Agenda with allocated Tdocs
Created: 2010-11-25 15:39     Last document: S5-103374
Agenda |
Topic |
Tdoc |
Title |
Source |
Doc-type |
Doc-for |
Avail |
Treated |
Decision |
Wdrn |
Replaced-by |
Replaces |
1 Opening of the meeting
|
|
|
|
|
|
|
|
|
|
| 2 Approval of the agenda and registration of new documents S5-103000 |
Agenda |
WG Chairman |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| 3 IPR declaration
|
|
|
|
|
|
|
|
|
|
| 4 Meetings and activities reports
|
|
|
|
|
|
|
|
|
|
| 4.1 Last SA5 meeting report S5-103001 |
Report from last SA5 meeting |
MCC |
report |
approval |
Yes |
Yes |
approved |
No |
|
| 4.2 Last SA meeting report S5-103002 |
Report from last SA meeting |
WG Chairman |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 4.3 LS status S5-103068 |
LS_in on Status of Broadband Forum work on Policy Control |
BBF liaison on PIM 2010 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103079 |
LS_in on Release 10 NIMTC Conclusion |
S2-104432 (S5-102888 in CH) |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| 4.4 Inter-organizational communication reports S5-103065 |
Approved working procedure SA5-BBF |
WG Chairman |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| 4.5 Other reports
|
|
|
|
|
|
|
|
|
|
| 5 Cross-SWG issues at SA5 level
|
|
|
|
|
|
|
|
|
|
| 5.1 Administrative issues at SA5 level S5-103013 |
SA5 Working Procedures |
WG Chairman |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103014 |
SA5 Meeting Facility Requirements |
WG Chairman |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103015 |
Draft TS/TR Management Process |
WG Vice Chair |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103016 |
CR Quality Check |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103062 |
Agenda Leaders Meeting |
WG Chairman |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103063 |
Minutes Leaders Meeting |
WG Chairman |
report |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103064 |
SA-approved SA5 revised ToR |
WG Chairman |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103096 |
Virtual meeting process |
WG Chairman |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| 5.2 Meeting calendar S5-103012 |
SA5 Meeting Calendar |
WG Chairman |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| 5.3 Technical issues at SA5 level
|
|
|
|
|
|
|
|
|
|
| 5.4 Review of the 3GPP Work Plan S5-103018 |
TR 30.820 Project scheduling for SA5 Release 10 |
MCC |
draft TS/TR |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103019 |
SA5 3GPP Work Plan |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103020 |
Deliverables due for the NEXT SA Plenary |
MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| 6 OAM&P (Operations, Administration, Maintenance & Provisioning
|
|
|
|
|
|
|
|
|
|
| 6.1 OAM&P Plenary S5-103003 |
OAM Time Plan |
WG Chairman |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103004 |
OAM Detailed Report from LAST Meeting |
OAM SWG Chair |
report |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103005 |
OAM Executive Report from THIS Meeting |
OAM SWG Chair |
report |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103006 |
OAM Detailed Report from THIS Meeting |
OAM SWG Chair |
report |
approval |
No |
No |
to be provided post-meeting by SA5 Chair |
No |
|
| |
|
S5-103069 |
LS_in Reply (cc: SA5) on enhancing AS security |
R2-105204 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103072 |
RESUBMITTED LS_in on Multiple trace session |
R3-101768 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-103370 |
No |
S5-103255 |
| |
|
S5-103255 |
LS_out Reply to RAN3 on Multiple trace session (S5-103072 / R3-101768) |
Huawei |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-103370 |
No |
S5-103370 |
S5-103072 |
|
|
S5-103370 |
LS_out Reply to RAN3 on Multiple trace session (S5-103072 / R3-101768) |
Huawei |
o/g LS |
discussion |
No |
No |
for email Approval |
No |
| S5-103255 |
|
|
S5-103076 |
LS_in Reply on OAM security and OAM connection issues of Relay Nodes |
R3-102539 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103077 |
LS_in on OAM architecture aspects for RNs |
R3-102541 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-103256 |
No |
S5-103256 |
| |
|
S5-103256 |
LS_out Reply to RAN3 on OAM architecture aspects for RNs (S5-103077 / R3-102541) |
Ericsson |
o/g LS |
discussion |
No |
No |
for email Approval |
No |
|
| |
|
S5-103081 |
LS_in Reply on Security aspects of H(e)NB remediation |
S3-101123 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103082 |
LS_in on H(e)NB related LI requirement |
SA3LI10_056r2 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#75 Sorrento |
No |
|
| |
|
S5-103083 |
LS_in on New Root data model in TR-069 family of specifications |
BBF liaison TR-181i2 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103084 |
Status on NGMN Top OPE Recommendations |
WG Chairman |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103085 |
LS_in Reply on updated BBF documents and follow up to S5-102574 |
BBF liaison bbf2010_1095_02 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-103257 |
No |
S5-103257 |
| |
|
S5-103257 |
LS_out Reply on updated BBF documents and follow up to S5-102574 (S5-103085) |
ALU |
o/g LS |
approval |
No |
No |
for email Approval |
No |
|
| |
|
S5-103086 |
Report Ad Hoc Meeting on Management of Converged Networks |
WG Chairman |
report |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103087 |
LS_in on RN E-CGI configuration by O&M |
R3-103091 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#75 Sorrento |
No |
|
| |
|
S5-103088 |
LS_in on mapping Uu bearers to Un bearers for relays |
R2-105996 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103100 |
Style rule for IOC name and attribute name |
Ericsson |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103101 |
Request for guidance from 3GPP TSG SA on issues related to cooperation with TM Forum (draft) |
WG Chairman |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103102 |
3GPP Copyright License Questionnaire |
TMF request |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103252 |
LS_in on OAM security and OAM connection issues of Relay Nodes |
S3-101119 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103260 |
Report of E-Meeting SA5#74-E, 26 - 28 Oct 2010 on OAM CRs |
SWG-OAM Chair |
report |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103273 |
OAM CRs agreed as reflected by the E-Meeting Report of SA5#74-E, 26 - 28 Oct 2010 |
MCC |
CR pack |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103276 |
LS_out to BBF on addition of two attributes for ETWS in TR-196 |
SA5 |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
|
| 6.1.1 SA2-SA5 on IMS Load Balancing (Jean Michel Cornily) S5-103144 |
LS_in on IMS Load Balancing |
S2-104383 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-103362 |
No |
S5-103362 |
| |
|
S5-103362 |
LS_out Reply to SA2 on IMS Load Balancing (S5-103144 / S2-104383) |
SA5 |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103258 |
New WID proposal on IMS Load Balancing (based on LS_in S5-103144 / S2-104383) |
China Mobile |
new WID |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103259 |
Report of the SA2-SA5 joint session on IMS Load Balancing (based on LS_in S5-103144 / S2-104383) |
Orange |
report |
discussion |
Yes |
Yes |
noted |
No |
|
| 6.2 New OAM&P Work Item proposals
|
|
|
|
|
|
|
|
|
|
| 6.3 OAM&P Maintenance and Rel-10 small Enhancements S5-103021 |
Agenda OAM&P Maintenance and Rel-10 small Enhancements |
OAM SWG Chair |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103154 |
Methodology for relationship attributes |
Ericsson |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103367 |
LS_out to CT4 addition of Trace interface linked to CR in S5-103306 etc. |
ZTE, NSN |
o/g LS |
discussion |
No |
No |
withdrawn |
Yes |
|
| 6.3.1 Release 7
|
|
|
|
|
|
|
|
|
|
| 6.3.2 Release 8 S5-103136 |
CR R8 32.425 Correct L3 message and cleanup |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103138 |
CR R9 32.425 Correct L3 message and cleanup |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103139 |
CR R10 32.425 Correct L3 message and cleanup |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103161 |
CR R8 32.531 Add missing requirement to indicate availability of new SW |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103162 |
CR R9 32.531 Add missing requirement to indicate availability of new SW |
Nokia Siemens Networkd |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103163 |
CR R10 32.531 Add missing requirement to indicate availability of new SW |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103164 |
CR R8 32.532 Correct requirements traceability of notifyNewSwAvailability |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
revised to S5-103291 |
No |
S5-103291 |
| |
|
S5-103291 |
CR R8 32.532 Correct requirements traceability of notifyNewSwAvailability |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103164 |
|
|
S5-103165 |
CR R9 32.532 Correct requirements traceability of notifyNewSwAvailability |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
revised to S5-103292 |
No |
S5-103292 |
| |
|
S5-103292 |
CR R9 32.532 Correct requirements traceability of notifyNewSwAvailability |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103165 |
|
|
S5-103166 |
CR R10 32.532 Correct requirements traceability of notifyNewSwAvailability |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
revised to S5-103293 |
No |
S5-103293 |
| |
|
S5-103293 |
CR R10 32.532 Correct requirements traceability of notifyNewSwAvailability |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103166 |
|
|
S5-103294 |
CR R8 32.533 Align support qualifier of notifyNewSwAvailability with 32.532 |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103295 |
CR R9 32.533 Align support qualifier of notifyNewSwAvailability with 32.532 |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103296 |
CR R9 32.537 Align support qualifier of notifyNewSwAvailability with 32.532 |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103297 |
CR R10 32.536 Align support qualifier of notifyNewSwAvailability with 32.532 |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103306 |
CR R8 32.422 Add missing interfaces S3, S4 and S6d in the interface table of SGSN |
ZTE |
CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103307 |
CR R9 32.422 Add missing interfaces S3, S4 and S6d in the interface table of SGSN |
ZTE |
CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103308 |
CR R10 32.422 Add missing interfaces S3, S4 and S6d in the interface table of SGSN |
ZTE |
CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103328 |
CR R8 32.423 Add missing interfaces S3, S4 and S6d trace record content of SGSN |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103329 |
CR R9 32.423 Add missing interfaces S3, S4 and S6d trace record content of SGSN |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103330 |
CR R10 32.423 Add missing interfaces S3, S4 and S6d trace record content of SGSN |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| 6.3.3 Release 9 S5-103094 |
CR R9 32.592 Correct errors in spec references, table number references, valid values |
ETRI |
CR |
agreement |
Yes |
Yes |
revised to S5-103282 |
No |
S5-103282 |
| |
|
S5-103282 |
CR R9 32.592 Correct errors in spec references, table number references, valid values |
ETRI |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103094 |
|
|
S5-103095 |
CR R10 32.592 Correct errors in spec references, table number references, valid values |
ETRI |
CR |
agreement |
Yes |
Yes |
revised to S5-103283 |
No |
S5-103283 |
| |
|
S5-103283 |
CR R10 32.592 Correct errors in spec references, table number references, valid values |
ETRI |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103095 |
|
|
S5-103114 |
CR R9 32.522 on target hierarchy |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103118 |
CR R9 32.422 Refine the trace conflict resolution to restrict only one TRSR in E-UTRAN (S5e100057 from #74-E) |
Motorola |
CR |
agreement |
Yes |
Yes |
revised to S5-103286 |
No |
S5-103286 |
| |
|
S5-103286 |
CR R9 32.422 Refine the trace conflict resolution to restrict only one TRSR in E-UTRAN (S5e100057 from #74-E) |
Motorola |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103118 |
|
|
S5-103119 |
CR R10 32.422 Refine the trace conflict resolution to restrict only one TRSR in E-UTRAN (S5e100058 from #74-E) |
Motorola |
CR |
agreement |
Yes |
Yes |
revised to S5-103361 |
No |
S5-103361 |
| |
|
S5-103361 |
CR R10 32.422 Refine the trace conflict resolution to restrict only one TRSR in E-UTRAN (S5e100058 from #74-E) |
Motorola |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103119 |
|
|
S5-103147 |
SuM CR R9 32.172 Correcting a misalignment and a fault introduced by S5-100707 |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103148 |
SuM CR R9 32.175 Correcting a misalignment and a fault introduced by S5-100707 - Align with 32.172 SuM NRM IS |
Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103192 |
CR R9 32.612 Change description way of the scope of Bulk CM management specification |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103194 |
CR R9 32.522 Correction on support qualifiers of SONControl attributes |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103195 |
CR R9 32.523 Correction on support qualifiers of SONControl attributes |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103228 |
CR R9 32.732 Correcting CscfFunction definition of IMS NRM - Align with SA2 TS 23.002 |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-103298 |
No |
S5-103298 |
| |
|
S5-103298 |
CR R9 32.732 Correcting CscfFunction definition of IMS NRM - Align with SA2 TS 23.002 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103228 |
|
|
S5-103229 |
CR R9 32.733 Correcting CscfFunction definition of IMS NRM - Align with TS 32.732 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103299 |
CR R9 32.733 Correcting CscfFunction definition of IMS NRM - Align with TS 32.732 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103230 |
CR R9 32.735 Correcting CscfFunction definition of IMS NRM - Align with TS 32.732 |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-103300 |
No |
S5-103300 |
| |
|
S5-103300 |
CR R9 32.735 Correcting CscfFunction definition of IMS NRM - Align with TS 32.732 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103230 |
|
|
S5-103231 |
CR R10 32.732 Correcting CscfFunction definition of IMS NRM - Align with SA2 TS 23.002 |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-103304 |
No |
S5-103304 |
| |
|
S5-103304 |
CR R10 32.732 Correcting CscfFunction definition of IMS NRM - Align with SA2 TS 23.002 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103231 |
|
|
S5-103232 |
CR R10 32.736 Correcting CscfFunction definition of IMS NRM - Align with TS 32.732 |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-103305 |
No |
S5-103305 |
| |
|
S5-103305 |
CR R10 32.736 Correcting CscfFunction definition of IMS NRM - Align with TS 32.732 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103232 |
|
|
S5-103233 |
CR R9 32.582 Addition of Service Area For Broadcast parameter |
NEC, DoCoMo, Alcatel-Lucent, Qualcomm |
CR |
agreement |
Yes |
Yes |
revised to S5-103277 |
No |
S5-103277 |
| |
|
S5-103277 |
CR R9 32.582 Addition of Service Area For Broadcast parameter |
NEC, DoCoMo, Alcatel-Lucent, Qualcomm |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103233 |
|
|
S5-103234 |
CR R10 32.582 Addition of Service Area For Broadcast parameter |
NEC, DoCoMo, Alcatel-Lucent, Qualcomm |
CR |
agreement |
Yes |
Yes |
revised to S5-103278 |
No |
S5-103278 |
| |
|
S5-103278 |
CR R10 32.582 Addition of Service Area For Broadcast parameter |
NEC, DoCoMo, Alcatel-Lucent, Qualcomm |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103234 |
|
|
S5-103235 |
CR R9 32.592 Addition of Emergency Area ID parameter |
NEC, DoCoMo, Alcatel-Lucent, Qualcomm, Technicolor |
CR |
agreement |
Yes |
Yes |
revised to S5-103279 |
No |
S5-103279 |
| |
|
S5-103279 |
CR R9 32.592 Addition of Emergency Area ID parameter |
NEC, DoCoMo, Alcatel-Lucent, Qualcomm, Technicolor |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103235 |
|
|
S5-103236 |
CR R10 32.592 Addition of Emergency Area ID parameter |
NEC, DoCoMo, Alcatel-Lucent, Qualcomm, Technicolor |
CR |
agreement |
Yes |
Yes |
revised to S5-103280 |
No |
S5-103280 |
| |
|
S5-103280 |
CR R10 32.592 Addition of Emergency Area ID parameter |
NEC, DoCoMo, Alcatel-Lucent, Qualcomm, Technicolor |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103236 |
6.3.4 Release 10 S5-103103 |
CR R9 32.522 Allow DM centralized architecture for Hand-over parameter optimization - Align with 32.500 |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
revised to S5-103284 |
No |
S5-103284 |
| |
|
S5-103284 |
CR R10 32.522 Allow EM centralized architecture for Hand-over parameter optimization - Align with 32.500 |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103103 |
|
|
S5-103117 |
CR R10 32.522 Split of SON control modelling (S5e100061 from SA5 #74-E) |
Motorola |
CR |
agreement |
Yes |
Yes |
rejected |
No |
|
| |
|
S5-103126 |
CR R10 32.752 Addition of maxNbrActDedicatedEpsBearer attribute |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103127 |
CR R10 32.756 Addition of maxNbrActDedicatedEpsBearer attribute |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103129 |
CR R10 32.732 Addition of maxNbrSessions attribute |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103130 |
CR R10 32.736 Addition of maxNbrSessions attribute |
China Mobile |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103149 |
CR R10 32.642 Correcting the definition of AssociatedWith1 |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-103327 |
No |
S5-103327 |
| |
|
S5-103327 |
CR R10 32.642 Correcting the definition of AssociatedWith1 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103149 |
|
|
S5-103150 |
CR R10 32.712 Correcting the name of AssociatedWith1 - Align with 32.642 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103151 |
CR R10 32.716 Correcting the attribute type and schema definition - Align with 32.712 IS |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103152 |
CR R10 32.531 Adding requirement for NotifyNewSwAvailability |
ZTE |
CR |
agreement |
Yes |
Yes |
rejected |
No |
|
| |
|
S5-103153 |
CR R10 32.532 Correcting the traced requirement of NotifyNewSwAvailability - Align with 32.531 |
ZTE |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103176 |
CR R10 32.425 Add measurements for radio coverage, radio/transport/hardware resource utilization, handover triggering, RACH performance |
Vodafone, AT&T, Orange, Telecom Italia |
CR |
agreement |
Yes |
Yes |
revised to S5-103253 |
No |
S5-103253 |
| |
|
S5-103253 |
CR R10 32.425 Adding measurements for radio coverage, radio/transport/hardware resource utilization, handover triggering, RACH performance |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
discussion |
Yes |
Yes |
noted |
No |
| S5-103176 |
|
|
S5-103177 |
CR R10 32.762 Add attributes to EUtranGenericCell and EUtranRelation IOC |
Vodafone, AT&T, Orange, Telecom Italia |
CR |
agreement |
Yes |
Yes |
revised to S5-103253 |
No |
S5-103254 |
| |
|
S5-103254 |
CR R10 32.762 Add attributes to EUtranGenericCell and EUtranRelation IOC |
Vodafone, AT&T, China Mobile, China Unicom, Deutsche Telekom, Orange, Telecom Italia, Verizon Wireless |
CR |
discussion |
Yes |
Yes |
noted |
No |
| S5-103177 |
|
|
S5-103185 |
CR R10 32.762 allow access class for a cell |
Alcatel-Lucent, Orange, AT&T |
CR |
agreement |
Yes |
Yes |
revised to S5-103324 |
No |
S5-103324 |
| |
|
S5-103324 |
PARKED CR from SA5#71, May 2010, Montreal: CR R10 32.762 Add an attribute to IOC EUtranGenericCell to set allowed access class per cell |
Orange, Alcatel-Lucent, AT&T |
CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103185 |
|
|
S5-103186 |
CR R10 32.766 allow access class for a cell |
Alcatel-Lucent, Orange, AT&T |
CR |
approval |
Yes |
Yes |
revised to S5-103321 |
No |
S5-103321 |
| |
|
S5-103321 |
CR R10 32.766 allow access class for a cell |
Alcatel-Lucent, Orange, AT&T |
CR |
approval |
Yes |
Yes |
revised to S5-103365 |
No |
S5-103365 |
S5-103186 |
|
|
S5-103365 |
CR R10 32.766 allow access class for a cell |
Alcatel-Lucent, Orange, AT&T |
CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103321 |
|
|
S5-103323 |
PARKED CR from SA5#71, May 2010, Montreal: CR R10 32.761 Add requirement to restrict access to cells |
Orange, AT&T, Alcatel-Lucent |
CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103188 |
CR R10 32.592 Add RSSI parameter to HeNB configuration parameters |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-103281 |
No |
S5-103281 |
| |
|
S5-103281 |
CR R10 32.592 Add RSSI parameter to HeNB configuration parameters |
Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103188 |
|
|
S5-103193 |
CR R10 32.616 Corrections to Bulk CM IRP SS - Align with 32.612 |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103218 |
CR R10 32.761 Adding Relay and Donor eNodeB |
China Mobile, Ericsson |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103219 |
CR R10 32.762 Adding Relay and Donor eNodeB |
China Mobile, Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-103287 |
No |
S5-103287 |
| |
|
S5-103287 |
CR R10 32.762 Adding Relay and Donor eNodeB NRM |
China Mobile, Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-103366 |
No |
S5-103366 |
S5-103219 |
|
|
S5-103366 |
CR R10 32.762 Adding Relay and Donor eNodeB NRM |
China Mobile, Ericsson |
CR |
agreement |
No |
No |
for email Approval |
No |
| S5-103287 |
|
|
S5-103220 |
CR R10 32.766 Adding Relay and Donor eNodeB |
China Mobile, Ericsson |
CR |
agreement |
Yes |
No |
for email Approval |
No |
|
| |
|
S5-103222 |
CR R10 32.111-2 Add alarmChangedTime to the output parameters of getAlarmList operation |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-103288 |
No |
S5-103288 |
| |
|
S5-103288 |
CR R10 32.111-2 Add alarmChangedTime to the output parameters of getAlarmList operation |
ZTE |
CR |
agreement |
Yes |
No |
for email Approval |
No |
| S5-103222 |
|
|
S5-103223 |
CR R10 32.111-6 Add alarmChangedTime parameter to the definition of a Structured Event of AlarmInformationSeq - Align with 32.111-2 IS |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-103289 |
No |
S5-103289 |
| |
|
S5-103289 |
CR R10 32.111-6 Add alarmChangedTime parameter to the definition of a Structured Event of AlarmInformationSeq - Align with 32.111-2 IS |
ZTE |
CR |
agreement |
Yes |
No |
for email Approval |
No |
| S5-103223 |
|
|
S5-103224 |
CR R10 32.421 Add requirements for trace data of S13, S13' interfaces |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103225 |
CR R10 32.422 Add interfaces S13 (MME trace) and S13' (SGSN trace) - Align with 32.421 |
ZTE |
CR |
agreement |
Yes |
Yes |
revised to S5-103290 |
No |
S5-103290 |
| |
|
S5-103290 |
CR R10 32.422 Add interfaces S13 (MME trace) and S13' (SGSN trace) - Align with 32.421 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103225 |
|
|
S5-103226 |
CR R10 32.423 Addition of trace record - Align with 32.421 and 32.422 |
ZTE |
CR |
agreement |
Yes |
Yes |
approved |
No |
|
| 6.4 OAM&P 10 Network Infrastructure Management (460032)
|
|
|
|
|
|
|
|
|
|
| 6.4.1 OAM&P for LIPA_SIPTO (450040) Zou Lan S5-103022 |
Agenda OAM&P for LIPA_SIPTO (450040) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103196 |
Rel-10 SIPTO impact on OAM specifications |
Huawei, Alcatel-Lucent |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103197 |
Rel-10 LIPA impact on OAM specifications |
Huawei, Alcatel-Lucent |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103198 |
CR Rel-10 32.642 Add SIPTOSupportted attribute to RNCFunction |
Huawei, Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-103347 |
No |
S5-103347 |
| |
|
S5-103347 |
CR Rel-10 32.642 Add SIPTOSupportted attribute to RNCFunction |
Huawei, Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103198 |
|
|
S5-103199 |
CR Rel-10 32.646 Add siptoSupported attribute to RNCFunction – Align with 32.642 IS |
Huawei, Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
revised to S5-103348 |
No |
S5-103348 |
| |
|
S5-103348 |
CR Rel-10 32.646 Add siptoSupported attribute to RNCFunction – Align with 32.642 IS |
Huawei, Alcatel-Lucent |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103199 |
|
|
S5-103041 |
Minutes OAM&P for LIPA_SIPTO (450040) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.4.2 Common RAT Network Resource Model (460033) Robert Petersen S5-103023 |
Agenda Common RAT Network Resource Model (460033) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103174 |
Paper on Generic RAN NRM (common RAT NRM) re EUTRAN, GERAN and UTRAN |
Ericsson |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103238 |
Draft TS 32.791 v011 Generic RAN NRM IRP; Requirements |
Ericsson |
draft TS/TR |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103239 |
pCR 32.792 Add IOCs etc |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103341 |
No |
S5-103341 |
| |
|
S5-103341 |
pCR 32.792 Add IOCs etc |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103239 |
|
|
S5-103243 |
Presentation of 32.791 v100 for SA#50 Information and Approval |
Ericsson |
other |
discussion |
Yes |
Yes |
revised to S5-103342 |
No |
S5-103342 |
| |
|
S5-103342 |
Presentation of TS 32.791 v100 (Generic RAN NRM IRP; Requirements) for SA#50 Information |
Ericsson |
other |
discussion |
Yes |
Yes |
approved |
No |
| S5-103243 |
|
|
S5-103249 |
NSN view on Common RAT scope |
Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103042 |
Minutes Common RAT Network Resource Model (460033) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.4.3 IRP Solution Set Specification Organization Improvements (470035) Jörg Schmidt S5-103024 |
Agenda IRP Solution Set Specification Organization Improvements (470035) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103200 |
Revised WID SP-100294 on IRP Solution Set Specification Organisation Improvements |
SA5 OAM |
revised WID |
agreement |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103201 |
Draft TS 32.526 SON Policy NRM IRP SS |
Huawei |
draft TS/TR |
agreement |
Yes |
Yes |
revised to S5-103351 |
No |
S5-103351 |
| |
|
S5-103351 |
Draft TS 32.526 SON Policy NRM IRP SS |
Huawei |
draft TS/TR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103201 |
|
|
S5-103202 |
Presentation of TS 32.526 v100 (SON Policy NRM IRP; SS definitions) for SA#50 Information and Approval |
Huawei |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103043 |
Minutes IRP Solution Set Specification Organization Improvements (470035) |
Rapporteur |
report |
approval |
No |
No |
to be provided post-meeting |
No |
|
| 6.4.4 Service Oriented Architecture (SOA) for IRP continuation (470036) Jörg Schmidt S5-103025 |
Agenda Service Oriented Architecture (SOA) for IRP continuation (470036) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103044 |
Minutes Service Oriented Architecture (SOA) for IRP continuation (470036) |
Rapporteur |
report |
approval |
No |
No |
withdrawn |
Yes |
|
| 6.4.5 IRP Overview, Profiles, Usage Guide (480042) Jörg Schmidt S5-103026 |
Agenda IRP Overview, Profiles, Usage Guide (480042) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103250 |
pCR on IRP Overview Input |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103343 |
No |
S5-103343 |
| |
|
S5-103343 |
pCR on IRP Overview Input |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103250 |
|
|
S5-103251 |
pCR 32.10x Material for Annex A (IRP Packaging Suggestions) |
Orange |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103331 |
Presentation of TS 32.103 v100 (IRP Overview and Usage Guide) for SA#50 Information |
Nokia Siemens Networks |
other |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103045 |
Minutes IRP Overview, Profiles, Usage Guide (480042) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.5 OAM&P 10 Performance Management (470039)
|
|
|
|
|
|
|
|
|
|
| 6.5.1 Key Performance Indicators (KPIs) for IMS (470040) Li Jian S5-103027 |
Agenda Key Performance Indicators (KPIs) for IMS (470040) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103128 |
CR R10 32.409 Addition of mean number of simultaneous online and answered sessions |
China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-103334 |
No |
S5-103334 |
| |
|
S5-103334 |
CR R10 32.409 Addition of mean number of simultaneous online and answered sessions |
China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103128 |
|
|
S5-103131 |
pCR on update Session Setup Time KPI definition |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103140 |
pCR 32.454 Correct Call Drop Rate |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103337 |
No |
S5-103337 |
| |
|
S5-103337 |
pCR 32.454 Correct Call Drop Rate |
Ericsson |
pseudo CR |
approval |
No |
No |
for email Approval |
No |
| S5-103140 |
|
|
S5-103141 |
CR R10 32.409 Add dropped session measurements |
Ericsson |
CR |
agreement |
Yes |
Yes |
revised to S5-103338 |
No |
S5-103338 |
| |
|
S5-103338 |
CR R10 32.409 Add dropped session measurements |
Ericsson |
CR |
agreement |
No |
No |
for email Approval |
No |
| S5-103141 |
|
|
S5-103142 |
pCR 32.454 on Correct Session Establishment Success Rate |
Ericsson, China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103143 |
CR R10 32.409 Split session establishment measurements |
Ericsson, China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-103339 |
No |
S5-103339 |
| |
|
S5-103339 |
CR R10 32.409 Split session establishment measurements |
Ericsson, China Mobile |
CR |
agreement |
No |
No |
for email Approval |
No |
| S5-103143 |
|
|
S5-103325 |
Presentation of TS 32.454 v100 (KPI for IMS) for SA#50 Information |
China Mobile |
other |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103046 |
Minutes Key Performance Indicators (KPIs) for IMS (470040) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.5.2 Key Performance Indicators (KPIs) for EPC (470041) Li Jian S5-103028 |
Agenda Key Performance Indicators (KPIs) for EPC (470041) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103125 |
CR R10 32.426 Modification of sub counters of EPS attach related measurements |
China Mobile |
CR |
agreement |
Yes |
Yes |
revised to S5-103333 |
No |
S5-103333 |
| |
|
S5-103333 |
CR R10 32.426 Modification of sub counters of EPS attach related measurements |
China Mobile |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103125 |
|
|
S5-103133 |
pCR on Dedicated bearer set-up time by MME (Mean) |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103335 |
No |
S5-103335 |
| |
|
S5-103335 |
pCR on Dedicated bearer set-up time by MME (Mean) |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103133 |
|
|
S5-103134 |
pCR on Dedicated EPS Bearer Creation Success Rate |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103336 |
No |
S5-103336 |
| |
|
S5-103336 |
pCR on Dedicated EPS Bearer Creation Success Rate |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103134 |
|
|
S5-103135 |
pCR on Tracking area update success rate |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103137 |
pCR on service request success ratio |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103326 |
Presentation of TS 32.455 v100 (KPI for EPC) for SA#50 Information |
China Mobile |
other |
approval |
No |
Yes |
approved |
No |
|
| |
|
S5-103352 |
CR R10 32.426 Modification of trigger message of total successful EPS service request measurement |
China Mobile |
CR |
approval |
Yes |
Yes |
revised to S5-103364 |
No |
S5-103364 |
| |
|
S5-103364 |
CR R10 32.426 Modification of trigger message of total successful EPS service request measurement |
China Mobile |
CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103352 |
|
|
S5-103047 |
Minutes Key Performance Indicators (KPIs) for EPC (470041) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.5.3 Management of UE based network performance measurements (470042) Zou Lan S5-103029 |
Agenda Management of UE based network performance measurements (470042) |
Rapporteur (Zou Lan) |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103104 |
Result from MDT conference calls |
Nokia Siemens Networks (Rapporteur Bodog Gyula) |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103070 |
LS_in Reply on MDT configuration for IDLE mode UE |
R2-105227 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103178 |
pCR 32.422 for MDT, 'Use of paging for configuring logged MDT' |
Ericsson, Alcatel-Lucent, Nokia Siemens Networks, ZTE |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103261 |
No |
S5-103261 |
| |
|
S5-103261 |
pCR 32.422 for MDT, 'Use of paging for configuring logged MDT' |
Ericsson, Alcatel-Lucent, Nokia Siemens Networks, ZTE |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103178 |
|
|
S5-103071 |
LS_in on Interaction with Trace for MDT |
R2-105267 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-103371 and S5-103373 |
No |
S5-103262 |
| |
|
S5-103123 |
pCR on Alternative way for getting the IP address of TCE |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103262 |
LS_out Reply to RAN2 on Interaction with Trace for MDT (S5-103071 / R2-105267) |
Huawei |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-103371 |
No |
S5-103371 |
| |
|
S5-103371 |
LS_out Reply to RAN2 on Interaction with Trace for MDT (S5-103071 / R2-105267) |
Huawei |
o/g LS |
discussion |
No |
No |
for email Approval |
No |
| S5-103262 |
|
|
S5-103107 |
LS_in Reply to S5-102568 = R2-105303 and S5-102079 = R2-104241 on MDT related UE measurement clarification |
R2-106021 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-103372 |
No |
S5-103372 |
| |
|
S5-103263 |
LS_out Reply on MDT related UE measurement clarification (S5-103107 / R2-106021) |
ALU |
o/g LS |
approval |
Yes |
Yes |
revised to S5-103372 |
No |
S5-103372 |
| |
|
S5-103372 |
LS_out Reply on MDT related UE measurement clarification (S5-103107 / R2-106021) |
ALU |
o/g LS |
approval |
No |
No |
for email Approval (send out after super CR agreed) |
No |
| S5-103263 |
|
|
S5-103108 |
LS_in on Status of MDT Stage 2 Design in RAN2 |
R2-106025 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103090 |
LS_in Reply to S5-102526 = R2-105309 on Location Information for MDT |
R2-106020 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103105 |
pCR for MDT stage 2 description for UMTS |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103264 |
No |
S5-103264 |
| |
|
S5-103206 |
pCR 32.422 Add UTRAN activation mechanisms for UE measurement management |
Huawei |
pseudo CR |
approval |
Yes |
No |
revised to S5-103264 |
No |
S5-103264 |
| |
|
S5-103264 |
pCR on MDT stage 2 description for UMTS |
Nokia Siemens Networks, Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103105, S5-103206 |
|
|
S5-103120 |
Discussion Paper on way forward to include RF measurements in MDT |
Motorola |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103121 |
LS_out on Inclusion of RF measurements into MDT report |
Motorola |
o/g LS |
approval |
Yes |
Yes |
revised to S5-103274 |
No |
S5-103274 |
| |
|
S5-103274 |
LS_out from SA5 to RAN2 (cc: RAN1) on inclusion of RF measurements into MDT report |
SA5 |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
| S5-103121 |
|
|
S5-103122 |
pCR on MDT configuration parameters |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103265 |
No |
S5-103265 |
| |
|
S5-103265 |
pCR on MDT configuration parameters |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103122 |
|
|
S5-103179 |
pCR 32.422 and 32.442 for MDT, 'MDT trace parameters' |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103266 |
No |
S5-103266 |
| |
|
S5-103191 |
pCR on Cleanup and add clarification to input parameters for CTT |
Alcatel-Lucent |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103266 |
No |
S5-103266 |
| |
|
S5-103205 |
pCR 32.422 Configurations of UE based performance measurements |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103266 |
No |
S5-103266 |
| |
|
S5-103266 |
pCR 32.422 and 32.442 for MDT, 'MDT trace parameters' |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103179, S5-103191, S5-103205 |
|
|
S5-103180 |
Handling of MDT trace context in the network |
Ericsson |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103181 |
pCR 32.422 for MDT, 'MDT trace deactivation mechanisms' |
Ericsson, Alcatel-Lucent, Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103182 |
pCR to shadow TS 32.422 for MDT, 'MDT trace recording session starting/stopping mechanisms' |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103267 |
No |
S5-103267 |
| |
|
S5-103124 |
pCR on Handling roaming scenarios in MDT |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103267 |
No |
S5-103267 |
| |
|
S5-103267 |
pCR to shadow TS 32.422 for MDT, “MDT trace recording session starting/stopping mechanisms” and Handling roaming scenarios in MDT |
Ericsson, Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103182, S5-103124 |
|
|
S5-103183 |
RAN OAM support for UE measurements collection |
Motorola, Vodafone |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103184 |
CR R10 32.422 Adding Mechanisms for IMSI or IMEI based MDT data collection in E-UTRAN |
Motorola, Vodafone |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103187 |
pCR on UE location with measurements |
Alcatel-Lucent |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103189 |
pCR on UE measurement collection co ordination |
Alcatel-Lucent |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103268 |
No |
S5-103268 |
| |
|
S5-103268 |
pCR on UE measurement collection co ordination |
Alcatel-Lucent |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103189 |
|
|
S5-103190 |
pCR on MDT configuration propagation |
Alcatel-Lucent |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103269 |
No |
S5-103269 |
| |
|
S5-103269 |
pCR on MDT configuration propagation |
Alcatel-Lucent |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103190 |
|
|
S5-103203 |
pCR 32.422 on control plane UE measurement management procedures |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103270 |
No |
S5-103270 |
| |
|
S5-103270 |
pCR 32.422 on control plane UE measurement management procedures |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103203 |
|
|
S5-103204 |
pCR 32.442 on MDT configurations from itf-N |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103303 |
No |
S5-103303 |
| |
|
S5-103303 |
pCR 32.442 on MDT configurations from itf-N |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103204 |
|
|
S5-103227 |
pCR 32.422 Add UE Capability to trace control and configuration parameters |
ZTE |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103272 |
No |
S5-103272 |
| |
|
S5-103272 |
pCR 32.422 Add UE Capability to trace control and configuration parameters |
ZTE |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103227 |
|
|
S5-103237 |
RAN OAM support for UE measurements configuration and collection |
Ericsson, Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103240 |
pCR on Avoiding MDT re-activation |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103271 |
LS_out Reply from SA5 to RAN2 on UE capabilities (S5-103071 / R2-105267) |
Qualcomm |
o/g LS |
approval |
Yes |
Yes |
revised to S5-103373 |
No |
S5-103373 |
| |
|
S5-103373 |
LS_out Reply from SA5 to RAN2 on UE capabilities (S5-103071 / R2-105267) |
SA5 |
o/g LS |
approval |
Yes |
Yes |
approved |
No |
| S5-103271 |
|
|
S5-103285 |
LS_in from SA3 to RAN2, SA1 (cc: SA5) on Review of MDT design and reply LS on Security Issues with Logged MDT |
S3-101401 |
i/c LS |
discussion |
Yes |
Yes |
withdrawn |
Yes |
|
| |
|
S5-103301 |
LS_out to CT4, RAN3, RAN2 (send out the shadow TS) |
Nokia Siemens Networks |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-103319 |
No |
S5-103319 |
| |
|
S5-103319 |
LS_out from SA5 to RAN2, RAN3, CT4 on MDT Stage 2 functionality |
SA5 |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-103301 |
|
|
S5-103302 |
Revised shadow TS 32.422 |
Nokia Siemens Networks |
draft TS/TR |
discussion |
Yes |
Yes |
revised to S5-103318 |
No |
S5-103318 |
| |
|
S5-103318 |
Revised shadow TS 32.422 |
Nokia Siemens Networks |
draft TS/TR |
discussion |
Yes |
Yes |
approved |
No |
| S5-103302 |
|
|
S5-103315 |
Super CR introducing MDT in 32.422 |
Nokia Siemens Networks |
CR |
approval |
No |
No |
for email Approval |
No |
|
| |
|
S5-103363 |
LS_out from SA5 to RAN2 on managing RLF reporting within MDT |
Nokia Siemens Networks |
o/g LS |
approval |
Yes |
No |
for email Approval |
No |
|
| |
|
S5-103048 |
Minutes Management of UE based network performance measurements (470042) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.5.4 3G HNB and LTE HeNB Subsystem performance measurements (470043) Chen Gang S5-103030 |
Agenda 3G HNB and LTE HeNB Subsystem performance measurements (470043) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103217 |
pCR on Add handover related Performance measurements to 32.453 |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103340 |
No |
S5-103340 |
| |
|
S5-103340 |
pCR on Add handover related Performance measurements to 32.453 |
China Mobile |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103217 |
|
|
S5-103221 |
WI Exception 3G Home NodeB Gateway and LTE Home eNodeB Gateway Performance Measurement |
China Mobile |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103049 |
Minutes 3G HNB and LTE HeNB Subsystem performance measurements (470043) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.6 OAM&P 10 Self-Organizing Networks (SON) - OAM aspects (460034)
|
|
|
|
|
|
|
|
|
|
| 6.6.1 SON Self-optimization management continuation (460035) Zou Lan S5-103031 |
Agenda SON Self-optimization management continuation (460035) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103073 |
LS_in on Information on the way forward concerning CCO solution |
R3-102479 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103074 |
LS_in Reply on Configuration Parameter Ranges for MRO |
R3-102518 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103089 |
LS_in Reply on S5-102476 = R2-105302 on Access Delay estimation for RACH Optimization |
R2-106011 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103156 |
Managing SON targets |
Nokia Siemens Networks |
other |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103157 |
CR R9 32.522 Allow NM centralized architecture for Hand-over parameter optimization - Align with 32.500 |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103208 |
pCR RACH optimization mgmt |
Huawei, Ericsson |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103345 |
No |
S5-103345 |
| |
|
S5-103345 |
pCR RACH optimization mgmt |
Huawei, Ericsson |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103208 |
|
|
S5-103209 |
Coordination among COC, ES and other self-optimization functions |
Huawei |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103210 |
CR R10 32.521 Add missing requirements for CCO |
Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-103344 |
No |
S5-103344 |
| |
|
S5-103344 |
CR R10 32.521 Add requirements for CCO |
Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103210 |
|
|
S5-103211 |
pCR on Proposal for capacity and coverage optimization |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103346 |
No |
S5-103346 |
| |
|
S5-103346 |
pCR on Proposal for capacity and coverage optimization |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103211 |
|
|
S5-103241 |
Overview of Coverage and Capacity Optimization |
Ericsson |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103050 |
Minutes SON Self-optimization management continuation (460035) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.6.2 SON Self-healing management (460036) Zhu Weihong S5-103032 |
Agenda SON Self-healing management (460036) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103212 |
pCR on Definition of cell outage |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103213 |
pCR on NRM for self-healing management |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103242 |
Presentation of 32.541 v200 to SA#50 for Approval |
ZTE |
other |
discussion |
Yes |
Yes |
revised to S5-103368 |
No |
S5-103368 |
| |
|
S5-103368 |
Presentation of TS 32.541 v200 (SON Self-healing concepts and requirements) for SA#50 Approval |
ZTE |
other |
discussion |
Yes |
Yes |
postponed to next meeting |
No |
| S5-103242 |
|
|
S5-103369 |
Revised WID SP-090757 on SON Self-healing management |
SA5 OAM |
revised WID |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103051 |
Minutes SON Self-healing management (460036) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.6.3 OAM aspects of Energy Saving in Radio Networks (470037) Clemens Suerbaum S5-103033 |
Agenda OAM aspects of Energy Saving in Radio Networks (470037) |
Rapporteur |
agenda |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103075 |
LS_in on Energy Saving Framework |
R3-102529 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-103374 |
No |
S5-103374 |
| |
|
S5-103309 |
LS_out Reply to RAN3 on Energy Saving Framework (S5-103075 / R3-102529) |
Nokia Siemens Networks |
o/g LS |
approval |
Yes |
Yes |
revised to S5-103374 |
No |
S5-103374 |
| |
|
S5-103374 |
LS_out Reply to RAN3 on Energy Saving Framework (S5-103075 / R3-102529) |
Nokia Siemens Networks |
o/g LS |
approval |
Yes |
No |
for email Approval |
No |
| S5-103309 |
|
|
S5-103091 |
pCR R10 32.551 Add new reference and abbreviations and correct errors in use cases |
ETRI |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103311 |
No |
S5-103311 |
| |
|
S5-103311 |
Merge of pCRs to 32.551 on cleanup proposal |
Huawei, Orange, ETRI |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103091, S5-103215 |
|
|
S5-103215 |
pCR 32.551 Inconsistency description cleanup |
Huawei, Orange |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103311 |
No |
S5-103311 |
| |
|
S5-103092 |
Results from virtual meeting #2 on ESM (20 October 2010) |
Nokia Siemens Networks |
report |
approval |
Yes |
Yes |
revised to S5-103310 |
No |
S5-103310 |
| |
|
S5-103310 |
Results from virtual meeting #2 on ESM (20 October 2010) |
Nokia Siemens Networks |
report |
approval |
Yes |
Yes |
approved |
No |
| S5-103092 |
|
|
S5-103111 |
CR R10 32.762 Introduction of attributes to reflect the status of Energy Saving |
Nokia Siemens Networks, ZTE, Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-103320 |
No |
S5-103320 |
| |
|
S5-103320 |
CR R10 32.762 Introduction of attributes to reflect the status of Energy Saving |
Nokia Siemens Networks, ZTE, Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103111 |
|
|
S5-103112 |
CR R10 32.762 NRM for ''candidate cells'' in energy saving management |
Nokia Siemens Networks, Huawei |
CR |
agreement |
Yes |
Yes |
noted |
No |
S5-103332 |
| |
|
S5-103113 |
CR R10 32.522 NRM for Energy Saving Management Policies and ESM switch |
Nokia Siemens Networks, Huawei |
CR |
agreement |
Yes |
Yes |
revised to S5-103317 |
No |
S5-103317 |
| |
|
S5-103317 |
CR R10 32.522 NRM for Energy Saving Management Policies and ESM switch |
Nokia Siemens Networks, Huawei |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103113 |
|
|
S5-103115 |
Presentation of 32.551 v200 to SA for approval |
Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
revised to S5-103316 |
No |
S5-103316 |
| |
|
S5-103316 |
Presentation of 32.551 v200 to SA for approval |
Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
revised to S5-103355 |
No |
S5-103355 |
S5-103115 |
|
|
S5-103355 |
Presentation of TS 32.551 v200 (Energy Saving Management; Concepts and requirements) for SA#50 Approval |
Nokia Siemens Networks |
other |
discussion |
No |
No |
for email Approval |
No |
| S5-103316 |
|
|
S5-103116 |
Status Document for ESM work item (UID_470037) |
Rapporteur |
WI status report |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103155 |
CR R10 32.762 NRM for ''candidate cells'' in energy saving management (including value ''partially'' |
Nokia Siemens Networks, NEC |
CR |
agreement |
Yes |
Yes |
revised to S5-103332 |
No |
S5-103332 |
| |
|
S5-103332 |
CR R10 32.762 NRM for ''candidate cells'' in energy saving management (including value ''partially'' |
Nokia Siemens Networks, NEC |
CR |
agreement |
Yes |
Yes |
revised to S5-103356 |
No |
S5-103356 |
S5-103155 |
|
|
S5-103356 |
CR R10 32.762 Adding NRM for candidate cells in Energy Saving Management (ESM) |
Nokia Siemens Networks, NEC |
CR |
agreement |
Yes |
Yes |
approved |
No |
| S5-103332 |
|
|
S5-103158 |
CR R10 32.762 Introduction of attribute to define a cell as not changeable |
Nokia Siemens Networks |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103167 |
pCR on Clarify outstanding issue: Remove hybrid from Rel-10 scope of ESM |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103168 |
pCR on Align requirements on thresholds (introduce time duration also to leave energy saving state) |
Nokia Siemens Networks, Vodafone |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103169 |
Multiplicity of ES operations |
Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103170 |
pCR on HO relation mandatory for energy saving? |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103171 |
pCR on Clarify requirement to not reconfigure cells |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103313 |
No |
S5-103313 |
| |
|
S5-103313 |
pCR on Clarify requirement to not reconfigure cells |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103171 |
|
|
S5-103172 |
pCR on Separating ESM information from EUtranGenericCell IOC |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised as CR to S5-103322 |
No |
S5-103322 |
| |
|
S5-103322 |
CR R10 32.766 on Separating ESM information from EUtranGenericCell IOC |
Nokia Siemens Networks |
CR |
approval |
Yes |
Yes |
revised to S5-103357 |
No |
S5-103357 |
S5-103172 |
|
|
S5-103357 |
CR R10 32.766 on Separating ESM information from EUtranGenericCell IOC |
Nokia Siemens Networks |
CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103322 |
|
|
S5-103175 |
pCR 32.551 Adding use cases on distributed ES solution |
NEC |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103314 |
No |
S5-103314 |
| |
|
S5-103314 |
pCR 32.551 Adding use cases on distributed ES solution |
NEC |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103358 |
No |
S5-103358 |
S5-103175 |
|
|
S5-103358 |
pCR 32.551 Adding use cases on distributed ES solution |
NEC |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103314 |
|
|
S5-103207 |
pCR on Coordination between ESM and COC |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103214 |
pCR 32.551 Add clarification on candidate cell |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103312 |
No |
S5-103312 |
| |
|
S5-103312 |
pCR 32.551 Add clarification on candidate cell |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103214 |
|
|
S5-103216 |
pCR on 32.551 ESM hybrid architecture |
Huawei |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103244 |
pCR 32.551 Add renewable energy resources related contents |
ZTE |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103052 |
Minutes OAM aspects of Energy Saving in Radio Networks (470037) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.7 OAM&P 10 Subscription Management (SuM) evolution (470038) Leo Yang S5-103034 |
Agenda OAM&P 10 Subscription Management (SuM) evolution (470038) |
Rapporteur |
agenda |
approval |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-103145 |
SuM CR R10 32.172 Correcting and improving access service modelling |
Ericsson |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103146 |
SuM CR R10 32.176 Correcting and improving access service modelling |
Ericsson |
CR |
agreement |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103053 |
Minutes OAM&P 10 Subscription Management (SuM) evolution (470038) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8 OAM&P Studies
|
|
|
|
|
|
|
|
|
|
| 6.8.1 Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) Olaf Pollakowski S5-103035 |
Agenda Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103098 |
Clarification and suggested way forward for 3GPP TMF model harmonization work |
Ericsson |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103246 |
pCR on Inventory recommendations update on inventory information and alternative inventory data transfer |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103247 |
Inventory object model enhancements |
Nokia Siemens Networks |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103054 |
Minutes Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (460037) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.2 Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) Olaf Pollakowski S5-103036 |
Agenda Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103245 |
pCR on Recommendations for FM IF Standards Alignment - update |
Nokia Siemens Networks |
pseudo CR |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103248 |
pCR on Updates to Alarm IRP support for TIP FM Alarm Handling Requirements (OS/OS) |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103354 |
No |
S5-103354 |
| |
|
S5-103354 |
pCR on Updates to Alarm IRP support for TIP FM Alarm Handling Requirements (OS/OS) |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103248 |
|
|
S5-103055 |
Minutes Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (460038) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.3 Study on version handling (470050) Thomas Tovinger S5-103037 |
Agenda Study on version handling (470050) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103159 |
pCR on Version handling |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103160 |
Presentation of TR 32.830 v100 (Study on version handling) for SA#50 Information |
Ericsson |
other |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103056 |
Minutes Study on version handling (470050) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.4 Study on Alarm correlation and alarm root cause analysis (480045) Edwin Tse S5-103038 |
Agenda Study of Alarm correlation and alarm root cause analysis (480045) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103099 |
TD expand scope of WID Study on Alarm Correlation and Alarm Root Cause Analysis |
Ericsson |
other |
discussion |
Yes |
Yes |
revised to S5-103349 |
No |
S5-103349 |
| |
|
S5-103349 |
Revised WID SP-100376 Study on Alarm Correlation and Alarm Root Cause Analysis |
SA5 OAM |
revised WID |
discussion |
Yes |
Yes |
approved |
No |
| S5-103099 |
|
|
S5-103132 |
Proposal of alarm correlation |
China Mobile |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103173 |
pCR 32.832 on AC_RCA |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
revised to S5-103350 |
No |
S5-103350 |
| |
|
S5-103350 |
pCR 32.832 on AC_RCA |
Ericsson |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
| S5-103173 |
|
|
S5-103360 |
Presentation of TR 32.832 v100 (Study on Alarm Correlation and Alarm Root Cause Analysis) for SA#50 Information |
Ericsson |
other |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103057 |
Minutes Study of Alarm correlation and alarm root cause analysis (480045) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.5 Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) Padma Sudarsa S5-103039 |
Agenda Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103058 |
Minutes Study on Alignment of 3GPP PM IRP and TMF Interface Program (TIP) PM (480046) |
Rapporteur |
report |
approval |
No |
No |
withdrawn |
Yes |
|
| 6.8.6 Study on Management of Converged Networks (480047) Olaf Pollakowski S5-103040 |
Agenda Study on Management of Converged Networks (480047) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103109 |
pCR 32.833 Definition of the problem space |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103110 |
pCR on 32.833 Femto UC |
Nokia Siemens Networks |
pseudo CR |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103059 |
Minutes Study on Management of Converged Networks (480047) |
Rapporteur |
report |
approval |
Yes |
Yes |
noted |
No |
|
| 6.8.7 Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) Linda Garbanati S5-103060 |
Agenda Study on UDC Information Model Handling and Provisioning: Example Use Cases (490039) |
Rapporteur |
agenda |
approval |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-103359 |
Minutes of the CT4, SA5 joint meeting on UDC |
Deutsche Telekom (Istvan ABA) |
report |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103061 |
Minutes Study on UDC Information Model Handling and Provisioning: Example Use Cases |
Rapporteur |
report |
approval |
No |
No |
withdrawn |
Yes |
|
| 7 Charging Management
|
|
|
|
|
|
|
|
|
|
| 7.1 Charging Plenary S5-102800 |
CH Agenda and Time Plan |
CH SWG Chair |
agenda |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102801 |
CH Detailed Report from LAST Meeting |
CH SWG Chair |
report |
approval |
Yes |
Yes |
approved |
No |
|
| |
|
S5-103010 |
CH Executive Report from THIS Meeting |
CH SWG Chair |
report |
approval |
Yes |
Yes |
noted (see Rev 2) |
No |
|
| |
|
S5-102803 |
CH Detailed Report from THIS Meeting |
CH SWG Chair |
report |
discussion |
No |
No |
to be provided post-meeting |
No |
|
| |
|
S5-102805 |
LS_in Reply from ITU-T SG13 to SA5 on Sharing draft Recommendations ITU-T Y.2233Rev.1 and Y.2111Rev.1 Amd |
ITU-T SG13 (COM13-LS116) |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-102806 |
LS_in to SA5 on charging for Voice over LTE (VoLTE) |
GSMA (CPWP81_008rev1) |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-102942 |
No |
S5-102942 |
| |
|
S5-102897 |
LS_out Reply on charging for Voice over LTE (VoLTE) |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-102942 |
No |
S5-102942 |
| |
|
S5-102942 |
LS_out Reply to GSMA, 3GPP SA2 (cc: CT3) on charging for Voice over LTE (VoLTE) (Reply to S5-102806) |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102808 |
LS_in to SA3-LI, SA5 on Network Provided Cell-ID |
S2-104439 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-102934 |
No |
S5-102934 |
| |
|
S5-102898 |
LS_out Reply to SA3-LI, SA5 on Network Provided Cell-ID (Reply to S5-102808) |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-102934 |
No |
S5-102934 |
| |
|
S5-102934 |
LS_out Reply to SA2 (cc: SA3-LI) on Network Provided Cell-ID (S2-104439 / S5-102808) - revision of S5-102898 |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102839 |
LS_out to CT1 (cc: SA1, SA2) on Network provided MS Time Zone information for IMS Charging (revised to S5-102889) |
ZTE |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-102889 |
No |
S5-102889 |
| |
|
S5-102889 |
LS_out to CT1 (cc: SA1, SA2) on Network provided MS Time Zone information for IMS Charging (revision of S5-102839) |
ZTE / MCC |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-102900 |
No |
S5-102900 |
S5-102839 |
|
|
S5-102900 |
LS_out to SA1 (CC: SA2) on Network provided MS Time Zone information for IMS Charging |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-102937 |
No |
S5-102937 |
S5-102889 |
|
|
S5-102937 |
LS_out to SA1 (cc: SA2) on Network-provided local time information for IMS Charging - revision of S5-102900 |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-102900 |
|
|
S5-102886 |
LS_in on Status of Broadband Forum work on Policy Control |
BBF liaison on PIM 2010 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-102887 |
LS_in on IMS Load Balancing |
S2-104383 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-102888 |
LS_in on Release 10 NIMTC Conclusion |
S2-104432 (S5-103079 in OAM) |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-102891 |
LS_in on Setting of IMSVoPS indicator by visited MME |
C1-103533 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-102892 |
LS_in on User CSG Information reporting |
C3-100982 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#75 Sorrento |
No |
|
| |
|
S5-102927 |
LS_out to SA2 on clarification for GGSN charging functions |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-102938 |
No |
S5-102938 |
| |
|
S5-102938 |
LS_out to SA2 on clarification on GGSN charging functions - revision of S5-102927 |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
approved |
No |
| S5-102927 |
7.2 New Charging Work Item proposals S5-102804 |
WID SP-100644 on QoS Control Based on Subscriber Spending Limits - for SA5 CH Revision |
WG Chairman |
revised WID |
discussion |
Yes |
Yes |
revised to S5-102809 |
No |
S5-102809 |
| |
|
S5-102809 |
Revised WID SP-100644 on QoS Control Based on Subscriber Spending Limits |
Huawei on behalf of supporters |
revised WID |
discussion |
Yes |
Yes |
revised to S5-102885 |
No |
S5-102885 |
S5-102804 |
|
|
S5-102873 |
Revised WID SP-100644 on QoS Control Based on Subscriber Spending Limits |
Nokia Siemens Networks |
revised WID |
discussion |
Yes |
Yes |
revised to S5-102885 |
No |
S5-102885 |
| |
|
S5-102885 |
Revised WID SP-100644 on QoS Control Based on Subscriber Spending Limits (Revision of S5-102809 + S5-102873 rev SP-100644) |
MCC (A Zoicas) |
revised WID |
discussion |
Yes |
Yes |
revised to S5-102909 |
No |
S5-102909 |
S5-102873 |
|
|
S5-102909 |
Revised WID SP-100644 on QoS Control Based on Subscriber Spending Limits |
SA5 CH |
revised WID |
discussion |
Yes |
Yes |
revised to S5-102936 |
No |
S5-102936 |
S5-102885 |
|
|
S5-102936 |
Revised WID SP-100644 on QoS Control Based on Subscriber Spending Limits (QoS_SSL) |
SA5 CH |
revised WID |
approval |
Yes |
Yes |
approved |
No |
| S5-102909 |
|
|
S5-102825 |
Discussion Paper on Interconnection charging improvements |
Deutsche Telekom |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-102890 |
New WID Optimal Media Routeing - Charging |
Alcatel-Lucent |
other |
discussion |
Yes |
Yes |
revised to S5-102895 |
No |
S5-102895 |
| |
|
S5-102895 |
New BB-level WID on Charging for Optimal Media Routeing - revision of S5-102890 |
Alcatel-Lucent / MCC |
new WID |
discussion |
Yes |
Yes |
revised to S5-102902 |
No |
S5-102902 |
S5-102890 |
|
|
S5-102902 |
New BB-level WID on Charging for Optimal Media Routeing |
SA5 CH |
new WID |
discussion |
Yes |
Yes |
approved |
No |
| S5-102895 |
7.3 Charging Maintenance and Rel-10 small Enhancements S5-102810 |
CR R10 32.251 Machine type communication |
Ericsson, Vodafone |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102811 |
CR R10 32.298 Machine type communication |
Ericsson, Vodafone |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102812 |
CR R10 32.299 Machine type communication |
Ericsson, Vodafone |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102813 |
CR R10 32.240 Clarification on IOI type 2 usage |
Ericsson |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102834 |
CR R8 32.275 Correction to Support of MMTel Information in MMTel Offline Charging |
ZTE |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102836 |
CR R8 32.275 Correction in CW Charging Flow |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102842 |
R10 32.298 Correction on CSG Information Change Trigger |
ZTE |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102843 |
R9 32.299 Correction on CSG Information Change Trigger |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102844 |
R9 32.298 Correction on CSG Information Change Trigger |
ZTE, ChinaMobile |
CR |
discussion |
No |
No |
withdrawn |
Yes |
|
| |
|
S5-102845 |
R9 32.251 Correction on CSG Information Change Trigger |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102846 |
R10 32.251 Correction on CSG Information Change Trigger |
ZTE |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102851 |
CR R8 32.280 correction of Annex C2 |
Deutsche Telekom |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102852 |
CR R8 32.280 editorial correction of AoC Cost Information |
Deutsche Telekom |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102861 |
Discussion paper on GGSN charging functions |
Orange |
other |
discussion |
Yes |
Yes |
revised to S5-102939 |
No |
S5-102939 |
| |
|
S5-102939 |
Discussion paper on GGSN charging functionalities in Rel-8 and later of TS 32.251 - revision of S5-102861 |
Orange / MCC |
other |
discussion |
Yes |
Yes |
noted |
No |
| S5-102861 |
|
|
S5-102863 |
CR R8 32.296-Correction on PRSUR and BTRM |
Huawei |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102882 |
CR R10 32.270 Harmonisation on E.164 address format |
Nokia Siemens Networks |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102883 |
CR R10 32.299 Harmonisation on E.164 address format |
Nokia Siemens Networks |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| 7.3.1 Release 7 S5-102867 |
CR R7 32.299 Correction on Inter-Operator-Identifier AVP - Alignment with TS 32.260 |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102868 |
CR R8 32.299 Correction on Inter-Operator-Identifier AVP - Alignment with TS 32.260 |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102869 |
CR R9 32.299 Correction on Inter-Operator-Identifier AVP - Alignment with TS 32.260 |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| 7.3.2 Release 8 S5-102830 |
CR R9 32.298 Add CDR Tag description for MMTel CDRs |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
Yes |
revised to S5-102914 |
No |
S5-102914 |
| |
|
S5-102914 |
CR R9 32.298 Add missing CDR Tag for MMTel CDRs |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102830 |
|
|
S5-102831 |
CR R10 32.298 Add CDR Tag description for MMTel CDRs |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
Yes |
revised to S5-102915 |
No |
S5-102915 |
| |
|
S5-102915 |
CR R10 32.298 Add missing CDR Tag for MMTel CDRs |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102831 |
|
|
S5-102870 |
CR R8 32.260 Correction on Operation Interval |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102871 |
CR R9 32.260 Correction on Operation Interval |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102872 |
CR R10 32.260 Correction on Operation Interval |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102913 |
CR R8 32.298 Add missing CDR Tag for MMTel CDRs |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| 7.3.3 Release 9 S5-102814 |
CR R9 32.299 Correction on Trigger-Type AVP |
Ericsson |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102816 |
CR R9 32.299 Correction of LCS-Format-Indicator |
Ericsson |
CR |
discussion |
Yes |
Yes |
revised to S5-102910 |
No |
S5-102910 |
| |
|
S5-102910 |
CR R9 32.299 Correction of LCS-Format-Indicator |
Ericsson |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102816 |
|
|
S5-102818 |
CR R10 32.296 Correction on PRSUR and BTRM |
Huawei |
CR |
discussion |
Yes |
Yes |
revised to S5-102908 |
No |
S5-102908 |
| |
|
S5-102908 |
CR R10 32.296 Correction on PRSUR and BTRM |
Huawei |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102818 |
|
|
S5-102826 |
CR R9 32.298 Add asn.1 description for GWMBMSRecord |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102911 |
No |
S5-102911 |
| |
|
S5-102828 |
CR R9 32.298 Add CDR Tag description for GWMBMSRecord |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102911 |
No |
S5-102911 |
| |
|
S5-102832 |
CR R9 32.298 Add RecordType description for GWMBMSRecord |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102911 |
No |
S5-102911 |
| |
|
S5-102911 |
CR R9 32.298 Missing RecordType for GWMBMSRecord |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102826, S5-102828, S5-102832 |
|
|
S5-102827 |
CR R10 32.298 Add asn.1 description for GWMBMSRecord |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102912 |
No |
S5-102912 |
| |
|
S5-102829 |
CR R10 32.298 Add CDR Tag description for GWMBMSRecord |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102912 |
No |
S5-102912 |
| |
|
S5-102833 |
CR R10 32.298 Add RecordType description for GWMBMSRecord |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102912 |
No |
S5-102912 |
| |
|
S5-102912 |
CR R10 32.298 Missing RecordType for GWMBMSRecord |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102827, S5-102829, S5-102833 |
|
|
S5-102835 |
CR R9 32.275 Correction to Support of MMTel Information in MMTel Offline Charging |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102903 |
No |
S5-102903 |
| |
|
S5-102903 |
R9 Correction to Support of MMTel Information in MMTel Offline Charging |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102835 |
|
|
S5-102837 |
CR R9 32.275 Correction in CW Charging Flow |
ZTE, ChinaMobile |
CR |
discussion |
Yes |
Yes |
revised to S5-102904 |
No |
S5-102904 |
| |
|
S5-102904 |
R9 32.275 Correction in CW Charging Flow |
ZTE, China Mobile |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102837 |
|
|
S5-102850 |
R9 32.299 Correction of Authorized-QoS AVP in its defination |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102918 |
No |
S5-102918 |
| |
|
S5-102918 |
R10 32.299 Correction of Authorized-QoS AVP |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102850 |
|
|
S5-102853 |
CR R9 32.280 editorial correction of AoC Cost Information |
Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
revised to S5-102905 |
No |
S5-102905 |
| |
|
S5-102905 |
CR R9 32.280 correction of AoC Cost Information |
Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102853 |
|
|
S5-102854 |
CR R10 32.280 editorial correction of AoC Cost Information |
Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
revised to S5-102906 |
No |
S5-102906 |
| |
|
S5-102906 |
CR R10 32.280 correction of AoC Cost Information |
Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102854 |
|
|
S5-102855 |
CR R9 32.280 Correction of Reason-Code in the AoC Tariff Information |
Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
revised to S5-102916 |
No |
S5-102916 |
| |
|
S5-102916 |
CR R9 32.280 Correction of Reason-Code in the AoC Tariff Information |
Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102855 |
|
|
S5-102856 |
CR R10 32.280 Correction of Reason-Code in the AoC Tariff Information |
Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
revised to S5-102917 |
No |
S5-102917 |
| |
|
S5-102917 |
CR R10 32.280 Correction of Reason-Code in the AoC Tariff Information |
Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102856 |
|
|
S5-102857 |
CR R9 32.298 correction in list of service data parameter |
Orange, Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102858 |
CR R10 32.298 correction in list of service data parameter |
Orange, Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| |
|
S5-102862 |
CR R9 32.296-Correction on PRSUR and BTRM |
Huawei |
CR |
discussion |
Yes |
Yes |
revised to S5-102907 |
No |
S5-102907 |
| |
|
S5-102907 |
CR R9 32.296 Correction on PRSUR and BTRM |
Huawei |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102862 |
|
|
S5-102874 |
CR R9 32.260 Timestamp granularity completion |
Nokia Siemens Networks, Ericsson |
CR |
discussion |
Yes |
Yes |
revised to S5-102920 |
No |
S5-102920 |
| |
|
S5-102920 |
CR R9 32.260 Correction on timestamp granularity |
Nokia Siemens Networks, Ericsson, Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102874 |
|
|
S5-102875 |
CR R10 32.260 Timestamp granularity completion |
Nokia Siemens Networks, Ericsson |
CR |
discussion |
Yes |
Yes |
revised to S5-102921 |
No |
S5-102921 |
| |
|
S5-102921 |
CR R10 32.260 Correction on timestamp granularity |
Nokia Siemens Networks, Ericsson, Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102875 |
|
|
S5-102876 |
CR R9 32.298 Timestamp granularity completion |
Nokia Siemens Networks, Ericsson |
CR |
discussion |
Yes |
Yes |
revised to S5-102922 |
No |
S5-102922 |
| |
|
S5-102922 |
CR R9 32.298 Correction on timestamp granularity |
Nokia Siemens Networks, Ericsson, Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102876 |
|
|
S5-102877 |
CR R10 32.298 Timestamp granularity completion |
Nokia Siemens Networks, Ericsson |
CR |
discussion |
Yes |
Yes |
revised to S5-102923 |
No |
S5-102923 |
| |
|
S5-102923 |
CR R10 32.298 Correction on timestamp granularity |
Nokia Siemens Networks, Ericsson, Deutsche Telekom |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102877 |
7.3.4 Release 10 S5-102838 |
CR R10 32.271 Correction from Ro to Rf interface |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102924 |
No |
S5-102924 |
| |
|
S5-102924 |
CR R10 32.271 Correction on title for Rf interface |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102838 |
|
|
S5-102849 |
CR R10 32.260 Editorial error correction on online charging architecture figure |
ZTE |
CR |
discussion |
Yes |
Yes |
revised to S5-102925 |
No |
S5-102925 |
| |
|
S5-102925 |
CR R10 32.260 Editorial error correction on online charging architecture figure |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102849 |
|
|
S5-102859 |
CR R10 32.251 charging characteristics cleaning |
Orange |
CR |
discussion |
Yes |
Yes |
revised to S5-102926 |
No |
S5-102926 |
| |
|
S5-102926 |
CR R10 32.251 Clarification on Charging Characteristics |
Orange |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102859 |
|
|
S5-102919 |
R10 32.260 Correction of Authorized-QoS AVP |
ZTE |
CR |
discussion |
Yes |
Yes |
approved |
No |
|
| 7.4 Rel-10 Charging
|
|
|
|
|
|
|
|
|
|
| 7.4.1 IWLAN mobility charging (440063) S5-102860 |
CR R10 32.252 New annex to cover PDG charging when re-using GGSN functionality |
Orange |
CR |
discussion |
Yes |
Yes |
revised to S5-102928 |
No |
S5-102928 |
| |
|
S5-102928 |
CR R10 32.252 New annex to cover PDG charging when re-using GGSN functionality - Align to TS 23.234 |
Orange |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102860 |
7.4.2 Charging for LIPA_SIPTO (460039) S5-102817 |
CR R10 32.251 LIPA-SIPTO Charging |
Huawei |
CR |
discussion |
Yes |
Yes |
rejected |
No |
|
| 7.4.3 Charging for IP Flow Mobility and seamless WLAN offload (470021) S5-102820 |
CR R10 32.251 PGW Charging description for WLAN access via GTP based ePDG/S2b |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised to S5-102929 |
No |
S5-102929 |
| |
|
S5-102929 |
CR R10 32.251PGW Charging description for WLAN access via GTP based ePDG/S2b |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102820 |
|
|
S5-102821 |
CR R10 32.251 IP Flow Mobility Charging principle description |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised to S5-102930 |
No |
S5-102930 |
| |
|
S5-102930 |
IP Flow Mobility Charging principle description - Align with SA2 TS 23.261 |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
revised to S5-102941 |
No |
S5-102941 |
S5-102821 |
|
|
S5-102941 |
CR R10 32.251 Adding IP Flow Mobility (IFOM) Charging principle description - Align with SA2 TS 23.261 - revision of S5-102930 |
Alcatel-Lucent |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102930 |
|
|
S5-102901 |
LS_in on IFOM charging |
S2-104438 |
i/c LS |
discussion |
Yes |
Yes |
replied in S5-102940 |
No |
S5-102940 |
| |
|
S5-102931 |
LS_out Reply on IFOM charging |
SA5 CH |
o/g LS |
discussion |
Yes |
Yes |
revised to S5-102940 |
No |
S5-102940 |
| |
|
S5-102940 |
LS_out Reply to SA2 (cc: CT3) on IFOM charging (S2-104438 / S5-102901) |
SA5 CH |
o/g LS |
discussion |
No |
Yes |
approved |
No |
| S5-102931 |
7.4.4 Add solutions for Rc reference point within the Online Charging System (OCS) (470045) S5-102819 |
CR R10 32.296 Rc Reference Point |
Huawei |
CR |
discussion |
Yes |
Yes |
revised to S5-102932 |
No |
S5-102932 |
| |
|
S5-102878 |
CR R10 32.296 Correction of Rc Reference Point guidance description |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
revised to S5-102932 |
No |
S5-102932 |
| |
|
S5-102932 |
CR R10 32.296 Correction of Rc Reference Point guidance description |
Nokia Siemens Networks, Huawei, Amdocs |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102819, S5-102878 |
|
|
S5-102864 |
CR R10 32.299 Adding Counter information in CCR and CCA |
Huawei |
CR |
discussion |
Yes |
Yes |
rejected |
No |
|
| |
|
S5-102865 |
CR R10 32.296 Adding AVP code for Counter Information |
Huawei |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102866 |
Discussion Paper of Rc reference approach |
Huawei |
other |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-102881 |
CR R10 32.240 Editorial clean-up on Rc reference point |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
revised to S5-102933 |
No |
S5-102933 |
| |
|
S5-102933 |
CR R10 32.240 Editorial clean-up on Rc reference point |
Nokia Siemens Networks |
CR |
discussion |
Yes |
Yes |
approved |
No |
| S5-102881 |
7.4.5 Advice of Charge (AoC) service support enhancements (470047) S5-102815 |
CR R10 32.280 Clarification of the UNI parameters |
Ericsson, Deutsche Telekom |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102822 |
CR R10 32.275 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging description |
Alcatel-Lucent |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102823 |
CR R10 32.299 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging |
Alcatel-Lucent |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| |
|
S5-102824 |
CR R10 32.298 Add 'Advice Of Charge (AoC)' MMTel supplementary service Charging |
Alcatel-Lucent |
CR |
discussion |
Yes |
No |
withdrawn |
Yes |
|
| 7.5 Rel-11 Charging
|
|
|
|
|
|
|
|
|
|
| 7.5.1 Network Provided Location Information for IMS Charging (490029) S5-102807 |
LS_in to SA1 (cc: SA5) on location information for IMS charging (Rel-11 NWK-PL2IMS) |
S2-104440 |
i/c LS |
discussion |
Yes |
Yes |
noted |
No |
|
| |
|
S5-103275 |
LS_in Reply from SA3-LI to SA2 (cc: SA5, SA3) on Network Provided Cell-ID |
SA3LI10_166r1 |
i/c LS |
discussion |
Yes |
Yes |
RESUBMITTED to SA5#75 Sorrento |
No |
|
| 8 Any Other Business
|
|
|
|
|
|
|
|
|
|
| 9 Closing
|
|
|
|
|
|
|
|
|
|
| |
Created: 2010-11-25 15:39     Last document: S5-103374