ETSI logo

www.3gpp.org / ftp / tsg_ran / wg2_rl2 / TSGR2_117-e / Inbox / Drafts / [Offline-031][NR16] Connection Control I (Ericsson) / Phase2 / UAI

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon R2-220xxxx - Correction on delta configuration for UAI overheating in EN-DC.docx 2022/02/25 6:49 55,2 KB
icon [Offline-031][NR16] Connection Control I (Ericsson)_phase2_v00.docx 2022/02/25 6:49 79,2 KB
icon [Offline-031][NR16] Connection Control I (Ericsson)_phase2_v01_Samsung.docx 2022/02/28 6:53 74,9 KB
icon [Offline-031][NR16] Connection Control I (Ericsson)_phase2_v02_HW.docx 2022/03/01 2:44 73,7 KB
icon [Offline-031][NR16] Connection Control I (Ericsson)_phase2_v03_vivo.docx 2022/03/01 8:50 76,8 KB
icon [Offline-031][NR16] Connection Control I (Ericsson)_phase2_v04_summary.docx 2022/03/02 10:10 77,6 KB

6 items.