Agenda with allocated Tdocs
Created: 2011-09-21 15:21     Last document: SP-110661
Agenda |
Topic |
Tdoc |
Title |
Source |
Doc-type |
Doc-for |
Avail |
Treated |
Decision |
Wdrn |
Replaced-by |
Replaces |
0 ALL AGENDA ITEMS
|
|
|
|
|
|
|
|
|
|
| 1 Opening of the Meeting
|
|
|
|
|
|
|
|
|
|
| 2 Approval of Agenda SP-110435 |
Draft agenda for TSG SA meeting #53 |
TSG SA Chairman |
Agenda |
Approval |
Yes |
Yes |
Approved |
No |
|
| 3 IPR Reminder
|
|
|
|
|
|
|
|
|
|
| 4 Reports from Previous Meetings
|
|
|
|
|
|
|
|
|
|
| 4.1 Report from TSG SA#52 SP-110436 |
Draft Report of TSG SA meeting #52 |
TSG SA Secretary |
Report |
Approval |
Yes |
Yes |
Approved |
No |
|
| 4.2 Reports from TSG SA ad-hoc meetings and workshops (Reports related to features will be covered under the feature related agenda item)
|
|
|
|
|
|
|
|
|
|
| 5 Items for early consideration (For contributions to this point, please contact chairman in advance of meeting) SP-110558 |
Progressing Rel-11 Work at TSG SA#53 |
SA WG2 Chairman |
Other |
Discussion |
Yes |
Yes |
Revised in SP-110599 |
No |
SP-110599 |
| |
|
SP-110599 |
Progressing Rel-11 Work at TSG SA#53 |
SA WG2 Chairman |
Other |
Discussion |
Yes |
Yes |
Noted |
No |
| SP-110558 |
|
|
SP-110602 |
SA WG2 Scheduling Considerations, Details |
SA WG2 Chairman |
Information |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110614 |
Results of RAN WI/SI prioritization at TSG RAN#53 |
TSG RAN Chairman |
Other |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110606 |
Outcome of Operator discussions on SA WG2 work prioritisation |
GSMA |
Discussion |
Discussion |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110615 |
Release 11 prioritization |
Deutsche Telekom, TeliaSonera, Verizon Wireless, Ericsson |
Discussion |
Discussion |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110592 |
SA WG2 prioritization |
TeliaSonera |
W/DRAW |
Discussion |
No |
No |
WITHDRAWN |
Yes |
|
| |
|
SP-110603 |
Proposed updated WID: LIPA Mobility and SIPTO at the Local Network (LIMONET) |
Verizon Wireless |
W/DRAW |
Approval |
No |
No |
WITHDRAWN |
Yes |
|
| |
|
SP-110604 |
Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) |
Verizon Wireless |
WID |
Approval |
Yes |
Yes |
It was decided to discuss this off-line and update the WID to take the other comments on BBAI Scoping into account. This was revised in SP-110619 |
No |
|
| |
|
SP-110619 |
Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) |
Huawei |
WID |
Approval |
Yes |
Yes |
The changes on changes needed to be removed, the Bratislava header removed and to add a clean version to the zip file, this was updated in SP-110647 |
No |
| SP-110604 |
|
|
SP-110647 |
Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) |
Huawei |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110619 |
|
|
SP-110440 |
LS from SA WG1: LS on MTC Group-Based Triggering |
SA WG1 |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110559 |
Prioritization of Near Term MTC Work |
KDDI, KT Corp., T-Mobile USA, Verizon, Hitachi, NEC |
Discussion |
Discussion |
Yes |
Yes |
Revised in SP-110568 |
No |
SP-110568 |
| |
|
SP-110568 |
Prioritization of Near Term MTC Work |
KDDI, KT Corp., T-Mobile USA, Hitachi, NEC |
Discussion |
Discussion |
Yes |
Yes |
Revised in SP-110616 |
No |
SP-110616 |
SP-110559 |
|
|
SP-110616 |
Prioritization of Near Term MTC Work |
KDDI, KPN, KT Corp., T-Mobile USA, Hitachi, NEC, Panasonic |
Discussion |
Discussion |
Yes |
Yes |
Noted |
No |
| SP-110568 |
|
|
SP-110571 |
Progressing SIMTC work for Rel-11 |
Intel |
Discussion |
Discussion |
Yes |
Yes |
Revised in SP-110618 |
No |
SP-110618 |
| |
|
SP-110618 |
Progressing SIMTC work for Rel-11 |
Intel |
Discussion |
Discussion |
Yes |
Yes |
Noted |
No |
| SP-110571 |
|
|
SP-110608 |
Delivering SIMTC in Release 11 |
Vodafone Group |
Discussion |
Discussion |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110620 |
Progressing SIMTC for Release 11 |
Intel, Vodafone Group |
Discussion |
Discussion |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110621 |
Release 11 prioritization update |
Drafting Group |
Discussion |
Discussion |
Yes |
Yes |
Revised in SP-110624 |
No |
SP-110624 |
| |
|
SP-110624 |
Release 11 prioritization update |
Drafting Group |
Discussion |
Discussion |
Yes |
Yes |
Noted |
No |
| SP-110621 |
|
|
SP-110625 |
Release 11 prioritization - output from Operator lunch time session |
Drafting Group |
Discussion |
Discussion |
Yes |
Yes |
Noted. Option 1 with MTCsp and MTCsms interfaces were endorsed |
No |
|
| |
|
SP-110643 |
DRAFT LS on Release 11 Features |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Vodafone commented that the action to TSG GERAN TSG RAN and RAN WG2 should explicitly mention TSG GERAN and TSG RAN in the text. AT&T asked whether it was necessary to add an action to SA WG1 to remove some requirements from the Release. The TSG SA Chair |
No |
|
| |
|
SP-110655 |
DRAFT LS on Release 11 Features |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised in SP-110656 |
No |
SP-110656 |
SP-110643 |
|
|
SP-110656 |
DRAFT LS on Release 11 Features |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised in SP-110657 |
No |
SP-110657 |
SP-110655 |
|
|
SP-110657 |
LS on Release 11 Features |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110656 |
|
|
SP-110623 |
Scheduling picture |
SA WG1 Chairman |
Discussion |
Presentation |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110597 |
On LTE for public safety |
Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular |
Discussion |
Discussion |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110607 |
LS from TETRA Association: Device to Device Service |
TETRA Association |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110639 |
[DRAFT] LS on Study item relevant for public safety - direct mode |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
This was revised off-line to indicate that TSG SA would like to continue the dialog with the TETRA Association regarding use-cases and scenarios on the use of LTE with respect to the scope of the study, in SP-110648 |
No |
|
| |
|
SP-110648 |
LS on Study item relevant for public safety - direct mode |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110639 |
|
|
SP-110590 |
WID on Proposal for a study on Proximity-based Services |
SA WG1 |
WID |
Approval |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110598 |
Updates to the SA WG1 study WID 'Study on Proximity-based Services' |
Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular |
WID |
Approval |
Yes |
Yes |
Revised in SP-110628 |
No |
SP-110628 |
| |
|
SP-110628 |
Updates to the SA WG1 study WID 'Study on Proximity-based Services' |
Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular |
WID |
Approval |
Yes |
Yes |
Vodafone commented it that should also be added, before bullet 5, that this is under network control. It was asked how this could be done if there is no network coverage. Vodafone clarified that it need not be under continuous coverage. Telecom Italia ad |
No |
| SP-110598 |
|
|
SP-110633 |
Updates to the SA WG1 study WID 'Study on Proximity-based Services' |
Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular |
WID |
Approval |
Yes |
Yes |
The WID needed to be updated again to remove revision marks, which was provided in SP-110638 |
No |
| SP-110628 |
|
|
SP-110638 |
Updates to the SA WG1 study WID 'Study on Proximity-based Services' |
Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110633 |
5.1 Challenges to working agreements (must have been previously requested)
|
|
|
|
|
|
|
|
|
|
| 6 Incoming Liaisons (Liaisons related to features will be covered under the feature related agenda item) SP-110437 |
LS from ITU-R Study Groups: REVISION OF RECOMMENDATION ITU-R M.1224 |
ITU-R Study Groups |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110439 |
LS from ITU-R Study Groups: INVITATION TO REVIEW REPORT ITU-R M.2014-1 |
ITU-R Study Groups |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110561 |
LS from ITU-R Study Groups: LS on 'WIDE-AREA SENSOR AND/OR ACTUATOR NETWORK (WASN) SYSTEMS' |
ITU-R Study Groups |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110562 |
LS from ITU-R Study Groups: LS on 'QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVES FOR WIRELESS ACCESS SYSTEMS' |
ITU-R Study Groups |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110438 |
LS from GSMA Embedded SIM Task Force: Response to LS on Clarification to eUICC uses cases and Requirements ref: S1-111298 |
GSMA Embedded SIM Task Force |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110446 |
LS from ETSI ISG AFI: Liaison statement to 3GPP |
ETSI ISG AFI |
LS In |
Information |
Yes |
Yes |
Noted. Forwarded to SA WG5 |
No |
|
| |
|
SP-110513 |
LS from TSG GERAN: LS on Service Identification for RRC Improvements in GERAN |
TSG GERAN |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| 7 Report from SA Working Groups
|
|
|
|
|
|
|
|
|
|
| 7.1 SA WG1 Report and Questions for Advice SP-110572 |
Status Report from SA WG1 to TSG SA#53 |
SA WG1 Chairman |
Report |
Presentation |
Yes |
Yes |
Revised in SP-110622 |
No |
SP-110622 |
| |
|
SP-110622 |
Status Report from SA WG1 to TSG SA#53 |
SA WG1 Chairman |
Report |
Presentation |
Yes |
Yes |
Noted |
No |
| SP-110572 |
7.2 SA WG2 Report and Questions for Advice SP-110453 |
SA WG2 Chairman's Report to TSG SA#53 |
SA WG2 Chairman |
Report |
Presentation |
Yes |
Yes |
Noted |
No |
|
| 7.3 SA WG3 Report and Questions for Advice SP-110497 |
SA WG3 Status Report |
SA WG3 Chairman |
Report |
Presentation |
Yes |
Yes |
Revised in SP-110601 |
No |
SP-110601 |
| |
|
SP-110601 |
SA WG3 Status Report |
SA WG3 Chairman |
Report |
Presentation |
Yes |
Yes |
Noted |
No |
| SP-110497 |
7.4 SA WG4 Report and Questions for Advice SP-110543 |
SA WG4 Status Report at TSG SA#53 |
SA WG4 Chairman |
Report |
Information |
Yes |
Yes |
Noted |
No |
|
| 7.5 SA WG5 Report and Questions for Advice SP-110515 |
SA WG5 Status Report |
SA WG5 Chairman |
Report |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110560 |
Outputs of July 2011 multi-SDO workshop on Converged Management of Fixed/Mobile Networks |
SA WG5 Chairman |
Report |
Presentation |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110570 |
Terms of Reference of Multi SDO Project on Fixed Mobile Convergence Network Management |
SA WG5 Chairman |
ToR |
Discussion |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110491 |
LS from SA WG5: Reply LS to NGMN NGCOR on Project NGCOR Update |
SA WG5 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| 8 Documents related to Rel-8 or Earlier Features
|
|
|
|
|
|
|
|
|
|
| 8.1 R99 CRs (Need to be very well justified!)
|
|
|
|
|
|
|
|
|
|
| 8.2 Rel-4 CRs (Need to be very well justified!)
|
|
|
|
|
|
|
|
|
|
| 8.3 Rel-5 CRs (Need to be very well justified!)
|
|
|
|
|
|
|
|
|
|
| 8.4 Rel-6 CRs (Need to be very well justified!)
|
|
|
|
|
|
|
|
|
|
| 8.5 Rel-7 CRs (Need to be very well justified!) SP-110544 |
CRs to TS 26.114 on 'Resolving reference to IETF Internet Draft (MTSI-MHI)' (Release 7 and Release 8) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110523 |
Rel-7 CRs on OAM Maintenance and small Enhancements (OAM7) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 8.6 Rel-8 CRs (Need to be very well justified!) SP-110454 |
3 CRs to 23.060 on SAES (Rel-8, Rel-9, Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110545 |
CRs to TS 26.114 on 'Clarification on SDP negotiation for video (MTSI-eMHI)' (Release 8 until Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110546 |
CRs to TS 26.114 on 'Correction of the reference to the 'a=imageattr' attribute' (MTSI-eMHI-DRASIS)' (Release 8 until Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110547 |
CRs to TS 26.237 on 'Resolving IETF dependencies (IMS_PSS_MBMS_US)' (Release 8 until Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110524 |
Rel-8 CRs on OAM Maintenance and small Enhancements (OAM8) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110528 |
Rel-8 CRs on Charging Management (CH8) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110533 |
Rel-8 CRs on 3G Home NodeB OAM&P Type 1 Management Interface (HNB-3G_OAM) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9 Documents Related to Rel-9 Features
|
|
|
|
|
|
|
|
|
|
| 9.1 (CRS) - Customized Ringing Signal
|
|
|
|
|
|
|
|
|
|
| 9.2 (eCAT) - Enhancements of IMS Customized Alerting Tone (CAT)
|
|
|
|
|
|
|
|
|
|
| 9.3 (EHNB) - Enhanced Home NodeB / eNodeB SP-110532 |
Rel-9 CRs on 3G HNB and LTE HeNB OAM&P Type 1 Interface (HNB_eHNB-OAM_Type1) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.4 (eMMTel) - Multi-Media Telephony Service enhancements
|
|
|
|
|
|
|
|
|
|
| 9.5 (ePRIOR) - Enhancements to Multimedia Priority Service
|
|
|
|
|
|
|
|
|
|
| 9.6 (EUI) - End User Identity
|
|
|
|
|
|
|
|
|
|
| 9.7 (PAN-EPNM) - Support of Personal Area Networks and Enhancements
|
|
|
|
|
|
|
|
|
|
| 9.8 (PWS) - Public Warning System SP-110445 |
LS from ITU-T Study Group 2: Harmonization of MIs and SCs for civic alerting purposes |
ITU-T Study Group 2 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| 9.9 (ServAl) - Services Alignment and Migration
|
|
|
|
|
|
|
|
|
|
| 9.10 (SSAC) - Service Specific Access Control in EPS
|
|
|
|
|
|
|
|
|
|
| 9.11 (UDC) - User Data Convergence
|
|
|
|
|
|
|
|
|
|
| 9.12 (VAS4SMS) - Value Added Services for Short Message Service
|
|
|
|
|
|
|
|
|
|
| 9.13 (eANDSF) - Access Network Discovery and Selection Enhancement
|
|
|
|
|
|
|
|
|
|
| 9.14 (IMS_EMER_GPRS_EPS) - Support for IMS Emergency Calls over GPRS and EPS SP-110455 |
3 CRs to 23.167 on IMS_EMER_GPRS_EPS (Rel-9, Rel-10, Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.15 (IMS_SCC) - IMS Services Centralization and Continuity
|
|
|
|
|
|
|
|
|
|
| 9.16 (LCS_LTE_EPS) - LCS Control Plane Solution for EPS
|
|
|
|
|
|
|
|
|
|
| 9.17 (LTEimp-Vocoder) - System aspects of vocoder rate adaptation for LTE
|
|
|
|
|
|
|
|
|
|
| 9.18 (MBMS_EPS) - MBMS support in EPS
|
|
|
|
|
|
|
|
|
|
| 9.19 (MUPSAP) - Multiple PDN Connection to the Same APN for PMIP-based Interfaces
|
|
|
|
|
|
|
|
|
|
| 9.20 (A5/4-GEA4) - 128 bit encryption for GSM and GPRS
|
|
|
|
|
|
|
|
|
|
| 9.21 (ACCSEC2) - Access Security Enhancements
|
|
|
|
|
|
|
|
|
|
| 9.22 (eGBAPush) - GBAPush enhancements
|
|
|
|
|
|
|
|
|
|
| 9.23 (GBA-IdM) - Extended Identity Management
|
|
|
|
|
|
|
|
|
|
| 9.24 (MEDIASEC) - IMS Media Plane Security (Stage 2)
|
|
|
|
|
|
|
|
|
|
| 9.25 (NDS_Backhaul) - Network Domain Security (NDS) enhancements to support backhaul security
|
|
|
|
|
|
|
|
|
|
| 9.26 (PUCI) - Protection against Unsolicited Communications for IMS
|
|
|
|
|
|
|
|
|
|
| 9.27 (DTMR) - Distortion Measurement Test Methods and Requirements
|
|
|
|
|
|
|
|
|
|
| 9.28 (IMS_PSS_MBMS_US_EXT) - IMS based PSS and MBMS User Service extensions
|
|
|
|
|
|
|
|
|
|
| 9.29 (M3A) - Managing MTSI Media Adaptation
|
|
|
|
|
|
|
|
|
|
| 9.30 (PMA) - PSS and MBMS Aspects
|
|
|
|
|
|
|
|
|
|
| 9.31 (SFR) - Syndicated Feed Reception within 3GPP environments
|
|
|
|
|
|
|
|
|
|
| 9.32 (TG) - Timed Graphics
|
|
|
|
|
|
|
|
|
|
| 9.33 (CH9) - Charging Management small Enhancements Rel-9 SP-110529 |
Rel-9 CRs on Charging Management (CH9) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.34 (OAM9) - OAM&P Rel-9 SP-110525 |
Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.35 (TEI9) - TEI Rel-9 SP-110456 |
12 CRs to 23.002, 23.272, 23.060, 23.401 and 23.402 on TEI9 (Rel-9, Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110509 |
Release 9 CRs on Security small Enhancements (TEI9) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110548 |
CRs to TS 26.090 on 'Correction of equation for pitch sharpening (TEI9)' (Release 9 and Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 9.36 Any other Rel-9 Documents
|
|
|
|
|
|
|
|
|
|
| 10 Documents Related to Rel-10 Features
|
|
|
|
|
|
|
|
|
|
| 10.1 (CCNL) - Completion of Communications on Not Logged-in
|
|
|
|
|
|
|
|
|
|
| 10.2 (CPM-SMS) - IP-Short-Message-Gateway enhancements for CPM-SMS Interworking
|
|
|
|
|
|
|
|
|
|
| 10.3 (EHNBF) - H(e)NB enhancements
|
|
|
|
|
|
|
|
|
|
| 10.4 (UDC_DM) - User Data Convergence - Data Model SP-110541 |
Rel-11 CRs on Charging for Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Data Bases (PEST-CH) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.5 (ECSRA_LAA) - Enabling Coder Selection and Rate Adaptation for UTRAN and E-UTRAN for Load Adaptive Applications
|
|
|
|
|
|
|
|
|
|
| 10.6 (eMPS) - Enhancements for Multimedia Priority Service
|
|
|
|
|
|
|
|
|
|
| 10.7 (IESE) - IMS Emergency Session Enhancements
|
|
|
|
|
|
|
|
|
|
| 10.8 (IFOM) - IP Flow Mobility and seamless WLAN offload
|
|
|
|
|
|
|
|
|
|
| 10.9 (IMS_SC_eIDT) - IMS Service Continuity - Inter Device Transfer enhancements
|
|
|
|
|
|
|
|
|
|
| 10.10 (LIPA_SIPTO) - Local IP Access and Selected Internet IP Traffic Offload SP-110573 |
Stage 1 CRs on Local IP Access and Selected Internet IP Traffic Offload (LIPA_SIPTO) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.11 (MAPCON) - Multi Access PDN Connectivity (Stage 2)
|
|
|
|
|
|
|
|
|
|
| 10.12 (NIMTC) - Network Improvements for Machine-type Communication SP-110458 |
7 CRs to 23.060 and 23.401 on NIMTC (Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.13 (OMR) - Optimal Media Routeing
|
|
|
|
|
|
|
|
|
|
| 10.14 (PEST) - Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases
|
|
|
|
|
|
|
|
|
|
| 10.15 (SMOG) - S2b Mobility Based on GTP
|
|
|
|
|
|
|
|
|
|
| 10.16 (LI10) - Lawful Interception in the 3GPP Rel-10 SP-110510 |
Release 10 CRs on Lawful Interception (LI10) |
SA WG3 |
W/DRAW |
Approval |
No |
No |
WITHDRAWN |
Yes |
|
| 10.17 (EAAT) - Enhancements and Addition of Audio Tests to 26.131 and 26.132 SP-110549 |
CRs to TS 26.131 and TS.26.132 on 'Enhancements and Addition of Audio Tests to 26.131 and 26.132 (EAAT)' (Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.18 (HTTP_SDS) - HTTP-based Streaming and Download Services
|
|
|
|
|
|
|
|
|
|
| 10.19 (MBS_Enh) - PSS and MBMS enhancements SP-110550 |
CRs to TS 26.234 and TS.26.346 on 'PSS and MBMS enhancements (MBS_enh)' (Release 10) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.20 (OPT_IMS_PSS_MBMS_US) - Optimization of IMS based PSS and MBMS User Service
|
|
|
|
|
|
|
|
|
|
| 10.21 (LTE_Relay) – Relays for LTE, including security aspects SP-110505 |
Release 10 CRs to 33.401 on Relay Node Security |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.22 (eAoC) - Advice of Charge (AoC) service support enhancements
|
|
|
|
|
|
|
|
|
|
| 10.23 (CH10) - Charging Management small Enhancements SP-110444 |
LS from CT WG1: Reply LS on IMS Application Reference Identifier(IARI) consideration for Charging |
CT WG1 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110530 |
Rel-10 CRs on Charging Management (CH10) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110516 |
30.820 Telecommunication management; Project scheduling and open issues for SA WG5, Release 10 |
SA WG5 |
TR |
Information / Approval |
Yes |
Yes |
Approved |
No |
|
| 10.24 (OAM10) - OAM&P Rel-10 SP-110526 |
Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110534 |
Rel-10 CRs on Alarm Correlation and Root Cause Analysis (OAM-AC-RCA) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110537 |
Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110539 |
Rel-10 CRs on IRP Solution Set specification organisation improvements (OAM-IRP-SS) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110540 |
Rel-11 CRs on UTRAN Self-Organizing Networks (SON) management (OAM-SON-UTRAN) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.25 (TEI10) - TEI Rel-10 SP-110486 |
LS from CT WG4: LS on authentication signalling with external networks over S2b |
CT WG4 |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110574 |
Stage 1 CRs on TEI Rel-10 (TEI10) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved. A Liaison Statement to CT WG1 was drafted in SP-110626. |
No |
|
| |
|
SP-110626 |
LS on Korean Public Alert System in LTE |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Revised in SP-110650 |
No |
SP-110650 |
| |
|
SP-110650 |
LS on Korean Public Alert System in LTE |
TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110626 |
|
|
SP-110459 |
6 CRs to 23.060 and 23.401 on TEI10 (Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110460 |
5 CRs to 23.002, 23.060 and 23.401 on TEI10 (Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110461 |
10 CRs to 23.228 and 23.237 on TEI10 (Rel-10, Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110506 |
Release 10 CR to 33.310 on CMPv2 profile (TEI10) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Revised in SP-110627 |
No |
SP-110627 |
| |
|
SP-110627 |
Release 10 CR to 33.310 on CMPv2 profile (TEI10) |
TSG SA |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110506 |
|
|
SP-110508 |
Release 10 CRs on Security small Enhancements (TEI10) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Revised in SP-110564 |
No |
SP-110564 |
| |
|
SP-110564 |
Release 10 CRs on Security small Enhancements (TEI10) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110508 |
|
|
SP-110551 |
CRs to TS 26.114 on 'Correction of functional requirements for jitter buffer management (TEI10, MTSI-MHI)' (Release 10 and Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110552 |
CRs to TS 26.114 on 'Signalling applicable AMR/AMR-WB mode set in SDP answer (TEI10)' (Release 10 and Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 10.26 Any other Rel-10 Documents SP-110443 |
LS from CT WG1: Reply LS on Equivalent PLMN identities and MDT |
CT WG1 |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110448 |
LS from SA WG2: Reply LS to Reply LS on Network Sharing |
SA WG2 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110449 |
LS from SA WG3: Reply LS on MDT privacy and roaming |
SA WG3 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110485 |
LS from RAN WG2: LS on Applicability of ePLMN to MDT |
RAN WG2 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110487 |
LS from RAN WG3: Response LS on Equivalent PLMN identities and MDT |
RAN WG3 |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110490 |
LS from SA WG5: Reply LS to LS on Equivalent PLMN identities and MDT |
SA WG5 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110553 |
CR to TS 26.114 on ' Video Codec Enhancement to MTSI (VCEM)' (Release 10 and Release 11) |
SA WG4 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11 Documents Related to Rel-11 or later Features
|
|
|
|
|
|
|
|
|
|
| 11.1 (IPXS) - Advanced IP Interconnection of Services SP-110465 |
3 CRs to 23.228 on IPXS (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.2 (MOSAP) - Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers SP-110575 |
Stage 1 CRs on Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers (MOSAP) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.3 (NOVES) - Non Voice Emergency Services SP-110474 |
New Building Block WID: Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Proposed revision provided in SP-110482. This was noted and the revised version considered. |
No |
|
| |
|
SP-110482 |
Proposed New Building Block WID on 'Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN |
Alcatel-Lucent |
WID |
Approval |
Yes |
Yes |
Based on agreements for Stage 2 prioritisation, this WID needed to be updated to remove the TR phase. This was revised in SP-110644 |
No |
| SP-110474 |
|
|
SP-110644 |
Proposed New Building Block WID on 'Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN |
Alcatel-Lucent |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110482 |
|
|
SP-110576 |
Stage 1 CRs on Non Voice Emergency Services (NOVES) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110577 |
Stage 1 CRs on Study on Non Voice Emergency Services (FS_NOVES) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.4 (QoS_SSL) - QoS Control Based on Subscriber Spending Limits SP-110466 |
1 CR to 23.203 on QoS_SSL (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110488 |
LS from SA WG5: Reply LS to C3-111217 on the work split between SA WG5 and CT WG3 for QoS Control Based on Subscriber Spending Limits (Rel-11 QoS_SSL) |
SA WG5 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110489 |
LS from SA WG5: Reply LS on CT WG3 aspect of QoS Control Based on Subscriber Spending Limits |
SA WG5 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110519 |
Revised WID on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) |
SA WG5 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110542 |
Rel-11 CRs on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.5 (SIMTC) - System Improvements to Machine-Type Communications SP-110447 |
LS from ETSI TC M2M: Reply to SA WG3 on potential co-operation between 3GPP work on MTC security and ETSI M2M |
ETSI TC M2M |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110578 |
Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
22.368 CR0096R2, 22.368 CR0098R2, 22.368 CR0095R3, 22.368 CR0099R3, 22.101 CR0383R2, 22.368 CR0103R2, 22.368 CR0108R1 Approved. Other CRs revised in SP-110629 |
No |
|
| |
|
SP-110629 |
Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) |
TSG SA |
CR Pack |
Approval |
Yes |
Yes |
Morpho Cards GmbH commented that the note in 22.101 CR0384R3 needed clarification that the configuration 'are mainly based on SMS'. The CR Pack was revised in SP-110651 |
No |
| SP-110578 |
|
|
SP-110651 |
Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) |
TSG SA |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110629 |
|
|
SP-110499 |
WI proposed revision on System Improvements for Machine Type Communication |
SA WG3 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110495 |
Standardization of Machine-type Communications |
MCC Work Plan Manager |
Report |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.6 (SIPTO_SC) - SIPTO Service Continuity of IP Data Session SP-110579 |
Stage 1 CRs on SIPTO Service Continuity of IP Data Session (SIPTO_SC) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.7 (LIMONET) - LIPA Mobility and SIPTO at the Local Network
|
|
|
|
|
|
|
|
|
|
| 11.8 (BBAI) - Support BroadBand Forum (BBF) Accesses Interworking SP-110450 |
LS from the Broadband Forum: WT-134 'Broadband Policy Control Framework (PCF)' |
Broadband Forum |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110451 |
LS from the Broadband Forum: WT-203 'Interworking between Next Generation Fixed and 3GPP Wireless Access' |
Broadband Forum |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110442 |
LS from the Broadband Forum: LS on QoS requirement for SIPTO traffic to 3GPP |
Broadband Forum |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110463 |
5 CRs to 23.203 on BBAI (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
23.203 CR0552R3; 23.203 CR0553R2 and 23.203 CR0575R3 were approved |
No |
|
| |
|
SP-110630 |
1 CR to 23.203 on BBAI (Rel-11) |
TSG SA |
CR Pack |
Approval |
Yes |
Yes |
Revised in SP-110652 |
No |
SP-110652 |
| |
|
SP-110652 |
1 CR to 23.203 on BBAI (Rel-11) |
TSG SA |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110630 |
|
|
SP-110479 |
TS 23.139: 3GPP System-Fixed Broadband Access Network Interworking; Stage 2 |
SA WG2 |
TS |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110600 |
Draft Agenda for the 3GPP BBF Workshop 09-10 Nov 2011, San Francisco, USA |
Co-chair of 3GPP-BBF workshop (Balazs Bertenyi). |
Agenda |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.9 (eMPS_SRVCC) - SRVCC aspect of enhancements for Multimedia Priority Service SP-110464 |
2 CRs to 23.216 and 23.237 on eMPS_SRVCC (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.10 (USSI) - Unstructured Supplementary Service Data (USSD) simulation service in IMS
|
|
|
|
|
|
|
|
|
|
| 11.11 (NWK-PL2IMS) - Network Provided Location Information for IMS SP-110471 |
Updated WID: Network Provided Location Information for IMS (NWK-PL2IMS) |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Alcatel-Lucent and NEC asked to be added as supporting companies. The WID was revised in SP-110631 |
No |
|
| |
|
SP-110631 |
Updated WID: Network Provided Location Information for IMS (NWK-PL2IMS) |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110471 |
|
|
SP-110478 |
TR 23.842: Study on Network Provided Location Information to the IMS |
SA WG2 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 11.12 (OSCAR) - Optimized Service Charging and Allocation of Resources in IMS whilst Roaming
|
|
|
|
|
|
|
|
|
|
| 11.13 (SAPP) - Service Awareness and Privacy Policies SP-110467 |
6 CRs to 23.203 on SAPP (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
23.203 CR0555R3 was revised in SP-110649 and the remaining CRs in this pack were approved. |
No |
|
| |
|
SP-110649 |
Revised CR: 23.203 CR0555R4 |
TSG SA |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.14 (VCSG) - VPLMN Autonomous CSG Roaming SP-110468 |
1 CR to 23.002 on VCSG (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.15 (vSRVCC) - Single Radio Video Call Continuity for 3G-CS
|
|
|
|
|
|
|
|
|
|
| 11.16 (EEA3_EIA3) - EEA3 and EIA3 (new Encryption & Integrity EPS security algorithms) SP-110591 |
LS from ETSI SAGE: 128-EEA3 and 128-EIA3 design and evaluation report |
ETSI SAGE |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110500 |
35.221 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 1: EEA3 and EIA3 specifications |
SA WG3 |
TS |
Approval |
Yes |
Yes |
Revised in SP-110565 |
No |
SP-110565 |
| |
|
SP-110565 |
35.221 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 1: EEA3 and EIA3 specifications |
SA WG3 |
TS |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110500 |
|
|
SP-110501 |
35.222 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 2: ZUC specification |
SA WG3 |
TS |
Approval |
Yes |
Yes |
Revised in SP-110569 |
No |
SP-110569 |
| |
|
SP-110569 |
35.222 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 2: ZUC specification |
SA WG3 |
TS |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110501 |
|
|
SP-110502 |
35.223 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 3: Implementors' test data |
SA WG3 |
TS |
Approval |
Yes |
Yes |
Revised in SP-110566 |
No |
SP-110566 |
| |
|
SP-110566 |
35.223 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 3: Implementors' test data |
SA WG3 |
TS |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110502 |
|
|
SP-110504 |
Release 11 CR to 33.401 on EEA3 and EIA3 (new Encryption & Integrity EPS security Algorithms) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110503 |
35.924 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 4: Design and Evaluation Report |
SA WG3 |
W/DRAW |
Information |
No |
No |
WITHDRAWN. See LS in SP-110591 |
Yes |
|
| 11.17 (SPUCI) - Specification of Protection against Unsolicited Communication for IMS
|
|
|
|
|
|
|
|
|
|
| 11.18 (EVS-codec) - Codec for Enhanced Voice Services
|
|
|
|
|
|
|
|
|
|
| 11.19 (VINE) - Support for 3GPP Voice Interworking with Enterprise IP-PBX SP-110580 |
Stage 1 CRs on Support for 3GPP Voice Interworking with Enterprise IP-PBX (VINE) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Morpho Cards GmbH reported some problems and this CR Pack was revised in SP-110632 |
No |
|
| |
|
SP-110632 |
Stage 1 CRs on Support for 3GPP Voice Interworking with Enterprise IP-PBX (VINE) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110580 |
11.20 (DIDA) - Data Identification in ANDSF
|
|
|
|
|
|
|
|
|
|
| 11.21 (OPIIS) - Operator Policies for IP Interface Selection
|
|
|
|
|
|
|
|
|
|
| 11.22 (LOBSTER) - Location-Based Selection of gateways for WLAN SP-110462 |
1 CR to 23.402 on LOBSTER (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.23 (HENB_SEC) - H(e)NB security features for UE mobility scenarios
|
|
|
|
|
|
|
|
|
|
| 11.24 (PWS_SEC) - Security aspects of Public Warning System
|
|
|
|
|
|
|
|
|
|
| 11.25 (ACR_CS) - Anonymous Call Rejection in the CS domain
|
|
|
|
|
|
|
|
|
|
| 11.26 (INIPUI) - IMS Network-Independent Public User Identities (including FS_INIPUI) SP-110581 |
Stage 1 CRs on IMS Network-Independent Public User Identities (INIPUI) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110527 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Revised in SP-110634 |
No |
SP-110634 |
| |
|
SP-110634 |
Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) |
TSG SA |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110527 |
|
|
SP-110535 |
Rel-11 CRs on CN performance measurements enhancement (OAM-ePM-CN) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
RIM commented that 32.426 CR0041 introduces new clauses with 'hanging paragraphs'. SA WG5 were asked to correct this. These CRs were then approved. |
No |
|
| |
|
SP-110536 |
Rel-11 CRs on IMS Performance Measurement enhancements (OAM-ePM-IMS) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110538 |
Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.27 (FULL-MOCN-GERAN) - Full Support of Multi-Operator Core Network by GERAN SP-110441 |
LS from SA WG2: LS on the introduction of FULL_MOCN-GERAN feature |
SA WG2 |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110483 |
LS from CT WG1: Reply LS on the introduction of FULL-MOCN-GERAN feature |
CT WG1 |
LS In |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110512 |
LS from TSG GERAN: Reply LS on the introduction of FULL-MOCN-GERAN feature |
TSG GERAN |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110635 |
[DRAFT] Reply LS on the introduction of FULL-MOCN-GERAN feature |
Renesas Mobile Europe Ltd. [3GPP TSG SA] |
LS OUT |
Approval |
Yes |
Yes |
After some discussion, no agreement could be reached on the deployment issues of making this mandatory or optional and the issue was postponed to the next meeting. This was then noted. |
No |
|
| |
|
SP-110457 |
1 CR to 23.251 on Full_MOCN-GERAN (Rel-10) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.28 (SMSMI) - SMS submit and delivery without MSISDN in IMS SP-110470 |
Updated WID: SMS submit and delivery without MSISDN in IMS (SMSMI) |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.29 (Ext_ATS) - Extensions of Acoustic Test Specifications in TS 26.131 and TS 26.132
|
|
|
|
|
|
|
|
|
|
| 11.30 (Web_GBA) - Security enhancements for usage of GBA from the browser
|
|
|
|
|
|
|
|
|
|
| 11.31 (LI11) - Lawful Interception in Release 11 SP-110511 |
Release 11 CRs on Lawful Interception (LI11) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.32 (CH11) - Charging Management small Enhancements Rel-11 SP-110531 |
Rel-11 CRs on Charging Management small Enhancements (CH11) |
SA WG5 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| 11.33 (OAM11) - OAM&P Rel-11 SP-110518 |
Revised WID on UTRAN Self-Organizing Networks (SON) management |
SA WG5 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110520 |
New WID proposal on Carrier Aggregation management |
SA WG5 |
WID |
Approval |
Yes |
Yes |
NEC asked to be added as a supporting company. The WID was revised in SP-110636 |
No |
|
| |
|
SP-110636 |
New WID proposal on Carrier Aggregation management |
TSG SA |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110520 |
|
|
SP-110521 |
New WID proposal on 3GPP and WLAN interworking Network Management |
SA WG5 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110522 |
New WID proposal on LTE SON coordination management |
SA WG5 |
WID |
Approval |
Yes |
Yes |
NEC asked to be added as a supporting company. The WID was revised in SP-110637 |
No |
|
| |
|
SP-110637 |
New WID proposal on LTE SON coordination management |
TSG SA |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110522 |
11.34 (TEI11) - TEI Rel-11 SP-110582 |
Stage 1 CRs on TEI Rel-11 (TEI11) |
SA WG1 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110469 |
3 CRs to 23.167, 23.204 and 23.228 on TEI11 (Rel-11) |
SA WG2 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110484 |
LS from CT WG1: LS on modification of security context storage rate on the UICC |
CT WG1 |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110514 |
LS from RAN WG2: Reply LS on modification of security context storage rate on the UICC |
RAN WG2 |
LS In |
Action |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110507 |
Release 11 CRs on Security small Enhancements (Sec11) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Revised in SP-110563 |
No |
SP-110563 |
| |
|
SP-110563 |
Release 11 CRs on Security small Enhancements (Sec11) |
SA WG3 |
CR Pack |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110507 |
11.35 Any other Rel-11 Documents
|
|
|
|
|
|
|
|
|
|
| 12 Documents related to current Study Items
|
|
|
|
|
|
|
|
|
|
| 12.1 (FS_AMTC) - Study on Alternatives to E.164 for Machine-Type Communications SP-110584 |
TR 22.988 V1.0.0 on Study on Alternatives to E.164 for Machine-Type Communications (Release 10) |
SA WG1 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 12.2 (FS_CSN) - Study on Continuity of Data Sessions to Local Networks SP-110585 |
TR 22.896 V1.0.0 on Study on Continuity of Data Sessions to Local Networks |
SA WG1 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 12.3 (FS_IMS_P2P) - Study on IMS based Peer-to-Peer Content Distribution Services
|
|
|
|
|
|
|
|
|
|
| 12.4 PLEASE USE 11.26: (FS_INIPUI) - Study on IMS Network-Independent Public User Identities
|
|
|
|
|
|
|
|
|
|
| 12.5 (FS_MODAI) - Study on Non-MTC Mobile Data Applications impacts SP-110586 |
TR 22.801 V1.0.0 on Study on non-MTC Mobile Data Applications impacts |
SA WG1 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 12.6 (FS_MTCe) - Study on enhancements for Machine-Type Communications (MTC)
|
|
|
|
|
|
|
|
|
|
| 12.7 (FS_U2e) - Study on UICC/USIM enhancements
|
|
|
|
|
|
|
|
|
|
| 12.8 (FS_CNO) - Study on Core Network Overload solutions SP-110473 |
Updated Study WID: Study on Core Network Overload solutions (FS_CNO) |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Noted. Proposed revision provided in SP-110496 |
No |
|
| |
|
SP-110496 |
Revision for Study on Core Network Overload Solutions |
Huawei, Hisilicon |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110473 |
12.9 (FS_eIMS) - Study on IMS Evolution
|
|
|
|
|
|
|
|
|
|
| 12.10 (FS_PP) - Study on Policy solutions and enhancements
|
|
|
|
|
|
|
|
|
|
| 12.11 (FS_eMEDIASEC) - Study on Extended IMS Media Plane Security features
|
|
|
|
|
|
|
|
|
|
| 12.12 (FS_SEEE) - Study on System Enhancements for Energy Efficiency
|
|
|
|
|
|
|
|
|
|
| 12.13 (FS_SSO_Int) - Study on Integration of Single Sign-On (SSO) frameworks with 3GPP networks SP-110587 |
TR 22.895 V1.0.0 on Study on Service aspects of integration of Single Sign-On (SSO) frameworks with 3GPP operator-controlled resources and mechanisms |
SA WG1 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 12.14 (FS_SSO_APS) - Study on Single Sign On (SSO) Application Security for IMS - based on SIP Digest
|
|
|
|
|
|
|
|
|
|
| 12.15 (FS_UKM) - Study on UTRAN key management enhancements
|
|
|
|
|
|
|
|
|
|
| 12.16 (FS_IVCS) - Study on Improved Video Coding Support
|
|
|
|
|
|
|
|
|
|
| 12.17 (FS_SS_PSS_MBMS) - Study on Surround Sound codec extension for PSS and MBMS
|
|
|
|
|
|
|
|
|
|
| 12.18 (FS_MAPIM) - Study on Multi Access PDN connectivity and IP flow Mobility SP-110472 |
Updated Study WID: Study on Multi Access PDN connectivity and IP flow Mobility (FS_MAPIM) |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Noted. Proposed revision provided in SP-110452 |
No |
|
| |
|
SP-110452 |
Update SID for FS_MAPIM (Multi Access PDN connectivity and IP flow mobility) |
ZTE |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| 12.19 (FS_IPv6) - Study on IPv6 Migration
|
|
|
|
|
|
|
|
|
|
| 12.20 (FS_rSRVCC) - Study on SR Voice Call Continuity from UTRAN/GERAN to E-UTRAN/HSPA SP-110477 |
TR 23.885: Feasibility Study of Single Radio Voice Call Continuity (SRVCC) from UTRAN/GERAN to E-UTRAN/HSPA; Stage 2 |
SA WG2 |
TR |
Approval |
Yes |
Yes |
Approved |
No |
|
| 12.21 (FS_SaMOG) - Study on S2a Mobility based On GTP and WLAN access to EPC
|
|
|
|
|
|
|
|
|
|
| 12.22 (FS_RAVEL) - Study on Roaming Architecture for Voice over IMS with Local Breakout SP-110480 |
TR 23.850: Study on Roaming Architecture for Voice over IMS with Local Breakout |
SA WG2 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 12.23 (M3DVC) - Study on Mobile 3D Video Coding
|
|
|
|
|
|
|
|
|
|
| 12.24 (FS_UMONC) - Study on Usage Monitoring Control Enhancement SP-110481 |
Updated SID for FS_UMONC (Study on Usage monitoring control enhancement) |
ZTE |
WID |
Approval |
Yes |
Yes |
Revised in SP-110617 |
No |
SP-110617 |
| |
|
SP-110617 |
Updated SID for FS_UMONC (Study on Usage monitoring control enhancement) |
ZTE, China Telecom, Allot |
W/DRAW |
Approval |
No |
No |
This was withdrawn |
Yes |
| SP-110481 |
12.25 (OAM-Studies) - OAM&P Studies SP-110517 |
32.834 Study on OAM aspects of Inter-RAT Energy Saving |
SA WG5 |
TR |
Information |
Yes |
Yes |
Noted |
No |
|
| 13 Proposed New WIDs (not part of an existing feature) SP-110588 |
WID on IMS-Based Telepresence |
SA WG1 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110589 |
WID on Service and Media Reachability for Users over Restrictive Firewalls |
SA WG1 |
WID |
Approval |
Yes |
Yes |
After changing the SA WG3 WID to a Study item, this WID needed update to make it a stand-alone WID. Other corrections and clarifications were also suggested and the WID was revised in SP-110641 |
No |
|
| |
|
SP-110641 |
WID on Service and Media Reachability for Users over Restrictive Firewalls |
TSG SA |
WID |
Approval |
Yes |
Yes |
The revision marks were accepted and the WID revised in SP-110653 |
No |
| SP-110589 |
|
|
SP-110653 |
WID on Service and Media Reachability for Users over Restrictive Firewalls |
TSG SA |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110641 |
|
|
SP-110498 |
WI proposal on IMS Firewall traversal |
SA WG3 |
WID |
Approval |
Yes |
Yes |
Noted. Proposed Update in SP-110605 |
No |
|
| |
|
SP-110605 |
Proposed Updated WID on ' IMS Firewall Traversal |
Acme Packet, China Mobile, Ericsson, Huawei, Juniper Networks, Vodafone, ZTE |
WID |
Approval |
Yes |
Yes |
It was proposed to re-work this as a Study WID now and then ask SA WG3 to review the study work and propose a normative WID to TSG SA#54 if considered necessary. This was revised in SP-110640 |
No |
|
| |
|
SP-110640 |
Study WID on ' IMS Firewall Traversal |
TSG SA |
WID |
Approval |
Yes |
Yes |
China Mobile asked for clarification that the aim of the study is to address the service requirements. Clarification of the intention to start a normative work item at TSG SA#54 if the study has progressed enough should be added. This was revised in SP-1 |
No |
| SP-110605 |
|
|
SP-110654 |
Study WID on ' IMS Firewall Traversal |
TSG SA |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110640 |
|
|
SP-110583 |
Stage 1 CRs on Proposed New WIDs (not part of an existing feature) |
SA WG1 |
W/DRAW |
Approval |
No |
No |
WITHDRAWN |
Yes |
|
| |
|
SP-110475 |
New Feature WID: Single Radio Voice Call Continuity from UTRAN/GERAN to E-UTRAN/HSPA |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110476 |
New Feature WID: WID for S2a Mobility based On GTP & PMIPv6 for WLAN access to EPC |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Qualcomm asked whether it was normal to approve a Work tem before the Study Item has completed and what will happen to the Study Item after the WID is approved. It was clarified that procedurally this is acceptable and the normative work should follow th |
No |
|
| |
|
SP-110642 |
New Feature WID: WID for S2a Mobility based On GTP & PMIPv6 for WLAN access to EPC |
SA WG2 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110476 |
|
|
SP-110554 |
New Work Item 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)', Feature |
SA WG4 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110555 |
New Work Item 'Enhancement to FEC for MBMS (EMM-EFEC)', Building Block |
SA WG4 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110556 |
New Work Item 'Download Delivery Enhancements for MBMS (EMM-DDE)', Building Block |
SA WG4 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| |
|
SP-110557 |
New Work Item ' IMS-based PSS and MBMS Streaming Synchronization Enhancements (EMM-IPME)', Building Block |
SA WG4 |
WID |
Approval |
Yes |
Yes |
Approved |
No |
|
| 14 Proposed New Study Items (SIDs)
|
|
|
|
|
|
|
|
|
|
| 15 Technical coordination with TSG CT, TSG GERAN and TSG RAN
|
|
|
|
|
|
|
|
|
|
| 15.1 TSG CT Report and Questions for Advice SP-110593 |
TSG CT Status Report |
TSG CT Chairman |
Report |
Presentation |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110594 |
Draft TSG CT#53 meeting report |
TSG CT Secretary (MCC) |
Report |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110595 |
IETF Status Report |
TSG CT Chairman |
Report |
Information |
Yes |
Yes |
Noted |
No |
|
| 15.2 TSG GERAN Report and Questions for Advice SP-110596 |
TSG GERAN Status Report |
TSG GERAN Chairman |
Report |
Presentation |
Yes |
Yes |
Noted |
No |
|
| 15.3 TSG RAN Report and Questions for Advice SP-110609 |
TSG RAN #53 report from TSG RAN Chairman |
TSG RAN Chairman |
Report |
Presentation |
Yes |
Yes |
Revised in SP-110645 |
No |
SP-110645 |
| |
|
SP-110645 |
TSG RAN #53 report from TSG RAN Chairman |
TSG RAN Chairman |
Report |
Presentation |
Yes |
Yes |
Noted |
No |
| SP-110609 |
|
|
SP-110610 |
TSG RAN#53 draft meeting report |
TSG RAN Secretary (MCC) |
Report |
Information |
Yes |
Yes |
Noted |
No |
|
| |
|
SP-110646 |
Results of TSG RAN WI/SI prioritization at TSG RAN#53 and TSG SA#53 |
TSG RAN Chairman |
OTHER |
Information |
Yes |
Yes |
TSG RAN will review their status according to the TSG SA priority agreements and will update the RAN prioritisation accordingly. The TSG RAN Chairman clarified that his report from TSG SA#53 will include this information and will try to explain the impac |
No |
|
| |
|
SP-110492 |
LS from ITU-R WP 5D: LIAISON STATEMENT TO THE 3GPP ORGANIZATIONAL PARTNERS ON THE COMPLETION OF REC. ITU-R M.[IMT.RSPEC] |
ITU-R WP 5D |
LS In |
Information |
Yes |
Yes |
Response in SP-110659. |
No |
|
| |
|
SP-110493 |
LS from TSG RAN: Response to ITU-R WP 5D on the completion of Rec. ITU-R M.[IMT.RSPEC] |
TSG RAN |
W/DRAW |
Information |
No |
No |
WITHDRAWN |
Yes |
|
| |
|
SP-110611 |
Proposed Response to ITU-R WP 5D/TEMP/519 = RP-110933 on the completion of Rec. ITU-R M.[IMT.RSPEC] |
TSG RAN |
LS OUT |
Approval |
Yes |
Yes |
This LS was reviewed and updated to show source as TSG RAN and TSG SA in SP-110659 |
No |
|
| |
|
SP-110659 |
Proposed Response to ITU-R WP 5D/TEMP/519 = RP-110933 on the completion of Rec. ITU-R M.[IMT.RSPEC] |
TSG RAN, TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110611 |
|
|
SP-110612 |
Update Submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Revision 11 of Recommendation ITU-R M.1457 |
TSG RAN |
LS OUT |
Approval |
Yes |
Yes |
This LS was reviewed and updated to show source as TSG RAN and TSG SA in SP-110658 |
No |
|
| |
|
SP-110658 |
Update Submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Revision 11 of Recommendation ITU-R M.1457 |
TSG RAN, TSG SA |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110612 |
|
|
SP-110613 |
Updated information on the roadmap for IMT-2000 CDMA DS & IMT-2000 CDMA TDD |
TSG RAN |
LS OUT |
Approval |
Yes |
Yes |
This LS was reviewed and updated to show source as TSG RAN and TSG SA and to remove the text on availability of LIMONET, in SP-110660 |
No |
|
| |
|
SP-110660 |
Updated information on the roadmap for IMT-2000 CDMA DS & IMT-2000 CDMA TDD |
TSG RAN |
LS OUT |
Approval |
Yes |
Yes |
Approved |
No |
| SP-110613 |
16 Project Management
|
|
|
|
|
|
|
|
|
|
| 16.1 Review of the work plan SP-110494 |
3GPP Work Plan review at Plenary #53 |
MCC Work Plan Manager |
Work Plan |
Presentation |
Yes |
Yes |
The Work Plan manager revised the slides to make agreed corrections to the slides in SP-110661 |
No |
|
| |
|
SP-110661 |
3GPP Work Plan review at Plenary #53 |
MCC Work Plan Manager |
Work Plan |
Presentation |
No |
Yes |
Noted |
No |
| SP-110494 |
16.2 Release contents and planning discussions
|
|
|
|
|
|
|
|
|
|
| 16.3 Specification Status
|
|
|
|
|
|
|
|
|
|
| 17 Project Support
|
|
|
|
|
|
|
|
|
|
| 17.1 Improvements to working methods
|
|
|
|
|
|
|
|
|
|
| 17.2 MCC Status Report SP-110567 |
MCC Support Team report |
MCC (John Meredith) |
Report |
Presentation |
Yes |
Yes |
Noted |
No |
|
| 18 Future meeting schedule
|
|
|
|
|
|
|
|
|
|
| 19 Any Other Business
|
|
|
|
|
|
|
|
|
|
| 20 Close of Meeting
|
|
|
|
|
|
|
|
|
|
| 99 WITHDRAWN ITEMS
|
|
|
|
|
|
|
|
|
|
| |
Created: 2011-09-21 15:21     Last document: SP-110661