Tdoc List
2020-09-09 10:42
Agenda | Topic | TDoc | Title | Source | Type | For | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Opening of the meeting |   | ||||||||||
2 | Approval of the agenda | S5‑204000 | Agenda | WG Chair | agenda | Yes |
Yes
| revised | No | S5‑204431 | ||
S5‑204431 | Agenda | WG Chair | agenda | Yes |
Yes
| approved | No | S5‑204000 | ||||
3 | IPR and legal declaration |   | ||||||||||
4 | Meetings and activities reports |   | ||||||||||
4.1 | Last SA5 meeting report | S5‑204001 | Report from last SA5 meeting | MCC | report | Yes |
Yes
| approved | No | |||
4.2 | Last SA meeting report |   | ||||||||||
4.3 | Inter-organizational reports |   | ||||||||||
5 | Cross-SWG issues |   | ||||||||||
5.1 | Administrative issues at SA5 level | S5‑204002 | SA5#132e e-meeting process | WG Chair | other | Yes |
Yes
| noted | No | |||
S5‑204003 | Post SA5#132e Email approval status | WG Chair | other | No |
No
| reserved | No | |||||
S5‑204480 | 3GPP SA5 Forge repository structure | Huawei | other | Endorsement | Yes |
Yes
| endorsed | No | ||||
S5‑204515 | 3GPP SA5 Forge repository structure | Huawei | other | Endorsement | No |
Yes
| withdrawn | Yes | ||||
5.2 | Technical issues at SA5 level |   | ||||||||||
5.3 | Liaison statements at SA5 level | S5‑204010 | LS from 5G ACIA cc SA5 on 5G capabilities exposure for factories of the future | 5G ACIA | LS in | Yes |
Yes
| noted | No | |||
S5‑204011 | Ls from GSMA cc SA5 on Response to SA2 on Clarification of NG.116 | GSMA | LS in | Yes |
Yes
| noted | No | |||||
S5‑204012 | Ls from GSMA to SA5 on NG.116 support of different access types | GSMA | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204476 | Reply to: Ls from GSMA to SA5 on NG.116 support of different access types | Huawei | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑204013 | LS ccSA5 on Clarification NG.116 GST Throughput Attributes and Non-3GPP Access Support | S2-1912772 | LS in | Yes |
Yes
| noted | No | |||||
S5‑204014 | LS ccSA5 on Reply on support of eCall over NR | C1-203221 | LS in | Yes |
Yes
| noted | No | |||||
S5‑204016 | Liaison to 3GPP SA2/SA5 on mapping between ENI architecture and NWDAF/MDAF | ETSI ISG ENI | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204440 | Reply to: Liaison to 3GPP SA2/SA5 on mapping between ENI architecture and NWDAF/MDAF | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑204018 | LS to SA5 on End-to-End Network Slicing Gap analysis | GSMA | LS in | Yes |
Yes
| noted | No | |||||
S5‑204029 | Ls to SA5 on the translation of GSMA GST/NEST | S2-1912467 | LS in | Yes |
Yes
| noted | No | |||||
S5‑204033 | Reply LS ccSA5 on Application Architecture for enabling Edge Applications | S2-2004386 | LS in | Yes |
Yes
| noted | No | |||||
S5‑204034 | LS to SA5 on Application Registration in relation to management aspects | S6-200949 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204117 | LS reply to SA6 on application registration in relation to mgmt aspects | Samsung Electronics Benelux BV | LS out | Agreement | Yes |
Yes
| approved | No | ||||
S5‑204323 | Discussion on 5G capabilities exposure | Orange | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑204432 | LS to SA5 on Completion of WT-456 and WT-470 | BBF | LS in | Yes |
Yes
| noted | No | |||||
S5‑204439 | Reply LS to 5G ACIA on 5G capabilities exposure for factories of the future | Orange | LS out | Approval | Yes |
Yes
| noted | No | ||||
5.4 | SA5 meeting calendar | S5‑204433 | SA5 meeting calendar | WG Chair | other | Yes |
Yes
| noted | No | |||
5.5 | Review of the Work Plan (REMOVE this item/row?) |   | ||||||||||
6 | OAM&P |   | ||||||||||
6.1 | OAM&P Plenary | S5‑204004 | OAM&P SWG action list | WG Vice Chair | other | Yes |
Yes
| revised | No | S5‑204664 | ||
S5‑204664 | OAM&P SWG action list | WG Vice Chair | other | - | Yes |
Yes
| noted | No | S5‑204004 | |||
S5‑204005 | SA5#132e_agenda_with_Tdocs_sequence_proposal_OAM | WG Vice Chair | agenda | Yes |
Yes
| noted | No | |||||
S5‑204006 | SA5#132e OAM Exec Report | WG Vice Chair | report | No |
No
| reserved | No | |||||
S5‑204007 | SA5#132e OAM Chair notes and conclusions | WG Chair | report | Yes |
Yes
| noted | No | |||||
S5‑204015 | LS Reply to SA5 on SNSSAI support in N4 Session Establishment | C4-203215 | LS in | Yes |
Yes
| noted | No | |||||
S5‑204019 | LSreply to 3GPP SA5 on the update of touchpoints in TS28.622 (ref. S5-197650) | ETSI ISG NFV | LS in | Yes |
Yes
| noted | No | |||||
S5‑204020 | LS to SA5 on QoE Measurement Collection | R2-2005778 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑204021 | LS Reply to SA5 on QoE Measurement Collection | S4-200962 | LS in | Yes |
Yes
| postponed | No | |||||
S5‑204028 | LS ccSA5 on propagation of user consent related information during Xn inter-PLMN handover | R3-204378 | LS in | Yes |
Yes
| noted | No | |||||
S5‑204537 | Reply to: Resubmitted LS ccSA5 on QoS Monitoring for URLLC | Intel | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑204035 | Ls to SA5 on methodology harmonization and REST-based network management framework (reply to 3GPP TSG SA5-S5-197541) | ITU-T SG2 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204647 | Reply to: Ls to SA5 on methodology harmonization and REST-based network management framework (reply to 3GPP TSG SA5-S5-197541) | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑204036 | Ls cc SA5 on LS on M.resm-AI “Requirements for energy saving management of 5G RAN system with AI” | ITU-T SG2 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204037 | Resubmitted Ls to SA5 on 3GPP Cooperation on Management Services | O-RAN | LS in | Yes |
Yes
| postponed | No | |||||
S5‑204038 | Liaison from ISG ZSM to IETF ccSA5 for TN coordination | ETSI ISG ZSM | LS in | Yes |
Yes
| noted | No | |||||
S5‑204039 | Ls to SA5 on Publication of major ZSM specifications | ETSI ISG ZSM | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204514 | Reply to: Ls to SA5 on Publication of major ZSM specifications | current meeting | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑204070 | LS reply to LS on M.resm-AI Requirements for energy saving management of 5G RAN system with AI | Orange | LS out | Approval | Yes |
Yes
| revised | No | S5‑204516 | |||
S5‑204516 | LS reply to LS on M.resm-AI Requirements for energy saving management of 5G RAN system with AI | Orange | LS out | Approval | Yes |
Yes
| approved | No | S5‑204070 | |||
6.2 | New OAM&P Work Item proposals | S5‑204265 | Discussion on the relation between Rel-17 autonomous related work | Huawei Technologies (Korea) | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑204518 | |
S5‑204518 | Discussion on the relation between Rel-17 autonomous related work | Huawei Technologies (Korea) | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑204265 | |||
S5‑204360 | New SID on YANG PUSH notifications | Ericsson | SID new | Yes |
Yes
| revised | No | S5‑204519 | ||||
S5‑204519 | New SID on YANG PUSH notifications | Ericsson | SID new | - | Yes |
Yes
| agreed | No | S5‑204360 | |||
S5‑204405 | New WID for access control of management service | Nokia, Nokia Shanghai Bell | SID new | Agreement | Yes |
Yes
| revised | No | S5‑204517 | |||
S5‑204517 | New WID for access control of management service | Nokia, Nokia Shanghai Bell | SID new | Agreement | Yes |
Yes
| agreed | No | S5‑204405 | |||
S5‑204406 | New SID for security management of network slice | Nokia, Nokia Shanghai Bell | SID new | Agreement | Yes |
Yes
| revised | No | S5‑204546 | |||
S5‑204546 | New SID on network slice management enhancement to include security aspects | Nokia, Nokia Shanghai Bell | SID new | Agreement | Yes |
Yes
| agreed | No | S5‑204406 | |||
S5‑204407 | LS to SA3 for new WID for access control of management service | Nokia, Nokia Shanghai Bell | LS out | Agreement | Yes |
Yes
| approved | No | ||||
S5‑204408 | LS to SA3 for new SID for security management of network slice | Nokia, Nokia Shanghai Bell | LS out | Agreement | No |
Yes
| withdrawn | Yes | ||||
6.3 | OAM&P Maintenance and Rel-16 small Enhancements | S5‑204023 | Ls to SA5 on Reply LS on the status update of the SON support for NR works | R2-2006372 | LS in | Yes |
Yes
| replied to | No | |||
S5‑204032 | Resubmitted LS ccSA5 on QoS Monitoring for URLLC | S2-2003468 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204094 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| revised | No | S5‑204520 | |||
S5‑204520 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204094 | |||
S5‑204095 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| revised | No | S5‑204521 | |||
S5‑204521 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204095 | |||
S5‑204096 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| revised | No | S5‑204522 | |||
S5‑204522 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204096 | |||
S5‑204097 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| revised | No | S5‑204523 | |||
S5‑204523 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204097 | |||
S5‑204098 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| revised | No | S5‑204524 | |||
S5‑204524 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204098 | |||
S5‑204099 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| revised | No | S5‑204525 | |||
S5‑204525 | Clean-up definitions and references | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204099 | |||
S5‑204102 | Rel-16 CR TS 28.530 Replacement of MF and managed function terms with network function | NEC Europe Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑204526 | |||
S5‑204526 | Rel-16 CR TS 28.530 Replacement of MF and managed function terms with network function | NEC Europe Ltd | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204102 | |||
S5‑204118 | Rel-15 CR Adding AUSF and SMSF as Trace Entity | Samsung Electronics Benelux BV | CR | Yes |
Yes
| revised | No | S5‑204535 | ||||
S5‑204535 | Rel-15 CR Adding AUSF and SMSF as Trace Entity | Samsung Electronics Benelux BV | CR | - | Yes |
Yes
| agreed | No | S5‑204118 | |||
S5‑204119 | Rel-16 CR Adding AUSF and SMSF as Trace Entity | Samsung Electronics Benelux BV | CR | Yes |
Yes
| revised | No | S5‑204536 | ||||
S5‑204536 | Rel-16 CR Adding AUSF and SMSF as Trace Entity | Samsung Electronics Benelux BV | CR | - | Yes |
Yes
| agreed | No | S5‑204119 | |||
S5‑204131 | Discussion on user consent in trace and MDT report procedure | HuaWei Technologies Co., Ltd | discussion | Yes |
Yes
| noted | No | |||||
S5‑204133 | Rel-16 CR TS 28.552 correct the descriptions of UL packet delay between PSA UPF and UE | HuaWei Technologies Co., Ltd | CR | Yes |
Yes
| not pursued | No | |||||
S5‑204135 | Rel-16 CR TS 28.550 Update description of MnS components used for configurable PM control | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204136 | Rel-16 CR TS 28.545 Update description of MnS components used for configurable FM control | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204528 | |||
S5‑204528 | Rel-16 CR TS 28.545 Update description of MnS components used for configurable FM control | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204136 | |||
S5‑204137 | Rel-16 CR TS 28.532 Change stage2 definition for performance data file report MnS to generic file data report MnS | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204138 | Rel-16 CR TS 28.532 Change RESTFUL definition for performance data file report MnS to generic file data report MnS | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204139 | Rel-16 CR TS 28.532 Change openAPI definition for performance data file report MnS to generic file data report MnS | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204140 | Rel-16 CR TS 28.532 Clarification on Annex A.1, A.2 and A.5 | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204504 | |||
S5‑204504 | Rel-16 CR TS 28.532 Clarification on Annex A.1, A.2 and A.5 | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204140 | |||
S5‑204141 | Rel-16 CR TS 28.532 Update URI for streamingDataReportingMnS to aligh with URI structure defined in 32.158 | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204142 | Rel-16 CR TS 28.533 Add missing definition | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204527 | |||
S5‑204527 | Rel-16 CR TS 28.533 Add missing definition | Huawei,Lenovo | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204142 | |||
S5‑204143 | Rel-15 CR TS 28.532 Correct the description for generic provisioning MnS | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204532 | |||
S5‑204532 | Rel-15 CR TS 28.532 Correct the description for generic provisioning MnS | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204143 | |||
S5‑204144 | Rel-16 CR TS 28.532 Correct the description for generic provisioning MnS | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204533 | |||
S5‑204533 | Rel-16 CR TS 28.532 Correct the description for generic provisioning MnS | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204144 | |||
S5‑204147 | Rel-15 CR TS 28.541 Correct on frequency related IOC | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204148 | Rel-16 CR TS 28.541 Correct on frequency related IOC | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204149 | Rel-15 CR TS 28.658 Add missing inheritance diagram for EUtranFrequency and EUtranFreqRelation | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204530 | |||
S5‑204530 | Rel-15 CR TS 28.658 Add missing inheritance diagram for EUtranFrequency and EUtranFreqRelation | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204149 | |||
S5‑204150 | Rel-16 CR TS 28.658 Add missing inheritance diagram for EUtranFrequency and EUtranFreqRelation | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204531 | |||
S5‑204531 | Rel-16 CR TS 28.658 Add missing inheritance diagram for EUtranFrequency and EUtranFreqRelation | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204150 | |||
S5‑204159 | Rel-16 CR 28.554 Correction of RAN UE throughput KPI | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204182 | Rel-15 CR 28.532 Correct and move the streaming solution from 28.550 to 28.532 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204183 | Rel-15 CR 28.550 Remove the streaming solution from 28.550 | Intel Corporation (UK) Ltd | CR | Agreement | No |
Yes
| revised | No | S5‑204184 | |||
S5‑204184 | Rel-16 CR 28.550 Remove the streaming solution from 28.550 | Intel Corporation (UK) Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | S5‑204183 | |||
S5‑204185 | Rel-16 CR 28.550 Correction of performance data streaming sequence flow | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204188 | Discussion on LS reply from SA2 on QoS monitoring for URLLC | Intel Corporation (UK) Ltd | discussion | Agreement | Yes |
Yes
| revised | No | S5‑204548 | |||
S5‑204548 | Discussion on LS reply from SA2 on QoS monitoring for URLLC | Intel Corporation (UK) Ltd | discussion | Agreement | Yes |
Yes
| endorsed | No | S5‑204188 | |||
S5‑204189 | LS reply to SA2 and RAN3 on QoS monitoring | Intel Corporation (UK) Ltd | LS out | Agreement | Yes |
Yes
| revised | No | S5‑204537 | |||
S5‑204190 | Rel-15 CR 28.550 Remove the streaming solution from 28.550 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204191 | Rel-16 CR 28.550 Remove the streaming solution from 28.550 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204192 | Rel-16 CR TS 28.531 Editorial corrections to remove redundant text from use cases | NEC Europe Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑204547 | |||
S5‑204547 | Rel-16 CR TS 28.531 Editorial corrections to remove redundant text from use cases | NEC Europe Ltd | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204192 | |||
S5‑204193 | Rel-16 CR TS 28.530 corrections | NEC Europe Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑204543 | |||
S5‑204543 | Rel-16 CR TS 28.530 corrections | NEC Europe Ltd | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204193 | |||
S5‑204196 | Rel-16 CR TS 32.422 Add the missing procedure of SCG failure reporting | Huawei | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204197 | Rel-16 CR TS 32.422 Update RCEF procedures according to user consent | Huawei | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204198 | Rel-16 CR TS 32.422 Update RLF procedures according to user consent | Huawei | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204200 | Rel-16 CR TS 28.552 Addition of AM policy association update notify measurements for PCF | China Mobile Com. Corporation, ZTE | CR | Yes |
Yes
| revised | No | S5‑204538 | ||||
S5‑204538 | Rel-16 CR TS 28.552 Addition of AM policy association update notify measurements for PCF | China Mobile Com. Corporation, ZTE | CR | - | Yes |
Yes
| agreed | No | S5‑204200 | |||
S5‑204201 | Rel-16 CR TS 28.552 Addition of SM policy association update measurements for PCF | China Mobile Com. Corporation, ZTE | CR | Yes |
Yes
| revised | No | S5‑204539 | ||||
S5‑204539 | Rel-16 CR TS 28.552 Addition of SM policy association update measurements for PCF | China Mobile Com. Corporation, ZTE | CR | - | Yes |
Yes
| agreed | No | S5‑204201 | |||
S5‑204202 | Rel-16 CR TS 28.545 Remove discarded IOC FMContol | ZTE Corporation | CR | Agreement | Yes |
Yes
| merged | No | S5‑204528 | |||
S5‑204203 | Rel-16 CR TS 28.628 Modify TOP as parent class | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204204 | Rel-16 CR TS 28.552 Update the description of RRC connection re-establishment related measurementss | ZTE Corporation | CR | Agreement | Yes |
Yes
| revised | No | S5‑204540 | |||
S5‑204540 | Rel-16 CR TS 28.552 Update the description of RRC connection re-establishment related measurementss | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204204 | |||
S5‑204205 | R16 CR TS28.552 Modify MCS related Measurements | ZTE Corporation | CR | Agreement | Yes |
Yes
| revised | No | S5‑204541 | |||
S5‑204541 | R16 CR TS28.552 Modify MCS related Measurements | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204205 | |||
S5‑204241 | Rel-15 CR TS 32.422 adding AMF interface trace information | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204242 | Rel-16 CR TS 32.422 adding AMF interface trace information | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204243 | Rel-16 28.541 CR Add missing definitions for perfReq | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204544 | |||
S5‑204544 | Rel-16 28.541 CR Add missing definitions for perfReq | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204243 | |||
S5‑204266 | Rel-16 CR 28.310 Add missing requirements traceability for energy saving use cases | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204268 | Rel-16 CR 28.541 Correction on duplicated annex numbering | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204269 | Rel-16 CR 28.531 Correction on network slice related identifiers | Huawei | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204303 | LS reply to RAN2 on user consent for trace reporting | HuaWei Technologies Co., Ltd | LS out | Yes |
Yes
| revised | No | S5‑204542 | ||||
S5‑204542 | LS reply to RAN2 on user consent for trace reporting | HuaWei Technologies Co., Ltd | LS out | - | Yes |
Yes
| approved | No | S5‑204303 | |||
S5‑204316 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | Yes |
Yes
| agreed | No | |||||
S5‑204318 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | Yes |
Yes
| agreed | No | |||||
S5‑204321 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | Yes |
Yes
| agreed | No | |||||
S5‑204322 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | Yes |
Yes
| agreed | No | |||||
S5‑204325 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | Yes |
Yes
| revised | No | S5‑204553 | ||||
S5‑204553 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | - | Yes |
Yes
| agreed | No | S5‑204325 | |||
S5‑204326 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | Yes |
Yes
| agreed | No | |||||
S5‑204327 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | Yes |
Yes
| revised | No | S5‑204668 | ||||
S5‑204668 | Correction of reference list and adding references throughout the document | Ericsson LM | CR | - | Yes |
Yes
| agreed | No | S5‑204327 | |||
S5‑204328 | CR Rel-12 Remove the reference to M-SDO tdoc | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204329 | CR Rel-13 Remove the reference to M-SDO tdoc | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204330 | CR Rel-14 Remove the reference to M-SDO tdoc | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204331 | CR Rel-15 Remove the reference to M-SDO tdoc | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204332 | CR Rel-16 Remove the reference to M-SDO tdoc | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204336 | Rel-16 CR 32.158 Add missing design pattern for asynchronous operations | Nokia, Nokia Shanghai Bell | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑204339 | Rel-16 CR 28.623 Add missing definitions to comDefs.yaml (OpenAPI definitions) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204341 | Rel-16 CR 28.623 Correct various smaller errors (e.g. validation errors) in genericNRM.yaml (OpenAPI definitions) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204342 | Rel-16 CR 28.622 Correct ThresholdMonitor definition (stage 2) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑204585 | |||
S5‑204585 | Rel-16 CR 28.622 Correct ThresholdMonitor definition (stage 2) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑204342 | |||
S5‑204343 | Rel-16 CR 28.623 Correct ThresholdMonitor definition (OpenAPI definitions) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑204650 | |||
S5‑204650 | Rel-16 CR 28.623 Correct ThresholdMonitor definition (OpenAPI definitions) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑204343 | |||
S5‑204362 | Rel-16 CR 28.622 Correct HeartbeatControl definition and some other smaller issues (stage 2) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑204549 | |||
S5‑204549 | Rel-16 CR 28.622 Correct HeartbeatControl definition and some other smaller issues (stage 2) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | S5‑204362 | |||
S5‑204363 | Rel-16 CR 28.532 Correct various smaller errors (e.g. validation errors) in faultMnS.yaml (OpenAPI definitions) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204365 | Rel-16 CR 28.532 Correct definition of ThresholdLevelInd (REST SS) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204367 | Rel-16 CR 28.532 Add missing object creation variant with HTTP POST (REST SS) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑204648 | |||
S5‑204648 | Rel-16 CR 28.532 Add missing object creation variant with HTTP POST (REST SS) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| not pursued | No | S5‑204367 | |||
S5‑204368 | Rel-16 CR 28.532 Add missing object creation variant with HTTP POST (OpenAPI definitions) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| revised | No | S5‑204649 | |||
S5‑204649 | Rel-16 CR 28.532 Add missing object creation variant with HTTP POST (OpenAPI definitions) | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| not pursued | No | S5‑204368 | |||
S5‑204400 | Rel-15 CR 28.531 Resolve inconsistency in the allocate procedures | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204402 | Rel-16 CR 28.531 Resolve inconsistency in the allocate procedures | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204404 | Add support for new administration messages when streaming trace data | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204409 | add relation between transport and application level endpoints stage 2 | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204534 | |||
S5‑204534 | add relation between transport and application level endpoints stage 2 | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204409 | |||
S5‑204410 | Add relation between transport and application level endpoints stage 3 | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204413 | Fix general information of network slice related identifiers | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204414 | Rel-16 CR 28.535 Add abbreviations to clause 3.3 | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204415 | Add support in band notification of error conditions when streaming trace data | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204416 | Rel-16 CR 28.535 Correction of requirements text in clause 5.1.1 | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204417 | Rel-16 CR 28.535 Remove Editors Notes from clause 5.1.2 | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204418 | Rel-16 CR 28.536 Add abbreviations to clause 3.3 | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204419 | Rel-16 CR 28.536 Add references to clause 4.1.2.3 | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204420 | Rel-16 CR 28.536 Correct title and add references in clause 4.1.1 | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204421 | Rel-16 CR 28.536 Remove Editors Note in clause 4.1.1 | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204422 | Rel-16 CR 28.536 Replace Editors Note in clause Annex A.5 with a Note | Ericsson LM, Deutsche Telekom | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204423 | Rel-16 CR 28.541 Add clarifying note to ServiceProfile | Ericsson LM | CR | Approval | Yes |
Yes
| revised | No | S5‑204545 | |||
S5‑204545 | Rel-16 CR 28.541 Add clarifying note to ServiceProfile | Ericsson LM | CR | Approval | Yes |
Yes
| agreed | No | S5‑204423 | |||
S5‑204427 | Rel-16 CR 32.422 Add missing 5G RCEF report collection | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204428 | Rel-16 CR 32.422 Add missing reports of RRC resume procedure failure | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204430 | Rel-16 CR 32.422 Add missing 5G RLF report collection | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204436 | Update the URI strcuture definition | Huawei,Nokia | CR | Agreement | Yes |
Yes
| revised | No | S5‑204529 | |||
S5‑204529 | Update the URI strcuture definition | Huawei,Nokia | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204436 | |||
S5‑204437 | Remove unintended normative statement from informative clause | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204552 | Rel-16 CR 28.623 Correct HeartbeatControl definition and some other smaller issues (stage 3) | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204651 | Rel-16 CR 28.623 Correct ThresholdMonitor definition (YANG) | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4 | Rel-16 Operations, Administration, Maintenance and Provisioning (OAM&P) |   | ||||||||||
6.4.1 | Management of QoE measurement collection | S5‑204317 | Create solution sets for managing QoE measurement collection | Oy LM Ericsson AB | pCR | Agreement | Yes |
Yes
| approved | No | ||
S5‑204478 | Presentation sheet for approval of TS 28.309 | Ericsson | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑204670 | Draft TS 28.309 | Ericsson | draft TS | Approval | No |
Yes
| approved | No | ||||
6.4.2 | Discovery of management services in 5G | S5‑204444 | Revised WID on Discovery of management services in 5G | Huawei | WID revised | Agreement | Yes |
Yes
| revised | No | S5‑204652 | |
S5‑204652 | Revised WID on Discovery of management services in 5G | Huawei | WID revised | Agreement | Yes |
Yes
| agreed | No | S5‑204444 | |||
6.4.3 | NRM enhancements | S5‑204069 | Correction of NRM YANG errors | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| agreed | No | ||
S5‑204072 | Correction of NRM YANG errors | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204134 | YANG SS for Trace Control | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204145 | Rel-16 CR TS 28.541 Correction on NR NRM | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204654 | |||
S5‑204654 | Rel-16 CR TS 28.541 Correction on NR NRM | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204145 | |||
S5‑204146 | Rel-16 CR TS 28.541 Update openAPI definition for localAddress to align with stage2 definition | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204177 | Rel-16 CR 28.541 Add IOC for predefined PCC rule - stage 2 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑204447 | |||
S5‑204447 | Rel-16 CR 28.541 Add IOC for predefined PCC rule - stage 2 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204177 | |||
S5‑204178 | Rel-16 CR 28.541 Add IOC for predefined PCC rule - stage 3 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑204448 | |||
S5‑204448 | Rel-16 CR 28.541 Add IOC for predefined PCC rule - stage 3 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| revised | No | S5‑204663 | S5‑204178 | ||
S5‑204663 | Rel-16 CR 28.541 Add IOC for predefined PCC rule - stage 3 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204448 | |||
S5‑204179 | Rel-16 CR 28.541 Enable PCF to support configurable 5QIs | Intel, CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204180 | Rel-16 CR 28.541 Add IOC for dynamic 5QIs - stage 2 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204181 | Rel-16 CR 28.541 Add IOC for dynamic 5QIs - stage 3 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204194 | Rel-16 CR TS 28.541 add TCE mapping info in GNBCUCPFunction | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑204665 | |||
S5‑204665 | Rel-16 CR TS 28.541 add TCE mapping info in GNBCUCPFunction | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑204194 | |||
S5‑204195 | Rel-16 CR TS 28.541 add TCE mapping info in openAPI solution | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑204666 | |||
S5‑204666 | Rel-16 CR TS 28.541 add TCE mapping info in openAPI solution | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑204195 | |||
S5‑204270 | Rel-16 CR 28.541 Update on ServiceProfile and SliceProfile | Huawei | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204304 | Rel-16 CR 28.541 Update NRM attribute definitions | CATT | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204394 | Addition of attribute for network slice supporting maximum of data volumn | China Mobile Com. Corporation | CR | Yes |
Yes
| revised | No | S5‑204653 | ||||
S5‑204653 | Addition of attribute for network slice supporting maximum of data volumn | China Mobile Com. Corporation | CR | - | Yes |
Yes
| agreed | No | S5‑204394 | |||
S5‑204395 | Addition of attribute for network slice supporting maximum number of PDU sessions | China Mobile Com. Corporation | CR | Yes |
Yes
| not pursued | No | |||||
S5‑204411 | 3GPP Forge process | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑204449 | |||
S5‑204449 | 3GPP Forge process | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑204411 | |||
S5‑204412 | Cleanup stage 2 editorial issue and stage 3 yaml error | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204445 | |||
S5‑204445 | Cleanup stage 2 editorial issue and stage 3 yaml error | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204412 | |||
S5‑204443 | LS to SA2 on dynamic 5Qis | Intel | LS out | Approval | Yes |
Yes
| approved | No | ||||
S5‑204446 | LS to SA2 on dynamic 5Qis | Intel | LS out | Approval | No |
Yes
| withdrawn | Yes | ||||
6.4.4 | Self-Organizing Networks (SON) for 5G networks | S5‑204111 | pCR 28.313 add references for MRO measurements | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑204451 | |
S5‑204451 | pCR 28.313 add references for MRO measurements | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑204111 | |||
S5‑204112 | pCR 28.313 add references for type 2 parameters | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑204113 | Discussion for RACH optimization | Intel Corporation (UK) Ltd | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑204114 | R-16 CR 28.522 Add measurements related to RACH optimization | Intel Corporation (UK) Ltd | CR | Approval | Yes |
Yes
| merged | No | S5‑204655 | |||
S5‑204262 | pCR TS 28.313 Corrections of Management service description | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204450 | |||
S5‑204450 | pCR TS 28.313 Corrections of Management service description | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204262 | |||
S5‑204263 | pCR TS 28.313 Corrections of D-SON procedure | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204452 | |||
S5‑204452 | pCR TS 28.313 Corrections of D-SON procedure | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204263 | |||
S5‑204372 | On RACH optimization granularity for NR | Ericsson France S.A.S | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑204434 | |||
S5‑204382 | Rel-16 CR 28.552 Add measurements for RACH optimization management for NR | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| revised | No | S5‑204435 | |||
S5‑204434 | On RACH optimization granularity for NR | Ericsson France S.A.S | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑204372 | |||
S5‑204435 | Rel-16 CR 28.552 Add measurements for RACH optimization management for NR | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| revised | No | S5‑204655 | S5‑204382 | ||
S5‑204655 | Rel-16 CR 28.552 Add measurements for RACH optimization management for NR | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| agreed | No | S5‑204435 | |||
S5‑204477 | Revised WID SON_5G | Intel | WID revised | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204479 | Presentation sheet for TS 28.313 for information and approval | Intel | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑204656 | Latest draft TS 28.313 | Intel | draft TS | Approval | Yes |
Yes
| approved | No | ||||
6.5 | Rel-17 Operations, Administration, Maintenance and Provisioning (OAM&P) |   | ||||||||||
6.5.1 | Network policy management for 5G mobile networks based on NFV scenarios | S5‑204074 | Revised WID network policy management for 5G mobile networks | China Mobile Com. Corporation | WID revised | Yes |
Yes
| noted | No | |||
S5‑204075 | pCR 28.555 add skeleton | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑204455 | |||
S5‑204455 | pCR 28.555 add skeleton | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑204075 | |||
S5‑204076 | pCR 28.555 add introduction | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑204456 | |||
S5‑204456 | pCR 28.555 add introduction | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑204076 | |||
S5‑204077 | pCR 28.555 add scope | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑204457 | |||
S5‑204457 | pCR 28.555 add scope | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑204077 | |||
S5‑204078 | pCR 28.555 add Concepts and background | China Mobile Com. Corporation | pCR | Yes |
Yes
| revised | No | S5‑204458 | ||||
S5‑204458 | pCR 28.555 add Concepts and background | China Mobile Com. Corporation | pCR | - | Yes |
Yes
| approved | No | S5‑204078 | |||
S5‑204079 | pCR 28.555 add business level requirements | China Mobile Com. Corporation | pCR | Yes |
Yes
| revised | No | S5‑204453 | ||||
S5‑204453 | pCR 28.555 add business level requirements | China Mobile Com. Corporation | pCR | - | Yes |
Yes
| approved | No | S5‑204079 | |||
S5‑204080 | pCR 28.555 add high level usecases | China Mobile Com. Corporation | pCR | Yes |
Yes
| revised | No | S5‑204454 | ||||
S5‑204454 | pCR 28.555 add high level usecases | China Mobile Com. Corporation | pCR | - | Yes |
Yes
| approved | No | S5‑204080 | |||
S5‑204082 | pCR 28.555 add specification level requirements | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204083 | pCR 28.555 add specification level use cases | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑204441 | draft TS 28.555 v000 | China Mobile | draft TS | Approval | Yes |
Yes
| approved | No | ||||
S5‑204442 | Initial draft TS 28.556 v000 | China Mobile | draft TS | Approval | Yes |
Yes
| approved | No | ||||
S5‑204658 | Latest draft TS 28.555 | China Mobile | draft TS | Approval | Yes |
Yes
| approved | No | ||||
S5‑204659 | Presentation sheet for TS 28.555 for information and approval | China Mobile | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
6.5.2 | Intent driven management service for mobile networks | S5‑204264 | Revised WID on Intent driven management service for mobile networks | Huawei Technologies (Korea) | WID revised | Yes |
Yes
| noted | No | |||
S5‑204296 | pCR 28.312 Add scope | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204460 | |||
S5‑204460 | pCR 28.312 Add scope | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204296 | |||
S5‑204297 | pCR 28.312 Add skeleton | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204461 | |||
S5‑204461 | pCR 28.312 Add skeleton | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204297 | |||
S5‑204298 | pCR 28.312 Add concept and background | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204462 | |||
S5‑204462 | pCR 28.312 Add concept and background | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204298 | |||
S5‑204338 | TR 28.812 Presentation sheet to SA for Information and Approval | Huawei | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑204459 | Revised WID on Intent driven management service for mobile networks | Huawei | WID revised | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
S5‑204660 | Draft TS 28.312 | Huawei | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.5.3 | Enhancements on EE for 5G networks |   | ||||||||||
6.5.4 | Management of non-public networks | S5‑204030 | Ls to SA5 on NPN network sharing | S2-2001398 | LS in | Yes |
Yes
| noted | No | |||
S5‑204031 | Ls to SA5 on CAG definition | S2-2001401 | LS in | Yes |
Yes
| noted | No | |||||
S5‑204132 | pCR 28.557 Roles related to NPN management | TELEFONICA S.A. | pCR | Approval | Yes |
Yes
| revised | No | S5‑204463 | |||
S5‑204463 | pCR 28.557 Roles related to NPN management | TELEFONICA S.A. | pCR | Approval | Yes |
Yes
| approved | No | S5‑204132 | |||
S5‑204156 | pCR 28.557 Structuring content on concepts and overview of NPN management | TELEFONICA S.A. | pCR | Approval | Yes |
Yes
| revised | No | S5‑204465 | |||
S5‑204465 | pCR 28.557 Structuring content on concepts and overview of NPN management | TELEFONICA S.A. | pCR | Approval | Yes |
Yes
| approved | No | S5‑204156 | |||
S5‑204271 | pCR 28.557 Proposed section titles from rapporteur | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204466 | |||
S5‑204466 | pCR 28.557 Proposed section titles from rapporteur | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204271 | |||
S5‑204272 | pCR 28.557 Add NPN terminologies and abbreviations | Huawei | pCR | Approval | Yes |
Yes
| merged | No | S5‑204467 | |||
S5‑204273 | pCR 28.557 Add introduction of TS | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204467 | |||
S5‑204467 | pCR 28.557 Add introduction of TS | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204273 | |||
S5‑204274 | pCR 28.557 Add scope of TS | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204468 | |||
S5‑204468 | pCR 28.557 Add scope of TS | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204274 | |||
S5‑204275 | pCR 28.557 Add concept of NPN | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204464 | |||
S5‑204464 | pCR 28.557 Add concept of NPN | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204275 | |||
S5‑204276 | pCR 28.557 Management of stand-alone non-public networks | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204469 | |||
S5‑204469 | pCR 28.557 Management of stand-alone non-public networks | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204276 | |||
S5‑204667 | Draft TS 28.557 | Huawei | draft TS | Approval | Yes |
Yes
| approved | No | ||||
6.5.5 | Enhancement on Management Aspects of 5G Service-Level Agreement | S5‑204267 | Rel-16 CR 28.541 Delete reliability and supportAccessTech to align with GST | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑204473 | |
S5‑204473 | Rel-16 CR 28.541 Delete reliability and supportAccessTech to align with GST | Huawei,Samsung | CR | Approval | Yes |
Yes
| agreed | No | S5‑204267 | |||
S5‑204277 | Rel-17 CR 28.541 Update maxNumberofConns | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑204472 | |||
S5‑204472 | Rel-17 CR 28.541 Update maxNumberofConns | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑204277 | |||
S5‑204278 | Rel-17 CR 28.541 Add NB-IoT support in ServiceProfile | Huawei | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204279 | NRM modelling of SliceProfile | Huawei | other | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑204280 | Living document of review of GSMA GST SA5#132e | Huawei, China Mobile | other | Approval | Yes |
Yes
| noted | No | ||||
S5‑204283 | Add requirements of SLA management | China Mobile Com. Corporation | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204284 | Discussion on updating slice profile according to different network slice subnets | China Mobile Com. Corporation | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
S5‑204285 | Discussion on updating slice profile according to different network slice subnets | China Mobile Com. Corporation | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
S5‑204286 | Discussion on updating slice profile according to different network slice subnets | China Mobile Com. Corporation | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
S5‑204287 | Discussion on updating slice profile according to different network slice subnets | China Mobile Com. Corporation | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
S5‑204289 | Discussion on updating slice profile according to different network slice subnets | China Mobile Com. Corporation | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
S5‑204290 | Discussion on updating slice profile according to different network slice subnets | China Mobile Com. Corporation | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
S5‑204291 | Discussion on updating slice profile according to different network slice subnets | China Mobile Com. Corporation | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑204292 | Update control loop deployed in different layers with SLA decomposition | China Mobile Com. Corporation | CR | Approval | Yes |
Yes
| revised | No | S5‑204471 | |||
S5‑204471 | Update control loop deployed in different layers with SLA decomposition | China Mobile Com. Corporation | CR | Approval | Yes |
Yes
| agreed | No | S5‑204292 | |||
S5‑204293 | Update sliceProfile considering different domains proposal 1 | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204294 | Update sliceProfile considering different domains proposal 2 | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204347 | DP on GST Translation and Configuration | Samsung Electronics Benelux BV | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑204348 | Rel-17 CR ServiceProfle to SliceProfile Translation - Option 1 | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204350 | Rel-17 CR ServiceProfle to SliceProfile Translation - Option 2 | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204351 | Rel-17 CR ServiceProfle to SliceProfile Translation - Option 1 - Stage 3 - XML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204352 | Rel-17 CR ServiceProfle to SliceProfile Translation - Option 1 - Stage 3 - YAML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204355 | Rel-17 CR ServiceProfle to SliceProfile Translation - Option 2 - Stage 3 - XML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204356 | Rel-17 CR ServiceProfle to SliceProfile Translation - Option 2 - Stage 3 - YAML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204359 | Rel-17 CR Configurable Parameters Configuration - Option 1 | Samsung Electronics Benelux BV | CR | Yes |
Yes
| not pursued | No | |||||
S5‑204364 | Rel-17 CR Configurable Parameters Configuration - Option 2 | Samsung Electronics Benelux BV | CR | Yes |
Yes
| not pursued | No | |||||
S5‑204369 | Rel-17 CR Configurable Parameters Configuration - Option 1 - Stage 3 - XML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204373 | Rel-17 CR Configurable Parameters Configuration - Option 1 - Stage 3 - YAML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204375 | Rel-17 CR Configurable Parameters Configuration - Option 2 - Stage 3 - XML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204378 | Rel-17 CR Configurable Parameters Configuration - Option 2 - Stage 3 - YAML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204379 | Rel-17 CR GST Translation and Configuration | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204381 | Rel-17 CR Deleting SupportedAccessTech | Samsung Electronics Benelux BV | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
S5‑204383 | Rel-16 CR Deleting SupportedAccessTech | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| merged | No | S5‑204473 | |||
S5‑204384 | Rel-17 CR Deleting SupportedAccessTech | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204386 | CR Rel-16 Deleting SupportedAccessTech - Stage 3 - XML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204387 | CR Rel-16 Deleting SupportedAccessTech - Stage 3 - YAML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| merged | No | S5‑204473 | |||
S5‑204388 | CR Rel-17 Deleting SupportedAccessTech - Stage 3 - XML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204389 | CR Rel-17 Deleting SupportedAccessTech - Stage 3 - YAML | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
6.5.6 | Management of MDT enhancement in 5G | S5‑204022 | LS ccSA5 on Reply LS on MDT and SON decisions related to RAN3 LSs | R2-2005911 | LS in | Yes |
Yes
| noted | No | |||
S5‑204026 | Ls to SA5 on Support for Streaming Based MDT and Trace report | R3-204110 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204669 | Reply to: Ls to SA5 on Support for Streaming Based MDT and Trace report | Ericsson | LS out | approval | Yes |
Yes
| approved | No | S5‑204319 | |||
S5‑204027 | Ls to SA5 on limitation of Propagation of immediate MDT configuration in case of Xn inter-RAT HO | R3-204115 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑204090 | Add handling of Xn handover for inter-RAT and information for mapping between URI of TCE and TCE ID | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204092 | Add new MDT requirements | Oy LM Ericsson AB | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204319 | Reply LS on support for stream based MDT/Trace reporting | Oy LM Ericsson AB | LS out | Approval | Yes |
Yes
| revised | No | S5‑204669 | |||
S5‑204324 | Reply LS on limitation of Propagation of immediate MDT configuration in case of Xn inter-RAT HO | Oy LM Ericsson AB | LS out | Approval | Yes |
Yes
| revised | No | S5‑204474 | |||
S5‑204474 | Reply LS on limitation of Propagation of immediate MDT configuration in case of Xn inter-RAT HO | Oy LM Ericsson AB | LS out | Approval | Yes |
Yes
| approved | No | S5‑204324 | |||
6.5.7 | Additional NRM features | S5‑204151 | Discussn on NR NRM update to support RAN sharing scenario | Huawei,China Telecom | discussion | Endorsement | Yes |
Yes
| noted | No | ||
S5‑204152 | Rel-17 CR TS 28.540 Add requirements for NR NRM to support RAN sharing scenario | Huawei | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
S5‑204153 | Rel-17 CR TS 28.541 Update NR NRM to support RAN sharing scenario | Huawei,China Telecom | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204260 | Rel-17 CR TS 28.540 Add requirements for NR NRM to support RAN sharing scenario | China Telecom Corporation Ltd.,Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204429 | Rel-17 CR TS 28.541 Add openAPI definition NR NRM support RAN sharing scenario(stage3) | Huawei, China Telecom | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
6.5.8 | Enhancement of QoE Measurement Collection |   | ||||||||||
6.5.9 | Self-Organizing Networks (SON) for 5G networks | S5‑204154 | On RACH optimization granularity for NR | Ericsson France S.A.S | discussion | Endorsement | Yes |
Yes
| withdrawn | Yes | ||
S5‑204155 | Add measurements for RACH optimization management for NR | Ericsson France S.A.S | CR | Approval | Yes |
Yes
| withdrawn | Yes | ||||
S5‑204261 | CR TS 28.541 Add the MLB support indicator in NRcellrelation | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑204481 | |||
S5‑204481 | CR TS 28.541 Add the MLB support indicator in NRcellrelation | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑204261 | |||
6.5.10 | Enhanced Closed loop SLS Assurance | S5‑204288 | Add use case of network resource usage and performance prediction assisted SLS communication service Assurance | China Mobile Com. Corporation | CR | Yes |
Yes
| not pursued | No | |||
S5‑204302 | Rel-17 CR TS 28.535 Add use case and requirements for close loop execution supervision | Huawei,China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204312 | Rel-17 CR TS 28.535 Update overview of management control loops | Huawei Technologies Japan K.K. | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204313 | Rel-17 CR TS 28.535 Management different type of control loops | Huawei Technologies Japan K.K. | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204314 | Rel-17 CR TS 28.535 Coordination between control loops | Huawei Technologies Japan K.K. | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204349 | Discussion regarding documenting closed loop interactions | Lenovo, Motorola Mobility | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑204354 | Rel 17 CR TS28.535 Add use case and requirements for enabling pause of a control loop | Lenovo, Motorola Mobility | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204357 | Rel 17 CR TS28.535 Add use case for disabling actions of an assurance loop | Lenovo, Motorola Mobility | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204361 | Rel17 CR TS28.536 Enhance CL model to support pause points | Lenovo, Motorola Mobility | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204393 | Rel-17 draftCR 28.536 Update text and figure in clause 4.1.1 | Ericsson LM, Deutsche Telekom | draftCR | Approval | Yes |
Yes
| noted | No | ||||
6.5.11 | Enhancements of 5G performance measurements and KPIs | S5‑204093 | Movement of “Distribution of Normally Released Call (5QI 1 QoS Flow) Duration” and “Distribution of Abnormally Released Call (5QI 1 QoS Flow) Duration” measurements to chapter 5.1.1.24. | Nokia Solutions & Networks (I) | CR | Approval | Yes |
Yes
| revised | No | S5‑204490 | |
S5‑204490 | Movement of “Distribution of Normally Released Call (5QI 1 QoS Flow) Duration” and “Distribution of Abnormally Released Call (5QI 1 QoS Flow) Duration” measurements to chapter 5.1.1.24. | Nokia Solutions & Networks (I) | CR | Approval | Yes |
Yes
| agreed | No | S5‑204093 | |||
S5‑204115 | Rel-17 CR TS 28.552 Add PLMN granularity for UE throughput measurements | China Telecom Corporation Ltd. | CR | Agreement | Yes |
Yes
| revised | No | S5‑204491 | |||
S5‑204491 | Rel-17 CR TS 28.552 Add PLMN granularity for UE throughput measurements | China Telecom Corporation Ltd. | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204115 | |||
S5‑204116 | Rel-17 CR TS 28.552 Add RRC establishment failure measurements | China Telecom Corporation Ltd. | CR | Agreement | Yes |
Yes
| revised | No | S5‑204492 | |||
S5‑204492 | Rel-17 CR TS 28.552 Add RRC establishment failure measurements | China Telecom Corporation Ltd. | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204116 | |||
S5‑204122 | Rel-17 CR Fixing KPIs | Samsung Electronics Benelux BV | CR | Yes |
Yes
| not pursued | No | |||||
S5‑204123 | Rel-16 CR Fixing KPIs | Samsung Electronics Benelux BV | CR | Yes |
Yes
| revised | No | S5‑204482 | ||||
S5‑204482 | Rel-16 CR Fixing KPIs | Samsung Electronics Benelux BV,China Mobile Com. Corporation | CR | - | Yes |
Yes
| agreed | No | S5‑204123 | |||
S5‑204124 | Rel-16 CR Deleting Round-trip packet delay between PSA UPF and UE | Samsung Electronics Benelux BV | CR | Yes |
Yes
| not pursued | No | |||||
S5‑204125 | Rel-17 CR Deleting Round-trip packet delay between PSA UPF and UE | Samsung Electronics Benelux BV | CR | Yes |
Yes
| not pursued | No | |||||
S5‑204160 | Rel-17 CR 28.552 Add measurements on network slice selection | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204161 | Rel-17 CR 28.552 Add measurements on NSSAI availability service | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204206 | R17 CR TS28.552 ADD EPS fallback handover related Measurement | ZTE Corporation | CR | Agreement | Yes |
Yes
| revised | No | S5‑204483 | |||
S5‑204483 | R17 CR TS28.552 ADD EPS fallback handover related Measurement | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204206 | |||
S5‑204240 | Rel-17 CR 28.552 Add incoming and outgoing GTP data packet loss TEI | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204493 | |||
S5‑204493 | Rel-17 CR 28.552 Add incoming and outgoing GTP data packet loss TEI | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204240 | |||
S5‑204259 | R17 CR TS28.552 ADD EPS fallback redirection related Measurement | ZTE Corporation | CR | Agreement | Yes |
Yes
| revised | No | S5‑204484 | |||
S5‑204484 | R17 CR TS28.552 ADD EPS fallback redirection related Measurement | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204259 | |||
S5‑204305 | R17 CR TS28.552 ADD EPS fallback handover time Measurement | ZTE Corporation | CR | Agreement | Yes |
Yes
| revised | No | S5‑204485 | |||
S5‑204485 | R17 CR TS28.552 ADD EPS fallback handover time Measurement | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204305 | |||
S5‑204346 | Rel-17 CR TS 28.552 Add measurements for RB distribution per layer of MU-MIMO | China Telecom Corporation Ltd., ZTE | CR | Agreement | Yes |
Yes
| revised | No | S5‑204486 | |||
S5‑204486 | Rel-17 CR TS 28.552 Add measurements for RB distribution per layer of MU-MIMO | China Telecom Corporation Ltd., ZTE | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204346 | |||
S5‑204358 | Rel-17 CR 28.552 Add UDM subscriber profile measurements | Nokia, Nokia Shanghai Bell | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑204376 | Rel-17 CR TS 28.552 Add MCS distribution measurement of MU-MIMO | China Telecom Corporation Ltd., ZTE | CR | Agreement | Yes |
Yes
| revised | No | S5‑204487 | |||
S5‑204487 | Rel-17 CR TS 28.552 Add MCS distribution measurement of MU-MIMO | China Telecom Corporation Ltd., ZTE | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204376 | |||
S5‑204392 | Rel-17 CR Additional KPI Definition for Max Subscriber and PDU Session | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| revised | No | S5‑204494 | |||
S5‑204494 | Rel-17 CR Additional KPI Definition for Max Subscriber and PDU Session | Samsung Electronics Benelux BV | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204392 | |||
S5‑204396 | Addition of RSRQ measurement | China Mobile Com. Corporation | CR | Yes |
Yes
| revised | No | S5‑204488 | ||||
S5‑204488 | Addition of RSRQ measurement | China Mobile Com. Corporation | CR | - | Yes |
Yes
| agreed | No | S5‑204396 | |||
S5‑204397 | Addition of SINR measurement | China Mobile Com. Corporation | CR | Yes |
Yes
| revised | No | S5‑204489 | ||||
S5‑204489 | Addition of SINR measurement | China Mobile Com. Corporation | CR | - | Yes |
Yes
| agreed | No | S5‑204397 | |||
S5‑204398 | SINR measurement is useful to troubleshoot weak coverage or low access rate for each cell. | China Mobile Com. Corporation | CR | Yes |
Yes
| merged | No | S5‑204482 | ||||
S5‑204475 | Rel-16 CR Deleting Round-trip packet delay between PSA UPF and UE | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.5.12 | Management of the enhanced tenant concept |   | ||||||||||
6.5.13 | Autonomous network levels | S5‑204084 | draft TS 28100-000 | China Mobile Com. Corporation | draft TS | Approval | Yes |
Yes
| approved | No | ||
S5‑204085 | pCR 28.100 Add skeleton | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204555 | |||
S5‑204555 | pCR 28.100 Add skeleton | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204085 | |||
S5‑204086 | pCR 28.100 Add Scope | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204087 | pCR 28.100 Add definitions and abbreviations | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204438 | LS to SA5 on introduction of TM FORUM Autonomous Network Project and Coordination Proposal | TMF | LS in | discussion | Yes |
Yes
| replied to | No | ||||
S5‑204550 | Reply to: LS to SA5 on introduction of TM FORUM Autonomous Network Project and Coordination Proposal | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑204508 | Latest draft TS 28.100 | China Mobile | draft TS | Approval | Yes |
Yes
| approved | No | ||||
S5‑204551 | 3GPP SA5 introduction on Autonomous Network - Introduction material for autonomous network joint workshop with TMF and other SDOs | SA5 Chair, SA5 vice-chair(Huawei) | other | Agreement | Yes |
Yes
| endorsed | No | ||||
6.5.14 | Management data collection control and discovery | S5‑204320 | TD Issues in data collection and discovery | Nokia, Nokia Shanghai Bell | discussion | Approval | Yes |
Yes
| noted | No | ||
6.5.15 | Enhancement of Handover Optimization |   | ||||||||||
6.6 | OAM&P Studies |   | ||||||||||
6.6.1 | Study on management and orchestration aspects with integrated satellite components in a 5G network | S5‑204344 | pCR 28.808 Add a solution to monitor delay on the DL-Air Interface with MEO or GEO satellite components | TNO | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑204345 | pCR 28.808 Remove two unnecessary use case clause headers | TNO | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204661 | Draft TR 28.808 | TNO | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.6.2 | Study on autonomous network levels | S5‑204088 | pCR 28.810 Update Clause 6.2.2 Potential relation with autonomous network related standardized features and interfaces | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑204089 | pCR 28.810 Add Conclusion and Recommendation | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204556 | |||
S5‑204556 | pCR 28.810 Add Conclusion and Recommendation | China Mobile, Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204089 | |||
S5‑204244 | pCR 28.810 Editorial improvements | Huawei | pCR | Approval | Yes |
Yes
| withdrawn | Yes | ||||
S5‑204299 | pCR 28.810 Update workflow | Huawei,China Mobile | pCR | Approval | Yes |
Yes
| revised | No | S5‑204557 | |||
S5‑204557 | pCR 28.810 Update workflow | Huawei,China Mobile | pCR | Approval | Yes |
Yes
| approved | No | S5‑204299 | |||
S5‑204300 | pCR 28.810 Remove unnecessary Editor's Note | Huawei,China Mobile | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204301 | pCR 28.810 Add potential requirements for coverage optimization use case | Huawei,China Mobile | pCR | Approval | Yes |
Yes
| revised | No | S5‑204558 | |||
S5‑204558 | pCR 28.810 Add potential requirements for coverage optimization use case | Huawei,China Mobile | pCR | Approval | Yes |
Yes
| approved | No | S5‑204301 | |||
S5‑204315 | pCR 28.810 Editorial improvements | Huawei Tech.(UK) Co., Ltd | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204503 | Presentation sheet for TR 28.810 | China Mobile | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑204507 | Latest draft TR 28.810 | China Mobile | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.6.3 | Study on enhancement of Management Data Analytics Service | S5‑204024 | Reply LS to SA5 on User Data Congestion Analytics | R3-194749 | LS in | Yes |
Yes
| noted | No | |||
S5‑204025 | Reply LS to SA5 on User Data Congestion Analytics | S2-1910210 | LS in | Yes |
Yes
| noted | No | |||||
S5‑204100 | Add potential solutions for the MDA assisted energy saving analysis | China Telecom Corporation Ltd. | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑204101 | Add potential solutions for the MDA assisted energy saving analysis | China Telecom Corporation Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑204587 | |||
S5‑204587 | Add potential solutions for the MDA assisted energy saving analysis | China Telecom Corporation Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑204101 | |||
S5‑204120 | pCR 28.809 Solution for Paging Optimization | Samsung Electronics Benelux BV | pCR | Yes |
Yes
| revised | No | S5‑204575 | ||||
S5‑204575 | pCR 28.809 Solution for Paging Optimization | Samsung Electronics Benelux BV | pCR | - | Yes |
Yes
| approved | No | S5‑204120 | |||
S5‑204121 | pCR 28.809 solution for RAN Node software upgrade | Samsung Electronics Benelux BV | pCR | Yes |
Yes
| revised | No | S5‑204576 | ||||
S5‑204576 | pCR 28.809 solution for RAN Node software upgrade | Samsung Electronics Benelux BV | pCR | - | Yes |
Yes
| approved | No | S5‑204121 | |||
S5‑204157 | pCR Add solution on MDA ML model training | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑204158 | pCR Add solution on MDA assisted SON coordination | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| merged | No | S5‑204559 | |||
S5‑204187 | Presentation of TR 28.809 for information | Intel Corporation (UK) Ltd | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑204199 | pCR 28.809 Use case and potential solutions of fault prediction analysis | ZTE Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑204571 | |||
S5‑204571 | pCR 28.809 Use case and potential solutions of fault prediction analysis | ZTE Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑204199 | |||
S5‑204245 | pCR 28.809 MDAS Analysis confidence levels | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204577 | |||
S5‑204577 | pCR 28.809 MDAS Analysis confidence levels | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204245 | |||
S5‑204246 | pCR 28.809 Add overview of MDA functionality | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204578 | |||
S5‑204578 | pCR 28.809 Add overview of MDA functionality | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204246 | |||
S5‑204247 | pCR 28.809 Editorial improvements | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204248 | pCR 28.809 Add Subscription to Management Data Analytics Reports | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204569 | |||
S5‑204569 | pCR 28.809 Add Subscription to Management Data Analytics Reports | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204248 | |||
S5‑204249 | pCR 28.809 Add Request for Management Data Analytics Reports | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204250 | pCR 28.809 Add CN related KPI anomaly analysis | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204505 | |||
S5‑204505 | pCR 28.809 Add CN related KPI anomaly analysis | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204250 | |||
S5‑204251 | pCR 28.809 Add possible solution for NAS congestion control | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204252 | pCR 28.809 updating E2E latency analysis use case | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204572 | |||
S5‑204572 | pCR 28.809 updating E2E latency analysis use case | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204252 | |||
S5‑204253 | pCR 28.809 updating network slice throughput analysis use case | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204573 | |||
S5‑204573 | pCR 28.809 updating network slice throughput analysis use case | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204253 | |||
S5‑204254 | pCR 28.809 updating fault analysis use case | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204255 | pCR 28.809 Add missing abbreviations | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204570 | |||
S5‑204570 | pCR 28.809 Add missing abbreviations | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204255 | |||
S5‑204307 | pCR 28.809 Update use case and potential requirements of E2E latency analysis | Huawei | pCR | Approval | Yes |
Yes
| merged | No | S5‑204572 | |||
S5‑204308 | pCR 28.809 Update use case and potential requirements of network slice load analysis | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204574 | |||
S5‑204574 | pCR 28.809 Update use case and potential requirements of network slice load analysis | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204308 | |||
S5‑204309 | pCR 28.809 Add use case and potential requirements of mobility performance analysis | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204561 | |||
S5‑204561 | pCR 28.809 Add use case and potential requirements of mobility performance analysis | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204309 | |||
S5‑204310 | pCR 28.809 Update use case and potential solutions of resource utilization analysis | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204565 | |||
S5‑204565 | pCR 28.809 Update use case and potential solutions of resource utilization analysis | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204310 | |||
S5‑204311 | pCR 28.809 Add the potential requirements and solutions for service experience related analysis | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204579 | |||
S5‑204579 | pCR 28.809 Add the potential requirements and solutions for service experience related analysis | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204311 | |||
S5‑204340 | pCR 28.809 Add load balancing optimization use case | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑204560 | |||
S5‑204560 | pCR 28.809 Add load balancing optimization use case | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| approved | No | S5‑204340 | |||
S5‑204353 | Security riak assessment analytics use case | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑204580 | |||
S5‑204580 | Security riak assessment analytics use case | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑204353 | |||
S5‑204377 | pCR Rel 17 Add description for analytics report | Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| revised | No | S5‑204568 | |||
S5‑204568 | pCR Rel 17 Add description for analytics report | Lenovo, Motorola Mobility | pCR | Approval | Yes |
Yes
| approved | No | S5‑204377 | |||
S5‑204380 | Update of inter-gNB beam handover use case solution in subclause 6.5.2 | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑204562 | |||
S5‑204562 | Update of inter-gNB beam handover use case solution in subclause 6.5.2 | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑204380 | |||
S5‑204385 | Update of SON conflict prevention and resolution use case in subclause 6.9.1 | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑204559 | |||
S5‑204559 | Update of SON conflict prevention and resolution use case in subclause 6.9.1 | Nokia Germany,Intel | pCR | Approval | Yes |
Yes
| approved | No | S5‑204385 | |||
S5‑204390 | pCR Rel-17 UC on MDAS assisted GST configuration | Samsung Electronics Benelux BV | pCR | Agreement | No |
Yes
| withdrawn | Yes | ||||
S5‑204391 | MDAS assisted network slice traffic projections | Samsung Electronics Benelux BV | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204581 | |||
S5‑204581 | MDAS assisted network slice traffic projections | Samsung Electronics Benelux BV | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204391 | |||
S5‑204399 | Update of KPI anomaly analysis use case and solution in subclause 6.3.6 | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑204567 | |||
S5‑204567 | Update of KPI anomaly analysis use case and solution in subclause 6.3.6 | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑204399 | |||
S5‑204401 | Update of Handover use case and solution considering user-trajectory info in subclause 6.5 | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑204564 | |||
S5‑204564 | Update of Handover use case and solution considering user-trajectory info in subclause 6.5 | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑204401 | |||
S5‑204403 | Update of Handover use case solution in subclause 6.5.1 | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑204563 | |||
S5‑204563 | Update of Handover use case solution in subclause 6.5.1 | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑204403 | |||
S5‑204426 | pCR TR 28.809 Further clarifications relating to network resource allocation | NEC Europe Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑204566 | |||
S5‑204566 | pCR TR 28.809 Further clarifications relating to network resource allocation | NEC Europe Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑204426 | |||
S5‑204506 | Latest draft TR 28.809 | Intel | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.6.4 | Study on network slice management enhancements | S5‑204041 | 28.811 skeleton | HUAWEI TECHNOLOGIES Co. Ltd. | draft TR | Approval | Yes |
Yes
| approved | No | ||
S5‑204257 | pCR 28.811 Add concepts | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204582 | |||
S5‑204582 | pCR 28.811 Add concepts | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204257 | |||
S5‑204258 | pCR 28.811 Add scope | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204583 | |||
S5‑204583 | pCR 28.811 Add scope | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204258 | |||
S5‑204509 | Latest draft TR 28.811 | Huawei | draft TR | Approval | Yes |
Yes
| approved | No | ||||
6.6.5 | Study on new aspects of EE for 5G networks | S5‑204065 | pCR TR 28.813 Key Issue: Network data analysis assisted ES - Possible OA&M centric solution | Orange, Intel, NEC, Nokia, AT&T, Deutsche Telekom,Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204586 | |
S5‑204586 | pCR TR 28.813 Key Issue: Network data analysis assisted ES - Possible OA&M centric solution | Orange, Intel, NEC, Nokia, AT&T, Deutsche Telekom,Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204065 | |||
S5‑204067 | pCR TR 28.813 Key Issue: 5GC EE KPI – Potential solution #1 enhancement | Orange, AT&T, Deutsche Telekom | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204584 | |||
S5‑204584 | pCR TR 28.813 Key Issue: 5GC EE KPI – Potential solution #1 enhancement | Orange, AT&T, Deutsche Telekom | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204067 | |||
S5‑204068 | pCR TR 28.813 Key Issue: EE KPI for network slice types | Orange, AT&T, Deutsche Telekom | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204588 | |||
S5‑204588 | pCR TR 28.813 Key Issue: EE KPI for network slice types | Orange, AT&T, Deutsche Telekom | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204068 | |||
S5‑204073 | pCR TR 28.813 Key Issue: VNF energy consumption estimation | Orange, AT&T, Deutsche Telekom | pCR | Agreement | Yes |
Yes
| approved | No | ||||
S5‑204256 | pCR 28.813 Add measurement assumption for energy consumption | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑204281 | pCR 28.813 Key Issue – Service-oriented energy saving | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204513 | |||
S5‑204513 | pCR 28.813 Key Issue – Service-oriented energy saving | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204281 | |||
S5‑204282 | pCR 28.813 Key Issue - Area based energy saving | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑204512 | |||
S5‑204512 | pCR 28.813 Key Issue - Area based energy saving | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑204282 | |||
S5‑204295 | Solutions on EE KPI for 5GC | China Telecomunication Corp. | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑204425 | discussion on EE KPI in case of NG-RAN sharing | China Telecomunication Corp. | pCR | Approval | Yes |
Yes
| revised | No | S5‑204511 | |||
S5‑204511 | discussion on EE KPI in case of NG-RAN sharing | China Telecomunication Corp. | pCR | Approval | Yes |
Yes
| approved | No | S5‑204425 | |||
S5‑204510 | Latest draft TR 28.813 | Orange | draft TR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204554 | Discussion paper on 5GC EE KPI | China Telecom | discussion | Endorsement | Yes |
Yes
| endorsed | No | ||||
6.6.6 | Study on management aspects of edge computing | S5‑204103 | draft TR 28.814 | Intel Corporation (UK) Ltd | draft TR | Approval | Yes |
Yes
| approved | No | ||
S5‑204104 | pCR 28.814 skeleton | Intel Corporation (UK) Ltd | draft TR | Approval | Yes |
Yes
| revised | No | S5‑204495 | |||
S5‑204495 | pCR 28.814 skeleton | Intel Corporation (UK) Ltd | draft TR | Approval | Yes |
Yes
| approved | No | S5‑204104 | |||
S5‑204105 | pCR 28.814 scope | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| merged | No | S5‑204496 | |||
S5‑204106 | pCR 28.814 edge computing management concept | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑204497 | |||
S5‑204497 | pCR 28.814 edge computing management concept | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑204106 | |||
S5‑204107 | pCR 28.814 use cases and requirements for EAS deployment | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑204499 | |||
S5‑204499 | pCR 28.814 use cases and requirements for EAS deployment | Intel Corporation (UK) Ltd,Samsung | pCR | Approval | Yes |
Yes
| approved | No | S5‑204107 | |||
S5‑204108 | pCR 28.814 use cases and requirements for EES deployment | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑204500 | |||
S5‑204500 | pCR 28.814 use cases and requirements for EES deployment | Intel Corporation (UK) Ltd,Samsung | pCR | Approval | Yes |
Yes
| approved | No | S5‑204108 | |||
S5‑204109 | pCR 28.814 use cases and requirements for ECS deployment | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑204501 | |||
S5‑204501 | pCR 28.814 use cases and requirements for ECS deployment | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑204109 | |||
S5‑204110 | pCR 28.814 add solutions for EDN deployment | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑204126 | pCR 28.814 Concept and Overview | Samsung Electronics Benelux BV | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204498 | |||
S5‑204498 | pCR 28.814 Concept and Overview | Samsung Electronics Benelux BV | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204126 | |||
S5‑204127 | pCR 28.814 Scope References Definitions | Samsung Electronics Benelux BV | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204496 | |||
S5‑204496 | pCR 28.814 Scope References Definitions | Samsung Electronics Benelux BV,Intel | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204127 | |||
S5‑204128 | pCR 28.814 Skeleton | Samsung Electronics Benelux BV | pCR | Agreement | Yes |
Yes
| approved | No | ||||
S5‑204129 | pCR 28.814 EAS Lifecycle Management | Samsung Electronics Benelux BV | pCR | Agreement | Yes |
Yes
| merged | No | S5‑204499 | |||
S5‑204130 | pCR 28.814 EDN Deployment | Samsung Electronics Benelux BV | pCR | Agreement | Yes |
Yes
| merged | No | S5‑204500 | |||
S5‑204662 | Draft TR 28.814 | Intel | draft TR | Approval | Yes |
Yes
| approved | No | ||||
7 | Charging |   | ||||||||||
7.1 | Charging Plenary | S5‑204008 | CH agenda and time plan | WG Vice Chair (Nokia) | agenda | Yes |
Yes
| revised | No | S5‑204643 | ||
S5‑204643 | CH agenda and time plan | WG Vice Chair (Nokia) | agenda | - | Yes |
Yes
| noted | No | S5‑204008 | |||
S5‑204009 | Charging exec report | WG vice Chair (Nokia) | report | Yes |
Yes
| noted | No | |||||
S5‑204017 | Resubmitted LS Out to SA2 and SA5 on making PSCELL ID available at the SGW of EPC | ETSI TC LI | LS in | Yes |
Yes
| postponed | No | |||||
7.2 | New Charging Work Item proposals | S5‑204226 | New WID on charging enhancement for URLLC | Huawei | WID new | Agreement | Yes |
Yes
| revised | No | S5‑204607 | |
S5‑204238 | Discussion paper on charging for CIoT 5GS feature | Huawei | discussion | Agreement | Yes |
Yes
| noted | No | ||||
S5‑204239 | New WID on 5G charging for CIOT | Huawei | WID new | Agreement | Yes |
Yes
| revised | No | S5‑204657 | |||
S5‑204657 | New SID on charging aspects for 5GS CIOT | Huawei | SID new | Agreement | Yes |
Yes
| agreed | No | S5‑204239 | |||
S5‑204306 | New SID Study on charging aspects of Proximity-based Services in 5GC | CATT | SID new | Approval | Yes |
Yes
| revised | No | S5‑204591 | |||
S5‑204333 | New WID on N40 Interface Enhancements to Support GERAN and UTRAN | China Mobile Com. Corporation | WID new | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑204334 | New WID on N40 Interface Enhancements to Support GERAN and UTRAN | China Mobile Com. Corporation | WID new | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑204335 | New WID on N40 Interface Enhancements to Support GERAN and UTRAN | China Mobile Com. Corporation | WID new | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑204337 | New WID on N40 Interface Enhancements to Support GERAN and UTRAN | China Mobile Com. Corporation | WID new | Approval | Yes |
Yes
| revised | No | S5‑204592 | |||
S5‑204591 | New SID Study on charging aspects of Proximity-based Services in 5GC | CATT | SID new | Approval | Yes |
Yes
| agreed | No | S5‑204306 | |||
S5‑204592 | New WID on N40 Interface Enhancements to Support GERAN and UTRAN | China Mobile Com. Corporation | WID new | Approval | Yes |
Yes
| agreed | No | S5‑204337 | |||
S5‑204607 | New WID on charging enhancement for URLLC | Huawei | WID new | Agreement | Yes |
Yes
| agreed | No | S5‑204226 | |||
7.3 | Charging Maintenance and Rel-16 small Enhancements | S5‑204040 | Rel-16 CR 32.274 Add Retransmission IE - non applicable | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||
S5‑204043 | Correction of two SCUR Scenarios figure title and message description | China Telecomunication Corp. | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204044 | Rel-16 CR 32.255 Charging Id Handling 5GC interworking with EPC | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204615 | |||
S5‑204045 | Rel-16 CR 32.255 Clarify Charging information 5GC interworking with EPC | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204616 | |||
S5‑204046 | Rel-16 CR 32.291 Clarify Charging information 5GC interworking with EPC | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204617 | |||
S5‑204047 | Rel-16 CR 32.291 Corrections in names and cardinality for attributes | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204048 | Rel-16 CR 32.291 Authorization of CHF services access by OAuth 2.0 | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204618 | |||
S5‑204066 | Rel-16 CR 32.291 Correction on category for triggerCategory | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204162 | Rel-16 CR 32.291 Charging characteristics not consistently defined | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204163 | Rel-16 CR 32.255 Correction of missing AF Charging Id in string format | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | S5‑204621 | |||
S5‑204164 | Rel-16 CR 32.291 Correction of missing AF Charging Id in string format | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | S5‑204622 | |||
S5‑204165 | Rel-16 CR 32.298 Correction of missing AF Charging Id in string format | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | S5‑204623 | |||
S5‑204166 | Rel-15 CR 32.291 Correction of nfConsumerIdentification in response | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204167 | Rel-16 CR 32.255 Missing handling of implicit armed triggers | Ericsson | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204168 | Rel-16 CR 32.290 Missing handling of resource at failure | Ericsson | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204169 | Rel-16 CR 32.291 Correction to tariffTimeChange with UTC time | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204170 | Rel-15 CR 32.298 Missing time in QFI container | Ericsson | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204171 | Rel-16 CR 32.291 Missing handling of location triggers | Ericsson | CR | Agreement | Yes |
Yes
| merged | No | S5‑204617 | |||
S5‑204172 | Rel-16 CR 32.291 Missing suspend of quota management | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | S5‑204624 | |||
S5‑204173 | Rel-16 CR 32.298 Missing suspend of quota management | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | S5‑204625 | |||
S5‑204207 | Rel-15 CR 32.291 Correct the InvocationSequenceNumber | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204208 | Rel-16 CR 32.291 Correct the InvocationSequenceNumber | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204209 | Rel-16 CR 32.255 Add the enhanced Diagnostics for 5G Charging | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204210 | Rel-16 CR 32.291 Add the enhanced Diagnostics for 5G Charging | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204211 | Rel-16 CR 32.298 Add the enhanced Diagnostics for 5G Charging | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204212 | Rel-16 CR 32.290 Add the attributes for CHFQM | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204606 | |||
S5‑204213 | Rel-16 CR 32.291 Add the attributes for CHFQM | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204227 | Rel-16 CR TS 32.255 Add EPC&ePDG interworking procedures | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204630 | |||
S5‑204228 | Rel-16 CR TS 32.255 Add ePDG as serving node | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204629 | |||
S5‑204229 | Rel-16 CR TS 32.255 Add support of stateless SMF | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑204230 | Rel-16 CR TS 32.255 Align 5WWC RAT types | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204638 | |||
S5‑204231 | Rel-16 CR TS 32.298 Add 5WWC RAT types | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204633 | |||
S5‑204232 | Rel-16 CR TS 32.291 Add timeLimit and eventLimit | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204634 | |||
S5‑204233 | Rel-16 CR TS 32.291 Update cardinality for event time stamps | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204635 | |||
S5‑204234 | Rel-16 CR TS 32.298 Add QHT in CHF CDR | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204235 | Rel-16 CR 32.255 Correct architecture figures and description | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204636 | |||
S5‑204236 | Discussion on the information element for multi-homed PDU Session | Huawei | discussion | Agreement | Yes |
Yes
| noted | No | ||||
S5‑204237 | Rel-16 CR 32.255 Add PDU address for IPv6 multi-homing | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204637 | |||
S5‑204366 | Rel-15 CR 32.290 Correction on Converged Charging and Requested Unit handling | Matrixx | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑204370 | Rel-16 CR 32.290 Correction on Converged Charging and Requested Unit handling | Matrixx | CR | Approval | Yes |
Yes
| revised | No | S5‑204639 | |||
S5‑204371 | Rel-15 CR 32.291 Correction on Converged Charging and Requested Unit handling | Matrixx | CR | Approval | Yes |
Yes
| revised | No | S5‑204631 | |||
S5‑204374 | Rel-16 CR 32.291 Correction on Converged Charging and Requested Unit handling | Matrixx | CR | Approval | Yes |
Yes
| revised | No | S5‑204632 | |||
S5‑204424 | Rel-16 Missing Quota Management Indicator data type | Amdocs Software Systems Ltd | CR | Agreement | Yes |
Yes
| merged | No | S5‑204624 | |||
S5‑204606 | Rel-16 CR 32.290 Add the attributes for CHFQM | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204212 | |||
S5‑204608 | Rel-16 CR 32.291 Update OpenAPI version | Huawei | CR | Yes |
Yes
| agreed | No | |||||
S5‑204615 | Rel-16 CR 32.255 Charging Id Handling 5GC interworking with EPC | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204044 | |||
S5‑204616 | Rel-16 CR 32.255 Clarify Charging information 5GC interworking with EPC | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204045 | |||
S5‑204617 | Rel-16 CR 32.291 Clarify Charging information 5GC interworking with EPC | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204046 | |||
S5‑204618 | Rel-16 CR 32.291 Authorization of CHF services access by OAuth 2.0 | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204048 | |||
S5‑204621 | Rel-16 CR 32.255 Correction of missing AF Charging Id in string format | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204163 | |||
S5‑204622 | Rel-16 CR 32.291 Correction of missing AF Charging Id in string format | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204164 | |||
S5‑204623 | Rel-16 CR 32.298 Correction of missing AF Charging Id in string format | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204165 | |||
S5‑204624 | Rel-16 CR 32.291 Missing suspend of quota management | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204172 | |||
S5‑204625 | Rel-16 CR 32.298 Missing suspend of quota management | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204173 | |||
S5‑204629 | Rel-16 CR TS 32.255 Add ePDG as serving node | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204228 | |||
S5‑204630 | Rel-16 CR TS 32.255 Add EPC&ePDG interworking procedures | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204227 | |||
S5‑204631 | Rel-15 CR 32.291 Correction on Converged Charging and Requested Unit handling | Matrixx | CR | Approval | Yes |
Yes
| agreed | No | S5‑204371 | |||
S5‑204632 | Rel-16 CR 32.291 Correction on Converged Charging and Requested Unit handling | Matrixx | CR | Approval | Yes |
Yes
| agreed | No | S5‑204374 | |||
S5‑204633 | Rel-16 CR TS 32.298 Add 5WWC RAT types | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204646 | S5‑204231 | ||
S5‑204646 | Rel-16 CR TS 32.298 Add 5WWC RAT types | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204633 | |||
S5‑204634 | Rel-16 CR TS 32.291 Add timeLimit and eventLimit | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204232 | |||
S5‑204635 | Rel-16 CR TS 32.291 Update cardinality for event time stamps | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204233 | |||
S5‑204636 | Rel-16 CR 32.255 Correct architecture figures and description | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204235 | |||
S5‑204637 | Rel-16 CR 32.255 Add PDU address for IPv6 multi-homing | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204237 | |||
S5‑204638 | Rel-16 CR TS 32.255 Align 5WWC RAT types | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204230 | |||
S5‑204639 | Rel-16 CR 32.290 Correction on Converged Charging and Requested Unit handling | Matrixx | CR | Approval | Yes |
Yes
| agreed | No | S5‑204370 | |||
S5‑204642 | Rel-15 CR 32.291 Update OpenAPI version | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204589 | Rel-16 CR TS 32.291 Add ePDG as serving node | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑204590 | Rel-16 CR TS 32.298 Add ePDG as serving node | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
7.4 | Rel-16 Charging |   | ||||||||||
7.4.1 | Network Slice Performance and Analytics Charging in 5G System | S5‑204042 | Add Isolation level and Area of service as the NS Performance and Analytics charging attribute | China Telecomunication Corp. | pCR | Approval | Yes |
Yes
| noted | No | ||
S5‑204058 | Rel-16 pCR 28.201 Update Charging Architecture | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑204609 | |||
S5‑204174 | Rel-16 pCR 28.201 Adding use of multiple unit usage | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑204626 | |||
S5‑204214 | LSout on NWDAF for Network Slice Performance and Analytics Charging | Huawei | LS out | Agreement | Yes |
Yes
| revised | No | S5‑204593 | |||
S5‑204215 | Rel16 pCR 28.201 Update the Bns | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204594 | |||
S5‑204216 | Rel16 pCR 28.201 Update the CHF selection based on NRF | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204595 | |||
S5‑204217 | Rel16 pCR 28.201 Update the clause 3 for new charging function | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204596 | |||
S5‑204218 | Rel16 pCR 28.201 Update the new charging function name | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204597 | |||
S5‑204219 | Rel16 pCR 28.201 Update the NS performance and analytics charging information | Huawei | pCR | Agreement | Yes |
Yes
| merged | No | S5‑204626 | |||
S5‑204220 | Rel16 pCR 28.201 Update the referenced figure and remove the editor's notes in clause 4 | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204598 | |||
S5‑204221 | Rel16 pCR 28.201 Update the the PA charging information in clause 5.1.3 | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204599 | |||
S5‑204222 | Rel-16 CR 32.298 Add the NS performance and analytics charging parameter | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204600 | |||
S5‑204223 | Rel-16 CR 32.291 Add the NSPA charging attribute for convergedchargingservice | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑204602 | |||
S5‑204593 | LSout on New function for Network Slice PA and Management Charging | Huawei | LS out | Agreement | Yes |
Yes
| approved | No | S5‑204214 | |||
S5‑204594 | Rel16 pCR 28.201 Update the Bns | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204215 | |||
S5‑204595 | Rel16 pCR 28.201 Update the CHF selection based on NRF | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204216 | |||
S5‑204596 | Rel16 pCR 28.201 Update the clause 3 for new charging function | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204217 | |||
S5‑204597 | Rel16 pCR 28.201 Update the new charging function name | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204218 | |||
S5‑204598 | Rel16 pCR 28.201 Update the referenced figure and remove the editor's notes in clause 4 | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204220 | |||
S5‑204599 | Rel16 pCR 28.201 Update the the PA charging information in clause 5.1.3 | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204221 | |||
S5‑204600 | Rel-16 CR 32.298 Add the NS performance and analytics charging parameter | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204222 | |||
S5‑204602 | Rel-16 CR 32.291 Add the NSPA charging attribute for convergedchargingservice | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204223 | |||
S5‑204603 | Draft TS 28.201 | Huawei | draft TS | Agreement | Yes |
Yes
| approved | No | ||||
S5‑204604 | Presentation to TSG of TS 28.201 for Approval | Huawei | TS or TR cover | Agreement | Yes |
Yes
| approved | No | ||||
S5‑204609 | Rel-16 pCR 28.201 Update Charging Architecture | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑204058 | |||
S5‑204626 | Rel-16 pCR 28.201 Adding use of multiple unit usage | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑204174 | |||
7.4.2 | Network Slice Management Charging in 5G System | S5‑204049 | Rel-16 CR 32.297 Introduction of TS 28.202 | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||
S5‑204053 | DP Subscriber Identifier in Network Slice Management Charging | Nokia, Nokia Shanghai Bell | discussion | Approval | Yes |
Yes
| noted | No | ||||
S5‑204054 | Rel-16 pCR 28.202 Solve Editor's note on Subscriber identifier | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑204611 | |||
S5‑204055 | DP NSI and multiple Service Profiles | Nokia, Nokia Shanghai Bell | discussion | Approval | Yes |
Yes
| noted | No | ||||
S5‑204056 | Rel-16 pCR 28.202 Solve Editor's note on multiple service profiles | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| merged | No | S5‑204612 | |||
S5‑204057 | Rel-16 pCR 28.202 Update Charging Architecture | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑204610 | |||
S5‑204059 | Rel-16 pCR 28.202 Complete charging information | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑204612 | |||
S5‑204060 | Rel-16 pCR 28.202 Solve Editor's note on Configuration update by CHF | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204061 | Rel-16 pCR 28.202 Solve Editor's note on Triggers description when CPF | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑204062 | Rel-16 pCR 28.202 Solve Editor's note on use of MUU | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑204063 | Rel-16 CR 32.291 Introduction of NSM charging information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204640 | |||
S5‑204064 | Rel-16 CR 32.298 Introduction of NSM charging information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204641 | |||
S5‑204071 | Rel-16 pCR 28.202 Change name of CSIF to CPF | Matrixx | pCR | Approval | Yes |
Yes
| revised | No | S5‑204601 | |||
S5‑204081 | DP on Common Charging architecture | Nokia, Nokia Shanghai Bell | discussion | Approval | Yes |
Yes
| noted | No | ||||
S5‑204175 | Rel-16 pCR 28.202 Adding trigger for CPF | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑204627 | |||
S5‑204176 | Rel-16 pCR 28.202 Adding charging information | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑204628 | |||
S5‑204224 | Rel16 pCR 28.202 Clarification of subscriber identifier | Huawei | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑204225 | Rel16 pCR 28.202 Update the CHF selection based on NRF | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑204605 | |||
S5‑204601 | Rel-16 pCR 28.202 Change name of CSIF to CEF | Matrixx | pCR | Approval | Yes |
Yes
| approved | No | S5‑204071 | |||
S5‑204605 | Rel16 pCR 28.202 Update the CHF selection based on NRF | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑204225 | |||
S5‑204610 | Rel-16 pCR 28.202 Update Charging Architecture | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑204057 | |||
S5‑204611 | Rel-16 pCR 28.202 Solve Editor's note on Subscriber identifier | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑204054 | |||
S5‑204612 | Rel-16 pCR 28.202 Complete charging information | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑204059 | |||
S5‑204613 | draft TS 28.202 | Nokia, Nokia Shanghai Bell | draft TS | Yes |
Yes
| approved | No | |||||
S5‑204614 | Presentation to TSG of TS 28.202 for Approval | Nokia, Nokia Shanghai Bell | TS or TR cover | Yes |
Yes
| approved | No | |||||
S5‑204627 | Rel-16 pCR 28.202 Adding trigger for CPF | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑204175 | |||
S5‑204628 | Rel-16 pCR 28.202 Adding charging information | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑204176 | |||
S5‑204640 | Rel-16 CR 32.291 Introduction of NSM charging information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204063 | |||
S5‑204641 | Rel-16 CR 32.298 Introduction of NSM charging information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204064 | |||
7.4.3 | Charging Access Traffic Steering, Switching and Splitting in 5G system architecture | S5‑204050 | Rel-16 CR 32.255 Completion of ATSSS triggers | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||
S5‑204051 | Rel-16 CR 32.291 Introduction of ATSSS | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204619 | |||
S5‑204052 | Rel-16 CR 32.298 Introduction of ATSSS | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑204620 | |||
S5‑204619 | Rel-16 CR 32.291 Introduction of ATSSS | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204051 | |||
S5‑204620 | Rel-16 CR 32.298 Introduction of ATSSS | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑204052 | |||
7.5 | Rel-17 Charging |   | ||||||||||
7.5.1 | IMS Charging in 5G System Architecture |   | ||||||||||
7.6 | Charging studies |   | ||||||||||
7.6.1 | Study on charging aspects of Edge Computing | S5‑204091 | DP Charging attributes of Edge Computing | China Telecomunication Corp. | discussion | Approval | No |
Yes
| withdrawn | Yes | ||
S5‑204186 | pCR Add skeleton of draft TR 28.815 | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑204644 | |||
S5‑204644 | pCR Add skeleton of draft TR 28.815 | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑204186 | |||
S5‑204645 | Draft TR 28.815 | Intel | draft TR | Approval | Yes |
Yes
| approved | No | ||||
8 | Any Other Business | S5‑204470 | (reserved) | OAM | other | discussion | No |
Yes
| withdrawn | Yes | ||
S5‑204502 | (reserved) | OAM | other | discussion | No |
Yes
| withdrawn | Yes | ||||
9 | Closing of the meeting |   |