ETSI logo

www.3gpp.org / ftp / tsg_ran / WG2_RL2 / TSGR2_115-e / Inbox / Drafts / [Offline-013][NR15] Connection Control II (vivo) / Phase 2 CRs / Full configuration CRs

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon R2-2107375 Clarification on full configuration-R15.docx 2021/08/20 6:32 39,2 KB
icon R2-2107376 Clarification on full configuration-R16.docx 2021/08/20 6:32 40,2 KB

2 items.