ETSI logo

www.3gpp.org / ftp / tsg_ran / WG2_RL2 / TSGR2_113-e / Inbox / Drafts / [Offline-406][eMTC R16] Clarification to the DRX cycle in RRC_IDLE and RRC_INACTIVE (Huawei)

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon draft_R2-2102067 DRX cycle in RRC_IDLE and INACTIVE-v0.docx 2021/01/29 9:20 36,6 KB
icon draft_R2-2102067 DRX cycle in RRC_IDLE and INACTIVE-v1 - QC.docx 2021/01/29 18:39 42,2 KB
icon draft_R2-2102067 DRX cycle in RRC_IDLE and INACTIVE-v2 - HW.docx 2021/02/04 7:22 40,7 KB
icon draft_R2-2102067 DRX cycle in RRC_IDLE and INACTIVE.docx 2021/02/04 12:11 37 KB

4 items.