DOCUMENT:
|
Agenda - opening session
|
Doc.Name
|
R5-090001
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090001.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Agenda - mid week session
|
Doc.Name
|
R5-090002
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090002.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Agenda - closing session
|
Doc.Name
|
R5-090003
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090003.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Session Programme
|
Doc.Name
|
R5-090004
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090004.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Leadership Team
|
Doc.Name
|
R5-090005
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090005.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Previous RAN5 WG Minutes
|
Doc.Name
|
R5-090006
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090006.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Previous RAN5 WG Action Points
|
Doc.Name
|
R5-090007
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090007.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Previous RAN5 WG bis Minutes
|
Doc.Name
|
R5-090008
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090008.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Previous RAN Plenary Notes
|
Doc.Name
|
R5-090009
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090009.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Active WI Update after previous RAN Plenary
|
Doc.Name
|
R5-090010
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090010.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TF 160 Status Report - current
|
Doc.Name
|
R5-090011
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090011.zip
|
|
|
Source:
|
TF 160 Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Previous GCF SG/CAG mtg notes
|
Doc.Name
|
R5-090012
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090012.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RAN5 Status Report at previous Plenary
|
Doc.Name
|
R5-090013
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090013.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TF 160 Status Report - previous Plenary
|
Doc.Name
|
R5-090014
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090014.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Email agreement status at previous Plenary
|
Doc.Name
|
R5-090015
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090015.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
RAN Plenary draft report
|
Doc.Name
|
R5-090016
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090016.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
SA Plenary draft report
|
Doc.Name
|
R5-090017
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090017.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RAN Chair report to SA Plenary
|
Doc.Name
|
R5-090018
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090018.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
PCG Meeting - latest draft report
|
Doc.Name
|
R5-090019
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090019.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
OP Meeting- latest draft report
|
Doc.Name
|
R5-090020
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090020.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Meeting Schedule RAN5
|
Doc.Name
|
R5-090021
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090021.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Liaison statement - template
|
Doc.Name
|
R5-090022
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090022.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RAN5 Agreed CRs summary
|
Doc.Name
|
R5-090023
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090023.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
RAN5 CRs for email agreement
|
Doc.Name
|
R5-090024
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090024.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Target Review - RF
|
Doc.Name
|
R5-090025
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090025.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Target Review - Sig
|
Doc.Name
|
R5-090026
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090026.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
RAN5 meeting minutes - first draft
|
Doc.Name
|
R5-090027
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090027.zip
|
|
|
Source:
|
Project Manager
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
RAN5 draft Status Report for next Plenary
|
Doc.Name
|
R5-090028
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090028.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Meeting Schedule RAN5 update
|
Doc.Name
|
R5-090029
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090029.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Deadlines for next 3 months
|
Doc.Name
|
R5-090030
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090030.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RAN5 next meeting details
|
Doc.Name
|
R5-090031
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090031.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
IMS CC test model / Addition of new ASP to reconfigure IP La yer
|
Doc.Name
|
R5-090032
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090032.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Reply LS on the addition of CS voice over HSPA radio bearer combinations to TS 34.108
|
Doc.Name
|
R5-090033
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090033.zip
|
|
|
Source:
|
TSG WG RAN4
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LS to RAN WG5 on UE restrictions on E-TFCIs
|
Doc.Name
|
R5-090034
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090034.zip
|
|
|
Source:
|
TSG WG RAN2
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Response LS on Multi Band Multi RAT Test Cases
|
Doc.Name
|
R5-090035
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090035.zip
|
|
|
Source:
|
TSG WG GERAN3
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Request for information on 3GPP R7 and R8 test cases
|
Doc.Name
|
R5-090036
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090036.zip
|
|
|
Source:
|
ETSI TC INT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Usage of IMS-CC TTCN-3 code for OMA Enablers
|
Doc.Name
|
R5-090037
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090037.zip
|
|
|
Source:
|
OMA IOP
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
PTCRB LS on Inner Loop Power Control Test Coverage
|
Doc.Name
|
R5-090038
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090038.zip
|
|
|
Source:
|
PTCRB
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LS on Expected UE behaviour in PMM-CONNECTED Mode
|
Doc.Name
|
R5-090039
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090039.zip
|
|
|
Source:
|
TSG WG RAN2
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Reply LS on Common Test Environment (TS 36.508)
|
Doc.Name
|
R5-090040
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090040.zip
|
|
|
Source:
|
TSG WG RAN2
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Reply LS on Special Conformance Testing Functions for UE (TS 36.509)
|
Doc.Name
|
R5-090041
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090041.zip
|
|
|
Source:
|
TSG WG RAN2
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LS to WP5D (via TSG-RAN): TEST CONDITION FOR ADJACENT CHANNE L SELECTIVITY
|
Doc.Name
|
R5-090042
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090042.zip
|
|
|
Source:
|
TSG WG RAN4
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LS to WP5D (via TSG-RAN): PARAMETERS OF IMT RADIO INTERFACE TECHNOLOGIES FOLLOWING WRC-07
|
Doc.Name
|
R5-090043
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090043.zip
|
|
|
Source:
|
TSG WG RAN4
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LS to WP5D (via TSG-RAN): Adjacent Channel Leakage Ration (A CLR) and Test Tolerances in 3GPP specifications
|
Doc.Name
|
R5-090044
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090044.zip
|
|
|
Source:
|
TSG WG RAN4
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Spurious emission requirements on PHS band including the fut ure plan in Japan
|
Doc.Name
|
R5-090045
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090045.zip
|
|
|
Source:
|
TSG WG RAN4
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Response LS on the test case “Correct behaviour when reachin g maximum transmit power”
|
Doc.Name
|
R5-090046
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090046.zip
|
|
|
Source:
|
TSG WG RAN4
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RESPONSE LS on Common Test Environment (TS 36.508)
|
Doc.Name
|
R5-090047
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090047.zip
|
|
|
Source:
|
TSG WG RAN4
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Reply LS on Common Test Environment (TS 36.508)
|
Doc.Name
|
R5-090048
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090048.zip
|
|
|
Source:
|
TSG WG RAN1
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Reply LS on enhancing radio bearer parameters in 34.108 for Improved Layer 2 UL (FDD)
|
Doc.Name
|
R5-090049
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090049.zip
|
|
|
Source:
|
TSG WG RAN1
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Test model enhancement for CS Voice over HSPA and Enhanced F ACH
|
Doc.Name
|
R5-090050
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090050.zip
|
|
|
Source:
|
MCC TF160
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Update of E-UTRAN test case 6.1.1.1
|
Doc.Name
|
R5-090051
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090051.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to test cases in clause 12
|
Doc.Name
|
R5-090052
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090052.zip
|
|
|
Source:
|
RIM
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TDD Intra frequency RSRQ Accuracy
|
Doc.Name
|
R5-090053
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090053.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TDD Inter frequency RSRQ Accuracy
|
Doc.Name
|
R5-090054
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090054.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of transmit modulation
|
Doc.Name
|
R5-090055
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090055.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Removal of an unused pixit and other routine updates
|
Doc.Name
|
R5-090056
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090056.zip
|
|
|
Source:
|
MCC TF160
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Cleanup USIM parameters for Idle mode test
|
Doc.Name
|
R5-090057
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090057.zip
|
|
|
Source:
|
MCC TF160
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction of frequencies used in 6.1.1.14
|
Doc.Name
|
R5-090058
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090058.zip
|
|
|
Source:
|
MCC TF160
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
36.523-3-100
|
Doc.Name
|
R5-090059
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090059.zip
|
|
|
Source:
|
Rapporteur
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Using AT commands for test automation
|
Doc.Name
|
R5-090060
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090060.zip
|
|
|
Source:
|
MCC TF160
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to GCF Rel7 CPC test case 8.2.2.54
|
Doc.Name
|
R5-090061
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090061.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction of WI-070 CPC test case 8.2.1.40
|
Doc.Name
|
R5-090062
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090062.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction of WI-070 CPC test case 8.2.6.61
|
Doc.Name
|
R5-090063
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090063.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3: Addition of test case 6.1.1.4: PLMN selection in sh ared network environment, Automatic mode
|
Doc.Name
|
R5-090064
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090064.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Addition of PLMN selection test case 6.1.1.5: PLMN selection in shared network environment, Manual mode
|
Doc.Name
|
R5-090065
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090065.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Update of LTE TC 8.1.2.2 RRC, Reject with wait time
|
Doc.Name
|
R5-090066
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090066.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Update of LTE TC 8.1.2.3 RRC - RRC Connection Estab lishment in RRC Idle state: return to idle state after T300 timeout
|
Doc.Name
|
R5-090067
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090067.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Update of RRC part1 TC 8.1.3.4 RRC Connection Relea se: redirection to another E-UTRAN frequency
|
Doc.Name
|
R5-090068
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090068.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Update of RRC part1 TC 8.1.3.6 RRC Connection Relea se: redirection from E-UTRAN to UTRAN
|
Doc.Name
|
R5-090069
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090069.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Update of RRC part3 TC 8.3.1.7 Measurement configur ation control and reporting / intra E-UTRAN measurements: bl acklisting
|
Doc.Name
|
R5-090070
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090070.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update of LTE TC 8.5.1.1 RRC - RRC Connection Re-e stablishment: Success (after Radio Link Failure)
|
Doc.Name
|
R5-090071
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090071.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update of LTE TC 8.5.1.3 RRC - RRC Connection Re-e stablishment: Failure: T311 Expiry
|
Doc.Name
|
R5-090072
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090072.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of new EMM TC 9.2.1.2.3: Successful combin ed attach procedure, EPS service only / MSC temporarily not reachable
|
Doc.Name
|
R5-090073
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090073.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of EMM TC 9.2.1.2.4 for Successful combine d attach procedure, EPS service only / CS domain not availab le.
|
Doc.Name
|
R5-090074
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090074.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3: Addition of EMM TC 9.2.1.1.6 for successful attach procedure in shared network
|
Doc.Name
|
R5-090075
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090075.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of EMM TC 10.2.2 for Dedicated EPS bearer context activation / Reject by UE
|
Doc.Name
|
R5-090076
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090076.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of EMM TC 10.3.2 for EPS bearer context mo dification / Failure
|
Doc.Name
|
R5-090077
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090077.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of EMM TC 10.4.1 for EPS bearer context d eactivation / Success
|
Doc.Name
|
R5-090078
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090078.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of EMM TC 10.5.1 for UE requested PDN con nectivity accepted by the network
|
Doc.Name
|
R5-090079
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090079.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of ESM TC 10.5.2 for UE requested PDN conn ectivity accepted by the network / no PDN address allocated
|
Doc.Name
|
R5-090080
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090080.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of ESM TC 10.5.3 for UE requested PDN conn ectivity not accepted
|
Doc.Name
|
R5-090081
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090081.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of ESM TC 10.6.2 for UE requested PDN disc onnect procedure not accepted by the network
|
Doc.Name
|
R5-090082
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090082.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of generic procedures for activation UE test mode and UE loopback
|
Doc.Name
|
R5-090083
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090083.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.508
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Test procedure to verify that an EPS bearer context is activ e
|
Doc.Name
|
R5-090084
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090084.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.508 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Corrections to 36.509
|
Doc.Name
|
R5-090085
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090085.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.509 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B -Update to test case 6.1.2.15
|
Doc.Name
|
R5-090086
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090086.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to generic test procedure for Enhanced L2 DL MAC- ehs transport block size selection test cases
|
Doc.Name
|
R5-090087
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090087.zip
|
|
|
Source:
|
Ericsson, Nokia, Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A -Update to test case 6.1.2.4
|
Doc.Name
|
R5-090088
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090088.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A -Update to test case 6.1.2.5
|
Doc.Name
|
R5-090089
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090089.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to Enhanced L2 DL radio bearer test cases
|
Doc.Name
|
R5-090090
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090090.zip
|
|
|
Source:
|
Ericsson, Nokia, Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to RRM E-TFC restriction test cases 8.4.4.1 and 8 .4.4.2
|
Doc.Name
|
R5-090091
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090091.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to titles of test cases 3 and 4 in TC 7.9.1
|
Doc.Name
|
R5-090092
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090092.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Extensions to CQI tests
|
Doc.Name
|
R5-090093
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090093.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Modifications to CQI test cases in annexes
|
Doc.Name
|
R5-090094
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090094.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability changes to CQI test cases
|
Doc.Name
|
R5-090095
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090095.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Introduction of requirements for UE UL power control operati on with discontinuous UL DPCCH transmission operation – chan ges to section 7
|
Doc.Name
|
R5-090096
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090096.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Introduction of requirements for UE UL power control operati on with discontinuous UL DPCCH transmission operation – chan ges to Annexes
|
Doc.Name
|
R5-090097
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090097.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Introduction of requirements for UE UL power control operati on with discontinuous UL DPCCH transmission operation
|
Doc.Name
|
R5-090098
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090098.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Work plan for Conformance Test Aspects - UMTS3500 - Status a fter RAN5#42
|
Doc.Name
|
R5-090099
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090099.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Status report for WI UMTS3500
|
Doc.Name
|
R5-090100
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090100.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Removal of reference to 11-bit Length Indicator in E-UTRA RL C test cases
|
Doc.Name
|
R5-090101
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090101.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to E-UTRA RLC test case 7.2.3.1
|
Doc.Name
|
R5-090102
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090102.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to E-UTRA RLC test case 7.2.3.2
|
Doc.Name
|
R5-090103
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090103.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 15.9 Communication Forwarding on Busy
|
Doc.Name
|
R5-090104
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090104.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 15.10 Communication Forwarding not logged in
|
Doc.Name
|
R5-090105
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090105.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 15.19 for inviting user to conference via conference focus
|
Doc.Name
|
R5-090106
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090106.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 15.15 Subscription to the MWI event packa ge
|
Doc.Name
|
R5-090107
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090107.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - New E-UTRA PDCP test case - 7.3.1.2 Maintenance o f PDCP sequence numbers (user plane, RLC UM)
|
Doc.Name
|
R5-090108
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090108.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - Correction to E-UTRA PDCP test case 7.3.1.1
|
Doc.Name
|
R5-090109
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090109.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 17.5 MO Speech, add text
|
Doc.Name
|
R5-090110
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090110.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - Applicability of new E-UTRA PDCP test case - 7.3. 1.2 Maintenance of PDCP sequence numbers (user plane, RLC UM )
|
Doc.Name
|
R5-090111
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090111.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Updates to MTSI TCs 12.12 and 17.1 for MO speech and video
|
Doc.Name
|
R5-090112
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090112.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Harmonizing the requirements within MTSI XCAP test cases
|
Doc.Name
|
R5-090113
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090113.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability statements of new MTSI test cases
|
Doc.Name
|
R5-090114
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090114.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of E-UTRA MAC test case: 7.1.3.3
|
Doc.Name
|
R5-090115
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090115.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update of E-UTRA MAC test case: 7.1.2.9
|
Doc.Name
|
R5-090116
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090116.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - New E-UTRA MAC test case - 7.1.7.1 DL-SCH Transpo rt Block Size support
|
Doc.Name
|
R5-090117
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090117.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - New E-UTRA MAC test case - 7.1.7.2 UL-SCH Transpo rt Block Size support
|
Doc.Name
|
R5-090118
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090118.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Applicability of new E-UTRA MAC test cases - 7.1. 7.1 and 7.1.7.2
|
Doc.Name
|
R5-090119
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090119.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
GCF UTRA priority list update after GCF CAG#17 (CAG-09-011r1 )
|
Doc.Name
|
R5-090120
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090120.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to testcase 8.5.2.2
|
Doc.Name
|
R5-090121
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090121.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to GCF WI-070 test case 8.2.6.57
|
Doc.Name
|
R5-090122
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090122.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B -Update to test case 7.2.2.4
|
Doc.Name
|
R5-090123
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090123.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 -Update to test case 7.2.2.8
|
Doc.Name
|
R5-090124
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090124.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B -Update to test case 7.2.2.9
|
Doc.Name
|
R5-090125
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090125.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A -Update to test case 7.2.3.3
|
Doc.Name
|
R5-090126
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090126.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A -Update to test case 7.2.3.4
|
Doc.Name
|
R5-090127
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090127.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A -Update to test case 8.1.1.1
|
Doc.Name
|
R5-090128
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090128.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 -Update to test case 8.1.2.5
|
Doc.Name
|
R5-090129
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090129.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A -Update to test case 8.1.2.7
|
Doc.Name
|
R5-090130
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090130.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A -Update to test case 8.1.3.5
|
Doc.Name
|
R5-090131
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090131.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to test case 8.2.4.1
|
Doc.Name
|
R5-090132
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090132.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.2.4.2
|
Doc.Name
|
R5-090133
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090133.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.2.4.3
|
Doc.Name
|
R5-090134
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090134.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - Update to test case 8.2.4.5
|
Doc.Name
|
R5-090135
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090135.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.2.4.6
|
Doc.Name
|
R5-090136
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090136.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.2.4.7
|
Doc.Name
|
R5-090137
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090137.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.2.4.9
|
Doc.Name
|
R5-090138
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090138.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.3.1.10
|
Doc.Name
|
R5-090139
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090139.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.3.1.8
|
Doc.Name
|
R5-090140
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090140.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.3.1.9
|
Doc.Name
|
R5-090141
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090141.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.3.2.3
|
Doc.Name
|
R5-090142
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090142.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new case 8.4.1.2
|
Doc.Name
|
R5-090143
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090143.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 8.4.1.8
|
Doc.Name
|
R5-090144
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090144.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to Idle Mode test method
|
Doc.Name
|
R5-090145
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090145.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to test case 8.5.4.1
|
Doc.Name
|
R5-090146
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090146.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.1.2.10
|
Doc.Name
|
R5-090147
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090147.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.1.2.6
|
Doc.Name
|
R5-090148
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090148.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.1.2.8
|
Doc.Name
|
R5-090149
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090149.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.1.2.9
|
Doc.Name
|
R5-090150
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090150.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.3.2.10
|
Doc.Name
|
R5-090151
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090151.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.3.2.12
|
Doc.Name
|
R5-090152
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090152.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.3.2.15
|
Doc.Name
|
R5-090153
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090153.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.3.2.3
|
Doc.Name
|
R5-090154
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090154.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 9.2.3.2.6
|
Doc.Name
|
R5-090155
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090155.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for LTE Protocol Testi ng in Idle Mode Operation
|
Doc.Name
|
R5-090156
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090156.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for LTE Protocol Testi ng in Inter-RAT Handover
|
Doc.Name
|
R5-090157
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090157.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Corrections to CPC MAC test case 7.1.6.3.4
|
Doc.Name
|
R5-090158
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090158.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to CPC MAC test case 7.1.6.2.11
|
Doc.Name
|
R5-090159
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090159.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of radio bearer parameters for UE HS-DSCH Physical Layer category 19 and 20
|
Doc.Name
|
R5-090160
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090160.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction of radio bearer parameters for UE HS-DSCH Physica l Layer category 15 and 18
|
Doc.Name
|
R5-090161
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090161.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to MAC-hs test case 7.1.5b1
|
Doc.Name
|
R5-090162
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090162.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE/SAE Signalling Work Items – Priority One Test Cases
|
Doc.Name
|
R5-090163
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090163.zip
|
|
|
Source:
|
GCF CAG
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction of applicability for test case 12.4.2.11
|
Doc.Name
|
R5-090164
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090164.zip
|
|
|
Source:
|
7 layers AG
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CT Draft Plenary Report
|
Doc.Name
|
R5-090165
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090165.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Editorial corrections to some applicability conditions
|
Doc.Name
|
R5-090166
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090166.zip
|
|
|
Source:
|
7 layers AG
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to E-DCH Transmission Time Interval
|
Doc.Name
|
R5-090167
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090167.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to Radio Bearer Setup message ( A17 & A18)
|
Doc.Name
|
R5-090168
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090168.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to testcase 8.1.2.19
|
Doc.Name
|
R5-090169
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090169.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to CPC testcases in 8.2.1.x & 8.2.2.x series
|
Doc.Name
|
R5-090170
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090170.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to CPC releated testcases in 8.2.6.x series
|
Doc.Name
|
R5-090171
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090171.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to CPC testcases 8.3.1.45, 8.3.1.46 & 8.3.4.11.
|
Doc.Name
|
R5-090172
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090172.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update to Coding rate parameters when 64QAM is configured
|
Doc.Name
|
R5-090173
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090173.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 36.508: Introduction of Event B IEs
|
Doc.Name
|
R5-090174
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090174.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE Demodulation of PDSCH Test Requirements text proposal
|
Doc.Name
|
R5-090175
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090175.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to TB test points for enhanced Layer 2
|
Doc.Name
|
R5-090176
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090176.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE RRM FDD/FDD Handover for intra/inter frequency text prop osal
|
Doc.Name
|
R5-090177
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090177.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRAN FDD intra-frequency measurements text proposal
|
Doc.Name
|
R5-090178
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090178.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RSTQ Accuracy Measurement Performance Requirements text prop osal
|
Doc.Name
|
R5-090179
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090179.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE RRM E-UTRA FDD to GSM Cell Re-Selection text proposal
|
Doc.Name
|
R5-090180
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090180.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE RRM E-UTRA FDD to GSM Handover text proposal
|
Doc.Name
|
R5-090181
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090181.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE UE Measurement Procedures Structure text proposal
|
Doc.Name
|
R5-090182
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090182.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE RRM E-UTRA FDD to UTRA FDD Cell Search text proposal
|
Doc.Name
|
R5-090183
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090183.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE UE inter-RAT Handover Structure text proposal
|
Doc.Name
|
R5-090184
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090184.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE RRM E-UTRA FDD to UTRA FDD Handover text proposal
|
Doc.Name
|
R5-090185
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090185.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE UE Transmit Timing Requirements text proposal
|
Doc.Name
|
R5-090186
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090186.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Clarification on compressed mode DL frame type
|
Doc.Name
|
R5-090187
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090187.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: CR for UE max power test case
|
Doc.Name
|
R5-090188
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090188.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: CR for MPR test case
|
Doc.Name
|
R5-090189
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090189.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: DL reference channels
|
Doc.Name
|
R5-090190
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090190.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
LTE-RF: TS 36.521-3 after RAN5#42
|
Doc.Name
|
R5-090191
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090191.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
LTE-RF: WID update
|
Doc.Name
|
R5-090192
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090192.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
LTE-RF: Work plan
|
Doc.Name
|
R5-090193
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090193.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
LTE-RF: Status report
|
Doc.Name
|
R5-090194
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090194.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Mobile Transmit Diversity in HSUPA/UMTS network
|
Doc.Name
|
R5-090195
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090195.zip
|
|
|
Source:
|
Magnolia Broadband
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-1B: Introduction of a new EMM test case, 9.2.3.1.4 Nor mal tracking area update / list of equivalent PLMNs in the T RACKING AREA UPDATE ACCEPT message
|
Doc.Name
|
R5-090196
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090196.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-1B: Introduction of a new EMM test case, 9.2.3.1.8 UE receives an indication that the RRC connection was released with cause 'load balancing TAU required''
|
Doc.Name
|
R5-090197
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090197.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-2: Introduction of new EMM test cases, 9.2.3.1.10 and 9.2.3.1.11 Normal tracking area update / Rejected
|
Doc.Name
|
R5-090198
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090198.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Removal of EMM test cases 9.2.2.2.4, 9.2.2.2.6, 9.2.2.2.7 an d 9.2.2.2.8.
|
Doc.Name
|
R5-090199
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090199.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of Applicability table for EPS mobility management te st cases
|
Doc.Name
|
R5-090200
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090200.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.2.1
|
Doc.Name
|
R5-090201
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090201.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.2.2
|
Doc.Name
|
R5-090202
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090202.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.2.4
|
Doc.Name
|
R5-090203
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090203.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add specific information elements for RRC reconfiguration
|
Doc.Name
|
R5-090204
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090204.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - Update of test case 8.2.2.1
|
Doc.Name
|
R5-090205
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090205.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
IMS test case 8.9 / Supported Header and expire rule during de-registration
|
Doc.Name
|
R5-090206
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090206.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Work plan for Multimedia Telephony Services for IMS – Status after RAN5#42
|
Doc.Name
|
R5-090207
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090207.zip
|
|
|
Source:
|
Ericsson, Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Status report for WI Multimedia Telephony Services for IMS – Status after RAN5#42
|
Doc.Name
|
R5-090208
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090208.zip
|
|
|
Source:
|
Ericsson, Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Add annex MTSI MT speech call, SS resources available
|
Doc.Name
|
R5-090209
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090209.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 16.11
|
Doc.Name
|
R5-090210
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090210.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 16.12
|
Doc.Name
|
R5-090211
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090211.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 16.13
|
Doc.Name
|
R5-090212
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090212.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Remove non MTSI related call setup test cases (2nd)
|
Doc.Name
|
R5-090213
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090213.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Remove MTSI test case 17.8
|
Doc.Name
|
R5-090214
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090214.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Remove video only based codec selection test cases
|
Doc.Name
|
R5-090215
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090215.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update MTSI test case 17.2
|
Doc.Name
|
R5-090216
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090216.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update MTSI test case 17.6
|
Doc.Name
|
R5-090217
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090217.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update MTSI test case 17.18
|
Doc.Name
|
R5-090218
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090218.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add annex MTSI MO text call
|
Doc.Name
|
R5-090219
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090219.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update MTSI test case 12.16
|
Doc.Name
|
R5-090220
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090220.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New MTSI test case 17.17
|
Doc.Name
|
R5-090221
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090221.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update annex C.11 MTSI MT speech call
|
Doc.Name
|
R5-090222
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090222.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update annex C.13 MTSI MT text call
|
Doc.Name
|
R5-090223
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090223.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update MTSI test case 12.13
|
Doc.Name
|
R5-090224
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090224.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update MTSI test case 12.17
|
Doc.Name
|
R5-090225
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090225.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Remove applicabilities for non MTSI related call setup test cases (2nd)
|
Doc.Name
|
R5-090226
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090226.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add applicabilities for new clause 16 test cases
|
Doc.Name
|
R5-090227
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090227.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Remove applicabilities for removed clause 16 test cases
|
Doc.Name
|
R5-090228
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090228.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add applicability for new clause 17 test case
|
Doc.Name
|
R5-090229
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090229.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.2.5
|
Doc.Name
|
R5-090230
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090230.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.2.7
|
Doc.Name
|
R5-090231
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090231.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.2.8
|
Doc.Name
|
R5-090232
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090232.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
.Bacth 1:Corrections to MAC test case 7.1.3.4
|
Doc.Name
|
R5-090233
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090233.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.3.5
|
Doc.Name
|
R5-090234
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090234.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.3.6
|
Doc.Name
|
R5-090235
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090235.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.4.11
|
Doc.Name
|
R5-090236
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090236.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.4.15
|
Doc.Name
|
R5-090237
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090237.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.4.16
|
Doc.Name
|
R5-090238
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090238.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to EMM test case 9.1.3.1
|
Doc.Name
|
R5-090239
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090239.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New TC9.3.7C -- MIMO Dual Stream Fading Conditions – UE cate gories 19-20
|
Doc.Name
|
R5-090240
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090240.zip
|
|
|
Source:
|
Qualcomm Europe
|
Abstract:
|
The core specifications for Rel-8 have been enhanced by the introduction of Comb ination of 64QAM and MIMO for HSDPA (FDD). So the test specifications need to be updated accordingly
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to EMM test case 9.1.3.2
|
Doc.Name
|
R5-090241
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090241.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New TC9.3.7D -- MIMO Dual Stream Static Orthogonal Condition s UE categories 15-20
|
Doc.Name
|
R5-090242
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090242.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to EMM test case 9.4.1
|
Doc.Name
|
R5-090243
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090243.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New TC9.3.7E -- MIMO Dual Stream Static Orthogonal Condition s UE categories 19-20
|
Doc.Name
|
R5-090244
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090244.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Adding test tolerances and MIMO propagation conditions in th e annex for New MIMO test cases
|
Doc.Name
|
R5-090245
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090245.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add applicability for the new test cases in Section 9.3.7
|
Doc.Name
|
R5-090246
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090246.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to EMM test case 9.4.3
|
Doc.Name
|
R5-090247
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090247.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to HSUPA TC 5.2D and 5.13.2B
|
Doc.Name
|
R5-090248
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090248.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Maximum Input Level for HS-PDSCH Reception (1.28TDD 64QAM)
|
Doc.Name
|
R5-090249
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090249.zip
|
|
|
Source:
|
ZTE corporation
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
New HSPA radio bearer test case for 1.28TDD 64QAM
|
Doc.Name
|
R5-090250
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090250.zip
|
|
|
Source:
|
ZTE corporation
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Test requirements for HS-DSCH 64QAM 1.28TDD
|
Doc.Name
|
R5-090251
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090251.zip
|
|
|
Source:
|
ZTE corporation
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
LTE-RF Investigation of E-UTRA-TDD for Occupied bandwidth te st case applicability
|
Doc.Name
|
R5-090252
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090252.zip
|
|
|
Source:
|
QUALCOMM EUROPE
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: TDD Applicability and CR for Spectrum Emission Mask and Additional Spectrum Emission Mask
|
Doc.Name
|
R5-090253
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090253.zip
|
|
|
Source:
|
QUALCOMM EUROPE
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: Investigation of E-UTRA-TDD for Adjacent Channel Lea kage power Ratio test case applicability
|
Doc.Name
|
R5-090254
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090254.zip
|
|
|
Source:
|
QUALCOMM EUROPE
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Status Report for WI 64 QAM for 1.28 Mcps TDD HSDPA
|
Doc.Name
|
R5-090255
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090255.zip
|
|
|
Source:
|
ZTE corporation
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
LTE-RF: TDD applicability and CR for Reference Sensitivity L evel
|
Doc.Name
|
R5-090256
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090256.zip
|
|
|
Source:
|
QUALCOMM EUROPE
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: TDD applicability and CR for Maximum Input Level
|
Doc.Name
|
R5-090257
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090257.zip
|
|
|
Source:
|
QUALCOMM EUROPE
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: TDD applicability and CR for Adjacent Channel Select ivity (ACS)
|
Doc.Name
|
R5-090258
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090258.zip
|
|
|
Source:
|
QUALCOMM EUROPE
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Work plan for WI 64QAM for 1.28Mcps TDD HSDPA
|
Doc.Name
|
R5-090259
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090259.zip
|
|
|
Source:
|
ZTE corporation
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Reply LS on SDP parameters for AMR codec
|
Doc.Name
|
R5-090260
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090260.zip
|
|
|
Source:
|
TSG WG SA4
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update E-UTRA PDCP TC 7.3.4.1
|
Doc.Name
|
R5-090261
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090261.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update E-UTRA PDCP TC 7.3.4.2
|
Doc.Name
|
R5-090262
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090262.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of new TC 7.3.5.4
|
Doc.Name
|
R5-090263
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090263.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of TC 7.3.6.1 PDCP Discard
|
Doc.Name
|
R5-090264
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090264.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Removal of TC 7.3.5.1
|
Doc.Name
|
R5-090265
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090265.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of message RRCConnectionReconfiguration and SMC in 36 .508
|
Doc.Name
|
R5-090266
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090266.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Intra-frequency cell search TDD
|
Doc.Name
|
R5-090267
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090267.zip
|
|
|
Source:
|
Huawei, R&S
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Intra-frequency Absolute RSRP measruement accuracy TDD
|
Doc.Name
|
R5-090268
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090268.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Intra-frequency Relative RSRP measruement accuracy TDD
|
Doc.Name
|
R5-090269
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090269.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Inter-frequency RSRP absolute accuracy TDD
|
Doc.Name
|
R5-090270
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090270.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Inter-frequency RSRP relative accuracy TDD
|
Doc.Name
|
R5-090271
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090271.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of the Maximum Output Power for UE with two transmit chains and two transmit antennas
|
Doc.Name
|
R5-090272
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090272.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing the maximum output power for the UE with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of the frequency error for UE with two t ransmit chains and two transmit antennas
|
Doc.Name
|
R5-090273
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090273.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing the frequency error for the UE with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of the output power dynamics in the upli nk for the UE with two transmit chains and two transmit ante nnas
|
Doc.Name
|
R5-090274
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090274.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing the output power dynamics for the U E with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of the Transmit ON/OFF power for the UE with two transmit chains and two transmit antennas
|
Doc.Name
|
R5-090275
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090275.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing the Transmit ON/OFF power for the U E with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of the mean power with the change of TFC for the UE with two transmit chains and two transmit antenn as
|
Doc.Name
|
R5-090276
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090276.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing the mean output power with the chan ge of TFC for the UE with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of power setting in uplink compressed mo de for the UE with two transmit chains and two transmit ante nnas
|
Doc.Name
|
R5-090277
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090277.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing power setting in uplink compressed mode for the UE with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of Occupied Bandwidth for the UE with tw o transmit chains and two transmit antennas
|
Doc.Name
|
R5-090278
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090278.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing Occupied Bandwidth for the UE with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of spectrum emission mask for the UE wit h two transmit chains and two transmit antennas
|
Doc.Name
|
R5-090279
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090279.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing spectrum emission mask for the UE w ith two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of ACLR for the UE with two transmit cha ins and two transmit antennas
|
Doc.Name
|
R5-090280
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090280.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing ACLR for the UE with two transmit c hains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of spurious emission for the UE with two transmit chains and two transmit antennas
|
Doc.Name
|
R5-090281
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090281.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing spurious emission for the UE with t wo transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of transmit intermodulation for the UE w ith two transmit chains and two transmit antennas
|
Doc.Name
|
R5-090282
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090282.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing transmit intermodulation for the UE with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Add the test method of transmit modulation for the UE with t wo transmit chains and two transmit antennas
|
Doc.Name
|
R5-090283
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090283.zip
|
|
|
Source:
|
Magnolia Broadband
|
Abstract:
|
Add the test setup and test mode for testing transmit modulation quality for the UE with two transmit chains and two antenna TX ports.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Bacth 1:Corrections to MAC test case 7.1.2.3
|
Doc.Name
|
R5-090284
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090284.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1: Addition of new MAC test case 7.1.3.9 : MAC reset
|
Doc.Name
|
R5-090285
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090285.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1: Addition of new MAC test case 7.1.4.12 : MAC reset
|
Doc.Name
|
R5-090286
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090286.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1: Addition of new MAC test case 7.1.4.9 : Correct Han dling of MAC control information [ Buffer Status/ a serving cell change occurs/Regular BSR]
|
Doc.Name
|
R5-090287
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090287.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Status report of WI MBSFN for FDD
|
Doc.Name
|
R5-090288
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090288.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Work Plan of WI MBSFN for FDD
|
Doc.Name
|
R5-090289
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090289.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 1: Addition of new EMM test case 9.2.1.1.24 : Attach / Abnormal case / Change of cell into a new tracking area
|
Doc.Name
|
R5-090290
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090290.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Protocol Te sting for PDCP
|
Doc.Name
|
R5-090291
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090291.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Applicability of new E-UTRA PDCP test case - 7.3.5.4
|
Doc.Name
|
R5-090292
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090292.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1: Applicablility for new MAC test cases 7.1.3.9, 7.1. 4.9 & 7.1.4.12
|
Doc.Name
|
R5-090293
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090293.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1: Applicability of new EMM test cases
|
Doc.Name
|
R5-090294
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090294.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposed for 3G LTE Protocol Te sting for MAC
|
Doc.Name
|
R5-090295
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090295.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposed for 3G LTE Protocol Te sting for ESM (EPS Session Management)
|
Doc.Name
|
R5-090296
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090296.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposed for 3G LTE Protocol Te sting for LTE/CDMA2000 Interworking
|
Doc.Name
|
R5-090297
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090297.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 8.4.5.2
|
Doc.Name
|
R5-090298
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090298.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A – Update of test case 8.2.4.1
|
Doc.Name
|
R5-090299
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090299.zip
|
|
|
Source:
|
CATT, CMCC
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 – Update of test case 8.1.3.4
|
Doc.Name
|
R5-090300
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090300.zip
|
|
|
Source:
|
CATT, CMCC
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on the test conditions on the application of MPR
|
Doc.Name
|
R5-090301
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090301.zip
|
|
|
Source:
|
ZTE corporation
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Some further considerations on the testing method when MPR a pplied
|
Doc.Name
|
R5-090302
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090302.zip
|
|
|
Source:
|
ZTE corporation
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Idle mode test timers configuration
|
Doc.Name
|
R5-090303
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090303.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Corrections to LTE idle mode test cases
|
Doc.Name
|
R5-090304
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090304.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.523-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to 8.7.1 and 8.7.2
|
Doc.Name
|
R5-090305
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090305.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 34.121-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New Annex H for Uplink Physical Channels
|
Doc.Name
|
R5-090306
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090306.zip
|
|
|
Source:
|
NEC, Anritsu
|
Abstract:
|
CR to 36.521-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to FDD PDSCH Single Antenna Port Performance test case
|
Doc.Name
|
R5-090307
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090307.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.521-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Text proposal for Reporting of Channel State Information
|
Doc.Name
|
R5-090308
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090308.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.521-1 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for RSRP Measurement Accuracy test cases
|
Doc.Name
|
R5-090309
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090309.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
Pseudo CR to 36.521-3
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for Annex C of TS 36.521-3
|
Doc.Name
|
R5-090310
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090310.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
Pseudo CR to 36.521-3
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to clause 4.3.3.3
|
Doc.Name
|
R5-090311
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090311.zip
|
|
|
Source:
|
NEC
|
Abstract:
|
CR to 36.508 Rel-8
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition 1.28 Mcps TDD contents in 6.11.5
|
Doc.Name
|
R5-090312
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090312.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the default RADIO BEARER SETUP message for con dition A22
|
Doc.Name
|
R5-090313
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090313.zip
|
|
|
Source:
|
Ericsson, MCC160
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction 1.28 Mcps TDD default RADIO BEARER SETUP message in 9.1.2
|
Doc.Name
|
R5-090314
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090314.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Additions to the default RRC messages for improved L2 in upl ink
|
Doc.Name
|
R5-090315
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090315.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition 1.28 Mcps TDD contents in 9.1.3
|
Doc.Name
|
R5-090316
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090316.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Introduction of alternative DRX configurations
|
Doc.Name
|
R5-090317
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090317.zip
|
|
|
Source:
|
Ericsson, NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition 1.28 Mcps TDD contents in 7.1.1.9 and 7.1.1.10
|
Doc.Name
|
R5-090318
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090318.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of RRC batch 1B test case 8.2.2.2 RRC Connection Reco nfiguration / SRB/DRB Reconfiguration: Success
|
Doc.Name
|
R5-090319
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090319.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition 1.28 Mcps TDD contents in 7.2.2a
|
Doc.Name
|
R5-090320
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090320.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition 1.28 Mcps TDD contents in 7.2.4.3s
|
Doc.Name
|
R5-090321
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090321.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction of EARFCN in 36.508
|
Doc.Name
|
R5-090322
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090322.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP of E-UTRAN TDD – GSM cell re-selection test case
|
Doc.Name
|
R5-090323
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090323.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP of E-UTRAN TDD – TDD inter frequency cell re-selection te st case
|
Doc.Name
|
R5-090324
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090324.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP of E-UTRAN TDD – TDD inter frequency handover test case
|
Doc.Name
|
R5-090325
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090325.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP of E-UTRAN TDD – TDD intra frequency cell re-selection te st case
|
Doc.Name
|
R5-090326
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090326.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP of E-UTRAN TDD – TDD intra frequency handover test case
|
Doc.Name
|
R5-090327
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090327.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP of E-UTRAN TDD – UTRAN TDD cell re-selection test case
|
Doc.Name
|
R5-090328
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090328.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Demodulation of TDD PDSCH test requirements text proposal
|
Doc.Name
|
R5-090329
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090329.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Update of test case 6.1.2.6
|
Doc.Name
|
R5-090330
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090330.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Modifying the reference measurement channel and performance requirement of 384kbps for LCR TDD
|
Doc.Name
|
R5-090331
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090331.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Adding the additional requirement of Adjacent Channel Select ivity for LCR TDD
|
Doc.Name
|
R5-090332
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090332.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction Intra/Inter-frequency cell power level of cell re -selection and handover test cases for LCR TDD
|
Doc.Name
|
R5-090333
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090333.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Changing the tables of HSDPA reference measurement channels for LCR TDD
|
Doc.Name
|
R5-090334
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090334.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Changing the tables of E-DCH fixed reference channels for L CR TDD
|
Doc.Name
|
R5-090335
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090335.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Adding the test parameters of MBMS for LCR TDD
|
Doc.Name
|
R5-090336
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090336.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Modifying P-CCPCH RSCP intra frequency relative requirement for LCR TDD
|
Doc.Name
|
R5-090337
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090337.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Summary of the CRs for LCR TDD in RAN5#42 Signaling Group
|
Doc.Name
|
R5-090338
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090338.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Work Plan for Conformance test aspects - MBMS LCR TDD Physic al Layer Enhancements – Status after RAN5#42
|
Doc.Name
|
R5-090339
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090339.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Status Report for WI UE conformance test aspect - MBMS LCR T DD Physical Layer Enhancements – Status after RAN5#42
|
Doc.Name
|
R5-090340
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090340.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
PHS requirement in Japan
|
Doc.Name
|
R5-090341
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090341.zip
|
|
|
Source:
|
KDDI
|
Abstract:
|
Introduction of Japanese PHS requirement.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Spurious emission requirements on PHS band including the fut ure plan in Japan
|
Doc.Name
|
R5-090342
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090342.zip
|
|
|
Source:
|
KDDI
|
Abstract:
|
CR to TS36.521-1.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: New EMM test case 9.2.1.1.20 : Attach / Abnormal c ase / Access barred because of access class barring or NAS s ignalling connection establishment rejected by the network
|
Doc.Name
|
R5-090343
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090343.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of new MTSI test case for Terminating Identificatio n Presentation
|
Doc.Name
|
R5-090344
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090344.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of new MTSI test case for Terminating Identificatio n Restriction
|
Doc.Name
|
R5-090345
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090345.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability statements of new MTSI test cases
|
Doc.Name
|
R5-090346
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090346.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 – Update to MAC test case 7.1.4.3
|
Doc.Name
|
R5-090347
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090347.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Protocol Te sting for RLC
|
Doc.Name
|
R5-090348
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090348.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposed for 3G LTE Protocol Te sting for EMM (EPS Mobility Management)
|
Doc.Name
|
R5-090349
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090349.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Work plan for enhanced CELL_FACH state in FDD - Status after RAN5#42
|
Doc.Name
|
R5-090350
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090350.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Status report for WI Enhanced CELL_FACH state in FDD
|
Doc.Name
|
R5-090351
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090351.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
RRC default signalling TDD fields updates
|
Doc.Name
|
R5-090352
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090352.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Work plan for Improved L2 for uplink - Status after RAN5#42
|
Doc.Name
|
R5-090353
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090353.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch-1B: Correction to 9.2.1.2.1 ''Combined attach procedur e / Success / EPS and non-EPS services''
|
Doc.Name
|
R5-090354
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090354.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Status report for WI Conformance Test Aspects of Improved L2 for uplink
|
Doc.Name
|
R5-090355
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090355.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Work plan for Combination of 64QAM and MIMO - Status after R AN5#42
|
Doc.Name
|
R5-090356
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090356.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Status report for WI Conformance Test Aspects of Combination of 64QAM and MIMO
|
Doc.Name
|
R5-090357
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090357.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Update of generic procedures in TS 36.508
|
Doc.Name
|
R5-090358
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090358.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the default NAS message contents in TS 36.508
|
Doc.Name
|
R5-090359
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090359.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the definition of simulated cells in TS 36.508
|
Doc.Name
|
R5-090360
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090360.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to Improved L2 UL RLC test case 7.2.2.15
|
Doc.Name
|
R5-090361
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090361.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction to the definition of simulated NAS cells in TS 36 .508
|
Doc.Name
|
R5-090362
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090362.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to Improved L2 UL RLC test case 7.2.3.38
|
Doc.Name
|
R5-090363
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090363.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction to the default RRC message contents in TS 36.508
|
Doc.Name
|
R5-090364
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090364.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the LTE Features and Test Prioritisation List
|
Doc.Name
|
R5-090365
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090365.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addtion of generic test procedure for Improved L2 UL radio b earer test cases
|
Doc.Name
|
R5-090366
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090366.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
New test case for MAC-i/is transport block size selection/ U L QPSK and 16QAM
|
Doc.Name
|
R5-090367
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090367.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Supported Channels for MBSFN FDD
|
Doc.Name
|
R5-090368
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090368.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Simulated network environment for MBSFN FDD
|
Doc.Name
|
R5-090369
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090369.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Additon of radio bearer parameters fro MBSFN FDD
|
Doc.Name
|
R5-090370
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090370.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Generic test procedure for MBSFN FDD
|
Doc.Name
|
R5-090371
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090371.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of default messages for MBSFN FDD
|
Doc.Name
|
R5-090372
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090372.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
MBSFN FDD configurations for signalling test
|
Doc.Name
|
R5-090373
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090373.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability of new test case for MAC-i/is transport block size selection/ UL QPSK and 16QAM
|
Doc.Name
|
R5-090374
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090374.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Corrections to 36.509
|
Doc.Name
|
R5-090375
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090375.zip
|
|
|
Source:
|
Ericsson, Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Statistical requirements for TC 9.2.3C
|
Doc.Name
|
R5-090376
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090376.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RX diversity in 34.121 clause 8 especially in clause 8.7
|
Doc.Name
|
R5-090377
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090377.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Statistical requirements for TC 7.8.5 (Power control in the downlink for F-DPCH)
|
Doc.Name
|
R5-090378
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090378.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Format for initial condition in global In channel TX TCs
|
Doc.Name
|
R5-090379
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090379.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TDD RTT correction for timer tolerance
|
Doc.Name
|
R5-090380
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090380.zip
|
|
|
Source:
|
Nokia, Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: Discussion on the message content for Rx spurious em issions
|
Doc.Name
|
R5-090381
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090381.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: Discussion on the message content for keeping consta nt Tx power
|
Doc.Name
|
R5-090382
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090382.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of Applicability new LTE test cases
|
Doc.Name
|
R5-090383
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090383.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE Signalling Protocol Test Case Prioritisation - Status af ter RAN5#42
|
Doc.Name
|
R5-090384
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090384.zip
|
|
|
Source:
|
Vodafone D2 GmbH
|
Abstract:
|
Batch List update according to changes on SIG test cases during RAN5#42 (to be d elivered 2 weeks after the meeting)
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction to GCF WI 10 RRC test cases 8.2.6.39 and 8.2.6.44
|
Doc.Name
|
R5-090385
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090385.zip
|
|
|
Source:
|
Anite
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Removal of “Out-of-synchronization handling of output power” heading
|
Doc.Name
|
R5-090386
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090386.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Format for initial condition in TRx TCs
|
Doc.Name
|
R5-090387
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090387.zip
|
|
|
Source:
|
Agilent Nokia Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of Reference sensitivity test in 7.3
|
Doc.Name
|
R5-090388
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090388.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Removal of Rx Narrowband Intermod 7.8.2
|
Doc.Name
|
R5-090389
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090389.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of initial conditions for Rx tests
|
Doc.Name
|
R5-090390
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090390.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Relocation of 36.521-1 Annex C DL mapping
|
Doc.Name
|
R5-090391
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090391.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE DL Performance Tests: Parameters and uncertainties
|
Doc.Name
|
R5-090393
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090393.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of 4.5 generic procedures in 36.508
|
Doc.Name
|
R5-090394
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090394.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction to 8.4.4.1 and 8.4.4.2
|
Doc.Name
|
R5-090395
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090395.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to minimum requirement table for 9.2.1 and 9.2.4
|
Doc.Name
|
R5-090396
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090396.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to minimum test time for 9.5.1 and 9.5.1A
|
Doc.Name
|
R5-090397
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090397.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to 64QAM TCs of 6.3B, 9.2.1H, and 9.2.1I
|
Doc.Name
|
R5-090398
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090398.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE Signalling Tests: 1 or 2 Rx antenna connections to UE
|
Doc.Name
|
R5-090399
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090399.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on test coverage for Regulatory test cases for va riable Channel Bandwidths
|
Doc.Name
|
R5-090400
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090400.zip
|
|
|
Source:
|
NTT DOCOMO, Orange
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 36.521-1: Addition of test combinations for test cases with MPR application
|
Doc.Name
|
R5-090401
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090401.zip
|
|
|
Source:
|
NTT DOCOMO, Orange
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 36.521-1: Update of SEM and Additional SEM test cases
|
Doc.Name
|
R5-090402
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090402.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 36.521-1: Update of Spurious Emissions test cases
|
Doc.Name
|
R5-090403
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090403.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 36.521-1: Update of ACLR test case
|
Doc.Name
|
R5-090404
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090404.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.3.2
|
Doc.Name
|
R5-090405
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090405.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 36.521-1: Update of Annex F.3.2 Measurement of transmi tter
|
Doc.Name
|
R5-090406
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090406.zip
|
|
|
Source:
|
NTT DOCOMO, Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 34.121-1: Correction to 5.2B
|
Doc.Name
|
R5-090407
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090407.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1:Corrections to MAC test case 7.1.4.2
|
Doc.Name
|
R5-090408
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090408.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 34.121-1: Correction to 5.9B
|
Doc.Name
|
R5-090409
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090409.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 34.121-1: Correction to 5.10B
|
Doc.Name
|
R5-090410
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090410.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Status Report for LTE3500 WI
|
Doc.Name
|
R5-090411
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090411.zip
|
|
|
Source:
|
Rapporteur
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Addition of Band V,VI and VIII minimum & test requirements t o 34.114
|
Doc.Name
|
R5-090412
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090412.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction of table 8.7.1.1.1.5 the reported value requirmen ts for 8.7.1.1.1
|
Doc.Name
|
R5-090413
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090413.zip
|
|
|
Source:
|
CATR
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-2: Update to RRC part 3 test case 8.3.1.3
|
Doc.Name
|
R5-090414
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090414.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-2: Update to RRC part 3 test case 8.3.1.5
|
Doc.Name
|
R5-090415
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090415.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-1: Update to RRC part 3 test case 8.3.3.1
|
Doc.Name
|
R5-090416
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090416.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Terminal Pr otocol Conformance Test Specifications - RRC part 3 (Measure ment Configuration Control and Reporting)
|
Doc.Name
|
R5-090417
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090417.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
A correction for the test requirement of 9.4.2.4 Location u pdating / rejected / roaming not allowed in this location ar ea
|
Doc.Name
|
R5-090418
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090418.zip
|
|
|
Source:
|
CATR
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to WI-010 GMM test case 12.9.8
|
Doc.Name
|
R5-090419
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090419.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
A correction for test requirement of 9.4.4 Location updating / release / expiry of T3240
|
Doc.Name
|
R5-090420
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090420.zip
|
|
|
Source:
|
CATR
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Editorial correction for 11.1.1.1 Attach initiated by conte xt activation/QoS Offered by Network is the QoS Requested
|
Doc.Name
|
R5-090421
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090421.zip
|
|
|
Source:
|
CATR
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Editorial correction for 11.1.1.1a Attach initiated by conte xt activation/QoS Offered by Network is the QoS Requested/Co rrect handling of QoS extensions for rates above 8640 kbps
|
Doc.Name
|
R5-090422
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090422.zip
|
|
|
Source:
|
CATR
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to GCF WI 68 MAC-ehs testcase 7.1.5a.4
|
Doc.Name
|
R5-090423
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090423.zip
|
|
|
Source:
|
Anite
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction for 12.2.1.5a PS attach / rejected / roaming not allowed in this location area
|
Doc.Name
|
R5-090424
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090424.zip
|
|
|
Source:
|
CATR
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to WI-70 Rel-7 CPC RRC testcase 8.3.1.44
|
Doc.Name
|
R5-090425
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090425.zip
|
|
|
Source:
|
Anite
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
A correction for 12.2.2.1 Combined PS attach / PS and non-PS attach accepted
|
Doc.Name
|
R5-090426
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090426.zip
|
|
|
Source:
|
CATR
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
WorkPlan for Conformance Test Aspects-LTE3500-Status after R AN#42
|
Doc.Name
|
R5-090427
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090427.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction to WI-70 Rel-7 CPC RRC testcase 8.3.1.46
|
Doc.Name
|
R5-090428
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090428.zip
|
|
|
Source:
|
Anite
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRAN FDD- FDD Inter-Frequency Measurements text proposal
|
Doc.Name
|
R5-090429
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090429.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRAN TDD- TDD Inter-Frequency Measurements text proposal
|
Doc.Name
|
R5-090430
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090430.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RAN5#41bis LTE Signalling Session Meeting Summary and Outcom es
|
Doc.Name
|
R5-090431
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090431.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Test requirements of TDD PDSCH demodulation performance with user-specific reference symbols
|
Doc.Name
|
R5-090432
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090432.zip
|
|
|
Source:
|
CMCC, CATT
|
Abstract:
|
This CR gives contribution on TDD PDSCH demodulation test case using user-specif ic reference symbols.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of Abbreviations in 36.509
|
Doc.Name
|
R5-090433
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090433.zip
|
|
|
Source:
|
CMCC
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 8.3.2.7
|
Doc.Name
|
R5-090434
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090434.zip
|
|
|
Source:
|
Alcatel-Lucent
|
Abstract:
|
To test the triggering of an inter-RAT measurement event B2 when serving becomes worse than absolute threshold1 AND Neighbour becomes better than another absolu te threshold2 (measurement of HPRD cells).
To test event based periodical reporting (reportInterval) and leaving condition for this event.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 6.2.2.3 Inter-RAT Cell s election / from E-UTRA RRC_IDLE to HRPD Idle, when the servi ng cell becomes non-suitable (S<0)
|
Doc.Name
|
R5-090435
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090435.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to RRM Random Access Procedure testcase 8.4.2.4
|
Doc.Name
|
R5-090436
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090436.zip
|
|
|
Source:
|
Anite
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 – Addition of new test case 6.2.3.8 Inter-RAT Cell R eselection: from E-UTRA RRC_IDLE to HRPD Idle – When HRPD ce ll is higher reselection priority than E-UTRA
|
Doc.Name
|
R5-090437
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090437.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 – Addition of new test case 6.2.3.11 Inter-RAT Cell Reselection: from E-UTRA RRC_IDLE to HRPD Idle – When HRPD c ell is lower reselection priority than E-UTRA
|
Doc.Name
|
R5-090438
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090438.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 – Addition of new test case 8.3.3.4 Measurement conf iguration control and reporting / SON / ANR: CGI reporting o f HRPD cell
|
Doc.Name
|
R5-090439
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090439.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: Update to 36.521-3 Annex E Cell Configuration mappin g
|
Doc.Name
|
R5-090440
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090440.zip
|
|
|
Source:
|
AT4 wireless
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to frequencies to be tested in RRM test cases
|
Doc.Name
|
R5-090441
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090441.zip
|
|
|
Source:
|
AT4 wireless
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: Clarification to 36.508 Simulated Cells for RF tests
|
Doc.Name
|
R5-090442
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090442.zip
|
|
|
Source:
|
AT4 wireless
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: Correction to 36.521-1 Frequency error test case
|
Doc.Name
|
R5-090443
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090443.zip
|
|
|
Source:
|
AT4 wireless
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New Rel-8 work item Proposal: Conformance test aspects – Enh anced UL for CELL_FACH state (FDD)
|
Doc.Name
|
R5-090444
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090444.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Introduction of radio bearer parameters for testing Improved L2 UL
|
Doc.Name
|
R5-090445
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090445.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to Improved L2 Test Case 7.2.2.15
|
Doc.Name
|
R5-090446
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090446.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a New Test Case for Improved L2 UL – MAC-i/is mu ltiplexing (multiple PDUs from different LC in one TTI)
|
Doc.Name
|
R5-090447
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090447.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a New Test Case for Improved L2 UL – Verificatio n of support of MAC-i/is segmentation with correct usage of SS field
|
Doc.Name
|
R5-090448
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090448.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a New Test Case for Improved L2 UL – Radio Bear er Reconfiguration from CELL_DCH to CELL_DCH: Success (with reconfiguration between fixed and flexible RLC, Serving E-DC H cell change between MAC-e/es and MAC-i/is)
|
Doc.Name
|
R5-090449
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090449.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability of new Improved L2 UL test cases
|
Doc.Name
|
R5-090450
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090450.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Introduction of radio bearer parameters for testing HS-DSCH Reception in CELL_FACH
|
Doc.Name
|
R5-090451
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090451.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RRC Connection Setup Default Message for HS-DSCH Reception i n CELL_FACH state
|
Doc.Name
|
R5-090452
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090452.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.5
|
Doc.Name
|
R5-090453
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090453.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.15
|
Doc.Name
|
R5-090454
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090454.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update of E-UTRA RLC (AM) test case 7.2.3.16
|
Doc.Name
|
R5-090455
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090455.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New Default SIB5/SIB5bis for Enhanced CELL FACH
|
Doc.Name
|
R5-090456
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090456.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.17
|
Doc.Name
|
R5-090457
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090457.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of E-UTRA RLC (AM) test case 7.2.3.18
|
Doc.Name
|
R5-090458
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090458.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of Radio Bearer Setup Condition for Enhanced CELL_F ACH
|
Doc.Name
|
R5-090459
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090459.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion paper on baseline moving for TTCN-3 ATS developme nt
|
Doc.Name
|
R5-090460
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090460.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability for new HS-DSCH in CELL_FACH test case
|
Doc.Name
|
R5-090461
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090461.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the RAB Setup for CS over HSPA (A23 set of par ameters) in 34.108
|
Doc.Name
|
R5-090462
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090462.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TS 36.509 after RAN5 #42
|
Doc.Name
|
R5-090463
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090463.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Abstract:
|
Update of TS 36.509 incl. all CRs approved at RAN5 #41'bis' and RAN5 #42
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Clean up the test algorithm for authentication
|
Doc.Name
|
R5-090464
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090464.zip
|
|
|
Source:
|
RIM
|
Abstract:
|
AP#41b.07 “AP on RIM to update cl. 4.9.1.2.2 in 36.508.”
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of Rel-7 IE’s to RRConnectionRequest and correction to Rel-7 IEs for Cell update and URA update under default m essages specified in 34.108
|
Doc.Name
|
R5-090465
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090465.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of Code Tree Allocation Table for 64QAM HSDPA Test Cases
|
Doc.Name
|
R5-090466
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090466.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to Radio Bearer Setup for 64QAM test cases
|
Doc.Name
|
R5-090467
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090467.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RAN5 test coverage for NAS protocol test cases
|
Doc.Name
|
R5-090468
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090468.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE RRM Cell Re-Selection text proposal
|
Doc.Name
|
R5-090469
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090469.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the test prose for CS over HSPA RRC test case 8.2.2.58
|
Doc.Name
|
R5-090470
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090470.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Proposal for RRC inter-RAT handover test cases
|
Doc.Name
|
R5-090471
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090471.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction to RAB test case 14.7.9 and 14.7.10
|
Doc.Name
|
R5-090472
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090472.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to generic test procedure 14.1.4.1 to include CS RAB only case
|
Doc.Name
|
R5-090473
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090473.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Terminal Pr otocol Conformance Test Specifications - RRC part 1 (8.1 RRC connection management procedures, 8.5 RRC Others)
|
Doc.Name
|
R5-090474
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090474.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Work plan for 3G Long-Term Evolution Terminal Protocol Confo rmance Test Specifications - Status after RAN5#42
|
Doc.Name
|
R5-090475
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090475.zip
|
|
|
Source:
|
NEC, Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Status report for 3G Long-Term Evolution Terminal Protocol C onformance Test Specifications - Status after RAN5#42
|
Doc.Name
|
R5-090476
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090476.zip
|
|
|
Source:
|
NEC, Motorola
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 1A - TC 9.1.2.1 Authentication accepted - Update of co nformance requirements
|
Doc.Name
|
R5-090477
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090477.zip
|
|
|
Source:
|
Samsung Electronics
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of TC 9.1.2.3 Authentication not accepted by the network, GUTI used, authentication reject and re-auth entication
|
Doc.Name
|
R5-090478
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090478.zip
|
|
|
Source:
|
Samsung Electronics
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1 - Update TC 9.1.2.4 Authentication not accepted by t he UE MAC code failure
|
Doc.Name
|
R5-090479
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090479.zip
|
|
|
Source:
|
Samsung Electronics
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - New TC 9.1.2.5 Authentication not accepted by the UE, SQN failure
|
Doc.Name
|
R5-090480
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090480.zip
|
|
|
Source:
|
Samsung Electronics
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - TC 9.3.2.1 Paging procedure revisited
|
Doc.Name
|
R5-090481
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090481.zip
|
|
|
Source:
|
Samsung Electronics
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1 - Adding TC 9.1.2.5 to applicability
|
Doc.Name
|
R5-090482
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090482.zip
|
|
|
Source:
|
Samsung Electronics
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Proposal for new TS 36.508 section on max. number of cells i n Protocol Conformance TCs
|
Doc.Name
|
R5-090483
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090483.zip
|
|
|
Source:
|
Rohde & Schwarz, Anritsu
|
Abstract:
|
See AP#41b.02 from RAN5 #41'bis' meeting: (=> Rohde&Schwarz and Anritsu to propose specification of max.number of cells to be simulated in TS 36.523 test cases.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Updating applicability table with input relevant to agreed a t RAN5#41bis 36.523-1 CRs
|
Doc.Name
|
R5-090484
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090484.zip
|
|
|
Source:
|
Samsung Electronics
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of 36.523-1 Reference list
|
Doc.Name
|
R5-090485
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090485.zip
|
|
|
Source:
|
Samsung Electronics
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Test iterations in Cell search and Handover test cases
|
Doc.Name
|
R5-090486
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090486.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Investigation of LTE TDD applicability for Transmit intermod ulation test case
|
Doc.Name
|
R5-090487
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090487.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE TDD applicability for Transmit intermodulation test case
|
Doc.Name
|
R5-090488
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090488.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Adding test coverage for Rel6 category 9 and 10 UE’s in exis ting HSDPA tests
|
Doc.Name
|
R5-090489
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090489.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Mandatory support of enhanced receiver for 64QAM or MIMO cap able UEs
|
Doc.Name
|
R5-090490
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090490.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Fixed reference channel FRC H-Set 11 for 64QAM + MIMO
|
Doc.Name
|
R5-090491
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090491.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability changes in 34.121-2 for HSDPA demodulation tes ts
|
Doc.Name
|
R5-090492
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090492.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Enhanced CELL_FACH: New Test Case for HARQ retransmissions w ithout ACK/NACK signalling in CELL_FACH/CELL_PCH/URA_PCH
|
Doc.Name
|
R5-090493
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090493.zip
|
|
|
Source:
|
Qualcomm Europe S.A.R.L.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability for new test case for HARQ retransmissions wit hout ACK/NACK signalling in CELL_FACH/CELL_PCH/URA_PCH
|
Doc.Name
|
R5-090494
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090494.zip
|
|
|
Source:
|
Qualcomm Europe S.A.R.L.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Work plan for Rel-8 work item for Dual-Cell HSDPA operation on adjacent carriers – Status after RAN5#42
|
Doc.Name
|
R5-090495
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090495.zip
|
|
|
Source:
|
Qualcomm Europe S.A.R.L.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Status Report for Rel-8 work item for Dual-Cell HSDPA operat ion on adjacent carriers – Status after RAN5#42
|
Doc.Name
|
R5-090496
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090496.zip
|
|
|
Source:
|
Qualcomm Europe S.A.R.L.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 1B: Correction to E-UTRA RLC test case 7.2.2.3
|
Doc.Name
|
R5-090497
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090497.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Removal of ‘11-bit "Length Indicators"’ from title of TC 7.2.2.3.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Correction to E-UTRA RLC test case 7.2.2.7
|
Doc.Name
|
R5-090498
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090498.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
The T_reordering is defined in table 7.2.2.7.3.1-1 and the note ‘Editors Note: T _reordering will be defined later. T-reodering is started in step 3 and shall no t expire until step 5.’ has been removed.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of new LTE test case 7.2.2.11 UM RLC / RLC re-establishment procedure
|
Doc.Name
|
R5-090499
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090499.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new LTE test case for UM RLC / RLC re-establishment procedure.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of applicabilities for new UM RLC test cases
|
Doc.Name
|
R5-090500
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090500.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
New UM RLC test case 7.2.2.11 has been added into TS 36.523-1. Additionally, tit le of TC 7.2.2.3 has been updated. TC 7.2.2.3 has been introduced in RAN5 #41bis meeting. The applicability of both test cases should be also added in TS 36.523 -2.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New Work Item Proposal: Conformance test aspects –Receiver T ype 3i
|
Doc.Name
|
R5-090501
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090501.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Work plan for Rel-8 work item for Receiver Type 3i – Status after RAN5#42
|
Doc.Name
|
R5-090502
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090502.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Attach Procedure / Success (last visited TAI and T AI list handling)
|
Doc.Name
|
R5-090503
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090503.zip
|
|
|
Source:
|
Vodafone
|
Abstract:
|
In the last meeting in Munich, operators proposed some new test cases. Four of t hese were aimed for batch 1B. This CR provides a prose test description for one of them.
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
FDD and TDD for Reference sensitivity level Test case 7.3
|
Doc.Name
|
R5-090504
|
Allocations:
|
Content Type:
|
File Name:
|
R5-090504.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2009-02-02 22:00:00
|
The file is not uploaded
|
|