Agenda with allocated Tdocs

Created: 2011-09-21 15:21     Last document: SP-110661

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
0
ALL AGENDA ITEMS
1
Opening of the Meeting
2
Approval of Agenda
SP-110435 Draft agenda for TSG SA meeting #53 TSG SA Chairman Agenda Approval Yes Yes Approved No
3
IPR Reminder
4
Reports from Previous Meetings
4.1
Report from TSG SA#52
SP-110436 Draft Report of TSG SA meeting #52 TSG SA Secretary Report Approval Yes Yes Approved No
4.2
Reports from TSG SA ad-hoc meetings and workshops (Reports related to features will be covered under the feature related agenda item)
5
Items for early consideration (For contributions to this point, please contact chairman in advance of meeting)
SP-110558 Progressing Rel-11 Work at TSG SA#53 SA WG2 Chairman Other Discussion Yes Yes Revised in SP-110599 No SP-110599
    SP-110599 Progressing Rel-11 Work at TSG SA#53 SA WG2 Chairman Other Discussion Yes Yes Noted No SP-110558
    SP-110602 SA WG2 Scheduling Considerations, Details SA WG2 Chairman Information Information Yes Yes Noted No
    SP-110614 Results of RAN WI/SI prioritization at TSG RAN#53 TSG RAN Chairman Other Information Yes Yes Noted No
    SP-110606 Outcome of Operator discussions on SA WG2 work prioritisation GSMA Discussion Discussion Yes Yes Noted No
    SP-110615 Release 11 prioritization Deutsche Telekom, TeliaSonera, Verizon Wireless, Ericsson Discussion Discussion Yes Yes Noted No
    SP-110592 SA WG2 prioritization TeliaSonera W/DRAW Discussion No No WITHDRAWN Yes
    SP-110603 Proposed updated WID: LIPA Mobility and SIPTO at the Local Network (LIMONET) Verizon Wireless W/DRAW Approval No No WITHDRAWN Yes
    SP-110604 Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) Verizon Wireless WID Approval Yes Yes It was decided to discuss this off-line and update the WID to take the other comments on BBAI Scoping into account. This was revised in SP-110619 No
    SP-110619 Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) Huawei WID Approval Yes Yes The changes on changes needed to be removed, the Bratislava header removed and to add a clean version to the zip file, this was updated in SP-110647 No SP-110604
    SP-110647 Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) Huawei WID Approval Yes Yes Approved No SP-110619
    SP-110440 LS from SA WG1: LS on MTC Group-Based Triggering SA WG1 LS In Action Yes Yes Noted No
    SP-110559 Prioritization of Near Term MTC Work KDDI, KT Corp., T-Mobile USA, Verizon, Hitachi, NEC Discussion Discussion Yes Yes Revised in SP-110568 No SP-110568
    SP-110568 Prioritization of Near Term MTC Work KDDI, KT Corp., T-Mobile USA, Hitachi, NEC Discussion Discussion Yes Yes Revised in SP-110616 No SP-110616 SP-110559
    SP-110616 Prioritization of Near Term MTC Work KDDI, KPN, KT Corp., T-Mobile USA, Hitachi, NEC, Panasonic Discussion Discussion Yes Yes Noted No SP-110568
    SP-110571 Progressing SIMTC work for Rel-11 Intel Discussion Discussion Yes Yes Revised in SP-110618 No SP-110618
    SP-110618 Progressing SIMTC work for Rel-11 Intel Discussion Discussion Yes Yes Noted No SP-110571
    SP-110608 Delivering SIMTC in Release 11 Vodafone Group Discussion Discussion Yes Yes Noted No
    SP-110620 Progressing SIMTC for Release 11 Intel, Vodafone Group Discussion Discussion Yes Yes Noted No
    SP-110621 Release 11 prioritization update Drafting Group Discussion Discussion Yes Yes Revised in SP-110624 No SP-110624
    SP-110624 Release 11 prioritization update Drafting Group Discussion Discussion Yes Yes Noted No SP-110621
    SP-110625 Release 11 prioritization - output from Operator lunch time session Drafting Group Discussion Discussion Yes Yes Noted. Option 1 with MTCsp and MTCsms interfaces were endorsed No
    SP-110643 DRAFT LS on Release 11 Features TSG SA LS OUT Approval Yes Yes Vodafone commented that the action to TSG GERAN TSG RAN and RAN WG2 should explicitly mention TSG GERAN and TSG RAN in the text. AT&T asked whether it was necessary to add an action to SA WG1 to remove some requirements from the Release. The TSG SA Chair No
    SP-110655 DRAFT LS on Release 11 Features TSG SA LS OUT Approval Yes Yes Revised in SP-110656 No SP-110656 SP-110643
    SP-110656 DRAFT LS on Release 11 Features TSG SA LS OUT Approval Yes Yes Revised in SP-110657 No SP-110657 SP-110655
    SP-110657 LS on Release 11 Features TSG SA LS OUT Approval Yes Yes Approved No SP-110656
    SP-110623 Scheduling picture SA WG1 Chairman Discussion Presentation Yes Yes Noted No
    SP-110597 On LTE for public safety Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular Discussion Discussion Yes Yes Noted No
    SP-110607 LS from TETRA Association: Device to Device Service TETRA Association LS In Information Yes Yes Noted No
    SP-110639 [DRAFT] LS on Study item relevant for public safety - direct mode TSG SA LS OUT Approval Yes Yes This was revised off-line to indicate that TSG SA would like to continue the dialog with the TETRA Association regarding use-cases and scenarios on the use of LTE with respect to the scope of the study, in SP-110648 No
    SP-110648 LS on Study item relevant for public safety - direct mode TSG SA LS OUT Approval Yes Yes Approved No SP-110639
    SP-110590 WID on Proposal for a study on Proximity-based Services SA WG1 WID Approval Yes Yes Noted No
    SP-110598 Updates to the SA WG1 study WID 'Study on Proximity-based Services' Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular WID Approval Yes Yes Revised in SP-110628 No SP-110628
    SP-110628 Updates to the SA WG1 study WID 'Study on Proximity-based Services' Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular WID Approval Yes Yes Vodafone commented it that should also be added, before bullet 5, that this is under network control. It was asked how this could be done if there is no network coverage. Vodafone clarified that it need not be under continuous coverage. Telecom Italia ad No SP-110598
    SP-110633 Updates to the SA WG1 study WID 'Study on Proximity-based Services' Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular WID Approval Yes Yes The WID needed to be updated again to remove revision marks, which was provided in SP-110638 No SP-110628
    SP-110638 Updates to the SA WG1 study WID 'Study on Proximity-based Services' Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular WID Approval Yes Yes Approved No SP-110633
5.1
Challenges to working agreements (must have been previously requested)
6
Incoming Liaisons (Liaisons related to features will be covered under the feature related agenda item)
SP-110437 LS from ITU-R Study Groups: REVISION OF RECOMMENDATION ITU-R M.1224 ITU-R Study Groups LS In Information Yes Yes Noted No
    SP-110439 LS from ITU-R Study Groups: INVITATION TO REVIEW REPORT ITU-R M.2014-1 ITU-R Study Groups LS In Information Yes Yes Noted No
    SP-110561 LS from ITU-R Study Groups: LS on 'WIDE-AREA SENSOR AND/OR ACTUATOR NETWORK (WASN) SYSTEMS' ITU-R Study Groups LS In Information Yes Yes Noted No
    SP-110562 LS from ITU-R Study Groups: LS on 'QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVES FOR WIRELESS ACCESS SYSTEMS' ITU-R Study Groups LS In Information Yes Yes Noted No
    SP-110438 LS from GSMA Embedded SIM Task Force: Response to LS on Clarification to eUICC uses cases and Requirements ref: S1-111298 GSMA Embedded SIM Task Force LS In Information Yes Yes Noted No
    SP-110446 LS from ETSI ISG AFI: Liaison statement to 3GPP ETSI ISG AFI LS In Information Yes Yes Noted. Forwarded to SA WG5 No
    SP-110513 LS from TSG GERAN: LS on Service Identification for RRC Improvements in GERAN TSG GERAN LS In Information Yes Yes Noted No
7
Report from SA Working Groups
7.1
SA WG1 Report and Questions for Advice
SP-110572 Status Report from SA WG1 to TSG SA#53 SA WG1 Chairman Report Presentation Yes Yes Revised in SP-110622 No SP-110622
    SP-110622 Status Report from SA WG1 to TSG SA#53 SA WG1 Chairman Report Presentation Yes Yes Noted No SP-110572
7.2
SA WG2 Report and Questions for Advice
SP-110453 SA WG2 Chairman's Report to TSG SA#53 SA WG2 Chairman Report Presentation Yes Yes Noted No
7.3
SA WG3 Report and Questions for Advice
SP-110497 SA WG3 Status Report SA WG3 Chairman Report Presentation Yes Yes Revised in SP-110601 No SP-110601
    SP-110601 SA WG3 Status Report SA WG3 Chairman Report Presentation Yes Yes Noted No SP-110497
7.4
SA WG4 Report and Questions for Advice
SP-110543 SA WG4 Status Report at TSG SA#53 SA WG4 Chairman Report Information Yes Yes Noted No
7.5
SA WG5 Report and Questions for Advice
SP-110515 SA WG5 Status Report SA WG5 Chairman Report Information Yes Yes Noted No
    SP-110560 Outputs of July 2011 multi-SDO workshop on Converged Management of Fixed/Mobile Networks SA WG5 Chairman Report Presentation Yes Yes Noted No
    SP-110570 Terms of Reference of Multi SDO Project on Fixed Mobile Convergence Network Management SA WG5 Chairman ToR Discussion Yes Yes Noted No
    SP-110491 LS from SA WG5: Reply LS to NGMN NGCOR on Project NGCOR Update SA WG5 LS In Information Yes Yes Noted No
8
Documents related to Rel-8 or Earlier Features
8.1
R99 CRs (Need to be very well justified!)
8.2
Rel-4 CRs (Need to be very well justified!)
8.3
Rel-5 CRs (Need to be very well justified!)
8.4
Rel-6 CRs (Need to be very well justified!)
8.5
Rel-7 CRs (Need to be very well justified!)
SP-110544 CRs to TS 26.114 on 'Resolving reference to IETF Internet Draft (MTSI-MHI)' (Release 7 and Release 8) SA WG4 CR Pack Approval Yes Yes Approved No
    SP-110523 Rel-7 CRs on OAM Maintenance and small Enhancements (OAM7) SA WG5 CR Pack Approval Yes Yes Approved No
8.6
Rel-8 CRs (Need to be very well justified!)
SP-110454 3 CRs to 23.060 on SAES (Rel-8, Rel-9, Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110545 CRs to TS 26.114 on 'Clarification on SDP negotiation for video (MTSI-eMHI)' (Release 8 until Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
    SP-110546 CRs to TS 26.114 on 'Correction of the reference to the 'a=imageattr' attribute' (MTSI-eMHI-DRASIS)' (Release 8 until Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
    SP-110547 CRs to TS 26.237 on 'Resolving IETF dependencies (IMS_PSS_MBMS_US)' (Release 8 until Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
    SP-110524 Rel-8 CRs on OAM Maintenance and small Enhancements (OAM8) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110528 Rel-8 CRs on Charging Management (CH8) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110533 Rel-8 CRs on 3G Home NodeB OAM&P Type 1 Management Interface (HNB-3G_OAM) SA WG5 CR Pack Approval Yes Yes Approved No
9
Documents Related to Rel-9 Features
9.1
(CRS) - Customized Ringing Signal
9.2
(eCAT) - Enhancements of IMS Customized Alerting Tone (CAT)
9.3
(EHNB) - Enhanced Home NodeB / eNodeB
SP-110532 Rel-9 CRs on 3G HNB and LTE HeNB OAM&P Type 1 Interface (HNB_eHNB-OAM_Type1) SA WG5 CR Pack Approval Yes Yes Approved No
9.4
(eMMTel) - Multi-Media Telephony Service enhancements
9.5
(ePRIOR) - Enhancements to Multimedia Priority Service
9.6
(EUI) - End User Identity
9.7
(PAN-EPNM) - Support of Personal Area Networks and Enhancements
9.8
(PWS) - Public Warning System
SP-110445 LS from ITU-T Study Group 2: Harmonization of MIs and SCs for civic alerting purposes ITU-T Study Group 2 LS In Information Yes Yes Noted No
9.9
(ServAl) - Services Alignment and Migration
9.10
(SSAC) - Service Specific Access Control in EPS
9.11
(UDC) - User Data Convergence
9.12
(VAS4SMS) - Value Added Services for Short Message Service
9.13
(eANDSF) - Access Network Discovery and Selection Enhancement
9.14
(IMS_EMER_GPRS_EPS) - Support for IMS Emergency Calls over GPRS and EPS
SP-110455 3 CRs to 23.167 on IMS_EMER_GPRS_EPS (Rel-9, Rel-10, Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
9.15
(IMS_SCC) - IMS Services Centralization and Continuity
9.16
(LCS_LTE_EPS) - LCS Control Plane Solution for EPS
9.17
(LTEimp-Vocoder) - System aspects of vocoder rate adaptation for LTE
9.18
(MBMS_EPS) - MBMS support in EPS
9.19
(MUPSAP) - Multiple PDN Connection to the Same APN for PMIP-based Interfaces
9.20
(A5/4-GEA4) - 128 bit encryption for GSM and GPRS
9.21
(ACCSEC2) - Access Security Enhancements
9.22
(eGBAPush) - GBAPush enhancements
9.23
(GBA-IdM) - Extended Identity Management
9.24
(MEDIASEC) - IMS Media Plane Security (Stage 2)
9.25
(NDS_Backhaul) - Network Domain Security (NDS) enhancements to support backhaul security
9.26
(PUCI) - Protection against Unsolicited Communications for IMS
9.27
(DTMR) - Distortion Measurement Test Methods and Requirements
9.28
(IMS_PSS_MBMS_US_EXT) - IMS based PSS and MBMS User Service extensions
9.29
(M3A) - Managing MTSI Media Adaptation
9.30
(PMA) - PSS and MBMS Aspects
9.31
(SFR) - Syndicated Feed Reception within 3GPP environments
9.32
(TG) - Timed Graphics
9.33
(CH9) - Charging Management small Enhancements Rel-9
SP-110529 Rel-9 CRs on Charging Management (CH9) SA WG5 CR Pack Approval Yes Yes Approved No
9.34
(OAM9) - OAM&P Rel-9
SP-110525 Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) SA WG5 CR Pack Approval Yes Yes Approved No
9.35
(TEI9) - TEI Rel-9
SP-110456 12 CRs to 23.002, 23.272, 23.060, 23.401 and 23.402 on TEI9 (Rel-9, Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110509 Release 9 CRs on Security small Enhancements (TEI9) SA WG3 CR Pack Approval Yes Yes Approved No
    SP-110548 CRs to TS 26.090 on 'Correction of equation for pitch sharpening (TEI9)' (Release 9 and Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
9.36
Any other Rel-9 Documents
10
Documents Related to Rel-10 Features
10.1
(CCNL) - Completion of Communications on Not Logged-in
10.2
(CPM-SMS) - IP-Short-Message-Gateway enhancements for CPM-SMS Interworking
10.3
(EHNBF) - H(e)NB enhancements
10.4
(UDC_DM) - User Data Convergence - Data Model
SP-110541 Rel-11 CRs on Charging for Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Data Bases (PEST-CH) SA WG5 CR Pack Approval Yes Yes Approved No
10.5
(ECSRA_LAA) - Enabling Coder Selection and Rate Adaptation for UTRAN and E-UTRAN for Load Adaptive Applications
10.6
(eMPS) - Enhancements for Multimedia Priority Service
10.7
(IESE) - IMS Emergency Session Enhancements
10.8
(IFOM) - IP Flow Mobility and seamless WLAN offload
10.9
(IMS_SC_eIDT) - IMS Service Continuity - Inter Device Transfer enhancements
10.10
(LIPA_SIPTO) - Local IP Access and Selected Internet IP Traffic Offload
SP-110573 Stage 1 CRs on Local IP Access and Selected Internet IP Traffic Offload (LIPA_SIPTO) SA WG1 CR Pack Approval Yes Yes Approved No
10.11
(MAPCON) - Multi Access PDN Connectivity (Stage 2)
10.12
(NIMTC) - Network Improvements for Machine-type Communication
SP-110458 7 CRs to 23.060 and 23.401 on NIMTC (Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
10.13
(OMR) - Optimal Media Routeing
10.14
(PEST) - Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases
10.15
(SMOG) - S2b Mobility Based on GTP
10.16
(LI10) - Lawful Interception in the 3GPP Rel-10
SP-110510 Release 10 CRs on Lawful Interception (LI10) SA WG3 W/DRAW Approval No No WITHDRAWN Yes
10.17
(EAAT) - Enhancements and Addition of Audio Tests to 26.131 and 26.132
SP-110549 CRs to TS 26.131 and TS.26.132 on 'Enhancements and Addition of Audio Tests to 26.131 and 26.132 (EAAT)' (Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
10.18
(HTTP_SDS) - HTTP-based Streaming and Download Services
10.19
(MBS_Enh) - PSS and MBMS enhancements
SP-110550 CRs to TS 26.234 and TS.26.346 on 'PSS and MBMS enhancements (MBS_enh)' (Release 10) SA WG4 CR Pack Approval Yes Yes Approved No
10.20
(OPT_IMS_PSS_MBMS_US) - Optimization of IMS based PSS and MBMS User Service
10.21
(LTE_Relay) – Relays for LTE, including security aspects
SP-110505 Release 10 CRs to 33.401 on Relay Node Security SA WG3 CR Pack Approval Yes Yes Approved No
10.22
(eAoC) - Advice of Charge (AoC) service support enhancements
10.23
(CH10) - Charging Management small Enhancements
SP-110444 LS from CT WG1: Reply LS on IMS Application Reference Identifier(IARI) consideration for Charging CT WG1 LS In Information Yes Yes Noted No
    SP-110530 Rel-10 CRs on Charging Management (CH10) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110516 30.820 Telecommunication management; Project scheduling and open issues for SA WG5, Release 10 SA WG5 TR Information / Approval Yes Yes Approved No
10.24
(OAM10) - OAM&P Rel-10
SP-110526 Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110534 Rel-10 CRs on Alarm Correlation and Root Cause Analysis (OAM-AC-RCA) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110537 Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110539 Rel-10 CRs on IRP Solution Set specification organisation improvements (OAM-IRP-SS) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110540 Rel-11 CRs on UTRAN Self-Organizing Networks (SON) management (OAM-SON-UTRAN) SA WG5 CR Pack Approval Yes Yes Approved No
10.25
(TEI10) - TEI Rel-10
SP-110486 LS from CT WG4: LS on authentication signalling with external networks over S2b CT WG4 LS In Action Yes Yes Noted No
    SP-110574 Stage 1 CRs on TEI Rel-10 (TEI10) SA WG1 CR Pack Approval Yes Yes Approved. A Liaison Statement to CT WG1 was drafted in SP-110626. No
    SP-110626 LS on Korean Public Alert System in LTE TSG SA LS OUT Approval Yes Yes Revised in SP-110650 No SP-110650
    SP-110650 LS on Korean Public Alert System in LTE TSG SA LS OUT Approval Yes Yes Approved No SP-110626
    SP-110459 6 CRs to 23.060 and 23.401 on TEI10 (Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110460 5 CRs to 23.002, 23.060 and 23.401 on TEI10 (Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110461 10 CRs to 23.228 and 23.237 on TEI10 (Rel-10, Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110506 Release 10 CR to 33.310 on CMPv2 profile (TEI10) SA WG3 CR Pack Approval Yes Yes Revised in SP-110627 No SP-110627
    SP-110627 Release 10 CR to 33.310 on CMPv2 profile (TEI10) TSG SA CR Pack Approval Yes Yes Approved No SP-110506
    SP-110508 Release 10 CRs on Security small Enhancements (TEI10) SA WG3 CR Pack Approval Yes Yes Revised in SP-110564 No SP-110564
    SP-110564 Release 10 CRs on Security small Enhancements (TEI10) SA WG3 CR Pack Approval Yes Yes Approved No SP-110508
    SP-110551 CRs to TS 26.114 on 'Correction of functional requirements for jitter buffer management (TEI10, MTSI-MHI)' (Release 10 and Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
    SP-110552 CRs to TS 26.114 on 'Signalling applicable AMR/AMR-WB mode set in SDP answer (TEI10)' (Release 10 and Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
10.26
Any other Rel-10 Documents
SP-110443 LS from CT WG1: Reply LS on Equivalent PLMN identities and MDT CT WG1 LS In Action Yes Yes Noted No
    SP-110448 LS from SA WG2: Reply LS to Reply LS on Network Sharing SA WG2 LS In Information Yes Yes Noted No
    SP-110449 LS from SA WG3: Reply LS on MDT privacy and roaming SA WG3 LS In Information Yes Yes Noted No
    SP-110485 LS from RAN WG2: LS on Applicability of ePLMN to MDT RAN WG2 LS In Information Yes Yes Noted No
    SP-110487 LS from RAN WG3: Response LS on Equivalent PLMN identities and MDT RAN WG3 LS In Action Yes Yes Noted No
    SP-110490 LS from SA WG5: Reply LS to LS on Equivalent PLMN identities and MDT SA WG5 LS In Information Yes Yes Noted No
    SP-110553 CR to TS 26.114 on ' Video Codec Enhancement to MTSI (VCEM)' (Release 10 and Release 11) SA WG4 CR Pack Approval Yes Yes Approved No
11
Documents Related to Rel-11 or later Features
11.1
(IPXS) - Advanced IP Interconnection of Services
SP-110465 3 CRs to 23.228 on IPXS (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.2
(MOSAP) - Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers
SP-110575 Stage 1 CRs on Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers (MOSAP) SA WG1 CR Pack Approval Yes Yes Approved No
11.3
(NOVES) - Non Voice Emergency Services
SP-110474 New Building Block WID: Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN SA WG2 WID Approval Yes Yes Proposed revision provided in SP-110482. This was noted and the revised version considered. No
    SP-110482 Proposed New Building Block WID on 'Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN ' Alcatel-Lucent WID Approval Yes Yes Based on agreements for Stage 2 prioritisation, this WID needed to be updated to remove the TR phase. This was revised in SP-110644 No SP-110474
    SP-110644 Proposed New Building Block WID on 'Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN ' Alcatel-Lucent WID Approval Yes Yes Approved No SP-110482
    SP-110576 Stage 1 CRs on Non Voice Emergency Services (NOVES) SA WG1 CR Pack Approval Yes Yes Approved No
    SP-110577 Stage 1 CRs on Study on Non Voice Emergency Services (FS_NOVES) SA WG1 CR Pack Approval Yes Yes Approved No
11.4
(QoS_SSL) - QoS Control Based on Subscriber Spending Limits
SP-110466 1 CR to 23.203 on QoS_SSL (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110488 LS from SA WG5: Reply LS to C3-111217 on the work split between SA WG5 and CT WG3 for QoS Control Based on Subscriber Spending Limits (Rel-11 QoS_SSL) SA WG5 LS In Information Yes Yes Noted No
    SP-110489 LS from SA WG5: Reply LS on CT WG3 aspect of QoS Control Based on Subscriber Spending Limits SA WG5 LS In Information Yes Yes Noted No
    SP-110519 Revised WID on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) SA WG5 WID Approval Yes Yes Approved No
    SP-110542 Rel-11 CRs on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) SA WG5 CR Pack Approval Yes Yes Approved No
11.5
(SIMTC) - System Improvements to Machine-Type Communications
SP-110447 LS from ETSI TC M2M: Reply to SA WG3 on potential co-operation between 3GPP work on MTC security and ETSI M2M ETSI TC M2M LS In Information Yes Yes Noted No
    SP-110578 Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) SA WG1 CR Pack Approval Yes Yes 22.368 CR0096R2, 22.368 CR0098R2, 22.368 CR0095R3, 22.368 CR0099R3, 22.101 CR0383R2, 22.368 CR0103R2, 22.368 CR0108R1 Approved. Other CRs revised in SP-110629 No
    SP-110629 Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) TSG SA CR Pack Approval Yes Yes Morpho Cards GmbH commented that the note in 22.101 CR0384R3 needed clarification that the configuration 'are mainly based on SMS'. The CR Pack was revised in SP-110651 No SP-110578
    SP-110651 Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) TSG SA CR Pack Approval Yes Yes Approved No SP-110629
    SP-110499 WI proposed revision on System Improvements for Machine Type Communication SA WG3 WID Approval Yes Yes Approved No
    SP-110495 Standardization of Machine-type Communications MCC Work Plan Manager Report Information Yes Yes Noted No
11.6
(SIPTO_SC) - SIPTO Service Continuity of IP Data Session
SP-110579 Stage 1 CRs on SIPTO Service Continuity of IP Data Session (SIPTO_SC) SA WG1 CR Pack Approval Yes Yes Approved No
11.7
(LIMONET) - LIPA Mobility and SIPTO at the Local Network
11.8
(BBAI) - Support BroadBand Forum (BBF) Accesses Interworking
SP-110450 LS from the Broadband Forum: WT-134 'Broadband Policy Control Framework (PCF)' Broadband Forum LS In Information Yes Yes Noted No
    SP-110451 LS from the Broadband Forum: WT-203 'Interworking between Next Generation Fixed and 3GPP Wireless Access' Broadband Forum LS In Information Yes Yes Noted No
    SP-110442 LS from the Broadband Forum: LS on QoS requirement for SIPTO traffic to 3GPP Broadband Forum LS In Action Yes Yes Noted No
    SP-110463 5 CRs to 23.203 on BBAI (Rel-11) SA WG2 CR Pack Approval Yes Yes 23.203 CR0552R3; 23.203 CR0553R2 and 23.203 CR0575R3 were approved No
    SP-110630 1 CR to 23.203 on BBAI (Rel-11) TSG SA CR Pack Approval Yes Yes Revised in SP-110652 No SP-110652
    SP-110652 1 CR to 23.203 on BBAI (Rel-11) TSG SA CR Pack Approval Yes Yes Approved No SP-110630
    SP-110479 TS 23.139: 3GPP System-Fixed Broadband Access Network Interworking; Stage 2 SA WG2 TS Information Yes Yes Noted No
    SP-110600 Draft Agenda for the 3GPP BBF Workshop 09-10 Nov 2011, San Francisco, USA Co-chair of 3GPP-BBF workshop (Balazs Bertenyi). Agenda Information Yes Yes Noted No
11.9
(eMPS_SRVCC) - SRVCC aspect of enhancements for Multimedia Priority Service
SP-110464 2 CRs to 23.216 and 23.237 on eMPS_SRVCC (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.10
(USSI) - Unstructured Supplementary Service Data (USSD) simulation service in IMS
11.11
(NWK-PL2IMS) - Network Provided Location Information for IMS
SP-110471 Updated WID: Network Provided Location Information for IMS (NWK-PL2IMS) SA WG2 WID Approval Yes Yes Alcatel-Lucent and NEC asked to be added as supporting companies. The WID was revised in SP-110631 No
    SP-110631 Updated WID: Network Provided Location Information for IMS (NWK-PL2IMS) SA WG2 WID Approval Yes Yes Approved No SP-110471
    SP-110478 TR 23.842: Study on Network Provided Location Information to the IMS SA WG2 TR Information Yes Yes Noted No
11.12
(OSCAR) - Optimized Service Charging and Allocation of Resources in IMS whilst Roaming
11.13
(SAPP) - Service Awareness and Privacy Policies
SP-110467 6 CRs to 23.203 on SAPP (Rel-11) SA WG2 CR Pack Approval Yes Yes 23.203 CR0555R3 was revised in SP-110649 and the remaining CRs in this pack were approved. No
    SP-110649 Revised CR: 23.203 CR0555R4 TSG SA CR Pack Approval Yes Yes Approved No
11.14
(VCSG) - VPLMN Autonomous CSG Roaming
SP-110468 1 CR to 23.002 on VCSG (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.15
(vSRVCC) - Single Radio Video Call Continuity for 3G-CS
11.16
(EEA3_EIA3) - EEA3 and EIA3 (new Encryption & Integrity EPS security algorithms)
SP-110591 LS from ETSI SAGE: 128-EEA3 and 128-EIA3 design and evaluation report ETSI SAGE LS In Information Yes Yes Noted No
    SP-110500 35.221 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 1: EEA3 and EIA3 specifications SA WG3 TS Approval Yes Yes Revised in SP-110565 No SP-110565
    SP-110565 35.221 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 1: EEA3 and EIA3 specifications SA WG3 TS Approval Yes Yes Approved No SP-110500
    SP-110501 35.222 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 2: ZUC specification SA WG3 TS Approval Yes Yes Revised in SP-110569 No SP-110569
    SP-110569 35.222 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 2: ZUC specification SA WG3 TS Approval Yes Yes Approved No SP-110501
    SP-110502 35.223 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 3: Implementors' test data SA WG3 TS Approval Yes Yes Revised in SP-110566 No SP-110566
    SP-110566 35.223 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 3: Implementors' test data SA WG3 TS Approval Yes Yes Approved No SP-110502
    SP-110504 Release 11 CR to 33.401 on EEA3 and EIA3 (new Encryption & Integrity EPS security Algorithms) SA WG3 CR Pack Approval Yes Yes Approved No
    SP-110503 35.924 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 4: Design and Evaluation Report SA WG3 W/DRAW Information No No WITHDRAWN. See LS in SP-110591 Yes
11.17
(SPUCI) - Specification of Protection against Unsolicited Communication for IMS
11.18
(EVS-codec) - Codec for Enhanced Voice Services
11.19
(VINE) - Support for 3GPP Voice Interworking with Enterprise IP-PBX
SP-110580 Stage 1 CRs on Support for 3GPP Voice Interworking with Enterprise IP-PBX (VINE) SA WG1 CR Pack Approval Yes Yes Morpho Cards GmbH reported some problems and this CR Pack was revised in SP-110632 No
    SP-110632 Stage 1 CRs on Support for 3GPP Voice Interworking with Enterprise IP-PBX (VINE) SA WG1 CR Pack Approval Yes Yes Approved No SP-110580
11.20
(DIDA) - Data Identification in ANDSF
11.21
(OPIIS) - Operator Policies for IP Interface Selection
11.22
(LOBSTER) - Location-Based Selection of gateways for WLAN
SP-110462 1 CR to 23.402 on LOBSTER (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
11.23
(HENB_SEC) - H(e)NB security features for UE mobility scenarios
11.24
(PWS_SEC) - Security aspects of Public Warning System
11.25
(ACR_CS) - Anonymous Call Rejection in the CS domain
11.26
(INIPUI) - IMS Network-Independent Public User Identities (including FS_INIPUI)
SP-110581 Stage 1 CRs on IMS Network-Independent Public User Identities (INIPUI) SA WG1 CR Pack Approval Yes Yes Approved No
    SP-110527 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) SA WG5 CR Pack Approval Yes Yes Revised in SP-110634 No SP-110634
    SP-110634 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) TSG SA CR Pack Approval Yes Yes Approved No SP-110527
    SP-110535 Rel-11 CRs on CN performance measurements enhancement (OAM-ePM-CN) SA WG5 CR Pack Approval Yes Yes RIM commented that 32.426 CR0041 introduces new clauses with 'hanging paragraphs'. SA WG5 were asked to correct this. These CRs were then approved. No
    SP-110536 Rel-11 CRs on IMS Performance Measurement enhancements (OAM-ePM-IMS) SA WG5 CR Pack Approval Yes Yes Approved No
    SP-110538 Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) SA WG5 CR Pack Approval Yes Yes Approved No
11.27
(FULL-MOCN-GERAN) - Full Support of Multi-Operator Core Network by GERAN
SP-110441 LS from SA WG2: LS on the introduction of FULL_MOCN-GERAN feature SA WG2 LS In Action Yes Yes Noted No
    SP-110483 LS from CT WG1: Reply LS on the introduction of FULL-MOCN-GERAN feature CT WG1 LS In Information Yes Yes Noted No
    SP-110512 LS from TSG GERAN: Reply LS on the introduction of FULL-MOCN-GERAN feature TSG GERAN LS In Action Yes Yes Noted No
    SP-110635 [DRAFT] Reply LS on the introduction of FULL-MOCN-GERAN feature Renesas Mobile Europe Ltd. [3GPP TSG SA] LS OUT Approval Yes Yes After some discussion, no agreement could be reached on the deployment issues of making this mandatory or optional and the issue was postponed to the next meeting. This was then noted. No
    SP-110457 1 CR to 23.251 on Full_MOCN-GERAN (Rel-10) SA WG2 CR Pack Approval Yes Yes Approved No
11.28
(SMSMI) - SMS submit and delivery without MSISDN in IMS
SP-110470 Updated WID: SMS submit and delivery without MSISDN in IMS (SMSMI) SA WG2 WID Approval Yes Yes Approved No
11.29
(Ext_ATS) - Extensions of Acoustic Test Specifications in TS 26.131 and TS 26.132
11.30
(Web_GBA) - Security enhancements for usage of GBA from the browser
11.31
(LI11) - Lawful Interception in Release 11
SP-110511 Release 11 CRs on Lawful Interception (LI11) SA WG3 CR Pack Approval Yes Yes Approved No
11.32
(CH11) - Charging Management small Enhancements Rel-11
SP-110531 Rel-11 CRs on Charging Management small Enhancements (CH11) SA WG5 CR Pack Approval Yes Yes Approved No
11.33
(OAM11) - OAM&P Rel-11
SP-110518 Revised WID on UTRAN Self-Organizing Networks (SON) management SA WG5 WID Approval Yes Yes Approved No
    SP-110520 New WID proposal on Carrier Aggregation management SA WG5 WID Approval Yes Yes NEC asked to be added as a supporting company. The WID was revised in SP-110636 No
    SP-110636 New WID proposal on Carrier Aggregation management TSG SA WID Approval Yes Yes Approved No SP-110520
    SP-110521 New WID proposal on 3GPP and WLAN interworking Network Management SA WG5 WID Approval Yes Yes Approved No
    SP-110522 New WID proposal on LTE SON coordination management SA WG5 WID Approval Yes Yes NEC asked to be added as a supporting company. The WID was revised in SP-110637 No
    SP-110637 New WID proposal on LTE SON coordination management TSG SA WID Approval Yes Yes Approved No SP-110522
11.34
(TEI11) - TEI Rel-11
SP-110582 Stage 1 CRs on TEI Rel-11 (TEI11) SA WG1 CR Pack Approval Yes Yes Approved No
    SP-110469 3 CRs to 23.167, 23.204 and 23.228 on TEI11 (Rel-11) SA WG2 CR Pack Approval Yes Yes Approved No
    SP-110484 LS from CT WG1: LS on modification of security context storage rate on the UICC CT WG1 LS In Action Yes Yes Noted No
    SP-110514 LS from RAN WG2: Reply LS on modification of security context storage rate on the UICC RAN WG2 LS In Action Yes Yes Noted No
    SP-110507 Release 11 CRs on Security small Enhancements (Sec11) SA WG3 CR Pack Approval Yes Yes Revised in SP-110563 No SP-110563
    SP-110563 Release 11 CRs on Security small Enhancements (Sec11) SA WG3 CR Pack Approval Yes Yes Approved No SP-110507
11.35
Any other Rel-11 Documents
12
Documents related to current Study Items
12.1
(FS_AMTC) - Study on Alternatives to E.164 for Machine-Type Communications
SP-110584 TR 22.988 V1.0.0 on Study on Alternatives to E.164 for Machine-Type Communications (Release 10) SA WG1 TR Information Yes Yes Noted No
12.2
(FS_CSN) - Study on Continuity of Data Sessions to Local Networks
SP-110585 TR 22.896 V1.0.0 on Study on Continuity of Data Sessions to Local Networks SA WG1 TR Information Yes Yes Noted No
12.3
(FS_IMS_P2P) - Study on IMS based Peer-to-Peer Content Distribution Services
12.4
PLEASE USE 11.26: (FS_INIPUI) - Study on IMS Network-Independent Public User Identities
12.5
(FS_MODAI) - Study on Non-MTC Mobile Data Applications impacts
SP-110586 TR 22.801 V1.0.0 on Study on non-MTC Mobile Data Applications impacts SA WG1 TR Information Yes Yes Noted No
12.6
(FS_MTCe) - Study on enhancements for Machine-Type Communications (MTC)
12.7
(FS_U2e) - Study on UICC/USIM enhancements
12.8
(FS_CNO) - Study on Core Network Overload solutions
SP-110473 Updated Study WID: Study on Core Network Overload solutions (FS_CNO) SA WG2 WID Approval Yes Yes Noted. Proposed revision provided in SP-110496 No
    SP-110496 Revision for Study on Core Network Overload Solutions Huawei, Hisilicon WID Approval Yes Yes Approved No SP-110473
12.9
(FS_eIMS) - Study on IMS Evolution
12.10
(FS_PP) - Study on Policy solutions and enhancements
12.11
(FS_eMEDIASEC) - Study on Extended IMS Media Plane Security features
12.12
(FS_SEEE) - Study on System Enhancements for Energy Efficiency
12.13
(FS_SSO_Int) - Study on Integration of Single Sign-On (SSO) frameworks with 3GPP networks
SP-110587 TR 22.895 V1.0.0 on Study on Service aspects of integration of Single Sign-On (SSO) frameworks with 3GPP operator-controlled resources and mechanisms SA WG1 TR Information Yes Yes Noted No
12.14
(FS_SSO_APS) - Study on Single Sign On (SSO) Application Security for IMS - based on SIP Digest
12.15
(FS_UKM) - Study on UTRAN key management enhancements
12.16
(FS_IVCS) - Study on Improved Video Coding Support
12.17
(FS_SS_PSS_MBMS) - Study on Surround Sound codec extension for PSS and MBMS
12.18
(FS_MAPIM) - Study on Multi Access PDN connectivity and IP flow Mobility
SP-110472 Updated Study WID: Study on Multi Access PDN connectivity and IP flow Mobility (FS_MAPIM) SA WG2 WID Approval Yes Yes Noted. Proposed revision provided in SP-110452 No
    SP-110452 Update SID for FS_MAPIM (Multi Access PDN connectivity and IP flow mobility) ZTE WID Approval Yes Yes Approved No
12.19
(FS_IPv6) - Study on IPv6 Migration
12.20
(FS_rSRVCC) - Study on SR Voice Call Continuity from UTRAN/GERAN to E-UTRAN/HSPA
SP-110477 TR 23.885: Feasibility Study of Single Radio Voice Call Continuity (SRVCC) from UTRAN/GERAN to E-UTRAN/HSPA; Stage 2 SA WG2 TR Approval Yes Yes Approved No
12.21
(FS_SaMOG) - Study on S2a Mobility based On GTP and WLAN access to EPC
12.22
(FS_RAVEL) - Study on Roaming Architecture for Voice over IMS with Local Breakout
SP-110480 TR 23.850: Study on Roaming Architecture for Voice over IMS with Local Breakout SA WG2 TR Information Yes Yes Noted No
12.23
(M3DVC) - Study on Mobile 3D Video Coding
12.24
(FS_UMONC) - Study on Usage Monitoring Control Enhancement
SP-110481 Updated SID for FS_UMONC (Study on Usage monitoring control enhancement) ZTE WID Approval Yes Yes Revised in SP-110617 No SP-110617
    SP-110617 Updated SID for FS_UMONC (Study on Usage monitoring control enhancement) ZTE, China Telecom, Allot W/DRAW Approval No No This was withdrawn Yes SP-110481
12.25
(OAM-Studies) - OAM&P Studies
SP-110517 32.834 Study on OAM aspects of Inter-RAT Energy Saving SA WG5 TR Information Yes Yes Noted No
13
Proposed New WIDs (not part of an existing feature)
SP-110588 WID on IMS-Based Telepresence SA WG1 WID Approval Yes Yes Approved No
    SP-110589 WID on Service and Media Reachability for Users over Restrictive Firewalls SA WG1 WID Approval Yes Yes After changing the SA WG3 WID to a Study item, this WID needed update to make it a stand-alone WID. Other corrections and clarifications were also suggested and the WID was revised in SP-110641 No
    SP-110641 WID on Service and Media Reachability for Users over Restrictive Firewalls TSG SA WID Approval Yes Yes The revision marks were accepted and the WID revised in SP-110653 No SP-110589
    SP-110653 WID on Service and Media Reachability for Users over Restrictive Firewalls TSG SA WID Approval Yes Yes Approved No SP-110641
    SP-110498 WI proposal on IMS Firewall traversal SA WG3 WID Approval Yes Yes Noted. Proposed Update in SP-110605 No
    SP-110605 Proposed Updated WID on ' IMS Firewall Traversal Acme Packet, China Mobile, Ericsson, Huawei, Juniper Networks, Vodafone, ZTE WID Approval Yes Yes It was proposed to re-work this as a Study WID now and then ask SA WG3 to review the study work and propose a normative WID to TSG SA#54 if considered necessary. This was revised in SP-110640 No
    SP-110640 Study WID on ' IMS Firewall Traversal TSG SA WID Approval Yes Yes China Mobile asked for clarification that the aim of the study is to address the service requirements. Clarification of the intention to start a normative work item at TSG SA#54 if the study has progressed enough should be added. This was revised in SP-1 No SP-110605
    SP-110654 Study WID on ' IMS Firewall Traversal TSG SA WID Approval Yes Yes Approved No SP-110640
    SP-110583 Stage 1 CRs on Proposed New WIDs (not part of an existing feature) SA WG1 W/DRAW Approval No No WITHDRAWN Yes
    SP-110475 New Feature WID: Single Radio Voice Call Continuity from UTRAN/GERAN to E-UTRAN/HSPA SA WG2 WID Approval Yes Yes Approved No
    SP-110476 New Feature WID: WID for S2a Mobility based On GTP & PMIPv6 for WLAN access to EPC SA WG2 WID Approval Yes Yes Qualcomm asked whether it was normal to approve a Work tem before the Study Item has completed and what will happen to the Study Item after the WID is approved. It was clarified that procedurally this is acceptable and the normative work should follow th No
    SP-110642 New Feature WID: WID for S2a Mobility based On GTP & PMIPv6 for WLAN access to EPC SA WG2 WID Approval Yes Yes Approved No SP-110476
    SP-110554 New Work Item 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)', Feature SA WG4 WID Approval Yes Yes Approved No
    SP-110555 New Work Item 'Enhancement to FEC for MBMS (EMM-EFEC)', Building Block SA WG4 WID Approval Yes Yes Approved No
    SP-110556 New Work Item 'Download Delivery Enhancements for MBMS (EMM-DDE)', Building Block SA WG4 WID Approval Yes Yes Approved No
    SP-110557 New Work Item ' IMS-based PSS and MBMS Streaming Synchronization Enhancements (EMM-IPME)', Building Block SA WG4 WID Approval Yes Yes Approved No
14
Proposed New Study Items (SIDs)
15
Technical coordination with TSG CT, TSG GERAN and TSG RAN
15.1
TSG CT Report and Questions for Advice
SP-110593 TSG CT Status Report TSG CT Chairman Report Presentation Yes Yes Noted No
    SP-110594 Draft TSG CT#53 meeting report TSG CT Secretary (MCC) Report Information Yes Yes Noted No
    SP-110595 IETF Status Report TSG CT Chairman Report Information Yes Yes Noted No
15.2
TSG GERAN Report and Questions for Advice
SP-110596 TSG GERAN Status Report TSG GERAN Chairman Report Presentation Yes Yes Noted No
15.3
TSG RAN Report and Questions for Advice
SP-110609 TSG RAN #53 report from TSG RAN Chairman TSG RAN Chairman Report Presentation Yes Yes Revised in SP-110645 No SP-110645
    SP-110645 TSG RAN #53 report from TSG RAN Chairman TSG RAN Chairman Report Presentation Yes Yes Noted No SP-110609
    SP-110610 TSG RAN#53 draft meeting report TSG RAN Secretary (MCC) Report Information Yes Yes Noted No
    SP-110646 Results of TSG RAN WI/SI prioritization at TSG RAN#53 and TSG SA#53 TSG RAN Chairman OTHER Information Yes Yes TSG RAN will review their status according to the TSG SA priority agreements and will update the RAN prioritisation accordingly. The TSG RAN Chairman clarified that his report from TSG SA#53 will include this information and will try to explain the impac No
    SP-110492 LS from ITU-R WP 5D: LIAISON STATEMENT TO THE 3GPP ORGANIZATIONAL PARTNERS ON THE COMPLETION OF REC. ITU-R M.[IMT.RSPEC] ITU-R WP 5D LS In Information Yes Yes Response in SP-110659. No
    SP-110493 LS from TSG RAN: Response to ITU-R WP 5D on the completion of Rec. ITU-R M.[IMT.RSPEC] TSG RAN W/DRAW Information No No WITHDRAWN Yes
    SP-110611 Proposed Response to ITU-R WP 5D/TEMP/519 = RP-110933 on the completion of Rec. ITU-R M.[IMT.RSPEC] TSG RAN LS OUT Approval Yes Yes This LS was reviewed and updated to show source as TSG RAN and TSG SA in SP-110659 No
    SP-110659 Proposed Response to ITU-R WP 5D/TEMP/519 = RP-110933 on the completion of Rec. ITU-R M.[IMT.RSPEC] TSG RAN, TSG SA LS OUT Approval Yes Yes Approved No SP-110611
    SP-110612 Update Submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Revision 11 of Recommendation ITU-R M.1457 TSG RAN LS OUT Approval Yes Yes This LS was reviewed and updated to show source as TSG RAN and TSG SA in SP-110658 No
    SP-110658 Update Submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Revision 11 of Recommendation ITU-R M.1457 TSG RAN, TSG SA LS OUT Approval Yes Yes Approved No SP-110612
    SP-110613 Updated information on the roadmap for IMT-2000 CDMA DS & IMT-2000 CDMA TDD TSG RAN LS OUT Approval Yes Yes This LS was reviewed and updated to show source as TSG RAN and TSG SA and to remove the text on availability of LIMONET, in SP-110660 No
    SP-110660 Updated information on the roadmap for IMT-2000 CDMA DS & IMT-2000 CDMA TDD TSG RAN LS OUT Approval Yes Yes Approved No SP-110613
16
Project Management
16.1
Review of the work plan
SP-110494 3GPP Work Plan review at Plenary #53 MCC Work Plan Manager Work Plan Presentation Yes Yes The Work Plan manager revised the slides to make agreed corrections to the slides in SP-110661 No
    SP-110661 3GPP Work Plan review at Plenary #53 MCC Work Plan Manager Work Plan Presentation No Yes Noted No SP-110494
16.2
Release contents and planning discussions
16.3
Specification Status
17
Project Support
17.1
Improvements to working methods
17.2
MCC Status Report
SP-110567 MCC Support Team report MCC (John Meredith) Report Presentation Yes Yes Noted No
18
Future meeting schedule
19
Any Other Business
20
Close of Meeting
99
WITHDRAWN ITEMS

Created: 2011-09-21 15:21     Last document: SP-110661