ETSI logo

www.3gpp.org / ftp / tsg_ran / WG2_RL2 / TSGR2_115-e / Inbox / Drafts / [Offline-013][NR15] Connection Control II (vivo) / Phase 2 CRs

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Full configuration CRs 2021/08/20 6:32
icon Reconfiguration With Sync CRs 2021/08/26 7:49

2 items.