Agenda with allocated Tdocs

Created: 2012-09-06 08:21     Last document: C1-123455

Agenda Topic Tdoc Title Source Doc-type Doc-for Avail Treated Decision Wdrn Replaced-by Replaces
1
Opening
2
Agenda and reports
C1-122522 agenda CT1 Chairman agenda information Yes Yes approved No
    C1-122549 draft C1-78 report MCC meeting report / action list approval Yes Yes approved No
3
Input liaison statements
C1-122570 Reply LS on Supporting T.38-based Fax service in IMS (C3-121263) CT3 i/c LS information Yes Yes noted No
    C1-122571 Reply LS on H(e)NB local IP address for Fixed Broadband Access network interworking (C4-121308) CT4 i/c LS information Yes Yes noted No
    C1-122572 Reply LS on Assignment of 3 digit MNC (CP-120424) TSG CT i/c LS information Yes Yes noted No
    C1-122573 Liaison Regarding MSF/ETSI/GSMA RCS VoLTE Interoperability Event ETSI TC INT i/c LS information Yes Yes noted No
    C1-122574 Response liaison statement to 3GPP SA5 and 3GPP CT1 on VoLTE charging requirements GSMA CPWP/RCPG i/c LS information Yes Yes noted No
    C1-122575 DVB-RCS2 as a non-3GPP IP Connectivity Access Network for IMS DVB-RCS2 i/c LS action Yes Yes noted No
    C1-122576 Publication of GSMA's Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 GSMA TSG i/c LS information Yes Yes replied to No
    C1-122577 Reply LS on stage 3 for modification of security context storage rate on the UICC (R2-122999) RAN2 i/c LS information Yes Yes noted No
    C1-122578 Response LS on SRVCC/vSRVCC handover indication from the AS layer (R2-123030) RAN2 i/c LS information Yes Yes noted No
    C1-122579 LS on CDMA2000 inter-working in LTE shared networks (R2-123141) RAN2 i/c LS information Yes Yes noted No
    C1-122580 Response LS on RR failures and network reselection (R2-123142) RAN2 i/c LS action Yes Yes replied to No
    C1-122581 LS on handover to a CSG cell with emergency call (R3-121431) RAN3 i/c LS action Yes Yes replied to No
    C1-122624 LS response on handover to a CSG cell with emergency call (S2-123228) SA2 i/c LS information Yes Yes replied to No
    C1-122582 LS on clarifying the expected behaviour when EPS capability of the UE is disabled (R5-122142) RAN5 i/c LS action Yes Yes replied to No
    C1-122583 LS response on voice support indication (RP-120883) TSG RAN i/c LS action Yes Yes noted No
    C1-122584 Reply LS on the condition to deactivate ISR by the SGSN (S2-122568) SA2 i/c LS information Yes Yes noted No
    C1-122585 Response LS on multimedia CAT (Customized Alerting Tones) and vSRVCC in the alerting phase (S2-122577) SA2 i/c LS information Yes Yes noted No
    C1-122586 Reply LS on OSCAR conclusions (S2-122578) SA2 i/c LS information Yes Yes noted No
    C1-122587 LS on IMS node blocking the identity of originating party (S2-122579) SA2 i/c LS action Yes Yes replied to No
    C1-122588 Reply LS on Operator policy requirements on setting of SRVCC and vSRVCC capabilities (S2-122618) SA2 i/c LS information Yes Yes noted No
    C1-122589 LS response on Capability Indicator for SRVCC from UTRAN/GERAN to E-UTRAN/HSPA (S2-122624) SA2 i/c LS information Yes Yes noted No
    C1-122590 LS on NAS vs AS alternatives for FULL-MOCN-GERAN issues at handovers to shared GERAN and at CSFB (S2-122625) SA2 i/c LS action Yes Yes noted No
    C1-122591 Reply LS on involving AS in routing decision for RAVEL (S2-123372) SA2 i/c LS information Yes Yes noted No
    C1-122592 LS on GSMA Application Network Efficiency Task Force “whitepaper and actions” (S2-123424) SA2 i/c LS information Yes Yes noted No
    C1-122593 Reply LS on Wi-Fi Roaming Task Force (S3-120512) SA3 i/c LS information Yes Yes noted No
    C1-122594 LS reply on allowing network authentication without challenge for home routed XCAP APN from IREG RILTE (S3-120535) SA3 i/c LS action Yes Yes noted No
    C1-122595 Reply LS on border control concepts for VINE (S3-120801) SA3 i/c LS action Yes Yes noted No
    C1-122596 LS on PWS key distribution (S3-120805) SA3 i/c LS action Yes Yes replied to No
    C1-122597 LS on GSMA Application Network Efficiency Task Force – whitepaper and actions (SP-120423) TSG SA i/c LS action Yes Yes replied to No
    C1-122598 Reply LS on Assignment of 3 digit MNC (SP-120429) TSG SA i/c LS information Yes Yes noted No
    C1-122599 Reply LS Availability of civic alerting function of 3GPP/3GPP2 terminal at roaming (SP-120448) TSG SA i/c LS information Yes Yes noted No
    C1-122625 Reply LS on UE reselecting from LTE to 2G/3G for CS services when backed-off from PS domain (S2-123354) SA2 i/c LS action Yes Yes noted No
    C1-122626 Reply LS on border control concepts for VINE (S2-123366) SA2 i/c LS information Yes Yes noted No
    C1-122627 LS on indicate the support of MSC server assisted mid-call feature for SCC AS (S2-123367) SA2 i/c LS information Yes Yes noted No
    C1-122628 Reply LS on Clarifications for congestion control for combined MM procedures (S2-123396) SA2 i/c LS information Yes Yes noted No
    C1-122629 LS on Inter RAT handover and Inter RAT Release with redirection between E-UTRAN and UTRAN (S2-123398) SA2 i/c LS information Yes Yes noted No
    C1-122630 LS on Inter RAT handover, Inter RAT Release with redirection, Inter RAT Reject with redirection between E-UTRAN and UTRAN (S2-123399) SA2 i/c LS information Yes Yes noted No
    C1-122631 Reply LS on CDMA2000 inter-working in LTE shared networks (S2-123400) SA2 i/c LS information Yes Yes noted No
    C1-122632 LS on Notification of IMS Information for CS to PS SRVCC (S2-123426) SA2 i/c LS action Yes Yes replied to No
    C1-122633 LS on capability to express a match-all filter using existing TFT filter attributes (S2-123427) SA2 i/c LS action Yes Yes replied to No
    C1-123044 Reply LS on the introduction of a new work item for GWCN-GERAN (GP-120803) TSG GERAN i/c LS discussion Yes Yes noted No
    C1-123045 LS (IREG_167) to 3GPP on IMS Emergency Calls GSMA IREG RILTE i/c LS discussion Yes Yes replied to No C1-122965
    C1-123047 Reply LS on DVB-RCS2 as a non-3GPP IP Connectivity Access Network for IMS (S1-122382) SA1 i/c LS action Yes Yes noted No
    C1-123050 Exception of NAS level congestion control in UTRAN/GERAN (S1-122382) SA1 i/c LS information Yes Yes noted No
    C1-123051 PWS Security Requirements (S1-122437) SA1 i/c LS information Yes Yes noted No
    C1-123052 Operator Determined Barring (ODB) of IMS related services (IREG_172) GSMA IREG RILTE i/c LS action Yes Yes noted No
4
Work organisation
4.1
Meeting schedule
4.2
Work plan and other administrative issues
C1-122550 How to request tdoc numbers MCC information information Yes Yes noted No
    C1-122551 CT1 delegate survival guide MCC information information Yes Yes noted No
    C1-122552 Work plan MCC work plan agreement Yes Yes revised No C1-123443
    C1-123443 Work plan MCC work plan agreement Yes Yes noted No C1-122552
    C1-122715 Current CT1 terms of reference MCC information information Yes Yes noted No
5
Corrections to old releases
5.1
IMS issues
5.2
Non-IMS issues
6
Rel-6
6.1
IMS issues
6.2
Non-IMS issues
7
Rel-7
7.1
Rel-7 IMS Work Items and issues
C1-122614 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes revised No C1-123100
    C1-123100 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes agreed No C1-122614
    C1-122615 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes revised No C1-123101
    C1-123101 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes agreed No C1-122615
    C1-122616 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes revised No C1-123102
    C1-123102 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes agreed No C1-122616
    C1-122617 Correction of SDP Profile about RFC4145 OKI,NTT CR agreement Yes Yes revised No C1-123103
    C1-123103 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes agreed No C1-122617
    C1-122618 Correction of SDP Profile about RFC4145 OKI,NTT CR agreement Yes Yes revised No C1-123104
    C1-123104 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes agreed No C1-122618
    C1-122750 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123105
    C1-123105 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122750
    C1-122751 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123106
    C1-123106 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122751
    C1-122752 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123107
    C1-123107 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122752
    C1-122753 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123108
    C1-123108 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122753
    C1-122754 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123109
    C1-123109 Correct handling of PPR in S-CSCF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122754
    C1-122917 Discussion on mismatch between emergency service category and emergency URN subtype Research In Motion UK Ltd. discussion discussion Yes Yes noted No
    C1-122919 Discussion on removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage discussion discussion Yes Yes noted No
    C1-122920 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123072
    C1-123072 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No C1-122920
    C1-122921 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123073
    C1-123073 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No C1-122921
    C1-122922 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123074
    C1-123074 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No C1-122922
    C1-122923 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123075
    C1-123075 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No C1-122923
    C1-122924 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123076
    C1-123076 Removal of dialled digits option from emergency call generation Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No C1-122924
    C1-123021 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123067
    C1-123067 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen, Alcatel-Lucent, NTT DOCOMO CR agreement Yes Yes revised No C1-123336 C1-123021
    C1-123336 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen, Alcatel-Lucent, NTT DOCOMO CR agreement Yes Yes revised No C1-123412 C1-123067
    C1-123412 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen, Alcatel-Lucent, NTT DOCOMO, Samsung CR agreement Yes Yes agreed No C1-123336
    C1-123022 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123068 C1-122181
    C1-123068 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123337 C1-123022
    C1-123337 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123413 C1-123068
    C1-123413 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes agreed No C1-123337
    C1-123023 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123069 C1-122182
    C1-123069 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123338 C1-123023
    C1-123338 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123414 C1-123069
    C1-123414 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes agreed No C1-123338
    C1-123024 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123070 C1-122183
    C1-123070 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123339 C1-123024
    C1-123339 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123415 C1-123070
    C1-123415 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes agreed No C1-123339
    C1-123025 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123071 C1-122184
    C1-123071 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123340 C1-123025
    C1-123340 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123416 C1-123071
    C1-123416 Emergency sub-service type handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes agreed No C1-123340
    C1-123026 UE emergency supplementary services handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes rejected No
    C1-123027 UE emergency supplementary services handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes rejected No
    C1-123028 UE emergency supplementary services handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes rejected No
    C1-123029 UE emergency supplementary services handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes rejected No
    C1-123030 UE emergency supplementary services handling Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes rejected No
7.2
Rel-7 non-IMS Work Items and issues
8
Rel-8
8.1
Rel-8 IMS Work Items and issues
C1-122558 Reference update: draft-ietf-simple-msrp-cema Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123110
    C1-123110 Reference update: draft-ietf-simple-msrp-cema Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122558
    C1-122559 Reference update: draft-ietf-simple-msrp-cema Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123111
    C1-123111 Reference update: draft-ietf-simple-msrp-cema Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122559
    C1-122560 Reference update: draft-ietf-simple-msrp-cema Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123112
    C1-123112 Reference update: draft-ietf-simple-msrp-cema Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122560
    C1-122561 Reference update: draft-ietf-simple-msrp-cema Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123113
    C1-123113 Reference update: draft-ietf-simple-msrp-cema Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122561
    C1-122600 Missing CANCEL procedure for Tmcid-bye Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-123114
    C1-123114 Missing CANCEL procedure for Tmcid-bye Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-122600
    C1-122601 Missing CANCEL procedure for Tmcid-bye Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-123115
    C1-123115 Missing CANCEL procedure for Tmcid-bye Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-122601
    C1-122602 Missing CANCEL procedure for Tmcid-bye Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-123116
    C1-123116 Missing CANCEL procedure for Tmcid-bye Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-122602
    C1-122603 Missing CANCEL procedure for Tmcid-bye Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-123117
    C1-123117 Missing CANCEL procedure for Tmcid-bye Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-122603
    C1-122604 Missing early dialog procedure Deutsche Telekom (Roland) CR agreement Yes Yes postponed No
    C1-122605 Missing early dialog procedure Deutsche Telekom (Roland) CR agreement Yes Yes postponed No
    C1-122606 Missing early dialog procedure Deutsche Telekom (Roland) CR agreement Yes Yes postponed No
    C1-122607 Missing early dialog procedure Deutsche Telekom (Roland) CR agreement Yes Yes postponed No
    C1-122608 Missing action after expiery of To-id Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-123118
    C1-123118 Missing action after expiery of To-id Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-122608
    C1-122609 Missing action after expiery of To-id Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-123119
    C1-123119 Missing action after expiery of To-id Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-122609
    C1-122610 Missing action after expiery of To-id Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-123120
    C1-123120 Missing action after expiery of To-id Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-122610
    C1-122611 Missing action after expiery of To-id Deutsche Telekom (Roland) CR agreement Yes Yes revised No C1-123121
    C1-123121 Missing action after expiery of To-id Deutsche Telekom (Roland) CR agreement No Yes postponed No C1-122611
    C1-122612 Public User Identity with user=phone Deutsche Telekom (Roland) discussion discussion Yes Yes noted No
    C1-122619 Correction of SDP Profile about RFC4145 OKI,NTT CR agreement Yes Yes revised No C1-123122
    C1-123122 Correction of SDP Profile about RFC 4145 OKI,NTT CR agreement Yes Yes agreed No C1-122619
    C1-122676 Removing duplicated IOI parameters in examples Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-123289
    C1-123289 Removing duplicated IOI parameters in examples Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-122676
    C1-122709 Operator initiated UE registration Deutsche Telekom CR agreement Yes Yes postponed No
    C1-122710 Operator initiated UE registration Deutsche Telekom CR agreement Yes Yes postponed No
    C1-122711 Operator initiated UE registration Deutsche Telekom CR agreement Yes Yes postponed No
    C1-122712 Operator initiated UE registration Deutsche Telekom CR agreement Yes Yes postponed No
    C1-122726 Diffs between draft-ietf-mmusic-sdp-media-capabilities rev 13 and 14 Research in Motion/ Andrew information information Yes Yes noted No
    C1-122727 Correcting CS SDP usage and updating media capabilities draft reference Research in Motion/ Andrew CR agreement Yes Yes revised No C1-123123
    C1-123123 Correcting CS SDP usage and updating media capabilities draft reference Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-122727
    C1-122728 Correcting CS SDP usage and updating media capabilities draft reference Research in Motion/ Andrew CR agreement Yes Yes revised No C1-123124
    C1-123124 Correcting CS SDP usage and updating media capabilities draft reference Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-122728
    C1-122729 Correcting CS SDP usage and updating media capabilities draft reference Research in Motion/ Andrew CR agreement Yes Yes revised No C1-123125
    C1-123125 Correcting CS SDP usage and updating media capabilities draft reference Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-122729
    C1-122730 Correcting CS SDP usage and updating media capabilities draft reference Research in Motion/ Andrew CR agreement Yes Yes revised No C1-123126
    C1-123126 Correcting CS SDP usage and updating media capabilities draft reference Research in Motion/ Andrew CR agreement Yes Yes agreed No C1-122730
    C1-122858 Reference update: draft-ietf-mmusic-ice-tcp Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123127
    C1-123127 Reference update: draft-ietf-mmusic-ice-tcp Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122858
    C1-122859 Reference update: draft-ietf-mmusic-ice-tcp Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123128
    C1-123128 Reference update: draft-ietf-mmusic-ice-tcp Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122859
    C1-122860 Reference update: draft-ietf-mmusic-ice-tcp Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123129
    C1-123129 Reference update: draft-ietf-mmusic-ice-tcp Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122860
    C1-122861 Reference update: draft-ietf-mmusic-ice-tcp Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123130
    C1-123130 Reference update: draft-ietf-mmusic-ice-tcp Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122861
    C1-122910 Correct references to TS 24.008 Research In Motion UK Ltd. CR agreement Yes No withdrawn Yes
    C1-122911 Specifying "sos" URI parameter in 24.503 Research In Motion UK Ltd. CR agreement Yes Yes agreed No
    C1-122912 Emergency PUID Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-123131
    C1-123131 Emergency PUID Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-122912
    C1-122913 Emergency redirect alignment Research In Motion UK Ltd. CR agreement Yes Yes agreed No
    C1-122992 Removal of P-Private-Network-indication header Huawei/Lili CR agreement Yes Yes postponed No
    C1-122993 Removal of P-Private-Network-indication header Huawei/Lili CR agreement Yes Yes postponed No
    C1-122994 Removal of P-Private-Network-indication header Huawei/Lili CR agreement Yes Yes postponed No
    C1-122995 Removal of P-Private-Network-indication header Huawei/Lili CR agreement Yes Yes postponed No
    C1-122996 P-CSCF handling UE port along with IP address during registration China Mobile, Huawei CR agreement Yes Yes revised No C1-123417
    C1-123417 P-CSCF handling UE port along with IP address during registration China Mobile, Huawei CR agreement Yes Yes agreed No C1-122996
    C1-122997 P-CSCF handling UE port along with IP address during registration China Mobile, Huawei CR agreement Yes Yes revised No C1-123418
    C1-123418 P-CSCF handling UE port along with IP address during registration China Mobile, Huawei CR agreement Yes Yes agreed No C1-122997
    C1-122998 P-CSCF handling UE port along with IP address during registration China Mobile, Huawei CR agreement Yes Yes revised No C1-123419
    C1-123419 P-CSCF handling UE port along with IP address during registration China Mobile, Huawei CR agreement Yes Yes agreed No C1-122998
8.2
Rel-8 non-IMS Work Items and issues
C1-122641 Partial VLR failure or VLR restart with CSFB while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123181
    C1-123181 Partial VLR failure or VLR restart with CSFB while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123343 C1-122641
    C1-123343 Partial VLR failure or VLR restart with CSFB while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes agreed No C1-123181
    C1-122642 Partial VLR failure or VLR restart with CSFB while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123182
    C1-123182 Partial VLR failure or VLR restart with CSFB while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123344 C1-122642
    C1-123344 Partial VLR failure or VLR restart with CSFB while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes agreed No C1-123182
    C1-122664 Partial VLR failure or VLR restart with CSFB and while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123179
    C1-123179 Partial VLR failure or VLR restart with CSFB and while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123341 C1-122664
    C1-123341 Partial VLR failure or VLR restart with CSFB and while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes agreed No C1-123179
    C1-122665 Partial VLR failure or VLR restart with CSFB and while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123180
    C1-123180 Partial VLR failure or VLR restart with CSFB and while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123342 C1-122665
    C1-123342 Partial VLR failure or VLR restart with CSFB and while ISR is activated Alcatel-Lucent/Jennifer CR agreement Yes Yes agreed No C1-123180
    C1-122694 Correction of Warning Message Delivery Procedure in GSM Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-123183
    C1-123183 Correction of Warning Message Delivery Procedure in GSM Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-122694
    C1-122695 Correction of Warning Message Delivery Procedure in GSM Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-123184
    C1-123184 Correction of Warning Message Delivery Procedure in GSM Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-122695
    C1-122696 Correction of Warning Message Delivery Procedure in GSM Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-123185
    C1-123185 Correction of Warning Message Delivery Procedure in GSM Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-122696
    C1-122697 Correction of Warning Message Delivery Procedure in GSM Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-123186
    C1-123186 Correction of Warning Message Delivery Procedure in GSM Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No C1-122697
    C1-122809 IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes revised No C1-123187
    C1-123187 IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122809
    C1-122810 IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes revised No C1-123188
    C1-123188 IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122810
    C1-122811 IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes revised No C1-123189
    C1-123189 IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122811
    C1-122812 IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes revised No C1-123190
    C1-123190 IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122812
    C1-122863 EMM Combined UE Waiting Flag set for IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes revised No C1-123191
    C1-123191 EMM Combined UE Waiting Flag set for IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122863
    C1-122864 EMM Combined UE Waiting Flag set for IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes revised No C1-123192
    C1-123192 EMM Combined UE Waiting Flag set for IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122864
    C1-122865 EMM Combined UE Waiting Flag set for IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes revised No C1-123193
    C1-123193 EMM Combined UE Waiting Flag set for IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122865
    C1-122866 EMM Combined UE Waiting Flag set for IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes revised No C1-123194
    C1-123194 EMM Combined UE Waiting Flag set for IMSI detach triggered by last PDP context deactivation Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122866
    C1-122867 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-123175
    C1-123175 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement No No withdrawn Yes C1-122867
    C1-122868 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-123176
    C1-123176 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement No No withdrawn Yes C1-122868
    C1-122869 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-123177
    C1-123177 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement No No withdrawn Yes C1-122869
    C1-122870 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-123178
    C1-123178 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-123371 C1-122870
    C1-123371 Handling of unknown protocol data Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-123178
    C1-123002 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123251
    C1-123251 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123195 C1-123002
    C1-123195 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes agreed No C1-123251
    C1-123003 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123252
    C1-123252 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123196 C1-123003
    C1-123196 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes agreed No C1-123252
    C1-123004 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123253
    C1-123253 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123197 C1-123004
    C1-123197 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes agreed No C1-123253
    C1-123005 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123254 C1-122554
    C1-123254 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123198 C1-123005
    C1-123198 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes agreed No C1-123254
9
Rel-9
9.1
Rel-9 IMS Work Items and issues
C1-122689 Payload Type problem - Assigning PT numbers Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-122690 Payload Type problem - Assigning PT numbers Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-122691 Payload Type problem - Assigning PT numbers Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-122758 Reference update: draft-kaplan-sip-session-id Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes postponed No
    C1-122759 Reference update: draft-kaplan-sip-session-id Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes postponed No
    C1-122760 Reference update: draft-kaplan-sip-session-id Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes postponed No
    C1-122761 Reference update: draft-kaplan-dispatch-session-id Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-123132
    C1-123132 Condition for usage of Session-ID header filed within MESSAGE response Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-122761
    C1-122762 Reference update: draft-kaplan-dispatch-session-id Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-123133
    C1-123133 Condition for usage of Session-ID header filed within MESSAGE response Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-122762
    C1-122763 Reference update: draft-kaplan-dispatch-session-id Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-123134
    C1-123134 Condition for usage of Session-ID header filed within MESSAGE response Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No C1-122763
    C1-122871 Removal of the MSC server assisted mid-call feature from Rel-9 Huawei/Lili CR agreement Yes Yes revised No C1-123135
    C1-123135 Removal of the MSC server assisted mid-call feature from Rel-9 Huawei/Lili CR agreement Yes Yes agreed No C1-122871
    C1-122872 Use of Feature-Caps header to indicate the support of mid-call feature for SCC AS Huawei/Lili CR agreement Yes Yes revised No C1-123136
    C1-123136 Use of Feature-Caps header to indicate the support of mid-call feature for SCC AS Huawei/Lili CR agreement Yes Yes agreed No C1-122872
    C1-122873 Use of Feature-Caps header to indicate the support of mid-call feature for SCC AS Huawei/Lili CR agreement Yes Yes revised No C1-123137
    C1-123137 Use of Feature-Caps header to indicate the support of mid-call feature for SCC AS Huawei/Lili CR agreement Yes Yes agreed No C1-122873
    C1-122957 Media plane security Vodafone CR agreement Yes Yes revised No C1-123140
    C1-123140 Media plane security Vodafone CR agreement Yes Yes revised No C1-123347 C1-122957
    C1-123347 Media plane security Vodafone CR agreement Yes Yes agreed No C1-123140
    C1-122956 Media plane security Vodafone CR agreement Yes Yes revised No C1-123139
    C1-123139 Media plane security Vodafone CR agreement Yes Yes revised No C1-123346 C1-122956
    C1-123346 Media plane security Vodafone CR agreement Yes Yes agreed No C1-123139
    C1-122955 Media plane security Vodafone CR agreement Yes Yes revised No C1-123138
    C1-123138 Media plane security Vodafone CR agreement Yes Yes revised No C1-123345 C1-122955
    C1-123345 Media plane security Vodafone CR agreement Yes Yes agreed No C1-123138
    C1-122960 mediasec deletions Vodafone CR agreement Yes Yes revised No C1-123143
    C1-123143 mediasec deletions Vodafone CR agreement Yes Yes agreed No C1-122960
    C1-122959 mediasec deletions Vodafone CR agreement Yes Yes revised No C1-123142
    C1-123142 mediasec deletions Vodafone CR agreement Yes Yes agreed No C1-122959
    C1-122958 mediasec ref deletions Vodafone CR agreement Yes Yes revised No C1-123141
    C1-123141 mediasec ref deletions Vodafone CR agreement Yes Yes agreed No C1-122958
    C1-122961 Summary of Issues with DTLS-SRTP (RFC 5763) Vodafone discussion discussion Yes Yes noted No
    C1-122962 Discussion on IMS Emergency Call when a number has multiple categories NTT DOCOMO discussion discussion Yes Yes agreed No
    C1-123031 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123144
    C1-123144 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123372 C1-123031
    C1-123372 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes agreed No C1-123144
    C1-123032 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123145
    C1-123145 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123373 C1-123032
    C1-123373 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes agreed No C1-123145
    C1-123033 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123146
    C1-123146 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes revised No C1-123374 C1-123033
    C1-123374 Emergency and normal registration independence Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes agreed No C1-123146
9.2
Rel-9 non-IMS Work Items and issues
10
Rel-10
10.1
(void)
10.2
IMS_SC_eIDT
C1-122530 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-123147
    C1-123147 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-122530
    C1-122531 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-123148
    C1-123148 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-122531
    C1-122724 Correcting 300 Multiple Choices Response Procedure Research in Motion/ Andrew CR agreement Yes Yes agreed No
    C1-122725 Correcting 300 Multiple Choices Response Procedure Research in Motion/ Andrew CR agreement Yes Yes agreed No
10.3
CCNL
10.4
IMSProtoc4
C1-122914 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-123151 C1-121197
    C1-123151 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes Yes agreed No C1-122914
    C1-123164 Correcting incorrect references in P-CSCF procedures when emergency call failure occurs Research In Motion UK Ltd. CR agreement Yes Yes agreed No
10.5
eAOC
10.6
OMR
C1-122683 OMR and SCC AS Ericsson, ST-Ericsson / Jan discussion discussion Yes Yes noted No
    C1-122684 OMR and SCC AS Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-123149
    C1-123149 Introduction of OMR in SCC AS Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-122684
    C1-122685 OMR and SCC AS Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-123150
    C1-123150 Introduction of OMR in SCC AS Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-122685
10.7
IESE
10.8
eSRVCC
C1-122532 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-123152
    C1-123152 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-122532
    C1-122533 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-123153
    C1-123153 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-122533
    C1-122563 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123154
    C1-123154 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122563
    C1-122564 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123155
    C1-123155 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-1233348 C1-122564
    C1-123348 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-123155
    C1-122677 Replacing the Contact header field with the Feature-Caps header field Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-123156
    C1-123156 Replacing the Contact header field with the Feature-Caps header field Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-122677
    C1-122678 Feature-Caps header field part of trust domain Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-123157
    C1-123157 Feature-Caps header field part of trust domain Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-122678
    C1-122679 Feature-Caps header field part of trust domain Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-123158
    C1-123158 Feature-Caps header field part of trust domain Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-122679
    C1-122692 Payload type correction – SIP 488 (Not Acceptable Here) response Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-123159
    C1-123159 Payload type correction - SIP 488 (Not Acceptable Here) response Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-122692
    C1-122693 Payload type correction - SIP 488 (Not Acceptable Here) response Ericsson, ST-Ericsson / Jan CR agreement Yes Yes revised No C1-123160
    C1-123160 Payload type correction - SIP 488 (Not Acceptable Here) response Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No C1-122693
    C1-122746 IBCF behaviour for eSRVCC NokiaSiemensNetworks CR agreement Yes Yes merged with C1-122874 No
    C1-122747 IBCF behaviour for eSRVCC NokiaSiemensNetworks CR agreement Yes Yes merged with C1-122875 No
    C1-122874 IBCF don't change the dialog-ID Huawei/Lili CR agreement Yes Yes revised No C1-123161
    C1-123161 IBCF don't change the dialog-ID Huawei/Lili CR agreement Yes Yes revised No C1-123446 C1-122874
    C1-123446 IBCF don't change the dialog-ID Huawei/Lili CR agreement Yes Yes postponed No C1-123161
    C1-122875 IBCF don't change the dialog-ID Huawei/Lili CR agreement Yes Yes revised No C1-123162
    C1-123162 IBCF don't change the dialog-ID Huawei/Lili CR agreement No Yes revised No C1-123447 C1-122875
    C1-123447 IBCF don't change the dialog-ID Huawei/Lili CR agreement Yes Yes postponed No C1-123162
10.9
aSRVCC
10.10
ECSRA_LAA-CN
10.11
eMPS-CN
10.12
NIMTC
C1-122737 Update status set to NOT UPDATED Vodafone CR agreement Yes Yes revised No C1-123301
    C1-123301 Update status set to NOT UPDATED Vodafone CR agreement Yes Yes revised No C1-123349 C1-122737
    C1-123349 Clarify MS behaviour after deletion of forbidden lists Vodafone CR agreement Yes Yes agreed No C1-123301
    C1-122738 Update status set to NOT UPDATED Vodafone CR agreement Yes Yes revised No C1-123302
    C1-123302 Update status set to NOT UPDATED Vodafone CR agreement Yes Yes revised No C1-123350 C1-122738
    C1-123350 Clarify MS behaviour after deletion of forbidden lists Vodafone CR agreement Yes Yes agreed No C1-123302
    C1-122739 Update status set to NOT UPDATED Vodafone CR agreement Yes Yes revised No C1-123303
    C1-123303 Update status set to NOT UPDATED Vodafone CR agreement Yes Yes revised No C1-123351 C1-122739
    C1-123351 Clarify UE behaviour after deletion of forbidden lists Vodafone CR agreement Yes Yes agreed No C1-123303
    C1-122740 Update status set to NOT UPDATED Vodafone CR agreement Yes Yes revised No C1-123304
    C1-123304 Update status set to NOT UPDATED Vodafone CR agreement Yes Yes revised No C1-123352 C1-122740
    C1-123352 Clarify UE behaviour after deletion of forbidden lists Vodafone CR agreement Yes Yes agreed No C1-123304
    C1-122785 Handling of MM procedure during combined RAU procedure HTC CR agreement Yes Yes revised No C1-123305
    C1-123305 Handling of MM procedure during combined RAU procedure HTC CR agreement Yes Yes revised No C1-123390 C1-122785
    C1-123390 Handling of MM procedure during combined RAU procedure HTC CR agreement Yes Yes agreed No C1-123305
    C1-122786 Handling of MM procedure during combined RAU procedure HTC CR agreement Yes Yes revised No C1-123306
    C1-123306 Handling of MM procedure during combined RAU procedure HTC CR agreement Yes Yes revised No C1-123391 C1-122786
    C1-123391 Handling of MM procedure during combined RAU procedure HTC CR agreement Yes Yes agreed No C1-123306
10.12.1
NAS signalling low priority and device properties
10.12.2
NAS level congestion control and mobility management back-off timers
10.12.3
Congestion control for CS domain and impact on Gs/SGs interfaces
C1-122668 Handling CSFB when PS MM Backoff timer is running Nokia Siemens Networks, Nokia, Samsung, ZTE CR agreement Yes Yes revised No C1-123199
    C1-123199 Handling CSFB when PS MM Backoff timer is running Nokia Siemens Networks, Nokia, Samsung, ZTE CR agreement Yes Yes postponed No C1-122668
    C1-122669 Handling CSFB when PS MM Backoff timer is running Nokia Siemens Networks, Nokia, Samsung, ZTE CR agreement Yes Yes revised No C1-123300
    C1-123300 Handling CSFB when PS MM Backoff timer is running Nokia Siemens Networks, Nokia, Samsung, ZTE CR agreement Yes Yes postponed No C1-122669
10.12.4
Session management back-off timers
10.12.5
Emergency bearer services
10.12.6
General issues
10.13
AT_IMS
10.14
AT_UICC
10.15
SMOG_St3
10.16
IFOM-CT
10.17
LIPA
10.18
SIPTO
10.19
MAPCON-St3
10.20
TIGHTER
10.21
MOCN-GERAN
10.22
FS_UE-CN_ES
10.23
TEI10 and other WIDs
10.23.1
IMS – TEI10 and other WIDs
10.23.2
SAE – TEI10 and other WIDs
10.23.3
Other TEI10 issues / WIDs
11
Rel-11
11.1
Release 11 documents for information
C1-122731 Current Issues on IETF drafts which are dependencies for CT1 specifications Research in Motion/ Andrew information information Yes Yes noted No
    C1-122925 Editor's note handling summary for 3GPP TS 24.229 Alcatel-Lucent / Keith Drage discussion discussion Yes Yes noted No
11.2
USSI
C1-122523 Evaluation of alternatives for USSD MIME body encoding Ericsson, ST-Ericsson / Ivo discussion discussion Yes Yes noted No
    C1-122524 Pseudo-CR on ENs on component types in BYE Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes revised No C1-123260
    C1-123260 Pseudo-CR on ENs on component types in BYE Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes agreed No C1-122524
    C1-122525 Pseudo-CR on return result Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes revised No C1-123262
    C1-123262 Pseudo-CR on return result Ericsson, ST-Ericsson / Ivo pseudo CR agreement No Yes postponed No C1-122525
    C1-122526 Pseudo-CR on EN in info package definition Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes revised No C1-123261
    C1-123261 Pseudo-CR on EN in info package definition Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes agreed No C1-122526
    C1-122527 Pseudo-CR on alternative clean up Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes revised No C1-123263
    C1-123263 Pseudo-CR on alternative clean up Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes revised No C1-123353 C1-122527
    C1-123353 Pseudo-CR on alternative clean up Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes agreed No C1-123263
    C1-122528 Annex A updates for USSI Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-123264
    C1-123264 Annex A updates for USSI Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-122528
    C1-122529 Pseudo-CR on minor changes Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes agreed No
    C1-122673 Pseudo-CR on Conclusions on USSD MIME body encoding Ericsson, ST-Ericsson / Ivo pseudo CR agreement Yes Yes postponed No
    C1-122795 USSD MIME type-Alternative 4 Orange/Youssef pseudo CR agreement Yes Yes revised No C1-123265
    C1-123265 USSD MIME type-Alternative 4 Orange/Youssef pseudo CR agreement Yes Yes revised No C1-123420 C1-122795
    C1-123420 USSD MIME type-Alternative 4 Orange/Youssef pseudo CR agreement Yes Yes agreed No C1-123265
    C1-122884 Peeling the onion: Solution for USSD payload format – alternative 4 Qualcomm Incorporated/Subbra pseudo CR agreement Yes Yes revised No C1-123266
    C1-123266 Peeling the onion: Solution for USSD payload format – alternative 4 Qualcomm Incorporated/Subbra pseudo CR agreement Yes Yes postponed No C1-122884
    C1-123001 Pseudo-CR on USSI AS actions China Mobile pseudo CR agreement Yes Yes revised No C1-123267
    C1-123267 Pseudo-CR on USSI AS actions China Mobile pseudo CR agreement Yes Yes agreed No C1-123001
11.3
IOI_IMS_CH
11.4
RLI (CT4)
11.5
EMC_PC
11.6
IPXS
C1-122680 Removing an EN regarding missing charging related headers Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-122999 Discussion on determining served network in IPXS China Mobile discussion discussion Yes Yes noted No
    C1-123000 Determining served network in IPXS China Mobile CR agreement Yes Yes revised No C1-123273
    C1-123273 Determining served network in IPXS China Mobile CR agreement No No withdrawn Yes C1-123000
11.7
VINE-CT
C1-122926 Addressing an editor's note relating to interface naming Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No
    C1-122927 Addressing an editor's note supported functionality for the ISC gateway function Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123268
    C1-123268 Addressing an editor's note supported functionality for the ISC gateway function Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-122927
    C1-122985 Discussion on functionalities of the IBCF on the ISC interface NTT discussion discussion Yes Yes noted No
    C1-122986 Functionalities of the IBCF on the ISC interface NTT CR agreement Yes Yes revised No C1-123269
    C1-123269 Functionalities of the IBCF on the ISC interface NTT CR agreement Yes Yes agreed No C1-122986
    C1-122984 Rename the ISC gateway function NTT CR agreement Yes Yes revised No C1-123270
    C1-123270 Rename the ISC gateway function NTT CR agreement No Yes postponed No C1-122984
    C1-122928 Specification of ISC gateway function - general clauses Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No
    C1-122929 Specification of ISC gateway function – SIP procedures Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123271
    C1-123271 Specification of ISC gateway function - SIP procedures Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-122929
    C1-122930 Specification of ISC gateway function – SDP procedures Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123272
    C1-123272 Specification of application gateway function - SDP procedures Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-122930
    C1-122931 Specification of ISC gateway function – SIP profile Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No
    C1-122932 Specification of ISC gateway function – SDP profile Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No
11.8
MRB
C1-122764 Usage of visited network MRB address when allocating MRF resources Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-123276
    C1-122933 Addressing editor's notes relating to OSCAR Alcatel-Lucent / Keith Drage CR agreement Yes Yes merged with C1-122764 No
    C1-123276 Usage of visited network MRB address when allocating MRF resources Ericsson, ST-Ericsson / Nevenka, Alcatel-Lucent CR agreement Yes Yes agreed No C1-122764
    C1-122765 Reference update: draft-ietf-mediactrl-mrb Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes agreed No
    C1-122766 Visited network MRB information Ericsson, ST-Ericsson / Nevenka CR agreement Yes Yes revised No C1-123277
    C1-122954 Transporting an MRB address from a visited network Vodafone CR agreement Yes Yes merged with C1-122766 No
    C1-123277 Visited network MRB information Ericsson, ST-Ericsson / Nevenka, Vodafone CR agreement Yes Yes revised No C1-123377 C1-122766
    C1-123377 Visited network MRB information Ericsson, ST-Ericsson / Nevenka, Vodafone CR agreement Yes Yes revised No C1-123396 C1-123277
    C1-123396 Visited network MRB information Ericsson, ST-Ericsson / Nevenka, Vodafone CR agreement Yes Yes agreed No C1-123377
    C1-122934 Addressing an editor's note relating to resources in multiple VPLMNs Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No
    C1-122935 Addressing an editor's note relating to border control functions on Mr, Mr' and Cr interfaces Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123278
    C1-123278 Addressing an editor's note relating to border control functions on Mr, Mr' and Cr interfaces Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-122935
    C1-122936 Addressing an editor's note relating to border control concepts for the Rc interface Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No
    C1-122937 Discussion on documentation structure for Query-Mode operation of MRB Alcatel-Lucent / Keith Drage discussion discussion Yes Yes noted No C1-122138
    C1-122938 Support of MRB Query mode in 3GPP TS 24.229 Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-122139
    C1-122970 Addressing an editor's note relating to IBCF usage on media resource allocation architecture Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No
11.9
GINI
C1-122779 Clarification of used identities for registration procedures CableLabs, Deutsche Telekom / martin CR agreement Yes Yes revised No C1-123274
    C1-123274 Clarification of used identities for registration procedures CableLabs, Deutsche Telekom / martin CR agreement Yes Yes revised No C1-123355 C1-122779
    C1-123355 Clarifications of used identities for registration procedures CableLabs, Deutsche Telekom / martin CR agreement Yes Yes agreed No C1-123274
    C1-122794 Add reg-event changes for RFC 6140 CableLabs, Deutsche Telekom / martin CR agreement Yes Yes revised No C1-123275
    C1-123275 Add reg-event changes for RFC 6140 CableLabs, Deutsche Telekom / martin CR agreement Yes Yes revised No C1-123354 C1-122794
    C1-123354 Add reg-event changes for RFC 6140 CableLabs, Deutsche Telekom / martin CR agreement Yes Yes revised No C1-123378 C1-123275
    C1-123378 Add reg-event changes for RFC 6140 CableLabs, Deutsche Telekom / martin CR agreement Yes Yes agreed No C1-123354
11.10
RAVEL-CT
C1-122674 MSC server adding g.3gpp.trf in initial INVITE Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-122686 Removing an EN regarding preservation of parameters in AS Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-122687 Removing EN regarding number normalization and enum translation Ericsson, ST-Ericsson / Jan CR agreement Yes Yes agreed No
    C1-122713 Usage of the “rn” parameter for interconnection routeing Deutsche Telekom discussion discussion Yes Yes noted No
    C1-122714 “rn” parameter for interconnection routeing Deutsche Telekom CR agreement Yes Yes revised No C1-123283
    C1-123283 “rn” parameter for interconnection routeing Deutsche Telekom CR agreement No Yes postponed No C1-122714
    C1-122743 IOI usage between TRF and terminating side NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123284
    C1-123284 IOI usage between TRF and terminating side NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122743
    C1-122744 Co-location of TRF NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123285
    C1-123285 Co-location of TRF NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122744
    C1-122745 NNI type CR NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123286
    C1-123286 NNI type CR NokiaSiemensNetworks CR agreement No Yes postponed No C1-122745
    C1-122879 ATCF adding g.3gpp.trf in initial INVITE request Huawei/Lili CR agreement Yes Yes revised No C1-123287
    C1-123287 ATCF adding g.3gpp.trf in initial INVITE request Huawei/Lili CR agreement No Yes postponed No C1-122879
    C1-122967 Application servers and RAVEL Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123288 C1-121952
    C1-123288 Application servers and RAVEL Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-122967
    C1-122968 Updates to charging introduction for RAVEL Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No
11.11
GBA-ext-St3 (CT4)
C1-122741 Qop for GBA_Digest NokiaSiemensNetworks CR agreement Yes Yes agreed No
    C1-122742 GBA_Digest procedures for Ua interface NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123255
    C1-123255 GBA_Digest procedures for Ua interface NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122742
11.12
NWK-PL2IMS-CT
C1-122565 Network Provided Location Information for IMS Ericsson, ST-Ericsson / Christer discussion discussion Yes Yes noted No
    C1-122566 Annex A: P-Access-Network-Info in ACK and CANCEL Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123256
    C1-123256 Annex A: P-Access-Network-Info in ACK Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122566
    C1-122876 Network provided location information inserted by the MSC server enhanced for ICS Huawei/Lili CR agreement Yes Yes revised No C1-123257
    C1-123257 Network provided location information inserted by the MSC server enhanced for ICS Huawei/Lili CR agreement Yes Yes agreed No C1-122876
    C1-122877 Network provided location information inserted by the SCC-AS Huawei/Lili CR agreement Yes Yes revised No C1-123258
    C1-123258 Network provided location information inserted by the SCC-AS Huawei/Lili CR agreement Yes Yes agreed No C1-122877
    C1-122878 Network provided location information inserted by the MSC server enhanced for ICS Huawei/Lili CR agreement Yes Yes revised No C1-123259
    C1-123259 Network provided location information inserted by the MSC server enhanced for ICS Huawei/Lili CR agreement Yes Yes agreed No C1-122878
11.13
IMSProtoc5
C1-122541 Correction of correction to profile tables for use of 3GPP IM CN subsystem XML body in restoration procedures Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123172
    C1-123172 Correction of correction to profile tables for use of 3GPP IM CN subsystem XML body in restoration procedures Research In Motion UK Ltd. CR discussion Yes Yes agreed No C1-122541
    C1-122542 Correcting profile tables for use of 3GPP IM CN subsystem XML body in response to request for emergency services Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123168
    C1-123168 Correcting profile tables for use of 3GPP IM CN subsystem XML body in response to request for emergency services Research In Motion UK Ltd. CR discussion Yes Yes agreed No C1-122542
    C1-122620 Discussion on addressing 3xx response in IBCF (exit point) in home network of originating UE Fujitsu, NTT discussion discussion Yes Yes noted No
    C1-122621 Addressing 3xx response in IBCF (exit point) in home network of originating UE Fujitsu, NTT CR agreement Yes Yes revised No C1-123292
    C1-123292 Addressing 3xx response in IBCF (exit point) in home network of originating UE Fujitsu, NTT CR agreement No No withdrawn Yes C1-122621
    C1-122789 DVB-RCS2 satellite access network as IP-CAN for IMS TNO CR agreement Yes Yes revised No C1-123169
    C1-123169 DVB-RCS2 satellite access network as IP-CAN for IMS TNO CR agreement Yes Yes revised No C1-123370 C1-122789
    C1-123370 DVB-RCS2 satellite access network as IP-CAN for IMS TNO CR agreement Yes Yes revised No C1-123428 C1-123169
    C1-123428 DVB-RCS2 satellite access network as IP-CAN for IMS TNO CR agreement Yes Yes agreed No C1-123370
    C1-122797 Hosted NAT traversal for MSRP media flows Orange/Youssef CR agreement Yes Yes revised No C1-123170
    C1-123170 Hosted NAT traversal for MSRP media flows Orange/Youssef CR agreement No Yes postponed No C1-122797
    C1-122834 Update the general requirements for tunnel procedures Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-122835 IP address obtained on S2a interface Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-122836 Tunnel modification by the UE Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-122837 Tunnel modification by the Network Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-122847 Correction to Annex M Huawei, HiSilicon CR agreement Yes Yes revised No C1-123293
    C1-123293 Correction DHCP mechanism for P-CSCF discovery in Annex M Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122847
    C1-122848 Correction to Annex O Huawei, HiSilicon CR agreement Yes Yes revised No C1-123294
    C1-123294 Correction to DHCP mechanism for P-CSCF discovery in Annex O Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122848
    C1-122849 Correction to Annex 9.2 Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-122939 Reversal of terminology change in annex D Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No
    C1-122940 Emergency priority using Resource-Priority header field Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123173
    C1-123173 Emergency priority using the Resource-Priority header field Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-122940
    C1-122941 Inclusion of SIP overload control Alcatel-Lucent, AT&T / Keith Drage discussion discussion Yes Yes noted No
    C1-122971 Condition for restoration procedures causing UE reregistration Alcatel-Lucent / Keith Drage CR agreement Yes Yes revised No C1-123174
    C1-123174 Condition for restoration procedures causing UE reregistration Alcatel-Lucent / Keith Drage CR agreement Yes Yes agreed No C1-122971
    C1-122983 Missing procedure for NASS-IMS bundled authentication at S-CSCF NTT CR agreement Yes Yes revised No C1-123171
    C1-123171 Missing procedure for NASS-IMS bundled authentication at S-CSCF NTT CR agreement Yes Yes agreed No C1-122983
11.14
vSRVCC-CT
C1-122850 eMPS for vSRVCC Samsung/Ricky, Nokia Siemens Networks CR agreement Yes Yes agreed No
    C1-122851 Clarifications for user connection attachment for vSRVCC – removal of editor’s note Samsung/Ricky CR agreement Yes Yes revised No C1-123087
    C1-123087 Clarifications for user connection attachment for vSRVCC – removal of editor’s note Samsung/Ricky CR agreement Yes Yes revised No C1-123369 C1-122851
    C1-123369 Clarifications for user connection attachment for vSRVCC – removal of editor’s note Samsung/Ricky CR agreement Yes Yes revised No C1-123424 C1-123087
    C1-123424 Clarifications for user connection attachment for vSRVCC - removal of editor's note Samsung/Ricky CR agreement Yes Yes agreed No C1-123369
11.15
rSRVCC-CT
C1-122534 CS to PS SRVCC - session transfer cancellation Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-122535 Minor numbering, spelling and styles corrections Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-122536 CS to PS SRVCC, alerting and held only Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-122622 CS to PS SRVCC - PS to CS SRVCC clean up and EN removal Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No
    C1-122623 Incorrect info package name g.3gpp.state-and-event-info Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-123088
    C1-123088 Incorrect info package name g.3gpp.state-and-event-info Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-122623
    C1-123006 Security context mapping for SRVCC from CS to PS Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-123089 C1-122317
    C1-123089 Security context mapping for SRVCC from CS to PS Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-123006
    C1-123007 Security context mapping for SRVCC from CS to PS Ericsson, ST-Ericsson CR agreement Yes Yes revised No C1-123090 C1-122318
    C1-123090 Security context mapping for SRVCC from CS to PS Ericsson, ST-Ericsson CR agreement Yes Yes agreed No C1-123007
11.16
ATURI
C1-122652 Completion of basic dialup scenaros with +CDU ST-Ericsson, Ericsson / Atle CR agreement Yes Yes revised No C1-123091
    C1-123091 Completion of basic dialup scenaros with +CDU ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No C1-122652
    C1-122654 Communication service indication in AT commands Intel CR agreement Yes Yes revised No C1-123092
    C1-123092 Communication service indication in AT commands Intel CR agreement No Yes postponed No C1-122654
    C1-122672 Service URNs in AT commands Intel, Research In Motion UK Ltd CR agreement Yes Yes revised No C1-123093
    C1-123093 Service URNs in AT commands Intel, Research In Motion UK Ltd CR agreement Yes Yes agreed No C1-122672
11.17
RT_VGCS_Red
C1-122634 TC-RT: Corrections to group call redundancy Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No
    C1-122635 TC-RT: Corrections to broadcast call redundancy Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No
11.18
SIMTC
C1-122716 TS 24.139 v0.1.0 Ericsson, ST-Ericsson/Zu draft TS/TR information Yes Yes noted No
    C1-122717 Pseudo-CR on TS 24.139 general Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-123080
    C1-123080 Pseudo-CR on TS 24.139 general Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-122717
    C1-122718 Pseudo-CR on TS 24.139 NSWO Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-123081
    C1-123081 Pseudo-CR on TS 24.139 NSWO Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-123366 C1-122718
    C1-123366 Pseudo-CR on TS 24.139 NSWO Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-123081
    C1-122719 Pseudo-CR on TS 24.139 Supporting QoS Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-123082
    C1-123082 Pseudo-CR on TS 24.139 Supporting QoS Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-122719
    C1-122720 Pseudo-CR on TS 24.139 tunnel management procedure Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes revised No C1-123083
    C1-123083 Pseudo-CR on TS 24.139 tunnel management procedure Ericsson, ST-Ericsson/Zu pseudo CR agreement Yes Yes agreed No C1-122720
    C1-122721 Reference for BBAI Ericsson, ST-Ericsson/Zu CR agreement Yes Yes agreed No
11.18.1
SIMTC-CS
C1-122830 Congestion control on SGs interface Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-122831 Congestion control on SGs interface when MME is congested Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-122832 Congestion control on Gs interface when SGSN is congested Huawei, HiSilicon CR agreement Yes Yes postponed No
11.18.2
SIMTC-RAN_OC
11.18.3
SIMTC-Reach
C1-122655 Dual priority network indication Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123205
    C1-123205 Dual priority network indication Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123397 C1-122655
    C1-123397 Additional condition for attach exceptions Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123432 C1-123205
    C1-123432 Additional condition for attach exceptions Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123448 C1-123397
    C1-123448 Additional condition for attach exceptions Alcatel-Lucent/Frank CR agreement Yes Yes agreed No C1-123432
    C1-122656 Dual Priority Requirements Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123206
    C1-123206 Dual Priority Requirements Alcatel-Lucent/Frank CR agreement No Yes revised No C1-123398 C1-122656
    C1-123398 Dual Priority Requirements Alcatel-Lucent/Frank CR agreement No No withdrawn Yes C1-123206
    C1-122666 Dual priority requirements Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123207
    C1-123207 Dual priority requirements Alcatel-Lucent/Frank CR agreement Yes Yes rejected No C1-122666
    C1-122667 Dual priority requirements Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123208
    C1-123208 Dual priority requirements Alcatel-Lucent/Frank CR agreement Yes Yes rejected No C1-122667
    C1-122670 External Identifier at the SMS Router Nokia Siemens Networks CR agreement Yes Yes agreed No
    C1-122671 Functionalities to be supported by SMS Router Nokia Siemens Networks CR agreement Yes Yes revised No C1-123094
    C1-123094 Functionalities to be supported by SMS Router Nokia Siemens Networks CR agreement Yes Yes agreed No C1-122671
    C1-122748 Terminating SMS to MSISDNless UE NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123066
    C1-123066 Terminating SMS to MSISDNless UE NokiaSiemensNetworks CR agreement Yes Yes postponed No C1-122748
    C1-122814 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-122815 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123095
    C1-123095 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123356 C1-122815
    C1-123356 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123404 C1-123095
    C1-123404 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123433 C1-123356
    C1-123433 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123450 C1-123404
    C1-123450 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123433
    C1-122816 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123096
    C1-123096 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123357 C1-122816
    C1-123357 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123405 C1-123096
    C1-123405 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123434 C1-123357
    C1-123434 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123451 C1-123405
    C1-123451 Handling of PDN connection for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123434
    C1-122817 Correction on handling of ESM NAS request for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123097
    C1-123097 Correction on handling of ESM NAS request for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123358 C1-122817
    C1-123358 Correction on handling of ESM NAS request for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes revised No C1-123406 C1-123097
    C1-123406 Correction on handling of ESM NAS request for dual-priority functionality Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123358
    C1-122818 Correction on handling of SM NAS request for dual-priority Huawei, HiSilicon CR agreement Yes Yes revised No C1-123098
    C1-123098 Correction on handling of SM NAS request for dual-priority Huawei, HiSilicon CR agreement Yes Yes revised No C1-123359 C1-122818
    C1-123359 Correction on handling of SM NAS request for dual-priority Huawei, HiSilicon CR agreement Yes Yes revised No C1-123407 C1-123098
    C1-123407 Correction on handling of SM NAS request for dual-priority Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123359
    C1-122819 Correction on handling of SM back-off timer for dual-priority Huawei, HiSilicon CR agreement Yes Yes revised No C1-123200
    C1-123200 Correction on handling of SM back-off timer for dual-priority Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122819
    C1-122820 Correction on handling of SM back-off timer for dual-priority Huawei, HiSilicon CR agreement Yes Yes revised No C1-123201
    C1-123201 Correction on handling of SM back-off timer for dual-priority Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122820
    C1-122821 Dual priority definition Huawei, HiSilicon CR agreement Yes Yes revised No C1-123202
    C1-123202 Dual priority definition Huawei, HiSilicon CR agreement Yes Yes revised No C1-123360 C1-122821
    C1-123360 Dual priority definition Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123202
    C1-122822 Dual priority definition Huawei, HiSilicon CR agreement Yes Yes revised No C1-123203
    C1-123203 Dual priority definition Huawei, HiSilicon CR agreement Yes Yes revised No C1-123361 C1-122822
    C1-123361 Dual priority definition Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123203
    C1-122823 Correction on NAS signalling low priority overriding handling Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-122825 EAB overriding handling Huawei, HiSilicon discussion discussion Yes Yes noted No
    C1-122826 EAB overriding handling Huawei, HiSilicon, Intel CR agreement Yes Yes merged into C1-123323 No
    C1-122827 EAB overriding handling Huawei, HiSilicon, Intel CR agreement Yes Yes merged into C1-123324 No
    C1-122828 EAB overriding handling Huawei, HiSilicon CR agreement Yes Yes revised No C1-123331
    C1-123331 EAB overriding handling Huawei, HiSilicon CR agreement Yes Yes revised No C1-123427 C1-122828
    C1-123427 EAB overriding handling Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123331
    C1-122829 Correction on overriding configurations Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-122880 T3246 handling for dual priority requirement LG Electronics CR agreement Yes Yes revised No C1-123209
    C1-123209 T3246 handling for dual priority requirement LG Electronics CR agreement No No withdrawn Yes C1-122880
    C1-122946 Override Extended Access Barring DP ZTE discussion discussion Yes Yes noted No
    C1-122947 UE configured for "Override_ExtendedAccessBarring" ZTE CR agreement Yes No withdrawn Yes
    C1-122948 UE configured for "Override_ExtendedAccessBarring" ZTE CR agreement Yes No withdrawn Yes
    C1-122949 UE configured for "Override_ExtendedAccessBarring" ZTE CR agreement Yes Yes revised No C1-123323
    C1-123323 UE configured for "Override_ExtendedAccessBarring" ZTE CR agreement Yes Yes revised No C1-123425 C1-122949
    C1-123425 UE configured for "Override_ExtendedAccessBarring" ZTE CR agreement Yes Yes agreed No C1-123323
    C1-122950 UE configured for "Override_ExtendedAccessBarring" ZTE CR agreement Yes Yes revised No C1-123324
    C1-123324 UE configured for "Override_ExtendedAccessBarring" ZTE CR agreement Yes Yes revised No C1-123426 C1-122950
    C1-123426 UE configured for "Override_ExtendedAccessBarring" ZTE CR agreement Yes Yes agreed No C1-123324
    C1-122974 PDN connections handling for dual priority UE CATT CR agreement Yes Yes merged with C1-122815 No
    C1-122975 PDN connections handling for dual priority UE CATT CR agreement Yes Yes merged with C1-122816 No
    C1-122976 ESM procudure handling for dual priority UE CATT CR agreement Yes Yes merged with the CR in C1-123097 No
    C1-122977 ESM procudure handling for dual priority UE CATT CR agreement Yes Yes merged with the CR in C1-123098 No
    C1-123009 Dual priority capability indication for roaming UEs Samsung/Youngkyo discussion discussion Yes Yes revised No C1-123041
    C1-123041 Dual priority capability indication for roaming UEs Samsung/Youngkyo discussion discussion Yes Yes noted No C1-123009
    C1-123010 Dual priority capability indication for roaming UEs Samsung/Youngkyo CR agreement Yes Yes postponed No
    C1-123011 Dual priority capability indication for roaming UEs Samsung/Youngkyo CR agreement Yes Yes postponed No
    C1-123018 Alert-SC based on IMSI Acision CR agreement Yes Yes agreed No
    C1-123020 Correction on NAS signalling low priority overriding handling Huawei, HiSilicon CR agreement Yes Yes agreed No
11.18.4
SIMTC-Sig
11.18.5
SIMTC-CN_Pow
11.18.6
SIMTC-PS_Only
C1-122648 Update result indication for combined procedures Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123210 C1-122459
    C1-123210 Update result indication for combined procedures Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123362 C1-122648
    C1-123362 Update result indication for combined procedures Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123429 C1-123210
    C1-123429 Update result indication for combined procedures Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123449 C1-123362
    C1-123449 Update result indication for combined procedures Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes agreed No C1-123429
    C1-122649 Additional condition for skipping VLR SGs registration Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123211
    C1-123211 Additional condition for skipping VLR SGs registration Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123363 C1-122649
    C1-123363 Additional condition for skipping VLR SGs registration Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes agreed No C1-123211
    C1-122650 SMS-only Support for PS-only Subscription Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123212 C1-122212
    C1-123212 SMS-only Support for PS-only Subscription Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes agreed No C1-122650
    C1-122651 Update result and cause values for combined procedures in case of PS-only subscription Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123213
    C1-123213 Update result and cause values for combined procedures in case of PS-only subscription Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes revised No C1-123364 C1-122651
    C1-123364 Update result and cause values for combined procedures in case of PS-only subscription Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes postponed No C1-123213
    C1-122722 SMS in MME terminology usage consistency Alcatel-Lucent, Verizon Wireless/Jennifer CR agreement Yes Yes agreed No
    C1-122756 SMS in MME – Registration Procedures for MME Ericsson, ST-Ericsson / Mikael information information Yes Yes revised No C1-123402
    C1-123402 SMS in MME – Registration Procedures for MME Ericsson, ST-Ericsson / Mikael information information Yes Yes noted No C1-122756
    C1-122757 Registration of MME for SMS Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-123232
    C1-123232 Registration of MME for SMS Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-123332 C1-122757
    C1-123332 Registration of MME for SMS Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-123393 C1-123232
    C1-123393 Registration of MME for SMS Orange, Verizon Wireless, Vodafone, Ericsson, Hitachi, Alcatel-Lucent, ZTE CR agreement Yes Yes agreed No C1-123332
    C1-122802 Possibility to ignore paging for non-GPRS services Huawei, HiSilicon CR agreement Yes Yes revised No C1-123214 C1-122421
    C1-123214 Posibility to ignore paging for non-GPRS services Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122802
    C1-122813 SMS only indication for GPRS Attach and RAU procedures Huawei, HiSilicon CR agreement No Yes postponed No
    C1-122881 Clarification on Support of SMS in MME LG Electronics CR agreement Yes Yes revised No C1-123217
    C1-123217 Clarification on Support of SMS in MME LG Electronics CR agreement Yes Yes agreed No C1-122881
    C1-123014 Clarification on description of SMS over GPRS Samsung/Youngkyo CR agreement Yes Yes revised No C1-123218
    C1-123218 Clarification on description of SMS over GPRS Samsung/Youngkyo CR agreement Yes Yes revised No C1-123367 C1-123014
    C1-123367 Clarification on description of SMS over GPRS Samsung/Youngkyo CR agreement Yes Yes agreed No C1-123218
11.18.7
General SIMTC
C1-122780 CS congestion control handling for combined procedure HTC CR agreement Yes Yes revised No C1-123215
    C1-123215 CS congestion control handling for combined procedure HTC CR agreement Yes Yes revised No C1-123379 C1-122780
    C1-123379 CS congestion control handling for combined procedure HTC CR agreement Yes Yes agreed No C1-123215
    C1-122781 CS congestion control handling for combined procedure HTC CR agreement Yes Yes revised No C1-123216
    C1-123216 CS congestion control handling for combined procedure HTC CR agreement Yes Yes revised No C1-123380 C1-122781
    C1-123380 CS congestion control handling for combined procedure HTC CR agreement Yes Yes agreed No C1-123216
11.19
BBAI
C1-122838 Pseudo-CR on TS 24.139 Definitions and Abbreviations Huawei, HiSilicon pseudo CR agreement Yes Yes revised No C1-123084
    C1-123084 Pseudo-CR on TS 24.139 Definitions and Abbreviations Huawei, HiSilicon pseudo CR agreement Yes Yes agreed No C1-122838
    C1-122839 Pseudo-CR on TS 24.139 General Huawei, HiSilicon pseudo CR agreement Yes Yes revised No C1-123085
    C1-123085 Pseudo-CR on TS 24.139 General Huawei, HiSilicon pseudo CR agreement Yes Yes agreed No C1-122839
11.19.1
BBAI-BBI
11.19.2
BBAI-BBII (CT3)
11.19.3
BBAI-BBIII (CT3)
11.20
Full_MOCN-GERAN
C1-122736 Skip Indicator for GERAN sharing Vodafone CR agreement Yes Yes revised No C1-123219
    C1-123219 Skip Indicator for GERAN sharing Vodafone CR agreement Yes Yes revised No C1-123368 C1-122736
    C1-123368 Skip Indicator for GERAN sharing Vodafone CR agreement Yes Yes agreed No C1-123219
    C1-122833 Selected PLMN in network sharing for CSFB Huawei, HiSilicon CR agreement Yes Yes revised No C1-123221
    C1-123221 Selected PLMN in network sharing for CSFB Huawei, HiSilicon CR agreement Yes Yes postponed No C1-122833
11.21
RT_ERGSM
11.22
DIDA
C1-122885 Discussion paper on DIDA operating system leaf Qualcomm Incorporated/Subra discussion discussion Yes Yes noted No
    C1-122886 Application-ID Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-123079
    C1-122989 ISRPs based on Application Identity Intel CR agreement Yes Yes merged with the CR in C1-122886 No
    C1-123079 Application-ID Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-123435 C1-122886
    C1-123435 Application-ID Qualcomm Incorporated/Subra CR agreement Yes Yes revised No C1-123455 C1-123079
    C1-123455 Application-ID Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No C1-123435
11.23
PWS_Sec
11.24
SAMOG_WLAN- CN (CT4)
11.25
eNR_EPC (CT4)
11.26
PROTOC_SMS_SGs (CT4)
11.27
SAES2, SAES2-CSFB
C1-122539 Correction and completion of handling of the maximum number of active EPS bearer contexts Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123223
    C1-123223 Correction and completion of handling of the maximum number of active EPS bearer contexts Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123365 C1-122539
    C1-123365 Correction and completion of handling of the maximum number of active EPS bearer contexts Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123387 C1-123223
    C1-123387 Correction and completion of handling of the maximum number of active EPS bearer contexts Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123439 C1-123365
    C1-123439 Correction and completion of handling of the maximum number of active EPS bearer contexts Research In Motion UK Ltd. CR discussion Yes Yes agreed No C1-123387
    C1-122540 Correction and completion of handling of the maximum number of active PDP contexts Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123224
    C1-123224 Correction and completion of handling of the maximum number of active PDP contexts Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123436 C1-122540
    C1-123436 Correction and completion of handling of the maximum number of active PDP contexts Research In Motion UK Ltd. CR discussion Yes Yes agreed No C1-123224
    C1-122543 Clearing of the maximum number of active EPS bearer contexts Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123307
    C1-123307 Clearing of the maximum number of active EPS bearer contexts Research In Motion UK Ltd. CR discussion Yes Yes agreed No C1-122543
    C1-122544 Clearing of the maximum number of active PDP contexts Research In Motion UK Ltd. CR discussion Yes Yes revised No C1-123381
    C1-123381 Clearing of the maximum number of active PDP contexts Research In Motion UK Ltd. CR discussion Yes Yes agreed No C1-122544
    C1-122546 Correction of handling of bearers subjected to priority Research In Motion UK Ltd., AT&T CR discussion Yes Yes postponed No
    C1-122547 Correction of handling of bearers for media or SIP signalling subjected to priority Research In Motion UK Ltd., AT&T CR discussion Yes Yes postponed No
    C1-122548 Correction of handling of bearers for media or SIP signalling subjected to priority Research In Motion UK Ltd. CR discussion Yes Yes postponed No
    C1-122657 New cause code for long term errors Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123249
    C1-123249 New cause code for long term errors Alcatel-Lucent/Frank CR agreement Yes Yes revised No C1-123386 C1-122657
    C1-123386 New cause code for long term errors Alcatel-Lucent/Frank CR agreement Yes Yes agreed No C1-123249
    C1-122658 Returning to E-UTRAN after CSFB Renesas Mobile Europe / Hannu discussion discussion Yes Yes postponed No
    C1-122659 Style correction on E-UTRA disabling text Renesas Mobile Europe / Hannu CR agreement Yes No withdrawn Yes
    C1-122660 PLMN selection ping-pong avoidance when disabling E-UTRA Renesas Mobile Europe / Hannu discussion discussion Yes Yes noted No
    C1-122661 PLMN selection timer for E-UTRA disabling Renesas Mobile Europe / Hannu CR agreement Yes Yes revised No C1-123225 C1-122227
    C1-123225 PLMN selection timer for E-UTRA disabling Renesas Mobile Europe / Hannu CR agreement Yes Yes revised No C1-123382 C1-122661
    C1-123382 PLMN selection timer for E-UTRA disabling Renesas Mobile Europe / Hannu CR agreement Yes Yes agreed No C1-123225
    C1-122662 PLMN selection timer for E-UTRA disabling Renesas Mobile Europe / Hannu CR agreement Yes Yes revised No C1-123308 C1-122228
    C1-123308 PLMN selection timer for E-UTRA disabling Renesas Mobile Europe / Hannu CR agreement Yes Yes revised No C1-123383 C1-122662
    C1-123383 PLMN selection timer for E-UTRA disabling Renesas Mobile Europe / Hannu CR agreement Yes Yes agreed No C1-123308
    C1-122698 Clarification of MME Name and VLR Name format Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes revised No C1-123227
    C1-123227 Clarification of MME Name and VLR Name format Ericsson, ST-Ericsson, ZTE CR agreement Yes Yes agreed No C1-122698
    C1-122699 Clarification of requirement to include the PCO IE Ericsson, ST-Ericsson / Mikael CR agreement Yes Yes agreed No
    C1-122704 RAU/combined RAU after E-UTRAN/UTRAN to GERAN Inter RAT handover Qualcomm Incorporated / Shyamal CR agreement Yes Yes revised No C1-123226
    C1-123226 RAU/combined RAU after E-UTRAN/UTRAN to GERAN Inter RAT handover Qualcomm Incorporated / Shyamal CR agreement Yes Yes agreed No C1-122704
    C1-122735 Transitioning to SGs-NULL upon Attach InterDigital CR agreement Yes Yes revised No C1-123228
    C1-123228 Transitioning to SGs-NULL upon Attach InterDigital CR agreement Yes Yes agreed No C1-122735
    C1-122782 Clarification to the ESR procedure in connected mode HTC CR agreement Yes Yes revised No C1-123231
    C1-123231 Clarification to the ESR procedure in connected mode HTC CR agreement Yes Yes postponed No C1-122782
    C1-122790 Discussion paper on interaction of T (of 23.122) and T3402 RIM / Chen-Ho discussion discussion Yes Yes noted No
    C1-122803 CKSN allocation for idle mode inter-system change Huawei, HiSilicon discussion discussion Yes Yes noted No C1-122050
    C1-122804 CKSN allocation for idle mode inter-system change Huawei, HiSilicon CR agreement Yes Yes revised No C1-123311 C1-122051
    C1-123311 CKSN allocation for idle mode inter-system change Huawei, HiSilicon CR agreement Yes Yes agreed No C1-122804
    C1-122840 Disabling E-UTRA capability for #7 and #14 Huawei, HiSilicon CR agreement Yes Yes revised No C1-123233
    C1-123233 Disabling E-UTRA capability for #7 and #14 Huawei, HiSilicon CR agreement Yes Yes revised No C1-123385 C1-122840
    C1-123385 Disabling E-UTRA capability for #7 and #14 Huawei, HiSilicon CR agreement Yes Yes revised No C1-123437 C1-123233
    C1-123437 Disabling E-UTRA capability for #7 and #14 Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123385
    C1-122852 Clarification of UE in CS/PS mode of operation Samsung/Ricky, ZTE, HTC, NEC CR agreement Yes Yes revised No C1-123234
    C1-123234 Clarification of UE in CS/PS mode of operation Samsung/Ricky, ZTE, HTC, NEC CR agreement Yes Yes agreed No C1-122852
    C1-122853 Clarification of E-UTRA re-enabling. Samsung/Ricky, Huawei, HilSilicon, Renesas Mobile Europe Ltd, NEC CR agreement Yes Yes revised No C1-123388
    C1-123388 Clarification of E-UTRA re-enabling. Samsung/Ricky, Huawei, HilSilicon, Renesas Mobile Europe Ltd, NEC CR agreement Yes Yes agreed No C1-122853
    C1-122854 CS/PS mode 1 UE with "IMS voice not available" (revert approved CR C1-115106) Samsung/Ricky, ZTE, HTC CR agreement Yes Yes postponed No
    C1-122857 AS/NAS interaction at connection establishment Samsung/Ricky discussion discussion Yes Yes noted No
    C1-122882 Clarification on TAU trigger after 1xSRVCC LG Electronics CR agreement Yes Yes agreed No
    C1-122987 Solving Excessive TAU Delay Nokia discussion discussion Yes Yes noted No
    C1-123019 Correction on statement of VLR name ZTE CR agreement Yes No withdrawn Yes
11.28
TEI11 and other WIDs
C1-122732 Updating to RFC 6665 Research in Motion/ Andrew discussion discussion Yes Yes noted No
    C1-122855 Low Priority Indicator vs NAS Signalling Low Priority Indication Terminology Samsung/Ricky, HTC CR agreement Yes Yes agreed No
    C1-122856 Low Priority Indicator vs NAS Signalling Low Priority Indication Terminology Samsung/Ricky, HTC CR agreement Yes Yes agreed No
11.28.1
IMS TEI11
C1-122545 Correction of handling of bearers for media or SIP signalling subjected to priority Research In Motion UK Ltd., AT&T CR agreement Yes Yes revised No C1-123290
    C1-123290 Correction of handling of bearers for media or SIP signalling subjected to priority Research In Motion UK Ltd., AT&T CR agreement No Yes postponed No C1-122545
    C1-122562 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes revised No C1-123279
    C1-123279 Reference update and technical changes: draft-ietf-sipcore-proxy-feature Ericsson, ST-Ericsson / Christer CR agreement Yes Yes agreed No C1-122562
    C1-122675 Removing EN regarding "related-icid" Ericsson, ST-Ericsson / Jan CR agreement Yes Yes postponed No
    C1-122688 related-icid-generated-at in 3455bis Ericsson, ST-Ericsson / Jan discussion discussion Yes Yes noted No
    C1-122749 Update references for TLS Extensions and PSK cyphersuites NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123280
    C1-123280 Update references for TLS Extensions and PSK cyphersuites NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122749
    C1-122755 Correction ue initiated deregistration NokiaSiemensNetworks CR agreement Yes Yes revised No C1-123295
    C1-123295 Correction ue initiated deregistration NokiaSiemensNetworks CR agreement Yes Yes agreed No C1-122755
    C1-122767 SMS domain selection NTT DOCOMO CR agreement Yes Yes revised No C1-123296 C1-122502
    C1-123296 SMS domain selection NTT DOCOMO CR agreement Yes Yes agreed No C1-122767
    C1-122768 Discussion on dedicated response code for PCSCF discovery NTT DOCOMO discussion discussion Yes Yes postponed No
    C1-122769 Dedicated response code for PCSCF discovery NTT DOCOMO CR agreement Yes Yes postponed No C1-122451
    C1-122770 PCSCF discovery clarification NTT DOCOMO CR agreement Yes Yes revised No C1-123281
    C1-123281 PCSCF discovery clarification NTT DOCOMO CR agreement Yes Yes revised No C1-123389 C1-122770
    C1-123389 PCSCF discovery clarification NTT DOCOMO CR agreement Yes Yes revised No C1-123440 C1-123281
    C1-123440 PCSCF discovery clarification NTT DOCOMO CR agreement Yes Yes agreed No C1-123389
    C1-122778 CC Recall consideration of not logged in Deutsche Telekom / Martin CR agreement Yes Yes agreed No
    C1-122796 Operator Determined Communication Barring Orange/Youssef discussion discussion Yes Yes noted No
    C1-122798 P-CSCF registration context lost Orange/Youssef CR agreement Yes Yes revised No C1-123297
    C1-123297 P-CSCF registration context lost Orange/Youssef CR agreement Yes Yes agreed No C1-122798
    C1-122799 usage of “header” privacy value Orange/Youssef CR agreement Yes Yes postponed No C1-122376
    C1-122887 Incorrect reference to OMA common policy schema Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No
    C1-122888 Incorrect reference to OMA common policy schema Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No
    C1-122889 Interrogation, activation, deactivation, registration and erasure for OIP and OIR Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122890 Interrogation, activation, deactivation, registration and erasure for TIP and TIR Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122891 Clarification on the interaction between OIP and OIR Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122892 Clarification on the interaction between TIP and TIR Qualcomm Incorporated/Subra CR agreement Yes Yes [not addressed] No
    C1-122893 Inconsistent values for XML element Qualcomm Incorporated/Subra CR agreement Yes Yes [not addressed] No
    C1-122894 Inconsistent values for XML element Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122895 Miscellaneous corrections Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122896 Miscellaneous corrections Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122897 Reference corrections Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No
    C1-122898 Reference corrections Qualcomm Incorporated/Subra CR agreement Yes Yes agreed No
    C1-122899 IETF reference style corrections Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122900 Flow corrections Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122901 Meaning when element is not included in IM CN subsystem CW XML body Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122902 Forwarding of 180 (ringing) is mandatory for the AS Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122903 Use of password for ACR/CB in registration, deregistration, activation, deactivation and interrogation procedures Qualcomm Incorporated/Subra discussion discussion Yes Yes noted No
    C1-122966 Support of non support of MWI Research In Motion UK LTD (Adrian) CR agreement Yes Yes revised No C1-123043
    C1-123043 Support of non support of MWI Research In Motion UK LTD (Adrian) CR agreement Yes Yes agreed No C1-122966
    C1-123034 Prevent ECT for PSAP callback Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes postponed No
    C1-123035 Invocation of MCID Ericsson, ST-Ericsson / Jörgen CR agreement Yes Yes postponed No
    C1-123036 IMS trace alignment with IETF INSIPID Vodafone CR agreement No Yes postponed No
11.28.2
Other TEI11 issues
C1-122537 Type of generic alert Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-123298
    C1-123298 Type of generic alert Ericsson, ST-Ericsson, China Mobile CR agreement Yes Yes agreed No C1-122537
    C1-122538 Corrections for Name for network provided over non-3GPP access network connected to EPC Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes revised No C1-123312
    C1-123312 Corrections for Name for network provided over non-3GPP access network connected to EPC Ericsson, ST-Ericsson / Ivo CR agreement Yes Yes agreed No C1-122538
    C1-122553 +CPOS and +CPOSR, enhancements for OTDOA Intel CR agreement Yes Yes revised No C1-123235 C1-122131
    C1-123235 +CPOS and +CPOSR, enhancementst for OTDOA Intel CR agreement Yes Yes agreed No C1-122553
    C1-122554 Correction to Figure 3.3-1 one2many, Acision CR agreement Yes Yes revised No C1-123005
    C1-122555 Correction for Repetition Rates one2many, Acision, KPN CR agreement Yes No withdrawn Yes
    C1-123046 Slide to explain C1-122556, 57 and 68 One2many other discussion Yes Yes noted No
    C1-122556 Reset request for E-UTRAN one2many, Acision, KPN CR agreement Yes Yes revised No C1-123250
    C1-123250 Reset request for E-UTRAN one2many, Acision, KPN CR agreement No Yes postponed No C1-122556
    C1-122557 Report from MME on Warning Message Delivery one2many, Acision, KPN CR agreement Yes Yes postponed No
    C1-122568 Failure List in WRITE-REPLACE-WARNING-CONFIRM and STOP-WARNING-CONFIRM one2many, Acision, KPN CR agreement Yes Yes postponed No
    C1-122567 Correction of reference to GSMA document "Coding of Cell Broadcast Functions" Research In Motion UK Ltd. CR agreement Yes Yes postponed No
    C1-122636 TC-RT: Cleanup of editorial or textual defects Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No
    C1-122637 TC-RT: Cleanup of editorial or textual defects Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No
    C1-122638 Support of handover to a CSG cell Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-123204 C1-122514
    C1-123204 Support of handover to a CSG cell Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-122638
    C1-122639 Corrections to Gs Support for MSC in Pool Nokia Siemens Networks / Robert CR agreement Yes Yes revised No C1-123313
    C1-123313 Corrections to Gs Support for MSC in Pool Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No C1-122639
    C1-122640 Corrections to SGs Support for MSC in Pool Nokia Siemens Networks / Robert CR agreement Yes Yes agreed No
    C1-122643 Abnormal case handling when processing access request Alcatel-Lucent/Jennifer discussion discussion Yes Yes noted No
    C1-122644 Abnormal cases and handling for Abort Procedure Alcatel-Lucent/Jennifer CR agreement Yes Yes revised No C1-123314
    C1-123314 Abnormal cases and handling for Abort Procedure Alcatel-Lucent/Jennifer CR agreement No Yes postponed No C1-122644
    C1-122645 Abnormal case handling during MM connection establishment Alcatel-Lucent/Jennifer CR agreement Yes Yes postponed No
    C1-122646 MM Connection Active state transition in the mobile station Alcatel-Lucent/Jennifer CR agreement Yes Yes rejected No
    C1-122653 Clarification of time-information elements of +CPOS ST-Ericsson, Ericsson / Atle CR agreement Yes Yes agreed No
    C1-122701 Clarification to Detach Procedure upon USIM Removal Qualcomm Incorporated / Shyamal discussion discussion Yes Yes noted No
    C1-122702 Clarification to Detach Procedure upon SIM/USIM Removal Qualcomm Incorporated / Shyamal CR agreement Yes No withdrawn Yes C1-122341
    C1-122703 Clarification to Detach Procedure upon USIM Removal Qualcomm Incorporated / Shyamal CR agreement Yes No withdrawn Yes C1-122342
    C1-122705 HSS update indication to avoid dual VLR registration for legacy UEs TeliaSonera-Nils CR agreement Yes No withdrawn Yes
    C1-122706 HSS update indication to avoid dual VLR registration for legacy UEs TeliaSonera-Nils CR agreement Yes No withdrawn Yes
    C1-122707 Considering ePLMN for ESM backoff timer with cause #50 or #51 TeliaSonera-Nils CR agreement Yes Yes revised No C1-123315
    C1-123315 Considering ePLMN for SM backoff Timer with cause #50 or #51 TeliaSonera-Nils CR agreement Yes Yes agreed No C1-122707
    C1-122708 Considering ePLMN for ESM backoff timer with cause #50 or #51 TeliaSonera-Nils CR agreement Yes Yes revised No C1-123316
    C1-123316 Considering ePLMN for ESM backoff timer with cause #50 or #51 TeliaSonera-Nils CR agreement Yes Yes agreed No C1-122708
    C1-122733 Removal of the “P-Channels” (Alternative 1) InterDigital CR agreement Yes Yes merged with C1-122883 No
    C1-122734 Removal of the “P-Channels” (Alternative 2) InterDigital CR agreement Yes Yes revised No C1-123239
    C1-123239 Removal of the “P-Channels” (Alternative 2) InterDigital CR agreement No No withdrawn Yes C1-122734
    C1-122771 Setting method of EMM combined procedure capability bit NTT DOCOMO CR agreement Yes Yes revised No C1-123229
    C1-123229 Setting method of EMM combined procedure capability bit NTT DOCOMO CR agreement No No withdrawn Yes C1-122771
    C1-122772 Setting method of EMM combined procedure capability bit NTT DOCOMO CR agreement Yes Yes revised No C1-123230
    C1-123230 Setting method of EMM combined procedure capability bit NTT DOCOMO CR agreement Yes Yes revised No C1-123384 C1-122772
    C1-123384 Setting method of EMM combined procedure capability bit NTT DOCOMO CR agreement Yes Yes agreed No C1-123230
    C1-122773 Introduction of new ESM cause value indicating user credential error NTT DOCOMO CR agreement Yes Yes revised No C1-123309
    C1-123309 Introduction of new ESM cause value indicating user credential error NTT DOCOMO CR agreement Yes Yes postponed No C1-122773
    C1-122774 Introduction of new SM cause value indicating user credential error NTT DOCOMO CR agreement Yes Yes revised No C1-123310
    C1-123310 Introduction of new SM cause value indicating user credential error NTT DOCOMO CR agreement Yes Yes postponed No C1-122774
    C1-122775 Inhibition of activating EPS Bearer in the registered Tracking Area NTT DOCOMO CR agreement Yes Yes revised No C1-123240
    C1-123240 Inhibition of activating EPS Bearer in the registered Tracking Area NTT DOCOMO CR agreement No Yes postponed No C1-122775
    C1-122776 Inhibition of activating PDP context in the registered Routing Area NTT DOCOMO CR agreement Yes Yes revised No C1-123241
    C1-123241 Inhibition of activating PDP context in the registered Routing Area NTT DOCOMO CR agreement No Yes postponed No C1-122776
    C1-122777 Clarification of PDP activation after completion of detach procedure NTT DOCOMO CR agreement Yes Yes revised No C1-123317
    C1-123317 Clarification of PDP activation after completion of detach procedure NTT DOCOMO CR agreement No No withdrawn Yes C1-122777
    C1-122783 Handlig of timer T3346 in connected mode HTC CR agreement Yes Yes revised No C1-123242
    C1-123242 Handlig of timer T3346 in connected mode HTC CR agreement No Yes postponed No C1-122783
    C1-122784 Handlig of timer T3346 in connected mode HTC CR agreement Yes Yes revised No C1-123243
    C1-123243 Handlig of timer T3346 in connected mode HTC CR agreement No Yes postponed No C1-122784
    C1-122791 Correcting error introduced by C1-122339 RIM, Samsung, New Postcom, Renesas Mobile Europe Ltd CR agreement Yes Yes agreed No
    C1-122792 Correcting erroneous definitive of reject causes introduced by C1-122338 Research In Motion UK Limited, Nokia Siemens Networks, Renesas Mobile Europe Ltd. CR agreement Yes Yes revised No C1-123318
    C1-123318 Correcting erroneous definitive of reject causes introduced by C1-122338 Research In Motion UK Limited, Nokia Siemens Networks, Renesas Mobile Europe Ltd. CR agreement Yes Yes agreed No C1-122792
    C1-122793 Maximum number of active EPS bearer contexts in combined procedure Renesas Mobile Europe, RIM, ZTE / Hannu CR agreement Yes Yes revised No C1-123319
    C1-123319 Maximum number of active EPS bearer contexts in combined procedure Renesas Mobile Europe, RIM, ZTE / Hannu CR agreement Yes Yes agreed No C1-122793
    C1-122800 Avoiding dual VLR registration for legacy UEs TeliaSonera-Nils CR agreement Yes Yes revised No C1-123236
    C1-123236 Avoiding dual VLR registration for legacy UEs TeliaSonera-Nils CR agreement Yes Yes revised No C1-123392 C1-122800
    C1-123392 Avoiding dual VLR registration for legacy UEs TeliaSonera-Nils CR agreement Yes Yes agreed No C1-123236
    C1-122801 Avoiding dual VLR registration for legacy UEs TeliaSonera-Nils CR agreement Yes Yes revised No C1-123237
    C1-123237 Avoiding dual VLR registration for legacy UEs TeliaSonera-Nils CR agreement Yes Yes agreed No C1-122801
    C1-122805 Reject cause #8 used for normal TAU Huawei, HiSilicon CR agreement Yes Yes postponed No C1-122052
    C1-122806 Reject cause #8 used for normal RAU Huawei, HiSilicon CR agreement Yes Yes postponed No C1-122053
    C1-122807 Correction on cause #2 in response to an LR Huawei, HiSilicon CR agreement Yes Yes postponed No C1-122055
    C1-122808 Clarification on DSMIP indication Huawei, HiSilicon CR agreement Yes Yes postponed No C1-122044
    C1-122841 Response of TAU complete message Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-122842 Selection of the ePDG Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-122843 UE state for ISMP policy Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-122844 Correction on bit number Huawei, HiSilicon CR agreement Yes Yes agreed No
    C1-122845 UE unable to perform 1x CS fallback for CS emergency call Huawei, HiSilicon CR agreement Yes Yes postponed No
    C1-122846 UE-initiated detach procedure during attach when in EMM-DEREGISTERED state Huawei, HiSilicon CR agreement Yes Yes revised No C1-123320
    C1-123320 UE-initiated detach procedure during attach when in EMM-DEREGISTERED state Huawei, HiSilicon CR agreement Yes Yes revised No C1-123441 C1-122846
    C1-123441 UE-initiated detach procedure during attach when in EMM-DEREGISTERED state Huawei, HiSilicon CR agreement Yes Yes agreed No C1-123320
    C1-122862 Non-seamless WLAN offload Huawei, HiSilicon, Ericsson, ST-Ericsson CR agreement Yes Yes postponed No C1-122031
    C1-122883 Removing NMO-III LG Electronics CR agreement Yes Yes revised No C1-123238
    C1-123238 Removing NMO-III LG Electronics CR agreement Yes Yes revised No C1-123394 C1-122883
    C1-123394 Removing NMO-III LG Electronics CR agreement Yes Yes agreed No C1-123238
    C1-122904 USIM file storage for PWS message reception Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122905 USIM file storage for PWS (option 2) Qualcomm Incorporated/Subra CR agreement Yes Yes postponed No
    C1-122906 Changes to the security context handling at power on Qualcomm Incorporated/Shyamal CR agreement Yes Yes revised No C1-123321
    C1-123321 Changes to the security context handling at power on Qualcomm Incorporated/Shyamal CR agreement Yes Yes agreed No C1-122906
    C1-122908 Support of leap seconds Qualcomm Incorporated, Verizon Wireless/Shyamal CR agreement Yes No withdrawn Yes
    C1-122915 Detecting a request for emergency service Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-123077
    C1-123077 Detecting a request for emergency service Research In Motion UK Ltd. CR agreement Yes Yes postponed No C1-122915
    C1-122916 Detecting a request for emergency service Research In Motion UK Ltd. CR agreement Yes Yes revised No C1-123078
    C1-123078 Detecting a request for emergency service Research In Motion UK Ltd. CR agreement No Yes postponed No C1-122916
    C1-122944 Table for presence requirements NEC CR agreement Yes Yes revised No C1-123248
    C1-123248 Table for presence requirements NEC CR agreement Yes Yes postponed No C1-122944
    C1-122945 Removing NMO III NEC CR agreement Yes Yes agreed No
    C1-122951 Clarifying in GMM substates ATTEMPTING-TO-ATTACH and ATTEMPTING-TO-UPDATE, CM layer triggered GMM message will be sent if T3346 is not running ZTE CR agreement Yes Yes revised No C1-123244
    C1-123244 Clarifying in GMM substates ATTEMPTING-TO-ATTACH and ATTEMPTING-TO-UPDATE, CM layer triggered GMM message will be sent if T3346 is not running ZTE CR agreement Yes Yes agreed No C1-122951
    C1-122952 Correct the requirement on QoS modification of default PDP context ZTE CR agreement Yes Yes revised No C1-123245
    C1-123245 Correct the requirement on QoS modification of default PDP context ZTE CR agreement Yes Yes agreed No C1-122952
    C1-122953 Remove the "combined routing area update procedure" in CSFB mobile terminating call ZTE CR agreement Yes Yes revised No C1-123322
    C1-123322 Remove the "combined routing area update procedure" in CSFB mobile terminating call ZTE CR agreement Yes Yes agreed No C1-122953
    C1-122978 SM congestion control CATT CR agreement Yes Yes revised No C1-123246
    C1-123246 SM congestion control CATT CR agreement No No withdrawn Yes C1-122978
    C1-122979 SM congestion control CATT CR agreement Yes Yes revised No C1-123247
    C1-123247 SM congestion control CATT CR agreement No No withdrawn Yes C1-122979
    C1-122980 Clarification of IPSec tunnel established between the UE and the ePDG CATT CR agreement Yes Yes revised No C1-123291
    C1-123291 Clarification of IPSec tunnel established between the UE and the ePDG CATT CR agreement Yes Yes revised No C1-123395 C1-122980
    C1-123395 Clarification of IPSec tunnel established between the UE and the ePDG CATT CR agreement Yes Yes revised No C1-123442 C1-123291
    C1-123442 Clarification of IPSec tunnel established between the UE and the ePDG CATT CR agreement Yes Yes agreed No C1-123395
    C1-122981 Correction of device properties in cause mapping CATT CR agreement Yes Yes agreed No
    C1-122982 Addtion of a trigger condition of a MS to enter EMM-DEREGISTERED state HTC CR agreement Yes Yes postponed No
    C1-122988 System time and leap seconds Qualcomm Incorporated, Verizon Wireless/Shyamal discussion discussion Yes Yes rejected No
    C1-122990 Coordination between EMM and GMM parameters for UE receiving EMM cause #22 HTC CR agreement Yes Yes postponed No
    C1-122991 Coordination between EMM and GMM parameters for MS receiving GMM cause #22 HTC CR agreement Yes Yes postponed No
    C1-123012 Fix the reference on UE configuration Samsung/Youngkyo CR agreement Yes Yes postponed No
    C1-123013 Removal of network mode of operation 3 Samsung/Youngkyo CR agreement Yes Yes merged into C1-122883 No
    C1-123015 Warning Message Reset Request one2many CR agreement Yes Yes noted No
    C1-123016 Report to CBC on Warning Message Delivery one2many CR agreement Yes Yes noted No
    C1-123017 Failure List in WRITE-REPLACE RESPONSE and STOP WARNING RESONSE one2many CR agreement Yes Yes noted No
    C1-123042 Support of leap seconds Qualcomm Incorporated, Verizon Wireless/Shyamal CR agreement Yes Yes postponed No
11.28.3
New / updated Rel-11 WIDs
C1-122647 WID on " Stage 3 for System Improvements to Machine-Type Communications" Alcatel-Lucent/ Jennifer revised WID agreement Yes Yes merged with C1-122700 No
    C1-122700 Updated SIMTC WID Ericsson, ST-Ericsson / Mikael revised WID agreement Yes Yes revised No C1-123063
    C1-123063 Updated SIMTC WID Ericsson, ST-Ericsson / Mikael revised WID agreement Yes Yes revised No C1-123430 C1-122700
    C1-123430 Updated SIMTC WID Ericsson, ST-Ericsson / Mikael revised WID agreement Yes Yes agreed No C1-123063
    C1-122973 Enhanced T.38 FAX support NEC, NTT new WID agreement Yes Yes revised No C1-123064
    C1-123064 Enhanced T.38 FAX support NEC, NTT new WID agreement Yes Yes endorsed No C1-122973
    C1-122942 Description of overload control Alcatel-Lucent, AT&T / Keith Drage CR agreement Yes Yes revised No C1-123166
    C1-123166 Description of overload control Alcatel-Lucent, AT&T / Keith Drage CR agreement Yes Yes revised No C1-123422 C1-122942
    C1-123422 Description of overload control Alcatel-Lucent, AT&T / Keith Drage CR agreement Yes Yes agreed No C1-123166
    C1-122943 Support of overload control Alcatel-Lucent, AT&T / Keith Drage CR agreement Yes Yes revised No C1-123167
    C1-123167 Support of overload control Alcatel-Lucent, AT&T / Keith Drage CR agreement Yes Yes revised No C1-123423 C1-122943
    C1-123423 Support of overload control Alcatel-Lucent, AT&T / Keith Drage CR agreement Yes Yes agreed No C1-123167
    C1-122972 Clarify CT1 position in T.38 interworking related work NEC, NTT discussion discussion Yes No withdrawn Yes
    C1-122663 WID on " CN Stage 3 for Full Support of Multi-Operator Core Network by GERAN” Alcatel-Lucent/ Jennifer revised WID agreement Yes Yes revised No C1-123062
    C1-123062 WID on " CN Stage 3 for Full Support of Multi-Operator Core Network by GERAN” Alcatel-Lucent/ Jennifer revised WID agreement Yes Yes revised No C1-123333 C1-122663
    C1-123333 WID on " CN Stage 3 for Full Support of Multi-Operator Core Network by GERAN” Alcatel-Lucent/ Jennifer revised WID agreement Yes Yes agreed No C1-123062
    C1-123008 Updated WID on enhanced Nodes Restoration for EPC ZTE revised WID agreement Yes Yes revised No C1-123065
    C1-123065 Updated WID on enhanced Nodes Restoration for EPC ZTE revised WID agreement Yes Yes revised No C1-123222 C1-123008
    C1-123222 Updated WID on enhanced Nodes Restoration for EPC ZTE revised WID agreement Yes Yes endorsed No C1-123065
    C1-123040 Support of T.38 related SDP attributes Nokia Siemens Networks CR agreement Yes Yes revised No C1-123335
    C1-123335 Support of T.38 related SDP attributes Nokia Siemens Networks CR agreement Yes Yes revised No C1-123400 C1-123040
    C1-123400 Support of T.38 related SDP attributes Nokia Siemens Networks CR agreement Yes Yes agreed No C1-123335
    C1-123282 Operator Determined Barring Orange new WID agreement Yes Yes revised No C1-123399
    C1-123399 Operator Determined Barring Orange new WID agreement Yes Yes revised No C1-123431 C1-123282
    C1-123431 Operator Determined Barring Orange new WID agreement Yes Yes agreed No C1-123399
12
Rel-12
12.1
Release 12 documents for information
12.2
LIMONET-LIPA
12.3
LIMONET-SIPTO (CT4)
12.4
New / updated Rel-12 WIDs
C1-122909 eMBMS and PLMN selection Qualcomm Incorporated/Shyamal discussion discussion Yes Yes noted No
    C1-123165 New WID on SIP overload control Alcatel-Lucent, AT&T new WID agreement Yes Yes revised No C1-123334
    C1-123334 New WID on SIP overload control Alcatel-Lucent, AT&T new WID agreement Yes Yes revised No C1-123403 C1-123165
    C1-123403 New WID on SIP overload control Alcatel-Lucent, AT&T, Belgacom, China Mobile, France Telecom, Orange, Verizon new WID agreement Yes Yes agreed No C1-123334
13
Output Liaison Statements
C1-123053 Reply to: Publication of GSMA's Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 CT1 o/g LS approval Yes Yes revised No C1-123326
    C1-123326 Reply to: Publication of GSMA's Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 CT1 o/g LS approval Yes Yes revised No C1-123401 C1-123053
    C1-123401 Reply LS to LS (C1-122576/TSGWIF_111) on Publication of GSMA's Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 CT1 o/g LS approval Yes Yes approved No C1-123326
    C1-123054 Reply to: Response LS on RR failures and network reselection (R2-123142) current meeting o/g LS approval Yes Yes revised No C1-123375
    C1-123375 Reply to: Response LS on RR failures and network reselection (R2-123142) current meeting o/g LS approval Yes Yes agreed No C1-123054
    C1-123055 Reply LS on handover to a CSG cell with emergency call (R3-121431) current meeting o/g LS approval Yes Yes approved No
    C1-123056 Reply to: LS on clarifying the expected behaviour when EPS capability of the UE is disabled (R5-122142) current meeting o/g LS approval Yes Yes revised No C1-123327
    C1-123327 Reply to LS on clarifying the expected behaviour when EPS capability of the UE is disabled (R5-122142) current meeting o/g LS approval Yes Yes approved No C1-123056
    C1-123330 Reply to: LS on IMS node blocking the identity of originating party (S2-122579) current meeting o/g LS approval Yes Yes agreed No
    C1-123058 Reply LS on PWS key distribution (S3-120805) current meeting o/g LS approval Yes Yes revised No C1-123408
    C1-123408 Reply to: LS on PWS key distribution (S3-120805) current meeting o/g LS approval Yes Yes revised No C1-123453 C1-123058
    C1-123453 Reply LS on PWS key distribution (S3-120805) current meeting o/g LS approval Yes Yes approved No C1-123408
    C1-123057 Reply to: LS on GSMA Application Network Efficiency Task Force – whitepaper and actions (SP-120423) current meeting o/g LS approval Yes Yes revised No C1-123409
    C1-123409 LS on GSMA Application Network Efficiency Task Force “whitepaper and actions” (SP-120423) current meeting o/g LS approval Yes Yes approved No C1-123057
    C1-123059 Reply to: LS on Notification of IMS Information for CS to PS SRVCC (S2-123426) current meeting o/g LS approval Yes Yes revised No C1-123328
    C1-123328 Reply to: LS on Notification of IMS Information for CS to PS SRVCC (S2-123426) current meeting o/g LS approval Yes Yes revised No C1-123376 C1-123059
    C1-123376 Reply to LS on Notification of IMS Information for CS to PS SRVCC (S2-123426) current meeting o/g LS approval Yes Yes approved No C1-123328
    C1-123060 Reply to: LS on capability to express a match-all filter using existing TFT filter attributes (S2-123427) current meeting o/g LS approval Yes Yes postponed No
    C1-122964 Reply LS on PDN connection re-establishment by IR.92 UE NTT DOCOMO o/g LS approval Yes Yes revised No C1-123325
    C1-123325 Reply LS on PDN connection re-establishment by IR.92 UE NTT DOCOMO o/g LS approval Yes Yes revised No C1-123410 C1-122964
    C1-123410 Reply LS on PDN connection re-establishment by IR.92 UE NTT DOCOMO o/g LS approval Yes Yes approved No C1-123325
    C1-122965 Reply LS on IMS Emergency Call NTT DOCOMO o/g LS approval Yes Yes revised No C1-123061
    C1-123061 Reply LS on IMS Emergency Call NTT DOCOMO o/g LS approval Yes Yes revised No C1-123329 C1-122965
    C1-123329 Reply LS on IMS Emergency Call NTT DOCOMO o/g LS approval Yes Yes revised No C1-123411 C1-123061
    C1-123411 Reply LS on IMS Emergency Calls NTT DOCOMO o/g LS approval Yes Yes approved No C1-123329
    C1-123086 LS on Operator initiated registration current meeting o/g LS discussion Yes Yes approved No
    C1-123220 LS on PAGING RESPONSE message in a shared GERAN current meeting o/g LS discussion Yes Yes approved No
    C1-123163 Dialog modification in signalling path between UE and S-CSCF current meeting o/g LS approval Yes Yes revised No C1-123452
    C1-123452 Dialog modification in signalling path between UE and S-CSCF current meeting o/g LS approval No Yes postponed No C1-123163
    C1-123299 (error) Hodges o/g LS approval Yes Yes revised No C1-123438
    C1-123438 LS on Stage 2 solution for Registration of MME for SMS in MME CT1, CT4 o/g LS approval Yes Yes revised No C1-123445 C1-123299
    C1-123445 LS on Stage 2 solution for Registration of MME for SMS in MME CT1, CT4 o/g LS approval Yes Yes endorsed No C1-123438
    C1-123421 Reply LS on border control concepts for VINE current meeting o/g LS discussion Yes Yes revised No C1-123454
    C1-123454 Reply LS on border control concepts for VINE current meeting o/g LS discussion Yes Yes approved No C1-123421
14
Late and misplaced documents
C1-122569 Reply LS on H(e)NB local IP address for Fixed Broadband Access network interworking (S3-120513) SA3 i/c LS information Yes No withdrawn Yes
    C1-122613 Clarifying usage of MCC+MNC in PCO IE Cisco CR agreement No Yes postponed Yes
    C1-122681 State alignment correction Ericsson, ST-Ericsson / Jan CR agreement No No withdrawn Yes
    C1-122682 State alignment correction Ericsson, ST-Ericsson / Jan CR agreement No No withdrawn Yes
    C1-122723 Additional guidance on use of 3xx responses Research in Motion/ Andrew CR agreement No No withdrawn Yes
    C1-122787 Handling of MM procedure during combined TAU procedure HTC CR agreement No No withdrawn Yes
    C1-122788 Handling of MM procedure during combined TAU procedure HTC CR agreement No No withdrawn Yes
    C1-122824 Correction on NAS signalling low priority overriding handling Huawei, HiSilicon CR agreement No No withdrawn Yes
    C1-122907 Changes to the security context handling at power on Qualcomm Incorporated/Shyamal CR agreement No No withdrawn Yes
    C1-122918 Discussion on draft-bakker-sipping-3gpp-ims-xml-body-handling Research In Motion UK Ltd. discussion discussion No Yes postponed No
    C1-122963 Reply LS on usage of XCAP for Voice over IMS discovery NTT DOCOMO o/g LS approval No No withdrawn Yes
    C1-122969 P-Charging-Function-Addresses header field operation Alcatel-Lucent / Keith Drage discussion discussion No Yes postponed No
    C1-123037 IMS trace deletion Vodafone CR agreement No Yes postponed No
    C1-123038 IMS trace deletion Vodafone CR agreement No Yes postponed No
    C1-123039 IMS trace deletion Vodafone CR agreement No Yes postponed No
    C1-123048 IANA registration of OMR parameters Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No
    C1-123049 IANA registration of OMR parameters Alcatel-Lucent / Keith Drage CR agreement Yes Yes postponed No
    C1-123444 (not allocated) nn other - Yes No withdrawn Yes
15
A.O.B.
16
Closing

Created: 2012-09-06 08:21     Last document: C1-123455