Agenda with allocated Tdocs

Created: 2013-10-14 08:24     Last document: C1-134525

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
Opening
2
Agenda and reports
C1-133662 agenda CT1 Chairman agenda agreement Yes Yes noted No
    C1-133777 draft C1-84 report MCC meeting report / action list approval Yes Yes revised No C1-134080
    C1-134080 draft C1-84 report MCC meeting report / action list approval Yes Yes approved No C1-133777
3
Input liaison statements
C1-133790 Reply LS on IMS Registration Control (C4-131487) CT4 i/c LS information Yes Yes noted No
    C1-133791 LS on SIP/SDP Usage for TCP/TLS session establishment (C4-131508) CT4 i/c LS action Yes Yes replied to No
    C1-133792 LS OUT on Rollback Behaviour in EPC during TAU/RAU rejection (C4-131514) CT4 i/c LS information Yes Yes noted No
    C1-133793 Reply LS on End-to-end QoS handling of MTSI (C4-131520) CT4 i/c LS information Yes Yes noted No
    C1-133794 LS on Parameter Format of AgeOfLocationInformation (C4-131544) CT4 i/c LS information Yes Yes noted No
    C1-133796 LS on Removal of OAM8-Trace from Rel-11 (CP-130586) TSG CT i/c LS action Yes Yes noted No
    C1-133797 LS on VAMOS III Support Indicator (GP-130775) TSG GERAN i/c LS action Yes Yes noted No
    C1-133798 LS on ER Band Support Indicator (GP-130778) TSG GERAN i/c LS action Yes Yes noted No
    C1-133799 Reply LS on Additional cause causes triggering redirection (GP-130801) GERAN2 i/c LS action Yes Yes replied to No
    C1-133800 Reply LS on Syntactic rules in comments in the MS RAC IE (GP-130841) GERAN2 i/c LS action Yes Yes noted No
    C1-133801 LS on Capability Indicator for MS Wideband RSRQ Measurements (GP-130843) GERAN2 i/c LS action Yes Yes noted No
    C1-133802 Reply LS on GERAN Iu mode (GP-130848) GERAN2 i/c LS action Yes Yes noted No
    C1-133803 Reply LS on Access control for UEs in RRC CONNECTED mode (R2-133014) RAN2 i/c LS information Yes Yes noted No
    C1-133804 LS on security aspects of protocol architectures for small cell enhancements (R2-133018) RAN2 i/c LS information Yes Yes noted No
    C1-133805 Reply LS on UEPCOP CT considerations (R2-133034) RAN2 i/c LS information Yes Yes noted No
    C1-133806 Reply LS on High Priority mobile terminated calls (R3-131613) RAN3 i/c LS information Yes Yes noted No
    C1-133807 LS on populating of Broadcast and Warning Area Lists (R3-131615) RAN3 i/c LS information Yes Yes noted No
    C1-133808 LS on SMSC Usage Restriction (S1-134179) SA1 i/c LS action Yes Yes noted No
    C1-133809 CSFB priority call handling in a network supporting Multimedia Priority Service (S2-132330) SA2 i/c LS action Yes Yes replied to No
    C1-133810 LS on UEPCOP CT considerations (S2-133078) SA2 i/c LS action Yes Yes replied to No
    C1-133811 Encoding of MS Time Zone for NetLoc (S5-130700) SA5 i/c LS action Yes Yes replied to No
    C1-133812 LS to GSMA RCPG on Support for E.164 representation of the other party identity (S5-131381) SA5 i/c LS information Yes Yes noted No
    C1-133813 Liaison Statement from WBA to 3GPP SA2 and CT1 Wireless Broadband Alliance i/c LS action Yes Yes noted No
    C1-133911 Reply LS on support for user location age or timestamp (C3-131316) CT3 i/c LS information Yes Yes noted No C1-133789
    C1-133996 LS on CSFB CS MO indication with SGsAP-SERVICE-REQUEST (S2-133736) SA2 i/c LS information Yes Yes noted No
    C1-133997 Reply LS to WBA Business WG / Next Generation Hotspot (S2-133824) SA2 i/c LS information Yes Yes noted No
    C1-133998 Reply LS to CT WG4 LS on new work item on "IMS support for RTP / RTCP transport multiplexing" (S2-133825) SA2 i/c LS information Yes Yes noted No
    C1-133999 LS on Roaming Forwarding of signalling for CS fall back (S2-133834) SA2 i/c LS information Yes Yes noted No
    C1-134000 Reply to LS from CT WG1 on uplink packet filters (S2-133840) SA2 i/c LS action Yes Yes replied to No
    C1-134001 Reply LS on Request for clarifications of stage 2 requirements for OPIIS (S2-133858) SA2 i/c LS information Yes Yes noted No
    C1-134003 LS on UEPCOP considerations (S2-133863) SA2 i/c LS information Yes Yes noted No
    C1-134004 LS on End-to-end fixed-mobile interworking (S4-131100) SA4 i/c LS information Yes Yes noted No
    C1-134005 Reply LS on End-to-end QoS handling of MTSI (S4-131105) SA4 i/c LS action Yes Yes replied to No
    C1-134025 LS on 3GPP RAT differentiation in ANDSF ISRP for WORM functionality (S2-133859) SA2 i/c LS information Yes Yes noted No
    C1-134054 LS on new work item on "IMS support for RTP / RTCP transport multiplexing" (C4-131546) CT4 i/c LS information Yes Yes noted No C1-133795
    C1-134079 GSMA TSG work on Smartphone Network Efficiency (SNE) GSMA TSG i/c LS action Yes Yes noted No
4
Work organisation
4.1
Meeting schedule
4.2
Work plan and other administrative issues
C1-133778 work plan MCC work plan information Yes Yes noted No
4.3
Vice Chairmen elections
5
Corrections to old releases
5.1
IMS issues
5.2
Non-IMS issues
6
Rel-6
6.1
IMS issues
6.2
Non-IMS issues
7
Rel-7
7.1
Rel-7 IMS Work Items and issues
C1-133912 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes revised No C1-134190
    C1-134190 GBA mode selection in NAF Ericsson / Ivo CR agreement No Yes postponed No C1-133912
    C1-133913 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes revised No C1-134191
    C1-134191 GBA mode selection in NAF Ericsson / Ivo CR agreement No Yes postponed No C1-133913
    C1-133914 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes revised No C1-134192
    C1-134192 GBA mode selection in NAF Ericsson / Ivo CR agreement No Yes postponed No C1-133914
    C1-133915 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes revised No C1-134193
    C1-134193 GBA mode selection in NAF Ericsson / Ivo CR agreement No Yes postponed No C1-133915
    C1-133916 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes revised No C1-134194
    C1-134194 GBA mode selection in NAF Ericsson / Ivo CR agreement No Yes postponed No C1-133916
    C1-133917 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes revised No C1-134195
    C1-134195 GBA mode selection in NAF Ericsson / Ivo CR agreement No Yes postponed No C1-133917
7.2
Rel-7 non-IMS Work Items and issues
8
Rel-8
8.1
Rel-8 IMS Work Items and issues
C1-133683 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes revised No C1-134196
    C1-134196 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133683
    C1-133684 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes revised No C1-134197
    C1-134197 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133684
    C1-133685 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes revised No C1-134198
    C1-134198 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133685
    C1-133686 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes revised No C1-134199
    C1-134199 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133686
    C1-133687 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes revised No C1-134200
    C1-134200 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133687
    C1-133710 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134201
    C1-134201 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133710
    C1-133711 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134202
    C1-134202 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133711
    C1-133712 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134203
    C1-134203 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133712
    C1-133713 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134204
    C1-134204 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133713
    C1-133714 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134205
    C1-134205 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133714
    C1-133715 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134206
    C1-134206 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133715
    C1-133716 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134207
    C1-134207 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133716
    C1-133717 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134208
    C1-134208 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133717
    C1-133718 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134209
    C1-134209 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133718
    C1-133719 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes revised No C1-134210
    C1-134210 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133719
    C1-133837 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes revised No C1-134212 C1-133266
    C1-134212 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133837
    C1-133838 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes revised No C1-134213 C1-133267
    C1-134213 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133838
    C1-133839 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes revised No C1-134214 C1-133268
    C1-134214 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133839
    C1-133840 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes revised No C1-134215 C1-133269
    C1-134215 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133840
    C1-133841 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes revised No C1-134216 C1-133270
    C1-134216 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133841
    C1-133842 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes revised No C1-134211 C1-133271
    C1-134211 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133842
8.2
Rel-8 non-IMS Work Items and issues
C1-133770 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo discussion discussion Yes Yes noted No
    C1-133771 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement Yes Yes revised No C1-134235
    C1-134235 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement No Yes postponed No C1-133771
    C1-133772 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement Yes Yes revised No C1-134236
    C1-134236 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement No Yes postponed No C1-133772
    C1-133773 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement Yes Yes revised No C1-134237
    C1-134237 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement No Yes [not addressed] No C1-133773
    C1-133774 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement Yes Yes revised No C1-134238
    C1-134238 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement No Yes postponed No C1-133774
    C1-133775 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement Yes Yes revised No C1-134239
    C1-134239 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement No Yes postponed No C1-133775
    C1-133924 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement Yes Yes revised No C1-134242
    C1-134242 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement No No withdrawn Yes C1-133924
    C1-133925 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement Yes Yes revised No C1-134243
    C1-134243 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement No No withdrawn Yes C1-133925
    C1-133926 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement Yes Yes revised No C1-134244
    C1-134244 Selective RAU when ISR is activated Intel Corporation, NSN, Interdigital, Cisco CR agreement Yes Yes revised No C1-134473 C1-133926
    C1-133927 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement Yes Yes revised No C1-134245
    C1-134245 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement Yes Yes revised No C1-134474 C1-133927
    C1-133928 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement Yes Yes revised No C1-134246
    C1-134246 Selective RAU when ISR is activated Intel, NSN, Interdigital CR agreement Yes Yes revised No C1-134475 C1-133928
    C1-133929 Discussion material on NW feature conversion of Periodic RAU/TAU to Combined RAU/TAU Intel discussion discussion Yes Yes noted No
    C1-133930 Removal of option to convert a periodic TAU into a combined TAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes No withdrawn Yes C1-133322
    C1-133931 Removal of option to convert a periodic TAU into a combined TAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes No withdrawn Yes C1-133323
    C1-133932 Removal of option to convert a periodic TAU into a combined TAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes No withdrawn Yes C1-133324
    C1-133933 Removal of option to convert a periodic TAU into a combined TAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes revised No C1-134126 C1-133325
    C1-133934 Removal of option to convert a periodic TAU into a combined TAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes revised No C1-134127 C1-133326
    C1-133935 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes No withdrawn Yes C1-133327
    C1-133936 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes No withdrawn Yes C1-133328
    C1-133937 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes No withdrawn Yes C1-133329
    C1-133938 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes revised No C1-134128 C1-133330
    C1-133939 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes revised No C1-134129 C1-133331
9
Rel-9
9.1
Rel-9 IMS Work Items and issues
C1-133673 Reverting IP routing text deleted in error Vodafone CR agreement Yes Yes agreed No
    C1-133674 Reverting IP routing text deleted in error Vodafone CR agreement Yes Yes agreed No
    C1-133675 Reverting subclause heading voided in error Vodafone CR agreement Yes Yes agreed No
    C1-133688 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133689 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133690 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133691 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133692 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133693 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133694 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133695 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133763 Map emergency URN to type of emergency service BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134119
    C1-134119 Map emergency URN to type of emergency service BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-133763
    C1-133764 Map emergency URN to type of emergency service BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134120
    C1-134120 Map emergency URN to type of emergency service BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-133764
    C1-133765 Map emergency URN to type of emergency service BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134121
    C1-134121 Map emergency URN to type of emergency service BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-133765
    C1-133766 Map emergency URN to type of emergency service BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134122
    C1-134122 Map emergency URN to type of emergency service BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-133766
    C1-133784 Correction of syntax of mediasec header field parameter Vodafone CR agreement Yes No withdrawn Yes C1-133472
    C1-133785 Correction of syntax of mediasec header field parameter Vodafone CR agreement Yes No withdrawn Yes C1-133473
    C1-133786 Correction of syntax of mediasec header field parameter Vodafone CR agreement Yes No withdrawn Yes C1-133474
    C1-133787 Correction of syntax of mediasec header field parameter Vodafone CR agreement Yes No withdrawn Yes C1-133475
    C1-133918 Fixing remaining errors in media security Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-133919 Fixing remaining errors in media security Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-133920 Fixing remaining errors in media security Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-133921 Fixing remaining errors in media security Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-134029 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO CR agreement Yes Yes revised No C1-134115
    C1-134115 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134422 C1-134029
    C1-134422 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134484 C1-134115
    C1-134484 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes agreed No C1-134422
    C1-134030 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO CR agreement Yes Yes revised No C1-134116
    C1-134116 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134423 C1-134030
    C1-134423 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134485 C1-134116
    C1-134485 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes agreed No C1-134423
    C1-134031 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO CR agreement Yes Yes revised No C1-134117
    C1-134117 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134424 C1-134031
    C1-134424 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134486 C1-134117
    C1-134486 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes agreed No C1-134424
    C1-134032 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO CR agreement Yes Yes revised No C1-134118
    C1-134118 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134425 C1-134032
    C1-134425 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134487 C1-134118
    C1-134487 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes agreed No C1-134425
9.2
Rel-9 non-IMS Work Items and issues
C1-133819 Discussion on Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer discussion discussion Yes Yes noted No
    C1-133820 Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134247
    C1-134247 Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement No Yes postponed No C1-133820
    C1-133821 Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134248
    C1-134248 Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement No Yes postponed No C1-133821
    C1-133822 Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134249
    C1-134249 Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement No Yes postponed No C1-133822
    C1-133823 Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134250
    C1-134250 Location update initiation for CSFB emergency call in case of LA change Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement No Yes postponed No C1-133823
10
Rel-10
10.1
Rel-10 IMS Work items and issues
C1-133834 Use of ECN in Multimedia Priority Service ACS, OEC, AT&T CR agreement Yes Yes revised No C1-134006
    C1-134006 Use of ECN in Multimedia Priority Service ACS, OEC, AT&T CR agreement Yes Yes revised No C1-134225 C1-133834
    C1-134225 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes revised No C1-134372 C1-134006
    C1-134372 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes agreed No C1-134225
    C1-133835 Use of ECN in Multimedia Priority Service ACS, OEC, AT&T CR agreement Yes Yes revised No C1-134007
    C1-134007 Use of ECN in Multimedia Priority Service ACS, OEC, AT&T CR agreement Yes Yes revised No C1-134226 C1-133835
    C1-134226 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes revised No C1-134373 C1-134007
    C1-134373 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes agreed No C1-134226
    C1-133836 Use of ECN in Multimedia Priority Service ACS, OEC, AT&T CR agreement Yes Yes revised No C1-134008
    C1-134008 Use of ECN in Multimedia Priority Service ACS, OEC, AT&T CR agreement Yes Yes revised No C1-134227 C1-133836
    C1-134227 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes revised No C1-134374 C1-134008
    C1-134374 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes agreed No C1-134227
    C1-133854 Interaction of Call Forwarding Busy and SRVCC alerting NSN discussion discussion Yes Yes noted No
    C1-133871 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes revised No C1-134219
    C1-134219 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes agreed No C1-133871
    C1-133872 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes revised No C1-134220
    C1-134220 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes agreed No C1-133872
    C1-133873 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes revised No C1-134221
    C1-134221 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes agreed No C1-133873
    C1-133875 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes revised No C1-134222
    C1-134222 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes agreed No C1-133875
    C1-133876 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes revised No C1-134223
    C1-134223 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes agreed No C1-133876
    C1-133877 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes revised No C1-134224
    C1-134224 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes agreed No C1-133877
    C1-133878 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson /Janne CR agreement Yes Yes postponed No
    C1-133879 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson /Janne CR agreement Yes Yes postponed No
    C1-133880 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson /Janne CR agreement Yes Yes postponed No
    C1-133881 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson /Janne CR agreement Yes Yes postponed No
    C1-133882 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson /Janne CR agreement Yes Yes postponed No
    C1-133883 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson /Janne CR agreement Yes Yes postponed No
10.2
Rel-10 non-IMS Work items and issues
C1-133736 MS's inconsistent behaviour when PS back-off timer is running Huawei, HiSilicon, Vodafone, InterDigital, CATT, HTC /Lin CR agreement Yes Yes agreed No C1-133353
    C1-133737 MS's inconsistent behaviour when PS back-off timer is running Huawei, HiSilicon, Vodafone, InterDigital, CATT, HTC /Lin CR agreement Yes Yes agreed No C1-133354
    C1-133738 MS's inconsistent behaviour when PS back-off timer is running Huawei, HiSilicon, Vodafone, InterDigital, CATT, HTC /Lin CR agreement Yes Yes agreed No C1-133355
    C1-133948 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes revised No C1-134251 C1-1331933
    C1-134251 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes agreed No C1-133948
    C1-133949 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes revised No C1-134252 C1-1331934
    C1-134252 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes agreed No C1-133949
    C1-133950 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes revised No C1-134253 C1-1331935
    C1-134253 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes agreed No C1-133950
    C1-133957 Cause Code #17 as triggers for redirection for MOCN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134258
    C1-134258 Cause Code #17 as triggers for redirection for MOCN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN CR agreement Yes Yes postponed No C1-133957
    C1-133959 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134254
    C1-134254 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-134389 C1-133959
    C1-134389 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement No Yes postponed No C1-134254
    C1-133960 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134255
    C1-134255 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134390 C1-133960
    C1-134390 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement No Yes postponed No C1-134255
    C1-133961 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134256
    C1-134256 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134391 C1-133961
    C1-134391 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement No Yes postponed No C1-134256
    C1-133969 Local ISR Deactivation upon EMM Backoff Initiation Qualcomm Incorporated / Lena CR agreement Yes Yes rejected No C1-133344
    C1-133970 Local ISR Deactivation upon EMM Backoff Initiation Qualcomm Incorporated / Lena CR agreement Yes No withdrawn Yes C1-133345
    C1-133971 Local ISR Deactivation upon EMM Backoff Initiation Qualcomm Incorporated / Lena CR agreement Yes No withdrawn Yes C1-133346
    C1-134033 CSFB handling for ATTEMPTING-TO-UPDATE UE ZTE discussion discussion Yes Yes noted No
    C1-134034 Combined Attach with UE configured for AttachWithIMSI Intel Corporation CR agreement Yes Yes revised No C1-134259
    C1-134259 Handling of Mobile Identity, old RAI and P-TMSI signature for combined Attach Intel Corporation CR agreement Yes Yes agreed No C1-134034
    C1-134035 Combined Attach with UE configured for AttachWithIMSI Intel Corporation CR agreement Yes Yes revised No C1-134260
    C1-134260 Handling of Mobile Identity, old RAI and P-TMSI signature for combined Attach Intel Corporation CR agreement Yes Yes agreed No C1-134035
    C1-134036 Combined Attach with UE configured for AttachWithIMSI Intel Corporation CR agreement Yes Yes revised No C1-134261
    C1-134261 Handling of Mobile Identity, old RAI and P-TMSI signature for combined Attach Intel Corporation CR agreement Yes Yes agreed No C1-134036
    C1-134051 Modification for paging with IMSI for CSFB to A/Gb or Iu mode China Mobile CR agreement Yes Yes revised No C1-134262
    C1-134262 Modification for paging with IMSI for CSFB to A/Gb or Iu mode China Mobile CR agreement No No withdrawn Yes C1-134051
    C1-134052 Modification for paging with IMSI for CSFB to A/Gb or Iu mode China Mobile CR agreement Yes Yes revised No C1-134263
    C1-134263 Modification for paging with IMSI for CSFB to A/Gb or Iu mode China Mobile CR agreement No No withdrawn Yes C1-134052
    C1-134053 Modification for paging with IMSI for CSFB to A/Gb or Iu mode China Mobile CR agreement Yes Yes revised No C1-134264
    C1-134264 Modification for paging with IMSI for CSFB to A/Gb or Iu mode China Mobile CR agreement No No withdrawn Yes C1-134053
    C1-134065 Interaction between MTC or IMS emergency call and 'Call control by USIM' Intel discussion discussion Yes Yes noted No
    C1-134397 Modification for paging with IMSI in MME for CSFB China Mobile CR agreement Yes Yes revised No C1-134468
    C1-134468 Modification for paging with IMSI in MME for CSFB China Mobile, Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-134397
    C1-134398 Modification for paging with IMSI in MME for CSFB China Mobile CR agreement Yes Yes revised No C1-134469
    C1-134469 Modification for paging with IMSI in MME for CSFB China Mobile, Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-134398
    C1-134399 Modification for paging with IMSI in MME for CSFB China Mobile CR agreement Yes Yes revised No C1-134470
    C1-134470 Modification for paging with IMSI in MME for CSFB China Mobile, Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-134399
    C1-134473 Selective RAU when ISR is activated Intel Corporation, NSN, Interdigital, Cisco CR agreement Yes Yes agreed No C1-134244
    C1-134474 Selective RAU when ISR is activated Intel Corporation, NSN, Interdigital, Cisco CR agreement Yes Yes agreed No C1-134245
    C1-134475 Selective RAU when ISR is activated Intel Corporation, NSN, Interdigital, Cisco CR agreement Yes Yes agreed No C1-134246
11
Rel-11
11.1
Release 11 documents for information
11.2
USSI
11.3
IOI_IMS_CH
11.4
RLI (CT4)
11.5
void
11.6
IPXS
11.7
VINE-CT
11.8
MRB
C1-133698 Reference update: RFC 6917 (draft-ietf-mediactrl-mrb) Ericsson / Christer CR agreement Yes Yes revised No C1-134188
    C1-134188 Reference update: RFC 6917 (draft-ietf-mediactrl-mrb) Ericsson / Christer CR agreement Yes Yes agreed No C1-133698
    C1-133699 Reference update: RFC 6917 (draft-ietf-mediactrl-mrb) Ericsson / Christer CR agreement Yes Yes revised No C1-134189
    C1-134189 Reference update: RFC 6917 (draft-ietf-mediactrl-mrb) Ericsson / Christer CR agreement Yes Yes agreed No C1-133699
11.9
GINI
11.10
RAVEL-CT
C1-134063 Loopback indication sent from TRF Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-134217
    C1-134217 Loopback indication sent from TRF Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-134063
    C1-134064 Loopback indication sent from TRF Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-134218
    C1-134218 Loopback indication sent from TRF Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-134064
11.11
IOC
C1-133696 Reference update: draft-ietf-soc-overload-control, draft-ietf-soc-overload-rate-control and draft-ietf-soc-load-control-event-package Ericsson / Christer CR agreement Yes Yes revised No C1-134438
    C1-134438 Reference update: draft-ietf-soc-overload-control, draft-ietf-soc-overload-rate-control and draft-ietf-soc-load-control-event-package Ericsson / Christer CR agreement Yes Yes agreed No C1-133696
    C1-133697 Reference update: draft-ietf-soc-overload-control, draft-ietf-soc-overload-rate-control and draft-ietf-soc-load-control-event-package Ericsson / Christer CR agreement Yes Yes revised No C1-134439
    C1-134439 Reference update: draft-ietf-soc-overload-control, draft-ietf-soc-overload-rate-control and draft-ietf-soc-load-control-event-package Ericsson / Christer CR agreement Yes Yes agreed No C1-133697
11.12
IODB
11.13
GBA-ext-St3 (CT4)
11.14
NWK-PL2IMS-CT
11.15
MMTel_T.38_FAX
11.16
IMSProtoc5
11.17
vSRVCC-CT
11.18
rSRVCC-CT
11.19
ATURI
11.20
RT_VGCS_Red
11.21
SIMTC work items
C1-134056 Correcting conditions for performing TAU when T3346 is running Ericsson / Magnus CR agreement Yes Yes agreed No
    C1-134057 Correcting conditions for performing TAU when T3346 is running Ericsson / Magnus CR agreement Yes Yes agreed No
11.22
BBAI work items
11.23
Full_MOCN-GERAN
11.24
RT_ERGSM
11.25
DIDA
11.26
SAMOG_WLAN- CN (CT4)
11.27
eNR_EPC (CT4)
11.28
PROTOC_SMS_SGs (CT4)
11.29
SAES2, SAES2-CSFB
C1-133739 MO CSFB indication Huawei, HiSilicon/Lin discussion discussion Yes Yes noted No
    C1-133740 MO CSFB indication Huawei, HiSilicon, Orange, NEC, ZTE, CATT/Lin CR agreement Yes Yes revised No C1-134268 C1-133565
    C1-134268 MO CSFB indication Huawei, HiSilicon, Orange, NEC, ZTE, CATT CR agreement Yes Yes postponed No C1-133740
    C1-133741 MO CSFB indication Huawei, HiSilicon, Orange, NEC, ZTE, CATT/Lin CR agreement Yes Yes revised No C1-134269 C1-133566
    C1-134269 MO CSFB indication Huawei, HiSilicon, Orange, NEC, ZTE, CATT/Lin CR agreement Yes Yes postponed No C1-133741
    C1-133780 Addition of MO CSFB indication for return to last LTE PLMN Ericsson / Mikael CR agreement Yes Yes revised No C1-134270
    C1-134270 Addition of MO CSFB indication for return to last LTE PLMNEricsson, NSN Ericsson, NSN CR agreement Yes Yes postponed No C1-133780
    C1-133781 Addition of MO CSFB indication for return to last LTE PLMN Ericsson / Mikael CR agreement Yes Yes revised No C1-134271
    C1-134271 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN CR agreement Yes Yes postponed No C1-133781
    C1-134126 Removal of option to convert a periodic TAU into a combined TAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes postponed No C1-133933
    C1-134127 Removal of option to convert a periodic TAU into a combined TAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes postponed No C1-133934
    C1-134128 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes postponed No C1-133938
    C1-134129 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes postponed No C1-133939
    C1-133940 Removal of option to convert a periodic TAU into a combined TAU Intel Corporation, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes postponed No C1-133373
    C1-133941 Removal of option to convert a periodic TAU into a combined TAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes postponed No C1-133374
    C1-133942 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes postponed No C1-133375
    C1-133943 Removal of option to convert a periodic RAU into a combined RAU Intel, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, Sony, NSN CR agreement Yes Yes postponed No C1-133376
    C1-133954 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134130
    C1-134130 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134426 C1-133954
    C1-134426 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134494 C1-134130
    C1-134494 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134426
    C1-133955 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134131
    C1-134131 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134427 C1-133955
    C1-134427 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134495 C1-134131
    C1-134495 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134427
    C1-134381 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134428
    C1-134428 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134496 C1-134381
    C1-134496 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134428
    C1-134382 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134429
    C1-134429 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134497 C1-134382
    C1-134497 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134429
11.30
TEI11 and other WIDs
11.30.1
IMS TEI11
C1-133885 Removing editor's note regarding potential overlap and interactions Ericsson /Janne CR agreement Yes Yes agreed No
    C1-133886 Removing editor's note regarding potential overlap and interactions Ericsson /Janne CR agreement Yes Yes agreed No
    C1-134038 Removal of editor's note Ericsson / Jörgen CR agreement Yes Yes agreed No
    C1-134039 Removal of editor's note Ericsson / Jörgen CR agreement Yes Yes agreed No
11.30.2
Other TEI11 issues
C1-133779 Considerations at CN operator selection in GERAN/UTRAN MOCN deployments Ericsson / Mikael discussion discussion Yes Yes noted No
    C1-133824 TAU complete and abnormal case handling on the MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes revised No C1-134309 C1-133391
    C1-134309 TAU complete and abnormal case handling on the MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134430 C1-133824
    C1-134430 TAU complete and abnormal case handling on the MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134501 C1-134309
    C1-134501 TAU complete and abnormal case handling on the MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC, Qualcomm Incorporated CR agreement Yes Yes postponed No C1-134430
    C1-133825 TAU complete and abnormal case handling on the MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes revised No C1-134310 C1-133392
    C1-134310 TAU complete and abnormal case handling on the MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134431 C1-133825
    C1-134431 TAU complete and abnormal case handling on the MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134502 C1-134310
    C1-134502 TAU complete and abnormal case handling on the MME Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC, Qualcomm Incorporated CR agreement Yes Yes postponed No C1-134431
    C1-133826 RAU complete and abnormal case handling on the SGSN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes revised No C1-134311 C1-133393
    C1-134311 RAU complete and abnormal case handling on the SGSN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes revised No C1-134432 C1-133826
    C1-134432 RAU complete and abnormal case handling on the SGSN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes revised No C1-134503 C1-134311
    C1-134503 RAU complete and abnormal case handling on the SGSN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes postponed No C1-134432
    C1-133827 RAU complete and abnormal case handling on the SGSN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes revised No C1-134312 C1-133394
    C1-134312 RAU complete and abnormal case handling on the SGSN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes revised No C1-134433 C1-133827
    C1-134433 RAU complete and abnormal case handling on the SGSN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes revised No C1-134504 C1-134312
    C1-134504 RAU complete and abnormal case handling on the SGSN Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, NEC /Jennifer CR agreement Yes Yes postponed No C1-134433
    C1-133944 Local deactivation of ISR after CSFB to correct resume of packet services Intel/Chen CR agreement Yes Yes revised No C1-134274
    C1-134274 Local deactivation of ISR after CSFB to correct resume of packet services Intel Corporation, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-134402 C1-133944
    C1-134402 Local deactivation of ISR after CSFB to correct resume of packet services Intel Corporation, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-134274
    C1-133945 Local deactivation of ISR after CSFB to correct resume of packet services Intel/Chen CR agreement Yes Yes revised No C1-134275
    C1-134275 Local deactivation of ISR after CSFB to correct resume of packet services Intel Corporation, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-134403 C1-133945
    C1-134403 Local deactivation of ISR after CSFB to correct resume of packet services Intel Corporation, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-134275
    C1-134026 MS Wideband RSRQ Measurement capability Ericsson / Mikael CR agreement Yes Yes revised No C1-134272
    C1-134272 MS Wideband RSRQ Measurement capability Ericsson / Mikael CR agreement Yes Yes agreed No C1-134026
    C1-134027 MS Wideband RSRQ Measurement capability Ericsson / Mikael CR agreement Yes Yes revised No C1-134273
    C1-134273 MS Wideband RSRQ Measurement capability Ericsson / Mikael CR agreement Yes Yes agreed No C1-134027
11.30.3
New / updated Rel-11 WIDs
C1-133709 Incorrect message name Ericsson / Ivo CR agreement Yes Yes agreed No
12
Rel-12
12.1
Release 12 documents for information
12.2
LIMONET-LIPA
12.3
REP-WMD
C1-133723 Restart Indication one2many CR agreement Yes Yes postponed No C1-133170
    C1-133724 eNB Restart Indication one2many CR agreement Yes Yes postponed No
    C1-133725 Unavailable eNodeB List one2many CR agreement Yes Yes revised No C1-134138
    C1-134138 Unavailable eNodeB List one2many CR agreement No No withdrawn Yes C1-133725
    C1-133726 eNodeB Indication one2many CR agreement Yes Yes revised No C1-134076
    C1-134076 eNodeB ID in Write-Replace Indication one2many CR agreement Yes Yes revised No C1-134137 C1-133726
    C1-134137 eNodeB ID in Stop-Warning Indication one2many CR agreement Yes Yes agreed No C1-134076
    C1-133727 WID discussion update one2many discussion discussion Yes Yes noted No
12.4
OPIIS-CT
C1-133902 Adding IARP in information provided by ANDSF CATT CR agreement Yes Yes revised No C1-134139
    C1-134139 Adding IARP in information provided by ANDSF CATT CR agreement Yes Yes revised No C1-134375 C1-133902
    C1-134375 Adding IARP in information provided by ANDSF CATT CR agreement Yes Yes agreed No C1-134139
    C1-133980 Introduction of Inter-APN Routing Policies (IARP) for ANDSF LG Electronics CR agreement Yes Yes revised No C1-134140
    C1-134140 Introduction of Inter-APN Routing Policies (IARP) for ANDSF LG Electronics CR agreement Yes Yes revised No C1-134434 C1-133980
    C1-134434 Introduction of Inter-APN Routing Policies (IARP) for ANDSF LG Electronics CR agreement Yes Yes revised No C1-134505 C1-134140
    C1-134505 Introduction of Inter-APN Routing Policies (IARP) for ANDSF LG Electronics CR agreement Yes Yes agreed No C1-134434
    C1-133981 Introduction of Inter-APN Routing Policies (IARP) for ANDSF MO LG Electronics CR agreement Yes Yes revised No C1-134141
    C1-134141 Introduction of Inter-APN Routing Policies (IARP) for ANDSF MO LG Electronics CR agreement Yes Yes revised No C1-134436 C1-133981
    C1-134436 Introduction of Inter-APN Routing Policies (IARP) for ANDSF MO LG Electronics CR agreement Yes Yes revised No C1-134506 C1-134141
    C1-134506 Introduction of Inter-APN Routing Policies (IARP) for ANDSF MO LG Electronics CR agreement Yes Yes agreed No C1-134436
12.5
eSaMOG_St3
C1-133707 EAP extensions for eSaMOG_St3 Ericsson / Ivo CR agreement Yes Yes revised No C1-134142
    C1-134142 EAP extensions for eSaMOG_St3 Ericsson CR agreement Yes Yes revised No C1-134404 C1-133707
    C1-134404 EAP extensions for eSaMOG_St3 Ericsson CR agreement Yes Yes postponed No C1-134142
    C1-133844 Skeleton of TS 24.244 ZTE/Joy draft TS/TR information Yes Yes agreed No
    C1-133845 Scope of TS 24.244 ZTE/Joy pseudo CR agreement Yes Yes revised No C1-134145
    C1-134145 Scope of TS 24.244 ZTE/Joy pseudo CR agreement Yes Yes agreed No C1-133845
    C1-134018 Multiple PDN support for trusted WLAN Huawei, HiSilicon/ Youyang CR agreement Yes Yes revised No C1-134143
    C1-134143 Multiple PDN support for trusted WLAN Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134018
    C1-134019 The usage of APN in non-3GPP access CATT CR agreement Yes Yes revised No C1-134144 C1-133901
    C1-134144 The usage of APN in non-3GPP access CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE CR agreement Yes Yes revised No C1-134376 C1-134019
    C1-134376 The usage of APN in non-3GPP access CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE CR agreement Yes Yes revised No C1-134405 C1-134144
    C1-134405 The usage of APN in non-3GPP access CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE CR agreement Yes Yes agreed No C1-134376
12.6
MTCe-UEPCOP-CT
C1-133783 Discussion on impact of DRX cycle extension Ericsson / Mikael discussion discussion Yes Yes noted No
    C1-133976 NAS impacts due to extended DRX cycle NSN discussion discussion Yes Yes noted No
12.7
LIMONET-SIPTO (CT4)
C1-133760 Detect that SIPTO@LN PDN connection involves a stand-alone GW after during inter-MME HO BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134146
    C1-134146 Detect that SIPTO@LN PDN connection involves a stand-alone GW after during inter-MME HO BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134377 C1-133760
    C1-134377 Detect that SIPTO@LN PDN connection involves a stand-alone GW after during inter-MME HO BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134146
    C1-133761 Detect that SIPTO@LN PDN connection involves a stand-alone GW after during inter-SGSN HO BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134147
    C1-134147 Detect that SIPTO@LN PDN connection involves a stand-alone GW after during inter-SGSN HO BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134378 C1-133761
    C1-134378 Detect that SIPTO@LN PDN connection involves a stand-alone GW after during inter-SGSN HO BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134147
    C1-133762 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd., Intel, NSN CR agreement Yes Yes revised No C1-134148 CP-130574
    C1-134148 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd., Intel, NSN CR agreement Yes Yes revised No C1-134406 C1-133762
    C1-134406 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd., Intel, NSN, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134440 C1-134148
    C1-134440 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd., Intel, NSN, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134406
    C1-133982 ISR handling for SIPTO at the local network LG Electronics, Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-133983 ISR handling for SIPTO at the local network LG Electronics, Huawei, HiSilicon CR agreement Yes Yes agreed No
12.8
Dia_SGSN_SMS (CT4)
C1-133956 Support for Diameter based interface between SGSN and SMS central functions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134074
    C1-134074 Support for Diameter based interface between SGSN and SMS central functions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134149 C1-133956
    C1-134149 Support for Diameter based interface between SGSN and SMS central functions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes agreed No C1-134074
12.9
MSRD_VAMOS (GERAN)
C1-133977 Introduction of VAMOS III Capability Indicator NSN CR agreement Yes Yes revised No C1-134150
    C1-134150 Introduction of VAMOS III Capability Indicator NSN CR agreement Yes Yes agreed No C1-133977
12.10
SAES3 Wis
12.10.1
SAES3
C1-133663 Detecting that all TAIs of a PLMN are forbidden when EMM#15 is received BlackBerry UK Ltd., Nokia, Telecom Italia CR agreement Yes Yes revised No C1-134133 C1-133624
    C1-134133 Detecting that all TAIs of a PLMN are forbidden when EMM#15 is received BlackBerry UK Ltd., Nokia, Telecom Italia CR agreement Yes Yes postponed No C1-133663
    C1-133668 Emergency call failure triggered by TRACKING AREA UPDATE ACCEPT message BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134153 C1-133568
    C1-134153 Emergency call failure triggered by TRACKING AREA UPDATE ACCEPT message BlackBerry UK Ltd. CR agreement No Yes postponed No C1-133668
    C1-133669 T3396 timer handling ZTE CR agreement Yes Yes revised No C1-134151
    C1-134151 T3396 timer handling ZTE CR agreement Yes Yes agreed No C1-133669
    C1-134515 Disabling E-UTRA capability for #14 in MS supporting S1 mode Huawei, HiSilicon, Qualcomm Incorporated CR agreement Yes Yes postponed No C1-134456
    C1-133759 Align procedures related to usage of "forbidden TAs for roaming" list BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134152
    C1-134152 Align procedures related to usage of "forbidden TAs for roaming" list BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134379 C1-133759
    C1-134379 Align procedures related to usage of "forbidden TAs for roaming" list BlackBerry UK Ltd. CR agreement No Yes postponed No C1-134152
    C1-133767 UE state transition in UE abnormal TAU failure Samsung/Youngkyo discussion discussion Yes Yes noted No
    C1-133768 UE state transition in UE abnormal TAU failure Samsung/Youngkyo CR agreement Yes Yes revised No C1-134154
    C1-134154 UE state transition in UE abnormal TAU failure Samsung/Youngkyo CR agreement No Yes postponed No C1-133768
    C1-133769 Setting UE specific DRX parameter Samsung/Youngkyo CR agreement Yes Yes revised No C1-134155
    C1-134155 Setting UE specific DRX parameter Samsung CR agreement Yes Yes revised No C1-134408 C1-133769
    C1-134408 Setting UE specific DRX parameter Samsung CR agreement Yes Yes postponed No C1-134155
    C1-133946 Enhancements on provision of and treatment of reject cause#15 Intel corporation CR agreement Yes Yes revised No C1-134134
    C1-134134 Enhancements on provision of and treatment of reject cause#15 Intel corporation CR agreement No Yes postponed No C1-133946
    C1-133964 Extension of EMM cause #15 to indicate that all TAs in the selected PLMN are forbidden for roaming Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-134135
    C1-134135 Extension of EMM cause #15 to indicate that all TAs in the selected PLMN are forbidden for roaming Qualcomm Incorporated / Lena CR agreement No Yes postponed No C1-133964
    C1-133965 Handling of equivalent PLMNs when UE disables the E-UTRA capability Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-134156
    C1-134156 Handling of equivalent PLMNs when UE disables the E-UTRA capability Qualcomm Incorporated / Lena CR agreement No Yes postponed No C1-133965
    C1-133967 Clarification of PDP context modification Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-134157
    C1-133973 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada CR agreement Yes Yes revised No C1-134158
    C1-134158 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone CR agreement Yes Yes revised No C1-134409 C1-133973
    C1-134409 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone CR agreement Yes Yes postponed No C1-134158
    C1-133975 Condition to stop the paging timer NSN CR agreement No No withdrawn Yes
    C1-134016 Observations on handling of EMM cause #15 Huawei, HiSilicon/Lin discussion discussion Yes Yes revised No C1-134073
    C1-134073 Observations on handling of EMM cause #15 Huawei, HiSilicon/Lin discussion discussion Yes Yes noted No C1-134016
    C1-134021 Trigger to enable the E-UTRAN capability HTC CR agreement Yes Yes revised No C1-134159 C1-132230
    C1-134159 Trigger to enable the E-UTRAN capability HTC CR agreement No Yes postponed No C1-134021
12.10.2
SAES3-CSFB
C1-133782 Cleanup of SGs paging without LAI case Ericsson / Mikael CR agreement Yes Yes revised No C1-134160
    C1-134160 Cleanup of SGs paging without LAI case Ericsson / Mikael CR agreement Yes Yes agreed No C1-133782
    C1-133846 Alignment of EMM state change of agreed corrections Vodafone CR agreement Yes Yes agreed No
    C1-133972 Trigger for Combined TAU with IMSI attach NSN, Vodafone CR agreement Yes Yes revised No C1-134161
    C1-134161 Trigger for Combined TAU with IMSI attach NSN, Vodafone, NEC, Qualcomm Incorporated, Samsung CR agreement Yes Yes agreed No C1-133972
    C1-134028 ISR deactivation for an MS which supports EMM combined procedures Huawei, HiSilicon/Christian CR agreement Yes Yes revised No C1-134132
    C1-134132 ISR deactivation for an MS which supports EMM combined procedures Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bel, NTT DOCOMO, Qualcomm Incorporated, NEC CR agreement Yes Yes agreed No C1-134028
12.10.3
SAES3-non3GPP
C1-133702 Bit order in fields of figures Ericsson / Ivo CR agreement Yes Yes revised No C1-134418
    C1-134418 Bit order in fields of figures Ericsson CR agreement Yes Yes revised No C1-134477 C1-133702
    C1-134477 Bit order in fields of figures Ericsson CR agreement Yes Yes agreed No C1-134418
    C1-133830 Applicability of source IP address/port in the IP flow description of ForNSWO flow distribution rules to new connections Qualcomm Incorporated CR agreement Yes Yes postponed No C1-133511
    C1-133831 Adding day of the week leaf to ANDSF MO Qualcomm Incorporated CR agreement Yes Yes revised No C1-134108
    C1-134108 Adding day of the week leaf to ANDSF MO Qualcomm Incorporated CR agreement Yes Yes revised No C1-134400 C1-133831
    C1-134400 Adding day of the week leaf to ANDSF MO Qualcomm Incorporated CR agreement Yes Yes revised No C1-134446 C1-134108
    C1-134446 Adding day of the week leaf to ANDSF MO Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134400
    C1-133832 Informative annex with ANDSF policy examples Qualcomm Incorporated CR agreement Yes Yes revised No C1-134109
    C1-134109 Informative annex with ANDSF policy examples Qualcomm Incorporated CR agreement Yes Yes revised No C1-134401 C1-133832
    C1-134401 Informative annex with ANDSF policy examples Qualcomm Incorporated CR agreement Yes Yes revised No C1-134437 C1-134109
    C1-134437 Informative annex with ANDSF policy examples Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-134401
    C1-133856 UpdatePolicy in flow distribution roles NSN CR agreement Yes Yes revised No C1-134110
    C1-134110 UpdatePolicy in flow distribution roles NSN, Ericsson CR agreement Yes Yes revised No C1-134442 C1-133856
    C1-134442 UpdatePolicy in flow distribution roles NSN, Ericsson CR agreement Yes Yes revised No C1-134508 C1-134110
    C1-134508 UpdatePolicy in flow distribution roles NSN, Ericsson CR agreement Yes Yes postponed No C1-134442
    C1-133857 ForNonSeamlessOffload clarification regarding operator services NSN CR agreement Yes Yes revised No C1-134111
    C1-134111 ForNonSeamlessOffload clarification regarding operator services NSN CR agreement Yes Yes revised No C1-134507 C1-133857
    C1-134507 ForNonSeamlessOffload clarification regarding operator services NSN CR agreement No Yes postponed No C1-134111
    C1-133858 ANDSF server information provisioning clarification NSN CR agreement Yes Yes revised No C1-134112
    C1-134112 ANDSF server information provisioning clarification NSN CR agreement Yes Yes agreed No C1-133858
    C1-133859 Multiple ISRP rules with same PLMN value NSN CR agreement Yes Yes revised No C1-134113
    C1-134113 Multiple ISRP rules with same PLMN value NSN CR agreement Yes Yes revised No C1-134443 C1-133859
    C1-134443 Multiple ISRP rules with same PLMN value NSN CR agreement Yes Yes agreed No C1-134113
    C1-133860 Removing Source IP address/port from ISRP NSN CR agreement Yes Yes revised No C1-134107
    C1-134107 Removing Source IP address/port from ISRP NSN CR agreement Yes Yes agreed No C1-133860
    C1-133979 UpdatePolicy clarifications and consistency Oracle CR agreement Yes Yes revised No C1-134441
    C1-134441 UpdatePolicy clarifications and consistency Oracle CR agreement Yes Yes revised No C1-134520 C1-133979
    C1-134520 UpdatePolicy clarifications and consistency Oracle CR agreement Yes Yes postponed No C1-134441
    C1-134017 Support of BBF convergency Huawei, HiSilicon/ Youyang CR agreement Yes Yes revised No C1-134114
    C1-134114 Support of BBF convergency Huawei, HiSilicon/ Youyang CR agreement Yes Yes revised No C1-134444 C1-134017
    C1-134444 Support of BBF convergency Huawei, Hisilicon CR agreement Yes Yes revised No C1-134516 C1-134114
    C1-134516 Support of BBF convergency Huawei, Hisilicon CR agreement Yes Yes agreed No C1-134444
12.11
bSRVCC
C1-133923 Access transfer and precondition Ericsson / Ivo CR agreement Yes Yes revised No C1-134097
    C1-134097 Access transfer and precondition Ericsson / Ivo CR agreement No Yes postponed No C1-133923
12.12
SMSMI-CT
C1-133850 Compliance Statement for UE and AS NSN CR agreement Yes Yes revised No C1-134098
    C1-134098 Compliance Statement for UE and AS NSN CR agreement Yes Yes agreed No C1-133850
    C1-133851 Tidyup of sender and receiver procedures NSN CR agreement Yes Yes revised No C1-134099
    C1-134099 Tidyup of sender and receiver procedures NSN CR agreement Yes Yes agreed No C1-133851
    C1-133852 Short Message Memory Available indication NSN CR agreement Yes Yes revised No C1-134100
    C1-134100 Short Message Memory Available indication NSN CR agreement Yes Yes agreed No C1-133852
    C1-133853 Error procedure in IP-SM-GW NSN CR agreement Yes Yes revised No C1-134101
    C1-134101 Error procedure in IP-SM-GW NSN CR agreement Yes Yes revised No C1-134411 C1-133853
    C1-134411 Error procedure in IP-SM-GW NSN CR agreement Yes Yes agreed No C1-134101
12.13
TURAN-CT
C1-133703 Editor's note in access via WLAN connected to EPC when WLAN is a restrictive non-3GPP access network Ericsson / Ivo CR agreement Yes Yes revised No C1-134102
    C1-134102 Editor's note in access via WLAN connected to EPC when WLAN is a restrictive non-3GPP access network Ericsson CR agreement Yes Yes agreed No C1-133703
    C1-133704 Pseudo-CR on clean up of solution for tunnelling of IMS services over restrictive non-3GPP access networks Ericsson / Ivo pseudo CR agreement Yes Yes revised No C1-134103
    C1-134103 Pseudo-CR on clean up of solution for tunnelling of IMS services over restrictive non-3GPP access networks Ericsson pseudo CR agreement Yes Yes revised No C1-134412 C1-133704
    C1-134412 Pseudo-CR on clean up of solution for tunnelling of IMS services over restrictive non-3GPP access networks Ericsson pseudo CR agreement Yes Yes revised No C1-134445 C1-134103
    C1-134445 Pseudo-CR on clean up of solution for tunnelling of IMS services over restrictive non-3GPP access networks Ericsson pseudo CR agreement Yes Yes agreed No C1-134412
    C1-133705 Solution for tunnelling of IMS services over restrictive non-3GPP access networks - keep-alive using RFC 6223 Ericsson / Ivo CR agreement Yes Yes revised No C1-134104
    C1-134104 Solution for tunnelling of IMS services over restrictive non-3GPP access networks - keep-alive using RFC 6223 Ericsson CR agreement Yes Yes agreed No C1-133705
    C1-133706 Pseudo-CR on keep-alive editor's note resolution Ericsson / Ivo pseudo CR agreement Yes Yes revised No C1-134105
    C1-134105 Pseudo-CR on keep-alive editor's note resolution Ericsson / Ivo pseudo CR agreement Yes Yes agreed No C1-133706
    C1-133788 Tunnelling over restrictive access networks IMS case Vodafone CR agreement Yes Yes revised No C1-134106
    C1-134106 Tunnelling over restrictive access networks IMS case Vodafone CR agreement Yes Yes revised No C1-134413 C1-133788
    C1-134413 Tunnelling over restrictive access networks IMS case Vodafone CR agreement Yes Yes revised No C1-134476 C1-134106
    C1-134476 Tunnelling over restrictive access networks IMS case Vodafone CR agreement Yes Yes agreed No C1-134413
    C1-133869 Firewall traversal for IMS services based on ICE Huawei/Bill discussion discussion Yes Yes noted No
12.14
IMS_TELEP
C1-133887 Protocol attributes for telepresence using IMS Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134313
    C1-134313 Protocol attributes for telepresence using IMS Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133887
    C1-133888 CLUE channel establishment using SDP Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134314
    C1-134314 CLUE channel establishment using SDP Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133888
    C1-133889 Sequence of SDP and CLUE during updating Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134315
    C1-134315 Sequence of SDP and CLUE during updating Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133889
    C1-133890 SDP update after CLUE exchange Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134316
    C1-134316 SDP update after CLUE exchange Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133890
    C1-133891 Presentation during an IM session supporting telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134317
    C1-134317 Presentation during an IM session supporting telepresence Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133891
    C1-133892 SCTP connection status when CLUE is removed Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134318
    C1-134318 SCTP connection status when CLUE is removed Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133892
    C1-133893 Media flows treatment after CLUE's removal Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134319
    C1-134319 Media flows treatment after CLUE's removal Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133893
    C1-133894 Session update due to user’s leaving Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134320
    C1-134320 Session update due to user’s leaving Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133894
    C1-133895 Fallback of IMS TP session Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134321
    C1-134321 Fallback of IMS TP session Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133895
    C1-133896 TP conference focus behavior with non-TP UE Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134322
    C1-134322 TP conference focus behavior with non-TP UE Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-133896
    C1-134015 VoLTE Calls – Forward Early Media AT&T, ALU, Qualcomm CR agreement Yes Yes revised No C1-134093
    C1-134093 VoLTE Calls – Forward Early Media AT&T, Alcatel-Lucent, Ericsson, Huawei, NSN, Qualcomm, Samsung CR agreement Yes Yes revised No C1-134125 C1-134015
    C1-134125 VoLTE Calls – Forward Early Media AT&T, Alcatel-Lucent, Ericsson, Huawei, NSN, Qualcomm, Samsung CR agreement Yes Yes agreed No C1-134093
12.15
eDRVCC
C1-133874 The MSC server early session support correction Ericsson /Janne CR agreement Yes Yes revised No C1-134323
    C1-134323 The MSC server early session support correction Ericsson /Janne CR agreement Yes Yes agreed No C1-133874
12.16
EMC_PC
C1-133667 Improve requirement to ignore the PSAP callback indicator BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134078
    C1-134078 Improve requirement to ignore the PSAP callback indicator BlackBerry UK Ltd., Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134330 C1-133667
    C1-134330 Improve requirement to ignore the PSAP callback indicator BlackBerry UK Ltd., Deutsche Telekom, Ericsson CR agreement Yes Yes agreed No C1-134078
    C1-133814 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134324
    C1-134324 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-133814
    C1-133905 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134325
    C1-134325 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-133905
    C1-133906 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134326
    C1-134326 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-133906
    C1-133907 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134327
    C1-134327 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-133907
    C1-133908 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134328
    C1-134328 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-133908
    C1-133909 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134329
    C1-134329 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-133909
    C1-134068 Use of emergency registration bindings for emergency callback Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No C1-133640
12.17
IMS_RegCon-CT
12.18
BusTI-CT
C1-133677 IPv4 and IPv6 coexistence in enterprise networks Orange/Youssef discussion discussion Yes Yes noted No
    C1-133678 ALT-C for indication of IPv4 and IPv6 addresses in SDP Orange/Youssef CR agreement Yes Yes revised No C1-134331
    C1-134331 ALT-C for indication of IPv4 and IPv6 addresses in SDP Orange/Youssef CR agreement No Yes postponed No C1-133678
    C1-133728 Update of Scope for Business Trunking Deutsche Telekom, Ericsson CR agreement Yes Yes postponed No
    C1-133729 Update of Definitions and Abbreviations for Business Trunking Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134332
    C1-134332 Addition of Definitions for Business Trunking Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134447 C1-133729
    C1-134447 Addition of Definitions for Business Trunking Deutsche Telekom, Ericsson CR agreement Yes Yes agreed No C1-134332
    C1-133730 Addition of Business Trunking Features for Signalling Security Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134333
    C1-134333 Addition of Business Trunking Features for Signalling Security Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134448 C1-133730
    C1-134448 Addition of Business Trunking Features for Signalling Security Deutsche Telekom, Ericsson CR agreement Yes Yes agreed No C1-134333
    C1-133731 Addition of Business Trunking Features at UE Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134334
    C1-134334 Addition of Business Trunking Features at UE Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134449 C1-133731
    C1-134449 Addition of Business Trunking Features at UE Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134478 C1-134334
    C1-134478 Addition of Business Trunking Features at UE Deutsche Telekom, Ericsson CR agreement Yes Yes agreed No C1-134449
    C1-133732 Addition of Business Trunking Features at P-CSCF Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134335
    C1-134335 Addition of Business Trunking Features at P-CSCF Deutsche Telekom, Ericsson CR agreement Yes Yes postponed No C1-133732
    C1-133733 Addition of Business Trunking Features at AS Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134336
    C1-134336 Addition of Business Trunking Features at AS Deutsche Telekom, Ericsson CR agreement Yes Yes postponed No C1-133733
    C1-133734 Addition of Business Trunking Features at IBCF Deutsche Telekom, Ericsson CR agreement Yes Yes revised No C1-134337
    C1-134337 Addition of Business Trunking Features at IBCF Deutsche Telekom, Ericsson CR agreement Yes Yes postponed No C1-133734
    C1-133735 Addition of Business Trunking Features at Transit Function Deutsche Telekom (Michael), Ericsson CR agreement Yes Yes revised No C1-134338
    C1-134338 Addition of Business Trunking Features at Transit Function Deutsche Telekom (Michael), Ericsson CR agreement Yes Yes revised No C1-134450 C1-133735
    C1-134450 Addition of Business Trunking Features at Transit Function Deutsche Telekom (Michael), Ericsson CR agreement No Yes postponed No C1-134338
12.19
UP6665
C1-133847 Update to RFC 6665 NSN CR agreement Yes Yes revised No C1-134339
    C1-134339 Update to RFC 6665 NSN CR agreement Yes Yes agreed No C1-133847
    C1-133848 Update to RFC 6665 NSN CR agreement Yes Yes revised No C1-134340
    C1-134340 Update to RFC 6665 NSN CR agreement Yes Yes agreed No C1-133848
    C1-133849 Update to RFC 6665 NSN CR agreement Yes Yes revised No C1-134341
    C1-134341 Update to RFC 6665 NSN CR agreement Yes Yes agreed No C1-133849
    C1-133861 Updating TS 24.606 to RFC 6665 Huawei/Bill CR agreement Yes Yes revised No C1-134342
    C1-134342 Updating TS 24.606 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes agreed No C1-133861
    C1-133862 Updating TS 24.292 to RFC 6665 Huawei/Bill CR agreement Yes Yes revised No C1-134343
    C1-134343 Updating TS 24.292 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-134479 C1-133862
    C1-134479 Updating TS 24.292 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-134498 C1-134343
    C1-134498 Updating TS 24.292 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-134521 C1-134479
    C1-134521 Updating TS 24.292 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes agreed No C1-134498
    C1-133863 Updating TS 24.147 to RFC 6665 Huawei/Bill CR agreement Yes Yes revised No C1-134344
    C1-134344 Updating TS 24.147 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes agreed No C1-133863
    C1-133864 Updating the depiction of the creation of subscription dialog Huawei/Bill CR agreement Yes Yes revised No C1-134345
    C1-134345 Updating the depiction of the creation of subscription dialog Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-134480 C1-133864
    C1-134480 Updating the depiction of the creation of subscription dialog Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-134499 C1-134345
    C1-134499 Updating the depiction of the creation of subscription dialog Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-134522 C1-134480
    C1-134522 Updating the depiction of the creation of subscription dialog Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes agreed No C1-134499
    C1-134048 Correction of some editorial errors BlackBerry UK Ltd CR agreement Yes Yes revised No C1-134346
    C1-134346 Correction of some editorial errors BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134048
12.20
FS_NNI_RS (CT3)
12.21
eMEDIASEC_CT (CT4)
C1-133708 End-to-access-edge media security for MSRP, BFCP and UDPTL Ericsson, NSN / Ivo CR agreement Yes Yes revised No C1-134347 C1-132734
    C1-134347 End-to-access-edge media security for MSRP, BFCP and UDPTL Ericsson, NSN / Ivo CR agreement Yes Yes agreed No C1-133708
    C1-133855 MSRP Media Security NSN CR agreement Yes Yes revised No C1-134348
    C1-134348 MSRP Media Security NSN CR agreement No Yes postponed No C1-133855
12.22
IMS_SSFDD (CT4)
C1-133676 Nonce caching and digest authentication- corrections Orange/Youssef CR agreement Yes Yes revised No C1-134228
    C1-134228 Nonce caching and digest authentication- corrections Orange/Youssef CR agreement Yes Yes revised No C1-134509 C1-133676
    C1-134509 Nonce caching and digest authentication- corrections Orange CR agreement Yes Yes revised No C1-134525 C1-134228
    C1-134525 Nonce caching and digest authentication- corrections Orange CR agreement Yes Yes agreed No C1-134509
    C1-133679 Indicating supported capabilities by intermediary elements Orange/Youssef CR agreement Yes Yes revised No C1-134230
    C1-134230 Indicating supported capabilities by intermediary elements Orange, Deutsche Telekom CR agreement Yes Yes revised No C1-134523 C1-133679
    C1-134523 Indicating supported capabilities by intermediary elements Orange, Deutsche Telekom CR agreement Yes Yes postponed No C1-134230
    C1-133680 Random SIP port numbers Orange/Youssef CR agreement Yes Yes revised No C1-134231
    C1-134231 Random SIP port numbers Orange/Youssef CR agreement No Yes postponed No C1-133680
    C1-133681 SIP transport selection in the presence of NAT Orange/Youssef CR agreement No Yes postponed No
    C1-133721 Compatibility mechanism for indication of network supported services to the UE in Feature-Caps header Deutsche Telekom discussion discussion Yes Yes noted No
12.23
CVO-CT (CT4)
12.24
SIS_CT (CT4)
12.25
E2EMTSI-CT (CT3)
12.26
REVOLTE_IMS
12.27
rtcp-mux
12.28
IMSProtoc6
C1-133665 Adding country-specific URN to configurable lists BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134229
    C1-134229 Adding country-specific URN to configurable lists BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134380 C1-133665
    C1-134380 Adding country-specific URN to configurable lists BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134510 C1-134229
    C1-134510 Adding country-specific URN to configurable lists BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134380
    C1-133666 Detecting Privacy applied to emergency request BlackBerry UK Ltd. CR agreement Yes Yes postponed No
    C1-133995 Discussion document on IMS Emergency call subject to privacy BlackBerry UK Ltd. discussion discussion Yes Yes noted No
    C1-134024 Network side extensions for indication of network supported services to the UE in Feature-Caps header Deutsche Telekom CR agreement Yes No withdrawn Yes
    C1-134069 SDP modification Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-134232
    C1-134232 SDP modification Alcatel-Lucent CR agreement Yes Yes postponed No C1-134069
    C1-134071 Reversal of change relating to digest authentication Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-134233
    C1-134233 Reversal of change relating to digest authentication Alcatel-Lucent CR agreement Yes Yes agreed No C1-134071
12.29
TEI12 and other R12 Wis
12.29.1
IMS TEI12
C1-133682 Consistency of the Additional Routeing Functionality description Orange/Youssef CR agreement Yes Yes revised No C1-134234
    C1-134234 Consistency of the Additional Routeing Functionality description Orange CR agreement Yes Yes postponed No C1-133682
    C1-133720 Error cause correction for XCAP Deutsche Telekom CR agreement Yes Yes postponed No
    C1-133755 Specific iFCs for terminating session cases for which the requested service is not subscribed Orange/Youssef CR agreement Yes Yes revised No C1-134350
    C1-134350 Specific iFCs for terminating session cases for which the requested service is not subscribed Orange/Youssef CR agreement No Yes postponed No C1-133755
    C1-133757 Polite deflection Orange/Youssef CR agreement Yes Yes postponed No
    C1-133776 MSRP-CEMA and privacy Ericsson / Christer CR agreement Yes Yes revised No C1-134351
    C1-134351 MSRP-CEMA and privacy Ericsson / Christer CR agreement Yes Yes agreed No C1-133776
    C1-133865 About the decision condition of the initial SIP INVITE request due to ATU-STI at the SCC AS Huawei/Bill CR agreement Yes Yes revised No C1-134352
    C1-134352 About the decision condition of the initial SIP INVITE request due to ATU-STI at the SCC AS Huawei/Bill CR agreement Yes Yes revised No C1-134452 C1-133865
    C1-134452 About the decision condition of the initial SIP INVITE request due to ATU-STI at the SCC AS Huawei CR agreement Yes Yes agreed No C1-134352
    C1-133866 About the UE and the MSC server call state in case of PS to CS SRVCC with the CAT service Huawei/Bill CR agreement Yes Yes revised No C1-134123
    C1-134123 About the UE and the MSC server call state in case of PS to CS SRVCC with the CAT service Huawei CR agreement Yes Yes revised No C1-134451 C1-133866
    C1-134451 About the UE and the MSC server call state in case of PS to CS SRVCC with the CAT service Huawei CR agreement Yes Yes revised No C1-134512 C1-134123
    C1-134512 About the UE and the MSC server call state in case of PS to CS SRVCC with the CAT service Huawei CR agreement Yes Yes agreed No C1-134451
    C1-133867 Correcting for the state change in case of aSRVCC Huawei/Bill CR agreement Yes Yes revised No C1-134124
    C1-134124 Correcting for the state change in case of aSRVCC Huawei CR agreement Yes Yes agreed No C1-133867
    C1-133868 Editorial correction about SRVCC Huawei/Bill CR agreement Yes Yes revised No C1-134353
    C1-134353 Editorial correction about SRVCC Huawei/Bill CR agreement Yes Yes agreed No C1-133868
    C1-133870 Correcting an error in TIR interaction Ericsson /Janne CR agreement Yes Yes agreed No
    C1-133884 SC UE deregistration Ericsson /Janne, Alcatel-Lucent CR agreement Yes Yes agreed No
    C1-133904 B2BUA topology hiding in the IBCF NEC, NTT CR agreement Yes Yes revised No C1-134355
    C1-134355 B2BUA topology hiding in the IBCF NEC, NTT CR agreement No Yes postponed No C1-133904
    C1-133922 SCC AS not sending re-INVITE to remote UE when PS to CS SRVCC access transfer transfers single held call Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-133985 Clean-up of Supplementary Services Configuration Samsung CR agreement Yes Yes revised No C1-134356
    C1-134356 Clean-up of Supplementary Services Configuration Samsung CR agreement Yes Yes agreed No C1-133985
    C1-133986 Provide linkage to Supplementary Services Configuration in TS 24.167 Samsung CR agreement Yes Yes revised No C1-134357
    C1-134357 Provide linkage to Supplementary Services Configuration in TS 24.167 Samsung, Orange CR agreement Yes Yes revised No C1-134511 C1-133986
    C1-134511 Provide linkage to Supplementary Services Configuration in TS 24.167 Samsung, Orange CR agreement Yes Yes agreed No C1-134357
    C1-133987 Release resources in the ATGW Samsung, Orange CR agreement Yes Yes revised No C1-134358
    C1-134358 Release resources in the ATGW Samsung, Orange CR agreement Yes Yes agreed No C1-133987
    C1-133988 Indications of support for access transfer features Samsung CR agreement Yes Yes revised No C1-134359
    C1-134359 Indications of support for access transfer features Samsung CR agreement Yes Yes agreed No C1-133988
    C1-134010 Correction to formatting of text in abnormal cases related to mobile originated sessions Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-134360
    C1-134360 Correction to formatting of text in Abnormal cases related to mobile originated sessions Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-134414 C1-134010
    C1-134414 Correction to formatting of text in Abnormal cases related to mobile originated sessions Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-134360
    C1-134011 Correcting table number for IM CN Subsystem XML body schema Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No
    C1-134012 Announcement during HOLD Qualcomm Incorporated/Subra CR agreement Yes Yes rejected No
    C1-134013 Recovery from radio link failure during VoLTE/VT calls Qualcomm Incorporated/Subra discussion discussion Yes Yes noted No
    C1-134014 Recovery from radio link failures during VoLTE/VT calls Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-134023 Announcement during HOLD Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-134362
    C1-134362 Announcement during HOLD Qualcomm Incorporated/Subra CR agreement No Yes postponed No C1-134023
    C1-134046 Correction of assured transfer Ericsson / Jörgen CR agreement Yes Yes revised No C1-134363
    C1-134363 Correction of assured transfer Ericsson / Jörgen CR agreement Yes Yes revised No C1-134415 C1-134046
    C1-134415 Correction of assured transfer Ericsson CR agreement Yes Yes revised No C1-134481 C1-134363
    C1-134481 Correction of assured transfer Ericsson CR agreement Yes Yes agreed No C1-134415
    C1-134047 Time zone in Pacific/Kiritimati Ericsson / Jörgen CR agreement Yes Yes revised No C1-134364
    C1-134364 Time zone in Pacific/Kiritimati Ericsson / Jörgen CR agreement Yes Yes revised No C1-134453 C1-134047
    C1-134453 Time zone in Pacific/Kiritimati Ericsson CR agreement Yes Yes agreed No C1-134364
    C1-134049 Management object of APN used for SS setting control China Mobile CR agreement Yes Yes revised No C1-134365
    C1-134365 Management object of APN used for SS setting control China Mobile CR agreement No Yes postponed No C1-134049
    C1-134050 Dynamic Services Interaction handling China Mobile CR agreement Yes Yes revised No C1-134366
    C1-134366 Dynamic Services Interaction handling China Mobile, Orange CR agreement Yes Yes postponed No C1-134050
    C1-134067 Handover cancellation when ATCF is a B2BUA Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-134361 C1-133637
    C1-134361 Handover cancellation when ATCF is a B2BUA Alcatel-Lucent / Keith Drage CR agreement No Yes postponed No C1-134067
    C1-134070 Option for eSRVCC for SCC AS procedure Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No
    C1-134072 Include DST adjustment in local time zone Ericsson / Jörgen CR agreement Yes Yes revised No C1-134367 C1-133488
    C1-134367 Include DST adjustment in local time zone Ericsson / Jörgen CR agreement Yes Yes revised No C1-134416 C1-134072
    C1-134416 Include DST adjustment in local time zone Ericsson CR agreement Yes Yes agreed No C1-134367
    C1-134075 New session cases for Service No Subscribed Orange/Youssef CR agreement Yes Yes revised No C1-134368
    C1-134368 New session cases for Service No Subscribed Orange/Youssef CR agreement No Yes postponed No C1-134075
12.29.2
non IMS TEI12
C1-133664 Correcting LIPA PDN connection deactivation upon SR BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134163 C1-132686
    C1-134163 Correcting LIPA PDN connection deactivation upon SR BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134371 C1-133664
    C1-134371 Correcting LIPA PDN connection deactivation upon SR BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134163
    C1-133670 Update ePLMN list for the emergency attached UE ZTE CR agreement Yes Yes revised No C1-134164
    C1-134164 Update ePLMN list for the emergency attached UE ZTE CR agreement No No withdrawn Yes C1-133670
    C1-133671 Update ePLMN list for the emergency attached MS ZTE CR agreement Yes Yes revised No C1-134165
    C1-134165 Update ePLMN list for the emergency attached MS ZTE CR agreement No No withdrawn Yes C1-133671
    C1-133672 SM cause #50,51 handling at the MS ZTE CR agreement Yes Yes revised No C1-134168
    C1-134168 SM cause #50,51 handling at the MS ZTE CR agreement Yes Yes revised No C1-134410 C1-133672
    C1-134410 SM cause #50,51 handling at the MS ZTE CR agreement Yes Yes agreed No C1-134168
    C1-133700 +CGDCONT handover indication Intel Corporation CR agreement Yes Yes revised No C1-134169
    C1-134169 +CGDCONT handover indication Intel Corporation CR agreement Yes Yes agreed No C1-133700
    C1-133701 New AT command for message waiting indication Intel Corporation CR agreement Yes Yes revised No C1-134170
    C1-134170 New AT command to control message waiting indication Intel Corporation CR agreement Yes Yes revised No C1-134513 C1-133701
    C1-134513 New AT command to control message waiting indication Intel Corporation CR agreement Yes Yes agreed No C1-134170
    C1-133742 Handling of TAU and IMSI detach collision Huawei, HiSilicon/Lin CR agreement Yes Yes revised No C1-134171 C1-132917
    C1-134171 Handling of TAU and IMSI detach collision Huawei, HiSilicon CR agreement Yes Yes revised No C1-134454 C1-133742
    C1-134454 Handling of TAU and IMSI detach collision Huawei, HiSilicon CR agreement No Yes postponed No C1-134171
    C1-133743 Handling of RAU and IMSI detach collision Huawei, HiSilicon/Lin CR agreement Yes Yes revised No C1-134172 C1-132918
    C1-134172 Handling of RAU and IMSI detach collision Huawei, HiSilicon CR agreement Yes Yes revised No C1-134455 C1-133743
    C1-134455 Handling of RAU and IMSI detach collision Huawei, HiSilicon CR agreement No Yes postponed No C1-134172
    C1-133744 Disabling E-UTRA capability for #14 in MS supporting S1 mode Huawei, HiSilicon, Qualcomm Incorporated/Lin CR agreement Yes Yes revised No C1-134173 C1-133645
    C1-134173 Disabling E-UTRA capability for #14 in MS supporting S1 mode Huawei, HiSilicon, Qualcomm Incorporated/Lin CR agreement Yes Yes revised No C1-134456 C1-133744
    C1-134456 Disabling E-UTRA capability for #14 in MS supporting S1 mode Huawei, HiSilicon, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134515 C1-134173
    C1-133745 UE-initiated detach procedure during tracking area updating procedure Huawei, HiSilicon/ Christian CR agreement Yes Yes revised No C1-134174 C1-132923
    C1-134174 UE-initiated detach procedure during tracking area updating procedure Huawei, HiSilicon CR agreement Yes Yes revised No C1-134457 C1-133745
    C1-134457 UE-initiated detach procedure during tracking area updating procedure Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134174
    C1-133746 MS-originated detach procedure during attach and routing area updating procedures Huawei, HiSilicon/ Christian CR agreement Yes Yes revised No C1-134175 C1-132924
    C1-134175 MS-originated detach procedure during attach and routing area updating procedures Huawei, HiSilicon CR agreement Yes Yes revised No C1-134460 C1-133746
    C1-134460 MS-originated detach procedure during attach and routing area updating procedures Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134175
    C1-133747 Update of ePLMN list for a UE with a PDN connection for emergency bearer services Huawei, HiSilicon/ Christian CR agreement Yes Yes revised No C1-134166 C1-132925
    C1-134166 Update of ePLMN list for a UE with a PDN connection for emergency bearer services Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-133747
    C1-133748 Update of ePLMN list for an MS with a PDN connection for emergency bearer services Huawei, HiSilicon/ Christian CR agreement Yes Yes revised No C1-134167 C1-132926
    C1-134167 Update of ePLMN list for an MS with a PDN connection for emergency bearer services Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-133748
    C1-133749 Deletion of the ePLMNs list upon receipt of #9, #10 or #40 Huawei, HiSilicon/ Christian CR agreement Yes Yes revised No C1-134176 C1-132931
    C1-134176 Deletion of the ePLMNs list upon receipt of #9, #10 or #40 Huawei, HiSilicon CR agreement Yes Yes revised No C1-134458 C1-133749
    C1-134458 Deletion of the ePLMNs list upon receipt of #9, #10 or #40 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134176
    C1-133750 Deletion of the ePLMNs list upon receipt of #9, #10 or #40 Huawei, HiSilicon/ Christian CR agreement Yes Yes revised No C1-134177 C1-132932
    C1-134177 Deletion of the ePLMNs list upon receipt of #9, #10 or #40 Huawei, HiSilicon/ Christian CR agreement Yes Yes revised No C1-134459 C1-133750
    C1-134459 Deletion of the ePLMNs list upon receipt of #9, #10 or #40 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134177
    C1-133751 Correction on reference of message type IE Huawei, HiSilicon/Lin CR agreement Yes Yes agreed No
    C1-133752 Selecting the (E)HPLMN when in VPLMN Huawei, HiSilicon, Samsung, NII Holdings Inc. CR agreement Yes Yes revised No C1-134178
    C1-134178 Selecting the (E)HPLMN when in VPLMN Huawei, HiSilicon, Samsung, NII Holdings Inc. CR agreement No Yes postponed No C1-133752
    C1-133815 Retry handling during UE initiated ESM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada CR agreement Yes Yes revised No C1-134179
    C1-134179 Retry handling during UE initiated ESM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134461 C1-133815
    C1-134461 Retry handling during UE initiated ESM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon CR agreement Yes Yes postponed No C1-134179
    C1-133816 Retry handling during MS initiated SM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada CR agreement Yes Yes revised No C1-134180
    C1-134180 Retry handling during MS initiated SM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134462 C1-133816
    C1-134462 Retry handling during MS initiated SM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon CR agreement Yes Yes postponed No C1-134180
    C1-133817 Handling of ESM STATUS with ESM cause #97 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada CR agreement Yes Yes revised No C1-134181
    C1-134181 Handling of ESM STATUS with ESM cause #97 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134463 C1-133817
    C1-134463 Handling of ESM STATUS with ESM cause #97 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon CR agreement Yes Yes postponed No C1-134181
    C1-133818 Handling of SM STATUS with SM cause #97 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada CR agreement Yes Yes revised No C1-134182
    C1-134182 Handling of SM STATUS with SM cause #97 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada CR agreement Yes Yes revised No C1-134464 C1-133818
    C1-134464 Handling of SM STATUS with SM cause #97 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada CR agreement Yes Yes postponed No C1-134182
    C1-133897 GUTI handling in the network abnormal case in attach procedure CATT CR agreement Yes Yes agreed No
    C1-133898 P-TMSI handling in Network abnormal case in attach procedure CATT CR agreement Yes Yes agreed No
    C1-133899 Stop ongoing user data transmission for MS abnormal case in RAU procedure CATT CR agreement Yes Yes agreed No
    C1-133900 Stop ongoing user data transmission for UE abnormal case in TAU procedure CATT CR agreement Yes Yes agreed No
    C1-133901 The usage of APN in non-3GPP access CATT CR agreement Yes Yes revised No C1-134019
    C1-133947 Correction of condition for including an IMEI in the Attach Request Intel/Chen CR agreement Yes Yes agreed No
    C1-133953 Discussion on UE retry during UE initiated SM/ESM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada discussion discussion Yes Yes noted No
    C1-133962 Fast higher priority PLMN search upon entering VPLMN Qualcomm Incorporated, Deutsche Telekom, AT&T, Renesas Mobile Europe, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134183 C1-133395
    C1-134183 Fast higher priority PLMN search upon entering VPLMN Qualcomm Incorporated, Deutsche Telekom, AT&T, Broadcom, Huawei, HiSilicon, BT CR agreement Yes Yes revised No C1-134482 C1-133962
    C1-134482 Fast higher priority PLMN search upon entering VPLMN Qualcomm Incorporated, Deutsche Telekom, AT&T, Broadcom, Huawei, HiSilicon, BT CR agreement Yes Yes agreed No C1-134183
    C1-133963 Fast higher priority PLMN search upon entering VPLMN Qualcomm Incorporated, Deutsche Telekom, AT&T, Renesas Mobile Europe, Huawei, HiSilicon / Lena CR agreement Yes Yes revised No C1-134184 C1-133396
    C1-134184 Fast higher priority PLMN search upon entering VPLMN Qualcomm Incorporated, Deutsche Telekom, AT&T, Broadcom, Huawei, HiSilicon, BT CR agreement Yes Yes agreed No C1-133963
    C1-133966 Update of +CNMPSD AT command Qualcomm Incorporated / Lena CR agreement Yes Yes postponed No
    C1-133968 PS signalling connection release with "follow-on proceed" and no service request pending Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-134185
    C1-134185 PS signalling connection release with "follow-on proceed" and no service request pending Qualcomm Incorporated CR agreement Yes Yes postponed No C1-133968
    C1-133974 Handling Service Request failure due to timeout in UTRAN NSN, LG Electronics, Intel Corporation, Bell Canada CR agreement Yes Yes revised No C1-134186
    C1-134186 Handling Service Request failure due to timeout in UTRAN NSN, LG Electronics, Intel Corporation, Bell Canada CR agreement Yes Yes revised No C1-134465 C1-133974
    C1-134465 Handling Service Request failure due to timeout in UTRAN NSN, LG Electronics, Intel Corporation, Bell Canada CR agreement Yes Yes postponed No C1-134186
    C1-133978 TCRT: Introduction of ER-GSM band NSN, Kapsch CarrierCom France S.A.S, Huawei CR agreement Yes Yes revised No C1-134187
    C1-134187 TCRT: Introduction of ER-GSM band NSN, Kapsch CarrierCom France S.A.S, Huawei CR agreement Yes Yes agreed No C1-133978
    C1-133984 Reference corrections for TS 24.008 LG Electronics CR agreement Yes Yes agreed No
    C1-133989 Terminology Alignment for name of forbidden lists between Stage 2 and Stage 3 Samsung CR agreement Yes Yes agreed No
    C1-133990 Duplicate entries in ACL and OCL when forming CSG Whitelist Samsung, Renesas Mobile Europe Ltd CR agreement Yes Yes agreed No
    C1-133991 User initiated PLMN reselection after manual CSG selection and registration on a CSG cell. Samsung, Renesas Mobile Europe Ltd CR agreement Yes Yes revised No C1-134300
    C1-134300 User initiated PLMN reselection after manual CSG selection and registration on a CSG cell. Samsung, Broadcom Corporation CR agreement Yes Yes revised No C1-134514 C1-133991
    C1-134514 User initiated PLMN reselection after manual CSG selection and registration on a CSG cell. Samsung, Broadcom Corporation CR agreement Yes Yes revised No C1-134524 C1-134300
    C1-134524 User initiated PLMN reselection after manual CSG selection and registration on a CSG cell. Samsung, Broadcom Corporation CR agreement Yes Yes agreed No C1-134514
    C1-133992 Correction on the cause mapping condition in MME when 2G/3G Roaming Agreement does not exist NTT DOCOMO, Samsung CR agreement Yes Yes rejected No
    C1-133993 ESM cause #66 without APN NTT DOCOMO CR agreement Yes Yes revised No C1-134301 C1-133531
    C1-134301 ESM cause #66 without APN NTT DOCOMO CR agreement Yes Yes postponed No C1-133993
    C1-133994 SM cause #66 without APN NTT DOCOMO CR agreement Yes Yes revised No C1-134302 C1-133532
    C1-134302 SM cause #66 without APN NTT DOCOMO CR agreement Yes Yes postponed No C1-133994
    C1-134009 Discussion on CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer discussion discussion Yes Yes noted No
    C1-134022 Clarification to the combined TAU procedure when rejected with EMM cause #10 HTC CR agreement Yes Yes revised No C1-134303
    C1-134303 Clarification to the combined TAU procedure when rejected with EMM cause #10 HTC, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134022
    C1-134037 Start timer T3440 for other cause values Intel Corporation discussion discussion Yes Yes noted No
    C1-134055 Clarification to the periodic RAU procedure when rejected with GMM cause #10 HTC CR agreement Yes Yes revised No C1-134304
    C1-134304 Clarification to the periodic RAU procedure when rejected with GMM cause #10 HTC, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134483 C1-134055
    C1-134483 Clarification to the periodic RAU procedure when rejected with GMM cause #10 HTC, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134304
    C1-134058 Correcting trigger for completion of CM Service Request procedure Ericsson / Magnus CR agreement Yes Yes revised No C1-134305 C1-133035
    C1-134305 Correcting trigger for completion of CM Service Request procedure Ericsson CR agreement Yes Yes agreed No C1-134058
    C1-134059 Clean-up of references Ericsson / Magnus CR agreement Yes Yes agreed No
    C1-134060 Clarification of requirements for UEs configured for dual priority Intel/Vivek CR agreement Yes Yes revised No C1-134306
    C1-134306 Clarification of requirements for UEs configured for dual priority Intel Corporation CR agreement Yes Yes revised No C1-134466 C1-134060
    C1-134466 Clarification of requirements for UEs configured for dual priority Intel Corporation CR agreement Yes Yes revised No C1-134517 C1-134306
    C1-134517 Clarification of requirements for UEs configured for dual priority Intel Corporation CR agreement Yes Yes postponed No C1-134466
    C1-134061 Clarification of requirements for MSs configured for dual priority Intel/Vivek CR agreement Yes Yes revised No C1-134307
    C1-134307 Clarification of requirements for MSs configured for dual priority Intel Corporation CR agreement Yes Yes revised No C1-134467 C1-134061
    C1-134467 Clarification of requirements for MSs configured for dual priority Intel Corporation CR agreement Yes Yes revised No C1-134518 C1-134307
    C1-134518 Clarification of requirements for MSs configured for dual priority Intel Corporation CR agreement Yes Yes postponed No C1-134467
    C1-134077 Syntactic rules in comments in the MS RAC IE Huawei, HiSilicon/Christian CR agreement Yes Yes revised No C1-134308
    C1-134308 Syntactic rules in comments in the MS RAC IE Huawei, HiSilicon/Christian CR agreement Yes Yes agreed No C1-134077
    C1-134086 GERAN Iu mode correction Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-134157 Clarification of PDP context modification Qualcomm Incorporated / Lena CR agreement Yes Yes agreed No C1-133967
12.30
new / updated Rel-12 WIDs
12.30.1
WIDs
C1-133722 Revised WID on "Support of RTP / RTCP transport multiplexing (signalling) in IMS" Alcatel-Lucent / Albrecht revised WID agreement Yes No withdrawn Yes
    C1-133754 WID on Signalling Improvements for Network Efficiency (SINE) Huawei, HiSilicon/Lin new WID agreement Yes Yes revised No C1-134090
    C1-134090 WID on Signalling Improvements for Network Efficiency (SINE) Huawei, HiSilicon/Lin new WID agreement Yes Yes revised No C1-134395 C1-133754
    C1-134395 WID on Signalling Improvements for Network Efficiency (SINE) Huawei, HiSilicon/Lin new WID agreement Yes Yes revised No C1-134500 C1-134090
    C1-134500 WID on Signalling Improvements for Network Efficiency (SINE) Huawei, HiSilicon/Lin new WID agreement Yes Yes agreed No C1-134395
    C1-133828 CT aspects of WLAN network selection for 3GPP terminals Qualcomm Incorporated new WID agreement Yes Yes revised No C1-134091
    C1-134091 CT aspects of WLAN network selection for 3GPP terminals Qualcomm Incorporated new WID agreement Yes Yes revised No C1-134417 C1-133828
    C1-134417 CT aspects of WLAN network selection for 3GPP terminals Qualcomm Incorporated new WID agreement Yes Yes revised No C1-134471 C1-134091
    C1-134471 CT aspects of WLAN network selection for 3GPP terminals Qualcomm Incorporated new WID agreement Yes Yes agreed No C1-134417
    C1-133843 Updates of eSaMOG WID ZTE/Joy revised WID agreement Yes Yes revised No C1-134092
    C1-134092 Updates of eSaMOG WID ZTE/Joy revised WID agreement Yes Yes agreed No C1-133843
    C1-133910 WID for UE Power Consumption Optimizations, stage 3 Ericsson / Mikael new WID agreement Yes Yes revised No C1-134094
    C1-134094 WID for UE Power Consumption Optimizations, stage 3 Ericsson / Mikael new WID agreement Yes Yes revised No C1-134388 C1-133910
    C1-134388 WID for UE Power Consumption Optimizations, stage 3 Ericsson / Mikael new WID agreement Yes Yes agreed No C1-134094
    C1-133951 Proposed WID for CT aspects of Optimized Offloading to WLAN in 3GPP RAT mobility BlackBerry / Richard new WID agreement Yes Yes revised No C1-134095
    C1-134095 Proposed WID for CT aspects of Optimized Offloading to WLAN in 3GPP RAT mobility BlackBerry / Richard new WID agreement Yes Yes agreed No C1-133951
    C1-133952 Proposed new WID on Security aspects of Public Warning System BlackBerry / Richard new WID agreement Yes Yes postponed No
    C1-134040 New WID: Enhancements to IMS operator determined barring Ericsson / Jörgen new WID agreement Yes Yes revised No C1-134096
    C1-134096 New WID: Enhancements to IMS operator determined barring Ericsson / Jörgen new WID agreement Yes Yes revised No C1-134396 C1-134040
    C1-134396 New WID: Enhancements to IMS operator determined barring Ericsson / Jörgen new WID agreement Yes Yes agreed No C1-134096
    C1-134062 New Acronym for WID Technical Aspects on Roaming End to End scenarios with VoLTE IMS and other networks Deutsche Telekom (Roland) revised WID agreement Yes Yes revised No C1-134354
    C1-134354 New Acronym for WID Technical Aspects on Roaming End to End scenarios with VoLTE IMS and other networks Deutsche Telekom (Roland) revised WID agreement Yes Yes revised No C1-134420 C1-134062
    C1-134420 New Acronym for WID Technical Aspects on Roaming End to End scenarios with VoLTE IMS and other networks Deutsche Telekom (Roland) revised WID agreement Yes Yes revised No C1-134472 C1-134354
    C1-134472 New Acronym for WID Technical Aspects on Roaming End to End scenarios with VoLTE IMS and other networks Deutsche Telekom (Roland) revised WID agreement Yes Yes endorsed No C1-134420
    C1-134066 CT aspects of Extended IMS media plane security features Alcatel-Lucent / Bruno Landais revised WID agreement Yes Yes endorsed No
12.30.2
CRs and discussion papers related to new WIDs
C1-133753 WI proposal to 3GPP CT1 on SINE Huawei, HiSilicon/Lin discussion discussion Yes Yes noted No
    C1-133829 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated, Blackberry CR agreement Yes Yes revised No C1-134162
    C1-134162 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated, Blackberry CR agreement Yes Yes revised No C1-134421 C1-133829
    C1-134421 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated, Blackberry CR agreement Yes Yes postponed No C1-134162
    C1-133903 The relative priority between specific 3GPP RATs and WLAN CATT CR agreement Yes No withdrawn Yes
    C1-134041 Discussion: Alternatives for barring of premium rate communications Ericsson / Jörgen discussion discussion Yes Yes revised No C1-134349
    C1-134349 Discussion: Alternatives for barring of premium rate communications Ericsson / Jörgen discussion discussion Yes Yes noted No C1-134041
    C1-134042 Alt1: Indicating premium rate communications in VPLMN country Ericsson / Jörgen CR agreement Yes Yes postponed No C1-131625
    C1-134043 Alt 1: ODB procedure to perform premium rate barring Ericsson / Jörgen CR agreement Yes Yes postponed No C1-131626
    C1-134044 Alt2: TRF procedure to block local premium rate communications Ericsson / Jörgen CR agreement Yes Yes postponed No C1-132482
    C1-134045 Alt 2: ODB procedure to indicate premium rate barring Ericsson / Jörgen CR agreement Yes Yes postponed No C1-132245
12.30.3
Status of future work items
13
Output Liaison Statements
C1-134081 Reply LS on SIP/SDP Usage for TCP/TLS session establishment current meeting o/g LS approval Yes Yes agreed No
    C1-134083 Reply LS on CSFB priority call handling in a network supporting Multimedia Priority Service current meeting o/g LS approval Yes Yes revised No C1-134392
    C1-134392 Reply LS on CSFB priority call handling in a network supporting Multimedia Priority Service current meeting o/g LS approval Yes Yes revised No C1-134491 C1-134083
    C1-134491 Reply LS on CSFB priority call handling in a network supporting Multimedia Priority Service current meeting o/g LS approval Yes Yes revised No C1-134519 C1-134392
    C1-134519 Reply LS on CSFB priority call handling in a network supporting Multimedia Priority Service current meeting o/g LS approval Yes Yes agreed No C1-134491
    C1-134084 Reply LS on UEPCOP CT considerations current meeting o/g LS approval Yes Yes revised No C1-134384
    C1-134384 Reply LS on UEPCOP CT considerations current meeting o/g LS approval Yes Yes revised No C1-134490 C1-134084
    C1-134490 Reply LS on UEPCOP CT considerations current meeting o/g LS approval Yes Yes agreed No C1-134384
    C1-134085 LS on encoding of MS Time Zone for NetLoc current meeting o/g LS approval Yes Yes revised No C1-134489
    C1-134489 LS on encoding of MS Time Zone for NetLoc current meeting o/g LS approval Yes Yes agreed No C1-134085
    C1-133833 LS to SA2 on merging ForServiceBased and ForFlowBased ISRP flow distribution containers Qualcomm o/g LS approval Yes Yes revised No C1-134369
    C1-134369 LS to SA2 on merging ForServiceBased and ForFlowBased ISRP flow distribution containers current meeting o/g LS approval Yes Yes revised No C1-134394 C1-133833
    C1-134394 LS to SA2 on merging ForServiceBased and ForFlowBased ISRP flow distribution containers current meeting o/g LS approval Yes Yes agreed No C1-134369
    C1-133958 Reply LS on Additional cause causes triggering redirection Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer o/g LS approval Yes Yes revised No C1-134082
    C1-134082 Reply LS on Additional cause causes triggering redirection current meeting o/g LS approval Yes Yes revised No C1-134385 C1-133958
    C1-134385 Reply LS on Additional cause causes triggering redirection current meeting o/g LS approval Yes Yes revised No C1-134419 C1-134082
    C1-134419 Reply LS on additional cause causes triggering redirection current meeting o/g LS approval Yes Yes agreed No C1-134385
    C1-134087 Reply LS on uplink packet filters current meeting o/g LS approval Yes Yes revised No C1-134387
    C1-134387 Reply LS on uplink packet filters current meeting o/g LS approval Yes Yes agreed No C1-134087
    C1-134088 Reply to: LS on End-to-end fixed-mobile interworking (S4-131100) current meeting o/g LS approval Yes Yes agreed No
    C1-134089 Reply LS on End-to-end QoS handling of MTSI current meeting o/g LS approval Yes Yes revised No C1-134386
    C1-134386 Reply LS on End-to-end QoS handling of MTSI current meeting o/g LS approval Yes Yes agreed No C1-134089
    C1-134136 LS on UE considering all TAs of a PLMN as forbidden tracking areas for roaming current meeting o/g LS approval Yes Yes revised No C1-134370
    C1-134370 LS on UE considering all TAs of a PLMN as forbidden tracking areas for roaming current meeting o/g LS approval Yes Yes agreed No C1-134136
    C1-134265 LS on Interaction between MTC or IMS emergency call and 'Call control by USIM' current meeting o/g LS approval Yes Yes agreed No
    C1-134383 LS on default APN operation current meeting o/g LS approval Yes Yes revised No C1-134393
    C1-134393 LS on default APN operation current meeting o/g LS approval Yes Yes agreed No C1-134383
    C1-134407 LS on interaction between SIPTO at the local network and the CS fallback service in connected mode current meeting o/g LS approval Yes Yes revised No C1-134492
    C1-134492 LS on interaction between SIPTO at the local network and the CS fallback service in connected mode current meeting o/g LS approval Yes Yes agreed No C1-134407
    C1-134435 LS on inter-APN routing capability and NSWO capability of the UE current meeting o/g LS approval Yes Yes revised No C1-134493
    C1-134493 LS on inter-APN routing capability and NSWO capability of the UE current meeting o/g LS approval No No withdrawn Yes C1-134435
    C1-134488 LS on limitation on background scan for (E)HPLMN within the same country current meeting o/g LS approval Yes Yes rejected No
14
Late and misplaced documents
C1-133756 SDP modification by the network for proactive transcoding Orange/Youssef CR agreement No Yes postponed No
    C1-133758 Sending of IMEI to IMS network Orange/Youssef discussion discussion No Yes postponed No
    C1-133789 Reply LS on support for user location age or timestamp (C3-131316) CT3 other information Yes No withdrawn Yes C1-133911
    C1-133795 LS on new work item on "IMS support for RTP / RTCP transport multiplexing" (C4-131546) CT4 i/c LS information Yes No withdrawn Yes C1-134054
    C1-134002 LS on 3GPP RAT differentiation in ANDSF ISRP for WORM functionality (S2-133859) SA2 i/c LS information Yes No withdrawn Yes C1-134025
    C1-134020 Handling of RAT based subscription HTC discussion discussion No No withdrawn Yes
    C1-134240 void void other discussion No No [not addressed] No
    C1-134241 void void other discussion No No [not addressed] No
    C1-134257 void void other discussion No No [not addressed] No
    C1-134266 void void other discussion No No [not addressed] No
    C1-134267 void void other discussion No No [not addressed] No
15
A.O.B.
16
Closing

Created: 2013-10-14 08:24     Last document: C1-134525