Agenda with allocated Tdocs

Created: 2013-11-18 14:56     Last document: C1-135223

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
Opening
2
Agenda and reports
C1-134526 agenda CT1 Chairman agenda information Yes Yes noted No
    C1-134799 draft C1-84bis report MCC meeting report / action list approval Yes Yes approved No
3
Input liaison statements
C1-134628 Reply LS to SA WG4 LS on End-to-end QoS handling of MTSI. (C3-131594) CT3 i/c LS information Yes Yes noted No
    C1-134629 Reply LS on Reply LS on support for user location age or timestamp (C4-131815) CT4 i/c LS information Yes Yes noted No
    C1-134630 LS on TLS protocol profile for eMediasec (C4-131868) CT4 i/c LS information Yes Yes noted No
    C1-134631 Reply LS on UEPCOP CT considerations (C4-131869) CT4 i/c LS information Yes Yes noted No
    C1-134632 LS on MO scenarios for the new P-CSCF restoration mechanism (C4-131882) CT4 i/c LS action Yes Yes replied to No
    C1-134633 Reply LS on Testing of the IP Multimedia Services Identity Module (ISIM) application support in ME (C6-130403) CT6 i/c LS information Yes Yes noted No
    C1-134634 Reply LS on security aspects of protocol architectures for small cell enhancements (R2-133650) RAN2 i/c LS information Yes Yes noted No
    C1-134635 Reply LS on UEPCOP considerations (R2-133695) RAN2 i/c LS information Yes Yes noted No
    C1-134636 LS on CN impacts in RAN2 solutions for WLAN/3GPP radio interworking (R2-133697) RAN2 i/c LS action Yes Yes replied to No
    C1-134637 Reply LS on security aspects of protocol architectures for small cell enhancements (R3-131919) RAN3 i/c LS information Yes Yes noted No
    C1-134638 LS on Charging Information Delivery to IMS CTF (S5-131750) SA5 i/c LS action Yes Yes replied to No
    C1-134639 LS on Standardization of a Diameter interface for Circuit Switched (CS) Domain Charging (S5-131753) SA5 i/c LS information Yes Yes noted No
    C1-134640 LS on Availability of SIP Instance Identifier (S5-131804) SA5 i/c LS action Yes Yes replied to No
    C1-134883 LS on End-to-end fixed-mobile interworking (S4-131304) SA4 i/c LS action Yes Yes noted No
    C1-134884 LS on Improved end-to-end QoS handling of MTSI (S4-131308) SA4 i/c LS information Yes Yes noted No
    C1-134885 Reply LS on new work item on "IMS support for RTP / RTCP transport multiplexing" (S4-131309) SA4 i/c LS information Yes Yes noted No
    C1-134886 LS on the handling of QoS parameters between IPv4 and IPv6 systems (S4-131315) SA4 i/c LS action Yes Yes forwarded to C1-86 No
    C1-135101 LS on TS 32.299 AVPs for update in TS 29.230 (S5-132102) SA5 i/c LS information Yes Yes noted No
    C1-135198 Reply LS on interaction between MTC or IMS emergency call and 'Call control by USIM' (C6-130581) CT6 i/c LS action Yes Yes forwarded to C1-86 No
4
Work organisation
4.1
Meeting schedule
4.2
Work plan and other administrative issues
C1-134797 Preliminary CT1/3/4/6 Meeting Calendar 2015 CT1 Chairman information information Yes Yes noted No
    C1-134798 work plan MCC discussion discussion Yes Yes revised No C1-135206
    C1-135206 work plan MCC discussion discussion Yes Yes noted No C1-134798
4.3
Joint session with CT6
5
Corrections to old releases
5.1
IMS issues
5.2
Non-IMS issues
6
Rel-6
6.1
IMS issues
6.2
Non-IMS issues
7
Rel-7
7.1
Rel-7 IMS Work Items and issues
C1-134732 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes agreed No C1-134190
    C1-134733 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes agreed No C1-134191
    C1-134734 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes agreed No C1-134192
    C1-134735 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes agreed No C1-134193
    C1-134736 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes agreed No C1-134194
    C1-134844 GBA mode selection in NAF Ericsson / Ivo CR agreement Yes Yes agreed No C1-134195
7.2
Rel-7 non-IMS Work Items and issues
8
Rel-8
8.1
Rel-8 IMS Work Items and issues
C1-134196 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133683
    C1-134197 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133684
    C1-134198 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133685
    C1-134199 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133686
    C1-134200 Reference update of draft-vanelburg-dispatch-private-network-ind NTT / Shunsuke CR agreement Yes Yes agreed No C1-133687
    C1-134201 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133710
    C1-134202 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133711
    C1-134203 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133712
    C1-134204 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133713
    C1-134205 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133714
    C1-134206 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133715
    C1-134207 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133716
    C1-134208 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133717
    C1-134209 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133718
    C1-134210 Reference update: RFC 7006 (draft-ietf-mmusic-sdp-miscellaneous-caps) Ericsson / Christer CR agreement Yes Yes agreed No C1-133719
    C1-134211 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133842
    C1-134212 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133837
    C1-134213 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133838
    C1-134214 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133839
    C1-134215 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133840
    C1-134216 Correction on procedures at the diverting AS of CFNR OKI, NTT CR agreement Yes Yes agreed No C1-133841
    C1-134533 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134534 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134535 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134536 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134537 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134538 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134539 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134540 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134541 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134542 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134543 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134544 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134545 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134546 Reference Update: draft-ietf-salud-alert-info-urns Deutsche Telekom / Michael CR agreement Yes Yes agreed No
    C1-134683 Diffs between IMEI URN internet draft versions BlackBerry/Andrew information information Yes Yes noted No
    C1-134684 Updating IMEI URN draft reference BlackBerry/Andrew CR agreement Yes Yes revised No C1-134984
    C1-134984 Updating IMEI URN draft reference BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134684
    C1-134685 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134985
    C1-134985 Updating IMEI URN draft reference BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134685
    C1-134686 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134986
    C1-134986 Updating IMEI URN draft reference BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134686
    C1-134687 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134987
    C1-134987 Updating IMEI URN draft reference BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134687
    C1-134688 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134988
    C1-134988 Updating IMEI URN draft reference BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134688
    C1-134715 Conference REFER handling, enhanced MSC Ericsson / Jörgen CR agreement Yes No withdrawn Yes C1-133581
    C1-134716 Conference REFER handling, enhanced MSC Ericsson / Jörgen CR agreement Yes No withdrawn Yes C1-133582
    C1-134717 Conference REFER handling, enhanced MSC Ericsson / Jörgen CR agreement Yes No withdrawn Yes C1-133583
    C1-134718 Conference REFER handling, enhanced MSC Ericsson / Jörgen CR agreement Yes No withdrawn Yes C1-133584
    C1-134719 Conference REFER handling, enhanced MSC Ericsson / Jörgen CR agreement Yes Yes revised No C1-135010 C1-133585
    C1-134720 REFER authentication correction Ericsson / Jörgen CR agreement Yes No withdrawn Yes C1-133277
    C1-134721 REFER authentication correction Ericsson / Jörgen CR agreement Yes No withdrawn Yes C1-133278
    C1-134722 REFER authentication correction Ericsson / Jörgen CR agreement Yes No withdrawn Yes C1-133279
    C1-134723 REFER authentication correction Ericsson / Jörgen CR agreement Yes No withdrawn Yes C1-133280
    C1-134724 REFER authentication correction Ericsson / Jörgen CR agreement Yes Yes revised No C1-135011
8.2
Rel-8 non-IMS Work Items and issues
C1-134662 Correction of disparity between TimeOfDay Variables in MO defenition and DDF Openet CR agreement Yes Yes rejected No
    C1-134663 Correction of disparity between TimeOfDay Variables in MO defenition and DDF Openet CR agreement Yes No withdrawn Yes
    C1-134664 Correction of disparity between TimeOfDay Variables in MO defenition and DDF Openet CR agreement Yes No withdrawn Yes
    C1-134665 Correction of disparity between TimeOfDay Variables in MO defenition and DDF Openet CR agreement Yes No withdrawn Yes
    C1-134666 Correction of disparity between TimeOfDay Variables in MO defenition and DDF Openet CR agreement Yes Yes revised No C1-135036
    C1-134851 Clarifications of FQDN coding in VLR name and MME name ORANGE CR agreement Yes Yes revised No C1-134955
    C1-134955 Clarifications of FQDN coding in VLR name and MME name Orange, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ZTE, Cisco CR agreement Yes Yes agreed with one sustained objection No C1-134851
    C1-134852 Clarifications of FQDN coding in VLR name and MME name ORANGE CR agreement Yes Yes revised No C1-134956
    C1-134956 Clarifications of FQDN coding in VLR name and MME name Orange, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ZTE, Cisco CR agreement Yes Yes agreed with one sustained objection No C1-134852
    C1-134853 Clarifications of FQDN coding in VLR name and MME name ORANGE CR agreement Yes Yes revised No C1-134957
    C1-134957 Clarifications of FQDN coding in VLR name and MME name Orange, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ZTE, Cisco CR agreement Yes Yes agreed with one sustained objection No C1-134853
9
Rel-9
9.1
Rel-9 IMS Work Items and issues
C1-133673 Reverting IP routing text deleted in error Vodafone CR agreement Yes Yes agreed No
    C1-133674 Reverting IP routing text deleted in error Vodafone CR agreement Yes Yes agreed No
    C1-133675 Reverting subclause heading voided in error Vodafone CR agreement Yes Yes agreed No
    C1-133688 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133689 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133690 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133691 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133692 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133693 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133694 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133695 Reference update: draft-kaplan-insipid-session-id Ericsson / Christer CR agreement Yes Yes agreed No
    C1-133918 Fixing remaining errors in media security Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-133919 Fixing remaining errors in media security Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-133920 Fixing remaining errors in media security Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-133921 Fixing remaining errors in media security Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-134484 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134903 C1-134422
    C1-134903 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Ericsson, BlackBerry UK Ltd, Samsung CR agreement Yes Yes agreed No C1-134484
    C1-134485 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134904 C1-134423
    C1-134904 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Ericsson, BlackBerry UK Ltd, Samsung CR agreement Yes Yes agreed No C1-134485
    C1-134486 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134905 C1-134424
    C1-134905 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Ericsson, BlackBerry UK Ltd, Samsung CR agreement Yes Yes agreed No C1-134486
    C1-134487 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes revised No C1-134906 C1-134425
    C1-134906 Clarification when receiving a 380 (Alternative Service) response indicating "emergency" NTT DOCOMO, Ericsson, BlackBerry UK Ltd, Samsung CR agreement Yes Yes agreed No C1-134487
    C1-134566 Map a request for particular functions from a privacy service to emergency URN BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-134119
    C1-134567 Map a request for particular functions from a privacy service to emergency URN BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-134120
    C1-134568 Map a request for particular functions from a privacy service to emergency URN BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-134121
    C1-134569 Map a request for particular functions from a privacy service to emergency URN BlackBerry UK Ltd. CR agreement Yes Yes postponed No C1-134122
    C1-134574 Fixing correction when receiving a 380 (Alternative Service) response indicating “emergency” to UE non-detectable IMS emergency call BlackBerry UK Ltd. discussion discussion Yes Yes revised No C1-134875
    C1-134875 Fixing correction when receiving a 380 (Alternative Service) response indicating “emergency” to UE non-detectable IMS emergency call BlackBerry UK Ltd., Samsung discussion discussion Yes Yes noted No C1-134574
    C1-134689 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134989
    C1-134989 Updating IMEI URN draft reference BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134689
    C1-134690 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134990
    C1-134990 Updating IMEI URN draft reference BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134690
    C1-134691 Updating IMEI URN draft reference BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134991
    C1-134991 Updating IMEI URN draft reference BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134691
    C1-134696 Correcting SCC AS procedures BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134992
    C1-134992 Correcting SCC AS procedures BlackBerry CR agreement Yes Yes agreed No C1-134696
    C1-134839 UE non-detectable emergency call with privacy delivered to PSAP via IMS Ericsson / Ivo discussion discussion Yes Yes noted No
    C1-134840 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-A + Sol-I2-A Ericsson / Ivo CR agreement Yes Yes postponed No
    C1-134841 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-A + Sol-I2-A Ericsson / Ivo CR agreement Yes Yes postponed No
    C1-134842 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-A + Sol-I2-A Ericsson / Ivo CR agreement Yes Yes postponed No
    C1-134843 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-A + Sol-I2-A Ericsson / Ivo CR agreement Yes Yes postponed No
    C1-134869 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-B + Sol-I2-A Ericsson / Ivo CR agreement Yes Yes postponed No
    C1-134870 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-B + Sol-I2-A Ericsson / Ivo CR agreement Yes Yes postponed No
    C1-134871 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-B + Sol-I2-A Ericsson / Ivo CR agreement Yes Yes postponed No
    C1-134872 UE non-detectable emergency call, privacy, delivery to PSAP via IMS - Sol-I1-B + Sol-I2-A Ericsson / Ivo CR agreement Yes Yes postponed No
9.2
Rel-9 non-IMS Work Items and issues
10
Rel-10
10.1
Rel-10 IMS Work items and issues
C1-134219 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes agreed No C1-133871
    C1-134220 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes agreed No C1-133872
    C1-134221 The MSC server mid-call support correction Ericsson /Janne CR agreement Yes Yes agreed No C1-133873
    C1-134222 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes revised No C1-134677 C1-133875
    C1-134677 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes revised No C1-135004 C1-134222
    C1-135004 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes agreed No C1-134677
    C1-134223 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes revised No C1-135005 C1-133876
    C1-135005 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes agreed No C1-134223
    C1-134224 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes revised No C1-135006 C1-133877
    C1-135006 Release of session subject to access transfer in SC UE Ericsson /Janne CR agreement Yes Yes agreed No C1-134224
    C1-134372 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes agreed No C1-134225
    C1-134373 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes agreed No C1-134226
    C1-134374 Use of ECN in Multimedia Priority Service Applied Communication Sciences, Office of Emergency Com., AT&T CR agreement Yes Yes agreed No C1-134227
    C1-135118 Incorrect preconditions for inclusion of P-Refused-URI-List and Retry-After header fields in INVITE Qualcomm Incorporated CR agreement Yes Yes agreed No
    C1-135119 Incorrect preconditions for inclusion of P-Refused-URI-List and Retry-After header fields in INVITE Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134560
    C1-135117 Incorrect preconditions for inclusion of P-Refused-URI-List and Retry-After header fields in INVITE Qualcomm Incorporated CR agreement Yes Yes agreed No
    C1-134602 SCC AS receives CANCEL from MSC NSN/Peter CR agreement Yes Yes revised No C1-134995
    C1-134995 SCC AS receives CANCEL from MSC NSN CR agreement Yes Yes agreed No C1-134602
    C1-134603 SCC AS receives CANCEL from MSC NSN/Peter CR agreement Yes Yes revised No C1-134996
    C1-134996 SCC AS receives CANCEL from MSC NSN CR agreement Yes Yes agreed No C1-134603
    C1-134604 SCC AS receives CANCEL from MSC NSN/Peter CR agreement Yes Yes revised No C1-134997
    C1-134997 SCC AS receives CANCEL from MSC NSN CR agreement Yes Yes agreed No C1-134604
    C1-134614 norefersub in Require / Supported Ericsson, Samsung / Ivo CR agreement Yes Yes revised No C1-135153
    C1-135153 norefersub in Require / Supported Ericsson, Samsung / Ivo CR agreement Yes Yes agreed No C1-134614
    C1-134615 norefersub in Require / Supported Ericsson, Samsung / Ivo CR agreement Yes Yes revised No C1-135154
    C1-135154 norefersub in Require / Supported Ericsson, Samsung / Ivo CR agreement Yes Yes agreed No C1-134615
    C1-134616 norefersub in Require / Supported Ericsson, Samsung / Ivo CR agreement Yes Yes revised No C1-135155
    C1-135155 norefersub in Require / Supported Ericsson, Samsung / Ivo CR agreement Yes Yes agreed No C1-134616
    C1-134669 Remote public user identity needed in MSC server Ericsson / Janne discussion discussion Yes Yes noted No
    C1-134670 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson / Janne CR agreement Yes Yes revised No C1-134998 C1-133881
    C1-134998 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson CR agreement Yes Yes revised No C1-135156 C1-134670
    C1-135156 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson CR agreement Yes Yes agreed No C1-134998
    C1-134671 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson / Janne CR agreement Yes Yes revised No C1-134999 C1-133882
    C1-134999 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson CR agreement Yes Yes revised No C1-135157 C1-134671
    C1-135157 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson CR agreement Yes Yes agreed No C1-134999
    C1-134672 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson / Janne CR agreement Yes Yes revised No C1-135000 C1-133883
    C1-135000 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson CR agreement Yes Yes revised No C1-135158 C1-134672
    C1-135158 SCC AS including the P-Asserted-Identity and the Contact header field towards the MSC server Ericsson CR agreement Yes Yes agreed No C1-135000
    C1-134673 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson / Janne CR agreement Yes Yes revised No C1-135001 C1-133878
    C1-135001 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson CR agreement Yes Yes agreed No C1-134673
    C1-134674 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson / Janne CR agreement Yes Yes revised No C1-135002 C1-133879
    C1-135002 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson CR agreement Yes Yes agreed No C1-134674
    C1-134675 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson / Janne CR agreement Yes Yes revised No C1-135003 C1-133880
    C1-135003 ATCF including the P-Asserted-Identity header field towards the MSC server Ericsson CR agreement Yes Yes agreed No C1-134675
    C1-134697 Correcting SCC AS procedures BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134993
    C1-134993 Correcting SCC AS procedures BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-134697
    C1-134698 Correcting SCC AS procedures BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134994
    C1-134994 Correcting SCC AS procedures BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-134698
10.2
Rel-10 non-IMS Work items and issues
C1-133736 MS's inconsistent behaviour when PS back-off timer is running Huawei, HiSilicon, Vodafone, InterDigital, CATT, HTC /Lin CR agreement Yes Yes agreed No C1-133353
    C1-133737 MS's inconsistent behaviour when PS back-off timer is running Huawei, HiSilicon, Vodafone, InterDigital, CATT, HTC /Lin CR agreement Yes Yes agreed No C1-133354
    C1-133738 MS's inconsistent behaviour when PS back-off timer is running Huawei, HiSilicon, Vodafone, InterDigital, CATT, HTC /Lin CR agreement Yes Yes agreed No C1-133355
    C1-134251 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes agreed No C1-133948
    C1-134252 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes agreed No C1-133949
    C1-134253 Correction of Back-off timer handling for GERAN InterDigital CR agreement Yes Yes agreed No C1-133950
    C1-134259 Handling of Mobile Identity, old RAI and P-TMSI signature for combined Attach Intel Corporation CR agreement Yes Yes agreed No C1-134034
    C1-134260 Handling of Mobile Identity, old RAI and P-TMSI signature for combined Attach Intel Corporation CR agreement Yes Yes agreed No C1-134035
    C1-134261 Handling of Mobile Identity, old RAI and P-TMSI signature for combined Attach Intel Corporation CR agreement Yes Yes agreed No C1-134036
    C1-134468 Modification for paging with IMSI in MME for CSFB China Mobile, Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-134397
    C1-134469 Modification for paging with IMSI in MME for CSFB China Mobile, Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-134398
    C1-134470 Modification for paging with IMSI in MME for CSFB China Mobile, Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-134399
    C1-134473 Selective RAU when ISR is activated Intel Corporation, NSN, Interdigital, Cisco CR agreement Yes Yes revised No C1-135014 C1-134244
    C1-135014 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes postponed No C1-134473
    C1-134474 Selective RAU when ISR is activated Intel Corporation, NSN, Interdigital, Cisco CR agreement Yes Yes revised No C1-135015 C1-134245
    C1-135015 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes postponed No C1-134474
    C1-134475 Selective RAU when ISR is activated Intel Corporation, NSN, Interdigital, Cisco CR agreement Yes Yes revised No C1-135016 C1-134246
    C1-135016 Selective RAU when ISR is activated Intel Corporation, NSN, InterDigital, Cisco, NEC CR agreement Yes Yes postponed No C1-134475
    C1-134619 MO CSFB handling when running T3346 ZTE/Fei CR agreement Yes Yes rejected No
    C1-134620 MO CSFB handling when running T3346 ZTE/Fei CR agreement Yes Yes rejected No
    C1-134621 MO CSFB handling when running T3346 ZTE/Fei CR agreement Yes Yes revised No C1-134958
    C1-134659 Correction of disparity between 3GPP Location Node Name in MO definition and DDF Openet CR agreement Yes Yes revised No C1-135037
    C1-135037 Correction of disparity between 3GPP Location Node Name in MO definition and DDF Openet CR agreement Yes Yes rejected No C1-134659
    C1-134660 Correction of disparity between 3GPP Location Node Name in MO definition and DDF Openet CR agreement Yes Yes revised No C1-135038
    C1-135038 Correction of disparity between 3GPP Location Node Name in MO definition and DDF Openet CR agreement Yes Yes rejected No C1-134660
    C1-134661 Correction of disparity between 3GPP Location Node Name in MO definition and DDF Openet CR agreement Yes Yes revised No C1-135039
    C1-135039 Correction of disparity between 3GPP Location Node Name in MO definition and DDF Openet CR agreement Yes Yes revised No C1-135164 C1-134661
    C1-134774 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes postponed No C1-134389
    C1-134775 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes postponed No C1-134390
    C1-134776 CSFB priority call handling in a network supporting Multimedia Priority Service Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes postponed No C1-134391
    C1-134777 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134876 C1-111745
    C1-134876 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134907 C1-134777
    C1-134907 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135135 C1-134876
    C1-135135 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated, NSN, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Samsung CR agreement Yes Yes agreed No C1-134907
    C1-134778 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134877
    C1-134877 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134908 C1-134778
    C1-134908 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135136 C1-134877
    C1-135136 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated, NSN, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Samsung CR agreement Yes Yes agreed No C1-134908
    C1-134779 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134878
    C1-134878 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134909 C1-134779
    C1-134909 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135137 C1-134878
    C1-135137 Keeping ongoing realtime and multimedia services if IMS VoPS change BlackBerry UK Ltd., AT&T, Qualcomm Incorporated, NSN, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Samsung CR agreement Yes Yes agreed No C1-134909
    C1-134780 Correcting handling of CS SERVICE NOTIFICATION message while the UE has an emergency bearer context BlackBerry UK Ltd., AT&T CR agreement Yes Yes revised No C1-134910
    C1-134910 Correcting handling of CS SERVICE NOTIFICATION message while the UE has an emergency bearer context BlackBerry UK Ltd., AT&T CR agreement No Yes postponed No C1-134780
    C1-134781 Correcting handling of CS SERVICE NOTIFICATION message while the UE has an emergency bearer context BlackBerry UK Ltd., AT&T CR agreement Yes Yes revised No C1-134911
    C1-134911 Correcting handling of CS SERVICE NOTIFICATION message while the UE has an emergency bearer context BlackBerry UK Ltd., AT&T CR agreement No Yes postponed No C1-134781
    C1-134782 Correcting handling of CS SERVICE NOTIFICATION message while the UE has an emergency bearer context BlackBerry UK Ltd., AT&T CR agreement Yes Yes revised No C1-134912
    C1-134912 Correcting handling of CS SERVICE NOTIFICATION message while the UE has an emergency bearer context BlackBerry UK Ltd., AT&T CR agreement No Yes postponed No C1-134782
    C1-134800 VoLTE Border TA Issue AT&T discussion discussion Yes Yes noted No
    C1-134811 Handling of intersystem change between A/Gb mode and Iu mode for MS supporting S1 mode (related to agreed CR 2460r2 on TS 24.008, CT1#84bis) NEC / Yannick discussion discussion Yes Yes noted No
11
Rel-11
11.1
Release 11 documents for information
11.2
USSI
11.3
IOI_IMS_CH
11.4
RLI (CT4)
11.5
void
11.6
IPXS
11.7
VINE-CT
11.8
MRB
C1-134188 Reference update: RFC 6917 (draft-ietf-mediactrl-mrb) Ericsson / Christer CR agreement Yes Yes agreed No C1-133698
    C1-134189 Reference update: RFC 6917 (draft-ietf-mediactrl-mrb) Ericsson / Christer CR agreement Yes Yes agreed No C1-133699
11.9
GINI
11.10
RAVEL-CT
C1-134657 Home network bypassing of E.164 translation Ericsson / Christer CR agreement Yes Yes revised No C1-135007
    C1-135007 Home network bypassing of E.164 translation Ericsson CR agreement Yes Yes agreed No C1-134657
    C1-134658 Home network bypassing of E.164 translation Ericsson / Christer CR agreement Yes Yes revised No C1-135008
    C1-135008 Home network bypassing of E.164 translation Ericsson CR agreement Yes Yes agreed No C1-134658
11.11
IOC
C1-134438 Reference update: draft-ietf-soc-overload-control, draft-ietf-soc-overload-rate-control and draft-ietf-soc-load-control-event-package Ericsson / Christer CR agreement Yes Yes agreed No C1-133696
    C1-134439 Reference update: draft-ietf-soc-overload-control, draft-ietf-soc-overload-rate-control and draft-ietf-soc-load-control-event-package Ericsson / Christer CR agreement Yes Yes agreed No C1-133697
11.12
IODB
11.13
GBA-ext-St3 (CT4)
11.14
NWK-PL2IMS-CT
C1-134600 P-ANI encoding correction NSN/Peter CR agreement Yes Yes rejected No
    C1-134601 P-ANI encoding correction NSN/Peter CR agreement Yes Yes revised No C1-135009
    C1-134609 utran-sai-id-3gpp and utran-sai-3gpp Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-134610 utran-sai-id-3gpp and utran-sai-3gpp Ericsson / Ivo CR agreement Yes Yes agreed No
11.15
MMTel_T.38_FAX
11.16
IMSProtoc5
11.17
vSRVCC-CT
11.18
rSRVCC-CT
11.19
ATURI
11.20
RT_VGCS_Red
11.21
SIMTC work items
C1-134056 Correcting conditions for performing TAU when T3346 is running Ericsson / Magnus CR agreement Yes Yes agreed No
    C1-134057 Correcting conditions for performing TAU when T3346 is running Ericsson / Magnus CR agreement Yes Yes agreed No
    C1-134758 Continuation of EAB override for requests on a PDN connection established with EAB override Intel / Chen-Ho CR agreement Yes Yes revised No C1-135021
    C1-135021 Continuation of EAB override for requests on a PDN connection established with EAB override Intel Corporation CR agreement Yes Yes postponed No C1-134758
    C1-134759 Continuation of EAB override for requests on a PDN connection established with EAB override Intel / Chen-Ho CR agreement Yes Yes revised No C1-135022
    C1-135022 Continuation of EAB override for requests on a PDN connection established with EAB override Intel Corporation CR agreement Yes Yes postponed No C1-134759
    C1-134760 Continuation of EAB override for requests on a PDN connection established with EAB override. Intel / Chen-Ho CR agreement Yes Yes revised No C1-135023
    C1-135023 Continuation of EAB override for requests on a PDN connection established with EAB override. Intel / Chen-Ho CR agreement Yes Yes postponed No C1-134760
    C1-134761 Continuation of EAB override for requests on a PDN connection established with EAB override. Intel / Chen-Ho CR agreement Yes Yes revised No C1-135024
    C1-135024 Continuation of EAB override for requests on a PDN connection established with EAB override. Intel / Chen-Ho CR agreement Yes Yes postponed No C1-134761
11.22
BBAI work items
11.23
Full_MOCN-GERAN
11.24
RT_ERGSM
11.25
DIDA
11.26
SAMOG_WLAN- CN (CT4)
11.27
eNR_EPC (CT4)
11.28
PROTOC_SMS_SGs (CT4)
11.29
SAES2, SAES2-CSFB
C1-134494 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135031 C1-134426
    C1-135031 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135209 C1-134494
    C1-135209 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-135031
    C1-134495 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-134767 C1-134427
    C1-134496 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135033 C1-134428
    C1-135033 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134496
    C1-134497 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135034 C1-134429
    C1-135034 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134497
    C1-134580 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN, Cisco, TeliaSonera, Vodafone / Mikael CR agreement Yes Yes revised No C1-135017 C1-134270
    C1-135017 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN, Cisco, TeliaSonera, Vodafone CR agreement Yes Yes revised No C1-135160 C1-134580
    C1-135160 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN, Cisco, TeliaSonera, Vodafone CR agreement Yes Yes revised No C1-135192 C1-135017
    C1-135192 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN, Cisco, TeliaSonera, Vodafone CR agreement Yes Yes agreed No C1-135160
    C1-134581 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN, Cisco, TeliaSonera, Vodafone / Mikael CR agreement Yes Yes revised No C1-135018 C1-134271
    C1-135018 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN, Cisco, TeliaSonera, Vodafone CR agreement Yes Yes revised No C1-135161 C1-134581
    C1-135161 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN, Cisco, TeliaSonera, Vodafone CR agreement Yes Yes revised No C1-135193 C1-135018
    C1-135193 Addition of MO CSFB indication for return to last LTE PLMN Ericsson, NSN, Cisco, TeliaSonera, Vodafone CR agreement Yes Yes agreed No C1-135161
    C1-134750 RRC establishment cause for 1xCSFB NSN, LG Electronics/Devaki CR discussion Yes Yes revised No C1-135019
    C1-135019 RRC establishment cause for 1xCSFB NSN, LG Electronics CR discussion Yes Yes agreed No C1-134750
    C1-134751 RRC establishment cause for 1xCSFB NSN, LG Electronics/Devaki CR discussion Yes Yes revised No C1-135020
    C1-134762 Removal of option to convert a periodic TAU into a combined TAU Intel Corporation, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, NSN, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes postponed No C1-133940
    C1-134763 Removal of option to convert a periodic TAU into a combined TAU Intel Corporation, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, NSN, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes postponed No C1-133941
    C1-134764 Removal of option to convert a periodic RAU into a combined RAU Intel Corporation, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, NSN, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes postponed No C1-133942
    C1-134765 Removal of option to convert a periodic RAU into a combined RAU Intel Corporation, Ericsson, TeliaSonera, Cisco, ZTE, Blackberry, Samsung, AT&T, Vodafone, NSN, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes postponed No C1-133943
11.30
TEI11 and other WIDs
11.30.1
IMS TEI11
C1-133885 Removing editor's note regarding potential overlap and interactions Ericsson /Janne CR agreement Yes Yes agreed No
    C1-133886 Removing editor's note regarding potential overlap and interactions Ericsson /Janne CR agreement Yes Yes agreed No
    C1-134038 Removal of editor's note Ericsson / Jörgen CR agreement Yes Yes agreed No
    C1-134039 Removal of editor's note Ericsson / Jörgen CR agreement Yes Yes agreed No
    C1-134570 Correct Annex A due to 3xx response containing a Contact header field BlackBerry UK Ltd. CR agreement Yes Yes agreed No
    C1-134571 Correct Annex A due to 3xx response containing a Contact header field BlackBerry UK Ltd. CR agreement Yes Yes agreed No
11.30.2
Other TEI11 issues
C1-134272 MS Wideband RSRQ Measurement capability Ericsson / Mikael CR agreement Yes Yes agreed No C1-134026
    C1-134273 MS Wideband RSRQ Measurement capability Ericsson / Mikael CR agreement Yes Yes agreed No C1-134027
    C1-134402 Local deactivation of ISR after CSFB to correct resume of packet services Intel Corporation, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-134274
    C1-134403 Local deactivation of ISR after CSFB to correct resume of packet services Intel Corporation, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-134275
    C1-134767 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135032 C1-134495
    C1-135032 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes revised No C1-135210 C1-134767
    C1-135210 UE paging after TMSI reallocation procedure abort Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, NTT Docomo, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-135032
    C1-134578 Cases of #17 to trigger redirection Ericsson, TeliaSonera, NSN / Mikael CR agreement Yes Yes revised No C1-135025
    C1-135025 Cases of #17 to trigger redirection Ericsson, TeliaSonera, NSN / Mikael CR agreement Yes Yes revised No C1-135200 C1-134578
    C1-135200 Cases of #17 to trigger redirection Ericsson, TeliaSonera, NSN CR agreement Yes Yes agreed No C1-135025
    C1-134579 Cases of #17 to trigger redirection Ericsson, TeliaSonera, NSN / Mikael CR agreement Yes Yes revised No C1-135026
    C1-135026 Cases of #17 to trigger redirection Ericsson, TeliaSonera, NSN / Mikael CR agreement Yes Yes revised No C1-135201 C1-134579
    C1-135201 Cases of #17 to trigger redirection Ericsson, TeliaSonera, NSN / Mikael CR agreement Yes Yes agreed No C1-135026
    C1-134592 TMSI handling during combined tracking area update procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE /Jennifer CR agreement Yes Yes revised No C1-135027
    C1-135027 TMSI handling during combined tracking area update procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE /Jennifer CR agreement Yes Yes agreed No C1-134592
    C1-134593 TMSI handling during combined tracking area update procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE /Jennifer CR agreement Yes Yes revised No C1-135028
    C1-135028 TMSI handling during combined tracking area update procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE /Jennifer CR agreement Yes Yes agreed No C1-134593
    C1-134594 TMSI handling during combined routing area update procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE /Jennifer CR agreement Yes Yes revised No C1-135029
    C1-135029 TMSI handling during combined routing area update procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE /Jennifer CR agreement Yes Yes agreed No C1-134594
    C1-134595 TMSI handling during combined routing area update procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE /Jennifer CR agreement Yes Yes revised No C1-135030
    C1-135030 TMSI handling during combined routing area update procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, ZTE /Jennifer CR agreement Yes Yes agreed No C1-134595
11.30.3
New / updated Rel-11 WIDs
C1-133709 Incorrect message name Ericsson / Ivo CR agreement Yes Yes revised No C1-135181
12
Rel-12
12.1
Release 12 documents for information
C1-134700 Current status of IETF drafts which are dependencies for CT1 specifications BlackBerry/ Andrew information information Yes Yes noted No
12.2
LIMONET-LIPA
12.3
REP-WMD
C1-134137 eNodeB ID in Stop-Warning Indication one2many CR agreement Yes Yes agreed No C1-134076
    C1-134527 Reload Request one2many CR agreement Yes No withdrawn Yes C1-133723
    C1-134528 eNB Restart Indication one2many CR agreement Yes Yes revised No C1-134927 C1-133724
    C1-134927 eNB Restart Indication one2many CR agreement Yes Yes postponed No C1-134528
    C1-134529 eNodeB ID in Write-Replace Warning Request one2many CR agreement Yes Yes postponed No
    C1-134753 Stop all indicator clarification NSN/Devaki CR agreement Yes Yes revised No C1-134930
    C1-134930 Stop all indicator clarification NSN CR agreement Yes Yes agreed No C1-134753
12.4
OPIIS-CT
C1-134375 Adding IARP in information provided by ANDSF CATT CR agreement Yes Yes agreed No C1-134139
    C1-134505 Introduction of Inter-APN Routing Policies (IARP) for ANDSF LG Electronics CR agreement Yes Yes agreed No C1-134434
    C1-134506 Introduction of Inter-APN Routing Policies (IARP) for ANDSF MO LG Electronics CR agreement Yes Yes revised No C1-134832 C1-134436
    C1-134832 Introduction of Inter-APN Routing Policies (IARP) for ANDSF MO LG Electronics CR agreement Yes Yes revised No C1-134916 C1-134506
    C1-134916 Introduction of Inter-APN Routing Policies (IARP) for ANDSF MO LG Electronics CR agreement Yes Yes agreed No C1-134832
    C1-134785 DDF in support of IARP for ANDSF MO LG Electronics CR agreement Yes Yes revised No C1-134915
    C1-134915 DDF in support of IARP for ANDSF MO LG Electronics CR agreement Yes Yes agreed No C1-134785
    C1-134833 The usage of IARP in determining the data traffic routing of IP flows CATT CR agreement Yes Yes revised No C1-134917
    C1-134917 The usage of IARP in determining the data traffic routing of IP flows CATT CR agreement Yes Yes agreed No C1-134833
12.5
eSaMOG_St3
C1-134143 Multiple PDN support for trusted WLAN Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134018
    C1-134405 The usage of APN in non-3GPP access CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE CR agreement Yes Yes agreed No C1-134376
    C1-134611 EAP extensions for eSaMOG_St3 Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT / Ivo CR agreement Yes Yes revised No C1-134918 C1-134404
    C1-134918 EAP extensions for eSaMOG_St3 Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT / Ivo CR agreement Yes Yes revised No C1-135141 C1-134611
    C1-135141 EAP extensions for eSaMOG_St3 Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT CR agreement Yes Yes agreed No C1-134918
    C1-134617 Pseudo-CR on bit and byte order in fields Ericsson / Ivo pseudo CR agreement Yes Yes revised No C1-134919
    C1-134919 Pseudo-CR on bit and byte order in fields Ericsson / Ivo pseudo CR agreement Yes Yes agreed No C1-134617
    C1-134701 WLCP procedures Qualcomm Incorporated/ Amer pseudo CR agreement Yes Yes revised No C1-134920
    C1-134920 WLCP procedures Qualcomm Incorporated/ Amer pseudo CR agreement Yes Yes revised No C1-135162 C1-134701
    C1-135162 WLCP procedures Qualcomm Incorporated/ Amer pseudo CR agreement Yes Yes revised No C1-135207 C1-134920
    C1-135207 WLCP procedures Qualcomm Incorporated/ Amer pseudo CR agreement Yes Yes agreed No C1-135162
    C1-134793 PDN connectivity request message for Multi-Connection Mode Huawei, HiSilicon/Youyang pseudo CR agreement Yes Yes revised No C1-134924
    C1-134924 PDN connectivity request message for Multi-Connection Mode Huawei, HiSilicon/Youyang pseudo CR agreement Yes Yes agreed No C1-134793
    C1-134812 Skeleton of General clause ZTE/Joy pseudo CR agreement Yes Yes revised No C1-134921
    C1-134921 Skeleton of General clause ZTE/Joy pseudo CR agreement No Yes postponed No C1-134812
    C1-134813 Overview of General clause ZTE/Joy pseudo CR agreement Yes Yes revised No C1-134925
    C1-134925 Overview of General clause ZTE/Joy pseudo CR agreement No Yes postponed No C1-134813
12.6
MTCe-UEPCOP-CT
C1-134583 Power Saving Mode scope in CT1 Ericsson / Mikael discussion discussion Yes Yes noted No
12.7
WORM-CT
C1-134575 Discussion on ISRP extensions for WORM Broadcom Corporation discussion discussion Yes Yes noted No
    C1-134576 Differentiating 3GPP radio access technologies in routing rules of ISRP Broadcom Corporation, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134922
    C1-134922 Differentiating 3GPP radio access technologies in routing rules of ISRP Broadcom Corporation, Huawei, HiSilicon CR agreement Yes Yes revised No C1-135163 C1-134576
    C1-135163 Differentiating 3GPP radio access technologies in routing rules of ISRP Broadcom Corporation, Huawei, HiSilicon CR agreement No Yes postponed No C1-134922
    C1-134703 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated, Blackberry, Motorola Mobility CR agreement Yes Yes revised No C1-134923 C1-134421
    C1-134923 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated, Blackberry, Motorola Mobility CR agreement Yes Yes revised No C1-135142 C1-134703
    C1-135142 Differentiating 3GPP radio access technologies in routing rules of ISRP Qualcomm Incorporated, Blackberry, Motorola Mobility CR agreement No Yes postponed No C1-134923
12.8
WLAN_NS-CT
C1-134792 Reselection procedures without ANDSF policy Huawei, HiSilicon/Youyang CR agreement Yes Yes revised No C1-134926
    C1-134926 Update access network reselection procedures Huawei, HiSilicon CR agreement Yes Yes revised No C1-135165 C1-134792
    C1-135165 Update access network reselection procedures Huawei, HiSilicon CR agreement Yes Yes revised No C1-135222 C1-134926
    C1-135222 Update access network reselection procedures Huawei, HiSilicon CR agreement Yes Yes agreed No C1-135165
    C1-134834 Introduction of WLAN Selection Policy for ANDSF MO CATT CR agreement Yes Yes revised No C1-134931
    C1-134931 Introduction of WLAN Selection Policy for ANDSF MO CATT CR agreement Yes Yes revised No C1-135166 C1-134834
    C1-135166 Introduction of WLAN Selection Policy for ANDSF MO CATT CR agreement Yes Yes revised No C1-135202 C1-134931
    C1-135202 Introduction of WLAN Selection Policy for ANDSF MO CATT CR agreement Yes Yes revised No C1-135218 C1-135166
    C1-135218 Introduction of WLAN Selection Policy for ANDSF MO CATT CR agreement Yes Yes agreed No C1-135202
12.9
SINE
C1-134597 Extension of back-off mechanism for additional SM reject cause codes Vodafone, TeliaSonera, NSN, Ericsson discussion discussion Yes Yes noted No
    C1-134754 UE service recovery mechanisms NSN/Devaki discussion discussion Yes Yes noted No
    C1-134755 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone/Devaki CR agreement Yes Yes revised No C1-134928
    C1-134928 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone/Devaki CR agreement No Yes postponed No C1-134755
    C1-134756 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone /Devaki CR agreement Yes Yes revised No C1-134929
    C1-134929 Handling Service Request failure due to timeout NSN, Verizon Wireless, LG Electronics, Cisco, Qualcomm Incorporated, Ericsson, Intel Corporation, Bell Canada, Vodafone /Devaki CR agreement No Yes postponed No C1-134756
    C1-134757 Discussion on Service Request Failure InterDigital, Samsung, HTC, Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-134769 Further discussion on UE retry during UE initiated SM/ESM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada /Jennifer discussion discussion Yes Yes revised No C1-134959 C1-133953
    C1-134959 Further discussion on UE retry during UE initiated SM/ESM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada /Jennifer discussion discussion Yes Yes noted No C1-134769
    C1-134770 Retry handling during UE initiated ESM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon, Qualcomm Incorporated, CATT /Jennifer CR agreement Yes Yes postponed No C1-134461
    C1-134771 Retry handling during MS initiated SM procedures Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon, Qualcomm Incorporated, CATT /Jennifer CR agreement Yes Yes postponed No C1-134462
    C1-134772 Handling of ESM STATUS with ESM cause #97 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon, Qualcomm Incorporated, CATT /Jennifer CR agreement Yes Yes postponed No C1-134463
    C1-134773 Handling of SM STATUS with SM cause #97 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, LG Electronics, Bell Canada, Huawei, HiSilicon, Qualcomm Incorporated, CATT /Jennifer CR agreement Yes Yes postponed No C1-134464
    C1-134849 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, ORANGE CR agreement Yes Yes revised No C1-135143
    C1-135143 Retry handling during UE initiated ESM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, Orange CR agreement Yes Yes postponed No C1-134849
    C1-134850 Retry handling during UE initiated SM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, ORANGE CR agreement Yes Yes revised No C1-135144
    C1-135144 Retry handling during UE initiated SM procedures Ericsson, NSN, TeliaSonera, Vodafone, Telecom Italia, ORANGE CR agreement Yes Yes postponed No C1-134850
12.10
LIMONET-SIPTO (CT4)
C1-133982 ISR handling for SIPTO at the local network LG Electronics, Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-133983 ISR handling for SIPTO at the local network LG Electronics, Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-134377 Detect that SIPTO@LN PDN connection involves a stand-alone GW after during inter-MME HO BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134146
    C1-134378 Detect that SIPTO@LN PDN connection involves a stand-alone GW after during inter-SGSN HO BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134147
    C1-134440 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd., Intel, NSN, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134573 C1-134406
    C1-134573 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd., Intel, NSN, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134873 C1-134440
    C1-134873 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-135035 C1-134573
    C1-135035 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-135145 C1-134873
    C1-135145 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback BlackBerry UK Ltd., Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN CR agreement Yes Yes agreed No C1-135035
    C1-134805 Removal of SIPTO@LN procedures upon SR reject unless SR received is not due to CS fallback or 1xCS fallback Huawei, HiSilicon CR agreement Yes No withdrawn Yes C1-134440
    C1-134572 Correcting IE name transporting L-GW address in INITIAL UE MESSAGE message for SIPTO@LN BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134874
    C1-134874 Correcting IE name transporting L-GW address in INITIAL UE MESSAGE message for SIPTO@LN BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134572
    C1-134786 Update of PDP context activation for SIPTO at the local network LG Electronics CR agreement Yes Yes agreed No
    C1-134867 TAU procedure actions because of SIPTO at local network Huawei, HiSilicon/Christian CR agreement Yes Yes agreed No
12.11
Dia_SGSN_SMS (CT4)
C1-134149 Support for Diameter based interface between SGSN and SMS central functions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes agreed No C1-134074
12.12
MSRD_VAMOS (GERAN)
C1-134150 Introduction of VAMOS III Capability Indicator NSN CR agreement Yes Yes agreed No C1-133977
12.13
SAES3 Wis
C1-134589 Discussion on non-EPS/non-GPRS services recovery and redirection for combined attached UEs/MSes Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Intel Corporation, ZTE /Jennifer discussion discussion Yes Yes revised No C1-134960
    C1-134960 Discussion on non-EPS/non-GPRS services recovery and redirection for combined attached UEs/MSes Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Intel Corporation, ZTE /Jennifer discussion discussion Yes Yes noted No C1-134589
    C1-134590 Non-EPS services recovery and redirection for combined attached UEs Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Intel Corporation, ZTE, Samsung, NSN /Jennifer CR agreement Yes Yes postponed No
    C1-134591 Non-GPRS services recovery and redirection for combined attached MSes Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Intel Corporation, ZTE, Samsung, NSN /Jennifer CR agreement Yes Yes postponed No
    C1-134643 Requirement for resetting the Attach/TAU attempt counter Samsung/Youngkyo CR agreement Yes Yes revised No C1-134933
    C1-134933 Requirement for resetting the Attach/TAU attempt counter Samsung Electronics Co., Ltd., CATT CR agreement Yes Yes revised No C1-135183 C1-134643
    C1-135183 Requirement for resetting the Attach/TAU attempt counter Samsung Electronics Co., Ltd., CATT CR agreement Yes Yes agreed No C1-134933
    C1-134645 TAU procedure initiation following CSFB failure or CSFB cancellation Samsung/Youngkyo CR agreement Yes Yes revised No C1-134935
    C1-134935 TAU procedure initiation following CSFB failure or CSFB cancellation Samsung Electronics Co., Ltd. CR agreement Yes Yes revised No C1-135159 C1-134645
    C1-135159 TAU procedure initiation following CSFB failure or CSFB cancellation Samsung Electronics Co., Ltd. CR agreement Yes Yes agreed No C1-134935
    C1-134648 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement No No withdrawn Yes
    C1-134649 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo CR agreement Yes Yes revised No C1-135197
    C1-135197 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung Electronics Co., Ltd. CR agreement Yes Yes postponed No C1-134649
    C1-134682 VoLTE Call setup failure due to bearer activation procedure collides a TAU procedure Samsung/Youngkyo discussion discussion Yes Yes noted No
12.13.1
SAES3
C1-134151 T3396 timer handling ZTE CR agreement Yes Yes agreed No C1-133669
    C1-135182 Correcting LIPA PDN connection deactivation upon SR BlackBerry UK Ltd., Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-134932
    C1-134584 Enhancement of EMM cause #15 Qualcomm Incorporated, Huawei, HiSilicon, HTC, ZTE CR agreement Yes Yes revised No C1-134913 C1-134135
    C1-134913 Enhancement of EMM cause #15 Qualcomm Incorporated, Huawei, HiSilicon, HTC, ZTE, Samsung, NTT DOCOMO, NSN CR agreement Yes Yes postponed No C1-134584
    C1-134947 Clarification to description of the EMM cause value#40 HTC CR agreement Yes Yes agreed No C1-134706
    C1-134744 Correction of conditions for re-enablement of E-UTRA having received cause #14 Samsung/Ricky, Huawei, HiSilicon CR agreement Yes Yes revised No C1-134936
    C1-134936 Correction of conditions for re-enablement of E-UTRA having received cause #14 Samsung/Ricky, Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134744
    C1-134748 Condition to stop the paging timer NSN,TeliaSonera, Deutsche Telekom AG, ORANGE, Ericsson, Vodafone /Devaki CR agreement Yes Yes revised No C1-134937
    C1-134937 Condition to stop the paging timer NSN,TeliaSonera, Deutsche Telekom AG, Orange, Ericsson, Vodafone CR agreement Yes Yes revised No C1-135204 C1-134748
    C1-135204 Condition to stop the paging timer NSN,TeliaSonera, Deutsche Telekom AG, Orange, Ericsson, Vodafone CR agreement Yes Yes agreed No C1-134937
    C1-134749 MME behaviour after sending Reject message with cause#9 NSN,TeliaSonera, Deutsche Telekom AG, ORANGE, Ericsson, Vodafone /Devaki CR agreement Yes Yes revised No C1-134938
    C1-134938 MME behaviour after sending Reject message with cause#9 NSN, TeliaSonera, Deutsche Telekom AG, Orange, Ericsson, Vodafone CR agreement Yes Yes revised No C1-135205 C1-134749
    C1-135205 MME behaviour after sending Reject message with cause#9 NSN, TeliaSonera, Deutsche Telekom AG, Orange, Ericsson, Vodafone CR agreement Yes Yes revised No C1-135219 C1-134938
    C1-135219 MME behaviour after sending Reject message with cause#9 NSN, TeliaSonera, Deutsche Telekom AG, Orange, Ericsson, Vodafone CR agreement Yes Yes agreed with one sustained objection No C1-135205
    C1-134766 Enhancements on provision of and treatment of reject cause#15 Intel/Chen-Ho CR agreement Yes Yes revised No C1-134914 C1-134134
    C1-134914 Enhancements on provision of and treatment of reject cause#15 Intel corporation CR agreement Yes Yes postponed No C1-134766
    C1-134784 Detecting that all TAIs of a PLMN are forbidden when EMM#15 is received BlackBerry UK Ltd., Telecom Italia CR agreement Yes Yes revised No C1-135203 C1-134133
    C1-135203 Detecting that all TAIs of a PLMN are forbidden when EMM#15 is received BlackBerry UK Ltd., Nokia, Telecom Italia, Teliasonera CR agreement Yes Yes postponed No C1-134784
    C1-134826 Start T3440 for EMM cause values #7, #8, #22 and #25 Intel / Vivek CR agreement Yes Yes postponed No
    C1-134830 Clarification for T3423 start condition LG Electronics CR agreement Yes Yes revised No C1-134939
    C1-134939 Clarification for T3423 start condition LG Electronics CR agreement Yes Yes revised No C1-135167 C1-134830
    C1-135167 Clarification for T3423 start condition LG Electronics CR agreement Yes Yes agreed No C1-134939
    C1-134831 Clarification for T3323 start condition LG Electronics CR agreement Yes Yes revised No C1-134940
    C1-134940 Clarification for T3323 start condition LG Electronics CR agreement Yes Yes revised No C1-135168 C1-134831
    C1-135168 Clarification for T3323 start condition LG Electronics CR agreement Yes Yes agreed No C1-134940
    C1-134868 Start T3440 for cause values #7, #8 and #22 Intel / Vivek CR agreement Yes Yes postponed No
    C1-135134 PLMN selection timer for enhanced EMM cause #15 Qualcomm Incorporated, Huawei, HiSilicon, ZTE, Samsung, NTT DOCOMO, NSN CR agreement Yes Yes postponed No
12.13.2
SAES3-CSFB
C1-133846 Alignment of EMM state change of agreed corrections Vodafone CR agreement Yes Yes agreed No
    C1-134132 ISR deactivation for an MS which supports EMM combined procedures Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bel, NTT DOCOMO, Qualcomm Incorporated, NEC CR agreement Yes Yes revised No C1-135195 C1-134028
    C1-135195 ISR deactivation for an MS which supports EMM combined procedures Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bel, NTT DOCOMO, Qualcomm Incorporated, NEC CR agreement Yes Yes agreed No C1-134132
    C1-134160 Cleanup of SGs paging without LAI case Ericsson / Mikael CR agreement Yes Yes agreed No C1-133782
    C1-134161 Trigger for Combined TAU with IMSI attach NSN, Vodafone, NEC, Qualcomm Incorporated, Samsung CR agreement Yes Yes agreed No C1-133972
    C1-134958 MO CSFB handling when running T3346 ZTE/Fei CR agreement No Yes postponed No C1-134621
    C1-135020 RRC establishment cause for 1xCSFB NSN, LG Electronics CR discussion Yes Yes agreed No C1-134751
    C1-134768 Paging identity usage after new Location Update Request during TMSI reallocation procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell /Jennifer CR agreement Yes Yes revised No C1-134941
    C1-134941 Paging identity usage after new Location Update Request during TMSI reallocation procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-135208 C1-134768
    C1-135208 Paging identity usage after new Location Update Request during TMSI reallocation procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-134941
    C1-134790 Trigger of the SGs service request procedure Huawei, HiSilicon/Lin CR agreement Yes Yes agreed No
    C1-134952 PLMN identity for the CS domain in the acceptance messages Huawei, HiSilicon/Christian CR agreement Yes Yes agreed No C1-134804
    C1-135036 Correction of disparity between TimeOfDay Variables in MO defenition and DDF Openet CR agreement Yes No withdrawn Yes C1-134666
12.13.3
SAES3-non3GPP
C1-135181 Incorrect message name Ericsson / Ivo CR agreement Yes Yes agreed No C1-133709
    C1-134107 Removing Source IP address/port from ISRP NSN CR agreement Yes Yes agreed No C1-133860
    C1-134112 ANDSF server information provisioning clarification NSN CR agreement Yes Yes agreed No C1-133858
    C1-134437 Informative annex with ANDSF policy examples Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-134704 C1-134401
    C1-134704 Informative annex with ANDSF policy examples Qualcomm Incorporated/ Amer, Alcatel-Lucent, Alcatel-Lucent Shanghai bell CR agreement Yes Yes revised No C1-134899 C1-134437
    C1-134899 Informative annex with ANDSF policy examples Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-135169 C1-134704
    C1-135169 Informative annex with ANDSF policy examples Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes agreed No C1-134899
    C1-134443 Multiple ISRP rules with same PLMN value NSN CR agreement Yes Yes agreed No C1-134113
    C1-134446 Adding day of the week leaf to ANDSF MO Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134400
    C1-134477 Bit order in fields of figures Ericsson CR agreement Yes Yes agreed No C1-134418
    C1-134516 Support of BBF convergency Huawei, Hisilicon CR agreement Yes Yes revised No C1-135194 C1-134444
    C1-135194 Support of BBF convergency Huawei, Hisilicon CR agreement Yes Yes revised No C1-135220 C1-134516
    C1-135220 Support of BBF convergency Huawei, Hisilicon CR agreement Yes Yes revised No C1-135223 C1-135194
    C1-135223 Support of BBF convergency Huawei, Hisilicon CR agreement Yes Yes agreed with one sustained objection No C1-135220
    C1-134667 Discussion Document on clarifying ambiguity of DDF AccessType Openet discussion discussion Yes Yes noted No
    C1-134668 Clarifying ambiguity of DDF AccessType. Openet CR agreement Yes Yes revised No C1-135040
    C1-135040 Clarifying ambiguity of DDF AccessType. Openet CR agreement Yes Yes postponed No C1-134668
    C1-134702 Clarifications and cleanup related to UE capabilities for ANDSF Qualcomm Incorporated/ Amer CR agreement Yes Yes revised No C1-134898
    C1-134898 Clarifications and cleanup related to UE capabilities for ANDSF Qualcomm Incorporated/ Amer CR agreement Yes Yes agreed No C1-134702
    C1-134783 Discussion on RAN2 LS on CN impacts in RAN2 solutions for WLAN/3GPP radio interworking BlackBerry / Richard discussion discussion Yes Yes noted No
    C1-134845 UpdatePolicy in flow distribution roles NSN, Ericsson CR agreement Yes Yes revised No C1-134901 C1-134508
    C1-134901 UpdatePolicy in flow distribution roles NSN, Ericsson CR agreement Yes Yes revised No C1-135170 C1-134845
    C1-135170 UpdatePolicy in flow distribution roles NSN, Ericsson CR agreement No Yes postponed No C1-134901
    C1-134846 Clarification of LocUri for update policy NSN CR agreement No No withdrawn Yes
    C1-134847 Clarification of LocUri for update policy NSN CR agreement Yes Yes revised No C1-134902
    C1-134902 Clarification of LocUri for update policy NSN CR agreement Yes Yes revised No C1-135171 C1-134847
    C1-135171 Clarification of LocUri for update policy NSN CR agreement No Yes postponed No C1-134902
    C1-135164 Correction of disparity between 3GPP Location Node Name in MO definition and DDF Openet CR agreement Yes Yes agreed No C1-135039
12.14
bSRVCC
C1-134676 Missing Contact and P-Asserted-Identity header fields Ericsson / Janne CR agreement Yes Yes revised No C1-134895
    C1-134895 Missing Contact and P-Asserted-Identity header fields Ericsson / Janne CR agreement Yes Yes agreed No C1-134676
12.15
SMSMI-CT
C1-134098 Compliance Statement for UE and AS NSN CR agreement Yes Yes agreed No C1-133850
    C1-134099 Tidyup of sender and receiver procedures NSN CR agreement Yes Yes agreed No C1-133851
    C1-134100 Short Message Memory Available indication NSN CR agreement Yes Yes agreed No C1-133852
    C1-134411 Error procedure in IP-SM-GW NSN CR agreement Yes Yes agreed No C1-134101
12.16
TURAN-CT
C1-134102 Editor's note in access via WLAN connected to EPC when WLAN is a restrictive non-3GPP access network Ericsson CR agreement Yes Yes agreed No C1-133703
    C1-134104 Solution for tunnelling of IMS services over restrictive non-3GPP access networks - keep-alive using RFC 6223 Ericsson CR agreement Yes Yes agreed No C1-133705
    C1-134476 Tunnelling over restrictive access networks IMS case Vodafone CR agreement Yes Yes agreed No C1-134413
    C1-134816 TURAN basedon ICE solution Huawei/Bill discussion discussion Yes Yes noted No
    C1-134817 TURAN-CT WID update Huawei/Bill revised WID agreement Yes Yes revised No C1-134896
    C1-134896 TURAN-CT WID update Huawei/Bill revised WID agreement Yes Yes revised No C1-135191 C1-134817
    C1-135191 TURAN-CT WID update Huawei revised WID agreement Yes Yes agreed No C1-134896
    C1-134818 Firewall traversal for IMS services based on ICE Huawei/Bill CR agreement Yes Yes revised No C1-134897
    C1-134897 Firewall traversal for IMS services based on ICE Huawei CR agreement Yes Yes postponed No C1-134818
12.17
IMS_TELEP
C1-134855 Information elements used in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134962
    C1-134962 Information elements used in telepresence Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134855
    C1-134856 Source selection during session establishment Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134963
    C1-134963 Source selection during session establishment Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134856
    C1-134857 Source selection in example signalling flows Huawei/Tommy pseudo CR agreement Yes Yes agreed No
    C1-134858 The composition way for received media Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134964
    C1-134964 The composition way for received media Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134858
    C1-134859 Switching in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134965
    C1-134965 Switching in telepresence Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134859
    C1-134860 UE capablity in IM session supporting telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134966
    C1-134966 UE capablity in IM session supporting telepresence Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134860
    C1-134861 Update procedures due to different triggers Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134879
    C1-134879 Update procedures due to different triggers Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134969 C1-134861
    C1-134969 Update procedures due to different triggers Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134879
    C1-134862 Engage presentation in the session Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134967
    C1-134967 Engage presentation in the session Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134862
    C1-134863 Voice only UE in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134880
    C1-134880 Voice only UE in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134970 C1-134863
    C1-134970 Voice only UE in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-135147 C1-134880
    C1-135147 Voice only UE in telepresence Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134970
    C1-134864 Terminal interoperability in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134881
    C1-134881 Terminal interoperability in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134971 C1-134864
    C1-134971 Terminal interoperability in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-135148 C1-134881
    C1-135148 Terminal interoperability in telepresence Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134971
    C1-134865 Interworking between different networks Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134882
    C1-134882 Interworking between different networks Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134972 C1-134865
    C1-134972 Interworking between different networks Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134882
    C1-134866 Media multiplexing in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-134968
    C1-134968 Media multiplexing in telepresence Huawei/Tommy pseudo CR agreement Yes Yes revised No C1-135146 C1-134866
    C1-135146 Media multiplexing in telepresence Huawei/Tommy pseudo CR agreement Yes Yes agreed No C1-134968
12.18
eDRVCC
C1-134323 The MSC server early session support correction Ericsson /Janne CR agreement Yes Yes agreed No C1-133874
    C1-134549 IPv4 and IPv6 coexistence in enterprise services ORANGE/Youssef discussion discussion Yes Yes noted No
    C1-134550 ALT-C for indication of IPv4 and IPv6 addresses in SDP ORANGE/Youssef CR agreement Yes Yes postponed No C1-134331
    C1-134678 Resolving editor's notes Ericsson / Janne CR agreement Yes Yes revised No C1-134973
    C1-134973 Resolving editor's notes Ericsson / Janne CR agreement Yes Yes agreed No C1-134678
12.19
EMC_PC
C1-134324 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134650 C1-133814
    C1-134650 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-134324
    C1-134325 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134651 C1-133905
    C1-134651 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-134325
    C1-134326 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134652 C1-133906
    C1-134652 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-134326
    C1-134327 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134653 C1-133907
    C1-134653 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-134327
    C1-134328 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134654 C1-133908
    C1-134654 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-134328
    C1-134329 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes revised No C1-134655 C1-133909
    C1-134655 Reference update: draft-ietf-ecrit-psap-callback Ericsson / Christer CR agreement Yes Yes agreed No C1-134329
    C1-134330 Improve requirement to ignore the PSAP callback indicator BlackBerry UK Ltd., Deutsche Telekom, Ericsson CR agreement Yes Yes agreed No C1-134078
    C1-134656 EN Removal: Support of the PSAP callback indicator in non-INVITE requests Ericsson / Christer CR agreement Yes Yes revised No C1-134974
    C1-134974 EN Removal: Support of the PSAP callback indicator in non-INVITE requests Ericsson / Christer CR agreement Yes Yes revised No C1-135149 C1-134656
    C1-135149 EN Removal: Support of the PSAP callback indicator in non-INVITE requests Ericsson / Christer CR agreement Yes Yes agreed No C1-134974
    C1-134808 Use of emergency registration bindings for emergency callback Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No C1-134068
12.20
IMS_RegCon-CT
12.21
BusTI-CT
C1-134447 Addition of Definitions for Business Trunking Deutsche Telekom, Ericsson CR agreement Yes Yes agreed No C1-134332
    C1-134448 Addition of Business Trunking Features for Signalling Security Deutsche Telekom, Ericsson CR agreement Yes Yes agreed No C1-134333
    C1-134478 Addition of Business Trunking Features at UE Deutsche Telekom, Ericsson CR agreement Yes Yes agreed No C1-134449
    C1-134547 Addition of Business Trunking Features at P-CSCF Deutsche Telekom, Ericsson / Michael CR agreement Yes Yes revised No C1-134975 C1-134335
    C1-134975 Addition of Business Trunking Features at P-CSCF Deutsche Telekom, Ericsson / Michael CR agreement Yes Yes agreed No C1-134547
    C1-134548 Addition of Business Trunking Features at AS Deutsche Telekom, Ericsson / Michael CR agreement Yes Yes revised No C1-134976 C1-134336
    C1-134976 Addition of Business Trunking Features at AS Deutsche Telekom, Ericsson / Michael CR agreement Yes Yes postponed No C1-134548
12.22
UP6665
C1-134339 Update to RFC 6665 NSN CR agreement Yes Yes revised No C1-134605 C1-133847
    C1-134605 Update to RFC 6665 NSN/Peter CR agreement Yes Yes revised No C1-134978 C1-134339
    C1-134978 Update to RFC 6665 NSN/Peter CR agreement Yes Yes agreed No C1-134605
    C1-134340 Update to RFC 6665 NSN CR agreement Yes Yes revised No C1-134606 C1-133848
    C1-134606 Update to RFC 6665 NSN/Peter CR agreement Yes Yes agreed No C1-134340
    C1-134341 Update to RFC 6665 NSN CR agreement Yes Yes revised No C1-134607 C1-133849
    C1-134607 Update to RFC 6665 NSN/Peter CR agreement Yes Yes agreed No C1-134341
    C1-134342 Updating TS 24.606 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-135096 C1-133861
    C1-135096 Updating TS 24.606 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes agreed No C1-134342
    C1-134344 Updating TS 24.147 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-135097 C1-133863
    C1-135097 Updating TS 24.147 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes agreed No C1-134344
    C1-134346 Correction of some editorial errors BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134048
    C1-134521 Updating TS 24.292 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes revised No C1-135098 C1-134498
    C1-135098 Updating TS 24.292 to RFC 6665 Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes agreed No C1-134521
    C1-134522 Updating the depiction of the creation of subscription dialog Huawei, BlackBerry UK Ltd, Fujitsu Limited CR agreement Yes Yes agreed No C1-134499
    C1-134692 Revision of Updating IMS to conform to RFC 6665 WID BlackBerry/ Andrew revised WID agreement Yes Yes revised No C1-134892
    C1-134892 Revision of Updating IMS to conform to RFC 6665 WID BlackBerry/ Andrew revised WID agreement Yes Yes agreed No C1-134692
    C1-134693 Notifier including a GRUU as the contact address BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134979
    C1-134979 Notifier including a GRUU as the contact address BlackBerry CR agreement Yes Yes postponed No C1-134693
    C1-134694 Correcting RFC 6665 title BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134980
    C1-134980 Correcting RFC 6665 title BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-134694
    C1-134695 Correcting RFC 6665 title BlackBerry/ Andrew CR agreement Yes Yes revised No C1-134981
    C1-134981 Correcting RFC 6665 title BlackBerry/ Andrew CR agreement Yes Yes agreed No C1-134695
    C1-134714 Update of 3GPP TS 24.629 Ericsson / Jörgen CR agreement Yes Yes revised No C1-134982
    C1-134982 Update of 3GPP TS 24.629 Ericsson / Jörgen CR agreement No Yes postponed No C1-134714
    C1-135010 Conference REFER handling, enhanced MSC Ericsson / Jörgen CR agreement Yes Yes agreed No C1-134719
    C1-135011 REFER authentication correction Ericsson / Jörgen CR agreement Yes Yes revised No C1-135150 C1-134724
    C1-135150 REFER authentication correction Ericsson CR agreement Yes Yes revised No C1-135212 C1-135011
    C1-135212 REFER authentication correction Ericsson CR agreement No Yes postponed No C1-135150
    C1-134747 Update TS 24.237 due to use of RFC 6665 replacing RFC 3265 Samsung, Ericsson, NSN / Ricky CR agreement Yes Yes revised No C1-134983
    C1-134983 Update TS 24.237 due to use of RFC 6665 replacing RFC 3265 Samsung, Ericsson, NSN / Ricky CR agreement Yes Yes agreed No C1-134747
    C1-134814 Updating TS 24.147 to RFC 6665 for RFC 3515 reference Huawei/Bill CR agreement Yes No withdrawn Yes
    C1-134815 Updating TS 24.147 to RFC 6665 for Record-Route header Huawei, BlackBerry UK Ltd CR agreement Yes Yes revised No C1-135099
    C1-135099 Updating TS 24.147 to RFC 6665 for Record-Route header Huawei, BlackBerry UK Ltd CR agreement Yes Yes agreed No C1-134815
    C1-134828 Updating TS 24.606 to RFC 6665 Huawei/Bill CR agreement Yes No withdrawn Yes
    C1-134829 Updating TS 24.292 to RFC 6665 Huawei/Bill CR agreement Yes No withdrawn Yes
    C1-134854 Mapping of Target-Dialog identifiers Ericsson / Jörgen CR agreement Yes Yes revised No C1-135100
    C1-135100 Mapping of Target-Dialog identifiers Ericsson / Jörgen CR agreement Yes Yes revised No C1-135151 C1-134854
    C1-135151 Mapping of Target-Dialog identifiers Ericsson CR agreement Yes Yes agreed No C1-135100
12.23
IODB
C1-134727 Discussion: Alternatives for barring of premium rate communications. Ericsson / Jörgen discussion discussion Yes Yes noted No
    C1-134728 Alt1: Indicating premium rate communications in VPLMN country Ericsson / Jörgen CR agreement Yes Yes revised No C1-135102 C1-134042
    C1-135102 Alt1: Indicating premium rate communications in VPLMN country Ericsson / Jörgen CR agreement No Yes postponed No C1-134728
    C1-134729 Alt 1: ODB procedure to perform premium rate barring Ericsson / Jörgen CR agreement Yes Yes revised No C1-135103 C1-134043
    C1-135103 Alt 1: ODB procedure to perform premium rate barring Ericsson / Jörgen CR agreement No Yes postponed No C1-134729
    C1-134730 Alt2: TRF procedure to block local premium rate communications Ericsson / Jörgen CR agreement Yes Yes revised No C1-135104 C1-134044
    C1-135104 Alt2: TRF procedure to block local premium rate communications Ericsson / Jörgen CR agreement No Yes postponed No C1-134730
    C1-134731 Alt 2: ODB procedure to indicate premium rate barring Ericsson / Jörgen CR agreement Yes Yes revised No C1-135105 C1-134045
    C1-135105 Alt 2: ODB procedure to indicate premium rate barring Ericsson / Jörgen CR agreement No Yes postponed No C1-134731
12.24
FS_NNI_RS (CT3)
12.25
eMEDIASEC_CT (CT4)
C1-134347 End-to-access-edge media security for MSRP, BFCP and UDPTL Ericsson, NSN / Ivo CR agreement Yes Yes revised No C1-134612 C1-133708
    C1-134612 End-to-access-edge media security for MSRP, BFCP and UDPTL Ericsson, NSN / Ivo CR agreement Yes Yes agreed No C1-134347
    C1-134613 End-to-end media security for MSRP using TLS and KMS Ericsson / Ivo CR agreement Yes Yes agreed No
12.26
IMS_SSFDD (CT4)
12.27
CVO-CT (CT4)
12.28
SIS_CT (CT4)
C1-134551 Determination of network capabilities necessary for services by the S-CSCF ORANGE/Youssef discussion discussion Yes Yes revised No C1-135012
    C1-135012 Determination of network capabilities necessary for services by the S-CSCF ORANGE/Youssef discussion discussion No No withdrawn Yes C1-134551
    C1-134552 Indicating supported capabilities by intermediary elements ORANGE/Youssef CR agreement Yes Yes revised No C1-135013 C1-134523
    C1-135013 Indicating supported capabilities by intermediary elements ORANGE/Youssef CR agreement Yes Yes revised No C1-135152 C1-134552
    C1-135152 Indicating supported capabilities by intermediary elements ORANGE/Youssef CR agreement Yes Yes revised No C1-135214 C1-135013
    C1-135214 Indicating supported capabilities by intermediary elements ORANGE CR agreement Yes Yes postponed No C1-135152
    C1-134553 SIP transport selection in the presence of NAT ORANGE/Youssef CR agreement No No withdrawn Yes
    C1-134554 SIP transport selection in the presence of NAT ORANGE/Youssef CR agreement No No withdrawn Yes
12.29
E2EMTSI-CT (CT3)
12.30
REVOLTE_IMS
12.31
rtcp-mux
12.32
IMSProtoc6
C1-135172 Correcting table number for IM CN Subsystem XML body schema Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-134011
    C1-134233 Reversal of change relating to digest authentication Alcatel-Lucent CR agreement Yes Yes agreed No C1-134071
    C1-135173 Correction to formatting of text in Abnormal cases related to mobile originated sessions Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-134414
    C1-135174 Include DST adjustment in local time zone Ericsson CR agreement Yes Yes agreed No C1-134416
    C1-135175 Time zone in Pacific/Kiritimati Ericsson CR agreement Yes Yes agreed No C1-134453
    C1-134510 Adding country-specific URN to configurable lists BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134380
    C1-134525 Nonce caching and digest authentication- corrections ORANGE CR agreement Yes Yes agreed No C1-134509
    C1-135108 P-CSCF discovery ORANGE/Youssef CR agreement No Yes postponed No C1-134557
    C1-135109 Number of retry attempts when receiving invalid challenges in IMS AKA procedure Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134559
    C1-135111 Inclusion of b=RR and b=RS at session-level in SDP Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134561
    C1-135112 Usage of b=AS Qualcomm Incorporated CR agreement Yes Yes revised No C1-135213 C1-134562
    C1-135213 Usage of b=AS Qualcomm Incorporated CR agreement Yes Yes postponed No C1-135112
    C1-135009 P-ANI encoding correction NSN CR agreement Yes Yes agreed No C1-134601
    C1-134608 Proxy-Authentication-Info header field not defined for SIP Ericsson / Ivo CR agreement Yes Yes revised No C1-135106
    C1-135106 Proxy-Authentication-Info header field not defined for SIP Ericsson CR agreement Yes Yes agreed No C1-134608
    C1-134699 Indication of services supported by the visited network BlackBerry/ Andrew discussion discussion Yes Yes noted No
    C1-135180 Nodes that set the access-class parameter Ericsson / Jörgen CR agreement Yes Yes agreed No C1-135128
    C1-135176 Correction term-ioi handling Ericsson / Jörgen CR agreement Yes Yes agreed No C1-134713
    C1-134809 SDP modification Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-135107 C1-134232
    C1-135107 SDP modification Alcatel-Lucent / Keith Drage CR agreement No Yes postponed No C1-134809
12.33
TEI12 and other R12 Wis
12.33.1
IMS TEI12
C1-133870 Correcting an error in TIR interaction Ericsson /Janne CR agreement Yes Yes agreed No
    C1-133884 SC UE deregistration Ericsson /Janne, Alcatel-Lucent CR agreement Yes Yes agreed No
    C1-133922 SCC AS not sending re-INVITE to remote UE when PS to CS SRVCC access transfer transfers single held call Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-134011 Correcting table number for IM CN Subsystem XML body schema Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-135172
    C1-134092 Updates of eSaMOG WID ZTE/Joy revised WID agreement Yes Yes agreed No C1-133843
    C1-134124 Correcting for the state change in case of aSRVCC Huawei CR agreement Yes Yes agreed No C1-133867
    C1-134125 VoLTE Calls – Forward Early Media AT&T, Alcatel-Lucent, Ericsson, Huawei, NSN, Qualcomm, Samsung CR agreement Yes Yes agreed No C1-134093
    C1-134351 MSRP-CEMA and privacy Ericsson / Christer CR agreement Yes Yes agreed No C1-133776
    C1-134353 Editorial correction about SRVCC Huawei/Bill CR agreement Yes Yes agreed No C1-133868
    C1-134356 Clean-up of Supplementary Services Configuration Samsung CR agreement Yes Yes agreed No C1-133985
    C1-134358 Release resources in the ATGW Samsung, ORANGE CR agreement Yes Yes agreed No C1-133987
    C1-134359 Indications of support for access transfer features Samsung CR agreement Yes Yes agreed No C1-133988
    C1-134396 New WID: Enhancements to IMS operator determined barring Ericsson / Jörgen new WID agreement Yes Yes agreed No C1-134096
    C1-134414 Correction to formatting of text in Abnormal cases related to mobile originated sessions Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-135173 C1-134360
    C1-134416 Include DST adjustment in local time zone Ericsson CR agreement Yes Yes revised No C1-135174 C1-134367
    C1-134452 About the decision condition of the initial SIP INVITE request due to ATU-STI at the SCC AS Huawei CR agreement Yes Yes agreed No C1-134352
    C1-134453 Time zone in Pacific/Kiritimati Ericsson CR agreement Yes Yes revised No C1-135175 C1-134364
    C1-134471 CT aspects of WLAN network selection for 3GPP terminals Qualcomm Incorporated new WID agreement Yes Yes agreed No C1-134417
    C1-134481 Correction of assured transfer Ericsson CR agreement Yes Yes revised No C1-134726 C1-134415
    C1-134726 Correction of assured transfer Ericsson CR agreement Yes Yes revised No C1-135178 C1-134481
    C1-135178 Correction of assured transfer Ericsson CR agreement Yes Yes agreed No C1-134726
    C1-134511 Provide linkage to Supplementary Services Configuration in TS 24.167 Samsung, ORANGE CR agreement Yes Yes revised No C1-134739 C1-134357
    C1-134739 Provide linkage to Supplementary Services Configuration in TS 24.167 Samsung/Ricky CR agreement Yes Yes revised No C1-135129 C1-134511
    C1-135129 Provide linkage to Supplementary Services Configuration in TS 24.167 Samsung/Ricky CR agreement Yes Yes agreed No C1-134739
    C1-134512 About the UE and the MSC server call state in case of PS to CS SRVCC with the CAT service Huawei CR agreement Yes Yes agreed No C1-134451
    C1-134531 Breaking the "Manipulating supplementary services" clause into two subclauses BlackBerry UK Ltd, Deutsche Telekom, Samsung / John-Luc CR agreement Yes Yes revised No C1-135113
    C1-135113 Breaking the "Manipulating supplementary services" clause into two subclauses BlackBerry UK Ltd, Deutsche Telekom, Samsung CR agreement Yes Yes agreed No C1-134531
    C1-134532 HTTP response code for unknown user BlackBerry UK Ltd CR agreement No No withdrawn Yes
    C1-134555 Transit function naming ORANGE/Youssef CR agreement No No withdrawn Yes
    C1-134556 Consistency of the Additional Routeing Functionality description and naming ORANGE/Youssef CR agreement No No withdrawn Yes C1-134234
    C1-134557 P-CSCF discovery ORANGE/Youssef CR agreement Yes Yes revised No C1-135108
    C1-134558 Editorial corrections to align with style conventions Qualcomm Incorporated CR agreement Yes Yes revised No C1-135110
    C1-135110 Editorial corrections to align with style conventions Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134558
    C1-134559 Number of retry attempts when receiving invalid challenges in IMS AKA procedure Qualcomm Incorporated CR agreement Yes Yes revised No C1-135109
    C1-134560 Incorrect preconditions for inclusion of P-Refused-URI-List and Retry-After header fields in INVITE Qualcomm Incorporated CR agreement Yes Yes revised No C1-135119
    C1-134561 Inclusion of b=RR and b=RS at session-level in SDP Qualcomm Incorporated CR agreement Yes Yes revised No C1-135111
    C1-134562 Usage of b=AS Qualcomm Incorporaed/Subra CR agreement Yes Yes revised No C1-135112
    C1-134563 Incorrect value for element in example Qualcomm Incorporaed/Subra CR agreement No No withdrawn Yes
    C1-134564 Announcement during hold Qualcomm Incorporaed/Subra CR agreement Yes Yes revised No C1-135114 C1-134362
    C1-135114 Announcement during hold Qualcomm Incorporated CR agreement Yes Yes revised No C1-135215 C1-134564
    C1-135215 Announcement during hold Qualcomm Incorporated CR agreement Yes Yes agreed No C1-135114
    C1-134565 RTCP flow during hold with announcement Qualcomm Incorporated CR agreement Yes Yes revised No C1-135115
    C1-135115 RTCP flow during hold with announcement Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134565
    C1-134577 Incorrect value for element in example Qualcomm Incorporaed/Subra CR agreement Yes Yes agreed No
    C1-134598 Clean Up of IMS_SS_control_preference leaf NSN/Peter CR agreement Yes Yes agreed No
    C1-134599 P-ANI in REGISTER from MSC enhanced for ICS NSN/Peter CR agreement Yes Yes revised No C1-135116
    C1-135116 P-ANI in REGISTER from MSC enhanced for ICS NSN/Peter CR agreement Yes Yes agreed No C1-134599
    C1-134624 Initial registration when IMS registration expires NTT DOCOMO discussion discussion Yes Yes noted No
    C1-134625 Initial registration when IMS registration expires NTT DOCOMO CR agreement Yes Yes revised No C1-135120
    C1-135120 Initial registration when IMS registration expires NTT DOCOMO CR agreement No Yes postponed No C1-134625
    C1-134626 B2BUA topology hiding in the IBCF NEC,NTT/Naoaki CR agreement Yes Yes revised No C1-135121
    C1-135121 B2BUA topology hiding in the IBCF NEC, NTT CR agreement Yes Yes rejected No C1-134626
    C1-134627 Correction of call flow for SRVCC procedure with ATCF in alerting phase NEC/Naoaki CR agreement No No withdrawn Yes
    C1-134642 Correction of assured transfer ORANGE/Youssef CR agreement Yes Yes revised No C1-135123
    C1-135123 Correction of assured transfer ORANGE CR agreement Yes Yes revised No C1-135177 C1-134642
    C1-135177 Correction of assured transfer ORANGE CR agreement No Yes postponed No C1-135123
    C1-134646 Error Correction in MO DDF Samsung/Youngkyo CR agreement Yes Yes agreed No
    C1-134679 Correcting ATU-STI to be ATU-STI for PS to CS SRVCC Ericsson / Janne CR agreement Yes Yes revised No C1-135124
    C1-135124 Correcting ATU-STI to be ATU-STI for PS to CS SRVCC Ericsson / Janne CR agreement Yes Yes agreed No C1-134679
    C1-134680 DISC ICS for non-enhanced MSC Ericsson / Janne discussion discussion Yes Yes noted No
    C1-134681 ICS capability-indicator when breaking out to CS Ericsson / Janne CR agreement Yes Yes revised No C1-135125
    C1-135125 ICS capability-indicator when breaking out to CS Ericsson CR agreement Yes Yes postponed No C1-134681
    C1-134705 Correction of call flow for SRVCC procedure with ATCF in alerting phase NEC/Naoaki CR agreement Yes Yes revised No C1-135126
    C1-135126 Correction of call flow for SRVCC procedure with ATCF in alerting phase NEC CR agreement Yes Yes agreed No C1-134705
    C1-134711 SCC AS includes access-type or access-class Ericsson / Jörgen CR agreement Yes Yes revised No C1-135127
    C1-135127 SCC AS includes access-type or access-class Ericsson CR agreement Yes Yes revised No C1-135179 C1-134711
    C1-135179 SCC AS includes access-type or access-class Ericsson CR agreement Yes Yes agreed No C1-135127
    C1-134712 Nodes that set the access-class parameter Ericsson / Jörgen CR agreement Yes Yes revised No C1-135128
    C1-135128 Nodes that set the access-class parameter Ericsson / Jörgen CR agreement Yes Yes revised No C1-135180 C1-134712
    C1-134713 Correction term-ioi handling Ericsson / Jörgen CR agreement Yes Yes revised No C1-135176
    C1-134725 Discussion: Instance ID in CDRs Ericsson / Jörgen discussion discussion Yes Yes noted No
    C1-134740 Providing better explanation of use of how to configure supplementary services Samsung/Ricky CR agreement Yes Yes revised No C1-135130
    C1-135130 Providing better explanation of use of how to configure supplementary services Samsung CR agreement Yes Yes agreed No C1-134740
    C1-134745 XCAP disabling and retry CS domain. Samsung/Ricky CR agreement Yes Yes agreed No
    C1-134746 Editorial correction in Annex F (Access Transfer Scenarios) Samsung, Ericsson / Ricky CR agreement Yes Yes agreed No
    C1-134807 Handover cancellation when ATCF is a B2BUA Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-135131 C1-134361
    C1-135131 Handover cancellation when ATCF is a B2BUA Alcatel-Lucent / Keith Drage CR agreement No Yes postponed No C1-134807
    C1-134810 Option for eSRVCC for SCC AS procedure Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-135132 C1-134070
    C1-135132 Option for eSRVCC for SCC AS procedure Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-134810
12.33.2
non IMS TEI12
C1-133751 Correction on reference of message type IE Huawei, HiSilicon/Lin CR agreement Yes Yes agreed No
    C1-133897 GUTI handling in the network abnormal case in attach procedure CATT CR agreement Yes Yes agreed No
    C1-133898 P-TMSI handling in Network abnormal case in attach procedure CATT CR agreement Yes Yes agreed No
    C1-133899 Stop ongoing user data transmission for MS abnormal case in RAU procedure CATT CR agreement Yes Yes agreed No
    C1-133900 Stop ongoing user data transmission for UE abnormal case in TAU procedure CATT CR agreement Yes Yes agreed No
    C1-133947 Correction of condition for including an IMEI in the Attach Request Intel/Chen CR agreement Yes Yes agreed No
    C1-133984 Reference corrections for TS 24.008 LG Electronics CR agreement Yes Yes agreed No
    C1-133989 Terminology Alignment for name of forbidden lists between Stage 2 and Stage 3 Samsung CR agreement Yes Yes revised No C1-134738
    C1-134738 Terminology Alignment for name of forbidden lists between Stage 2 and Stage 3 Samsung/Ricky CR agreement Yes Yes agreed No C1-133989
    C1-133990 Duplicate entries in ACL and OCL when forming CSG Whitelist Samsung, Renesas Mobile Europe Ltd CR agreement Yes Yes agreed No
    C1-134059 Clean-up of references Ericsson / Magnus CR agreement Yes Yes agreed No
    C1-134086 GERAN Iu mode correction Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-134157 Clarification of PDP context modification Qualcomm Incorporated / Lena CR agreement Yes Yes agreed No C1-133967
    C1-134166 Update of ePLMN list for a UE with a PDN connection for emergency bearer services Huawei, HiSilicon, ZTE CR agreement Yes Yes agreed No C1-133747
    C1-134167 Update of ePLMN list for an MS with a PDN connection for emergency bearer services Huawei, HiSilicon, ZTE CR agreement Yes Yes revised No C1-134801 C1-133748
    C1-134801 Update of ePLMN list for an MS with a PDN connection for emergency bearer services Huawei, HiSilicon, ZTE/Christian CR agreement Yes Yes agreed No C1-134167
    C1-134169 +CGDCONT handover indication Intel Corporation CR agreement Yes Yes agreed No C1-133700
    C1-134184 Fast higher priority PLMN search upon entering VPLMN Qualcomm Incorporated, Deutsche Telekom, AT&T, Broadcom, Huawei, HiSilicon, BT CR agreement Yes Yes agreed No C1-133963
    C1-134187 TCRT: Introduction of ER-GSM band NSN, Kapsch CarrierCom France S.A.S, Huawei CR agreement Yes Yes agreed No C1-133978
    C1-134303 Clarification to the combined TAU procedure when rejected with EMM cause #10 HTC, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134022
    C1-134305 Correcting trigger for completion of CM Service Request procedure Ericsson CR agreement Yes Yes agreed No C1-134058
    C1-134308 Syntactic rules in comments in the MS RAC IE Huawei, HiSilicon/Christian CR agreement Yes Yes agreed No C1-134077
    C1-134371 Correcting LIPA PDN connection deactivation upon SR BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-134932 C1-134163
    C1-134932 Correcting LIPA PDN connection deactivation upon SR BlackBerry UK Ltd., Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell CR agreement Yes Yes revised No C1-135182 C1-134371
    C1-134410 SM cause #50,51 handling at the MS ZTE CR agreement Yes Yes agreed No C1-134168
    C1-134457 UE-initiated detach procedure during tracking area updating procedure Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134174
    C1-134458 Deletion of the ePLMNs list upon receipt of #9, #10 or #40 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134176
    C1-134459 Deletion of the ePLMNs list upon receipt of #9, #10 or #40 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134177
    C1-134460 MS-originated detach procedure during attach and routing area updating procedures Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134175
    C1-134482 Fast higher priority PLMN search upon entering VPLMN Qualcomm Incorporated, Deutsche Telekom, AT&T, Broadcom, Huawei, HiSilicon, BT CR agreement Yes Yes agreed No C1-134183
    C1-134483 Clarification to the periodic RAU procedure when rejected with GMM cause #10 HTC, Qualcomm Incorporated CR agreement Yes Yes agreed No C1-134304
    C1-134513 New AT command to control message waiting indication Intel Corporation CR agreement Yes Yes agreed No C1-134170
    C1-134524 User initiated PLMN reselection after manual CSG selection and registration on a CSG cell. Samsung, Broadcom Corporation CR agreement Yes Yes revised No C1-134737 C1-134514
    C1-134737 User initiated PLMN selection after manual CSG selection and registration on a CSG cell. Samsung/Ricky, Broadcom Corporation, NEC CR agreement Yes Yes agreed No C1-134524
    C1-134530 Removal of cells=all feature from RNC one2many CR agreement Yes Yes agreed No
    C1-134585 Update of +CNMPSD AT command Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-134942 C1-133966
    C1-134942 Update of +CNMPSD AT command Qualcomm Incorporated, Ericsson CR agreement Yes Yes agreed No C1-134585
    C1-134586 Update of +CCFC AT command Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-134943
    C1-134943 Update of +CCFC AT command Qualcomm Incorporated / Lena CR agreement Yes Yes agreed No C1-134586
    C1-134587 PS signalling connection release with "follow-on proceed" and no service request pending Qualcomm Incorporated / Lena CR agreement Yes Yes revised No C1-134944 C1-134185
    C1-134944 PS signalling connection release with "follow-on proceed" and no service request pending Qualcomm Incorporated, BlackBerry UK Ltd. CR agreement Yes Yes revised No C1-135185 C1-134587
    C1-135185 PS signalling connection release with “follow-on proceed” and no service request pending Qualcomm Incorporated, BlackBerry UK Ltd. CR agreement Yes Yes agreed No C1-134944
    C1-134596 Addition of band class and frequency information to USIM for system acquisition Motorola Solutions CR agreement Yes Yes postponed No
    C1-134622 Paging response when running T3346 ZTE/Fei CR agreement Yes Yes revised No C1-134945
    C1-134945 Paging response when running T3346 ZTE CR agreement Yes Yes revised No C1-135187 C1-134622
    C1-135187 Paging response when running T3346 ZTE CR agreement Yes Yes revised No C1-135217 C1-134945
    C1-135217 Paging response when running T3346 ZTE CR agreement Yes Yes agreed No C1-135187
    C1-134623 Paging response when running T3346 ZTE/Fei CR agreement Yes Yes revised No C1-134946
    C1-134946 Paging response when running T3346 ZTE CR agreement Yes Yes agreed No C1-134623
    C1-134644 Requirement for resetting the RAU attempt counter Samsung/Youngkyo CR agreement Yes Yes revised No C1-134934
    C1-134934 Requirement for resetting the RAU attempt counter Samsung/Youngkyo CR agreement Yes Yes revised No C1-135184 C1-134644
    C1-135184 Requirement for resetting the RAU attempt counter Samsung Electronics Co., Ltd., CATT CR agreement Yes Yes agreed No C1-134934
    C1-134647 MS behavior in state GMM-REGISTERED.ATTEMPTING-TO-UPDATE Samsung/Youngkyo CR agreement Yes Yes agreed No
    C1-134706 Clarification to description of the EMM cause value#40 HTC CR agreement Yes Yes revised No C1-134947
    C1-134708 Discussion on the applicability of a network services among equivalent PLMNs. HTC discussion discussion Yes Yes noted No
    C1-134709 USSI support for +CUSD Intel Corporation CR agreement Yes Yes revised No C1-134890
    C1-134890 USSI support for +CUSD Intel Corporation CR agreement Yes Yes agreed No C1-134709
    C1-134710 MS initiated PDP Context Activation without PDP address Intel Corporation CR agreement Yes Yes revised No C1-134954
    C1-134954 MS initiated PDP Context Activation without PDP address Intel Corporation CR agreement Yes Yes agreed No C1-134710
    C1-134741 HPLMN criteria matching correction Samsung/Ricky, Broadcom Corporation CR agreement Yes Yes agreed No
    C1-134742 EHPLMN exception clarification Samsung/Ricky, Broadcom Corporation CR agreement Yes Yes rejected No
    C1-134743 Clarifications on Automatic Network Selection Mode and EHPLMN Samsung/Ricky, Broadcom Corporation CR agreement Yes Yes revised No C1-134948
    C1-134948 Clarifications on Automatic Network Selection Mode and EHPLMN Samsung/Ricky, Broadcom Corporation CR agreement No No withdrawn Yes C1-134743
    C1-134752 RRC Establishment cause when UE receives paging over 1xCDMA 2000 access NSN/Devaki discussion discussion Yes Yes noted No
    C1-134787 Disabling E-UTRA capability for #14 in MS supporting S1 mode Huawei, HiSilicon, Qualcomm Incorporated/Lin CR agreement Yes Yes postponed No C1-134515
    C1-134788 Paging on Iu interface for processing Gs paging Huawei, HiSilicon/Lin CR agreement Yes Yes agreed No
    C1-134789 Update of informative references Huawei, HiSilicon/Lin CR agreement Yes Yes agreed No
    C1-134791 Correction on a normal RAU trigger Huawei, HiSilicon/Lin CR agreement Yes Yes agreed No
    C1-134794 RAU complete and abnormal case handling on the SGSN Huawei, NTT DoCoMo, HiSilicon, NEC, Qualcomm Incorporated/Christian CR agreement Yes Yes revised No C1-134949
    C1-134949 RAU complete and abnormal case handling on the SGSN Huawei, NTT DoCoMo, HiSilicon, NEC, Qualcomm Incorporated/Christian CR agreement Yes Yes postponed No C1-134794
    C1-134795 TAU complete and abnormal case handling on the MME Huawei, NTT DoCoMo, HiSilicon, NEC, Qualcomm Incorporated/Christian CR agreement Yes Yes revised No C1-134950
    C1-134950 TAU complete and abnormal case handling on the MME Huawei, NTT DoCoMo, HiSilicon, NEC, Qualcomm Incorporated/Christian CR agreement Yes Yes postponed No C1-134795
    C1-134796 Restoration of the Gs association when receiving RAU request Huawei, NTT DoCoMo, HiSilicon, NEC, Qualcomm Incorporated CR agreement Yes Yes postponed No
    C1-134802 Cleanup of duplicate requirements, message and procedure names Huawei, HiSilicon/Christian CR agreement Yes Yes revised No C1-134951
    C1-134951 Cleanup of duplicate requirements, message and procedure names Huawei, HiSilicon CR agreement Yes Yes revised No C1-135186 C1-134802
    C1-135186 Cleanup of duplicate requirements, message and procedure names Huawei, HiSilicon CR agreement Yes Yes agreed No C1-134951
    C1-134803 Missing sentence in the sub-clause 6.5.4.6 Huawei, HiSilicon/Christian CR agreement Yes Yes agreed No
    C1-134804 PLMN identity for the CS domain in the acceptance messages Huawei, HiSilicon/Christian CR agreement Yes Yes revised No C1-134952
    C1-134806 MTCe Small Data and Device Triggering Enhancements (MTCe-SDDTE) Huawei, HiSilicon, Intel Corporation/Christian discussion discussion Yes Yes noted No
    C1-134819 Clarification of requirements for MSs configured for dual priority Intel / Vivek CR agreement Yes Yes revised No C1-135041
    C1-135041 Clarification of requirements for MSs configured for dual priority Intel Corporation CR agreement Yes Yes agreed No C1-134819
    C1-134820 Clarification of requirements for UEs configured for dual priority Intel / Vivek CR agreement Yes Yes revised No C1-135042
    C1-135042 Clarification of requirements for UEs configured for dual priority Intel Corporation CR agreement Yes Yes agreed No C1-134820
    C1-134821 Conditions to to ignore paging for non-GPRS services Intel / Vivek CR agreement Yes Yes revised No C1-135043
    C1-135043 Conditions to to ignore paging for non-GPRS services Intel / Vivek CR agreement Yes Yes postponed No C1-134821
    C1-134822 Conditionsfor performing RAU and TAU for MS configured with Dual Priority Intel Corporation CR agreement Yes Yes postponed No
    C1-134823 Conditionsfor performing RAU and TAU for UE configured with Dual Priority Intel Corporation CR agreement Yes Yes postponed No
    C1-134824 Clarification for dual priority MS to ignore backoff timer T3346 when timer was started with "Extended wait time" Intel / Vivek CR agreement Yes No withdrawn Yes
    C1-134825 Clarification for dual priority MS to ignore backoff timer T3346 when timer was started with "Extended wait time" Intel / Vivek CR agreement Yes No withdrawn Yes
    C1-134835 Clarification on handling of timer T3396 CATT CR agreement Yes Yes agreed No
    C1-134836 Reset of attach attempt counter and TAU attmept counter CATT CR agreement Yes No withdrawn Yes
    C1-134837 Reset of GPRS attach attempt counter and RAU attmept counter CATT CR agreement Yes No withdrawn Yes
    C1-134838 Reset of location update attempt counter CATT CR agreement Yes Yes revised No C1-134953
    C1-134953 Reset of location update attempt counter CATT CR agreement Yes Yes agreed No C1-134838
12.34
new / updated Rel-12 WIDs
12.34.1
WIDs
C1-134095 Proposed WID for CT aspects of Optimized Offloading to WLAN in 3GPP RAT mobility BlackBerry / Richard new WID agreement Yes Yes agreed No C1-133951
    C1-134388 WID for UE Power Consumption Optimizations, stage 3 Ericsson / Mikael new WID agreement Yes Yes revised No C1-134582 C1-134094
    C1-134582 WID for UE Power Consumption Optimizations, stage 3 Ericsson / Mikael new WID agreement Yes Yes revised No C1-134891 C1-134388
    C1-134891 WID for UE Power Consumption Optimizations, stage 3 Ericsson / Mikael new WID agreement Yes Yes revised No C1-135189 C1-134582
    C1-135189 WID for UE Power Consumption Optimizations, stage 3 Ericsson new WID agreement Yes Yes agreed No C1-134891
    C1-134500 WID on Signalling Improvements for Network Efficiency (SINE) Huawei, HiSilicon/Lin new WID agreement Yes Yes agreed No C1-134395
    C1-134848 Revision WID on "Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks” Huawei, HiSilicon /Youyang revised WID agreement Yes Yes revised No C1-134893
    C1-134893 Revision WID on "Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks” Huawei, HiSilicon /Youyang revised WID endorsement Yes Yes revised No C1-135190 C1-134848
    C1-135190 Revision WID on "Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks” Huawei, HiSilicon /Youyang revised WID endorsement Yes Yes revised No C1-135216 C1-134893
    C1-135216 Revision WID on "Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks” Huawei, HiSilicon /Youyang revised WID endorsement Yes Yes revised No C1-135221 C1-135190
    C1-135221 Revision WID on "Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks” Huawei, HiSilicon /Youyang revised WID endorsement No Yes postponed No C1-135216
    C1-134961 CT aspects of Network Provided Location Information for IMS Trusted WLAN Access Network China Telecom, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, China Unicom new WID endorsement Yes Yes revised No C1-135133
    C1-135133 CT aspects of Network Provided Location Information for IMS Trusted WLAN Access Network China Telecom, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, China Unicom new WID endorsement Yes Yes revised No C1-135199 C1-134961
    C1-135199 CT aspects of Network Provided Location Information for IMS Trusted WLAN Access Network China Telecom, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, China Unicom new WID endorsement Yes Yes endorsed No C1-135133
12.34.2
CRs and discussion papers related to new WIDs
12.34.3
Status of future work items
C1-134588 Proximity-based Services (ProSe) stage 2 status and potential CT impacts Qualcomm Incorporated / Lena discussion discussion Yes Yes noted No
13
Output Liaison Statements
C1-134618 Reply LS on CN impacts in RAN2 solutions for WLAN/3GPP radio interworking Ericsson / Ivo o/g LS agreement Yes No withdrawn Yes
    C1-134641 LS on Delayed deflection option for CDIV ORANGE/Youssef o/g LS approval Yes Yes revised No C1-135122
    C1-135122 LS on Delayed deflection option for CDIV current meeting o/g LS approval Yes Yes revised No C1-135139 C1-134641
    C1-135139 LS on Delayed deflection option for CDIV current meeting o/g LS approval Yes Yes approved No C1-135122
    C1-134827 Reply LS on CN impacts in RAN2 solutions for WLAN/3GPP interworking Intel/ Vivek o/g LS agreement Yes No withdrawn Yes
    C1-134887 Reply LS on MO scenarios for the new P-CSCF restoration mechanism current meeting o/g LS approval Yes Yes approved No
    C1-134888 LS on Charging Information Delivery to IMS CTF (S5-131750) SA5 o/g LS action No Yes postponed No
    C1-134889 Reply LS on Availability of SIP Instance Identifier current meeting o/g LS approval Yes Yes revised No C1-135188
    C1-135188 Reply LS on Availability of SIP Instance Identifier current meeting o/g LS approval Yes Yes revised No C1-135196 C1-134889
    C1-135196 Reply LS on Availability of SIP Instance Identifier current meeting o/g LS approval Yes Yes approved No C1-135188
    C1-134900 Reply LS on CN impacts in RAN2 solutions for WLAN/3GPP radio interworking (R2-133697) current meeting o/g LS approval Yes Yes revised No C1-135140
    C1-135140 Reply LS on CN impacts in RAN2 solutions for WLAN/3GPP radio interworking (R2-133697) current meeting o/g LS approval Yes Yes agreed No C1-134900
    C1-134977 ALT-C for indication of IPv4 and IPv6 addresses in SDP current meeting o/g LS approval Yes Yes revised No C1-135138
    C1-135138 ALT-C for indication of IPv4 and IPv6 addresses in SDP current meeting o/g LS approval Yes Yes approved No C1-134977
    C1-135211 LS on Transfer of ETSI TS 182 025 current meeting o/g LS approval Yes Yes approved No
14
Late and misplaced documents
C1-134707 Clarification to the handling of EMM cause#8 HTC CR agreement No No withdrawn Yes
    C1-134894 ? Huawei/ Christian discussion discussion No No withdrawn Yes
15
A.O.B.
16
Closing

Created: 2013-11-18 14:56     Last document: C1-135223