ETSI logo

www.3gpp.org / ftp / tsg_ran / WG1_RL1 / TSGR1_100b_e / Inbox / drafts / 5.1 RAN1 Aspects for RF requirements for NR frequency range 1 (FR1)

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon [100b-e-LS-TxSwitching-01] 2020/04/25 1:39
icon [100b-e-LS-TxSwitching-02] 2020/04/30 14:32
icon [100b-e-LS-TxSwitching-03] 2020/04/30 10:51
icon [100b-e-LS-TxSwitching-04] 2020/05/01 19:58
icon R1-2002191.zip 2020/04/14 7:48 1372,6 KB
icon R1-2002724.zip 2020/04/21 7:38 1375,7 KB
icon R1-20xxxxx - Outcome of preparation phase for Uplink Tx switching.doc 2020/04/18 3:03 1594,5 KB
icon R1-20xxxxx - Outcome of preparation phase for Uplink Tx switching.zip 2020/04/18 3:08 1372,6 KB
icon R1-20xxxxx - [100b-e-LS-TxSwitching-01]_v7-Nokia_Samsung.docx 2020/04/22 5:06 100,9 KB

9 items.