Agenda with allocated Tdocs
Created: 2011-12-14 08:36     Last document: SP-110882
Agenda |
Topic |
Tdoc |
Title |
Source |
Doc-type |
Doc-for |
Avail |
Treated |
Decision |
Wdrn |
Replaced-by |
Replaces |
0 ALL AGENDA ITEMS
|
|
|
|
|
|
|
|
|
|
| 1 Opening of the Meeting
|
|
|
|
|
|
|
|
|
|
| 2 Approval of Agenda SP-110662 |
Draft agenda for TSG SA meeting #54 |
TSG SA Chairman |
Agenda |
Approval |
Yes |
Yes |
Revised in SP-110762 |
No |
SP-110762 |
| |
|
SP-110762 |
Draft agenda for TSG SA meeting #54 |
TSG SA Chairman |
Agenda |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110662 |
3 IPR Reminder
|
|
|
|
|
|
|
|
|
|
| 4 Reports from Previous Meetings
|
|
|
|
|
|
|
|
|
|
| 4.1 Report from TSG SA#53 SP-110663 |
Draft Report of TSG SA meeting #53 |
TSG SA Secretary |
Report |
Approval |
Yes |
Yes |
Revised. Alcatel-Lucent commented that their comment did not appear to be included in the report. The MCC Secretary will check this off-line. It was clarified that under the report of SP-11615, 'BBAI BBIII' should read 'SIMTC BBIII'. This was corrected a |
No |
|
| |
|
SP-110853 |
Draft Report of TSG SA meeting #53 |
TSG SA Secretary |
Report |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110663 |
4.2 Reports from TSG SA ad-hoc meetings and workshops SP-110665 |
Chairmen's Summary of 3GPP-BBF Workshop |
Workshop Convenors |
Report |
Information |
Yes |
Yes |
Noted. It was clarified that BBF review before 'final approval' referred to Release freeze. This was then noted. |
No |
|
| |
|
SP-110664 |
Draft Report of 3GPP-BBF Workshop |
TSG SA Secretary |
Report |
Information |
Yes |
Yes |
Noted. This was provided for information and was noted. |
No |
|
| |
|
SP-110833 |
Policy and Charging convergence in Rel-11 |
Vodafone Group |
OTHER |
Discussion |
Yes |
Yes |
Noted. The SA WG2 Chairman reported that BBI and BBII progress was not as good as hoped or reported in this contribution. NEC commented that BBF appears to be investigating convergence, which may be premature. Verizon supported the proposal from Vodafone |
No |
|
| |
|
SP-110851 |
Proposed updated WID: Support for BroadBand Forum Accesses Interworking |
Verizon Wireless |
WID |
Approval |
Yes |
Yes |
Noted. No agreement could be reached on this and this was left for further off-line discussion. The proposed WID was then noted |
No |
|
| |
|
SP-110852 |
DRAFT - LS on Broadband Access Interworking Building Block III |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110667 |
LS from the Broadband Forum: BBF status report prior to BBF and 3GPP workshop |
Broadband Forum |
LS In |
Information |
Yes |
Yes |
Noted. Can be noted, workshop already held. This LS was noted. |
No |
|
| 5 Items for early consideration SP-110763 |
Warning System Security Configuration |
SA WG2 Chairman (Samsung) |
OTHER |
Discussion |
Yes |
Yes |
Noted. Nokia Siemens Networks commented that the PWS digital signature work has been started in Rel-9 and moved to Rel-10 and Rel-11, without actually being completed, so there is currently no specification for using digital signature, but only to specif |
No |
|
| |
|
SP-110821 |
Warning system default configuration |
NTT DOCOMO, KDDI, SOFTBANK MOBILE, Fujitsu, Hitachi, NEC, NTC |
Discussion |
Discussion |
Yes |
Yes |
Noted. Vodafone commented that the roaming issues appear to be the biggest issue, where there are 189 European operators, whose subscribers can roam into other regions. AT&T commented that there are no regulations for inbound roamers' handsets and an app |
No |
|
| |
|
SP-110830 |
Default configuration of PWS display |
Samsung Electronics |
OTHER |
Discussion |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110844 |
Support of a Default 'ON' Setting for ETWS/PWS Messages |
AT&T, Sprint, T-Mobile USA, US Cellular, Alcatel-Lucent, One2Many, Qualcomm, Trueposition |
OTHER |
Discussion |
Yes |
Yes |
Noted. Vodafone commented that operators should not be expected to implement the default settings rather than maintaining a list which is applied to it's subscribers. O2 commented that there is also an issue with expecting operators to maintain a list wh |
No |
|
| |
|
SP-110841 |
Public Warning System Configuration |
Vodafone |
OTHER |
Discussion |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110855 |
CMAS Application |
T-Mobile USA |
OTHER |
Discussion |
Yes |
Yes |
Noted. Research in Motion commented that this use of an application should be the decision made on whether cell-broadcast is always on or not (i.e. the application could switch cell broadcast on if it is present on the terminal), which would allow the me |
No |
|
| |
|
SP-110764 |
3 CRs to 23.401 on ETWS (Rel-8, Rel-9, Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
No |
| No |
|
| |
|
SP-110828 |
Mandatory Terminal Support for full MOCN in GERAN |
Telenor, Vodafone, TeliaSonera, Deutsche Telekom, Orange |
OTHER |
Discussion |
Yes |
Yes |
Revised in SP-110850 |
No |
SP-110850 |
| |
|
SP-110850 |
Mandatory Terminal Support for full MOCN in GERAN |
Telenor, Vodafone, TeliaSonera, Deutsche Telekom, Orange, T-Mobile USA |
OTHER |
Discussion |
Yes |
Yes |
Noted. Orange supported this proposal and added that general support for GERAN terminals should apply and not be restricted to M2M type devices. It was commented that there are likely to be a number of Rel-10 MTC terminals which will not include FULL-MOC |
No |
| SP-110828 |
|
|
SP-110857 |
[DRAFT] Reply LS on the introduction of FULL-MOCN-GERAN feature |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised to remove 'draft' in SP-110867 |
No |
|
| |
|
SP-110867 |
Reply LS on the introduction of FULL-MOCN-GERAN feature |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110857 |
|
|
SP-110866 |
LS on PWS support in 3GPP UEs |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised. There were some concerns over points 4a, b and c. AT&T commented that as this has not been developed in WGs, that these discussions should be held in SA WG1 and proposed to remove the bullets from this LS. It was commented that SA WG1 may make r |
No |
|
| |
|
SP-110875 |
LS on PWS support in 3GPP UEs |
TSG SA |
LS OUT |
Approval |
Yes |
No |
| No |
| SP-110866 |
5.1 Challenges to working agreements
|
|
|
|
|
|
|
|
|
|
| 6 Incoming Liaisons SP-110669 |
LS from ITU-T Study Group 13: Request for information for the new draft Recommendation Q.1741.8 (referencing of 3GPP Release 10) |
ITU-T Study Group 13 |
LS In |
Information |
Yes |
Yes |
Response in SP-11858. A response was provided by TSG CT in SP-110837, which was reviewed. A response was provided in SP-11858. |
No |
|
| |
|
SP-110837 |
LS from TSG CT: LS on co-ordination of SDO input to ITU-T Q.1741.8 |
TSG CT |
LS In |
Action |
Yes |
Yes |
Revised. The TSG RAN Chairman proposed to also add that the 37.xxx-series are also excluded. The attached CP-110914 in this LS was revised accordingly into an LS from TSG SA in SP-110858. |
No |
|
| |
|
SP-110858 |
LS on co-ordination of SDO input to ITU-T Q.1741.8 |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110671 |
LS from ITU-T Study Group 13: New work item on the framework on the identifiers in Future Networks |
ITU-T Study Group 13 |
LS In |
Information |
Yes |
Yes |
Noted. The SA WG2 Chairman commented that SA WG2 had begun to address many of the issues raise here and considered this important for development of future 'phone number' schemes. The TSG CT Chairman reported that this is also being considered in CT WGs. |
No |
|
| |
|
SP-110680 |
LS from ITU-T Study Group 11: Request for feedback on attached draft revision of Supplement 62 to ITU-T Q series Recommendations |
ITU-T Study Group 11 |
LS In |
Action |
Yes |
Yes |
Response in SP-110859. The attached list of specifications for Emergency Telecommunications Service contains entries under 9.1 for 3GPP specifications, which should be reviewed. The TSG CT Chairman commented that the list was unclear and should be organi |
No |
|
| |
|
SP-110859 |
[Draft] Reply LS on feedback on Supplement 62 to ITU-T Q series Recommendations |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised. This was reviewed and it was suggested to add reference to agreements made in the San Francisco WG meetings. This was discussed off-line and the LS revised in SP-110868 |
No |
|
| |
|
SP-110868 |
Reply LS on feedback on Supplement 62 to ITU-T Q series Recommendations |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised in SP-110876 |
No |
SP-110876 |
SP-110859 |
|
|
SP-110876 |
Reply LS on feedback on Supplement 62 to ITU-T Q series Recommendations |
TSG SA |
LS OUT |
Approval |
Yes |
No |
| No |
| SP-110868 |
|
|
SP-110723 |
LS from SA WG1: LS on Multiple E.212 Mobile Country Codes assigned to one country/political entity |
SA WG1 |
LS In |
Information |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110782 |
LS from MultiService Forum: Liaison Regarding MSF VoLTE Interoperability Event |
MultiService Forum (MSF) |
LS In |
Information |
Yes |
Yes |
Noted. Companies were asked to take this into account and the LS was noted. |
No |
|
| |
|
SP-110675 |
LS from CT WG1: Reply LS on Applicability of ePLMN to MDT |
CT WG1 |
LS In |
Information |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110783 |
LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS (PPDR) ON THE PRELIMINARY DRAFT NEW REPORT ITU-R M.[LMS.PPDR.UHF CHANNELS] |
ITU-R WP5A |
LS In |
Information |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110784 |
LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS - INVITATION TO REVIEW THE WORKING DOCUMENT TOWARDS THE REVISION OF REPORT ITU-R M.2014-1 |
ITU-R WP5A |
LS In |
Information |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110824 |
LS from TETRA + Critical Communications Association: Re: LS on Study item relevant for public safety - direct mode |
TETRA + Critical Communications Association |
LS In |
Information |
Yes |
Yes |
Noted. It was recognised that this was a work in progress and no response was needed. This was then noted. |
No |
|
| |
|
SP-110666 |
LS from ETSI TC ATTM: General Engineering of energy efficient base station |
ETSI TC ATTM |
LS In |
Information |
Yes |
Yes |
Reply requested by 21 October 2011 ! Draft response from TSG RAN in SP-110847. Final Response in SP-110860 |
No |
|
| |
|
SP-110854 |
Additional information to SP-110666 (LS from ETSI TC ATTM) |
TSG SA Secretary |
OTHER |
Information |
Yes |
Yes |
Noted. This was provided for information and was noted. |
No |
|
| |
|
SP-110765 |
LS from ETSI TC-EE: ETSI TC-EE Work Item on Network level power efficiency |
ETSI TC-EE |
LS In |
Information |
Yes |
Yes |
Draft response from TSG RAN in SP-110847. Final Response in SP-110860 |
No |
|
| |
|
SP-110847 |
Draft Reply LS to ETSI TC ATTM General Engineering of energy efficient base station |
TSG RAN |
LS OUT |
Approval |
Yes |
Yes |
Revised. Response to SP-110666, SP-110765. The LS was endorsed and updated to make it from TSG SA and change the contacts and remove draft, in SP-110860 |
No |
|
| |
|
SP-110860 |
Reply LS to ETSI TC ATTM General Engineering of energy efficient base station |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
|
| 7 Reports from TSG SA Working Groups and other TSGs
|
|
|
|
|
|
|
|
|
|
| 7.1 SA WG1 Report and Questions for Advice SP-110805 |
Status Report from SA WG1 to TSG SA#54 |
SA WG1 Chairman |
Report |
Presentation |
Yes |
Yes |
Noted. The SA WG1 Chairman was thanked for this report, which was noted. |
No |
|
| 7.2 SA WG2 Report and Questions for Advice SP-110728 |
SA WG2 Status Report |
SA WG2 Chairman |
Report |
Presentation |
Yes |
Yes |
Revised in SP-110827 |
No |
SP-110827 |
| |
|
SP-110827 |
SA WG2 Status Report |
SA WG2 Chairman |
Report |
Presentation |
Yes |
Yes |
Noted. The SA WG2 Chairman was thanked for this report, which was noted. |
No |
| SP-110728 |
7.3 SA WG3 Report and Questions for Advice SP-110684 |
SA WG3 Status Report |
SA WG3 Chairman |
REPORT |
Presentation |
Yes |
Yes |
Noted. The SA WG3 Chairman was thanked for this report, which was noted. |
No |
|
| |
|
SP-110685 |
Proposed Update of SA WG3 Terms of Reference |
SA WG3 |
ToR |
Approval |
Yes |
Yes |
Revised. It was noticed that 'privacy' needs to be added in one more place. The ToR was revised accordingly in SP-110862 |
No |
|
| |
|
SP-110862 |
Proposed Update of SA WG3 Terms of Reference |
SA WG3 |
ToR |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110685 |
7.4 SA WG4 Report and Questions for Advice SP-110785 |
SA WG4 Status Report at TSG SA#54 |
SA WG4 Chairman |
Report |
Presentation |
Yes |
Yes |
Noted. The SA WG4 Chairman was thanked for this report, which was noted. |
No |
|
| 7.5 SA WG5 Report and Questions for Advice SP-110696 |
SA WG5 Status Report |
SA WG5 Chairman |
Report |
Presentation |
Yes |
Yes |
Noted. The SA WG5 Chairman was thanked for this report, which was noted. |
No |
|
| |
|
SP-110766 |
Introduction of documents related to Converged Management of Fixed Mobile Networks submitted to this TSG SA meeting |
SA WG5 Chairman |
OTHER |
Information |
Yes |
Yes |
Noted. This was reviewed and taken as background for the related contributions. This was then noted. |
No |
|
| |
|
SP-110679 |
LS from SA WG5: LS on formal aspects to be considered for the 3GPP - TM Forum Joint Working Groups |
SA WG5 |
LS In |
Action |
Yes |
No |
The agreements and way forward were included in a liaison to SA WG5, which was drafted off-line in SP-110863. Final response in SP-110xxx |
No |
|
| |
|
SP-110863 |
[DRAFT] Reply LS on formal aspects to be considered for the 3GPP - TM Forum Joint Working Groups |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised. NEC commented that there is too much detail for the TMF on the process for checking the legal aspects. It was clarified that this is primarily aimed at SA WG5 and this information was considered useful. Vodafone commented that the second paragra |
No |
|
| |
|
SP-110880 |
[DRAFT] Reply LS on formal aspects to be considered for the 3GPP - TM Forum Joint Working Groups |
TSG SA |
LS OUT |
Approval |
No |
No |
| No |
| SP-110863 |
|
|
SP-110678 |
LS from SA WG5: Enhanced Reply LS to NGMN NGCOR on Project NGCOR Update |
SA WG5 |
LS In |
Information |
Yes |
Yes |
Noted. The SA WG5 Chairman reported that according to the NGNM procedures, they cannot work with SDOs directly but need to work though the NGNM Partners. This was noted and SA WG5 were encouraged to continue the communication with NGNM. |
No |
|
| |
|
SP-110768 |
Minutes of multi SDO meeting in Zurich Nov 1st-2nd 2011 |
SA WG5 Chairman |
Report |
Information |
Yes |
Yes |
Noted. LS drafted in SP-110864. It was clarified that the joint working group cannot make decisions for 3GPP but can provide agreed recommendations for input to the member bodies of the JCG. Research in Motion clarified that all involved bodies would nee |
No |
|
| |
|
SP-110864 |
DRAFT - LS on Converged Management Multi-SDO activity |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised. It was suggested to clarify that such joint activities do not have decision power. Vodafone asked whether the request to formalize a Multi-SDO setup, or should it rather state that the Terms of Reference are not aligned with the working procedur |
No |
|
| |
|
SP-110881 |
DRAFT - LS on Converged Management Multi-SDO activity |
TSG SA |
LS OUT |
Approval |
No |
No |
| No |
| SP-110864 |
|
|
SP-110770 |
Draft ToR for Converged Management of Fixed Mobile Networks project |
SA WG5 Chairman |
OTHER |
Information |
Yes |
Yes |
Noted. As the joint activity will be done using workshops and liaison, the ToR was not necessary and was noted. |
No |
|
| |
|
SP-110767 |
SA WG5 presentation at multi SDO meeting in Zurich Nov 1st-2nd 2011 |
SA WG5 Chairman |
OTHER |
Presentation |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110769 |
SA WG5 comments on multi SDO activity |
SA WG5 Chairman |
OTHER |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110771 |
TM Forum proposal on handling of Joint Working Group output documents |
SA WG5 Chairman |
Report |
Information |
Yes |
Yes |
Noted |
No |
|
| 7.6 TSG RAN report and Questions for Advice SP-110845 |
TSG RAN Status Report to TSG SA#54 |
TSG RAN Chairman |
Report |
Presentation |
Yes |
Yes |
Noted. The TSG RAN Chairman was thanked for this report, which was noted. |
No |
|
| |
|
SP-110846 |
Draft report of TSG RAN meeting #54 |
TSG RAN Secretary |
Report |
Information |
Yes |
Yes |
Noted. This was provided for information and was noted. |
No |
|
| |
|
SP-110842 |
LS from TSG RAN: LS on FGI 27 in LTE and Single Radio VCC |
TSG RAN |
LS In |
Information |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110843 |
LS from TSG RAN: Reply LS on Capability handling of LTE TDD and FDD modes |
TSG RAN |
LS In |
Information |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| 7.7 TSG CT report and Questions for Advice SP-110834 |
TSG CT Status Report to TSG SA#54 |
TSG CT Chairman |
Report |
Presentation |
Yes |
Yes |
Noted. The TSG CT Chairman was thanked for this report, which was noted. |
No |
|
| |
|
SP-110835 |
Draft report of TSG CT meeting #54 |
TSG CT Secretary |
Report |
Information |
Yes |
Yes |
Noted. This was provided for information and was noted. |
No |
|
| |
|
SP-110836 |
IETF Status report to TSG SA#54 |
TSG CT Chairman |
Report |
Presentation |
Yes |
Yes |
Noted. Research in Motion commented that it is important to have a reasonable attendance from 3GPP Member companies at the IETF meetings in order to progress the important work there and encouraged delegates to try to attend whenever possible. The TSG CT |
No |
|
| 7.8 TSG GERAN report and Questions for Advice SP-110777 |
TSG GERAN Report to TSG SA#54 |
TSG GERAN Chairman |
Report |
Presentation |
Yes |
Yes |
Noted. The TSG GERAN Chairman was thanked for this report, which was noted. |
No |
|
| |
|
SP-110683 |
LS from CT WG4: Reply LS on Service Identification for RRC Improvements in GERAN |
CT WG4 |
LS In |
Information |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110779 |
LS from TSG GERAN: Reply LS on Service Identification for RRC Improvements in GERAN |
TSG GERAN |
LS In |
Information |
Yes |
Yes |
Noted. This was reviewed and noted. |
No |
|
| |
|
SP-110839 |
LS from TSG CT: LS on Work progress on RRC Improvements in GERAN |
TSG CT |
LS In |
Action |
Yes |
Yes |
Noted. The approach outlined in this LS was confirmed. The scope of this work is GERAN and not other RATs |
No |
|
| 8 Documents related to Rel-8 or Earlier Features
|
|
|
|
|
|
|
|
|
|
| 8.1 R99 CRs (Need to be very well justified!)
|
|
|
|
|
|
|
|
|
|
| 8.2 Rel-4 CRs (Need to be very well justified!)
|
|
|
|
|
|
|
|
|
|
| 8.3 Rel-5 CRs (Need to be very well justified!)
|
|
|
|
|
|
|
|
|
|
| 8.4 Rel-6 CRs (Need to be very well justified!)
|
|
|
|
|
|
|
|
|
|
| 8.5 Rel-7 CRs (Need to be very well justified!) SP-110804 |
CRs to TS 26.114 on 'Alignment of SDP Capneg usage with MTSI deployments (MTSI-MHI)' (Release 7 and Release 8) |
NOKIA Corporation, Nokia Siemens Networks, Verizon Wireless, Telefon AB LM Ericsson, ST-Ericsson SA |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110787 |
CR to TS 26.114 on 'Alignment of SDP Capneg usage with MTSI deployments (MTSI-eMHI)' (Release 8) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Noted. This CR was noted as a revised version had been approved (SP-110804). |
No |
|
| |
|
SP-110681 |
LS from CT WG1: LS on Use of SDP Capability Negotiation |
CT WG1 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110682 |
LS from CT WG1: LS on making use of SDP Capability Negotiation optional when offering AVPF for video |
CT WG1 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110786 |
CRs to TS 26.114 on 'Correction to H.264 RTP Payload Format Reference (MTSI-MHI)' (Release 7 until Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110703 |
Rel-7 CRs on OAM Maintenance and small Enhancements (OAM7) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 8.6 Rel-8 CRs (Need to be very well justified!) SP-110806 |
Stage 1 CR on Rel-8 HomeNB |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Revised. It was clarified that this CR does not impact the UE and should not be marked on the cover page. It was agreed to remove the impact indication and the CR was revised in SP-110870 |
No |
|
| |
|
SP-110870 |
Stage 1 CR on Rel-8 HomeNB |
TSG SA |
CR Pack |
Approval |
No |
Yes |
Approved |
No |
| SP-110806 |
|
|
SP-110807 |
Stage 1 CRs on Rel-8 IMSTSS |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110729 |
6 CRs to 23.401, 23.107 on SAES, TEI8 (Rel 8, Rel-9, Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110788 |
CRs to TS 26.237 on 'On Resolving IETF dependencies (IMS_PSS_MBMS_US)' (Release 8 until 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110789 |
CRs to TS.26.346 on 'AlternativeUnicastDelivery and Time Synchronisation between UE and BM-SC (PSS_MBMS_OMTV)' (Release 8 until 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110704 |
Rel-8 CRs on OAM Maintenance and small Enhancements (OAM8) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110708 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9 Documents Related to Rel-9 Features
|
|
|
|
|
|
|
|
|
|
| 9.1 (CRS) - Customized Ringing Signal
|
|
|
|
|
|
|
|
|
|
| 9.2 (eCAT) - Enhancements of IMS Customized Alerting Tone (CAT)
|
|
|
|
|
|
|
|
|
|
| 9.3 (EHNB) - Enhanced Home NodeB / eNodeB SP-110808 |
Stage 1 CRs on Enhanced Home NodeB / eNodeB (EHNB) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
22.220 CR0148; 22.220 CR0149R1; 22.220 CR0150R1 Approved. Other CRs revised in SP-110871 |
No |
|
| |
|
SP-110871 |
Stage 1 CRs on Enhanced Home NodeB / eNodeB (EHNB) |
TSG SA |
CR Pack |
Approval |
No |
Yes |
Approved |
No |
| SP-110808 |
9.4 (eMMTel) - Multi-Media Telephony Service enhancements
|
|
|
|
|
|
|
|
|
|
| 9.5 (ePRIOR) - Enhancements to Multimedia Priority Service
|
|
|
|
|
|
|
|
|
|
| 9.6 (EUI) - End User Identity
|
|
|
|
|
|
|
|
|
|
| 9.7 (PAN-EPNM) - Support of Personal Area Networks and Enhancements
|
|
|
|
|
|
|
|
|
|
| 9.8 (PWS) - Public Warning System SP-110668 |
LS from TTA: Response LS on Korean Public Alert System in LTE |
TTA |
LS In |
Information |
Yes |
Yes |
This was reviewed and noted. |
No |
|
| |
|
SP-110838 |
LS from TSG CT: LS on Korean Public Alert System |
TSG CT |
LS In |
Information |
Yes |
Yes |
This was reviewed and noted. |
No |
|
| |
|
SP-110809 |
Stage 1 CRs on Public Warning System (PWS) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110882 |
LS on Documentation of support for public warning system in 3GPP |
TSG SA |
LS OUT |
Approval |
No |
No |
| No |
|
| 9.9 (ServAl) - Services Alignment and Migration
|
|
|
|
|
|
|
|
|
|
| 9.10 (SSAC) - Service Specific Access Control in EPS
|
|
|
|
|
|
|
|
|
|
| 9.11 (UDC) - User Data Convergence
|
|
|
|
|
|
|
|
|
|
| 9.12 (VAS4SMS) - Value Added Services for Short Message Service
|
|
|
|
|
|
|
|
|
|
| 9.13 (eANDSF) - Access Network Discovery and Selection Enhancement
|
|
|
|
|
|
|
|
|
|
| 9.14 (IMS_EMER_GPRS_EPS) - Support for IMS Emergency Calls over GPRS and EPS SP-110730 |
3 CRs to 23.167 on IMS_EMER_GPRS_EPS (Rel-9, Rel-10, Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.15 (IMS_SCC) - IMS Services Centralization and Continuity
|
|
|
|
|
|
|
|
|
|
| 9.16 (LCS_LTE_EPS) - LCS Control Plane Solution for EPS
|
|
|
|
|
|
|
|
|
|
| 9.17 (LTEimp-Vocoder) - System aspects of vocoder rate adaptation for LTE SP-110790 |
CRs to TS 26.114 on 'Update of reference for ECN (LTEimp-Vocoder)' (Release 9 until Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.18 (MBMS_EPS) - MBMS support in EPS SP-110731 |
1 CR to 23.246 on MBMS_EPS (Rel-9) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.19 (MUPSAP) - Multiple PDN Connection to the Same APN for PMIP-based Interfaces
|
|
|
|
|
|
|
|
|
|
| 9.20 (A5/4-GEA4) - 128 bit encryption for GSM and GPRS
|
|
|
|
|
|
|
|
|
|
| 9.21 (ACCSEC2) - Access Security Enhancements
|
|
|
|
|
|
|
|
|
|
| 9.22 (eGBAPush) - GBAPush enhancements
|
|
|
|
|
|
|
|
|
|
| 9.23 (GBA-IdM) - Extended Identity Management
|
|
|
|
|
|
|
|
|
|
| 9.24 (MEDIASEC) - IMS Media Plane Security (Stage 2)
|
|
|
|
|
|
|
|
|
|
| 9.25 (NDS_Backhaul) - Network Domain Security (NDS) enhancements to support backhaul security
|
|
|
|
|
|
|
|
|
|
| 9.26 (PUCI) - Protection against Unsolicited Communications for IMS
|
|
|
|
|
|
|
|
|
|
| 9.27 (DTMR) - Distortion Measurement Test Methods and Requirements
|
|
|
|
|
|
|
|
|
|
| 9.28 (IMS_PSS_MBMS_US_EXT) - IMS based PSS and MBMS User Service extensions
|
|
|
|
|
|
|
|
|
|
| 9.29 (M3A) - Managing MTSI Media Adaptation SP-110791 |
CRs to TS 26.114 on 'Managing MTSI Media Adaptation (M3A)' (Release 9 until Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.30 (PMA) - PSS and MBMS Aspects SP-110792 |
CRs to TS 26.234, TS 26.244 and TS.26.346 on ' PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9 and Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.31 (SFR) - Syndicated Feed Reception within 3GPP environments
|
|
|
|
|
|
|
|
|
|
| 9.32 (TG) - Timed Graphics
|
|
|
|
|
|
|
|
|
|
| 9.33 (CH9) - Charging Management small Enhancements Rel-9 SP-110709 |
Rel-9 CRs on Charging Management (CH9) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.34 (OAM9) - OAM&P Rel-9
|
|
|
|
|
|
|
|
|
|
| 9.35 (TEI9) - TEI Rel-9 SP-110732 |
13 CRs to 23.060, 23.401, 23.402 on TEI9 (Rel-9, Rel-10, Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110733 |
10 CRs to 23.167, 23.203, 23.272 on TEI9 (Rel-9, Rel-10, Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
23.203 CR0592R1; 23.203 CR0591R1; 23.203 CR0590R1; 23.272 CR0713R1; 23.272 CR0714R1; 23.272 CR0716R2; 23.272 CR0717R2 were approved. |
No |
|
| |
|
SP-110829 |
3 CRs to 23.167 on TEI9 (Rel 9, Rel 10, Rel-11) - replace CRs approved at TSG SA WG 2 # 88 in TD SP-110733 |
Huawei, Deutsche Telekom, Research In Motion UK Ltd |
CR Pack |
Approval |
Yes |
Yes |
Revised in SP-110869 |
No |
SP-110869 |
| |
|
SP-110869 |
3 CRs to 23.167 on TEI9 (Rel 9, Rel 10, Rel-11) - replace CRs approved at TSG SA WG 2 # 88 in TD SP-110733 |
Huawei, Deutsche Telekom, Research In Motion UK Ltd |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110829 |
9.36 Any other Rel-9 Documents
|
|
|
|
|
|
|
|
|
|
| 10 Documents Related to Rel-10 Features
|
|
|
|
|
|
|
|
|
|
| 10.1 (CCNL) - Completion of Communications on Not Logged-in
|
|
|
|
|
|
|
|
|
|
| 10.2 (CPM-SMS) - IP-Short-Message-Gateway enhancements for CPM-SMS Interworking
|
|
|
|
|
|
|
|
|
|
| 10.3 (EHNBF) - H(e)NB enhancements
|
|
|
|
|
|
|
|
|
|
| 10.4 (UDC_DM) - User Data Convergence - Data Model
|
|
|
|
|
|
|
|
|
|
| 10.5 (ECSRA_LAA) - Enabling Coder Selection and Rate Adaptation for UTRAN and E-UTRAN for Load Adaptive Applications
|
|
|
|
|
|
|
|
|
|
| 10.6 (eMPS) - Enhancements for Multimedia Priority Service
|
|
|
|
|
|
|
|
|
|
| 10.7 (IESE) - IMS Emergency Session Enhancements
|
|
|
|
|
|
|
|
|
|
| 10.8 (IFOM) - IP Flow Mobility and seamless WLAN offload
|
|
|
|
|
|
|
|
|
|
| 10.9 (IMS_SC_eIDT) - IMS Service Continuity – Inter Device Transfer enhancements
|
|
|
|
|
|
|
|
|
|
| 10.10 (LIPA_SIPTO) - Local IP Access and Selected Internet IP Traffic Offload SP-110734 |
3 CRs to 23.060, 23.401, 23.402 on LIPA_SIPTO (Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110691 |
Release 10 CRs to 33.320 Security for Local IP Access and Selected Internet IP Traffic Offload (LIPA_SIPTO) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.11 (MAPCON) - Multi Access PDN Connectivity (Stage 2) SP-110735 |
1 CR to 23.402 on MAPCON, IFOM (Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.12 (NIMTC) - Network Improvements for Machine-type Communication SP-110736 |
10 CRs to 23.060, 23.401 on NIMTC (Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.13 (OMR) - Optimal Media Routeing
|
|
|
|
|
|
|
|
|
|
| 10.14 (PEST) - Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases
|
|
|
|
|
|
|
|
|
|
| 10.15 (SMOG) - S2b Mobility Based on GTP
|
|
|
|
|
|
|
|
|
|
| 10.16 (LI10) - Lawful Interception in the 3GPP Rel-10
|
|
|
|
|
|
|
|
|
|
| 10.17 (EAAT) - Enhancements and Addition of Audio Tests to 26.131 and 26.132 SP-110793 |
CRs to TS 26.131 and TS 26.132 on 'Enhancements and Addition of Audio Tests to 26.131 and 26.132 (EAAT)' (Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.18 (HTTP_SDS) - HTTP-based Streaming and Download Services SP-110794 |
CRs to TS 26.244 and TS 26.247 on 'HTTP-based Streaming and Download Services (HTTP_SDS)' (Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.19 (MBS_Enh) - PSS and MBMS enhancements SP-110795 |
CRs to TS 26.234 and TS.26.346 on 'PSS and MBMS enhancements (MBS_enh)' (Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.20 (OPT_IMS_PSS_MBMS_US) - Optimization of IMS based PSS and MBMS User Service SP-110796 |
CR to TS 26.237 on 'Registration of Content Reporting Configuration Info Package (OPT_IMS_PSS_MBMS_US)' (Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.21 (VCEM) - Video Coding Enhancements in MTSI SP-110797 |
CRs to TS 26.114 on 'Video Coding Enhancements in MTSI (VCEM)' (Release 10 and Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.22 (LTE_Relay) - Relays for LTE, including security aspects
|
|
|
|
|
|
|
|
|
|
| 10.23 (eAoC) - Advice of Charge (AoC) service support enhancements
|
|
|
|
|
|
|
|
|
|
| 10.24 (CH10) - Charging Management small Enhancements SP-110710 |
Rel-10 CRs on Charging Management (CH10) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.25 (OAM10) - OAM&P Rel-10 SP-110706 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110715 |
Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110717 |
Rel-10 CRs on IRP Solution Set specification organisation improvements (OAM-IRP-SS) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110721 |
Rel-10 CRs on SON self-optimization management continuation (LTE_SON-OAM-SO) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110722 |
Rel-10 CRs on OAM Maintenance and small Enhancements Network Infrastructure Management (OAM10-NIM) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.26 (TEI10) - TEI Rel-10 SP-110810 |
Stage 1 CRs on Study on TEI Rel-10 (TEI10) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Renesas commented that the second bullet in 7.2 should be removed as the Class identifiers are not separable. 22.146 CR0061R1; 22.146 CR0062R1 were approved. 22.268 CR0018R1; 22.268 CR0019R1 were revised in SP-110872 |
No |
|
| |
|
SP-110872 |
Stage 1 CRs on Study on TEI Rel-10 (TEI10) |
TSG SA |
CR Pack |
Approval |
No |
Yes |
Approved |
No |
| SP-110810 |
|
|
SP-110737 |
16 CRs to 23.002, 23.060, 23.167, 23.203, 23.216, 23.221, 23.228, 23.237 on TEI10 (Rel-10, Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110738 |
12 CRs to 23.246. 23.272, 23.292 on TEI10 (Rel-10, Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110692 |
Release 10 CR to 33.310 on Network Domain Security (NDS) enhancements to support backhaul security (TEI10) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110694 |
Release 10 CRs on Security small Enhancements (TEI10) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.27 Any other Rel-10 Documents
|
|
|
|
|
|
|
|
|
|
| 11 Documents Related to Rel-11 Features
|
|
|
|
|
|
|
|
|
|
| 11.1 (IPXS) - Advanced IP Interconnection of Services SP-110739 |
2 CRs to 23.228 on IPXS (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.2 (NOVES) - Non Voice Emergency Services SP-110811 |
Stage 1 CRs on Non Voice Emergency Services (NOVES) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
22.101 CR0392 revised in SP-110873, other CRs approved |
No |
|
| |
|
SP-110873 |
22.101 CR0392R1 |
TSG SA |
CR Pack |
Approval |
No |
Yes |
Approved |
No |
| SP-110810 |
|
|
SP-110740 |
4 CRs to 23.167, 23.237, 23.401 on NOVES-IMSESOM (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved. It was noted that there was some unnecessary text in the other comments of a CR which should be avoided. These CRs were approved. |
No |
|
| 11.3 (QoS_SSL) - QoS Control Based on Subscriber Spending Limits SP-110741 |
1 CR to 23.203 on QoS_SSL (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110720 |
Rel-11 CRs on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Revised in SP-110849 |
No |
SP-110849 |
| |
|
SP-110849 |
Rel-11 CRs on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110720 |
11.4 (SIMTC) - System Improvements to Machine-Type Communications SP-110670 |
LS from ITU-T Study Group 13: Item in ITU-T Q.3/13 Work Programme concerning Machine Oriented Communications (MOC) |
ITU-T Study Group 13 |
LS In |
Information |
Yes |
Yes |
Noted. This LS should be reviewed by SA WG1. The TSG SA Chairman undertook to inform the LS contact of this. The LS was then noted. |
No |
|
| |
|
SP-110781 |
LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON 'WIDE-AREA SENSOR AND/OR ACTUATOR NETWORK (WASN) SYSTEMS' |
ITU-R WP5A |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110673 |
LS from 3GPP2: 3GPP2 CORRESPONDENCE: Re: 3GPP2 SC.R4005-0 v1.0 cdma2000 M2M Numbering Recommendations System Requirements Document |
3GPP2 |
LS In |
Information |
Yes |
Yes |
Noted. The SA WG3 Chairman reported that they had dealt with this and the LS was noted. |
No |
|
| |
|
SP-110672 |
LS from ETSI M2M: Request to 3GPP for feedback on proposed changes to GBA specifications in support of M2M Integrity Validation |
ETSI M2M |
LS In |
Information |
Yes |
Yes |
Noted. The SA WG3 Chairman reported that they had dealt with this and the LS was noted. |
No |
|
| |
|
SP-110856 |
LS from ETSI TC M2M: Reply to 3GPP SA3 regarding M2M Integrity Validation |
ETSI TC M2M |
LS In |
Information |
Yes |
Yes |
Noted. The SA WG3 Chairman reported that they had dealt with this and the LS was noted. |
No |
|
| |
|
SP-110840 |
LS from TSG CT: LS on M2M devices with dual priority applications |
TSG CT |
LS In |
Information |
Yes |
Yes |
Noted. Vodafone clarified that the Normal priority access is the traffic which does not have an access class indicated and does not add new functionality so only minimal editorial changes are expected to SA WG2 specifications to update the number of clas |
No |
|
| |
|
SP-110812 |
Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
It was decided to return these CRs to SA WG1 for further evaluation. |
No |
|
| |
|
SP-110825 |
Proposed CR to SA to TR 21.905 on Adding of MTC terms and definitions |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110727 |
LS from SA WG2: Reply to 'LS on EAB Requirement for RAN Sharing' |
SA WG2 |
LS In |
Information |
Yes |
Yes |
Noted. The communication between RAN WG2 and SA WG2 is expected to continue. This LS was then noted. |
No |
|
| |
|
SP-110751 |
Revised WID: Stage-2 aspects of System Improvements for Machine Type Communication (SIMTC) |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Revised. This update was endorsed and should be merged with other changes from SA WG5 in SP-110699 in SP-110874 |
No |
|
| |
|
SP-110699 |
Revised WID on System Improvements for Machine Type Communication |
SA WG5 |
WID |
Approval |
Yes |
Yes |
Revised. It was asked not to make references to clause 7.1.5 in the WID. It was decided to work on this off-line and to merge the WID updates in SP-110751 and SP-110699 into a single WID update which was drafted in SP-110874 |
No |
|
| |
|
SP-110874 |
Revised WID: Stage-2 aspects of System Improvements for Machine Type Communication (SIMTC) |
TSG SA |
0 |
Approval |
Yes |
Yes |
Revised. Nokia Siemens Networks commented that there were work tasks in the work plan related to this which should be deleted from the work plan and asked whether the presentation to TSG SA should be #49 or #54. It was agreed to add both with the comment |
No |
|
| |
|
SP-110877 |
Revised WID: Stage-2 aspects of System Improvements for Machine Type Communication (SIMTC) |
TSG SA |
0 |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110874 |
|
|
SP-110742 |
1 CR to 23.221 on SIMTC-Reach (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110775 |
Standardization of Machine-type Communications |
MCC Work Plan Manager |
Report |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.5 (BBAI) - Support BroadBand Forum (BBF) Accesses Interworking SP-110726 |
LS from SA WG2: LS on 3GPP UE Definition |
SA WG2 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110743 |
2 CRs to 23.203 on BBAI (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110754 |
TR 23.839, version 1.4.1: Study on Support of BBF Access Interworking (Release 11) for information |
SA WG2 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.6 (eMPS_SRVCC) - SRVCC aspect of enhancements for Multimedia Priority Service
|
|
|
|
|
|
|
|
|
|
| 11.7 (USSI) - Unstructured Supplementary Service Data (USSD) simulation service in IMS
|
|
|
|
|
|
|
|
|
|
| 11.8 (NWK-PL2IMS) - Network Provided Location Information for IMS SP-110700 |
Revised WID on Network Provided Location Information for IMS Charging |
SA WG5 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110755 |
TR 23.842, Version 2.0.0: Study on Network Provided Location Information to the IMS; (Release 11) for approval |
SA WG2 |
TR |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.9 (OSCAR) - Optimized Service Charging and Allocation of Resources in IMS whilst Roaming SP-110756 |
TR 23.849, Version 1.0.0: Study on Stage 2 aspects of Optimised Service Charging and Allocation of Resources in IMS whilst Roaming (Release 11) for 'one step' approval |
SA WG2 |
TR |
Approval |
Yes |
Yes |
Revised in SP-110822 |
No |
SP-110822 |
| |
|
SP-110822 |
TR 23.849, Version 1.0.1: Study on Stage 2 aspects of Optimised Service Charging and Allocation of Resources in IMS whilst Roaming (Release 11) for information |
SA WG2 |
TR |
Information |
Yes |
Yes |
Noted |
No |
| SP-110756 |
|
|
SP-110831 |
Discussion on OSCAR normative work |
Alcatel-Lucent |
OTHER |
Discussion |
Yes |
Yes |
Noted. It was decided that the SA WG2 are expected to resolve the MRB/MRF Discovery mechanism as the main remaining work for this TR and the remainder of the work will then be given to CT WG1 once the decision has been made. This contribution was then no |
No |
|
| 11.10 (SAPP) - Service Awareness and Privacy Policies SP-110744 |
2 CRs to 23.203 on SAPP (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.11 (vSRVCC) - Single Radio Video Call Continuity for 3G-CS SP-110745 |
8 CRs to 23.216, 23.237 on vSRVCC (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.12 (EEA3_EIA3) - EEA3 and EIA3 (new Encryption & Integrity EPS security algorithms) SP-110689 |
35.924 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 4: Design and Evaluation Report |
SA WG3 |
TR |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.13 (SPUCI) - Specification of Protection against Unsolicited Communication for IMS SP-110687 |
33.838 Study on Protection against Unsolicited Communication for IMS |
SA WG3 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.14 (VINE) - Support for 3GPP Voice Interworking with Enterprise IP-PBX
|
|
|
|
|
|
|
|
|
|
| 11.15 (DIDA) - Data Identification in ANDSF SP-110757 |
TR 23.855, Version 1.0.0: Data Identification in ANDSF (DIDA); (Release 11) for 'one step' approval |
SA WG2 |
TR |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110746 |
1 CR to 23.402 on DIDA (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.16 (HENB_SEC) - H(e)NB security features for UE mobility scenarios SP-110690 |
Release 11 CR to 33.320 on H(e)NB security features for UE mobility scenarios (HNB_Mob_Sec) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.17 (PWS_SEC) - Security aspects of Public Warning System
|
|
|
|
|
|
|
|
|
|
| 11.18 (ACR_CS) - Anonymous Call Rejection in the CS domain
|
|
|
|
|
|
|
|
|
|
| 11.19 (INIPUI) - IMS Network-Independent Public User Identities (including FS_INIPUI)
|
|
|
|
|
|
|
|
|
|
| 11.20 (FULL_MOCN-GERAN) - Full Support of Multi-Operator Core Network by GERAN SP-110778 |
LS from TSG GERAN: Reply LS on the introduction of FULL_MOCN-GERAN feature |
TSG GERAN |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110724 |
LS from SA WG1: Reply LS on the introduction of FULL-MOCN-GERAN feature |
SA WG1 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110674 |
LS from CT WG1: Reply LS on the introduction of FULL-MOCN-GERAN feature |
CT WG1 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.21 (SaMOG) - S2a Mobility based On GTP and WLAN access to EPC (including FS_SaMOG) SP-110758 |
TR 23.852, Version 1.0.0: Study on S2a Mobility based On GTP & WLAN access to EPC (SaMOG); Stage 2 (Release 11) for information |
SA WG2 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.22 (SMSMI) - SMS submit and delivery without MSISDN in IMS SP-110759 |
TR 23.863, Version 1.0.0: Support of Short Message Service (SMS) in IMS without MSISDN; Stage 2 (Release 11) for information |
SA WG2 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.23 (VCSG) - VPLMN Autonomous CSG Roaming SP-110676 |
LS from SA WG2: LS on VCSG WI Stage 2 completion |
SA WG2 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110749 |
8 CRs to 23.060, 23.401 on VCSG (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.24 (rSRVCC) Single Radio Voice Call Continuity from UTRAN/GERAN to E-UTRAN/HSPA (including FS_rSRVCC) SP-110780 |
LS from GERAN WG2: Reply LS on agreements on SRVCC from CS to PS |
GERAN WG2 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110747 |
2 CRs to 23.216, 23.237 on rSRVCC (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.25 (Ext_ATS) - Extensions of Acoustic Test Specifications in TS 26.131 and TS 26.132
|
|
|
|
|
|
|
|
|
|
| 11.26 (Web_GBA) - Security enhancements for usage of GBA from the browser
|
|
|
|
|
|
|
|
|
|
| 11.27 (EMM) Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements. Including Building Blocks: EMM_EFEC, EMM_DDE, EMM_IPME SP-110798 |
Update of the 3GPP Work Item 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)' |
SA WG4 |
WID |
Approval |
Yes |
Yes |
Revised. A clean version of the WID was needed so the document was revised to include this in SP-110878 |
No |
|
| |
|
SP-110878 |
Update of the 3GPP Work Item 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)' |
SA WG4 |
WID |
Approval |
No |
Yes |
Approved |
No |
| SP-110798 |
11.28 (LI11) - Lawful Interception in Release 11
|
|
|
|
|
|
|
|
|
|
| 11.29 (CH11) - Charging Management small Enhancements Rel-11 SP-110711 |
Rel-11 CRs on Charging Management small Enhancements (CH11) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110712 |
Rel-11 CRs on Transit Inter Operator Identifier for IMS Interconnection Charging in multi operator environment (IOI-IMS-CH) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.30 (OAM11) - OAM&P Rel-11 SP-110698 |
32.834 Study on OAM aspects of inter-RAT Energy Saving |
SA WG5 |
TR |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110701 |
New WID proposal on Inter-RAT Energy Saving Management |
SA WG5 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110697 |
32.901 User Data Convergence (UDC) information model handling and provisioning: Example use cases |
SA WG5 |
TR |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110707 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110713 |
Rel-11 CRs on CN performance measurements enhancement (OAM-ePM-CN) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110714 |
Rel-11 CRs on IMS Performance Measurement enhancements (OAM-ePM-IMS) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110716 |
Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110718 |
Rel-11 CRs on LTE Self-Organizing Networks (SON) coordination management (OAM-SON-LTE_COORD) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110719 |
Rel-11 CRs on UTRAN Self-Organizing Networks (SON) management (OAM-SON-UTRAN) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.31 (TEI11) - TEI Rel-11 SP-110813 |
Stage 1 CRs on TEI Rel-11 (TEI11) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110748 |
8 CRs to 23.060, 23.221, 23.228, 23.237, 23.246, 23.292, 23.401 on TEI11 (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.32 Any other Rel-11 Documents SP-110693 |
Release 11 CRs on Security small Enhancements (Sec11) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Revised in SP-110848 |
No |
SP-110848 |
| |
|
SP-110848 |
Release 11 CRs on Security small Enhancements (Sec11) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
33.320 CR0072R3 in SP-110832. All other CRs were approved. |
No |
| SP-110693 |
|
|
SP-110832 |
Proposed modification to CR S3-111205 'H(e)NB identity verification requirements for UE access control enforcement' |
Intel |
CR Pack |
Approval |
Yes |
Yes |
Revised. Replaces 33.320 CR0072R3 in SP-110848. There were a number of concerns over the consistency of the specification if this is done. It was suggested to ask SA WG3 for further consideration of the CR. Intel suggested trying to incorporate the issue |
No |
|
| |
|
SP-110879 |
Proposed modification to CR S3-111205 'H(e)NB identity verification requirements for UE access control enforcement' |
Intel |
CR Pack |
Approval |
No |
No |
| No |
| SP-110832 |
12 Documents Related to Rel-12 and later Features
|
|
|
|
|
|
|
|
|
|
| 12.1 (EVS_codec) - Codec for Enhanced Voice Services
|
|
|
|
|
|
|
|
|
|
| 12.2 (IMS_TELEP) - IMS-based Telepresence SP-110814 |
Stage 1 CRs on IMS-based Telepresence (IMS_TELEP) |
SA WG1 |
CR Pack |
Approval |
Yes |
No |
| No |
|
| 12.3 (SMURFs) - Service and Media Reachability for Users over Restrictive Firewalls SP-110815 |
Stage 1 CR on Service and Media Reachability for Users over Restrictive Firewalls (SMURFs) |
SA WG1 |
CR Pack |
Approval |
Yes |
No |
| No |
|
| 12.4 (MOSAP) - Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers
|
|
|
|
|
|
|
|
|
|
| 12.5 (SIPTO_SC) - SIPTO Service Continuity of IP Data Session
|
|
|
|
|
|
|
|
|
|
| 12.6 (LIMONET) - LIPA Mobility and SIPTO at the Local Network
|
|
|
|
|
|
|
|
|
|
| 12.7 (OPIIS) - Operator Policies for IP Interface Selection
|
|
|
|
|
|
|
|
|
|
| 12.8 (LOBSTER) - Location-Based Selection of gateways for WLAN SP-110752 |
Revised WID: LOcation-Based Selection of gaTEways foR WLAN (LOBSTER) |
SA WG2 |
WID |
Approval |
Yes |
No |
| No |
|
| 12.9 (TEI12) - TEI Rel-12 SP-110816 |
Stage 1 CRs on TEI Rel-12 (TEI12) |
SA WG1 |
CR Pack |
Approval |
Yes |
No |
| No |
|
| 12.10 Any other Rel-12 Documents
|
|
|
|
|
|
|
|
|
|
| 13 Documents related to current Study Items
|
|
|
|
|
|
|
|
|
|
| 13.1 (FS_AMTC) - Study on Alternatives to E.164 for Machine-Type Communications
|
|
|
|
|
|
|
|
|
|
| 13.2 (FS_CSN) - Study on Continuity of Data Sessions to Local Networks SP-110818 |
TR 22.896 V2.0.0 on Study on Continuity of Data Sessions to Local Networks |
SA WG1 |
TR |
Approval |
Yes |
No |
| No |
|
| 13.3 (FS_IMS_P2P) - Study on IMS based Peer-to-Peer Content Distribution Services
|
|
|
|
|
|
|
|
|
|
| 13.4 (FS_INIPUI) - Study on IMS Network-Independent Public User Identities
|
|
|
|
|
|
|
|
|
|
| 13.5 (FS_MODAI) - Study on Non-MTC Mobile Data Applications impacts SP-110817 |
TR 22.801 V2.0.0 on Study on non-MTC; Mobile Data Applications impacts |
SA WG1 |
TR |
Approval |
Yes |
No |
| No |
|
| 13.6 (FS_MTCe) - Study on enhancements for Machine-Type Communications (MTC)
|
|
|
|
|
|
|
|
|
|
| 13.7 (FS_U2e) - Study on UICC/USIM enhancements
|
|
|
|
|
|
|
|
|
|
| 13.8 (FS_CNO) - Study on Core Network Overload solutions
|
|
|
|
|
|
|
|
|
|
| 13.9 (FS_eIMS) - Study on IMS Evolution SP-110760 |
TR 23.812, Version 2.0.0: Feasibility Study on IMS Evolution (Release 11) for approval |
SA WG2 |
TR |
Approval |
Yes |
No |
| No |
|
| 13.10 (FS_PP) - Study on Policy solutions and enhancements
|
|
|
|
|
|
|
|
|
|
| 13.11 (FS_eMEDIASEC) - Study on Extended IMS Media Plane Security features
|
|
|
|
|
|
|
|
|
|
| 13.12 (FS_SEEE) - Study on System Enhancements for Energy Efficiency
|
|
|
|
|
|
|
|
|
|
| 13.13 (FS_SSO_Int) - Study on Integration of Single Sign-On (SSO) frameworks with 3GPP networks
|
|
|
|
|
|
|
|
|
|
| 13.14 (FS_SSO_APS) - Study on Single Sign On (SSO) Application Security for IMS - based on SIP Digest
|
|
|
|
|
|
|
|
|
|
| 13.15 (FS_UKM) - Study on UTRAN key management enhancements SP-110688 |
33.859 UTRAN key management enhancements |
SA WG3 |
TR |
Approval |
Yes |
No |
| No |
|
| 13.16 (FS_IVCS) - Study on Improved Video Coding Support
|
|
|
|
|
|
|
|
|
|
| 13.17 (FS_SS_PSS_MBMS) - Study on Surround Sound codec extension for PSS and MBMS
|
|
|
|
|
|
|
|
|
|
| 13.18 (FS_MAPIM) - Study on Multi Access PDN connectivity and IP flow Mobility
|
|
|
|
|
|
|
|
|
|
| 13.19 (FS_IPv6) - Study on IPv6 Migration
|
|
|
|
|
|
|
|
|
|
| 13.20 (FS_RAVEL) - Study on Roaming Architecture for Voice over IMS with Local Breakout SP-110761 |
TR 23.850, Version 2.0.0: Study on Roaming Architecture for Voice over IMS with Local Breakout (Release 11) for approval |
SA WG2 |
TR |
Approval |
Yes |
No |
| No |
|
| 13.21 (M3DVC) - Study on Mobile 3D Video Coding SP-110799 |
TR 26.905 Mobile stereoscopic 3D video (Release 11) version 1.0.0 |
SA WG4 |
TR |
Information |
Yes |
No |
| No |
|
| 13.22 (FS_UMONC) - Study on Usage Monitoring Control Enhancement
|
|
|
|
|
|
|
|
|
|
| 13.23 (FS_ProSe) - Study on Proximity based Services
|
|
|
|
|
|
|
|
|
|
| 13.24 (FS_iFire) - Study on IMS Firewall traversal
|
|
|
|
|
|
|
|
|
|
| 13.25 (OAM-Studies) - OAM&P Studies
|
|
|
|
|
|
|
|
|
|
| 14 Proposed New WIDs (not part of an existing feature) SP-110725 |
LS from SA WG1: Reply LS on WID for GBA extensions for re-use of SIP Digest credentials |
SA WG1 |
LS In |
Information |
Yes |
No |
Related to SA WG3 WID SP-110686 |
No |
|
| |
|
SP-110677 |
LS from SA WG3: LS on WID for GBA extensions for re-use of SIP Digest credentials |
SA WG3 |
LS In |
Information |
Yes |
No |
| No |
|
| |
|
SP-110686 |
WI proposal on GBA extensions for re-use of SIP Digest credentials |
SA WG3 |
WID |
Approval |
Yes |
No |
| No |
|
| |
|
SP-110753 |
New WID on roaming architecture for voice over IMS with Local Breakout (RAVEL) |
SA WG2 |
WID |
Approval |
Yes |
No |
See also SP-110803 |
No |
|
| |
|
SP-110803 |
New WID proposal on Charging aspects for Roaming Architecture for Voice over IMS with Local Breakout |
SA WG5 |
WID |
Approval |
Yes |
No |
See also SP-110753 |
No |
|
| |
|
SP-110750 |
1 CR to 23.228 on RAVEL (Proposed New WID) (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
No |
| No |
|
| 15 Proposed New Study Items (SIDs) SP-110819 |
Proposed WID for User plane congestion management (UPCON) |
SA WG1 |
WID |
Approval |
Yes |
No |
| No |
|
| |
|
SP-110820 |
Proposed WID on Study on RAN Sharing Enhancements |
SA WG1 |
WID |
Approval |
Yes |
No |
| No |
|
| |
|
SP-110800 |
New Study Item 'Improved Support for Dynamic Adaptive Streaming over HTTP in 3GPP' |
SA WG4 |
WID |
Approval |
Yes |
No |
| No |
|
| |
|
SP-110702 |
New WID proposal on Telecommunication Management; OAM Aspects of Network sharing |
SA WG5 |
WID |
Approval |
Yes |
No |
| No |
|
| 16 Project Management SP-110802 |
CRs to 21.900 |
MCC Specifications Manager |
CR Pack |
Approval |
Yes |
No |
| No |
|
| 16.1 Review of the work plan SP-110772 |
3GPP Work Plan review at Plenary TSG SA#54 |
MCC Work Plan Manager |
Work plan |
Presentation |
No |
No |
| No |
|
| |
|
SP-110773 |
3GPP Green activities / Energy Saving |
MCC Work Plan Manager |
Report |
Information |
Yes |
No |
| No |
|
| |
|
SP-110774 |
3GPP Releases Descriptions - Rel-10 to Rel-12 |
MCC Work Plan Manager |
OTHER |
Information |
Yes |
No |
| No |
|
| 16.2 Release contents and planning discussions
|
|
|
|
|
|
|
|
|
|
| 16.3 Specification Status
|
|
|
|
|
|
|
|
|
|
| 17 Project Support
|
|
|
|
|
|
|
|
|
|
| 17.1 Improvements to working methods SP-110776 |
Update of the 3GPP WID Template |
MCC Work Plan Manager |
OTHER |
Approval |
Yes |
No |
| No |
|
| |
|
SP-110865 |
LS to PCG on cooperation with External Bodies |
TSG SA |
LS OUT |
Approval |
No |
No |
| No |
|
| 17.2 MCC Status Report SP-110801 |
MCC Report to TSG SA#54 |
MCC Specifications Manager |
Report |
Presentation |
Yes |
No |
| No |
|
| 18 Future meeting schedule
|
|
|
|
|
|
|
|
|
|
| 19 Any Other Business
|
|
|
|
|
|
|
|
|
|
| 20 Close of Meeting
|
|
|
|
|
|
|
|
|
|
| 99 WITHDRAWN DOCUMENTS SP-110861 |
Outcome of PWS Off-line discussions |
Discussion Group |
OTHER |
Information |
No |
No |
WITHDRAWN |
Yes |
|
| |
|
SP-110826 |
SA WG5 comments on Zurich multi-SDO meeting outputs |
SA WG5 Chairman |
OTHER |
Information |
No |
No |
WITHDRAWN: Duplicate of SP-110769 |
Yes |
|
| |
|
SP-110823 |
LS from ITU-R WP5A: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON 'WIDE-AREA SENSOR AND/OR ACTUATOR NETWORK (WASN) SYSTEMS' |
ITU-R WP5A |
LS In |
Information |
No |
No |
WITHDRAWN: Duplicate of SP-110781 |
Yes |
|
| |
|
SP-110705 |
Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) |
SA WG5 |
CR Pack |
Approval |
No |
No |
WITHDRAWN |
Yes |
|
| |
|
SP-110695 |
Release 11 CRs on Lawful Interception (LI11) |
SA WG3 |
CR Pack |
Approval |
No |
No |
WITHDRAWN |
Yes |
|
| |
Created: 2011-12-14 08:36     Last document: SP-110882