ETSI logo

www.3gpp.org / ftp / tsg_ran / WG2_RL2 / TSGR2_117-e / Inbox / Drafts / [Pre117-e][605][Relay] Open issues on relay control plane procedures (Huawei) / Phase 2 discussion

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Draft R2-2202822 Report of [Pre117-e][605][Relay].docx 2022/02/17 12:40 212,4 KB
icon Draft Report_v00_Rapp.docx 2022/02/15 16:29 219 KB

2 items.