Agenda with allocated Tdocs

Created: 2011-12-14 08:36     Last document: SP-110882

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
0
ALL AGENDA ITEMS
1
Opening of the Meeting
2
Approval of Agenda
SP-110662 Draft agenda for TSG SA meeting #54 TSG SA Chairman Agenda Approval Yes Yes Revised in SP-110762 No SP-110762
    SP-110762 Draft agenda for TSG SA meeting #54 TSG SA Chairman Agenda Approval Yes Yes Approved No SP-110662
3
IPR Reminder
4
Reports from Previous Meetings
4.1
Report from TSG SA#53
SP-110663 Draft Report of TSG SA meeting #53 TSG SA Secretary Report Approval Yes Yes Revised. Alcatel-Lucent commented that their comment did not appear to be included in the report. The MCC Secretary will check this off-line. It was clarified that under the report of SP-11615, 'BBAI BBIII' should read 'SIMTC BBIII'. This was corrected a No
    SP-110853 Draft Report of TSG SA meeting #53 TSG SA Secretary Report Approval Yes Yes Approved No SP-110663
4.2
Reports from TSG SA ad-hoc meetings and workshops
SP-110665 Chairmen's Summary of 3GPP-BBF Workshop Workshop Convenors Report Information Yes Yes Noted. It was clarified that BBF review before 'final approval' referred to Release freeze. This was then noted. No
    SP-110664 Draft Report of 3GPP-BBF Workshop TSG SA Secretary Report Information Yes Yes Noted. This was provided for information and was noted. No
    SP-110833 Policy and Charging convergence in Rel-11 Vodafone Group OTHER Discussion Yes Yes Noted. The SA WG2 Chairman reported that BBI and BBII progress was not as good as hoped or reported in this contribution. NEC commented that BBF appears to be investigating convergence, which may be premature. Verizon supported the proposal from Vodafone No
    SP-110851 Proposed updated WID: Support for BroadBand Forum Accesses Interworking Verizon Wireless WID Approval Yes Yes Noted. No agreement could be reached on this and this was left for further off-line discussion. The proposed WID was then noted No
    SP-110852 DRAFT - LS on Broadband Access Interworking Building Block III TSG SA LS OUT Approval Yes Yes Noted No
    SP-110667 LS from the Broadband Forum: BBF status report prior to BBF and 3GPP workshop Broadband Forum LS In Information Yes Yes Noted. Can be noted, workshop already held. This LS was noted. No
5
Items for early consideration
SP-110763 Warning System Security Configuration SA WG2 Chairman (Samsung) OTHER Discussion Yes Yes Noted. Nokia Siemens Networks commented that the PWS digital signature work has been started in Rel-9 and moved to Rel-10 and Rel-11, without actually being completed, so there is currently no specification for using digital signature, but only to specif No
    SP-110821 Warning system default configuration NTT DOCOMO, KDDI, SOFTBANK MOBILE, Fujitsu, Hitachi, NEC, NTC Discussion Discussion Yes Yes Noted. Vodafone commented that the roaming issues appear to be the biggest issue, where there are 189 European operators, whose subscribers can roam into other regions. AT&T commented that there are no regulations for inbound roamers' handsets and an app No
    SP-110830 Default configuration of PWS display Samsung Electronics OTHER Discussion Yes Yes Noted. This was reviewed and noted. No
    SP-110844 Support of a Default 'ON' Setting for ETWS/PWS Messages AT&T, Sprint, T-Mobile USA, US Cellular, Alcatel-Lucent, One2Many, Qualcomm, Trueposition OTHER Discussion Yes Yes Noted. Vodafone commented that operators should not be expected to implement the default settings rather than maintaining a list which is applied to it's subscribers. O2 commented that there is also an issue with expecting operators to maintain a list wh No
    SP-110841 Public Warning System Configuration Vodafone OTHER Discussion Yes Yes Noted. This was reviewed and noted. No
    SP-110855 CMAS Application T-Mobile USA OTHER Discussion Yes Yes Noted. Research in Motion commented that this use of an application should be the decision made on whether cell-broadcast is always on or not (i.e. the application could switch cell broadcast on if it is present on the terminal), which would allow the me No
    SP-110764 3 CRs to 23.401 on ETWS (Rel-8, Rel-9, Rel-10) SA WG2 CR Pack Approval Yes No No
    SP-110828 Mandatory Terminal Support for full MOCN in GERAN Telenor, Vodafone, TeliaSonera, Deutsche Telekom, Orange OTHER Discussion Yes Yes Revised in SP-110850 No SP-110850
    SP-110850 Mandatory Terminal Support for full MOCN in GERAN Telenor, Vodafone, TeliaSonera, Deutsche Telekom, Orange, T-Mobile USA OTHER Discussion Yes Yes Noted. Orange supported this proposal and added that general support for GERAN terminals should apply and not be restricted to M2M type devices. It was commented that there are likely to be a number of Rel-10 MTC terminals which will not include FULL-MOC No SP-110828
    SP-110857 [DRAFT] Reply LS on the introduction of FULL-MOCN-GERAN feature TSG SA LS OUT Approval Yes Yes Revised to remove 'draft' in SP-110867 No
    SP-110867 Reply LS on the introduction of FULL-MOCN-GERAN feature TSG SA LS OUT Approval Yes Yes Approved No SP-110857
    SP-110866 LS on PWS support in 3GPP UEs TSG SA LS OUT Approval Yes Yes Revised. There were some concerns over points 4a, b and c. AT&T commented that as this has not been developed in WGs, that these discussions should be held in SA WG1 and proposed to remove the bullets from this LS. It was commented that SA WG1 may make r No
    SP-110875 LS on PWS support in 3GPP UEs TSG SA LS OUT Approval Yes No No SP-110866
5.1
Challenges to working agreements
6
Incoming Liaisons
SP-110669 LS from ITU-T Study Group 13: Request for information for the new draft Recommendation Q.1741.8 (referencing of 3GPP Release 10) ITU-T Study Group 13 LS In Information Yes Yes Response in SP-11858. A response was provided by TSG CT in SP-110837, which was reviewed. A response was provided in SP-11858. No
    SP-110837 LS from TSG CT: LS on co-ordination of SDO input to ITU-T Q.1741.8 TSG CT LS In Action Yes Yes Revised. The TSG RAN Chairman proposed to also add that the 37.xxx-series are also excluded. The attached CP-110914 in this LS was revised accordingly into an LS from TSG SA in SP-110858. No
    SP-110858 LS on co-ordination of SDO input to ITU-T Q.1741.8 TSG SA LS OUT Approval Yes Yes Approved No
    SP-110671 LS from ITU-T Study Group 13: New work item on the framework on the identifiers in Future Networks ITU-T Study Group 13 LS In Information Yes Yes Noted. The SA WG2 Chairman commented that SA WG2 had begun to address many of the issues raise here and considered this important for development of future 'phone number' schemes. The TSG CT Chairman reported that this is also being considered in CT WGs. No
    SP-110680 LS from ITU-T Study Group 11: Request for feedback on attached draft revision of Supplement 62 to ITU-T Q series Recommendations ITU-T Study Group 11 LS In Action Yes Yes Response in SP-110859. The attached list of specifications for Emergency Telecommunications Service contains entries under 9.1 for 3GPP specifications, which should be reviewed. The TSG CT Chairman commented that the list was unclear and should be organi No
    SP-110859 [Draft] Reply LS on feedback on Supplement 62 to ITU-T Q series Recommendations TSG SA LS OUT Approval Yes Yes Revised. This was reviewed and it was suggested to add reference to agreements made in the San Francisco WG meetings. This was discussed off-line and the LS revised in SP-110868 No
    SP-110868 Reply LS on feedback on Supplement 62 to ITU-T Q series Recommendations TSG SA LS OUT Approval Yes Yes Revised in SP-110876 No SP-110876 SP-110859
    SP-110876 Reply LS on feedback on Supplement 62 to ITU-T Q series Recommendations TSG SA LS OUT Approval Yes No No SP-110868
    SP-110723 LS from SA WG1: LS on Multiple E.212 Mobile Country Codes assigned to one country/political entity SA WG1 LS In Information Yes Yes Noted. This was reviewed and noted. No
    SP-110782 LS from MultiService Forum: Liaison Regarding MSF VoLTE Interoperability Event MultiService Forum (MSF) LS In Information Yes Yes Noted. Companies were asked to take this into account and the LS was noted. No
    SP-110675 LS from CT WG1: Reply LS on Applicability of ePLMN to MDT CT WG1 LS In Information Yes Yes Noted. This was reviewed and noted. No
    SP-110783 LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS (PPDR) ON THE PRELIMINARY DRAFT NEW REPORT ITU-R M.[LMS.PPDR.UHF CHANNELS] ITU-R WP5A LS In Information Yes Yes Noted. This was reviewed and noted. No
    SP-110784 LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS - INVITATION TO REVIEW THE WORKING DOCUMENT TOWARDS THE REVISION OF REPORT ITU-R M.2014-1 ITU-R WP5A LS In Information Yes Yes Noted. This was reviewed and noted. No
    SP-110824 LS from TETRA + Critical Communications Association: Re: LS on Study item relevant for public safety - direct mode TETRA + Critical Communications Association LS In Information Yes Yes Noted. It was recognised that this was a work in progress and no response was needed. This was then noted. No
    SP-110666 LS from ETSI TC ATTM: General Engineering of energy efficient base station ETSI TC ATTM LS In Information Yes Yes Reply requested by 21 October 2011 ! Draft response from TSG RAN in SP-110847. Final Response in SP-110860 No
    SP-110854 Additional information to SP-110666 (LS from ETSI TC ATTM) TSG SA Secretary OTHER Information Yes Yes Noted. This was provided for information and was noted. No
    SP-110765 LS from ETSI TC-EE: ETSI TC-EE Work Item on Network level power efficiency ETSI TC-EE LS In Information Yes Yes Draft response from TSG RAN in SP-110847. Final Response in SP-110860 No
    SP-110847 Draft Reply LS to ETSI TC ATTM General Engineering of energy efficient base station TSG RAN LS OUT Approval Yes Yes Revised. Response to SP-110666, SP-110765. The LS was endorsed and updated to make it from TSG SA and change the contacts and remove draft, in SP-110860 No
    SP-110860 Reply LS to ETSI TC ATTM General Engineering of energy efficient base station TSG SA LS OUT Approval Yes Yes Approved No
7
Reports from TSG SA Working Groups and other TSGs
7.1
SA WG1 Report and Questions for Advice
SP-110805 Status Report from SA WG1 to TSG SA#54 SA WG1 Chairman Report Presentation Yes Yes Noted. The SA WG1 Chairman was thanked for this report, which was noted. No
7.2
SA WG2 Report and Questions for Advice
SP-110728 SA WG2 Status Report SA WG2 Chairman Report Presentation Yes Yes Revised in SP-110827 No SP-110827
    SP-110827 SA WG2 Status Report SA WG2 Chairman Report Presentation Yes Yes Noted. The SA WG2 Chairman was thanked for this report, which was noted. No SP-110728
7.3
SA WG3 Report and Questions for Advice
SP-110684 SA WG3 Status Report SA WG3 Chairman REPORT Presentation Yes Yes Noted. The SA WG3 Chairman was thanked for this report, which was noted. No
    SP-110685 Proposed Update of SA WG3 Terms of Reference SA WG3 ToR Approval Yes Yes Revised. It was noticed that 'privacy' needs to be added in one more place. The ToR was revised accordingly in SP-110862 No
    SP-110862 Proposed Update of SA WG3 Terms of Reference SA WG3 ToR Approval Yes Yes Approved No SP-110685
7.4
SA WG4 Report and Questions for Advice
SP-110785 SA WG4 Status Report at TSG SA#54 SA WG4 Chairman Report Presentation Yes Yes Noted. The SA WG4 Chairman was thanked for this report, which was noted. No
7.5
SA WG5 Report and Questions for Advice
SP-110696 SA WG5 Status Report SA WG5 Chairman Report Presentation Yes Yes Noted. The SA WG5 Chairman was thanked for this report, which was noted. No
    SP-110766 Introduction of documents related to Converged Management of Fixed Mobile Networks submitted to this TSG SA meeting SA WG5 Chairman OTHER Information Yes Yes Noted. This was reviewed and taken as background for the related contributions. This was then noted. No
    SP-110679 LS from SA WG5: LS on formal aspects to be considered for the 3GPP - TM Forum Joint Working Groups SA WG5 LS In Action Yes No The agreements and way forward were included in a liaison to SA WG5, which was drafted off-line in SP-110863. Final response in SP-110xxx No
    SP-110863 [DRAFT] Reply LS on formal aspects to be considered for the 3GPP - TM Forum Joint Working Groups TSG SA LS OUT Approval Yes Yes Revised. NEC commented that there is too much detail for the TMF on the process for checking the legal aspects. It was clarified that this is primarily aimed at SA WG5 and this information was considered useful. Vodafone commented that the second paragra No
    SP-110880 [DRAFT] Reply LS on formal aspects to be considered for the 3GPP - TM Forum Joint Working Groups TSG SA LS OUT Approval No No No SP-110863
    SP-110678 LS from SA WG5: Enhanced Reply LS to NGMN NGCOR on Project NGCOR Update SA WG5 LS In Information Yes Yes Noted. The SA WG5 Chairman reported that according to the NGNM procedures, they cannot work with SDOs directly but need to work though the NGNM Partners. This was noted and SA WG5 were encouraged to continue the communication with NGNM. No
    SP-110768 Minutes of multi SDO meeting in Zurich Nov 1st-2nd 2011 SA WG5 Chairman Report Information Yes Yes Noted. LS drafted in SP-110864. It was clarified that the joint working group cannot make decisions for 3GPP but can provide agreed recommendations for input to the member bodies of the JCG. Research in Motion clarified that all involved bodies would nee No
    SP-110864 DRAFT - LS on Converged Management Multi-SDO activity TSG SA LS OUT Approval Yes Yes Revised. It was suggested to clarify that such joint activities do not have decision power. Vodafone asked whether the request to formalize a Multi-SDO setup, or should it rather state that the Terms of Reference are not aligned with the working procedur No
    SP-110881 DRAFT - LS on Converged Management Multi-SDO activity TSG SA LS OUT Approval No No No SP-110864
    SP-110770 Draft ToR for Converged Management of Fixed Mobile Networks project SA WG5 Chairman OTHER Information Yes Yes Noted. As the joint activity will be done using workshops and liaison, the ToR was not necessary and was noted. No
    SP-110767 SA WG5 presentation at multi SDO meeting in Zurich Nov 1st-2nd 2011 SA WG5 Chairman OTHER Presentation Yes Yes Noted No
    SP-110769 SA WG5 comments on multi SDO activity SA WG5 Chairman OTHER Information Yes Yes Noted No
    SP-110771 TM Forum proposal on handling of Joint Working Group output documents SA WG5 Chairman Report Information Yes Yes Noted No
7.6
TSG RAN report and Questions for Advice
SP-110845 TSG RAN Status Report to TSG SA#54 TSG RAN Chairman Report Presentation Yes Yes Noted. The TSG RAN Chairman was thanked for this report, which was noted. No
    SP-110846 Draft report of TSG RAN meeting #54 TSG RAN Secretary Report Information Yes Yes Noted. This was provided for information and was noted. No
    SP-110842 LS from TSG RAN: LS on FGI 27 in LTE and Single Radio VCC TSG RAN LS In Information Yes Yes Noted. This was reviewed and noted. No
    SP-110843 LS from TSG RAN: Reply LS on Capability handling of LTE TDD and FDD modes TSG RAN LS In Information Yes Yes Noted. This was reviewed and noted. No
7.7
TSG CT report and Questions for Advice
SP-110834 TSG CT Status Report to TSG SA#54 TSG CT Chairman Report Presentation Yes Yes Noted. The TSG CT Chairman was thanked for this report, which was noted. No
    SP-110835 Draft report of TSG CT meeting #54 TSG CT Secretary Report Information Yes Yes Noted. This was provided for information and was noted. No
    SP-110836 IETF Status report to TSG SA#54 TSG CT Chairman Report Presentation Yes Yes Noted. Research in Motion commented that it is important to have a reasonable attendance from 3GPP Member companies at the IETF meetings in order to progress the important work there and encouraged delegates to try to attend whenever possible. The TSG CT No
7.8
TSG GERAN report and Questions for Advice
SP-110777 TSG GERAN Report to TSG SA#54 TSG GERAN Chairman Report Presentation Yes Yes Noted. The TSG GERAN Chairman was thanked for this report, which was noted. No
    SP-110683 LS from CT WG4: Reply LS on Service Identification for RRC Improvements in GERAN CT WG4 LS In Information Yes Yes Noted. This was reviewed and noted. No
    SP-110779 LS from TSG GERAN: Reply LS on Service Identification for RRC Improvements in GERAN TSG GERAN LS In Information Yes Yes Noted. This was reviewed and noted. No
    SP-110839 LS from TSG CT: LS on Work progress on RRC Improvements in GERAN TSG CT LS In Action Yes Yes Noted. The approach outlined in this LS was confirmed. The scope of this work is GERAN and not other RATs No
8
Documents related to Rel-8 or Earlier Features
8.1
R99 CRs (Need to be very well justified!)
8.2
Rel-4 CRs (Need to be very well justified!)
8.3
Rel-5 CRs (Need to be very well justified!)
8.4
Rel-6 CRs (Need to be very well justified!)
8.5
Rel-7 CRs (Need to be very well justified!)
SP-110804 CRs to TS 26.114 on 'Alignment of SDP Capneg usage with MTSI deployments (MTSI-MHI)' (Release 7 and Release 8) NOKIA Corporation, Nokia Siemens Networks, Verizon Wireless, Telefon AB LM Ericsson, ST-Ericsson SA CR Pack Approval Yes Yes Approved No
    SP-110787 CR to TS 26.114 on 'Alignment of SDP Capneg usage with MTSI deployments (MTSI-eMHI)' (Release 8) SA WG4 CR Pack Approval Yes Yes Noted. This CR was noted as a revised version had been approved (SP-110804). No
    SP-110681 LS from CT WG1: LS on Use of SDP Capability Negotiation CT WG1 LS In Information Yes Yes Noted No
    SP-110682 LS from CT WG1: LS on making use of SDP Capability Negotiation optional when offering AVPF for video CT WG1 LS In Information Yes Yes Noted No
    SP-110786 CRs to TS 26.114 on 'Correction to H.264 RTP Payload Format Reference (MTSI-MHI)' (Release 7 until Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
    SP-110703 Rel-7 CRs on OAM Maintenance and small Enhancements (OAM7) SA WG5 CR Pack Approval Yes Yes Approved No
8.6
Rel-8 CRs (Need to be very well justified!)
SP-110806 Stage 1 CR on Rel-8 HomeNB SA WG1 CR Pack Approval Yes Yes Revised. It was clarified that this CR does not impact the UE and should not be marked on the cover page. It was agreed to remove the impact indication and the CR was revised in SP-110870 No
    SP-110870 Stage 1 CR on Rel-8 HomeNB TSG SA CR Pack Approval No Yes Approved No SP-110806
    SP-110807 Stage 1 CRs on Rel-8 IMSTSS SA WG1 CR Pack Approval Yes Yes Approved No
    SP-110729 6 CRs to 23.401, 23.107 on SAES, TEI8 (Rel 8, Rel-9, Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110788 CRs to TS 26.237 on 'On Resolving IETF dependencies (IMS_PSS_MBMS_US)' (Release 8 until 10) SA WG4 CR Pack Approval Yes Yes Approved No
    SP-110789 CRs to TS.26.346 on 'AlternativeUnicastDelivery and Time Synchronisation between UE and BM-SC (PSS_MBMS_OMTV)' (Release 8 until 10) SA WG4 CR Pack Approval Yes Yes Approved No
    SP-110704 Rel-8 CRs on OAM Maintenance and small Enhancements (OAM8) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110708 Rel-8 CRs on Charging Management (CH8) SA WG5 CR Pack Approval Yes Yes Approved No
9
Documents Related to Rel-9 Features
9.1
(CRS) - Customized Ringing Signal
9.2
(eCAT) - Enhancements of IMS Customized Alerting Tone (CAT)
9.3
(EHNB) - Enhanced Home NodeB / eNodeB
SP-110808 Stage 1 CRs on Enhanced Home NodeB / eNodeB (EHNB) SA WG1 CR Pack Approval Yes Yes 22.220 CR0148; 22.220 CR0149R1; 22.220 CR0150R1 Approved. Other CRs revised in SP-110871 No
    SP-110871 Stage 1 CRs on Enhanced Home NodeB / eNodeB (EHNB) TSG SA CR Pack Approval No Yes Approved No SP-110808
9.4
(eMMTel) - Multi-Media Telephony Service enhancements
9.5
(ePRIOR) - Enhancements to Multimedia Priority Service
9.6
(EUI) - End User Identity
9.7
(PAN-EPNM) - Support of Personal Area Networks and Enhancements
9.8
(PWS) - Public Warning System
SP-110668 LS from TTA: Response LS on Korean Public Alert System in LTE TTA LS In Information Yes Yes This was reviewed and noted. No
    SP-110838 LS from TSG CT: LS on Korean Public Alert System TSG CT LS In Information Yes Yes This was reviewed and noted. No
    SP-110809 Stage 1 CRs on Public Warning System (PWS) SA WG1 CR Pack Approval Yes Yes Approved No
    SP-110882 LS on Documentation of support for public warning system in 3GPP TSG SA LS OUT Approval No No No
9.9
(ServAl) - Services Alignment and Migration
9.10
(SSAC) - Service Specific Access Control in EPS
9.11
(UDC) - User Data Convergence
9.12
(VAS4SMS) - Value Added Services for Short Message Service
9.13
(eANDSF) - Access Network Discovery and Selection Enhancement
9.14
(IMS_EMER_GPRS_EPS) - Support for IMS Emergency Calls over GPRS and EPS
SP-110730 3 CRs to 23.167 on IMS_EMER_GPRS_EPS (Rel-9, Rel-10, Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
9.15
(IMS_SCC) - IMS Services Centralization and Continuity
9.16
(LCS_LTE_EPS) - LCS Control Plane Solution for EPS
9.17
(LTEimp-Vocoder) - System aspects of vocoder rate adaptation for LTE
SP-110790 CRs to TS 26.114 on 'Update of reference for ECN (LTEimp-Vocoder)' (Release 9 until Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
9.18
(MBMS_EPS) - MBMS support in EPS
SP-110731 1 CR to 23.246 on MBMS_EPS (Rel-9) SA WG2 CR Pack Approval Yes Yes Approved No
9.19
(MUPSAP) - Multiple PDN Connection to the Same APN for PMIP-based Interfaces
9.20
(A5/4-GEA4) - 128 bit encryption for GSM and GPRS
9.21
(ACCSEC2) - Access Security Enhancements
9.22
(eGBAPush) - GBAPush enhancements
9.23
(GBA-IdM) - Extended Identity Management
9.24
(MEDIASEC) - IMS Media Plane Security (Stage 2)
9.25
(NDS_Backhaul) - Network Domain Security (NDS) enhancements to support backhaul security
9.26
(PUCI) - Protection against Unsolicited Communications for IMS
9.27
(DTMR) - Distortion Measurement Test Methods and Requirements
9.28
(IMS_PSS_MBMS_US_EXT) - IMS based PSS and MBMS User Service extensions
9.29
(M3A) - Managing MTSI Media Adaptation
SP-110791 CRs to TS 26.114 on 'Managing MTSI Media Adaptation (M3A)' (Release 9 until Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
9.30
(PMA) - PSS and MBMS Aspects
SP-110792 CRs to TS 26.234, TS 26.244 and TS.26.346 on ' PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9 and Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
9.31
(SFR) - Syndicated Feed Reception within 3GPP environments
9.32
(TG) - Timed Graphics
9.33
(CH9) - Charging Management small Enhancements Rel-9
SP-110709 Rel-9 CRs on Charging Management (CH9) SA WG5 CR Pack Approval Yes Yes Approved No
9.34
(OAM9) - OAM&P Rel-9
9.35
(TEI9) - TEI Rel-9
SP-110732 13 CRs to 23.060, 23.401, 23.402 on TEI9 (Rel-9, Rel-10, Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110733 10 CRs to 23.167, 23.203, 23.272 on TEI9 (Rel-9, Rel-10, Rel-11) SA WG2 CR Pack Approval Yes Yes 23.203 CR0592R1; 23.203 CR0591R1; 23.203 CR0590R1; 23.272 CR0713R1; 23.272 CR0714R1; 23.272 CR0716R2; 23.272 CR0717R2 were approved. No
    SP-110829 3 CRs to 23.167 on TEI9 (Rel 9, Rel 10, Rel-11) - replace CRs approved at TSG SA WG 2 # 88 in TD SP-110733 Huawei, Deutsche Telekom, Research In Motion UK Ltd CR Pack Approval Yes Yes Revised in SP-110869 No SP-110869
    SP-110869 3 CRs to 23.167 on TEI9 (Rel 9, Rel 10, Rel-11) - replace CRs approved at TSG SA WG 2 # 88 in TD SP-110733 Huawei, Deutsche Telekom, Research In Motion UK Ltd CR Pack Approval Yes Yes Approved No SP-110829
9.36
Any other Rel-9 Documents
10
Documents Related to Rel-10 Features
10.1
(CCNL) - Completion of Communications on Not Logged-in
10.2
(CPM-SMS) - IP-Short-Message-Gateway enhancements for CPM-SMS Interworking
10.3
(EHNBF) - H(e)NB enhancements
10.4
(UDC_DM) - User Data Convergence - Data Model
10.5
(ECSRA_LAA) - Enabling Coder Selection and Rate Adaptation for UTRAN and E-UTRAN for Load Adaptive Applications
10.6
(eMPS) - Enhancements for Multimedia Priority Service
10.7
(IESE) - IMS Emergency Session Enhancements
10.8
(IFOM) - IP Flow Mobility and seamless WLAN offload
10.9
(IMS_SC_eIDT) - IMS Service Continuity – Inter Device Transfer enhancements
10.10
(LIPA_SIPTO) - Local IP Access and Selected Internet IP Traffic Offload
SP-110734 3 CRs to 23.060, 23.401, 23.402 on LIPA_SIPTO (Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110691 Release 10 CRs to 33.320 Security for Local IP Access and Selected Internet IP Traffic Offload (LIPA_SIPTO) SA WG3 CR Pack Approval Yes Yes Approved No
10.11
(MAPCON) - Multi Access PDN Connectivity (Stage 2)
SP-110735 1 CR to 23.402 on MAPCON, IFOM (Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
10.12
(NIMTC) - Network Improvements for Machine-type Communication
SP-110736 10 CRs to 23.060, 23.401 on NIMTC (Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
10.13
(OMR) - Optimal Media Routeing
10.14
(PEST) - Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases
10.15
(SMOG) - S2b Mobility Based on GTP
10.16
(LI10) - Lawful Interception in the 3GPP Rel-10
10.17
(EAAT) - Enhancements and Addition of Audio Tests to 26.131 and 26.132
SP-110793 CRs to TS 26.131 and TS 26.132 on 'Enhancements and Addition of Audio Tests to 26.131 and 26.132 (EAAT)' (Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
10.18
(HTTP_SDS) - HTTP-based Streaming and Download Services
SP-110794 CRs to TS 26.244 and TS 26.247 on 'HTTP-based Streaming and Download Services (HTTP_SDS)' (Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
10.19
(MBS_Enh) - PSS and MBMS enhancements
SP-110795 CRs to TS 26.234 and TS.26.346 on 'PSS and MBMS enhancements (MBS_enh)' (Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
10.20
(OPT_IMS_PSS_MBMS_US) - Optimization of IMS based PSS and MBMS User Service
SP-110796 CR to TS 26.237 on 'Registration of Content Reporting Configuration Info Package (OPT_IMS_PSS_MBMS_US)' (Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
10.21
(VCEM) - Video Coding Enhancements in MTSI
SP-110797 CRs to TS 26.114 on 'Video Coding Enhancements in MTSI (VCEM)' (Release 10 and Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
10.22
(LTE_Relay) - Relays for LTE, including security aspects
10.23
(eAoC) - Advice of Charge (AoC) service support enhancements
10.24
(CH10) - Charging Management small Enhancements
SP-110710 Rel-10 CRs on Charging Management (CH10) SA WG5 CR Pack Approval Yes Yes Approved No
10.25
(OAM10) - OAM&P Rel-10
SP-110706 Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110715 Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110717 Rel-10 CRs on IRP Solution Set specification organisation improvements (OAM-IRP-SS) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110721 Rel-10 CRs on SON self-optimization management continuation (LTE_SON-OAM-SO) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110722 Rel-10 CRs on OAM Maintenance and small Enhancements Network Infrastructure Management (OAM10-NIM) SA WG5 CR Pack Approval Yes Yes Approved No
10.26
(TEI10) - TEI Rel-10
SP-110810 Stage 1 CRs on Study on TEI Rel-10 (TEI10) SA WG1 CR Pack Approval Yes Yes Renesas commented that the second bullet in 7.2 should be removed as the Class identifiers are not separable. 22.146 CR0061R1; 22.146 CR0062R1 were approved. 22.268 CR0018R1; 22.268 CR0019R1 were revised in SP-110872 No
    SP-110872 Stage 1 CRs on Study on TEI Rel-10 (TEI10) TSG SA CR Pack Approval No Yes Approved No SP-110810
    SP-110737 16 CRs to 23.002, 23.060, 23.167, 23.203, 23.216, 23.221, 23.228, 23.237 on TEI10 (Rel-10, Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110738 12 CRs to 23.246. 23.272, 23.292 on TEI10 (Rel-10, Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110692 Release 10 CR to 33.310 on Network Domain Security (NDS) enhancements to support backhaul security (TEI10) SA WG3 CR Pack Approval Yes Yes Approved No
    SP-110694 Release 10 CRs on Security small Enhancements (TEI10) SA WG3 CR Pack Approval Yes Yes Approved No
10.27
Any other Rel-10 Documents
11
Documents Related to Rel-11 Features
11.1
(IPXS) - Advanced IP Interconnection of Services
SP-110739 2 CRs to 23.228 on IPXS (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.2
(NOVES) - Non Voice Emergency Services
SP-110811 Stage 1 CRs on Non Voice Emergency Services (NOVES) SA WG1 CR Pack Approval Yes Yes 22.101 CR0392 revised in SP-110873, other CRs approved No
    SP-110873 22.101 CR0392R1 TSG SA CR Pack Approval No Yes Approved No SP-110810
    SP-110740 4 CRs to 23.167, 23.237, 23.401 on NOVES-IMSESOM (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved. It was noted that there was some unnecessary text in the other comments of a CR which should be avoided. These CRs were approved. No
11.3
(QoS_SSL) - QoS Control Based on Subscriber Spending Limits
SP-110741 1 CR to 23.203 on QoS_SSL (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110720 Rel-11 CRs on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) SA WG5 CR Pack Approval Yes Yes Revised in SP-110849 No SP-110849
    SP-110849 Rel-11 CRs on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) SA WG5 CR Pack Approval Yes Yes Approved No SP-110720
11.4
(SIMTC) - System Improvements to Machine-Type Communications
SP-110670 LS from ITU-T Study Group 13: Item in ITU-T Q.3/13 Work Programme concerning Machine Oriented Communications (MOC) ITU-T Study Group 13 LS In Information Yes Yes Noted. This LS should be reviewed by SA WG1. The TSG SA Chairman undertook to inform the LS contact of this. The LS was then noted. No
    SP-110781 LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON 'WIDE-AREA SENSOR AND/OR ACTUATOR NETWORK (WASN) SYSTEMS' ITU-R WP5A LS In Information Yes Yes Noted No
    SP-110673 LS from 3GPP2: 3GPP2 CORRESPONDENCE: Re: 3GPP2 SC.R4005-0 v1.0 cdma2000 M2M Numbering Recommendations System Requirements Document 3GPP2 LS In Information Yes Yes Noted. The SA WG3 Chairman reported that they had dealt with this and the LS was noted. No
    SP-110672 LS from ETSI M2M: Request to 3GPP for feedback on proposed changes to GBA specifications in support of M2M Integrity Validation ETSI M2M LS In Information Yes Yes Noted. The SA WG3 Chairman reported that they had dealt with this and the LS was noted. No
    SP-110856 LS from ETSI TC M2M: Reply to 3GPP SA3 regarding M2M Integrity Validation ETSI TC M2M LS In Information Yes Yes Noted. The SA WG3 Chairman reported that they had dealt with this and the LS was noted. No
    SP-110840 LS from TSG CT: LS on M2M devices with dual priority applications TSG CT LS In Information Yes Yes Noted. Vodafone clarified that the Normal priority access is the traffic which does not have an access class indicated and does not add new functionality so only minimal editorial changes are expected to SA WG2 specifications to update the number of clas No
    SP-110812 Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) SA WG1 CR Pack Approval Yes Yes It was decided to return these CRs to SA WG1 for further evaluation. No
    SP-110825 Proposed CR to SA to TR 21.905 on Adding of MTC terms and definitions SA WG1 CR Pack Approval Yes Yes Approved No
    SP-110727 LS from SA WG2: Reply to 'LS on EAB Requirement for RAN Sharing' SA WG2 LS In Information Yes Yes Noted. The communication between RAN WG2 and SA WG2 is expected to continue. This LS was then noted. No
    SP-110751 Revised WID: Stage-2 aspects of System Improvements for Machine Type Communication (SIMTC) SA WG2 WID Approval Yes Yes Revised. This update was endorsed and should be merged with other changes from SA WG5 in SP-110699 in SP-110874 No
    SP-110699 Revised WID on System Improvements for Machine Type Communication SA WG5 WID Approval Yes Yes Revised. It was asked not to make references to clause 7.1.5 in the WID. It was decided to work on this off-line and to merge the WID updates in SP-110751 and SP-110699 into a single WID update which was drafted in SP-110874 No
    SP-110874 Revised WID: Stage-2 aspects of System Improvements for Machine Type Communication (SIMTC) TSG SA 0 Approval Yes Yes Revised. Nokia Siemens Networks commented that there were work tasks in the work plan related to this which should be deleted from the work plan and asked whether the presentation to TSG SA should be #49 or #54. It was agreed to add both with the comment No
    SP-110877 Revised WID: Stage-2 aspects of System Improvements for Machine Type Communication (SIMTC) TSG SA 0 Approval Yes Yes Approved No SP-110874
    SP-110742 1 CR to 23.221 on SIMTC-Reach (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110775 Standardization of Machine-type Communications MCC Work Plan Manager Report Information Yes Yes Noted No
11.5
(BBAI) - Support BroadBand Forum (BBF) Accesses Interworking
SP-110726 LS from SA WG2: LS on 3GPP UE Definition SA WG2 LS In Information Yes Yes Noted No
    SP-110743 2 CRs to 23.203 on BBAI (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110754 TR 23.839, version 1.4.1: Study on Support of BBF Access Interworking (Release 11) for information SA WG2 TR Information Yes Yes Noted No
11.6
(eMPS_SRVCC) - SRVCC aspect of enhancements for Multimedia Priority Service
11.7
(USSI) - Unstructured Supplementary Service Data (USSD) simulation service in IMS
11.8
(NWK-PL2IMS) - Network Provided Location Information for IMS
SP-110700 Revised WID on Network Provided Location Information for IMS Charging SA WG5 WID Approval Yes Yes Approved No
    SP-110755 TR 23.842, Version 2.0.0: Study on Network Provided Location Information to the IMS; (Release 11) for approval SA WG2 TR Approval Yes Yes Approved No
11.9
(OSCAR) - Optimized Service Charging and Allocation of Resources in IMS whilst Roaming
SP-110756 TR 23.849, Version 1.0.0: Study on Stage 2 aspects of Optimised Service Charging and Allocation of Resources in IMS whilst Roaming (Release 11) for 'one step' approval SA WG2 TR Approval Yes Yes Revised in SP-110822 No SP-110822
    SP-110822 TR 23.849, Version 1.0.1: Study on Stage 2 aspects of Optimised Service Charging and Allocation of Resources in IMS whilst Roaming (Release 11) for information SA WG2 TR Information Yes Yes Noted No SP-110756
    SP-110831 Discussion on OSCAR normative work Alcatel-Lucent OTHER Discussion Yes Yes Noted. It was decided that the SA WG2 are expected to resolve the MRB/MRF Discovery mechanism as the main remaining work for this TR and the remainder of the work will then be given to CT WG1 once the decision has been made. This contribution was then no No
11.10
(SAPP) - Service Awareness and Privacy Policies
SP-110744 2 CRs to 23.203 on SAPP (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.11
(vSRVCC) - Single Radio Video Call Continuity for 3G-CS
SP-110745 8 CRs to 23.216, 23.237 on vSRVCC (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.12
(EEA3_EIA3) - EEA3 and EIA3 (new Encryption & Integrity EPS security algorithms)
SP-110689 35.924 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 4: Design and Evaluation Report SA WG3 TR Approval Yes Yes Approved No
11.13
(SPUCI) - Specification of Protection against Unsolicited Communication for IMS
SP-110687 33.838 Study on Protection against Unsolicited Communication for IMS SA WG3 TR Information Yes Yes Noted No
11.14
(VINE) - Support for 3GPP Voice Interworking with Enterprise IP-PBX
11.15
(DIDA) - Data Identification in ANDSF
SP-110757 TR 23.855, Version 1.0.0: Data Identification in ANDSF (DIDA); (Release 11) for 'one step' approval SA WG2 TR Approval Yes Yes Approved No
    SP-110746 1 CR to 23.402 on DIDA (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.16
(HENB_SEC) - H(e)NB security features for UE mobility scenarios
SP-110690 Release 11 CR to 33.320 on H(e)NB security features for UE mobility scenarios (HNB_Mob_Sec) SA WG3 CR Pack Approval Yes Yes Approved No
11.17
(PWS_SEC) - Security aspects of Public Warning System
11.18
(ACR_CS) - Anonymous Call Rejection in the CS domain
11.19
(INIPUI) - IMS Network-Independent Public User Identities (including FS_INIPUI)
11.20
(FULL_MOCN-GERAN) - Full Support of Multi-Operator Core Network by GERAN
SP-110778 LS from TSG GERAN: Reply LS on the introduction of FULL_MOCN-GERAN feature TSG GERAN LS In Information Yes Yes Noted No
    SP-110724 LS from SA WG1: Reply LS on the introduction of FULL-MOCN-GERAN feature SA WG1 LS In Information Yes Yes Noted No
    SP-110674 LS from CT WG1: Reply LS on the introduction of FULL-MOCN-GERAN feature CT WG1 LS In Information Yes Yes Noted No
11.21
(SaMOG) - S2a Mobility based On GTP and WLAN access to EPC (including FS_SaMOG)
SP-110758 TR 23.852, Version 1.0.0: Study on S2a Mobility based On GTP & WLAN access to EPC (SaMOG); Stage 2 (Release 11) for information SA WG2 TR Information Yes Yes Noted No
11.22
(SMSMI) - SMS submit and delivery without MSISDN in IMS
SP-110759 TR 23.863, Version 1.0.0: Support of Short Message Service (SMS) in IMS without MSISDN; Stage 2 (Release 11) for information SA WG2 TR Information Yes Yes Noted No
11.23
(VCSG) - VPLMN Autonomous CSG Roaming
SP-110676 LS from SA WG2: LS on VCSG WI Stage 2 completion SA WG2 LS In Information Yes Yes Noted No
    SP-110749 8 CRs to 23.060, 23.401 on VCSG (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.24
(rSRVCC) Single Radio Voice Call Continuity from UTRAN/GERAN to E-UTRAN/HSPA (including FS_rSRVCC)
SP-110780 LS from GERAN WG2: Reply LS on agreements on SRVCC from CS to PS GERAN WG2 LS In Information Yes Yes Noted No
    SP-110747 2 CRs to 23.216, 23.237 on rSRVCC (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.25
(Ext_ATS) - Extensions of Acoustic Test Specifications in TS 26.131 and TS 26.132
11.26
(Web_GBA) - Security enhancements for usage of GBA from the browser
11.27
(EMM) Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements. Including Building Blocks: EMM_EFEC, EMM_DDE, EMM_IPME
SP-110798 Update of the 3GPP Work Item 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)' SA WG4 WID Approval Yes Yes Revised. A clean version of the WID was needed so the document was revised to include this in SP-110878 No
    SP-110878 Update of the 3GPP Work Item 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)' SA WG4 WID Approval No Yes Approved No SP-110798
11.28
(LI11) - Lawful Interception in Release 11
11.29
(CH11) - Charging Management small Enhancements Rel-11
SP-110711 Rel-11 CRs on Charging Management small Enhancements (CH11) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110712 Rel-11 CRs on Transit Inter Operator Identifier for IMS Interconnection Charging in multi operator environment (IOI-IMS-CH) SA WG5 CR Pack Approval Yes Yes Approved No
11.30
(OAM11) - OAM&P Rel-11
SP-110698 32.834 Study on OAM aspects of inter-RAT Energy Saving SA WG5 TR Approval Yes Yes Approved No
    SP-110701 New WID proposal on Inter-RAT Energy Saving Management SA WG5 WID Approval Yes Yes Approved No
    SP-110697 32.901 User Data Convergence (UDC) information model handling and provisioning: Example use cases SA WG5 TR Approval Yes Yes Approved No
    SP-110707 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110713 Rel-11 CRs on CN performance measurements enhancement (OAM-ePM-CN) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110714 Rel-11 CRs on IMS Performance Measurement enhancements (OAM-ePM-IMS) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110716 Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110718 Rel-11 CRs on LTE Self-Organizing Networks (SON) coordination management (OAM-SON-LTE_COORD) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110719 Rel-11 CRs on UTRAN Self-Organizing Networks (SON) management (OAM-SON-UTRAN) SA WG5 CR Pack Approval Yes Yes Approved No
11.31
(TEI11) - TEI Rel-11
SP-110813 Stage 1 CRs on TEI Rel-11 (TEI11) SA WG1 CR Pack Approval Yes Yes Approved No
    SP-110748 8 CRs to 23.060, 23.221, 23.228, 23.237, 23.246, 23.292, 23.401 on TEI11 (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.32
Any other Rel-11 Documents
SP-110693 Release 11 CRs on Security small Enhancements (Sec11) SA WG3 CR Pack Approval Yes Yes Revised in SP-110848 No SP-110848
    SP-110848 Release 11 CRs on Security small Enhancements (Sec11) SA WG3 CR Pack Approval Yes Yes 33.320 CR0072R3 in SP-110832. All other CRs were approved. No SP-110693
    SP-110832 Proposed modification to CR S3-111205 'H(e)NB identity verification requirements for UE access control enforcement' Intel CR Pack Approval Yes Yes Revised. Replaces 33.320 CR0072R3 in SP-110848. There were a number of concerns over the consistency of the specification if this is done. It was suggested to ask SA WG3 for further consideration of the CR. Intel suggested trying to incorporate the issue No
    SP-110879 Proposed modification to CR S3-111205 'H(e)NB identity verification requirements for UE access control enforcement' Intel CR Pack Approval No No No SP-110832
12
Documents Related to Rel-12 and later Features
12.1
(EVS_codec) - Codec for Enhanced Voice Services
12.2
(IMS_TELEP) - IMS-based Telepresence
SP-110814 Stage 1 CRs on IMS-based Telepresence (IMS_TELEP) SA WG1 CR Pack Approval Yes No No
12.3
(SMURFs) - Service and Media Reachability for Users over Restrictive Firewalls
SP-110815 Stage 1 CR on Service and Media Reachability for Users over Restrictive Firewalls (SMURFs) SA WG1 CR Pack Approval Yes No No
12.4
(MOSAP) - Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers
12.5
(SIPTO_SC) - SIPTO Service Continuity of IP Data Session
12.6
(LIMONET) - LIPA Mobility and SIPTO at the Local Network
12.7
(OPIIS) - Operator Policies for IP Interface Selection
12.8
(LOBSTER) - Location-Based Selection of gateways for WLAN
SP-110752 Revised WID: LOcation-Based Selection of gaTEways foR WLAN (LOBSTER) SA WG2 WID Approval Yes No No
12.9
(TEI12) - TEI Rel-12
SP-110816 Stage 1 CRs on TEI Rel-12 (TEI12) SA WG1 CR Pack Approval Yes No No
12.10
Any other Rel-12 Documents
13
Documents related to current Study Items
13.1
(FS_AMTC) - Study on Alternatives to E.164 for Machine-Type Communications
13.2
(FS_CSN) - Study on Continuity of Data Sessions to Local Networks
SP-110818 TR 22.896 V2.0.0 on Study on Continuity of Data Sessions to Local Networks SA WG1 TR Approval Yes No No
13.3
(FS_IMS_P2P) - Study on IMS based Peer-to-Peer Content Distribution Services
13.4
(FS_INIPUI) - Study on IMS Network-Independent Public User Identities
13.5
(FS_MODAI) - Study on Non-MTC Mobile Data Applications impacts
SP-110817 TR 22.801 V2.0.0 on Study on non-MTC; Mobile Data Applications impacts SA WG1 TR Approval Yes No No
13.6
(FS_MTCe) - Study on enhancements for Machine-Type Communications (MTC)
13.7
(FS_U2e) - Study on UICC/USIM enhancements
13.8
(FS_CNO) - Study on Core Network Overload solutions
13.9
(FS_eIMS) - Study on IMS Evolution
SP-110760 TR 23.812, Version 2.0.0: Feasibility Study on IMS Evolution (Release 11) for approval SA WG2 TR Approval Yes No No
13.10
(FS_PP) - Study on Policy solutions and enhancements
13.11
(FS_eMEDIASEC) - Study on Extended IMS Media Plane Security features
13.12
(FS_SEEE) - Study on System Enhancements for Energy Efficiency
13.13
(FS_SSO_Int) - Study on Integration of Single Sign-On (SSO) frameworks with 3GPP networks
13.14
(FS_SSO_APS) - Study on Single Sign On (SSO) Application Security for IMS - based on SIP Digest
13.15
(FS_UKM) - Study on UTRAN key management enhancements
SP-110688 33.859 UTRAN key management enhancements SA WG3 TR Approval Yes No No
13.16
(FS_IVCS) - Study on Improved Video Coding Support
13.17
(FS_SS_PSS_MBMS) - Study on Surround Sound codec extension for PSS and MBMS
13.18
(FS_MAPIM) - Study on Multi Access PDN connectivity and IP flow Mobility
13.19
(FS_IPv6) - Study on IPv6 Migration
13.20
(FS_RAVEL) - Study on Roaming Architecture for Voice over IMS with Local Breakout
SP-110761 TR 23.850, Version 2.0.0: Study on Roaming Architecture for Voice over IMS with Local Breakout (Release 11) for approval SA WG2 TR Approval Yes No No
13.21
(M3DVC) - Study on Mobile 3D Video Coding
SP-110799 TR 26.905 Mobile stereoscopic 3D video (Release 11) version 1.0.0 SA WG4 TR Information Yes No No
13.22
(FS_UMONC) - Study on Usage Monitoring Control Enhancement
13.23
(FS_ProSe) - Study on Proximity based Services
13.24
(FS_iFire) - Study on IMS Firewall traversal
13.25
(OAM-Studies) - OAM&P Studies
14
Proposed New WIDs (not part of an existing feature)
SP-110725 LS from SA WG1: Reply LS on WID for GBA extensions for re-use of SIP Digest credentials SA WG1 LS In Information Yes No Related to SA WG3 WID SP-110686 No
    SP-110677 LS from SA WG3: LS on WID for GBA extensions for re-use of SIP Digest credentials SA WG3 LS In Information Yes No No
    SP-110686 WI proposal on GBA extensions for re-use of SIP Digest credentials SA WG3 WID Approval Yes No No
    SP-110753 New WID on roaming architecture for voice over IMS with Local Breakout (RAVEL) SA WG2 WID Approval Yes No See also SP-110803 No
    SP-110803 New WID proposal on Charging aspects for Roaming Architecture for Voice over IMS with Local Breakout SA WG5 WID Approval Yes No See also SP-110753 No
    SP-110750 1 CR to 23.228 on RAVEL (Proposed New WID) (Rel-11) SA WG2 CR Pack Approval Yes No No
15
Proposed New Study Items (SIDs)
SP-110819 Proposed WID for User plane congestion management (UPCON) SA WG1 WID Approval Yes No No
    SP-110820 Proposed WID on Study on RAN Sharing Enhancements SA WG1 WID Approval Yes No No
    SP-110800 New Study Item 'Improved Support for Dynamic Adaptive Streaming over HTTP in 3GPP' SA WG4 WID Approval Yes No No
    SP-110702 New WID proposal on Telecommunication Management; OAM Aspects of Network sharing SA WG5 WID Approval Yes No No
16
Project Management
SP-110802 CRs to 21.900 MCC Specifications Manager CR Pack Approval Yes No No
16.1
Review of the work plan
SP-110772 3GPP Work Plan review at Plenary TSG SA#54 MCC Work Plan Manager Work plan Presentation No No No
    SP-110773 3GPP Green activities / Energy Saving MCC Work Plan Manager Report Information Yes No No
    SP-110774 3GPP Releases Descriptions - Rel-10 to Rel-12 MCC Work Plan Manager OTHER Information Yes No No
16.2
Release contents and planning discussions
16.3
Specification Status
17
Project Support
17.1
Improvements to working methods
SP-110776 Update of the 3GPP WID Template MCC Work Plan Manager OTHER Approval Yes No No
    SP-110865 LS to PCG on cooperation with External Bodies TSG SA LS OUT Approval No No No
17.2
MCC Status Report
SP-110801 MCC Report to TSG SA#54 MCC Specifications Manager Report Presentation Yes No No
18
Future meeting schedule
19
Any Other Business
20
Close of Meeting
99
WITHDRAWN DOCUMENTS
SP-110861 Outcome of PWS Off-line discussions Discussion Group OTHER Information No No WITHDRAWN Yes
    SP-110826 SA WG5 comments on Zurich multi-SDO meeting outputs SA WG5 Chairman OTHER Information No No WITHDRAWN: Duplicate of SP-110769 Yes
    SP-110823 LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON 'WIDE-AREA SENSOR AND/OR ACTUATOR NETWORK (WASN) SYSTEMS' ITU-R WP5A LS In Information No No WITHDRAWN: Duplicate of SP-110781 Yes
    SP-110705 Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) SA WG5 CR Pack Approval No No WITHDRAWN Yes
    SP-110695 Release 11 CRs on Lawful Interception (LI11) SA WG3 CR Pack Approval No No WITHDRAWN Yes

Created: 2011-12-14 08:36     Last document: SP-110882