ETSI logo

www.3gpp.org / ftp / tsg_ran / WG4_Radio / TSGR4_97_e / Inbox / Drafts / [97e][146] BC_simplification / draft WF CR LS

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Draft R4-2016935 - WF on rules on request sheet and notations of CA-DC configurations_v2.pptx 2020/11/10 16:44 60,1 KB
icon Draft R4-2016935 - WF on rules on request sheet and notations of CA-DC configurations_v3.pptx 2020/11/11 15:56 60,2 KB
icon draft R4-2016936 WF on updating cover sheet of request sheet.pptx 2020/11/09 15:03 50 KB
icon draft R4-2016936 WF on updating cover sheet of request sheet_r1.zip 2020/11/10 13:01 146,6 KB
icon draft R4-2016936 WF on updating cover sheet of request sheet_r2.zip 2020/11/11 12:32 146,5 KB
icon Draft R4-2016937-revision of R4-2014960 CR to TS 38.101-1 on simplification for inter-band CA configuration.docx 2020/11/10 13:33 928,5 KB
icon Draft R4-2016938-revision of R4-2014961 CR to TS 38.101-2 on simplification for inter-band CA configuration.docx 2020/11/10 13:34 78,3 KB
icon Draft R4-2016939-revision of R4-2014962 CR to TS 38.101-3 on simplification for inter-band CA configuration between FR1 and FR2.docx 2020/11/10 13:34 740 KB
icon Draft2_R4-2016937-revision of R4-2014960 CR to TS 38.101-1 on simplification for inter-band CA configuration.docx 2020/11/11 7:24 916,8 KB
icon Draft2_R4-2016938-revision of R4-2014961 CR to TS 38.101-2 on simplification for inter-band CA configuration.docx 2020/11/11 7:25 58,9 KB
icon Draft2_R4-2016939-revision of R4-2014962 CR to TS 38.101-3 on simplification for inter-band CA configuration between FR1 and FR2.docx 2020/11/11 7:25 701,7 KB
icon Draft3_R4-2016937-revision of R4-2014960 CR to TS 38.101-1 on simplification for inter-band CA configuration.docx 2020/11/12 7:57 928,4 KB
icon Draft3_R4-2016938-revision of R4-2014961 CR to TS 38.101-2 on simplification for inter-band CA configuration.docx 2020/11/12 7:57 59,1 KB
icon Draft3_R4-2016939-revision of R4-2014962 CR to TS 38.101-3 on simplification for inter-band CA configuration between FR1 and FR2.docx 2020/11/12 7:57 710,5 KB
icon draft_R4-2016940_WF for MSD test point specification methodology for LTE CA.pptx 2020/11/09 22:16 48,6 KB
icon draft_R4-2016940_WF for MSD test point specification methodology for LTE CA_r1.pptx 2020/11/10 20:35 48,7 KB
icon Draft_R4-2017819_New_WID_BCS4.docx 2020/11/12 22:37 41,3 KB
icon Draft_R4-2017820_BCS4_motivation.docx 2020/11/12 22:38 52 KB

18 items.