ETSI logo

www.3gpp.org / ftp / tsg_ran / WG4_Radio / TSGR4_102-e / Inbox / Drafts / [102-e][131] NRSL_enh_Part_2 / Round 1

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Draft Summary_131_1st round_after GTW_v00.docx 2022/02/23 2:55 106 KB
icon Draft Summary_131_1st round_v00.docx 2022/02/17 8:19 92,2 KB
icon Draft Summary_131_1st round_v01_LGE.docx 2022/02/21 7:48 71,3 KB
icon Draft Summary_131_1st round_v02_LGE_HW.docx 2022/02/21 15:27 65,8 KB
icon Draft Summary_131_1st round_v03_HW_Qualcomm.docx 2022/02/21 23:04 75,8 KB
icon Draft Summary_131_1st round_v04_Qualcomm_CATT.docx 2022/02/22 1:55 99 KB
icon Draft Summary_131_1st round_v05_CATT_Xiaomi.docx 2022/02/22 2:35 77,6 KB
icon Draft Summary_131_1st round_v06_Xiaomi_vivo.docx 2022/02/22 4:26 80,3 KB
icon Draft Summary_131_after 1st round.docx 2022/02/24 9:52 124,6 KB
icon Revised R4-2203912_Draft CR for TS 38.101-1, Remaining RF requirements for intra-band con-current operation_LGE.docx 2022/02/23 2:40 194,8 KB
icon Revised R4-2203912_Draft CR for TS 38.101-1, Remaining RF requirements for intra-band con-current operation_LGE2.docx 2022/02/23 2:45 196,1 KB
icon Revised R4-2203912_Draft CR for TS 38.101-1, Remaining RF requirements for intra-band con-current operation_LGE2_Qualcomm.docx 2022/02/24 4:21 199,9 KB
icon Revision of R4-2204155_Draft CR on remaining issues (MPR requirements) for intra-band con-current V2X operation_v1.docx 2022/02/24 3:33 76,3 KB

13 items.