |
22.101 CR0445R3 |
CR Pack |
Approval |
Approved |
|
|
| Morpho Cards GmbH commented that there were clauses included in this CR which were not modified. Delegates were reminded that unaffected clauses should not appear in CRs. This CR was then approved. |
14 |
SP-130113 |
New WID on ESID (Emergency session identification) |
SA WG1 |
Objective: The objective of this work item is to specify service requirements for the IM CN subsystem so that each emergency service is properly managed in all the possible network scenarios described above: 1. [...]. |
WID |
Approval |
Noted |
|
|
| Update proposed in SP-130126 |
12.12 |
SP-130114 |
Exception sheet on GCSE_LTE |
SA WG1 |
Feature / Item: GCSE_LTE Affects: UE/MS: X CN: X GERAN: UTRAN: E-UTRAN (LTE): X Expected Completion Date: 06/2013 (SA#60) Service(s) impacted: GCSE_LTE Specification(s) affected: 22.468 Task(s) within work whic [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This Rel-12 Stage 1 exception was approved. |
12.11 |
SP-130115 |
Exception sheet on ProSe |
SA WG1 |
Feature / Item: Proximity Services Affects: UE/MS: X CN: X GERAN: UTRAN: E-UTRAN (LTE): X Expected Completion Date: June, 2013 Service(s) impacted: Proximity-based Services Specification(s) affected: 22.278, 22 [...]. |
Exception sheet |
Approval |
Approved |
|
|
| It was noted that the abbreviation PS for Public Safety was not ideal. This Rel-12 Stage 1 exception was approved. |
12.11 |
SP-130116 |
Stage 1 CRs on ProSe |
SA WG1 |
22.115 CR0067R4; 22.278 CR0120R7; 22.278 CR0121R3; 22.278 CR0122R6; 22.278 CR0123R2; 22.278 CR0124R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 5 |
SP-130117 |
Exception sheet on IMS_WebRTC |
SA WG1 |
Feature / Item: IMS_WebRTC Affects: UE/MS: X CN: X GERAN: UTRAN: E-UTRAN (LTE): Expected Completion Date: 06/2013 (SA#60) Service(s) impacted: IMS_WebRTC Specification(s) affected: 22.228 Task(s) within work wh [...]. |
Exception sheet |
Approval |
Approved |
|
|
| This exception until June 2013 was approved. |
13.5 |
SP-130118 |
TR 22.888 v.1.0.0 on FS_MTCe |
SA WG1 |
Abstract of document: This document is the feasibility study for MTC enhancements, with use cases and potential requirements. Changes since last presentation to TSG SA Meeting #57 This is the 1st presentation t [...]. |
TR |
Approval |
Approved |
|
|
|
| 12.11 |
SP-130119 |
Stage 1 CRs on FS_ProSe |
SA WG1 |
22.803 CR0003R6; 22.803 CR0005R1; 22.803 CR0007R1; 22.803 CR0008R6; 22.803 CR0009R1; 22.803 CR0010R1; 22.803 CR0012R2; 22.803 CR0016R1; 22.803 CR0018R1; 22.803 CR0019; 22.803 CR0031R1; 22.803 CR0036R1; 22.803 C [...]. |
CR Pack |
Approval |
Approved |
|
|
|
| 16.1 |
SP-130120 |
3GPP Work Plan review at Plenary #59 |
MCC Work Plan Manager |
- |
Work Plan |
Presentation |
Noted |
|
|
| The Work Plan manager was thanked for the report, which was noted. |
12.21 |
SP-130121 |
Standardization of Machine-type Communications |
MCC Work Plan Manager |
- |
OTHER |
Presentation |
Noted |
|
|
| This was provided for information and was noted. |
12.12 |
SP-130122 |
WID proposal for Group Communication System Enablers for LTE (Update to SA WG1 WID SP-120876) |
SA WG2 Chairman |
Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Revised |
SP-130156 |
|
| Update of SA WG2 Approved version (SP-130098) with an objection from China Mobile. |
11.35 |
SP-130123 |
Stage 1 CRs on TEI11 |
SA WG1 |
22.011 CR0191R2; 22.041 CR0017R1 |
CR Pack |
Approval |
Approved |
|
|
|
| 14 |
SP-130124 |
New WID on ASAC (Application and Service Access Control) |
SA WG1 |
Objective: The objective is to specify service requirements for system that shall be able to allow/prohibit the communication initiation of particular applications defined by operator and subject to regional re [...]. |
WID |
Approval |
Approved |
|
|
|
| 14 |
SP-130125 |
Exception sheet for ASAC |
SA WG1 |
Feature / Item: Application and Service Access Control Affects: UE/MS: X CN: GERAN: UTRAN: E-UTRAN (LTE): X Expected Completion Date: SA Plenary #60, June 2013 Service(s) impacted: Access Control for applicatio [...]. |
Exception Sheet |
Approval |
Approved |
|
|
|
| 14 |
SP-130126 |
Editorial update of S1-131053 (ESID WID) |
Telecom Italia |
This contribution reflects some editorial improvements that MCC and Telecom Italia identified in the ESID WID in S1-131053. Objective: The objective of this work item is to specify service requirements for the [...]. |
WID |
Approval |
Approved |
|
|
| Proposed update to SP-130113. This WID was approved. |
1 |
SP-130127 |
Invitation for Concerts on 27th Feb./4th Mar. 2013 |
Hitachi, Ltd. |
Wienerkultur 2013: On behalf of 'European Friends of 3GPP' and 'Mobile Competence Centre', Hitachi is pleased to invite all the delegates to two Classical Concerts held as Social Events during both the GERAN/RA [...]. |
OTHER |
Presentation |
Noted |
|
|
| Mr. Kusaba was thanked for organising this cultural event and delegates were encouraged to attend the concert. This presentation was then noted. |
6 |
SP-130128 |
LS from ITU-T SG2: Report on the status of Cell Broadcasting issue |
ITU-T SG2 |
ITU-T SG2 would like to express our thanks to 3GPP TSG SA, 3GPP2 TSG X, TIA TR-45.8, and ATIS WTSC for your reply to our liaison on availability of civic alerting function of 3GPP/3GPP2 terminal at roaming and [...]. |
LS In |
Information |
Noted |
|
| COM 2 - LS 006 |
This was reviewed and noted. |
6 |
SP-130129 |
LS from i3 Forum WS 'Technical Aspects': Reply to ETSI E2NA LS on 'Location of Media Transcoders' |
i3 Forum WS 'Technical Aspects' |
i3Forum thanks ETSI E2NA for their liaison on location of media transcoders. i3Forum recognizes there is little guidance indeed, and welcomes ETSI E2NA studying this topic, taking into account all possible scen [...]. |
LS In |
Information |
Noted |
|
| i3-LS-2013-2-20 |
Related to SP-130137 (LS from E2NA). This was reviewed and noted. |
5 |
SP-130130 |
Revised WID Web Real Time Communication (WebRTC) Access to IMS |
Rapporteur (Ericsson) |
Objective: The objective of this work item is to specify service requirements for: - the ability for WebRTC clients to access IMS, including for example, reusing IMS client security credentials and/or public id [...]. |
WID |
Approval |
Noted |
|
|
| This WID was noted and should worked upon by SA WG3 when requirements are available for the September TSG SA meeting. |
6 |
SP-130131 |
LS from ITU-T Study Group 5: Development of a Recommendation for eco-specifications and rating criteria for mobile phones eco-rating programs |
ITU-T Study Group 5 |
ITU-T Study Group 5 (SG5) would like to update 3GPP on SG5's work program that was revised during its 29 January - 7 February 2013 meeting in Geneva. SG5 is planning to develop a Recommendation, for eco-specifi [...]. |
LS In |
Information |
Noted |
|
| COM 5 - LS 20 |
This was reviewed and noted. |
13.22 |
SP-130132 |
TR 32.835 Study of Heterogeneous Networks Management |
SA WG5 |
Abstract of document: This document investigates and makes recommendations on how management information can be selected by the manager over Itf-N for heterogeneous networks nodes that are owned, deployed and m [...]. |
TR |
Information |
Revised |
SP-130143 |
|
|
| 5 |
SP-130133 |
Revised WID for Web Real Time Communication (WebRTC) Access to IMS |
Alcatel-Lucent, AT&T, Broadcom Corporation, China Mobile, Deutsche Telekom, Ericsson, Huawei, Intel, Qualcomm, Telecom Italia, T-MOBILE, Verizon , ZTE |
SA WG2 is to be included in the feature IMS_WebRTC (along with SA WG3). Rather than creating a separate building block WID, it is proposed to extend the existing SA WG1 feature WID (as approved by SA plenary in [...]. |
WID |
Approval |
Noted |
|
|
| SA WG2 to get an understanding on the scope and objectives in their May 2013 meeting. SA WG3 should develop their WID as appropriate for the September TSG. With this, the WID was then noted. |
7.6 |
SP-130134 |
LS from TSG RAN: 3GPP internal LS on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012, 'Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)' |
TSG RAN |
TSG CT, TSG SA and RAN WGs are kindly asked to consider the workplan agreed by TSG RAN and proceed accordingly, specifically as per Step 3 with reference to the review of the baseline material in Attachments 1& [...]. |
LS In |
Action |
Noted |
|
| RP-130382 |
Antonia Napolitano (antonia.napolitano@telecomitalia.it) (Telecom Italia) agreed to act as the coordinator for TSG SA for this information. This LS was then noted. |
7.6 |
SP-130135 |
LS from TSG RAN: LS on Development of a reply to ITU-R WP5D On Attachment 5.18 to Document 5D/300 on IMT-2000 UPDATES OF RECOMMENDATION ITU-R M.1457 WITH AN ADAPTATION OF THE IMT-ADVANCED UPDATE PROCESS DEVELOPED FOR RECOMMENDATION ITU-R M.2012 |
TSG RAN |
3GPP received from ITU-R WP 5D the Liaison statement in attachment. The document describes a proposed revision of the process toward the future updates of Recommendation ITU-R M.1457 ('Detailed specifications o [...]. |
LS In |
Action |
Noted |
|
| RP-130384 |
Comments on the time plan for Revision 12 of ITU-R M.1457 submission should be sent to the TSG RAN Chairman. This was then noted. |
6 |
SP-130136 |
LS from MultiService Forum (MSF): Dissolution of the MSF |
MultiService Forum (MSF) |
The MSF appreciates the long and successful liaison relationship with 3GPP. In recognition of this relationship, the MSF wishes to advise 3GPP of the decision to dissolve the forum following the Q1 2013 technic [...]. |
LS In |
Action |
Noted |
|
| MSF-2013-005-00 |
| 6 |
SP-130137 |
LS from ETSI E2NA: Location of Media Transcoders |
ETSI E2NA |
As the number of voice and video codecs available on the market place increases, resorting to transcoding functions becomes unavoidable. There seems to be little guidance on where to implement and invoke these [...]. |
LS In |
Action |
Response in SP-130161 |
| SP-120891 |
E2NA(12)04_016r1 |
Re-submission of SP-120891 by MCC for related LSs in SP-130009, SP-130129 and SP-130145. A response was drafted in SP-130157. Final response in SP-130161 |
12.28 |
SP-130138 |
Release 12 CRs on Security enhancements for usage of Generic Bootstrapping Architecture (GBA) from the browser (Stage 2) (Web_GBA) |
SA WG3 |
33.222 CR0039R2; 33.222 CR0040R2; 33.222 CR0041R2; 33.222 CR0042R2 |
CR Pack |
Approval |
Approved |
| SP-130035 |
|
| 11.33 |
SP-130139 |
Rel-11 CRs on IRP framework enhancements to support Management of Converged Networks (OAM-FMC-IRP) |
SA WG5 |
28.628 CR0001; 32.300 CR0014R1; 32.602 CR0012R2; 32.103 CR0004R2 |
CR Pack |
Approval |
Approved |
| SP-130060 |
|
| 10.24 |
SP-130140 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
32.422 CR0249; 32.422 CR0250; 32.656 CR0009R1; 32.656 CR0010R2; 32.762 CR0093R1; 32.762 CR0094R1; 32.766 CR0050R1; 32.766 CR0051R1 |
CR Pack |
Approval |
Approved |
| SP-130047 |
|
| 7.5 |
SP-130141 |
SA WG5 Status Report |
SA WG5 Chairman |
Report of SA WG5 activities |
Report |
Presentation |
Noted |
| SP-130041 |
| There were no questions and no actions from SA WG5. The SA WG5 Chairman was thanked for this report, which was then noted. |
7.3 |
SP-130142 |
SA WG3 Status Report |
SA WG3 Chairman |
Report of SA WG3 activities |
Report |
Information |
Noted |
| SP-130029 |
| The SA WG3 Chairman was thanked for this report, which was then noted. |
13.22 |
SP-130143 |
TR 32.835 Study of Heterogeneous Networks Management |
SA WG5 |
Abstract of document: This document investigates and makes recommendations on how management information can be selected by the manager over Itf-N for heterogeneous networks nodes that are owned, deployed and m [...]. |
TR |
Information |
Noted |
| SP-130132 |
|
| 11.35 |
SP-130144 |
Problem identified with SA WG4 CR 26.346-0306 - Confidentiality Protection of Associated Delivery Procedure Messages |
Telefon AB LM Ericsson, ST-Ericsson SA, Qualcomm Incorporated, Huawei Technologies |
In further reviewing the SA WG4 CR 26.346-0306, the source companies identified that it introduces a possibility for a bid-down attack with the use of HTTPS for ADP due to the requirement in SA WG4 CR that the [...]. |
OTHER |
Decision |
Noted |
|
|
| This proposal was endorsed and SA WG4 were asked to review 26.346 CR0306 for correction at their next meeting. SA WG3 were also asked to review their related CR. |
6 |
SP-130145 |
LS from GERAN WG2: Reply LS on providing information on transcoding functions in 3GPP standards |
GERAN WG2 |
GERAN WG2 would like to inform SA that there is no transcoding function in PS domain in GSM system. While for CS domain, transcoding function is required for codec adaptation between radio traffic channel and A [...]. |
LS In |
Action |
Noted |
|
| GP-130222 |
For response to SP-120891 / SP-130137 (LS from E2NA). This was reviewed and noted. |
12.21 |
SP-130146 |
LS from GERAN WG2: Reply LS on requesting input on MTCe solutions |
GERAN WG2 |
GERAN WG2 would like to thank SA WG2 for their LS on requesting input on MTCe solutions. GERAN WG2 will analyse the solutions included in the TR 23.887 that may affect GERAN specifications and feed back the res [...]. |
LS In |
Information |
Noted |
|
| GP-130222 |
It was reported that a more detailed response will be developed at the next GERAN WG2 meeting. This LS was then noted. |
7.7 |
SP-130147 |
TSG CT Status report |
TSG CT Chairman |
TSG CT Status Report to TSG SA #59 |
Report |
Presentation |
Noted |
|
|
| The TSG CT Chairman was thanked for this report, which was then noted. |
7.7 |
SP-130148 |
TSG CT draft meeting report |
TSG CT Secretary (MCC) |
Draft report of TSG CT meeting #59 |
Report |
Information |
Noted |
|
|
| This was provided for information and was noted. |
7.7 |
SP-130149 |
IETF status report |
TSG CT Chairman |
Report of IETF dependencies |
Report |
Presentation |
Noted |
|
|
| There were no questions. Delegates were encouraged to participate in work as outlined in the report. The TSG CT Chairman was thanked for this report, which was then noted. |
6 |
SP-130150 |
LS from TSG CT: Reply LS on providing information on transcoding functions in 3GPP standards |
TSG CT |
TSG CT provides this reply to TSG SA as a consolidated response from the TSG CT working groups to aid TSG SA in providing a response to ETSI E2NA on their questions regarding transcoding functions in 3GPP. The [...]. |
LS In |
Action |
Noted. LS to ETSI E2NA drafted in SP-130157 |
|
| CP-130159 |
This was reviewed and a response LS to ETSI E2NA to collect all responses was drafted in SP-130157. This was then noted. |
7.7 |
SP-130151 |
LS from TSG CT: Shifting of WI IMS Emergency PSAP Callback stage 3 to Rel-12 |
TSG CT |
At CT#59 3GPP TSG CT Plenary discussed the still open 3GPP Rel-11 issues in CT Working Groups. As CT WG1 lead Work Item 'IMS Emergency PSAP Callback (EMC_PC)' still shows a low completion rate, CT Plenary decid [...]. |
LS In |
Information |
Noted |
|
| CP-130172 |
SA WG1 and SA WG2 specifications should be reviewed to determine any impacts of removing the functionality. This LS was then noted. |
7.6 |
SP-130152 |
TSG RAN Status Report to TSG SA#59 |
TSG RAN Chairman |
Draft report of TSG RAN meeting #59 |
Report |
Presentation |
Noted |
|
|
| The TSG RAN Chairman was thanked for his great contribution to TSG RAN as Chairman and wished luck in his future work in 3GPP. The TSG RAN Chairman was thanked for this report, which was then noted. |
7.6 |
SP-130153 |
Draft report of TSG RAN meeting #59 |
TSG RAN Secretary (MCC) |
Draft report of TSG RAN meeting #59 |
Report |
Information |
Noted |
|
|
| This was provided for information and was noted. |
7.8 |
SP-130154 |
TSG GERAN Status Report to TSG SA#59 |
TSG GERAN Chairman |
Draft report of TSG GERAN meeting #57 |
Report |
Presentation |
Noted |
|
|
| There were no questions. The TSG GERAN Chairman was congratulated on his re-election. The TSG GERAN Chairman was thanked for this report, which was then noted. |
16.3 |
SP-130155 |
CRs to list of Specifications |
MCC Specifications Manager |
21.101 CR0072; 21.101 CR0073; 21.201 CR0012; 21.201 CR0013; 21.202 CR0015; 21.202 CR0016; 41.101 CR0052; 41.101 CR0053 |
CR Pack |
Approval |
Approved |
|
|
|
| 12.12 |
SP-130156 |
WID proposal for Group Communication System Enablers for LTE (Update to SA WG1 WID SP-120876) |
SA WG2 Chairman |
Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Revised |
SP-130158 |
SP-130122 |
| Some editorial corrections to the supporting companies and Intel, T-Mobile USA and Huawei asked to be added. This was revised accordingly in SP-130158 |
6 |
SP-130157 |
DRAFT LS on providing information on transcoding functions in 3GPP standards |
TSG SA |
To: ETSI E2NA. CC: To: ETSI E2NA. TSG CT, CT WG1, CT WG3, CT WG4, TSG GERAN, GERAN WG2, SA WG2, SA WG4 |
LS OUT |
Approval |
Revised |
SP-130161 |
|
| Response to SP-130137 |
12.12 |
SP-130158 |
WID proposal for Group Communication System Enablers for LTE (Update to SA WG1 WID SP-120876) |
SA WG2 Chairman |
Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. |
WID |
Approval |
Approved |
| SP-130156 |
|
| 12.35 |
SP-130159 |
Revised WID Lawful Interception Release 12 |
SA WG3 |
Objective: The objective of this work item is to update lawful interception specifications for the latest Rel-12 architecture and services as described in the above justification. The enhancements to specificat [...]. |
WID |
Approval |
Approved |
| SP-130031 |
|
| 14 |
SP-130160 |
New Work Item Description on 'End-to-end MTSI extensions' (E2EMTSI) (Feature) |
SA WG4 |
Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that i [...]. |
WID |
Approval |
Approved |
| SP-130027 |
| Approved. Any modification to IETF protocols should be discussed with CT WG1 |
6 |
SP-130161 |
LS on providing information on transcoding functions in 3GPP standards |
TSG SA |
To: ETSI E2NA. CC: To: ETSI E2NA. TSG CT, CT WG1, CT WG3, CT WG4, TSG GERAN, GERAN WG2, SA WG2, SA WG4 |
LS OUT |
Approval |
Approved |
| SP-130157 |
|
| |
Created: 2013-03-05 12:33     END OF LIST
[161] Documents Allocated, [160] Received
Last Allocated Document: SP-130161