Tdoc List
2012-12-12 12:22
Tdoc |
Title |
Source |
Doc-type |
Doc-for |
Agenda |
Avail |
Treated |
Decision |
Wdrn |
Replaced-by |
Replaces |
SP-120659 |
Draft agenda for TSG SA meeting #58 |
TSG SA Chairman |
Agenda |
Approval |
2 |
Yes |
Yes |
The agenda was reviewed and approved. |
No |
|
| SP-120660 |
Draft Report of TSG SA meeting #57 |
TSG SA Secretary |
Report |
Approval |
4.1 |
Yes |
Yes |
The draft report was reviewed and approved. The revision marks will be accepted and the report placed on the FTP server as version 1.0.0. |
No |
|
| SP-120661 |
The 3GPP system area in Rel-12 |
Qualcomm |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Telefonica asked how long the lifetime of a phone was expected to be, if it could work on 2 AA batteries. Qualcomm explained that this was for MTC devices and would use much less power than a 'smart phone'. Qualcomm were thanked for this presentation, wh |
No |
|
| SP-120662 |
Draft agenda for TSG SA meeting #58 |
TSG SA Chairman |
Agenda |
Approval |
99 |
No |
No |
WITHDRAWN |
Yes |
| SP-120659 |
SP-120663 |
Public safety requirements for Release 12 |
US Department of Commerce |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
The US Department of Commerce were thanked for this presentation, which was noted. |
No |
|
| SP-120664 |
Network Enhancements for Better Customer Experience |
KDDI |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Revised in SP-120900 |
No |
SP-120900 |
| SP-120665 |
Rel-12 Priorities |
Deutsche Telekom |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Alcatel-Lucent asked whether the proximity services were intended for commercial use and asked whether some priority should be given to certain PCC BBs. Deutsche Telekom clarified that the commercial issues are concentrated upon and benefits can be seen |
No |
|
| SP-120666 |
Areas of Focus for Release 12 |
AT&T |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Alcatel-Lucent commented that many companies are interested in MTC and P4C and it is becoming clear that not all work in these Work Items is achievable in Rel-12. Juniper also commented that they have a presentation suggesting a subset of these to focus |
No |
|
| SP-120667 |
Samsung's View on Release 12 Items |
Samsung Electronics |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
KDDI asked for slide other Work Items can be included as new market items but noted that these are not in the prioritized list. Samsung were thanked for this presentation, which was noted. |
No |
|
| SP-120668 |
Enhanced Policy Control and Charging for Rel-12 |
Allot Communications, China Telecom, NTT DOCOMO, Tekelec, Openet, Movik Networks, Comverse, Sandvine, IAESI |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
It was clarified that slide 9 presents PCC-related work which is considered important, but does not suggest this is the whole Scope of Rel-12. Allot Communications, China Telecom, NTT DOCOMO, Tekelec, Openet, Movik Networks, Comverse, Sandvine and IAESI |
No |
|
| SP-120669 |
Shaping LTE to address the needs of the Public Safety community |
General Dynamics Broadband |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
T-Mobile asked why Application Servers are outside of 3GPP, as IMS is in 3GPP. It was explained that the internal working of the application server is not specified by 3GPP. General Dynamics Broadband were thanked for this presentation, which was noted. |
No |
|
| SP-120670 |
Rel-12 Focus areas |
Intel |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Revised in SP-120687 |
No |
SP-120687 |
| SP-120671 |
LGE's view on the focusing areas in Release 12 |
LG Electronics |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
LG Electronics were thanked for this presentation, which was noted. |
No |
|
| SP-120672 |
Verizon View on Priorities for Release 12 (SA and CT) |
Verizon |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Intel commented that 3GPP needs to facilitate web-based application development in the specifications. Verizon were thanked for this presentation, which was noted. |
No |
|
| SP-120673 |
Focus Areas for Release 12 |
Nokia Siemens Networks, Nokia |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Nokia Siemens Networks and Nokia were thanked for this presentation, which was noted. |
No |
|
| SP-120674 |
Requirements, potential solution approaches and technologies for Rel-12 |
Cygnus Broadband |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Cygnus Broadband were not available to present this, but it was recognised that other presentations covered the same topics and the presentation was noted. |
No |
|
| SP-120675 |
Focus areas for 3GPP Rel-12 |
SOFTBANK MOBILE Corp. |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
SOFTBANK MOBILE Corp. were thanked for this presentation, which was noted. |
No |
|
| SP-120676 |
Release 12 content prioritization |
TeliaSonera |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
TeliaSonera were thanked for this presentation, which was noted. |
No |
|
| SP-120677 |
Rel-12 prioritization |
Telecom Italia |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Alcatel-Lucent asked whether the MTC was focussed on all BBs or only congestion avoidance, Telecom Italia clarified that all activities are important for handling data and signalling growth. Verizon commented that the other P4C BBs in SP-120679 were not |
No |
|
| SP-120678 |
Rel-12: Areas of focus |
Alcatel-lucent |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Formatting error: Revised in SP-120896 |
No |
SP-120896 |
| SP-120679 |
3GPP Release 12 Prioritisation |
Telecom Italia, Telefonica, Deutsche Telekom, Orange |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
RIM asked if the Release planning improvements suggested in Slide 9 could be achieved by improving the SA WG1 requirements work, which often are more detailed than expected. SA WG2 Chairman commented that they are sometimes not detailed enough, but agree |
No |
|
| SP-120680 |
Key Work and Study Items for 3GPP Release 12 |
Vodafone, China Mobile, Ericsson, Huawei, Qualcomm |
OTHER |
Presentation |
5.1 |
Yes |
Yes |
Vodafone, China Mobile, Ericsson, Huawei and Qualcomm were thanked for this contribution, which was noted. |
No |
|
| SP-120681 |
The Cost-Efficient Traffic Adaptable System |
NTT DOCOMO |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Revised in SP-120882 |
No |
SP-120882 |
| SP-120682 |
NEC's View on challenges and Technologies for Rel-12 |
NEC |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Alcatel-Lucent asked why SaMOG is not promoted as a priority and . NEC clarified that SaMOG is important but felt that LIMONET is most important. NEC were thanked for this presentation, which was noted. |
No |
|
| SP-120683 |
3GPP Rel-12 Prioritization: Public Safety & Mission Critical communications |
Telefonica, Telecom Italia, Orange |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Verizon commented that ProSe work has not yet started in SA WG2 and due to the overload of SA WG2, prioritization of work is needed. Telecom Italia agreed and added that the Public Safety work was a good opportunity for LTE use. Telefonica commented that |
No |
|
| SP-120684 |
Release 12 Priorities |
Huawei |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
It was clarified that the WLAN Security is an SA WG3 Work Item in cooperation with SA WG2. Huawei were thanked for this presentation, which was noted. |
No |
|
| SP-120685 |
TSG SA Release 12 content prioritization |
Ericsson |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Revised in SP-120688 |
No |
SP-120688 |
| SP-120686 |
Key objectives in TSG SA for Rel-12 |
Research In Motion UK Ltd. |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Orange asked how inter-QoS and SDO coordination improvements are expected to be achieved. Research In Motion suggested that inter-SDO cooperation needs to be leveraged to focus on these issues. It was clarified that the Security requirement referred to c |
No |
|
| SP-120687 |
Rel-12 Focus areas |
Intel |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Intel were thanked for this presentation, which was noted. |
No |
| SP-120670 |
SP-120688 |
TSG SA Release 12 content prioritization |
Ericsson |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Ericsson clarified that they would also like to complete the technical work on the prioritized items for Rel-12. Ericsson were thanked for this presentation, which was noted. |
No |
| SP-120685 |
SP-120689 |
High Priority Work and Study Items for 3GPP Release 12 |
Juniper Networks |
OTHER |
Discussion |
5.1 |
Yes |
Yes |
This was provided for background information to the presentation in SP-120690 and was noted. |
No |
|
| SP-120690 |
JUSTIFICATION FOR RELEASE 12 PRIORITIZATION |
Juniper Networks |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Juniper Networks were thanked for this presentation, which was noted. |
No |
|
| SP-120691 |
LS from the Broadband Forum: Answer to 3GPP liaison S2-122623 (bbf2012.691.00) on 3GPP BBAI status updates and assumptions |
Broadband Forum |
LS In |
Information |
11.5 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120692 |
LS from CT WG1: LS on IMS service level trace removal of feature from old releases |
CT WG1 |
LS In |
Action |
7.7 |
Yes |
Yes |
Noted. This LS was reviewed and noted. The reply from TSG CT in SP-120906 was reviewed. |
No |
|
| SP-120693 |
LS from Global ICT Standardisation Forum for India (GISFI): Liaison statement on GISFI Indian network security related standardization activity |
Global ICT Standardisation Forum for India (GISFI) |
LS In |
Information |
13.26 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120694 |
LS from ETSI TC Human Factors: LS to 3GPP on possible feedback on M376 deliverables |
ETSI TC Human Factors |
LS In |
Action |
6 |
Yes |
Yes |
Action deadline was 05/11/2012. Motorola Mobility commented that this was provided to make companies aware of the public procurement issues, This was then noted. |
No |
|
| SP-120695 |
LS from TCCA CCBG System Architecture Group: General Architecture Considerations for Critical Communication Systems |
TCCA CCBG System Architecture Group |
LS In |
Information |
12.9 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120696 |
LS from RAN WG2: Reply LS on Cooperation for Energy Efficiency Measurement |
RAN WG2 |
LS In |
Information |
13.11 |
Yes |
Yes |
This LS was noted. |
No |
|
| SP-120697 |
LS from RAN WG3: LS on Stage 3 change for broadband access network interworking |
RAN WG3 |
LS In |
Information |
11.5 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120698 |
LS from RAN WG3: Support for Broadband Forum Accesses Interworking |
RAN WG3 |
LS In |
Action |
11.5 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120699 |
LS from SA WG1: LS on OMA M2M device classification |
SA WG1 |
LS In |
Information |
12.18 |
Yes |
Yes |
Noted |
No |
|
| SP-120700 |
LS from SA WG1: LS on Progression of normative ProSe work |
SA WG1 |
LS In |
Information |
13.23 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120701 |
LS from SA WG3: Reply LS on SA WG3 eMBMS changes impacting CT WG6 |
SA WG3 |
LS In |
Information |
9 |
Yes |
Yes |
This LS was noted. |
No |
|
| SP-120702 |
LS from SA WG3: Integration of Web GBA with Crypto API |
SA WG3 |
LS In |
Information |
12.31 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120703 |
LS from SA WG3: Reply LS on Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 |
SA WG3 |
LS In |
Action |
12.31 |
Yes |
Yes |
Nokia commented that SA WG3 had taken a different approach to this Liaison than other WGs and asked how this should be handled by TSG SA. It was considered useful to consider this information for sending to the GSMA. The SA WG3 Chairman explained that so |
No |
|
| SP-120704 |
LS from SA WG5: LS on modification of term '3G' in SA WG5 specifications |
SA WG5 |
LS In |
Information |
12.30 |
Yes |
Yes |
Noted |
No |
|
| SP-120705 |
LS from SA WG5: LS on Cooperation for Energy Efficiency Measurement |
SA WG5 |
LS In |
Information |
13.11 |
Yes |
Yes |
Noted. Nokia suggested that SA WG5 try again to have an effective correspondence with ETSI EE as there was little that can be done by TSG SA at present. Orange suggested informing ETSI EE of the work done by SA WG5. The SA WG5 Chairman reported that they |
No |
|
| SP-120706 |
LS from ITU-R WP 5D: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS INVITATION TO INPUT MATERIAL FOR DEVELOPMENT OF WORKING DOCUMENT TOWARD A PRELIMINARY DRAFT NEW REPORT ON THE USE OF IMT FOR BROADBAND PPDR APPLICATIONS |
ITU-R WP 5D |
LS In |
Action |
7.6 |
Yes |
Yes |
Postponed SP-120461 from TSG SA#57. This LS was reviewed and noted. |
No |
|
| SP-120707 |
LS from TIA TR-45.8: Response to Availability of civic alerting function of 3GPP/3GPP2 terminal at roaming |
TIA TR-45.8 |
LS In |
Information |
6 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120708 |
LS from SA WG2: LS on Clarification on authentication and policy control procedures for 3GPP UE roaming in BBF domain |
SA WG2 |
LS In |
Information |
11.5 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120709 |
SA WG2 Status Report at TSG SA#58 |
SA WG2 Chairman |
Report |
Presentation |
7.2 |
Yes |
Yes |
The SA WG2 Chairman was thanked for this report, which was noted. |
No |
|
| SP-120710 |
16 Rel-8 and mirror CRs to 23.060, 23.221, 23.251 and 23.401 (SAES) |
SA WG2 |
CR Pack |
Approval |
8.5 |
Yes |
Yes |
Approved |
No |
|
| SP-120711 |
3 Rel-9 and mirror CRs to 23.271 (LCS_LTE_EPS) |
SA WG2 |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved. Linked to RAN WG2: TS 36.305 CRs 0047/0048/0049 and CT WG4: TS 29.171 (No CRs available) |
No |
|
| SP-120712 |
1 Rel-9 (only) CR to 23.237 (IMS_SCC-SPI) |
SA WG2 |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved |
No |
|
| SP-120713 |
12 Rel-9 and mirror CRs to 23.167, 23.272, 23.401 (TEI9; TEI9, SRVCC) |
SA WG2 |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved |
No |
|
| SP-120714 |
11 Rel-10 (and mirror) CRs to 23.002, 23.216, 23.237 (TEI10) |
SA WG2 |
CR Pack |
Approval |
10.25 |
Yes |
Yes |
Approved |
No |
|
| SP-120715 |
8 Rel-10 (and mirror) CRs to 23.060, 23.237, 23.401 (TEI10; TEI10, SAES; TEI10, IMS_SCC-SPI) |
SA WG2 |
CR Pack |
Approval |
10.25 |
Yes |
Yes |
Approved. Note for 23.401 CR2477R4: Rel-11 changes are slightly different and are contained in 23.401 CR2478R3 under TEI11 (SP-120726). |
No |
|
| SP-120716 |
1 Rel-11 CR to 23.203 (QoS_SSL) |
SA WG2 |
CR Pack |
Approval |
11.3 |
Yes |
Yes |
Approved |
No |
|
| SP-120717 |
12 Rel-11 CRs to 23.060, 23.401, 23.204, 23.228. 23.272, 23.682 (SIMTC, SIMTC-Reach) |
SA WG2 |
CR Pack |
Approval |
11.4 |
Yes |
Yes |
Approved |
No |
|
| SP-120718 |
1 Rel-11 CR to 23.139 (BBAI) |
SA WG2 |
CR Pack |
Approval |
11.5 |
Yes |
Yes |
Revised version proposed in SP-120755. This CR was therefore considered as revised in SP-120755. |
No |
|
| SP-120719 |
1 Rel-11 CR to 23.401 (NWK-PL2IMS) |
SA WG2 |
CR Pack |
Approval |
11.8 |
Yes |
Yes |
Approved |
No |
|
| SP-120720 |
3 Rel-11 CRs to 23.203 (SAPP) |
SA WG2 |
CR Pack |
Approval |
11.11 |
Yes |
Yes |
Approved |
No |
|
| SP-120721 |
1 Rel-11 CR to 23.060 (SIRIG) |
SA WG2 |
CR Pack |
Approval |
11.17 |
Yes |
Yes |
Approved |
No |
|
| SP-120722 |
4 Rel-11 CRs to 23.272, 23.251 (FULL_MOCN-GERAN; FULL_MOCN-GERAN, FULL_MOCN-GERAN, FULL_MOCN-GERAN-GWCN) |
SA WG2 |
CR Pack |
Approval |
11.18 |
Yes |
Yes |
23.272 CR0810R6; 23.251 CR0077R5; 23.251 CR0080R3 were approved. 23.251 CR0067R7 was noted. |
No |
|
| SP-120723 |
3 Rel-11 CRs to 23.402 (SaMOG_WLAN) |
SA WG2 |
CR Pack |
Approval |
11.19 |
Yes |
Yes |
Approved |
No |
|
| SP-120724 |
2 Rel-11 CRs to 23.216 and 23.251 (rSRVCC) |
SA WG2 |
CR Pack |
Approval |
11.20 |
Yes |
Yes |
Approved |
No |
|
| SP-120725 |
2 Rel-11 CRs to 23.228 (RAVEL) |
SA WG2 |
CR Pack |
Approval |
11.21 |
Yes |
Yes |
Approved |
No |
|
| SP-120726 |
13 Rel-11 CRs to various specifications (TEI11; TEI11, SAES; TEI11, NIMTC; TEI-11, LCS_LTE-NBPS) |
SA WG2 |
CR Pack |
Approval |
11.34 |
Yes |
Yes |
Approved |
No |
|
| SP-120727 |
1 Rel-12 CR to 23.204 (SMSMI) |
SA WG2 |
CR Pack |
Approval |
12.17 |
Yes |
Yes |
Approved |
No |
|
| SP-120728 |
5 Rel-12 CRs to 23.237, 23.292 (TEI12) |
SA WG2 |
CR Pack |
Approval |
12.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120729 |
Presentation of TR 23.862 version 1.0.0: 'EPC enhancements to Support Interworking with Data Application Providers (MOSAP); Stage 2 (Release 12)' for Information |
SA WG2 |
TR |
Information |
12.4 |
Yes |
Yes |
Noted. RIM asked that the hanging paragraphs are removed during the development of this TR. This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG2. |
No |
|
| SP-120730 |
Presentation of TR 23.853 version 1.0.0: 'Operator Policies for IP Interface Selection (OPIIS); (Release 12)' for Approval |
SA WG2 |
TR |
Approval |
12.15 |
Yes |
Yes |
This TR was approved and placed under TSG SA change control (Release 12). |
No |
|
| SP-120731 |
Presentation of TR 23.863 version 2.0.0: 'Support of Short Message Service (SMS) in IMS without MSISDN; Stage 2 (Release 12)' for Approval |
SA WG2 |
TR |
Approval |
12.17 |
Yes |
Yes |
This TR was approved and placed under TSG SA change control (Release 12). |
No |
|
| SP-120732 |
Presentation of TR 23.897 version 1.0.0: 'Feasibility study on IMS Business Trunking for IP-PBX in Static Mode of Operation (Release 12)' for Information |
SA WG2 |
TR |
Information |
12.20 |
Yes |
Yes |
Noted |
No |
|
| SP-120733 |
Presentation of TR 23.800 version 1.0.0: 'Study on Application Based Charging; Stage 2 (Release 12)' for Information |
SA WG2 |
TR |
Information |
13.20 |
Yes |
Yes |
Noted |
No |
|
| SP-120734 |
Presentation of TR 23.858 version 1.0.0: 'Usage Monitoring Control PCC Enhancement; (Release 12)' for Information |
SA WG2 |
TR |
Information |
13.22 |
Yes |
Yes |
Noted |
No |
|
| SP-120735 |
Updated WID: 'IMS registration control (IMS_RegCon)' |
SA WG2 |
WID |
Approval |
12.11 |
Yes |
Yes |
Approved |
No |
|
| SP-120736 |
Updated WID: 'User plane congestion management requirements (UPCON)' |
SA WG2 |
WID |
Approval |
12.12 |
Yes |
Yes |
Proposed Update provided in SP-120890. This was then noted. |
No |
|
| SP-120737 |
Updated WID: 'LIPA Mobility and SIPTO at the Local Network (LIMONET)' |
SA WG2 |
WID |
Approval |
12.14 |
Yes |
Yes |
The supporting companies needed confirmation. Nokia commented that there had been expectations of reducing the Scope of WIDs in SA WG2 and asked what the advantage of expanding the Scope in this way was. TeliaSonera agreed and asked to be removed as a su |
No |
|
| SP-120738 |
Updated WID: 'Operator Policies for IP Interface selection (OPIIS)' |
SA WG2 |
WID |
Approval |
12.15 |
Yes |
Yes |
Approved |
No |
|
| SP-120739 |
Updated WID: 'IMS Business Trunking for IP-PBX in Static Mode of Operation (BusTI)' |
SA WG2 |
WID |
Approval |
12.20 |
Yes |
Yes |
Noted. Proposed update in SP-120862 |
No |
|
| SP-120740 |
Updated Study WID: 'Study of IP Flow Mobility support for S2a and S2b Interfaces (FS_NBIFOM)' (S2 124793) |
SA WG2 |
WID |
Approval |
13.19 |
Yes |
Yes |
Merged Update in SP-120742. This was noted. |
No |
|
| SP-120741 |
Updated Study WID: 'Study of IP Flow Mobility support for S2a and S2b Interfaces (FS_NBIFOM)' (S2 124868) |
SA WG2 |
WID |
Approval |
13.19 |
Yes |
Yes |
Merged Update in SP-120742. This was noted. |
No |
|
| SP-120742 |
Updated Study WID: 'Study of IP Flow Mobility support for S2a and S2b Interfaces (FS_NBIFOM)' (merged updates) |
SA WG2 Chairman, MCC |
WID |
Approval |
13.19 |
Yes |
Yes |
Approved. Merged Update of SP-120740 and SP-120741 |
No |
|
| SP-120743 |
New WID: 'Proximity-based Services |
SA WG2 |
WID |
Approval |
13.23 |
Yes |
Yes |
It was clarified that this updates the WID provided by SA WG1 in SP-120883. There was some confusion over the intention of the changes. RIM suggested creating separate SA WG1 and SA WG2 WIDs for this. Vodafone asked why the objectives state that TR study |
No |
|
| SP-120744 |
New Study WID: 'Providing control of inbound/outbound Connections when a firewall or NAT is deployed in the PLMN |
SA WG2 |
WID |
Approval |
15 |
Yes |
Yes |
Proposed update in SP-120887. This was therefore considered as revised in SP-120887. |
No |
|
| SP-120745 |
3GPP Work Plan review at Plenary #58 |
MCC Work Plan Manager |
Work plan |
Presentation |
16.1 |
Yes |
Yes |
The MCC Work Plan manager was thanked for this report, which was noted. |
No |
|
| SP-120746 |
3GPP Releases Descriptions - Rel-11 to Rel-12 |
MCC Work Plan Manager |
OTHER |
Information |
16.1 |
Yes |
Yes |
The MCC Work Plan manager was thanked for this report, which was noted. |
No |
|
| SP-120747 |
Standardization of Machine-type Communications |
MCC Work Plan Manager |
OTHER |
Presentation |
12.18 |
Yes |
Yes |
The MCC Work Plan manager was thanked for this report, which was noted. |
No |
|
| SP-120748 |
Next steps for Rel-12 project management |
TSG SA Chairman |
Presentation |
Decision |
5 |
Yes |
Yes |
China Mobile asked when the process would be applied. It was clarified that commitments will be made at TSG SA#59 and new Work Items from then will need to include resource budgets. Slide 5: T-Mobile asked whether the future Release planning would be don |
No |
|
| SP-120749 |
Summary and conclusions on strategic areas for Rel-12 |
TSG SA Chairman |
OTHER |
Decision |
5.1 |
Yes |
Yes |
This was revised to take comments and agreed additional Work items into account in SP-120915 |
No |
|
| SP-120750 |
LS from CT WG6: Reply LS on SA WG3 eMBMS changes |
CT WG6 |
LS In |
Action |
9 |
Yes |
Yes |
This LS was noted. |
No |
|
| SP-120751 |
LS from GERAN WG2: Response LS on reporting the UE E-UTRAN Capabilities for rSRVCC from GERAN to E-UTRAN |
GERAN WG2 |
LS In |
Information |
11.20 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120752 |
Background on Revised CR to TS 22.101 and revised CR to TR 22.805 for UPCON |
KDDI, NTT DOCOMO, AT&T, Orange, SoftBank Mobile, Qualcomm Incorporated, NEC, Intel, Allot Communications, Movik Networks, InterDigital Communications, Cisco, Samsung, Huawei, Research in Motion |
Contribution |
Discussion |
12.12 |
Yes |
Yes |
Revised in SP-120918 |
No |
SP-120918 |
| SP-120753 |
Revision of CR0434R2 to TS 22.101: Addition of UPCON Requirements |
KDDI, NTT DOCOMO, Research in Motion, NEC, Allot Communications, Juniper Networks, SoftBank Mobile, Harris Corporation, InterDigital Communications, Bell Canada, AT&T, ETRI, Qualcomm Incorporated, Chunghwa Telecom, ITRI, Orange, Intel, Movik Networks, Cis |
CR Pack |
Approval |
12.12 |
Yes |
Yes |
Revised in SP-120919 |
No |
SP-120919 |
| SP-120754 |
Revision of CR0001R3 to TR 22.805: Update of Consolidated Requirements; Addition of Use Case to Requirements Traceability Annex |
KDDI |
CR Pack |
Approval |
12.12 |
Yes |
Yes |
Revised in SP-120920 |
No |
SP-120920 |
| SP-120755 |
Update to 23.139 CR0032R1: Correction to UE reflective QoS notification |
Qualcomm, Ericsson, ST-Ericsson |
CR Pack |
Approval |
11.5 |
Yes |
Yes |
Approved. Revision of CR in SP-120718 |
No |
|
| SP-120756 |
SA WG4 Status Report at TSG SA#58 |
SA WG4 Chairman |
Report |
Presentation |
7.4 |
Yes |
Yes |
The SA WG4 Chairman was thanked for this report, which was noted. |
No |
|
| SP-120757 |
CRs to TS 26.346 on 'PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9 until Release 11) |
SA WG4 |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved |
No |
|
| SP-120758 |
CRs to TS 26.237 on 'Correction of nBookmark XML Schema (TEI9)' (Release 9 and Release 10) |
SA WG4 |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved |
No |
|
| SP-120759 |
CR to TS 26.346 on 'Addition to the feature tag table (MBS_Enh)' (Release 10) |
SA WG4 |
CR Pack |
Approval |
10.18 |
Yes |
Yes |
Approved |
No |
|
| SP-120760 |
CRs to TS 26.131 and TS 26.132 on 'Extensions of Acoustic Test Specifications in TS 26.131 and TS 26.132 (Ext_ATS)' (Release 11) |
SA WG4 |
CR Pack |
Approval |
11.26 |
Yes |
Yes |
Approved |
No |
|
| SP-120761 |
CRs to TS 26.247, TS 26.346 and TR 26.946 on 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements; Download Delivery Enhancements for MBMS (EMM-DDE)' (Release 11) |
SA WG4 |
CR Pack |
Approval |
11.27 |
Yes |
Yes |
Approved |
No |
|
| SP-120762 |
TR 26.951 Enhancements to Multimedia (EMM): EMM, DDE and IPME Aspects (Release 11) v. 2.0.0 |
SA WG4 |
TR |
Approval |
11.27 |
Yes |
Yes |
Approved as 26.851. |
No |
|
| SP-120763 |
Rel-11 Work Item Exception sheet for EMM-EFEC (Enhancement to FEC for MBMS) |
SA WG4 |
Exception Sheet |
Approval |
11.27 |
Yes |
Yes |
It was commented that this work had been delayed for some time in SA WG4. It was clarified that TSG SA had agreed for SA WG4 to try to resolve this by voting at their next meeting, so this time is needed to complete if the issue is resolved. This excepti |
No |
|
| SP-120764 |
CR to TS 26.346 on 'MBMS UE UTC Time Synchronization (TEI11)' (Release 11) |
SA WG4 |
CR Pack |
Approval |
11.34 |
Yes |
Yes |
Approved |
No |
|
| SP-120765 |
CR to TS 26.114 on 'Coordination of Video Orientation (CVO)' (Release 12) |
SA WG4 |
CR Pack |
Approval |
12.26 |
Yes |
Yes |
Approved |
No |
|
| SP-120766 |
CR to TS 26.267 on 'Clarification on switching IVS to robust modulator mode (TEI12)' (Release 12) |
SA WG4 |
CR Pack |
Approval |
12.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120767 |
New Work Item Description on 'IMS-based Streaming and Download Delivery Enhancements' (IMS_SDE) (Feature) |
SA WG4 |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
|
| SP-120768 |
New Work Item Description on 'Mobile stereoscopic 3D services extensions' (M3DV_Ext) (Feature) |
SA WG4 |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
|
| SP-120769 |
New Work Item Description on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE' (ART_LTE) (Feature) |
SA WG4 |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
|
| SP-120770 |
New Work Item Description on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - UE Delay aspects' (ART_LTE-UED) (BB) |
SA WG4 |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
|
| SP-120771 |
New Work Item Description on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - NarrowBand and WideBand aspects' (ART_LTE-NBWB) (BB) |
SA WG4 |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
|
| SP-120772 |
New Work Item Description on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - Super wideband and fullband aspects' (ART_LTE-SUPER) (BB) |
SA WG4 |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
|
| SP-120773 |
SA WG5 Status Report |
SA WG5 Chairman |
Report |
Presentation |
7.5 |
Yes |
Yes |
The SA WG5 Chairman was thanked for this report, which was noted. |
No |
|
| SP-120774 |
New WID Study on Alarm Management |
SA WG5 |
WID |
Approval |
15 |
Yes |
Yes |
Approved |
No |
|
| SP-120775 |
New WID Short Message Service - Service Center (SMS-SC) Offline Charging |
SA WG5 |
WID |
Approval |
12.29 |
Yes |
Yes |
Approved |
No |
|
| SP-120776 |
Revised WID Management for Carrier Aggregation for LTE |
SA WG5 |
WID |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120777 |
Revised WID Multi-vendor plug and play and Play eNB connection to the network |
SA WG5 |
WID |
Approval |
12.30 |
Yes |
Yes |
Approved |
No |
|
| SP-120778 |
Revised WID 3GPP Fault Management Solution Profile for NGMN Next Generation Converged Operations Requirements (NGCOR) |
SA WG5 |
WID |
Approval |
12.30 |
Yes |
Yes |
Approved |
No |
|
| SP-120779 |
Revised WID Network Management for 3GPP Interworking WLAN |
SA WG5 |
WID |
Approval |
12.30 |
Yes |
Yes |
Approved |
No |
|
| SP-120780 |
WI Exception for LTE Self-Organizing Networks (SON) coordination management (OAM-SON-LTE_COORD) |
SA WG5 |
Exception sheet |
Approval |
11.32 |
Yes |
Yes |
NEC commented that this extension was mainly requested in order to have a vote in SA WG5 and this work is self-contained and will not impact other work completion and suggested it is moved to Rel 12 instead of voting for Rel 11. Nokia Siemens Networks co |
No |
|
| SP-120781 |
WI Exception for IRP framework enhancements to support Management of Converged Networks |
SA WG5 |
Exception sheet |
Approval |
11.32 |
Yes |
Yes |
This exception request was approved. |
No |
|
| SP-120782 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
CR Pack |
Approval |
10.24 |
Yes |
Yes |
Approved |
No |
|
| SP-120783 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
CR Pack |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120784 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
CR Pack |
Approval |
8.5 |
Yes |
Yes |
Approved |
No |
|
| SP-120785 |
Rel-9 CRs on Charging Management (CH9) |
SA WG5 |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved |
No |
|
| SP-120786 |
Rel-9 CRs on Charging Management (CH9) Batch2 |
SA WG5 |
CR Pack |
Approval |
99 |
No |
No |
WITHDRAWN |
Yes |
|
| SP-120787 |
Rel-10 CRs on Charging Management (CH10) |
SA WG5 |
CR Pack |
Approval |
10.23 |
Yes |
Yes |
Approved |
No |
|
| SP-120788 |
Rel-12 CRs on Charging Management (CH12) |
SA WG5 |
CR Pack |
Approval |
12.29 |
Yes |
Yes |
Approved |
No |
|
| SP-120789 |
Rel-11 CRs on Charging Management small Enhancements (CH11) |
SA WG5 |
CR Pack |
Approval |
11.31 |
Yes |
Yes |
Approved |
No |
|
| SP-120790 |
Rel-11 CRs on Management of Carrier Aggregation for LTE (OAM-CA) |
SA WG5 |
CR Pack |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120791 |
Rel-11 CRs on LTE Self-Organizing Networks (SON) coordination management (OAM-SON-LTE_COORD) |
SA WG5 |
CR Pack |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120792 |
Rel-11 CRs on Charging for System Improvements for Machine Type Communications (SIMTC-CH) |
SA WG5 |
CR Pack |
Approval |
11.31 |
Yes |
Yes |
Approved |
No |
|
| SP-120793 |
Rel-11 CRs on Unification of Charging session from SIP AS and SRVCC functions in IMS (UCHIMS_AS-SRVCC) |
SA WG5 |
CR Pack |
Approval |
11.31 |
Yes |
Yes |
Approved |
No |
|
| SP-120794 |
Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) |
SA WG5 |
CR Pack |
Approval |
10.24 |
Yes |
Yes |
Approved |
No |
|
| SP-120795 |
Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) Batch1 |
SA WG5 |
CR Pack |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120796 |
Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) Batch2 |
SA WG5 |
CR Pack |
Approval |
11.32 |
Yes |
Yes |
32.766 CR0049 revised in SP-120912 The remaining CRs were approved. |
No |
|
| SP-120797 |
Rel-12 CRs on Converged Management Model Alignment (Phase 2)(OAM-MODAL) |
SA WG5 |
CR Pack |
Approval |
12.30 |
Yes |
Yes |
Approved |
No |
|
| SP-120798 |
Rel-11 CRs on QoS Control Based on Subscriber Spending Limits (QoS_SSL) |
SA WG5 |
CR Pack |
Approval |
11.3 |
Yes |
Yes |
Approved |
No |
|
| SP-120799 |
Rel-11 CRs on IRP framework enhancements to support Management of Converged Networks (OAM-FMC-IRP) |
SA WG5 |
CR Pack |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120800 |
Rel-11 CRs on Inter-RAT Energy Saving Management (OAM-IRAT-ESM) |
SA WG5 |
CR Pack |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120801 |
Rel-11 CRs on Charging for Roaming Architecture for Voice over IMS with Local Breakout (RAVEL-CH) |
SA WG5 |
CR Pack |
Approval |
11.21 |
Yes |
Yes |
Approved |
No |
|
| SP-120802 |
28.390 Fixed Mobile Convergence (FMC) Interface Integration Reference Point (IRP) Solution Profiles |
SA WG5 |
TS |
Information |
12.30 |
Yes |
Yes |
Noted |
No |
|
| SP-120803 |
28.621 Telecommunication management; Generic Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120804 |
28.622 Telecommunication management; Generic Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120805 |
28.623 Telecommunication management; Generic Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120806 |
28.624 Telecommunication management; State Management Data Definition Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120807 |
28.625 Telecommunication management; State Management Data Definition Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120808 |
28.626 Telecommunication management; State Management Data Definition Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120809 |
28.627 Telecommunication management; Self-Organizing Networks (SON) Policy Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120810 |
28.628 Telecommunication management; Self-Organizing Networks (SON) Policy Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120811 |
28.629 Telecommunication management; Self-Organizing Networks (SON) Policy Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120812 |
28.631Telecommunication management; Inventory Management (IM) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120813 |
28.632 Telecommunication management; Inventory Management (IM) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120814 |
28.633 Telecommunication management; Inventory Management (IM) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120815 |
28.651 Telecommunication management; Universal Terrestrial Radio Access Network (UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120816 |
28.652 Telecommunication management; Universal Terrestrial Radio Access Network (UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120817 |
28.653 Telecommunication management; Universal Terrestrial Radio Access Network (UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120818 |
28.657 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120819 |
28.658 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120820 |
28.659 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120821 |
28.661 Telecommunication management; Generic Radio Access Network (RAN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120822 |
28.662 Telecommunication management; Generic Radio Access Network (RAN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120823 |
28.663 Telecommunication management; Generic Radio Access Network (RAN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120824 |
28.671 Telecommunication management; Home Node B (HNB) Subsystem (HNS) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120825 |
28.672 Telecommunication management; Home Node B (HNB) Subsystem (HNS) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120826 |
28.673 Telecommunication management; Home Node B (HNB) Subsystem (HNS) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120827 |
28.674 Telecommunication management; Home enhanced Node B (HeNB) Subsystem (HeNS) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120828 |
28.675 Telecommunication management; Home enhanced Node B (HeNB) Subsystem (HeNS) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120829 |
28.676 Telecommunication management; Home enhanced Node B (HeNB) Subsystem (HeNS); Network Resource Model (NRM); Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120830 |
28.704 Telecommunication management; IP Multimedia Subsystem (IMS) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120831 |
28.705 Telecommunication management; IP Multimedia Subsystem (IMS) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120832 |
28.706 Telecommunication management; IP Multimedia Subsystem (IMS) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120833 |
28.707 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120834 |
28.708 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120835 |
28.709 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120836 |
28.731 Telecommunication management; Transport Network (TN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120837 |
28.732 Telecommunication management; Transport Network (TN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120838 |
28.733 Telecommunication management; Transport Network (TN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120839 |
28.734 Telecommunication management; Signalling Transport Network (STN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Requirements |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120840 |
32.107 Telecommunication management; Fixed Mobile Convergence (FMC) Federated Network Information Model (FNIM) |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120841 |
32.156 Telecommunication management; Fixed Mobile Convergence (FMC); Model Repertoire |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120842 |
32.157 Telecommunication management; Integration Reference Point (IRP) Information Service (IS) template |
SA WG5 |
TS |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120843 |
32.830 Telecommunication management; Study on version handling over Itf-N |
SA WG5 |
TR |
Approval |
12.30 |
Yes |
Yes |
Approved |
No |
|
| SP-120844 |
32.854 Telecommunication management; Fixed Mobile Convergence (FMC) 3GPP / TM Forum Concrete Model Relationships and Use Cases |
SA WG5 |
TR |
Approval |
11.32 |
Yes |
Yes |
Approved |
No |
|
| SP-120845 |
LS from SA WG3: Reply LS on Liaison statement on GISFI Indian network security related standardization activity |
SA WG3 |
LS In |
Information |
13.26 |
Yes |
Yes |
This LS was reviewed and noted. |
No |
|
| SP-120846 |
SA WG3 Status Report |
SA WG3 Chairman |
REPORT |
Information |
7.3 |
Yes |
Yes |
The SA WG3 Chairman was thanked for this report, which was noted. |
No |
|
| SP-120847 |
Revised WID for Security Aspects of WLAN Network Selection for 3GPP Terminals |
SA WG3 |
WID |
Approval |
12.19 |
Yes |
Yes |
Approved |
No |
|
| SP-120848 |
Revised WID: System Improvements for Machine Type Communication (SIMTC) |
SA WG3 |
WID |
Approval |
11.4 |
Yes |
Yes |
Approved |
No |
|
| SP-120849 |
Updated SID on 'Firewall Traversal (iFire) |
SA WG3 |
WID |
Approval |
13.24 |
Yes |
Yes |
Approved |
No |
|
| SP-120850 |
New WID on Tunnelling of UE Services over Restrictive Access Networks |
SA WG3 |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
|
| SP-120851 |
Revised WID Lawful Interception Rel-12 |
SA WG3 |
WID |
Approval |
12.28 |
Yes |
Yes |
Approved |
No |
|
| SP-120852 |
TR 33.823 Security for Usage of GBA with a UE browser |
SA WG3 |
TR |
Approval |
12.25 |
Yes |
Yes |
Approved |
No |
|
| SP-120853 |
TR 33.844 Security Study on IP Multimedia Subsystem (IMS) Based Peer-to-Peer Content Distribution Services |
SA WG3 |
TR |
Approval |
13.3 |
Yes |
Yes |
Approved |
No |
|
| SP-120854 |
Release 12 CRs on Lawful Interception (LI12) |
SA WG3 |
CR Pack |
Approval |
12.28 |
Yes |
Yes |
Approved |
No |
|
| SP-120855 |
Release 7 CRs on Development of UEA2 and UIA2 (AlgUEA2) |
SA WG3 |
CR Pack |
Approval |
8.4 |
Yes |
Yes |
Approved |
No |
|
| SP-120856 |
Release 12 CRs on Security small Enhancements (SEC12) |
SA WG3 |
CR Pack |
Approval |
12.31 |
Yes |
Yes |
Approved |
No |
|
| SP-120857 |
Release 10 CRs on Security small Enhancements (TEI10) |
SA WG3 |
CR Pack |
Approval |
99 |
No |
No |
WITHDRAWN |
Yes |
|
| SP-120858 |
Release 11 CRs on Security small Enhancements (SEC11) |
SA WG3 |
CR Pack |
Approval |
11.33 |
Yes |
Yes |
Approved |
No |
|
| SP-120859 |
Release 9 CRs to 33.310 on Network Domain Security (NDS) enhancements to support backhaul security (NDS_Backhaul) |
SA WG3 |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved |
No |
|
| SP-120860 |
Release 9 CRs on Security small Enhancements (TEI9) |
SA WG3 |
CR Pack |
Approval |
9 |
Yes |
Yes |
CRs 33.246 CR0165R1; 33.246 CR0166R1; 33.246 CR0167R1 were revised in SP-120894. The remaining CRs: 33.246 CR0168R1; 33.246 CR0169; 33.246 CR0170; 33.320 CR0093R1, were approved. |
No |
|
| SP-120861 |
Release 12 CRs for IMS media plane security extensions (eMEDIASEC) |
SA WG3 |
CR Pack |
Approval |
12.24 |
Yes |
Yes |
Approved |
No |
|
| SP-120862 |
Update of WID: IMS Business Trunking for IP-PBX in Static Mode of Operation (BusTI) |
Deutsche Telekom |
WID |
Approval |
12.20 |
Yes |
Yes |
Approved. Update to SP-120739 |
No |
| SP-120739 |
SP-120863 |
Status Report from SA WG1 to TSG SA#58 |
SA WG1 Chairman |
Report |
Presentation |
7.1 |
Yes |
Yes |
The SA WG1 Chairman was thanked for this report, which was noted. |
No |
|
| SP-120864 |
Stage 1 CRs on TEI Rel-8 (TEI8) |
SA WG1 |
CR Pack |
Approval |
8.5 |
Yes |
Yes |
Approved |
No |
|
| SP-120865 |
Stage 1 CRs on TEI Rel-9 (TEI9) |
SA WG1 |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved |
No |
|
| SP-120866 |
Stage 1 CRs on TEI Rel-10 (TEI10) |
SA WG1 |
CR Pack |
Approval |
10.25 |
Yes |
Yes |
Approved |
No |
|
| SP-120867 |
Stage 1 CRs on TEI Rel-11 (TEI11) |
SA WG1 |
CR Pack |
Approval |
11.34 |
Yes |
Yes |
Approved |
No |
|
| SP-120868 |
Stage 1 CRs on MTCe: Service Requirement Maintenance (MTCe-SRM) |
SA WG1 |
CR Pack |
Approval |
12.8 |
Yes |
Yes |
Approved |
No |
|
| SP-120869 |
Stage 1 CRs on New Rel-11 requirements |
SA WG1 |
CR Pack |
Approval |
11.34 |
Yes |
Yes |
Approved |
No |
|
| SP-120870 |
Stage 1 CRs on Public Warning System Security (PWS_Sec) |
SA WG1 |
CR Pack |
Approval |
12.22 |
Yes |
Yes |
Approved |
No |
|
| SP-120871 |
Stage 1 CRs on User Plane Congestion Management (UPCON) |
SA WG1 |
CR Pack |
Approval |
12.12 |
Yes |
Yes |
Noted. Proposed revision in SP-120753 |
No |
|
| SP-120872 |
Stage 1 CRs on Feasibility Study on User Plane Congestion Management (FS_UPCON) |
SA WG1 |
CR Pack |
Approval |
12.12 |
Yes |
Yes |
Noted. Proposed revision in SP-120754 |
No |
|
| SP-120873 |
Stage 1 CRs on Sequential Flexible Alerting (SEQ_FA) |
SA WG1 |
CR Pack |
Approval |
14 |
Yes |
Yes |
Approved |
No |
|
| SP-120874 |
Stage 1 CRs on Language and Modality Information for communications (LangInfo) |
SA WG1 |
CR Pack |
Approval |
99 |
Yes |
Yes |
WITHDRAWN. Change should be made to a different TS. |
No |
|
| SP-120875 |
TR 22.803 V2.0.0 on Feasibility Study for Proximity Services (FS_ProSe) |
SA WG1 |
TR |
Approval |
13.23 |
Yes |
Yes |
Approved |
No |
|
| SP-120876 |
Revised Work Item for Group Communication System Enablers for LTE (GCSE_LTE) |
SA WG1 |
WID |
Approval |
12.9 |
Yes |
Yes |
Approved |
No |
|
| SP-120877 |
WID for Proximity-based Services (Normative work) (ProSe) |
SA WG1 |
WID |
Approval |
13.23 |
Yes |
Yes |
Revised in SP-120883 |
No |
SP-120883 |
| SP-120878 |
WID for Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) |
SA WG1 |
WID |
Approval |
14 |
Yes |
Yes |
Proposed update in SP-120892. This was therefore considered as revised in SP-120892 |
No |
|
| SP-120879 |
WID for Sequential Flexible Alerting (SEQ_FA) |
SA WG1 |
WID |
Approval |
14 |
Yes |
Yes |
Proposed update in SP-120895. This was therefore considered as revised in SP-120895. |
No |
|
| SP-120880 |
WID for Language and Modality Information for communications (LangInfo) |
SA WG1 |
WID |
Approval |
14 |
Yes |
Yes |
Some modifications were needed and this was revised in SP-120937 |
No |
|
| SP-120881 |
Rel-12 mirror CR: 23.002 CR0260: Adding the missing ATGW to IMS entities description subclause |
ZTE |
CR Pack |
Approval |
11.34 |
Yes |
Yes |
Approved. Mirror CR to 23.002 CR0259R1 in SP-120726 |
No |
|
| SP-120882 |
The Cost-Efficient Traffic Adaptable System |
NTT DOCOMO |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
NTT DOCOMO were thanked for this presentation, which was noted. |
No |
| SP-120681 |
SP-120883 |
WID for Proximity-based Services (Normative work) (ProSe) |
SA WG1 |
WID |
Approval |
13.23 |
Yes |
Yes |
This WID was approved. |
No |
| SP-120877 |
SP-120884 |
Extended Coverage for Public Safety (eCPS) |
Broadcom Corporation |
Contribution |
Discussion |
99 |
Yes |
No |
WITHDRAWN |
Yes |
|
| SP-120885 |
Support Team Report |
MCC Support Team Coordinator |
REPORT |
Presentation |
17.2 |
Yes |
Yes |
The MCC coordinator was thanked for this presentation, which was noted. |
No |
|
| SP-120886 |
Update to Specifications lists |
MCC Specifications Manager |
CR Pack |
Approval |
99 |
No |
No |
WITHDRAWN |
Yes |
|
| SP-120887 |
New Study WID: 'Providing control of inbound/outbound Connections when a firewall or NAT is deployed in the PLMN |
Orange |
WID |
Approval |
15 |
Yes |
Yes |
Noted. It was noted that the document header contained the wrong TD number. It was also noted that this work had not been included in work items for consideration in Rel-12. Nokia considered this a useful study for UE power consumption work. Verizon sugg |
No |
| SP-120744 |
SP-120888 |
TSG GERAN Status Report |
TSG GERAN Chairman |
Report |
Presentation |
7.8 |
Yes |
Yes |
The TSG GERAN Chairman was thanked for this report, which was noted. |
No |
|
| SP-120889 |
LS from ETSI TC EE: Liaison to 3GPP on Cooperation for Energy Efficiency Measurements |
ETSI TC EE |
LS In |
Information |
13.11 |
Yes |
Yes |
This LS was noted. |
No |
|
| SP-120890 |
Updated WID: 'User plane congestion management requirements (UPCON)' |
NEC |
WID |
Approval |
12.12 |
Yes |
Yes |
Approved. Update to SP-120736 |
No |
|
| SP-120891 |
LS from ETSI E2NA: Location of Media Transcoders |
ETSI E2NA |
LS In |
Action |
6 |
Yes |
Yes |
Forwarded to WGs in SP-120933. Orange suggested forwarding this to SA WG2, CT WG1, CT WG3 and CT WG4 asking them to provide responses to TSG SA#59 where TSG SA will provide a coordinated response to ETSI E2NA. A LS to the WGs was drafted in SP-120917. Fi |
No |
|
| SP-120892 |
Proposed Change to WID for Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) in SP-120878 |
T-Mobile USA |
WID |
Approval |
14 |
Yes |
Yes |
Approved. Update to SP-120878 |
No |
|
| SP-120893 |
Time Budget for SA WG2 Project Management |
SA WG2 Chairman |
Discussion |
Decision |
5 |
Yes |
Yes |
Endorsed. Orange asked when the time budget would be introduced during a release. The SA WG2 Chairman replied that each Work Item request would include the budget and this would be recorded in the Work Plan, For items where the budget cannot be estimated |
No |
|
| SP-120894 |
Update of CRs 33.246 CR0165R1; 33.246 CR0166R1; 33.246 CR0167R1 in SP-120860: Release 9 CRs on Security small Enhancements (TEI9) |
Ericsson |
CR Pack |
Approval |
9 |
Yes |
Yes |
Approved. Update to part of SP-120860 |
No |
|
| SP-120895 |
Editorial revision of SP-120879 New WID on Sequential Flexible Alerting (SEQ_FA) |
MCC, Orange |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
| SP-120879 |
SP-120896 |
Rel-12: Areas of focus |
Alcatel-lucent |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Alcatel-lucent were thanked for this presentation, which was noted. |
No |
| SP-120678 |
SP-120897 |
WID PCEF-based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks |
SA WG5 |
WID |
Information |
12.16 |
Yes |
Yes |
As this work was under review, this WID was noted. |
No |
|
| SP-120898 |
Discussion paper for UMONC WID |
China Telecom, Orange, China Unicom, KDDI, ZTE, Allot Communications, Tekelec, Comverse, Juniper Networks, Openet, Openwave, Sandvine |
Contribution |
Discussion |
13.22 |
Yes |
Yes |
This paper was then noted and the updated WID reviewed. |
No |
|
| SP-120899 |
New WID: Usage Monitoring Control PCC Enhancement |
China Telecom, China Unicom, Vodafone, KDDI, Orange, ZTE, Allot Communications, Tekelec, Comverse, Juniper Networks, Openet, Openwave, Sandvine |
WID |
Approval |
13.22 |
Yes |
Yes |
Revised in SP-120914 |
No |
SP-120914 |
| SP-120900 |
Network Enhancements for Better Customer Experience |
KDDI, Sprint |
Presentation |
Presentation |
5.1 |
Yes |
Yes |
Intel asked whether for slide 7, the QoS over multiple accesses included non-3GPP accesses. It was clarified that non-3GPP accesses were also intended. This needs to be studied as 3GPP cannot put requirements on non-3GPP Accesses. KDDI and Sprint were th |
No |
| SP-120664 |
SP-120901 |
Public Safety Communication requirements in Release 12 |
Vodafone |
Contribution |
Approval |
5 |
Yes |
Yes |
LS drafted in SP-120916 (revised during off-line discussions to SP-120923). This was then noted. |
No |
|
| SP-120902 |
Rev of S2-124833_4808_4302_Network sharing impact on the CSFB_23 251_v5.8 (Revision of 23.251 CR0067R7 from SP-120722) |
Huawei, Hisilicon, Vodafone |
CR Pack |
Approval |
11.18 |
Yes |
Yes |
Approved. Revision of 23.251 CR0067R7 from SP-120722 |
No |
|
| SP-120903 |
TSG CT Status Report |
TSG CT Chairman |
REPORT |
Presentation |
7.7 |
Yes |
Yes |
The TSG CT Chairman was thanked for this report, which was noted. |
No |
|
| SP-120904 |
IEFT Status report |
TSG CT Chairman |
REPORT |
Presentation |
7.7 |
Yes |
Yes |
The TSG CT Chairman was thanked for this report, which was noted. |
No |
|
| SP-120905 |
Draft Report of TSG CT#58 |
TSG CT Secretary (MCC) |
REPORT |
Information |
7.7 |
Yes |
Yes |
This was provided for information and was noted. |
No |
|
| SP-120906 |
LS from TSG CT: Reply LS on IMS service level trace removal of feature from old releases |
TSG CT |
LS In |
Information |
7.7 |
Yes |
Yes |
It was clarified that SA WG5 would review this LS at their next meeting and a similar approach is expected from SA WG5 to remove the IMS service level trace functionality. This was then noted. |
No |
|
| SP-120907 |
LS from TSG RAN: [DRAFT] Letter to ITU-R WP5D [on Preliminary Draft New Report on THE USES OF IMT FOR BROADBAND PPDR APPLICATIONS] |
TSG RAN |
LS In |
Review / Endorsement |
7.6 |
Yes |
Yes |
Revised in SP-120930 |
No |
SP-120930 |
| SP-120908 |
LS from TSG RAN: Reply LS on backhaul study in MEF |
TSG RAN |
LS In |
Information |
7.6 |
Yes |
Yes |
The TSG RAN Chairman indicated that the attachment to this may be of interested to delegates and encouraged delegates to read it. This LS was then noted. |
No |
|
| SP-120909 |
Updated TSG CT ToR |
TSG CT Chairman |
ToR |
Information |
7.7 |
Yes |
Yes |
This updated Terms of reference was noted. |
No |
|
| SP-120910 |
TSG RAN Status Report to TSG SA#58 |
TSG RAN Chairman |
REPORT |
Presentation |
7.6 |
Yes |
Yes |
The TSG RAN Chairman was thanked for this report, which was noted. |
No |
|
| SP-120911 |
Draft report of TSG RAN meeting #58 |
TSG RAN Secretary |
REPORT |
Information |
7.6 |
Yes |
Yes |
This was provided for information and was noted. |
No |
|
| SP-120912 |
32.766 CR0049R1: Addition of Network Sharing support for MDT |
SA WG5 |
CR Pack |
Approval |
11.32 |
Yes |
Yes |
Approved. Revision of 32.766 CR0049 in SP-120796 |
No |
|
| SP-120913 |
Draft WID for Public Safety |
Vodafone |
WID |
Approval |
5 |
Yes |
Yes |
This was provided for information and was noted. |
No |
|
| SP-120914 |
New WID: Usage Monitoring Control PCC Enhancement |
China Telecom, China Unicom, Vodafone, KDDI, Orange, ZTE, Allot Communications, Tekelec, Comverse, Juniper Networks, Openet, Openwave, Sandvine |
WID |
Approval |
13.22 |
Yes |
Yes |
Some improvement to the Objective was needed and this was discussed off-line and revised in SP-120928 |
No |
| SP-120899 |
SP-120915 |
Workshop on Release 12 content. DRAFT Summary and Conclusions |
TSG SA Chairman |
OTHER |
Decision |
5.1 |
Yes |
Yes |
Verizon commented that FS_CNO could be considered for moving to CT WGs. This would need to be discussed and agreed in SA WG2. Orange suggested that P4C BB2 was considered by some companies as essential and suggested moving it to the other items for consi |
No |
| SP-120749 |
SP-120916 |
[DRAFT] LS on Additional Public Safety and Critical Communications requirements in Release 12. |
TSG SA (Vodafone) |
LS OUT |
Approval |
5 |
Yes |
Yes |
Revised in SP-120922 |
No |
SP-120922 |
| SP-120917 |
[DRAFT] LS on providing information on transcoding functions in 3GPP standards |
TSG SA (Orange) |
LS OUT |
Approval |
6 |
Yes |
Yes |
Editorial errors were noted and should be corrected. Renesas suggested copying this to GERAN WG2 and adding them to the first action. This was revised accordingly and draft removed, in SP-120933 |
No |
|
| SP-120918 |
Background on Revised CR to TS 22.101 and revised CR to TR 22.805 for UPCON |
KDDI, NTT DOCOMO, AT&T, Orange, SoftBank Mobile, Qualcomm Incorporated, NEC, Intel, Allot Communications, Movik Networks, InterDigital Communications, Cisco, Samsung, Research in Motion, LG Electronics |
Contribution |
Discussion |
12.12 |
Yes |
Yes |
This was noted and the CRs reviewed. |
No |
| SP-120752 |
SP-120919 |
Revision of CR0434R2 to TS 22.101: Addition of UPCON Requirements |
KDDI, NTT DOCOMO, Research in Motion, NEC, Allot Communications, Juniper Networks, SoftBank Mobile, Harris Corporation, InterDigital Communications, Bell Canada, AT&T, ETRI, Qualcomm Incorporated, Chunghwa Telecom, ITRI, Orange, Intel, Movik Networks, Cis |
CR Pack |
Approval |
12.12 |
Yes |
Yes |
Approved |
No |
| SP-120753 |
SP-120920 |
Revision of CR0001R3 to TR 22.805: Update of Consolidated Requirements; Addition of Use Case to Requirements Traceability Annex |
KDDI |
CR Pack |
Approval |
12.12 |
Yes |
Yes |
Revised in SP-120925 |
No |
SP-120925 |
SP-120754 |
SP-120921 |
Workshop on Release 12 content. DRAFT Summary and Conclusions |
TSG SA Chairman |
OTHER |
Decision |
5.1 |
Yes |
Yes |
TeliaSonera commented that information on the total available meeting time available in SA WG2 is essential for the March 2013 meeting. The SA WG2 Chairman clarified that budget numbers would be fixed at SA WG2#95. The slides were updated to indicate tha |
No |
| SP-120915 |
SP-120922 |
[DRAFT] LS on Additional Public Safety and Critical Communications requirements in Release 12. |
TSG SA (Vodafone) |
LS OUT |
Approval |
5 |
Yes |
Yes |
Revised to remove attachment in SP-120923 |
No |
| SP-120916 |
SP-120923 |
[DRAFT] LS on Additional Public Safety and Critical Communications requirements in Release 12. |
TSG SA (Vodafone) |
LS OUT |
Approval |
5 |
Yes |
Yes |
TeliaSonera asked what is meant by 'Public Safety Authorities'. Vodafone explained that this is in common use in SA WG1 to mean the various authorities dealing with national Public Safety requirements. It was suggested to change the text to 'taking into |
No |
| SP-120922 |
SP-120924 |
[DRAFT] LS on Additional Public Safety and Critical Communications requirements in Release 12. |
TSG SA (Vodafone) |
LS OUT |
Approval |
5 |
Yes |
Yes |
This was revised to remove draft and update the Source of the LS in SP-120931 |
No |
| SP-120923 |
SP-120925 |
Revision of CR0001R3 to TR 22.805: Update of Consolidated Requirements; Addition of Use Case to Requirements Traceability Annex |
KDDI |
CR Pack |
Approval |
12.12 |
Yes |
Yes |
Approved |
No |
| SP-120920 |
SP-120926 |
Updated WID: 'LIPA Mobility and SIPTO at the Local Network (LIMONET)' |
SA WG2 |
WID |
Approval |
12.14 |
Yes |
Yes |
Approved |
No |
| SP-120737 |
SP-120927 |
Draft Reply LS on Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 |
TSG SA |
LS OUT |
Approval |
12.31 |
Yes |
Yes |
This was revised to remove 'draft' in SP-120934 |
No |
|
| SP-120928 |
New WID: Usage Monitoring Control PCC Enhancement |
China Telecom, China Unicom, Vodafone, KDDI, Orange, ZTE, Allot Communications, Tekelec, Comverse, Juniper Networks, Openet, Openwave, Sandvine |
WID |
Approval |
13.22 |
Yes |
Yes |
Approved |
No |
| SP-120914 |
SP-120929 |
New WID: 'Proximity-based Services |
SA WG2 |
WID |
Approval |
13.23 |
Yes |
Yes |
The SA WG2 Chairman asked for clarification of the title of the Feasibility Study which contains 'Rel-12'. It was agreed to revert back to the original title of the Study WID. The change of UICC impacts was questioned. It was clarified that this was chan |
No |
| SP-120743 |
SP-120930 |
[Draft] Letter to ITU-R WP5D [on Preliminary Draft New Report on THE USES OF IMT FOR BROADBAND PPDR APPLICATIONS] |
TSG SA |
LS OUT |
Approval |
7.6 |
Yes |
Yes |
Vodafone and AT&T provided a number of editorial corrections and clarifications. The LS was revised accordingly, also to remove draft and revision marks, in SP-120936 |
No |
| SP-120907 |
SP-120931 |
LS on Additional Public Safety and Critical Communications requirements in Release 12. |
TSG SA |
LS OUT |
Approval |
5 |
Yes |
Yes |
Approved |
No |
| SP-120924 |
SP-120932 |
Workshop on Release 12 content. Summary and Conclusions |
TSG SA Chairman |
OTHER |
Decision |
5.1 |
Yes |
Yes |
APPROVED. ZTE asked whether, for example, if the FS_UMONC work is completed at the next SA WG2 meeting, the time budget will still need to be provided. The SA WG2 Chairman explained that a request for zero budget is not useful. Intel asked whether the MO |
No |
| SP-120921 |
SP-120933 |
LS on providing information on transcoding functions in 3GPP standards |
TSG SA |
LS OUT |
Approval |
6 |
Yes |
Yes |
Approved |
No |
| SP-120917 |
SP-120934 |
Reply LS on Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 |
TSG SA |
LS OUT |
Approval |
12.31 |
Yes |
Yes |
Approved |
No |
| SP-120927 |
SP-120935 |
New WID: 'Proximity-based Services |
SA WG2 |
WID |
Approval |
13.23 |
Yes |
Yes |
Approved. NOTE: This WID is regarded as an update to the approved WID in SP-120883. |
No |
| SP-120929 |
SP-120936 |
Letter to ITU-R WP5D [on Preliminary Draft New Report on THE USES OF IMT FOR BROADBAND PPDR APPLICATIONS] |
TSG SA |
LS OUT |
Approval |
7.6 |
Yes |
Yes |
Approved |
No |
| SP-120930 |
SP-120937 |
WID for Language and Modality Information for communications (LangInfo) |
SA WG1 |
WID |
Approval |
14 |
Yes |
Yes |
Approved |
No |
| SP-120880 |
|