ETSI logo

www.3gpp.org / ftp / tsg_ran / wg2_rl2 / TSGR2_118-e / Inbox / Drafts / [Offline-021][NR1516] UE capabilities II (Huawei) / phase 2 / eMIMO

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon draft LS on eMIMO features defined in different granularity with prerequisite_v00.docx 2022/05/13 4:44 22 KB
icon draft LS on eMIMO features defined in different granularity with prerequisite_v01_ER.docx 2022/05/17 13:07 28,8 KB
icon draft LS on eMIMO features defined in different granularity with prerequisite_v02_HW.docx 2022/05/18 3:37 26,5 KB
icon R2-220xxxx_38306_CR#0722_Rel-16_Clarification on capabilities reported in different granularity with prerequisite.docx 2022/05/13 4:45 158,3 KB
icon R2-220xxxx_38306_CR#0723_Rel-17_Clarification on capabilities reported in different granularity with prerequisite.docx 2022/05/13 4:45 166,4 KB

5 items.