C1-110001 |
agenda |
CT1 Chairman |
agenda |
agreement |
2 |
Yes |
Yes |
noted |
No |
|
| C1-110002 |
draft C1-68 meeting report |
MCC |
meeting report / action list |
approval |
2 |
Yes |
Yes |
approved |
No |
|
| C1-110003 |
work plan |
MCC |
work plan |
agreement |
4.2 |
Yes |
Yes |
noted |
No |
|
| C1-110004 |
Response code in Reason header field |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110005 |
Response code in Reason header field |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110006 |
Response code in Reason header field |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110630 |
| C1-110007 |
UE initiated deregistration |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110579 |
| C1-110008 |
UE initiated deregistration |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110580 |
| C1-110009 |
UE initiated deregistration |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110581 |
| C1-110010 |
Other databases |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.4 |
Yes |
Yes |
agreed |
No |
|
| C1-110011 |
Record-Rout at SCC AS – MO calls |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
revised |
No |
C1-110608 |
| C1-110012 |
Record-Rout at SCC AS – MO calls |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
revised |
No |
C1-110609 |
| C1-110013 |
Record-Rout at SCC AS – MT calls |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110014 |
Record-Rout at SCC AS – MT calls |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110015 |
reg-id in Contact |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.4 |
Yes |
Yes |
revised |
No |
C1-110549 |
| C1-110016 |
Remote leg release |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110017 |
Remote leg release |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
revised |
No |
C1-110610 |
| C1-110018 |
Previously established dialog |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
revised |
No |
C1-110611 |
| C1-110019 |
Previously established dialog |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
revised |
No |
C1-110612 |
| C1-110020 |
Contact registration |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110021 |
Contact registration |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
revised |
No |
C1-110613 |
| C1-110022 |
Clarification of possible triggers for network-initiated reauthentication |
Nokia |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110560 |
| C1-110023 |
Update to IMS registration procedures due to USAT initiated Refresh for ISIM/USIM EFs |
Nokia |
discussion |
discussion |
11.24.1 |
Yes |
Yes |
noted |
No |
|
| C1-110024 |
Update to IMS registration procedures due to USAT initiated Refresh for ISIM/USIM EFs |
Nokia |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110561 |
| C1-110025 |
Network-initiated link removal procedure |
Ericsson, ST-Ericsson |
CR |
agreement |
11.16 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110026 |
Network-initiated link removal procedure |
Ericsson, ST-Ericsson |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110491 |
| C1-110027 |
Clarification to the handling of SM cause value 27 |
HTC Corp |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110439 |
| C1-110028 |
Clarification to the handling of timer T3245 |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110029 |
Clarification to the handling of timer T3245 |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110030 |
Handling of secondary PDP context activation procedure in case of APN congestion |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110468 |
| C1-110031 |
Handling of dedicated EPS bearer context activation procerdure in case of APN congestion |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110469 |
| C1-110032 |
Handling of network initiated PDP context activation procedure when SM back off timer is running. |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110033 |
Reply LS on the Usage of MBR and GBR bearers in MTSI (C3-101505) |
CT3 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110034 |
LS on Inter PLMN mobility procedure (C4-103323) |
CT4 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110035 |
Response LS on LS on MTC USIM requirements for Rel-10 (C6-100585) |
CT6 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110036 |
Reply LS on Progress on relay node security (C6-100586) |
CT6 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110037 |
LS on USIM based manual CSG list display restriction per PLMN (C6-100644) |
CT6 |
i/c LS |
action |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110038 |
LS on Extended Access Barring (GP-102072) |
GERAN2 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110039 |
Reply LS on RAN sharing for Home(e)NB cells (R2-106942) |
RAN2 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110040 |
Response LS on RAN sharing for Home(e)NB cells (R3-103742) |
RAN3 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110041 |
Reply LS on GERAN and UTRAN handling of RFSP Index/SPID (R3-103788) |
RAN3 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110042 |
UE procedures for ePDG selection when roaming (S2-106006) |
SA2 |
i/c LS |
action |
3 |
Yes |
Yes |
replied to |
No |
|
| C1-110043 |
LS on CN node selection (S2-106007) |
SA2 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110044 |
LS on new Study Item on Core Network Overload issues (S3-101400) |
SA3 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110045 |
Reply LS to S1-103315-LS on MTC USIM requirements for Rel-10 (S3-101435) |
SA3 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110046 |
LS on exception to SA WG3 to continue working on Relay Node (SP-100874) |
TSG SA |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110047 |
LS on Extended Access Barring (SP-100898) |
TSG SA |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110048 |
Device identifiers for common IMS |
3GPP2 TSG-X |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110049 |
Pseudo-CR on P-CR implementation correction |
Infineon Technologies |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110050 |
Pseudo-CR on establishment of collaborative session upon originating session setup alternative 2 |
Infineon Technologies |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110532 |
| C1-110051 |
Pseudo-CR on establishment of collaborative session upon terminating session setup alternative 2 |
Infineon Technologies |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110533 |
| C1-110052 |
Pseudo-CR on establishment of collaborative session upon originating session setup alternative 2 with forked responses |
Infineon Technologies |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110053 |
Correction of Inter System Routing Policy (ISRP) MO structure |
Nokia Siemens Networks, Nokia |
discussion |
discussion |
11.16 |
Yes |
Yes |
noted |
No |
|
| C1-110054 |
Inter System Routing Policy (ISRP) MO correction |
Nokia Siemens Networks, Nokia |
CR |
agreement |
11.16 |
Yes |
Yes |
postponed |
No |
|
| C1-110055 |
ePDG selection for known VPLMN |
Nokia Siemens Networks |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110456 |
| C1-110056 |
Handling of CS Fallback Mobile Originating Calls |
Alcatel-Lucent, AT&T |
CR |
agreement |
11.23 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110057 |
Explicit Signalling Indication During Attach |
Alcatel-Lucent, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110712 |
| C1-110058 |
Explicit Signalling Indication During Attach |
Alcatel-Lucent, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110713 |
| C1-110059 |
GUMMEI Type indication during establishment of NAS signalling connection |
Alcatel-Lucent |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110736 |
| C1-110060 |
P-TMSI Type indication during establishment of PS signalling connection |
Alcatel-Lucent |
CR |
agreement |
11.23 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110061 |
Avoiding the problem of barring duplication for MO CSFB |
NTT DOCOMO |
discussion |
discussion |
11.23 |
Yes |
Yes |
noted |
No |
|
| C1-110062 |
Avoiding the problem of barring duplication for MO CSFB |
NTT DOCOMO |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110737 |
| C1-110063 |
Reconsidering the UE behavior when it is barred to MO CSFB |
NTT DOCOMO |
discussion |
discussion |
11.23 |
Yes |
Yes |
noted |
No |
|
| C1-110064 |
Reconsidering the UE behavior when it is barred to MO CSFB |
NTT DOCOMO |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110714 |
| C1-110065 |
LS on Access class barring for CSFB |
NTT DOCOMO |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110715 |
| C1-110066 |
NIMTC: Identifying request for resources for machine-to-machine communication |
RIM, Chen |
discussion |
discussion |
11.12 |
Yes |
Yes |
noted |
No |
|
| C1-110067 |
Service Type for machine-to-machine communication – 24.301 |
Research in Motion |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110068 |
Service Type for machine-to-machine communication – 24.008 |
Research in Motion |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110069 |
Device properties and RRC establishment cause = Delay tolerant – 24.301 |
Research in Motion |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110488 |
| C1-110070 |
Device properties and RRC establishment cause = Delay tolerant – 24.008 |
Research in Motion |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110487 |
| C1-110071 |
Enhancement of +CPOS and +CPOSR for LPP, capability request and velocity request |
ST-Ericsson, Ericsson / Atle |
CR |
agreement |
11.24.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110072 |
Enhancement and alignment of +CLIP, +CCWA and +CLCC when CLI is not available |
ST-Ericsson, Ericsson / Atle |
CR |
agreement |
11.24.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110073 |
Pseudo-CR on MO identifier for the NAS configuration MO |
Ericsson, ST-Ericsson / Atle |
pseudo CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
|
| C1-110074 |
The urn:oma:mo:ext-3gpp-conf:1 registered with OMNA |
Ericsson, ST-Ericsson / Atle |
CR |
agreement |
10.16.1 |
Yes |
Yes |
agreed |
No |
|
| C1-110075 |
The urn:oma:mo:ext-3gpp-ICS:1.0 registered with OMNA |
Ericsson, ST-Ericsson / Atle |
CR |
agreement |
9.4 |
Yes |
Yes |
agreed |
No |
|
| C1-110076 |
The urn:oma:mo:ext-3gpp-ICS:1.0 registered with OMNA |
Ericsson, ST-Ericsson / Atle |
CR |
agreement |
9.4 |
Yes |
Yes |
agreed |
No |
|
| C1-110077 |
Requirement for inclusion of LCS client identity IE in SGsAP-PAGING-REQUEST message |
Ericsson, ST-Ericsson / Mikael |
CR |
agreement |
11.24.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110078 |
Mobility management congestion control and back-off timer |
Ericsson, ST-Ericsson / Mikael |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110470 |
| C1-110079 |
Mobility management congestion control and back-off timer |
Ericsson, ST-Ericsson / Mikael |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110471 |
| C1-110080 |
Revised WID on "Optimal Media Routeing" |
Alcatel-Lucent |
revised WID |
agreement |
11.6 |
Yes |
Yes |
endorsed |
No |
|
| C1-110081 |
Optimal Media Routeing – SDP attribute syntax definition |
Alcatel-Lucent |
CR |
agreement |
11.6 |
Yes |
Yes |
revised |
No |
C1-110558 |
| C1-110082 |
Update SDP profile table for Optimal Media Routeing |
Alcatel-Lucent |
CR |
agreement |
11.6 |
Yes |
Yes |
revised |
No |
C1-110559 |
| C1-110083 |
Introduce cause value to reflect call rejection due to destination feature |
Alcatel-Lucent |
CR |
agreement |
11.23 |
Yes |
No |
[not addressed] |
No |
|
| C1-110084 |
Method to handle network initiated PDP context for an APN for which the back off time is running. |
HTC Corp |
discussion |
discussion |
11.12 |
Yes |
Yes |
noted |
No |
|
| C1-110085 |
Handling of network initiated EPS context activation procedure when SM back off timer is running. |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110086 |
Clarification on sending low priority indicator when the attaching for emergency bearer services. |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110087 |
Clarification on sending low priority indicator when the attaching for emergency bearer services. |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110088 |
Addition to Combined procedure for PDN disconnection for LIPA |
InterDigital |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110462 |
| C1-110089 |
Addition to Combined procedure for PDN disconnection for LIPA |
InterDigital |
CR |
agreement |
14 |
No |
No |
withdrawn |
Yes |
|
| C1-110090 |
Corrections to the PDP Context Deactivation for LIPA |
InterDigital |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110463 |
| C1-110091 |
Exception for the LIPA PDN disconnection |
InterDigital |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110769 |
| C1-110092 |
Local Bearer deactivation during CSFB |
InterDigital |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110716 |
C1-105149 |
C1-110093 |
Providing the UE with R99 QoS |
Renesas/Marko |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110717 |
| C1-110094 |
Low priority indication by the MS for the service request procedure |
Panasonic / Benjamin |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110472 |
| C1-110095 |
Low priority indication by the UE for the service request procedure |
Panasonic / Benjamin |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110096 |
Proposed changes for RFC3455bis |
Deutsche Telekom |
discussion |
discussion |
11.1 |
Yes |
Yes |
revised |
No |
C1-110616 |
| C1-110097 |
RFC3455bis new proposed draft |
Deutsche Telekom |
information |
information |
11.1 |
Yes |
Yes |
noted |
No |
|
| C1-110098 |
Clarification of IMS Registration condition for VoLTE UEs |
NTT DOCOMO |
CR |
agreement |
11.24.1 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110099 |
Inter system change to S1-mode with no active PDP Context |
Ericsson, ST-Ericsson, TeliaSonera, NTT DOCOMO |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110718 |
| C1-110100 |
XML representation of leaf and node names starting with a digit |
Ericsson, ST-Ericsson |
CR |
agreement |
11.24.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110101 |
Support of AT commands for SMS |
Ericsson, ST-Ericsson |
CR |
agreement |
11.24.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110102 |
Support of AT commands for voice |
Ericsson, ST-Ericsson |
CR |
agreement |
11.24.2 |
Yes |
Yes |
revised |
No |
C1-110466 |
| C1-110103 |
Integrity protection of periodic updates |
Ericsson, ST-Ericsson |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110711 |
| C1-110104 |
Reference version of TS 24.368 v1.0.1 |
Ericsson, ST-Ericsson |
draft TS/TR |
information |
11.12 |
Yes |
Yes |
noted |
No |
|
| C1-110105 |
Updates of the NAS configuration MO |
Ericsson, ST-Ericsson |
pseudo CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110484 |
| C1-110106 |
Correction of USAT profile activation |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
revised |
No |
C1-110709 |
| C1-110107 |
Detection of currently active SIM or USIM |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
revised |
No |
C1-110727 |
| C1-110108 |
Alignment with SIM Application Toolkit |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
rejected |
No |
|
| C1-110109 |
Modification of default value for MT profile and write response |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
revised |
No |
C1-110707 |
| C1-110110 |
Correction of USAT event response |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
revised |
No |
C1-110708 |
| C1-110111 |
Handling of non-delivered CS SERVICE INDICATION |
Nokia Siemens Networks |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
|
| C1-110112 |
Correction of handling of call forwarding |
Nokia Siemens Networks |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
|
| C1-110113 |
Implicit detach handling for EPS and non-EPS services |
Alcatel-Lucent/ Jennifer Liu |
CR |
agreement |
11.23 |
Yes |
No |
[not addressed] |
No |
|
| C1-110114 |
Clarification on Inclusion of Additional GUTI IE |
Alcatel-Lucent/ Jennifer Liu |
CR |
agreement |
9.2.1 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110115 |
Clarification on Inclusion of Additional GUTI IE |
Alcatel-Lucent/ Jennifer Liu |
CR |
agreement |
9.2.1 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110116 |
Clarification on Inclusion of Additional GUTI IE |
Alcatel-Lucent/ Jennifer Liu |
CR |
agreement |
9.2.1 |
Yes |
Yes |
revised |
No |
C1-110454 |
| C1-110117 |
Clarification on Inclusion of Additional mobile identity and RAI IEs |
Alcatel-Lucent/ Jennifer Liu |
CR |
agreement |
9.2.1 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110118 |
Clarification on Inclusion of Additional mobile identity and RAI IEs |
Alcatel-Lucent/ Jennifer Liu |
CR |
agreement |
9.2.1 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110119 |
Clarification on Inclusion of Additional mobile identity and RAI IEs |
Alcatel-Lucent/ Jennifer Liu |
CR |
agreement |
9.2.1 |
Yes |
Yes |
revised |
No |
C1-110455 |
| C1-110120 |
Impact of NAS signalling low priority indicator on selection of MSC/VLR |
Motorola |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110121 |
Clarification of CSFB cancellation |
Motorola, Vodafone |
CR |
agreement |
11.23 |
Yes |
Yes |
postponed |
No |
|
| C1-110122 |
Attach with IMSI Alignment of Terminology |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110475 |
| C1-110123 |
Attach with IMSI Alignment of Terminology |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110476 |
| C1-110124 |
Specific requirements Alignment of Terminology |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
|
| C1-110125 |
Specific requirements Alignment of Terminology |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
|
| C1-110126 |
NMO I behavior |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110477 |
| C1-110127 |
Extended Periodic Timer Correction |
Nokia Siemens Networks, Alcatel-Lucent, ZTE |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
|
| C1-110128 |
UEs configured with long minimum periodic PLMN search time limit |
Nokia Siemens Networks, Samsung, Alcatel-Lucent |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110478 |
| C1-110129 |
Attach Attempt Counter |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110479 |
| C1-110130 |
Low priority indicator Storage and Re-configuration |
Nokia Siemens Networks |
discussion |
discussion |
11.12 |
Yes |
Yes |
noted |
No |
|
| C1-110131 |
Modifications to S-CSCF procedures in support of MPS |
Telcordia, AT&T, NCS |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110562 |
| C1-110132 |
Modifications to P-CSCF and IBCF procedures in support of MPS |
Telcordia, AT&T, NCS |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110563 |
| C1-110133 |
Notify UE when a HNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd. |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110464 |
| C1-110134 |
Notify UE when a HeNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd. |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110465 |
| C1-110135 |
Granular control over preventing usage of network provided services or functions |
Research In Motion UK Ltd. |
CR |
agreement |
11.24.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110136 |
Select E-CSCF upon S-SCSF failure |
Research In Motion UK Ltd. |
CR |
agreement |
11.7 |
Yes |
Yes |
revised |
No |
C1-110557 |
| C1-110137 |
Correct P-CSCF handling of requests for emergency services with Route header fields |
Research In Motion UK Ltd. |
CR |
agreement |
8.1 |
Yes |
Yes |
revised |
No |
C1-110564 |
| C1-110138 |
Correct P-CSCF handling of requests for emergency services with Route header fields |
Research In Motion UK Ltd. |
CR |
agreement |
8.1 |
Yes |
Yes |
revised |
No |
C1-110565 |
| C1-110139 |
Correct P-CSCF handling of requests for emergency services with Route header fields |
Research In Motion UK Ltd. |
CR |
agreement |
8.1 |
Yes |
Yes |
revised |
No |
C1-110566 |
| C1-110140 |
Correct P-CSCF handling of requests for emergency services with Route header fields |
Research In Motion UK Ltd. |
CR |
agreement |
8.1 |
Yes |
Yes |
revised |
No |
C1-110567 |
| C1-110141 |
Clarification on PDP Context Activation and Modification for the LIPA PDN connection |
LG Electronics |
CR |
agreement |
11.17 |
Yes |
Yes |
postponed |
No |
|
| C1-110142 |
Service request initiation for dual rx 1xCSFB UE |
LG Electronics |
CR |
agreement |
10.15 |
Yes |
Yes |
revised |
No |
C1-110457 |
| C1-110143 |
Service request initiation for dual rx 1xCSFB UE |
LG Electronics |
CR |
agreement |
10.15 |
Yes |
Yes |
revised |
No |
C1-110458 |
| C1-110144 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110624 |
| C1-110145 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110625 |
| C1-110146 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110626 |
| C1-110147 |
Signalling flow correction for the terminating case when using I1 reference point |
ZTE |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110148 |
Signalling flow correction for the terminating case when using I1 reference point |
ZTE |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110149 |
Editor’s note delete for aSRVCC on A.17.1 |
ZTE |
CR |
agreement |
11.9 |
Yes |
Yes |
revised |
No |
C1-110543 |
| C1-110150 |
Adding clauce A.18 for eSRVCC signalling flow |
ZTE |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110535 |
| C1-110151 |
Discussion on the methods for alerting transfer with mid-call feature |
ZTE |
discussion |
discussion |
11.9 |
Yes |
Yes |
noted |
No |
|
| C1-110152 |
Signalling flows for eSRVCC assisted mid-call feature including ATCF |
ZTE |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110536 |
| C1-110153 |
Signalling flows for eSRVCC assisted mid-call feature without ATCF |
ZTE |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110537 |
| C1-110154 |
SRVCC in alerting phase |
ZTE |
revised WID |
agreement |
11.9 |
Yes |
Yes |
revised |
No |
C1-110443 |
| C1-110155 |
Formulisation of WLAN files |
Research In Motion UK LTD (adrian) |
new WID |
agreement |
14 |
No |
No |
withdrawn |
Yes |
|
| C1-110156 |
TS ab.cde 3GPP System to Wireless Local Area Network Interworking Management Object |
Research In Motion UK LTD (adrian) |
draft TS/TR |
information |
14 |
No |
No |
withdrawn |
Yes |
|
| C1-110157 |
Formal definition of WLAN ME files |
Research In Motion UK LTD (adrian) |
CR |
agreement |
14 |
No |
No |
withdrawn |
Yes |
|
| C1-110158 |
Missing Automatic Network Selection HPLMN Functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.1 |
Yes |
Yes |
revised |
No |
C1-110450 |
| C1-110159 |
Missing Automatic Network Selection HPLMN Functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.1 |
Yes |
Yes |
revised |
No |
C1-110451 |
| C1-110160 |
Missing Automatic Network Selection HPLMN Functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.1 |
Yes |
Yes |
revised |
No |
C1-110452 |
| C1-110161 |
State machine correlation corrections |
Research In Motion UK LTD (adrian) |
CR |
agreement |
10.3 |
Yes |
Yes |
revised |
No |
C1-110614 |
| C1-110162 |
Clarification of Service control |
Research In Motion UK LTD (adrian) |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110163 |
Removal of confusing duplicate text for I1. |
Research In Motion UK LTD (adrian) |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110164 |
Removal of confusing duplicate text for I1. |
Research In Motion UK LTD (adrian) |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110165 |
Inserting of missing feature tag for registration from MSC enhanced for ICS |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110166 |
Inserting of missing feature tag for registration from MSC enhanced for ICS |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110167 |
Inserting of missing feature tag for registration from MSC enhanced for ICS |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110593 |
| C1-110168 |
Inclusion of Network TADs functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110594 |
| C1-110169 |
Inclusion of Network TADs functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110595 |
| C1-110170 |
Completing correction of indication that aspects of the session description are not acceptable |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110596 |
| C1-110171 |
Completing correction of indication that aspects of the session description are not acceptable |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110597 |
| C1-110172 |
Completing correction of indication that aspects of the session description are not acceptable |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110598 |
| C1-110173 |
Pseudo-CR on evaluation of establishment of collaborative session upon session setup |
Infineon Technologies |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110534 |
| C1-110174 |
Clarification to SM cause value#31 |
HTC Corp |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
|
| C1-110175 |
Clarification to ESM cause value#31 |
HTC Corp |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110738 |
| C1-110176 |
Addition of value “priority” to CPC parameter |
NTT / Hiroshi |
CR |
agreement |
8.3 |
Yes |
Yes |
postponed |
No |
|
| C1-110177 |
Addition of value “priority” to CPC parameter |
NTT / Hiroshi |
CR |
agreement |
8.3 |
Yes |
Yes |
postponed |
No |
|
| C1-110178 |
Addition of value “priority” to CPC parameter |
NTT / Hiroshi |
CR |
agreement |
8.3 |
Yes |
Yes |
postponed |
No |
|
| C1-110179 |
Addition of value “priority” to CPC parameter |
NTT / Hiroshi |
CR |
agreement |
8.3 |
Yes |
Yes |
postponed |
No |
|
| C1-110180 |
Clarification on P-CSCF behaviour in case of insufficient bandwidth |
NTT / Hiroshi |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
|
| C1-110181 |
Handling of periodic TAU timer, mobile reachable timer and MM back-off timer |
HTC Corp. |
discussion |
discussion |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110182 |
Handling of periodic TAU timer, mobile reachable timer and MM back-off timer |
HTC Corp., Alcatel-Lucent, ZTE, Hitachi |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110485 |
C1-104798 |
C1-110183 |
Handling of periodic RAU timer, mobile reachable timer and MM back-off timer |
HTC Corp., Alcatel-Lucent, ZTE, Hitachi |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110486 |
C1-104799 |
C1-110184 |
Handling Attach/TAU attemp counter when receiveing MM back-off timer |
HTC Corp. |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110185 |
Handling Attach/TAU attemp counter when receiveing MM back-off timer |
HTC Corp. |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110186 |
Explicit IMSI detach from EPS services triggered by PTAU reject |
Huawei, Hisilicon |
CR |
agreement |
10.15 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110187 |
Explicit IMSI detach from EPS services triggered by PTAU reject |
Huawei, Hisilicon |
CR |
agreement |
10.15 |
Yes |
Yes |
revised |
No |
C1-110459 |
| C1-110188 |
Explicit IMSI detach from GPRS services triggered by PRAU reject |
Huawei, Hisilicon |
CR |
agreement |
10.15 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110189 |
Explicit IMSI detach from GPRS services triggered by PRAU reject |
Huawei, Hisilicon |
CR |
agreement |
10.15 |
Yes |
Yes |
revised |
No |
C1-110460 |
| C1-110190 |
Storage and handling of the NAS signalling low priority indicator |
Huawei, Hisilicon |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110191 |
Storage and handling of the NAS signalling low priority indicator |
Huawei, Hisilicon |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110192 |
Restriction on the use of the UE requested bearer resource allocation procedure for LIPA PDN connection |
Huawei, Hisilicon |
CR |
agreement |
11.17 |
Yes |
Yes |
postponed |
No |
|
| C1-110193 |
Restriction on the use of the UE requested bearer resource modification procedure for LIPA PDN connection |
Huawei, Hisilicon |
CR |
agreement |
11.17 |
Yes |
Yes |
postponed |
No |
|
| C1-110194 |
Restriction on the use of the secondary PDP context activation procedure for LIPA PDN connection |
Huawei, Hisilicon |
CR |
agreement |
11.17 |
Yes |
Yes |
postponed |
No |
|
| C1-110195 |
Restriction on the use of the PDP context modification procedure for LIPA PDN connection |
Huawei, Hisilicon |
CR |
agreement |
11.17 |
Yes |
Yes |
postponed |
No |
|
| C1-110196 |
Removal of the SGs association on the VLR |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110197 |
Correction on detach and service request collision |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110729 |
| C1-110198 |
Correction on GPRS detach and service request collision |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110739 |
| C1-110199 |
Correction on UE substate selection |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110740 |
| C1-110200 |
Correction on MS substate selection |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110741 |
| C1-110201 |
Discarding LSA identity in MM INFORMATION REQUEST message |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
No |
[not addressed] |
No |
|
| C1-110202 |
Correction to reject cause value 48 name |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
No |
[not addressed] |
No |
|
| C1-110203 |
Correction to Unsuccessful secondary PDP context activation procedure initiated by the MS |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
No |
[not addressed] |
No |
|
| C1-110204 |
Clarification of FID Value Assignment |
Huawei, Hisilicon |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110494 |
| C1-110205 |
Revision to Network-initiated Removal of Foreign Link from a PDN Connection |
Huawei, Hisilicon |
CR |
agreement |
14 |
No |
No |
withdrawn |
Yes |
|
| C1-110206 |
Clarification of Multi-Access Capability Impact for Procedure between UE and ANDSF |
Huawei, Hisilicon |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110495 |
| C1-110207 |
Modification of UE-initiated Removal of an Access Network from a PDN Connection |
Huawei, Hisilicon |
CR |
agreement |
14 |
No |
No |
withdrawn |
Yes |
|
| C1-110208 |
Support of incremental cost information in AoC-D |
Deutsche Telekom / Reinhard |
CR |
agreement |
11.5 |
Yes |
Yes |
postponed |
No |
|
| C1-110209 |
Correction of the AoC XML schema |
Deutsche Telekom / Reinhard |
CR |
agreement |
11.5 |
Yes |
Yes |
postponed |
No |
|
| C1-110210 |
Correction of the AoC XML schema |
Deutsche Telekom / Reinhard |
CR |
agreement |
11.5 |
Yes |
Yes |
postponed |
No |
|
| C1-110211 |
3GPP CT1 IANA Registrations |
Huawei / Georg |
discussion |
discussion |
4.2 |
Yes |
Yes |
noted |
No |
|
| C1-110212 |
Procedure proposal for IMS_SC_eIDT decision taking. |
Huawei / Georg |
discussion |
discussion |
11.2 |
Yes |
Yes |
noted |
No |
|
| C1-110213 |
TR 24.837 v0.5.0 |
Huawei / Georg |
information |
information |
11.2 |
Yes |
Yes |
revised |
No |
C1-110500 |
| C1-110214 |
Conclusion of TR 24.837 ("Runtime"-CR) |
Huawei / Georg |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110502 |
| C1-110215 |
Update of flows of establishment of collaborative session at origination- alternative 1b |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110503 |
| C1-110216 |
Procedures of establishment of collaborative session at origination- alternative 1b |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110504 |
| C1-110217 |
Conclusion of media modification |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110218 |
Resolve Editor's Notes in ECT procedures for Collaborative Session |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110505 |
| C1-110219 |
Conclusion of supplementary services |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110506 |
| C1-110220 |
Skelton and initital input for IMS_SC_eIDT subclauses in TS 24.237 |
Huawei / Georg |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110507 |
| C1-110221 |
Flows for session replication performed by SCC AS |
Huawei/Lili |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110222 |
Procedures of session replication performed by SCC AS |
Huawei/Lili |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110527 |
| C1-110223 |
Signalling flows for collaborative session of participants of differents subscriptions |
Huawei/Lili |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110224 |
Procedures for collaborative session of participants of differents subscriptions |
Huawei/Lili |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110528 |
| C1-110225 |
ATCF procedures for eSRVCC failure cases |
Huawei/Lili |
CR |
agreement |
11.8 |
Yes |
Yes |
postponed |
No |
|
| C1-110226 |
RFC3455bis discussed proposals |
Deutsche Telekom |
information |
information |
11.1 |
Yes |
Yes |
noted |
No |
|
| C1-110227 |
Input reference version of TR 24.826 |
NEC (rapporteur) |
draft TS/TR |
information |
11.22 |
Yes |
Yes |
noted |
No |
|
| C1-110228 |
Editorial cleanup |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
agreed |
No |
|
| C1-110229 |
General description of switch-off of non-3GPP access networks |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
revised |
No |
C1-110722 |
| C1-110230 |
Key issue: “Degradation of service due to switch-off of non-3GPP access networks” |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
revised |
No |
C1-110723 |
| C1-110231 |
Key issue: “Impacts for multi-access and flow mobility” |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
revised |
No |
C1-110724 |
| C1-110232 |
Solution “Network based handling for multi-access and flow mobility” |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
revised |
No |
C1-110725 |
| C1-110233 |
Clarification of relationship between CREG, CEREG and CGREG, and introduction of registration for EPS and non-EPS services (or ‘SMS only’) in CEREG |
Research In Motion |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110732 |
| C1-110234 |
Completion of introduction of "Low priority" indication in 24.008 CS messages (NIMTC CT1 open issue 9) |
Research In Motion, InterDigital Communications, Alcatel-Lucent |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110480 |
| C1-110235 |
Adding NAS signalling priority indication in SM messages (NIMTC CT1 open issue 10) |
Research In Motion (Claude) |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110481 |
| C1-110236 |
Adding NAS signalling priority indication in EPS SM messages (NIMTC CT1 open issue 10) |
Research In Motion (Claude) |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110482 |
| C1-110237 |
Handling of Location Updating and CS Service Request after CS fallback for mobile originating calls |
Research In Motion, Motorola Mobility |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110733 |
| C1-110238 |
Correction of the handling of the P-TMSI type IE |
Nokia Siemens Networks, Research In Motion |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110720 |
| C1-110239 |
Correction of the handling of the Old GUTI type IE |
Nokia Siemens Networks, Research In Motion |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110721 |
| C1-110240 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110582 |
| C1-110241 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110583 |
| C1-110242 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110584 |
| C1-110243 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110585 |
| C1-110244 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110586 |
| C1-110245 |
Annex A / Insertion of Path header by complex UE |
Orange/ Youssef |
CR |
agreement |
11.4 |
Yes |
Yes |
revised |
No |
C1-110550 |
| C1-110246 |
MO for providing phone-context parameter |
Orange/ Youssef |
CR |
agreement |
11.4 |
Yes |
Yes |
revised |
No |
C1-110551 |
| C1-110247 |
Expiration time in Re-REGISTER |
Orange/ Youssef |
CR |
agreement |
11.4 |
Yes |
Yes |
revised |
No |
C1-110552 |
| C1-110248 |
SIP response to a non-REGSITER initial or standalone request received from a non-registered user |
Orange/ Youssef |
CR |
agreement |
11.4 |
Yes |
Yes |
revised |
No |
C1-110553 |
| C1-110249 |
Sending of location information from LRF to E-CSCF |
Orange/ Youssef |
CR |
agreement |
10.4 |
Yes |
Yes |
revised |
No |
C1-110615 |
| C1-110250 |
Handling of re-REGISTER for Hosted NAT traversal |
Orange/ Youssef |
CR |
agreement |
9.5 |
Yes |
Yes |
revised |
No |
C1-110600 |
| C1-110251 |
Explicit Congestion Notification (ECN) for RTP over UDP |
Ericsson, ST-Ericsson / Jan |
CR |
agreement |
11.10 |
Yes |
Yes |
revised |
No |
C1-110618 |
| C1-110252 |
Clarifying the restoration procedure |
Ericsson, ST-Ericsson / Jan /RIM /John-Luc |
CR |
agreement |
11.4 |
Yes |
Yes |
revised |
No |
C1-110617 |
| C1-110253 |
Reference update: draft-ietf-mmusic-ice-tcp |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110576 |
| C1-110254 |
Reference update: draft-ietf-mmusic-ice-tcp |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110577 |
| C1-110255 |
Reference update: draft-ietf-mmusic-ice-tcp |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110578 |
| C1-110256 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110587 |
| C1-110257 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110588 |
| C1-110258 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110589 |
| C1-110259 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110260 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110261 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
10.1 |
Yes |
Yes |
agreed |
No |
|
| C1-110262 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
10.1 |
Yes |
Yes |
agreed |
No |
|
| C1-110263 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
10.1 |
Yes |
Yes |
agreed |
No |
|
| C1-110264 |
Reference update: draft-ietf-sipcore-keep |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110265 |
Reference update: draft-ietf-sipcore-keep |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110266 |
Reference update: draft-ietf-sipcore-keep |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110267 |
Reference update: draft-ietf-sipcore-keep |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110268 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110590 |
| C1-110269 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110591 |
| C1-110270 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110592 |
| C1-110271 |
STN-SR missing in procedures |
NokiaSiemens Networks |
CR |
agreement |
11.9 |
Yes |
Yes |
revised |
No |
C1-110545 |
| C1-110272 |
TI assignment for MSC server for srvcc for alerting call |
NokiaSiemens Networks |
CR |
agreement |
11.9 |
Yes |
Yes |
revised |
No |
C1-110546 |
| C1-110273 |
Encoding of PANI for E-UTRAN |
NokiaSIemens Networks |
CR |
agreement |
9.2.1 |
Yes |
Yes |
revised |
No |
C1-110440 |
| C1-110274 |
Encoding of PANI for E-UTRAN |
NokiaSiemens Networks |
CR |
agreement |
9.2.1 |
Yes |
Yes |
revised |
No |
C1-110441 |
| C1-110275 |
Encoding of PANI for E-UTRAN |
NokiaSiemens Networks |
CR |
agreement |
9.2.1 |
Yes |
Yes |
revised |
No |
C1-110442 |
| C1-110276 |
Issues related to SRVCC and PS-CS Session Continuity |
NokiaSiemens Networks |
discussion |
discussion |
9.4 |
Yes |
Yes |
noted |
No |
|
| C1-110277 |
Transferable Sessions |
NokiaSiemens Networks |
CR |
agreement |
9.4 |
Yes |
Yes |
postponed |
No |
|
| C1-110278 |
Transferable Sessions |
NokiaSiemens Networks |
CR |
agreement |
9.4 |
Yes |
Yes |
postponed |
No |
|
| C1-110279 |
Transferable Sessions |
NokiaSiemens Networks |
CR |
agreement |
9.4 |
Yes |
Yes |
postponed |
No |
|
| C1-110280 |
Collaborative session discovery by UEs of different subscriber, flow |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110281 |
Collaborative session discovery by UEs of different subscriber, procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110529 |
| C1-110282 |
Feature tag for routing to AS of other subscriber |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110283 |
Inter-UE transfer without establishing a collaborative session, pull mode, flow |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110284 |
Inter-UE transfer without establishing a collaborative session, pull mode, procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110530 |
| C1-110285 |
Inter-UE replication by remote UE, skeleton |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110286 |
Inter-UE replication by remote UE, push mode, flow |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110287 |
Inter-UE replication by remote UE, pull mode, flow |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110288 |
Inter-UE replication by remote UE, push mode, UE procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110289 |
Inter-UE replication by remote UE, push mode, UE procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110290 |
Inter-UE replication by remote UE, SCC AS procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110531 |
| C1-110291 |
g.3gpp.access-type media feature tag name corrected |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
|
| C1-110292 |
g.3gpp.mid-call info package description corrected |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110293 |
g.3gpp.mid-call info package description corrected |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
|
| C1-110294 |
PS-PS access transfer, accepting terminating early dialog |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
|
| C1-110295 |
Alerting SRVCC, waiting call |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.9 |
Yes |
Yes |
revised |
No |
C1-110547 |
| C1-110296 |
SRVCC enhancement, ATCF access transfer procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110538 |
| C1-110297 |
SRVCC enhancement, ATCF compliance update |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110539 |
| C1-110298 |
SCC AS managing STN-SR |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110540 |
| C1-110299 |
Alternative method for transport of ATU-STI and C-MSISDN from SCC AS to ATCF |
Ericsson, ST-Ericsson / Ivo |
discussion |
discussion |
11.8 |
Yes |
Yes |
noted |
No |
|
| C1-110300 |
Delivering ATU-STI and C-MSISDN from SCC AS to ATCF - evaluation |
Ericsson, ST-Ericsson / Ivo |
discussion |
discussion |
11.8 |
Yes |
Yes |
noted |
No |
|
| C1-110301 |
SCC AS sending ATU-STI and C-MSISDN to ATCF |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110542 |
| C1-110302 |
SRVCC enhancement, ATCF call set up procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110541 |
| C1-110303 |
Maximum Transmission Unit in Protocol configuration options |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110731 |
| C1-110304 |
Sessions transferred by SRVCC and by PS-CS access transfer |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
9.4 |
Yes |
Yes |
postponed |
No |
|
| C1-110305 |
Sessions transferred by SRVCC and by PS-CS access transfer |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
9.4 |
Yes |
Yes |
postponed |
No |
|
| C1-110306 |
Sessions transferred by SRVCC and by PS-CS access transfer |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
9.4 |
Yes |
Yes |
postponed |
No |
|
| C1-110307 |
IMS parameter preventing establishment of IP-CAN bearer used only for IMS |
Ericsson, ST-Ericsson, Samsung, Huawei |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110449 |
| C1-110308 |
Pseudo-CR on NMO I behaviour |
NEC / Yannick |
pseudo CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
|
| C1-110309 |
T3440 is not started when user plane radio bearers are setup during TAU |
NEC / Yannick |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
|
| C1-110310 |
On the coding of LOCATION UPDATING REQUEST message in A/Gb mode |
NEC / Yannick |
discussion |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110311 |
Congestion control for GPRS Mobility Management |
KPN |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110312 |
Congestion control for EPS Mobility Management |
KPN |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110313 |
Correction MS behaviour with unsuccessful PDP context activation initiated by the MS |
KPN |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110314 |
Insertion of “orig” parameter by IBCF |
KPN |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110619 |
| C1-110315 |
Allocation of TI and assignment of CC state to alerting call for SRVCC |
Samsung, Nokia Siemens Networks |
CR |
agreement |
11.9 |
Yes |
Yes |
revised |
No |
C1-110447 |
| C1-110316 |
SRVCC is supported for an established IMS session in Rel-9. |
Samsung, Nokia Siemens Networks |
CR |
agreement |
10.15 |
Yes |
Yes |
revised |
No |
C1-110461 |
| C1-110317 |
Allowing state-and-event-info XML to be used for other applications in future |
Samsung |
CR |
agreement |
11.9 |
Yes |
Yes |
agreed |
No |
|
| C1-110318 |
Corrections of UE procedures for SRVCC in alerting state |
Samsung |
CR |
agreement |
11.9 |
Yes |
Yes |
revised |
No |
C1-110548 |
| C1-110319 |
Race Condition for SRVCC Alerting. |
Samsung |
CR |
agreement |
11.9 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110320 |
Clarification of MSC server procedures |
Samsung |
CR |
agreement |
10.3 |
Yes |
Yes |
postponed |
No |
|
| C1-110321 |
Clarification of MSC server procedures |
Samsung |
CR |
agreement |
10.3 |
Yes |
Yes |
postponed |
No |
|
| C1-110322 |
Identifying sessions targeted for session transfer |
Samsung |
discussion |
discussion |
9.4 |
Yes |
Yes |
noted |
No |
|
| C1-110323 |
Implementation of MSC server assisted mid-call feature |
Alcatel-Lucent |
discussion |
discussion |
10.3 |
Yes |
Yes |
noted |
No |
|
| C1-110324 |
Discussion on Cell Broadcast Service for MOCN network |
One2many, Alcatel-Lucent |
discussion |
discussion |
11.21 |
Yes |
Yes |
revised |
No |
C1-110453 |
| C1-110325 |
Clarification on TAI list inclusion |
Qualcomm Incorporated / Miguel |
CR |
agreement |
14 |
No |
No |
withdrawn |
Yes |
|
| C1-110326 |
Explicit signalling of native vs mapped GUTI during attach |
Qualcomm Incorporated / Miguel |
CR |
agreement |
11.23 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110327 |
Explicit signalling of native vs mapped P-TMSI during attach |
Qualcomm Incorporated / Miguel |
CR |
agreement |
11.23 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110328 |
EMM state after lower layers failure during TAU when TIN=P-TMSI |
Qualcomm Incorporated / Miguel |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
|
| C1-110329 |
EMM state after lower layers failure during RAU when TIN=GUTI |
Qualcomm Incorporated / Miguel |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
|
| C1-110330 |
Stopping T3411 when UE moves to EMM-CONNECTED |
Qualcomm Incorporated |
CR |
agreement |
11.23 |
Yes |
Yes |
postponed |
No |
|
| C1-110331 |
Stopping T3311 when UE moves to PMM-CONNECTED mode |
Qualcomm Incorporated / Miguel |
CR |
agreement |
11.23 |
Yes |
Yes |
postponed |
No |
|
| C1-110332 |
Enhanced AKA for Relay Nodes |
Qualcomm Incorporated / Miguel |
CR |
agreement |
11.23 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110333 |
On non-decimal digit in MCC |
Qualcomm Incorporated / Miguel |
discussion |
discussion |
11.23 |
Yes |
Yes |
noted |
No |
|
| C1-110334 |
Discussion on inhibiting manual CSG selection outside the Operator CSG list |
Qualcomm Incorporated / Miguel |
discussion |
discussion |
4.4 |
Yes |
Yes |
noted |
No |
|
| C1-110335 |
UE procedures for ePDG selection |
Motorola Mobility |
discussion |
discussion |
9.2.2 |
Yes |
Yes |
noted |
No |
|
| C1-110336 |
Reference update for MIPv4 |
Motorola Mobility |
CR |
agreement |
9.2.4 |
Yes |
Yes |
agreed |
No |
|
| C1-110337 |
Reference update for MIPv4 |
Motorola Mobility |
CR |
agreement |
9.2.4 |
Yes |
Yes |
agreed |
No |
|
| C1-110338 |
ANDSF MO support for Non-seamless WLAN Offload |
Motorola Mobility |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110493 |
| C1-110339 |
Automatic re-attach following TAU reject or Service Request reject |
Motorola Mobility |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110734 |
| C1-110340 |
Correct CDIV-TIR interaction |
Ericsson, ST-Ericsson/Jan |
CR |
agreement |
9.5 |
Yes |
Yes |
revised |
No |
C1-110601 |
| C1-110341 |
Correct CDIV-TIR interaction |
Ericsson, ST-Ericsson/Jan |
CR |
agreement |
9.5 |
Yes |
Yes |
revised |
No |
C1-110602 |
| C1-110342 |
Correct CDIV-TIR interaction |
Ericsson, ST-Ericsson/Jan |
CR |
agreement |
9.5 |
Yes |
Yes |
revised |
No |
C1-110603 |
| C1-110343 |
Discussion: AoC-D, analysis of adding "incremental" cost format |
Ericsson, ST-Ericsson/Ivo |
discussion |
discussion |
11.5 |
Yes |
Yes |
noted |
No |
|
| C1-110344 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110572 |
| C1-110345 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110573 |
| C1-110346 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110574 |
| C1-110347 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110575 |
| C1-110348 |
Specifying "sos" URI parameter in 24.229 |
InterDigital Communications |
CR |
agreement |
8.1 |
Yes |
Yes |
revised |
No |
C1-110568 |
| C1-110349 |
Specifying "sos" URI parameter in 24.229 |
InterDigital Communications |
CR |
agreement |
8.1 |
Yes |
Yes |
revised |
No |
C1-110569 |
| C1-110350 |
Specifying "sos" URI parameter in 24.229 |
InterDigital Communications |
CR |
agreement |
8.1 |
Yes |
Yes |
revised |
No |
C1-110570 |
| C1-110351 |
Specifying "sos" URI parameter in 24.229 |
InterDigital Communications |
CR |
agreement |
8.1 |
Yes |
Yes |
revised |
No |
C1-110571 |
| C1-110352 |
Procedures for indicating collaborative session establishment by providing controllee UE SIP URI in SDP using P-Asserted-Identity |
InterDigital Communications |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110508 |
| C1-110353 |
Add XML schema for controller loss preferences |
InterDigital Communications |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110509 |
| C1-110354 |
Discussion on PSAP call back indicator |
InterDigital Communications |
discussion |
discussion |
11.4 |
Yes |
Yes |
noted |
No |
|
| C1-110355 |
Correct no CS domain available indication |
Research In Motion UK Ltd. |
CR |
agreement |
11.23 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110356 |
Clarification of IMS Registration conditions, taking into account the network operator’s preference for selection of the voice domain |
Research In Motion UK Ltd. |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110448 |
| C1-110357 |
Definition of a Controller Capable UE |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110510 |
| C1-110358 |
Transfer of collaborative session control cleanup. |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110511 |
| C1-110359 |
Completion of originating collaborative session establishment by providing controllee UE SIP URI in SDP using P-Asserted-Identity |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110525 |
| C1-110360 |
Originating collaborative session establishment using Multiple REFER |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110526 |
| C1-110361 |
Transfer of collaborative session control selection |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
postponed |
No |
|
| C1-110362 |
Establishment of collaborative session upon originating IMS session setup selection |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
postponed |
No |
|
| C1-110363 |
Establishment of collaborative session upon terminating IMS session setup selection |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
postponed |
No |
|
| C1-110364 |
Handling of wait time for CN congestion control |
Vodafone |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110365 |
IFOM capability discovery through ISRP |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110496 |
| C1-110366 |
IFOM capability discovery through ISRP – ANDSF |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110497 |
| C1-110367 |
IFOM condition for binding acknowledge |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110498 |
| C1-110368 |
IFOM error condition |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
|
| C1-110369 |
IFOM correction on attach to additional access procedure |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110499 |
| C1-110370 |
IFOM procedures for multiple foreign links scenario |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110700 |
| C1-110371 |
IFOM capability discovery for H1 |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110701 |
| C1-110372 |
IFOM routing and IP filter communication |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110702 |
| C1-110373 |
Non-seamless WLAN offload |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110374 |
Status of TR 24.837 work |
Huawei / Georg |
information |
information |
11.2 |
Yes |
Yes |
revised |
No |
C1-110501 |
| C1-110375 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
Yes |
Yes |
revised |
No |
C1-110605 |
| C1-110376 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
Yes |
Yes |
revised |
No |
C1-110606 |
| C1-110377 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
Yes |
Yes |
revised |
No |
C1-110607 |
| C1-110378 |
Information of data traffic routing used by MAPCON capable UE |
ZTE |
CR |
agreement |
11.19 |
Yes |
Yes |
revised |
No |
C1-110704 |
| C1-110379 |
Partial Handover in MAPCON |
ZTE |
CR |
agreement |
11.19 |
Yes |
Yes |
revised |
No |
C1-110705 |
| C1-110380 |
Network-initiated removal of an access |
ZTE |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110703 |
| C1-110381 |
BRI in case of removal of foreign link from a PDN connection |
ZTE |
CR |
agreement |
11.16 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110382 |
clarification for APN sent by the network |
CATT |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110735 |
| C1-110383 |
clarification for PDN connection requiring PAP/CHAP |
CATT |
CR |
agreement |
11.23 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110384 |
indicating the device properties configured in the MS to the network |
CATT |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110385 |
indicating the device properties configured in the UE to the network |
CATT |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110386 |
SigComp disabling by P-CSCF |
NTT DOCOMO |
discussion |
discussion |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110648 |
| C1-110387 |
Reference corrections to CDIV interworking |
NTT |
CR |
agreement |
9.5 |
Yes |
Yes |
revised |
No |
C1-110604 |
| C1-110388 |
Pseudo-CR on 4.6.2.1.1.1 Alternative 1 (REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110389 |
Pseudo-CR on 4.6.4.1.1.1 Alternative 1 (REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110390 |
Pseudo-CR on 4.6.2.1.1a "Media flow transfer initiated by a UE not participating in the ongoing collaborative session - media on controllee UE" |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110391 |
Pseudo-CR on 4.6.2.1.1.2 Alternative 2 (SIP REFER with method=REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110392 |
Pseudo-CR on 4.6.4.1.1.2 Alternative 2 (SIP REFER with method= REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110393 |
Pseudo-CR on 4.6.2.1.1.3 Alternative 3 based on SIP INVITE request |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110512 |
| C1-110394 |
Pseudo-CR on 4.6.4.1.1.3 Alternative 3 based on SIP INVITE request |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110513 |
| C1-110395 |
Pseudo-CR on 4.6.2.1.2.1 Alternative 1 (REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110514 |
| C1-110396 |
Pseudo-CR on 4.6.4.1.2.1 Alternative 1 (REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110397 |
Pseudo-CR on 4.6.2.1.2.2 Alternative 2 (SIP REFER with method= REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110398 |
Pseudo-CR on 4.6.4.1.2.2 Alternative 2 (SIP REFER with method= REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110515 |
| C1-110399 |
Pseudo-CR on 4.6.2.1.2.3 Alternative 3 (Based on SIP INVITE request) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110516 |
| C1-110400 |
Pseudo-CR on 4.6.4.1.2.3 Alternative 3 (Based on SIP re-INVITE request) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110401 |
Pseudo-CR on 4.6.2.1.3.1 Alternative 1 (REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110517 |
| C1-110402 |
Pseudo-CR on 4.6.4.1.3.1 Alternative 1 (REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110403 |
Pseudo-CR on 4.6.2.1.3.3 Alternative 3 (SIP REFER with method= REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110518 |
| C1-110404 |
Pseudo-CR on 4.6.4.1.3.3 Alternative 3 (SIP REFER with method= REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110405 |
Pseudo-CR on 4.6.2.1.3.2 Alternative 2 based on SIP re-INVITE request |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110519 |
| C1-110406 |
Pseudo-CR on 4.6.4.1.3.2 Alternative 3 based on SIP re-INVITE request |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110520 |
| C1-110407 |
Pseudo-CR on 4.6.3 Identified issues |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110408 |
Pseudo-CR on 4.6.2.1.4.1 Inter-UE transfer solicited by a target UE without prior information about the existing session-Alternative 1 |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110521 |
| C1-110409 |
Pseudo-CR on 4.6.2.1.4.1 Inter-UE transfer solicited by a target UE without prior information about the existing session-Alternative 2 |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110410 |
Pseudo-CR on 4.6.2.2.2 Controllee UE initiated addition of media to another controllee UE |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
|
| C1-110411 |
Pseudo-CR on 4.6.4.2.2.1 Alternative 1 (SIP REFER with media feature tag) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110522 |
| C1-110412 |
Pseudo-CR on 5.6 Evaluation of solutions for media flows transfer |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110523 |
| C1-110413 |
Key information proposal required to interpret signalling flows |
ETRI |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110524 |
| C1-110414 |
Emergency attach during back off duration |
ZTE |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110415 |
Emergency attach during back off duration |
ZTE |
CR |
agreement |
11.12 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110416 |
Emergency bearer services for low priority UEs |
ZTE |
CR |
agreement |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110417 |
Emergency bearer services for low priority UEs |
ZTE |
CR |
agreement |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110418 |
PLMN selection when back-off timer is running |
ZTE |
CR |
agreement |
11.12 |
Yes |
Yes |
postponed |
No |
|
| C1-110419 |
Discussion on alerting transfer when forked response received |
ZTE |
discussion |
discussion |
11.9 |
Yes |
Yes |
noted |
No |
|
| C1-110420 |
Alternative methods for transport of the SRVCC capacity of the UE to ATCF |
ZTE |
discussion |
discussion |
11.8 |
Yes |
Yes |
noted |
No |
|
| C1-110421 |
Clarification to the handling of timer T3396 |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110422 |
Clarification to the handling of timer T3496 |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110423 |
Correction to the condition of inclusion of PCO IE in PDN CONNECTIVITY REJECT message |
HTC Corp |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
|
| C1-110424 |
Revision to Network-initiated Removal of Foreign Link from a PDN Connection |
Huawei, Hisilicon |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110490 |
| C1-110425 |
Modification of UE-initiated Removal of an Access Network from a PDN Connection |
Huawei, Hisilicon |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
|
| C1-110426 |
Conclusions (first part) |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
revised |
No |
C1-110726 |
| C1-110427 |
EMM cause for NIMTC |
Samsung/Grace |
CR |
agreement |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110428 |
EMM cause for NIMTC |
Samsung/Grace |
CR |
agreement |
11.12 |
Yes |
No |
[not addressed] |
No |
|
| C1-110429 |
P-CSCF handling of media parameters not allowed |
China Mobile |
CR |
agreement |
10.2 |
Yes |
Yes |
revised |
No |
C1-110555 |
| C1-110430 |
ATCF handover procedure |
China Mobile |
CR |
agreement |
14 |
No |
No |
withdrawn |
Yes |
|
| C1-110431 |
Correct the additional mobile identity in attach request R8message and RAU request message |
China Mobile |
CR |
agreement |
9.2.1 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110432 |
Correct the additional mobile identity in attach request R9message and RAU request message |
China Mobile |
CR |
agreement |
9.2.1 |
Yes |
No |
withdrawn |
Yes |
|
| C1-110433 |
Liaison Statement on eCall Testing Deliverables |
ETSI TC MSG |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110434 |
Reply LS (056) to 3GPP CT1 on Ability for DNS/ENUM servers to determine the operator originating a query |
GSMA IREG Packet ENUM |
i/c LS |
action |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110435 |
LS on RAN Sharing for H(e)NB Cells (R2-110691) |
RAN2 |
i/c LS |
action |
3 |
Yes |
Yes |
replied to |
No |
|
| C1-110436 |
Reply LS on CN node selection (R2-110692) |
RAN2 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110437 |
Reply LS on CS Fallback cancellation (R2-110693) |
RAN2 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110438 |
LS on PDN Disconnection for LIPA (R3-110431) |
RAN3 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110439 |
Clarification to the handling of SM cause value 27 |
HTC Corp, KPN |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110728 |
C1-110027 |
C1-110440 |
Encoding of PANI for E-UTRAN |
NokiaSIemens Networks |
CR |
agreement |
9.2.1 |
No |
No |
withdrawn |
Yes |
| C1-110273 |
C1-110441 |
Encoding of PANI for E-UTRAN |
NokiaSiemens Networks |
CR |
agreement |
9.2.1 |
No |
No |
withdrawn |
Yes |
| C1-110274 |
C1-110442 |
Encoding of PANI for E-UTRAN |
NokiaSiemens Networks |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110275 |
C1-110443 |
SRVCC in alerting phase |
ZTE |
revised WID |
agreement |
11.9 |
Yes |
Yes |
agreed |
No |
| C1-110154 |
C1-110444 |
Reply LS on SRVCC in alerting phase being a stand-alone feature (S2-110156) |
SA2 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110445 |
LS response on Inter PLMN mobility procedure (S2-110157) |
SA2 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110446 |
Reply LS on RAN sharing for Home(e)NB cells (S2-110160) |
SA2 |
i/c LS |
information |
3 |
Yes |
Yes |
noted |
No |
|
| C1-110447 |
Allocation of TI and assignment of CC state to alerting call for SRVCC |
Samsung, Nokia Siemens Networks |
CR |
agreement |
11.9 |
Yes |
Yes |
agreed |
No |
| C1-110315 |
C1-110448 |
Clarification of IMS Registration conditions, taking into account the network operator’s preference for selection of the voice domain |
Research In Motion UK Ltd. |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110664 |
C1-110356 |
C1-110449 |
IMS parameter preventing establishment of IP-CAN bearer used only for IMS |
Ericsson, ST-Ericsson, Samsung, Huawei |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110782 |
C1-110307 |
C1-110450 |
Missing Automatic Network Selection HPLMN Functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.1 |
Yes |
Yes |
agreed |
No |
| C1-110158 |
C1-110451 |
Missing Automatic Network Selection HPLMN Functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.1 |
Yes |
Yes |
agreed |
No |
| C1-110159 |
C1-110452 |
Missing Automatic Network Selection HPLMN Functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.1 |
Yes |
Yes |
agreed |
No |
| C1-110160 |
C1-110453 |
Discussion on Cell Broadcast Service for MOCN network |
One2many, Alcatel-Lucent |
discussion |
discussion |
11.21 |
Yes |
Yes |
noted |
No |
| C1-110324 |
C1-110454 |
Clarification on Inclusion of Additional GUTI IE |
Alcatel-Lucent, China Mobile |
CR |
agreement |
11.23 |
Yes |
Yes |
rejected |
No |
| C1-110116 |
C1-110455 |
Clarification on Inclusion of Additional mobile identity and RAI IEs |
Alcatel-Lucent, China Mobile |
CR |
agreement |
11.23 |
Yes |
Yes |
rejected |
No |
| C1-110119 |
C1-110456 |
ePDG selection for known VPLMN |
Nokia Siemens Networks |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110055 |
C1-110457 |
Service request initiation for dual rx 1xCSFB UE |
LG Electronics |
CR |
agreement |
10.15 |
Yes |
Yes |
agreed |
No |
| C1-110142 |
C1-110458 |
Service request initiation for dual rx 1xCSFB UE |
LG Electronics |
CR |
agreement |
10.15 |
Yes |
Yes |
agreed |
No |
| C1-110143 |
C1-110459 |
Explicit IMSI detach from EPS services triggered by PTAU reject |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110187 |
C1-110460 |
Explicit IMSI detach from GPRS services triggered by PRAU reject |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110189 |
C1-110461 |
SRVCC is supported for an established IMS session in Rel-9. |
Samsung, Nokia Siemens Networks |
CR |
agreement |
10.15 |
Yes |
Yes |
agreed |
No |
| C1-110316 |
C1-110462 |
Addition to Combined procedure for PDN disconnection for LIPA |
InterDigital |
CR |
agreement |
11.17 |
Yes |
Yes |
agreed |
No |
| C1-110088 |
C1-110463 |
Corrections to the PDP Context Deactivation for LIPA |
InterDigital |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110750 |
C1-110090 |
C1-110464 |
Notify UE when a HNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd., Verizon Wireless, Vodafone |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110751 |
C1-110133 |
C1-110465 |
Notify UE when a HeNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd., Verizon Wireless, Vodafone |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110752 |
C1-110134 |
C1-110466 |
Support of AT commands for voice |
Ericsson, ST-Ericsson |
CR |
agreement |
11.24.2 |
Yes |
Yes |
agreed |
No |
| C1-110102 |
C1-110467 |
LS on Cell Broadcast Service for MOCN Shared Network |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110753 |
| C1-110468 |
Handling of secondary PDP context activation procedure in case of APN congestion |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110765 |
C1-110030 |
C1-110469 |
Handling of dedicated EPS bearer context activation procerdure in case of APN congestion |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110767 |
C1-110031 |
C1-110470 |
Mobility management congestion control and back-off timer |
Ericsson, ST-Ericsson, KPN, Vodafone, HTC Corp, ZTE |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110768 |
C1-110078 |
C1-110471 |
Mobility management congestion control and back-off timer |
Ericsson, ST-Ericsson, KPN, HTC Corp, ZTE |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110079 |
C1-110472 |
Low priority indication by the MS for the service request procedure |
Panasonic |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110743 |
C1-110094 |
C1-110473 |
LS on low access priority indication for the service request procedure |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110755 |
| C1-110474 |
Reply to LS on RAN Sharing for H(e)NB Cells |
CT1 |
o/g LS |
approval |
13 |
Yes |
Yes |
revised |
No |
C1-110774 |
| C1-110475 |
Attach with IMSI Alignment of Terminology |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110122 |
C1-110476 |
Attach with IMSI Alignment of Terminology |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110123 |
C1-110477 |
NMO I behavior |
Nokia Siemens Networks, NEC |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110126 |
C1-110478 |
UEs configured with long minimum periodic PLMN search time limit |
Nokia Siemens Networks, Samsung, Alcatel-Lucent |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110128 |
C1-110479 |
Attach Attempt Counter |
Nokia Siemens Networks |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110129 |
C1-110480 |
Completion of introduction of "Low priority" indication in 24.008 CS messages |
Research In Motion, InterDigital Communications, Alcatel-Lucent, Huawei, Hisilicon |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110781 |
C1-110234 |
C1-110481 |
Adding NAS signalling priority indication in SM messages |
Research In Motion, Huawei, Hisilicon |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110235 |
C1-110482 |
Adding NAS signalling priority indication in EPS SM messages |
Research In Motion (Claude), Huawei, Hisilicon |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110236 |
C1-110483 |
LS on PLMN selection when back-off timer is running |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110756 |
| C1-110484 |
Updates of the NAS configuration MO |
Ericsson, ST-Ericsson |
pseudo CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110105 |
C1-110485 |
Handling of periodic TAU timer, mobile reachable timer and MM back-off timer |
HTC Corp., Alcatel-Lucent, ZTE, Hitachi |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110744 |
C1-110182 |
C1-110486 |
Handling of periodic RAU timer, mobile reachable timer and MM back-off timer |
HTC Corp., Alcatel-Lucent, ZTE, Hitachi |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110745 |
C1-110183 |
C1-110487 |
Device properties and RRC establishment cause = Delay tolerant – 24.008 |
Research in Motion |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110746 |
C1-110070 |
C1-110488 |
Device properties and RRC establishment cause = Delay tolerant – 24.301 |
Research in Motion |
CR |
agreement |
11.12 |
Yes |
Yes |
revised |
No |
C1-110747 |
C1-110069 |
C1-110489 |
Provision of the RRC establishment cause "Delay tolerant" |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110757 |
| C1-110490 |
Revision to Network-initiated Removal of Foreign Link from a PDN Connection |
Huawei, Hisilicon, Ericsson, ST-Ericsson |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110748 |
C1-110424 |
C1-110491 |
Network-initiated link removal procedure |
Ericsson, ST-Ericsson |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110026 |
C1-110492 |
LS on the interaction between ISRP and ISMP |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110760 |
| C1-110493 |
ANDSF MO support for Non-seamless WLAN Offload |
Motorola Mobility, Qualcomm Incorporated, LG Electronics |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110338 |
C1-110494 |
Clarification of FID Value Assignment |
Huawei, Hisilicon |
CR |
agreement |
11.16 |
No |
No |
withdrawn |
Yes |
| C1-110204 |
C1-110495 |
Clarification of Multi-Access Capability Impact for Procedure between UE and ANDSF |
Huawei, Hisilicon |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110780 |
C1-110206 |
C1-110496 |
IFOM capability discovery through ISRP |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110365 |
C1-110497 |
IFOM capability discovery through ISRP – ANDSF |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
revised |
No |
C1-110749 |
C1-110366 |
C1-110498 |
IFOM condition for binding acknowledge |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110367 |
C1-110499 |
IFOM correction on attach to additional access procedure |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110369 |
C1-110500 |
TR 24.837 v0.5.0 |
Huawei / Georg |
information |
information |
11.2 |
Yes |
Yes |
noted |
No |
| C1-110213 |
C1-110501 |
Status of TR 24.837 work |
Huawei / Georg |
information |
information |
11.2 |
No |
No |
withdrawn |
Yes |
| C1-110374 |
C1-110502 |
Conclusion of TR 24.837 ("Runtime"-CR) |
Huawei / Georg |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110554 |
C1-110214 |
C1-110503 |
Update of flows of establishment of collaborative session at origination- alternative 1b |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110639 |
C1-110215 |
C1-110504 |
Procedures of establishment of collaborative session at origination- alternative 1b |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110640 |
C1-110216 |
C1-110505 |
Resolve Editor's Notes in ECT procedures for Collaborative Session |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110218 |
C1-110506 |
Conclusion of supplementary services |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110219 |
C1-110507 |
Skelton and initital input for IMS_SC_eIDT subclauses in TS 24.237 |
Huawei / Georg |
CR |
agreement |
11.2 |
No |
Yes |
postponed |
No |
| C1-110220 |
C1-110508 |
Procedures for indicating collaborative session establishment by providing controllee UE SIP URI in SDP using P-Asserted-Identity |
InterDigital Communications |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110656 |
C1-110352 |
C1-110509 |
Add XML schema for controller loss preferences |
InterDigital Communications |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110668 |
C1-110353 |
C1-110510 |
Definition of a Controller Capable UE |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110357 |
C1-110511 |
Transfer of collaborative session control cleanup. |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110358 |
C1-110512 |
Pseudo-CR on 4.6.2.1.1.3 Alternative 3 based on SIP INVITE request |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110393 |
C1-110513 |
Pseudo-CR on 4.6.4.1.1.3 Alternative 3 based on SIP INVITE request |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110394 |
C1-110514 |
Pseudo-CR on 4.6.2.1.2.1 Alternative 1 (REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110395 |
C1-110515 |
Pseudo-CR on 4.6.4.1.2.2 Alternative 2 (SIP REFER with method= REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110398 |
C1-110516 |
Pseudo-CR on 4.6.2.1.2.3 Alternative 3 (Based on SIP INVITE request) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110399 |
C1-110517 |
Pseudo-CR on 4.6.2.1.3.1 Alternative 1 (REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110401 |
C1-110518 |
Pseudo-CR on 4.6.2.1.3.3 Alternative 3 (SIP REFER with method= REFER) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110403 |
C1-110519 |
Pseudo-CR on 4.6.2.1.3.2 Alternative 2 based on SIP re-INVITE request |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110405 |
C1-110520 |
Pseudo-CR on 4.6.4.1.3.2 Alternative 3 based on SIP re-INVITE request |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110406 |
C1-110521 |
Pseudo-CR on 4.6.2.1.4.1 Inter-UE transfer solicited by a target UE without prior information about the existing session-Alternative 1 |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110629 |
C1-110408 |
C1-110522 |
Pseudo-CR on 4.6.4.2.2.1 Alternative 1 (SIP REFER with media feature tag) |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110411 |
C1-110523 |
Pseudo-CR on 5.6 Evaluation of solutions for media flows transfer |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110412 |
C1-110524 |
Key information proposal required to interpret signalling flows |
ETRI |
CR |
agreement |
11.2 |
No |
Yes |
postponed |
No |
| C1-110413 |
C1-110525 |
Completion of originating collaborative session establishment by providing controllee UE SIP URI in SDP using P-Asserted-Identity |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110655 |
C1-110359 |
C1-110526 |
Originating collaborative session establishment using Multiple REFER |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110360 |
C1-110527 |
Procedures of session replication performed by SCC AS |
Huawei/Lili |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110657 |
C1-110222 |
C1-110528 |
Procedures for collaborative session of participants of differents subscriptions |
Huawei/Lili |
CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110641 |
C1-110224 |
C1-110529 |
Collaborative session discovery by UEs of different subscriber, procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110281 |
C1-110530 |
Inter-UE transfer without establishing a collaborative session, pull mode, procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110284 |
C1-110531 |
Inter-UE replication by remote UE, SCC AS procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110290 |
C1-110532 |
Pseudo-CR on establishment of collaborative session upon originating session setup alternative 2 |
Infineon Technologies |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110050 |
C1-110533 |
Pseudo-CR on establishment of collaborative session upon terminating session setup alternative 2 |
Infineon Technologies |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110051 |
C1-110534 |
Pseudo-CR on evaluation of establishment of collaborative session upon session setup |
Infineon Technologies |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110173 |
C1-110535 |
Adding clauce A.18 for eSRVCC signalling flow |
ZTE |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110642 |
C1-110150 |
C1-110536 |
Signalling flows for eSRVCC assisted mid-call feature including ATCF |
ZTE |
CR |
agreement |
11.8 |
No |
Yes |
postponed |
No |
| C1-110152 |
C1-110537 |
Signalling flows for eSRVCC assisted mid-call feature without ATCF |
ZTE |
CR |
agreement |
11.8 |
No |
Yes |
postponed |
No |
| C1-110153 |
C1-110538 |
SRVCC enhancement, ATCF access transfer procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110643 |
C1-110296 |
C1-110539 |
SRVCC enhancement, ATCF compliance update |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110644 |
C1-110297 |
C1-110540 |
SCC AS managing STN-SR |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
No |
Yes |
postponed |
No |
| C1-110298 |
C1-110541 |
SRVCC enhancement, ATCF call set up procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
C1-110645 |
C1-110302 |
C1-110542 |
SCC AS sending ATU-STI and C-MSISDN to ATCF |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
revised |
No |
1-110646 |
C1-110301 |
C1-110543 |
Editor’s note delete for aSRVCC on A.17.1 |
ZTE |
CR |
agreement |
11.9 |
Yes |
Yes |
agreed |
No |
| C1-110149 |
C1-110544 |
Revised eIUT WID |
Huawei |
revised WID |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110627 |
| C1-110545 |
STN-SR missing in procedures |
NokiaSiemens Networks |
CR |
agreement |
11.9 |
Yes |
Yes |
agreed |
No |
| C1-110271 |
C1-110546 |
TI assignment for MSC server for srvcc for alerting call |
NokiaSiemens Networks |
CR |
agreement |
11.9 |
Yes |
Yes |
revised |
No |
C1-110673 |
C1-110272 |
C1-110547 |
Alerting SRVCC, waiting call |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.9 |
No |
Yes |
postponed |
No |
| C1-110295 |
C1-110548 |
Corrections of UE procedures for SRVCC in alerting state |
Samsung |
CR |
agreement |
11.9 |
Yes |
Yes |
agreed |
No |
| C1-110318 |
C1-110549 |
reg-id in Contact |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.4 |
Yes |
Yes |
agreed |
No |
| C1-110015 |
C1-110550 |
Annex A / Insertion of Path header by complex UE |
Orange/ Youssef |
CR |
agreement |
11.4 |
No |
Yes |
postponed |
No |
| C1-110245 |
C1-110551 |
MO for providing phone-context parameter |
Orange/ Youssef |
CR |
agreement |
11.4 |
Yes |
Yes |
revised |
No |
C1-110672 |
C1-110246 |
C1-110552 |
Expiration time in Re-REGISTER |
Orange/ Youssef |
CR |
agreement |
11.4 |
No |
Yes |
postponed |
No |
| C1-110247 |
C1-110553 |
SIP response to a non-REGSITER initial or standalone request received from a non-registered user |
Orange/ Youssef |
CR |
agreement |
11.4 |
No |
Yes |
postponed |
No |
| C1-110248 |
C1-110554 |
Conclusion of TR 24.837 ("Runtime"-CR) |
Huawei / Georg |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110628 |
C1-110502 |
C1-110555 |
P-CSCF handling of media parameters not allowed |
China Mobile |
CR |
agreement |
10.2 |
No |
Yes |
postponed |
No |
| C1-110429 |
C1-110556 |
LS on Support of incremental cost information in AoC-D |
T1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110652 |
| C1-110557 |
Select E-CSCF upon S-SCSF failure |
Research In Motion UK Ltd. |
CR |
agreement |
11.7 |
Yes |
Yes |
agreed |
No |
| C1-110136 |
C1-110558 |
Optimal Media Routeing – SDP attribute syntax definition |
Alcatel-Lucent |
CR |
agreement |
11.6 |
Yes |
Yes |
agreed |
No |
| C1-110081 |
C1-110559 |
Update SDP profile table for Optimal Media Routeing |
Alcatel-Lucent |
CR |
agreement |
11.6 |
Yes |
Yes |
agreed |
No |
| C1-110082 |
C1-110560 |
Clarification of possible triggers for network-initiated reauthentication |
Nokia |
CR |
agreement |
11.4 |
Yes |
Yes |
agreed |
No |
| C1-110022 |
C1-110561 |
Update to IMS registration procedures due to USAT initiated Refresh for ISIM/USIM EFs |
Nokia |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110674 |
C1-110024 |
C1-110562 |
Modifications to S-CSCF procedures in support of MPS |
Telcordia, AT&T, NCS |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110131 |
C1-110563 |
Modifications to P-CSCF and IBCF procedures in support of MPS |
Telcordia, AT&T, NCS |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110132 |
C1-110564 |
Correct P-CSCF handling of requests for emergency services with Route header fields |
Research In Motion UK Ltd. |
CR |
agreement |
8.1 |
Yes |
Yes |
agreed |
No |
| C1-110137 |
C1-110565 |
Correct P-CSCF handling of requests for emergency services with Route header fields |
Research In Motion UK Ltd. |
CR |
agreement |
8.1 |
Yes |
Yes |
agreed |
No |
| C1-110138 |
C1-110566 |
Correct P-CSCF handling of requests for emergency services with Route header fields |
Research In Motion UK Ltd. |
CR |
agreement |
8.1 |
Yes |
Yes |
agreed |
No |
| C1-110139 |
C1-110567 |
Correct P-CSCF handling of requests for emergency services with Route header fields |
Research In Motion UK Ltd. |
CR |
agreement |
8.1 |
Yes |
Yes |
agreed |
No |
| C1-110140 |
C1-110568 |
Specifying "sos" URI parameter in 24.229 |
InterDigital Communications |
CR |
agreement |
8.1 |
Yes |
Yes |
agreed |
No |
| C1-110348 |
C1-110569 |
Specifying "sos" URI parameter in 24.229 |
InterDigital Communications |
CR |
agreement |
8.1 |
Yes |
Yes |
agreed |
No |
| C1-110349 |
C1-110570 |
Specifying "sos" URI parameter in 24.229 |
InterDigital Communications |
CR |
agreement |
8.1 |
Yes |
Yes |
agreed |
No |
| C1-110350 |
C1-110571 |
Specifying "sos" URI parameter in 24.229 |
InterDigital Communications |
CR |
agreement |
8.1 |
Yes |
Yes |
agreed |
No |
| C1-110351 |
C1-110572 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
| C1-110344 |
C1-110573 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
| C1-110345 |
C1-110574 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
| C1-110346 |
C1-110575 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110677 |
C1-110347 |
C1-110576 |
Reference update: draft-ietf-mmusic-ice-tcp |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
| C1-110253 |
C1-110577 |
Reference update: draft-ietf-mmusic-ice-tcp |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
| C1-110254 |
C1-110578 |
Reference update: draft-ietf-mmusic-ice-tcp |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
| C1-110255 |
C1-110579 |
UE initiated deregistration |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110007 |
C1-110580 |
UE initiated deregistration |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110670 |
C1-110008 |
C1-110581 |
UE initiated deregistration |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110009 |
C1-110582 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110240 |
C1-110583 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110241 |
C1-110584 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110242 |
C1-110585 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110243 |
C1-110586 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110244 |
C1-110587 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110256 |
C1-110588 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110257 |
C1-110589 |
Reference update: RFC 6086 |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110258 |
C1-110590 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110621 |
C1-110268 |
C1-110591 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110622 |
C1-110269 |
C1-110592 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110623 |
C1-110270 |
C1-110593 |
Inserting of missing feature tag for registration from MSC enhanced for ICS |
Research In Motion UK LTD (adrian) |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110647 |
C1-110167 |
C1-110594 |
Inclusion of Network TADs functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110653 |
C1-110168 |
C1-110595 |
Inclusion of Network TADs functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110654 |
C1-110169 |
C1-110596 |
Completing correction of indication that aspects of the session description are not acceptable |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
No |
No |
withdrawn |
Yes |
| C1-110170 |
C1-110597 |
Completing correction of indication that aspects of the session description are not acceptable |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
No |
No |
withdrawn |
Yes |
| C1-110171 |
C1-110598 |
Completing correction of indication that aspects of the session description are not acceptable |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
No |
withdrawn |
Yes |
| C1-110172 |
C1-110599 |
LS on identifying sessions targeted for access transfer |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
|
| C1-110600 |
Handling of re-REGISTER for Hosted NAT traversal |
Orange/ Youssef |
CR |
agreement |
9.5 |
Yes |
Yes |
agreed |
No |
| C1-110250 |
C1-110601 |
Correct CDIV-TIR interaction |
Ericsson, ST-Ericsson/Jan |
CR |
agreement |
9.5 |
Yes |
Yes |
agreed |
No |
| C1-110340 |
C1-110602 |
Correct CDIV-TIR interaction |
Ericsson, ST-Ericsson/Jan |
CR |
agreement |
9.5 |
Yes |
Yes |
agreed |
No |
| C1-110341 |
C1-110603 |
Correct CDIV-TIR interaction |
Ericsson, ST-Ericsson/Jan |
CR |
agreement |
9.5 |
Yes |
Yes |
agreed |
No |
| C1-110342 |
C1-110604 |
Reference corrections to CDIV interworking |
NTT |
CR |
agreement |
9.5 |
Yes |
Yes |
agreed |
No |
| C1-110387 |
C1-110605 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
Yes |
Yes |
revised |
No |
C1-110631 |
C1-110375 |
C1-110606 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
Yes |
Yes |
revised |
No |
C1-110632 |
C1-110376 |
C1-110607 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
Yes |
Yes |
revised |
No |
C1-110633 |
C1-110377 |
C1-110608 |
Record-Rout at SCC AS – MO calls |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
| C1-110011 |
C1-110609 |
Record-Rout at SCC AS – MO calls |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
| C1-110012 |
C1-110610 |
Remote leg release |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110637 |
C1-110017 |
C1-110611 |
Previously established dialog |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
No |
No |
withdrawn |
Yes |
| C1-110018 |
C1-110612 |
Previously established dialog |
Alcatel-Lucent/ Milo |
CR |
agreement |
10.3 |
Yes |
Yes |
revised |
No |
C1-110638 |
C1-110019 |
C1-110613 |
Contact registration |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110021 |
C1-110614 |
State machine correlation corrections |
Research In Motion UK LTD (adrian) |
CR |
agreement |
10.3 |
Yes |
Yes |
agreed |
No |
| C1-110161 |
C1-110615 |
Sending of location information from LRF to E-CSCF |
Orange/ Youssef |
CR |
agreement |
10.4 |
Yes |
Yes |
revised |
No |
C1-110671 |
C1-110249 |
C1-110616 |
Proposed changes for RFC3455bis |
Deutsche Telekom |
discussion |
discussion |
11.1 |
No |
No |
[not addressed] |
No |
| C1-110096 |
C1-110617 |
Clarifying the restoration procedure |
Ericsson, ST-Ericsson / Jan /RIM /John-Luc |
CR |
agreement |
11.4 |
No |
Yes |
postponed |
No |
| C1-110252 |
C1-110618 |
Explicit Congestion Notification (ECN) for RTP over UDP |
Ericsson, ST-Ericsson / Jan |
CR |
agreement |
11.10 |
Yes |
Yes |
agreed |
No |
| C1-110251 |
C1-110619 |
Insertion of “orig” parameter by IBCF |
KPN |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110650 |
C1-110314 |
C1-110620 |
LS on MSC server assisted mid-call feature |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110663 |
| C1-110621 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110590 |
C1-110622 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110591 |
C1-110623 |
P-CSCF Path SIP URI and IMS flow token correction |
Ericsson,ST-Ericsson / Christer |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110592 |
C1-110624 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110634 |
C1-110144 |
C1-110625 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110635 |
C1-110145 |
C1-110626 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110636 |
C1-110146 |
C1-110627 |
Revised eIUT WID |
Huawei |
revised WID |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110544 |
C1-110628 |
Conclusion of TR 24.837 ("Runtime"-CR) |
Huawei / Georg |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110669 |
C1-110554 |
C1-110629 |
Pseudo-CR on 4.6.2.1.4.1 Inter-UE transfer solicited by a target UE without prior information about the existing session-Alternative 1 |
ETRI |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110521 |
C1-110630 |
Response code in Reason header field |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110659 |
C1-110006 |
C1-110631 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
No |
Yes |
postponed |
No |
| C1-110605 |
C1-110632 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
No |
Yes |
postponed |
No |
| C1-110606 |
C1-110633 |
Gateway model when the originated from CS domain |
Fujitsu Limited, NTT |
CR |
agreement |
9.6 |
No |
Yes |
postponed |
No |
| C1-110607 |
C1-110634 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
agreed |
No |
| C1-110624 |
C1-110635 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
agreed |
No |
| C1-110625 |
C1-110636 |
Clarification for the terminating procedure when using MSC server enhanced for ICS |
ZTE |
CR |
agreement |
9.4 |
Yes |
Yes |
agreed |
No |
| C1-110626 |
C1-110637 |
Remote leg release |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110610 |
C1-110638 |
Previously established dialog |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110612 |
C1-110639 |
Update of flows of establishment of collaborative session at origination- alternative 1b |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110503 |
C1-110640 |
Procedures of establishment of collaborative session at origination- alternative 1b |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
revised |
No |
C1-110658 |
C1-110504 |
C1-110641 |
Procedures for collaborative session of participants of differents subscriptions |
Huawei/Lili |
CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110528 |
C1-110642 |
Adding clauce A.18 for eSRVCC signalling flow |
ZTE |
CR |
agreement |
11.8 |
Yes |
Yes |
agreed |
No |
| C1-110535 |
C1-110643 |
SRVCC enhancement, ATCF access transfer procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
agreed |
No |
| C1-110538 |
C1-110644 |
SRVCC enhancement, ATCF compliance update |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
agreed |
No |
| C1-110539 |
C1-110645 |
SRVCC enhancement, ATCF call set up procedures |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
agreed |
No |
| C1-110541 |
C1-110646 |
SCC AS sending ATU-STI and C-MSISDN to ATCF |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.8 |
Yes |
Yes |
agreed |
No |
| C1-110542 |
C1-110647 |
Inserting of missing feature tag for registration from MSC enhanced for ICS |
Research In Motion UK LTD (adrian) |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110593 |
C1-110648 |
SigComp disabling by P-CSCF |
NTT DOCOMO |
discussion |
discussion |
11.24.1 |
Yes |
Yes |
noted |
No |
| C1-110386 |
C1-110649 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
revised |
No |
C1-110651 |
| C1-110650 |
Insertion of “orig” parameter by IBCF |
KPN |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110665 |
C1-110619 |
C1-110651 |
New Reference for Alert-URN |
Deutsche Telekom |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110649 |
C1-110652 |
LS on Support of incremental cost information in AoC-D |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110556 |
C1-110653 |
Inclusion of Network TADs functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110666 |
C1-110594 |
C1-110654 |
Inclusion of Network TADs functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
revised |
No |
C1-110667 |
C1-110595 |
C1-110655 |
Completion of originating collaborative session establishment by providing controllee UE SIP URI in SDP using P-Asserted-Identity |
Research In Motion (Andrew) |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110525 |
C1-110656 |
Procedures for indicating collaborative session establishment by providing controllee UE SIP URI in SDP using P-Asserted-Identity |
InterDigital Communications |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110508 |
C1-110657 |
Procedures of session replication performed by SCC AS |
Huawei/Lili |
CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110527 |
C1-110658 |
Procedures of establishment of collaborative session at origination- alternative 1b |
Huawei/Lili |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110640 |
C1-110659 |
Response code in Reason header field |
Alcatel-Lucent/ Milo |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110630 |
C1-110660 |
new TS template |
Huawei / Georg |
TS/TR for info / approval |
agreement |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110661 |
pCR |
Huawei / Georg |
pseudo CR |
agreement |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110662 |
new tdoc for info/discussion |
Huawei / Georg |
information |
information |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110663 |
LS on MSC server assisted mid-call feature |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110675 |
C1-110620 |
C1-110664 |
Clarification of IMS Registration conditions, taking into account the network operator’s preference for selection of the voice domain |
Research In Motion UK Ltd. |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110676 |
C1-110448 |
C1-110665 |
Insertion of “orig” parameter by IBCF |
KPN |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110650 |
C1-110666 |
Inclusion of Network TADs functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
agreed |
No |
| C1-110653 |
C1-110667 |
Inclusion of Network TADs functionality |
Research In Motion UK LTD (adrian) |
CR |
agreement |
9.4 |
Yes |
Yes |
agreed |
No |
| C1-110654 |
C1-110668 |
Add XML schema for controller loss preferences |
InterDigital Communications |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110509 |
C1-110669 |
Conclusion of TR 24.837 ("Runtime"-CR) |
Huawei / Georg |
pseudo CR |
agreement |
11.2 |
Yes |
Yes |
agreed |
No |
| C1-110628 |
C1-110670 |
UE initiated deregistration |
Alcatel-Lucent/ Milo |
CR |
agreement |
9.3 |
Yes |
Yes |
agreed |
No |
| C1-110580 |
C1-110671 |
Sending of location information from LRF to E-CSCF |
Orange/ Youssef |
CR |
agreement |
10.4 |
Yes |
Yes |
agreed |
No |
| C1-110615 |
C1-110672 |
MO for providing phone-context parameter |
Orange/ Youssef |
CR |
agreement |
11.4 |
No |
Yes |
postponed |
No |
| C1-110551 |
C1-110673 |
TI assignment for MSC server for srvcc for alerting call |
NokiaSiemens Networks |
CR |
agreement |
11.9 |
Yes |
Yes |
agreed |
No |
| C1-110546 |
C1-110674 |
Update to IMS registration procedures due to USAT initiated Refresh for ISIM/USIM EFs |
Nokia |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110678 |
C1-110561 |
C1-110675 |
LS on MSC server assisted mid-call feature |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110663 |
C1-110676 |
Clarification of IMS Registration conditions, taking into account the network operator’s preference for selection of the voice domain |
Research In Motion UK Ltd. |
CR |
agreement |
11.24.1 |
Yes |
Yes |
revised |
No |
C1-110679 |
C1-110664 |
C1-110677 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
revised |
No |
C1-110680 |
C1-110575 |
C1-110678 |
Update to IMS registration procedures due to USAT initiated Refresh for ISIM/USIM EFs |
Nokia |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110674 |
C1-110679 |
Clarification of IMS Registration conditions, taking into account the network operator’s preference for selection of the voice domain |
Research In Motion UK Ltd. |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110676 |
C1-110680 |
Removal of reference to CPC and OLI Internet Draft |
InterDigital Communications |
CR |
agreement |
8.3 |
Yes |
Yes |
agreed |
No |
| C1-110677 |
C1-110681 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110682 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110683 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110684 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110685 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110686 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110687 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110688 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110689 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110690 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110691 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110692 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110693 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110694 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110695 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110696 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110697 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110698 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110699 |
void |
void |
other |
discussion |
14 |
No |
No |
[not addressed] |
No |
|
| C1-110700 |
IFOM procedures for multiple foreign links scenario |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110370 |
C1-110701 |
IFOM capability discovery for H1 |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110371 |
C1-110702 |
IFOM routing and IP filter communication |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
No |
No |
withdrawn |
Yes |
| C1-110372 |
C1-110703 |
Network-initiated removal of an access |
ZTE |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110380 |
C1-110704 |
Information of data traffic routing used by MAPCON capable UE |
ZTE |
CR |
agreement |
11.19 |
Yes |
Yes |
revised |
No |
C1-110772 |
C1-110378 |
C1-110705 |
Abnormal case during the handover procedure |
ZTE |
CR |
agreement |
11.19 |
Yes |
Yes |
revised |
No |
C1-110771 |
C1-110379 |
C1-110706 |
LS on Restriction on the use of LIPA PDN connection |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110763 |
| C1-110707 |
Modification of default value for MT profile and write response |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
agreed |
No |
| C1-110109 |
C1-110708 |
Correction of USAT event response |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
agreed |
No |
| C1-110110 |
C1-110709 |
Correction of USAT profile activation |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
agreed |
No |
| C1-110106 |
C1-110710 |
Low Priority Indicator Storage and Reconfiguration |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110758 |
| C1-110711 |
Integrity protection of periodic updates |
Ericsson, ST-Ericsson |
CR |
agreement |
11.12 |
No |
Yes |
postponed |
No |
| C1-110103 |
C1-110712 |
Explicit Signalling Indication During Attach |
Alcatel-Lucent, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Qualcomm Incorporated |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110057 |
C1-110713 |
Explicit Signalling Indication During Attach |
Alcatel-Lucent, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Qualcomm Incorporated |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110058 |
C1-110714 |
Reconsidering the UE behavior when it is barred to MO CSFB |
NTT DOCOMO |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110064 |
C1-110715 |
LS on Access class barring for CSFB |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110754 |
C1-110065 |
C1-110716 |
Local Bearer deactivation during CSFB |
InterDigital |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110762 |
C1-110092 |
C1-110717 |
Providing the UE with R99 QoS |
Renesas Electronics Europe |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110093 |
C1-110718 |
Inter system change to S1-mode with no active PDP Context |
Ericsson, ST-Ericsson, TeliaSonera, NTT DOCOMO, Qualcomm Incorporated |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110099 |
C1-110719 |
LS on Inter system change to S1-mode with no active PDP Context |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110761 |
| C1-110720 |
Correction of the handling of the P-TMSI type IE |
Nokia Siemens Networks, Research In Motion |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110238 |
C1-110721 |
Correction of the handling of the Old GUTI type IE |
Nokia Siemens Networks, Research In Motion |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110239 |
C1-110722 |
General description of switch-off of non-3GPP access networks |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
agreed |
No |
| C1-110229 |
C1-110723 |
Key issue: “Degradation of service due to switch-off of non-3GPP access networks” |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
agreed |
No |
| C1-110230 |
C1-110724 |
Key issue: “Impacts for multi-access and flow mobility” |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
agreed |
No |
| C1-110231 |
C1-110725 |
Solution “Network based handling for multi-access and flow mobility” |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
agreed |
No |
| C1-110232 |
C1-110726 |
Conclusions (first part) |
NEC / Gottfried |
pseudo CR |
agreement |
11.22 |
Yes |
Yes |
agreed |
No |
| C1-110426 |
C1-110727 |
Detection of currently active SIM or USIM |
ST-Ericsson, Giesecke & Devrient |
CR |
agreement |
11.14 |
Yes |
Yes |
agreed |
No |
| C1-110107 |
C1-110728 |
Clarification to the handling of SM cause value 27 |
HTC Corp, KPN |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110773 |
C1-110439 |
C1-110729 |
Correction on detach and service request collision |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110778 |
C1-110197 |
C1-110730 |
LS on ANDSF usage for I-WLAN Mobility |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110759 |
| C1-110731 |
Maximum Transmission Unit in Protocol configuration options |
Ericsson, ST-Ericsson / Ivo |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110303 |
C1-110732 |
Clarification of relationship between CREG, CEREG and CGREG. Introduction of registration for EPS and non-EPS services for ‘SMS only’ in CREG. |
Research In Motion, Qualcomm Incorporated, Ericsson, ST-Ericsson, Renesas Electronics Europe, Motorola Mobility. |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110233 |
C1-110733 |
Handling of Location Updating and CS Service Request after CS fallback for mobile originating calls |
Research In Motion, AT&T, Motorola Mobility, NEC, Alcatel-Lucent |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110237 |
C1-110734 |
Automatic re-attach following TAU reject or Service Request reject |
Motorola Mobility |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110339 |
C1-110735 |
clarification for APN sent by the network |
CATT |
CR |
agreement |
11.23 |
No |
Yes |
postponed |
No |
| C1-110382 |
C1-110736 |
GUMMEI Type indication during establishment of NAS signalling connection |
Alcatel-Lucent |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110059 |
C1-110737 |
Avoiding the problem of barring duplication for MO CSFB |
NTT DOCOMO |
CR |
agreement |
11.23 |
Yes |
Yes |
postponed |
No |
| C1-110062 |
C1-110738 |
Clarification to ESM cause value#31 |
HTC Corp |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110175 |
C1-110739 |
Correction on GPRS detach and service request collision |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
revised |
No |
C1-110779 |
C1-110198 |
C1-110740 |
Correction on UE substate selection |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110199 |
C1-110741 |
Correction on MS substate selection |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110200 |
C1-110742 |
LS on non-decimal digits in MCC |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110775 |
| C1-110743 |
Low priority indication by the MS for the service request procedure |
Panasonic |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110472 |
C1-110744 |
Handling of periodic TAU timer, mobile reachable timer and MM back-off timer |
HTC Corp., Alcatel-Lucent, ZTE, Hitachi |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110485 |
C1-110745 |
Handling of periodic RAU timer, mobile reachable timer and MM back-off timer |
HTC Corp., Alcatel-Lucent, ZTE, Hitachi |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110486 |
C1-110746 |
Device properties and RRC establishment cause = Delay tolerant – 24.008 |
Research in Motion |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110487 |
C1-110747 |
Device properties and RRC establishment cause = Delay tolerant – 24.301 |
Research in Motion |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110488 |
C1-110748 |
Revision to Network-initiated Removal of Foreign Link from a PDN Connection |
Huawei, Hisilicon, Ericsson, ST-Ericsson |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110490 |
C1-110749 |
IFOM capability discovery through ISRP – ANDSF |
Qualcomm Incorporated/Patrick |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110497 |
C1-110750 |
Corrections to the PDP Context Deactivation for LIPA |
InterDigital |
CR |
agreement |
11.17 |
Yes |
Yes |
postponed |
No |
| C1-110463 |
C1-110751 |
Notify UE when a HNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd., Verizon Wireless, Vodafone |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110770 |
C1-110464 |
C1-110752 |
Notify UE when a HeNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd., Verizon Wireless, Vodafone |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110784 |
C1-110465 |
C1-110753 |
LS on Cell Broadcast Service for MOCN Shared Network |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110764 |
C1-110467 |
C1-110754 |
LS on Access class barring for CSFB |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110715 |
C1-110755 |
LS on low access priority indication for the service request procedure in EPS |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110473 |
C1-110756 |
LS on PLMN selection when back-off timer is running |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110776 |
C1-110483 |
C1-110757 |
Provision of the RRC establishment cause "Delay tolerant" |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110489 |
C1-110758 |
LS on low priority indicator storage and reconfiguration |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110710 |
C1-110759 |
LS on ANDSF usage for I-WLAN Mobility |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110730 |
C1-110760 |
LS on the interaction between ISRP and ISMP |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110492 |
C1-110761 |
LS on Inter system change to S1-mode with no active PDP Context |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110719 |
C1-110762 |
Local Bearer deactivation during CSFB |
InterDigital |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110716 |
C1-110763 |
LS on restriction on the use of LIPA PDN connection |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110706 |
C1-110764 |
LS on Cell Broadcast Service for MOCN Shared Network |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110777 |
C1-110753 |
C1-110765 |
Handling of secondary PDP context activation procedure in case of APN congestion |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110468 |
C1-110766 |
LS on Session Management Backoff Timer applicability |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
revised |
No |
C1-110783 |
| C1-110767 |
Handling of dedicated EPS bearer context activation procerdure in case of APN congestion |
HTC Corp |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110469 |
C1-110768 |
Mobility management congestion control and back-off timer |
Ericsson, ST-Ericsson, KPN, Vodafone, HTC Corp, ZTE |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110470 |
C1-110769 |
Exception for the LIPA PDN disconnection |
InterDigital |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110786 |
C1-110091 |
C1-110770 |
Notify UE when a HNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd., Verizon Wireless, Vodafone |
CR |
agreement |
11.17 |
Yes |
Yes |
revised |
No |
C1-110785 |
C1-110751 |
C1-110771 |
Abnormal case during the handover procedure |
ZTE |
CR |
agreement |
11.19 |
Yes |
Yes |
agreed |
No |
| C1-110705 |
C1-110772 |
Information of data traffic routing used by MAPCON capable UE |
ZTE |
CR |
agreement |
11.19 |
Yes |
Yes |
agreed |
No |
| C1-110704 |
C1-110773 |
Clarification to the handling of SM cause value 27 |
HTC Corp, KPN |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110728 |
C1-110774 |
Reply to LS on RAN Sharing for H(e)NB Cells |
CT1 |
o/g LS |
approval |
13 |
Yes |
Yes |
agreed |
No |
| C1-110474 |
C1-110775 |
LS on non-decimal digits in MCC |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110742 |
C1-110776 |
LS on PLMN selection when back-off timer is running |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110756 |
C1-110777 |
LS on Cell Broadcast Service for MOCN Shared Network |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110764 |
C1-110778 |
Correction on detach and service request collision |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110729 |
C1-110779 |
Correction on GPRS detach and service request collision |
Huawei, Hisilicon |
CR |
agreement |
11.23 |
Yes |
Yes |
agreed |
No |
| C1-110739 |
C1-110780 |
Clarification of Multi-Access Capability Impact for Procedure between UE and ANDSF |
Huawei, Hisilicon |
CR |
agreement |
11.16 |
Yes |
Yes |
agreed |
No |
| C1-110495 |
C1-110781 |
Completion of introduction of "Low priority" indication in 24.008 CS messages |
Research In Motion, InterDigital Communications, Alcatel-Lucent, Huawei, Hisilicon |
CR |
agreement |
11.12 |
Yes |
Yes |
agreed |
No |
| C1-110480 |
C1-110782 |
IMS parameter preventing establishment of IP-CAN bearer used only for IMS |
Ericsson, ST-Ericsson, Samsung, Huawei |
CR |
agreement |
11.24.1 |
Yes |
Yes |
agreed |
No |
| C1-110449 |
C1-110783 |
LS on Session Management Backoff Timer applicability |
CT1 |
o/g LS |
agreement |
13 |
Yes |
Yes |
agreed |
No |
| C1-110766 |
C1-110784 |
Notify UE when a HeNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd., Verizon Wireless, Vodafone |
CR |
agreement |
11.17 |
Yes |
Yes |
agreed |
No |
| C1-110752 |
C1-110785 |
Notify UE when a HNB provides access to a residential/enterprise IP network |
Research In Motion UK Ltd., Verizon Wireless, Vodafone |
CR |
agreement |
11.17 |
Yes |
Yes |
agreed |
No |
| C1-110770 |
C1-110786 |
Exception for the LIPA PDN disconnection |
InterDigital |
CR |
agreement |
11.17 |
Yes |
Yes |
agreed |
No |
| C1-110769 |
|