Agenda with allocated Tdocs

Created: 2012-02-21 12:53     Last document: C1-120907

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
Opening
2
Agenda and reports
C1-120001 agenda CT1 Chairman agenda agreement Yes Yes noted No
    C1-120002 draft C1-75 report MCC meeting report approval Yes Yes approved No
3
Input liaison statements
C1-120028 LS on Impact of USSD SIP dialogue on PCC (C3-111924) CT3 i/c LS information Yes Yes noted No
    C1-120029 Reply LS on Request to define extensions to H(e)NB to SeGW interface for BBAI (C4-112973) CT4 i/c LS information Yes Yes noted No
    C1-120030 LS on M2M devices with dual priority applications. (CP-110938) TSG CT i/c LS information Yes Yes replied to No
    C1-120031 LLC AM not applicable from Rel-8 (GP-111542) GERAN3 i/c LS action Yes Yes replied to No
    C1-120032 Reply LS on the introduction of FULL-MOCN-GERAN feature (GP-111802) GERAN i/c LS information Yes Yes noted No
    C1-120033 Reply LS on Fast Return after CSFB (GP-111871) GERAN2 i/c LS information Yes Yes noted No
    C1-120034 Reply LS on length of security in PWS (GP-111882) GERAN2 i/c LS information Yes Yes noted No
    C1-120035 LS on issues on inbound CSG mobility failure (GP-111889) GERAN2 i/c LS action Yes Yes replied to No
    C1-120036 Reply LS on agreements on SRVCC from CS to PS (GP-111900) GERAN2 i/c LS information Yes Yes noted No
    C1-120037 LS on peak rate limitations in CT1 specifications for 8C-HSDPA (R2-116476) RAN2 i/c LS action Yes Yes noted No
    C1-120038 LS on NAS->AS indication for access requests subject to EAB (R2-116525) RAN2 i/c LS action Yes Yes replied to No
    C1-120039 Reply LS on length of security in PWS (R2-116558) RAN2 i/c LS information Yes Yes noted No
    C1-120040 Reply LS on requirements for verification of UE messages from H(e)NB to H(e)NB-GW (R3-113147) RAN3 i/c LS information Yes Yes noted No
    C1-120041 LS on FGI 27 in LTE and Single Radio VCC (RP-111769) TSG RAN i/c LS information Yes Yes noted No
    C1-120042 Reply LS on Capability handling of LTE TDD and FDD modes (RP-111770) TSG RAN i/c LS action Yes Yes noted No
    C1-120043 Reply LS on EAB Requirements (S1-113383) SA1 i/c LS information Yes Yes noted No
    C1-120044 Reply LS on Handling of CS emergency call from non CSG member on a CSG cell (S1-113420) SA1 i/c LS information Yes Yes replied to No
    C1-120045 Reply LS on the introduction of FULL-MOCN-GERAN feature (S1-113444) SA1 i/c LS information Yes Yes noted No
    C1-120046 Reply LS on length of security in PWS (S1-113459) SA1 i/c LS information Yes Yes noted No
    C1-120047 LS reply on SRVCC enhancements when UE has several registration flows over E-UTRAN or UTRAN access network (S2-115421) SA2 i/c LS information Yes Yes noted No
    C1-120048 LS on agreements on SRVCC from CS to PS (S2-115422) SA2 i/c LS action Yes Yes noted No
    C1-120049 Reply LS on the introduction of FULL-MOCN-GERAN feature (SP-110867) TSG SA i/c LS information Yes Yes noted No
    C1-120050 LS on PWS support in 3GPP UEs (SP-110890) TSG SA i/c LS action Yes Yes noted No
    C1-120051 New work item on the framework on the identifiers in Future Networks ITU-T SG13 i/c LS information Yes Yes noted No
    C1-120052 Documentation of support for public warning system in 3GPP (SP-110891) TSG SA i/c LS action Yes Yes noted No
    C1-120053 LS on making use of SDP Capability Negotiation optional when offering AVPF for video 3GPP2 TSG-X i/c LS information Yes Yes noted No
    C1-120054 Liaison statement to 3GPP SA5 on further VoLTE charging requirements GSMA CPWP i/c LS information Yes Yes noted No
    C1-120055 Response LS on service awareness in VPLMN (response #2 to CPWP Doc 90_005/ S2-113798) GSMA CPWP i/c LS information Yes Yes noted No
    C1-120068 PWS: Role and architecture of the CBC and CBE nodes (S3-111226) SA3 i/c LS action Yes Yes replied to No
    C1-120101 Response LS on IMSI Paging for CSFB (S2-120405) SA2 i/c LS action Yes Yes noted No
    C1-120102 Reply LS on Limitation on PS voice RAB for Intra UMTS SRVCC (S2-120402) SA2 i/c LS information Yes Yes noted No
    C1-120466 LS (IREG LS_132) to 3GPP CT1/CT4 on usage of XCAP for Voice over IMS GSMA RILTE i/c LS action Yes Yes replied to No
    C1-120477 IREG RILTE LS_134: Supplementary service HOLD and simplex video media. GSMA RILTE i/c LS action Yes Yes replied to No
    C1-120533 LS response to 3GPP CT1 on IMS Interconnection Charging Enhancements for transit scenarios in multi operator environments (Transit IOI) GSMA IREG Packet i/c LS action Yes Yes forwarded to C1-77 No
    C1-120684 LS on requirements for verification of UE messages from H(e)NB to H(e)NB-GW (S3-120205) SA3 i/c LS information Yes Yes forwarded to C1-77 No
    C1-120780 LS on the introduction of extended UE capabilities for dual mode UEs (R2-121009) RAN2 i/c LS information Yes Yes noted No
4
Work organisation
4.1
Meeting schedule
4.2
Work plan and other administrative issues
C1-120003 work plan MCC work plan agreement Yes Yes revised No C1-120887
    C1-120887 work plan MCC work plan agreement Yes Yes noted No C1-120003
    C1-120004 how to request tdoc numbers MCC information information Yes Yes noted No
    C1-120005 CT1 delegate survival guide MCC information information Yes Yes noted No
    C1-120284 proposed new WID template (for information) MCC information information Yes Yes noted No
5
Corrections to Rel-5 and older
5.1
Rel-5 and older: IMS issues
C1-120179 Geo-Redundancy Registration AT&T CR agreement Yes Yes revised No C1-120550
    C1-120550 Geo-Redundancy Registration AT&T CR agreement Yes Yes agreed No C1-120179
    C1-120180 Geo-Redundancy Registration AT&T CR agreement Yes Yes revised No C1-120551
    C1-120551 Geo-Redundancy Registration AT&T CR agreement Yes Yes agreed No C1-120180
    C1-120181 Geo-Redundancy Registration AT&T CR agreement Yes Yes revised No C1-120552
    C1-120552 Geo-Redundancy Registration AT&T CR agreement Yes Yes agreed No C1-120181
    C1-120182 Geo-Redundancy Registration AT&T CR agreement Yes Yes revised No C1-120553
    C1-120553 Geo-Redundancy Registration AT&T CR agreement Yes Yes agreed No C1-120182
    C1-120183 Geo-Redundancy Registration AT&T CR agreement Yes Yes revised No C1-120554
    C1-120554 Geo-Redundancy Registration AT&T CR agreement Yes Yes agreed No C1-120183
    C1-120184 Geo-Redundancy Registration AT&T CR agreement Yes Yes revised No C1-120555
    C1-120555 Geo-Redundancy Registration AT&T CR agreement Yes Yes agreed No C1-120184
    C1-120185 Geo-Redundancy Registration AT&T CR agreement Yes Yes revised No C1-120556
    C1-120556 Geo-Redundancy Registration AT&T CR agreement Yes Yes agreed No C1-120185
5.2
Rel-5 and older: non-IMS issues
6
Rel-6
6.1
IMS2, PRESNC, SEC1-SC
6.2
All other Rel-6 WIs
7
Rel-7
7.1
VCC, CSICS, CSItermS, SMSIP, EMC1, PCC, ServID, MTSI, IMSProtoc, GRUU, FBI, FBI-pcbl, TEI7 (IMS related), +all other IMS related issues
C1-120233 Reference update - Reason header in SIP responses Ericsson,ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-120238 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120558
    C1-120558 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120238
    C1-120239 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120559
    C1-120559 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120239
    C1-120240 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120560
    C1-120560 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120240
    C1-120241 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120561
    C1-120561 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120241
    C1-120242 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120562
    C1-120562 Location Conveyance: Reference Update Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120242
    C1-120243 Location Conveyance: Location Forwarding to MGCF and PSAP Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-120244 Location Conveyance: Location Forwarding to MGCF and PSAP Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-120245 Location Conveyance: Location Forwarding to MGCF and PSAP Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-120246 Location Conveyance: Location Forwarding to MGCF and PSAP Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-120247 Location Conveyance: Location Forwarding to MGCF and PSAP Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120563
    C1-120248 Location Conveyance: Location in ACK and CANCEL Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-120249 Location Conveyance: Location in ACK and CANCEL Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-120250 Location Conveyance: Location in ACK and CANCEL Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-120251 Location Conveyance: Location in ACK and CANCEL Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
    C1-120252 Location Conveyance: Location in ACK and CANCEL Ericsson, ST-Ericsson / Christer CR agreement Yes No withdrawn Yes
7.2
SDoUE, NSP-CR, EVGCS, IVGCS, VGCSflex, TEI7 (non-IMS) + all other non-IMS Rel-7 issues
C1-120155 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120622
    C1-120622 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120155
    C1-120156 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120623
    C1-120623 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120156
    C1-120157 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120624
    C1-120624 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120157
    C1-120158 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120625
    C1-120625 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120158
    C1-120159 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120626
    C1-120626 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120159
    C1-120160 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120627
    C1-120627 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120160
    C1-120161 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120628
    C1-120628 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120161
    C1-120162 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120629
    C1-120629 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120162
    C1-120163 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120630
    C1-120630 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120163
    C1-120164 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120631
    C1-120631 TC-RT: Additional Calling Party Number Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120164
8
Rel-8
8.1
Rel-8 IMS Work Items and issues
C1-120111 Corrections on the conditions of MSRP SDP a=path attribute NTT CR agreement Yes Yes agreed No
    C1-120112 Corrections on the conditions of MSRP SDP a=path attribute NTT CR agreement Yes Yes agreed No
    C1-120113 Corrections on the conditions of MSRP SDP a=path attribute NTT CR agreement Yes Yes agreed No
    C1-120114 Corrections on the conditions of MSRP SDP a=path attribute NTT CR agreement Yes Yes agreed No
    C1-120198 Speech media component NokiaSiemensNetworks CR agreement Yes Yes agreed No
    C1-120199 Speech media component NokiaSiemensNetworks CR agreement Yes Yes agreed No
    C1-120200 Speech media component NokiaSiemensNetworks CR agreement Yes Yes agreed No
    C1-120215 Connection to be used for XCAP NokiaSiemensNetworks; Nokia CR agreement Yes Yes revised No C1-120565
    C1-120565 Connection to be used for XCAP NokiaSiemensNetworks; Nokia CR agreement Yes Yes agreed No C1-120215
    C1-120216 Connection to be used for XCAP NokiaSiemensNetworks, Nokia CR agreement Yes Yes revised No C1-120566
    C1-120566 Connection to be used for XCAP NokiaSiemensNetworks, Nokia CR agreement Yes Yes agreed No C1-120216
    C1-120217 Connection to be used for XCAP NokiaSiemensNetworks, Nokia CR agreement Yes Yes revised No C1-120567
    C1-120567 Connection to be used for XCAP NokiaSiemensNetworks, Nokia CR agreement Yes Yes agreed No C1-120217
    C1-120218 Configuration of XCAP root URI NokiaSiemensNetworks, Nokia CR agreement Yes Yes revised No C1-120573
    C1-120573 Configuration of XCAP root URI NokiaSiemensNetworks, Nokia CR agreement Yes Yes agreed No C1-120218
    C1-120219 Configuration of XCAP root URI NokiaSiemensNetworks, Nokia CR agreement Yes Yes revised No C1-120574
    C1-120574 Configuration of XCAP root URI NokiaSiemensNetworks, Nokia CR agreement Yes Yes agreed No C1-120219
    C1-120220 Configuration of XCAP root URI NokiaSiemensNetworks, Nokia CR agreement Yes Yes revised No C1-120575
    C1-120575 Configuration of XCAP root URI NokiaSiemensNetworks, Nokia CR agreement Yes Yes agreed No C1-120220
    C1-120221 Incorrect XSD for CUG NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120577
    C1-120577 Incorrect XSD for CUG NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120221
    C1-120222 Incorrect XSD for CUG NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120578
    C1-120578 Incorrect XSD for CUG NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120222
    C1-120223 Incorrect XSD for CUG NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120579
    C1-120579 Incorrect XSD for CUG NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120223
    C1-120224 Incorrect XSD for CUG NokiaSiemensNetwork CR agreement Yes Yes revised No C1-120576
    C1-120576 Incorrect XSD for CUG NokiaSiemensNetwork CR agreement Yes Yes agreed No C1-120224
    C1-120300 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-120301 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-120302 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-120303 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120571
    C1-120313 Updating references to IMEI URN and XML body handling drafts Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120580
    C1-120580 Updating references to IMEI URN and XML body handling drafts Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-120313
    C1-120314 Updating references to IMEI URN and XML body handling drafts Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120581
    C1-120581 Updating references to IMEI URN and XML body handling drafts Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-120314
    C1-120315 Updating references to IMEI URN and XML body handling drafts Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120582
    C1-120582 Updating references to IMEI URN and XML body handling drafts Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-120315
    C1-120316 Updating references to IMEI URN and XML body handling drafts Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120583
    C1-120583 Updating references to IMEI URN and XML body handling drafts Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-120316
    C1-120317 Including E-UTRAN acces types in P-Access-Network-Info header field Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120584
    C1-120584 Including E-UTRAN access types in P-Access-Network-Info header field Research in Motion, Deutsche Telekom, Orange, Telecom Italia, NTT Docomo, Motorola Mobility, Samsung, Belgacom CR agreement Yes Yes agreed No C1-120317
    C1-120444 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120586
    C1-120586 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120816 C1-120444
    C1-120816 CDIV building of Index Deutsche Telekom CR agreement Yes Yes agreed No C1-120586
    C1-120445 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120587
    C1-120587 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120817 C1-120445
    C1-120817 CDIV building of Index Deutsche Telekom CR agreement Yes Yes agreed No C1-120587
    C1-120446 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120588
    C1-120588 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120818 C1-120446
    C1-120818 CDIV building of Index Deutsche Telekom CR agreement Yes Yes agreed No C1-120588
    C1-120447 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120589
    C1-120589 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120819 C1-120447
    C1-120819 CDIV building of Index Deutsche Telekom CR agreement Yes Yes agreed No C1-120589
    C1-120448 MCID History Info Deutsche Telekom CR agreement Yes Yes revised No C1-120590
    C1-120590 MCID History Info Deutsche Telekom CR agreement Yes Yes postponed No C1-120448
    C1-120449 MCID History Info Deutsche Telekom CR agreement Yes Yes revised No C1-120591
    C1-120591 MCID History Info Deutsche Telekom CR agreement Yes Yes postponed No C1-120449
    C1-120450 MCID History Info Deutsche Telekom CR agreement Yes Yes revised No C1-120592
    C1-120592 MCID History Info Deutsche Telekom CR agreement Yes Yes postponed No C1-120450
    C1-120451 MCID History Info Deutsche Telekom CR agreement Yes Yes revised No C1-120593
    C1-120593 MCID History Info Deutsche Telekom CR agreement Yes Yes postponed No C1-120451
    C1-120456 Updating of UUS references Alcatel-Lucent / Keith Drage CR agreement Yes Yes Technically endorsed with one sustained objection No C1-115016
    C1-120457 Updating of UUS references Alcatel-Lucent / Keith Drage CR agreement Yes Yes Technically endorsed with one sustained objection No C1-115017
    C1-120458 Updating of UUS references Alcatel-Lucent / Keith Drage CR agreement Yes Yes Technically endorsed with one sustained objection No C1-115018
    C1-120459 Updating of UUS references Alcatel-Lucent / Keith Drage CR agreement Yes Yes Technically endorsed with one sustained objection No C1-115019
    C1-120564 Connection to be used for XCAP Nokia Siemens Networks, Nokia CR agreement Yes Yes agreed No
    C1-120572 Configuration of XCAP root URI Nokia Siemens Networks, Nokia CR agreement Yes Yes agreed No
    C1-120585 CDIV building of Index Deutsche Telekom CR agreement Yes Yes revised No C1-120815
    C1-120815 CDIV building of Index Deutsche Telekom CR agreement Yes Yes agreed No C1-120585
8.2
Rel-8 non-IMS Work Items and issues
C1-120012 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion / Atle CR agreement Yes Yes revised No C1-120493
    C1-120493 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion / Atle CR agreement Yes Yes agreed No C1-120012
    C1-120013 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion / Atle CR agreement Yes Yes revised No C1-120494
    C1-120494 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion / Atle CR agreement Yes Yes agreed No C1-120013
    C1-120014 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion / Atle CR agreement Yes Yes revised No C1-120495
    C1-120495 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion / Atle CR agreement Yes Yes agreed No C1-120014
    C1-120015 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion / Atle CR agreement Yes Yes revised No C1-120496
    C1-120496 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion / Atle CR agreement Yes Yes revised No C1-120804 C1-120015
    C1-120804 Redocumentation and alignment of the public warning system Ericsson, ST-Ericsson, one2many, Renesas Mobile Europe, Research in Motion, LG Electronics, NTT DOCOMO CR agreement Yes Yes agreed No C1-120496
    C1-120086 Removal of LLC Acknowledged mode Renesas Mobile Europe / Hannu CR agreement Yes Yes revised No C1-120523
    C1-120523 Removal of LLC Acknowledged mode Renesas Mobile Europe, Ericsson, ST-Ericsson, Deutsche Telecom CR agreement Yes Yes agreed No C1-120086
    C1-120087 Removal of LLC Acknowledged mode Renesas Mobile Europe / Hannu CR agreement Yes Yes revised No C1-120524
    C1-120524 Removal of LLC Acknowledged mode Renesas Mobile Europe / Hannu CR agreement Yes Yes agreed No C1-120087
    C1-120088 Removal of LLC Acknowledged mode Renesas Mobile Europe / Hannu CR agreement Yes Yes revised No C1-120525
    C1-120525 Removal of LLC Acknowledged mode Renesas Mobile Europe / Hannu CR agreement Yes Yes agreed No C1-120088
    C1-120089 Removal of LLC Acknowledged mode Renesas Mobile Europe / Hannu CR agreement Yes Yes revised No C1-120526
    C1-120526 Removal of LLC Acknowledged mode Renesas Mobile Europe / Hannu CR agreement Yes Yes agreed No C1-120089
    C1-120094 alignement of clause 9 of the PWS one2many CR agreement Yes Yes rejected No
    C1-120095 alignement of clause 9 of the PWS one2many CR agreement Yes Yes rejected No
    C1-120096 alignement of clause 9 of the PWS one2many CR agreement Yes Yes rejected No
    C1-120097 alignement of clause 9 of the PWS one2many CR agreement Yes Yes revised No C1-120497
    C1-120135 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO discussion discussion Yes Yes noted No
    C1-120136 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO CR agreement Yes Yes revised No C1-120632
    C1-120632 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO CR agreement No No withdrawn Yes C1-120136
    C1-120137 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO CR agreement Yes Yes revised No C1-120633
    C1-120633 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO CR agreement No No withdrawn Yes C1-120137
    C1-120138 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO CR agreement Yes Yes revised No C1-120634
    C1-120634 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO CR agreement No No withdrawn Yes C1-120138
    C1-120139 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO CR agreement Yes Yes revised No C1-120635
    C1-120635 Clarification of ISR activation condition for Periodic RAU NTT DOCOMO CR agreement No No withdrawn Yes C1-120139
    C1-120140 Clarification of Combined RA/LA update triggers by CSFB UE NTT DOCOMO discussion discussion Yes Yes noted No
    C1-120141 Clarification of Combined RA/LA update triggers by CSFB UE NTT DOCOMO CR agreement Yes Yes revised No C1-120636
    C1-120636 Correction of Combined RA/LA update triggers by CSFB UE NTT DOCOMO CR agreement Yes Yes agreed No C1-120141
    C1-120142 Clarification of Combined RA/LA update triggers by CSFB UE NTT DOCOMO CR agreement Yes Yes revised No C1-120637
    C1-120637 Correction of Combined RA/LA update triggers by CSFB UE NTT DOCOMO CR agreement Yes Yes agreed No C1-120142
    C1-120143 Clarification of Combined RA/LA update triggers by CSFB UE NTT DOCOMO CR agreement Yes Yes revised No C1-120638
    C1-120638 Correction of Combined RA/LA update triggers by CSFB UE NTT DOCOMO CR agreement Yes Yes agreed No C1-120143
    C1-120144 Clarification of Combined RA/LA update triggers by CSFB UE NTT DOCOMO CR agreement Yes Yes revised No C1-120639
    C1-120639 Correction of Combined RA/LA update triggers by CSFB UE NTT DOCOMO CR agreement Yes Yes agreed No C1-120144
    C1-120295 Discussion of conditions for selecting GERAN or UTRAN due to no IMS voice Research In Motion UK Ltd. discussion discussion Yes Yes noted No
    C1-120296 Correcting conditions for selecting GERAN or UTRAN due to no IMS voice Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-120297 Correcting conditions for selecting GERAN or UTRAN due to no IMS voice Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-120298 Correcting conditions for selecting GERAN or UTRAN due to no IMS voice Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-120299 Correcting conditions for selecting GERAN or UTRAN due to no IMS voice Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120490
    C1-120376 Essential correction to MME behaviour in case of lower layer failure context deactivation ZTE (Yingzhe) CR agreement Yes Yes rejected No C1-115048
    C1-120377 Essential correction to MME behaviour in case of lower layer failure context deactivation ZTE (Yingzhe) CR agreement Yes Yes rejected No C1-115049
    C1-120378 Essential correction to MME behaviour in case of lower layer failure context deactivation ZTE (Yingzhe) CR agreement Yes Yes rejected No C1-115050
    C1-120379 Essential correction to MME behaviour in case of lower layer failure context deactivation ZTE (Yingzhe) CR agreement Yes Yes revised No C1-120640 C1-115051
9
Rel-9
9.1
CRS, eCAT-SS, eMMTel-CC, IMSProtoc3, IMS_SCC-SPI, IMS_SCC-ICS, IMS_SCC-ICS_I1, EMC2, MEDIASEC_CORE, PAN_EPNM, IMS_EMER_GPRS_EPS (24.229), IMS_EMER_GPRS_EPS-SRVCC, TEI9 (IMS related), +all other Rel-9 IMS issues
C1-120098 Reference update for MIKEY_TICKET RFC Vodafone CR agreement Yes Yes revised No C1-120568
    C1-120568 Reference update for MIKEY_TICKET RFC Vodafone CR agreement No No [not addressed] No C1-120098
    C1-120099 Reference update for MIKEY_TICKET RFC Vodafone CR agreement Yes Yes revised No C1-120569
    C1-120569 Reference update for MIKEY_TICKET RFC Vodafone CR agreement No No [not addressed] No C1-120099
    C1-120100 Reference update for MIKEY_TICKET RFC Vodafone CR agreement Yes Yes revised No C1-120570
    C1-120570 Reference update for MIKEY_TICKET RFC Vodafone CR agreement No No [not addressed] No C1-120100
    C1-120345 IETF i-d update Huawei, HiSilicon CR agreement Yes No withdrawn Yes
    C1-120346 IETF i-d update Huawei, HiSilicon CR agreement Yes No withdrawn Yes
    C1-120349 Updating IMEI URN draft reference Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120491
    C1-120491 Updating IMEI URN draft reference nn CR agreement Yes Yes agreed No C1-120349
    C1-120350 Updating IMEI URN draft reference Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120492
    C1-120492 Updating IMEI URN draft reference nn CR agreement Yes Yes agreed No C1-120350
    C1-120392 Clarifications on non UE detectable emergency call Huawei CR agreement Yes No withdrawn Yes
    C1-120393 Clarifications on non UE detectable emergency call Huawei CR agreement Yes No withdrawn Yes
    C1-120394 Clarifications on non UE detectable emergency call Huawei CR agreement Yes No withdrawn Yes
    C1-120599 Correction of 19.2.1 Procedures for adding new media on controllee UE by controller UE ETRI CR agreement Yes Yes revised No C1-120843
    C1-120843 Correction of 19.2.1 Procedures for adding new media on controllee UE by controller UE ETRI CR agreement Yes Yes agreed No C1-120599
9.2
IMS_EMER_GPRS_EPS (non-IMS), SSAC, VAS4SMS, PWS-St3, eANDSF, MUPSAP, LCS_EPS-CPS ,EHNB-CT1, TEI9 (non-IMS issues) + all other Rel-9 non-IMS issues
C1-120115 UE behavior when UE fails to attach emergency bearers NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu discussion discussion Yes Yes noted No
    C1-120116 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120499
    C1-120499 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120806 C1-120116
    C1-120806 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes agreed No C1-120499
    C1-120117 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120500
    C1-120500 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120807 C1-120117
    C1-120807 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes agreed No C1-120500
    C1-120118 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120501
    C1-120501 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120808 C1-120118
    C1-120808 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes agreed No C1-120501
    C1-120119 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120502
    C1-120502 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120809 C1-120119
    C1-120809 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes agreed No C1-120502
    C1-120120 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120503
    C1-120810 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes agreed No C1-120503
    C1-120132 Modification of the location registration method in CS fallback procedure NTT DOCOMO CR agreement Yes Yes revised No C1-120641
    C1-120641 Modification of the location registration method in CS fallback procedure NTT DOCOMO CR agreement Yes Yes agreed No C1-120132
    C1-120133 Modification of the location registration method in CS fallback procedure NTT DOCOMO CR agreement Yes Yes revised No C1-120642
    C1-120642 Modification of the location registration method in CS fallback procedure NTT DOCOMO CR agreement Yes Yes agreed No C1-120133
    C1-120134 Modification of the location registration method in CS fallback procedure NTT DOCOMO CR agreement Yes Yes revised No C1-120643
    C1-120643 Modification of the location registration method in CS fallback procedure NTT DOCOMO CR agreement Yes Yes agreed No C1-120134
    C1-120289 Exclusion of Normal Attach combined with Emergency PDN Connectivity Request Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-120644
    C1-120644 Exclusion of Normal Attach combined with Emergency PDN Connectivity Request Qualcomm Incorporated / Lena CR agreement No Yes postponed No C1-120289
    C1-120290 Exclusion of Normal Attach combined with Emergency PDN Connectivity Request Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-120645
    C1-120645 Exclusion of Normal Attach combined with Emergency PDN Connectivity Request Qualcomm Incorporated / Lena CR agreement No Yes postponed No C1-120290
    C1-120291 Exclusion of Normal Attach combined with Emergency PDN Connectivity Request Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-120646
    C1-120646 Exclusion of Normal Attach combined with Emergency PDN Connectivity Request Qualcomm Incorporated / Lena CR agreement No Yes postponed No C1-120291
    C1-120437 Equivalent PLMN List and CSG Reporting in Dedicated and DTM Mode Renesas/Marko discussion discussion Yes Yes revised No C1-120469
    C1-120469 Equivalent PLMN List and CSG Reporting in Dedicated and DTM Mode Renesas/Marko discussion discussion Yes Yes noted No C1-120437
    C1-120438 TAU in idle mode for UE’s E-UTRAN radio capability update Qualcomm Incorporated / Lena CR agreement Yes Yes postponed No
    C1-120439 TAU in idle mode for UE’s E-UTRAN radio capability update Qualcomm Incorporated / Lena CR agreement Yes Yes postponed No
    C1-120440 TAU in idle mode for UE’s E-UTRAN radio capability update Qualcomm Incorporated / Lena CR agreement Yes Yes postponed No
    C1-120470 E-UTRA capability handling during inter-mode mobility Clearwire, Sprint, Qualcomm Incorporated / Lena discussion discussion Yes Yes noted No
    C1-120683 Re-attach for emergency bearer service NTT DOCOMO, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120811
    C1-120811 Re-attach for emergency bearer service NTT DOCOMO, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes agreed No C1-120683
10
Rel-10
10.1
void
10.2
IMS_SC_eIDT
C1-120258 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120594
    C1-120594 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120258
    C1-120259 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120595
    C1-120595 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120259
    C1-120428 Correction of the the destination of IUT request message in subclause 16.3 ETRI CR agreement Yes Yes revised No C1-120596
    C1-120596 Correction of the the destination of IUT request message in subclause 16.3 ETRI CR agreement Yes Yes revised No C1-120846 C1-120428
    C1-120846 Correction of the the destination of IUT request message in subclause 16.3 ETRI CR agreement Yes Yes agreed No C1-120596
    C1-120429 Correction of the the destination of IUT request message in subclause 16.3 ETRI CR agreement Yes Yes revised No C1-120597
    C1-120597 Correction of the the destination of IUT request message in subclause 16.3 ETRI CR agreement Yes Yes revised No C1-120847 C1-120429
    C1-120847 Correction of the the destination of IUT request message in subclause 16.3 ETRI CR agreement Yes Yes agreed No C1-120597
    C1-120430 Editorial error correction in subclause 4.1 ETRI CR agreement Yes No withdrawn Yes
    C1-120431 Editorial error correction in subclause 4.1 ETRI CR agreement Yes Yes revised No C1-120598
    C1-120432 Corrections of 14.2.1 Procedures for adding new media on controllee UE by controller UE ETRI CR agreement Yes Yes revised No C1-120600
    C1-120600 Corrections of 14.2.1 Procedures for adding new media on controllee UE by controller UE ETRI CR agreement Yes Yes revised No C1-120844 C1-120432
    C1-120844 Correction of 14.2.1 Procedures for adding new media on controllee UE by controller UE ETRI CR agreement Yes Yes agreed No C1-120600
    C1-120433 Corrections of 14.2.1 Procedures for adding new media on controllee UE by controller UE ETRI CR agreement Yes Yes revised No C1-120601
    C1-120601 Corrections of 14.2.1 Procedures for adding new media on controllee UE by controller UE ETRI CR agreement Yes Yes revised No C1-120845 C1-120433
    C1-120845 Correction of 14.2.1 Procedures for adding new media on controllee UE by controller UE ETRI CR agreement Yes Yes agreed No C1-120601
10.3
CCNL
C1-120365 CCNL timer specification and general clean-up Ericsson, ST-Ericsson / Jorgen CR agreement Yes Yes revised No C1-120602
10.4
IMSProtoc4
C1-120174 Supporting Fax service in IMS NEC, NTT CR agreement Yes Yes postponed No
    C1-120175 Supporting Fax service in IMS NEC, NTT CR agreement Yes Yes postponed No
10.5
eAOC
10.6
OMR
10.7
IESE
10.8
eSRVCC
C1-120165 ATCF passing Recv-Info, Supported, Accept Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-120604
    C1-120604 ATCF passing Recv-Info, Supported, Accept Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-120165
    C1-120166 ATCF passing Recv-Info and Accept Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-120605
    C1-120605 ATCF passing Recv-Info, Supported, Accept Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-120166
    C1-120203 ATCF-Path-URI in MESSAGE sent from SCC AS NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120606
    C1-120606 ATCF-Path-URI in MESSAGE sent from SCC AS NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120203
    C1-120204 ATCF-Path-URI in MESSAGE sent from SCC AS NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120607
    C1-120607 ATCF-Path-URI in MESSAGE sent from SCC AS NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120204
    C1-120205 P-CSCF forwarding REGISTER when ATCF is used NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120608
    C1-120608 P-CSCF forwarding REGISTER when ATCF is used NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120868 C1-120205
    C1-120868 P-CSCF forwarding REGISTER when ATCF is used NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120608
    C1-120206 P-CSCF forwarding REGISTER when ATCF is used NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120609
    C1-120609 P-CSCF forwarding REGISTER when ATCF is used NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120869 C1-120206
    C1-120869 P-CSCF forwarding REGISTER when ATCF is used NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120609
    C1-120207 REGISTER handling in ATCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120610
    C1-120610 REGISTER handling in ATCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120871 C1-120207
    C1-120871 REGISTER handling in ATCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120610
    C1-120208 REGISTER handling in ATCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120611
    C1-120611 REGISTER handling in ATCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-120872 C1-120208
    C1-120872 REGISTER handling in ATCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-120611
    C1-120256 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120612
    C1-120612 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120256
    C1-120257 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120613
    C1-120613 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120257
10.9
aSRVCC
C1-120209 Overlapping conditions in MSC on INFO NokiaSiemensNetworks, Samsung CR agreement Yes Yes revised No C1-120614
    C1-120614 Overlapping conditions in MSC on INFO NokiaSiemensNetworks, Samsung CR agreement Yes Yes agreed No C1-120209
    C1-120210 Overlapping conditions in MSC on INFO NokiaSiemensNetworks, Samsung CR agreement Yes Yes revised No C1-120615
    C1-120615 Overlapping conditions in MSC on INFO NokiaSiemensNetworks, Samsung CR agreement Yes Yes agreed No C1-120210
    C1-120228 State verification to avoid call state mismatch v8 Ericsson,ST-Ericsson / Jan CR agreement Yes Yes revised No C1-120527 C1-114960
    C1-120527 State verification to avoid call state mismatch v8 Ericsson,ST-Ericsson / Jan CR agreement Yes Yes postponed No C1-120228
    C1-120229 State verification to avoid call state mismatch v8 Ericsson,ST-Ericsson / Jan CR agreement Yes Yes revised No C1-120528 C1-114961
    C1-120528 State verification to avoid call state mismatch v8 Ericsson,ST-Ericsson / Jan CR agreement Yes Yes postponed No C1-120229
    C1-120230 MSC server state verification procedure solving an EN v6 - BYE + ised Ericsson,ST-Ericsson / Jan CR agreement Yes Yes revised No C1-120529 C1-115183
    C1-120529 MSC server state verification procedure solving an EN v6 - BYE + ised Ericsson,ST-Ericsson / Jan CR agreement Yes Yes postponed No C1-120230
    C1-120231 MSC server state verification procedure Ericsson,ST-Ericsson / Jan CR agreement Yes Yes revised No C1-120530 C1-115184
    C1-120530 MSC server state verification procedure Ericsson,ST-Ericsson / Jan CR agreement Yes Yes postponed No C1-120231
    C1-120792 Call Control state modelling for (r)SRVCC NEC CR agreement Yes Yes revised No C1-120839 C1-120537
    C1-120839 Call Control state modelling for aSRVCC NEC CR agreement Yes Yes agreed No C1-120792
    C1-120793 Call Control state modelling for (r)SRVCC NEC CR agreement Yes Yes revised No C1-120840
    C1-120840 Call Control state modelling for aSRVCC NEC CR agreement Yes Yes agreed No C1-120793
10.10
ECSRA_LAA-CN
10.11
eMPS-CN
10.12
NIMTC
10.12.1
NAS signalling low priority and device properties
C1-120397 Change of MS configuration CATT CR agreement Yes Yes rejected No
    C1-120398 Change of MS configuration CATT CR agreement Yes Yes postponed No
    C1-120399 Change of UE configuration CATT CR agreement Yes Yes rejected No
    C1-120400 Change of UE configuration CATT CR agreement Yes Yes postponed No
    C1-120401 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120703
    C1-120703 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120828 C1-120401
    C1-120828 Handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120892 C1-120703
    C1-120892 Handling NAS signalling low priority indication CATT CR agreement Yes Yes agreed No C1-120828
    C1-120402 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120704
    C1-120704 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120829 C1-120402
    C1-120829 Handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120893 C1-120704
    C1-120893 Handling NAS signalling low priority indication CATT CR agreement Yes Yes agreed No C1-120829
    C1-120403 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120705
    C1-120705 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120830 C1-120403
    C1-120830 Handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120894 C1-120705
    C1-120894 Handling NAS signalling low priority indication CATT CR agreement Yes Yes agreed No C1-120830
    C1-120404 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120706
    C1-120706 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120831 C1-120404
    C1-120831 Clarification of handling NAS signalling low priority indication CATT CR agreement Yes Yes revised No C1-120895 C1-120706
    C1-120895 Handling NAS signalling low priority indication CATT CR agreement Yes Yes agreed No C1-120831
10.12.2
NAS level congestion control and mobility management back-off timers
C1-120186 Allow AC11-15 user when MM backoff timer is running Nokia Siemens Networks/Devaki CR agreement Yes Yes revised No C1-120718
    C1-120718 Allow AC11-15 user when MM backoff timer is running Nokia Siemens Networks/Devaki CR agreement Yes Yes agreed No C1-120186
    C1-120187 Allow AC11-15 user when MM backoff timer is running Nokia Siemens Networks/Devaki CR agreement Yes Yes revised No C1-120719
    C1-120719 Allow AC11-15 user when MM backoff timer is running Nokia Siemens Networks/Devaki CR agreement Yes Yes agreed No C1-120187
    C1-120274 Correction of "Extended Wait Time" in the timer tables. Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes rejected No
    C1-120275 Correction of "Extended Wait Time" in the timer tables. Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes revised No C1-120720
    C1-120276 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes revised No C1-120707
    C1-120707 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel, CATT CR agreement Yes Yes revised No C1-120902 C1-120276
    C1-120902 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel, CATT CR agreement Yes Yes agreed No C1-120707
    C1-120277 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes revised No C1-120708
    C1-120708 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel, CATT CR agreement Yes Yes revised No C1-120903 C1-120277
    C1-120903 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel, CATT CR agreement Yes Yes agreed No C1-120708
    C1-120278 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes revised No C1-120709
    C1-120709 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes revised No C1-120904 C1-120278
    C1-120904 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes agreed No C1-120709
    C1-120279 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes revised No C1-120710
    C1-120710 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes revised No C1-120905 C1-120279
    C1-120905 Release of NAS signalling connection with EWT Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes agreed No C1-120710
    C1-120280 Inclusion of T3246 condition when reselecting to CS due to Service Reject cause #22 Samsung, InterDigital Communications LLC CR agreement Yes Yes postponed No
    C1-120281 Inclusion of T3246 condition when reselecting to CS due to Service Reject cause #22 Samsung, InterDigital Communications LLC CR agreement Yes Yes postponed No
    C1-120292 SMS transfer while T3346 is running in LTE InterDigital discussion discussion Yes Yes noted No
    C1-120293 MO SMS when T3346 is running in LTE InterDigital CR agreement Yes Yes revised No C1-120711 C1-114259
    C1-120711 MO SMS when T3346 is running in LTE InterDigital CR agreement Yes Yes agreed No C1-120293
    C1-120294 MO SMS when T3346 is running in LTE InterDigital CR agreement Yes Yes revised No C1-120712 C1-114260
    C1-120712 MO SMS when T3346 is running in LTE InterDigital CR agreement Yes Yes agreed No C1-120294
    C1-120327 Rejecting ESM messages with low priority indicator Huawei, HiSilicon CR agreement Yes Yes rejected No
    C1-120328 Rejecting ESM messages with low priority indicator Huawei, HiSilicon CR agreement Yes Yes revised No C1-120722
    C1-120329 Rejecting SM messages with low priority indicator Huawei, HiSilicon CR agreement Yes Yes rejected No
    C1-120330 Rejecting SM messages with low priority indicator Huawei, HiSilicon CR agreement Yes Yes revised No C1-120723
    C1-120723 Rejecting SM messages with low priority indicator Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120330
    C1-120358 Device management notification received while T3346 running LG Electronics CR agreement Yes No withdrawn Yes
    C1-120359 Device management notification received while T3346 running LG Electronics CR agreement Yes No withdrawn Yes
    C1-120367 Location Update when T3346 is running in NMO1 InterDigital CR agreement Yes Yes agreed No
    C1-120368 Location Update when T3346 is running in NMO1 InterDigital CR agreement Yes Yes agreed No
    C1-120395 Correction on MO CSFB handling CATT CR agreement Yes Yes revised No C1-120468
    C1-120468 Correction on MO CSFB handling CATT CR agreement Yes Yes rejected No C1-120395
    C1-120396 Correction on MO CSFB handling CATT CR agreement Yes Yes revised No C1-120721
    C1-120405 Congestion control for UE with PDN connection for emergency bearer service CATT discussion discussion Yes Yes noted No
    C1-120409 Correction to the handling of wait time from AS Intel, CATT, HTC CR agreement Yes Yes revised No C1-120473
    C1-120473 Correction to the handling of wait time from AS Intel, CATT, HTC CR agreement Yes Yes revised No C1-120714 C1-120409
    C1-120714 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes revised No C1-120873 C1-120473
    C1-120873 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes agreed No C1-120714
    C1-120410 Correction to the handling of wait time from AS Intel, CATT, HTC CR agreement Yes Yes revised No C1-120474
    C1-120474 Correction to the handling of wait time from AS Intel, CATT, HTC CR agreement Yes Yes revised No C1-120715 C1-120410
    C1-120715 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes revised No C1-120874 C1-120474
    C1-120874 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes agreed No C1-120715
    C1-120413 Correction for TAU triggering after paging Nokia Siemens Networks, Nokia, LG Electronics CR agreement Yes Yes revised No C1-120782
    C1-120782 Correction for TAU triggering after paging Nokia Siemens Networks, Nokia, LG Electronics CR agreement Yes Yes agreed No C1-120413
    C1-120414 Correction for TAU triggering after paging Nokia Siemens Networks, Nokia, LG Electronics CR agreement Yes Yes revised No C1-120783
    C1-120783 Correction for TAU triggering after paging Nokia Siemens Networks, Nokia, LG Electronics CR agreement Yes Yes agreed No C1-120414
    C1-120415 Correction for RAU triggering while T3346 and receiving of paging Nokia Siemens Networks, Nokia, LG Electronics CR agreement Yes Yes revised No C1-120784
    C1-120784 Correction for RAU triggering while T3346 and receiving of paging Nokia Siemens Networks, Nokia, LG Electronics CR agreement Yes Yes agreed No C1-120415
    C1-120416 Correction for RAU triggering while T3346 and receiving of paging Nokia Siemens Networks, Nokia, LG Electronics CR agreement Yes Yes revised No C1-120785
    C1-120785 Correction for RAU triggering while T3346 and receiving of paging Nokia Siemens Networks, Nokia, LG Electronics CR agreement Yes Yes agreed No C1-120416
    C1-120419 Back-off timer handling in connected mode mobility Qualcomm Incorporated / Patrick CR agreement Yes Yes revised No C1-120786
    C1-120786 Back-off timer handling in connected mode mobility Qualcomm Incorporated / Patrick CR agreement Yes Yes agreed No C1-120419
    C1-120420 Back-off timer handling in connected mode mobility Qualcomm Incorporated / Patrick CR agreement Yes Yes revised No C1-120787
    C1-120787 Back-off timer handling in connected mode mobility Qualcomm Incorporated / Patrick CR agreement Yes Yes agreed No C1-120420
    C1-120424 Send Uplink Transport of NAS messages during emergency PDN setup Panasonic CR agreement Yes No withdrawn Yes
    C1-120425 Send Uplink Transport of NAS messages during emergency PDN setup Panasonic CR agreement Yes No withdrawn Yes
    C1-120475 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes revised No C1-120716
    C1-120716 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes revised No C1-120875 C1-120475
    C1-120875 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes agreed No C1-120716
    C1-120476 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes revised No C1-120717
    C1-120717 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes revised No C1-120876 C1-120476
    C1-120876 Correction to the handling of wait time from AS Intel, CATT, HTC, Samsung CR agreement Yes Yes agreed No C1-120717
10.12.3
Congestion control for CS domain and impact on Gs/SGs interfaces
10.12.4
Session management back-off timers
C1-120121 Summary of discussion on T3402 in ATTACH REJECT NTT DOCOMO discussion discussion Yes Yes noted No
    C1-120122 Correction of handling of ATTACH REJECT together with SM back NTT DOCOMO CR agreement Yes Yes revised No C1-120788 C1-115335
    C1-120788 Correction of handling of ATTACH REJECT together with SM back NTT DOCOMO CR agreement Yes Yes revised No C1-120877 C1-120122
    C1-120877 Correction of handling of ATTACH REJECT together with SM back-off timer NTT DOCOMO CR agreement Yes Yes agreed No C1-120788
    C1-120123 Correction of handling of ATTACH REJECT together with SM back NTT DOCOMO CR agreement Yes Yes revised No C1-120789 C1-115336
    C1-120789 Correction of handling of ATTACH REJECT together with SM back NTT DOCOMO CR agreement Yes Yes revised No C1-120821 C1-120123
    C1-120821 Correction of handling of ATTACH REJECT together with SM back NTT DOCOMO CR agreement Yes Yes revised No C1-120878 C1-120789
    C1-120878 Correction of handling of ATTACH REJECT together with SM back-off timer NTT DOCOMO CR agreement Yes Yes agreed No C1-120821
    C1-120124 Application of ESM backoff Timer when UE received ESM cause #50 or #51 NTT DOCOMO discussion discussion Yes Yes noted No
    C1-120125 Application of ESM backoff Timer when UE received ESM cause #50 or #51 NTT DOCOMO CR agreement Yes No withdrawn Yes C1-115211
    C1-120126 Application of ESM backoff Timer when UE received ESM cause #50 or #51 NTT DOCOMO CR agreement Yes Yes revised No C1-120790 C1-115212
    C1-120127 Application of ESM backoff Timer when UE received ESM cause #50 or #51 NTT DOCOMO CR agreement Yes No withdrawn Yes C1-115209
    C1-120128 Application of ESM backoff Timer when UE received ESM cause #50 or #51 NTT DOCOMO CR agreement Yes Yes revised No C1-120791 C1-115210
10.12.5
Emergency bearer services
10.12.6
General issues
C1-120331 Indication of supporting T3312 extended value in RAU Huawei, HiSilicon, Vodafone CR agreement Yes No withdrawn Yes
    C1-120332 Indication of supporting T3312 extended value in RAU Huawei, HiSilicon, Vodafone CR agreement Yes Yes revised No C1-120796
10.13
AT_IMS
10.14
AT_UICC
10.15
SMOG-St3
10.16
IFOM-CT
C1-120508 Correction of a terminology in EndDestIPaddress leaf Panasonic CR agreement Yes Yes agreed No C1-120426
    C1-120509 Correction of a terminology in EndDestIPaddress leaf Panasonic CR agreement Yes Yes agreed No C1-120427
10.17
LIPA
10.18
SIPTO
10.19
MAPCON-St3
10.20
TIGHTER
10.21
MOCN-GERAN
10.22
FS_UE-CN_ES
10.23
TEI10 and other WIDs
10.23.1
IMS – TEI10 and other WIDs
C1-120079 Phone-context errors Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120211 IMS-ALG in the P-CSCF is invoked for Transcoding Control NokiaSiemensNetworks CR agreement Yes Yes agreed No
    C1-120212 IMS-ALG in the P-CSCF is invoked for Transcoding Control NokiaSiemensNetworks CR agreement Yes Yes agreed No
    C1-120254 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120618
    C1-120618 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120254
    C1-120255 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120619
    C1-120619 Reference update: draft-holmberg-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120255
    C1-120260 UE usage of Feature-Caps Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120616
    C1-120616 UE usage of Feature-Caps Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120260
    C1-120261 UE usage of Feature-Caps Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120617
    C1-120617 UE usage of Feature-Caps Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120261
    C1-120318 Removing contradictory statement from User initiated deregstration procedure Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120620
    C1-120620 Removing contradictory statement from User initiated deregstration procedure Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-120318
    C1-120319 Removing contradictory statement from User initiated deregstration procedure Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120621
    C1-120621 Removing contradictory statement from User initiated deregstration procedure Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-120319
10.23.2
SAE – TEI10 and other WIDs
C1-120006 SGs paging handling in the VLR and the MME failure cases Alcatel-Lucent, ZTE CR agreement Yes Yes revised No C1-120647 C1-115366
    C1-120647 SGs paging handling in the VLR and the MME failure cases Alcatel-Lucent, ZTE CR agreement Yes Yes revised No C1-120882 C1-120006
    C1-120882 SGs paging handling in the VLR and the MME failure cases Alcatel-Lucent, ZTE CR agreement Yes Yes agreed No C1-120647
    C1-120007 SGs paging handling in the VLR and the MME failure cases Alcatel-Lucent, ZTE CR agreement Yes Yes revised No C1-120648 C1-115367
    C1-120648 SGs paging handling in the VLR and the MME failure cases Alcatel-Lucent, ZTE CR agreement Yes Yes revised No C1-120883 C1-120007
    C1-120883 SGs paging handling in the VLR and the MME failure cases Alcatel-Lucent, ZTE CR agreement Yes Yes agreed No C1-120648
    C1-120008 SGs paging handling in the VLR and the MME failure cases Alcatel-Lucent/ Jennifer CR agreement Yes No withdrawn Yes C1-114555
    C1-120009 SGs paging handling in the VLR and the MME failure cases Alcatel-Lucent/ Jennifer CR agreement Yes No withdrawn Yes C1-114556
    C1-120082 Extended Wait Timer processing Renesas Mobile Europe / Hannu discussion discussion Yes Yes noted No
    C1-120286 Indication of UE SRVCC Capabilities Qualcomm Incorporated, Motorola Mobility / Lena discussion discussion Yes Yes noted No
    C1-120287 Update of UE SRVCC capability indication Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-120649
    C1-120649 Update of UE SRVCC capability indication Qualcomm Incorporated / Lena CR agreement No No withdrawn Yes C1-120287
    C1-120288 Update of UE SRVCC capability indication Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-120700
    C1-120700 Update of UE SRVCC capability indication Qualcomm Incorporated / Lena CR agreement No Yes postponed No C1-120288
    C1-120384 P-CSCF IP address Huawei, HiSilicon CR agreement Yes Yes revised No C1-120504
    C1-120504 P-CSCF IP address Huawei, HiSilicon CR agreement No No [not addressed] No C1-120384
    C1-120385 P-CSCF IP address Huawei, HiSilicon CR agreement Yes Yes revised No C1-120505
    C1-120505 P-CSCF IP address Huawei, HiSilicon CR agreement No No [not addressed] No C1-120385
    C1-120386 HA IP address from DNS Huawei, HiSilicon CR agreement Yes Yes revised No C1-120506
    C1-120506 HA IP address from DNS Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120386
    C1-120387 HA IP address from DNS Huawei, HiSilicon CR agreement Yes Yes revised No C1-120507
    C1-120507 HA IP address from DNS Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120387
10.23.3
Other TEI10 issues / WIDs
C1-120016 +CESQ=?, removal of non-existing parameter ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-120017 +CESQ=?, removal of non-existing parameter ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-120018 +CSQ and +CESQ, alignment of parameters with value ranges in 3GPP TSs ST-Ericsson, Ericsson / Atle CR agreement Yes Yes revised No C1-120701
    C1-120701 +CESQ, alignment of parameters with value ranges in 3GPP TSs ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No C1-120018
    C1-120019 +CSQ and +CESQ, alignment of parameters with value ranges in 3GPP TSs ST-Ericsson, Ericsson / Atle CR agreement Yes Yes revised No C1-120702
    C1-120702 +CESQ, alignment of parameters with value ranges in 3GPP TSs ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No C1-120019
    C1-120020 Correction of +CSUS ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-120021 Correction of +CSUS ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-120426 Correction of a terminology in EndDestIPaddress leaf Panasonic CR agreement Yes Yes revised No C1-120508
    C1-120427 Correction of a terminology in EndDestIPaddress leaf Panasonic CR agreement Yes Yes revised No C1-120509
11
Rel-11
11.1
Release 11 documents for information
C1-120312 Current Issues on IETF drafts which are dependencies for CT1 specifications Research in Motion/ Andrew information information Yes Yes noted No
    C1-120452 New version of RFC3455bis Deutsche Telekom information information Yes Yes noted No
    C1-120465 Editor's note handling summary for 3GPP TS 24.229 Alcatel-Lucent / Keith Drage discussion discussion Yes Yes noted No
11.2
USSI
C1-120056 Pseudo-CR on editorial corrections Intel pseudo CR agreement Yes Yes revised No C1-120685
    C1-120685 Pseudo-CR on editorial corrections Intel pseudo CR agreement Yes Yes agreed No C1-120056
    C1-120057 Pseudo-CR on editor’s notes on optimised MESSAGE based USSI solution Intel pseudo CR agreement Yes Yes revised No C1-120686
    C1-120686 Pseudo-CR on editor’s notes on optimised MESSAGE based USSI solution Intel pseudo CR agreement No No [not addressed] No C1-120057
    C1-120058 Pseudo-CR on flow for MESSAGE based USSI solution using In-Reply-To header field Intel pseudo CR agreement Yes No withdrawn Yes
    C1-120059 Pseudo-CR on flow for optimised MESSAGE based USSI solution using In-Reply-To header field Intel pseudo CR agreement Yes Yes revised No C1-120692
    C1-120692 Pseudo-CR on flow for optimised MESSAGE based USSI solution using In-Reply-To header field Intel pseudo CR agreement No No [not addressed] No C1-120059
    C1-120060 Pseudo-CR on procedures for MESSAGE based USSI solution Intel pseudo CR agreement Yes No withdrawn Yes
    C1-120061 Pseudo-CR on procedures for optimised MESSAGE based USSI solution Intel pseudo CR agreement Yes No withdrawn Yes
    C1-120062 Pseudo-CR on procedures for MESSAGE based USSI solution using In-Reply-To header field Intel pseudo CR agreement Yes Yes revised No C1-120689
    C1-120689 Pseudo-CR on procedures for MESSAGE based USSI solution using In-Reply-To header field Intel pseudo CR agreement No No withdrawn Yes C1-120062
    C1-120063 Pseudo-CR on procedures for optimised MESSAGE based USSI solution using In-Reply-To header field Intel pseudo CR agreement Yes Yes revised No C1-120690
    C1-120690 Pseudo-CR on procedures for optimised MESSAGE based USSI solution using In-Reply-To header field Intel pseudo CR agreement No No [not addressed] No C1-120063
    C1-120092 USSI 2nd Conference Call Minutes Deutsche Telekom discussion discussion Yes Yes noted No
    C1-120173 USSD MESSAGE-based solution with instance-id alternative Orange/Youssef pseudo CR agreement Yes Yes revised No C1-120691
    C1-120691 USSD MESSAGE-based solution with instance-id alternative Orange/Youssef pseudo CR agreement No No [not addressed] No C1-120173
    C1-120213 Encoding of MIME type – use Facility Information Element NokiaSiemensNetworks pseudo CR agreement Yes Yes revised No C1-120693
    C1-120693 Encoding of MIME type – use Facility Information Element NokiaSiemensNetworks pseudo CR agreement Yes Yes agreed No C1-120213
    C1-120214 Procedures for USSI NokiaSiemensNetworks pseudo CR agreement Yes No withdrawn Yes
    C1-120262 Pseudo-CR on UA and AS actions for the SIP INVITE mechanism Ericsson, ST-Ericsson / Christer pseudo CR agreement Yes Yes revised No C1-120694
    C1-120694 Pseudo-CR on UA and AS actions for the SIP INVITE mechanism Ericsson, ST-Ericsson / Christer pseudo CR agreement Yes Yes agreed No C1-120262
    C1-120382 Pseudo-CR on flow for MESSAGE based USSI solution using Reply-To and In-Reply-To header field Intel/Research in Motion pseudo CR agreement Yes Yes revised No C1-120687
    C1-120687 Pseudo-CR on flow for MESSAGE based USSI solution using Reply-To and In-Reply-To header field Intel/Research in Motion pseudo CR agreement Yes Yes revised No C1-120884 C1-120382
    C1-120884 Pseudo-CR on flow for MESSAGE based USSI solution using Reply-To and In-Reply-To header field Intel/Research in Motion pseudo CR agreement Yes Yes agreed No C1-120687
    C1-120383 Pseudo-CR on procedures for MESSAGE based USSI solution Intel/Research in Motion pseudo CR agreement Yes Yes revised No C1-120688
    C1-120688 Pseudo-CR on procedures for MESSAGE based USSI solution Intel/Research in Motion pseudo CR agreement Yes Yes agreed No C1-120383
    C1-120390 Latest TS 24.390 v0.5.1 for information Huawei draft TS/TR information Yes Yes noted No
    C1-120391 Procedure of UE sending USSD request, further information required from network- SIP INVITE Huawei pseudo CR agreement Yes No withdrawn Yes
    C1-120760 Result of Show of Hands on USSD CT1 Chairman information information Yes Yes noted No
11.3
IOI_IMS_CH
C1-120237 Removing the possibility to add void in transit-ioi Ericsson,ST-Ericsson / Jan CR agreement Yes No withdrawn Yes
    C1-120282 IMS_IOI_CH input on IBCF behaviour Deutsche Telekom / Martin CR agreement Yes Yes revised No C1-120751
    C1-120751 IMS_IOI_CH input on IBCF behaviour Deutsche Telekom / Martin CR agreement Yes Yes revised No C1-120848 C1-120282
    C1-120848 IMS_IOI_CH input on IBCF behaviour Deutsche Telekom / Martin CR agreement Yes Yes agreed No C1-120751
11.4
RLI (CT4)
11.5
EMC_PC
11.6
IPXS
C1-120253 IPXS: Application invocation procedures Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120695 C1-115152
    C1-120695 IPXS: Application invocation procedures Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120849 C1-120253
    C1-120849 IPXS: Application invocation procedures Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120695
11.7
VINE-CT
11.8
MRB
C1-120460 Introduction of MRB functional entity Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-120752
    C1-120752 Introduction of MRB functional entity Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-120885 C1-120460
    C1-120885 Introduction of MRB functional entity Alcatel-Lucent CR agreement Yes Yes revised No C1-120896 C1-120752
    C1-120896 Introduction of MRB functional entity Alcatel-Lucent CR agreement Yes Yes agreed No C1-120885
    C1-120461 AS selection of MRF resources Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-120753 C1-115157
    C1-120753 AS selection of MRF resources Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-120461
    C1-120462 Revisions to Rc interface - 1 Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-120754
    C1-120754 Revisions to Rc interface Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-120462
    C1-120464 MRB to MRB Alcatel-Lucent / Keith Drage discussion discussion Yes Yes noted No
11.9
GINI
C1-120283 GINI input on profile tables CableLabs, Deutsche Telekom CR agreement Yes Yes revised No C1-120696
    C1-120696 GINI input on profile tables CableLabs, Deutsche Telekom CR agreement Yes Yes agreed No C1-120283
    C1-120421 Add general support for RFC 6140 CableLabs, Deutsche Telekom CR agreement Yes Yes revised No C1-120697
    C1-120697 Add general support for RFC 6140 CableLabs, Deutsche Telekom CR agreement Yes Yes revised No C1-120850 C1-120421
    C1-120850 Add general support for RFC 6140 CableLabs, Deutsche Telekom CR agreement Yes Yes agreed No C1-120697
    C1-120422 Add complex UE support for RFC 6140 mainline GIN registration functionality Deutsche Telekom, CableLabs CR agreement Yes Yes revised No C1-120698
    C1-120698 Add complex UE support for RFC 6140 mainline GIN registration functionality Deutsche Telekom, CableLabs CR agreement Yes Yes revised No C1-120851 C1-120422
    C1-120851 Add complex UE support for RFC 6140 mainline GIN registration functionality Deutsche Telekom, CableLabs CR agreement Yes Yes agreed No C1-120698
    C1-120423 Add S-CSCF support for RFC 6140 mainline GIN registration functionality CableLabs, Deutsche Telekom / Martin CR agreement Yes Yes revised No C1-120699
    C1-120699 Add S-CSCF support for RFC 6140 mainline GIN registration functionality CableLabs, Deutsche Telekom / Martin CR agreement Yes Yes revised No C1-120852 C1-120423
    C1-120852 Add S-CSCF support for RFC 6140 mainline GIN registration functionality CableLabs, Deutsche Telekom / Martin CR agreement Yes Yes agreed No C1-120699
11.10
GBA-ext-St3 (CT4)
11.11
IMSProtoc5
C1-120066 Changing 3xx response code at IBCF Fujitsu Limited, NTT CR agreement Yes Yes revised No C1-120755
    C1-120755 Changing 3xx response code at IBCF Fujitsu Limited, NTT CR agreement Yes Yes revised No C1-120853 C1-120066
    C1-120853 Changing 3xx response code at IBCF Fujitsu Limited, NTT CR agreement Yes Yes revised No C1-120886 C1-120755
    C1-120886 Changing 3xx response code at IBCF Fujitsu Limited, NTT CR agreement No Yes postponed No C1-120853
    C1-120148 Addition of procedures in case of Fiber access network. OKI, NTT CR agreement Yes Yes agreed No
    C1-120149 Removal of Editor's Note about access-info of P-Access-Network-Info header network. OKI, NTT CR agreement Yes Yes agreed No
    C1-120170 P-Served-User and session case Orange/Youssef CR agreement Yes Yes revised No C1-120756
    C1-120756 P-Served-User and session case Orange/Youssef CR agreement Yes Yes revised No C1-120879 C1-120170
    C1-120879 P-Served-User and session case Orange/Youssef CR agreement No Yes postponed No C1-120756
    C1-120171 S-CSCF behavior when the number of simultaneous registrations for the same UE is reached Orange/Youssef CR agreement Yes Yes revised No C1-120757
    C1-120757 S-CSCF behavior when the number of simultaneous registrations for the same UE is reached Orange/Youssef CR agreement Yes Yes revised No C1-120880 C1-120171
    C1-120880 S-CSCF behavior when the number of simultaneous registrations for the same UE is reached Orange/Youssef CR agreement Yes Yes agreed No C1-120757
    C1-120172 P-CSCF address provided by OMA DM for fixed access (Annex E) Orange/Youssef CR agreement Yes Yes revised No C1-120758
    C1-120758 P-CSCF address provided by OMA DM for fixed access (Annex E) Orange/Youssef CR agreement Yes Yes revised No C1-120881 C1-120172
    C1-120881 P-CSCF address provided by OMA DM for fixed access (Annex E) Orange/Youssef CR agreement Yes Yes revised No C1-120906 C1-120758
    C1-120906 P-CSCF address provided by OMA DM for fixed access (Annex E). Orange/Youssef CR agreement Yes Yes agreed No C1-120881
    C1-120232 P-Served-User to BGCF Ericsson,ST-Ericsson / Jan CR agreement Yes Yes revised No C1-120776
    C1-120776 P-Served-User to BGCF Ericsson,ST-Ericsson / Jan CR agreement Yes Yes revised No C1-120854 C1-120232
    C1-120854 P-Served-User to BGCF Ericsson,ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-120776
    C1-120563 Location Conveyance: Location Forwarding to MGCF and PSAP Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120247
11.12
vSRVCC-CT
C1-120270 DISCUSSION: Outstanding issues for vSRVCC Samsung discussion discussion Yes Yes noted No
    C1-120271 Clarifications for user connection attachment for vSRVCC Samsung CR agreement Yes Yes agreed No C1-114767
    C1-120272 Unclear specification of alerting functionality for vSRVCC and SRVCC Samsung CR agreement Yes Yes revised No C1-120531
    C1-120531 Unclear specification of alerting functionality for vSRVCC and SRVCC Samsung CR agreement Yes Yes revised No C1-120832 C1-120272
    C1-120832 Unclear MSC specification of alerting functionality for vSRVCC and SRVCC. Samsung CR agreement Yes Yes agreed No C1-120531
    C1-120360 Setting of SRVCC to UTRAN/GERAN capability bit for UE not supporting vSRVCC Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120532
    C1-120532 Setting of SRVCC to UTRAN/GERAN capability bit for UE not supporting vSRVCC Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-120360
11.13
rSRVCC-CT
C1-120069 CS to PS SRVCC, overview Ericsson, ST-Ericsson / Ivo discussion discussion Yes Yes noted No
    C1-120070 CS to PS SRVCC, registration flows in PS Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120071 CS to PS SRVCC, registration flows in CS Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120072 CS to PS SRVCC, originating call Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120073 CS to PS SRVCC, terminating call Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120074 CS to PS SRVCC access transfer occurs during a call Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-120557
    C1-120557 CS to PS SRVCC access transfer occurs during a call Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-120074
    C1-120075 CS to PS SRVCC, MIME type for CS to PS SRVCC information Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120076 CS to PS SRVCC, MIME type to be used with INFO Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-120534
    C1-120534 CS to PS SRVCC, MIME type to be used with INFO Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-120076
    C1-120077 CS to PS SRVCC, INFO package Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120078 CS to PS SRVCC, feature tags Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120371 Signalling flows for eSRVCC assisted mid-call feature including ATCF ZTE (David) CR agreement Yes Yes agreed No
    C1-120389 rSRVCC occurs during a call without CS media anchored in ATGW Huawei CR agreement Yes Yes revised No C1-120535
    C1-120535 rSRVCC occurs during a call without CS media anchored in ATGW Huawei CR agreement Yes Yes revised No C1-120842 C1-120389
    C1-120842 rSRVCC occurs during a call without CS media anchored in ATGW Huawei CR agreement Yes Yes revised No C1-120888 C1-120535
    C1-120888 rSRVCC occurs during a call without CS media anchored in ATGW Huawei CR agreement Yes Yes agreed No C1-120842
    C1-120411 Call clearing in CS for rSRVCC NEC CR agreement Yes Yes revised No C1-120536
    C1-120536 Call clearing in CS for rSRVCC NEC CR agreement Yes Yes revised No C1-120833 C1-120411
    C1-120833 Call clearing in CS for rSRVCC NEC CR agreement Yes Yes agreed No C1-120536
    C1-120412 Call Control state modelling for (r)SRVCC NEC CR agreement Yes Yes revised No C1-120537
    C1-120537 Call Control state modelling for (r)SRVCC NEC CR agreement No Yes revised No C1-120792 C1-120412
    C1-120435 CS to PS SRVCC, keys to flows Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120777 CS to PS SRVCC, ATGW transfer details structure Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-120794 Call Control state modelling for rSRVCC NEC CR agreement Yes Yes revised No C1-120841
    C1-120841 Call Control state modelling for rSRVCC NEC CR agreement Yes Yes agreed No C1-120794
11.14
RT_VGCS_Red
C1-120153 TC-RT: Group Call Redundancy Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120521
    C1-120521 TC-RT: Group Call Redundancy Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120153
    C1-120154 TC-RT: Broadcast Call Redundancy Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-120522
    C1-120522 TC-RT: Broadcast Call Redundancy Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-120154
11.15
SIMTC
11.15.1
SIMTC-CS
C1-120225 SIMTC Status Ericsson, ST-Ericsson / Mikael information information Yes Yes noted No
11.15.2
SIMTC-RAN_OC
C1-120188 Discussion on EAB Nokia Siemens Networks/Devaki discussion discussion Yes Yes noted No
    C1-120189 Extended Access Barring for UTRAN Nokia Siemens Networks/Devaki CR agreement Yes Yes revised No C1-120539
    C1-120539 Extended Access Barring for UTRAN Nokia Siemens Networks, Huawei, HiSilicon CR agreement Yes Yes revised No C1-120800 C1-120189
    C1-120800 Extended Access Barring for UTRAN Nokia Siemens Networks, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120539
    C1-120190 Extended Access Barring for EUTRAN Nokia Siemens Networks/Devaki CR agreement Yes Yes revised No C1-120540
    C1-120540 Extended Access Barring for EUTRAN Nokia Siemens Networks, Huawei, HiSilicon CR agreement Yes Yes revised No C1-120801 C1-120190
    C1-120801 Extended Access Barring for EUTRAN Nokia Siemens Networks, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120540
    C1-120340 EAB indication from NAS Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-120341 EAB indication from NAS Huawei, HiSilicon CR agreement Yes No withdrawn Yes
11.15.3
SIMTC-Reach
C1-120418 Identified issues for devices with dual priority applications Qualcomm Incorporated/Patrick discussion discussion Yes Yes revised No C1-120682
    C1-120682 Identified issues for devices with dual priority applications Qualcomm Incorporated/Patrick discussion discussion No No [not addressed] No C1-120418
11.15.4
SIMTC-Sig
11.15.5
SIMTC-CN_Pow
11.15.6
SIMTC
C1-120145 CT1 Impacts and open issues of introducing dual priority service Vodafone discussion discussion Yes Yes noted No
    C1-120146 Dual priority service for UE configured for NAS signalling low priority Vodafone CR agreement Yes Yes postponed No
    C1-120147 Dual priority service for MS configured for NAS signalling low priority Vodafone CR agreement Yes Yes postponed No
    C1-120191 Discussion on Multi-level priorities Nokia Siemens Networks/Devaki discussion discussion Yes Yes noted No
    C1-120407 MTC Device handling normal priority access Panasonic CR agreement Yes Yes postponed No
    C1-120408 MTC Device handling normal priority access Panasonic CR agreement Yes Yes postponed No
11.16
BBAI
C1-120108 Definition of reflective QoS Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-120510
    C1-120510 Definition of reflective QoS Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-120834 C1-120108
    C1-120834 Definition of reflective QoS Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-120510
    C1-120109 Reflective QoS selection mode Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-120511
    C1-120511 Reflective QoS selection mode Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-120835 C1-120109
    C1-120835 Reflective QoS selection mode Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-120511
    C1-120110 QoS with S2c over trusted BBF Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-120512
    C1-120512 QoS with S2c over trusted BBF Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-120110
11.16.1
BBAI-BBI
C1-120197 HA procedure for QOS support over untrusted access Alcatel-Lucent/ Jennifer pseudo CR agreement Yes Yes revised No C1-120513
    C1-120513 HA procedure for QOS support over untrusted access Alcatel-Lucent/ Jennifer pseudo CR agreement Yes Yes agreed No C1-120197
    C1-120370 Pseudo-CR on Supporting Tunnel management procedure with S2b ZTE (Joy) pseudo CR agreement Yes Yes revised No C1-120514
    C1-120514 Pseudo-CR on Supporting Tunnel management procedure with S2b ZTE (Joy) pseudo CR agreement Yes Yes revised No C1-120836 C1-120370
    C1-120836 Pseudo-CR on Supporting Tunnel management procedure with S2b ZTE (Joy) pseudo CR agreement Yes Yes agreed No C1-120514
11.16.2
BBAI-BBII
11.16.3
BBAI-BBIII
11.17
Full_MOCN-GERAN
C1-120010 Selected PLMN Id indication for the CS domain Alcatel-Lucent, Huawei, HiSilicon CR agreement Yes Yes revised No C1-120467 C1-115347
    C1-120467 Selected PLMN Id indication for the CS domain Alcatel-Lucent, Huawei, HiSilicon CR agreement Yes Yes revised No C1-120543 C1-120010
    C1-120543 Selected PLMN Id indication for the CS domain Alcatel-Lucent, Huawei, HiSilicon CR agreement Yes Yes revised No C1-120863 C1-120467
    C1-120863 Selected PLMN Id indication for the CS domain Alcatel-Lucent, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120543
11.18
RT_ERGSM
11.19
PWS_Sec
11.20
SAMOG_WLAN- CN (CT4)
11.21
LOBSTER-CT (CT4)
C1-120369 Clarify the 3GPP AAA Server provide the HA address to the ePDG during the tunnel establishment ZTE (Joy) CR agreement Yes No withdrawn Yes
11.22
eNR_EPC (CT4)
11.23
PROTOC_SMS_SGs (CT4)
C1-120193 SMS service over LTE through Diameter interfaces Alcatel-Lucent, VerizonWireless CR agreement Yes Yes postponed No
11.24
SAES2, SAES2-CSFB
C1-120083 PDP and EPS bearer contexts for emergency call Renesas Mobile Europe / Hannu discussion discussion Yes Yes revised No C1-120545
    C1-120545 PDP and EPS bearer contexts for emergency call Renesas Mobile Europe / Hannu discussion discussion Yes Yes noted No C1-120083
    C1-120103 Allow UE to find new RAT on Network errors Verizon Wireless, Alcatel-Lucent, Nokia Siemens Networks CR agreement Yes Yes revised No C1-120547
    C1-120547 Allow UE to find new RAT on Network errors Verizon Wireless, Alcatel-Lucent, Nokia Siemens Networks CR agreement No Yes postponed No C1-120103
    C1-120104 NAS changes for cause code 17 Verizon Wireless, Alcatel-Lucent, Nokia Siemens Networks CR agreement Yes Yes revised No C1-120548
    C1-120548 NAS changes for cause code 17 Verizon Wireless, Alcatel-Lucent, Nokia Siemens Networks CR agreement No Yes postponed No C1-120104
    C1-120194 Discussion on SGs and Gs association status synchronization in the EPS and GPRS network Alcatel-Lucent/ Jennifer discussion discussion Yes Yes noted No
    C1-120195 SGs and Gs association status synchronization in the EPS and GPRS network Alcatel-Lucent/ Jennifer CR agreement Yes Yes postponed No
    C1-120196 SGs and Gs association status synchronization in the EPS and GPRS network Alcatel-Lucent/ Jennifer CR agreement Yes Yes postponed No
    C1-120661 Local ISR deactivation in the UE upon change of the UE's usage setting or the voice domain preference for E-UTRAN NEC / Yannick CR agreement Yes Yes agreed No C1-120266
    C1-120662 Local ISR deactivation in the MS upon change of the UE's usage setting or the voice domain preference for E-UTRAN NEC / Yannick CR agreement Yes Yes agreed No C1-120267
    C1-120268 Conditions for using transport of NAS messages procedure NEC / Yannick CR agreement Yes Yes revised No C1-120549
    C1-120549 Conditions for using transport of NAS messages procedure NEC / Yannick CR agreement No Yes postponed No C1-120268
    C1-120490 Correcting conditions for selecting GERAN or UTRAN due to no IMS voice Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120812 C1-120299
    C1-120812 Correcting conditions for selecting GERAN or UTRAN due to no IMS voice Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120889 C1-120490
    C1-120889 Correcting conditions for selecting GERAN or UTRAN due to no IMS voice Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-120812
    C1-120304 Correcting conditions for detaching from non-EPS services due SMS using IMS Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120515
    C1-120515 Correcting conditions for detaching from non-EPS services due SMS using IMS Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-120304
    C1-120305 Correcting conditions for detaching from non-EPS services due SMS using IMS Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120516
    C1-120516 Correcting conditions for detaching from non-EPS services due SMS using IMS Research In Motion UK Ltd. CR agreement No No withdrawn Yes C1-120305
    C1-120306 Correcting indicating IMS capability “SMS using IMS functionality” Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120517
    C1-120517 Correcting indicating IMS capability “SMS using IMS functionality” Research In Motion UK Ltd. CR agreement No No withdrawn Yes C1-120306
    C1-120307 Setting configuration values specified in TS 24.167, +CEVDP, +CVDP, +CMMIVT Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120518
    C1-120518 Setting configuration values specified in TS 24.167, +CEVDP, +CVDP, +CMMIVT Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120813 C1-120307
    C1-120813 Setting configuration values specified in TS 24.167, +CEVDP, +CVDP, +CMMIVT Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-120518
    C1-120310 Correct +CREG reported status Research In Motion UK Ltd. CR agreement Yes Yes agreed No
    C1-120333 MM state handling in E-UTRAN Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-120334 MM state handling in E-UTRAN Huawei, HiSilicon, NEC CR agreement Yes Yes revised No C1-120650
    C1-120650 MM state handling in E-UTRAN Huawei, HiSilicon, NEC CR agreement Yes Yes agreed No C1-120334
    C1-120352 Stopping timer T3417 in the abnormal cases of the service request procedure LG Electronics, Cisco Systems CR agreement Yes Yes revised No C1-120653
    C1-120653 Stopping timer T3417 or T3417ext in the abnormal cases of the service request procedure LG Electronics, Cisco Systems CR agreement Yes Yes agreed No C1-120352
    C1-120640 Essential correction to MME behaviour in case of lower layer failure context deactivation ZTE (Yingzhe) CR agreement Yes Yes revised No C1-120837 C1-120379
    C1-120837 Essential correction to MME behaviour in case of lower layer failure context deactivation ZTE (Yingzhe) CR agreement Yes Yes revised No C1-120897 C1-120640
    C1-120897 Corrections to MME behaviour in Service Request Abnormal Cases handling ZTE (Yingzhe) CR agreement No Yes agreed No C1-120837
    C1-120381 QoS for default bearer Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-120779
    C1-120779 QoS for default bearer Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-120381
    C1-120441 Handling of stored RAND and RES values in case of connection aborted Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-120651
    C1-120651 Handling of stored RAND and RES values in case of connection aborted Qualcomm Incorporated, ZTE CR agreement Yes Yes agreed No C1-120441
    C1-120652 Handling of stored RAND and RES values in case of connection aborted Qualcomm Incorporated, ZTE CR agreement Yes Yes agreed No
    C1-120442 LAU when TIN indicates “P-TMSI” and last combined TAU attempt failed Qualcomm Incorporated, AT&T / Lena CR agreement Yes Yes revised No C1-120654
    C1-120654 LAU when TIN indicates “P-TMSI” and last combined TAU attempt failed Qualcomm Incorporated, AT&T / Lena CR agreement No No withdrawn Yes C1-120442
    C1-120820 Handling of update status upon combined TAU abnormal failure Qualcomm Incorporated, AT&T CR agreement Yes Yes agreed No
11.25
TEI11 and other WIDs
11.25.1
IMS TEI11
C1-120064 Clarification of SRVCC handover information in +CIREPH AT command Intel CR agreement Yes Yes revised No C1-120759
    C1-120759 Clarification of SRVCC handover information in +CIREPH AT command Intel CR agreement Yes Yes agreed No C1-120064
    C1-120065 Inclusion of URIs in AT commands Intel CR agreement Yes Yes postponed No
    C1-120067 Subscription correction Fujitsu Limited, NTT CR agreement Yes Yes agreed No
    C1-120080 Errors in ICSI description Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-120091 Correction of C-MSISDN related reference Deutsche Telekom CR agreement Yes No withdrawn Yes
    C1-120167 MSC server assisted mid-call feature - merging MSC server SRVCC procedures Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-120763
    C1-120763 MSC server assisted mid-call feature - merging MSC server SRVCC procedures Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-120167
    C1-120168 ICSI to visited network - ENs Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-120778
    C1-120778 ICSI to visited network - ENs Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-120168
    C1-120169 Clarification of AS behavior when maximum number of diversions is reached Orange/Youssef CR agreement Yes Yes revised No C1-120764
    C1-120764 Clarification of AS behavior when maximum number of diversions is reached Orange/Youssef CR agreement Yes Yes revised No C1-120890 C1-120169
    C1-120890 Clarification of AS behavior when maximum number of diversions is reached Orange/Youssef CR agreement Yes Yes agreed No C1-120764
    C1-120176 Discussion paper on Discussion paper on allowing the E-CSCF to function as a B2BUA AT&T, Telcordia Technologies discussion discussion Yes Yes noted No
    C1-120177 Discussion paper on the use of Contact Parameters in a 3XX Response from an LRF Andrew Corporation, Telcordia Technologies, AT&T discussion discussion Yes Yes noted No
    C1-120178 Use of Contact Parameters in a 3XX Response from an LRF Andrew Corporation, Telcordia Technologies, AT&T CR agreement Yes Yes revised No C1-120765
    C1-120765 Use of Contact Parameters in a 3XX Response from an LRF Andrew Corporation, Telcordia Technologies, AT&T CR agreement Yes Yes revised No C1-120856 C1-120178
    C1-120856 Use of Contact Parameters in a 3XX Response from an LRF Andrew Corporation, Telcordia Technologies, AT&T CR agreement Yes Yes revised No C1-120898 C1-120765
    C1-120898 Use of Contact Parameters in a 3XX Response from an LRF Andrew Corporation, Telcordia Technologies, AT&T CR agreement Yes Yes agreed No C1-120856
    C1-120234 Adding ICS control during SRVCC Ericsson,ST-Ericsson, Samsung CR agreement Yes Yes revised No C1-120762
    C1-120762 Adding ICS control during SRVCC Ericsson,ST-Ericsson, Samsung CR agreement Yes Yes revised No C1-120855 C1-120234
    C1-120855 Adding ICS control during SRVCC Ericsson,ST-Ericsson, Samsung CR agreement Yes Yes agreed No C1-120762
    C1-120235 DISC Charging correlation Ericsson,ST-Ericsson / Jan discussion discussion Yes Yes noted No
    C1-120236 SRVCC Charging correlation Ericsson,ST-Ericsson / Jan CR agreement Yes Yes revised No C1-120761
    C1-120761 SRVCC Charging correlation Ericsson,ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-120236
    C1-120264 GRUU: S-CSCF URI matching Ericsson, ST-Ericsson / Christer CR agreement Yes Yes postponed No
    C1-120265 GRUU: UE self-assigned GRUU Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-120766
    C1-120766 GRUU: UE self-assigned GRUU Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-120265
    C1-120269 P-CSCF releasing the session when resource is lost Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes postponed No
    C1-120273 Incorrect reference to use of operator specific timer for source access release. Samsung, Ericsson, ST-Ericsson CR agreement Yes Yes agreed No
    C1-120571 Correcting procedure for propagating service profile update to the UE Research In Motion UK Ltd. CR agreement Yes Yes postponed No C1-120303
    C1-120320 Multimedia Telephony Application Server indicating it is on the route Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120767
    C1-120767 Multimedia Telephony Application Server indicating it is on the route Research in Motion CR agreement Yes Yes revised No C1-120867 C1-120320
    C1-120867 Multimedia Telephony Application Server indicating it is on the route Research in Motion CR agreement Yes Yes agreed No C1-120767
    C1-120321 Editorial corrections Research in Motion/ Andrew CR agreement Yes Yes agreed No
    C1-120322 Correcting a reference Research in Motion/ Andrew CR agreement Yes Yes agreed No
    C1-120323 Correcting a reference Research in Motion/ Andrew CR agreement Yes Yes agreed No
    C1-120324 Correcting references Research in Motion/ Andrew CR agreement Yes Yes agreed No
    C1-120325 Clarification on forking related issues Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120768
    C1-120768 Clarification on forking related issues Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-120325
    C1-120326 Addressing Instance ID privacy issues Research in Motion/ Andrew CR agreement Yes Yes revised No C1-120769
    C1-120769 Addressing Instance ID privacy issues Research in Motion/ Andrew CR agreement No Yes postponed No C1-120326
    C1-120362 TIR AS procedures Ericsson, ST-Ericsson /Jorgen CR agreement Yes Yes agreed No
    C1-120363 HOLD-CONF interaction Ericsson, ST-Ericsson/ Jorgen CR agreement Yes Yes revised No C1-120770
    C1-120770 HOLD-CONF interaction Ericsson, ST-Ericsson/ Jorgen CR agreement Yes Yes agreed No C1-120363
    C1-120364 Revoking CC requests Ericsson, ST-Ericsson / Jorgen CR agreement Yes Yes revised No C1-120771
    C1-120771 Revoking CC requests Ericsson, ST-Ericsson / Jorgen CR agreement Yes Yes revised No C1-120858 C1-120364
    C1-120858 Revoking CC requests Ericsson, ST-Ericsson / Jorgen CR agreement No Yes agreed No C1-120771
    C1-120602 CCNL service duration timers Ericsson, ST-Ericsson / Jorgen CR agreement Yes Yes agreed No C1-120365
    C1-120366 Completion of communication in ICS Ericsson, ST-Ericsson / Jorgen CR agreement Yes Yes revised No C1-120772
    C1-120772 Completion of communication in ICS Ericsson, ST-Ericsson / Jorgen CR agreement Yes Yes revised No C1-120859 C1-120366
    C1-120859 Completion of communication in ICS Ericsson, ST-Ericsson / Jorgen CR agreement No Yes agreed No C1-120772
    C1-120598 Editorial error correction in subclause 4.1 ETRI CR agreement Yes Yes agreed No C1-120431
    C1-120434 Clarifying SCC AS behaviour when removing media during full PS-PS access transfer ETRI CR agreement Yes Yes revised No C1-120773
    C1-120773 Clarifying SCC AS behaviour when removing media during full PS-PS access transfer ETRI CR agreement Yes Yes agreed No C1-120434
    C1-120453 Discussion, HOLD and unidirectional media Ericsson, ST-Ericsson /Jorgen discussion discussion Yes Yes noted No
    C1-120454 Clarification of HOLD procedures Ericsson, ST-Ericsson /Jorgen CR agreement Yes Yes revised No C1-120774
    C1-120774 Clarification of HOLD procedures Ericsson, ST-Ericsson /Jorgen CR agreement Yes Yes agreed No C1-120454
    C1-120455 CFNL for unregistered UE in ICS Ericsson, ST-Ericsson /Jorgen CR agreement Yes Yes revised No C1-120775
    C1-120775 CFNL for unregistered UE in ICS Ericsson, ST-Ericsson /Jorgen CR agreement Yes Yes agreed No C1-120455
    C1-120750 CCNL definition text and general clean-up Ericsson, ST-Ericsson / Jorgen CR agreement Yes Yes agreed No
11.25.2
Other TEI11 issues
C1-120022 Correction of action command syntax according to V.250 ST-Ericsson, Ericsson / Atle CR agreement Yes Yes revised No C1-120655
    C1-120655 Correction of action command syntax according to V.250 ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No C1-120022
    C1-120023 Usage of AT-commands in insecure scenarios ST-Ericsson, Ericsson, Renesas Mobile Europe, Alcatel-Lucent CR agreement Yes Yes agreed No
    C1-120024 Correction of AT-command +CALCC ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-120025 Response to test version of AT- commands shall not be optional ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-120026 +CREG, +CGREG and +CEREG, addition of cause values ST-Ericsson, Ericsson / Atle CR agreement Yes Yes revised No C1-120656
    C1-120656 +CREG, +CGREG and +CEREG, addition of cause values ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No C1-120026
    C1-120027 Indication of optional parameter in AT-command syntax ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-120081 "HPLMN Direct Access Indicator" and 802.1x usage Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-120519
    C1-120519 "HPLMN Direct Access Indicator" and 802.1x usage Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-120081
    C1-120084 Definition of “chosen PLMN” Renesas Mobile Europe / Hannu CR agreement Yes Yes agreed No
    C1-120085 RRC Establishment cause for emergency and detach Renesas Mobile Europe, HTC, Research In Motion UK Ltd. CR agreement Yes Yes agreed No
    C1-120093 Normal stop of T303 Acer Incorporated CR agreement Yes Yes agreed No
    C1-120497 alignement of clause 9 of the PWS one2many, Ericsson, ST-Ericsson CR agreement Yes Yes postponed No C1-120097
    C1-120105 Alignment of descriptions for context parameters ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-120503 Re-attach for emergency bearer service NTT DOCOMO, CATT, Renesas Mobile Europe, Deutsche Telekom, KDDI, SOFTBANK MOBILE, Telecom Italia, NTC, Hitachi, Panasonic, Sharp, NEC, Fujitsu CR agreement Yes Yes revised No C1-120810 C1-120120
    C1-120790 Application of ESM backoff Timer when UE received ESM cause #50 or #51 NTT DOCOMO CR agreement No Yes postponed No C1-120126
    C1-120791 Application of ESM backoff Timer when UE received ESM cause #50 or #51 NTT DOCOMO CR agreement No Yes postponed No C1-120128
    C1-120129 Sorting out inconsistency problem in ETWS/PWS specification NTT DOCOMO discussion discussion Yes No withdrawn Yes
    C1-120131 Sorting out inconsistency problem in ETWS/PWS specification NTT DOCOMO CR agreement Yes Yes revised No C1-120498
    C1-120498 Sorting out inconsistency problem in ETWS/PWS specification NTT DOCOMO, Renesas Mobile Europe, Telefonica, one2many CR agreement Yes Yes revised No C1-120805 C1-120131
    C1-120805 Sorting out inconsistency problem in ETWS/PWS specification NTT DOCOMO, Renesas Mobile Europe, Telefonica, one2many CR agreement Yes Yes revised No C1-120857 C1-120498
    C1-120857 Sorting out inconsistency problem in ETWS/PWS specification NTT DOCOMO, Renesas Mobile Europe, Telefonica, one2many CR agreement Yes Yes agreed No C1-120805
    C1-120150 Handling of security related parameters at switch on and switch off Nokia Siemens Networks, Nokia CR agreement Yes Yes revised No C1-120657 C1-115120
    C1-120657 Handling of security related parameters at switch on and switch off Nokia Siemens Networks, Nokia CR agreement Yes Yes agreed No C1-120150
    C1-120151 Correction of the Emergency number list IE Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No
    C1-120226 Extension of maximum bitrates in QoS IE Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-120659
    C1-120660 Extension of maximum bitrates in EPS QoS IE Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes postponed No
    C1-120659 Extension of maximum bitrates in QoS IE Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes postponed No C1-120226
    C1-120227 Clarification and alignment of CC#38 applicability Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No
    C1-120266 Local ISR deactivation in the UE upon change of the UE's usage setting or the voice domain preference for E-UTRAN NEC / Yannick CR agreement Yes Yes revised No C1-120661
    C1-120267 Local ISR deactivation in the MS upon change of the UE's usage setting or the voice domain preference for E-UTRAN NEC / Yannick CR agreement Yes Yes revised No C1-120662
    C1-120720 Correction of "Extended Wait Time" in the timer tables. Samsung, InterDigital Communications LLC, HTC, Intel CR agreement Yes Yes agreed No C1-120275
    C1-120285 Correction of binary coding in clause 9.4.1.2.2 Qualcomm Incorporated / Lena CR agreement Yes Yes agreed No
    C1-120308 Adding SMS using IMS support indication to +CAVIMS Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120663
    C1-120663 Adding +CASIMS: SMS using IMS support indication Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-120308
    C1-120309 Completing conditions for indicating IMS capability “SMS using IMS functionality” Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120664
    C1-120664 Completing conditions for indicating IMS capability “SMS using IMS functionality” Research In Motion UK Ltd. CR agreement No No withdrawn Yes C1-120309
    C1-120311 Introduction of support for multiple interaction areas Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-120665
    C1-120665 Introduction of support for multiple interaction areas Research In Motion UK Ltd. CR agreement No Yes postponed No C1-120311
    C1-120722 Rejecting ESM messages with low priority indicator Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120328
    C1-120796 Indication of supporting T3312 extended value in RAU Huawei, HiSilicon, Vodafone CR agreement Yes Yes revised No C1-120838 C1-120332
    C1-120838 Indication of supporting T3312 extended value in RAU Huawei, HiSilicon, Vodafone CR agreement Yes Yes agreed No C1-120796
    C1-120335 Subclause reference correction Huawei, HiSilicon CR agreement Yes Yes revised No C1-120666
    C1-120666 Subclause reference correction Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120335
    C1-120336 PDN connection for emergency bearer services Huawei, HiSilicon discussion discussion Yes Yes revised No C1-120471
    C1-120471 PDN connection for emergency bearer services Huawei, HiSilicon discussion discussion Yes Yes noted No C1-120336
    C1-120337 Service request procedure when the UE has an established PDN connection for EMC Huawei, HiSilicon CR agreement Yes Yes revised No C1-120667
    C1-120667 Service request procedure when the UE has an established PDN connection for EMC Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120337
    C1-120338 UE-requested modification procedure of a GBR bearer Huawei, HiSilicon CR agreement Yes Yes revised No C1-120668
    C1-120668 UE-requested modification procedure of a GBR bearer Huawei, HiSilicon CR agreement Yes Yes revised No C1-120899 C1-120338
    C1-120899 UE-requested modification procedure of a GBR bearer Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120668
    C1-120339 Local EPS bearer deactivation without ESM signalling in the network side Huawei, HiSilicon CR agreement Yes Yes revised No C1-120669
    C1-120669 Local EPS bearer deactivation without ESM signalling in the network side Huawei, HiSilicon, ZTE CR agreement Yes Yes revised No C1-120814 C1-120339
    C1-120814 Local EPS bearer deactivation without ESM signalling in the network side Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-120669
    C1-120342 IETF RFC references in TS 23.040, 24.259, 24.327 Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-120343 IETF reference update Huawei, HiSilicon CR agreement Yes Yes revised No C1-120671
    C1-120671 IETF reference update Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120343
    C1-120344 IETF reference update Huawei, HiSilicon CR agreement Yes Yes revised No C1-120672
    C1-120672 IETF reference update Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120344
    C1-120348 IETF reference update Huawei, HiSilicon CR agreement Yes Yes revised No C1-120673
    C1-120673 IETF reference update Huawei, HiSilicon CR agreement Yes Yes agreed No C1-120348
    C1-120351 Adding domain name to ISRPs LG Electronics CR agreement Yes Yes revised No C1-120520
    C1-120520 Adding domain name to ISRPs LG Electronics CR agreement Yes Yes agreed No C1-120351
    C1-120353 Stopping T3346 after inter-PLMN HO LG Electronics CR agreement Yes Yes revised No C1-120674
    C1-120674 Stopping T3346 after inter-PLMN HO LG Electronics CR agreement No No withdrawn Yes C1-120353
    C1-120354 Correction of LAU trigger when EMM/GMM backoff LG Electronics CR agreement Yes Yes revised No C1-120675
    C1-120675 Correction of LAU trigger when EMM/GMM backoff LG Electronics CR agreement Yes Yes agreed No C1-120354
    C1-120355 Correction of detach procedure collision LG Electronics, Huawei, HiSilicon CR agreement Yes Yes revised No C1-120676
    C1-120676 Correction of detach procedure collision LG Electronics, Huawei, HiSilicon CR agreement No Yes postponed No C1-120355
    C1-120356 Correction of detach procedure collision LG Electronics, Huawei, HiSilicon CR agreement Yes Yes revised No C1-120677
    C1-120677 Correction of detach procedure collision LG Electronics, Huawei, HiSilicon CR agreement No Yes postponed No C1-120356
    C1-120357 Correction of TAU trigger after 1x SRVCC LG Electronics CR agreement Yes Yes revised No C1-120678
    C1-120678 Correction of TAU trigger after 1x SRVCC LG Electronics CR agreement No No withdrawn Yes C1-120357
    C1-120361 Removing reference to non- existent timer T3247 Research In Motion CR agreement Yes Yes agreed No
    C1-120372 Correct the behaviors of the VLR during the implicit IMSI detach procedure ZTE (Yingzhe) CR agreement Yes Yes revised No C1-120679
    C1-120679 Correct the behaviors of the VLR during the implicit IMSI detach procedure ZTE (Yingzhe) CR agreement Yes Yes agreed No C1-120372
    C1-120373 Clarification of the condition for setting TMSI in paging message IMSI detach procedure ZTE (Yingzhe) CR agreement Yes No withdrawn Yes
    C1-120374 Correction of the condition for local EPS bearer context deactivation ZTE (Yingzhe) CR agreement Yes Yes revised No C1-120670
    C1-120670 Correction of the condition for local EPS bearer context deactivation ZTE (Yingzhe) CR agreement No No withdrawn Yes C1-120374
    C1-120375 Clarification of new EPS security context ZTE, Qualcomm Incorporated CR agreement Yes Yes agreed No
    C1-120380 Clarification of location update type for manual CSG selection Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-120680
    C1-120680 Clarification of location update type for manual CSG selection Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-120380
    C1-120721 Correction on MO CSFB handling CATT CR agreement Yes Yes agreed No C1-120396
    C1-120436 Corrections to CPNER parameters Renesas/Marko CR agreement Yes Yes agreed No
    C1-120443 Clarify emergency numbers list transfer by the network. Orange CR agreement Yes Yes revised No C1-120681
    C1-120681 Clarify emergency numbers list transfer by the network. Orange CR agreement Yes Yes postponed No C1-120443
    C1-120472 Information paper for ETWS discussion in CT1#76 (including recap of conf-call discussion) NTT DOCOMO information information Yes Yes noted No
    C1-120870 Indication of supporting T3412 extended value in TAU Huawei, HiSilicon, Vodafone CR agreement Yes Yes agreed No
11.25.3
new / updated Rel-11 WIDs
C1-120090 WID on Roaming Architecture for Voice over IMS with Local Breakout Deutsche Telekom new WID agreement Yes Yes revised No C1-120484
    C1-120484 WID on Roaming Architecture for Voice over IMS with Local Breakout Deutsche Telekom new WID agreement Yes Yes agreed No C1-120090
    C1-120106 Rel-11 BBF Interworking Building Block I Ericsson, ST-Ericsson/Zu revised WID agreement Yes Yes revised No C1-120485
    C1-120485 Rel-11 BBF Interworking Building Block I Ericsson, ST-Ericsson/Zu revised WID agreement Yes Yes agreed No C1-120106
    C1-120107 Rel-11 BBF Interworking Building Block II Ericsson, ST-Ericsson/Zu revised WID agreement Yes Yes revised No C1-120486
    C1-120486 Rel-11 BBF Interworking Building Block II Ericsson, ST-Ericsson/Zu revised WID agreement Yes Yes endorsed No C1-120107
    C1-120192 WID on “Enhancement of the Protocols for SMS over SGs” Alcatel-Lucent revised WID agreement Yes Yes revised No C1-120487
    C1-120487 WID on “Enhancement of the Protocols for SMS over SGs” Alcatel-Lucent revised WID agreement Yes Yes endorsed No C1-120192
    C1-120388 CT aspect on Network Provided Location Information for IMS Huawei, HiSilicon new WID agreement Yes Yes revised No C1-120488
    C1-120488 CT aspect on Network Provided Location Information for IMS Huawei, HiSilicon new WID agreement Yes Yes endorsed No C1-120388
12
Rel-12
12.1
Release 12 documents for information
12.2
LIMONET-LIPA
12.3
LIMONET-SIPTO (CT4)
12.4
new / updated Rel-12 WIDs
C1-120417 Data identification in ANDSF (DIDA) – Stage 3 Qualcomm Incorporated / Patrick new WID agreement Yes Yes revised No C1-120489
    C1-120489 Data identification in ANDSF (DIDA) – Stage 3 Qualcomm Incorporated / Patrick new WID agreement Yes Yes agreed No C1-120417
13
Output liaison statements
C1-120011 Reply LS on the introduction of FULL-MOCN-GERAN feature current meeting o/g LS agreement Yes Yes revised No C1-120797
    C1-120797 LS on indication of selected PLMN for the CS domain current meeting o/g LS agreement Yes Yes revised No C1-120862 C1-120011
    C1-120862 LS on indication of selected PLMN for the CS domain current meeting o/g LS agreement Yes Yes agreed No C1-120797
    C1-120478 LS on LLC acknowledged mode not applicable in Rel-8 current meeting o/g LS approval Yes Yes revised No C1-120822
    C1-120822 LS on LLC acknowledged mode not applicable in Rel-8 current meeting o/g LS approval Yes Yes agreed No C1-120478
    C1-120479 Reply LS on issues on inbound CSG mobility failure current meeting o/g LS approval Yes Yes agreed No
    C1-120480 Reply LS on Handling of CS emergency call from non CSG member on a CSG cell current meeting o/g LS approval Yes Yes agreed No
    C1-120347 LS on indication of selected PLMN for CS domain Huawei, HiSilicon o/g LS agreement Yes No withdrawn Yes
    C1-120406 LS on Handling PDN connection request from UE with MM back-off timer running CATT o/g LS agreement Yes Yes revised No C1-120781
    C1-120781 LS on Handling PDN connection request from UE with MM back-off timer running CATT o/g LS agreement Yes Yes revised No C1-120861 C1-120406
    C1-120861 LS on Handling PDN connection request from UE with MM back-off timer running current meeting o/g LS agreement Yes Yes agreed No C1-120781
    C1-120481 Reply LS on PWS: Role and architecture of the CBC and CBE nodes current meeting o/g LS approval Yes Yes revised No C1-120798
    C1-120798 Reply LS on PWS: Role and architecture of the CBC and CBE nodes current meeting o/g LS approval Yes Yes revised No C1-120864 C1-120481
    C1-120864 Reply LS on PWS: Role and architecture of the CBC and CBE nodes current meeting o/g LS approval Yes Yes agreed No C1-120798
    C1-120482 Reply LS on usage of XCAP for Voice over IMS current meeting o/g LS approval Yes Yes revised No C1-120823
    C1-120823 Reply LS on usage of XCAP for Voice over IMS current meeting o/g LS approval Yes Yes agreed No C1-120482
    C1-120483 Reply LS to the LS (RILTE Doc 23_005r3) on Supplementary service HOLD and simplex video media.from GSMA RILTE current meeting o/g LS approval Yes Yes revised No C1-120860
    C1-120860 Reply LS to the LS (RILTE Doc 23_005r3) on Supplementary service HOLD and simplex video media.from GSMA RILTE current meeting o/g LS approval Yes Yes agreed No C1-120483
    C1-120538 LS on structure of "IP address/ports and selected codec for the IMS media anchoring" in CS to PS SRVCC current meeting o/g LS approval Yes Yes revised No C1-120799
    C1-120799 LS on structure of "IP address/ports and selected codec for the IMS media anchoring" in CS to PS SRVCC current meeting o/g LS approval Yes Yes revised No C1-120827 C1-120538
    C1-120827 LS on structure of "IP address/ports and selected codec for the IMS media anchoring" in CS to PS SRVCC current meeting o/g LS approval Yes Yes agreed No C1-120799
    C1-120541 LS on Extended Access Barring current meeting o/g LS approval Yes Yes revised No C1-120802
    C1-120802 LS on Extended Access Barring current meeting o/g LS approval Yes Yes revised No C1-120891 C1-120541
    C1-120891 LS on Extended Access Barring current meeting o/g LS approval Yes Yes revised No C1-120907 C1-120802
    C1-120907 LS on Extended Access Barring current meeting o/g LS approval Yes Yes agreed No C1-120891
    C1-120542 LS on M2M Dual Priority current meeting o/g LS approval Yes Yes revised No C1-120824
    C1-120824 LS on M2M Dual Priority current meeting o/g LS approval Yes Yes agreed No C1-120542
    C1-120544 PDP and EPS bearer contexts for emergency call current meeting o/g LS approval Yes Yes revised No C1-120825
    C1-120825 PDP and EPS bearer contexts for emergency call current meeting o/g LS approval Yes Yes agreed No C1-120544
    C1-120546 LS on RR failures and network reselection current meeting o/g LS approval Yes Yes agreed No
    C1-120603 Supporting T.38-based Fax service in IMS current meeting o/g LS approval Yes Yes revised No C1-120826
    C1-120826 Supporting T.38-based Fax service in IMS current meeting o/g LS approval Yes Yes revised No C1-120866 C1-120603
    C1-120866 Supporting T.38-based Fax service in IMS current meeting o/g LS approval Yes Yes revised No C1-120901 C1-120826
    C1-120901 Supporting T.38-based Fax service in IMS current meeting o/g LS approval Yes Yes agreed No C1-120866
    C1-120658 Reply LS on stage 3 for modification of security context storage rate on the UICC current meeting o/g LS approval Yes Yes agreed No
    C1-120713 MO SMS when T3346 is running in LTE current meeting o/g LS approval No No withdrawn Yes
    C1-120803 LS on re-documentation and alignment of PWS current meeting o/g LS approval Yes Yes revised No C1-120865
    C1-120865 LS on re-documentation and alignment of PWS current meeting o/g LS approval Yes Yes revised No C1-120900 C1-120803
    C1-120900 LS on re-documentation and alignment of PWS current meeting o/g LS approval Yes Yes agreed No C1-120865
14
Late and misplaced docs
C1-120130 Sorting out inconsistency problem in ETWS/PWS specification NTT DOCOMO CR agreement No No withdrawn Yes
    C1-120152 Correction of SMS over IP related errors Nokia Siemens Networks / Robert CR agreement No No [not addressed] No
    C1-120201 Coding of values for feature-tags used for eSRVCC NokiaSiemensNetworks CR agreement No No [not addressed] No
    C1-120202 Coding of values for feature-tags used for eSRVCC NokiaSiemensNetworks CR agreement No No [not addressed] No
    C1-120263 GRUU: Multiple contacts Ericsson, ST-Ericsson / Christer CR agreement No No [not addressed] No
    C1-120463 Revisions to Rc interface – 2 Alcatel-Lucent / Keith Drage CR agreement No No [not addressed] No
15
AOB
C1-120795 Good Bye CT1 - Hideyuki NTT DOCOMO information information Yes Yes noted No
16
Closing

Created: 2012-02-21 12:53     Last document: C1-120907