Agenda with allocated Tdocs

Created: 2012-05-02 08:36     Last document: C1-121739

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
opening
2
agenda and reports
C1-120908 agenda CT1 Chairman agenda agreement Yes Yes noted No
3
input liaison statements
C1-120931 LS Reply on PSS HTTP-based Download and Streaming and 3GP-DASH QoS management (C3-120295) CT3 i/c LS information Yes Yes noted No
    C1-120932 IBCF handling of different II-NNI types (C3-120494) CT3 i/c LS action Yes Yes forwarded to C1-78 No
    C1-120933 LS reply on LS (IREG LS_132) to 3GPP CT1/CT4 on usage of XCAP for Voice over IMS (C4-120526) CT4 i/c LS information Yes Yes noted No
    C1-120934 LS on issues on Inbound CSG Mobility Failure (C4-120581) CT4 i/c LS information Yes Yes noted No
    C1-120935 Reply LS on Capability handling of LTE TDD and FDD modes (R2-121035) RAN2 i/c LS information Yes Yes noted No
    C1-120936 LS on Capability Indicator for SRVCC from UTRAN/GERAN to E-UTRAN/HSPA (R3-120451) RAN3 i/c LS information Yes Yes noted No
    C1-120937 LS on clarification of UE behaviour when operating in CS-PS mode 1 of operation. (R5-120648) RAN5 i/c LS action Yes Yes replied to No
    C1-120938 LS requesting clarification of whether the UE’s Whitelist is updated after Manual Selection to Hybrid CSG Cell (R5-120761) RAN5 i/c LS action Yes Yes replied to No
    C1-120939 Reply LS on Supporting T.38-based Fax service in IMS (S1-120273) SA1 i/c LS information Yes Yes noted No
    C1-120940 LS on Guidelines for National IP Interconnection (S1-120337) SA1 i/c LS information Yes Yes noted No
    C1-120941 Reply LS on re-documentation and alignments of PWS (GP-120301) GERAN2 i/c LS information Yes Yes noted No
    C1-120942 LS on Corrections to Alternative EFTA multislot class field (GP-120314) TSG GERAN i/c LS action Yes Yes noted No
    C1-120943 LS on FANR capability indication (GP-120432) TSG GERAN i/c LS action Yes Yes noted No
    C1-120944 Reply LS on the introduction of FULL-MOCN-GERAN feature (GP-120441) TSG GERAN i/c LS information Yes Yes noted No
    C1-120945 LS on Reverse SRVCC from UTRAN/GERAN to E-UTRAN/HSPA (GP-120442) TSG GERAN i/c LS information Yes Yes noted No
    C1-120946 Reply LS on issues on inbound CSG mobility failure (GP-120443) GERAN2 i/c LS action Yes Yes forwarded to C1-78 No
    C1-120947 Reply LS on CSFB awareness in UMTS and GERAN (GP-120450) GERAN2 i/c LS information Yes Yes noted No
    C1-120948 LS reply to GSMA on further VoLTE charging requirements (S5-120353) SA5 i/c LS information Yes Yes replied to No
    C1-120949 LS S5-120249 LS out to SA2 and CT1 on RAVEL Charging principles (S5-120357) SA5 i/c LS action Yes Yes replied to No
    C1-120950 LS on Wi-Fi Roaming Task Force – whitepaper and actions (SP-120170) TSG SA i/c LS information Yes Yes noted No
    C1-120951 Progress of internet-drafts in frozen releases (SP-120171) TSG SA i/c LS action Yes Yes noted No
    C1-120952 Reply LS on Wi-Fi Roaming Task Force – whitepaper and actions (SP-120186) TSG SA i/c LS information Yes Yes noted No
    C1-120953 LS on requirements for verification of UE messages from H(e)NB to H(e)NB-GW (S3-120205) SA3 i/c LS information Yes Yes noted No
    C1-120954 LS on OSCAR conclusions (S2-120845) SA2 i/c LS action Yes Yes noted No
    C1-120955 LS on the introduction of FULL-MOCN-GERAN feature (S2-120933) SA2 i/c LS information Yes Yes noted No
    C1-120956 LS on Completion of Stage 2 DIDA specification (S2-120983) SA2 i/c LS information Yes Yes noted No
    C1-120957 LS on EAB for network sharing (S2-121100) SA2 i/c LS information Yes Yes noted No
    C1-120958 Clarifications for congestion control for combined MM procedures (S2-121153) SA2 i/c LS information Yes Yes replied to No
    C1-120959 LS on UE AS capability request over S1 (S2-121158) SA2 i/c LS information Yes Yes noted No
    C1-120960 LS on capability to express a match-all filter using existing TFT filter attributes (S2-121159) SA2 i/c LS action Yes Yes forwarded to C1-78 No
    C1-120961 Reply LS on agreements on SRVCC from CS to PS (S2-121160) SA2 i/c LS information Yes Yes noted No
    C1-120962 LS on PWS Requirements for UEs in Limited Service State (S3-120241) SA3 i/c LS information Yes Yes noted No
    C1-120963 Reply LS on PWS support in 3GPP UEs (S3-120242) SA3 i/c LS information Yes Yes noted No
    C1-120964 Reply LS on length of security in PWS (S3-120244) SA3 i/c LS information Yes Yes noted No
    C1-120965 Outgoing IREG LS_125 Response to 3GPP CT1 on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (Transit IOI) GSMA IREG Packet i/c LS action Yes Yes replied to No
    C1-120966 Reply LS (IREG LS_141) to 3GPP TSG CT and CT4 on usage of XCAP for Voice over IMS GSMA IREG Packet i/c LS information Yes Yes noted No
    C1-120989 IREG RILTE LS_140: Allowing network authentication without challenge for home routed XCAP APN. GSMA RILTE i/c LS action Yes Yes forwarded to C1-78 No
    C1-120993 LS to CT1 on NAS/AS interaction for EAB (R2-121986) RAN2 i/c LS action Yes Yes noted No
    C1-121002 LS on notification of SGSN info for rSRVCC (R3-120890) RAN3 i/c LS information Yes Yes noted No
    C1-121044 LS reply to GSMA CPWP on further VoLTE charging requirements (S5-120793) SA5 i/c LS action Yes Yes replied to No
    C1-121351 Reply LS to 3GPP on Set of guidelines for national IP Interconnection ETSI TISPAN i/c LS information Yes Yes noted No
    C1-121357 Assignment of 3 digit MNCs ITU-T SG 2 i/c LS information Yes Yes forwarded to C1-78 No
    C1-121370 LS (IREG_152) to 3GPP on PDN connection re-establishment by IR.92 UE GSMA IREG RILTE i/c LS action Yes Yes forwarded to C1-78 No
    C1-121390 Reply LS on VoHSPA capability indication (R2-121987) RAN2 i/c LS action Yes Yes forwarded to C1-78 No
    C1-121695 Reply LS on Supporting T.38-based Fax service in IMS (S4-120527) SA4 i/c LS information Yes Yes noted No
4
work organisation
4.1
meeting schedule
4.2
work plan and other administrative issues
C1-120921 CT1 delegate survival guide MCC nformation information Yes Yes noted No
    C1-120922 how to request tdoc numbers MCC nformation information Yes Yes noted No
    C1-121173 work plan MCC work plan information Yes Yes noted No
    C1-121174 draft C1-76 meeting report MCC meeting report / action list approval Yes Yes approved No
5
corrections to old releases
5.1
IMS issues
5.2
non-IMS issues
6
Rel-6
6.1
IMS issues
6.2
non-IMS issues
7
Rel-7
7.1
Rel-7 IMS Work Items and issues
C1-121003 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement Yes Yes revised No C1-121400
    C1-121400 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement No Yes postponed No C1-121003
    C1-121004 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement Yes Yes revised No C1-121401
    C1-121401 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement No Yes postponed No C1-121004
    C1-121005 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement Yes Yes revised No C1-121402
    C1-121402 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement No Yes postponed No C1-121005
    C1-121006 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement Yes Yes revised No C1-121403
    C1-121403 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement No Yes postponed No C1-121006
    C1-121007 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement Yes Yes revised No C1-121404
    C1-121404 Correlation of SIP MESSAGE in UE terminated SM deliver procedure over IP Huawei/Lili CR agreement No Yes postponed No C1-121007
    C1-121038 Correction on SDP Profile Status OKI,NTT CR agreement Yes Yes agreed No
    C1-121039 Correction on SDP Profile Status OKI,NTT CR agreement Yes Yes agreed No
    C1-121040 Correction on SDP Profile Status OKI,NTT CR agreement Yes Yes agreed No
    C1-121041 Correction on SDP Profile Status OKI,NTT CR agreement Yes Yes agreed No
    C1-121042 Correction on SDP Profile Status OKI,NTT CR agreement Yes Yes agreed No
    C1-121050 GRUU: S-CSCF URI matching Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-121051 GRUU: S-CSCF URI matching Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-121052 GRUU: S-CSCF URI matching Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-121053 GRUU: S-CSCF URI matching Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-121054 GRUU: S-CSCF URI matching Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-121194 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-121195 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-121196 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-121197 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-121198 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-121406
    C1-121232 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121407
    C1-121407 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-121232
    C1-121233 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121408
    C1-121408 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-121233
    C1-121234 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121409
    C1-121409 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-121234
    C1-121235 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121410
    C1-121410 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-121235
    C1-121236 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121411
    C1-121411 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-121236
    C1-121405 GRUU: S-CSCF URI matching Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-121412 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion, Orange CR agreement Yes Yes revised No C1-121704
    C1-121704 Correcting contradictory statements regarding GRUU handling by IBCF Research in Motion, Orange CR agreement Yes Yes agreed No C1-121412
7.2
Rel-7 non-IMS Work Items and issues
C1-121308 Correction of TFT description ZTE/Yingzhe CR agreement Yes No withdrawn Yes
    C1-121309 Correction of TFT description ZTE/Yingzhe CR agreement Yes No withdrawn Yes
    C1-121310 Correction of TFT description ZTE/Yingzhe CR agreement Yes No withdrawn Yes
    C1-121311 Correction of TFT description ZTE/Yingzhe CR agreement Yes No withdrawn Yes
    C1-121312 Correction of TFT description ZTE/Yingzhe CR agreement Yes Yes revised No C1-121452
    C1-121425 Correction on SDP Profile Status OKI, NTT CR agreement Yes Yes revised No C1-121670
    C1-121670 Correction on SDP Profile Status OKI, NTT CR agreement Yes Yes agreed No C1-121425
8
Rel-8
8.1
Rel-8 IMS Work Items and issues
C1-121028 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-121443
    C1-121443 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes agreed No C1-121028
    C1-121029 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-121444
    C1-121444 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-121692 C1-121029
    C1-121692 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes agreed No C1-121444
    C1-121030 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-121445
    C1-121445 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-121693 C1-121030
    C1-121693 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes agreed No C1-121445
    C1-121031 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-121446
    C1-121446 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-121694 C1-121031
    C1-121694 Wrong xml NetworkIndicator element Deutsche Telekom (Roland) CR agreement Yes Yes agreed No C1-121446
    C1-121055 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121413
    C1-121413 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121055
    C1-121056 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121414
    C1-121414 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121056
    C1-121057 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121415
    C1-121415 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121057
    C1-121058 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121416
    C1-121416 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121058
    C1-121059 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121417
    C1-121417 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121059
    C1-121060 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121418
    C1-121418 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121060
    C1-121061 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121419
    C1-121419 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121061
    C1-121062 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121420
    C1-121420 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121062
    C1-121063 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121426
    C1-121426 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121063
    C1-121064 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121427
    C1-121427 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121064
    C1-121065 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121428
    C1-121428 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121065
    C1-121066 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121429
    C1-121429 Reference update: draft-salud-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121066
    C1-121081 Restoration procedures missing in entry IBCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-121082 Restoration procedures missing in entry IBCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-121083 Restoration procedures missing in entry IBCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-121084 Restoration procedures missing in entry IBCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-121149 Discussion on SMS domain selection NTT DOCOMO discussion discussion Yes Yes noted No
    C1-121150 Discussion on how UE detects IMS registration failure NTT DOCOMO discussion discussion Yes Yes noted No
    C1-121182 CUG failure code specification Ericsson, ST-Ericsson/Jorgen CR agreement Yes No withdrawn Yes
    C1-121183 CUG failure code specification Ericsson, ST-Ericsson/Jorgen CR agreement Yes No withdrawn Yes
    C1-121184 CUG failure code specification Ericsson, ST-Ericsson/Jorgen CR agreement Yes No withdrawn Yes
    C1-121185 CUG failure code specification Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes revised No C1-121430
    C1-121186 History-Info mapping correction for CDIV Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes revised No C1-121431
    C1-121431 History-Info mapping correction for CDIV Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes agreed No C1-121186
    C1-121237 Diffs between Internet Drafts referenced by TS 24.292 Research in Motion/ Andrew information information Yes Yes noted No
    C1-121238 Updating Internet Draft references used by ICS Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121421
    C1-121421 Updating Internet Draft references used by ICS Research in Motion/ Andrew CR agreement No Yes postponed No C1-121238
    C1-121239 Updating Internet Draft references used by ICS Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121422
    C1-121422 Updating Internet Draft references used by ICS Research in Motion/ Andrew CR agreement No Yes postponed No C1-121239
    C1-121240 Updating Internet Draft references used by ICS Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121423
    C1-121423 Updating Internet Draft references used by ICS Research in Motion/ Andrew CR agreement No Yes postponed No C1-121240
    C1-121241 Updating Internet Draft references used by ICS Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121424
    C1-121424 Updating Internet Draft references used by ICS Research in Motion/ Andrew CR agreement No Yes postponed No C1-121241
    C1-121297 CDIV-302 clarification Orange/Youssef CR discussion Yes No withdrawn Yes
    C1-121298 CDIV-302 clarification Orange/Youssef CR discussion Yes No withdrawn Yes
    C1-121299 CDIV-302 clarification Orange/Youssef CR discussion Yes No withdrawn Yes
    C1-121300 CDIV-302 clarification Orange/Youssef CR discussion Yes Yes revised No C1-121432
    C1-121342 Removal of misleading material from examples annex Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121433
    C1-121433 Removal of misleading material from examples annex Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121342
    C1-121343 Removal of misleading material from examples annex Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121434
    C1-121434 Removal of misleading material from examples annex Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121343
    C1-121344 Removal of misleading material from examples annex Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121435
    C1-121435 Removal of misleading material from examples annex Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121344
    C1-121345 Removal of misleading material from examples annex Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121436
    C1-121436 Removal of misleading material from examples annex Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121345
    C1-121346 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121438
    C1-121438 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121346
    C1-121347 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121439
    C1-121439 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121347
    C1-121348 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121440
    C1-121440 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121348
    C1-121349 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121441
    C1-121441 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121349
    C1-121350 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-121442
    C1-121442 Issues with reminder notification of diversion Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-121350
    C1-121437 Removal of misleading material from examples annex Alcatel-Lucent CR agreement Yes Yes agreed No
8.2
Rel-8 non-IMS Work Items and issues
C1-120927 Alignment and correction of aspects for public warning system for GERAN Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121366
    C1-121366 Alignment and correction of aspects for public warning system for GERAN Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-120927
    C1-120928 Alignment and correction of aspects for public warning system for GERAN Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121367
    C1-121367 Alignment and correction of aspects for public warning system for GERAN Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-120928
    C1-120929 Alignment and correction of aspects for public warning system for GERAN Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121368
    C1-121368 Alignment and correction of aspects for public warning system for GERAN Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-120929
    C1-120930 Alignment and correction of aspects for public warning system for GERAN Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121369
    C1-121369 Alignment and correction of aspects for public warning system for GERAN Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-120930
    C1-121034 Discussion on expected UE behaviour when operating in CS/PS mode 1 and disabling the E-UTRA capability Qualcomm Incorporated / Lena discussion discussion Yes Yes noted No
    C1-121134 CT1 correction of system behaviour upon MME implicit detach timer expiry when SGs is associated and ISR is activated NTT DOCOMO discussion discussion Yes Yes noted No
    C1-121135 Change to the detach message to the VLR when the MME's Implicit Detach Timer expires NTT DOCOMO CR agreement Yes Yes revised No C1-121453
    C1-121453 Change to the detach message to the VLR when the MME's Implicit Detach Timer expires NTT DOCOMO CR agreement Yes Yes revised No C1-121671 C1-121135
    C1-121671 Change to the detach message to the VLR when the MME's Implicit Detach Timer expires NTT DOCOMO CR agreement Yes Yes agreed No C1-121453
    C1-121136 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes revised No C1-121454
    C1-121454 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes revised No C1-121672 C1-121136
    C1-121672 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes agreed No C1-121454
    C1-121137 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes revised No C1-121455
    C1-121455 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes revised No C1-121673 C1-121137
    C1-121673 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes agreed No C1-121455
    C1-121138 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes revised No C1-121456
    C1-121456 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes revised No C1-121674 C1-121138
    C1-121674 Change to the detach message for implicit detach at MME NTT DOCOMO CR agreement Yes Yes agreed No C1-121456
    C1-121139 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121457
    C1-121457 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121679 C1-121139
    C1-121679 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121705 C1-121457
    C1-121705 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes agreed No C1-121679
    C1-121140 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121458
    C1-121458 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121680 C1-121140
    C1-121680 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121706 C1-121458
    C1-121706 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes agreed No C1-121680
    C1-121141 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121459
    C1-121459 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121681 C1-121141
    C1-121681 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121707 C1-121459
    C1-121707 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes agreed No C1-121681
    C1-121142 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121460
    C1-121460 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121682 C1-121142
    C1-121682 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes revised No C1-121708 C1-121460
    C1-121708 Additional trigger to GPRS detach and abnormal case handling NTT DOCOMO CR agreement Yes Yes agreed No C1-121682
    C1-121143 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes revised No C1-121465
    C1-121465 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes revised No C1-121683 C1-121143
    C1-121683 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes agreed No C1-121465
    C1-121144 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes revised No C1-121466
    C1-121466 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes revised No C1-121684 C1-121144
    C1-121684 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes agreed No C1-121466
    C1-121145 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes revised No C1-121467
    C1-121467 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes revised No C1-121685 C1-121145
    C1-121685 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes agreed No C1-121467
    C1-121146 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes revised No C1-121468
    C1-121468 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes revised No C1-121686 C1-121146
    C1-121686 Clarification of MME behaviour in receiving CS Paging when MRT has expired but IDT is running while ISR is activated NTT DOCOMO CR agreement Yes Yes agreed No C1-121468
    C1-121158 Discussion on IMS UE re-attempting to get IMS connectivity NTT DOCOMO discussion discussion Yes Yes noted No
    C1-121159 Correction on conditions for IMS UE re-attempting to get IMS connectivity NTT DOCOMO CR agreement Yes Yes revised No C1-121594
    C1-121594 Correction on conditions for IMS UE re-attempting to get IMS connectivity NTT DOCOMO CR agreement Yes Yes postponed No C1-121159
    C1-121160 Correction on conditions for IMS UE re-attempting to get IMS connectivity NTT DOCOMO CR agreement Yes Yes revised No C1-121595
    C1-121595 Correction on conditions for IMS UE re-attempting to get IMS connectivity NTT DOCOMO CR agreement Yes Yes postponed No C1-121160
    C1-121161 Correction on conditions for IMS UE re-attempting to get IMS connectivity NTT DOCOMO CR agreement Yes Yes revised No C1-121596
    C1-121596 Correction on conditions for IMS UE re-attempting to get IMS connectivity NTT DOCOMO CR agreement Yes Yes postponed No C1-121161
    C1-121597 Addition of "IMS supported" indicator NTT DOCOMO CR agreement Yes Yes postponed No C1-121162
    C1-121220 CS-PS mode 1 UE behaviour when disabling EUTRAN during attach or tracking area update NEC, HTC, Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-121280 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121469
    C1-121469 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121687 C1-121280
    C1-121687 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121469
    C1-121281 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121470
    C1-121470 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121688 C1-121281
    C1-121688 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121470
    C1-121282 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121471
    C1-121471 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121689 C1-121282
    C1-121689 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121471
    C1-121283 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121472
    C1-121472 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121690 C1-121283
    C1-121690 Correction to HA discovery based on DHCPv6 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121472
    C1-121461 Gs update SGSN receiving Detach Notification from MME NTT DOCOMO CR agreement Yes Yes revised No C1-121675
    C1-121675 Gs update SGSN receiving Detach Notification from MME NTT DOCOMO CR agreement Yes Yes agreed No C1-121461
    C1-121462 Gs update SGSN receiving Detach Notification from MME NTT DOCOMO CR agreement Yes Yes revised No C1-121676
    C1-121676 Gs update SGSN receiving Detach Notification from MME NTT DOCOMO CR agreement Yes Yes agreed No C1-121462
    C1-121463 Gs update SGSN receiving Detach Notification from MME NTT DOCOMO CR agreement Yes Yes revised No C1-121677
    C1-121677 Gs update SGSN receiving Detach Notification from MME NTT DOCOMO CR agreement Yes Yes agreed No C1-121463
    C1-121464 Gs update SGSN receiving Detach Notification from MME NTT DOCOMO CR agreement Yes Yes revised No C1-121678
    C1-121678 Gs update SGSN receiving Detach Notification from MME NTT DOCOMO CR agreement Yes Yes agreed No C1-121464
9
Rel-9
9.1
Rel-9 IMS Work Items and issues
C1-121008 Use of Feature-Caps header to indicate the support of mid-call feature for SCC AS Huawei/Lili CR agreement Yes Yes postponed No
    C1-121009 Use of Feature-Caps header to indicate the support of mid-call feature for SCC AS Huawei/Lili CR agreement Yes Yes postponed No
    C1-121010 Use of Feature-Caps header to indicate the support of mid-call feature for SCC AS Huawei/Lili CR agreement Yes Yes postponed No
    C1-121067 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121447
    C1-121447 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121067
    C1-121068 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121448
    C1-121448 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121068
    C1-121069 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-121449
    C1-121449 Reference update: draft-liess-dispatch-alert-info-urns Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-121069
    C1-121094 Unauthorized non emergency session in P-CSCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-121095 Unauthorized non emergency session in P-CSCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-121096 Unauthorized non emergency session in P-CSCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-121102 Reference update for MIKEY_TICKET RFC Vodafone CR agreement Yes Yes agreed No C1-120098
    C1-121103 Reference update for MIKEY_TICKET RFC Vodafone CR agreement Yes Yes agreed No C1-120099
    C1-121104 Reference update for MIKEY_TICKET RFC Vodafone CR agreement Yes Yes agreed No C1-120100
9.2
Rel-9 non-IMS Work Items and issues
C1-121070 Ensuring add filter resource modification targets a single traffic flow aggregate Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121473
    C1-121473 Ensuring add filter resource modification targets a single traffic flow aggregate Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-121070
    C1-121071 Ensuring add filter resource modification targets a single traffic flow aggregate Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121474
    C1-121474 Ensuring add filter resource modification targets a single traffic flow aggregate Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-121071
    C1-121072 Ensuring add filter resource modification targets a single traffic flow aggregate Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121475
    C1-121475 Ensuring add filter resource modification targets a single traffic flow aggregate Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-121072
    C1-121251 Corrections to Alternative EFTA multislot class field RIM (Richard) CR agreement Yes Yes revised No C1-121477
    C1-121477 Corrections to Alternative EFTA multislot class field RIM (Richard) CR agreement Yes Yes agreed No C1-121251
    C1-121252 Corrections to Alternative EFTA multislot class field RIM (Richard) CR agreement Yes Yes revised No C1-121478
    C1-121478 Corrections to Alternative EFTA multislot class field RIM (Richard) CR agreement Yes Yes agreed No C1-121252
    C1-121253 Corrections to Alternative EFTA multislot class field RIM (Richard) CR agreement Yes Yes revised No C1-121479
    C1-121479 Corrections to Alternative EFTA multislot class field RIM (Richard) CR agreement Yes Yes agreed No C1-121253
10
Rel-10
10.1
void
10.2
IMS_SC_eIDT
10.3
CCNL
10.4
IMSProtoc4
C1-121113 Supporting Fax service in IMS NEC, NTT CR agreement Yes Yes postponed No C1-120174
    C1-121114 Supporting Fax service in IMS NEC, NTT CR agreement Yes Yes postponed No C1-120175
10.5
eAOC
10.6
OMR
10.7
IESE
C1-121658 Missing emergency call procedure in S-CSCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-121537
    C1-121657 Missing emergency call procedure in S-CSCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
10.8
eSRVCC
C1-121011 Disc on eSRVCC issue in case of roaming Huawei/Lili discussion discussion Yes Yes noted No
    C1-121012 Address the issue in eSRVCC Huawei/Lili CR agreement Yes Yes postponed No
    C1-121013 Address the issue in eSRVCC Huawei/Lili CR agreement Yes Yes postponed No
    C1-121073 Path header set by ATCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-121450
    C1-121450 Path header set by ATCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-121073
    C1-121074 Path header set by ATCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-121451
    C1-121451 Path header set by ATCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-121074
10.9
aSRVCC
C1-121023 Incorrect header field for media feature tags Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-121024 Incorrect header field for media feature tags Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-121077 State verification to avoid state mismatch Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121372 C1-120527
    C1-121372 State verification to avoid state mismatch Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121702 C1-121077
    C1-121702 State verification to avoid state mismatch Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-121372
    C1-121078 State verification to avoid state mismatch Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121373 C1-120528
    C1-121373 State verification to avoid state mismatch Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121703 C1-121078
    C1-121703 State verification to avoid state mismatch Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-121373
    C1-121079 MSC server state verification procedure solving an EN Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121374 C1-120529
    C1-121374 MSC server state verification procedure solving an EN Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-121079
    C1-121080 MSC server state verification procedure solving an EN Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121375 C1-120530
    C1-121375 MSC server state verification procedure solving an EN Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-121080
    C1-121132 P-CSCF releasing the session when resource is lost Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-121545 C1-120269
    C1-121545 P-CSCF releasing the session when resource is lost Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-121132
10.10
ECSRA_LAA-CN
10.11
eMPS-CN
10.12
NIMTC
10.12.1
NAS signalling low priority and device properties
C1-121249 Abnormal cases when Extended Wait Time is received RIM / Richard CR agreement No No withdrawn Yes
    C1-121250 Abnormal cases when Extended Wait Time is received RIM / Richard CR agreement No No withdrawn Yes
10.12.2
NAS level congestion control and mobility management back-off timers
C1-121247 Abnormal cases when Extended Wait Time is received RIM / Richard CR agreement Yes Yes revised No C1-121480
    C1-121480 Abnormal cases when Extended Wait Time is received Research In Motion UK Limited CR agreement Yes Yes agreed No C1-121247
    C1-121248 Abnormal cases when Extended Wait Time is received RIM / Richard CR agreement Yes Yes revised No C1-121481
    C1-121481 Abnormal cases when Extended Wait Time is received Research In Motion UK Limited CR agreement Yes Yes agreed No C1-121248
    C1-121301 Abnormal cases when Extended Wait Time is received RIM / Richard CR agreement Yes Yes revised No C1-121482
    C1-121482 Abnormal cases when Extended Wait Time is received Research In Motion UK Limited CR agreement Yes Yes agreed No C1-121301
    C1-121302 Abnormal cases when Extended Wait Time is received RIM / Richard CR agreement Yes Yes revised No C1-121483
    C1-121483 Abnormal cases when Extended Wait Time is received Research In Motion UK Limited CR agreement Yes Yes agreed No C1-121302
    C1-121313 Reject message with T3346 running but T3246 not running ZTE/Yingzhe discussion discussion Yes Yes noted No
    C1-121314 Reject #22 when T3346 running but T3246 not running ZTE/Yingzhe CR agreement Yes Yes revised No C1-121613
    C1-121613 Reject #22 when T3346 running but T3246 not running ZTE/Yingzhe CR agreement Yes Yes agreed No C1-121314
    C1-121315 Reject #22 when T3346 running but T3246 not running ZTE/Yingzhe CR agreement Yes Yes revised No C1-121614
    C1-121614 Reject #22 when T3346 running but T3246 not running ZTE/Yingzhe CR agreement Yes Yes agreed No C1-121315
    C1-121316 Reject #22 when T3346 running but T3246 not running ZTE/Yingzhe CR agreement Yes Yes postponed No
    C1-121317 Reject #22 when T3346 running but T3246 not running ZTE/Yingzhe CR agreement Yes Yes postponed No
10.12.3
Congestion control for CS domain and impact on Gs/SGs interfaces
10.12.4
Session management back-off timers
10.12.5
Emergency bearer services
10.12.6
General issues
C1-121203 Trigger to Location Update procedure due to Manual PLMN selection when T3346 timer is running. HTC CR agreement Yes Yes revised No C1-121709
    C1-121709 Trigger to Location Update procedure due to Manual PLMN selection when T3346 timer is running. HTC CR agreement Yes Yes revised No C1-121735 C1-121203
    C1-121735 Trigger to Location Update procedure due to Manual PLMN selection when T3346 timer is running. HTC CR agreement No Yes postponed No C1-121709
    C1-121204 Trigger to Location Update procedure due to Manual PLMN selection when T3346 timer is running. HTC CR agreement Yes Yes revised No C1-121710
    C1-121710 Trigger to Location Update procedure due to Manual PLMN selection when T3346 timer is running. HTC CR agreement Yes Yes revised No C1-121736 C1-121204
    C1-121736 Trigger to Location Update procedure due to Manual PLMN selection when T3346 timer is running. HTC CR agreement No Yes postponed No C1-121710
    C1-121205 Correction to the handling of PS back off timer for access class 11-15 HTC CR agreement Yes Yes postponed No
    C1-121206 Correction to the handling of PS back off timer for access class 11-15 HTC CR agreement Yes Yes postponed No
    C1-121210 Clarification to the SMS transfer procedure for a UE with AC 11-15 and T3346 timer is running. HTC CR agreement No No withdrawn Yes
    C1-121211 Clarification to the SMS transfer procedure for a UE with AC 11-15 and T3346 timer is running. HTC CR agreement No No withdrawn Yes
    C1-121243 Correction to the condition to trigger Location updating procedure HTC CR agreement Yes Yes revised No C1-121484
    C1-121484 Correction to the condition to trigger Location updating procedure HTC CR agreement No Yes postponed No C1-121243
    C1-121244 Correction to the condition to trigger Location updating procedure HTC CR agreement Yes Yes revised No C1-121485
    C1-121485 Correction to the condition to trigger Location updating procedure HTC CR agreement No Yes postponed No C1-121244
10.13
AT_IMS
10.14
AT_UICC
10.15
SMOG_St3
10.16
IFOM-CT
C1-121122 IETF reference update Qualcomm Incorporated /Patrick CR agreement Yes Yes agreed No
    C1-121123 IETF reference update Qualcomm Incorporated /Patrick CR agreement Yes Yes agreed No
10.17
LIPA
10.18
SIPTO
10.19
MAPCON-St3
10.20
TIGHTER
10.21
MOCN-GERAN
10.22
FS_UE-CN_ES
10.23
TEI10 and other WIDs
10.23.1
IMS – TEI10 and other WIDs
C1-121177 Correcting implementation error, dai parameter Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes agreed No
    C1-121178 Correcting implementation error, dai parameter Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes agreed No
10.23.2
SAE – TEI10 and other WIDs
C1-121118 MME paging handling for "SMS Indicator" case Alcatel-Lucent, ZTE/ Jennifer CR agreement Yes No withdrawn Yes
    C1-121119 MME paging handling for "SMS Indicator" case Alcatel-Lucent, ZTE/ Jennifer CR agreement Yes Yes revised No C1-121486
    C1-121486 MME paging handling for "SMS Indicator" case Alcatel-Lucent, ZTE/ Jennifer CR agreement Yes Yes agreed No C1-121119
    C1-121262 SGs paging handling in the MME Huawei, HiSilicon CR agreement Yes Yes agreed No
10.23.3
Other TEI10 issues / WIDs
11
Rel-11
11.1
Release 11 documents for information
C1-121032 Draft of RFC3455bis Deutsche Telekom (Roland) information information Yes Yes noted No
    C1-121242 Current Issues on IETF drafts which are dependencies for CT1 specifications Research in Motion/ Andrew information information Yes Yes noted No
11.2
USSI
C1-120999 Pseudo-CR on Agreement on USSI solution Alternative 1 (SIP INVITE based) Deutsche Telekom, Huawei, Ericsson, ST-Ericsson, Nokia Siemens Networks, ZTE, Telecom Italia, China Mobile, Belgacom, Vodafone, AT&T, NTT DOCOMO pseudo CR agreement Yes Yes revised No C1-121528
    C1-121528 Pseudo-CR on Agreement on USSI solution Alternative 1 (SIP INVITE based) Deutsche Telekom, Huawei, Ericsson, ST-Ericsson, Nokia Siemens Networks, ZTE, Telecom Italia, China Mobile, Belgacom, Vodafone, AT&T, NTT DOCOMO pseudo CR agreement Yes Yes revised No C1-121624 C1-120999
    C1-121624 Pseudo-CR on Agreement on USSI solution Alternative 1 (SIP INVITE based) Deutsche Telekom, Huawei, Ericsson, ST-Ericsson, Nokia Siemens Networks, ZTE, Telecom Italia, China Mobile, Belgacom, Vodafone, AT&T, NTT DOCOMO pseudo CR agreement Yes Yes agreed No C1-121528
    C1-121014 The latest TS 24.390 v0.6.0 for information Huawei/Lili draft TS/TR information Yes Yes noted No
    C1-121230 MESSAGE vs INVITE based solution Qualcomm Incorporated, Research in Motion discussion discussion Yes Yes noted No
11.3
IOI_IMS_CH
11.4
RLI (CT4)
11.5
EMC_PC
11.6
IPXS
11.7
VINE-CT
11.8
MRB
11.9
GINI
C1-121133 Removal of EN regarding PUI format Deutsche Telekom / Martin CR agreement Yes Yes revised No C1-121529
    C1-121529 Removal of EN regarding PUI format Deutsche Telekom / Martin CR agreement Yes Yes agreed No C1-121133
    C1-121231 Addition of GRUU procedures for RFC6140 procedures Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121530
    C1-121530 Addition of GRUU procedures for RFC6140 procedures Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121653 C1-121231
    C1-121653 Addition of GRUU procedures for RFC6140 procedures Research in Motion/ Andrew CR agreement Yes Yes revised No C1-121716 C1-121530
    C1-121716 Addition of GRUU procedures for RFC6140 procedures Research in Motion/ Andrew CR agreement No Yes postponed No C1-121653
11.10
RAVEL-CT
C1-121000 Discussion on RAVEL stage3 work Deutsche Telekom discussion discussion Yes Yes noted No
    C1-121001 Addition of the transit and roaming function Deutsche Telekom, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121525
    C1-121525 Addition of the transit and roaming function Deutsche Telekom, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121625 C1-121001
    C1-121625 Addition of the transit and roaming function Deutsche Telekom, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121717 C1-121525
    C1-121717 Addition of the transit and roaming function Deutsche Telekom, Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-121625
    C1-121075 Providing TRF address for RAVEL routing NokiaSiemensNetworks discussion discussion Yes Yes noted No
    C1-121090 Loop-back routing Ericsson, ST-Ericsson, Deutche Telekom / Jan CR agreement Yes Yes revised No C1-121526
    C1-121526 Loop-back routing Ericsson, ST-Ericsson, Deutche Telekom / Jan CR agreement Yes Yes revised No C1-121626 C1-121090
    C1-121626 Loop-back routing Ericsson, ST-Ericsson, Deutche Telekom / Jan CR agreement Yes Yes revised No C1-121718 C1-121526
    C1-121718 Loop-back routing Ericsson, ST-Ericsson, Deutche Telekom / Jan CR agreement Yes Yes agreed No C1-121626
    C1-121091 Enhanced handling of IOI Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121527
    C1-121527 Enhanced handling of IOI Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No C1-121091
    C1-121092 Roaming Architecture for Voice over IMS with Local Breakout Ericsson, ST-Ericsson, Deutche Telekom / Jan CR agreement Yes Yes postponed No
    C1-121093 Enhanced handling of IOI in MSC server Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
11.11
GBA-ext-St3 (CT4)
C1-121076 GBA_Digest procedures for 24.109 NokiaSiemensNetworks CR agreement Yes Yes revised No C1-121531
    C1-121531 GBA_Digest procedures for 24.109 NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-121076
11.12
NWK-PL2IMS-CT
C1-121019 PANI header support of network provided location information Huawei/Lili CR agreement Yes Yes revised No C1-121533
    C1-121533 PANI header support of network provided location information Huawei/Lili CR agreement No Yes postponed No C1-121019
    C1-121020 Distribution of location information- AS procedures Huawei/Lili CR agreement Yes Yes revised No C1-121534
    C1-121534 Distribution of location information- AS procedures Huawei/Lili CR agreement No Yes postponed No C1-121020
    C1-121021 Distribution of location information- P-CSCF procedures Huawei/Lili CR agreement Yes Yes revised No C1-121535
    C1-121535 Distribution of location information- P-CSCF procedures Huawei/Lili CR agreement No Yes postponed No C1-121021
    C1-121341 Disc on distribution of location information within the IMS Huawei/Lili discussion discussion Yes Yes noted No
11.13
IMSProtoc5
C1-120991 Editorial correction in border control concepts Fujitsu, NTT CR agreement Yes Yes agreed No
    C1-120992 Changing response at IBCF Fujitsu, NTT, Ericsson, Orange CR agreement Yes Yes revised No C1-121539 C1-120886
    C1-121539 Changing response at IBCF Fujitsu, NTT, Ericsson, Orange CR agreement Yes Yes postponed No C1-120992
    C1-121037 Clarification about reuse of an existing TCP connections. OKI,NTT CR agreement Yes No withdrawn Yes
    C1-121043 Editorial correction on SDP Profile Status OKI,NTT CR agreement Yes Yes revised No C1-121540
    C1-121540 Editorial correction on SDP Profile Status OKI,NTT CR agreement Yes Yes agreed No C1-121043
    C1-121192 Applicability of IBCFs on the ISC interface NTT discussion discussion Yes Yes noted No
    C1-121193 Applicability of IBCFs on the ISC interface NTT CR agreement Yes Yes revised No C1-121541
    C1-121541 Applicability of IBCFs on the ISC interface NTT CR agreement No Yes postponed No C1-121193
    C1-121406 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-121198
    C1-121200 Align handling of P-Asserted-Identity/P-Preferred-Identity with IETF Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes C1-091046
    C1-121229 Correcting profile tables for default handling of 3GPP IM CN subsystem XML body Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-121543
    C1-121543 Correcting profile tables for default handling of 3GPP IM CN subsystem XML body Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-121627 C1-121229
    C1-121627 Correcting profile tables for default handling of 3GPP IM CN subsystem XML body Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-121724 C1-121543
    C1-121724 Correcting Conformance of IM CN subsystem entities, IBCF and profile tables for use of 3GPP IM CN subsystem XML body in restoration procedures Research In Motion UK Ltd. CR agreement Yes Yes postponed No C1-121627
    C1-121294 Transparent passing of contact feature tags by B2BUA AS Orange/Youssef CR discussion Yes Yes revised No C1-121542
    C1-121542 Transparent passing of contact feature tags by B2BUA AS Orange/Youssef CR discussion Yes Yes revised No C1-121719 C1-121294
    C1-121719 Transparent passing of contact feature tags by B2BUA AS Orange/Youssef CR discussion Yes Yes agreed No C1-121542
    C1-121295 P-Served-User and session case Orange/Youssef CR discussion Yes Yes revised No C1-121544 C1-120879
    C1-121544 P-Served-User and session case Orange/Youssef CR discussion Yes Yes postponed No C1-121295
11.14
vSRVCC-CT
C1-121227 Outstanding NAS Modifications as a result of vSRVCC handover Samsung/Ricky, HTC, NEC CR agreement Yes Yes revised No C1-121385
    C1-121385 Outstanding NAS Modifications as a result of vSRVCC handover Samsung, HTC, NEC CR agreement Yes Yes revised No C1-121628 C1-121227
    C1-121628 Outstanding NAS Modifications as a result of vSRVCC handover Samsung, HTC, NEC CR agreement Yes Yes agreed No C1-121385
    C1-121228 Modifications to UR code for SRVCC due to introduction of vSRVCC Samsung/Ricky, HTC, NEC CR agreement Yes Yes revised No C1-121386
    C1-121386 Modifications to UR code for SRVCC due to introduction of vSRVCC Samsung, HTC, NEC CR agreement Yes Yes revised No C1-121629 C1-121228
    C1-121629 Modifications to UR code for SRVCC due to introduction of vSRVCC Samsung, HTC, NEC CR agreement Yes Yes agreed No C1-121386
    C1-121254 Missing operator policy requirements on setting of SRVCC and vSRVCC capabilities Research In Motion UK Ltd. CR agreement Yes Yes postponed No
    C1-121273 Mobility management procedures for IMS voice terminations Huawei, HiSilicon, Samsung CR agreement Yes Yes revised No C1-121391
    C1-121391 Mobility management procedures for IMS voice terminations Huawei, HiSilicon, Samsung CR agreement Yes Yes agreed No C1-121273
    C1-121340 Adding SRVCC details NEC CR agreement Yes Yes revised No C1-121392
    C1-121392 Adding SRVCC details NEC CR agreement Yes Yes revised No C1-121630 C1-121340
    C1-121630 Clarify maintenance concept for this specification NEC CR agreement Yes Yes agreed No C1-121392
11.15
rSRVCC-CT
C1-120967 CS to PS SRVCC, issues Ericsson, ST-Ericsson discussion discussion Yes Yes noted No
    C1-120968 CS to PS SRVCC - references Ericsson, ST-Ericsson CR agreement Yes No withdrawn Yes
    C1-120969 CS to PS SRVCC - terms and abbreviations Ericsson, ST-Ericsson CR agreement Yes No withdrawn Yes
    C1-120971 CS to PS SRVCC - additional URIs of network entities Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-120972 ATU-STI for CS to PS SRVCC Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-120973 CS to PS SRVCC - compliance Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121393
    C1-121393 CS to PS SRVCC - compliance Ericsson, ST-Ericsson CR agreement No Yes postponed No C1-120973
    C1-120974 CS to PS SRVCC - PS registration Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121394
    C1-121394 CS to PS SRVCC - PS registration Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes agreed No C1-120974
    C1-120975 CS to PS SRVCC - originating call Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121395
    C1-121395 CS to PS SRVCC - originating call Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes agreed No C1-120975
    C1-120976 CS to PS SRVCC - terminating call Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121396
    C1-121396 CS to PS SRVCC - terminating call Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes agreed No C1-120976
    C1-120977 CS to PS SRVCC, ATGW-anchored element Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121397
    C1-121397 CS to PS SRVCC, ATGW-anchored element Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-120977
    C1-120978 CS to PS SRVCC - access transfer - MSC server procedures Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121560
    C1-121560 CS to PS SRVCC - access transfer - MSC server procedures Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes agreed No C1-120978
    C1-120979 CS to PS SRVCC - access transfer - ATCF procedures Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121561
    C1-121561 CS to PS SRVCC - access transfer - ATCF procedures Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes agreed No C1-120979
    C1-120980 CS to PS SRVCC - access transfer - SC UE procedures Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121562
    C1-121562 CS to PS SRVCC - access transfer - SC UE procedures Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes revised No C1-121635 C1-120980
    C1-121635 CS to PS SRVCC - access transfer - SC UE procedures Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes agreed No C1-121562
    C1-120981 CS to PS SRVCC - access transfer - SCC AS procedures Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121563
    C1-121563 CS to PS SRVCC - access transfer - SCC AS procedures Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes revised No C1-121636 C1-120981
    C1-121636 CS to PS SRVCC - access transfer - SCC AS procedures Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes agreed No C1-121563
    C1-121015 Address the Editor's Note in the flows of rSRVCC without CS media anchored in ATGW Huawei/Lili CR agreement Yes Yes revised No C1-121549
    C1-121549 Address the Editor's Note in the flows of rSRVCC without CS media anchored in ATGW Huawei/Lili CR agreement Yes Yes agreed No C1-121015
    C1-121016 CS to PS SRVCC - access transfer - MSC server procedures when media is not anchored in ATGW Huawei/Lili CR agreement Yes Yes revised No C1-121550
    C1-121550 CS to PS SRVCC - access transfer - MSC server procedures when media is not anchored in ATGW Huawei/Lili CR agreement Yes Yes agreed No C1-121016
    C1-121017 CS to PS SRVCC - access transfer - ATCF procedures when media is not anchored in ATGW Huawei/Lili CR agreement Yes Yes revised No C1-121551
    C1-121551 CS to PS SRVCC - access transfer - ATCF procedures when media is not anchored in ATGW Huawei/Lili CR agreement Yes Yes agreed No C1-121017
    C1-121025 CS to PS SRVCC - enhancements of PS to CS SRVCC Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-121552
    C1-121552 CS to PS SRVCC - enhancements of PS to CS SRVCC Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-121631 C1-121025
    C1-121631 CS to PS SRVCC - enhancements of PS to CS SRVCC Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes postponed No C1-121552
    C1-121026 CS to PS SRVCC - transaction identifier Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-121553
    C1-121553 CS to PS SRVCC - transaction identifier Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-121026
    C1-121027 CS to PS SRVCC - flows - transaction identifier Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-121554
    C1-121554 CS to PS SRVCC - flows - transaction identifier Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-121027
    C1-121175 Security context mapping for SRVCC from CS to PS Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121565
    C1-121565 Security context mapping for SRVCC from CS to PS Ericsson, ST-Ericsson CR agreement Yes Yes postponed No C1-121175
    C1-121176 Security context mapping for SRVCC from CS to PS Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121566
    C1-121566 Security context mapping for SRVCC from CS to PS Ericsson, ST-Ericsson CR agreement Yes Yes postponed No C1-121176
    C1-121255 Request for call clearing from upper layer after CS to PS handover Research In Motion UK Limited, NEC, Nokia Siemens Networks CR agreement Yes Yes agreed No
    C1-121318 UE rSRVCC capability ZTE/David discussion discussion Yes Yes noted No
    C1-121319 Addition of capability for CS to PS SRVCC to CS registration ZTE/David CR agreement Yes Yes postponed No
    C1-121320 Definition of XML shcema for indicating UE support of CS to PS SRVCC ZTE/David CR agreement Yes Yes postponed No
    C1-121321 Signalling flow of CS to PS SRVCC in alerting phase - incoming ZTE/David CR agreement Yes Yes revised No C1-121564
    C1-121564 Signalling flow of CS to PS SRVCC in alerting phase - incoming ZTE/David CR agreement No Yes postponed No C1-121321
    C1-121322 Signaling flow of CS to PS SRVCC in alerting phase - outgoing ZTE/David CR agreement Yes Yes revised No C1-121555
    C1-121555 Signaling flow of CS to PS SRVCC in alerting phase - outgoing ZTE/David CR agreement No Yes postponed No C1-121322
    C1-121323 Definition of feature tag cs to ps SRVCC in alerting phase ZTE/David CR agreement Yes Yes revised No C1-121556
    C1-121556 Definition of feature tag cs to ps SRVCC in alerting phase ZTE/David CR agreement Yes Yes revised No C1-121691 C1-121323
    C1-121691 Definition of feature tag cs to ps SRVCC in alerting phase ZTE/David CR agreement Yes Yes agreed No C1-121556
    C1-121324 Addition of UE capability for CS to PS SRVCC in alerting phase to PS registration ZTE/David CR agreement Yes Yes revised No C1-121557
    C1-121557 Addition of UE capability for CS to PS SRVCC in alerting phase to PS registration ZTE/David CR agreement Yes Yes revised No C1-121632 C1-121324
    C1-121632 Addition of UE capability for CS to PS SRVCC in alerting phase to PS registration ZTE CR agreement Yes Yes revised No C1-121725 C1-121557
    C1-121725 Addition of UE capability for CS to PS SRVCC in alerting phase to PS registration ZTE CR agreement Yes Yes agreed No C1-121632
    C1-121325 Addition of capability for CS to PS SRVCC in alerting phase to CS registration ZTE/David CR agreement Yes Yes revised No C1-121558
    C1-121558 Addition of capability for CS to PS SRVCC in alerting phase to CS registration ZTE/David CR agreement Yes Yes revised No C1-121633 C1-121325
    C1-121633 Addition of capability for CS to PS SRVCC in alerting phase to CS registration ZTE CR agreement Yes Yes agreed No C1-121558
    C1-121326 Definition of XML shcema for indicating support of CS to PS SRVCC in alerting phase ZTE/David CR agreement Yes Yes revised No C1-121559
    C1-121559 Definition of XML shcema for indicating support of CS to PS SRVCC in alerting phase ZTE/David CR agreement Yes Yes revised No C1-121634 C1-121326
    C1-121634 Definition of XML schema for indicating support of CS to PS SRVCC in alerting phase ZTE/David CR agreement Yes Yes revised No C1-121726 C1-121559
    C1-121726 Definition of XML schema for indicating support of CS to PS SRVCC in alerting phase ZTE/David CR agreement Yes Yes agreed No C1-121634
    C1-121327 ATCF procedure for CS to PS SRVCC ZTE/David CR agreement Yes No withdrawn Yes
    C1-121328 MSC Server procedure for CS to PS SRVCC ZTE/David CR agreement Yes No withdrawn Yes
    C1-121329 UE procedure for CS to PS SRVCC ZTE/David CR agreement Yes No withdrawn Yes
    C1-121330 SCC AS procedure for CS to PS SRVCC ZTE/David CR agreement Yes No withdrawn Yes
    C1-121337 Discussion “CS to PS SRVCC capability indication” NEC discussion discussion Yes Yes noted No
    C1-121338 Adding UE’s rSRVCC capability to NAS signalling NEC CR agreement Yes Yes postponed No
11.16
RT_VGCS_Red
C1-121128 Cleanup corrections to group call redundancy Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No
    C1-121129 Cleanup corrections to broadcast call redundancy Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No
11.17
SIMTC
11.17.1
SIMTC-CS
11.17.2
SIMTC-RAN_OC
C1-121213 Extended access barring not applicable for MT, AC11-15 Nokia Siemens Networks, Nokia, HTC, Renesas Mobile, Huawei, HiSilicon CR agreement Yes Yes revised No C1-121500
    C1-121500 Extended access barring not applicable for MT, AC11-15 Nokia Siemens Networks, Nokia, HTC, Renesas Mobile, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121213
    C1-121214 Extended access barring not applicable for MT Nokia Siemens Networks, Nokia, HTC, Renesas Mobile, Huawei, HiSilicon CR agreement Yes Yes revised No C1-121501
    C1-121501 Extended access barring not applicable for MT Nokia Siemens Networks, Nokia, HTC, Renesas Mobile, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121214
    C1-121274 EAB configuration Huawei, HiSilicon, Nokia Siemens Networks CR agreement Yes Yes agreed No
    C1-121275 UE configured for EAB accessing with access class 11-15 or initiating emergency call Huawei, HiSilicon, Nokia Siemens Networks CR agreement Yes Yes revised No C1-121502
    C1-121502 UE configured for EAB accessing with access class 11-15 or initiating emergency call Huawei, HiSilicon, Nokia Siemens Networks CR agreement Yes Yes agreed No C1-121275
    C1-121503 Applicability of EAB when the UE is responding to paging Huawei, HiSilicon CR agreement Yes Yes agreed No
11.17.3
SIMTC-Reach
C1-120915 Discussion on MME Support of SMS over LTE - SMS in MME Alcatel-Lucent/ Jennifer discussion discussion Yes Yes noted No
    C1-120916 Support of SMS in MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121504
    C1-121504 Support of SMS in MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121641 C1-120916
    C1-121641 Support of SMS in MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121711 C1-121504
    C1-121711 Support of SMS in MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement No Yes postponed No C1-121641
    C1-120917 Support of point to point direct SMS service via the MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121507
    C1-121507 Support of point to point direct SMS service via the MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121644 C1-120917
    C1-121644 Support of point to point direct SMS service via the MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes postponed No C1-121507
    C1-120918 Support of SMS in MME for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121510
    C1-121510 Support of SMS in MME for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121640 C1-120918
    C1-121640 Support of SMS in MME for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121715 C1-121510
    C1-121715 Support of SMS in MME for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes agreed No C1-121640
    C1-120919 SMS-only Support for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121603
    C1-121603 SMS-only Support for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121651 C1-120919
    C1-121651 SMS-only Support for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121714 C1-121603
    C1-121714 SMS-only Support for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes agreed No C1-121651
    C1-120920 Support of SMS in MME for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121511
    C1-121511 Support of SMS in MME for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121647 C1-120920
    C1-121647 Support of SMS in MME for PS-only Subscription Alcatel-Lucent, Verizon Wireless CR agreement Yes Yes revised No C1-121712 C1-121511
    C1-121712 Support of SMS in MME for PS-only Subscription Alcatel-Lucent, Verizon Wireless CR agreement Yes Yes agreed No C1-121647
    C1-121115 Support of SMS in MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121506
    C1-121506 Support of SMS in MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121643 C1-121115
    C1-121643 Support of SMS in MME Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes postponed No C1-121506
    C1-121116 Support of point to point direct SMS service via the MME - AnnexB CM-layer Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121509
    C1-121509 Support of point to point direct SMS service via the MME - AnnexB CM-layer Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121646 C1-121116
    C1-121646 Support of point to point direct SMS service via the MME - AnnexB CM-layer Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes postponed No C1-121509
    C1-121117 SMS-only Support for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes revised No C1-121604
    C1-121604 SMS-only Support for PS-only Subscription Alcatel-Lucent, Verizon Wireless/ Jennifer CR agreement Yes Yes postponed No C1-121117
    C1-121257 Clarification on support for MSISDN-less operation LG Electronics CR agreement Yes No withdrawn Yes
    C1-121285 “SMS only” definition Huawei, HiSilicon CR agreement Yes No withdrawn Yes
    C1-121286 “SMS only” definition Huawei, HiSilicon CR agreement Yes Yes revised No C1-121639
    C1-121639 “SMS only” definition Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-121286
    C1-121287 Combined procedures for "SMS only" Huawei, HiSilicon CR agreement Yes Yes revised No C1-121599
    C1-121599 Combined procedures for "SMS only" Huawei, HiSilicon CR agreement Yes Yes revised No C1-121648 C1-121287
    C1-121648 Combined procedures for "SMS only" Huawei, HiSilicon, Intel, Nokia Siemens Networks, Ericsson, ST-Ericsson, Alcatel-Lucent, Verizon CR agreement Yes Yes agreed No C1-121599
    C1-121288 Cause value for PS-only Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-121289 Cause value for PS-only Huawei, HiSilicon CR agreement Yes Yes revised No C1-121600
    C1-121600 Cause value for PS-only Huawei, HiSilicon CR agreement Yes Yes revised No C1-121649 C1-121289
    C1-121649 Cause value for PS-only Huawei, HiSilicon, Intel, Nokia Siemens Networks, Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-121600
    C1-121290 SMS supported indication Huawei, HiSilicon CR agreement Yes Yes revised No C1-121601
    C1-121601 SMS supported indication Huawei, HiSilicon CR agreement Yes Yes revised No C1-121650 C1-121290
    C1-121650 SMS supported indication Huawei, HiSilicon, Intel, Nokia Siemens Networks, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121713 C1-121601
    C1-121713 SMS supported indication Huawei, HiSilicon, Intel, Nokia Siemens Networks, Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-121650
    C1-121291 GPRS MS behavior for "SMS only" Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-121292 Mobile station not reachable flag stored in the MME Huawei, HiSilicon CR agreement Yes Yes revised No C1-121505
    C1-121505 Mobile station not reachable flag stored in the MME Huawei, HiSilicon CR agreement Yes Yes revised No C1-121642 C1-121292
    C1-121642 Mobile station not reachable flag stored in the MME Huawei, HiSilicon, Alcatel-Lucent, Verizon Wireless CR agreement Yes Yes agreed No C1-121505
    C1-121293 Transfer of SMS between the UE and the MME Huawei, HiSilicon CR agreement Yes Yes revised No C1-121508
    C1-121508 Transfer of SMS between the UE and the MME Huawei, HiSilicon CR agreement Yes Yes revised No C1-121645 C1-121293
    C1-121645 Transfer of SMS between the UE and the MME Huawei, HiSilicon, Alcatel-Lucent, Verizon Wireless CR agreement Yes Yes postponed No C1-121508
    C1-121598 Notes from the CT1 breakout session on PS-only feature impacts in CT1 (Focus on TS 24.008) Huawei information information Yes Yes noted No
11.17.4
SIMTC-Sig
11.17.5
SIMTC-CN_Pow
11.17.6
SIMTC: SIMTC: "CN-based" and power considerations
C1-121212 SMS Service via PS domain Nokia Siemens Networks CR agreement Yes No withdrawn Yes
    C1-121303 Support for PS-only services Intel Corporation CR agreement Yes No withdrawn Yes
11.18
BBAI
C1-121045 TR 24.820 v0.3.0 Ericsson, ST-Ericsson/Zu draft TS/TR information Yes Yes noted No
    C1-121046 Pseudo-CR on UE Notification procedure Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-121518
    C1-121518 Pseudo-CR on UE Notification procedure Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-121652 C1-121046
    C1-121652 Pseudo-CR on UE Notification procedure Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-121518
    C1-121047 Pseudo-CR on non-seamless WLAN offload Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-121519
    C1-121519 Pseudo-CR on non-seamless WLAN offload Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-121047
    C1-121048 Pseudo-CR on UE-EPC network protocols and Network Discovery and Selection Methods Conclusion Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-121520
    C1-121520 Pseudo-CR on UE-EPC network protocols and Network Discovery and Selection Methods Conclusion Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-121048
    C1-121049 Pseudo-CR on TR Conclusion Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-121524
    C1-121524 Pseudo-CR on TR Conclusion Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes postponed No C1-121049
11.18.1
BBAI-BBI
C1-121172 Support of reflective QoS function in the network Nokia Siemens Networks pseudo CR agreement No No withdrawn Yes
    C1-121216 NAT-T detection requirement at Tunnel management procedure with S2b ZTE/Joy pseudo CR agreement Yes Yes revised No C1-121521
    C1-121521 NAT-T detection requirement at Tunnel management procedure with S2b ZTE/Joy pseudo CR agreement Yes Yes agreed No C1-121216
    C1-121217 NAT-T detection requirement at S2c Procedures ZTE/Joy pseudo CR agreement Yes Yes revised No C1-121522
    C1-121522 NAT-T detection requirement at S2c Procedures ZTE/Joy pseudo CR agreement Yes Yes agreed No C1-121217
    C1-121272 Pseudo-CR on Procedures for BBF using H(e)NB Huawei, HiSilicon pseudo CR agreement Yes Yes revised No C1-121523
    C1-121523 Pseudo-CR on Procedures for BBF using H(e)NB Huawei, HiSilicon pseudo CR agreement Yes Yes revised No C1-121727 C1-121272
    C1-121727 Pseudo-CR on Procedures for BBF using H(e)NB Huawei, HiSilicon pseudo CR agreement Yes Yes agreed No C1-121523
11.18.2
BBAI-BBII (CT3)
11.18.3
BBAI-BBIII (CT3)
11.19
Full_MOCN-GERAN
C1-121098 CS fallback to MOCN TeliaSonera discussion discussion Yes Yes noted No
    C1-121099 Introduction of GERAN network sharing capability TeliaSonera CR agreement Yes Yes revised No C1-121512
    C1-121512 Introduction of GERAN network sharing capability TeliaSonera CR agreement Yes Yes agreed No C1-121099
    C1-121246 Encoding of chosen PLMN identity within the skip indicator Research In Motion UK Limited CR agreement Yes Yes postponed No
11.20
RT_ERGSM
11.21
DIDA
C1-121124 OS type leaf Qualcomm Incorporated discussion discussion Yes Yes noted No
    C1-121125 OS type leaf Qualcomm Incorporated /Patrick CR agreement Yes Yes revised No C1-121514
    C1-121514 OS type leaf Qualcomm Incorporated /Patrick CR agreement No Yes postponed No C1-121125
    C1-121221 Adding application identity to ISRP Motorola Mobility, LG Electroncics CR agreement Yes Yes revised No C1-121513
    C1-121513 Adding application identity to ISRP Motorola Mobility, LG Electroncics CR agreement Yes Yes postponed No C1-121221
11.22
PWS_Sec
C1-121105 Security Protection Flags for PWS Vodafone discussion discussion Yes Yes noted No
    C1-121106 Security Protection Flags for PWS Vodafone CR agreement Yes Yes postponed No
11.23
SAMOG_WLAN- CN (CT4)
C1-121112 Changes for the SAMOG WID Alcatel-Lucent/Frank A CR agreement Yes Yes revised No C1-121383
    C1-121383 Changes for the SAMOG WID Alcatel-Lucent/Frank A CR agreement No Yes postponed No C1-121112
    C1-121271 Non-seamless WLAN offload Huawei, HiSilicon CR agreement Yes Yes revised No C1-121515
11.24
LOBSTER-CT (CT4)
11.25
eNR_EPC (CT4)
11.26
PROTOC_SMS_SGs (CT4)
11.27
SAES2, SAES2-CSFB
C1-120986 Miscellaneous corrections to authentication when PDN connection for emergency is (or is being) established NEC / Yannick CR agreement Yes Yes revised No C1-121516
    C1-120997 EUTRAN disabling Renesas Mobile Europe/ Hannu discussion discussion Yes Yes noted No
    C1-120998 EUTRAN disabling correction Renesas Mobile Europe/ Hannu CR agreement Yes Yes postponed No
    C1-121097 Checking T3246 for CS Fallback emergency call InterDigital; Samsung CR agreement Yes Yes agreed No
    C1-121100 Status MSC Selection for MSC in Pool at MME and SGSN TeliaSonera information information Yes Yes noted No
    C1-121101 Dual VLR problem TeliaSonera discussion discussion Yes Yes noted No
    C1-121111 UE Behavior when receiving fatal cause code Alcatel-Lucent/Frank A discussion discussion Yes Yes noted No
    C1-121120 PDN connection retry using default APN when the SM cause value indicates APN is unknown Alcatel-Lucent, HTC/ Jennifer CR agreement Yes No withdrawn Yes
    C1-121121 PDN connection retry using default APN when the ESM cause value indicates APN is unknown Alcatel-Lucent, HTC/ Jennifer CR agreement Yes Yes revised No C1-121567
    C1-121567 PDN connection retry using default APN when the ESM cause value indicates APN is unknown Alcatel-Lucent, HTC CR agreement Yes Yes postponed No C1-121121
    C1-121130 Correction of the error handling for notification messages Nokia Siemens Networks, Renesas Mobile Europe / Robert CR agreement Yes Yes agreed No
    C1-121147 Introduction of LTE Enable Timer NTT DOCOMO discussion discussion Yes Yes noted No
    C1-121148 Introduction of LTE Enable Timer NTT DOCOMO CR agreement Yes Yes revised No C1-121568
    C1-121568 Introduction of LTE Enable Timer NTT DOCOMO CR agreement Yes Yes postponed No C1-121148
    C1-121188 Editorial corrections to 24.301 New Postcom CR agreement Yes Yes revised No C1-121569
    C1-121569 Corrections to 24.301 New Postcom CR agreement Yes Yes agreed No C1-121188
    C1-121189 Clarification on description of triggering UE to enter EMM-DEREGISTERED state New Postcom CR agreement Yes Yes revised No C1-121570
    C1-121570 Clarification on description of triggering UE to enter EMM-DEREGISTERED state New Postcom CR agreement Yes Yes agreed No C1-121189
    C1-121218 ISR deactivation and TAU/combined TAU in connected mode mobility from GERAN to E-UTRAN Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-121571
    C1-121571 ISR deactivation and TAU/combined TAU in connected mode mobility from GERAN to E-UTRAN Qualcomm Incorporated / Lena CR agreement Yes Yes agreed No C1-121218
    C1-121219 ISR deactivation and RAU/combined RAU in connected mode mobility from E-UTRAN to GERAN Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-121572
    C1-121572 ISR deactivation and RAU/combined RAU in connected mode mobility from E-UTRAN to GERAN Qualcomm Incorporated / Lena CR agreement Yes Yes agreed No C1-121219
    C1-121224 Clarification of the inclusion of "EPS bearer context status IE" in ESR. Samsung/Ricky CR agreement Yes Yes agreed No
    C1-121225 Use of existing NAS signalling connection for uplink signalling Samsung/Ricky, NEC CR agreement Yes Yes revised No C1-121573
    C1-121573 Use of existing NAS signalling connection for uplink signalling Samsung/Ricky, NEC CR agreement Yes Yes revised No C1-121655 C1-121225
    C1-121655 Use of existing NAS signalling connection for uplink signalling Samsung, NEC CR agreement Yes Yes postponed No C1-121573
    C1-121226 Use of existing PS signalling connection for uplink signalling Samsung/Ricky, NEC CR agreement Yes Yes revised No C1-121574
    C1-121574 Use of existing PS signalling connection for uplink signalling Samsung/Ricky, NEC CR agreement Yes Yes revised No C1-121656 C1-121226
    C1-121656 Use of existing PS signalling connection for uplink signalling Samsung/Ricky, NEC CR agreement Yes Yes postponed No C1-121574
    C1-121256 Alternative actions on local release of NAS signalling connection RIM, Qualcomm Inc (Chen-Ho) CR agreement Yes Yes revised No C1-121371
    C1-121371 Enhancements on local release of NAS signalling connection RIM, Qualcomm Inc (Chen-Ho) CR agreement Yes Yes revised No C1-121654 C1-121256
    C1-121654 Enhancements on local release of NAS signalling connection Research In Motion UK Ltd., HTC CR agreement Yes Yes postponed No C1-121371
    C1-121263 E-UTRAN capability disable for CS/PS mode 2 UE Huawei, HiSilicon CR agreement Yes Yes revised No C1-121575
    C1-121575 E-UTRAN capability disable for CS/PS mode 2 UE Huawei, HiSilicon CR agreement Yes Yes revised No C1-121696 C1-121263
    C1-121696 E-UTRAN capability disable for CS/PS mode 2 UE Huawei, HiSilicon CR agreement Yes Yes revised No C1-121722 C1-121575
    C1-121722 E-UTRAN capability disable for CS/PS mode 2 UE Huawei, HiSilicon CR agreement Yes Yes revised No C1-121737 C1-121696
    C1-121737 E-UTRAN capability disable for CS/PS mode 2 UE Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121722
    C1-121264 Release of NAS signalling connection before selecting to 2G or 3G Huawei, HiSilicon CR agreement Yes Yes revised No C1-121576
    C1-121576 Release of NAS signalling connection before selecting to 2G or 3G Huawei, HiSilicon CR agreement Yes Yes revised No C1-121728 C1-121264
    C1-121728 Release of NAS signalling connection before selecting to 2G or 3G Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121576
    C1-121265 Congestion control for 1xCS fallback emergency call Huawei, HiSilicon, HTC CR agreement Yes Yes revised No C1-121578
    C1-121578 Congestion control for 1xCS fallback emergency call Huawei, HiSilicon, HTC CR agreement Yes Yes agreed No C1-121265
    C1-121266 Allowing emergency CSFB when network is congested Huawei, HiSilicon, HTC CR agreement Yes Yes revised No C1-121577
    C1-121577 Allowing emergency CSFB when network is congested Huawei, HiSilicon, HTC CR agreement Yes Yes agreed No C1-121266
    C1-121270 Correction on IE names and IE reference Huawei, HiSilicon CR agreement Yes Yes agreed No
11.28
TEI11 and other WIDs
C1-121167 Correction of WLAN_Location Nokia Siemens Networks/ Nokia CR agreement Yes Yes revised No C1-121380
    C1-121380 Correction of WLAN_Location Nokia Siemens Networks/ Nokia CR agreement Yes Yes postponed No C1-121167
    C1-121168 Discussion on ANDSF Validity Conditions Nokia Siemens Networks/ Nokia discussion discussion Yes Yes noted No
    C1-121169 Correction to the validity constraint within ISMP Nokia Siemens Networks/ Nokia CR agreement Yes Yes revised No C1-121381
    C1-121381 Correction to the validity constraint within ISMP Nokia Siemens Networks/ Nokia CR agreement No Yes postponed No C1-121169
    C1-121170 Correction to the validity constraint within ISRP Nokia Siemens Networks/ Nokia CR agreement Yes Yes revised No C1-121382
    C1-121382 Correction to the validity constraint within ISRP Nokia Siemens Networks/ Nokia CR agreement No Yes postponed No C1-121170
    C1-121171 Remove PMIP qualifier for S2a interface Nokia Siemens Networks CR agreement Yes Yes revised No C1-121384
    C1-121384 Remove PMIP qualifier for S2a interface Nokia Siemens Networks, Alcatel-Lucent CR agreement Yes Yes agreed No C1-121171
11.28.1
IMS TEI11
C1-120970 URIs for PS to CS SRVCC Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-120996 URI AT commands way forward Intel discussion discussion Yes Yes noted No
    C1-121085 Missing emergency call procedure in S-CSCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121537
    C1-121537 Missing emergency call procedure in S-CSCF Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121658 C1-121085
    C1-121086 MSC server registration when the access transfer is unsuccessful Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121538
    C1-121538 MSC server registration when the access transfer is unsuccessful Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-121086
    C1-121087 Payload type and codec mapping mismatch Ericsson, ST-Ericsson / Jan discussion discussion Yes Yes noted No
    C1-121088 Adding the related-icid in charging overview Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-121536
    C1-121536 Adding the related-icid in charging overview Ericsson, ST-Ericsson / Jan CR agreement No Yes postponed No C1-121088
    C1-121089 MSC server and deregistration using temporary IMPU Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-121162 Addition of "IMS supported" indicator NTT DOCOMO CR agreement Yes Yes revised No C1-121597
    C1-121179 E-CSCF handling of PAI in responses Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes agreed No
    C1-121180 Unreachable condition modification Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes revised No C1-121729
    C1-121729 Unreachable condition modification Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes agreed No C1-121180
    C1-121181 Addition of CFNRc Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes agreed No
    C1-121430 CUG failure code specification Ericsson, ST-Ericsson/Jorgen CR agreement Yes Yes agreed No C1-121185
    C1-121190 Editorial corrections to 24.229 New Postcom CR agreement Yes Yes agreed No
    C1-121199 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-121547 C1-120571
    C1-121547 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-121659 C1-121199
    C1-121659 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-121732 C1-121547
    C1-121732 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-121659
    C1-121296 Operator defined call barring Orange/Youssef CR discussion Yes Yes revised No C1-121548
    C1-121548 Operator defined call barring Orange/Youssef CR discussion No Yes postponed No C1-121296
    C1-121432 CDIV-302 clarification Orange/Youssef CR discussion Yes Yes revised No C1-121730 C1-121300
    C1-121730 CDIV-302 clarification Orange/Youssef CR discussion Yes Yes postponed No C1-121432
    C1-121305 Discussion paper on the SIP INVITE Header Profile (to E-CSCF) in support of LbyV Andrew Corporation, Telcordia Technologies, AT&T discussion discussion Yes Yes noted No
    C1-121306 Use of Contact Parameters in a 3XX Response from an LRF Andrew Corporation, Telcordia Technologies, AT&T CR agreement Yes Yes revised No C1-121546
    C1-121546 Use of Contact Parameters in a 3XX Response from an LRF Andrew Corporation, Telcordia Technologies, AT&T CR agreement Yes Yes agreed No C1-121306
11.28.2
Other TEI11 issues
C1-120909 Extension of maximum bitrates in QoS IE Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121579 C1-120659
    C1-121579 Extension of maximum bitrates in QoS IE Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-120909
    C1-120910 Extension of maximum bitrates in QoS IE Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121580 C1-120660
    C1-121580 Extension of maximum bitrates in QoS IE Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-120910
    C1-120912 Traffic flow aggregate description and TFT IE extension Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121581
    C1-121581 Traffic flow aggregate description and TFT IE extension Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121662 C1-120912
    C1-121662 Traffic flow aggregate description and TFT IE extension Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-121581
    C1-120913 Traffic flow aggregate description and TFT IE extension Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121582
    C1-121582 Traffic flow aggregate description and TFT IE extension Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-121663 C1-120913
    C1-121663 Traffic flow aggregate description and TFT IE extension Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-121582
    C1-120923 Alignment of response codes ST-Ericsson, Ericsson / Magnus CR agreement Yes Yes revised No C1-121583
    C1-121583 Alignment of response codes ST-Ericsson, Ericsson / Magnus CR agreement Yes Yes agreed No C1-120923
    C1-120924 Removal of editor’s note for security aspects of public warning systems in Rel-11 ST-Ericsson, Ericsson / Magnus CR agreement Yes Yes agreed No
    C1-120925 Response to +CNEM=? is missing ST-Ericsson, Ericsson / Magnus CR agreement Yes Yes agreed No
    C1-120926 Correction of value range for ST-Ericsson, Ericsson / Magnus CR agreement Yes Yes agreed No
    C1-120982 NAI used for authentication Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-120983 NAI used for authentication Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-121377
    C1-121377 NAI used for authentication Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-120983
    C1-120987 Correction to TAU trigger for the support of terminating access domain selection for voice calls NEC / Yannick CR agreement Yes Yes revised No C1-121584
    C1-121584 Correction to TAU trigger for the support of terminating access domain selection for voice calls NEC / Yannick CR agreement Yes Yes agreed No C1-120987
    C1-120988 Correction to RAU trigger for the support of terminating access domain selection for voice calls NEC / Yannick CR agreement Yes Yes revised No C1-121585
    C1-121585 Correction to RAU trigger for the support of terminating access domain selection for voice calls NEC / Yannick CR agreement Yes Yes agreed No C1-120988
    C1-120990 added to result codes +CSSI and +CSSU ST-Ericsson, Ericsson / Magnus CR agreement Yes Yes revised No C1-121586
    C1-121586 added to result codes +CSSI and +CSSU ST-Ericsson, Ericsson / Magnus CR agreement Yes Yes agreed No C1-120990
    C1-120994 TAU rejected by the network with cause 17 Acer Incorporated CR agreement Yes Yes revised No C1-121587
    C1-121587 TAU rejected by the network with cause 17 Acer Incorporated CR agreement No Yes postponed No C1-120994
    C1-120995 Timer of mobility management in MM state 9 Acer Incorporated CR agreement Yes Yes revised No C1-121588
    C1-121588 Timer of mobility management in MM state 9 Acer Incorporated CR agreement Yes Yes postponed No C1-120995
    C1-121033 Update of AT command +CMUX Qualcomm Incorporated, Renesas Mobile Europe / Lena CR agreement Yes Yes agreed No
    C1-121036 FANR capability indication Qualcomm Incorporated, China Mobile Com. Corporation / Lena CR agreement Yes Yes revised No C1-121589
    C1-121589 FANR capability indication Qualcomm Incorporated, China Mobile Com. Corporation / Lena CR agreement Yes Yes agreed No C1-121036
    C1-121126 APN leaf usage Qualcomm Incorporated /Patrick CR agreement Yes Yes revised No C1-121378
    C1-121378 APN leaf usage Qualcomm Incorporated /Patrick CR agreement Yes Yes agreed No C1-121126
    C1-121127 USIM file usage for PWS message reception Qualcomm Incorporated /Patrick CR agreement Yes Yes postponed No
    C1-121131 Correction to the duplication detection mechanism Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-121379
    C1-121379 Correction to the duplication detection mechanism Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-121131
    C1-121151 Application of ESM backoff Timer when UE received ESM cause #50 or #51 NTT DOCOMO discussion discussion Yes Yes noted No
    C1-121152 Application of ESM backoff Timer when UE received ESM cause #50 or #51(Alt.1) NTT DOCOMO CR agreement Yes No withdrawn Yes
    C1-121153 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.1) NTT DOCOMO CR agreement Yes No withdrawn Yes
    C1-121154 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt2) NTT DOCOMO CR agreement Yes No withdrawn Yes
    C1-121155 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.2) NTT DOCOMO CR agreement Yes No withdrawn Yes
    C1-121156 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.3) NTT DOCOMO CR agreement Yes Yes revised No C1-121590
    C1-121590 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.3) NTT DOCOMO CR agreement Yes Yes revised No C1-121664 C1-121156
    C1-121664 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.3) NTT DOCOMO CR agreement Yes Yes revised No C1-121733 C1-121590
    C1-121733 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.3) NTT DOCOMO CR agreement Yes Yes agreed No C1-121664
    C1-121157 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.3) NTT DOCOMO CR agreement Yes Yes revised No C1-121591
    C1-121591 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.3) NTT DOCOMO CR agreement Yes Yes revised No C1-121665 C1-121157
    C1-121665 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.3) NTT DOCOMO CR agreement Yes Yes revised No C1-121734 C1-121591
    C1-121734 Application of ESM backoff Timer when UE received ESM cause #50 or #51 (Alt.3) NTT DOCOMO CR agreement Yes Yes agreed No C1-121665
    C1-121163 Addition of "IMS supported" indicator NTT DOCOMO CR agreement Yes No withdrawn Yes
    C1-121164 Addition of "IMS supported" indicator NTT DOCOMO CR agreement Yes No withdrawn Yes
    C1-121165 Addition of SM-backoff timer handling for NW initiated PDN connectivity deactivation NTT DOCOMO CR agreement Yes Yes revised No C1-121592
    C1-121592 Addition of SM-backoff timer handling for NW initiated PDN connectivity deactivation NTT DOCOMO CR agreement Yes Yes revised No C1-121666 C1-121165
    C1-121666 Addition of SM-backoff timer handling for NW initiated PDN connectivity deactivation NTT DOCOMO CR agreement Yes Yes revised No C1-121723 C1-121592
    C1-121723 Addition of SM-backoff timer handling for NW initiated PDN connectivity deactivation NTT DOCOMO CR agreement Yes Yes postponed No C1-121666
    C1-121166 Addition of SM-backoff timer handling for NW initiated PDN connectivity deactivation NTT DOCOMO CR agreement Yes Yes revised No C1-121593
    C1-121593 Addition of SM-backoff timer handling for NW initiated PDN connectivity deactivation NTT DOCOMO CR agreement Yes Yes revised No C1-121667 C1-121166
    C1-121667 Addition of SM-backoff timer handling for NW initiated PDN connectivity deactivation NTT DOCOMO CR agreement Yes Yes postponed No C1-121593
    C1-121187 Correction to incomplete title of reference New Postcom CR agreement Yes Yes agreed No
    C1-121191 MO SMS when T3346 is running InterDigital Communications LLC CR agreement Yes Yes rejected No
    C1-121201 Clarification to the handling of the Local Emergency Numbers List HTC CR agreement Yes Yes revised No C1-121605
    C1-121605 Handling of the Local Emergency Numbers List HTC, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-121201
    C1-121202 Clarification to the handling of the Local Emergency Numbers List HTC CR agreement Yes Yes revised No C1-121606
    C1-121606 Handling of the Local Emergency Numbers List HTC, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-121202
    C1-121207 Clarification to the GMM cause #9 HTC CR agreement Yes Yes revised No C1-121607
    C1-121607 Clarification to the GMM cause #9 HTC CR agreement Yes Yes agreed No C1-121207
    C1-121208 Clarification to the Reject cause IE HTC CR agreement No No withdrawn Yes
    C1-121209 Clarification to the description of GPRS UPDATE Status HTC CR agreement Yes Yes revised No C1-121608
    C1-121608 Clarification to the description of GPRS UPDATE Status HTC CR agreement Yes Yes agreed No C1-121209
    C1-121222 Service Request following redirection to E-UTRAN Motorola Mobility CR agreement Yes Yes revised No C1-121609
    C1-121609 Service Request following redirection to E-UTRAN Motorola Mobility CR agreement Yes No withdrawn Yes C1-121222
    C1-121223 Inclusion of T3246 condition when reselecting to CS due to Service Reject cause #22 Samsung/Ricky, Interdigital Communications LLC CR agreement Yes Yes agreed No C1-120281
    C1-121245 Removal of security for ETWS/PWS over E-UTRAN RIM / Richard CR agreement Yes Yes agreed No
    C1-121258 T3396 for a well-known APN LG Electronics CR agreement Yes Yes postponed No
    C1-121259 CSFB bearer suspension failure LG Electronics CR agreement Yes Yes revised No C1-121610
    C1-121610 CSFB bearer suspension failure LG Electronics CR agreement No Yes postponed No C1-121259
    C1-121260 Correction of detach procedure collision LG Electronics, Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-120676
    C1-121261 Correction of detach procedure collision LG Electronics, Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-120677
    C1-121267 Discussion on HPLMN selection in network sharing Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-121268 Regain normal services for limited UE Huawei, HiSilicon CR agreement Yes Yes revised No C1-121611
    C1-121611 Regain normal services for limited UE Huawei, HiSilicon CR agreement No Yes postponed No C1-121268
    C1-121269 Correction on location registration task state Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-121515 Non-seamless WLAN offload Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121271
    C1-121276 Handling of the ePLMN list on receipt of #14 in S1 mode Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-121277 Handling of the ePLMN list on receipt of #14 Huawei, HiSilicon CR agreement Yes Yes revised No C1-121612
    C1-121612 Handling of the ePLMN list on receipt of #14 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-121277
    C1-121278 Setting of the Update status for a UE which is IMSI attached for non-EPS services Huawei, HiSilicon, InterDigital Communications LLC CR agreement Yes Yes agreed No
    C1-121279 Security mechanisms for tunnel setup using IPsec and IKEv2 Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-121284 Technology annex for non-3GPP access to EPC Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-121452 Correction of TFT description ZTE/Yingzhe CR agreement Yes Yes revised No C1-121660 C1-121312
    C1-121660 Correction of TFT description ZTE/Yingzhe CR agreement Yes Yes agreed No C1-121452
    C1-121331 Alignment of disconnecting PDN connection CATT CR agreement Yes Yes agreed No
    C1-121332 Alignment of disconnecting PDN connection CATT CR agreement Yes Yes agreed No
    C1-121333 Correction of APN based congestion control CATT CR agreement Yes Yes revised No C1-121637
    C1-121637 Correction of APN based congestion control CATT CR agreement Yes Yes revised No C1-121738 C1-121333
    C1-121738 Correction of APN based congestion control CATT CR agreement Yes Yes agreed No C1-121637
    C1-121334 Correction of APN based congestion control CATT CR agreement Yes Yes revised No C1-121638
    C1-121638 Correction of APN based congestion control CATT CR agreement Yes Yes revised No C1-121739 C1-121334
    C1-121739 Correction of APN based congestion control CATT CR agreement Yes Yes agreed No C1-121638
    C1-121335 Correction of high priority user CATT CR agreement Yes Yes agreed No
    C1-121336 Correction of high priority user CATT CR agreement Yes Yes revised No C1-121731
    C1-121731 Correction of high priority user CATT CR agreement No Yes postponed No C1-121336
    C1-121476 Clarification on the EPS re-use of the Traffic Flow Template IE format Ericsson, ST Ericsson CR agreement Yes Yes revised No C1-121661
    C1-121661 Clarification on the EPS re-use of the Traffic Flow Template IE format Ericsson, ST Ericsson CR agreement Yes Yes agreed No C1-121476
    C1-121516 Miscellaneous corrections to authentication when PDN connection for emergency is (or is being) established NEC / Yannick CR agreement Yes Yes agreed No C1-120986
11.28.3
new / updated Rel-11 WIDs
C1-120911 Updated SIMTC WID Ericsson, ST-Ericsson, Alcatel-Lucent / Mikael revised WID agreement Yes Yes revised No C1-121363
    C1-121363 Updated SIMTC WID Ericsson, ST-Ericsson, Alcatel-Lucent / Mikael revised WID agreement Yes Yes agreed No C1-120911
    C1-121018 Revised WID on network provided information within IMS Huawei/Lili revised WID agreement Yes Yes revised No C1-121364
    C1-121364 Revised WID on network provided information within IMS Huawei/Lili revised WID agreement Yes Yes endorsed No C1-121018
    C1-121215 Update WID on LOBSTER-CT ZTE/Joy revised WID agreement Yes Yes revised No C1-121365
    C1-121365 Update WID on LOBSTER-CT ZTE/Joy revised WID agreement Yes Yes endorsed No C1-121215
    C1-121339 vSRVCC WID update NEC revised WID agreement Yes Yes revised No C1-121668
    C1-121668 vSRVCC WID update NEC revised WID agreement Yes Yes revised No C1-121720 C1-121339
    C1-121720 vSRVCC WID update NEC revised WID agreement Yes Yes agreed No C1-121668
    C1-121358 Revised WID for Media Resource Broker Vodafone revised WID agreement Yes Yes revised No C1-121669
    C1-121669 Revised WID for Media Resource Broker Vodafone revised WID agreement Yes Yes agreed No C1-121358
12
Rel-12
12.1
Release 12 documents for information
12.2
LIMONET-LIPA
12.3
LIMONET-SIPTO (CT4)
12.4
new / updated Rel-12 WIDs
13
Output Liaison Statements
C1-121360 LS on capability to express a match-all filter using existing TFT filter attributes current meeting o/g LS approval Yes Yes revised No C1-121615
    C1-121615 LS on capability to express a match-all filter using existing TFT filter attributes current meeting o/g LS approval Yes No withdrawn Yes C1-121360
    C1-121361 Reply LS on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (Transit IOI) current meeting o/g LS approval Yes Yes revised No C1-121616
    C1-121616 Reply LS on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (Transit IOI) current meeting o/g LS approval Yes Yes agreed No C1-121361
    C1-120985 Reply LS on clarification of UE behaviour when operating in CS-PS mode 1 of operation NEC / Yannick o/g LS agreement Yes No withdrawn Yes
    C1-121035 Reply LS on clarification of UE behaviour when operating in CS/PS mode 1 of operation Qualcomm Incorporated / Lena o/g LS agreement Yes Yes revised No C1-121602
    C1-121602 Reply LS on clarification of UE behaviour when operating in CS/PS mode 1 of operation Qualcomm Incorporated / Lena o/g LS agreement Yes Yes revised No C1-121623 C1-121035
    C1-121623 Reply LS on clarification of UE behaviour when operating in CS/PS mode 1 of operation current meeting o/g LS agreement Yes Yes revised No C1-121721 C1-121602
    C1-121721 Reply LS on clarification of UE behaviour when operating in CS/PS mode 1 of operation current meeting o/g LS agreement Yes Yes agreed No C1-121623
    C1-121362 Reply LS on further VoLTE charging requirements current meeting o/g LS approval Yes Yes agreed No
    C1-121107 Draft LS on Disabling receipt of PWS Warning Notifications Vodafone o/g LS agreement Yes No withdrawn Yes
    C1-121304 Reply LS on Updating UE’s Whitelist after Manual Selection to Hybrid CSG Cell Intel Corporation o/g LS agreement Yes Yes revised No C1-121353
    C1-121353 LS on Updating UE’s Whitelist after Manual Selection to Hybrid CSG Cell current meeting o/g LS agreement Yes Yes agreed No C1-121304
    C1-121307 LS on HPLMN selection in network sharing Huawei, HiSilicon o/g LS agreement Yes No withdrawn Yes
    C1-121352 Reply to: IBCF handling of different II-NNI types (C3-120494) current meeting o/g LS approval No No withdrawn Yes
    C1-121354 Reply to: Reply LS on issues on inbound CSG mobility failure (GP-120443) current meeting o/g LS approval No No withdrawn Yes
    C1-121355 LS reply to SA5 on RAVEL charging principles current meeting o/g LS approval Yes Yes revised No C1-121697
    C1-121697 LS reply to SA5 on RAVEL charging principles current meeting o/g LS approval Yes Yes agreed No C1-121355
    C1-121356 LS reply to SA5 on further VoLTE charging requirements current meeting o/g LS approval Yes Yes revised No C1-121698
    C1-121698 LS reply to SA5 on further VoLTE charging requirements current meeting o/g LS approval Yes Yes agreed No C1-121356
    C1-121359 Clarifications for congestion control for combined MM procedures current meeting o/g LS approval Yes Yes revised No C1-121699
    C1-121699 Clarifications for congestion control for combined MM procedures current meeting o/g LS approval Yes Yes agreed No C1-121359
    C1-121376 LS on Disabling receipt of PWS Warning Notifications current meeting o/g LS approval Yes Yes revised No C1-121617
    C1-121617 LS on Disabling receipt of PWS Warning Notifications current meeting o/g LS approval Yes Yes agreed No C1-121376
    C1-121387 Reply LS on PDN connection re-establishment by IR.92 UE current meeting o/g LS approval Yes Yes revised No C1-121618
    C1-121618 Reply LS on PDN connection re-establishment by IR.92 UE current meeting o/g LS approval No Yes postponed No C1-121387
    C1-121388 LS on SRVCC/vSRVCC handover indication from the AS layer current meeting o/g LS approval Yes Yes revised No C1-121619
    C1-121619 LS on SRVCC/vSRVCC handover indication from the AS layer current meeting o/g LS approval Yes Yes revised No C1-121701 C1-121388
    C1-121701 LS on SRVCC/vSRVCC handover indication from the AS layer current meeting o/g LS approval Yes Yes agreed No C1-121619
    C1-121389 Operator policy requirements on setting of SRVCC and vSRVCC capabilities current meeting o/g LS approval Yes Yes revised No C1-121620
    C1-121620 Operator policy requirements on setting of SRVCC and vSRVCC capabilities current meeting o/g LS approval Yes Yes agreed No C1-121389
    C1-121517 LS on EUTRA disabling current meeting o/g LS approval Yes Yes revised No C1-121621
    C1-121621 LS on EUTRA disabling current meeting o/g LS approval Yes Yes revised No C1-121700 C1-121517
    C1-121700 LS on EUTRA disabling current meeting o/g LS approval Yes Yes agreed No C1-121621
    C1-121532 LS on quality of protection (qop) for GBA_Digest current meeting o/g LS approval Yes Yes revised No C1-121622
    C1-121622 LS on quality of protection (qop) for GBA_Digest current meeting o/g LS approval Yes Yes agreed No C1-121532
14
Late and misplaced documents
C1-120914 WID on "Stage 3 for System Improvements to Machine-Type Communications" Alcatel-Lucent/ Jennifer revised WID agreement No No withdrawn Yes
    C1-120984 NONCE_UE replayed only for mapped security context Renesas/Marko CR agreement Yes Yes postponed No
    C1-121022 Alignment of clause 9 for PWS one2many CR agreement Yes Yes postponed No C1-120497
    C1-121108 NAS changes for cause code 17 during attach Alcatel-Lucent/Verizon Wireless /Frank A CR agreement No No withdrawn Yes
    C1-121109 NAS changes for cause code 17 during tracking area update Alcatel-Lucent/Verizon Wireless/ Frank A CR agreement No No withdrawn Yes
    C1-121110 PDN connection request with invalid APN Alcatel-Lucent/Frank A CR agreement No No withdrawn Yes
    C1-121398 void void other discussion No No [not addressed] No
    C1-121399 void void other discussion No No [not addressed] No
    C1-121487 void void other discussion No No [not addressed] No
    C1-121488 void void other discussion No No [not addressed] No
    C1-121489 void void other discussion No No [not addressed] No
    C1-121490 void void other discussion No No [not addressed] No
    C1-121491 void void other discussion No No [not addressed] No
    C1-121492 void void other discussion No No [not addressed] No
    C1-121493 void void other discussion No No [not addressed] No
    C1-121494 void void other discussion No No [not addressed] No
    C1-121495 void void other discussion No No [not addressed] No
    C1-121496 void void other discussion No No [not addressed] No
    C1-121497 void void other discussion No No [not addressed] No
    C1-121498 void void other discussion No No [not addressed] No
    C1-121499 void void other discussion No No [not addressed] No
15
A.O.B.
16
Closing

Created: 2012-05-02 08:36     Last document: C1-121739