Tdoc List

2014-04-07 09:01

Tdoc Title Source Doc-type Doc-for Agenda Avail Treated Decision Wdrn Replaced-by Replaces
C1-140786 agenda CT1 Chairman agenda agreement 1 Yes Yes noted No
C1-140787 USSD domain selection - stage-3 Ericsson / Ivo new WID agreement 12.42.1 Yes Yes revised No C1-141255
C1-140788 CT aspects of smart congestion mitigation in E-UTRAN Ericsson / Ivo new WID agreement 12.42.1 Yes Yes revised No C1-141269
C1-140789 Keeping ongoing realtime and multimedia services if IMS VoPS change for a CS/PS mode 1 UE registered for EPS services only BlackBerry UK Ltd. CR agreement 14 No Yes postponed No C1-140743
C1-140790 Align procedures related to usage of "forbidden TAs for roaming" list BlackBerry UK Ltd. CR agreement 14 No Yes postponed No C1-140243
C1-140791 Introduce enhanced EMM cause #15 for disabling the E-UTRA capability BlackBerry UK Ltd., NSN, Nokia, Qualcomm Incorporated, Huawei, HiSilicon, Samsung, CISCO, ZTE CR agreement 12.41.2 Yes Yes revised No C1-141454
C1-140792 Specify the PDN type value of a to be HO-ed PDN connection BlackBerry UK Ltd. CR agreement 12.16.3 Yes Yes revised No C1-141288
C1-140793 Completing description of emergency service procedure in the event privacy can apply BlackBerry UK Ltd. CR agreement 12.40 Yes Yes postponed No C1-140728
C1-140794 Non UE detected emergency call correction: additional cases for retry attempt using EMERGENCY SETUP in CS domain BlackBerry UK Ltd. CR agreement 9.1 Yes Yes postponed No
C1-140795 Non UE detected emergency call correction: additional cases for retry attempt using EMERGENCY SETUP in CS domain BlackBerry UK Ltd. CR agreement 9.1 Yes Yes postponed No
C1-140796 Non UE detected emergency call correction: additional cases for retry attempt using EMERGENCY SETUP in CS domain BlackBerry UK Ltd. CR agreement 9.1 Yes Yes postponed No
C1-140797 Non UE detected emergency call correction: additional cases for retry attempt using EMERGENCY SETUP in CS domain BlackBerry UK Ltd. CR agreement 9.1 Yes Yes postponed No
C1-140798 BCM handling in NW init procedures Ericsson / Mikael CR agreement 8.2 Yes Yes rejected No
C1-140799 BCM handling in NW init procedures Ericsson / Mikael CR agreement 8.2 Yes Yes rejected No
C1-140800 BCM handling in NW init procedures Ericsson / Mikael CR agreement 8.2 Yes Yes rejected No
C1-140801 BCM handling in NW init procedures Ericsson / Mikael CR agreement 8.2 Yes Yes rejected No
C1-140802 BCM handling in NW init procedures Ericsson / Mikael CR agreement 8.2 Yes Yes revised No C1-141397
C1-140803 Cases of #17 to trigger redirection Ericsson / Mikael CR agreement 10.2 Yes Yes revised No C1-141398
C1-140804 Cases of #17 to trigger redirection Ericsson / Mikael CR agreement 12.41.2 Yes Yes revised No C1-141325 C1-140530
C1-140805 Abbreviation update Ericsson / Mikael CR agreement 12.41.2 Yes Yes agreed No
C1-140806 TFT filter settings Ericsson / Mikael CR agreement 11.2 Yes Yes revised No C1-141426 C1-140770
C1-140807 TFT filter settings Ericsson / Mikael CR agreement 11.2 Yes Yes revised No C1-141427 CP-140174
C1-140808 TFT filter settings Ericsson / Mikael CR agreement 11.2 Yes Yes revised No C1-141428 C1-140772
C1-140809 TFT filter settings Ericsson / Mikael CR agreement 11.2 Yes Yes revised No C1-141429 C1-140773
C1-140810 Protocol stack of WLCP China Telecom, ZTE/Joy pseudo CR / text proposal agreement 12.8 Yes Yes revised No C1-141260
C1-140811 Abnormal cases in the UE and TWAG China Telecom, ZTE/Joy pseudo CR / text proposal agreement 12.8 Yes Yes revised No C1-141261
C1-140812 Handling of unknown, unforeseen, and erroneous protocol data ZTE/Joy pseudo CR / text proposal agreement 12.8 Yes Yes revised No C1-141262
C1-140813 Abbreviations update ZTE/Joy pseudo CR / text proposal agreement 12.8 Yes Yes agreed No
C1-140814 Multiple PDP context activation using +CGACT Intel Corporation CR agreement 12.41.2 Yes Yes revised No C1-141331
C1-140815 +CUSATD and +CUSATA alignment Intel Corporation CR agreement 12.41.2 Yes Yes revised No C1-141335
C1-140816 Clarifications for +CUSATD Intel Corporation CR agreement 12.41.2 Yes Yes revised No C1-141417
C1-140817 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 Yes Yes revised No C1-141357
C1-140818 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 Yes Yes revised No C1-141358
C1-140819 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 Yes Yes revised No C1-141359
C1-140820 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 Yes Yes revised No C1-141360
C1-140821 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 Yes Yes revised No C1-141361
C1-140822 Handling of non-provisioned Supplementary Services BlackBerry UK Ltd (Nick) discussion discussion 8.1 Yes Yes noted No
C1-140823 WLAN_NS PLMN selection BlackBerry UK Ltd CR agreement 12.10 Yes Yes revised No C1-141280
C1-140824 MO enhancements for WLAN_NS PLMN Selection BlackBerry UK Ltd CR agreement 12.10 Yes Yes revised No C1-141281
C1-140825 PSM deactivation ZTE/Fei CR agreement 12.4 Yes No withdrawn Yes
C1-140826 PSM deactivation ZTE/Fei CR agreement 12.4 Yes No withdrawn Yes
C1-140827 Service Request attempt counter ZTE,NSN/Fei CR agreement 12.6 Yes Yes revised No C1-141308
C1-140828 T3412 and T3417 correction ZTE/Fei CR agreement 12.41.2 Yes Yes revised No C1-141336
C1-140829 T3346 and T3312 correction ZTE/Fei CR agreement 12.41.2 Yes Yes revised No C1-141337
C1-140830 IMS based telepresence: 24.229 SDP impacts Ericsson / Christer CR agreement 12.20 Yes Yes revised No C1-141464
C1-140831 IMS based telepresence: 24.229 TP UE role impacts Ericsson / Christer CR agreement 12.20 Yes No withdrawn Yes
C1-140832 Clarification of payload type usage for telephony-events Ericsson / Christer CR agreement 12.40 No Yes revised No C1-141050
C1-140833 Reference update: RFC 7090 (draft-ietf-ecrit-psap-callback) Ericsson / Christer CR agreement 12.22 No No withdrawn Yes
C1-140834 Reference update: RFC 7090 (draft-ietf-ecrit-psap-callback) Ericsson / Christer CR agreement 12.22 Yes Yes postponed No
C1-140835 Extended scope of TS 26.114 Ericsson / Christer CR agreement 12.41.1 Yes Yes revised No C1-141595
C1-140836 draft C1-86 meeting report MCC meeting report / action list approval 2 Yes Yes approved No
C1-140837 work plan MCC work plan agreement 4.2 Yes Yes postponed No
C1-140838 Editorial corrections MCC CR agreement 12.41.1 Yes Yes agreed No
C1-140839 SDP answer unnecessarily included both in reliable 183 response and in 200 response Ericsson / Ivo CR agreement 12.41.1 Yes Yes revised No C1-141462
C1-140840 Providing TWAG User Plane address for usage in single-connection mode Ericsson / Ivo CR agreement 12.8 Yes Yes revised No C1-141263
C1-140841 Providing TWAG control plane address for usage in multi-connection mode Ericsson / Ivo CR agreement 12.8 Yes Yes revised No C1-141264
C1-140842 Corrections of minor errors Ericsson / Ivo CR agreement 12.8 Yes Yes agreed No
C1-140843 Pseudo-CR on MAC address coding Ericsson / Ivo pseudo CR / text proposal agreement 12.8 Yes Yes revised No C1-141265
C1-140844 Non deterministic structure of UE_profile Ericsson / Ivo discussion discussion 11.2 Yes Yes noted No
C1-140845 Non deterministic structure of UE_profile - Alt A Ericsson / Ivo CR agreement 11.2 Yes Yes rejected No
C1-140846 Non deterministic structure of UE_profile - Alt A Ericsson / Ivo CR agreement 11.2 Yes Yes rejected No
C1-140847 Non deterministic structure of UE_profile - Alt B Ericsson / Ivo CR agreement 11.2 Yes Yes revised No C1-141410
C1-140848 LS on WLCP and T3396 and related procedures Ericsson / Ivo o/g LS approval 13 Yes Yes revised No C1-141511
C1-140849 Access transfer and precondition Ericsson / Ivo CR agreement 12.17 Yes Yes revised No C1-141286
C1-140850 Implications of P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo discussion discussion 8.1 Yes Yes noted No
C1-140851 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 Yes Yes revised No C1-141250
C1-140852 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 Yes Yes revised No C1-141251
C1-140853 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 Yes Yes revised No C1-141252
C1-140854 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 Yes Yes revised No C1-141253
C1-140855 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 Yes Yes revised No C1-141254
C1-140856 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-A Ericsson / Ivo CR agreement 12.40 Yes Yes postponed No C1-134843
C1-140857 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-B Ericsson / Ivo CR agreement 12.40 Yes Yes postponed No C1-140173
C1-140858 CT aspects of smart congestion mitigation in E-UTRAN Ericsson / Ivo discussion discussion 12.42.2 Yes Yes noted No
C1-140859 Providing information to lower layer for ACB skip Ericsson / Ivo CR agreement 12.42.2 Yes Yes revised No C1-141599
C1-140860 Providing information to lower layer for ACB skip Ericsson / Ivo CR agreement 12.42.2 Yes Yes revised No C1-141600
C1-140861 Reply LS on MMTEL and SMS prioritization Ericsson / Ivo o/g LS approval 13 Yes Yes revised No C1-141512
C1-140862 Reference update of draft-ietf-mmusic-udptl-dtls Ericsson / Ivo CR agreement 12.31 Yes Yes revised No C1-141481
C1-140863 Reply LS on handling of QoS parameters between IPv4 and IPv6 systems (C3-140355) CT3 i/c LS information 3 Yes Yes replied to No
C1-140864 LS on Voice centric UE registration requirements (C4-140256) CT4 i/c LS action 3 Yes Yes noted No
C1-140865 LS on Overload Control for WLAN accesses (C4-140373) CT4 i/c LS information 3 Yes Yes noted No
C1-140866 LS on Changing the TCP setup direction for NAT traversal (C4-140390) CT4 i/c LS action 3 Yes Yes noted No
C1-140867 LS on Transfer of ETSI business trunking specifications (CP-140187) TSG CT i/c LS information 3 Yes Yes noted No
C1-140868 LS on PWS service restoration (CP-140199) TSG CT i/c LS information 3 Yes Yes noted No
C1-140869 LS on Capability Indicator for MFBI support (GP-140237) GERAN2 i/c LS action 3 Yes Yes noted No
C1-140870 Reply LS on provisioning of E-UTRA capabilities in GERAN (GP-140245) GERAN2 i/c LS information 3 Yes Yes forwarded to C1-87 No
C1-140871 LS to 3GPP TSG CT WG1 Clarifications in 24.229 regarding P-CSCF discovery and IMS flow set GSMA GSG i/c LS action 3 Yes Yes replied to No
C1-140872 Migration of eCall Transport ETSI TC MSG i/c LS information 3 Yes Yes revised No C1-141029
C1-140873 LS on MMTEL and SMS prioritization (R2-141005) RAN2 i/c LS action 3 Yes Yes replied to No
C1-140874 LS on Core Network assisted eNodeB parameters tuning (R2-141014) RAN2 i/c LS information 3 Yes Yes noted No
C1-140875 LS on CN impacts of RAN2 solutions for WLAN/3GPP radio interworking (R2-141026) RAN2 i/c LS information 3 Yes Yes noted No
C1-140876 Reply LS on additional causes triggering redirection (R3-140462) RAN3 i/c LS information 3 Yes Yes noted No
C1-140877 LS on ECT – Assured Transfer description in MMTel (S1-140291) SA1 i/c LS information 3 Yes Yes noted No
C1-140878 LS on Prioritization of MMTEL-voice (S1-140330) SA1 i/c LS information 3 Yes Yes noted No
C1-140879 LS on Extending IEEE 802.11u Generic Container (S2-134581) SA2 i/c LS action 3 Yes Yes noted No
C1-140880 LS on UE requirements for PSAP callback (S2-140419) SA2 i/c LS information 3 Yes Yes noted No
C1-140881 LS on merging ForServiceBased and ForFlowBased ISRP flow distribution containers (S2-140450) SA2 i/c LS information 3 Yes Yes noted No
C1-140882 LS on removing source IP port from ISPR and IARP (S2-140478) SA2 i/c LS action 3 Yes Yes replied to No
C1-140883 LS on ProSe charging (S2-140519) SA2 i/c LS information 3 Yes Yes noted No
C1-140884 Reply LS on new work item on "IMS support for RTP / RTCP transport multiplexing" (S2-140542) SA2 i/c LS information 3 Yes Yes noted No
C1-140885 LS to SA WG3 on WLCP security aspects (S2-140550) SA2 i/c LS information 3 Yes Yes noted No
C1-140886 LS on Maintenance of I-WLAN Solution (S2-140554) SA2 i/c LS information 3 Yes Yes noted No
C1-140887 LS response on Roaming Forwarding of signalling for CS fall back (S2-140569) SA2 i/c LS information 3 Yes Yes noted No
C1-140888 LS on solutions for the failure of CONF service after eSRVCC (S2-140570) SA2 i/c LS action 3 Yes Yes forwarded to C1-87 No
C1-140889 LS about the removal of ENs from TR 23.703 annexes (S2-140776) SA2 i/c LS information 3 Yes Yes noted No
C1-140890 LS on GCSE QCIs and connected mode DRX (S2-140846) SA2 i/c LS information 3 Yes Yes replied to No
C1-140891 LS on Provisioning of ProSe configuration information in a public safety ProSe enabled UE (S2-140847) SA2 i/c LS action 3 Yes Yes replied to No
C1-140892 LS on Wi-Fi Peer-to-Peer parameters (S2-140848) SA2 i/c LS information 3 Yes Yes noted No
C1-140893 Reply LS on CSFB priority call handling in a network supporting Multimedia Priority Service (S2-140533) SA2 i/c LS action 3 Yes Yes noted No
C1-140894 Reply LS on security aspects of protocol architectures for small cell enhancements (S3-140209) SA3 i/c LS information 3 Yes Yes noted No
C1-140895 LS on the handling of QoS parameters between IPv4 and IPv6 systems (S4-131315) SA4 i/c LS action 3 Yes Yes noted No
C1-140896 LS on RTP profile negotiation (S4-140172) SA4 i/c LS action 3 Yes Yes replied to No
C1-140897 LS on Charging Information Delivery to IMS CTF (S5-131750) SA5 i/c LS action 3 Yes Yes replied to No
C1-140898 Reply LS on Maintenance of I-WLAN Solution (SP-140149) TSG SA i/c LS information 3 Yes Yes noted No
C1-140899 Response LS on Transfer of ETSI business trunking specifications (SP-140171) TSG SA i/c LS information 3 Yes Yes noted No
C1-140900 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 No No withdrawn Yes
C1-140901 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 No No withdrawn Yes
C1-140902 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 No No withdrawn Yes
C1-140903 IOI in MESSAGE Ericsson / Janne CR agreement 10.1 Yes Yes agreed No C1-140479
C1-140904 IOI in MESSAGE Ericsson / Janne CR agreement 10.1 Yes Yes agreed No C1-140480
C1-140905 IOI in MESSAGE Ericsson / Janne CR agreement 10.1 Yes Yes agreed No C1-140481
C1-140906 Restructuring annex F table and correcting a spelling error Ericsson / Janne CR agreement 12.17 Yes Yes revised No C1-141496
C1-140907 SIP timer table update due to RFC 6026 Ericsson / Janne CR agreement 12.40 Yes Yes agreed No
C1-140908 Preconditions in the MSC server for dual radio Ericsson / Janne CR agreement 12.21 Yes Yes revised No C1-141473
C1-140909 Indication of NNI Routeing scenarios in SIP requests Ericsson / Janne new WID agreement 12.42.1 Yes Yes revised No C1-141271
C1-140910 Proposed II-NNI traversal indication messages flows Ericsson / Janne discussion discussion 12.42.2 Yes Yes revised No C1-141228
C1-140911 DRVCC transfer scenarios with conference control-v3 Ericsson, Samsung CR agreement 12.41.1 Yes Yes revised No C1-141495
C1-140912 Routeing to MSC server in S-CSCF Ericsson / Janne CR agreement 12.41.1 Yes Yes revised No C1-141497
C1-140913 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 Yes Yes revised No C1-141498
C1-140914 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 Yes Yes revised No C1-141499
C1-140915 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 Yes Yes revised No C1-141500
C1-140916 New Study Item on Impacts of RFC7044 for introduction of the new History-Info header field DeutscheTelekom (Roland) new WID agreement 12.41.2 Yes Yes revised No C1-141272
C1-140917 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141371
C1-140918 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141372
C1-140919 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141373
C1-140920 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141374
C1-140921 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141375
C1-140922 Handling of SDP answer in terminating UE DeutscheTelekom (Roland) CR agreement 7.1 Yes Yes rejected No
C1-140923 Handling of SDP answer in terminating UE DeutscheTelekom (Roland) CR agreement 7.1 Yes Yes rejected No
C1-140924 Handling of SDP answer in terminating UE DeutscheTelekom (Roland) CR agreement 7.1 Yes Yes rejected No
C1-140925 Handling of SDP answer in terminating UE DeutscheTelekom (Roland) CR agreement 7.1 Yes Yes rejected No
C1-140926 Handling of SDP answer in terminating UE DeutscheTelekom (Roland) CR agreement 7.1 Yes Yes rejected No
C1-140927 Handling of SDP answer in terminating UE DeutscheTelekom (Roland) CR agreement 7.1 Yes Yes revised No C1-141370
C1-140928 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 No No withdrawn Yes
C1-140929 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 No No withdrawn Yes
C1-140930 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 No No withdrawn Yes
C1-140931 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 No No withdrawn Yes
C1-140932 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 No No withdrawn Yes
C1-140933 Reducing size of ANDSF MO Ericsson / Ivo discussion discussion 12.16.3 Yes Yes noted No
C1-140934 Reducing size of ANDSF MO Ericsson / Ivo CR agreement 12.16.3 Yes Yes revised No C1-141290
C1-140935 Clarification on usage of values of feature capability indicators OKI, NTT CR agreement 10.1 Yes Yes revised No C1-141386
C1-140936 Clarification on usage of values of feature capability indicators OKI, NTT CR agreement 10.1 Yes Yes revised No C1-141387
C1-140937 Clarification on usage of values of feature capability indicators OKI, NTT CR agreement 10.1 Yes Yes revised No C1-141388
C1-140938 Correction on syntax of values of media feature tag OKI, NTT CR agreement 11.1 Yes Yes revised No C1-141389
C1-140939 Correction on syntax of values of media feature tag OKI, NTT CR agreement 11.1 Yes Yes revised No C1-141390
C1-140940 WLAN/3GPP Radio Interworking (UTRA_LTE_WLAN_interw) status Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer discussion discussion 12.42.2 Yes Yes revised No C1-141273
C1-140941 WID on "CT aspects of WLAN/3GPP Radio Interworking” Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer new WID agreement 12.42.1 Yes Yes revised No C1-141274
C1-140942 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 10.2 Yes Yes revised No C1-141399
C1-140943 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 10.2 Yes Yes revised No C1-141400
C1-140944 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 10.2 Yes Yes revised No C1-141401
C1-140945 Considerations on default UE retry behaviour for ESM/SM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, AT&T, Bell Canada, LG Electronics, Huawei, HiSilicon discussion discussion 12.6 Yes Yes revised No C1-141540
C1-140946 UE retry handling with optional network signalled timer Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon /Jennifer CR agreement 12.6 Yes Yes revised No C1-141310 C1-140429
C1-140947 UE retry handling with optional network signalled timer Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon /Jennifer CR agreement 12.6 Yes Yes revised No C1-141311 C1-140430
C1-140948 Addition of default retry wait time parameter Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon /Jennifer CR agreement 12.6 Yes Yes revised No C1-141312
C1-140949 P-CR on ProSe Direct Discovery procedures Qualcomm Inc. pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141259
C1-140950 Decorrelate instance-id and IMEI transport in SIP signalling Orange/Youssef CR agreement 8.1 Yes Yes rejected No
C1-140951 Decorrelate instance-id and IMEI transport in SIP signalling Orange/Youssef CR agreement 14 No Yes postponed No
C1-140952 Decorrelate instance-id and IMEI transport in SIP signalling Orange/Youssef CR agreement 14 No Yes postponed No
C1-140953 Decorrelate instance-id and IMEI transport in SIP signalling Orange/Youssef CR agreement 14 No Yes postponed No
C1-140954 Decorrelate instance-id and IMEI transport in SIP signalling Orange/Youssef CR agreement 14 No Yes revised No C1-141369
C1-140955 Proactive media transcoding in IMS Orange/Youssef CR agreement 12.41.1 Yes Yes revised No C1-141485
C1-140956 Communication Waiting- correction Orange/Youssef CR agreement 12.41.1 Yes Yes revised No C1-141486
C1-140957 Call barring-validity condition Orange/Youssef CR agreement 14 No Yes postponed No
C1-140958 SIP transport selection in the presence of NAT by P-CSC Orange/Youssef CR agreement 14 No Yes postponed No
C1-140959 Return to last LTE PLMN indication for emergency calls Ericsson / Mikael CR agreement 11.2 Yes Yes agreed No
C1-140960 Return to last LTE PLMN indication for emergency calls Ericsson / Mikael CR agreement 11.2 Yes Yes agreed No
C1-140961 Capability indicator for MFBI-support Ericsson / Mikael CR agreement 12.41.2 Yes Yes revised No C1-141416
C1-140962 Corrections to Table F.2.3 (SRVCC Transfer scenarios with conference control) Samsung, Ericsson CR agreement 12.41.1 Yes Yes revised No C1-141457
C1-140963 Setting the "MPTY auxiliary state" after access transfer of a conference call Samsung CR agreement 12.41.1 Yes Yes agreed No C1-140618
C1-140964 Exclude USSD from SS configuration Samsung CR agreement 12.41.1 Yes Yes revised No C1-141461
C1-140965 Setting "Call in MPTY" MPTY auxiliary state after access transfer of a conference call Samsung CR agreement 12.41.2 Yes Yes revised No C1-141453
C1-140966 Clarification of "steering of roaming" Samsung CR agreement 12.41.2 Yes Yes revised No C1-141326
C1-140967 Use of "registered PLMN or equivalent PLMN" terminology Samsung discussion discussion 12.16.1 Yes Yes noted No
C1-140968 Clarifications on the selection of another RAT when disabling E-UTRA. Samsung CR agreement 12.16.1 Yes Yes postponed No
C1-140969 CS Fallback after Manual CSG selection Samsung discussion discussion 12.16.2 Yes Yes noted No
C1-140970 PLMN selection timer for enhanced EMM cause #15 Qualcomm Incorporated, BlackBerry, NSN, Samsung, Nokia / Lena CR agreement 12.41.2 Yes Yes revised No C1-141455 C1-140091
C1-140971 Addition of configuration parameter for EMM cause #15 extension Qualcomm Incorporated, BlackBerry, NSN, Samsung, Nokia / Lena CR agreement 12.41.2 Yes Yes agreed No
C1-140972 Enhancement of EMM cause #15 Qualcomm Incorporated / Lena CR agreement 12.41.2 No No withdrawn Yes C1-140672
C1-140973 Proximity-based Services (ProSe) CT1 impacts Qualcomm Incorporated / Lena information information 12.5 Yes Yes noted No
C1-140974 Skeleton of TS 24.333 Qualcomm Incorporated / Lena draft TS/TR information 12.5 Yes Yes agreed No
C1-140975 Scope of TS 24.333 Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141256
C1-140976 Provisioning parameters for ProSe Direct services Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141257
C1-140977 Skeleton of TS 24.334 Qualcomm Incorporated / Lena draft TS/TR information 12.5 Yes Yes revised No C1-141258
C1-140978 Scope of TS 24.334 Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141531
C1-140979 Indication of UE ProSe capability Qualcomm Incorporated / Lena CR agreement 12.5 Yes Yes revised No C1-141532
C1-140980 Revised WID on CT aspects of Proximity-based Services (ProSe) Qualcomm Incorporated / Lena revised WID agreement 12.42.1 Yes Yes revised No C1-141510
C1-140981 AS procedures for delivery of original destination identity NTT / Shunsuke discussion discussion 12.41.2 Yes Yes noted No
C1-140982 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement 8.1 Yes Yes agreed No
C1-140983 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement 8.1 Yes Yes agreed No
C1-140984 Reference update of draft-vanelburg-dispatch-private-network-ind - NTT / Shunsuke CR agreement 8.1 Yes Yes agreed No
C1-140985 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement 8.1 Yes Yes agreed No
C1-140986 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement 8.1 Yes Yes agreed No
C1-140987 USSI domain selection clarification Deutsche Telekom CR agreement 11.1 Yes Yes postponed No
C1-140988 Capability indication by P-CSCF Deutsche Telekom, Orange CR agreement 12.40 Yes Yes revised No C1-141391
C1-140989 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 Yes Yes revised No C1-141341
C1-140990 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 Yes Yes revised No C1-141342
C1-140991 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 Yes Yes revised No C1-141343
C1-140992 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 Yes Yes revised No C1-141344
C1-140993 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 Yes Yes revised No C1-141345
C1-140994 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 Yes Yes revised No C1-141346
C1-140995 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 Yes Yes revised No C1-141347
C1-140996 ANDSF root node NSN/Gabor CR agreement 12.16.3 Yes Yes revised No C1-141289
C1-140997 Note about source and destination IP addresses and port number terminology NSN/Gabor CR agreement 12.16.3 Yes Yes revised No C1-141291
C1-140998 Source IP address/port number alignment NSN/Gabor CR agreement 12.16.3 Yes Yes revised No C1-141292 C1-140417
C1-140999 Reply LS on removing source IP port from ISPR and IARP NSN/Gabor o/g LS approval 13 Yes Yes approved No
C1-141000 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes revised No C1-141411 C1-140155
C1-141001 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes revised No C1-141412 C1-140156
C1-141002 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes revised No C1-141413 C1-140157
C1-141003 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes revised No C1-141414 C1-140158
C1-141004 Correction of wrong action and reference to procedure when handling reject cause #8 Intel / Chen CR agreement 11.2 Yes Yes agreed No
C1-141005 Correction of wrong action and reference to procedure when handling reject cause #8 Intel / Chen CR agreement 11.2 Yes Yes agreed No
C1-141006 Corrections to UE power saving mode Intel / Chen CR agreement 12.4 Yes Yes revised No C1-141294
C1-141007 Corrections to UE power saving mode Intel / Chen CR agreement 12.4 Yes Yes revised No C1-141295
C1-141008 Removal of the erroneous term "allowable" PLMN Intel / Chen CR agreement 12.10 Yes Yes agreed No
C1-141009 Re-enabling E-UTRA capability when IMS voice becomes available Intel / Chen CR agreement 12.16.1 Yes Yes revised No C1-141415
C1-141010 Implementation specific timer to re-enable E-UTRA capability after EMM cause #18 Intel / Chen CR agreement 12.16.2 Yes Yes rejected No
C1-141011 Disable E-UTRA capability for GPRS only detach Intel / Chen CR agreement 12.41.2 Yes Yes revised No C1-141418
C1-141012 New RAU trigger for PMM mode re-synchronization Intel / Chen CR agreement 12.41.2 Yes Yes revised No C1-141419
C1-141013 Discussion on skip ACB for SMS and MMTEL voice and video services Intel / Chen discussion discussion 12.42.2 Yes Yes noted No
C1-141014 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated / Amer CR agreement 12.9 Yes Yes revised No C1-141278 C1-140391
C1-141015 Editorial corrections related to WLAN selection Qualcomm Incorporated / Amer CR agreement 12.10 Yes Yes revised No C1-141283
C1-141016 Alignment between temporary and permanent OIR Orange/Youssef CR agreement 12.41.1 Yes Yes revised No C1-141487
C1-141017 Deletion of reference to ANDSF MO BlackBerry UK Ltd CR agreement 10.2 Yes Yes revised No C1-141402
C1-141018 Deletion of reference to ANDSF MO BlackBerry UK Ltd CR agreement 10.2 Yes Yes revised No C1-141403
C1-141019 P-CR on ProSe Direct Discovery Monitor Request procedure Qualcomm Inc. pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141533
C1-141020 P-CR on ProSe Direct Discovery Match Report procedure Qualcomm Inc. pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141534
C1-141021 T3340 is not started when user plane radio bearers are setup during RAU MediaTek Inc. CR agreement 12.41.2 Yes Yes revised No C1-141329
C1-141022 Handling of Abnormal Cases related to Emergency PDN Connectivity Request Procedure Qualcomm Incorporated / Arvind CR agreement 12.41.2 Yes Yes revised No C1-141327
C1-141023 Handling of Abnormal Cases related to Emergency PDP Activation Request Procedure Qualcomm Incorporated / Arvind CR agreement 12.41.2 Yes Yes revised No C1-141328
C1-141024 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141376
C1-141025 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141377
C1-141026 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141378
C1-141027 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141379
C1-141028 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes revised No C1-141380
C1-141029 Migration of eCall Transport ETSI TC MSG i/c LS information 3 Yes Yes forwarded to C1-87 No C1-140872
C1-141030 Syntax for OLI is incorrect NSN CR agreement 7.1 Yes Yes agreed No
C1-141031 Syntax for OLI is incorrect NSN CR agreement 7.1 Yes Yes agreed No
C1-141032 Syntax for OLI is incorrect NSN CR agreement 7.1 Yes Yes agreed No
C1-141033 Syntax for OLI is incorrect NSN CR agreement 7.1 Yes Yes agreed No
C1-141034 Syntax for OLI is incorrect NSN CR agreement 7.1 Yes Yes agreed No
C1-141035 Syntax for OLI is incorrect NSN CR agreement 7.1 Yes Yes agreed No
C1-141036 GRUU validation NSN CR agreement 8.1 Yes Yes revised No C1-141363
C1-141037 GRUU validation NSN CR agreement 8.1 Yes Yes revised No C1-141364
C1-141038 GRUU validation NSN CR agreement 8.1 Yes Yes revised No C1-141365
C1-141039 GRUU validation NSN CR agreement 8.1 Yes Yes revised No C1-141366
C1-141040 GRUU validation NSN CR agreement 8.1 Yes Yes revised No C1-141367
C1-141041 Issues with definition of "tokenized-by" NSN discussion discussion 12.40 Yes Yes noted No
C1-141042 Issue with "tokenized-by" NSN CR agreement 12.40 Yes Yes revised No C1-141482
C1-141043 MMTel Supplementary Services for WebRTC NSN discussion discussion 12.27 Yes Yes noted No
C1-141044 SDP offer/answer for Call Hold NSN discussion discussion 12.41.1 Yes Yes noted No
C1-141045 TADS in case of multiple UEs NSN CR agreement 12.41.1 Yes Yes revised No C1-141458
C1-141046 Clarification of payload type usage for telephony-events Ericsson / Christer CR agreement 8.1 Yes Yes revised No C1-141381
C1-141047 Clarification of payload type usage for telephony-events Ericsson / Christer CR agreement 8.1 Yes Yes revised No C1-141382
C1-141048 Clarification of payload type usage for telephony-events Ericsson / Christer CR agreement 8.1 Yes Yes revised No C1-141383
C1-141049 Clarification of payload type usage for telephony-events Ericsson / Christer CR agreement 8.1 Yes Yes revised No C1-141384
C1-141050 Clarification of payload type usage for telephony-events Ericsson / Christer CR agreement 8.1 Yes Yes revised No C1-141385 C1-140832
C1-141051 Discussion on the protocol considerations for PC3 interface Broadcom/Marko discussion discussion 12.5 Yes Yes noted No
C1-141052 Corrections to PDN connectivity procedure Broadcom/Marko pseudo CR / text proposal agreement 12.8 Yes Yes revised No C1-141266
C1-141053 Removing editor’s note for re-transmission and reliability Broadcom/Marko pseudo CR / text proposal agreement 12.8 Yes Yes revised No C1-141267
C1-141054 Profile table changes for SDES media plane security role Ericsson / Nevenka CR agreement 9.1 Yes Yes agreed No
C1-141055 Profile table changes for SDES media plane security role Ericsson / Nevenka CR agreement 9.1 Yes Yes agreed No
C1-141056 Profile table changes for SDES media plane security role Ericsson / Nevenka CR agreement 9.1 Yes Yes agreed No
C1-141057 Profile table changes for SDES media plane security role Ericsson / Nevenka CR agreement 9.1 Yes Yes agreed No
C1-141058 Profile tables changes for e2e media security for MSRP using TLS and KMS Ericsson / Nevenka CR agreement 12.31 Yes Yes agreed No
C1-141059 Profile tables changes for mediasec header field Ericsson / Nevenka CR agreement 12.31 Yes Yes agreed No
C1-141060 ICS indication for CS originating calls via MGCF Ericsson / Nevenka CR agreement 12.41.1 Yes Yes revised No C1-141488
C1-141061 Pseudo-CR on missing cause code for PDN CONNECTIVITY REJECT message NSN pseudo CR / text proposal agreement 12.8 Yes Yes revised No C1-141309
C1-141062 Handling CS Service Notification NSN, NEC, Ericsson CR agreement 10.2 Yes Yes revised No C1-141608
C1-141063 Handling CS Service Notification NSN, NEC, Ericsson CR agreement 10.2 Yes Yes revised No C1-141609
C1-141064 Handling CS Service Notification NSN, NEC, Ericsson CR agreement 10.2 Yes Yes revised No C1-141610
C1-141065 PS signaling connection release NSN/ Devaki CR agreement 12.41.2 Yes Yes revised No C1-141330
C1-141066 MME behavior when there is failure due to RAB setup during Service request NSN/ Devaki CR agreement 12.16.1 Yes Yes revised No C1-141320
C1-141067 Correction to Service Request procedure NSN, Qualcomm Incorporated/ Devaki CR agreement 12.6 No No withdrawn Yes
C1-141068 MME behavior when there is lower layer failure during TAU procedure NSN/ Devaki CR agreement 12.16.1 Yes Yes revised No C1-141321
C1-141069 Location update sent during radio bearer release NSN/ Devaki discussion discussion 12.41.2 Yes Yes noted No
C1-141070 Correction in applying IARP Huawei, HiSilicon/Youyang CR agreement 12.7 Yes Yes agreed No
C1-141071 Relation between IARP and ISMP Huawei, HiSilicon/Youyang CR agreement 12.7 Yes Yes revised No C1-141275
C1-141072 IP address type for WLCP Huawei, HiSilicon/Youyang CR agreement 12.8 Yes No withdrawn Yes
C1-141073 Requested connectivity type in SCM Huawei, HiSilicon/Youyang CR agreement 12.8 Yes Yes revised No C1-141268
C1-141074 TWAG user plane address Huawei, HiSilicon/Youyang CR agreement 12.8 Yes No withdrawn Yes
C1-141075 Correct the condition to select the 3GPP RPLMN Huawei, HiSilicon/Youyang CR agreement 12.10 Yes Yes agreed No
C1-141076 Further discussion on PS services resuming after CSFB failure Huawei, HiSilicon/Lin discussion discussion 12.16.2 Yes Yes noted No
C1-141077 Discussion on ACB skip mechanism for IMS services and SMS Huawei, HiSilicon/Lin discussion discussion 12.42.2 Yes Yes noted No
C1-141078 Attach retry for ESM #54 “PDN connection does not exist” Huawei, HiSilicon/Lin CR agreement 12.6 Yes Yes revised No C1-141313
C1-141079 Behaviour of CS/PS mode 1 UE with IMS voice available Huawei, HiSilicon/Lin CR agreement 12.16.1 Yes Yes revised No C1-141322
C1-141080 Implicit detach cause value used for P-RAU Huawei, HiSilicon, ZTE/Lin CR agreement 12.41.2 Yes Yes agreed No
C1-141081 A missed handling for a non-semantical mandatory IE error Huawei, HiSilicon/Lin CR agreement 12.41.2 Yes Yes agreed No
C1-141082 Available old TMSI Huawei, HiSilicon/Lin CR agreement 12.41.2 Yes Yes revised No C1-141332
C1-141083 Available old TMSI Huawei, HiSilicon/Lin CR agreement 12.41.2 Yes Yes revised No C1-141333
C1-141084 Correction to TFT checks Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 12.41.2 Yes Yes revised No C1-141421
C1-141085 Correction to packet filters Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 12.41.2 Yes Yes revised No C1-141422
C1-141086 TFT handling Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian discussion discussion 11.2 Yes Yes noted No
C1-141087 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 Yes Yes revised No C1-141222
C1-141088 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 Yes Yes revised No C1-141223
C1-141089 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 Yes Yes revised No C1-141224
C1-141090 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 Yes Yes revised No C1-141225
C1-141091 Timer T3324 expiry Huawei, HiSilicon, InterDigital/Christian CR agreement 12.4 Yes Yes revised No C1-141296
C1-141092 Power saving mode activation Huawei, HiSilicon, InterDigital/Christian CR agreement 12.4 Yes Yes revised No C1-141297
C1-141093 Updates due to power saving mode Huawei, HiSilicon, InterDigital/Christian CR agreement 12.4 Yes Yes revised No C1-141298
C1-141094 Editorials on power saving mode Huawei, HiSilicon/Christian CR agreement 12.4 Yes Yes revised No C1-141299
C1-141095 Editorial on power saving mode Huawei, HiSilicon/Christian CR agreement 12.4 Yes Yes revised No C1-141300
C1-141096 Evaluation on extending UE retry handling for other ESM/SM cause codes Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer discussion discussion 12.6 Yes Yes revised No C1-141314
C1-141097 Terminology usage alignment and editorials Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 12.41.2 Yes Yes revised No C1-141334
C1-141098 Available-Capacity not implemented Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 12.41.2 Yes Yes agreed No
C1-141099 Discussion on support of category indication for prioritization of emergency alerts Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer discussion discussion 12.3 Yes Yes noted No
C1-141100 Support of category indication for prioritization of emergency alerts Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 12.3 Yes Yes revised No C1-141642
C1-141101 Correction to Service Request procedure NSN, Qualcomm Incorporated/ Devaki CR agreement 12.6 Yes Yes revised No C1-141315
C1-141102 Local release of NAS signalling connection for emergency sessions after IMSI detach Intel / Chen CR agreement 12.16.1 Yes Yes revised No C1-141542
C1-141103 Using default value for T3402 upon attach failure in new PLMN Intel / Chen CR agreement 12.41.2 Yes Yes revised No C1-141423
C1-141104 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes rejected No
C1-141105 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes rejected No
C1-141106 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes rejected No
C1-141107 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes rejected No
C1-141108 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes rejected No
C1-141109 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141349
C1-141110 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141350
C1-141111 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141351
C1-141112 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141352
C1-141113 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141353
C1-141114 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141354
C1-141115 Multitasking during a video call Qualcomm Incorporated/Subra discussion discussion 12.40 Yes Yes noted No
C1-141116 Editorial corrections Qualcomm Incorproated/Subra CR agreement 12.41.1 Yes Yes agreed No
C1-141117 Correction of feature tag name from « g.3gpp.pstop » to « g.3gpp.pstops » Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes revised No C1-141490
C1-141118 Release of held sessions after conference establishment using URI list Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes revised No C1-141463 C1-140600
C1-141119 Signaling of hold and resume for unidirectional media Qualcomm Incorporated/Subra discussion discussion 12.41.1 Yes Yes noted No
C1-141120 Media directionality when resuming a session established with one-way media – alt- A Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes postponed No C1-140596
C1-141121 Media directionality when resuming a session established with one-way media – alt- B Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes postponed No
C1-141122 Relationship at P-CSCF between forwarding the 18x response and the initiation of resource reservation Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes revised No C1-141460
C1-141123 Corrections to Require and Supported header fields for inclusion of precondition tag Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes revised No C1-141491
C1-141124 TMSI reallocation – abnormal cases Huawei, HiSilicon/Christian CR agreement 12.41.2 Yes Yes revised No C1-141424
C1-141125 Corrections for newly introduced PSM InterDigital CR agreement 12.4 Yes Yes revised No C1-141301
C1-141126 Corrections for newly introduced PSM InterDigital CR agreement 12.4 Yes Yes revised No C1-141302
C1-141127 Clean-up of HOLD flows Ericsson, Rohde & Schwarz / Jörgen CR agreement 12.41.1 Yes Yes agreed No
C1-141128 Editorial clean-up, 24.629 Ericsson / Jörgen (rapporteur) CR agreement 12.41.1 Yes Yes revised No C1-141492
C1-141129 Conference event subscription fallback Ericsson / Jörgen CR agreement 12.25 Yes Yes revised No C1-141474
C1-141130 Determination of access-class Ericsson / Jörgen discussion discussion 12.40 Yes Yes noted No
C1-141131 Definition of new access-type parameter Ericsson / Jörgen CR agreement 12.40 Yes Yes postponed No
C1-141132 Use of access-type "3GPP-CS" Ericsson / Jörgen CR agreement 12.41.1 Yes Yes postponed No
C1-141133 AS determination of used registration Ericsson / Jörgen CR agreement 12.40 Yes Yes postponed No
C1-141134 Correction of info in H-I header Ericsson / Jörgen CR agreement 12.41.1 Yes Yes revised No C1-141493
C1-141135 Discussion: eIODB alternatives Ericsson / Jörgen discussion discussion 12.26 Yes Yes noted No
C1-141136 Alt 2 TRF barring of premium rate calls Ericsson / Jörgen CR agreement 12.26 Yes Yes postponed No C1-135104
C1-141137 Alt 2: ODB procedure to indicate premium rate barring Ericsson / Jörgen CR agreement 12.26 Yes Yes postponed No C1-140711
C1-141138 Correction of default document namespace text Ericsson / Jörgen CR agreement 12.41.1 Yes Yes revised No C1-141494
C1-141139 Transit-IOI handling over ISC Ericsson / Jörgen CR agreement 12.40 Yes Yes postponed No
C1-141140 SDP parameter indicating no-hold Ericsson / Jörgen CR agreement 12.41.1 Yes Yes postponed No
C1-141141 Correction of I-CSCF IOI Note Ericsson / Jörgen CR agreement 12.40 Yes Yes agreed No
C1-141142 IOI in NOTIFY response Ericsson / Jörgen CR agreement 12.40 Yes Yes agreed No
C1-141143 Summary of actions made to create version 0.0.0 of 3GPP TS 24.523 Alcatel-Lucent / Keith Drage discussion discussion 12.29 Yes Yes noted No
C1-141144 Draft 3GPP TS 24.523 Alcatel-Lucent / Keith Drage draft TS/TR information 12.29 Yes Yes revised No C1-141479
C1-141145 Summary of actions made to create version 0.0.0 of 3GPP TS 24.524 Alcatel-Lucent / Keith Drage discussion discussion 12.29 Yes Yes noted No
C1-141146 Draft 3GPP TS 24.524 Alcatel-Lucent / Keith Drage draft TS/TR information 12.29 Yes Yes revised No C1-141480
C1-141147 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement 11.2 Yes Yes revised No C1-141406 C1-140701
C1-141148 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement 11.2 Yes Yes revised No C1-141407 C1-140456
C1-141149 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement 11.2 Yes Yes revised No C1-141408 C1-140703
C1-141150 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement 11.2 Yes Yes revised No C1-141409 C1-140704
C1-141151 Keep the ongoing IMS Voice call if the registeration status of a CS/PS mode 1 UE changed to PS only HTC CR agreement 10.2 Yes Yes revised No C1-141501
C1-141152 Keep the ongoing IMS Voice call if the registeration status of a CS/PS mode 1 UE changed to PS only HTC CR agreement 10.2 Yes Yes revised No C1-141502
C1-141153 Keep the ongoing IMS Voice call if the registeration status of a CS/PS mode 1 UE changed to PS only HTC CR agreement 10.2 Yes Yes revised No C1-141503
C1-141154 Handling of Service request procedure for emergency bearer services HTC CR agreement 12.6 Yes Yes revised No C1-141316
C1-141155 Handling of Service request procedure for emergency bearer services HTC CR agreement 12.6 Yes Yes revised No C1-141317
C1-141156 Handling of service request attempt counter HTC CR agreement 12.6 Yes Yes rejected No
C1-141157 Handling of service request attempt counter HTC CR agreement 12.6 Yes Yes rejected No
C1-141158 Correction to the handling of service request attempt counter HTC CR agreement 12.6 No No withdrawn Yes
C1-141159 Correction to the handling of service request attempt counter HTC CR agreement 12.6 No No withdrawn Yes
C1-141160 Clarification to the manual CSG selection procedure HTC CR agreement 12.16.2 Yes Yes revised No C1-141323
C1-141161 Clarification to Note in section 10.5.5.25 HTC CR agreement 12.42.2 No No withdrawn Yes
C1-141162 MME handling on collision between attach and paging for EPS services CATT, NSN CR agreement 12.16.1 Yes Yes revised No C1-141405
C1-141163 No data transmission when PSM is activated CATT CR agreement 12.4 Yes Yes revised No C1-141304
C1-141164 No data transmission when PSM is activated CATT CR agreement 12.4 Yes Yes revised No C1-141305
C1-141165 No T3324 handling for emergency attached MS CATT CR agreement 12.4 Yes Yes revised No C1-141303
C1-141166 The Set of implicit detach timer with PSM activated CATT CR agreement 12.4 Yes Yes revised No C1-141306
C1-141167 Clarification on T3324 handling CATT CR agreement 12.4 Yes Yes revised No C1-141307
C1-141168 Introduction of WLAN selection mechanism based on WLANSP CATT CR agreement 12.10 Yes Yes revised No C1-141284 C1-140668
C1-141169 Introduction of PSPL into TS 24.312 CATT CR agreement 12.10 Yes Yes revised No C1-141282
C1-141170 Discussion on formulation of SCM LS reply that makes RAN2 happy NTT DOCOMO discussion discussion 12.42.2 Yes Yes noted No
C1-141171 Cause Support Indicator NTT DOCOMO discussion discussion 12.6 Yes Yes noted No
C1-141172 ESM cause support indicator NTT DOCOMO CR agreement 12.6 Yes No withdrawn Yes
C1-141173 SM cause support indicator NTT DOCOMO CR agreement 12.6 Yes No withdrawn Yes
C1-141174 CT aspects of Smart Congestion Mitigation in E-UTRAN LG Electronics / Jae new WID agreement 12.42.1 Yes Yes revised No C1-141270
C1-141175 Discussion on Smart Congestion Mitigation in UE side LG Electronics / Jae discussion discussion 12.42.2 Yes Yes noted No
C1-141176 Smart congestion mitigation in E-UTRAN for MMTEL and SMS (Alternative 1) LG Electronics / Jae CR agreement 12.42.2 Yes Yes revised No C1-141601
C1-141177 Smart congestion mitigation in E-UTRAN for MMTEL and SMS (Alternative 2) LG Electronics / Jae CR agreement 12.42.2 Yes Yes revised No C1-141602
C1-141178 Smart congestion mitigation in E-UTRAN for MMTEL voice and video (Alternative 1) LG Electronics / Jae CR agreement 12.42.2 Yes Yes postponed No
C1-141179 Smart congestion mitigation in E-UTRAN for MMTEL voice and video (Alternative 2) LG Electronics / Jae CR agreement 12.42.2 Yes Yes postponed No
C1-141180 Smart congestion mitigation in E-UTRAN for SMS over IP (Alternative 1) LG Electronics / Jae CR agreement 12.42.2 Yes Yes postponed No
C1-141181 Smart congestion mitigation in E-UTRAN for SMS over IP (Alternative 2) LG Electronics / Jae CR agreement 12.42.2 Yes Yes postponed No
C1-141182 Clarification and cleanup for IARP LG Electronics / Jae CR agreement 12.7 Yes Yes revised No C1-141276
C1-141183 Clarification of IARP for ANDSF MO LG Electronics / Jae CR agreement 12.7 Yes Yes revised No C1-141277
C1-141184 Clarification on UE procedures according to 3GPP RAT differentiation in ISRP LG Electronics / Jae CR agreement 12.9 Yes Yes revised No C1-141279 C1-140406
C1-141185 Definition of Preferred Service Provider List (PSPL) in ANDSF MO LG Electronics / Taehun CR agreement 12.10 Yes No withdrawn Yes
C1-141186 Cleanups of the ANDSF MO LG Electronics / Taehun CR agreement 12.16.3 Yes Yes revised No C1-141293
C1-141187 AT commands for eMBMS feature support Intel Corporation CR agreement 12.41.2 Yes No withdrawn Yes
C1-141188 Insufficiently documented UE precondition handling causing interoperability problems Ericsson / Ivo discussion discussion 8.1 Yes Yes noted No
C1-141189 Remove editor’s notes from PLMN selection procedures Huawei, HiSilicon/Youyang CR agreement 12.10 Yes Yes revised No C1-141285
C1-141190 Update of telepresence enhanced IMS meeting description information Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No
C1-141191 Update of initiation procedures for a CLUE Data Channel Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141465
C1-141192 TP UE's behaviour in termination procedure Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141226
C1-141193 SDP usage in CLUE sessions Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No
C1-141194 Fallback of IM session supporting telepresence Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141466
C1-141195 Media transmission before completion of CLUE negotiation Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No
C1-141196 Sequence of SDP and CLUE negotiation Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141231
C1-141197 Media streams treatment after CLUE's removal Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141467
C1-141198 Relationship between SCTP association and CLUE Data Channel Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No
C1-141199 Adoption of media multiplexing in release 12 Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141468
C1-141200 CLUE handling in MRF for IMS telepresence Huawei/Tommy discussion discussion 12.20 Yes Yes noted No
C1-141201 Proposed skeleton of new TS 24.103 Huawei/Tommy draft TS/TR agreement 12.20 Yes Yes revised No C1-141469
C1-141202 Scope for TS 24.103 Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141232
C1-141203 Overview of telepresence using IMS Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141471
C1-141204 Protocols usage for telepresence Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141472
C1-141205 Barring premium rate number NSN, Ericsson CR agreement 12.26 Yes Yes revised No C1-141475
C1-141206 Barring premium rate number NSN, Ericsson CR agreement 12.26 Yes Yes revised No C1-141476
C1-141207 Business trunking;Architecture and functional description Deutsche Telekom (Michael) draft TS/TR information 12.29 Yes Yes agreed No
C1-141208 Conditions for performing RAU for MS configured with Dual Priority Intel CR agreement 12.41.2 Yes Yes revised No C1-141536 C1-140455 C1-140455
C1-141209 Conditions for performing TAU for UE configured with Dual Priority Intel CR agreement 12.41.2 Yes Yes revised No C1-141537 C1 140294
C1-141210 Start T3440 for EMM cause values #7, #8 Intel CR agreement 12.41.2 Yes Yes revised No C1-141538
C1-141211 Start T3440 for EMM cause values #7, #8 Intel CR agreement 12.41.2 Yes Yes revised No C1-141539 C1-134826
C1-141212 WLAN Selection Procedure Intel CR agreement 12.10 Yes No withdrawn Yes
C1-141213 Discussion on the supplementary service after eSRVCC ZTE discussion discussion 11.1 Yes Yes noted No
C1-141214 WebRTC Scope Huawei/Bill pseudo CR / text proposal agreement 12.27 Yes Yes revised No C1-141477
C1-141215 WebRTC Skeleton Huawei/Bill draft TS/TR agreement 12.27 Yes Yes revised No C1-141478
C1-141216 Firewall traversal for IMS services based on ICE Huawei/Bill CR agreement 12.19 Yes Yes revised No C1-141287 C1-140421
C1-141217 Clarification on requirement for an announcement to the caller after aSRVCC Huawei/Georg CR agreement 12.41.1 Yes Yes revised No C1-141459
C1-141218 Adding new call type for SMS Ericsson CR agreement 12.42.2 Yes Yes revised No C1-141456
C1-141219 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange, Nokia CR agreement 12.6 Yes Yes revised No C1-141318 C1-140425
C1-141220 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange, Nokia CR agreement 12.6 Yes Yes revised No C1-141319 C1-140426
C1-141221 Protocol options for ProSe EPC-level Discovery Intel discussion discussion 12.5 Yes Yes noted No
C1-141222 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 Yes Yes revised No C1-141430 C1-141087
C1-141223 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 Yes Yes revised No C1-141431 C1-141088
C1-141224 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 Yes Yes revised No C1-141432 C1-141089
C1-141225 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 Yes Yes revised No C1-141433 C1-141090
C1-141226 TP UE's behaviour in termination procedure Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141192
C1-141227 LS to 3GPP CT1 on Provisioning and non-provisioning of IMS Supplementary Services and the necessary handling over Ut GSMA IREG RILTE i/c LS action 3 Yes Yes forwarded to C1-87 No
C1-141228 Proposed II-NNI traversal indication messages flows Ericsson / Janne discussion discussion 12.42.2 Yes Yes noted No C1-140910
C1-141229 LS to 3GPP CT1 on how to discover the XUI GSMA IREG RILTE i/c LS information 3 Yes Yes forwarded to C1-87 No
C1-141230 LS OUT on a UE Capability indicating the support of P-CSCF restoration (C4-140270) CT4 i/c LS action 3 Yes Yes forwarded to C1-87 No
C1-141231 Sequence of SDP and CLUE negotiation Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141196
C1-141232 Scope for TS 24.103 Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141470 C1-141202
C1-141233 LS on the problem of UE Radio Capability information size (S2-141251) SA2 i/c LS information 3 Yes Yes noted No
C1-141234 LS on IMS registration using I2 and CSFB interaction (S2-141270) SA2 i/c LS action 3 Yes Yes replied to No
C1-141235 Reply LS on providing access network information for charging (S2-141422) SA2 i/c LS action 3 Yes Yes noted No
C1-141236 Reply LS on applying EAB override for requests made for a PDN connection established with EAB override (S2-141483) SA2 i/c LS information 3 Yes Yes noted No
C1-141237 Reply LS on Overload Control for WLAN accesses (S2-141485) SA2 i/c LS information 3 Yes Yes noted No
C1-141238 Reply LS on CN impacts of RAN2 solutions for WLAN/3GPP radio interworking (S2-141506) SA2 i/c LS information 3 Yes Yes noted No
C1-141239 LS on TFT for default bearer (S2-141510) SA2 i/c LS action 3 Yes Yes forwarded to C1-87 No
C1-141240 LS on BCM handling in NW init procedures (S2-141511) SA2 i/c LS action 3 Yes Yes replied to No
C1-141241 Reply LS on IOI in MESSAGE with SRVCC Information (S5-140691) SA5 i/c LS information 3 Yes Yes noted No
C1-141242 Reply LS on Clarifications in 24.229 regarding P-CSCF discovery and IMS flow set current meeting o/g LS approval 13 Yes Yes revised No C1-141634
C1-141243 Reply LS on GCSE QCIs and connected mode DRX current meeting o/g LS approval 13 Yes Yes revised No C1-141513
C1-141244 LS on precedence of UICC over ME for ProSe configuration information in a public safety ProSe enabled UE current meeting o/g LS approval 13 Yes Yes approved No
C1-141245 AS determination of used registration BlackBerry CR agreement 12.40 Yes Yes postponed No
C1-141246 LS on handling of QoS parameters between IPv4 and IPv6 systems current meeting o/g LS approval 13 Yes Yes revised No C1-141546
C1-141247 - current meeting o/g LS approval 13 Yes Yes revised No C1-141514
C1-141248 LS on charging information delivery to IMS CTF current meeting o/g LS approval 13 Yes Yes revised No C1-141515
C1-141249 Reply to: LS to 3GPP CT1 on Provisioning and non-provisioning of IMS Supplementary Services and the necessary handling over Ut current meeting o/g LS approval 13 Yes Yes revised No C1-141668
C1-141250 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 Yes Yes revised No C1-141518 C1-140851
C1-141251 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 No Yes revised No C1-141519 C1-140852
C1-141252 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 No Yes revised No C1-141520 C1-140853
C1-141253 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 No Yes revised No C1-141521 C1-140854
C1-141254 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO / Ivo CR agreement 8.1 No Yes revised No C1-141522 C1-140855
C1-141255 USSD domain selection - stage-3 Ericsson / Ivo new WID agreement 12.42.1 Yes Yes revised No C1-141504 C1-140787
C1-141256 Scope of TS 24.333 Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141571 C1-140975
C1-141257 Provisioning parameters for ProSe Direct services Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141572 C1-140976
C1-141258 Skeleton of TS 24.334 Qualcomm Incorporated / Lena draft TS/TR information 12.5 Yes Yes revised No C1-141574 C1-140977
C1-141259 P-CR on ProSe Direct Discovery procedures Qualcomm Inc. pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141575 C1-140949
C1-141260 Protocol stack of WLCP China Telecom, ZTE/Joy pseudo CR / text proposal agreement 12.8 Yes Yes agreed No C1-140810
C1-141261 Abnormal cases in the UE and TWAG China Telecom, ZTE, Broadcom Corporation pseudo CR / text proposal agreement 12.8 Yes Yes revised No C1-141580 C1-140811
C1-141262 Handling of unknown, unforeseen, and erroneous protocol data ZTE/Joy pseudo CR / text proposal agreement 12.8 Yes Yes agreed No C1-140812
C1-141263 Providing TWAG User Plane address for usage in single-connection mode Ericsson, Huawei, HiSilicon CR agreement 12.8 Yes Yes agreed No C1-140840
C1-141264 Providing TWAG control plane address for usage in multi-connection mode Ericsson, Huawei, HiSilicon CR agreement 12.8 Yes Yes agreed No C1-140841
C1-141265 Pseudo-CR on MAC address coding Ericsson / Ivo pseudo CR / text proposal agreement 12.8 Yes Yes agreed No C1-140843
C1-141266 Corrections to PDN connectivity procedure Broadcom/Marko pseudo CR / text proposal agreement 12.8 Yes Yes agreed No C1-141052
C1-141267 Removing editor’s note for re-transmission and reliability Broadcom/Marko pseudo CR / text proposal agreement 12.8 Yes Yes agreed No C1-141053
C1-141268 Requested connectivity type in SCM Huawei, HiSilicon/Youyang CR agreement 12.8 Yes Yes agreed No C1-141073
C1-141269 CT aspects of smart congestion mitigation in E-UTRAN Ericsson / Ivo new WID agreement 12.42.1 Yes Yes revised No C1-141506 C1-140788
C1-141270 CT aspects of Smart Congestion Mitigation in E-UTRAN LG Electronics / Jae new WID agreement 12.42.1 Yes Yes revised No C1-141507 C1-141174
C1-141271 Indication of NNI Routeing scenarios in SIP requests Ericsson / Janne new WID agreement 12.42.1 Yes Yes agreed No C1-140909
C1-141272 New Study Item on Impacts of RFC7044 for introduction of the new History-Info header field DeutscheTelekom (Roland) new WID agreement 12.41.2 Yes Yes revised No C1-141509 C1-140916
C1-141273 WLAN/3GPP Radio Interworking (UTRA_LTE_WLAN_interw) status Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer discussion discussion 12.42.2 Yes Yes revised No C1-141541 C1-140940
C1-141274 WID on "CT aspects of WLAN/3GPP Radio Interworking” Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer new WID agreement 12.42.1 Yes Yes revised No C1-141508 C1-140941
C1-141275 Relation between IARP and ISMP Huawei, HiSilicon/Youyang CR agreement 12.7 Yes Yes revised No C1-141525 C1-141071
C1-141276 Clarification and cleanup for IARP LG Electronics / Jae CR agreement 12.7 Yes Yes agreed No C1-141182
C1-141277 Clarification of IARP for ANDSF MO LG Electronics / Jae CR agreement 12.7 No Yes postponed No C1-141183
C1-141278 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated / Amer CR agreement 12.9 Yes Yes revised No C1-141526 C1-141014
C1-141279 Clarification on UE procedures according to 3GPP RAT differentiation in ISRP LG Electronics / Jae CR agreement 12.9 Yes Yes agreed No C1-141184
C1-141280 WLAN_NS PLMN selection BlackBerry UK Ltd CR agreement 12.10 Yes Yes revised No C1-141527 C1-140823
C1-141281 MO enhancements for WLAN_NS PLMN Selection BlackBerry UK Ltd CR agreement 12.10 Yes Yes revised No C1-141528 C1-140824
C1-141282 Introduction of PSPL into TS 24.312 CATT CR agreement 12.10 Yes Yes revised No C1-141582 C1-141169
C1-141283 Editorial corrections related to WLAN selection Qualcomm Incorporated / Amer CR agreement 12.10 Yes Yes revised No C1-141529 C1-141015
C1-141284 Introduction of WLAN selection mechanism based on WLANSP CATT CR agreement 12.10 Yes Yes revised No C1-141583 C1-141168
C1-141285 Remove editor’s notes from PLMN selection procedures Huawei, HiSilicon/Youyang CR agreement 12.10 Yes Yes revised No C1-141530 C1-141189
C1-141286 Access transfer and precondition Ericsson / Ivo CR agreement 12.17 Yes Yes postponed No C1-140849
C1-141287 Firewall traversal for IMS services based on ICE Huawei/Bill CR agreement 12.19 Yes Yes revised No C1-141589 C1-141216
C1-141288 Specify the PDN type value of a to be HO-ed PDN connection BlackBerry UK Ltd. CR agreement 12.16.3 No Yes postponed No C1-140792
C1-141289 ANDSF root node NSN/Gabor CR agreement 12.16.3 Yes Yes revised No C1-141588 C1-140996
C1-141290 Reducing size of ANDSF MO Ericsson CR agreement 12.16.3 Yes Yes agreed No C1-140934
C1-141291 Note about source and destination IP addresses and port number terminology NSN/Gabor CR agreement 12.16.3 No No withdrawn Yes C1-140997
C1-141292 Source IP address/port number alignment NSN CR agreement 12.16.3 Yes Yes agreed No C1-140998
C1-141293 Cleanups of the ANDSF MO LG Electronics / Taehun CR agreement 12.16.3 Yes Yes agreed No C1-141186
C1-141294 Corrections to UE power saving mode Intel Corporation, Huawei, HiSilicon, CATT CR agreement 12.4 Yes Yes agreed No C1-141006
C1-141295 Corrections to UE power saving mode Intel / Chen CR agreement 12.4 Yes Yes agreed No C1-141007
C1-141296 Timer T3324 expiry Huawei, HiSilicon, InterDigital/Christian CR agreement 12.4 Yes Yes revised No C1-141561 C1-141091
C1-141297 Power saving mode activation Huawei, HiSilicon, InterDigital/Christian CR agreement 12.4 Yes Yes revised No C1-141562 C1-141092
C1-141298 Updates due to power saving mode Huawei, HiSilicon, InterDigital/Christian CR agreement 12.4 Yes Yes agreed No C1-141093
C1-141299 Editorials on power saving mode Huawei, HiSilicon/Christian CR agreement 12.4 Yes Yes agreed No C1-141094
C1-141300 Editorial on power saving mode Huawei, HiSilicon/Christian CR agreement 12.4 Yes Yes agreed No C1-141095
C1-141301 Corrections for newly introduced PSM InterDigital CR agreement 12.4 Yes Yes revised No C1-141564 C1-141125
C1-141302 Corrections for newly introduced PSM InterDigital CR agreement 12.4 No No withdrawn Yes C1-141126
C1-141303 No T3324 handling for emergency attached MS CATT CR agreement 12.4 Yes Yes revised No C1-141563 C1-141165
C1-141304 No data transmission when PSM is activated CATT, ZTE CR agreement 12.4 Yes Yes revised No C1-141569 C1-141163
C1-141305 No data transmission when PSM is activated CATT CR agreement 12.4 Yes Yes revised No C1-141643 C1-141164
C1-141306 The Set of implicit detach timer with PSM activated CATT CR agreement 12.4 Yes Yes agreed No C1-141166
C1-141307 Clarification on T3324 handling CATT CR agreement 12.4 Yes Yes revised No C1-141570 C1-141167
C1-141308 Service Request attempt counter ZTE,NSN CR agreement 12.6 Yes Yes revised No C1-141577 C1-140827
C1-141309 Pseudo-CR on missing cause code for PDN CONNECTIVITY REJECT message NSN pseudo CR / text proposal agreement 12.8 Yes Yes agreed No C1-141061
C1-141310 UE retry handling with optional network signalled timer Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon, LG Electronics, Huawei, HiSilicon CR agreement 12.6 Yes Yes postponed No C1-140946
C1-141311 UE retry handling with optional network signalled timer Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon, LG Electronics, Huawei, HiSilicon CR agreement 12.6 Yes Yes postponed No C1-140947
C1-141312 Addition of default retry wait time parameter Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Bell Canada, AT&T, Verizon, LG Electronics, Huawei, HiSilicon CR agreement 12.6 Yes Yes postponed No C1-140948
C1-141313 Attach retry for ESM #54 “PDN connection does not exist” Huawei, HiSilicon/Lin CR agreement 12.6 Yes Yes agreed No C1-141078
C1-141314 Evaluation on extending UE retry handling for other ESM/SM cause codes Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, AT&T, Bell Canada discussion discussion 12.6 No Yes postponed No C1-141096
C1-141315 Correction to Service Request procedure NSN, Qualcomm Incorporated, HTC CR agreement 12.6 Yes Yes agreed No C1-141101
C1-141316 Handling of Service request procedure for emergency bearer services HTC CR agreement 12.6 Yes Yes revised No C1-141578 C1-141154
C1-141317 Handling of Service request procedure for emergency bearer services HTC CR agreement 12.6 Yes Yes revised No C1-141579 C1-141155
C1-141318 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange, Nokia CR agreement 12.6 Yes Yes postponed No C1-141219
C1-141319 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange, Nokia CR agreement 12.6 Yes Yes postponed No C1-141220
C1-141320 MME behavior when there is failure due to RAB setup during Service request NSN/ Devaki CR agreement 12.16.1 No Yes postponed No C1-141066
C1-141321 MME behavior when there is lower layer failure during TAU procedure NSN/ Devaki CR agreement 12.16.1 Yes Yes agreed No C1-141068
C1-141322 Behaviour of CS/PS mode 1 UE with IMS voice available Huawei, HiSilicon/Lin CR agreement 12.16.1 Yes Yes agreed No C1-141079
C1-141323 Clarification to the manual CSG selection procedure HTC CR agreement 12.16.2 No Yes postponed No C1-141160
C1-141324 LS on PS services resuming after CSFB failure current meeting o/g LS approval 13 Yes Yes revised No C1-141516
C1-141325 Cases of #17 to trigger redirection Ericsson / Mikael CR agreement 12.41.2 Yes Yes agreed No C1-140804
C1-141326 Clarification of "steering of roaming" Samsung CR agreement 12.41.2 No No withdrawn Yes C1-140966
C1-141327 Handling of Abnormal Cases related to Emergency PDN Connectivity Request Procedure Qualcomm Incorporated / Arvind CR agreement 12.41.2 Yes Yes revised No C1-141616 C1-141022
C1-141328 Handling of Abnormal Cases related to Emergency PDP Activation Request Procedure Qualcomm Incorporated / Arvind CR agreement 12.41.2 Yes Yes revised No C1-141661 C1-141023
C1-141329 T3340 is not started when user plane radio bearers are setup during RAU MediaTek Inc. CR agreement 12.41.2 No No withdrawn Yes C1-141021
C1-141330 PS signaling connection release NSN, Mediatek, Samsung CR agreement 12.41.2 Yes Yes agreed No C1-141065
C1-141331 Multiple PDP context activation using +CGACT Intel Corporation CR agreement 12.41.2 Yes Yes agreed No C1-140814
C1-141332 Available old TMSI Huawei, HiSilicon/Lin CR agreement 12.41.2 Yes Yes agreed No C1-141082
C1-141333 Available old TMSI Huawei, HiSilicon/Lin CR agreement 12.41.2 Yes Yes agreed No C1-141083
C1-141334 Terminology usage alignment and editorials Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 12.41.2 Yes Yes agreed No C1-141097
C1-141335 +CUSATD and +CUSATA alignment Intel Corporation CR agreement 12.41.2 Yes Yes agreed No C1-140815
C1-141336 T3412 and T3417 correction ZTE/Fei CR agreement 12.41.2 Yes Yes revised No C1-141621 C1-140828
C1-141337 T3346 and T3312 correction ZTE/Fei CR agreement 12.41.2 Yes Yes revised No C1-141596 C1-140829
C1-141338 Reply LS on BCM handling in NW init procedures current meeting o/g LS approval 13 Yes Yes revised No C1-141547
C1-141339 nn void other discussion 14 No Yes [not addressed] No
C1-141340 nn void other discussion 14 No Yes [not addressed] No
C1-141341 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 No No withdrawn Yes C1-140989
C1-141342 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 No No withdrawn Yes C1-140990
C1-141343 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 No No withdrawn Yes C1-140991
C1-141344 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 No No withdrawn Yes C1-140992
C1-141345 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 No No withdrawn Yes C1-140993
C1-141346 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 6.1 No No withdrawn Yes C1-140994
C1-141347 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 12.40 Yes Yes revised No C1-141592 C1-140995
C1-141348 Syntax for OLI is incorrect NSN CR agreement 7.1 Yes Yes agreed No
C1-141349 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 12.40 Yes Yes revised No C1-141593 C1-141109
C1-141350 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141651 C1-141110
C1-141351 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141652 C1-141111
C1-141352 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141653 C1-141112
C1-141353 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141654 C1-141113
C1-141354 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141655 C1-141114
C1-141355 Addressing the notification message when memory becomes available Qualcomm Incorporated CR agreement 7.1 Yes Yes revised No C1-141656
C1-141356 Addressing the notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes revised No C1-141657
C1-141357 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 Yes Yes rejected No C1-140817
C1-141358 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 No Yes rejected No C1-140818
C1-141359 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 No Yes rejected No C1-140819
C1-141360 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 No Yes rejected No C1-140820
C1-141361 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 8.1 Yes Yes revised No C1-141550 C1-140821
C1-141362 Handling of non-provisioned Supplementary Services BlackBerry other information 8.1 No No withdrawn Yes
C1-141363 GRUU validation NSN CR agreement 8.1 Yes Yes agreed No C1-141036
C1-141364 GRUU validation NSN CR agreement 8.1 Yes Yes agreed No C1-141037
C1-141365 GRUU validation NSN CR agreement 8.1 Yes Yes agreed No C1-141038
C1-141366 GRUU validation NSN CR agreement 8.1 Yes Yes agreed No C1-141039
C1-141367 GRUU validation NSN CR agreement 8.1 Yes Yes agreed No C1-141040
C1-141368 nn void other discussion 14 No Yes [not addressed] No
C1-141369 Decorrelate instance-id and IMEI transport in SIP signalling Orange/Youssef CR agreement 12.40 Yes Yes postponed No C1-140954
C1-141370 Handling of SDP answer in terminating UE DeutscheTelekom (Roland) CR agreement 12.41.1 No Yes postponed No C1-140927
C1-141371 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-140917
C1-141372 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-140918
C1-141373 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-140919
C1-141374 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-140920
C1-141375 Procedures for OIR not subscribed DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-140921
C1-141376 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-141024
C1-141377 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-141025
C1-141378 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-141026
C1-141379 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-141027
C1-141380 Presentation of calling identity in terminating UE DeutscheTelekom (Roland) CR agreement 8.1 Yes Yes postponed No C1-141028
C1-141381 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes revised No C1-141625 C1-141046
C1-141382 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes revised No C1-141626 C1-141047
C1-141383 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes revised No C1-141627 C1-141048
C1-141384 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes revised No C1-141628 C1-141049
C1-141385 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes revised No C1-141629 C1-141050
C1-141386 Clarification on usage of values of feature capability indicators OKI, NTT CR agreement 10.1 No No withdrawn Yes C1-140935
C1-141387 Clarification on usage of values of feature capability indicators OKI, NTT CR agreement 10.1 No No withdrawn Yes C1-140936
C1-141388 Clarification on usage of values of feature capability indicators OKI, NTT CR agreement 12.41.1 Yes Yes revised No C1-141630 C1-140937
C1-141389 Correction on syntax of values of media feature tag OKI, NTT CR agreement 11.1 No No withdrawn Yes C1-140938
C1-141390 Correction on syntax of values of media feature tag OKI, NTT CR agreement 11.1 No No withdrawn Yes C1-140939
C1-141391 Capability indication by P-CSCF Deutsche Telekom, Orange CR agreement 12.40 Yes Yes revised No C1-141594 C1-140988
C1-141392 nn void other discussion 14 No Yes [not addressed] No
C1-141393 nn void other discussion 14 No Yes [not addressed] No
C1-141394 nn void other discussion 14 No Yes [not addressed] No
C1-141395 nn void other discussion 14 No Yes [not addressed] No
C1-141396 nn void other discussion 14 No Yes [not addressed] No
C1-141397 BCM handling in NW init procedures Ericsson / Mikael CR agreement 12.41.2 Yes Yes revised No C1-141597 C1-140802
C1-141398 Cases of #17 to trigger redirection Ericsson / Mikael CR agreement 10.2 Yes Yes agreed No C1-140803
C1-141399 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 10.2 Yes Yes agreed No C1-140942
C1-141400 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 10.2 Yes Yes agreed No C1-140943
C1-141401 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 10.2 Yes Yes agreed No C1-140944
C1-141402 Deletion of reference to ANDSF MO BlackBerry UK Ltd CR agreement 10.2 Yes Yes revised No C1-141523 C1-141017
C1-141403 Deletion of reference to ANDSF MO BlackBerry UK Ltd CR agreement 10.2 Yes Yes revised No C1-141524 C1-141018
C1-141404 void void other agreement 14 No Yes [not addressed] No
C1-141405 MME handling on collision between attach and paging for EPS services CATT, NSN CR agreement 12.16.1 Yes Yes agreed No C1-141162
C1-141406 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement 11.2 Yes Yes revised No C1-141556 C1-141147
C1-141407 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement 11.2 Yes Yes revised No C1-141557 C1-141148
C1-141408 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement 11.2 Yes Yes revised No C1-141558 C1-141149
C1-141409 Handling of PDP context activation procedure in equivalent PLMN HTC CR agreement 11.2 Yes Yes revised No C1-141559 C1-141150
C1-141410 Non deterministic structure of UE_profile - Alt B Ericsson / Ivo CR agreement 11.2 Yes Yes revised No C1-141560 C1-140847
C1-141411 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes revised No C1-141567 C1-141000
C1-141412 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes revised No C1-141568 C1-141001
C1-141413 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes revised No C1-141565 C1-141002
C1-141414 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes revised No C1-141566 C1-141003
C1-141415 Re-enabling E-UTRA capability when IMS voice becomes available Intel / Chen CR agreement 12.16.1 No Yes postponed No C1-141009
C1-141416 Capability indicator for MFBI-support Ericsson / Mikael CR agreement 12.41.2 Yes Yes agreed No C1-140961
C1-141417 Clarifications for +CUSATD Intel Corporation CR agreement 12.41.2 Yes Yes revised No C1-141617 C1-140816
C1-141418 Disable E-UTRA capability for GPRS only detach Intel Corporation CR agreement 12.41.2 Yes Yes revised No C1-141618 C1-141011
C1-141419 New RAU trigger for PMM mode re-synchronization Intel / Chen CR agreement 12.41.2 Yes Yes revised No C1-141619 C1-141012
C1-141420 LS on Location update collision with RAB release current meeting o/g LS approval 13 Yes Yes revised No C1-141636
C1-141421 Correction to TFT checks Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement 12.41.2 Yes Yes revised No C1-141598 C1-141084
C1-141422 Correction to packet filters Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 12.41.2 Yes Yes revised No C1-141607 C1-141085
C1-141423 Using default value for T3402 upon attach failure in new PLMN Intel / Chen CR agreement 12.41.2 No Yes postponed No C1-141103
C1-141424 TMSI reallocation – abnormal cases in the MS Huawei, HiSilicon/Christian CR agreement 12.41.2 Yes Yes agreed No C1-141124
C1-141425 TMSI reallocation – abnormal cases in the network side Huawei, HiSilicon CR agreement 12.41.2 Yes Yes revised No C1-141603
C1-141426 TFT filter settings Ericsson / Mikael CR agreement 11.2 Yes Yes postponed No C1-140806
C1-141427 TFT filter settings Ericsson / Mikael CR agreement 11.2 Yes Yes postponed No C1-140807
C1-141428 TFT filter settings Ericsson / Mikael CR agreement 11.2 Yes Yes postponed No C1-140808
C1-141429 TFT filter settings Ericsson / Mikael CR agreement 11.2 Yes Yes postponed No C1-140809
C1-141430 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 No Yes postponed No C1-141222
C1-141431 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 No Yes postponed No C1-141223
C1-141432 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 No Yes postponed No C1-141224
C1-141433 TFT validy criteria Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 11.2 No Yes postponed No C1-141225
C1-141434 void void other discussion 14 No Yes [not addressed] No
C1-141435 void void other discussion 14 No Yes [not addressed] No
C1-141436 void void other discussion 14 No Yes [not addressed] No
C1-141437 void void other discussion 14 No Yes [not addressed] No
C1-141438 void void other discussion 14 No Yes [not addressed] No
C1-141439 void void other discussion 14 No Yes [not addressed] No
C1-141440 void void other discussion 14 No Yes [not addressed] No
C1-141441 void void other discussion 14 No Yes [not addressed] No
C1-141442 void void other discussion 14 No Yes [not addressed] No
C1-141443 void void other discussion 14 No Yes [not addressed] No
C1-141444 void void other discussion 14 No Yes [not addressed] No
C1-141445 void void other discussion 14 No Yes [not addressed] No
C1-141446 void void other discussion 14 No Yes [not addressed] No
C1-141447 void void other discussion 14 No Yes [not addressed] No
C1-141448 void void other discussion 14 No Yes [not addressed] No
C1-141449 void void other discussion 14 No Yes [not addressed] No
C1-141450 void void other discussion 14 No Yes [not addressed] No
C1-141451 void void other discussion 14 No Yes [not addressed] No
C1-141452 void void other discussion 14 No Yes [not addressed] No
C1-141453 Setting "Call in MPTY" MPTY auxiliary state after access transfer of a conference call Samsung CR agreement 12.41.2 Yes Yes agreed No C1-140965
C1-141454 Introduce enhanced EMM cause #15 for disabling the E-UTRA capability BlackBerry UK Ltd., NSN, Nokia, Qualcomm Incorporated, Huawei, HiSilicon, Samsung, CISCO, ZTE CR agreement 12.41.2 Yes Yes revised No C1-141604 C1-140791
C1-141455 PLMN selection timer for enhanced EMM cause #15 Qualcomm Incorporated, BlackBerry UK Ltd., NSN, Samsung, Nokia CR agreement 12.41.2 Yes Yes revised No C1-141622 C1-140970
C1-141456 New call types to enable access class barring skip for SMS over SGs and SMS over S102 Ericsson CR agreement 12.42.2 Yes Yes postponed No C1-141218
C1-141457 Corrections to Table F.2.3 (SRVCC Transfer scenarios with conference control) Samsung, Ericsson CR agreement 12.41.1 Yes Yes agreed No C1-140962
C1-141458 TADS in case of multiple UEs NSN CR agreement 12.41.1 Yes Yes agreed No C1-141045
C1-141459 Clarification on requirement for an announcement to the caller after aSRVCC Huawei CR agreement 12.41.1 Yes Yes agreed No C1-141217
C1-141460 Relationship at P-CSCF between forwarding the 18x response and the initiation of resource reservation Qualcomm Incorporated/Subra CR agreement 12.40 Yes Yes agreed No C1-141122
C1-141461 Exclude USSD from SS configuration Samsung CR agreement 12.41.1 Yes Yes agreed No C1-140964
C1-141462 SDP answer unnecessarily included both in reliable 183 response and in 200 response Ericsson / Ivo CR agreement 12.40 Yes Yes agreed No C1-140839
C1-141463 Release of held sessions after conference establishment using URI list Qualcomm Incorporated/Subra CR agreement 12.41.1 No Yes postponed No C1-141118
C1-141464 IMS based telepresence: 24.229 SDP impacts Ericsson CR agreement 12.20 Yes Yes agreed No C1-140830
C1-141465 Update of initiation procedures for a CLUE Data Channel Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141191
C1-141466 Fallback of IM session supporting telepresence Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141194
C1-141467 Media streams treatment after CLUE's removal Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141197
C1-141468 Adoption of media multiplexing in release 12 Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141199
C1-141469 Proposed skeleton of new TS 24.103 Huawei/Tommy draft TS/TR agreement 12.20 Yes Yes agreed No C1-141201
C1-141470 Scope for TS 24.103 Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141232
C1-141471 Overview of telepresence using IMS Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes revised No C1-141641 C1-141203
C1-141472 Protocols usage for telepresence Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141204
C1-141473 Preconditions in the MSC server for dual radio Ericsson / Janne CR agreement 12.21 Yes Yes postponed No C1-140908
C1-141474 Conference event subscription fallback Ericsson CR agreement 12.25 Yes Yes revised No C1-141631 C1-141129
C1-141475 Barring premium rate number NSN, Ericsson CR agreement 12.26 Yes Yes postponed No C1-141205
C1-141476 Barring premium rate number NSN, Ericsson CR agreement 12.26 Yes Yes postponed No C1-141206
C1-141477 WebRTC Scope Huawei/Bill pseudo CR / text proposal agreement 12.27 Yes Yes revised No C1-141590 C1-141214
C1-141478 WebRTC Skeleton Huawei/Bill draft TS/TR agreement 12.27 Yes Yes revised No C1-141591 C1-141215
C1-141479 Draft 3GPP TS 24.523 Alcatel-Lucent / Keith Drage draft TS/TR information 12.29 Yes Yes agreed No C1-141144
C1-141480 Draft 3GPP TS 24.524 Alcatel-Lucent / Keith Drage draft TS/TR information 12.29 Yes Yes agreed No C1-141146
C1-141481 Reference update of draft-ietf-mmusic-udptl-dtls Ericsson / Ivo CR agreement 12.31 Yes Yes agreed No C1-140862
C1-141482 Issue with "tokenized-by" NSN CR agreement 12.40 Yes Yes agreed No C1-141042
C1-141483 revised WID on ETSI E2NA specs transfer Alcatel-Lucent revised WID agreement 12.42.1 No No withdrawn Yes
C1-141484 LS on handling of multitasking during a video telephony session current meeting o/g LS approval 13 Yes Yes revised No C1-141635
C1-141485 Proactive media transcoding in IMS Orange CR agreement 12.41.1 Yes Yes revised No C1-141632 C1-140955
C1-141486 Communication Waiting- correction Orange CR agreement 12.41.1 Yes Yes agreed No C1-140956
C1-141487 Alignment between temporary and permanent OIR Orange/Youssef CR agreement 12.41.1 No Yes postponed No C1-141016
C1-141488 ICS indication for CS originating calls via MGCF Ericsson / Nevenka CR agreement 12.41.1 Yes Yes agreed No C1-141060
C1-141489 Correction of feature tag name from « g.3gpp.pstop » to « g.3gpp.pstops » Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes agreed No
C1-141490 Correction of feature tag name from « g.3gpp.pstop » to « g.3gpp.pstops » Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes agreed No C1-141117
C1-141491 Corrections to Require and Supported header fields for inclusion of precondition tag Qualcomm Incorporated/Subra CR agreement 12.41.1 Yes Yes agreed No C1-141123
C1-141492 Editorial clean-up, 24.629 Ericsson / Jörgen (rapporteur) CR agreement 12.41.1 Yes Yes agreed No C1-141128
C1-141493 Correction of info in H-I header Ericsson / Jörgen CR agreement 12.41.1 Yes Yes agreed No C1-141134
C1-141494 Correction of default document namespace text Ericsson / Jörgen CR agreement 12.41.1 Yes Yes agreed No C1-141138
C1-141495 DRVCC transfer scenarios with conference control-v3 Ericsson, Samsung CR agreement 12.41.1 Yes Yes agreed No C1-140911
C1-141496 Restructuring annex F table and correcting a spelling error Ericsson / Janne CR agreement 12.17 Yes Yes agreed No C1-140906
C1-141497 Routeing to MSC server in S-CSCF Ericsson / Janne CR agreement 12.41.1 Yes Yes agreed No C1-140912
C1-141498 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 Yes Yes agreed No C1-140913
C1-141499 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 Yes Yes agreed No C1-140914
C1-141500 IOI exchange between the SCC AS and ATCF Ericsson / Janne CR agreement 10.1 Yes Yes agreed No C1-140915
C1-141501 Keep the ongoing IMS Voice call if the registeration status of a CS/PS mode 1 UE changed to PS only HTC CR agreement 10.2 No Yes postponed No C1-141151
C1-141502 Keep the ongoing IMS Voice call if the registeration status of a CS/PS mode 1 UE changed to PS only HTC CR agreement 10.2 No Yes postponed No C1-141152
C1-141503 Keep the ongoing IMS Voice call if the registeration status of a CS/PS mode 1 UE changed to PS only HTC CR agreement 10.2 No Yes postponed No C1-141153
C1-141504 void nn other discussion 14 No Yes [not addressed] No
C1-141505 USSD domain selection - stage-3 Ericsson / Ivo new WID agreement 12.42.1 Yes Yes agreed No C1-141255
C1-141506 CT aspects of smart congestion mitigation in E-UTRAN Ericsson / Ivo new WID agreement 12.42.1 No No withdrawn Yes C1-141269
C1-141507 CT aspects of Smart Congestion Mitigation in E-UTRAN LG Electronics / Jae new WID agreement 12.42.1 Yes Yes revised No C1-141544 C1-141270
C1-141508 WID on "CT aspects of WLAN/3GPP Radio Interworking” Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer new WID agreement 12.42.1 Yes Yes revised No C1-141545 C1-141274
C1-141509 New Study Item on Impacts of RFC7044 for introduction of the new History-Info header field DeutscheTelekom (Roland) new WID agreement 12.41.2 Yes Yes revised No C1-141573 C1-141272
C1-141510 Revised WID on CT aspects of Proximity-based Services (ProSe) Qualcomm Incorporated / Lena revised WID agreement 12.42.1 Yes Yes agreed No C1-140980
C1-141511 LS on session management back-off timer in UE connected to TWAN current meeting o/g LS approval 13 Yes Yes revised No C1-141637 C1-140848
C1-141512 Reply LS on MMTEL and SMS prioritization current meeting o/g LS approval 13 Yes Yes approved No C1-140861
C1-141513 Reply LS on GCSE QCIs and connected mode DRX current meeting o/g LS approval 13 Yes Yes approved No C1-141243
C1-141514 LS on RTP profile negotiation from SA5 current meeting o/g LS approval 13 Yes Yes approved No C1-141247
C1-141515 LS on charging information delivery to IMS CTF current meeting o/g LS approval 13 Yes Yes approved No C1-141248
C1-141516 LS on PS services resuming after CSFB failure current meeting o/g LS approval 13 Yes Yes revised No C1-141605 C1-141324
C1-141517 LS on impact of PC3 transport protocol on PC3 security current meeting o/g LS approval 13 Yes Yes revised No C1-141548
C1-141518 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes revised No C1-141551 C1-141250
C1-141519 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes revised No C1-141552 C1-141251
C1-141520 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes revised No C1-141553 C1-141252
C1-141521 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes revised No C1-141554 C1-141253
C1-141522 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes revised No C1-141555 C1-141254
C1-141523 Deletion of reference to ANDSF MO BlackBerry UK Ltd CR agreement 10.2 Yes Yes agreed No C1-141402
C1-141524 Deletion of reference to ANDSF MO BlackBerry UK Ltd CR agreement 10.2 Yes Yes agreed No C1-141403
C1-141525 Relation between IARP and ISMP Huawei, HiSilicon/Youyang CR agreement 12.7 Yes Yes agreed No C1-141275
C1-141526 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated / Amer CR agreement 12.9 Yes Yes revised No C1-141581 C1-141278
C1-141527 WLAN_NS PLMN selection BlackBerry UK Ltd CR agreement 12.10 Yes Yes revised No C1-141584 C1-141280
C1-141528 MO enhancements for WLAN_NS PLMN Selection BlackBerry UK Ltd CR agreement 12.10 Yes Yes revised No C1-141586 C1-141281
C1-141529 Corrections related to WLAN selection Qualcomm Incorporated / Amer CR agreement 12.10 Yes Yes revised No C1-141587 C1-141283
C1-141530 Remove editor’s notes from PLMN selection procedures Huawei, HiSilicon CR agreement 12.10 Yes Yes revised No C1-141646 C1-141285
C1-141531 Scope of TS 24.334 Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141576 C1-140978
C1-141532 Indication of UE ProSe capability Qualcomm Incorporated / Lena CR agreement 12.5 Yes Yes postponed No C1-140979
C1-141533 P-CR on ProSe Direct Discovery Monitor Request procedure Qualcomm Inc. pseudo CR / text proposal agreement 12.5 Yes Yes agreed No C1-141019
C1-141534 P-CR on ProSe Direct Discovery Match Report procedure Qualcomm Inc. pseudo CR / text proposal agreement 12.5 Yes Yes agreed No C1-141020
C1-141535 void void other information 14 No Yes [not addressed] No
C1-141536 Conditions for performing RAU for MS configured with Dual Priority Intel CR agreement 12.41.2 Yes Yes agreed No C1-141208
C1-141537 Conditions for performing TAU for UE configured with Dual Priority Intel CR agreement 12.41.2 Yes Yes agreed No C1-141209
C1-141538 Start T3440 for EMM cause values #7, #8 Intel, Ericsson CR agreement 12.41.2 Yes Yes revised No C1-141662 C1-141210
C1-141539 Start T3440 for EMM cause values #7, #8 Intel CR agreement 12.41.2 Yes Yes revised No C1-141663 C1-141211
C1-141540 Considerations on default UE retry behaviour for ESM/SM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, AT&T, Bell Canada, LG Electronics, Huawei, HiSilicon discussion discussion 12.6 Yes Yes noted No C1-140945
C1-141541 WLAN/3GPP Radio Interworking (UTRA_LTE_WLAN_interw) status nn discussion discussion 12.42.2 Yes Yes noted No C1-141273
C1-141542 Local release of NAS signalling connection for emergency sessions after IMSI detach Intel Corporation CR agreement 12.16.1 Yes Yes agreed No C1-141102
C1-141543 Response LS on provisioning of E-UTRA capabilities in GERAN (R2-141761) RAN2 i/c LS information 3 Yes Yes forwarded to C1-87 No
C1-141544 CT aspects of Smart Congestion Mitigation in E-UTRAN LG Electronics / Jae new WID agreement 12.42.1 Yes Yes revised No C1-141633 C1-141507
C1-141545 WID on "CT aspects of WLAN/3GPP Radio Interworking” Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer new WID agreement 12.42.1 Yes Yes agreed No C1-141508
C1-141546 LS on handling of QoS parameters between IPv4 and IPv6 systems current meeting o/g LS approval 13 Yes Yes approved No C1-141246
C1-141547 Reply LS on BCM handling in NW init procedures current meeting o/g LS approval 13 Yes Yes revised No C1-141638 C1-141338
C1-141548 LS on impact of PC3 transport protocol on PC3 security current meeting o/g LS approval 13 Yes Yes approved No C1-141517
C1-141549 Reply LS on IMS registration using I2 and CSFB interaction current meeting o/g LS approval 13 Yes Yes revised No C1-141639
C1-141550 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 12.41.1 Yes Yes revised No C1-141673 C1-141361
C1-141551 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes agreed No C1-141518
C1-141552 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes agreed No C1-141519
C1-141553 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes agreed No C1-141520
C1-141554 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes agreed No C1-141521
C1-141555 Corrections for voice centric UE to continue being reachable for IMS voice when P-CSCF serving the UE stops being available Ericsson, NTT DOCOMO CR agreement 8.1 Yes Yes agreed No C1-141522
C1-141556 Handling of PDP context activation procedure in equivalent PLMN HTC,Samsung, Huawei, HiSilicon CR agreement 11.2 Yes Yes revised No C1-141611 C1-141406
C1-141557 Handling of PDP context activation procedure in equivalent PLMN HTC,Samsung, Huawei, HiSilicon CR agreement 11.2 Yes Yes revised No C1-141612 C1-141407
C1-141558 Handling of PDP context activation procedure in equivalent PLMN HTC,Samsung, Huawei, HiSilicon CR agreement 11.2 Yes Yes revised No C1-141613 C1-141408
C1-141559 Handling of PDP context activation procedure in equivalent PLMN HTC,Samsung, Huawei, HiSilicon CR agreement 11.2 Yes Yes revised No C1-141614 C1-141409
C1-141560 Non deterministic structure of UE_profile - Alt B Ericsson / Ivo CR agreement 11.2 Yes Yes agreed No C1-141410
C1-141561 Timer T3324 expiry Huawei, HiSilicon, InterDigital/Christian CR agreement 12.4 Yes Yes revised No C1-141615 C1-141296
C1-141562 Power saving mode activation Huawei, HiSilicon, InterDigital, Intel Corporation CR agreement 12.4 Yes Yes agreed No C1-141297
C1-141563 No T3324 handling for emergency attached MS CATT CR agreement 12.4 Yes Yes agreed No C1-141303
C1-141564 Corrections for newly introduced PSM InterDigital CR agreement 12.4 Yes Yes agreed No C1-141301
C1-141565 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes agreed No C1-141413
C1-141566 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes agreed No C1-141414
C1-141567 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes agreed No C1-141411
C1-141568 Continuation of EAB override for requests on a PDN connection established with EAB override Intel, NSN, HTC, Ericsson, Samsung / Chen CR agreement 11.2 Yes Yes agreed No C1-141412
C1-141569 No data transmission when PSM is activated CATT, ZTE CR agreement 12.4 Yes Yes agreed No C1-141304
C1-141570 Clarification on T3324 handling CATT CR agreement 12.4 No No withdrawn Yes C1-141307
C1-141571 Scope of TS 24.333 Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes agreed No C1-141256
C1-141572 Provisioning parameters for ProSe Direct services Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes agreed No C1-141257
C1-141573 New Study Item on Impacts of RFC7044 for introduction of the new History-Info header field DeutscheTelekom (Roland) new WID agreement 12.41.2 Yes Yes agreed No C1-141509
C1-141574 Skeleton of TS 24.334 Qualcomm Incorporated / Lena draft TS/TR information 12.5 Yes Yes agreed No C1-141258
C1-141575 P-CR on ProSe Direct Discovery procedures Qualcomm Inc. pseudo CR / text proposal agreement 12.5 Yes Yes revised No C1-141623 C1-141259
C1-141576 Scope of TS 24.334 Qualcomm Incorporated / Lena pseudo CR / text proposal agreement 12.5 Yes Yes agreed No C1-141531
C1-141577 Service Request attempt counter ZTE,NSN CR agreement 12.6 Yes Yes agreed No C1-141308
C1-141578 Handling of Service request procedure for emergency bearer services HTC, Samsung, NSN CR agreement 12.6 Yes Yes revised No C1-141644 C1-141316
C1-141579 Handling of Service request procedure for emergency bearer services HTC CR agreement 12.6 Yes Yes revised No C1-141645 C1-141317
C1-141580 Abnormal cases in the UE and TWAG China Telecom, ZTE, Broadcom Corporation pseudo CR / text proposal agreement 12.8 Yes Yes agreed No C1-141261
C1-141581 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated / Amer CR agreement 12.9 Yes Yes agreed No C1-141526
C1-141582 Introduction of PSPL into TS 24.312 CATT, LG Electronics, Intel Corporation CR agreement 12.10 Yes Yes revised No C1-141647 C1-141282
C1-141583 Introduction of WLAN selection mechanism based on WLANSP CATT, Intel Corporation,LG Electronics CR agreement 12.10 Yes Yes revised No C1-141648 C1-141284
C1-141584 WLAN_NS PLMN selection BlackBerry UK Ltd CR agreement 12.10 Yes Yes revised No C1-141649 C1-141527
C1-141585 LS on availability of Hotspot 2.0 specifications current meeting o/g LS approval 13 Yes Yes revised No C1-141606
C1-141586 MO enhancements for WLAN_NS PLMN Selection BlackBerry UK Ltd CR agreement 12.10 Yes Yes revised No C1-141650 C1-141528
C1-141587 Corrections related to WLAN selection Qualcomm Incorporated / Amer CR agreement 12.10 Yes Yes agreed No C1-141529
C1-141588 ANDSF root node NSN/Gabor CR agreement 12.16.3 Yes Yes agreed No C1-141289
C1-141589 Firewall traversal for IMS services based on ICE Huawei/Bill CR agreement 12.19 Yes Yes agreed No C1-141287
C1-141590 WebRTC Scope Huawei/Bill pseudo CR / text proposal agreement 12.27 Yes Yes agreed No C1-141477
C1-141591 WebRTC Skeleton Huawei/Bill draft TS/TR agreement 12.27 Yes Yes agreed No C1-141478
C1-141592 Support of RFC 3263 for P-CSCF discovery procedure Deutsche Telekom CR agreement 12.40 Yes Yes agreed No C1-141347
C1-141593 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 12.40 Yes Yes revised No C1-141658 C1-141349
C1-141594 Capability indication by P-CSCF Deutsche Telekom, Orange CR agreement 12.40 Yes Yes revised No C1-141660 C1-141391
C1-141595 Extended scope of TS 26.114 Ericsson / Christer CR agreement 12.41.1 Yes Yes agreed No C1-140835
C1-141596 T3346 and T3312 correction ZTE/Fei CR agreement 12.41.2 Yes Yes revised No C1-141620 C1-141337
C1-141597 BCM handling in NW init procedures Ericsson / Mikael CR agreement 12.41.2 Yes Yes agreed No C1-141397
C1-141598 Correction to TFT checks Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement 12.41.2 Yes Yes agreed No C1-141421
C1-141599 Providing information to lower layer for ACB skip Ericsson / Ivo CR agreement 12.42.2 Yes Yes revised No C1-141666 C1-140859
C1-141600 Providing information to lower layer for ACB skip Ericsson / Ivo CR agreement 12.42.2 Yes Yes revised No C1-141667 C1-140860
C1-141601 Smart congestion mitigation in E-UTRAN for MMTEL and SMS (Alternative 1) LG Electronics / Jae CR agreement 12.42.2 No Yes postponed No C1-141176
C1-141602 Smart congestion mitigation in E-UTRAN for MMTEL and SMS (Alternative 2) LG Electronics / Jae CR agreement 12.42.2 No Yes postponed No C1-141177
C1-141603 TMSI reallocation – abnormal cases in the network side Huawei, HiSilicon CR agreement 12.41.2 Yes Yes agreed No C1-141425
C1-141604 Introduce enhanced EMM cause #15 for disabling the E-UTRA capability BlackBerry UK Ltd., NSN, Nokia, Qualcomm Incorporated, Huawei, HiSilicon, Samsung, CISCO, ZTE CR agreement 12.41.2 Yes Yes revised No C1-141624 C1-141454
C1-141605 LS on PS services resuming after CSFB failure current meeting o/g LS approval 13 Yes Yes revised No C1-141640 C1-141516
C1-141606 LS on availability of Hotspot 2.0 specifications current meeting o/g LS approval 13 No No withdrawn Yes C1-141585
C1-141607 Correction to packet filters Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 12.41.2 Yes Yes revised No C1-141664 C1-141422
C1-141608 Handling CS Service Notification NSN, NEC, Ericsson CR agreement 10.2 Yes Yes agreed No C1-141062
C1-141609 Handling CS Service Notification NSN, NEC, Ericsson CR agreement 10.2 Yes Yes agreed No C1-141063
C1-141610 Handling CS Service Notification NSN, NEC, Ericsson CR agreement 10.2 Yes Yes agreed No C1-141064
C1-141611 Handling of PDP context activation procedure in equivalent PLMN HTC,Samsung, Huawei, HiSilicon CR agreement 11.2 Yes Yes postponed No C1-141556
C1-141612 Handling of PDP context activation procedure in equivalent PLMN HTC,Samsung, Huawei, HiSilicon CR agreement 11.2 Yes Yes postponed No C1-141557
C1-141613 Handling of PDP context activation procedure in equivalent PLMN HTC,Samsung, Huawei, HiSilicon CR agreement 11.2 Yes Yes postponed No C1-141558
C1-141614 Handling of PDP context activation procedure in equivalent PLMN HTC,Samsung, Huawei, HiSilicon CR agreement 11.2 Yes Yes postponed No C1-141559
C1-141615 Timer T3324 expiry Huawei, HiSilicon, InterDigital/Christian CR agreement 12.4 Yes Yes agreed No C1-141561
C1-141616 Handling of Abnormal Cases related to Emergency PDN Connectivity Request Procedure Qualcomm Incorporated / Arvind CR agreement 12.41.2 Yes Yes revised No C1-141665 C1-141327
C1-141617 Clarifications for +CUSATD Intel Corporation CR agreement 12.41.2 Yes Yes agreed No C1-141417
C1-141618 Disable E-UTRA capability for GPRS only detach Intel Corporation CR agreement 12.41.2 Yes Yes agreed No C1-141418
C1-141619 New RAU trigger for PMM mode re-synchronization Intel / Chen CR agreement 12.41.2 Yes Yes agreed No C1-141419
C1-141620 T3346 and T3312 correction ZTE/Fei CR agreement 12.41.2 Yes Yes agreed No C1-141596
C1-141621 T3412 and T3417 correction ZTE CR agreement 12.41.2 Yes Yes agreed No C1-141336
C1-141622 PLMN selection timer for enhanced EMM cause #15 Qualcomm Incorporated, BlackBerry UK Ltd., NSN, Samsung, Nokia CR agreement 12.41.2 Yes Yes agreed No C1-141455
C1-141623 P-CR on ProSe Direct Discovery procedures Qualcomm Inc. pseudo CR / text proposal agreement 12.5 Yes Yes agreed No C1-141575
C1-141624 Introduce enhanced EMM cause #15 for disabling the E-UTRA capability BlackBerry UK Ltd., NSN, Nokia, Qualcomm Incorporated, Huawei, HiSilicon, Samsung, CISCO, ZTE CR agreement 12.41.2 Yes Yes agreed No C1-141604
C1-141625 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes agreed No C1-141381
C1-141626 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes agreed No C1-141382
C1-141627 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes agreed No C1-141383
C1-141628 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes agreed No C1-141384
C1-141629 Clarification of payload type usage for telephony-events Ericsson CR agreement 8.1 Yes Yes agreed No C1-141385
C1-141630 Clarification on usage of values of feature capability indicators OKI, NTT CR agreement 12.41.1 Yes Yes agreed No C1-141388
C1-141631 Conference event subscription fallback Ericsson CR agreement 12.25 Yes Yes agreed No C1-141474
C1-141632 Proactive media transcoding in IMS Orange CR agreement 12.41.1 Yes Yes agreed No C1-141485
C1-141633 CT aspects of Smart Congestion Mitigation in E-UTRAN LG Electronics / Jae new WID agreement 12.42.1 Yes Yes agreed No C1-141544
C1-141634 Reply LS on Clarifications in 24.229 regarding P-CSCF discovery and IMS flow set current meeting o/g LS approval 13 Yes Yes approved No C1-141242
C1-141635 LS on handling of multitasking during a video telephony session current meeting o/g LS approval 13 Yes Yes revised No C1-141659 C1-141484
C1-141636 LS on Location update collision with RAB release current meeting o/g LS approval 13 Yes Yes revised No C1-141669 C1-141420
C1-141637 LS on session management back-off timer in UE connected to TWAN current meeting o/g LS approval 13 Yes Yes approved No C1-141511
C1-141638 Reply LS on BCM handling in NW init procedures current meeting o/g LS approval 13 Yes Yes approved No C1-141547
C1-141639 Reply LS on IMS registration using I2 and CSFB interaction current meeting o/g LS approval 13 Yes Yes approved No C1-141549
C1-141640 LS on PS services resuming after CSFB failure current meeting o/g LS approval 13 Yes Yes approved No C1-141605
C1-141641 Overview of telepresence using IMS Huawei/Tommy pseudo CR / text proposal agreement 12.20 Yes Yes agreed No C1-141471
C1-141642 Support of category indication for prioritization of emergency alerts Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement 12.3 Yes Yes agreed No C1-141100
C1-141643 No data transmission when PSM is activated CATT CR agreement 12.4 Yes Yes agreed No C1-141305
C1-141644 Handling of Service request procedure for emergency bearer services HTC, Samsung, NSN CR agreement 12.6 Yes Yes agreed No C1-141578
C1-141645 Handling of Service request procedure for emergency bearer services HTC CR agreement 12.6 Yes Yes agreed No C1-141579
C1-141646 Remove editor’s notes from PLMN selection procedures Huawei, HiSilicon CR agreement 12.10 No Yes postponed No C1-141530
C1-141647 Introduction of PSPL into TS 24.312 CATT, LG Electronics, Intel Corporation CR agreement 12.10 No Yes postponed No C1-141582
C1-141648 Introduction of WLAN selection mechanism based on WLANSP CATT, Intel Corporation,LG Electronics CR agreement 12.10 Yes Yes agreed No C1-141583
C1-141649 WLAN_NS PLMN selection BlackBerry UK Ltd CR agreement 12.10 No Yes postponed No C1-141584
C1-141650 MO enhancements for WLAN_NS PLMN Selection BlackBerry UK Ltd CR agreement 12.10 No Yes postponed No C1-141586
C1-141651 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes agreed No C1-141350
C1-141652 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes agreed No C1-141351
C1-141653 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes agreed No C1-141352
C1-141654 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes agreed No C1-141353
C1-141655 Addressing of notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes agreed No C1-141354
C1-141656 Addressing the notification message when memory becomes available Qualcomm Incorporated CR agreement 7.1 Yes Yes agreed No C1-141355
C1-141657 Addressing the notification message when memory becomes available Qualcomm Incorporated/Subra CR agreement 7.1 Yes Yes agreed No C1-141356
C1-141658 Remote strength tag value in subsequent SDP offers Qualcomm Incorporated/Subra CR agreement 12.40 Yes Yes agreed No C1-141593
C1-141659 LS on temporary unavailability of camera and/or screen during a video telephony session current meeting o/g LS approval 13 Yes Yes approved No C1-141635
C1-141660 Capability indication by P-CSCF Deutsche Telekom, Orange CR agreement 12.40 Yes Yes agreed No C1-141594
C1-141661 Handling of Abnormal Cases related to Emergency PDP Activation Request Procedure Qualcomm Incorporated / Arvind CR agreement 12.41.2 Yes Yes postponed No C1-141328
C1-141662 Start T3440 for EMM cause values #7, #8 Intel, Ericsson CR agreement 12.41.2 Yes Yes revised No C1-141670 C1-141538
C1-141663 Start T3440 for EMM cause values #7, #8 Intel CR agreement 12.41.2 Yes Yes revised No C1-141671 C1-141539
C1-141664 Correction to packet filters Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 12.41.2 Yes Yes revised No C1-141672 C1-141607
C1-141665 Handling of Abnormal Cases related to Emergency PDN Connectivity Request Procedure Qualcomm Incorporated / Arvind CR agreement 12.41.2 Yes Yes postponed No C1-141616
C1-141666 Providing information to lower layer for ACB skip Ericsson / Ivo CR agreement 12.42.2 Yes Yes postponed No C1-141599
C1-141667 Providing information to lower layer for ACB skip Ericsson / Ivo CR agreement 12.42.2 Yes Yes postponed No C1-141600
C1-141668 Reply to: LS to 3GPP CT1 on Provisioning and non-provisioning of IMS Supplementary Services and the necessary handling over Ut current meeting o/g LS approval 13 No Yes postponed No C1-141249
C1-141669 LS on Location update collision with RAB release current meeting o/g LS approval 13 Yes Yes approved No C1-141636
C1-141670 Start T3440 for EMM cause values #7, #8 Intel, Ericsson CR agreement 12.41.2 Yes Yes agreed No C1-141662
C1-141671 Start T3440 for EMM cause values #7, #8 Intel CR agreement 12.41.2 Yes Yes agreed No C1-141663
C1-141672 Correction to packet filters Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell/Christian CR agreement 12.41.2 Yes Yes agreed No C1-141664
C1-141673 Handling of Supplementary Service provisioning errors BlackBerry UK Ltd (Nick) CR agreement 12.41.1 Yes Yes postponed No C1-141550