Agenda Topic TDoc Title Source Type For Avail Treated Decision Wdrn Replaced-by Replaces
1 Opening of the meeting                      
2 Approval of the agenda S5‑237300 Agenda WG Chair agenda   Yes
Yes
approved No    
3 IPR and legal declaration S5‑237301 IPR and legal declaration WG Chair other   Yes
Yes
noted No    
4 Meetings and activities reports                      
4.1 Last SA5 meeting report S5‑237302 Report from last SA5 meeting MCC report   Yes
Yes
approved No    
4.2 Inter-organizational reports                      
5 SA5 level issues                      
5.1 Administrative issues at SA5 level S5‑237303 Post e-meeting email approval status WG Vice Chair (Ericsson) other   No
No
reserved No    
    S5‑237314 SA5 working procedures WG Chair, WG Vice Chair(Ericsson) other   Yes
Yes
revised No S5‑238095  
    S5‑238095 SA5 working procedures WG Chair, WG Vice Chair(Ericsson) other - Yes
Yes
approved No   S5‑237314
    S5‑237315 SA5 Meeting facility requirements WG Chair other   Yes
Yes
noted No    
    S5‑237318 Process for management of draft TS-TRs WG Chair discussion   No
Yes
withdrawn Yes    
    S5‑237372 SA5 working procedures Nokia, Nokia Shanghai Bell other Approval Yes
Yes
merged No S5‑238095  
    S5‑237373 User Guide - Using Forge for SA5 Nokia, Nokia Shanghai Bell other Information Yes
Yes
noted No    
    S5‑237375 Rel-19 SA5 work planning SA5 Chair, SA5 Vice chair (Ericsson),SA5 Vice chair (Nokia) Work Plan Information Yes
Yes
noted No    
5.2 Technical issues at SA5 level                      
5.3 Liaison statements at SA5 level S5‑237333 LS on inputs for mapping GSMA OPG architecture roles with 3GPP defined Edge architectures S6-233417 LS in   Yes
Yes
replied to No    
    S5‑237335 IETF HTTP RFCs obsoleted by RFCs 9110, 9111 and 9113 C4-233513 LS in   Yes
Yes
noted No    
    S5‑237341 LS to SA, SA3 and SA5 on potential collaboration between 3GPP SA3/SA5 and ETSI SAI ISG ETSI ISG SAI LS in   Yes
Yes
postponed No    
    S5‑237343 LS to 3GPP re Monitoring of Encrypted 5GS Signalling Traffic GSMA LS in   Yes
Yes
replied to No    
    S5‑237410 Reply LS to LS to 3GPP re Monitoring of Encrypted 5GS Signalling Traffic MATRIXX Software, Nokia,Nokia Shanghai Bell LS out Approval Yes
Yes
revised No S5‑238140  
    S5‑238140 Reply LS to LS to 3GPP re Monitoring of Encrypted 5GS Signalling Traffic MATRIXX Software, Nokia,Nokia Shanghai Bell LS out Approval Yes
Yes
approved No   S5‑237410
    S5‑237974 Update on autonomous networks key effectiveness indicators LS(23)0004 Update on autonomous networks key effectiveness indicators TM Forum LS in Approval Yes
Yes
postponed No    
    S5‑238097 Reply LS on Monitoring of Encrypted 5GS Signalling Traffic S3-235009 LS in discussion Yes
Yes
noted No    
    S5‑238127 Tuesday Q0 Breakout on 5.3 Trace OAM/CH LS disc Nokia report Information Yes
Yes
noted No    
5.4 SA5 meeting calendar S5‑237319 SA5 meeting calendar WG Chair other   Yes
Yes
noted No    
6 OAM&P                      
6.1 OAM&P Plenary S5‑237304 OAM&P action list WG Vice Chair (Nokia) other   No
Yes
noted No    
    S5‑237305 OAM meeting process WG Vice Chair (Ericsson) other   No
Yes
withdrawn Yes    
    S5‑237306 agenda_with_Tdocs_sequence_proposal_OAM WG Chair agenda   Yes
Yes
noted No    
    S5‑237307 OAM Exec Report WG Vice Chair (Nokia) report   No
Yes
noted No    
    S5‑237308 OAM Chair notes and conclusions WG Chair report   No
Yes
noted No    
    S5‑237311 Collection of useful endorsed documents in OAM WG Vice Chair (Nokia) discussion   No
Yes
noted No    
    S5‑237312 Collecction of external communication documents in OAM WG Vice Chair (Nokia) discussion   No
Yes
noted No    
    S5‑237316 Collection of Rel-18 3GPP SA5 OAM WoP WG Chair discussion   Yes
Yes
noted No    
    S5‑237317 Living document for stage 2-3 alignment WG Vice Chair (Ericsson) discussion   No
Yes
email approval No    
    S5‑237320 Time Plan for OAM&P sessions WG Chair other   Yes
Yes
revised No S5‑238345  
    S5‑238345 Time Plan for OAM&P sessions WG Chair other - Yes
Yes
noted No   S5‑237320
    S5‑237321 Reply LS on Enhancement on the attribute for 5GLAN management C4-234414 LS in   Yes
Yes
replied to No    
    S5‑238099 Reply to: Reply LS on Enhancement on the attribute for 5GLAN management China Mobile LS out approval Yes
Yes
approved No    
    S5‑237323 LS on a Framework for Network Slices in Networks Built from IETF Technologies Submission IETF LS in   Yes
Yes
noted No    
    S5‑237324 Reply LS on area scope for QoE measurements R2-2311400 LS in   Yes
Yes
replied to No    
    S5‑238098 Reply to: Reply LS on area scope for QoE measurements Ericsson LS out approval Yes
Yes
approved No    
    S5‑237325 Reply LS on QMC support in RRC_IDLE and RRC_INACTIVE R2-2311409 LS in   Yes
Yes
noted No    
    S5‑237326 Response LS on introduction new attribute to support source coordination between LTE and NR SA R3-235702 LS in   Yes
Yes
noted No    
    S5‑237327 Reply LS on Reply to LS on AI/ML for NG-RAN Energy Saving Energy Cost index R3-235743 LS in   Yes
Yes
postponed No    
    S5‑237328 Reply LS on Multiple Trace/MDT configurations R3-235882 LS in   Yes
Yes
postponed No    
    S5‑237329 Reply LS on Priority information and NR-DC R3-235912 LS in   Yes
Yes
noted No    
    S5‑237330 Reply LS on MBS communication service R3-235913 LS in   Yes
Yes
noted No    
    S5‑237331 Further reply LS on Cell ID (re)configuration for mobile IAB cell R3-235921 LS in   Yes
Yes
noted No    
    S5‑237332 Reply LS on the provisioning services specified in SA5 S2-2311892 LS in   Yes
Yes
noted No    
    S5‑237334 LSout to 3GPP SA5 Reply to "5G network energy efficiency and energy saving" (NFV(22)000018) ETSI ISG NFV LS in   Yes
Yes
noted No    
    S5‑237336 LS on user consent for SON/MDT for NB-IoT Ues R2-2309030 LS in   Yes
Yes
replied to No    
    S5‑238102 Reply to: LS on user consent for SON/MDT for NB-IoT Ues Ericsson LS out approval Yes
Yes
approved No    
    S5‑237337 LS on MDT measurements collection in MR-DC R3-232070 LS in   Yes
Yes
postponed No    
    S5‑237338 LS on QoE measurement collection for application sessions delivered via MBS broadcast or multicast R3-233457 LS in   Yes
Yes
replied to No    
    S5‑238103 Reply to: LS on QoE measurement collection for application sessions delivered via MBS broadcast or multicast Ericsson LS out approval Yes
Yes
approved No    
    S5‑237339 Reply LS on area scope for QoE measurements S4-231490 LS in   Yes
Yes
noted No    
    S5‑237340 LS on MDT for NPN R3-234744 LS in   Yes
Yes
replied to No    
    S5‑237342 Liaison Multi-SDO Autonomous Networks (AN) Formal Liaison: Call for Candidate Proposals for AN SDO Information Sharing TM Forum LS in   Yes
Yes
replied to No    
    S5‑237344 LSout about PIM specification development by ETSI NFV ETSI ISG NFV LS in   Yes
Yes
replied to No    
    S5‑237345 Publication of ETSI NFV specification on Intent Management Service Interface and Intent Information Model ETSI ISG NFV LS in   Yes
Yes
replied to No    
    S5‑237346 LSout on “Certificate Management” ETSI ISG NFV LS in   Yes
Yes
postponed No    
    S5‑237435 LS to SA2 on network energy related information exposure Huawei LS out Approval Yes
Yes
revised No S5‑238106  
    S5‑238106 LS to SA2 on network energy related information exposure Huawei LS out Approval Yes
Yes
approved No   S5‑237435
    S5‑237439 Reply LS on S5-237345 Publication of ETSI NFV specification on Intent Management Service Interface and Intent Information Model Huawei LS out Approval Yes
Yes
revised No S5‑238162  
    S5‑238162 Reply LS on S5-237345 Publication of ETSI NFV specification on Intent Management Service Interface and Intent Information Model Huawei LS out Approval Yes
Yes
approved No   S5‑237439
    S5‑237440 Reply LS on S5-237344 LSout about PIM specification development by ETSI NFV Huawei LS out Approval Yes
Yes
approved No    
    S5‑237504 Reply LS on MDT for NPN Ericsson LM LS out   Yes
Yes
revised No S5‑238101  
    S5‑238101 Reply LS on MDT for NPN Ericsson LM LS out - Yes
Yes
approved No   S5‑237504
    S5‑237585 LS on the progress update of AI/ML Management specifications in SA5 NEC, Intel LS out Approval Yes
Yes
revised No S5‑238107  
    S5‑238107 LS on the progress update of AI/ML Management specifications in SA5 NEC, Intel LS out Approval Yes
Yes
approved No   S5‑237585
    S5‑237633 Reply LS on Multiple TraceMDT configurations Nokia, Nokia Shangai Bell LS out Approval Yes
Yes
noted No    
    S5‑237661 Reply LS on MDT for NPN Nokia, Nokia Shanghai Bell LS out Approval Yes
Yes
merged No S5‑238101  
    S5‑237662 Reply LS on MDT measurements collection in MR-DC Nokia, Nokia Shanghai Bell LS out Approval Yes
Yes
merged No S5‑238100  
    S5‑237688 Reply LS on MDT measurements collection in MR-DC Huawei LS out Approval Yes
Yes
noted No    
    S5‑238100 Reply LS on MDT measurements collection in MR-DC Huawei LS out Approval No
Yes
withdrawn Yes    
    S5‑237698 Reply to Liaison Multi-SDO Autonomous Networks (AN) Formal Liaison: Call for Candidate Proposals for AN SDO Information Sharing WG Chair LS out   No
Yes
email approval No    
    S5‑237707 LS reply on inputs for mapping GSMA OPG architecture roles with 3GPP defined Edge architectures Samsung R&D Institute India LS out Agreement Yes
Yes
revised No S5‑238096  
    S5‑238096 LS reply on inputs for mapping GSMA OPG architecture roles with 3GPP defined Edge architectures Samsung R&D Institute India LS out Agreement Yes
Yes
approved No   S5‑237707
    S5‑237941 LS on issues with Packet Uu Loss Rate with delay threshold in the DL per DRB per UE Samsung Electronics Iberia SA LS out Approval Yes
Yes
approved No    
    S5‑238108 LS reply for LS on user consent for SON/MDT for NB-IoT Ues S3-235004 LS in discussion Yes
Yes
postponed No    
6.2 New OAM&P Work Item proposals                      
6.2.1 Intelligence and Automation S5‑237479 New SID on effectiveness of zero-touch orchestration and management China Mobile, China Telecomunication SID new Approval Yes
Yes
noted No    
    S5‑238272 New SID on effectiveness of zero-touch orchestration and management China Mobile, China Telecomunication SID new Approval No
Yes
withdrawn Yes    
    S5‑237542 New Rel-19 SID Study on AI and ML management phase 2 Intel, NEC SID new Discussion Yes
Yes
revised No S5‑238133  
    S5‑238133 New Rel-19 SID Study on AI and ML management phase 2 Intel, NEC SID new Discussion Yes
Yes
agreed No   S5‑237542
    S5‑237608 New SID: Study on Management Data Analytics (MDA) – Phase 3 NEC, Intel SID new Agreement Yes
Yes
revised No S5‑238134  
    S5‑238134 New SID: Study on Management Data Analytics (MDA) – Phase 3 NEC, Intel SID new Agreement Yes
Yes
revised No S5‑238351 S5‑237608
    S5‑238351 New SID: Study on Management Data Analytics (MDA) – Phase 3 NEC, Intel SID new Agreement Yes
Yes
agreed No   S5‑238134
    S5‑237660 New Rel-19 Study on intent driven management services for mobile networks phase 3 Huawei SID new Approval Yes
Yes
revised No S5‑238135 S5‑237226
    S5‑238135 New Rel-19 Study on intent driven management services for mobile networks phase 3 Huawei SID new Approval Yes
Yes
agreed No   S5‑237660
    S5‑237687 Rel-19 OAM topic Progress in SA5#152 WG Chair discussion Information Yes
Yes
noted No   S5‑237186
    S5‑237702 New Study on Closed Control loop management Samsung R&D Institute India WID new Agreement Yes
Yes
revised No S5‑238136  
    S5‑238136 New Study on Closed Control loop management Samsung R&D Institute India WID new Agreement Yes
Yes
agreed No   S5‑237702
    S5‑237812 New SID on Management aspect of Network Digital Twin China Mobile E-Commerce Co. SID new Approval Yes
Yes
revised No S5‑238204  
    S5‑238204 New SID on Management aspect of Network Digital Twin China Mobile E-Commerce Co. SID new Approval Yes
Yes
revised No S5‑238344 S5‑237812
    S5‑238344 New SID on Management aspect of Network Digital Twin China Mobile E-Commerce Co. SID new Approval Yes
Yes
agreed No   S5‑238204
    S5‑237948 DP on unifying Confusing Control Loops ZTE Corporation discussion Endorsement Yes
Yes
noted No    
6.2.2 Management Architecture and Mechanisms S5‑237538 New SID on cloud aspects of management and orchestration Microsoft Europe SARL SID new   Yes
Yes
revised No S5‑238194  
    S5‑238194 New SID on cloud aspects of management and orchestration Microsoft Europe SARL SID new - Yes
Yes
agreed No   S5‑237538
    S5‑237578 Rel-19 New SID Enablers for Security Monitoring Nokia UK SID new Approval Yes
Yes
revised No S5‑238264  
    S5‑238264 Rel-19 New SID Enablers for Security Monitoring Nokia UK,DTAG SID new Approval Yes
Yes
agreed No   S5‑237578
    S5‑237579 Rel-19 Discussion paper on enablers for security monitoring Nokia UK discussion Discussion Yes
Yes
revised No S5‑238195  
    S5‑238195 Rel-19 Discussion paper on enablers for security monitoring Nokia UK discussion Discussion No
Yes
noted No   S5‑237579
    S5‑237580 Rel-19 New WID for MSAC Nokia UK WID new Approval Yes
Yes
noted No    
    S5‑237616 New SID on SBMA enhancement phase 3 Huawei SID new Approval Yes
Yes
revised No S5‑238196  
    S5‑238196 New SID on SBMA enhancement phase 3 Huawei SID new Approval Yes
Yes
agreed No   S5‑237616
    S5‑237619 New WID on 5G performance measurements and KPIs phase 4 China Telecom Corporation Ltd. WID new Approval Yes
Yes
revised No S5‑238202  
    S5‑238202 New WID on 5G performance measurements and KPIs phase 4 China Telecom Corporation Ltd. WID new Approval Yes
Yes
agreed No   S5‑237619
    S5‑237645 New SID on Management Aspects of NTN Phase 2 CATT, China Unicom SID new Approval Yes
Yes
revised No S5‑238206  
    S5‑238206 New SID on Management Aspects of NTN Phase 2 CATT, China Unicom SID new Approval Yes
Yes
agreed No   S5‑237645
    S5‑237655 New WID on 5G Advanced NRM features phase 3 Nokia, Nokia Shanghai Bell WID new Approval Yes
Yes
revised No S5‑238203  
    S5‑238203 New WID on 5G Advanced NRM features phase 3 Nokia, Nokia Shanghai Bell WID new Approval Yes
Yes
revised No S5‑238262 S5‑237655
    S5‑238262 New WID on 5G Advanced NRM features phase 3 Nokia, Nokia Shanghai Bell WID new Approval Yes
Yes
agreed No   S5‑238203
    S5‑237674 New SID on management aspects of RedCap feature AsiaInfo Technologies Inc SID new   Yes
Yes
revised No S5‑238342  
    S5‑238342 New SID on management aspects of RedCap feature AsiaInfo Technologies Inc SID new - Yes
Yes
agreed No   S5‑237674
    S5‑237700 New SID on Management aspects of Integrated Sensing and Communication ZTE Corporation,China Unicom SID new Approval Yes
Yes
revised No S5‑238307 S5‑237236
    S5‑238307 New SID on Management aspects of Integrated Sensing and Communication ZTE Corporation,China Unicom SID new Approval No
Yes
noted No   S5‑237700
    S5‑237721 New Study on Enhancement of Management Aspects related to NWDAF Phase 2 China Telecommunications SID new Approval Yes
Yes
revised No S5‑238208  
    S5‑238208 New Study on Enhancement of Management Aspects related to NWDAF Phase 2 China Telecommunications SID new Approval Yes
Yes
revised No S5‑238352 S5‑237721
    S5‑238352 New Study on Enhancement of Management Aspects related to NWDAF Phase 2 China Telecommunications SID new Approval Yes
Yes
agreed No   S5‑238208
    S5‑237815 Rel-19 New WID on Data Management phase 2 Nokia, Nokia Shanghai Bell WID new Approval Yes
Yes
revised No S5‑238200  
    S5‑238200 Rel-19 New WID on Data Management phase 2 Nokia, Nokia Shanghai Bell WID new Approval Yes
Yes
agreed No   S5‑237815
    S5‑237818 Rel-19 New SID on Plan management Nokia, Nokia Shanghai Bell WID new Approval Yes
Yes
revised No S5‑238199  
    S5‑238199 Rel-19 New SID on Plan management Nokia, Nokia Shanghai Bell WID new Approval Yes
Yes
revised No S5‑238347 S5‑237818
    S5‑237883 New SID on Management of IAB Nodes Ericsson LM SID new Approval Yes
Yes
revised No S5‑238207  
    S5‑238207 New SID on Management of IAB Nodes Ericsson LM SID new Approval Yes
Yes
agreed No   S5‑237883
    S5‑237884 New WID on Support for Subscriber and Equipment Trace and QoE collection functionality in RAN and core network Ericsson WID new   Yes
Yes
revised No S5‑238205  
    S5‑238205 New WID on Support for Subscriber and Equipment Trace and QoE collection functionality in RAN and core network Ericsson WID new - Yes
Yes
revised No S5‑238343 S5‑237884
    S5‑238343 New WID on Support for Subscriber and Equipment Trace and QoE collection functionality in RAN and core network Ericsson WID new - Yes
Yes
agreed No   S5‑238205
    S5‑237885 New SID on data management, subscriptions and reporting Ericsson SID new   Yes
Yes
revised No S5‑238201  
    S5‑238201 New Study on data management, regarding subscriptions and reporting Ericsson SID new - Yes
Yes
agreed No   S5‑237885
    S5‑237886 New WID on Provide management functions for Rel-19 traffic and radio functions in the RAN and the core network Ericsson WID new   Yes
Yes
noted No    
    S5‑237892 DP on simplifying the decision-making architecture VODAFONE Group Plc discussion Discussion Yes
Yes
revised No S5‑238198  
    S5‑238198 DP on simplifying the decision-making architecture VODAFONE Group Plc,Verizon,Telefonica,Deutsche Telekom AG discussion Discussion Yes
Yes
noted No   S5‑237892
    S5‑237928 New Rel-19 Study on Management of Network Sharing Phase 3 China Unicom, China Telcom, Ericsson, Huawei, ZTE, CMCC SID new Approval Yes
Yes
revised No S5‑238209  
    S5‑238209 New Rel-19 Study on Management of Network Sharing Phase 3 China Unicom, China Telcom, Ericsson, Huawei, ZTE, CMCC SID new Approval Yes
Yes
agreed No   S5‑237928
    S5‑237964 Discussion paper on Alarm definition Ericsson Hungary Ltd discussion Endorsement Yes
Yes
revised No S5‑238120  
    S5‑238120 Discussion paper on Alarm definition Ericsson Hungary Ltd discussion Endorsement No
Yes
noted No   S5‑237964
6.2.3 Support of New Services S5‑237434 New SID on energy efficiency and energy saving aspects of 5G networks and services Huawei SID new Agreement Yes
Yes
revised No S5‑238235  
    S5‑238235 New SID on energy efficiency and energy saving aspects of 5G networks and services Huawei SID new Agreement Yes
Yes
revised No S5‑238353 S5‑237434
    S5‑238353 New SID on energy efficiency and energy saving aspects of 5G networks and services Huawei SID new Agreement Yes
Yes
agreed No   S5‑238235
    S5‑237798 Rel-19 SID MExpo Nokia SID new Discussion Yes
Yes
revised No S5‑238243  
    S5‑238243 Rel-19 SID MExpo Nokia,Telefonica, DTAG SID new Discussion Yes
Yes
revised No S5‑238354 S5‑237798
    S5‑238354 Rel-19 SID MExpo Nokia,Telefonica, DTAG SID new Discussion Yes
Yes
agreed No   S5‑238243
    S5‑237799 Rel-19 WID MExpo Nokia WID new Discussion Yes
Yes
noted No    
6.3 OAM&P Maintenance and Rel-18 small Enhancements S5‑237534 Rel 17 CR TS 28.105 Resolve issues related to the usage of confidenceIndication attribute Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238124  
    S5‑238124 Rel 17 CR TS 28.105 Resolve issues related to the usage of confidenceIndication attribute Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑237534
    S5‑237535 Rel 18 CR TS 28.105 Resolve issues related to the usage of confidenceIndication attribute Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238125  
    S5‑238125 Rel 18 CR TS 28.105 Resolve issues related to the usage of confidenceIndication attribute Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑237535
6.3.1 Methodology S5‑237584 Rel-18 CR TS 32.156 Supplement the specification for establishing a relationship between <> and model elements in UML class diagram China Mobile Com. Corporation CR Agreement Yes
Yes
revised No S5‑238287  
    S5‑238287 Rel-18 CR TS 32.156 Supplement the specification for establishing a relationship between <> and model elements in UML class diagram China Mobile Com. Corporation, Ericsson, Huawei, Nokia CR Agreement Yes
Yes
agreed No   S5‑237584
    S5‑237722 Rel-15 CR TS 32.156 Clarification on predefined dataType and example L.M. Ericsson Limited CR Approval Yes
Yes
not pursued No    
    S5‑237723 Rel-16 CR TS 32.156 Clarification on predefined dataType and example L.M. Ericsson Limited CR Approval Yes
Yes
not pursued No    
    S5‑237724 Rel-17 CR TS 32.156 Clarification on predefined dataType and example L.M. Ericsson Limited CR Approval Yes
Yes
not pursued No    
    S5‑237725 Rel-18 CR TS 32.156 Clarification on predefined dataType and example L.M. Ericsson Limited CR Approval Yes
Yes
revised No S5‑238290  
    S5‑238290 Rel-18 CR TS 32.156 Clarification on predefined dataType and example L.M. Ericsson Limited CR Approval Yes
Yes
agreed No   S5‑237725
    S5‑237894 Discussion paper on datatype visualization Ericsson Inc. discussion Endorsement Yes
Yes
revised No S5‑238286  
    S5‑238286 Discussion paper on datatype visualization Ericsson, China Mobile, Huawei, Nokia discussion Endorsement Yes
Yes
endorsed No   S5‑237894
6.3.2 ANL                      
6.3.3 MDAS S5‑237593 correction on startTime and stopTime in MDARequest Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237594 Correction on startTime and stopTime in MDARequest Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237646 Rel-18 CR 28.104 Update discription on deployment of multiple MDAs CATT CR Approval Yes
Yes
not pursued No    
    S5‑238292 Rel-18 CR 28.104 Update discription on deployment of multiple MDAs CATT CR Approval No
Yes
withdrawn Yes    
    S5‑237647 Rel-17 CR 28.104 Update discription on deployment of multiple MDAs CATT CR Approval Yes
Yes
not pursued No    
    S5‑238291 Rel-17 CR 28.104 Update discription on deployment of multiple MDAs CATT CR Approval No
Yes
withdrawn Yes    
    S5‑237709 Correct issues for references of enabling data Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237710 Correct issues for references of enabling data Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237882 Correction of attribute properties Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    S5‑237893 Correction of attribute properties Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    S5‑237967 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
revised No S5‑238174  
    S5‑238174 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
agreed No   S5‑237967
    S5‑237968 Rel-18 CR 28.104 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
revised No S5‑238175  
    S5‑238175 Rel-18 CR 28.104 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
agreed No   S5‑237968
6.3.4 AI/ML S5‑237521 CR TS 28.105 Rel-17 Correction of IOC name Ericsson India Private Limited CR Approval Yes
Yes
revised No S5‑238293  
    S5‑238293 CR TS 28.105 Rel-17 Correction of IOC name Ericsson India Private Limited CR Approval Yes
Yes
agreed No   S5‑237521
    S5‑237522 CR TS 28.105 Rel-18 Correction of IOC name Ericsson India Private Limited CR Approval Yes
Yes
revised No S5‑238294  
    S5‑238294 CR TS 28.105 Rel-18 Correction of IOC name Ericsson India Private Limited CR Approval Yes
Yes
agreed No   S5‑237522
    S5‑237523 TS 28.105 Rel-17 Correction of attribute properties Ericsson India Private Limited CR Approval Yes
Yes
revised No S5‑238295  
    S5‑238295 TS 28.105 Rel-17 Correction of attribute properties Ericsson India Private Limited CR Agreement Yes
Yes
agreed No   S5‑237523
    S5‑237531 TS 28.105 Rel-18 Correction of attribute properties Ericsson India Private Limited CR Approval Yes
Yes
revised No S5‑238296  
    S5‑238296 TS 28.105 Rel-18 Correction of attribute properties Ericsson India Private Limited CR Approval Yes
Yes
agreed No   S5‑237531
    S5‑237533 TS 28.105 Rel-18 Correction of MLTrainingFunction constraints Ericsson India Private Limited CR Approval Yes
Yes
revised No S5‑238297  
    S5‑238297 TS 28.105 Rel-18 Correction of MLTrainingFunction constraints Ericsson India Private Limited CR Approval Yes
Yes
agreed No   S5‑237533
    S5‑237571 Rel 18 CR TS 28.105 Fix incorrect figure label Ericsson CR Approval Yes
Yes
agreed No    
    S5‑237574 Rel 17 CR TS 28.105 Fix incorrect figure label Ericsson CR Approval Yes
Yes
agreed No    
    S5‑237622 Rel-18 CR TS 28.105 Removing ML Entity ID attribute Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237833 Rel-17 TS 28.105 Restore definition of attribute mLEntityList Ericsson India Private Limited CR Approval Yes
Yes
not pursued No    
    S5‑238285 Rel 17 CR TS 28.105 Remove unused attribute mLEntityList Ericsson,Nokia CR Agreement Yes
Yes
agreed No    
    S5‑238360 Draft CR AIML_MGMT - TS 28.105; Enchantements for AI-ML management NEC draftCR Approval No
Yes
email approval No    
6.3.5 Energy efficiency                      
6.3.6 Intent driven management S5‑237681 Rel-17 CR TS28.312 Clarify the description of object instance ZTE Corporation CR Approval Yes
Yes
agreed No    
    S5‑237683 Rel-18 CR TS28.312 Clarify the description of object instance ZTE Corporation CR Approval Yes
Yes
agreed No    
    S5‑237726 Clarify verbs in attribute definitions Ericsson CR Approval Yes
Yes
revised No S5‑238298  
    S5‑238298 Clarify verbs in attribute definitions Ericsson CR Approval Yes
Yes
agreed No   S5‑237726
    S5‑237727 Clarify verbs in attribute definitions Ericsson CR Approval Yes
Yes
revised No S5‑238299  
    S5‑238299 Clarify verbs in attribute definitions Ericsson CR Approval Yes
Yes
agreed No   S5‑237727
    S5‑237728 Correct intent driven MnS description in clause 4.2.2 Ericsson CR Approval Yes
Yes
revised No S5‑238300  
    S5‑238300 Correct intent driven MnS description in clause 4.2.2 Ericsson CR Approval Yes
Yes
agreed No   S5‑237728
    S5‑237729 Rel-18 CR TS 28.312 Correct intent driven MnS description in clause 4.2.2 L.M. Ericsson Limited CR Approval Yes
Yes
revised No S5‑238301  
    S5‑238301 Rel-18 CR TS 28.312 Correct intent driven MnS description in clause 4.2.2 L.M. Ericsson Limited CR Approval Yes
Yes
agreed No   S5‑237729
    S5‑237906 Rel-17 CR 28.312 Correct create an intent procedure Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238302  
    S5‑238302 Rel-17 CR 28.312 Correct create an intent procedure Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237906
    S5‑237907 Rel-18 CR 28.312 Correct create an intent procedure Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238303  
    S5‑238303 Rel-18 CR 28.312 Correct create an intent procedure Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237907
6.3.7 SON                      
6.3.8 QMC                      
6.3.9 Network slicing management S5‑237347 Correction of yang code for sliceprofile Ericsson India Private Limited CR Approval Yes
Yes
revised No S5‑238326  
    S5‑238326 Correction of yang code for sliceprofile Ericsson India Private Limited CR Approval Yes
Yes
agreed No   S5‑237347
    S5‑237377 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in DelayTolerance Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237378 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in DeterministicComm Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237379 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in XLThpt Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237380 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in MaxPktSize Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237381 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in MaxNumberofPDUSessions Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237382 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in KPIMonitoring Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237383 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in TermDensity Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237384 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in Positioning Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237385 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in Synchronicity Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237386 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in EnergyEfficiency Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237387 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in NSSAASupport Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237388 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in MaxNumberofUEs Nokia, Nokia Shanghai Bell CR Approval No
Yes
withdrawn Yes    
    S5‑237389 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in RadioSpectrum Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237390 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in UserMgmtOpen Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237391 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in V2XCommMode Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237392 Rel-17 CR TS 28.541 Corrections to servAttrCom attribute in NBIoT Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237393 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in DelayTolerance Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237394 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in DeterministicComm Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237395 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in XLThpt Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237396 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in MaxPktSize Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237397 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in MaxNumberofPDUSessions Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237398 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in KPIMonitoring Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237399 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in TermDensity Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237400 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in Positioning Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237401 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in Synchronicity Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237402 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in EnergyEfficiency Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237403 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in NSSAASupport Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237404 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in MaxNumberofUEs Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237405 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in RadioSpectrum Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237406 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in UserMgmtOpen Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237407 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in V2XCommMode Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237408 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in NBIoT Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237409 Rel-18 CR TS 28.541 Corrections to servAttrCom attribute in NonIPSupport Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237497 Rel-18 CR TS 28.531 Correct the description of Procedure of Network Slice Instance allocation ZTE Corporation CR Approval Yes
Yes
revised No S5‑238304  
    S5‑238304 Rel-18 CR TS 28.531 Correct the description of Procedure of Network Slice Instance allocation ZTE Corporation CR Approval Yes
Yes
agreed No   S5‑237497
    S5‑237731 Rel-16 CR TS 28.541 Enhance description of jitter in attribute table L.M. Ericsson Limited, Deutsche Telekom CR Approval Yes
Yes
not pursued No    
    S5‑237732 Rel-17 CR TS 28.541 Enhance description of jitter in attribute table L.M. Ericsson Limited, Deutsche Telekom CR Approval Yes
Yes
not pursued No    
    S5‑237733 Rel-18 CR TS 28.541 Enhance description of jitter in attribute table L.M. Ericsson Limited, Deutsche Telekom CR Approval Yes
Yes
not pursued No    
    S5‑237734 Rel-18 CR TS 28.541 Enhance network slice model description L.M. Ericsson Limited, Deutsche Telekom CR Approval Yes
Yes
not pursued No    
    S5‑237952 Rel-18 Ts 28.541 Correction of yang code for sliceprofile Ericsson India Private Limited CR Approval Yes
Yes
agreed No    
    S5‑237957 Rel-18 TS 28.623 YANG Correction of GeoAreaGrp and GeoCoordinateGrp Ericsson India Private Limited CR Approval Yes
Yes
revised No S5‑238284  
    S5‑238284 Rel-18 TS 28.623 YANG Correction of GeoAreaGrp and GeoCoordinateGrp Ericsson India Private Limited CR Approval Yes
Yes
agreed No   S5‑237957
    S5‑237958 Rel-17 CR 28.623 YANG Correction of attribute type TaiGrp Ericsson India Private Limited CR Approval Yes
Yes
revised No S5‑238325  
    S5‑238325 Rel-17 CR 28.623 YANG Correction of attribute type TaiGrp Ericsson India Private Limited CR Approval Yes
Yes
agreed No   S5‑237958
6.3.10 MEC management S5‑237595 remove duplicated clause for ECS measurement Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237596 Remove duplicated clause for ECS meansurement Huawei CR Agreement Yes
Yes
agreed No    
6.3.11 General NRM S5‑237363 TS28.541 Rel18 correction to NSSF interface between NWDAF and NSSF Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237364 TS28.541 Rel17 correction to NSSF interface between NWDAF and NSSF Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237365 TS28.541 Rel16 correction to NSSF interface between NWDAF and NSSF Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237366 TS28.541 Rel16 correction to DRACHOptimizationFunction stage 3 issue Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237367 TS28.541 Rel17 correction to DRACHOptimizationFunction stage 3 issue Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237368 TS28.541 Rel18 correction to DRACHOptimizationFunction stage 3 issue Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237369 TS28.541 Rel16 correction to 5GC resourceType allowed values Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237370 TS28.541 Rel17 correction to 5GC resourceType allowed values Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237371 TS28.541 Rel18 correction to 5GC resourceType allowed values Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237376 Rel-17 CR 32.160 Clarify YANG revision date handling Ericsson Hungary Ltd CR Approval Yes
Yes
agreed No    
    S5‑237411 Rel-16 Correct IOC instance creation and deletion Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237412 Rel-16 Correct IOC instance creation and deletion (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237413 Rel-17 Correct IOC instance creation and deletion Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237414 Rel-17 Correct IOC instance creation and deletion (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237415 Rel-18 Correct IOC instance creation and deletion Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237416 Rel-18 Correct IOC instance creation and deletion (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237426 Rel-18 Correct dnai and dnaiList attribute definitions Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238305  
    S5‑238305 Rel-18 Correct dnai and dnaiList attribute definitions Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237426
    S5‑238306 Rel-17 Correct dnai and dnaiList attribute definitions Ericsson Inc. CR Approval Yes
Yes
agreed No    
    S5‑237441 Rel-17 CR TS28.623 Correct the yaml definition for ThresholdMonitor IOC to align with stage2 definition Huawei CR Agreement Yes
Yes
revised No S5‑238310  
    S5‑238310 Rel-17 CR TS28.623 Correct the yaml definition for ThresholdMonitor IOC to align with stage2 definition Huawei CR Agreement Yes
Yes
agreed No   S5‑237441
    S5‑237442 Rel-18 CR TS28.623 Correct the yaml definition for ThresholdMonitor IOC to align with stage2 definition Huawei CR Agreement Yes
Yes
revised No S5‑238311  
    S5‑238311 Rel-18 CR TS28.623 Correct the yaml definition for ThresholdMonitor IOC to align with stage2 definition Huawei CR Agreement Yes
Yes
agreed No   S5‑237442
    S5‑237443 Rel-17 CR TS 28.541 Correct the issues for NrNrm YAML file Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237444 Rel-18 CR TS 28.541 Correct the issues for NrNrm YAML file Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237498 DP Schema definition Issues SubNetwork and ManagedElement OpenAPI SS Nokia, Nokia Shanghai Bell discussion Endorsement Yes
Yes
revised No S5‑238312  
    S5‑238312 DP Schema definition Issues SubNetwork and ManagedElement OpenAPI SS Nokia, Nokia Shanghai Bell discussion Endorsement Yes
Yes
endorsed No   S5‑237498
    S5‑237530 Rel-18 CR TS 28.623 Solution Sets clarifications Ericsson Hungary Ltd CR Approval Yes
Yes
agreed No    
    S5‑237532 Rel-18 CR 32.160 Clarify YANG revision date handling Ericsson Hungary Ltd CR Approval Yes
Yes
agreed No    
    S5‑237620 Rel-17 CR TS 28.622 Correcting the definition of mgtDataName attribute Nokia, Nokia Shanghai Bell, Ericsson CR Approval Yes
Yes
merged No S5‑238314  
    S5‑237621 Rel-18 CR TS 28.622 Correcting the definition of mgtDataName attribute Nokia, Nokia Shanghai Bell, Ericsson CR Approval Yes
Yes
merged No S5‑238315  
    S5‑237915 Rel-18 CR 28.541 Correct redundant attribute definitions Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238321  
    S5‑238321 Rel-18 CR 28.541 Correct redundant attribute definitions Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237915
    S5‑237933 Rel-18 CR TS 28.623 Removal of the Corba and XML Solution Sets Ericsson Hungary Ltd CR Approval Yes
Yes
not pursued No    
    S5‑237962 Rel-17 CR 28.623 YANG Corrections (SA5#152) Ericsson Hungary Ltd CR Approval Yes
Yes
agreed No    
    S5‑237963 Rel-17 CR 28.541 YANG Corrections (SA5#152) Ericsson Hungary Ltd CR Approval Yes
Yes
agreed No    
    S5‑238137 Rel18 28.541 YANG Corrections Ericsson CR Agreement Yes
Yes
agreed No    
6.3.12 PM/KPI S5‑237603 Fix error related to number of PDU session creation measurement Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237604 Fix error related to number of PDU session creation measurement Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237605 Fix error related to number of PDU session creation measurement Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237752 Rel-16 CR TS 28.554 Correction Utilization KPI definition of PDU session establishment time of network slice China Mobile, Ericsson CR Approval Yes
Yes
agreed No    
    S5‑237754 Rel-17 CR TS 28.554 Correction Utilization KPI definition of PDU session establishment time of network slice China Mobile, Ericsson CR Approval Yes
Yes
agreed No    
    S5‑237755 Rel-17 CR TS 28.554 Correction Utilization KPI definition of PDU session establishment time of network slice China Mobile E-Commerce Co., Ericsson CR Approval No
Yes
withdrawn Yes    
    S5‑237804 Rel-18 CR TS 28.554 Correction Utilization KPI definition of PDU session establishment time of network slice China Mobile, Ericsson CR Approval Yes
Yes
agreed No    
    S5‑237898 Rel-17 CR 28.622 Add measurement bin support to NRM Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238314  
    S5‑238314 Rel-17 CR 28.622 Add measurement bin support to NRM Ericsson Inc.,Nokia CR Approval Yes
Yes
agreed No   S5‑237898
    S5‑237899 Rel-18 CR 28.622 Add measurement bin support to NRM Ericsson Inc.,Nokia CR Approval Yes
Yes
revised No S5‑238315  
    S5‑238315 Rel-18 CR 28.622 Add measurement bin support to NRM Ericsson Inc.,Nokia CR Approval Yes
Yes
agreed No   S5‑237899
    S5‑237900 Rel-17 CR 28.623 Add measurement bin support to NRM (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238316  
    S5‑238316 Rel-17 CR 28.623 Add measurement bin support to NRM (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237900
    S5‑237901 Rel-18 CR 28.623 Add measurement bin support to NRM (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238317  
    S5‑238317 Rel-18 CR 28.623 Add measurement bin support to NRM (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237901
6.3.13 Trace/MDT S5‑237539 Rel-16 CR TS32.421 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237540 Rel-17 CR TS32.421 Align N38 in SMF with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237541 Rel-18 CR TS32.421 Align N38 in SMF with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237543 Rel-16 CR TS32.422 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
revised No S5‑238318  
    S5‑238318 Rel-16 CR TS32.422 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No   S5‑237543
    S5‑237545 Rel-17 CR TS32.422 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
revised No S5‑238319  
    S5‑238319 Rel-17 CR TS32.422 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No   S5‑237545
    S5‑237547 Rel-18 CR TS32.422 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
revised No S5‑238320  
    S5‑238320 Rel-18 CR TS32.422 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No   S5‑237547
    S5‑237549 Rel-16 CR TS32.423 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237551 Rel-17 CR TS32.423 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237553 Rel-18 CR TS32.423 Align N38 in SMF requirement with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237557 Rel-16 CR TS 28.623 Align N38 in SMF with TS23.501 Ericsson LM CR Agreement Yes
Yes
revised No S5‑237919  
    S5‑237558 Rel-17 CR TS28.623 Align N38 in SMF with TS23.501 Ericsson LM CR Agreement Yes
Yes
revised No S5‑237912  
    S5‑237560 Rel-18 CR TS 28.623 Align N38 in SMF with TS23.501 Ericsson LM CR Agreement Yes
Yes
revised No S5‑237887  
    S5‑237586 Rel-15 CR TS32.421 Missing N16 in SMF requirement Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237587 Rel-16 CR TS32.421 Missing N16 in SMF requirement Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237589 Rel-17 CR TS32.421 Missing N16 in SMF requirement Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237590 Rel-18 CR TS32.421 Missing N16 in SMF requirement Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237591 Rel-16 CR TS32.421 Missing N16a in SMF requirement Ericsson LM CR Agreement Yes
Yes
agreed No    
    S5‑237592 Rel-17 CR TS32.421 Missing N16a in SMF requirement Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237609 TS32.421 R18 Missing N16a in SMF requirement Ericsson Ltd CR Agreement Yes
Yes
agreed No    
    S5‑237634 Rel-15 CR TS 32.421 Add the missing requirements for tracing of CHF and NWDAF Nokia, Nokia Shangai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237635 Rel-16 CR TS 32.421 Add the missing requirements for tracing of CHF and NWDAF Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237636 Rel-17 CR TS 32.421 Add the missing requirements for tracing of CHF and NWDAF Nokia, Nokia Shangai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237637 Rel-18 CR TS 32.421 Add the missing requirements for tracing of CHF and NWDAF Nokia, Nokia Shangai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237638 Rel-15 CR TS 32.423 Add the missing Trace record content for CHF Nokia, Nokia Shangai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237639 Rel-16 CR TS 32.423 Add the missing Trace record content for CHF Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237640 Rel-17 CR TS 32.423 Add the missing Trace record content for CHF Nokia, Nokia Shangai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237641 Rel-18 CR TS 32.423 Add the missing Trace record content for CHF Nokia, Nokia Shangai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237642 Rel-17 CR TS 32.421 Adding the missing requirements for tracing new NFs Nokia, Nokia Shangai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237643 Rel-18 CR TS 32.421 Adding the missing requirements for tracing new NFs Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237887 Rel-18 CR TS 28.623 Align N38 in SMF with TS23.501 Ericsson LM CR Agreement Yes
Yes
revised No S5‑237888 S5‑237560
    S5‑237888 Rel-18 CR TS 28.623 Align N38 in SMF with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
revised No S5‑238251 S5‑237887
    S5‑238251 Rel-18 CR TS 28.623 Align N38 in SMF with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No   S5‑237888
    S5‑237889 Rel-16 CR 32.423 Correct trace administrative message definitions Ericsson Inc. CR Agreement Yes
Yes
revised No S5‑238336  
    S5‑238336 Rel-16 CR 32.423 Correct trace administrative message definitions Ericsson Inc. CR Agreement Yes
Yes
agreed No   S5‑237889
    S5‑237890 Rel-17 CR 32.423 Correct trace administrative message definitions Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238337  
    S5‑238337 Rel-17 CR 32.423 Correct trace administrative message definitions Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237890
    S5‑237891 Rel-18 CR 32.423 Correct trace administrative message definitions Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238338  
    S5‑238338 Rel-18 CR 32.423 Correct trace administrative message definitions Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237891
    S5‑237912 Rel-17 CR TS28.623 Align N38 in SMF with TS23.501 Ericsson LM CR Agreement Yes
Yes
revised No S5‑238250 S5‑237558
    S5‑238250 Rel-17 CR TS28.623 Align N38 in SMF with TS23.501 Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237912
    S5‑237919 Rel-16 CR TS 28.623 Align N38 in SMF with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
revised No S5‑238249 S5‑237557
    S5‑238249 Rel-16 CR TS 28.623 Align N38 in SMF with TS23.501 Ericsson Ltd CR Agreement Yes
Yes
agreed No   S5‑237919
    S5‑237920 Rel-16 CR TS28.623 Adding N16 and N16a into module_3gpp-common-trace.yang Ericsson LM CR Agreement Yes
Yes
agreed No    
    S5‑237922 Rel-17 CR TS28.623 Adding N16 and N16a into module_3gpp-common-trace.yang Ericsson LM CR Agreement Yes
Yes
agreed No    
    S5‑237925 Rel-18 CR TS28.623 Adding N16 and N16a into module_3gpp-common-trace.yang Ericsson Ltd CR Agreement Yes
Yes
agreed No    
6.3.14 Other S5‑237417 Rel-16 CR 28.532 Clarify MnS capability definitions Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238322 S5‑236550
    S5‑238322 Rel-16 CR 28.532 Clarify MnS capability definitions Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237417
    S5‑237418 Rel-17 CR 28.532 Clarify MnS capability definitions Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238323 S5‑236551
    S5‑238323 Rel-17 CR 28.532 Clarify MnS capability definitions Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237418
    S5‑237419 Rel-18 CR 28.532 Clarify MnS capability definitions Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238324  
    S5‑238324 Rel-18 CR 28.532 Clarify MnS capability definitions Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237419
    S5‑237420 Rel-16 CR 28.622 Clarify HeartbeatControl IOC definition Ericsson Inc. CR Approval Yes
Yes
not pursued No   S5‑236534
    S5‑237421 Rel-17 CR 28.622 Clarify HeartbeatControl IOC definition Ericsson Inc. CR Approval Yes
Yes
not pursued No   S5‑236535
    S5‑237422 Rel-18 CR 28.622 Clarify HeartbeatControl IOC definition Ericsson Inc. CR Approval Yes
Yes
not pursued No   S5‑236536
    S5‑237423 Rel-16 CR 28.623 Clarify HeartbeatControl IOC definition (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
not pursued No   S5‑236532
    S5‑237424 Rel-17 CR 28.623 Clarify HeartBeatControl IOC definition (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
not pursued No   S5‑236531
    S5‑237425 Rel-18 CR 28.623 Clarify HeartbeatControl IOC definition (stage3, yang) Ericsson Inc. CR Approval Yes
Yes
not pursued No   S5‑236533
    S5‑237436 Rel-17 CR 28.532 Clarify streaming data reporting service definitions Ericsson Inc. CR Agreement Yes
Yes
agreed No    
    S5‑237510 Rel-15 CR 28.526 Fix incorrect operations and parameters Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237511 Rel-16 CR 28.526 Fix incorrect operations and parameters Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237512 Rel-17 CR 28.526 Fix incorrect operations and parameters Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237513 Rel-15 CR 28.526 Fix incorrect version of ETSI GS NFV IFA013 Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237514 Rel-15 CR 28.526 Fix incorrect version of ETSI GS NFV IFA013 Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237515 Rel-17 CR 28.526 Fix incorrect version of ETSI GS NFV IFA013 Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237516 Rel-15 CR 28.526 Remove unsupported operations Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237517 Rel-16 CR 28.526 Remove unsupported operations Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237518 Rel-17 CR 28.526 Remove unsupported operations Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237796 Rel-17 CR 28.622 h70 NodeFilter Nokia CR Agreement Yes
Yes
not pursued No    
    S5‑238328 Rel-17 CR 28.622 h70 NodeFilter Nokia CR Agreement No
Yes
withdrawn Yes    
    S5‑237797 Rel-18 CR 28.622 i40 NodeFilter Nokia CR Agreement Yes
Yes
not pursued No    
    S5‑238329 Rel-18 CR 28.622 i40 NodeFilter Nokia CR Agreement No
Yes
withdrawn Yes    
    S5‑237895 Correction of attribute properties Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    S5‑237896 Rel-18 CR 28.532 Clarify streaming data reporting service definitions Ericsson Inc. CR Approval Yes
Yes
agreed No    
    S5‑237897 Correction of attribute properties Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    S5‑237902 Correction of attribute properties Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    S5‑237905 Correction of attribute properties Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    S5‑237908 Correction of attribute properties Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    S5‑237909 Rel-16 CR 32.158 Clarify mapping of DNs to URIs Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237910 Correction of attribute properties Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    S5‑237911 Rel-17 CR 32.158 Clarify mapping of DNs to URIs Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237913 Rel-18 CR 32.158 Clarify mapping of DNs to URIs Ericsson Inc. CR Approval Yes
Yes
not pursued No    
    S5‑237917 Rel-18 CR 32.156 Editorial clean up Ericsson Inc. CR Approval Yes
Yes
revised No S5‑238330  
    S5‑238330 Rel-18 CR 32.156 Editorial clean up Ericsson Inc. CR Approval Yes
Yes
agreed No   S5‑237917
    S5‑237937 Rel-17 CR TS 28.632 Correct multiplicities in relations to ManagedFunction Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238332  
    S5‑238332 Rel-17 CR TS 28.632 Correct multiplicities in relations to ManagedFunction Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑237937
    S5‑237959 Rel-16 CR TS 28.632 Correct multiplicities in relations to ManagedFunction Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238331  
    S5‑238331 Rel-16 CR TS 28.632 Correct multiplicities in relations to ManagedFunction Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑237959
    S5‑237960 Rel-16 CR TS28.536 Fix the properties of attributes ZTE Corporation CR Approval Yes
Yes
not pursued No    
    S5‑237961 Rel-17 CR TS28.536 Fix the properties of attributes ZTE Corporation CR Approval Yes
Yes
agreed No    
    S5‑237965 Rel-17 CR 28.556 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
revised No S5‑238333  
    S5‑238333 Rel-17 CR 28.556 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
agreed No   S5‑237965
    S5‑237966 Rel-17 CR 28.536 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
revised No S5‑238189  
    S5‑238189 Rel-17 CR 28.536 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
agreed No   S5‑237966
    S5‑237969 Rel-15 CR 28.541 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
revised No S5‑238190  
    S5‑238190 Rel-15 CR 28.541 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
agreed No   S5‑237969
    S5‑237970 Rel-16 CR 28.541 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
revised No S5‑238191  
    S5‑238191 Rel-16 CR 28.541 Correction of attribute properties Ericsson-LG Co., LTD CR Agreement Yes
Yes
agreed No   S5‑237970
    S5‑237971 Correction of attribute properties Ericsson CR Agreement Yes
Yes
revised No S5‑238192  
    S5‑238192 Correction of attribute properties Ericsson CR Agreement Yes
Yes
agreed No   S5‑237971
    S5‑237972 Rel-18 CR 28.541 Correction of attribute properties Ericsson CR Agreement Yes
Yes
revised No S5‑238193  
    S5‑238193 Rel-18 CR 28.541 Correction of attribute properties Ericsson CR Agreement Yes
Yes
agreed No   S5‑237972
6.4 OAM&P Rel-18 Work Items - Intelligence and Automation                      
6.4.1 Self-Configuration of RAN NEs                      
6.4.1.1 RANSC_WoP#1 S5‑237465 pCR TS 28.317 Update use case for self-configuration management China Mobile, Huawei pCR Approval Yes
Yes
approved No    
    S5‑237469 Presentation of TS 28.317 to SA for information China Mobile, Huawei TS or TR cover Approval Yes
Yes
revised No S5‑238229  
    S5‑238229 Presentation of TS 28.317 to SA for information China Mobile, Huawei TS or TR cover Approval Yes
Yes
approved No   S5‑237469
    S5‑238230 Draft TS 28.317 Huawei draft TS Approval No
Yes
email approval No    
6.4.1.2 RANSC_WoP#2                      
6.4.1.3 RANSC_WoP#3 S5‑237445 pCR TS 28.317 Add stage3 definition for MnS component type B Huawei,China Mobile pCR Approval Yes
Yes
approved No    
    S5‑237446 Rel-18 CR TS 28.532 Add resources-RanScNrm as Resource for provisioning MnS Huawei,China Mobile CR Agreement Yes
Yes
agreed No    
    S5‑237466 pCR TS 28.317 Update attribute definition of self-configuration management (type B) China Mobile, Huawei pCR Approval Yes
Yes
approved No    
    S5‑237467 pCR TS 28.317 Add stage3 definition for MnS component type A China Mobile, Huawei pCR Approval Yes
Yes
revised No S5‑238231  
    S5‑238231 pCR TS 28.317 Add stage3 definition for MnS component type A China Mobile, Huawei pCR Approval Yes
Yes
noted No   S5‑237467
6.4.1.4 Draft TS email approval                      
6.4.2 Management Data Analytics phase 2 S5‑238128 Tuesday Q0 Breakout on 6.4.2 eMDAS Intel report Information Yes
Yes
noted No    
    S5‑238359 Draft CR eMDAS_Ph2 – TS28.104 Further enhancements into the Management Data Analytics (Phase 2) NEC draftCR Approval No
Yes
email approval No    
6.4.2.1 eMDAS_Ph2_WoP#1                      
6.4.2.2 eMDAS_Ph2_WoP#2 S5‑237628 Rel-18 Input to draft CR TS 28.104 Predictions of maintenance management related PMs Nokia, Nokia Shangai Bell draftCR Approval Yes
Yes
revised No S5‑238110  
    S5‑238110 Rel-18 Input to draft CR TS 28.104 Predictions of maintenance management related PMs Nokia, Nokia Shangai Bell draftCR Approval Yes
Yes
approved No   S5‑237628
    S5‑237689 Rel-18 InputToDraftCR TS 28.104 Add general description for NF resource related analytics and Predictions of Management data Huawei draftCR Approval Yes
Yes
revised No S5‑238308  
    S5‑238308 Rel-18 InputToDraftCR TS 28.104 Add general description for NF resource related analytics and Predictions of Management data Huawei draftCR Approval Yes
Yes
approved No   S5‑237689
    S5‑237690 Rel-18 InputToDraftCR TS 28.104 corrections for resource related analysis Huawei draftCR Approval Yes
Yes
revised No S5‑238138  
    S5‑238138 Rel-18 InputToDraftCR TS 28.104 corrections for resource related analysis Huawei draftCR Approval Yes
Yes
approved No   S5‑237690
6.4.2.3 eMDAS_Ph2_WoP#3                      
6.4.2.4 eMDAS_Ph2_WoP#4                      
6.4.2.5 eMDAS_Ph2_WoP#5                      
6.4.2.6 eMDAS_Ph2_WoP#6                      
6.4.2.7 eMDAS_Ph2_WoP#7 S5‑237600 Rel-18 draftCR 28.104 Add solution for MDA assisted control plane congestion analysis Huawei draftCR Approval Yes
Yes
revised No S5‑238139  
    S5‑238139 Rel-18 draftCR 28.104 Add solution for MDA assisted control plane congestion analysis Huawei draftCR Approval Yes
Yes
approved No   S5‑237600
    S5‑237601 Update connection data volumes meansurement Huawei CR Agreement Yes
Yes
agreed No    
6.4.3 AI/ML management                      
6.4.3.1 AIML_MGT_WoP#1 S5‑237482 Rel-18 Input to draft CR TS 28.105 ML Triggering AIML Inference Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
revised No S5‑238115  
    S5‑238115 Rel-18 Input to draft CR TS 28.105 ML Triggering AIML Inference Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No   S5‑237482
    S5‑237483 Rel-18 Input to draft CR TS 28.105 AIML Inference Outcomes Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
revised No S5‑238116  
    S5‑238116 Rel-18 Input to draft CR TS 28.105 AIML Inference Outcomes Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No   S5‑237483
    S5‑237484 Rel-18 Input to draft CR TS 28.105 Configuration of Energy Saving Functions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
revised No S5‑238113  
    S5‑238113 Rel-18 Input to draft CR TS 28.105 Configuration of Energy Saving Functions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No   S5‑237484
    S5‑237485 Rel-18 Input to draft CR TS 28.105 Configuration of Load balancing Functions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
revised No S5‑238170  
    S5‑238170 Rel-18 Input to draft CR TS 28.105 Configuration of Load balancing Functions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No   S5‑237485
    S5‑237486 Rel-18 Input to draft CR TS 28.105 Configuration of Mobility Optimization Functions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No    
    S5‑238171 Rel-18 Input to draft CR TS 28.105 Configuration of Mobility Optimization Functions Nokia, Nokia Shanghai Bell draftCR Approval No
Yes
withdrawn Yes    
    S5‑237487 Rel-18 Input to draft CR TS 28.105 Information on Learned capabilities Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
not treated No    
    S5‑237488 Rel-18 Input to draft CR TS 28.105 ML Inference emulation Requirements Nokia, Nokia Shanghai Bell, NTT DOCOMO, NEC draftCR Approval Yes
Yes
revised No S5‑238132  
    S5‑238132 Rel-18 Input to draft CR TS 28.105 ML Inference emulation Requirements Nokia, Nokia Shanghai Bell, NTT DOCOMO, NEC draftCR Approval Yes
Yes
approved No   S5‑237488
    S5‑237489 Rel-18 Input to draft CR TS 28.105 Information on executed AIML Actions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
revised No S5‑238121  
    S5‑238121 Rel-18 Input to draft CR TS 28.105 Information on executed AIML Actions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No   S5‑237489
    S5‑237490 Rel-18 Input to draft CR TS 28.105 NRM attributes on Learned capabilities Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
not treated No    
    S5‑237491 Rel-18 Input to draft CR TS 28.105 Coordinating ML Inference Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
not treated No    
    S5‑237492 Rel-18 Input to draft CR TS 28.105 Extend NRM for RAN AIML Inference Functions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
revised No S5‑238172  
    S5‑238172 Rel-18 Input to draft CR TS 28.105 Extend NRM for RAN AIML Inference Functions Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No   S5‑237492
    S5‑237493 Rel-18 Input to draft CR TS 28.105 ML Inference emulation NRM Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
not treated No    
    S5‑237499 Rel-18 Input to draft CR TS 28.105 Use case and requirements for ML Inference activation Nokia, Nokia Shanghai Bell, NTT DOCOMO, Intel draftCR Approval Yes
Yes
revised No S5‑238111  
    S5‑238111 Rel-18 Input to draft CR TS 28.105 Use case and requirements for ML Inference activation Nokia, Nokia Shanghai Bell, NTT DOCOMO, Intel draftCR Approval Yes
Yes
approved No   S5‑237499
    S5‑237500 Rel-18 Input to draft CR TS 28.105 ML inference policy-based activation Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
merged No S5‑238111  
    S5‑237501 Rel-18 Input to draft CR TS 28.105 NRM for AIML activation policies Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
revised No S5‑238112  
    S5‑238112 Rel-18 Input to draft CR TS 28.105 NRM for AIML activation policies Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
approved No   S5‑237501
    S5‑237520 Rel-18 Input to draft CR TS 28.105 ML entity versions and artefacts Nokia Belgium draftCR Approval Yes
Yes
revised No S5‑238131  
    S5‑238131 Rel-18 Input to draft CR TS 28.105 ML entity versions and artefacts Nokia Belgium draftCR Approval Yes
Yes
noted No   S5‑237520
    S5‑237536 Rel 18 Input to DraftCR TS 28.105 AIML Inference History NRM Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
revised No S5‑238117  
    S5‑238117 Rel 18 Input to DraftCR TS 28.105 AIML Inference History NRM Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No   S5‑237536
    S5‑237537 Rel 18 Input to DraftCR 28.105 Add ML performance metrics Nokia, Nokia Shanghai Bell draftCR Approval Yes
Yes
noted No    
    S5‑237544 Input to DraftCR 28.105 Correction of ML update related IOCs Intel, NEC other Agreement Yes
Yes
revised No S5‑238341  
    S5‑238341 Input to DraftCR 28.105 Correction of ML update related IOCs Intel, NEC other Agreement Yes
Yes
approved No   S5‑237544
    S5‑237546 Add NRM for AnLF Intel CR Agreement Yes
Yes
revised No S5‑238340  
    S5‑238340 Add NRM for AnLF Intel CR Agreement Yes
Yes
agreed No   S5‑237546
    S5‑237548 Input to DraftCR 28.105 Update NRMs for AI-ML inference function Intel, NEC other Agreement Yes
Yes
revised No S5‑238334  
    S5‑238334 Input to DraftCR 28.105 Update NRMs for AI-ML inference function Intel, NEC other Agreement Yes
Yes
revised No S5‑238350 S5‑237548
    S5‑238350 Input to DraftCR 28.105 Update NRMs for AI-ML inference function Intel, NEC, Ericsson, Huawei other Agreement Yes
Yes
approved No   S5‑238334
    S5‑237550 Input to DraftCR 28.105 Add NRMs for actions executed according to the inference report Intel, NEC other Agreement Yes
Yes
revised No S5‑238122  
    S5‑238122 Input to DraftCR 28.105 Add NRMs for actions executed according to the inference report Intel, NEC other Agreement Yes
Yes
noted No   S5‑237550
    S5‑237588 Rel-18 Input to draft CR TS 28.105 ML inference NRM clarifications NEC, Intel draftCR Agreement Yes
Yes
merged No S5‑238334  
    S5‑237611 Input to draft CR TS28.105: Corrections voiding existing clause 6.2 and introducing new clause NEC, Intel draftCR Agreement Yes
Yes
approved No    
    S5‑237632 Rel-18 Input to draft CR TS 28.105 Description, Use case and requirements for Context of ML Entities Nokia, Nokia Shangai Bell draftCR Approval Yes
Yes
revised No S5‑238126  
    S5‑238126 Rel-18 Input to draft CR TS 28.105 Description, Use case and requirements for Context of ML Entities Nokia, Nokia Shangai Bell draftCR Approval Yes
Yes
noted No   S5‑237632
    S5‑237679 Rel-18 Input to DraftCR TS 28.105 Correction of ML Inference NRM Ericsson India Private Limited draftCR Approval Yes
Yes
merged No S5‑238334  
    S5‑237691 Rel-18 InputToDraftCR TS 28.105 corrections for ML performance indicator selection Huawei draftCR Approval Yes
Yes
approved No    
    S5‑237692 Rel-18 InputToDraftCR TS 28.105 corrections of inheritance hierarchy for intelligence functions Huawei draftCR Approval Yes
Yes
merged No S5‑238334  
    S5‑237693 Rel-18 InputToDraftCR TS 28.105 corrections for ML entity loading Huawei draftCR Approval Yes
Yes
revised No S5‑238177  
    S5‑238177 Rel-18 InputToDraftCR TS 28.105 corrections for ML entity loading Huawei draftCR Approval Yes
Yes
noted No   S5‑237693
    S5‑237720 Input to Rel-18 DraftCR TS28.105 Add use case and requirements for training data effectiveness reporting and analytics China Mobile E-Commerce Co. draftCR Approval No
Yes
withdrawn Yes    
    S5‑237740 Input to Rel-18 DraftCR TS28.105 Add use case and requirements for training data effectiveness reporting and analytics China Mobile E-Commerce Co.,Nokia draftCR Approval Yes
Yes
revised No S5‑238273  
    S5‑238273 Input to Rel-18 DraftCR TS28.105 Add use case and requirements for training data effectiveness reporting and analytics China Mobile E-Commerce Co.,Nokia draftCR Approval Yes
Yes
approved No   S5‑237740
    S5‑237747 Input to Rel-18 DraftCR TS28.105 Add use case and requirements for pre-processed event data for ML training China Mobile E-Commerce Co.,Nokia draftCR Approval Yes
Yes
noted No    
    S5‑237832 Input to DraftCR 28.105 Correction of ML Testing NRM Ericsson India Private Limited draftCR Approval Yes
Yes
noted No    
    S5‑237834 Input to DraftCR TS 28.105 Discussion paper on AIML Inference NRM Ericsson India Private Limited discussion Endorsement Yes
Yes
noted No    
    S5‑237921 Rel-18 Input to Draft CR 28.105 add UC for ML Evaluation China Mobile Com. Corporation draftCR Approval Yes
Yes
noted No    
    S5‑237923 Rel-18 Input to Draft CR 28.105 add UC for ML Knowledge Transfer Learning China Mobile Com. Corporation draftCR Approval Yes
Yes
not treated No    
    S5‑237924 Rel-18 Input to Draft CR 28.105 add Description, UC and requirements for ML emulation phase China Mobile Com. Corporation draftCR Approval Yes
Yes
merged No S5‑238132  
    S5‑237927 Rel-18 Input to Draft CR 28.105 modification on ML training initiated by producer China Mobile Com. Corporation draftCR Approval Yes
Yes
revised No S5‑238123  
    S5‑238123 Rel-18 Input to Draft CR 28.105 modification on ML training initiated by producer China Mobile Com. Corporation draftCR Approval Yes
Yes
approved No   S5‑237927
    S5‑238114 Minutes of the breakout session Intel report discussion Yes
Yes
noted No    
6.4.3.2 AIML_MGT_WoP#2 S5‑237502 Rel18 Input To draftCR TS 28.105 Coordination of the ML capabilities Nokia, Nokia Shanghai Bell, TELUS draftCR Approval Yes
Yes
not treated No    
    S5‑237694 Rel-18 InputToDraftCR TS 28.105 Add deployment scenarios for AIML related functions Huawei draftCR Approval Yes
Yes
revised No S5‑238119  
    S5‑238119 Rel-18 InputToDraftCR TS 28.105 Add deployment scenarios for AIML related functions Huawei draftCR Approval Yes
Yes
revised No S5‑238347 S5‑237694
    S5‑238347 Rel-18 InputToDraftCR TS 28.105 Add deployment scenarios for AIML related functions Huawei, Ericsson, Intel, NEC draftCR Approval Yes
Yes
approved No   S5‑238119
    S5‑237926 Rel-18 Input to Draft CR 28.105 modification on description of AIML update control China Mobile Com. Corporation draftCR Approval Yes
Yes
revised No S5‑238118  
    S5‑238118 Rel-18 Input to Draft CR 28.105 modification on description of AIML update control China Mobile Com. Corporation draftCR Approval Yes
Yes
noted No   S5‑237926
6.4.4 Intent driven Management Service for mobile network phase 2                      
6.4.4.1 IDMS_MN_ph2_WoP#1 S5‑237433 Rel-18 CR TS28.312 Update the stage3 to aign with the latest stage2 Huawei CR Agreement Yes
Yes
revised No S5‑238173  
    S5‑238173 Rel-18 CR TS28.312 Update the stage3 to aign with the latest stage2 Huawei CR Agreement Yes
Yes
agreed No   S5‑237433
    S5‑237494 Rel18_CR_28312 Correct intent Report Model Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
merged No S5‑238188  
    S5‑237748 Rel-18 CR TS 28.312 Add Common Contexts China Mobile Com. Corporation CR Agreement Yes
Yes
not pursued No    
    S5‑237819 Rel-18 CR TS 28.312 Revisions to ValueRange China Mobile Com. Corporation CR Agreement Yes
Yes
revised No S5‑238176  
    S5‑238176 Rel-18 CR TS 28.312 Revisions to ValueRange China Mobile Com. Corporation CR Agreement Yes
Yes
agreed No   S5‑237819
    S5‑238228 Agenda and minutes for IDMS_MN_ph2 breakout session Huawei report Information Yes
Yes
noted No    
6.4.4.2 IDMS_MN_ph2_WoP#2 S5‑237429 Rel-18 CR TS 28.312 Update RadioNetworkExpectation definition Huawei, Deutsche Telekom CR Agreement Yes
Yes
revised No S5‑238178  
    S5‑238178 Rel-18 CR TS 28.312 Update RadioNetworkExpectation definition Huawei, Deutsche Telekom CR Agreement Yes
Yes
agreed No   S5‑237429
    S5‑237430 Rel-18 CR TS 28.312 Update Annex D YAML document example to align with the latest intentNRM and intentExpectationNRM YAML definition Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237431 Rel-18 CR TS 28.312 Update ValueRangeType to support scenario specific intent expectation Huawei, Deutsche Telekom CR Agreement Yes
Yes
revised No S5‑238179  
    S5‑238179 Rel-18 CR TS 28.312 Update ValueRangeType to support scenario specific intent expectation Huawei, Deutsche Telekom CR Agreement Yes
Yes
agreed No   S5‑237431
    S5‑237597 Update 5GC expectation Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237612 Rel-18 CR TS 28.312 Update the description of requirements for obtaining intent report information in use cases China Mobile Com. Corporation CR Agreement Yes
Yes
revised No S5‑238180  
    S5‑238180 Rel-18 CR TS 28.312 Update the description of requirements for obtaining intent report information in use cases China Mobile Com. Corporation CR Agreement Yes
Yes
agreed No   S5‑237612
    S5‑237711 Correct issues for End-to-end Network Resource Expectation Huawei CR Agreement Yes
Yes
revised No S5‑238181  
    S5‑238181 Correct issues for End-to-end Network Resource Expectation Huawei CR Agreement Yes
Yes
agreed No   S5‑237711
    S5‑237730 Rel-18 CR TS 28.312 Correct Yaml in Annex D L.M. Ericsson Limited CR Approval Yes
Yes
agreed No    
6.4.4.3 IDMS_MN_ph2_WoP#3 S5‑237432 Rel-18 CR TS 28.312 Correct the stage2 and stage3 definition for intentPriority Huawei, Deutsche Telekom CR Agreement Yes
Yes
revised No S5‑238182  
    S5‑238182 Rel-18 CR TS 28.312 Correct the stage2 and stage3 definition for intentPriority Huawei, Deutsche Telekom CR Agreement Yes
Yes
agreed No   S5‑237432
    S5‑237437 Rel-18 CR TS 28.312 add recommendedSolutions value in IntentReport NTT DOCOMO CR Agreement Yes
Yes
revised No S5‑238197  
    S5‑238197 Rel-18 CR TS 28.312 add recommendedSolutions value in IntentReport NTT DOCOMO CR Agreement Yes
Yes
agreed No   S5‑237437
    S5‑237438 Rel-18 CR TS 28.312 add attributes of intent preemption NTT DOCOMO, China Mobile Com. Corporation CR Agreement Yes
Yes
revised No S5‑238183  
    S5‑238183 Rel-18 CR TS 28.312 add attributes of intent preemption NTT DOCOMO, China Mobile Com. Corporation CR Agreement Yes
Yes
agreed No   S5‑237438
    S5‑237471 Discussion on issues caused by multiple IntentReports per Intent Huawei Technologies Japan K.K. discussion Discussion Yes
Yes
noted No    
    S5‑237472 Rel-18 CR 28.312 IntentReport cardinality Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑238187 Rel-18 CR 28.312 IntentReport cardinality Huawei CR Agreement No
Yes
withdrawn Yes    
    S5‑237474 Rel-18 CR 28.312 Missing attribute definitions Huawei CR Agreement Yes
Yes
revised No S5‑238188  
    S5‑238188 Rel-18 CR 28.312 Missing attribute definitions Huawei CR Agreement Yes
Yes
agreed No   S5‑237474
    S5‑237495 Rel18_CR_28312 information on a test Intent Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No    
    S5‑237496 Rel18_CR_28312 Clarify observation period and fulfilment deadline Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238226  
    S5‑238226 Rel18_CR_28312 Clarify observation period and fulfilment deadline Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑237496
    S5‑237506 Rel-18 CR 28.312 Intent Conflict Resolution Procedure Huawei, ZTE CR Agreement Yes
Yes
revised No S5‑238184 S5‑237116
    S5‑238184 Rel-18 CR 28.312 Intent Conflict Resolution Procedure Huawei, ZTE CR Agreement Yes
Yes
agreed No   S5‑237506
    S5‑237519 Rel-18 CR 28.312 Errors in attribute definitions Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237678 Clarify MnS consumer how handling infeasible results of intent fulfilment feasibility check ZTE Corporation, China Mobile, Huawei CR Approval Yes
Yes
agreed No   S5‑236951
    S5‑237680 Rel-18 CR TS 28.312 Update the description about intent handling function ZTE Corporation CR Approval Yes
Yes
agreed No    
    S5‑237704 Rel-18 CR 28.312 Conflict Resolution enhancements Samsung R&D Institute India CR Agreement Yes
Yes
not pursued No    
    S5‑238185 Rel-18 CR 28.312 Conflict Resolution enhancements Samsung R&D Institute India CR Agreement No
Yes
withdrawn Yes    
    S5‑237705 Rel-18 CR TS 28.312 5.3.4.3Adjust the content in clause 5.3.4.3 Resolving Intent-related conflicts Huawei CR Agreement Yes
Yes
revised No S5‑238186  
    S5‑238186 Rel-18 CR TS 28.312 5.3.4.3Adjust the content in clause 5.3.4.3 Resolving Intent-related conflicts Huawei CR Agreement Yes
Yes
agreed No   S5‑237705
    S5‑237820 Rel-18 CR TS 28.312 Update 6.1 and 7.1 to support the operations of unsubscribing intent reporting and querying intent reporting subscriptions China Mobile Com. Corporation CR Agreement Yes
Yes
revised No S5‑238227  
    S5‑238227 Rel-18 CR TS 28.312 Update 6.1 and 7.1 to support the operations of unsubscribing intent reporting and querying intent reporting subscriptions China Mobile Com. Corporation CR Agreement Yes
Yes
agreed No   S5‑237820
6.4.4.4 IDMS_MN_ph2_WoP#4                      
6.4.4.5 IDMS_MN_ph2_WoP#5                      
6.5 OAM&P Rel-18 Work Items - Management Architecture and Mechanisms                      
6.5.1 Service based management architecture S5‑238130 Thursday Q0 Breakout on 6.5.1 Fault Mgmt 28.111 Ericsson report Information Yes
Yes
noted No    
6.5.1.1 eSBMA_WoP#1 S5‑237358 Presentation of Specification to TSG: TS 28.111, Version 1.0.0 Ericsson Hungary Ltd TS or TR cover Approval Yes
Yes
revised No S5‑238309  
    S5‑238309 Presentation of Specification to TSG: TS 28.111, Version 1.0.0 Ericsson Hungary Ltd TS or TR cover Approval Yes
Yes
approved No   S5‑237358
    S5‑237359 Rel-18 pCR 28.111 FM full updates Ericsson Hungary Ltd pCR Approval Yes
Yes
revised No S5‑238142  
    S5‑238142 Rel-18 pCR 28.111 FM full updates Ericsson Hungary Ltd pCR Approval Yes
Yes
approved No   S5‑237359
    S5‑237447 Rel-18 CR TS 28.533 Overview of the usage of CRUD operations and NRM fragments in SBMA Huawei, Deutsche Telekom CR Agreement Yes
Yes
revised No S5‑238141  
    S5‑238141 Rel-18 CR TS 28.533 Overview of the usage of CRUD operations and NRM fragments in SBMA Huawei, Deutsche Telekom CR Agreement Yes
Yes
agreed No   S5‑237447
    S5‑237524 DP Common notification Filtering Ericsson Hungary Ltd discussion Endorsement Yes
Yes
noted No    
    S5‑237904 Rel-18 CR TS28.532 update the reference for TraceJob in StreamingDataReport MnS Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237938 Rel-18 CR 28.532 Remove-Update FM related parts Ericsson Hungary Ltd CR Approval Yes
Yes
not pursued No    
    S5‑237940 Rel-18 CR 28.622 Remove-Update FM related parts Ericsson Hungary Ltd. CR Approval Yes
Yes
not pursued No   S5‑237043
    S5‑237942 Rel-18 CR 28.623 Remove-Update FM related parts Ericsson Hungary Ltd. CR Approval Yes
Yes
not pursued No   S5‑237044
6.5.1.2 eSBMA_WoP#2                      
6.5.1.3 eSBMA_WoP3#                      
6.5.1.4 eSBMA_WoP#4 S5‑237973 Introduction of SBMA in 32.300 Ericsson CR   Yes
Yes
revised No S5‑238143  
    S5‑238143 Introduction of SBMA in 32.300 Ericsson CR - Yes
Yes
agreed No   S5‑237973
6.5.1.5 eSBMA_WoP#5                      
6.5.1.6 eSBMA_WoP#6 S5‑237509 Rel-18 Input to DraftCR 28.622 Improvement to description of data scope Huawei other Approval Yes
Yes
approved No    
    S5‑237717 Rel-18 Input to DraftCR 28.622 Specify notificationFilter Ericsson Hungary Ltd other Approval Yes
Yes
revised No S5‑238144  
    S5‑238144 Rel-18 Input to DraftCR 28.622 Specify notificationFilter Ericsson Hungary Ltd other Approval Yes
Yes
noted No   S5‑237717
    S5‑237719 Rel-18 pCR 32.161 Update-extend JEX definitions Ericsson Hungary Ltd pCR Approval Yes
Yes
revised No S5‑238145  
    S5‑238145 Rel-18 pCR 32.161 Update-extend JEX definitions Ericsson Hungary Ltd pCR Approval Yes
Yes
noted No   S5‑237719
    S5‑237822 Rel-18 pCR 32.161 Improve Jex Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
merged No S5‑238145  
6.5.1.7 eSBMA_WoP#7                      
6.5.1.8 eSBMA_WoP#8 S5‑237354 Rel-18 CR TS 28.622 Add capability for advertising NRM properties Stage 2 Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238146 S5‑235182
    S5‑238146 Rel-18 CR TS 28.622 Add capability for advertising NRM properties Stage 2 Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No   S5‑237354
    S5‑237355 Rel-18 CR TS 28.623 Add capability for advertising NRM properties Stage 3 Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238147 S5‑235183
    S5‑238147 Rel-18 CR TS 28.623 Add capability for advertising NRM properties Stage 3 Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No   S5‑237355
6.5.1.9 Draft TS email approval S5‑238261 Draft TS 28.111 Ericsson draft TS Approval No
Yes
email approval No    
6.5.2 Network slicing provisioning rules                      
6.5.2.1 NSRULE_WoP#1 S5‑237735 Rel-18 CR TS 28.531 Update use case and allocate for network slice isolation L.M. Ericsson Limited, Deutsche Telekom CR Approval Yes
Yes
revised No S5‑238148  
    S5‑238148 Rel-18 CR TS 28.531 Update use case and allocate for network slice isolation Ericsson, Deutsche Telekom, Nokia, Telefonica, Huawei CR Approval Yes
Yes
agreed No   S5‑237735
6.5.2.2 NSRULE_WoP#2 S5‑237348 Rel-18 CR TS 28.541 Add NRM for network slice isolation Nokia, Nokia Shanghai Bell, Telefonica CR Approval Yes
Yes
revised No S5‑238149 S5‑237083
    S5‑238149 Rel-18 CR TS 28.541 Add NRM for network slice isolation Nokia, Nokia Shanghai Bell, Telefonica, Ericsson, Deutsche Telekom, Huawei CR Approval Yes
Yes
agreed No   S5‑237348
    S5‑237349 Rel-18 CR TS 28.531 Add and update use case for network slice isolation support Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
merged No S5‑238148 S5‑237082
    S5‑237736 Rel-18 CR TS 28.541 Network slicing rules solution description Ericsson, Deutsche Telekom CR Approval Yes
Yes
merged No S5‑238149  
    S5‑237932 Discussion paper on isolation and sharing L.M. Ericsson Limited discussion Endorsement No
Yes
withdrawn Yes    
6.5.3 Management of Trace/MDT phase 2                      
6.5.3.1 5GMDT_Ph2_WoP#1 S5‑237505 Rel-18 CR TS32.422 Adding NPN Area Scope of MDT Ericsson LM CR Approval Yes
Yes
revised No S5‑238150  
    S5‑238150 Rel-18 CR TS32.422 Adding NPN Area Scope of MDT Ericsson LM,Nokia CR Approval Yes
Yes
agreed No   S5‑237505
    S5‑237507 Rel-18 CR TS28.622 Adding NPN Area Scope of MDT Ericsson LM CR Approval Yes
Yes
revised No S5‑238151  
    S5‑238151 Rel-18 CR TS28.622 Adding NPN Area Scope of MDT Ericsson LM,Nokia CR Approval Yes
Yes
agreed No   S5‑237507
    S5‑237508 Rel-18 CR TS28.623 Adding NPN Area Scope of MDT Ericsson LM CR Approval Yes
Yes
revised No S5‑238152  
    S5‑238152 Rel-18 CR TS28.623 Adding NPN Area Scope of MDT Ericsson LM CR Approval Yes
Yes
agreed No   S5‑237508
6.5.3.2 5GMDT_Ph2_WoP#2                      
6.5.3.3 5GMDT_Ph2_WoP#3 S5‑237625 Rel-18 CR TS 32.422 NPN support for MDT Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
merged No S5‑238150  
    S5‑237626 Rel-18 CR TS 28.622 MDT support for NPN Nokia, Nokia Shangai Bell CR Approval Yes
Yes
merged No S5‑238151  
    S5‑237627 Rel-18 CR TS 28.623 MDT support for NPN Nokia, Nokia Shangai Bell CR Approval Yes
Yes
revised No S5‑238153  
    S5‑238153 Rel-18 CR TS 28.623 MDT support for NPN Nokia, Nokia Shangai Bell CR Approval Yes
Yes
agreed No   S5‑237627
    S5‑237629 Rel-18 CR TS 32.422 Addressing tracing gaps in signalling based trace activation Nokia, Nokia Shangai Bell CR Approval Yes
Yes
revised No S5‑238154  
    S5‑238154 Rel-18 CR TS 32.422 Addressing tracing gaps in signalling based trace activation Nokia, Nokia Shangai Bell CR Approval Yes
Yes
not pursued No   S5‑237629
    S5‑237630 Rel-18 CR TS 28.622 Addressing tracing gaps in signalling based trace activation Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No    
    S5‑238155 Rel-18 CR TS 28.622 Addressing tracing gaps in signalling based trace activation Nokia, Nokia Shanghai Bell CR Approval No
Yes
withdrawn Yes    
    S5‑237631 Rel-18 CR TS 28.623 Addressing tracing gaps in signalling based trace activation Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No    
    S5‑238156 Rel-18 CR TS 28.623 Addressing tracing gaps in signalling based trace activation Nokia, Nokia Shanghai Bell CR Approval No
Yes
withdrawn Yes    
6.5.3.4 5GMDT_Ph2_WoP#4 S5‑237695 Rel-18 CR TS 32.422 add inidcations to support MDT measurements collection in NR-DC Huawei CR Approval Yes
Yes
not pursued No    
    S5‑237696 Rel-18 CR TS 28.622 add inidcations to support MDT measurements collection in NR-DC Huawei CR Approval Yes
Yes
not pursued No    
    S5‑237697 Rel-18 CR TS 28.623 add inidcations to support MDT measurements collection in NR-DC Huawei CR Approval Yes
Yes
not pursued No    
6.5.3.5 5GMDT_Ph2_WoP#5                      
6.5.4 5G performance measurements and KPIs phase 3 S5‑238161 Minutes of breakout UE level measurements Intel report discussion Yes
Yes
noted No    
6.5.4.1 PM_KPI_5G_Ph3_WoP#1 S5‑237686 Rel-18 CR TS 28.552 Add new measurement for average value of Timing Advance per SS-RSRP and AOA ranges China Unicom CR Approval Yes
Yes
revised No S5‑238157  
    S5‑238157 Rel-18 CR TS 28.552 Add new measurement for average value of Timing Advance per SS-RSRP and AOA ranges China Unicom CR Approval Yes
Yes
agreed No   S5‑237686
6.5.4.2 PM_KPI_5G_Ph3_WoP#2 S5‑237672 Rel-18 CR TS 28.552 Add new measurement on Average DL GTP packet delay P.I. WORKS CR Agreement Yes
Yes
revised No S5‑238158  
    S5‑238158 Rel-18 CR TS 28.552 Add new measurement on Average DL GTP packet delay P.I. WORKS CR Agreement Yes
Yes
agreed No   S5‑237672
    S5‑237673 Rel-18 CR TS 28.552 Add new measurement on distribution of DL GTP packet delay P.I. WORKS CR Agreement Yes
Yes
revised No S5‑238159  
    S5‑238159 Rel-18 CR TS 28.552 Add new measurement on distribution of DL GTP packet delay P.I. WORKS CR Agreement Yes
Yes
agreed No   S5‑237673
6.5.4.3 PM_KPI_5G_Ph3_WoP#3 S5‑237624 Rel-18 CR TS 28.550 Include signalling in PM Streaming schema Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238160  
    S5‑238160 Rel-18 CR TS 28.550 Include signalling in PM Streaming schema Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑237624
6.5.4.4 PM_KPI_5G_Ph3_WoP#4 S5‑237552 Initial Skeleton of draft TS 28.abc UE level measurements Intel other Agreement Yes
Yes
approved No    
    S5‑237554 pCR Add structure for new draft TS 28.abc UE level measurements Intel other Agreement Yes
Yes
revised No S5‑237955  
    S5‑237555 pCR TS 28.abc Add template for UE level measurement definition Intel other Agreement Yes
Yes
revised No S5‑238339  
    S5‑238339 pCR TS 28.abc Add template for UE level measurement definition Intel other Agreement Yes
Yes
approved No   S5‑237555
    S5‑237556 pCR TS 28.abc Add NRMs for UE measurement job Intel, Nokia, NEC other Agreement Yes
Yes
noted No    
    S5‑237559 pCR TS 28.abc Add MnS framework for UE level measurement collection and reporting Intel, Nokia, NEC other Agreement Yes
Yes
noted No    
    S5‑237561 pCR TS 28.abc Add MnS service components for UE level measurement collection Intel, Nokia, NEC other Agreement Yes
Yes
noted No    
    S5‑237562 pCR TS 28.abc Add Per-UE measurement related to DL packet delay between PSA UPF and UE Intel other Agreement Yes
Yes
revised No S5‑238164  
    S5‑238164 pCR TS 28.abc Add Per-UE measurement related to DL packet delay between PSA UPF and UE Intel other Agreement Yes
Yes
approved No   S5‑237562
    S5‑237563 pCR TS 28.abc Add Per-UE measurement related to UL packet delay between PSA UPF and UE Intel other Agreement Yes
Yes
revised No S5‑238165  
    S5‑238165 pCR TS 28.abc Add Per-UE measurement related to UL packet delay between PSA UPF and UE Intel other Agreement Yes
Yes
approved No   S5‑237563
    S5‑237649 pCR TS 28.abc Add per-UE measurement related to average DL/UL UE throughput China Telecom Corporation Ltd., Intel other   Yes
Yes
revised No S5‑238167  
    S5‑238167 pCR TS 28.abc Add per-UE measurement related to average DL/UL UE throughput China Telecom Corporation Ltd., Intel other - Yes
Yes
noted No   S5‑237649
    S5‑237714 pCR TS 28.abc Add Per-UE measurement related to average packet delay China Telecom Corporation Ltd., Intel other Approval Yes
Yes
revised No S5‑238166  
    S5‑238166 pCR TS 28.abc Add Per-UE measurement related to average packet delay China Telecom Corporation Ltd., Intel other Approval Yes
Yes
noted No   S5‑237714
    S5‑237715 pCR TS 28.abc Add per-UE measurement related to average packet loss China Telecommunications, Intel other Approval Yes
Yes
revised No S5‑238168  
    S5‑238168 pCR TS 28.abc Add per-UE measurement related to average packet loss China Telecommunications, Intel other Approval Yes
Yes
noted No   S5‑237715
    S5‑237718 pCR TS 28.abc Add per-UE measurement related to average packet loss for split gNB deployment scenario China Telecommunications, Intel other Approval Yes
Yes
revised No S5‑238169  
    S5‑238169 pCR TS 28.abc Add per-UE measurement related to average packet loss for split gNB deployment scenario China Telecommunications, Intel other Approval Yes
Yes
noted No   S5‑237718
    S5‑237949 DP on analysis of dependency of NFs' enhancement for measurements per UE ZTE Corporation discussion Endorsement Yes
Yes
noted No    
    S5‑237955 pCR Add structure for new draft TS 28.abc UE level measurements Intel other Agreement Yes
Yes
approved No   S5‑237554
6.5.5 Additional NRM features phase 2                      
6.5.5.1 AdNRM_ph2_WoP#1 S5‑237448 Discussion paper on separate yaml file for different control NRM fragments in TS 28.623 Huawei, Deutsche Telekom, Telefónica, NEC discussion Endorsement Yes
Yes
revised No S5‑238240  
    S5‑238240 Discussion paper on separate yaml file for different control NRM fragments in TS 28.623 Huawei, Deutsche Telekom, Telefónica, NEC,Nokia discussion Endorsement Yes
Yes
endorsed No   S5‑237448
    S5‑237449 Rel-18 CR TS28.623 Separate yaml file for trace control NRM fragment Huawei CR Agreement Yes
Yes
revised No S5‑238241  
    S5‑238241 Rel-18 CR TS28.623 Separate yaml file for trace control NRM fragment Huawei CR Agreement Yes
Yes
agreed No   S5‑237449
6.5.5.2 AdNRM_ph2_WoP#2                      
6.5.5.3 AdNRM_ph2_WoP#3 S5‑237598 Clarification on the usage of sNssaiInfoList in multiple places Huawei CR Agreement Yes
Yes
agreed No    
    S5‑237599 Update description of ExtSnssai Huawei CR Agreement Yes
Yes
agreed No    
6.5.5.4 AdNRM_ph2_WoP#4 S5‑237360 TS28.541 Rel18 NRM enhancements for NRFFunction phase 4 Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237361 TS28.541 Rel18 NRM enhancements for MNPFFunction Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237362 TS28.541 Rel18 NRM enhancements for class diagram Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No    
    S5‑238163 TS28.541 Rel18 NRM enhancements for class diagram Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑236246
6.5.5.5 AdNRM_ph2_WoP#5 S5‑237350 Discussion paper to clarify network slice SLA attribute jitter Nokia, Nokia Shanghai Bell, KDDI, TELUS discussion Endorsement Yes
Yes
revised No S5‑238242  
    S5‑238242 Discussion paper to clarify network slice SLA attribute jitter Nokia, Nokia Shanghai Bell, KDDI, TELUS,Telefonica discussion Endorsement Yes
Yes
noted No   S5‑237350
    S5‑237351 Rel-18 CR TS 28.541 Fix inconsistencies related to network slice SLA attribute jitter Nokia, Nokia Shanghai Bell, KDDI, TELUS CR Approval Yes
Yes
not pursued No   S5‑236334
    S5‑237352 Rel-18 CR TS 28.541 Add support for GSMA attribute for slice QoS Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238244 S5‑236339
    S5‑238244 Rel-18 CR TS 28.541 Add support for GSMA attribute for slice QoS Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No   S5‑237352
    S5‑237353 Rel-18 CR TS 28.541 Add support for GSMA attributes related to data networks Nokia, Nokia Shanghai Bell, Samsung CR Approval Yes
Yes
revised No S5‑238313 S5‑236340
    S5‑238313 Rel-18 CR TS 28.541 Add support for GSMA attributes related to data networks Nokia, Nokia Shanghai Bell, Samsung CR Approval Yes
Yes
agreed No   S5‑237353
    S5‑237703 Rel-18 CR 28.541 Radio Specturm in SliceSubnet Samsung R&D Institute India CR Agreement Yes
Yes
not pursued No    
    S5‑237946 Rel-18 CR TS 28.541 Add slice validity info to ServiceProfile Samsung Electronics Iberia SA CR Approval Yes
Yes
not pursued No    
    S5‑238245 Rel-18 CR TS 28.541 Add slice validity info to ServiceProfile Samsung Electronics Iberia SA CR Approval No
Yes
withdrawn Yes    
6.5.6 Management Aspects related to NWDAF                      
6.5.6.1 MANWDAF_WoP#1 S5‑237712 Editorial modification for the use case of performance measurements for NWDAF China Telecom CR Agreement Yes
Yes
agreed No    
    S5‑237713 Editorial modification for the performance measurements of NWDAF China Telecom CR Agreement Yes
Yes
agreed No    
6.5.6.2 MANWDAF_WoP#2 S5‑237684 Rel 18 CR TS 28.541 Stage 3 Add FL related attributes in NWDAFFunction Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237685 Rel-18 CR TS 28.541 Add FL related attributes in NWDAFFunction Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237809 Rel-18 CR 28.552 Add measurements related to NWDAF analytics service failure Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238210  
    S5‑238210 Rel-18 CR 28.552 Add measurements related to NWDAF analytics service failure Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑237809
    S5‑237811 Rel-18 CR TS 28.541 Correction of attributes defined in NWDAFFunction Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No    
    S5‑237816 Rel-18 CR 28.552 Add measurement related to time consumption of NWDAF providing ML model training service information Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238289  
    S5‑238289 Rel-18 CR 28.552 Add measurement related to time consumption of NWDAF providing ML model training service information Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
not pursued No   S5‑237816
    S5‑237817 Rel-18 CR 28.552 Add measurements related to NWDAF ML model training service failure Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238211  
    S5‑238211 Rel-18 CR 28.552 Add measurements related to NWDAF ML model training service failure Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
revised No S5‑238348 S5‑237817
    S5‑238348 Rel-18 CR 28.552 Add measurements related to NWDAF ML model training service failure Nokia, Nokia Shanghai Bell CR Approval Yes
Yes
agreed No   S5‑238211
6.5.6.3 MANWDAF_WoP#3                      
6.5.7 Enhanced Edge Computing Management                      
6.5.7.1 eECM_WoP#1 S5‑237606 Rel-18 DraftCR 28.538 adding processMonitor in EASRequirement Huawei draftCR Approval Yes
Yes
revised No S5‑238238  
    S5‑238238 Rel-18 DraftCR 28.538 adding processMonitor in EASRequirement Huawei draftCR Approval Yes
Yes
approved No   S5‑237606
    S5‑237607 Rel-18 DraftCR 28.538 Correction on EAS instantiation triggered by PM Huawei draftCR Approval Yes
Yes
revised No S5‑238237  
    S5‑238237 Rel-18 DraftCR 28.538 Correction on EAS instantiation triggered by PM Huawei draftCR Approval Yes
Yes
approved No   S5‑237607
6.5.7.2 eECM_WoP#2 S5‑237374 Rel-18 CR 28.538 DraftCR to CR Samsung R&D Institute UK CR Agreement Yes
Yes
revised No S5‑238239  
    S5‑238239 Rel-18 CR 28.538 DraftCR to CR Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   S5‑237374
6.5.7.3 eECM_WoP#3 S5‑237602 Rel-18 DraftCR 28.538 update EAS to connect to UPF procedure Huawei draftCR Approval Yes
Yes
revised No S5‑238232  
    S5‑238232 Rel-18 DraftCR 28.538 update EAS to connect to UPF procedure Huawei draftCR Approval Yes
Yes
approved No   S5‑237602
6.5.8 Management Aspect of 5GLAN                      
6.5.8.1 5GLAN_Mgt_WoP#1                      
6.5.8.2 5GLAN_Mgt_WoP#2                      
6.5.9 Management Aspects of NTN                      
6.5.9.1 OAM_NTN_WoP#1 S5‑237658 Rel-18 CR TS 28.530 Add management capability support for NTN China Unicom, China Telecom CR Approval Yes
Yes
withdrawn Yes    
    S5‑237659 Rel-18 CR TS 28.530 Add Annex network management support for NTN architecture China Unicom CR Approval Yes
Yes
withdrawn Yes    
    S5‑237699 Rel-18 CR TS 28.530 Add management capability support for NTN China Unicom, China Telecom CR Approval Yes
Yes
revised No S5‑238212  
    S5‑238212 Rel-18 CR TS 28.530 Add management capability support for NTN China Unicom, China Telecom CR Approval Yes
Yes
agreed No   S5‑237699
    S5‑237701 Rel-18 CR TS 28.530 Add Annex network management support for NTN architecture China Unicom CR Approval Yes
Yes
revised No S5‑238213  
    S5‑238213 Rel-18 CR TS 28.530 Add Annex network management support for NTN architecture China Unicom CR Approval Yes
Yes
agreed No   S5‑237701
6.5.9.2 OAM_NTN_WoP#2 S5‑237644 Update definitions of Ephemeris CATT CR Approval Yes
Yes
revised No S5‑238214  
    S5‑238214 Update definitions of Ephemeris CATT CR Approval Yes
Yes
agreed No   S5‑237644
6.5.9.3 OAM_NTN_WoP#3                      
6.5.10 Management of cloud-native Virtualized Network Functions                      
6.5.10.1 MCVNF_WoP#1 S5‑237939 Update references from TS 28.526 to ETSI NFV IFA 013 Microsoft CR Approval Yes
Yes
revised No S5‑238215  
    S5‑238215 Update references from TS 28.526 to ETSI NFV IFA 013 Microsoft CR Approval Yes
Yes
agreed No   S5‑237939
6.5.10.2 MCVNF_WoP#2                      
6.5.10.3 MCVNF_WoP#3 S5‑237675 Rel-18 CR TS 28.531 Add the introduction for the procedure of NF instance creation ZTE Corporation CR Approval Yes
Yes
revised No S5‑238216 S5‑237106
    S5‑238216 Rel-18 CR TS 28.531 Add the introduction for the procedure of NF instance creation ZTE Corporation CR Approval Yes
Yes
revised No S5‑238349 S5‑237675
    S5‑238349 Rel-18 CR TS 28.531 Add the introduction for the procedure of NF instance creation ZTE Corporation CR Approval Yes
Yes
agreed No   S5‑238216
    S5‑237677 Rel-18 CR TS 28.531 Update reference for NS lifecycle management procedure ZTE Corporation CR Approval Yes
Yes
merged No S5‑238215  
6.5.11 Management Aspects of 5G Network Sharing Phase2                      
6.5.11.1 MANS_ph2_WoP#1 S5‑237462 Rel-18 CR TS 28.541 Address EP_F1 issue for MOCN RAN sharing scenario Huawei,China Unicom CR Agreement Yes
Yes
revised No S5‑238233 S5‑236318
    S5‑238233 Rel-18 CR TS 28.541 Address EP_F1 issue for MOCN RAN sharing scenario Huawei,China Unicom CR Agreement Yes
Yes
not pursued No   S5‑237462
    S5‑237463 Rel-18 CR TS 28.622 Enhance the ManagementDataCollection to support request management data per PLMN Huawei,Ericsson,China Unicom CR Agreement Yes
Yes
revised No S5‑238234  
    S5‑238234 Rel-18 CR TS 28.622 Enhance the ManagementDataCollection to support request management data per PLMN Huawei,Ericsson,China Unicom CR Agreement Yes
Yes
agreed No   S5‑237463
    S5‑237464 Rel-18 CR TS 28.623 Enhance the ManagementDataCollection to support request management data per PLMN Huawei,Ericsson,China Unicom CR Agreement Yes
Yes
agreed No    
    S5‑237617 Rel-18 CR TS 28.552 Add PLMN granularity for PDU sessions related measurements for NG-RAN MOCN network sharing scenario China Unicom CR Approval Yes
Yes
agreed No    
    S5‑237618 Rel-18 CR TS 28.552 Add PLMN granularity for peak PRB used for data traffic measurements for NG-RAN MOCN network sharing scenario China Unicom CR Approval Yes
Yes
agreed No    
    S5‑237676 Rel-18 CR TS 32.130 Add requirements for NG-RAN MOCN network sharing scenario with multiple Cell Identity broadcast China Unicom CR Approval Yes
Yes
withdrawn Yes    
    S5‑237929 Rel-18 CR TS 32.130 Add requirements for NG-RAN MOCN network sharing scenario with multiple Cell Identity broadcast China Unicom CR Approval Yes
Yes
agreed No    
6.5.11.2 MANS_ph2_WoP#2                      
6.5.12 Management Aspects of URLLC                      
6.5.12.1 URLLC_Mgt_WoP#1 S5‑237708 Rel-18 CR 28.541 Modify the attributes of UL and DL latency in RAN China Unicom CR Approval Yes
Yes
revised No S5‑238225  
    S5‑238225 Rel-18 CR 28.541 Modify the attributes of UL and DL latency in RAN China Unicom CR Approval Yes
Yes
agreed No   S5‑237708
6.5.12.2 URLLC_Mgt_WoP#2 S5‑237706 Rel-18 CR 28.554 Add new KPI on DL reliability with delay threshold in RAN China Unicom CR Approval Yes
Yes
withdrawn Yes    
    S5‑237931 Rel-18 CR 28.554 Add new KPI on DL reliability with delay threshold in RAN China Unicom CR Approval Yes
Yes
not pursued No    
6.5.13 Management aspects of 5G system supporting satellite backhaul (Preliminary work before SA)                      
6.5.13.1 OAM_5GSATB_WoP#1 S5‑237813 Rel-18 CR 28.541 Add satellite backhaul information for QoS monitoring per QoS flow per UE China Telecom Corporation Ltd. CR Approval Yes
Yes
revised No S5‑238104  
    S5‑238104 Rel-18 CR 28.541 Add satellite backhaul information for QoS monitoring per QoS flow per UE China Telecom Corporation Ltd. CR Approval Yes
Yes
revised No S5‑238246 S5‑237813
    S5‑238246 Rel-18 CR 28.541 Add satellite backhaul information for QoS monitoring per QoS flow per UE China Telecom Corporation Ltd. CR Approval Yes
Yes
agreed No   S5‑238104
    S5‑237814 Rel-18 CR 28.541 Add satellite backhaul information to support 5G system with satellite backhaul architecture China Telecom Corporation Ltd. CR   Yes
Yes
revised No S5‑238105  
    S5‑238105 Rel-18 CR 28.541 Add satellite backhaul information to support 5G system with satellite backhaul architecture China Telecom Corporation Ltd. CR - Yes
Yes
revised No S5‑238247 S5‑237814
    S5‑238247 Rel-18 CR 28.541 Add satellite backhaul information to support 5G system with satellite backhaul architecture China Telecom Corporation Ltd. CR - Yes
Yes
not pursued No   S5‑238105
6.5.13.2 OAM_5GSATB_WoP#2                      
6.6 OAM&P Rel-18 Work Items - Support of New Services                      
6.6.1 Access control for management service S5‑238129 Tuesday Q2 Breakout on 6.6.1 MSAC Nokia report Information Yes
Yes
noted No    
    S5‑238358 DraftCR TS 28.533 on Access control for management service Nokia, Nokia Shanghai Bel,Deutsche Telekom, Telefonical draftCR Approval No
Yes
email approval No    
6.6.1.1 MSAC_WoP#1                      
6.6.1.2 MSAC_WoP#2 S5‑237581 Rel-18 InputToDraftCR 28.533 on concept of Entities, Information Model for Access control Nokia UK draftCR Approval Yes
Yes
revised No S5‑238109  
    S5‑238109 Rel-18 InputToDraftCR 28.533 on concept of Entities, Information Model for Access control Nokia UK,Telefonica,DTAG draftCR Approval Yes
Yes
approved No   S5‑237581
6.6.1.3 MSAC_WoP#3 S5‑237582 Rel-18 InputToDraftCR 28.533 on REST and OpenAPI based solution set for Access control Nokia UK draftCR Approval Yes
Yes
noted No    
    S5‑237583 Rel-18 InputToDraftCR 28.533 on Netconf solution set for Access control Nokia UK draftCR Approval Yes
Yes
noted No    
    S5‑237666 Rel-18 InputToDraftCR TS 28.533 Update the description of role based access control Huawei draftCR Approval Yes
Yes
revised No S5‑238269  
    S5‑238269 Rel-18 InputToDraftCR TS 28.533 Update the description of role based access control Huawei draftCR Approval Yes
Yes
approved No   S5‑237666
    S5‑237667 Rel-18 InputToDraftCR TS 28.533 Correct the description of attribute identityType and identityName Huawei draftCR Approval Yes
Yes
approved No    
6.6.1.4 MSAC_WoP#4                      
6.6.2 Enhancements of EE for 5G Phase 2                      
6.6.2.1 EE5GPLUS_Ph2_WoP#1 S5‑237503 Add definitions Huawei, Ericsson, Nokia CR Agreement Yes
Yes
agreed No   S5‑237094
    S5‑237610 Rel-18 CR 28.541 Add energy saving attributes to IOC UPFFunction Huawei CR Approval Yes
Yes
revised No S5‑238288  
    S5‑238288 Rel-18 CR 28.541 Add energy saving attributes to IOC UPFFunction Huawei CR Approval Yes
Yes
agreed No   S5‑237610
6.6.2.2 EE5GPLUS_Ph2_WoP#2 S5‑237716 Rel-18 Add KPI on Energy Efficiency of URLLC Network Slice based on reliability China Unicom, Ericsson CR Approval Yes
Yes
withdrawn Yes    
    S5‑237930 Rel-18 Add KPI on Energy Efficiency of URLLC Network Slice based on reliability China Unicom, Ericsson CR Approval Yes
Yes
not pursued No    
    S5‑237947 Rel-18 CR TS 28.554 KPI for EE of URLLC NS based on its reliability Samsung Electronics Iberia SA CR Approval Yes
Yes
not pursued No    
6.6.3 Management of non-public networks phase 2                      
6.6.3.1 OAM_NPN_Ph2_WoP#1 S5‑237615 Rel-18 CR TS 28.557 Correction on procedure figure for NPN provisioning by a network slice of a PLMN Huawei CR Agreement Yes
Yes
agreed No    
6.6.3.2 OAM_NPN_Ph2_WoP#2 S5‑237613 Rel-18 CR TS 28.557 Add use case and requirements for dedicated resource demand for NPN service customers Huawei CR Agreement Yes
Yes
revised No S5‑238248  
    S5‑238248 Rel-18 CR TS 28.557 Add use case and requirements for dedicated resource demand for NPN service customers Huawei CR Agreement Yes
Yes
not pursued No   S5‑237613
6.6.3.3 OAM_NPN_Ph2_WoP#3                      
6.6.3.4 OAM_NPN_Ph2_WoP#4 S5‑237614 Rel-18 CR TS 28.557 Add use case for E2E latency monitoring in NPN Huawei CR Agreement Yes
Yes
not pursued No    
6.6.4 Network and Service Operations for Energy Utilities                      
6.6.4.1 NSOEU_WoP#1                      
6.6.4.2 NSOEU_WoP#2 S5‑237837 Rel-18 pCR 28.318 Diverse clean ups and alignment Samsung Electronics GmbH pCR Approval Yes
Yes
revised No S5‑238218  
    S5‑238218 Rel-18 pCR 28.318 Diverse clean ups and alignment Samsung Electronics GmbH pCR Approval Yes
Yes
approved No   S5‑237837
6.6.4.3 NSOEU_WoP#3 S5‑237800 Rel-18 pCR 28.318 table of contents Nokia pCR Agreement Yes
Yes
approved No    
    S5‑237801 DP: Impacts of 3GPP Architecture on Cell Availability PM Nokia discussion Endorsement Yes
Yes
noted No    
    S5‑238219 DP: Impacts of 3GPP Architecture on Cell Availability PM Nokia discussion Endorsement No
Yes
withdrawn Yes    
    S5‑237802 DP: Cell Availability Nokia discussion Endorsement Yes
Yes
noted No    
    S5‑238220 DP: Cell Availability Nokia discussion Endorsement No
Yes
withdrawn Yes    
    S5‑237836 Rel-18 pCR 28.318 5.3 Corrections to Exposed coordinated recovery Samsung Electronics GmbH pCR Approval Yes
Yes
revised No S5‑238222  
    S5‑238222 Rel-18 pCR 28.318 5.3 Corrections to Exposed coordinated recovery Samsung Electronics GmbH pCR Approval Yes
Yes
approved No   S5‑237836
    S5‑237903 Rel-18 pCR TS 28.318 Cell Availability performance measurement definition Nokia Hungary pCR Approval Yes
Yes
revised No S5‑238221  
    S5‑238221 Rel-18 pCR TS 28.318 Cell Availability performance measurement definition Nokia Hungary pCR Approval Yes
Yes
approved No   S5‑237903
    S5‑237914 Rel-18 pCR TS 28.318 Stage 2 definition for exposing performance and prediction information for high availability Nokia Hungary pCR Approval Yes
Yes
noted No    
    S5‑237916 Rel-18 pCR TS 28.318 Stage 3 definition for exposing performance and prediction information for high availability Nokia Hungary pCR Approval Yes
Yes
noted No    
    S5‑237918 Rel-18 pCR TS 28.318 Procedure for exposing performance and prediction information for high availability Nokia Hungary pCR Approval Yes
Yes
noted No    
    S5‑237951 Rel-18 pCR TS 28.318 NRM definitions Network Performance Monitoring Samsung Electronics Iberia SA pCR Approval Yes
Yes
revised No S5‑238223  
    S5‑238223 Rel-18 pCR TS 28.318 NRM definitions Network Performance Monitoring Samsung Electronics Iberia SA pCR Approval Yes
Yes
noted No   S5‑237951
    S5‑237953 Rel-18 pCR TS 28.318 PMs and KPI definition for NSOEU Samsung Electronics Iberia SA pCR Approval Yes
Yes
approved No    
6.6.4.4 NSOEU_WoP#4 S5‑237835 Presentation of Specification/Report to TSG: TS 28.318, Version 0.3.0 (1.0.0) Samsung Electronics GmbH TS or TR cover Approval Yes
Yes
revised No S5‑238346  
    S5‑238346 Presentation of Specification/Report to TSG: TS 28.318, Version 0.3.0 (1.0.0) Samsung Electronics GmbH TS or TR cover Approval No
Yes
email approval No   S5‑237835
    S5‑237950 Rel-18 pCR TS 28.318 NRM definitions_Coordinated Rapid Recovery Samsung Electronics Iberia SA pCR Approval Yes
Yes
revised No S5‑238224  
    S5‑238224 Rel-18 pCR TS 28.318 NRM definitions_Coordinated Rapid Recovery Samsung Electronics Iberia SA pCR Approval Yes
Yes
noted No   S5‑237950
6.6.4.5 Draft TS email approval S5‑238217 Draft TR 28.318 Samsung draft TR Approval No
Yes
email approval No    
6.7 OAM&P Studies - Intelligence and Automation                      
6.7.1 Study on evaluation of autonomous network levels                      
6.7.1.1 FS_ANLEVA_WoP#1 S5‑237480 pCR TR 28.909 Add background of relevant studies in TM Forum China Mobile, Huawei pCR Approval Yes
Yes
revised No S5‑238327  
    S5‑238327 pCR TR 28.909 Add background of relevant studies in TM Forum China Mobile, Huawei pCR Approval Yes
Yes
approved No   S5‑237480
6.7.1.2 FS_ANLEVA_WoP#2 S5‑237481 pCR TR 28.909 Add potential KEI for fault management China Mobile, Huawei pCR Approval Yes
Yes
approved No   S5‑234745
6.7.1.3 FS_ANLEVA_WoP#3                      
6.7.1.4 FS_ANLEVA_WoP#4                      
6.7.1.5 Draft TR email approval S5‑238355 Draft TR 28.909 China Mobile draft TR Approval No
Yes
email approval No    
6.7.2 Study on intent-driven management for network slicing                      
6.7.2.1 FS_NETSLICE_IDMS_WoP#1                      
6.7.2.2 FS_NETSLICE_IDMS_WoP#2                      
6.7.2.3 FS_NETSLICE_IDMS_WoP#3                      
6.7.2.4 FS_NETSLICE_IDMS_WoP#4 S5‑237737 pCR TR 28.836 Add definitions and abbreviations L.M. Ericsson Limited, Deutsche Telekom pCR Approval Yes
Yes
revised No S5‑238252  
    S5‑238252 pCR TR 28.836 Add definitions and abbreviations L.M. Ericsson Limited, Deutsche Telekom pCR Approval Yes
Yes
approved No   S5‑237737
    S5‑237738 pCR TR 28.836 Rapporteur clean-up template information L.M. Ericsson Limited pCR Approval Yes
Yes
approved No    
6.7.2.5 FS_NETSLICE_IDMS_WoP#5 S5‑237739 pCR TR 28.836 Update conclusions and recommendations L.M. Ericsson Limited, Deutsche Telekom pCR Approval Yes
Yes
revised No S5‑238263  
    S5‑238263 pCR TR 28.836 Update conclusions and recommendations L.M. Ericsson Limited, Deutsche Telekom pCR Approval Yes
Yes
approved No   S5‑237739
    S5‑238335 Presentation sheet TR 28.836 Ericsson TS or TR cover Approval Yes
Yes
approved No    
6.7.2.6 Draft TR email approval S5‑238236 Draft TR 28.836 Ericsson draft TR Approval No
Yes
email approval No    
6.7.3 Study on Fault Supervision Evolution                      
6.7.3.1 FS_FSEV_WoP#1 S5‑237741 pCR TR 28.830 Add description of relation with performance management Huawei, China Mobile pCR Approval No
Yes
withdrawn Yes    
    S5‑237744 pCR TR 28.830 Add description of relation with performance management Huawei, China Mobile pCR Approval Yes
Yes
noted No    
6.7.3.2 FS_FSEV_WoP#2 S5‑237742 pCR TR 28.830 Add solution of performance related alarm analysis Huawei, China Mobile pCR Approval No
Yes
withdrawn Yes    
    S5‑237743 pCR TR 28.830 Add solution of fault cause analysis enhancement Huawei, China Mobile pCR Approval No
Yes
withdrawn Yes    
    S5‑237745 pCR TR 28.830 Add solution of performance related alarm analysis Huawei, China Mobile pCR Approval Yes
Yes
noted No    
    S5‑237746 pCR TR 28.830 Add solution of fault cause analysis enhancement Huawei, China Mobile pCR Approval Yes
Yes
revised No S5‑238265  
    S5‑238265 pCR TR 28.830 Add solution of fault cause analysis enhancement Huawei, China Mobile pCR Approval Yes
Yes
approved No   S5‑237746
6.7.3.3 FS_FSEV_WoP#3                      
6.7.3.4 Draft TR email approval S5‑238356 Draft TR 28.830 China Mobile draft TR Approval No
Yes
email approval No    
6.8 OAM&P Studies - Management Architecture and Mechanisms                      
6.8.1 Study on Data management phase 2                      
6.8.1.1 FS_MADCOL_ph2_WoP#1 S5‑237468 pCR TR 28.842 Add Key Issue and potential solution for reporting data for managementDataCollection Huawei, Deutsche Telekom pCR Approval Yes
Yes
revised No S5‑238266  
    S5‑238266 pCR TR 28.842 Add Key Issue and potential solution for reporting data for managementDataCollection Huawei, Deutsche Telekom pCR Approval Yes
Yes
approved No   S5‑237468
    S5‑237470 pCR TR 28.842 Add potential solution for discovery of management data Huawei, Deutsche Telekom pCR Approval Yes
Yes
approved No    
    S5‑237935 Rel-18 pCR TR 28.842 Potential solution for discovery of stored data Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No    
    S5‑237943 DP on discovery of stored management data Microsoft Europe SARL discussion Endorsement Yes
Yes
endorsed No    
    S5‑237945 pCR 28.842 Potential solution for discovery of stored management data Microsoft Europe SARL pCR Approval Yes
Yes
approved No    
    S5‑238267 Minutes breakout session on MADCOL Nokia report Information Yes
Yes
noted No    
6.8.1.2 FS_MADCOL_ph2_WoP#2 S5‑237623 Rel-18 pCR 28.842 New KI on reporting of stored Management data Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑238268  
    S5‑238268 Rel-18 pCR 28.842 New KI on reporting of stored Management data Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
noted No   S5‑237623
    S5‑237821 Rel-18 pCR 28.842 New KI on Context information for historical data Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
noted No    
    S5‑237944 pCR 28.842 Potential solution for retrieval of stored management data Microsoft Europe SARL,Nokia pCR Approval Yes
Yes
approved No    
6.8.1.3 FS_MADCOL_ph2_WoP#3 S5‑237934 Rel-18 pCR TR 28.842 New key issue on the definition of NodeFilter and dataScope in ManagementDataCollection Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑238271  
    S5‑238271 Rel-18 pCR TR 28.842 New key issue on the definition of NodeFilter and dataScope in ManagementDataCollection Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
noted No   S5‑237934
    S5‑237936 Rel-18 pCR TR 28.842 Potential solution to report supported capabilities Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑238274  
    S5‑238274 Rel-18 pCR TR 28.842 Potential solution to report supported capabilities Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑237936
6.8.1.4 FS_MADCOL_ph2_WoP#4                      
6.8.1.5 Draft TR email approval S5‑238270 Draft TR 28.842 Nokia draft TR Approval No
Yes
email approval No    
6.9 OAM&P Studies - Support of New Services                      
6.9.1 Study on Key Quality Indicators (KQIs)for 5G service experience                      
6.9.1.1 FS_KQI_5G_WoP#1 S5‑237648 pCR TR 28.863 Issue1 Conclusion for Definition of KQI HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
approved No    
    S5‑237650 pCR TR 28.863 Issue#2 Conclusion for scenarios for 5G KQI HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
approved No    
    S5‑237654 pCR TR 28.863 Rapporteur clean up HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
approved No    
    S5‑237682 Presentation sheet of TR 28.863 for SA approval HUAWEI TECHNOLOGIES Co. Ltd. TS or TR cover Approval Yes
Yes
revised No S5‑238276  
    S5‑238276 Presentation sheet of TR 28.863 for SA approval HUAWEI TECHNOLOGIES Co. Ltd. TS or TR cover Approval Yes
Yes
approved No   S5‑237682
    S5‑238275 Revised Study on Key Quality Indicators (KQIs) for 5G service experience Huawei SID revised Agreement Yes
Yes
agreed No    
6.9.1.2 FS_KQI_5G_WoP#2                      
6.9.1.3 FS_KQI_5G_WoP#3 S5‑237651 pCR TR 28.863 Issue#4 Desription of URLLC HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
revised No S5‑238278  
    S5‑238278 pCR TR 28.863 Issue#4 Desription of URLLC HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
approved No   S5‑237651
    S5‑237652 pCR TR 28.863 Issue#4 Solution of URLLC HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
revised No S5‑238279  
    S5‑238279 pCR TR 28.863 Issue#4 Solution of URLLC HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
approved No   S5‑237652
6.9.1.4 FS_KQI_5G_WoP#4 S5‑237653 pCR TR 28.863 Issue#5 Conclusion for Cloud VR HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
revised No S5‑238280  
    S5‑238280 pCR TR 28.863 Issue#5 Conclusion for Cloud VR HUAWEI TECHNOLOGIES Co. Ltd. pCR Approval Yes
Yes
approved No   S5‑237653
6.9.1.5 FS_KQI_5G_WoP#5                      
6.9.1.6 Draft TR email approval S5‑238277 Draft TR 28.863 Huawei draft TR Approval No
Yes
email approval No    
6.9.2 Study on Deterministic Communication Service Assurance                      
6.9.2.1 FS_DCSA_WoP#1                      
6.9.2.2 FS_DCSA_WoP#2                      
6.9.2.3 FS_DCSA_WoP#3                      
6.9.2.4 FS_DCSA_WoP#4 S5‑237749 pCR TR 28.865 Add conclusion of issue2 service assurance for video monitoring Huawei pCR Approval Yes
Yes
revised No S5‑238281  
    S5‑238281 pCR TR 28.865 Add conclusion of issue2 service assurance for video monitoring Huawei pCR Approval Yes
Yes
approved No   S5‑237749
    S5‑237750 pCR TR 28.865 Add conclusion of issue3 service assurance for PLC control Huawei pCR Approval Yes
Yes
revised No S5‑238282  
    S5‑238282 pCR TR 28.865 Add conclusion of issue3 service assurance for PLC control Huawei pCR Approval Yes
Yes
approved No   S5‑237750
    S5‑237751 pCR TR 28.865 Add conclusions and recommendations for the FS_DCSA study item Huawei pCR Approval Yes
Yes
revised No S5‑238283  
    S5‑238283 pCR TR 28.865 Add conclusions and recommendations for the FS_DCSA study item Huawei pCR Approval Yes
Yes
approved No   S5‑237751
6.9.2.5 FS_DCSA_WoP#5                      
6.9.2.6 Draft TR email approval S5‑238357 Draft TR 28.865 Huawei draft TR Approval No
Yes
email approval No    
7 Charging                      
7.1 Charging Plenary S5‑237309 CH agenda and time plan SA5 SWG CH Chair (MATRIXX Software) agenda   Yes
Yes
revised No S5‑237975  
    S5‑237975 CH agenda and time plan SA5 SWG CH Chair (MATRIXX Software) agenda - Yes
Yes
noted No   S5‑237309
    S5‑237310 Collection of useful contributions and external communication documents Huawei discussion   No
Yes
noted No    
    S5‑237313 Charging exec report SA5 SWG CH Chair (MATRIXX Software) report   Yes
Yes
noted No    
    S5‑237322 LS on String based Charging Identifier over SBI C4-234657 LS in   Yes
Yes
postponed No    
7.2 New Charging Work Item proposals S5‑237356 New WID on NEF Charging enhancement to support AI/ML in 5GS OPPO WID new Approval Yes
Yes
revised No S5‑237988  
    S5‑237988 New WID on NEF Charging enhancement to support AI/ML in 5GS OPPO WID new Approval Yes
Yes
agreed No   S5‑237356
    S5‑237357 AI/ML support for NEF based charging OPPO Beijing CR Approval Yes
Yes
revised No S5‑237989  
    S5‑237989 AI/ML support for NEF based charging OPPO Beijing CR Approval Yes
Yes
agreed No   S5‑237357
    S5‑237427 Rel-18 CR TS 32291 AI/ML support for NEF based charging OPPO Beijing CR Approval Yes
Yes
merged No S5‑238077  
    S5‑237990 Rel-18 CR TS 32291 AI/ML support for NEF based charging OPPO Beijing CR Approval No
Yes
withdrawn Yes    
    S5‑237428 Rel-18 CR TS 32298 AI/ML support for NEF based charging OPPO Beijing CR Approval Yes
Yes
merged No S5‑238079  
    S5‑237991 Rel-18 CR TS 32298 AI/ML support for NEF based charging OPPO Beijing CR Approval No
Yes
withdrawn Yes    
    S5‑237564 Discussion paper for charging aspects of AIML during different phases Nokia, Nokia Shanghai Bell discussion Discussion Yes
Yes
noted No    
    S5‑237824 New WID on charging aspects of Satellite Backhaul in 5GS CATT WID new Approval Yes
Yes
revised No S5‑237992  
    S5‑237992 New WID on charging aspects of Satellite Backhaul in 5GS CATT WID new Approval Yes
Yes
agreed No   S5‑237824
    S5‑237825 Introduce the charging business roles for the integration of satellite into 5GS CATT CR Approval Yes
Yes
merged No S5‑237994  
    S5‑237993 Introduce the charging business roles for the integration of satellite into 5GS CATT CR Approval No
Yes
withdrawn Yes    
    S5‑237826 Addition of the satellite backhaul in charging principle CATT CR Approval Yes
Yes
revised No S5‑237994  
    S5‑237994 Addition of the satellite backhaul in charging principle CATT CR Approval Yes
Yes
agreed No   S5‑237826
    S5‑237827 Add charging information for the satellite backhaul CATT CR Approval Yes
Yes
revised No S5‑237995  
    S5‑237995 Add charging information for the satellite backhaul CATT CR Approval Yes
Yes
agreed No   S5‑237827
    S5‑237828 Add trigger conditions for the satellite backhaul CATT CR Approval Yes
Yes
revised No S5‑238060  
    S5‑238060 Add trigger conditions for the satellite backhaul CATT CR Approval Yes
Yes
agreed No   S5‑237828
    S5‑237829 Add message flow for the satellite backhaul CATT CR Approval Yes
Yes
revised No S5‑238061  
    S5‑238061 Add message flow for the satellite backhaul CATT CR Approval Yes
Yes
agreed No   S5‑237829
    S5‑237830 Add the satellite backhaul information in EAS deployment charging CATT CR Approval Yes
Yes
revised No S5‑238062  
    S5‑238062 Add the satellite backhaul information in EAS deployment charging CATT CR Approval Yes
Yes
agreed No   S5‑237830
    S5‑237831 Addition of the satellite backhaul in edge computing charging principles CATT CR Approval Yes
Yes
revised No S5‑238063  
    S5‑238063 Addition of the satellite backhaul in edge computing charging principles CATT CR Approval Yes
Yes
agreed No   S5‑237831
7.3 Charging Maintenance and Rel-18 small Enhancements S5‑237460 Resolve References to nrm yaml MATRIXX Software CR Agreement Yes
Yes
agreed No    
    S5‑237461 Resolve References to nrm yaml MATRIXX Software CR Agreement Yes
Yes
revised No S5‑237976  
    S5‑237976 Resolve References to nrm yaml MATRIXX Software CR Agreement Yes
Yes
agreed No   S5‑237461
    S5‑237565 Rel-18 CR TS 32.254 SUPI and APF ID Correction Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
not pursued No    
    S5‑237566 Rel-18 CR TS 32.254 Enhance Application Charging description Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
revised No S5‑238070  
    S5‑238070 Rel-18 CR TS 32.254 Enhance Application Charging description Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
agreed No   S5‑237566
    S5‑237576 Rel-18 CR TS 32.290 Failure handling without CHF connectivity Nokia. Nokia Shanghai Bell CR Agreement Yes
Yes
revised No S5‑238071  
    S5‑238071 Rel-18 CR TS 32.290 Failure handling without CHF connectivity Nokia. Nokia Shanghai Bell CR Agreement Yes
Yes
agreed No   S5‑237576
    S5‑237577 Rel-18 CR TS 32.291 Service Consumption with unlimited quota Nokia. Nokia Shanghai Bell CR Agreement Yes
Yes
not pursued No    
    S5‑237757 Rel-18 CR 32.291 Correction of content of type problem json Ericsson LM CR Agreement Yes
Yes
not pursued No   S5‑236697
    S5‑237758 Rel-16 CR 32.254 Removal of editor's note for the NEF API Charging Information Ericsson LM CR Agreement Yes
Yes
revised No S5‑238072  
    S5‑238072 Rel-16 CR 32.254 Correction of cardinality for NEF external id Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237758
    S5‑237759 Rel-17 CR 32.254 Correction external identifiers as a list Ericsson LM CR Agreement Yes
Yes
revised No S5‑238073  
    S5‑238073 Rel-17 CR 32.254 Correction of cardinality for NEF external id Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237759
    S5‑237760 Rel-18 CR 32.254 Correction external and internal identifiers as a list Ericsson LM CR Agreement Yes
Yes
revised No S5‑238074  
    S5‑238074 Rel-18 CR 32.254 Correction of cardinality for NEF external id Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237760
    S5‑237761 Rel-16 CR 32.291 Correction of cardinality for NEF external id Ericsson LM CR Agreement Yes
Yes
revised No S5‑238075  
    S5‑238075 Rel-16 CR 32.291 Correction of cardinality for NEF external id Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237761
    S5‑237762 Rel-17 CR 32.291 Correction of NEF external id as a list Ericsson LM CR Agreement Yes
Yes
revised No S5‑238076  
    S5‑238076 Rel-17 CR 32.291 Correction of cardinality for NEF external id Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237762
    S5‑237763 Rel-18 CR 32.291 Correction of NEF internal and external id as lists Ericsson LM CR Agreement Yes
Yes
revised No S5‑238077  
    S5‑238077 Rel-18 CR 32.291 Correction of cardinality for NEF external id Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237763
    S5‑237764 Rel-17 CR 32.298 Correction of NEF external id as a list Ericsson LM CR Agreement Yes
Yes
revised No S5‑238078  
    S5‑238078 Rel-17 CR 32.298 Correction of NEF external id as a list Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237764
    S5‑237765 Rel-18 CR 32.298 Correction of NEF internal and external id as lists Ericsson LM CR Agreement Yes
Yes
revised No S5‑238079  
    S5‑238079 Rel-18 CR 32.298 Correction of cardinality for NEF external id Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237765
    S5‑237766 Rel-18 CR 32.254 Correction of subscriber identifier Ericsson LM CR Agreement Yes
Yes
not pursued No    
    S5‑237767 Rel-18 CR 32.291 Correction of tenant identifier Ericsson LM CR Agreement Yes
Yes
not pursued No    
    S5‑237768 Rel-18 CR 32.298 Correction of CHF CDR tenant and subscriber identifier Ericsson LM CR Agreement Yes
Yes
not pursued No    
    S5‑237769 Rel-18 CR 32.254 Addition of Trusted AF Ericsson LM CR Agreement Yes
Yes
not pursued No    
    S5‑237770 Rel-18 CR 32.298 Correction of record opening time Ericsson LM CR Agreement Yes
Yes
revised No S5‑238082 S5‑236699
    S5‑238082 Rel-18 CR 32.298 Correction of record opening time Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237770
    S5‑237771 Rel-18 CR 32.255 Correction of record opening time Ericsson LM CR Agreement Yes
Yes
revised No S5‑238081 S5‑236701
    S5‑238081 Rel-18 CR 32.255 Correction of record opening time Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237771
    S5‑237772 Rel-18 CR 32.298 Correction of duration Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑236703
    S5‑237773 Rel-18 CR 32.255 Addition of invocation timestamp in CDR Ericsson LM CR Agreement Yes
Yes
revised No S5‑238083 S5‑236707
    S5‑238083 Rel-18 CR 32.255 Addition of invocation timestamp in CDR Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237773
    S5‑237774 Rel-18 CR 32.260 Addition of invocation timestamp in CDR Ericsson LM CR Agreement Yes
Yes
revised No S5‑238085 S5‑236711
    S5‑238085 Rel-18 CR 32.260 Addition of invocation timestamp in CDR Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237774
    S5‑237775 Rel-18 CR 32.291 Addition of invocation timestamp in CDR Ericsson LM CR Agreement Yes
Yes
revised No S5‑238084 S5‑236709
    S5‑238084 Rel-18 CR 32.291 Addition of invocation timestamp in CDR Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237775
    S5‑237776 Rel-18 CR 32.298 Addition of invocation timestamp in CHF CDR Ericsson LM CR Agreement Yes
Yes
revised No S5‑238086 S5‑236705
    S5‑238086 Rel-18 CR 32.298 Addition of invocation timestamp in CHF CDR Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237776
    S5‑237777 Rel-18 CR 32.255 Correction of Multiple Unit Usage Ericsson LM CR Agreement Yes
Yes
revised No S5‑238087 S5‑236713
    S5‑238087 Rel-18 CR 32.255 Correction of Multiple Unit Usage Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237777
    S5‑237778 Rel-17 CR 32.255 Correction of LBO CHF selection Ericsson LM CR Agreement Yes
Yes
revised No S5‑238088  
    S5‑238088 Rel-17 CR 32.255 Correction of LBO CHF selection Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237778
    S5‑237779 Rel-18 CR 32.255 Correction of LBO CHF selection Ericsson LM CR Agreement Yes
Yes
revised No S5‑238089  
    S5‑238089 Rel-18 CR 32.255 Correction of LBO CHF selection Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237779
    S5‑237823 Rel-18 CR 32.291 Correction of tenant identifier Ericsson LM CR Agreement Yes
Yes
not pursued No    
    S5‑237838 Discussion paper on triggers in charging stage 2 and stage 3 Huawei discussion Discussion Yes
Yes
noted No    
    S5‑237839 Rel-18 CR 32.291 Update the Trigger Type for IMS Charging Huawei CR Agreement Yes
Yes
revised No S5‑238090  
    S5‑238090 Rel-18 CR 32.291 Update the Trigger Type for IMS Charging Huawei CR Agreement Yes
Yes
agreed No   S5‑237839
    S5‑237840 Rel-18 CR 32.260 Update on Triggers for IMS charging Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑237841 Rel-18 CR 32.256 Update on Triggers for AMF charging Huawei CR Agreement Yes
Yes
revised No S5‑238091  
    S5‑238091 Rel-18 CR 32.256 Update on Triggers for AMF charging Huawei CR Agreement Yes
Yes
agreed No   S5‑237841
    S5‑237842 Rel-18 CR 32.255 Clarification on message flow of home routed charging Huawei CR Agreement Yes
Yes
revised No S5‑238092 S5‑236610
    S5‑238092 Rel-18 CR 32.255 Clarification on message flow of home routed charging Huawei CR Agreement Yes
Yes
agreed No   S5‑237842
    S5‑237843 Rel-18 CR 32.255 Addition of Roaming Charging Profile Change Huawei CR Agreement Yes
Yes
revised No S5‑238093  
    S5‑238093 Rel-18 CR 32.255 Addition of Roaming Charging Profile Change Huawei CR Agreement Yes
Yes
agreed No   S5‑237843
    S5‑237844 Rel-18 CR 32.255 Addition of 5G Data Connectivity Converged Charging per network slice Huawei CR Agreement Yes
Yes
revised No S5‑238080  
    S5‑238080 Rel-18 CR 32.255 Addition of 5G Data Connectivity Converged Charging per network slice Huawei CR Agreement Yes
Yes
agreed No   S5‑237844
    S5‑237845 Rel-18 CR 32.255 Clarification on EPS to 5GS handover for roaming in Home routed scenario Huawei CR Agreement Yes
Yes
revised No S5‑238094  
    S5‑238094 Rel-18 CR 32.255 Clarification on EPS to 5GS handover for roaming in Home routed scenario Huawei CR Agreement Yes
Yes
agreed No   S5‑237845
    S5‑237846 Rel-17 CR 32.254 Correct the 5G VNGM Charging Information Huawei CR Agreement Yes
Yes
revised No S5‑238253  
    S5‑238253 Rel-17 CR 32.254 Correct the 5G VNGM Charging Information Huawei CR Agreement Yes
Yes
agreed No   S5‑237846
    S5‑237847 Rel-18 CR 32.254 Correct the 5G VNGM Charging Information Huawei CR Agreement Yes
Yes
revised No S5‑238254  
    S5‑238254 Rel-18 CR 32.254 Correct the 5G VNGM Charging Information Huawei CR Agreement Yes
Yes
agreed No   S5‑237847
    S5‑237848 Rel-17 CR 32.298 Correct the reference and term used for 5G charging Huawei CR Agreement Yes
Yes
revised No S5‑238255  
    S5‑238255 Rel-17 CR 32.298 Correct the reference and term used for 5G charging Huawei CR Agreement Yes
Yes
agreed No   S5‑237848
    S5‑237849 Rel-18 CR 32.298 Correct the reference and term used for 5G charging Huawei CR Agreement Yes
Yes
revised No S5‑238256  
    S5‑238256 Rel-18 CR 32.298 Correct the reference and term used for 5G charging Huawei CR Agreement Yes
Yes
agreed No   S5‑237849
    S5‑237850 Clarify the reference to CHF to CHF interaction Huawei CR Agreement Yes
Yes
revised No S5‑238257  
    S5‑238257 Clarify the reference to CHF to CHF interaction Huawei CR Agreement Yes
Yes
agreed No   S5‑237850
    S5‑237986 Rel-17 CR 32.291 Update OpenAPI version Huawei CR Agreement No
Yes
email approval No    
    S5‑237987 Rel-18 CR 32.291 Update OpenAPI version Huawei CR Agreement No
Yes
email approval No    
    S5‑238258 Rel-18 CR 32.255 Clarification on roaming charging profile Huawei CR Agreement Yes
Yes
agreed No   S5‑237029
    S5‑238259 Rel-18 CR 32.255 Update the roaming charging profile transfer Huawei CR Agreement Yes
Yes
agreed No   S5‑237030
    S5‑238260 Rel-18 CR 32.255 Clarification on QBC triggers Charging CR Agreement Yes
Yes
agreed No   S5‑237031
7.4 Rel-18 Charging                      
7.4.1 Charging Aspects of Network Slicing Phase 2 S5‑237456 Rel-18 pCR TS 28.203 Clarify IEC and ECUR scenarios MATRIXX Software pCR Approval Yes
Yes
revised No S5‑237996  
    S5‑237996 Rel-18 pCR TS 28.203 Clarify IEC and ECUR scenarios MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑237456
    S5‑237457 Rel-18 pCR TS 28.203 Addition of ECUR in triggers table MATRIXX Software pCR Approval Yes
Yes
revised No S5‑237997  
    S5‑237997 Rel-18 pCR TS 28.203 Addition of ECUR in triggers table MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑237457
    S5‑237458 Rel-18 pCR TS 28.203 Clarify Quota management description MATRIXX Software pCR Approval Yes
Yes
revised No S5‑238000  
    S5‑238000 Rel-18 pCR TS 28.203 Clarify Quota management description MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑237458
    S5‑237529 Addition of CHF-CHF architecture to support Network Slice Charging MATRIXX Software CR Agreement Yes
Yes
revised No S5‑238002  
    S5‑238002 Addition of CHF-CHF architecture to support Network Slice Charging MATRIXX Software CR Agreement Yes
Yes
agreed No   S5‑237529
    S5‑237851 Rel-18 pCR 28.203 Update Charging principle for NSACF Charging Huawei pCR Approval Yes
Yes
revised No S5‑237999  
    S5‑237999 Rel-18 pCR 28.203 Update Charging principle for NSACF Charging Huawei pCR Approval Yes
Yes
approved No   S5‑237851
    S5‑237852 Rel-18 pCR 28.203 Clarification on the quota management Huawei pCR Approval Yes
Yes
merged No S5‑238000  
    S5‑237853 Rel-18 pCR 28.203 Clarification on the reporting in charging data message Huawei pCR Approval Yes
Yes
revised No S5‑238001  
    S5‑238001 Rel-18 pCR 28.203 Clarification on the reporting in charging data message Huawei pCR Approval Yes
Yes
approved No   S5‑237853
    S5‑237854 Rel-18 pCR 28.203 Update for the event based charging Huawei pCR Approval Yes
Yes
revised No S5‑237998  
    S5‑237998 Rel-18 pCR 28.203 Update for the event based charging Huawei pCR Approval Yes
Yes
approved No   S5‑237854
    S5‑237977 Draft TS 28.203 MATRIXX Software draft TS Approval No
Yes
email approval No    
    S5‑237985 Revised WID on Charging Aspects of Network Slicing Phase 2 MATRIXX Software WID revised Agreement Yes
Yes
agreed No    
7.4.2 Charging Aspects for NSSAA S5‑237450 Rel-18 pCR TS 28.204 Introduction of CHF selection MATRIXX Software pCR Approval Yes
Yes
approved No    
    S5‑237451 Rel-18 pCR TS 28.204 Introduction of CDR description MATRIXX Software pCR Approval Yes
Yes
approved No    
    S5‑237452 Rel-18 pCR TS 28.204 Introduction of Detailed message format for converged charging MATRIXX Software pCR Approval Yes
Yes
revised No S5‑238003  
    S5‑238003 Rel-18 pCR TS 28.204 Introduction of Detailed message format for converged charging MATRIXX Software pCR Approval Yes
Yes
approved No   S5‑237452
    S5‑237453 Rel-18 pCR TS 28.204 Introduction of Formal Network slice-specific authentication charging parameter description MATRIXX Software pCR Approval Yes
Yes
approved No    
    S5‑237454 Rel-18 pCR TS 28.204 Introduction of Bindings for NS-specific authentication and authorization converged charging MATRIXX Software pCR Approval Yes
Yes
approved No    
    S5‑237455 Presentation of TS 28.204 to SA#102 MATRIXX Software TS or TR cover Information Yes
Yes
revised No S5‑238004  
    S5‑238004 Presentation of TS 28.204 to SA#102 MATRIXX Software TS or TR cover Information Yes
Yes
approved No   S5‑237455
    S5‑237528 Rel-18 pCR TS 28.204 Refinement on charging information MATRIXX Software pCR Approval Yes
Yes
approved No    
    S5‑237978 Draft TS 28.204 MATRIXX Software draft TS discussion No
Yes
email approval No    
7.4.3 Charging Aspects for Enhanced Support of Non-Public Networks S5‑237855 Rel-18 CR 32.255 Addition of the Architecture considerations for NPN charging Huawei, China Mobile CR Agreement Yes
Yes
revised No S5‑238017  
    S5‑238017 Rel-18 CR 32.255 Addition of the Architecture considerations for NPN charging Huawei, China Mobile CR Agreement Yes
Yes
agreed No   S5‑237855
7.4.4 Charging Aspects of IMS Data Channel                      
7.4.5 Charging Aspects for SMF and MB-SMF to Support 5G Multicast-broadcast Services S5‑237753 Remove MBS session charging information China Mobile Com. Corporation, Huawei CR Approval Yes
Yes
revised No S5‑238018  
    S5‑238018 Remove MBS session charging information China Mobile Com. Corporation, Huawei CR Approval Yes
Yes
agreed No   S5‑237753
    S5‑237756 Rel-18 pCR 32.27x Add MBS session charging information China Mobile Com. Corporation other Approval Yes
Yes
revised No S5‑238024  
    S5‑238024 Rel-18 pCR 32.27x Add MBS session charging information China Mobile Com. Corporation other Approval Yes
Yes
approved No   S5‑237756
    S5‑237803 Rel-18 pCR 32.27x Add scope China Mobile Com. Corporation other Approval Yes
Yes
revised No S5‑238019  
    S5‑238019 Rel-18 pCR 32.27x Add scope China Mobile Com. Corporation other Approval Yes
Yes
agreed No   S5‑237803
    S5‑237805 Rel-18 pCR 32.27x Add references China Mobile Com. Corporation other Approval Yes
Yes
revised No S5‑238020  
    S5‑238020 Rel-18 pCR 32.27x Add references China Mobile Com. Corporation other Approval Yes
Yes
agreed No   S5‑237805
    S5‑237806 Rel-18 pCR 32.27x Add definitions of terms, symbols and abbreviations China Mobile Com. Corporation other Approval Yes
Yes
revised No S5‑238021  
    S5‑238021 Rel-18 pCR 32.27x Add definitions of terms, symbols and abbreviations China Mobile Com. Corporation other Approval Yes
Yes
agreed No   S5‑237806
    S5‑237807 Rel-18 pCR 32.27x Add general information for 5MBS charging China Mobile Com. Corporation other Approval Yes
Yes
approved No S5‑238023  
    S5‑238023 Rel-18 pCR 32.27x Add general information for 5MBS charging China Mobile Com. Corporation other Approval Yes
Yes
approved No   S5‑237807
    S5‑237808 Rel-18 pCR 32.27x Add Bmbs interface information China Mobile Com. Corporation other   Yes
Yes
revised No S5‑238025  
    S5‑238025 Rel-18 pCR 32.27x Add Bmbs interface information China Mobile Com. Corporation other - Yes
Yes
approved No   S5‑237808
    S5‑237810 Rel-18 pCR 32.27x Add Ga interface information China Mobile Com. Corporation other Approval Yes
Yes
revised No S5‑238026  
    S5‑238026 Rel-18 pCR 32.27x Add Ga interface information China Mobile Com. Corporation other Approval Yes
Yes
approved No   S5‑237810
    S5‑237856 CR TS 32.291 Support of MBS charging in 5G data connectivity domain charging in Stage 3 Huawei CR Agreement Yes
Yes
revised No S5‑238027  
    S5‑238027 CR TS 32.291 Support of MBS charging in 5G data connectivity domain charging in Stage 3 Huawei CR Agreement Yes
Yes
agreed No   S5‑237856
    S5‑237857 CR TS 32.291 Support of 5G Multicast-broadcast Services charging in Stage 3 Huawei CR Agreement Yes
Yes
not pursued No    
    S5‑238028 CR TS 32.291 Support of 5G Multicast-broadcast Services charging in Stage 3 Huawei CR Agreement No
Yes
withdrawn Yes    
    S5‑237954 Rel-18 pCR TR 32.27x MBS Termination Trigger Nokia, Nokia Shanghai Bell other Approval Yes
Yes
noted No    
    S5‑237956 Rel-18 pCR TR 32.27x MBS Charging Principles Nokia, Nokia Shanghai Bell other Approval Yes
Yes
revised No S5‑238022  
    S5‑238022 Rel-18 pCR TR 32.27x MBS Charging Principles Nokia, Nokia Shanghai Bell other Approval Yes
Yes
approved No   S5‑237956
    S5‑237979 Draft TS 32.27x China Mobile other Approval No
Yes
email approval No    
    S5‑238029 TS 32.27x Presentation for Information China Mobile other Approval Yes
Yes
approved No    
7.4.6 Charging Aspects of TSN S5‑237858 Presentation of TS 32.282 for information and approval Huawei TS or TR cover Approval Yes
Yes
revised No S5‑238015  
    S5‑238015 Presentation of TS 32.282 for information and approval Huawei TS or TR cover Approval Yes
Yes
approved No   S5‑237858
    S5‑237859 Rel-18 pCR 32.282 Add message flows for 5GS bridge configuration and management charging Huawei pCR Approval Yes
Yes
revised No S5‑238005  
    S5‑238005 Rel-18 pCR 32.282 Add message flows for 5GS bridge configuration and management charging Huawei pCR Approval Yes
Yes
approved No   S5‑237859
    S5‑237860 Rel-18 pCR 32.282 Add message flows for time synchronization service charging Huawei pCR Approval Yes
Yes
revised No S5‑238006  
    S5‑238006 Rel-18 pCR 32.282 Add message flows for time synchronization service charging Huawei pCR Approval Yes
Yes
approved No   S5‑237860
    S5‑237861 Rel-18 pCR 32.282 Add message flows for QoS and TSC assistance service charging Huawei pCR Approval Yes
Yes
revised No S5‑238007  
    S5‑238007 Rel-18 pCR 32.282 Add message flows for QoS and TSC assistance service charging Huawei pCR Approval Yes
Yes
approved No   S5‑237861
    S5‑237862 Rel-18 pCR 32.282 Add message flows for TSC and TS service notification charging Huawei pCR Approval Yes
Yes
revised No S5‑238008  
    S5‑238008 Rel-18 pCR 32.282 Add message flows for TSC and TS service notification charging Huawei pCR Approval Yes
Yes
approved No   S5‑237862
    S5‑237863 Rel-18 pCR 32.282 Update CDR generation, record transfer and file transfer in charging scenarios Huawei pCR Approval Yes
Yes
approved No    
    S5‑237864 Rel-18 pCR 32.282 Add the charging data request and response massage Huawei pCR Approval Yes
Yes
revised No S5‑238009  
    S5‑238009 Rel-18 pCR 32.282 Add the charging data request and response massage Huawei pCR Approval Yes
Yes
approved No   S5‑237864
    S5‑237865 Rel-18 pCR 32.282 Add the TSN charging CHF record data Huawei pCR Approval Yes
Yes
approved No    
    S5‑237866 Rel-18 pCR 32.282 Define the structure of TSN Charging Information Huawei pCR Approval Yes
Yes
revised No S5‑238010  
    S5‑238010 Rel-18 pCR 32.282 Define the structure of TSN Charging Information Huawei pCR Approval Yes
Yes
approved No   S5‑237866
    S5‑237867 Rel-18 pCR 32.282 Define the information for 5GS bridge configuration and management Huawei pCR Approval Yes
Yes
revised No S5‑238011  
    S5‑238011 Rel-18 pCR 32.282 Define the information for 5GS bridge configuration and management Huawei pCR Approval Yes
Yes
approved No   S5‑237867
    S5‑237868 Rel-18 pCR 32.282 Define the information for time synchronization service Huawei pCR Approval Yes
Yes
revised No S5‑238012  
    S5‑238012 Rel-18 pCR 32.282 Define the information for time synchronization service Huawei pCR Approval Yes
Yes
approved No   S5‑237868
    S5‑237869 Rel-18 pCR 32.282 Add the TSN charging parameter description, message format and binding Huawei pCR Approval Yes
Yes
revised No S5‑238013  
    S5‑238013 Rel-18 pCR 32.282 Add the TSN charging parameter description, message format and binding Huawei pCR Approval Yes
Yes
approved No   S5‑237869
    S5‑237870 Rel-18 pCR 32.282 Update TSN charging information in charging principles Huawei pCR Approval Yes
Yes
approved No    
    S5‑237871 Rel-18 CR 32.254 Add charging support for TSN service Huawei CR Agreement Yes
Yes
revised No S5‑238014  
    S5‑238014 Rel-18 CR 32.254 Add charging support for TSN service Huawei CR Agreement Yes
Yes
agreed No   S5‑237871
    S5‑237980 Draft TS 32.282 Huawei draft TS Approval No
Yes
email approval No    
7.4.7 Charging Aspects of B2B S5‑237525 Add a new clause for CHF to CHF to support B2B charging - architecture MATRIXX Software CR Agreement Yes
Yes
not pursued No    
    S5‑237526 Discussion paper on Reference points for CHF to CHF MATRIXX Software discussion Agreement Yes
Yes
noted No    
    S5‑237527 Discussion paper on CHF to CHF description MATRIXX Software discussion Agreement Yes
Yes
noted No    
    S5‑237780 Rel-18 CR 32.240 Addition of business CHF via consumer CHF Ericsson LM CR Agreement Yes
Yes
revised No S5‑238016  
    S5‑238016 Rel-18 CR 32.240 Addition of business CHF via consumer CHF Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237780
7.4.8 Charging Aspects of 5WWC phase 2 S5‑237656 Discussion paper on charging requirements for 5WWC phase 2 China Unicom, Huawei discussion Endorsement Yes
Yes
noted No    
    S5‑237657 R18 CR 32.255 Add clarification text for use of UE behind the RGs China Unicom, Huawei CR Approval Yes
Yes
revised No S5‑238030  
    S5‑238030 R18 CR 32.255 Add clarification text for use of UE behind the RGs China Unicom, Huawei CR Approval Yes
Yes
agreed No   S5‑237657
7.4.9 Charging for roaming and additional actor using CHF to CHF interface S5‑237781 Rel-18 CR 32.256 Addition of CHF selection by H-CHF Ericsson LM CR Agreement Yes
Yes
revised No S5‑238032  
    S5‑238032 Rel-18 CR 32.256 Addition of CHF selection by H-CHF Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237781
    S5‑237782 Rel-18 CR 32.256 Addition of CHF to CHF flow Ericsson LM CR Agreement Yes
Yes
revised No S5‑238033  
    S5‑238033 Rel-18 CR 32.256 Addition of CHF to CHF flow Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237782
    S5‑237783 Rel-18 CR 32.256 Addition of CHF information Ericsson LM CR Agreement Yes
Yes
revised No S5‑238034  
    S5‑238034 Rel-18 CR 32.256 Addition of CHF information Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237783
    S5‑237784 Rel-18 CR 32.255 Addition of CHF selection by H-CHF Ericsson LM CR Agreement Yes
Yes
merged No S5‑238036  
    S5‑237785 Rel-18 CR 32.255 Addition of CHF to CHF roaming charging profile Ericsson LM CR Agreement Yes
Yes
revised No S5‑238037  
    S5‑238037 Rel-18 CR 32.255 Addition of CHF to CHF roaming charging profile Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237785
    S5‑237786 Rel-18 CR 32.255 Addition of CHF to CHF flow Ericsson LM CR Agreement Yes
Yes
revised No S5‑238042  
    S5‑238042 Rel-18 CR 32.255 Addition of CHF to CHF flow Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237786
    S5‑237787 Rel-18 CR 32.255 Addition of CHF information Ericsson LM CR Agreement Yes
Yes
revised No S5‑238043  
    S5‑238043 Rel-18 CR 32.255 Addition of CHF information Ericsson LM CR Agreement Yes
Yes
agreed No   S5‑237787
    S5‑237872 Rel-18 CR 32.255 Clarify the selection of two LBO roaming architectures Huawei CR Agreement Yes
Yes
revised No S5‑238035  
    S5‑238035 Rel-18 CR 32.255 Clarify the selection of two LBO roaming architectures Huawei CR Agreement Yes
Yes
agreed No   S5‑237872
    S5‑237873 Rel-18 CR 32.256 Clarify the selection of two LBO roaming architectures Huawei CR Agreement Yes
Yes
revised No S5‑238031  
    S5‑238031 Rel-18 CR 32.256 Clarify the selection of two LBO roaming architectures Huawei CR Agreement Yes
Yes
agreed No   S5‑237873
    S5‑237874 Rel-18 CR 32.255 Add CHF to CHF interaction principle for LBO roaming Huawei CR Agreement Yes
Yes
revised No S5‑238036  
    S5‑238036 Rel-18 CR 32.255 Add CHF to CHF interaction principle for LBO roaming Huawei CR Agreement Yes
Yes
agreed No   S5‑237874
    S5‑237875 Rel-18 CR 32.290 Add CHF to CHF interaction failure handling Huawei CR Agreement Yes
Yes
revised No S5‑238044  
    S5‑238044 Rel-18 CR 32.290 Add CHF to CHF interaction failure handling Huawei CR Agreement Yes
Yes
agreed No   S5‑237875
    S5‑237876 Rel-18 CR 32.290 Quota mangement for CHF to CHF communication Huawei CR Agreement Yes
Yes
revised No S5‑238045 S5‑236634
    S5‑238045 Rel-18 CR 32.290 Quota mangement for CHF to CHF communication Huawei CR Agreement Yes
Yes
agreed No   S5‑237876
7.4.10 Charging aspects of Satellite Access in 5GS S5‑237878 Add charging requirements for satellite access charging CATT CR Approval Yes
Yes
revised No S5‑238057  
    S5‑238057 Add charging requirements for satellite access charging CATT CR Approval Yes
Yes
agreed No   S5‑237878
    S5‑237879 Add satellite indication for satellite charging CATT CR Approval Yes
Yes
not pursued No    
    S5‑237880 Add satellite feature for satellite access charging CATT CR Approval Yes
Yes
revised No S5‑238058  
    S5‑238058 Add satellite feature for satellite access charging CATT CR Approval Yes
Yes
agreed No   S5‑237880
7.5 Charging studies                      
7.5.1 Study on Nchf charging services phase 2 S5‑237459 Rel-18 pCR 28.826 Introduce one Solution for common IEs with clause 6 evaluation and conclusion MATRIXX Software pCR Approval Yes
Yes
revised No S5‑238039  
    S5‑238039 Rel-18 pCR 28.826 Introduce one Solution for common IEs with clause 6 evaluation and conclusion MATRIXX Software pCR Approval Yes
Yes
agreed No   S5‑237459
    S5‑237573 Rel-18 pCR TR 28.826 Update of evaluation and conclusions clause 5.1 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
merged No S5‑238040  
    S5‑237575 Rel-18 pCR TR 28.826 Update of evaluation and conclusions clause 5.3 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
merged No S5‑238040  
    S5‑237788 Rel-18 pCR 28.826 Removal of editor's note solution 1.21 Ericsson LM pCR Approval Yes
Yes
revised No S5‑238038  
    S5‑238038 Rel-18 pCR 28.826 Removal of editor's note solution 1.21 Ericsson LM pCR Approval No
Yes
approved No   S5‑237788
    S5‑237789 Rel-18 pCR 28.826 Addition of solution for documentation Ericsson LM pCR Approval Yes
Yes
merged No S5‑238039  
    S5‑237790 Rel-18 pCR 28.826 Study conclusion and recommendations Ericsson LM pCR Approval Yes
Yes
revised No S5‑238040  
    S5‑238040 Rel-18 pCR 28.826 Study conclusion and recommendations Ericsson LM pCR Approval Yes
Yes
approved No   S5‑237790
    S5‑237981 Draft TR 28.826 Ericsson draft TR Approval No
Yes
email approval No    
    S5‑238041 TR 28.826 Presentation for approval Ericsson TS or TR cover Approval Yes
Yes
approved No    
7.5.2 Study on CHF Segmentation S5‑237473 Adding Key Issue for Topic 4 Amdocs, Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑238051  
    S5‑238051 Adding Key Issue for Topic 4 Amdocs, Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑237473
    S5‑237475 Solution for Topic 4 key Issue 4b and 4d Amdocs, Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑238053  
    S5‑238053 Solution for Topic 4 key Issue 4b and 4d Amdocs, Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑237475
    S5‑237476 Charging Domain in Nchf Converged Charging SBI Amdocs, Nokia, Nokia Shanghai Bell pCR   Yes
Yes
revised No S5‑238054  
    S5‑238054 Charging Domain in Nchf Converged Charging SBI Amdocs, Nokia, Nokia Shanghai Bell pCR - Yes
Yes
approved No   S5‑237476
    S5‑237477 HTTP2 Header Based Routing Amdocs, Nokia, Nokia Shanghai Bell pCR   Yes
Yes
revised No S5‑238055  
    S5‑238055 HTTP2 Header Based Routing Amdocs, Nokia, Nokia Shanghai Bell pCR - Yes
Yes
approved No   S5‑237477
    S5‑237478 Solution for Topic 4 Key Issue 4a Amdocs Software Systems Ltd pCR   Yes
Yes
revised No S5‑238052  
    S5‑238052 Solution for Topic 4 Key Issue 4a Amdocs Software Systems Ltd pCR - Yes
Yes
approved No   S5‑237478
    S5‑237567 Rel-18 pCR TR 28.840 Abreviations section update Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
approved No    
    S5‑237568 Rel-18 pCR TR 28.840 Editorial Correction Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
revised No S5‑238046  
    S5‑238046 Rel-18 pCR TR 28.840 Editorial Correction Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
approved No   S5‑237568
    S5‑237569 Rel-18 pCR TR 28.840 Solutions Evaluation Topci#1 Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
revised No S5‑238048  
    S5‑238048 Rel-18 pCR TR 28.840 Solutions Evaluation Topci#1 Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
approved No   S5‑237569
    S5‑237570 Rel-18 pCR TR 28.840 Solutions Evaluation Topic#2 Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
revised No S5‑238049  
    S5‑238049 Rel-18 pCR TR 28.840 Solutions Evaluation Topic#2 Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
approved No   S5‑237570
    S5‑237572 Rel-18 pCR TR 28.840 Topic #3 for CHF Selection Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
revised No S5‑238050  
    S5‑238050 Rel-18 pCR TR 28.840 Topic #3 for CHF Selection Nokia, Nokia Shanghai Bell, Amdocs pCR Approval Yes
Yes
approved No   S5‑237572
    S5‑237791 Rel-18 pCR 28.840 Addition of solution for CHF Selection by NF Consumers Information Ericsson LM pCR Approval Yes
Yes
revised No S5‑238047  
    S5‑238047 Rel-18 pCR 28.840 Addition of solution for CHF Selection by NF Consumers Information Ericsson LM pCR Approval Yes
Yes
approved No   S5‑237791
    S5‑237792 Rel-18 pCR 28.840 Addition of solution for CHF Selection based on SUPI or Group ID Ericsson LM pCR Approval Yes
Yes
approved No    
    S5‑237793 Rel-18 pCR 28.840 Update of solution 4.1 Use NF type and CHF to CHF Ericsson LM pCR Approval Yes
Yes
revised No S5‑238056  
    S5‑238056 Rel-18 pCR 28.840 Update of solution 4.1 Use NF type and CHF to CHF Ericsson LM pCR Approval Yes
Yes
approved No   S5‑237793
    S5‑237794 Rel-18 pCR 28.840 Addition of solution 4 Use NF type and SCP Ericsson LM pCR Approval Yes
Yes
approved No    
    S5‑237795 Rel-18 pCR 28.840 Addition of solution 4 Use NF type and CHF redirect Ericsson LM pCR Approval Yes
Yes
approved No    
    S5‑237877 Rel-18 pCR 28.840 Resolve EN in solution #1.4 for CHF selection by NF instance Huawei pCR Approval Yes
Yes
noted No    
    S5‑237982 Draft TR 28.840 Nokia, Nokia Shanghai Bell draft TR Approval No
Yes
email approval No    
7.5.3 Study on charging aspects of Satellite in 5GS S5‑237881 TR 28.844 Rapporteur cleanup CATT pCR Approval Yes
Yes
revised No S5‑238059  
    S5‑238059 TR 28.844 Rapporteur cleanup CATT pCR Approval Yes
Yes
approved No   S5‑237881
    S5‑237983 Draft TR 28.844 CATT draft TR Approval No
Yes
email approval No    
7.5.4 Study on Charging Aspects of Ranging and Sidelink Positioning S5‑237663 Rel-18 pCR TR 28.845 Update Solution for 5GS charging of Ranging Sidelink Positioning UE Discovery China Telecom pCR Approval Yes
Yes
revised No S5‑238064  
    S5‑238064 Rel-18 pCR TR 28.845 Update Solution for 5GS charging of Ranging Sidelink Positioning UE Discovery China Telecom pCR Approval Yes
Yes
approved No   S5‑237663
    S5‑237664 Rel-18 pCR TR 28.845 Update Solution for 5GS charging of UE positioning assisted by Sidelink Positioning and involving 5GC China Telecom pCR Approval Yes
Yes
approved No    
    S5‑237665 Rel-18 pCR TR 28.845 Update Solution for 5GS charging of UE only Sidelink Positioning for Target UE using Located UE China Telecom pCR Approval Yes
Yes
revised No S5‑238065  
    S5‑238065 Rel-18 pCR TR 28.845 Update Solution for 5GS charging of UE only Sidelink Positioning for Target UE using Located UE China Telecom pCR Approval Yes
Yes
approved No   S5‑237665
    S5‑237668 Rel-18 pCR TR 28.845 Update Solution for 5GS charging of Ranging SL Positioning service exposure China Telecom pCR Approval Yes
Yes
revised No S5‑238066  
    S5‑238066 Rel-18 pCR TR 28.845 Update Solution for 5GS charging of Ranging SL Positioning service exposure China Telecom pCR Approval Yes
Yes
approved No   S5‑237668
    S5‑237669 Rel-18 pCR TR 28.845 Add Evaluation and Conclusion for 5GS charging of Ranging Sidelink Positioning UE Discovery China Telecom pCR Approval Yes
Yes
revised No S5‑238067  
    S5‑238067 Rel-18 pCR TR 28.845 Add Evaluation and Conclusion for 5GS charging of Ranging Sidelink Positioning UE Discovery China Telecom pCR Approval Yes
Yes
approved No   S5‑237669
    S5‑237670 Rel-18 pCR TR 28.845 Add Evaluation and Conclusion for 5GS charging of UE positioning assisted by Sidelink Positioning and involving 5GC China Telecom pCR Approval Yes
Yes
approved No    
    S5‑237671 Rel-18 pCR TR 28.845 Add Evaluation and Conclusion for 5GS charging of UE only Sidelink Positioning for Target UE using Located UE China Telecom pCR Approval Yes
Yes
revised No S5‑238068  
    S5‑238068 Rel-18 pCR TR 28.845 Add Evaluation and Conclusion for 5GS charging of UE only Sidelink Positioning for Target UE using Located UE China Telecom pCR Approval Yes
Yes
approved No   S5‑237671
    S5‑237984 Draft TR 28.845 China Telecom draft TR Approval No
Yes
email approval No    
    S5‑238069 Presentation of TR 28.845 for Information China Telecom TS or TR cover Approval Yes
Yes
approved No    
8 Any Other Business                      