1 | Opening of the meeting | C3-80 |
2 | Agenda/schedule | C3-80 |
2.1 | Approval of the agenda. | C3-80 |
2.2 | Proposed schedule | C3-80 |
3 | Registration of documents | C3-80 |
4 | Reports | C3-80 |
4.1 | Report from previous CT3 meeting | C3-80 |
4.2 | Report from previous CT plenary | C3-80 |
4.3 | Reports from other groups | C3-80 |
5 | Items for immediate consideration | C3-80 |
5.1 | IPR disclosures | C3-80 |
5.2 | Antitrust declarations | C3-80 |
5.3 | Other items for immediate consideration | C3-80 |
6 | Received Liaison Statements | C3-80 |
7 | Release 7 and earlier releases | C3-80 |
8 | Release 8 | C3-80 |
8.1 | Interworking between IM subsystem and IP [IMS-CCR-IWIP] | C3-80 |
8.2 | Interworking between IM Subsystem with CS [IMS-CCR-IWCS] | C3-80 |
8.3 | Media Gateway Control Function (MGCF) – IM Media Gateway (IMS-MGW) Mn Interface [IMS-CCR-Mn] | C3-80 |
8.4 | Multimedia Broadcast and Multicast Service [MBMS] | C3-80 |
8.5 | Policy and Charging Control (non-SAE) [PCC] | C3-80 |
8.6 | Void | C3-80 |
8.7 | Diameter for Gi interface [DIAMGi] | C3-80 |
8.8 | Diameter for Wi interface [DIAMWi] | C3-80 |
8.9 | Void | C3-80 |
8.10 | Protocol impact from providing IMS services via fixed broadband [FBI] | C3-80 |
8.11 | IMS Interworking Protocol Aspects in Support of Cable Rebulatory Requirements [PktCbl-Intw] | C3-80 |
8.12 | Void | C3-80 |
8.13 | Interworking between the 3GPP CS domain with BICC or ISUP as ignaling protocol and external SIP-I networks [ExtSIPI] | C3-80 |
8.14 | PCC aspects of SAE [SAES-St3-PCC] | C3-80 |
8.14.1 | - Signalling flows (29.213) | C3-80 |
8.14.2 | - Gx and Gxx interfaces (29.212) | C3-80 |
8.14.3 | - Rx interface (29.214) | C3-80 |
8.14.4 | - S9 interface (29.215) | C3-80 |
8.15 | Interworking between EPC and external PDNs [SAES-St3-intwk] | C3-80 |
8.16 | IMS inter-operator service interconnection interface [FBI2-IOPSI] | C3-80 |
8.17 | Interworking between the 3GPP CS domain with SIP-I as ignaling protocol and other networks [SIP_Nc] | C3-80 |
8.18 | Interworking between User-to-User Signaling (UUS) and SIP [UUSIW] | C3-80 |
8.19 | Work Items related to TISPAN transfer | C3-80 |
8.19.1 | - Maintenance of TISPAN R1 [MAINT_R1] | C3-80 |
8.19.2 | - Maintenance of TISPAN R2 [MAINT_R2] | C3-80 |
8.19.3 | - Documentation of TISPAN R1 and R2 in CT3 [REDOC_TIS-C3] | C3-80 |
8.19.4 | - Support of Overlap ignaling [Overlap] | C3-80 |
8.19.5 | - Stage 3 (CT3) of CWonIMS [CW_IMS] | C3-80 |
8.19.6 | - Stage 3 (CT3) of [CCBS_CCNR] | C3-80 |
8.20 | Contributions on Common IMS related to 3GPP2 [REDOC_3GPP2] | C3-80 |
8.21 | Support of Service-Level Interworking for Messaging Services [MESSIW] | C3-80 |
8.22 | Enhancement of interworking between MTSI and Circuit Switched networks [MTSI_eMHI] | C3-80 |
8.23 | Core Network Impacts for A-Interface Over IP [AoIP-CN] | C3-80 |
8.24 | IMS Centralized Service Control Protocol; Addressing, Subscriber Data [ICSRA] | C3-80 |
8.25 | CAT solution for voice and video call in CS domain [CAT_SS] | C3-80 |
8.26 | Technical Enhancements and Improvements [TEI8] | C3-80 |
8.27 | Rel-8 contributions on other Work Items | C3-80 |
9 | Release 9 | C3-80 |
9.1 | Interworking between IM subsystem and IP [IMS-CCR-IWIP] | C3-80 |
9.2 | Interworking between IM Subsystem with CS [IMS-CCR-IWCS] | C3-80 |
9.3 | Protocol impact from providing IMS services via fixed broadband [FBI] | C3-80 |
9.4 | MBMS [MBMS] | C3-80 |
9.5 | Interworking between the 3GPP CS domain with BICC or ISUP as ignaling protocol and external SIP-I networks [ExtSIPI] | C3-80 |
9.6 | Interworking between the 3GPP CS domain with SIP-I as ignaling protocol and other networks [SIP_Nc] | C3-80 |
9.7 | PCC aspects of SAE [SAES-St3-PCC] | C3-80 |
9.8 | Reserved | C3-80 |
9.14 | Reserved | C3-80 |
9.9 | Reserved | C3-80 |
9.10 | Reserved | C3-80 |
9.15 | Reserved | C3-80 |
9.11 | Reserved | C3-80 |
9.12 | Reserved | C3-80 |
9.13 | Reserved | C3-80 |
9.16 | CS-IBCF and CS-TrGW definition in 3GPP specifications [CS-IBCF] | C3-80 |
9.17 | Interconnection Border Control Function (IBCF) – Transition Gateway (TrGW); Ix interface; Stage 3 [IMS_IBCF] | C3-80 |
9.18 | CT3 Aspects of MBMS Support in EPS [MBMS_EPS] | C3-80 |
9.19 | Operational Description of the Inter-IMS NNI [II-NNI] | C3-80 |
9.20 | Support for IMS Emergency Calls over GPRS and EPS [IMS_EMER_GPRS_EPS] | C3-80 |
9.21 | PCC Enhancements [PCC-Enh] | C3-80 |
9.22 | Completion of IMS Restoration Procedures [eIMS_RP] | C3-80 |
9.23 | CT1 aspects of SRVCC support for IMS Emergency Calls [IMS_EMER_GPRS_EPS-SRVCC] | C3-80 |
9.24 | IMS Media Plane Security [MEDIASEC_CORE] | C3-80 |
9.25 | Technical Enhancements and Improvements [TEI9] | C3-80 |
9.26 | Rel-9 contributions on other work items | C3-80 |
10 | Release 10 | C3-80 |
10.1 | Interworking between IM subsystem and IP [IMS-CCR-IWIP] | C3-80 |
10.2 | Interworking between IM Subsystem with CS [IMS-CCR-IWCS] | C3-80 |
10.3 | PCC aspects of SAE [SAES-St3-PCC] | C3-80 |
10.4 | Interworking between EPC and external PDNs [SAES-St3-intwk] | C3-80 |
10.5 | CT3 Aspects of MBMS Support in EPS [MBMS_EPS] | C3-80 |
10.6 | PCC Enhancements [PCC-Enh] | C3-80 |
10.7 | Reserved | C3-80 |
10.8 | Reserved | C3-80 |
10.9 | Reserved | C3-80 |
10.10 | Reserved | C3-80 |
10.11 | Reserved | C3-80 |
10.12 | Reserved | C3-80 |
10.13 | Reserved | C3-80 |
10.14 | Reserved | C3-80 |
10.15 | Reserved | C3-80 |
10.16 | CPM-SMS Interworking [CPM-SMS] | C3-80 |
10.17 | Optimal Media Routeing [OMR] | C3-80 |
10.18 | Further Improvements of II-NNI specification based on Operational Feedback and Evolution of Other Specifications [II-NNI2] | C3-80 |
10.19 | Call Completion Not Logged in [CCNL] | C3-80 |
10.20 | IP Flow Mobility and WLAN offload (Stage 3) [IFOM-CT] | C3-80 |
10.21 | Enabling Coder Selection and Rate Adaption for UTRAN and E-UTRAN for Load Adaptive Applications; CN impacts [ECSRA_LAA-CN] | C3-80 |
10.21.1 | - Packet Core impacts | C3-80 |
10.21.2 | - IMS/CS impacts | C3-80 |
10.22 | S2b Mobility based on GTP [SMOG-St3] | C3-80 |
10.23 | CT aspects of Enhancements for Multimedia Priority Service [eMPS-CN] | C3-80 |
10.24 | PCRF failure and restoration [PCRF-FR] | C3-80 |
10.25 | CT aspects of Multi Access PDN Connectivity [MAPCON-St3] | C3-80 |
10.26 | CT3 Aspects of Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Data Bases [PEST-CT3] | C3-80 |
10.27 | Dynamic View of Headers in Messages for II-NNI [NNI_DV] | C3-80 |
10.28 | CS and IMS Interworking for CAT early session model [CIIC_ES] | C3-80 |
10.29 | Stage 3 for Network Improvements for Machine Type Communications [NIMTC] | C3-80 |
10.30 | Technical Enhancements and Improvements [TEI10] | C3-80 |
10.31 | Rel-10 contributions on other Work Items | C3-80 |
11 | Release 11 | C3-80 |
11.1 | Interworking between IM subsystem and IP [IMS-CCR-IWIP] | C3-80 |
11.2 | Interworking between IM Subsystem with CS [IMS-CCR-IWCS] | C3-80 |
11.3 | Policy Control and Charging [PCC] | C3-80 |
11.4 | Interworking between EPC and external PDNs [SAES-St3-intwk] | C3-80 |
11.5 | PCC aspects of SAE [SAES-St3-PCC] | C3-80 |
11.6 | CT3 Aspects of MBMS Support in EPS [MBMS_EPS] | C3-80 |
11.7 | PCC Enhancements [PCC-Enh] | C3-80 |
11.8 | Optimal Media Routeing [OMR] | C3-80 |
11.9 | Dynamic View of Headers in Messages for II-NNI [NNI_DV] | C3-80 |
11.10 | Reserved | C3-80 |
11.11 | Reserved | C3-80 |
11.12 | Reserved | C3-80 |
11.13 | Reserved | C3-80 |
11.14 | Reserved | C3-80 |
11.15 | Reserved | C3-80 |
11.16 | CT3 aspects of Service Awareness and Privacy Policies [SAPP-CT3] | C3-80 |
11.17 | CT3 aspects of QoS Control Based on Subscriber Spending Limits [QoS_SSL-CT3] | C3-80 |
11.18 | USSD Simulation Service in IMS-stage 3 [USSI] | C3-80 |
11.19 | Single Radio Video Call Continuity [vSRVCC-CT] | C3-80 |
11.19.1 | - IMS-related | C3-80 |
11.19.2 | - PCC-related | C3-80 |
11.20 | Further improvement of usability of II-NNI specification for inter-connection [NNI_OI] | C3-80 |
11.21 | IMS Stage-3 IETF Protocol Alignment [IMSProtoc5] | C3-80 |
11.22 | CT aspects of Single Radio Voice Call Continuity from UTRAN/GERAN to E-UTRAN/HSPA [rSRVCC-CT] | C3-80 |
11.22.1 | - IMS/CS related | C3-80 |
11.22.2 | - Packet Core related | C3-80 |
11.23 | Stage 3 for System Improvements to Machine-Type Communications [SIMTC-Reach] | C3-80 |
11.24 | Support for BroadBand Forum Accesses Interworking; Core Network Impacts, Building Block I [BBAI_BBI-CT] | C3-80 |
11.25 | Support for BroadBand Forum Accesses Interworking; Core Network Impacts, Building Block II [BBAI_BBII-CT] | C3-80 |
11.26 | CN aspects of Anonymous Call Rejection in the CS domain [ACR_CS-CN] | C3-80 |
11.27 | Advanced Interconnection of Services [IPXS] | C3-80 |
11.28 | Enhancements for Multimedia Priority Service (MPS) Gateway Control Priority [eMPS_Gateway] | C3-80 |
11.29 | CN aspects of Mobility based On GTP & PMIPv6 for WLAN access to EPC [SaMOG_WLAN-CN] | C3-80 |
11.30 | CT aspect on Network Provided Location Information for IMS [NWK-PL2IMS-CT] | C3-80 |
11.31 | II-NNI enhancements: SIP timers applicability [NNI_timers] | C3-80 |
11.32 | Roaming Architecture for Voice over IMS with Local Breakout – CT aspects [RAVEL-CT] | C3-80 |
11.33 | Inclusion of Media Resource Broker [MRB] | C3-80 |
11.34 | Enhanced T.38 FAX support [MMTel_T.38_FAX] | C3-80 |
11.35 | Enhanced Nodes Restoration for EPC [eNR_EPC] | C3-80 |
11.36 | IMS overload control [IOC] | C3-80 |
11.37 | Technical Enhancements and Improvements [TEI11] | C3-80 |
11.38 | Rel-11 contributions on other Work Items | C3-80 |
12 | Release 12 | C3-80 |
12.1 | Interworking between IM subsystem and IP [IMS-CCR-IWIP] | C3-80 |
12.2 | Interworking between IM Subsystem with CS [IMS-CCR-IWCS] | C3-80 |
12.3 | Policy Control and Charging [PCC] | C3-80 |
12.4 | PCC aspects of SAE [SAES-St3-PCC] | C3-80 |
12.5 | Reserved | C3-80 |
12.6 | Reserved | C3-80 |
12.7 | Reserved | C3-80 |
12.8 | Reserved | C3-80 |
12.9 | Reserved | C3-80 |
12.10 | Reserved | C3-80 |
12.11 | Interworking between a PLMN with WLAN to access the EPC and a PDN [SAES_WLAN_EPC_intwk] | C3-80 |
12.12 | CT aspects of Extended IMS media plane security features [eMEDIASEC-CT] | C3-80 |
12.13 | IMS-based Telepresence (Stage 3) [IMS_TELEP] | C3-80 |
12.14 | IMS Stage-3 IETF Protocol Alignment [IMSProtoc6] | C3-80 |
12.15 | IMS Emergency PSAP Callback [EMC_PC] | C3-80 |
12.16 | Diameter Overload Control [FS_DOCME] | C3-80 |
12.17 | Study on Indication of NNI Routeing scenarios in SIP requests [FS_NNI_RS] | C3-80 |
12.17.1 | Indication of NNI Routeing scenarios in SIP requests [NNI_RS] | C3-80 |
12.18 | Study on XML based access of AF to the PCRF [FS_XML_AF_PCRF] | C3-80 |
12.18.1 | Representational State Transfer (REST) reference point between Application Function (AF) and Protocol Converter (PC) [REST_AF_PC] | C3-80 |
12.19 | Dual-Radio VCC Enhancements [eDRVCC] | C3-80 |
12.20 | Single Radio Voice Call Continuity (SRVCC) before ringing [bSRVCC] | C3-80 |
12.21 | ICS Interworking Enhancement in MSC server [ICS_IWE] | C3-80 |
12.22 | CT Aspects of Coordination of Video Orientation [CVO-CT] | C3-80 |
12.23 | CT3 aspects of Application Based Charging [ABC-CT3] | C3-80 |
12.24 | CT3 Aspect of Usage Monitoring Control PCC Enhancement [UMONC-CT3] | C3-80 |
12.25 | CT Aspects of Signalling of Image Size [SIS-CT] | C3-80 |
12.26 | CT Aspects of End-to-End MTSI Extensions [E2EMTSI-CT] | C3-80 |
12.27 | Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP Ues in fixed broadband access networks [P4C-F-CT3] | C3-80 |
12.28 | Study on Technical aspects on Roaming End-to-end scenarios with VoLTE IMS and other networks [FS_REVOLTE_IMS] | C3-80 |
12.29 | CT Aspects of IMS Business Trunking for IP-PBX in Static Mode of operation [BusTI-CT] | C3-80 |
12.30 | Updating IMS to conform to RFC 6665 [UP6665] | C3-80 |
12.31 | eMBMS restoration procedures [eMBMS_Rest] | C3-80 |
12.32 | Reserved | C3-80 |
12.33 | Enhancements to IMS Operator Determined Barring [eIODB] | C3-80 |
12.34 | CT aspects of Network Provided Location Information for IMS Trusted WLAN Access Network [NETLOC_TWAN_CT] | C3-80 |
12.35 | CT aspects of Small Data and Device Triggering Enhancements [MTCe-SDDTE-CT] | C3-80 |
12.36 | CT aspects of Proximity-based Services [ProSe-CT] | C3-80 |
12.37 | CT aspects of Core Network Overload – User Location Information reporting improvements [CNO_ULI-CT] | C3-80 |
12.38 | ICE impacts on IMS H.248 profiles [ICEH248] | C3-80 |
12.39 | ALT-C for indication of IPv4 and IPv6 addresses in SDP [ALTC] | C3-80 |
12.40 | IMS Signalling Activated Trace [ISAT] | C3-80 |
12.41 | Impacts of RFC7044 for introduction of the new History-Info header field [HISTORY_CT] | C3-80 |
12.42 | CT aspects of Group Communication System Enablers for LTE [GCSE_LTE-CT] | C3-80 |
12.43 | Diameter Overload Control for PCC-based Diameter applications [DOCME-PCC] | C3-80 |
12.44 | P-CSCF restoration enhancements [PCSCF_RES] | C3-80 |
12.45 | CT Impacts of Codec for Enhanced Voice Services [EVS_codec-CT] | C3-80 |
12.46 | Technical Enhancements and Improvements [TEI12] | C3-80 |
12.46.1 | TEI12 for IMS/CS | C3-80 |
12.46.2 | TEI12 for Packet Core | C3-80 |
12.47 | Rel-12 contributions on other Work Items | C3-80 |
13 | Release 13 | C3-80 |
13.1 | CT aspects of User Plane Congestion Management (UPCON) for Building Block I [UPCON-DOTCON-CT] | C3-80 |
13.2 | CT aspects of voice over E-UTRAN Paging Policy Differentiation [voE-UTRAN_PPD-CT] | C3-80 |
13.3 | CT Aspects of End-to-End MTSI Extensions [E2EMTSI-CT] | C3-80 |
13.4 | CT3 part of Support of RTP / RTCP multiplexing (signaling) in IMS [RTCP_MUX] | C3-80 |
13.5 | CT aspects of Double Resource Reuse for Multiple Media Sessions [DRuMS-CT] | C3-80 |
13.6 | CT3 Aspect of Usage Monitoring Control extension [eUMONC-CT3] | C3-80 |
13.7 | IMS Stage-3 IETF Protocol Alignment [IMSProtoc7] | C3-80 |
13.8 | Interworking of Called IN number and original Called IN number ISUP parameters [INNB_IW] | C3-80 |
13.9 | Technical Enhancements and Improvements [TEI13] | C3-80 |
13.9.1 | TEI13 for IMS/CS | C3-80 |
13.9.2 | TEI13 for Packet Core | C3-80 |
13.10 | Rel-13 contributions on other Work Items | C3-80 |
13.11 | PCC aspects of SAE [SAES-St3-PCC] | C3-80 |
13.12 | CT aspects of Group Communication System Enablers for LTE [GCSE_LTE-CT] | C3-80 |
14 | Joint sessions | C3-80 |
15 | Work Organisation | C3-80 |
15.1 | Work Plan Review | C3-80 |
15.2 | Specification Review | C3-80 |
15.3 | Next meetings; allocation of hosts | C3-80 |
15.4 | Calendar | C3-80 |
16 | Summary of results | C3-80 |
17 | Any other business | C3-80 |
18 | Closing of the meeting | C3-80 |