ETSI logo

www.3gpp.org / ftp / tsg_ct / WG3_interworking_ex-CN3 / TSGC3_113e / Inbox / Draft / PCC / 5G_CIoT

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon draft_r1_C3-210081 PCC control for DDD status and availability after DDN failure events(29.512 Rel-16).doc 2021/01/27 2:11 669 KB
icon draft_r1_C3-210082 PCC control for DDD status and availability after DDN failure events(29.512 Rel-17).doc 2021/01/27 2:11 666 KB
icon draft_r2_C3-210081 PCC control for DDD status and availability after DDN failure events(29.512 Rel-16).doc 2021/01/27 11:14 665 KB
icon draft_r2_C3-210082 PCC control for DDD status and availability after DDN failure events(29.512 Rel-17).doc 2021/01/27 11:14 666 KB

4 items.